Loading...
HomeMy WebLinkAbout33-24 Site PlanSITE U:\Accounts\HWCNX\HWCNX20005 - Costello Dr Self Storage-TMP 64-((10)-3\DESIGN\_SHEETS\SDP\CS0000.dwg PLOTTED: 10/22/2024 1:44 PM, BY: Joseph Miller PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: SITE DEVELOPMENT PLANCS0000 BYNO.DATEREVISIONSHWCNX20005 AS SHOWN TEAM 10-27-2021 JKM SHEET APPROVED BY OF1 46 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493LOCATION MAP Scale: 1" = 2000'NORTHCALL 1-800-552-7001 CALL BEFORE YOU DIG ALWAYS CALL 811 BEFORE YOU DIG IN VIRGINIA SECTION 56-265.17 REQUIRES THREE WORKING DAYS NOTICE TO UTILITIES BEFORE YOU EXCAVATE, DRILL OR BLAST VIRGINIA UTILITY PROTECTION SERVICE, INC. TICKET NUMBER(S): PREPARED BY: PENNONI ASSOCIATES INC. 117 East Piccadilly Street Winchester, VA 22601 T 540.667.2139 F 540.665.0493 09-20-2024 1 SITE PLAN REVISION - REVISED POND GRADING 10-21-20242 SIGNATURE SUBMISSION H&W CONSTRUCTION, INC.1025 MARTINSBURG PIKE | WINCHESTER, VA 22603COVER SHEETCOSTELLO DRIVE SELF STORAGESELF STORAGE FACILITY0 COSTELLO DRIVE | WINCHESTER, VA 22604SHAWNEE MAGISTERIAL DISTRICTPREPARED FOR: OWNER/DEVELOPER H&W CONSTRUCTION, INC. 1025 MARTINSBURG PIKE WINCHESTER, VA 22603 (540) 667-3752 COSTELLO DRIVE SELF STORAGE SELF STORAGE FACILITY SITE DEVELOPMENT PLAN SITE PLAN #: 01-22 SITE PLAN REVISION #: 33-24 SHAWNEE MAGISTERIAL DISTRICT - FREDERICK COUNTY, VIRGINIA ORIGINAL SUBMISSION DATE: 12-13-2021 REVISED SUBMISSION DATE: 07-05-2022 REVISION SUBMISSION DATE: 09-20-2024 RESPONSIBLE LAND DISTURBER THE RESPONSIBLE LAND DISTURBER IS THAT PARTY RESPONSIBLE FOR CARRYING OUT THE LAND DISTURBING ACTIVITY AS SET FORTH IN THE PLANS. NAME:_____________________________________________________ CERTIFICATION #:___________________________________________ DATE: _____________________________________________________ APPROVED BY FREDERICK COUNTY ZONING ADMINISTRATOR "SITE PLAN VALID FOR FIVE YEARS FROM APPROVAL DATE" ________________________________________________________________________________ APPROVED BY DATE LOCAL UTILITIES RAPPAHANNOCK ELECTRIC CO-OP 137 KELLEY COURT FRONT ROYAL, VIRGINIA 22630 (540) 662-2037 VERIZON 404 HILLANDALE LANE WINCHESTER, VIRGINIA 22602 (540) 665-3156 COMCAST COMMUNICATIONS 195 RAINVILLE ROAD WINCHESTER, VIRGINIA 22602 (540) 504-0942 WASHINGTON GAS 350 HILLANDALE LN. WINCHESTER, VIRGINIA 22602 (540) 868-7913 FREDERICK WATER 315 TASKER ROAD STEPHENS CITY, VIRGINIA 22655 (540) 868-1061 SITE DEVELOPMENT NOTES 1.THE EXISTING CONDITIONS, FEATURES, PROPERTY INFORMATION AND TOPOGRAPHY ARE AS ORIGINALLY PREPARED BY GREENWAY ENGINEERING, THEN SUPPLEMENTED WITH ADDITIONAL FIELD WORK BY MARSH & LEGGE LAND SURVEYORS, PLC. DATED. 2.THIS SURVEY AND PLAN ARE REFERENCED TO NAD83 VA NORTH ZONE COORDINATE SYSTEM AND NAVD88 DATUM, UNITS = US SURVEY FT. 3.SUBSEQUENT TO REVIEW OF FEMA FLOOD INSURANCE RATE MAP NO. 51069C0219E, EFFECTIVE 1/29/2021, THE LIMITS OF CONSTRUCTION ARE LOCATED IN ZONE X, AN AREA OF MINIMAL FLOOD HAZARD. SHEET INDEX Sheet Number Sheet Title 1 COVER SHEET 2 GENERAL NOTES AND LEGENDS 3 EXISTING CONDITIONS 4 EROSION AND SEDIMENT CONTROL NARRATIVE 5 EROSION AND SEDIMENT CONTROL PHASE I 6 EROSION AND SEDIMENT CONTROL PHASE II 7 SEDIMENT BASIN 1 PLAN & COMPUTATIONS 8 EROSION AND SEDIMENT CONTROL DETAILS 9 EROSION AND SEDIMENT CONTROL DETAILS AND COMPUTATIONS 10 EROSION AND SEDIMENT CONTROL DETAILS AND COMPUTATIONS 11 ROAD PROFILES 12 SIGHT DISTANCE 13 SIGHT DISTANCE 14 TYPICAL SECTIONS 14A MOT PLAN 15 OVERALL PLAN 16 PHASING PLAN 17 SITE PLAN 18 GRADING PLAN 19 SITE DETAILS 20 UTILTY PLAN 21 SANITARY SEWER PROFILES 22 WATERLINE PROFILES 23 FREDERICK WATER DETAILS 24 FREDERICK WATER DETAILS 25 PREDEVELOPMENT DRAINAGE MAP 26 POST-DEVELOPMENT DRAINAGE MAP 27 REGULATORY COMPLIANCE SUMMARY - WATER QUANTITY 28 REGULATORY COMPLIANCE SUMMARY - WATER QUALITY 29 WET POND PLAN & WET POND SECTION A-A 30 WET POND DETAILS & NARRATIVES 31 BIO-RETENTION FACILITY A PLAN & COMPUTATIONS 32 BIO-RETENTION FACILITY B PLAN & COMPUTATIONS 33 BIO-RETENTION BASIN DETAILS & NARRATIVES 34 STORM SEWER PROFILES 35 STORM SEWER PROFILES 36 STORM SEWER COMPUTATIONS 37 STORM SEWER DETAILS 38 STORM SEWER DETAILS 39 LANDSCAPE PLAN 40 LANDSCAPE NOTES AND DETAILS 41 LIFE SAFETY PLAN 42 LIGHTING PLAN 43 LIGHTING DETAILS 44 LIGHTING DETAILS 45 LIGHTING DETAILS 46 LIGHTING DETAILS PREVIOUS APPROVALS LAND DISTURBANCE & VSMP PLAN 08/27/2021 Site Plan Revision Narrative This site plan revision is to adjust the grading for the Level 1 Stormwater Management (SWM) wet pond to accommodate encroachments resulting from the proposed left turn lane on Prince Frederick Drive (Route 781). The previously approved pond volumes have been preserved, and updated pond calculations have been provided. No changes to the pond riser and outfall pipe are required as part of this revision. The revisions include: ·Modifications to the grading of the Level 1 SWM wet pond. The revised grading is limited to the north and east portion of the pond embankment with a revised area of less than 40,000 sf. No changes to the approved entrances on Costello Dr (Va. Route 1367) result from the grading changes. ·Updated pond design computations to reflect the grading changes. ·Adjustments to the Erosion and Sediment (E&S) drainage basin to align with the new pond grading. ·Updated pond landscaping to correspond with the grading modifications. 9-20-2024 9-20-202410-21-2024 6806907007 0 0 700710 720 678682684686688692692 692 694694 694 696696 696 698698 6 98 7 0 2 7027027 0 4 704 7 0 4 706708712 714 716 718 722 724 726 690700710720 6846866 8 8692694696698702704706708712714716718 6806907007 1 0 682684686688692694694696698702704706708680 676 678 682684686 688 6 8 0 69 0 678 682 684686688 690700 710 686 688 69 2 6 9 4 696698702 704 706 708 712714 716 (699.9) (699.5) (698.7) (699.2) (698.9) (697.9)(695.3) (695.6) (699.8) (700.0) X698.82 X698.93 X 698.43 X698.41 X698.62 X698.79 X698.91 X699.51 X700.22 X700.07 X699.67 X701.37 X701.33 X700.89 X704.50 X702.67 X702.27 X702.57 X703.59 X703.70 X703.22 X703.74 X704.17 X703.99 X704.30 X703.98 X704.10 X703.44 X703.92 X703.75 X702.95 X703.13 X702.72 X701.54 X701.90 X701.79 X709.5 X700.4 X 711.3X700.2 X704.30 X704.10 X685.08X686.07X687.19X687.92X686.93X686.25X685.72X685.03X684.07X684.07X683.08X682.78X682.28X681.72X681.87X681.41X681.24X681.74X679.86X679.37X679.17X679.88X678.51X678.02X677.97X677.95X677.62X677.62X677.0 7 X676. 7 1 X676. 5 5 X677. 0 1 X678. 2 6 X 676. 9 5 X 676. 8 4 X 677. 3 4 X 677. 3 8 X678. 8 5 X678. 8 4 X 677. 0 6 X 677. 1 7 X695.9X717.4 X 717.0 X716.9 X 717.3 X716.2 X716.5 X 718.9 X 725.3X725.6 X 725.2 X724.6 X726.3X726.2X726.2 X725.9 X725.7X725.6 X 725.9 X 725.2 X 723.0 X721.1 X 719.8 X717.5 X 715.2 X712.7 X 711.2 X 709.5 X 705.7 X 701.7 X696.3 X691.0 X689.3 X 688.9 X690.7 ZONE RA ZONE B2 ZONE RA ZONE B2 ZONE M1N 22°53'02" E - 629.74'TAX PARCEL 64-10-3 LOT 3 = 9.9972 ACRES WALTER H. AIKENS LIMITED PARTNERSHIP, L.L.P. ZONE: B2 USE: UNIMPROVED INST. NO. 100008805TAX PARCEL 64-10-4 LOT 4 = 5.0000 ACRES FOUR OAKS PROPERTIES L.P., L.L.P. ZONE: B2 USE: UNIMPROVED INST. NO. 090009504 Costello Dr. (R t e 1 3 6 7 ) ( L o c a l ) 80' R/W 35 MPH POS T E D S P D L M T DB 955 PG 15 2 Road Class: L o c a l ADT: 2,600 Prince Frederick Dr. (Rte 781)Variable Width R/WDB 802 PG 1065 & Inst. No. 080003321COVERSTONE DR. - RTE-1538 VARIABLE WIDTH R/W INST. NO. 080002019(UNIMPROVED)Ryco Lane60' R/WDB 955 PG 15210+0011+00Storm MH Rim = 675.60 Inv. In= 668.85 Inv. In= 668.75 4' Ø Concrete SWM Riser Top of Grate = 695.71 Inv. In 5" orifice (SW) = 690.77 Inv. In 7" orifice (SW) = 693.86 Inv. Out 18" CPP (NE) = 690.96 Ex. SWM Basin Drop Inlet Top of Grate = 698.15 Inv. Out 36" CMP = 690.66 Ex. Drop Inlet Top of Grate = 716.08 Inv. In 6" CPP (SW) = 711.45 Inv. Out 15" CPP (NE) = 711.28 Drop Inlet Top of Grate = 698.35 Inv. Out 15" CPP = 695.38 Ex. Curb Inlet Top of Grate = 712.18 Inv. In 15" CPP (SW) = 706.45 Inv. Out 18" CPP (NW) = 706.28 Ex. Drop Inlet Top of Grate = 717.25 Inv. In 6" CPP (SW) = 712.40 Inv. In 6" CPP (W) = 712.45 Inv. Out 6" CPP (NE) = 712.35 Ex. Curb Inlet Top = 698.96 Inv. In 36" CMP = 690.17 Inv. Out 36" CMP = 690.07 Ex. Block Shed Ex. Block Retaining Wall Ex. Metal Fence Ex. Transformer Ex. Chainlink Fence Millwood Station Volunteer Fire & Rescue Company One Story Block Bldg. Ex. Dual 41' - 36" HDPE @ 1.04% Ex. Transformer Community Center One Story Block Bldg. Ex. Chainlink Fence Crushed 33' - 15" HDPE @ 1.15% Ex. 137.43' - 60" RCP @ 1.77% Ex. 70.71' - 36" RCP @ 1.15% Ex. Asphalt Parking Lot EX. 8" PVC SAN. SEWER @ 0.85% Ex. 83' - 36" CMP @ 0.60% Ex. 18" CPP Ex. 15" CPP Ex. 18" CPP Ex. 18" CPP Ex. 15" CPP Ex. 6" CPP Ex. Signs Ex. 24' - 36" CMP @ 0.38% Ex. Gas Valve & Marker Ex. Gravel Shoulde r EXA RIM 698.15 INV OUT 689.17 (EXB) EXB RIM 691.87 INV IN 683.13 (EXA) INV IN 684.17 (EXB1) INV OUT 682.84 (EXC)401.48' OF 8" PVC @ 1.50% EXC RIM 685.86 INV IN 676.75 (EXB) INV IN 677.56 (EXC1) INV OUT 676.51 (EXD) 397.21' OF 8" PVC @ 1.53% EXD RIM 675.31 INV IN 663.61 (EXC) INV IN 665.67 (EXD1) INV OUT 663.46 (EXE) 400.18' OF 8" PVC @ 3.22% EXE RIM 675.71 INV IN 661.60 (EXD) 228.6 2 ' O F 8 " P V C @ 0 . 