Loading...
HomeMy WebLinkAbout09-18 135 Imboden Dr - PIN 54-7-14 - Stonewall - Backfile (2)SITE PLAN TRACKING SHEET Comment Sheets: GIS VDOT Frederick Water Winchester Inspections _ Stephens City _Public. Works Middletown Parks & Rec _ Airport Health Dept. Fire One copy of Site Plan application form Payment of site plan review fee One reproducible copy of Site Plan OPEN FILE: File Opened Reference Manual updated/number assigned D-base updated - (I Y' Scan documents to Planning S: drive I Application Action Summary updated Scan additional items as needed (Project Planner to direct) CLOSE FILE: Z t Approved (or denied) letter mailed to applicant/copy to file and cc's File stamped "approved", "denied" or "withdrawn" Reference Manual updated -1 � D-base updated Scanning updated Application Action Summary updated Sys ID# DATE. �'lJ RECEIVED FROM FOR �I ��.:. -12 10M CtiI J 1 , 00 7� �O� i 35 .L m bocAC-r-1 �r. ACCOUNT HOW PAID BEGINNING CASH BALANCE AMOUNT L CHECK PAID �? 1 BALANCE MONEY DUE ORDER BY (02001 R DT5-MMA S1657N-CL Please note: The site plans associated with this file are located in the file room. 0 COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/665-6395 July 2, 2018 John Lewis, PE Painter -Lewis, P.L.C. 817 Cedar Creek Grade, Suite 120 Winchester, Virginia, 22601 Re: Approval for Site Plan #09-18, Jennings Investments — 135 Imboden Drive Property Identification Number (PIN: 54-7-14) Dear Mr. Lewis: The above -referenced site plan was approved on July 2, 2018. The site plan is approved for an 12,928 square foot (SF) building addition (three (3) buildings) in the M1 (Light Industrial) District on huboden Drive in the Stonewall Magisterial District. Other site improvements include outdoor storage areas, security fencing, landscaping/screening and building -mounted lighting fixtures. All requirements of the Frederick County Zoning Ordinance have been met in the approved site plan, including review agency comments from all relevant review agencies. Attached are three (3) copies of the signed site plan from the Zoning Administrator. Please forward these copies to the appropriate representative(s). Furthermore, advise the owner(s) that a copy should be kept for future reference, and an approved copy must be kept on the construction site throughout the development process. Once site development is complete, the owner(s) should contact this office to schedule an on -site inspection. Do not hesitate to contact me if you have any questions or concerns. Sincerely, M. Tyler Klein, AICP Planner MTK/pd Attachments cc: Judith McCann -Slaughter, Stonewall Magisterial District Gary R. Oates & William H. Cline, Stonewall District Planning Commissioner Jane Anderson, Real Estate Commissioner of Revenue Jennings Investments, LLC, P.O. Box 3830, Winchester, VA 22604 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 0 COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/665-6395 February 21, 2018 John Lewis, PE Painter -Lewis, P.L.C. 817 Cedar Creek Grade, Suite 120 Winchester, Virginia, 22601 Re: Review Comments for Site Plan #09-18, Jennings Investments —135 Imboden Drive Property Identification Number (PIN: 54-7-14) Dear Mr. Lewis: Planning Staff has reviewed the above -referenced site plan to determine if administrative approval can be granted. At this time, administrative approval cannot be granted. This site plan may not be approved until the issues in this letter, as well as all issues of the other review agencies, have been adequately addressed. Please review Staff s comments listed below and then prepare a revised site plan which adequately addresses each concern. Review Comments: 1) Site Plan Reference Number. Include the site plan number, #09-18, on the Cover Sheet. 2) North Arrow. Add a north arrow to the vicinity and location maps on the Cover Sheet. 3) General Notes. The following revisions should be made to Sheet 1: • Parcel PIN: Update the parcel PIN to 54-7-14. • Site Address: Provide the site address of existing, and future buildings (assigned by Department of GIS). • Use: Update to "Existing/Proposed Use" and further specify "Commercial/Industrial." • Buffer Requirements: A Category B Type Buffer is required between the M 1 and MH 1 Zoning Districts. • Si na e: Cite the Zoning Ordinance Section number pertaining to signage; add a note that any changes to existing signage will require a separate (new) permit. • Previous Approvals: Add a note referencing approved Site Plan SP #26-85. 4) Sidewalks. A 5' sidewalk should be added from the exit on proposed building #2, see Staff markup on Sheet 4. 