HomeMy WebLinkAbout08-24 BOS Staff Report REZONING #08-24
D&M Container Services (J. Johnson)
Staff Report for the Board of Supervisors
Prepared: October 29, 2024
Staff Contact: M. Tyler Klein, AICP, Senior Planner
Executive Summary:
Meeting Schedule
Planning Commission: September 4, 2024
October 2, 2024
Action: Tabled to 10/2/24
Action: Recommended Approval
Board of Supervisors: November 13, 2024 Action: Pending
Property Information
Property Identification Number (PIN) 86-A-180
Address 1290 Fairfax Pike, White Post
Magisterial District Opequon
Acreage +/- 13.0-acres
Zoning & Present Land Use Zoning: RA (Rural Areas)
Land Use: Residential
Proposed Zoning M1 (Light Industrial)
Adjoining Property Zoning & Present Land Use
North: RA (Rural Areas) Land Use: Residential
South: RA (Rural Areas) Land Use: Vacant
East: RA (Rural Areas) Land Use: Residential
West: RA (Rural Areas) Land Use: Residential
Proposed Use
This is a request to rezone one (1) parcel totaling 13-acres from the RA (Rural Areas) Zoning
District to the M1 (Light Industrial) Zoning District with proffers for the purposes of
establishing a container service facility and other M1 Zoning District uses.
Positives Concerns
The proposed rezoning proposes a use
(container service facility) typically
associated with the “industrial” land use
designation as identified in the
Comprehensive Plan. The revised proffer
statement (9/25/24) further limits the allowed
M1 uses to those which impacts have been
mitigated through other proffered
Proffer 3.7 seeks to address “high quality
architecture” as identified in Plan policy. Other
recent rezoning applications in the vicinity
have committed to 100% of the road facing
facades to be constructed of one or a
combination of the following: cast stone,
stone, brick, architectural block, glass, wood,
dryvit or stucco. Whereas included in the
Page 2 of 7
commitments, and limits hours of operation
for certain activities associated with a
“container service facility.”
The proffer statement includes right-of-way
(ROW) reservation for the future condition of
Route 277 as an “improved minor arterial
roadway,” including a 10’ wide multi-use
trail, addressing Plan policy.
The revised proffer statement addresses area
plan policy about implementing “high-quality
architecture and site design” in this area of the
County by including a landscape buffer along
Route 277 and committing to building
materials for the façade.
revised proffer statement (9/25/2024) “a
minimum surface area of twenty-five percent
(25%) of the building façade facing Route 277
Fairfax Pike shall be constructed to contain
one or a combination of the following: cast
stone, stone, brick, architectural block, glass,
wood, dryvit, or stucco.”
Page 3 of 7
Review Agency Comments:
Review Agency
Comment
Date
Comment Summary Status
Frederick County (FC)
County Attorney
September 19,
2024
Legal Form.
See revised comment letter.
Addressed
Virginia Department of
Transportation
(VDOT)
June 11, 2024 “VDOT has reviewed our portion of
the rezoning application of tax map 86-
A-180 (Owner, Jimmy A Johnson). We
have the following comment, while we
do not see any issue with the proposed
use, the rezoning of the parcel to M1,
would not allow us to use the traffic
data provided. M1 would allow many
uses that would far exceed the 85 VPD,
and we would have to look at the
highest and best use for the parcel and
use that to determine the traffic impact.
The proffer statement did not proffer
out any specific high traffic uses, so we
would need to re-evaluate this based on
the highest and best use of M1 which is
not represented in this application.”
Addressed
FC Public Works May 20, 2024 No comments at this time.
FC Fire Marshal May 13, 2024 “Any and all future development shall
comply with the Frederick County Fire
Prevention Code.”
Frederick Water May 21, 2024 “The project parcel is located within the
sewer and water service area (SWSA),
and therefore by county policy,
Frederick Water’s water and sewer
services may be extended to the site at
the user’s expense. A 12-inch water
main traverses the property frontage
along Fairfax Pike. Sanitary sewer
service is not presently in the vicinity.
The rezoning application package
clearly intends to not pursue public
sewer but proposes to utilize private
private on-site waste disposal. Frederick
Water has not been in discussion with
the application regarding this private
on-site sewer disposal approach and
will defer to the County and the Health
Addressed
Page 4 of 7
Department on the appropriateness of
utilizing private on-site sewer disposal.”
See comment letter.
Virginia Department of
Health (VDH)
May 1, 2024 “It appears the plan is to utilize the
existing onsite waste sewage system
and water supply currently connected to
existing structures and use the dwelling
at 1290 Fairfax Pike as a business
office.
