Loading...
05-24 Site Plan - Geometric PlanF.F.E. (710.94) HCP. F.F.E. (710.87) SH SH F.F.E. (710.98) CO F.F.E. (710.94) F.F.E. (710.94) CO GM WPP TRB STOP WTP WPP NP. WV INV. (7 0 3. 5 8) NP. 18" R C P CO TRB CO TRB CO CO WPP TRB WV WPP 15" PEAR COCOCO COCO CO 18" PEAR STREET STOP TRB 15" RCP INV. (703.96)MSPMPMPFH WV MLPMSP MLP MSP 15" RCPINV. (704.54)TRB THH 12" PEAR 12" PEAR CO 12" PEAR 12" PEAR 12" PEAR 12" PEAR 15" PEAR 15" PEAR 15" PEAR 15" PEAR 15" PEAR 15" PEAR MLP MLP NP.NP. INV . ( 7 0 5 . 3 7 ) STOP WV MB TRB THH 12" PEAR 15" MAPLE 18" MAPLE 1 5 " RCP INV . ( 7 0 4 . 8 8 ) WV THH WV WV BO WSPINV. (704.66)MSP WPPSTOP GA GA GA GA GA 15" RCP RIM (709.87) IN (700.17) OUT (699.97) 10" SWEETGUM 10" SWEETGUM 8" SWEETGUM SPD. 25 TR A/C A/C ROOF RIDGE (741.02) EX. W / L ( A P P R O X . - F R O M P L A N )EX. W /L (APPROX -FROM PLAN ) WV 6" PVC (SEWER SERVICE) DOOR DOORDOORDOOR DOOR DOOR DOOR DOOR DOOR DOOR DOORDOOR DOOR STEEL COLUMN (TYPICAL)EX. 8" (DATR) W/M (MARKED)EX. 6" (DATR) W/M (MARKED) E X . W /M ( M A R K E D )OFFICECONC.CONC. WALKMAIN DOOR INV. (7 0 3. 6 8) PIN 43-19-17 POLY PROCESSING CO., INC. DB 609 PG 864 ZONED: M1 USE: COMMERCIAL PIN 43-19-1D W. DEALTREY LIMITED PARTNERSHIP INST. 200015633 ZONED: M1 USE: COMMERCIAL PIN 43-19-48 GRANT INVESTMENT MANAGEMENT, LLC INST. 160012472 6.6358 ACRES ZONED: M1 USE: COMMERCIAL DI-3B TOP=707.60 IN=704.00 OUT=703.95 LOW PT. CEILING (725.65) ROOF LINE HIGH PT. CEILING (734.98) INTERIOR WALL LINE Mc G H E E R O A D ~ R T - 8 6 1 V A R I A B L E W I D T H V D O T R /W - 3 5 M P H ( P O S T E D ) A D T = 6 , 8 0 0 LENOIR DRIVE 60' VDOT RIGHT OF W A Y (35 MPH PSTD SPD L M T ) ONE STORY METAL WAREHOUSE ±78,315 SF TOTAL (±75,613 WAREHOUSE, ±2,702 OFFICE) ±30' BLDG HT S 42°24'11" W 718.21'N 47°35'49" W 459.99'C3 C4 L1 C5 C 6 C 1 C2CENTURY LANE60' VDOT RIGHT OF WAY( 35 MPH PSTD SPD LMT)RIM (707.47) IN (702.47) IN (701.87) OUT (701.77) RIM (707.47) IN (703.92) OUT (703.82) 75' BLDG S B C K75'BLDG SBCK 75' BLDG SBCK 25'BLDG SBCK5'PRKGSBCK10' PRKG SBCK 10'PRKGSBCK10' PRKG SBCK FH WV EX WV EX WV EX WV EX FH DITCH BTTM (APPROX) EX 20' PERM A N E N T E S M T INST# 0 2 0 0 1 6 2 7 9 EX 10' DRNG & U TI L E S M T ALON G A L L L O T LI N E S DB 88 8 P G 1 3 7 7 EX 10' DRNG & UTIL ESMT ALONG ALL LOT LINES DB 888 PG 1377 EX. 20' SANITARY ESMT INST# 060013903 RT 860 60' PUBLIC RIGHT OF WAY 15" TULIP POPLAR 8" TULIP POPLAR 10" TULIP POPLAR 10" SWEETGUM 10" PEAR 6" PEAR 12" PEAR 10" TULIP POPLAR 12" TULIP POPLAR 10" SWEETGUM EX SHRUB 79.26'182.52'195.75'49.61'1.1 EX1.2 1.0 166.33'69.17'PROPOSED 11,505 SF BUILDING EXPANSION (BLDG HT: 26' ABOVE FF, 30' ABOVE FG) A EX2 BLDG A5 8" SDR-35/26 LAT (PRIVATE) 8" SDR-35/26 