8 1 % EXB1 RIM 707.20 INV OUT 695.89 (EXB)142.59' OF 8" PVC @ 8.22% EXC1 RIM 700.65 INV OUT 683.40 (EXC)182.67' OF 8" PVC @ 3.20%EXD1 RIM 683.76 INV OUT 671.43 (EXD) 1 8 5 . 4 1 ' O F 8 " P V C @ 3 . 1 1 % Costello Dr. (R t e 1 3 6 7 ) 80' R/W 35 MPH POS T E D S P D L M T DB 955 PG 15 2 Road Class: L o c a l ADT: 2,600 50'R 50'R1,312'R776'R552'RROAD IMPROVEMENT PLANDONE BY OTHERS SEE PIP"ONE LOGISTICS PRINCEFREDERICK DRIVE"3115" RCP CL III15" RCP CL III303215" RCP CL III3315" RCP CL III34TOP=678.81TOP=680.88TOP=681.58TOP=684.07INV=675.007728EP7651EP68068467868668869074497497754476873:1 MAX 6926946966986767836TC8063TC8189TC8682TC7710TC6826806806786766826846926863:1 MAX 68668668869268869069468469069481988049807379237698762189 72 84 75 BP 26 30 25 32 83 50 Inv 82 50 Inv CE DD CIP CIP Install Diversion Dike to Convey Sediment-Laden Runoff to the Sediment Basin. Ensure Positive Drainage Along the Berm. See Sediment Basin 1 Comps & Details (Sheet 6) SD A B Sheet Flow 50 lf @ 1.96% Shallow Flow 517 lf @ 6.89% C Channel Flow 673 lf @ 1.0% Total Flow Path Tc = 8.5 Mins. Install Diversion Dike to Convey Sediment-Laden Runoff to the Sediment Basin. Ensure Positive Drainage Along the Dike. The Contractor Shall First Construct the Dike per this Plan Location, using Material taken from the Sediment Basin Excavation. When Major Earthwork commences fill will be placed in the swale running through the on-site Drainage Area North of the Diversion Dike. The Fill Placement shall proceed from West to East. Place the Storm Sewer Conduits and Raise Existing Utility Facilities in conjunction with Fill Operations. The Contractor Shall Ensure that a Diversion Dike is maintained along the Top of this Fill Slope throughout the operation, diverting Sediment Laden Runoff to the Sediment Basin. The Proposed Storm Sewer Main will By-Pass the Sediment Basin during Construction Operations. Drainage Area SB2B (To Temp. Cross Culverts) DA = 2.771 Ac. CNW = 94 Drainage Area SB2A (To Temp. Diversion Dike) DA = 6.513 Ac. CN = 94 Drainage Area SB1A (Directly To Sediment Basin) DA = 4.985 Ac. CN = 94 Drainage Area UD1 (On-Site - Un-Detained to SP 1) DA = 1.394 Ac. CN = 94 Sediment Basin SB1 (Total Drainage Area to SB1) DA = 14.269 Ac. CIP Temp. Dual 100' - 24" CMP @ 1.00% (Install Cross Culvert to Convey Sediment-Laden Runoff to the SB) Install Temp. Slope Drain(s) to Protect the Cut Slope DD DD DD SB 1 700 698 696 694 692 690 688 686 684 688 68 8 686 686 684 682 686 688 D LOD LOD LOD LOD OP OP SF CD CD TS TS B/M B/M B/M BOTTOM OF BASIN 674.50' 69 6 ' 68 0 ' 68 4 ' 69 2 ' 69 0 ' 68 8 ' 68 6 ' 68 2 ' 67 8 ' 69 4 ' 676' 678' 680' 682' 684' 682' 680' 678' 676' 674' 672 ' 67 0 ' WASH RACK U:\Accounts\HWCNX\HWCNX20005 - Costello Dr Self Storage-TMP 64-((10)-3\DESIGN\_SHEETS\SDP\REVISIONS\CS2100.dwg PLOTTED: 9/20/2024 10:19 AM, BY: Brendan Snell PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: SITE DEVELOPMENT PLANCS2100 BYNO.DATEREVISIONSWICKG21005 AS SHOWN TEAM 10-27-2021 JKM SHEET APPROVED BY OF5 46 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 50'100'PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTH H&W CONSTRUCTION, INC.1025 MARTINSBURG PIKE | WINCHESTER, VA 22603EROSION AND SEDIMENT CONTROL PHASE ICOSTELLO DRIVE SELF STORAGESELF STORAGE FACILITY0 COSTELLO DRIVE | WINCHESTER, VA 22604SHAWNEE MAGISTERIAL DISTRICTEROSION AND SEDIMENT CONTROL LEGEND NO.TITLE KEY SYMBOL 3.02 TEMPORARY STONE CONSTRUCTION ENTRANCE CE 3.07 STORM DRAIN INLET PROTECTION IP DRAINAGE DIVIDES 3.09 TEMPORARY DIVERSION DIKE DD DD 3.14 TEMPORARY SEDIMENT BASIN SB SB LIMITS OF DISTURBANCE LOD 3.18 OUTLET PROTECTION OP SILT FENCE SF3.05 3.36 SOIL STABILIZATION BLANKETS & MATTING B/M B/M 3.08 CULVERT INLET PROTECTION CIP 3.15 SDSLOPE DRAIN 3.20 ROCK CHECK DAMS CD 3.31 TEMPORARY SEEDING TS TS ----BYNO.DATEREVISIONS09-20-2024 1 SITE PLAN REVISION - REVISED POND GRADING 9-20-2024 9-20-2024 10-21-20242SIGNATURE SUBMISSION10-21-2024 N 22°53'02" E - 629.74'Costello Dr. (R t e 1 3 6 7 ) ( L o c a l ) 80' R/W 35 MPH POS T E D S P D L M T DB 955 PG 15 2 Road Class: L o c a l ADT: 2,600 Prince Frederick Dr. (Rte 781)Variable Width R/WDB 802 PG 1065 & Inst. No. 080003321COVERSTONE DR. - RTE-1538 VARIABLE WIDTH R/W INST. NO. 080002019(UNIMPROVED)Ryco Lane60' R/WDB 955 PG 152Ex. Block Shed Ex. Block Retaining Wall Ex. Metal Fence Ex. Transformer Ex. Chainlink Fence Millwood Station Volunteer Fire & Rescue Company One Story Block Bldg. Ex. Transformer Community Center One Story Block Bldg. Ex. Chainlink Fence Ex. Asphalt Parking Lot Ex. Gas Valve & Marker Costello Dr. (R t e 1 3 6 7 ) 80' R/W 35 MPH POS T E D S P D L M T DB 955 PG 15 2 Road Class: L o c a l ADT: 2,600 680 690674 676 678 682 684 686 688 690686688692694 694 696 696 690700700710 710 720720692694696 696698698702702704704706706 708708 712714714716716718718722722724724726 726 680690700 70 0 6 7 8682684686688692 692 6 9 4 694 6 9 6 696 6 9 8 698 702 702704 704 680690678682684686688700710 720720 696 698 702 7047067087 1 2 714714 716 716 71871 8 722 722 72 4 724 7 1 0 710 70 2 70470670 8 71 2 712 71 4 714 716 716 7006 9 8 702704706 690 69 2 694 696 6 9 8 70070 2704706 680 690 682 684 686 688 692694696 698 690 700 710 692 694 696 698 702 704 706 708700 700698 698 702 690 684 686688 692694696 700698702704700702670 690700 TP 102 101 403 412 404 406 402 513 511 502 501 504 303 304 302 301 203204 211 405 512 411 202 201 401 400 503 103 PD 519 5'X10' VDOT CL 1 RIP-RAP Bio-Retention A Bio-Retention B Wet Pond IP OP OP OP OP OP CIP LOD LOD LOD LOD CE IP IP IP IP IP IP IP IP IP IP IP IP IP IP SF B/M B/M B/M B/M B/M B/M B/M PS PS IP IP CIP B/M To Str. 412 DA = 0.26 Ac. To Str. 405 DA = 0.23 Ac. To Str. 406 DA = 0.23 Ac. To Str. 411 DA = 0.26 Ac. To Str. 512 DA = 0.23 Ac. To Str. 513 DA = 0.23 Ac. To Str. 504 DA = 0.26 Ac.To Str. 303DA = 0.22 Ac.To Str. 302DA = 0.27 Ac.To Str. 304 DA = 1.23 Ac. To Forebay DA = 0.52 Ac. To Forebay DA = 0.95 Ac. To Forebay DA = 0.26 Ac. To Str. 503 DA = 0.26 Ac. To Str. 402 DA = 0.10 Ac. To Str. 403 DA = 0.11 Ac.To Str. 203DA = 0.11 Ac.To Str. 202DA = 0.07 Ac.To Str. 211DA = 0.05 Ac.To Str. 204 DA = 3.30 Ac. To Wet Pond DA = 4.26 Ac. To Str. 404 DA = 0.14 Ac. OP CIP 50'R 50'R1,312'R776'R552'RROAD IMPROVEMENT PLANDONE BY OTHERS SEE PIP"ONE LOGISTICS PRINCEFREDERICK DRIVE"3115" RCP CL III15" RCP CL III303215" RCP CL III3315" RCP CL III34TOP=678.81TOP=680.88TOP=681.58TOP=684.07INV=675.007728EP7651EP68068467868668869074497497754476873:1 MAX 6926946966986767836TC8063TC8189TC8682TC7710TC6826806806786766826846926863:1 MAX 686686688692688690694684690694819880498073792376987621U:\Accounts\HWCNX\HWCNX20005 - Costello Dr Self Storage-TMP 64-((10)-3\DESIGN\_SHEETS\SDP\REVISIONS\CS2200.dwg PLOTTED: 9/20/2024 10:20 AM, BY: Brendan Snell PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: SITE DEVELOPMENT PLANCS2200 BYNO.DATEREVISIONSWICKG21005 AS SHOWN TEAM 10-27-2021 JKM SHEET APPROVED BY OF6 46 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 50'100'PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTH H&W CONSTRUCTION, INC.1025 MARTINSBURG PIKE | WINCHESTER, VA 22603EROSION AND SEDIMENT CONTROL PHASE IICOSTELLO DRIVE SELF STORAGESELF STORAGE FACILITY0 COSTELLO DRIVE | WINCHESTER, VA 22604SHAWNEE MAGISTERIAL DISTRICTEROSION AND SEDIMENT CONTROL LEGEND NO.TITLE KEY SYMBOL 3.02 TEMPORARY STONE CONSTRUCTION ENTRANCE CE 3.07 STORM DRAIN INLET PROTECTION IP DRAINAGE DIVIDES 3.32 PERMANENT SEEDING PS PS 3.09 TEMPORARY DIVERSION DIKE DD DD 3.14 TEMPORARY SEDIMENT BASIN SB SB LIMITS OF DISTURBANCE LOD 3.18 OUTLET PROTECTION OP SILT FENCE SF3.05 3.36 SOIL STABILIZATION BLANKETS & MATTING B/M B/M 3.08 CULVERT INLET PROTECTION CIP 3.15 SDSLOPE DRAIN 3.20 ROCK CHECK DAMS CD ----BYNO.DATEREVISIONS09-20-2024 1 SITE PLAN REVISION - REVISED POND GRADING 9-20-2024 9-20-2024 10-21-20242SIGNATURE SUBMISSION10-21-2024 Ex. 3 - 8" Conduits35' BRL35' BR L Prince Frederick Dr. (Rte 781)Variable Width R/WDB 802 PG 1065 & Inst. No. 080003321Storm MH Rim = 675.60 Inv. In= 668.85 Inv. In= 668.75 Ex. Dual 41' - 36" HDPE @ 1.04%Ex. 137.43' - 60" RCP @ 1.77% Ex. 70.71' - 36" RCP @ 1.15% EX. 8" PVC SAN. SEWER @ 0.85% Ex. Signs 400.18' OF 8" PVC @ 3.22% EXE RIM 675.71 INV IN 661.60 (EXD) 228.6 2 ' O F 8 " P V C @ 0 . 8 1 % 1 8 5 . 4 1 ' O F 8 " P V C @ 3 . 1 1 % 679 09 676 35 INV 676 40 INV 676 01 INV 675 89 INV 667 25 INV 673 40 TW 680 690674 676 678 682 684 686 688 694 696 696 6 7 8 680690678682684686688680 690 682 684 686 688 692 700 698 702 690 684 686 688 692 694 696 670 -3.0:1 -3.0:1-3.0:1678 85 EP 680 86 EP 683 33 EP 684 85 EP 687 16 EP 687 55 EP 684 89 EP 687 13 EP 689 EP 677 51 INV 670 00 INV TP 102 101 203204 211 202 201 103 PD 7728EP7651EP744974973:1 MAX 7836TC8063TC7710TC6826806806786766926863:1 MAX 69268869069468480737923769876213115" RCP CL III15" RCP CL III303215" RCP CL IIITOP=678.81TOP=680.88TOP=681.58INV=675.00PR. R.O.W.PR. CG6PR. EP 50'R 50'RTIE INTO EX. EP;LAST 2' OF CURB TOBE NOSED DOWNTIE INTO EX. EP776'RPR. TEMPORARYCONSTRUCTION EASEMENTPR. 