Loading...
HomeMy WebLinkAbout08-24 PC Staff Report - October REZONING #08-24 D&M Container Services (J. Johnson) Staff Report for the Planning Commission Prepared: September 26, 2024 Staff Contact: M. Tyler Klein, AICP, Senior Planner Executive Summary: Meeting Schedule Planning Commission: September 4, 2024 October 2, 2024 Action: Tabled to 10/2/24 Action: Pending Board of Supervisors: November 13, 2024 Action: Pending Property Information Property Identification Number (PIN) 86-A-180 Address 1290 Fairfax Pike, Stephens City Magisterial District Opequon Acreage +/- 13.0-acres Zoning & Present Land Use Zoning: RA (Rural Areas) Land Use: Residential Proposed Zoning M1 (Light Industrial) Adjoining Property Zoning & Present Land Use North: RA (Rural Areas) Land Use: Residential South: RA Land Use: Vacant East: RA Land Use: Residential West: RA Land Use: Residential Proposed Use This is a request to rezone one (1) parcel totaling 13-acres from the RA (Rural Areas) Zoning District to the M1 (Light Industrial) Zoning District with proffers for the purposes of establishing a container service facility and other M1 Zoning District uses. Positives Concerns The proposed rezoning proposes a use (container service facility) typically associated with the “industrial” land use designation as identified in the Comprehensive Plan. The revised proffer statement (9/25/24) limits the allowed M1 uses to those which impacts have been mitigated through other proffered Proffer 3.7 seeks to address “high quality architecture” as identified in Plan policy. Other recent rezoning application in the vicinity have committed to 100% of the road facing facades to be constructed of one or a combination of the following: cast stone, stone, brick, architectural block, glass, wood, dry vit or stucco. Whereas included in the 50 Page 2 of 9 commitments, addressing stated concerns from the Planning Commission. The proffer statement includes right-of-way (ROW) reservation for the future condition of Route 277 as an “improved minor arterial roadway,” including a 10’ wide multi-use trail. The revised proffer statement seeks to address stated concerns and area plan policy about implementing “high-quality architecture and site design” in this area of the County by including a landscape buffer along Route 277 and committing to building materials for the façade. revised proffer statement (9/25/2024) “a minimum surface area of twenty-five percent (25%) of the building façade facing Route 277 Fairfax Pike shall be constructed to contain one or a combination of the following: cast stone, stone, brick, architectural block, glass, wood, dry vit, or stucco.” 51 Page 3 of 9 Review Agency Comments: Review Agency Comment Date Comment Summary Status Frederick County (FC) County Attorney September 19, 2024 Legal Form. See revised comment letter. Addressed Virginia Department of Transportation (VDOT) June 11, 2024 “VDOT has reviewed our portion of the rezoning application of tax map 86- A-180 (Owner, Jimmy A Johnson). We have the following comment, while we do not see any issue with the proposed use, the rezoning of the parcel to M1, would not allow us to use the traffic data provided. M1 would allow many uses that would far exceed the 85 VPD, and we would have to look at the highest and best use for the parcel and use that to determine the traffic impact. The proffer statement did not proffer out any specific high traffic uses, so we would need to re-evaluate this based on the highest and best use of M1 which is not represented in this application.” Addressed FC Public Works May 20, 2024 No comments at this time. FC Fire Marshal May 13, 2024 “Any and all future development shall comply with the Frederick County Fire Prevention Code.” Frederick Water May 21, 2024 “The project parcel is located within the sewer and water service area (SWSA), and therefore by county policy, Frederick Water’s water and sewer services may be extended to the site at the user’s expense. A 12-inch water main traverses the property frontage along Fairfax Pike. Sanitary sewer service is not presently in the vicinity. The rezoning application package clearly intends to not pursue public sewer but proposes to utilize private on-site waste disposal. Frederick Water has not been in discussion with the applicant regarding this private on-site sewer disposal approach and will defer Addressed 52 Page 4 of 9 to the County and the Health Department on the appropriateness of utilizing private on-site sewer disposal.” See comment letter. Virginia Department of Health (VDH) May 1, 2024 “It appears the plan is to utilize the existing onsite waste sewage system and water supply currently connected to existing structures and use the dwelling at 1290 Fairfax Pike as a business office. Our concern is whether the existing onsite sewage system