LAT (PRIVATE)392OF 8" SDR-35 @ 0.41%A1 A2 A3 A4 8" SD R - 3 5 / 2 6 L A T ( P R I V A T E ) 8" SDR-35/25 LAT (PRIVATE)12'x45'LOADING SPACE12'x45'LOADING SPACE12'x45'LOADING SPACEPROP LGHT PROP LGHT 18' TYP25.86'26.04'25.28'9'TYP10 10 10 10 11 11 15 14 20'14'16'PROP TRASH ENCLOSUREEX1 BORE / JACK INSTALLATION 8" SDR-35/26 LATPROP 20'FW ESMT(2) PROP 5000 GAL GREASE TRAPS 15 LF NEW CG-6 7 LF NEW CG-6 7 LF NEW CG-6 10 LF NEW CG-6 REMOVABLE LOCKING BOLLARD W/ KNOX BOX 6" CONC BOLLARD 6" CONC BOLLARD CHAIN CHAIN PROP 20' FW ESMT 3 68 INV PROP TRANSFORMER PAD (SEE ELEC PLANS) PROP POWER POLE (SEE ELEC PLANS) CONDENSING UNITS ON CONC PAD CONDENSING UNIT ON CONC PAD (2) PROP 6" CONC BOLLARDS EXISTING PARKING PASSENGER AND TRUCK TRAFFIC EXISTING PARKINGPASSENGER TRAFFIC ONLY(2) PROP 6" CONC BOLLARDS AFTER TREE REMOVAL REPLACE CG-6 AS NEEDED AFTER TREE REMOVAL REPLACE CG-6 AS NEEDED 38 LF NEW CG-6 18.38'14.67'11.97' 10.31' PROP. 6' TALL BOARD FENCE DUMPSTER ENCLOSURE PROP. MIN 10' WIDE DOUBLE GATE EX. C&G TO REMAIN EX. CONC. TO REMAIN PROP. REINF. CONCRETE PAD 13.3' 4" SDR 35/26 GREASE TRAP VENT LINES 4" SDR 35/26 CLEANOUT FOR VENT LINE VENT PLUMBING CONNECTION WL "A" PROP 6" DOM WL PRO P 20' FW E S M T (2) PROP 6" GV EX 6" FIRELINE (TO REMAIN) (2) 45° PROP 6" GV CUT-IN BY CONTRACTOR 9' 1'1' END OF FW ESMT END OF FW OWNERSHIP BLDG MECH RM (SEE MEP/ARCH PLANS) 1- PROP. 4" FIRE MTR (6" SERVICE) 1- PROP. 4" DOM MTR (6" SERVICE) 1-PROP. 4" DOM BACKFLOW PREVENTERPROP20'FW ESMTPROP VARIED WIDTH FW ES MT FH PROP 6" FH ASSM 6x6x6 DIP TEE 2 - 6" GV CUT IN BY CONTRACTOR PROP 20' FW ESMT FH PROP 6" FH ASSM 8x8x6 DIP TEE 2-GV CUT IN BY CONTRACTOR 705705706707708709 70670770870971070 8 706 707 708 709 710709 710 70 8 7 0 97097087077 0 6 706711 710 709 708 707 70770 8 7 1 0 70 9 70 8 7 0 7 7 0 6 70 570570 6 707707708709710710 709 7 0 7 707 706707 7 0 9 707 708 7 0 7706 U:\Accounts\AMSRV\AMSRV23001 - 205 McGhee Road\DESIGN\_SHEETS\SP\CS4000.dwg PLOTTED: 8/20/2024 11:27 AM, BY: David Frank PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSAMSRV23001 AS NOTED TEAM 12-11-2023 WDHAPPROVED BY DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.049305-20-20242REVISED GREASE TRAP AND VAULTS07-02-20243RELOCATION OF SUMPSTER PAD AND ENCLOSUREMH07-16-20244GREASE TRAP VENT LINESMH KLM04-23-20241GREASE TRAP RELOCATIONKLM00 30'60' GRAPHIC SCALE 1"=30' APPROVED PERMIT SET ARCADIA MANAGEMENT LLC10645 N. TATUM BOULEVARD., 200-163 | PHOENIX, ARIZONA 85028SHOCKEY PROJECT FOR MANUFACTURING CONVERSIONPROJECTSHOCKEY CONSTRUCTION PROJECT - TM# 43-19-48SITE PLAN205 MCGHEE ROAD | WINCHESTER, VIRGINIA 22603GAINESBORO MAGISTERIAL DISTRICTGEOMETRIC PLAN CS4000 TOTAL SHEETS 17 NORT H 05/20/2024    (HEAVY DUTY) ASPHALT PAVEMENT NTS 1 1 2" SURFACE COURSE (SM 12.5A) 3" BASE COURSE (BM25) COMPACTED SUBGRADE 6" DENSE GRADED STONE (21B) PAVEMENT SECTION NOTE: HEAVY DUTY SECTION PROPOSED. MATCH EXISTING PAVEMENT SECTION. UTILITY NOTES: 1. ALL PROPOSED SANITARY SEWER AND STORM SEWER ARE PART OF PRIVATE SYSTEMS, EXCEPT FOR EX. MH THROUGH SANITARY MH "A". 