6' SHOULDER;4' PAVEDEX. UNDERGROUNDCOMMUNICATION TO BERELOCATED IN PR. 15' DRY UTILITYEASEMENT BEHIND PR. DITCH(DESIGN BY OTHERS)EX. UNDERGROUND TELEVISION TO BERELOCATED IN PR. 15' DRY UTILITY EASEMENTBEHIND PR. DITCH (DESIGN BY OTHERS)PR. RIGHT OF WAYDEDICATION8' CL II RIP RAPDEPTH = 3.6'PR. 15' DRY UTILITYEASEMENTPR. DI-3BPR. DI-3BPR. ES-1PR. EW-12PR. EW-12U:\Accounts\HWCNX\HWCNX20005 - Costello Dr Self Storage-TMP 64-((10)-3\DESIGN\_SHEETS\SDP\REVISIONS\CS2300.dwg PLOTTED: 9/20/2024 10:20 AM, BY: Brendan Snell PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: SITE DEVELOPMENT PLANCS2300 BYNO.DATEREVISIONSWICKG21005 AS SHOWN TEAM 10-27-2021 JKM SHEET APPROVED BY OF7 46 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTH H&W CONSTRUCTION, INC.1025 MARTINSBURG PIKE | WINCHESTER, VA 22603SEDIMENT BASIN 1 PLAN & COMPUTATIONSCOSTELLO DRIVE SELF STORAGESELF STORAGE FACILITY0 COSTELLO DRIVE | WINCHESTER, VA 22604SHAWNEE MAGISTERIAL DISTRICTEarthen Embankments Notes Site Preparation Areas designated for borrow sites, embankment construction, and structural work should be cleared, grubbed and stripped of topsoil. All trees, vegetation, roots and other objectionable material should be removed. All cleared and grubbed material should be disposed of outside and below the limits of the embankment and reservoir, as directed by the owner or his representative. When specified, a sufficient quantity of topsoil should be stockpiled in a suitable location for use on the embankment and other designated areas. Earth Fill 1.Material - Fill material should be taken from an approved, designated borrow area. It should be free of roots, stumps, wood, rubbish, stones greater than 6 inches, and frozen or other objectionable materials. Fill material for the center of the embankment and the cutoff trench should conform to Unified Soil Classification GC, SC, or CL. Consideration may be given to the use of other materials in the embankment based on the recommendations of a geotechnical engineer supervises the design and construction. 2.Placement - Areas on which fill is to be placed should be scarified before its placement. Fill material should be placed in layers a maximum of 8 inches thick (before compaction), which should be continuous over the entire length of the fill. The most permeable borrow material should be placed in the downstream portions of the embankment. The principal spillway must be installed concurrently with fill placement and not excavated into the embankment. 3.Compaction - Fill material should be compacted with appropriate compaction equipment such as a sheepsfoot, rubber-tired or vibratory roller. The number of required passes by the compaction equipment over the fill material may vary with soil conditions. Fill material should contain sufficient moisture such that the required degree of compaction will be obtained with the equipment used. The minimum required density is 95% of maximum dry density with a moisture content within 2% of the optimum, unless otherwise specified by the engineer. Each layer of the fill should be compacted as necessary to obtain minimum density and the engineer should certify, at the time of construction, that each fill layer meets the minimum density requirement. All compaction is to be determined by either Standard Proctor Test (ASTM D698) or the Modified Proctor Test (ASTM D1557) as directed by the geotechnical engineer based on site and soil conditions and the size and type of structure being built. 4.Cutoff Trench - The cutoff trench should be excavated into impervious material along or parallel to the centerline of the embankment as shown on the plans. The equipment used for excavation should govern the bottom width of the trench, with the minimum width being 4 The depth should be at least 4 feet below existing grade or as shown on the plans. The side slopes of the trench should be 1H:1V or flatter. The backfill should be compacted with construction equipment, rollers, or hand tampers to assure maximum density and Minimum permeability. Compaction requirements shall be the same as those for the embankment. The trench shall be drained during the backfilling / compacting operations. 5.Top Soil - The surface layer of compacted fill should be scarified prior to placement of at least 6 inches of topsoil. The topsoil shall be stabilized with in accordance with the Virginia Erosion and Sediment Control Handbook, 1992 edition. Structure and Conduit Backfill Backfill that is beside pipes or structures should be of the same type and quality as specified for the adjoining fill material. The fill should be placed in horizontal layers not to exceed 4 inches in thickness and compacted by hand tampers or other manually directed compaction equipment. The material should completely fill all spaces under and beside the pipe. During the backfilling operation, equipment should not be driven closer than 4 feet, as measured horizontally, to any part of a structure. Also, equipment should NEVER be driven over any part of a structure or pipe, unless compacted fill has been placed to a depth specified by the structural live load capacity of the structure or pipe in order to adequately distribute the load. Sediment Basin Conversion Notes ·The proposed SWM Detention Facility will first serve as a Temporary Sediment Basin, during construction and until such time that all disturbed areas within the contributing drainage area have achieved final stabilization. Conversion to the Permanent SWM Detention Facility can be completed ONLY after final stabilization and approval from the Frederick County Erosion and Sediment Control Administrator. ·Modifications to the Riser Structure are required as part of the Conversion from a Temporary Sediment Basin to a Permanent SWM Detention Facility. See the "Sediment Basin Modifications Required for SWM Detention Facility" Detail. ·The wet storage area must be de-watered following the methods outlined in the VESCH, 1992 edition. ·Sediment and other debris shall be removed to a contained spoil area. ·Re-grading of the basin will be necessary to provide for an impermeable liner, to achieve the final design grades and place the topsoil layer to promote final stabilization. ·Final modifications to the riser structure should be carefully inspected for structural integrity and compliance with the approved plans. 00 30'60'SEDIMENT BASIN 1 - PLAN VIEW Scale: 1" = 30'BYNO.DATEREVISIONS09-20-2024 1 SITE PLAN REVISION - REVISED POND GRADING 9-20-2024 9-20-2024 10-21-20242SIGNATURE SUBMISSION10-21-2024 703 32 703 17 694 93 725 32 715 04 689 81 685 35 685 32 692 12 679 09 700 31 704 08 676 35 INV 704 22 HP 698 61 SAG 676 40 INV 676 01 INV 675 89 INV 667 25 INV 673 40 TW 680 690674 676 678 682 684 686 688 690686688692694 694 696 696 690700700710 710 720720692694696 696698698702702704704706706 708708 712714714716716718718722722724724726 726 680690700 70 0 6 7 8682684686688692 692 6 9 4 694 6 9 6 696 6 9 8 698 702 702704 704 680690678682684686688700710 720720 696 698 702 7047067087 1 2 714714 716 716 71871 8 722 722 72 4 724 7 1 0 710 70 2 70470670 8 71 2 712 71 4 714 716 716 7006 9 8 702704706 690 69 2 694 696 6 9 8 70070 2704706 680 690 682 684 686 688 692694696 698 690 700 710 692 694 696 698 702 704 706 708700 700698 698 702 690 684 686688 692694696 700698702704700702670 690700 699.7 8 700.1 8 SAN CO EXC SAN CO PROP. 20' PRIVATESAN. SWR ES MT. APROP. 20'F.W. ESMT.PROP. 20'F.W. ESMT.PROP. 20' F.W. ESMT.PROP. 20'F.W. ESMT.PROP. 20' F.W. ESMT. PROP. 20' F.W. ESMT. 10+00 11+00 12+00 13+00 14+00 15+0015+15ZONE RA ZONE B2 ZONE RA ZONE B2 ZONE M1N 23°29'36" E - 577.06'S 66°30'20" E - 3 5 7 . 7 6 'N 22°53'02" E - 629.74'N 58°17'11" W - 368.25' S 66°30'20" E - 1 9 4 . 9 9 ' S 42°4 0 ' 2 9 " E 226.70'L1C1 S 47°19'32" W - 204.89'S 64°33'35" W - 199.80'N 58°17'11" W - 483.16' Costello Dr. (R t e 1 3 6 7 ) ( L o c a l ) 80' R/W 35 MPH POS T E D S P D L M T DB 955 PG 15 2 Road Class: L o c a l ADT: 2,600 Prince Frederick Dr. (Rte 781)Variable Width R/WDB 802 PG 1065 & Inst. No. 080003321C2COVERSTONE DR. - RTE-1538 VARIABLE WIDTH R/W INST. NO. 080002019(UNIMPROVED)Ryco Lane60' R/WDB 955 PG 152T.M. 64-10-1 Fredericktowne Group, L.C. Zone: B2 Use: Vacant DB 802 PG 1055, 1059 & 1062 See DB 955 PG 152 Ex. Block Shed Ex. Block Retaining Wall Ex. Metal Fence Ex. Transformer Ex. Chainlink Fence T.M. 64-10-2 Fredericktowne Group, L.C. Zone: B2 Use: Vacant DB 802 PG 1055, 1059 & 1062 See DB 955 PG 152 T.M. 64-10-5 Frederick County, Virginia Industrial Development Authority Zone: B2 Use: Fire & Rescue Station / Community Center Inst. No. 070003086 Millwood Station Volunteer Fire & Rescue Company One Story Block Bldg. T.M. 64-A-89 Fredericktowne Group, L.C. Zone: B2 Use: Vacant DB 802 PG 1055, 1059 & 1062 See Inst. No. 080003321 T.M. 64-A-89B Prince Frederick Group, L.C. Zone: B2 Use: Office DB 802 PG 992, 1001 & 1047 See DB 955 PG 152 T.M. 64-A-89 Prince Frederick Group, L.C. Zone: B2 Use: Vacant DB 802 PG 1055, 1059 & 1062 See Inst. No. 080003321 T.M. 64-A-88 Winchester Regional Airport Authority Zone: RA Use: Airport DB 423 PG 30 See DB 800 PG 1693 T.M. 64-A-87 JGR Three, LLC, et als Zone: RA Use: Vacant Inst. No. 140000018 Ex. Transformer Community Center One Story Block Bldg. Ex. Chainlink Fence Ex. Asphalt Parking Lot Ex. Signs Ex. Gas Valve & Marker Ex. Gravel Shoulde r Ex. 8" W/LEx. Tee w/ 1 - Valve 1 - WV 3 - WV's 1 - WV Costello Dr. (R t e 1 3 6 7 ) 80' R/W 35 MPH POS T E D S P D L M T DB 955 PG 15 2 Road Class: L o c a l ADT: 2,600 STORAGE FAC I L I T Y P A D 9,450 FT2 STORAGE FAC I L I T Y P A D 15,750 FT 2 2-LEVEL TOTAL S T O R A G E 3 1 , 5 0 0 F T 2 STORAGE FAC I L I T Y P A D 15,750 FT 2 2-LEVEL TOTA L S T O R A G E 3 1 , 5 0 0 F T 2 PROP. FENCELOWER FFE = 6 9 8 . 