5) Outdoor Storage. Add a note that the proposed "Stone Yards" are "Outdoor Storage 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 Re: SP #09-18, Jennings Investments — 135 Imboden Drive February 21, 2018 Page 2 Areas." Provide additional details regarding the proposed "8' chain link fence with opaque panels." Per § 165-201.10 in no case shall chain -link fencing with slats be utilized for screening. 6) Buffers &Screening. Staff notes the buffer and screening presently shown on Sheet 11 would otherwise satisfy the Category B Type Buffer with a landscape screen (plantings plus 25' active and 75' active distance). Should the Applicant choose to pursue a Category B Type Buffer with a full screen, a 6' tall opaque screen or hedge would also be required as the "existing vegetation to be preserved for buffer screen" does not fulfill the requirements for a mature woodland (50') which may be counted as part of the screen requirements. The note referencing existing vegetation counting towards the buffer screen requirements should be removed. Staff supports the preservation of existing trees and shrubs on site. 7) Site Lighting. Please provide a Photometric Plan for the proposed wall -mounted lighting fixtures; include details regarding fixture type and cite the Zoning Ordinance section number under "General Notes," note 10 on Sheet 1. 8) Agency Approvals. Comment sheets (approvals) are required from the following agencies: the Virginia Department of Transportation (VDOT), the County Engineer (Public Works), Frederick Water (formerly FCSA), the Fire Marshall's office, the Geographic Inforn2ation Systems (GIS), and the Inspections Department. After you have revised the, please resubmit one (1) copy so that I may verify the information contained on the plan. I will need all approved review agency comment sheets and at least five (5) hard copies and one digital (PDF) of the final plan for approval. Do not hesitate to contact me if you have any questions or concerns regarding this letter. Sincerely, M. Tyler Klein, AICP Planner MTK/pd Attachment cc: Jennings Investments, LLC, P.O. Box 3830, Winchester, VA 22604 u PAINTER-LEWIS, P.L.C. CONSUL TING ENGINEERS 817 Cedar Creek Grade, Suite 120 Winchester, VA 22601 14 June 2018 Mr. Tyler Klein Frederick County Department of Planning and Zoning 107 North Kent Street Winchester, VA 22601 RE: 135 Imboden Drive Site Plan #09-18 Review Dear Tyler: tel.: (540)662-5792 fax.: (540)662-5793 email: office@painterlewis.com iJ JUN 1 5 2018 u' FREDE41CK COUNTY Your comments contained in correspondence dated June 4, 2018 have been addressed as follows: 1. The cut sheets for the proposed building mounted lights has been enlarged and an estimate of the foot candle limits has been added to Sheet 4. Along with this letter you will find a copy of the revised site plan. VERY TRULY YOURS, - John C. Lewis, P.E., C.L.A. Job No.: 1707044 Page - 1 �la� 1CGv"- REQUEST FOR SITE PLAN COMMENTS Frederick County Inspections Department Comment Mail to: Frederick County Inspections Department Attn: Building Official 107 North Kent Street Winchester, Virginia 22601 Hand deliver to: Frederick County Inspections Dept. 107 North Kent Street, 2nd Floor Winchester, Virginia 22601 Phone: (540) 665-5650 Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Please attach two (2) oopte§ of the Site Plan with this sheet t Applicant's Name: Painter -Lewis, P.L.C. Email Address: office@paintedewis.com Mailing Address: 617 Cedar creek Grade Suite #120 Winchester, Virginia 22601 Name of development and description of the request: 135 Imboden Drive Site Plan Feesability Location of Property: 135 Imboden Drive, Winchester, VA 22604 Department Comments: Telephone: 540-662-57 g2 -FREDERICK COUNTY INSPECTIONS DEPARTMENT USE ONLY - Date Received o2 / 2 Review Number 4 5 (circle one) Date Reviewed 41 a7 )1 k Cc( Z Y1 I $ Revision Required Date Approved Signature & Date Il �� - /1-,�"2��f� 4'2� ► it p Please Return %Form to A 1poalit }ie fit: s e y'44` u Sts 6 +ry e J .. !,�`r � n.y#��,¢r� ... , y _ � � v �,'Sa �. ,t�.�>. ,�` ...i � • t ... �'�'� , .S �' � n r.: ,3< <t ".f , �M: a4.6 !' , {, ,., � �.•, 1 _. ._ .