Loading...
HomeMy WebLinkAbout08-24 PC Staff Report - September REZONING #08-24 D&M Container Services (J. Johnson) Staff Report for the Planning Commission Prepared: August 26, 2024 Staff Contact: M. Tyler Klein, AICP, Senior Planner Executive Summary: Meeting Schedule Planning Commission: September 4, 2024 Action: Pending Board of Supervisors: September 25, 2024 Action: Pending Property Information Property Identification Number (PIN) 86-A-180 Address 1290 Fairfax Pike, Stephens City Magisterial District Opequon Acreage +/- 13.0-acres Zoning & Present Land Use Zoning: RA (Rural Areas) Land Use: Residential Proposed Zoning M1 (Light Industrial) Adjoining Property Zoning & Present Land Use North: RA (Rural Areas) Land Use: Residential South: RA Land Use: Vacant East: RA Land Use: Residential West: RA Land Use: Residential Proposed Use This is a request to rezone one (1) parcel totaling 13-acres from the RA (Rural Areas) Zoning District to the M1 (Light Industrial) Zoning District with proffers for the purposes of establishing a container service facility. Positives Concerns The proposed rezoning proposes a use (container service facility) typically associated with the “industrial” land use designation as identified in the Comprehensive Plan. The proffer statement includes right-of-way (ROW) reservation for the future condition of The proposed rezoning application materials do not specifically address how the use addresses the Southern Frederick Area Plan’s vision for “a mix of flexible uses” or “industrial and commercial opportunity [with] high quality architecture and site design.” In this respect, the application may not be fully compatible with the Comprehensive Plan 462 Page 2 of 8 Route 277 as an “improved minor arterial roadway.” policies. The proffer statement does not address the Plan envisioned high-quality architecture or site design. Other recent applications in the vicinity have addressed this plan policy through inclusion of screening elements along Route 277 to buffer industrial activities. As proposed, any M1 (Light Industrial) Zoning District use would be allowed; some of these uses could have a negative impact on surrounding properties and/or the transportation network (noise, dust, odor, glare, vibrations, traffic, etc.) that may not be fully mitigated by the proposed proffer statement and GDP. The proposed rezoning does not address the Plan identified 10-foot-wide multi-use trail along Route 277. 463 Page 3 of 8 Review Agency Comments: Review Agency Comment Date Comment Summary Status Frederick County (FC) County Attorney June 3, 2024 Legal Form. See comment letter. Addressed Virginia Department of Transportation (VDOT) June 11, 2024 “VDOT has reviewed our portion of the rezoning application of tax map 86- A-180 (Owner, Jimmy A Johnson). We have the following comment, while we do not see any issue with the proposed use, the rezoning of the parcel to M1, would not allow us to use the traffic data provided. M1 would allow many uses that would far exceed the 85 VPD, and we would have to look at the highest and best use for the parcel and use that to determine the traffic impact. The proffer statement did not proffer out any specific high traffic uses, so we would need to re-evaluate this based on the highest and best use of M1 which is not represented in this application.” Addressed FC Public Works May 20, 2024 No comments at this time. FC Fire Marshal May 13, 2024 “Any and all future development shall comply with the Frederick County Fire Prevention Code.” Frederick Water May 21, 2024 “The project parcel is located within the sewer and water service area (SWSA), and therefore by county policy, Frederick Water’s water and sewer services may be extended to the site at the user’s expense. A 12-inch water main traverses the property frontage along Fairfax Pike. Sanitary sewer service is not presently in the vicinity. The rezoning application package clearly intends to not pursue public sewer but proposes to utilize private on-site waste disposal. Frederick Water has not been in discussion with the applicant regarding this private on-site sewer disposal approach and will defer Addressed 464 Page 4 of 8 to the County and the Health Department on the appropriateness of utilizing private on-site sewer disposal.” See comment letter. Virginia Department of Health (VDH) May 1, 2024 “It appears the plan is to utilize the existing onsite waste sewage system and water supply currently connected to existing structures and use the dwelling at 1290 Fairfax Pike as a business office. Our concern is whether the existing onsite sewage system and private well are safe, adequate, and proper for proposed use.” See comment letter. Addressed Planning & Zoning Staff Analysis: Comprehensive Plan Conformance: The Comprehensive Plan (adopted November 2021) and the Southern Frederick Area Plan (SOFRED, 2017) provide guidance on the future development of the subject property. The Plan identifies the subject properties with a “industrial” land use designation and as being within the limits of the Sewer and Water Service Area (SWSA) and outside of the Urban Development Area (UDA). Further, the SOFRED plan identifies the subject properties within the “Route 277 Triangle – Centers of Economy” planning area (map inset below). The plan states: “The Route 277 Triangle Centers of Economy is designed to be a significant area of commercial and industrial opportunity that is fully supportive of the Frederick County Economic Development Authority’s targeted goals and strategies. The intent of the mixed- use designation is to further “enhance the County’s commercial and industrial areas and to provide focus to the County’s future regional employment centers. In specific areas a mix of flexible uses, with office uses in prominent locations, is encouraged. Such areas are supported by substantial areas of industrial and commercial opportunity and provide areas that are well designed with high quality architecture and site design. It is the intent of such areas to promote a strong positive community image. “ 465 Page 5 