0 0 ' UPPER FFE = 7 0 8 . 0 0 ' LOWER FFE = 7 0 8 . 0 0 ' UPPER FFE = 7 1 8 . 0 0 ' SLAB FFE = 71 8 . 0 0 ' 25' X 40' OFFICE 3' GATE20' GATE3' GATE20' GATE30'R25 ' R CG-6 TYP.FUTURE STORAGE FAC I L I T Y P A D 15,750 FT 2 FUTURE STORAGE FAC I L I T Y P A D 15,750 FT 2 SLAB FFE = 71 8 . 0 0 ' SLAB FFE = 71 7 . 5 0 ' Bio-Retention A Bio-Retention B Adjust Ex. Boundary Line. (Separate Plat, By Others) Adjusted Boundary Line Location (Separate Plat, By Others) SWM ESMT. SWM ESMT. SWM ESMT.SWM ESMT.SWM ESMT.Screening Buffer Esmt. Screening Buffer Esmt. 52'R 5 2 'RS 23°29'40" W 637.26'Wet Pond Prop. VDOT Milling Limits Prop. VDOT Milling LimitsProp. VDOT Milling Limits Placement of CG-12 final location to be determined by VDOT inspector Placement of CG-12 final location to be determined by VDOT inspector Prop. VDOT Milling Limits Prop. VDOT Milling Limits S W M E S M T . SWM ESMT.SWM ESMT.TP 102 101 403 412 404 406 402 513 511 502 501 504 303 304 302 301 203204 211 405 512 411 202 201 401 400 503 103 PD 519 5'X10' VDOT CL 1 RIP-RAP Study Point 1 AA7728EP7651EP68068467868668869074497497754476873:1 MAX 6926946966986767836TC8063TC8189TC8682TC7710TC6826806806786766826846926863:1 MAX 68668668869268869069468469069481988049807379237698762150'R 50'R1,312'R776'R552'RROAD IMPROVEMENT PLANDONE BY OTHERS SEE PIP"ONE LOGISTICS PRINCEFREDERICK DRIVE"3115" RCP CL III15" RCP CL III303215" RCP CL III3315" RCP CL III34TOP=678.81TOP=680.88TOP=681.58TOP=684.07INV=675.00U:\Accounts\HWCNX\HWCNX20005 - Costello Dr Self Storage-TMP 64-((10)-3\DESIGN\_SHEETS\SDP\REVISIONS\CS4000.dwg PLOTTED: 9/20/2024 10:21 AM, BY: Brendan Snell PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: SITE DEVELOPMENT PLANCS4000 BYNO.DATEREVISIONSWICKG21005 AS SHOWN TEAM 10-27-2021 JKM SHEET APPROVED BY OF15 46 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 50'100'PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTH H&W CONSTRUCTION, INC.1025 MARTINSBURG PIKE | WINCHESTER, VA 22603OVERALL PLANCOSTELLO DRIVE SELF STORAGESELF STORAGE FACILITY0 COSTELLO DRIVE | WINCHESTER, VA 22604SHAWNEE MAGISTERIAL DISTRICT----BYNO.DATEREVISIONS09-20-2024 1 SITE PLAN REVISION - REVISED POND GRADING 9-20-2024 9-20-2024 10-21-20242SIGNATURE SUBMISSION10-21-2024 Ground Cover Hatch Key Forested Ground Cover Good Condition (HSG D) Range Ground Cover Good Condition (HSG D) Road Right of Way having C&G and Storm Sewer (HSG D) Commercial & Business District (HSG D) 10+0 0 11+0 0 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+0 0 27+0 0 28+0 0 28+6 4 30+0031+0032+0033+0034+0035+0036+0037+0038+0038+1510+0011+0012+0012+43Ex. 8" W/LEx. Tee w/ 1 - Valve 1 - WV 3 - WV's 1 - WV EXA RIM 698.15 INV OUT 689.17 (EXB) EXB RIM 691.87 INV IN 683.13 (EXA) INV IN 684.17 (EXB1) INV OUT 682.84 (EXC) 401.48' OF 8" PVC @ 1.50% EXC RIM 685.86 INV IN 676.75 (EXB) INV IN 677.56 (EXC1) INV OUT 676.51 (EXD) 397.21' OF 8" PVC @ 1.53% EXD RIM 675.31 INV IN 663.61 (EXC) INV IN 665.67 (EXD1) INV OUT 663.46 (EXE) 400.18' OF 8" PVC @ 3.22% EXE RIM 675.71 INV IN 661.60 (EXD) 228.6 2 ' O F 8 " P V C @ 0 . 8 1 % EXB1 RIM 707.20 INV OUT 695.89 (EXB)142.59' OF 8" PVC @ 8.22% EXC1 RIM 700.65 INV OUT 683.40 (EXC)182.67' OF 8" PVC @ 3.20%EXD1 RIM 683.76 INV OUT 671.43 (EXD) 1 8 5 . 4 1 ' O F 8 " P V C @ 3 . 1 1 % 710720720720 710 720 680690 70 0 700 710 72 0 670680 690 690700710720710720 710700 710700690680670680670660680690 700 700 710 700 710 710720710710 71072 0 7 2 0 730 7107207 3 0 730 730 730 720 7107207 3 0 7 4 0 72 0 710720 700700 700 710 710710680690 680690700Costello Dr. (Rte 1367) 8 0 ' R / W Prince Frederick Dr. (Rte 781) Variable Width R/WCOVERSTONE DR. (Rte 1538) Variable Width R/WRyco Lane(UnImproved) 60' R/WCostello Dr. (Rte 1367) 80' R/WCostello Dr. (Rte 1367) 80' R/W10+0 0 11+0 0 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+0 0 27+0 0 28+0 0 28+6 4 30+0031+0032+0033+0034+0035+0036+0037+0038+0038+1510+0011+0012+0012+43Ex. 8" W/LEx. Tee w/ 1 - Valve 1 - WV 3 - WV's 1 - WV EXA RIM 698.15 INV OUT 689.17 (EXB) EXB RIM 691.87 INV IN 683.13 (EXA) INV IN 684.17 (EXB1) INV OUT 682.84 (EXC) 401.48' OF 8" PVC @ 1.50% EXC RIM 685.86 INV IN 676.75 (EXB) INV IN 677.56 (EXC1) INV OUT 676.51 (EXD) 397.21' OF 8" PVC @ 1.53% EXD RIM 675.31 INV IN 663.61 (EXC) INV IN 665.67 (EXD1) INV OUT 663.46 (EXE) 400.18' OF 8" PVC @ 3.22% EXE RIM 675.71 INV IN 661.60 (EXD) 228.6 2 ' O F 8 " P V C @ 0 . 8 1 % EXB1 RIM 707.20 INV OUT 695.89 (EXB)142.59' OF 8" PVC @ 8.22% EXC1 RIM 700.65 INV OUT 683.40 (EXC)182.67' OF 8" PVC @ 3.20%EXD1 RIM 683.76 INV OUT 671.43 (EXD) 1 8 5 . 4 1 ' O F 8 " P V C @ 3 . 1 1 % 3C 41E 3B 41D 9B 9B 3C 3C 3C 3B 3B 3B 3B 41D 102 101 403 412 404 406 402 513 511 502 501 504 303 304 302 301 203204 211 405 512 411 202 201 401400 503 103PD 519 67 25 Inv 64 82 Inv 77 82 76 05 Top 84 75 BP 24 58 HP 20 03 99 73 28 42 26 00 18 50 04 35 Inv 22 74 HP 21 19 HP 17 40 18 41 22 58 HP 28 03 HP 18 95 HP 16 38 37 07 38 07 38 98 05 80 HP 01 52 HP 04 22 Crest0158 98 60 Sag 15 90 HP Study Point 1 A B Sheet Flow 100 lf @ 2.63% Shallow Flow 309 lf @ 5.72% Channel Flow 601 lf @ 5.00% Total Flow Path Tc = 10.9 Mins. Total Flow Path Tc = 14.9 Mins. Upland DA 50 (To Ex. SWM Pond 50) DA = 23.403 Ac. CNW = 94 Upland DA 40 (To Ex. SWM Pond 40) DA = 3.215 Ac. CNW = 78 A BSheet Flow 75 lf @ 3.23% C D Shallow Flow 85 lf @ 8.82% Multiple Pipe Flow Segments to Daylight Pipe Flow Segments 1,195 lf @ 1.73% A B Sheet Flow 75 lf @ 1.21% C Shallow Flow 131 lf @ 0.76% Upland DA 60 (To Ex. SWM Pond 60) DA = 14.531 Ac. CNW = 95 D E Pipe Flow Segments 896 lf @ 0.94% Upland DA 30 (To Ex. SWM Pond 30) DA = 2.419 Ac. CN = 95 Upland DA 10 (Directly To SP 1) DA = 9.218 Ac. CNW = 82Upland DA 20 (To Storm Sewer w/ Un-Detained Outfall ) DA = 9.768 Ac. CNW = 81 Sheet Flow 100 lf @ 2.78% Shallow Flow 366 lf @ 4.60% A B C D Pipe Flow Segments 344 lf @ 0.47% Total Flow Path Tc = 11.1 Mins. Total Flow Path Tc = 9.3 Mins. CRVWFR 0LOOZRRG )LUH 5HVFXHEx. SWM Pond 40 Ex. SWM Pond 30 Ex. SWM Pond 50 Ex. SWM Pond 60 Upland DA 10 Upland DA 20Upland DA 60 Upland DA 50 Upland DA 30 Upland DA 40 Upland DA 20A (To Storm Sewer w/ Un-Detained Outfall ) DA = 4.984 Ac. CNW = 81 Upland DA 20B (To Storm Sewer w/ Un-Detained Outfall ) DA = 4.783 Ac. CNW = 81 Drainage Area 1A (On-Site - Un-Detained to SP 1) DA = 0.92 Ac. (0.71 Ac. Inside LOD) CN = 80 Drainage Area 1B (R/W To SP 1) DA = 1.16 Ac. CN = 93 WET POND Level 1 Design, Computations & Details (Sh. ##) DA to Bio-Ret. B Total DA = 2.46 Ac. CNW = 92 DA to Bio-Ret. A Total DA = 2.82 Ac. CNW = 93 DA to Wet Pond "Local" DA = 9.51 Ac. (8.49 Ac. Inside LOD) CNW = 93 See Note BIO-RET. B (See Sheet ##) BIO-RET. A (See Sheet ##) A A 8140EP8000EP7728EP7651EP680682684678686688690744974977544768778643:1 MAX 3:1MAX6926946966986766907836TC8063TC8189TC8682TC7710TC6826806806786766826846926863:1 MAX 686686688692688690694684690694819880498073792381107698762150'R 50'R1,312'R776'R552'R3115" RCP CL III15" RCP CL III303215" RCP CL III3315" RCP CL III34TOP=678.81TOP=680.88TOP=681.58TOP=684.07INV=675.00U:\Accounts\HWCNX\HWCNX20005 - Costello Dr Self Storage-TMP 64-((10)-3\DESIGN\_SHEETS\SDP\REVISIONS\CS6001.dwg PLOTTED: 9/20/2024 10:28 AM, BY: Brendan Snell PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: SITE DEVELOPMENT PLANCS6001 BYNO.DATEREVISIONSWICKG21005 AS SHOWN TEAM 10-27-2021 JKM SHEET APPROVED BY OF26 46 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTH H&W CONSTRUCTION, INC.1025 MARTINSBURG PIKE | WINCHESTER, VA 22603POST-DEVELOPMENT DRAINAGE MAPCOSTELLO DRIVE SELF STORAGESELF STORAGE FACILITY0 COSTELLO DRIVE | WINCHESTER, VA 22604SHAWNEE MAGISTERIAL DISTRICT00 120'240' ----BYNO.DATEREVISIONS09-20-2024 1 SITE PLAN REVISION - REVISED POND GRADING 9-20-2024 9-20-2024 10-21-20242SIGNATURE SUBMISSION10-21-2024 U:\Accounts\HWCNX\HWCNX20005 - Costello Dr Self Storage-TMP 64-((10)-3\DESIGN\_SHEETS\SDP\REVISIONS\CS6002.dwg PLOTTED: 9/20/2024 10:28 AM, BY: Brendan Snell PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: SITE DEVELOPMENT PLANCS6002 BYNO.DATEREVISIONSWICKG21005 AS SHOWN TEAM 10-27-2021 JKM SHEET APPROVED BY OF27 46 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 H&W CONSTRUCTION, INC.1025 MARTINSBURG PIKE | WINCHESTER, VA 22603REGULATORY COMPLIANCE SUMMARY - WATER QUANTITYCOSTELLO DRIVE SELF STORAGESELF STORAGE FACILITY0 COSTELLO DRIVE | WINCHESTER, VA 22604SHAWNEE MAGISTERIAL DISTRICTMS-19 Limits of Analysis @ Study Point #1 The Limits of Analysis Requirement per 9VAC25-870-66.B.4 is met by utilizing 9VAC25-870-66.B.3 to show compliance with the Channel Protection criteria. MS-19 Channel Protection @ Study Point #1 The Channel Protection Requirement per 9VAC25-870-66.B.1.b is met by utilizing 9VAC25-870-66.B.3 to show compliance with the Channel Protection criteria. The associated "Energy Balance Equation" is satisfied and no further Channel Protection is required. Natural Channel (Cobble Bottom / n=0.040) Existing Channel Section (NTS) Storm Event 2 Yr. Storm 10 Yr. Storm Peak Q 62.38 cfs 152.10 cfs Flow Depth 0.88' 1.23' Max. Velocity 2.87 fps 3.61 fps Runoff Computations D10 = 1.23'MS-19 Flood Protection @ Study Point #1 Flood Protection at the Study Point is met by 9VAC25-870-66.C.2.a, where the 10 yr. Post-Development Flow (Q10 ) is confined within the Stormwater Conveyance System.. Study Point 1 65.81 Wide Surface Custom Cross Section See SWM Report ----BYNO.DATEREVISIONS09-20-2024 1 SITE PLAN REVISION - REVISED POND GRADING 9-20-2024 9-20-2024 10-21-20242SIGNATURE SUBMISSION10-21-2024 52'R 12'12'12' S W M E S M T . SWM ESMT.SWM ESMT.679 09 676 35 INV 676 40 INV 676 01 INV 675 89 INV 667 25 INV 673 40 TW 680 690674 676 678 682 684 686 688 694 694 696 696 680690678682684686688702 670 678 85 EP EP 683 33 EP 684 85 EP 687 16 EP 687 55 EP 684 89 EP 677 51 INV 670 00 INVEx. 