and private well are safe, adequate, and proper for proposed use.” See comment letter. Addressed Planning & Zoning Staff Analysis: Comprehensive Plan Conformance: The Comprehensive Plan (adopted November 2021) and the Southern Frederick Area Plan (SOFRED, 2017) provide guidance on the future development of the subject property. The Plan identifies the subject properties with a “industrial” land use designation and as being within the limits of the Sewer and Water Service Area (SWSA) and outside of the Urban Development Area (UDA). Further, the SOFRED plan identifies the subject properties within the “Route 277 Triangle – Centers of Economy” planning area (map inset below). The plan states: “The Route 277 Triangle Centers of Economy is designed to be a significant area of commercial and industrial opportunity that is fully supportive of the Frederick County Economic Development Authority’s targeted goals and strategies. The intent of the mixed- use designation is to further “enhance the County’s commercial and industrial areas and to provide focus to the County’s future regional employment centers. In specific areas a mix of flexible uses, with office uses in prominent locations, is encouraged. Such areas are supported by substantial areas of industrial and commercial opportunity and provide areas that are well designed with high quality architecture and site design. It is the intent of such areas to promote a strong positive community image. “ 53 Page 5 of 9 Further, the “Business Development” Chapter of the Comprehensive Plan includes several “targeted industries” for expansion of industrial land uses, this includes advanced manufacturing, headquarters and back office, professional and creative services, and agribusiness and food processing. The proposed rezoning proposes a use (container service facility) typically associated with the “industrial” land use designation in the Comprehensive Plan. However, the proposed rezoning application materials do not specifically address how the use supports the County’s targeted industries (identified above) or the area plan’s vision for “a mix of flexible uses.” In this respect, the application is not fully compatible with the Comprehensive Plan policies. Transportation & Site Access: The Plan also identifies transportation improvements in the vicinity of the subject properties. Fairfax Pike (Route 277) is identified as an “improved minor arterial roadway;” right-of-way will be required along the subject properties frontage to accommodate this future condition as well as any warranted turn lanes (subject to VDOT approval). Further, the Plan identifies a multi-use trail along the frontage. The proffer statement, revised September 25, 2024, provides for 52.5’ of right-of-way (ROW) reservation along Fairfax Pike for the future condition (widening), and to include the multi-use trail shown on the Plan. Further, the proffer statement includes a provision for a Traffic Impact Analysis (TIA) at the time of site plan for any uses that may generate more than 85 daily trips. Proffer Statement, Generalized Development Plan (GD)), & Impact Analysis: Following the Planning Commission public hearing on September 4, 2024, the applicant has revised the proffer statement. The proffer statement, revised September 25, 2024, proposes the following: 54 Page 6 of 9 Proffers (Summarized; Revised 9/25/24) Staff Comment Proffer 1 – Transportation: 1.1. The Owner shall reserve additional right- of-way along Fairfax Pike as necessary to construct future road frontage improvements. The reservation will locate the new Route 277 Fairfax Pike right-of- way line 52.5’ from the centerline of the existing roadway fronting the subject property. Said right of way shall be dedicated within 90 days of receiving written notice from Frederick County. 1.2. If the Applicant elects to develop the M1 Property with any permitted use that results in a higher net new trip generation from the Property than the proposed 85 daily trips (ADP) shown in the “General Development Plan”, prepared by Penonni Associates Inc, dated June 28, 2024 (the “GDP”), then as part of any conditional use permit or site plan approval process for those uses, the Applicant shall submit a Traffic Impact Analysis (TIA) to the County and the Virginia Department of Transportation (“VDOT”). Subject to County and VDOT acceptance of the submitted TIA, and the Applicant shall mitigate any additional impacts caused by such additional trips 1.3. In determining whether the uses collectively have an increased traffic impact for purposes of Proffer 1.2, the Applicant may use actual traffic counts for then existing uses on the Property in lieu of the estimates that were employed in the TIA, for determining background traffic at the time of site plan submission. Proffer 1.1 (revised), as