of 8 Further, the “Business Development” Chapter of the Comprehensive Plan includes several “targeted industries” for expansion of industrial land uses, this includes advanced manufacturing, headquarters and back office, professional and creative services, and agribusiness and food processing. The proposed rezoning proposes a use (container service facility) typically associated with the “industrial” land use designation in the Comprehensive Plan. However, the proposed rezoning application materials do not specifically address how the use supports the County’s targeted industries (identified above) or the area plan’s vision for “a mix of flexible uses” or “industrial and commercial opportunity [with] high quality architecture and site design.” In this respect, the application is not fully compatible with the Comprehensive Plan policies. As proposed, any M1 (Light Industrial) Zoning District use would be allowed; some of these uses could have a negative impact on surrounding properties and/or the transportation network (noise, dust, odor, glare, vibrations, traffic, etc.). Transportation & Site Access: The Plan also identifies transportation improvements in the vicinity of the subject properties. Fairfax Pike (Route 277) is identified as an “improved minor arterial roadway;” right-of-way will be required along the subject properties frontage to accommodate this future condition as well as any warranted turn lanes (subject to VDOT approval). Further, the Plan identifies a multi-use trail along the frontage. The proffer statement, dated July 8, 2024, provides for right-of-way reservation along Fairfax Pike for the future condition (widening), but does not identify or include the multiuse trail shown on the Plan. Further, the proffer statement includes a provision for a Traffic Impact Analysis (TIA) at the time of site plan for any uses that may generate more than 85 daily trips. 466 Page 6 of 8 Proffer Statement, Generalized Development Plan (GD)), & Impact Analysis: The proffer statement, dated July 8, 2024, proposes the following: Proffer (Date of Revision, if applicable) Staff Comment Proffer 1 – Transportation: 1.1. The Owner shall reserve additional right- of-way along Fairfax Pike as necessary to construct future road frontage improvements. The reservation will locate the new Route 277 Fairfax Pike right-of- way line 45.5’ from the centerline of the existing roadway fronting the subject property. Said right of way shall be dedicated within 90 days of receiving written notice from Frederick County. 1.2. If the Applicant elects to develop the M1 Property with any permitted use that results in a higher net new trip generation from the Property than the proposed 85 daily trips (ADP) shown in the “General Development Plan”, prepared by Penonni Associates Inc, dated June 28, 2024 (the “GDP”), then as part of any conditional use permit or site plan approval process for those uses, the Applicant shall submit a Traffic Impact Analysis (TIA) to the County and the Virginia Department of Transportation (“VDOT”). Subject to County and VDOT acceptance of the submitted TIA, and the Applicant shall mitigate any additional impacts caused by such additional trips 1.3. In determining whether the uses collectively have an increased traffic impact for purposes of Proffer 1.2, the Applicant may use actual traffic counts for then existing uses on the Property in lieu of the estimates that were employed in the TIA, for determining background traffic at the time of site plan submission. Proffer 1.1, as proposed, the rezoning seeks to implement Comprehensive Plan policy for the future condition of Fairfax Pike (Route 277) as an “improved minor arterial roadway.” However, the proffer statement does not include the Plan identified 10-foot-wide multi-use trail along the roadway. Proffer 1.2 & 1.3, as proposed, seek to address concerns with development of any M1 allowed use, specific to transportation impacts, and would aid to mitigate future impacts depending on the use. However, the proffer statement is silent on how other potential impacts (glare, noise, odor, vibrations) of some M1 uses would be mitigated. Proffer 2 – Fire and Rescue: No comment. 467 Page 7 of 8 2.1. The Owner shall contribute to the Board the sum of $0.10 per square foot of gross floor area for fire and rescue purposes, payable upon the issuance of a building permit for each structure. Proffer 3 – Land Use: 3.1 M1- Light Industrial land uses are proposed in two (2) phases and shall be in conformance with the “General Development Plan”, prepared by Pennoni Associates Inc dated June 28, 2024. 3.2 The existing residential structure will be converted to a business use and will be allowed to remain as an existing nonconforming structure at time of Right- of Way dedication. Building gross square footage expansion will not be allowed for the existing nonconforming structure. All other future building construction and site improvements shall conform to current zoning requirements at time of permitting. 3.3 Existing on-site well and drainfield facilities shall meet current Health Department design requirements and standards for the proposed business use. Necessary facility upgrades shall be required to be in place at time of building occupancy. Proffer 3, as proposed, does not address how the proposal supports the County’s targeted industries or the area plan’s vision for “a mix of flexible uses” or “industrial and commercial opportunity [with] high quality architecture and site design.” The proffer statement does not address the Plan envisioned high-quality architecture or site design. Other recent applications in the vicinity have addressed this plan policy through inclusion of screening elements along Route 277 to buffer industrial activities. 468 Page 8 of 8 The generalized development plan (GDP) dated April 24, 2024, is included below and identifies Phase I and Phase II use of the property. Following a public hearing, staff is seeking a recommendation from the Planning Commission to forward to the Board of Supervisors on this rezoning application. 469