3 - 8" ConduitsStorm MH Rim = 675.60 Inv. In= 668.85 Inv. In= 668.75 Ex. Dual 41' - 36" HDPE @ 1.04%Ex. 137.43' - 60" RCP @ 1.77% Ex. 70.71' - 36" RCP @ 1.15% EX. 8" PVC SAN. SEWER @ 0.85% Ex. Signs 21.05' - 36" R C P C L I I I 43.00' - 36 " R C P C L I I I 45.99' - 15" RCP CL III1 0 5 . 5 9 ' - 3 6 " RCP C L I I I 90.40' - 24" RCP CL III102 101 203204 202 201 103 PD 4" DIP21.05' - 36" R C P C L I I I 43.00' - 36 " R C P C L I I I 45.99' - 15" RCP CL III1 0 5 . 5 9 ' - 3 6 " RCP C L I I I 90.40' - 24" RCP CL III102 101 203204 202 201 103 PD 4" DIPTop Berm = 684.50'Top Berm = 684.50'WET POND Level 1Lim i ts o f Norma l Poo l @ WSE = 675 .00 ' 10' W i d e S a f e t y B e n c h Create "Wet Pond Forebay", using a Submerged Gabion Weir 10' W i d e A q u a t i c B e n c h FOREBAY 100 Yr. WSE = 682.19'AASee Sheet ## for "Wet Pond Section A-A" Impermeable Liner Limits 10 Yr. WSE = 679.77' Normal Pool Water Surface Elevation = 675.00' Water Surface Area = 13,380 ft2 Actual Storage Depth = 4.00 ft Provided Storage Volume = 30,323 ft3 Tv = Required Storage Volume = 27,888 ft3 PRINCIPAL RISER ·5' Ø Riser Crest Elevation = 681.00' ·Passes the 100 Yr - 24 Hr Storm Event, While Providing at Least 2.0' Freeboard ·See Sheets ## & ## Principal Riser Details for All Design Elevations 12" SCH. 40 PVC (Reverse Sloped) & VDOT Std. EW-1 20' - 4" DIP Pond Drain 7651EP743:1 MAX 7836TC8063TC7710TC6826806806786766926863:1 MAX 692688690694684690694807379237621PR. R.O.W.PR. CG6PR. EP 50'R 50'RTIE INTO EX. EP;LAST 2' OF CURB TOBE NOSED DOWNTIE INTO EX. EP776'RPR. TEMPORARYCONSTRUCTION EASEMENTPR. 6' SHOULDER;4' PAVEDEX. UNDERGROUNDCOMMUNICATION TO BERELOCATED IN PR. 15' DRY UTILITYEASEMENT BEHIND PR. DITCH(DESIGN BY OTHERS)EX. UNDERGROUND TELEVISION TO BERELOCATED IN PR. 15' DRY UTILITY EASEMENTBEHIND PR. DITCH (DESIGN BY OTHERS)PR. RIGHT OF WAYDEDICATION8' CL II RIP RAPDEPTH = 3.6'PR. 15' DRY UTILITYEASEMENTPR. DI-3BPR. DI-3BPR. ES-1PR. EW-12PR. EW-123115" RCP CL III15" RCP CL III303215" RCP CL III33TOP=678.81TOP=680.88TOP=681.58INV=675.00WET POND SECTION A-A HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 655 660 665 670 675 680 685 690 695 700 655 660 670 680 690 700 7+50 8+00697.7697.70696.6696.639+00694.3694.29691.9691.9010+00693.0693.02690.1690.0511+00678.2678.20671.4671.4312+00677.0676.9712+50 FIN. GRADE 100 Yr. WSE = 682.19' Top of Berm = 684.50' 10 Yr. WSE = 679.77' 25 Yr. WSE = 681.36'09+40 = Limits of the Permanent Pool = 675.0010' (W) Safety Bench @ 2% Slope EX. GRADE EX. GRADE FIN. GRADE (3:1 SLOPE) Principal Spillway (Shown Reference Only. See Storm Profile 101 - 102) Construct Pond Liner to 10 Yr. WSE @ Minimum (See Impermeable Liner Note, Sh. ##) 28" Freeboard 42" from Riser Top to Berm Top 1 Yr. WSE = 677.27' 2 Yr. WSE = 677.55'09+30 = Upper Limits of Safety Bench = 675.20'09+50 = Lower Limits of Aquatic Bench = 674.80'10+52 = Limits of the Permanent Pool = 675.0009+42 = Lower Limits of Aquatic Bench = 674.80'10+62 = Upper Limits of Safety Bench = 675.20'Permanent Pool WSE = 675.00' 10' (W) Aquatic Bench @ 2% Slope 8' Min. Top Width 10' (W) Aquatic Bench @ 2% Slope 10' (W) Safety Bench @ 2% Slope FIN. GRADE (3:1 SLOPE) WET POND SECTION A-A HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 655 660 665 670 675 680 685 690 695 700 655 660 670 680 690 700 7+50 8+00697.7697.70696.6696.639+00694.3694.29691.9691.9010+00693.0693.02690.1690.0511+00678.2678.20671.4671.4312+00677.0676.9712+50 FIN. GRADE 100 Yr. WSE = 682.19' Top of Berm = 684.50' 10 Yr. WSE = 679.77' 25 Yr. WSE = 681.36'09+40 = Limits of the Permanent Pool = 675.0010' (W) Safety Bench @ 2% Slope EX. GRADE EX. GRADE FIN. GRADE (3:1 SLOPE) Principal Spillway (Shown Reference Only. See Storm Profile 101 - 102) Construct Pond Liner to 10 Yr. WSE @ Minimum (See Impermeable Liner Note, Sh. ##) 28" Freeboard 42" from Riser Top to Berm Top 1 Yr. WSE = 677.27' 2 Yr. WSE = 677.55'09+30 = Upper Limits of Safety Bench = 675.20'09+50 = Lower Limits of Aquatic Bench = 674.80'10+52 = Limits of the Permanent Pool = 675.0009+42 = Lower Limits of Aquatic Bench = 674.80'10+62 = Upper Limits of Safety Bench = 675.20'Permanent Pool WSE = 675.00' 10' (W) Aquatic Bench @ 2% Slope 8' Min. Top Width 10' (W) Aquatic Bench @ 2% Slope 10' (W) Safety Bench @ 2% Slope FIN. GRADE (3:1 SLOPE)U:\Accounts\HWCNX\HWCNX20005 - Costello Dr Self Storage-TMP 64-((10)-3\DESIGN\_SHEETS\SDP\REVISIONS\CS6010.dwg PLOTTED: 9/20/2024 10:29 AM, BY: Brendan Snell PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: SITE DEVELOPMENT PLANCS6010 BYNO.DATEREVISIONSWICKG21005 AS SHOWN TEAM 10-27-2021 JKM SHEET APPROVED BY OF29 46 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTH ---- H&W CONSTRUCTION, INC.1025 MARTINSBURG PIKE | WINCHESTER, VA 22603WET POND PLAN & WET POND SECTION A-ACOSTELLO DRIVE SELF STORAGESELF STORAGE FACILITY0 COSTELLO DRIVE | WINCHESTER, VA 22604SHAWNEE MAGISTERIAL DISTRICT00 30'60'WET POND - PLAN VIEW Scale: 1" = 30'BYNO.DATEREVISIONS09-20-2024 1 SITE PLAN REVISION - REVISED POND GRADING 9-20-2024 9-20-2024 10-21-20242SIGNATURE SUBMISSION10-21-2024 Wet Pond - Principal Riser Section Not to Scale Trash Rack (See Note 6) Earthen Berm (See Note 4) 9' Ø x 1.75' Thick Conc. Base (See Note 1)3:1 Side Slope3 : 1 S i d e S l o p e Hand Wheel w/ Restrained Stem, (Place Accessibly) Ex. Grade Proposed Outlet Protection (See Table Sheet 36) Top of Embankment = 684.50 90.40' - 24" RCP CL. III @ 1.11% (See Note 5) Notes: 1.Concrete Base & Inside Concrete Fill Provide Anti- Floatation Anchoring. Embed the Principal Riser at least 6" into the Concrete Base. (See Plate 3.14-14, Sheet 10). 2.Note 2 is intentionally omitted. 3.Connect the Concrete Slab Elevating the VDOT Std. EW-1, Using 1" Ø Steel Rod Dowel @ 6" O.C. 4.See "Earthen Embankments Note" on Sheet 30 for further guidance relative to construction of the Embankment, including the Cutoff Trench 5.Install the Riser Outfall Pipe per ASTM C-361 (Rubber Gaskets W.T. Joints) 6.Plastic Solutions Inc. Round Series Trash Rack, Part #RS 60 (Bolted to Structure W/ 2" SS Anchor Bolts) (See Detail, Sheet 30) Fill Riser to Flow Line w/ 2.0' Concrete Wet Pond- Principal Riser Plan Not to Scale 90.40' - 24" RCP CL. III @ 1.11% (See Note 5) Plastic Solutions Inc. Round Series Trash Rack, Part # = RS 60 (Not Shown, See Detail Sh. 30) Wet Pond - Principal Riser Elevation Not to Scale 20' - 4" DIP Pond Drain 90.40' - 24" RCP CL. III @ 1.11% (See Note 5) Rectangular Weir [48" (W) x 48" (H)] Plastic Solutions Inc. Round Series Trash Rack, Part # = RS 60 (See Detail Sheet 30) 6" Minimum Wall Thickness 6" Minimum Wall Thickness Note: All References to Note Numbers in this Detail are shown on the "Wet Pond Principal Riser Section", on this Sheet. Inv. = 671.00' Wet Pond Details for Plan Sheets 8' Embankment Permanent Pool W.S.E. = 675.00' Principal Riser Bottom = 669.00' 9' Ø x 1.75" Thick Conc. Base (See Note 1) Rectangular Weir [36" (W) x 24" (H)] 25' - 12" SCH 40 PVC (Reverse Sloped) Fill Riser w/ 2.0' Concrete to the Flow Line Rectangular Weir [36" (W) x 24" (H)] Rectangular Weir [48" (W) x 48" (H)] ℄Weir O p e ni n g s 25' - 12" SCH 40 PVC (Reverse Sloped) Note: All References to Note Numbers in this Detail are shown on the "Wet Pond Principal Riser Section", on this Sheet. Principal Riser Crest = 681.00' Rectangular Weir = 677.00' [48" (W) x 48" (H)] Rectangular Weir = 675.00' [36" (W) x 24" (H)] 20' - 4" D.I.P. Pond Drain (Install w/ Intake Guard Strapped to End of Pipe) 5' Ø Riser Structure per AASHTO M199 4" Gate Valve (Typ. Closed) 5' Ø Riser Structure per AASHTO M199 60° 15°℄Weir Openings℄Weir Open ings VDOT Std. EW-1 (Anchor EW-1 to Conc. Slab - See Note 3) Inv. = 671.00' Place a 2' x 2' x 6" Conc. Slab (To Support End of Pipe and Intake Guard) Inv. = 672.00' 25' - 1 2 " S C H 4 0 P V C (R e v e r s e S l o p e d ) Footing Bottom = 667.25'U:\Accounts\HWCNX\HWCNX20005 - Costello Dr Self Storage-TMP 64-((10)-3\DESIGN\_SHEETS\SDP\REVISIONS\CS6011.dwg PLOTTED: 9/20/2024 10:30 AM, BY: Brendan Snell PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: SITE DEVELOPMENT PLANCS6011 BYNO.DATEREVISIONSWICKG21005 