2.FIRE METER AND DOMESTIC METER, BACK-FLOW DEVICES AND ASSOCIATED PIPING SHALL BE PER FREDERICK WATER INSPECTOR'S REQUIREMENTS. 3.EXISTING FIRE SERVICE REQUIRES COMPLIANCE WITH CURRENT FREDERICK WATER STANDARDS. INSIDE NEPTUNE PROSPECTUS III 4" METER IS REQUIRED, INSIDE BACK-FLOW PREVENTER SHALL REMAIN. 4.CONTRACTOR SHALL RE-VERIFY SANITARY INVERTS AT TIME OF CONSTRUCTION. 5.CONTRACTOR SHALL ADJUST FREDERICK WATER FACILITIES TO GRADE, PER FREDERICK WATER INSPECTOR'S REQUIREMENTS. 6.WATERLINE EASEMENTS ARE PROPOSED FOR ALL EXISTING WATERLINES, IDENTIFIED ON "ALTA/NSPS LAND TITLE SURVEY OF THE LAND OF GRANT INVESTMENT MANAGEMENT, LLC", DATED 10/23/2023, PREPARED BY MARSH & LEGGE LAND SURVEYORS, P.L.C., AND OTHER FREDERICK-WATER-PROVIDED PLAN INFORMATION, THAT ARE NOT CONTAINED WITHIN EXISTING EASEMENTS. 7.CONTRACTOR SHALL ADJUST FREDERICK WATER FACILITIES TO GRADE PER THE FREDERICK WATER'S INSPECTOR'S REQUIREMENTS. (HEAVY DUTY) CONCRETE DUMPSTER PAD NTS 7" - 4,000 PSI CONCRETE 8" DENSE GRADED STONE (21B) COMPACTED SUBGRADE 6" X 6" W2.9 W.W.F. WATERMAIN CUT-IN CONNECTION NOTES: CONTRACTOR SHALL: 1.TEST PIT EXISTING MAINS PER FREDERICK WATER INSPECTOR'S REQUIREMENTS. 2.INSTALL JOINT RESTRAINTS ON EXISTING WATER MAIN PER CURRENT FREDERICK WATER REQUIREMENTS, PRIOR TO SHUT-DOWN. 3.PREPARE WORK AS FAR IN ADVANCE AS POSSIBLE TO MINIMIZE SHUT-DOWN TIME. 4.HAVE SUFFICIENT RESOURCES ONSITE TO ACCOMPLISH TASK PER FREDERICK WATER INSPECTOR'S REQUIREMENTS. 5.PREPARE A WATER-SHUT-DOWN PLAN SATISFACTORY TO THE FREDERICK WATER INSPECTOR, FIREWATCH, NIGHT-TIME WORK, ETC., AS MAY BE REQUIRED. 6.SCHEDULE SHUT-DOWN WITH THE FREDERICK WATER INSPECTOR, FREDERICK COUNTY FIRE MARSHALL, AND ALL AFFECTED CUSTOMERS AT LEAST SEVEN (7) DAYS IN ADVANCE, AND MAKE PREPARATIONS AS REQUIRED BY ALL PARTIES. 7.REMOVE EXISTING WATER FACILITIES AS REQUIRED AND FURNISH TO THE FREDERICK WATER INSPECTOR. 8.TWO MJ LONG SOLID SLEEVES ARE REQUIRED. 9.ALL NEW PIPE SHALL BE CL52 DIP. GREASE TRAP NOTES: 1.TANK SECTIONS SHALL BE BOLTED TOGETHER. 2.WATERTIGHT BOLT-DOWN FRAME AND COVERS ARE REQUIRED. 3.PENETRATIONS SHALL HAVE BOOTS. 4.TANK COMPONENTS AND INSTALLATION SHALL BE TRAFFIC RATED. 5.CONTRACTOR SHALL COORDINATE INSTALLATION AND INSPECTIONS WITH BOTH FREDERICK COUNTY INSPECTIONS DEPARTMENT AND FREDERICK WATER.