�__ 18 0 0 Building shall comply with The Virginia Uniform Statewide Building Code Other codes that apply are ICC/ ANSI Al 17.1-2009 Accessible and Usable Buildings and Facilities and International Energy Code. Question on the use of the buildings as defined in 2012 Virginia Building Code. Building shall maintain height and area as required under T503 for its intended use. Distance to the property line or additional buildings appear ok per T601/602 Main entrances leading into conditioned space 3000 sq ft or larger requires vestibles per 2012 Virginia Energy Code. Accessible parking is provided at each facility. Accessible route shall be provided from parking/unloading area to main entrance or entrances. Maximum threshold at door is 11/2". Maximum slope of landing at door is 2%. Maximum slope for walkways is 5%. Question on Building #4 accessible route to main entrance. Question on Building #2 accessible route at curb area at accessible parking area Question on Building #3 threshold Please note the requirements in Chapter 17 of BOCA for special inspection requirements on the type of structure ( Soils, concrete etc.) Compaction/soil bearing/soil testing shall be required for placement of new store. 6/28 Building #4 — accessible route from unloading area shall be free of obstruction and offer clear access from unloading area to curb ramp — Minimum access aisle shall be 48" Building #2 — 60% of all entrances shall be accessible. Question on stair entrance. s:\site plan comments\2012\imboden drive .doe d FREDERICK FREDERICK WATER WATER SITE PLAN "VIEW COMMENTS PO Box 1877, Winchester, VA 22604-8377 540.868.1061 voice 315 Taskeerr Road, Stephens QCity, ,(V�A 22655 540.868.1429 fax Project, Applicant REVIEW STATUS attention "TIN �,�N,� review number -Z correct &resubmit approved as noted number of items to be corrected approved may submit just cover sheet and the revised sheets. DRAWINGS g send me by4 1. print of sheets ++ 2. two CDs: each disc shall contain the following plan sheets 1 a) One CD (containing all of the above noted sheets) shall be in Pj�F, format. Each sheet shall be in its own file and be in landscape orientation. Each file shall be titled with the project name and appropriate sheet number. b) One CD shall be in Llsformat; (1) in Model Space, (2) in state plane coordinate system NAD 83, (3) compatible with AutoCAD 2006. c) Each of the two CDs shall be labeled with its format prom name, and placed in its own paper CD envelope. EASE M NTS DY IN A copy of the recorded onsite FW easement(s) is/are required. Y N A copy of the recorded offsite FW easement(s) is/are required. The easement document shall contain a plat and both shall be signed by the Frederick Water. o The Frederick Water requires specific language in its deed of easement. o Visit our website www.firederickwater.com to obtain a copy of the form. o A copy of the recorded deed(s) of easement shall be received before service will be authorized. OTHER Y(/NO This project also requires DEQ - Valley Region Office approval. Y!N / This project also requires VDH — Lexington Field Office approval. N This project also requires VDH — Lexington Field Office — Project Summary Report. BY DATE FOR DRAWINGS ABOVE, see VDH website for form Y�/ N / This project has a sewer pump station that FW will own. Title to the pump station site shall be granted �/ to the Frederick Water in fee simple absolute. Also, (1) a copy ofDEQ's Certificate to Construct, (2) a copy of DEQ's Certificate to Operate, and (3) two copies of the FW approved O & M manual are required. These documents must be received before service will be authorized. (4) Work cannot commence that would connect to FW facilities or require FW inspections until the contract is returned to is office. I Date: 5 j5' kv Earl W. Wiley — Engi Bring Assistant JAN 18 0 0 Frederick County Department of Fire and Rescue Office of the Fire Marshal 1080 Coverstone Urine Winchester, VA 22602 (540) 665-6350 Fax: (540) 678-4739 Email: fmoOkvs.us Plan Review & Comments Date Received 2/12/2018 Plan/Permit Type Site Plan 02.12-18 Name 135 Imboden Drive Address 135 Imboden DR Winchester Project Name Site Plan 02-12-18 Applicant Name & Number Painter -Lewis, PLC 540-662-5792 RE# Permit Number Emergency Vehicle Access: Adp4luate Inadequate N/A Hydrant Locaton: Ade ate Inadequate N/A Siamese Location: Adequate Inadequate Fire Lanes Required: ' 4r No NIA Plan Approval Status Approve Comments Areas hl lighted In yellow shall be striped in yellow Areas hi lighted In orange shall have No Parking Fire Lane signs installed Signature: Reviewed By: . Kenneth Scott, Jr. Title: `� Date Reviewed 2114=18 VA 22602 0 REQUEST FOR SITE PLAN COMMENTS Request for Street Name Comment Mail to: Frederick County Information Technologies, GIS Division Attn: GIS Manager 107 North Kent Street, Winchester, Virginia 22601 Hand deliver to: Frederick County Information Technologies, GIS Division 107 North Kent Street, I" Floor Winchester, Virginia 22601 Phone: (540) 665-5614 Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the Site Plan with this sheet. Applicant's Name: Painter -Lewis, P.L.C. Mailing Address: 817 Cedar Creek Grade, Suite 