AS SHOWN TEAM 12-13-2021 JKM SHEET APPROVED BY OF30 46 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 ---- H&W CONSTRUCTION, INC.1025 MARTINSBURG PIKE | WINCHESTER, VA 22603WET POND DETAILS & NARRATIVESCOSTELLO DRIVE SELF STORAGESELF STORAGE FACILITY0 COSTELLO DRIVE | WINCHESTER, VA 22604SHAWNEE MAGISTERIAL DISTRICTVA DCR Stormwater Design Specification No. 14, Wet Pond, Ver. 2.0 January 1, 2013 SECTION 8: CONSTRUCTION 8.1 Construction Sequence The following is a typical construction sequence to properly install a wet pond. The steps may be modified to reflect different wet pond designs, site conditions, and the size, complexity and configuration of the proposed facility. Step 1: Use of Wet Pond as an E&S Control. A wet pond may serve as a sediment basin during project construction. If this is done, the volume should be based on the more stringent sizing rule (erosion and sediment control requirement vs. water quality treatment requirement). Installation of the permanent riser should be initiated during the construction phase, and design elevations should be set with final cleanout of the sediment basin and conversion to the post-construction wet pond in mind. The bottom elevation of the wet pond should be lower than the bottom elevation of the temporary sediment basin. Appropriate procedures should be implemented to prevent discharge of turbid waters when the basin is being converted into a wet pond. Step 2: Stabilize the Drainage Area. Wet ponds should only be constructed after the contributing drainage area to the pond is completely stabilized. If the proposed pond site will be used as a sediment trap or basin during the construction phase, the construction notes should clearly indicate that the facility will be de-watered, dredged and re-graded to design dimensions after the original site construction is complete. Step 3: Assemble Construction Materials on-site, make sure they meet design specifications, and prepare any staging areas. Step 4: Install E&S Controls prior to construction, including temporary de-watering devices and stormwater diversion practices. All areas surrounding the pond that are graded or denuded during construction must be planted with turf grass, native plantings, or other approved methods of soil stabilization. Step 5: Clear and Strip the project area to the desired sub-grade. Step 6: Excavate the Core Trench and Install the Spillway Pipe. Step 7: Install the Riser or Outflow Structure, and ensure the top invert of the overflow weir is constructed level at the design elevation. Step 8: Construct the Embankment and Any Internal Berms in 8- to 12-inch lifts, or as directed by geotechnical recommendations, and compact as required with appropriate equipment. Step 9: Excavate/Grade until the appropriate elevation and desired contours are achieved for the bottom and side slopes of the pond. Step 10: Construct the Emergency Spillway in cut or structurally stabilized soils. Step 11: Install Outlet Protection, including emergency and primary outlet apron protection. Step 12: Stabilize Exposed Soils with temporary seed mixtures appropriate for the pond buffer. All areas above the normal pool elevation should be permanently stabilized by hydroseeding or seeding over straw. Step 13: Plant the Pond Buffer Area, following the pond landscaping plan (Section 6.7). 8.2 Construction Inspection Multiple inspections are critical to ensure that stormwater ponds are properly constructed. ·Inspections are recommended during the following stages of construction: ·Pre-construction meeting ·Initial site preparation (including installation of E&S controls) ·Excavation/Grading (interim and final elevations) ·Installation of the embankment, the riser/primary spillway, and the outlet structure ·Implementation of the pond landscaping plan and vegetative stabilization ·Final inspection (develop a punchlist for facility acceptance) Upon final inspection and acceptance, the GPS coordinates for all wet ponds should be logged for entry into the VSMP Authority’s BMP maintenance tracking data base. A construction phase inspection checklist for Wet Ponds can be accessed at the end of this specification. VA DEQ Stormwater Design Specification Introduction: Appendix A: Earthen Embankment SECTION A-7: Design Criteria A geotechnical engineering study should evaluate the stability of the proposed embankment and should consist of (1) a site investigation, (2) laboratory testing, and (3) an engineering analysis. 1.A field investigation should include the review of available soils information and a subsurface exploration. Test borings, test pits, or both, should be used to evaluate the foundations, abutments, borrow materials, reservoir area, embankment design and any other pertinent geological considerations. In areas underlain by Karst limestone, a subsurface profile using seismic or sonar technology should be considered to verify that subsurface anomalies do not exist. This type of subsurface investigation may also be recommended in areas known to have been previously mined for mineral extractions. 2.Laboratory testing should be completed to evaluate the various soils. At a minimum, an index property test should be completed to classify the soils following the Unified Soil Classification System. Shear strength, compressibility, and permeability testing may be required depending upon the size and complexity of the embankment and the nature of the site’s subsurface conditions. 3.A geotechnical engineer should do an engineering analysis and present his or her findings, recommendations and comments on items such as: foundation materials and preparation; design of interior drainage features and filters; and geotechnical design of conduits/structures through the embankment, including seepage and stability analyses. The engineer should also provide a summary describing the soil types and rock strata encountered and explaining the laboratory tests and their results. VA DCR Stormwater Design Specification No. 14, Wet Pond, Ver. 2.0 January 1, 2013 SECTION 6: DESIGN CRITERIA 6.4 Required Geotechnical Testing Soil borings should be conducted within the footprint of the proposed embankment, in the vicinity of the proposed outlet structure, and in at least two locations within the proposed wet pond treatment area. Soil boring data is needed to (1) determine the physical characteristics of the excavated material to determine its adequacy as structural fill or other use, (2) determine the need and appropriate design depth of the embankment cut-off trench; (3) provide data for structural designs of the outlet works (e.g., bearing capacity and buoyancy), (4) determine the depth to groundwater and bedrock and (5) evaluate potential infiltration losses (and the potential need for a liner). Guidance on soil explorations in general can be found in Appendix 8-A of Stormwater Design Specification No. 8 (Infiltration). Wet Pond Impermeable Liner Note The Detention Facility shall be lined with an impermeable liner (30 mil PVC Geo-Membrane Liner covered by 8 to 12 oz./sy Non Woven Geo-Textile) including bottom and sides up to the 10 Yr WSE for Detention Facilities. Contractor may utilize clay liner provided the liner is with an 18-inch thick layer of low permeability clay soil (Classified as CL or CH in accordance with Unified Soil Classification System.) Any hard rock encountered at or above the pond elevation shall be over excavated at least 18 Inches below the planned bottom elevation to allow for construction of the 18-inch thick clay liner. All material placed as a clay liner shall be compacted to at least 95% of the maximum dry density and within minus 1% and Plus 3% of the optimum moisture content as determined by the standard proctor method (AASHTO T-99).BYNO.DATEREVISIONS09-20-2024 1 SITE PLAN REVISION - REVISED POND GRADING 9-20-2024 9-20-2024 10-21-20242SIGNATURE SUBMISSION10-21-2024 STRM 101 TO 103 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 660 665 670 675 680 685 690 695 700 705 660 670 680 690 700 WATR XING STA. 9+82.85PVC INV=662.9525' - 12" PVC SCH-40 @ -12.00% 9+50675.010+00672.0675.29688.5680.0911+00693.5673.95695.012+00694.7696.713+00 13+50RIM=681.00102 - RISER STRUCTURE 5' DIAINV OUT 671.00 (101)INV OUT 671.00 (PD)10+87.90EX. GRADE FIN. GRADE (3:1 CUT SLOPE) OUTLET PROTECTION APRON DO NOT FILL IN CHANNEL TO CREATE APRON, EXCAVATE APRON TO DAYLIGHT AND PLACE RIPRAP (SEE OUTLET PROTECTION CALCULATIONS TABLE, SH. 36) 90' - 24" RCP CL III @ 1 . 