proposed, the rezoning seeks to implement Comprehensive Plan policy for the future condition of Fairfax Pike (Route 277) as an “improved minor arterial roadway,” including the Plan identified 10-foot-wide multi-use trail along the roadway. Proffer 1.2 & 1.3, as proposed, seeks to address concerns with development of M1 allowed uses, specific to transportation impacts, beyond those uses studies (container service facility) and would aid to mitigate future transportation impacts depending on the use. Proffer 2 – Fire and Rescue: 55 Page 7 of 9 2.1. The Owner shall contribute to the Board the sum of $0.10 per square foot of gross floor area for fire and rescue purposes, payable upon the issuance of a building permit for each structure. Proffer 3 – Land Use: 3.1 M1- Light Industrial land uses are proposed in two (2) phases and shall be in conformance with the “General Development Plan”, prepared by Pennoni Associates Inc dated June 28, 2024. 3.2 The existing residential structure may be converted to a business use and will be allowed to remain as an existing nonconforming structure at time of Right- of Way dedication. Building gross square footage expansion will not be allowed for the existing nonconforming structure. All other future building construction and site improvements shall conform to current zoning requirements at time of permitting. 3.3 Existing on-site well and drain field facilities shall meet current Health Department design requirements and standards for the proposed business use. Necessary facility upgrades shall be required to be in place at time of building occupancy. 3.4 The following uses would be allowed, and all other M1 uses would be restricted: • Landscape and Horticultural Services • Offices and Storage Facilities for Building Construction Contractors, Heavy Construction Contractors and Special Trade Contractors • Professional, Scientific and Technical Services, including Business Offices not providing Proffers 3.4, 3.5, have been added to address stated concerns from the Planning Commission to limit potential allowed uses to reduce impact on adjoining properties. Proffer 3.6 has been added to mitigate potential impacts of the container service uses (hours of operation restrictions). Proffers 3.7 and 3.8 have been added to better address Plan policy specific to “high-quality architecture and site design.” Other recent rezoning application in the vicinity have committed to 100% of the road facing facades to be constructed of one or a combination of the following: cast stone, stone, brick, architectural block, glass, wood, dry vit or stucco. The buffer treatment along the roadway frontage is equivalent to other applications in the vicinity. 56 Page 8 of 9 services to the general public on a primary basis. • Business, Professional, Labor, Political and Similar Organizations • Public Administration and Government Support Buildings including Fire and Ambulance Services • Public Utilities • Truck or Fleet Maintenance Facilities • Self-Service Storage Facilities • Flex-Tech 3.5 The following conditional uses shall be allowed: • Tractor Truck and Tractor Trailer Truck Parking 3.6 Hours of operations shall be limited to 6 am to 8 pm Monday through Saturday. The repair and servicing operations shall be limited to the hours of 7 am to 5 pm. 3.7 A minimum surface area of twenty-five percent (25%) of the building façade facing Route 277 Fairfax Pike shall be constructed to contain one or a combination of the following: cast stone, stone, brick, architectural block, glass, wood, dry vit, or stucco. The proposed materials will be submitted to the county for review, comment, and approval during the permitting process. 3.8 10’ Landscape screen along the frontage of Rt 277 Fairfax Pike with a minimum landscaping density of three plants per 10 linear feet. The generalized development plan (GDP) dated April 24, 2024, is included below and identifies Phase I and Phase II use of the property. 57 Page 9 of 9 Planning Commission Summary and Action From the 09/04/24 Meeting: The Planning Commission held a public hearing on September 4, 2024. One (1) member of the public spoke in support of the proposed rezoning application. The primary discussion among the Planning Commission was the potential impact of the rezoning that as proposed may allow for any allowed M1 Zoning District use, some of which may have an impact on adjoining properties. The application was tabled to October 2, 2024 and the applicant was directed to address allowed uses, future right-of-way (ROW) for Route 277 to accommodate a trail section, hours of operation for a container service facility, and architecture and site design. Following a public hearing, staff is seeking a recommendation from the Planning Commission to forward to the Board of Supervisors on this rezoning application. 58