Our concern is whether the existing
onsite sewage system and private well
are safe, adequate, and proper for
proposed use.”
See comment letter.
Addressed
Planning & Zoning Staff Analysis:
Comprehensive Plan Conformance:
The Comprehensive Plan (adopted November 2021) and the Southern Frederick Area Plan
(SOFRED, 2017) provide guidance on the future development of the subject property. The Plan
identifies the subject properties with a “industrial” land use designation and as being within the
limits of the Sewer and Water Service Area (SWSA) and outside of the Urban Development Area
(UDA). Further, the SOFRED plan identifies the subject properties within the “Route 277 Triangle
– Centers of Economy” planning area (map inset below). The plan states:
“The Route 277 Triangle Centers of Economy is designed to be a significant area of
commercial and industrial opportunity that is fully supportive of the Frederick County
Economic Development Authority’s targeted goals and strategies. The intent of the mixed-
use designation is to further “enhance the County’s commercial and industrial areas and to
provide focus to the County’s future regional employment centers. In specific areas a mix
of flexible uses, with office uses in prominent locations, is encouraged. Such areas are
supported by substantial areas of industrial and commercial opportunity and provide areas
that are well designed with high quality architecture and site design. It is the intent of such
areas to promote a strong positive community image. “
Page 5 of 7
Further, the “Business Development” Chapter of the Comprehensive Plan includes several
“targeted industries” for expansion of industrial land uses, this includes advanced manufacturing,
headquarters and back office, professional and creative services, and agribusiness and food
processing.
The proposed rezoning proposes a use (container service facility) typically associated with the
“industrial” land use designation in the Comprehensive Plan. However, the proposed rezoning
application materials do not specifically address how the use supports the County’s targeted
industries (identified above) or the area plan’s vision for “a mix of flexible uses.” In this respect,
the application is not fully compatible with the Comprehensive Plan policies.
Transportation & Site Access:
The Plan also identifies transportation improvements in the vicinity of the subject properties.
Fairfax Pike (Route 277) is identified as an “improved minor arterial roadway;” right-of-way will
be required along the subject properties frontage to accommodate this future condition as well as
any warranted turn lanes (subject to VDOT approval). Further, the Plan identifies a multi-use trail
along the frontage.
The proffer statement, revised September 25, 2024, provides for 52.5’ of right-of-way (ROW)
reservation along Fairfax Pike for the future condition (widening), and to include the multi-use
trail shown on the Plan. Further, the proffer statement includes a provision for a Traffic Impact
Analysis (TIA) at the time of the site plan for any uses that may generate more than 85 daily trips.
Proffer Statement, Generalized Development Plan (GDP), & Impact Analysis:
The proffer statement, revised September 25, 2024, proposes the following:
Page 6 of 7
Proffers
(Revision Dated 9/25/24)
Staff Comment
Proffer 1 – Transportation No comments.
Proffer 2 – Fire and Rescue
No comments.
Proffer 3 – Land Use
Proffers 3.7 and 3.8 have been included to
better address Plan policy specific to “high-
quality architecture and site design.” Other
recent rezoning applications in the vicinity
have committed to 100% of the road facing
facades to be constructed of one or a
combination of the following: cast stone,
stone, brick, architectural block, glass, wood,
dryvit or stucco. The buffer treatment along
the roadway frontage is equivalent to other
applications in the vicinity.
The generalized development plan (GDP) dated April 24, 2024, is included below and identifies
Phase I and Phase II use of the property.
Page 7 of 7
Planning Commission Summary and Action From the 09/04/24 Meeting:
The Planning Commission held a public hearing on September 4, 2024. One (1) member of the
public spoke in support of the proposed rezoning application. The primary discussion among the
Planning Commission was the potential impact of the rezoning that as proposed may allow for any
allowed M1 Zoning District use, some of which may have an impact on adjoining properties. The
application was tabled to October 2, 2024, and the applicant was directed to address allowed uses,
future right-of-way (ROW) for Route 277 to accommodate a trail section, hours of operation for a
container service facility, and architecture and site design.
Planning Commission Summary and Action From the 10/02/24 Meeting:
The Planning Commission discussed this item on October 2, 2024. In their remarks, the Planning
Commission expressed support for the changes the applicant made to the application to address
future Route 277 ROW, architectural standards envisioned by the Plan, hours of operation, and
restrict industrial uses that could impact adjoining residential properties and roadways. The
Planning Commission unanimously recommended approval (Commissioner DeHaven absent) of
the rezoning application.
Following a public hearing, staff is seeking a decision from the Board of Supervisors on this
rezoning application.