1 1 %RIM=673.36103 - VDOT STD. EW-1 (24")INV OUT 672.00 (102)11+12.90PRINCIPAL RISER (See Sh. ## For Principal Riser Section, Elevation & Plan) Perm. Pool WSE = 675.00'101 - VDOT STD. EW-1 (24")INV 670.00 (102)9+97.50FIN. GRADE (3:1 SLOPE) 40" CLEAR 20' - 4" DIP @ 0.00% STRM 201 TO 204 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 665 670 675 680 685 690 695 700 665 670 680 690 700 EX. SSWR XING STA. 10+82.85PVC INV=668.519+00691.6691.59686.4686.3510+00680.6680.61676.1676.0711+00677.7677.68681.1681.0712+00680.8680.8012+50RIM=685.06202 - DI-3B (L=6' RT)INV IN 676.90 (203)INV IN 676.90 (211)INV OUT 676.90 (201)11+05.59201 - ES-1 (36")INV 675.00 (202)10+00204 - ES-1 (36")INV 677.50 (203)11+69.57RIM=685.17203 - DI-3C (L=8')INV IN 677.30 (204)INV OUT 677.30 (202)11+48.59FIN. GRADE EX. GRADE 106' - 36" RC P C L I I I @ 1.80% 43' - 36" RCP CL III @ 0.93% 21' - 36" RCP CL III @ 0.95% OUTLET PROTECTION APRON (SEE OUTLET PROTECTION CALCULATIONS TABLE, SH. 36) GABION BASKET WEIR (SEE DETAILS, SH. 36) STRM 301 TO 304 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 675 680 685 690 695 700 705 710 675 680 690 700 710 WATR XING STA. 10+62.648" DIP INV=689.74EX. GRADE FIN. GRADE 9+50683.6683.6210+00683.1683.06686.2686.2411+00687.3687.30685.7685.6712+00RIM=697.31303 - DI-4CC (L=8')INV IN 685.00 (304)INV OUT 684.80 (302)10+85.14RIM=697.16302 - DI-4CC (L=8')INV IN 684.20 (303)INV OUT 684.00 (301)10+40.14301 - ES-1 (36")INV 683.00 (302)10+00304 - ES-1 (36")INV OUT 685.50 (303)11+29.3540' - 36" R C P C L I I I @ 2.49% 45' - 36" RCP CL I I I @ 1.33% 44' - 36" RCP CL III @ 1.13% OUTLET PROTECTION APRON (SEE OUTLET PROTECTION CALCULATIONS TABLE, SH. 36) 19" CLEAR STRM 202 TO 211 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 665 670 675 680 685 690 695 700 665 670 680 690 700 APPROX. EX. WATR XING STA. 10+31.2812" DIP INV=674.849+50 10+00679.1679.0811+00RIM=683.07211 - DI-3B (L=6' RT)INV OUT 678.10 (202)10+45.99FIN. GRADE EX. GRADE 18" MIN CLEARRIM=685.06202 - DI-3B (L=6' RT)INV IN 676.90 (203)INV IN 676.90 (211)INV OUT 676.90 (201)10+0046' - 15" RCP CL III @ 2.61%TEST PIT REQ. - STA. 10+31.39CONTRACTOR TO ADJUST VERTICAL TO ENSURE 18" MIN. CLEAR TO STORM PIPE OR AS DIRECTED BY THE FREDERICK WATER INSPECTOR.U:\Accounts\HWCNX\HWCNX20005 - Costello Dr Self Storage-TMP 64-((10)-3\DESIGN\_SHEETS\SDP\REVISIONS\CS6100.dwg PLOTTED: 9/20/2024 10:30 AM, BY: Brendan Snell PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: SITE DEVELOPMENT PLANCS6100 BYNO.DATEREVISIONSWICKG21005 AS SHOWN TEAM 10-27-2021 JKM SHEET APPROVED BY OF34 46 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 50'100'PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 H&W CONSTRUCTION, INC.1025 MARTINSBURG PIKE | WINCHESTER, VA 22603STORM SEWER PROFILESCOSTELLO DRIVE SELF STORAGESELF STORAGE FACILITY0 COSTELLO DRIVE | WINCHESTER, VA 22604SHAWNEE MAGISTERIAL DISTRICT----BYNO.DATEREVISIONS09-20-2024 1 SITE PLAN REVISION - REVISED POND GRADING 9-20-2024 9-20-2024 10-21-20242SIGNATURE SUBMISSION10-21-2024 STORAGE FAC I L I T Y P A D 9,450 FT2 STORAGE FACI L I T Y P A D 15,750 FT 2 2-LEVEL TOTAL S T O R A G E 3 1 , 5 0 0 F T 2 STORAGE FAC I L I T Y P A D 15,750 FT 2 2-LEVEL TOTAL S T O R A G E 3 1 , 5 0 0 F T 2 BOLLARD (TYP. )PROP. FENCELOWER FFE = 6 9 8 . 0 0 ' UPPER FFE = 7 0 8 . 0 0 ' LOWER FFE = 7 0 8 . 0 0 ' UPPER FFE = 7 1 8 . 0 0 ' SLAB FFE = 71 8 . 0 0 ' 25' X 40' OFFICE 8'18' TYP.10' TYP KIOSK 3' GATE KIOSK20' GATE5 KIOSK 3' GATE KIOSK 20' GATEFUTURE STORAGE FAC I L I T Y P A D 15,750 FT 2 FUTURE STORAGE FAC I L I T Y P A D 15,750 FT 2 SLAB FFE = 71 8 . 0 0 ' SLAB FFE = 71 7 . 5 0 ' Bio-Retention A Bio-Retention B SWM ESMT. SWM ESMT. SWM ESMT.SWM ESMT.SWM ESMT.120lf Variable Height Retaining Wall (Structural Design By Others) Screening Buffer Esmt. Screening Buffer Esmt.S 23°29'40" W 637.26'45.79'45.29'PROP. 5' CONC. S I D E W A L K TW=691.20 BW=690.70 TW=700.00 BW=699.00TW=699.30 BW=695.00 VDOT HR-1 TYP E I I PEDESTIAN RA I L I N G 694 93 725 32 715 04700710 720720696698702704706 708 712714714716716718718722722724724726 726 700 692 694 696 698 702 704 720720 714714 716 716 71871 8 722 722 72 4 724 7 1 0 710 70 2 70470670 8 71 2 712 71 4 714 716 716 7006 9 8 702704706 690 692 694 696 6 9 8 700 70 2704 706690 700 692 694 696 698 702 704 706 708690700 699.23 700.08 700.74 701.81 702.74 703.40 703.64 703.62700.91 702.69 698.09 699.62 PROP. 20' PRIVATE SAN. SWR ES MT. TP 10+0010+89 10+00 11+00 12+00 13+00 14+00 15+0015+1535' BRL 20' Wide Sewer Esmt. DB 838 PG 1476 30' Wide W/L & Sewer Esmt. DB 838 PG 1476 Ex. Metal Fence Ex. Transformer Ex. Chainlink Fence T.M. 64-A-88 Winchester Regional Airport Authority Zone: RA Use: Airport DB 423 PG 30 See DB 800 PG 1693 20' Wide W/L Esmt. DB 795 PG 340 Community Center One Story Block Bldg. Ex. 12" PVC W/L Ex. 16" DI W/L 3 - WV's 1 - WV Costello Dr. (R t e 1 3 6 7 ) 80' R/W 35 MPH POS T E D S P D L M T DB 955 PG 15 2 Road Class: L o c a l ADT: 2,600 LANDSCAPE S C R E E N A LANDSCAPE SCREEN BWALL USED F O R S C R E E N I N G (137.5 LF) LANDSCAPE S C R E E N C LANDSCAPE SCREEN D30 LFENTRANCESCREENING BU F F E R E S M T SCREENING BUFFER ESMT Bio-Retention A Bio-Retention B Wet Pond S W M E S M T .SWM ESMT.40 INV 676 01 INV 680 690674 676 678 682 684 686 688 694 694 696 696 69068268468668835' BRL34+0025' VEG. BUFFER Top Berm = 684.50'Top Berm = 684.50'100 Yr. WSE = 682.19'AImpermeable Liner Limits 10 Yr. WSE = 679.77' 3:1 MAX 8063TC6826806806786926863:1 MAX 69268869069468469069480737923PR. R.O.W.TIE INTO EX. EP;LAST 2' OF CURB TOBE NOSED DOWN776'RPR. TEMPORARYCONSTRUCTION EASEMENTEX. UNDERGROUNDCOMMUNICATION TO BERELOCATED IN PR. 15' DRY UTILITYEASEMENT BEHIND PR. DITCH(DESIGN BY OTHERS)EX. UNDERGROUND TELEVISION TO BERELOCATED IN PR. 15' DRY UTILITY EASEMENTBEHIND PR. DITCH (DESIGN BY OTHERS)PR. RIGHT OF WAYDEDICATION8' CL II RIP RAPDEPTH = 3.6'PR. 15' DRY UTILITYEASEMENTPR. DI-3BPR. ES-115" RCP CL III15" RCP CL III3215" RCP CL III33TOP=680.88TOP=681.58U:\Accounts\HWCNX\HWCNX20005 - Costello Dr Self Storage-TMP 64-((10)-3\DESIGN\_SHEETS\SDP\REVISIONS\CS7000.dwg PLOTTED: 9/20/2024 10:31 AM, BY: Brendan Snell PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: SITE DEVELOPMENT PLANCS7000 BYNO.DATEREVISIONSWICKG21005 AS SHOWN TEAM 10-27-2021 JKM SHEET APPROVED BY OF39 46 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 30'60'PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTH H&W CONSTRUCTION, INC.1025 MARTINSBURG PIKE | WINCHESTER, VA 22603LANDSCAPE PLANCOSTELLO DRIVE SELF STORAGESELF STORAGE FACILITY0 COSTELLO DRIVE | WINCHESTER, VA 22604SHAWNEE MAGISTERIAL DISTRICTPROP. SHADE TREE PROP. EVG. TREE PROP. SHRUBS PROP. PLANT LABEL LANDSCAPE LEGEND PROP. HERBACEOUS PLANTINGS WET POND LANDSCAPE PLAN SCALE: 1" = 30' ----BYNO.DATEREVISIONS09-20-2024 1 SITE PLAN REVISION - REVISED POND GRADING 9-20-2024 9-20-2024 10-21-20242SIGNATURE SUBMISSION10-21-2024 U:\Accounts\HWCNX\HWCNX20005 - Costello Dr Self Storage-TMP 64-((10)-3\DESIGN\_SHEETS\SDP\REVISIONS\CS7500.dwg PLOTTED: 9/20/2024 10:31 AM, BY: Brendan Snell PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: SITE DEVELOPMENT PLANCS7500 BYNO.DATEREVISIONSWICKG21005 AS SHOWN TEAM 10-27-2021 JKM SHEET APPROVED BY OF40 46 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 H&W CONSTRUCTION, INC.1025 MARTINSBURG PIKE | WINCHESTER, VA 22603LANDSCAPE NOTES AND DETAILSCOSTELLO DRIVE SELF STORAGESELF STORAGE FACILITY0 COSTELLO DRIVE | WINCHESTER, VA 22604SHAWNEE MAGISTERIAL DISTRICTGENERAL CONDITIONS:LANDSCAPE CALCULATIONS: LANDSCAPED AREA/ OPEN SPACE CALCULATIONS TOTAL SITE AREA 252,255.04 SF LANDSCAPED AREA / OPEN SPACE REQUIRED 37,838.26 SF (15.00%) LANDSCAPED AREA / OPEN SPACE PROVIDED 84,421.77 SF (33.47%) SCOPE OF WORK THE LANDSCAPE CONTRACTOR SHALL PROVIDE ALL MATERIALS, LABOR AND EQUIPMENT TO COMPLETE ALL LANDSCAPE WORK AS SHOWN ON THE PLANS AND SPECIFICATIONS. NOTE: IF THE CONTRACTOR BIDS ACCORDING TO THE PLANT LIST, HE/SHE SHOULD THOROUGHLY CHECK THE PLANT LIST QUANTITIES WITH THE SYMBOLS DRAWN ON THE PLAN, TOP BE SURE THERE ARE NO DISCREPANCIES. IF THERE IS A DISCREPANCY BETWEEN THE DRAWING AND THE LIST ON THE PLANS, THE DRAWING TAKES PRECEDENCE. STANDARDS A.ALL PLANT MATERIAL WILL CONFORM TO THE CURRENT ISSUE OF THE AMERICAN STANDARD FOR NURSERY STOCK PUBLISHED BY THE AMERICAN NURSERY & LANDSCAPE ASSOCIATION (ANLA). B.PLANT MATERIAL MUST BE SELECTED FROM NURSERIES THAT HAVE BEEN INSPECTED AND CERTIFIED BY STATE PLANT INSPECTORS. C.COLLECTED MATERIAL MAY BE USED ONLY WHEN APPROVED BY OWNER'S REPRESENTATIVE. D.NOMENCLATURE WILL BE IN ACCORDANCE WITH HORTUS III BY L.H. BAILEY. SUBSTITUTIONS:PRE-BID IT IS THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO MAKE EVERY REASONABLE EFFORT TO FIND THE MATERIAL SPECIFIED BY THE ARCHITECT. THE LANDSCAPE CONTRACTOR MAY OFFER SUBSTITUTIONS TO THE LANDSCAPE ARCHITECT FOR HIS/HER CONSIDERATION. THE LANDSCAPE CONTRACTOR WILL NOTIFY THE LANDSCAPE ARCHITECT IF THERE ARE KNOWN DISEASES OR INSECT RESISTANT SPECIES THAT CAN BE SUBSTITUTED FOR A SELECTED PEST-PRONE PLANT. THE CONTRACTOR SHALL SUBMIT A BASE BID AS PER PLAN PLUS PRICE CLARIFICATIONS FOR ALL RECOMMENDED SUBSTITUTIONS. SUBSTITUTIONS:POST-BID IT IS THE INTENT TO ELIMINATE POST-BID SUBSTITUTIONS. HOWEVER, IN THE EVENT THAT THE CONTRACT MATERIAL HAS BECOME UNAVAILABLE, AN APPROPRIATE SUBSTITUTION MUST BE APPROVED BY THE OWNER'S REPRESENTATIVE. UTILITIES AND UNDERGROUND FEATURES THE LANDSCAPE CONTRACT SHALL NOTIFY UTILITY COMPANIES AND/OR THE GENERAL CONTRACTOR IN ADVANCE OF CONSTRUCTION TO LOCATE UTILITIES. A.IF THERE IS A CONFLICT WITH THE UTILITIES AND THE PLANTING, THE LANDSCAPE ARCHITECT SHALL BE RESPONSIBLE FOR RELOCATING PLANTS PRIOR TO THE PLANTING PROCESS. ANY COST DUE TO RELOCATING AFTER PLANTING SHALL BE BORNE BY THE OWNER. DRAINAGE IF PLANTS ARE TO BE INSTALLED IN AREAS THAT SHOW OBVIOUS POOR DRAINAGE, AND THE PLANTS ARE INAPPROPRIATE FOR THAT CONDITION, THE LANDSCAPE CONTRACTOR SHALL BE RELOCATED, THE CONTRACT SHALL BE ADJUSTED TO ALLOW FOR DRAINAGE CORRECTION AT A NEGOTIATED COST, OR THE PLANT SELECTION MODIFIED BY THE LANDSCAPE ARCHITECT TO ACCOMMODATE THE POOR DRAINAGE SITUATION. WARRANTY A.THE STANDARD WARRANTY IS FOR A ONE (1) YEAR PERIOD, EXCLUDING BULBS, SOD AND ANNUALS, COMMENCING ON THE DATE OF INITIAL ACCEPTANCE. AL PLANTS SHALL BE ALIVE AND IN SATISFACTORY GROWTH AT THE END OF THE GUARANTEE PERIOD. B.BALLED AND BURLAPPED (B&B). 1. BALLED AND BURLAPPED PLANTS SHALL BE DUG WITH FIRM ROOT BALLS FREE OF NOXIOUS WEEDS. THERE SHOULD BE NO EXCESS SOIL ON TOP OF THE ROOT BALL OR AROUND THE TRUNK. 2. BALL SIZE SHALL BE IN ACCORDANCE WITH ANLA STANDARDS. 3. CALIPER AND HEIGHT MEASUREMENTS: IN SIZE GRADING B&B SINGLE-TRUNK TREES, CALIPER SHALL TAKE PRECEDENCE OVER HEIGHT. CALIPER OF THE TRUNK SHALL BE TAKEN 6" ABOVE THE GROUND LEVEL (UP TO INCLUDING 4" CALIPER SIZE) AND 12" ABOVE THE GROUND LEVEL OF LARGER TREES. FOR MULTIPLE-TRUNK TRESS, HEIGHT MEASUREMENT SHALL TAKE PRECEDENCE OVER CALIPER. C.CONTAINER-GROWN STOCK 1. THE SIZE OF CONTAINER-GROWN SHRUBS IS MEASURED BY HEIGHT AND WIDTH OF PLANT. CONTAINER-GROWN TREES ARE MEASURED BY THE SAME STANDARDS LISTED IN B.3 ABOVE. THE ROOT SYSTEM OF CONTAINER-GROWN PLANTS SHALL BE WELL-DEVELOPED AND WELL- DISTRIBUTED THROUGHOUT THE CONTAINER. 2. ALL CONTAINER-GROWN TREES AND SHRUBS THAT HAVE CIRCLING AND MATTED ROOTS SHALL BE TREATED IN THE FOLLOWING MANNER PRIOR TO PLANTING: USING A KNIFE OR SHARP BLADE, MAKE 4-5 CUTS, 1" DEEP, THE LENGTH OF THE ROOT BALL, TO CUT ALL CIRCLING ROOTS. SEE PLANTING PROCEDURES FOR ALL CONTAINER-GROWN TREES & SHRUBS IN THIS SECTION. 3. ALL CONTAINER-GROWN PLANTS SHOULD BE GROUPED AND WATERED DAILY UNTIL THEY ARE PLANTED IN THE LANDSCAPE, THE SOIL SHALL BE KEPT MOIST WITH THE EQUIVALENT OF ONE INCH OF RAINFALL PER WEEK. A.PRUNING SHALL BE DONE BEFORE PLANTING OR DURING THE PLANTING OPERATION. PRUNING DETAIL FOR TREES IN THIS SECTION. B.ALL PLANT MATERIAL IN TRANSIT SHALL BE COVERED TO KEEP MATERIAL FROM DRYING OUT. THE COVERING SHALL COMPLY WITH STATE AND LOCAL LAWS PERTAINING TO THE TRANSPORT OF MATERIALS. C.TREES SHALL BE PLACED IN AN UPRIGHT POSITION WITH THE ROOTBALL COVERED BY MULCH AND KEPT MOIST. TREES AND SHRUBS SHOULD NOT BE LEFT ON SITE UNPLANTED FOR MORE THAN 24 HOURS WITHOUT ADEQUATE WATER TO INSURE ROOTS SURVIVAL. INSPECTION A.PLANTS MAY BE SUBJECT TO INSPECTION AND APPROVAL BY THE OWNER OR OWNER'S REPRESENTATIVE AT THE PLACE OF GROWTH OR HOLDING YARD FOR CONFORMITY TO SPECIFICATION REQUIREMENTS AS TO QUALITY, SIZE AND VARIETY. B.PLANTS DAMAGED IN HANDLING OR TRANSPORTATION CAN BE REJECTED BY THE OWNER OR OWNER'S REPRESENTATIVE. C.STATE NURSERY INSPECTION CERTIFICATES SHALL BE FURNISHED TO THE LANDSCAPE ARCHITECT UPON REQUEST. PLANTING PROCEDURES FOR ALL CONTAINER-GROWN TREES & SHRUBS A.REMOVE THE PLANT EITHER BY CUTTING OR INVERTING THE CONTAINER. B.FOR UNTREATED PLASTIC CONTAINER GROWN PLANTS WITH CIRCLING ROOTS, USE A SHARP KNIFE TO MAKE 1" CUTS THE LENGTH OF THE ROOTBALL. C.PLANT SHRUB TO TREE A MINIMUM OF 1/8 OF THE HEIGHT OF THE ROOTBALL ABOVE EXISTING GRADE. D.APPLY A 2 TO 3" THICK LAYER OF APPROVED MULCH. KEEP MULCH 6" AWAY FROM THE TRUNK OF ALL TREES AND SHRUBS. E.PLANTS GROWN IN ROOT CONTAINMENT BAGS MUST HAVE THE BAGS REMOVED DURING THE PLANTING OPERATION. NO ADDITIONAL SLASHING OF THE ROOTBALL IS NECESSARY. MAINTENANCE OF LANDSCAPING NOTES: 1. ALL LANDSCAPED AREA SHALL BE MAINTAINED IN GOOD CONDITION BY OWNER. 2. REASONABLE PROVISIONS SHALL BE MADE FOR PROTECTION FROM VEHICLES, PEDESTRIANS, OR SHOPPING CARTS. 3. DEAD OR DYING VEGETATION SHALL BE REPLACED AT DIRECTION OF ADMINISTRATOR. 4. SHRUBS SHALL BE REPLACED AT A SIZE CONSISTENT WITH THAT OF EXPECTED FOR SPECIES AND TIME SINCE INSTALLATION. 5. TREES SHALL BE REPLACED AT A SIZE OF 0.5" CALIPER ABOVE 2" FOR EVERY YEAR SINCE INSTALLATION UP TO 5" CALIPER. GENERAL LANDSCAPING NOTES: 1. NO TREES OR SHRUBS SHALL BE PLACED ON FREDERICK WATER EASEMENTS. 2. ALL LANDSCAPING SHALL COMPLY WITH SECTION§165-203.01 LANDSCAPING REQUIREMENTS OF THE FREDERICK COUNTY ZONING ORDINANCE. 3. OWNER WILL ACCEPT FOR REVIEW, SUBSTITUTIONS FOR ALL LANDSCAPING PROVIDED THEY SATISFY APPLICABLE REGULATIONS. 4. OUTDOOR STORAGE AREAS FOR RVS, BOATS, AND TRAILERS ARE EXEMPT FROM LANDSCAPING REQUIREMENTS (§165-201.10(H)). SHRUB PLANTING NOT TO SCALE 3x DIAMETER OF ROOT BALL OR CONTAINER SIZE 2" OF MULCH CREATE A SAUCER SHAPE WITH MULCH TO HOLD WATER SLOPE SIDES OF PLANTING HOLE REMOVE BURLAP OR WIRE BASKET FROM TOP 1/3 OF ROOT BALL TAMP SOIL AROUND ROOT BALL BASE FIRMLY TO PREVENT ROOT BALL FROM SHIFTING PRUNE ONLY DAMAGED OR DEAD BRANCHES TREE PLANTING NOT TO SCALE 3x DIAMETER OF ROOT BALL SET TRUNK PLUMB L DO NOT MULCH WITHIN 6" OF TRUNK 3" OF MULCH SLOPE SIDES OF PLANTING HOLE REMOVE BURLAP OR WIRE BASKET FROM TOP 1/3 OF ROOT BALL TAMP SOIL AROUND ROOT BALL BASE FIRMLY WITH FOOT PRESSURE TO PREVENT ROOT BALL FROM SHIFTING SECURE GUYS WITH RUBBER HOSE TO TRUNK PRUNE ONLY DAMAGED OR DEAD BRANCHES *(2) 2"x2" WOOD STAKES SET AT 180° (ALT: STEEL FENCE POSTS) C NOTES: 1.*STAKE ONLY TO PREVENT WIND TIP OR WHEN PLANTING ON STEEP SLOPES 2. REMOVE ALL TAGS AND ROPES FROM BRANCHES AND ROOT BALL. PITCH FROM C OF PLANTING AREA TYPICAL MULCH EDGING DETAIL4" MIN.MULCH LAYER TOPSOIL L PROVIDE EDGE WITH CLEAN, CRISP SEPARATION BETWEEN MULCHED BED AND ADJACENT SURFACE CONDITIONS CUT EDGE MINIMUM 4" BELOW GRADE TO RECEIVE MULCH TURF, SIDEWALK, OR CURB 2" MIN. MULCH LAYER NOT TO SCALE EVERGREEN TREE PLANTING NOT TO SCALE 3x DIAMETER OF ROOT BALL SET TRUNK PLUMB L DRIVE STAKES AT AN ANGLE INSIDE OF SAUCER DO NOT MULCH WITHIN 6" OF TRUNK 3" OF MULCH CREATE A SAUCER SHAPE WITH MULCH TO HOLD WATER SLOPE SIDES OF PLANTING HOLE REMOVE BURLAP OR WIRE BASKET FROM TOP 1/3 OF ROOT BALL TAMP SOIL AROUND ROOT BALL BASE FIRMLY WITH FOOT PRESSURE TO PREVENT ROOT BALL FROM SHIFTING PRUNE ONLY DAMAGED OR DEAD BRANCHES C PARKING LOT LANDSCAPING PERIMETER LANDSCAPING PARKING LOT IMPERVIOUS AREA 70,700 SF REQUIRED PROVIDED PERIMETER PARKING LOT SHADE TREES 7 (1 PER 10,000 SF) 7 3' HIGH HEADLIGHT SCREENING YES YES INTERIOR LANDSCAPING TOTAL PARKING LOT AREA 3,552 SF PARKING SPACES 5 REQUIRED PROVIDED PARKING LOT LANDSCAPED AREA 178 SF (5.00%) 314 SF (8.84%) INTERIOR PARKING LOT SHADE TREES 1 (1 PER 10 SPACES) 1 PARKING LOT PLANT LIST SYMBOL BOTANICAL NAME COMMON NAME SIZE SPACING QUANTITY TREES ZS ZELKOVA SERRATA ' GREEN VASE'GREEN VASE JAPANESE ZELKOVA 1 1/4" CAL. MIN.AS SHOWN 8 SHRUBS BM BUXUS MICROPHYLLA VAR. KOREANA 'WINTERGREEN' WINTERGREEN KOREAN BOXWOOD 3 GAL. CONT. MIN./ 36" HT. MIN.4' O.C.15 STORAGE FACILITIES, SELF-SERVICE SCREENING LANDSCAPE SCREEN A LENGTH OF LANDSCAPE SCREEN 275 LF REQUIRED PROVIDED EVERGREEN TREES 45 (12' OC X 2 ROWS)45 LANDSCAPE SCREEN B LENGTH OF LANDSCAPE SCREEN 352 LF REQUIRED PROVIDED EVERGREEN TREES 59 (12' OC X 2 ROWS)59 LANDSCAPE SCREEN C TOTAL LENGTH OF LANDSCAPE SCREEN 315 LF LENGTH OF PROPOSED WALL*-137.5 LF LENGTH OF LANDSCAPE SCREEN TO BE PLANTED 177.5 LF REQUIRED PROVIDED EVERGREEN TREES 30 (12' OC X 2 ROWS)30 LANDSCAPE SCREEN D TOTAL LENGTH OF LANDSCAPE SCREEN 302 LF LENGTH OF ENTRANCE -30 LF LENGTH OF LANDSCAPE SCREEN TO BE PLANTED 272 LF REQUIRED PROVIDED EVERGREEN TREES 45 (12' OC X 2 ROWS)45 SELF STORAGE SCREENING PLANT LIST SYMBOL BOTANICAL NAME COMMON NAME SIZE SPACING QUANTITY TREES JV JUNIPERUS VIRGINIANA ' HETZII COLUMNARIS'GREEN COLUMNAR JUNIPER 4' HT. MIN 12' OC 49 PS PINUS STROBUS EASTERN WHITE PINE 4' HT MIN 12' OC 30 PM PSEUDOTSUGA MENZIESII DOUGLAS FIR 4' HT MIN 12' OC 46 TO THUJA OCCIDENTALIS 'SMARAGD'SMARAGD ARBORVITAE 4' HT MIN 12' OC 45 * WALL IS BEING UTILIZED TO MEET SCREENING REQUIREMENT IN THIS AREA BIORETENTION A TOTAL AREA OF BIORETENTION 2,263 SHRUBS PROVIDED (30" HIGH, 10' O.C.)20 HERBACEOUS/PERENNIALS PROVIDED (1 GAL. CONT. SPACING VARIES)513 BIO-RETENTION CALCULATIONS: PLANTING TEMPLATE: PERENNIAL GARDEN WITH SHRUBS BIORETENTION B TOTAL AREA OF BIORETENTION 2,335 SHRUBS PROVIDED (30" HIGH, 10' O.C.)24 HERBACEOUS/PERENNIALS PROVIDED (1 GAL. CONT. SPACING VARIES)164 BIORETENTION PLANT LIST SYMBOL BOTANICAL NAME COMMON NAME SIZE SPACING QUANTITY SHRUBS CS CORNUS SERICEA RED TWIG DOGWOOD 30" HT. MIN.AS SHOWN 19 IV ILEX VERTICILATA WINTERBERRY 30" HT. MIN.AS SHOWN 15 IH ITEA VIRGINICA 'HENRY'S GARNET'HENRY'S GARNET VIRGINIA SWEETSPIRE 30" HT. MIN AS SHOWN 10 HERBACEOUS/PERENNIALS CP CALTHA PALUSTRIS MARSH MARIGOLD 1 GAL. CONT.18" O.C.85 CE CAREX ELATA 'AUREA'BOWLES GOLDEN SEDGE 1 GAL. CONT.24" O.C.110 CT CAREX STRICTA TUSSOCK SEDGE 1 GAL. CONT.18" O.C.101 EP EUPATORIUM PURPUREA JOE PYE WEED 1 GAL. CONT.24" O.C.177 IR IRIS VERSICOLOR BLUE FLAG IRIS 1 GAL. CONT.24" O.C.59 LC LOBELIA CARDINALIS CARDINAL FLOWER 1 GAL. CONT.24" O.C.145 OR PERENNIAL PLANTING DETAIL GROUNDCOVER, ORNAMENTAL GRASS PLAN VIEW "D" "D" "D" SCHEDULE VARIES SEE PLAN PLANTING SECTION SEED MIX A SEED MIX B ----BYNO.DATEREVISIONS09-20-2024 1 SITE PLAN REVISION - REVISED POND GRADING 9-20-2024 9-20-2024 10-21-20242SIGNATURE SUBMISSION10-21-2024