120 Winchester, VA 22061 Name of development and/or description of the request: 135 Imboden Dr Location of Property: 135 Imboden Dr Tax Man Number 54-7-14 GIS Manager Comments: Telephone: Based on the Site Plan Drovided we have issued preliminary Addresses as the followi (540)662-5792 Phase 1:137 Imboden Dr. Phase ll: 141 Imboden Dr. Phase III: 139 Imboden Dr. Any changes to the layout will require review of assigned Preliminarys. Official Addresses assigned with Bld Permits. -GIS MANAGER USE ONLY - Date Received 2018-05-15 Review Number 1 2 3 4 5 (circle one) Date Reviewed MT6-5y— Revision Required No „ , / Date Approved 2018-05-29 Signature & Date: ** Please Return Form to Applicant** 17 I June 22, 2018 Mr. John C. Lewis Painter -Lewis, P.L.C. 817 Cedar Creek Grade Winchester, Virginia 22601 RE: Revised Site Plan Comments — 135 Imboden Drive Frederick County, Virginia Dear Mr. Lewis: COUNTY of 1F'REDERICK Department of Public Works 5401665-5643 FAX: 540/ 678-0682 Upon review of the revised site plan dated June 14, 2018, we recommend approval of the subject plan. Joseph W. Johnson, P.E. Civil Engineer JCW/kco cc: Planning and Development file Sincerely, Joe C. Wilder Director of Public Works 107 North Kent Street, Second Floor, Suite 200 • Winchester, Virginia 22601-5000 John Lewis From: Timothy Rhodes <timothy.rhodes@vdot.virginia.gov> Sent: Friday, June 29, 2018 11:49 AM To: John Lewis Cc: Matthew Smith; Rhonda Funkhouser; Tyler Klein; Edwin Carter Subject: 135 Imboden Drive Commercial Entrance Site Plan John, A VDOT review has been conducted for the 135 Imboden Drive Site Plan signature dated June 14, 2018. Based off of the review of the Drawings, all of the previous VDOT comments have been addressed and the Site Plan is approved by our office. Please ensure that all applicable agencies have the most recent set of approved Drawings. We offer the following general comments: Our review and comments are general in nature. Should details be overlooked during plan review or conditions in the field exist such that additional measures are warranted, such measures shall be completed to the satisfaction of the department. Materials used and methods of construction shall adhere to the current observed VDOT Road and Bridge Specifications, Road and Bridge Standards, Manual on Uniform Traffic Control Devices, and Land Use Permit Special Provisions. A preconstruction conference shall be held by the engineer and/or the developer with the attendance of the contractor, various County agencies, utility companies, and VDOT prior to initiation of work. All drainage is to be carried within the right-of-way in ditch lines or gutters along the street to a pipe or drainage easement. Any construction related changes to the approved plan must come through the design engineer to VDOT for approval. Please allow a minimum of 5 business days for VDOT review. 0 0 A Land Use Permit shall be obtained before any work is performed on the State's right-of- way. The permit is issued by this office and may require application fees, the salary & expenses of a State assigned inspector, and surety bond coverage. If you have any questions or need further information, please do not hesitate to contact me. Sincerely, Timothy Rhodes VDOT—Land Development Engineer Clarke, Frederick, Shenandoah & Warren Counties 14031 Old Valley Pike Edinburg, VA. 22824 (540)-984-5630 0 0 PAINTER-LEWIS$ P.L.C. CON5UL77NGENGINEER5 tel.: (540)662-5792 817 Cedar Creek Grade, Suite 120 fax.: (540)662-5793 Winchester, VA 22601 email: office@painterlewis.com 30 May 2018 Mr. Tyler Klein Frederick County Department of Planning and Zoning 107 North Kent Street Winchester, VA 22601 RE: 135 Imboden Drive Site Plan #09-18 Review Dear Tyler: Your comments contained in correspondence dated February 21, 2018 have been ad- dressed as follows: 1. The site plan reference number has been added to Sheet 1. 2. North arrows have been added to the maps on Sheet 1. 3. The PIN number has been updated. The addresses are shown on Sheet 1. The uses have been updated. A Category C buffer is shown. Notes regarding signs and lighting have been added to Sheet 1. The previous site plan number has been added to Sheet 1. 4. A sidewalk has been added to Building #2. 5. The stone yards have been relabeled as outdoor storage. A fence detail has been added to Sheet 8. 6. The landscape plan has been revised to include deciduous trees and opaque fencing. 7. Light spec and photometric pattern is shown on Sheet 4. 8. Agency approvals are forthcoming. Along with this letter you will find a copy of the revised site plan. VERY TRULY YOURS; John C. Lewis, P.E., C.L.A. Job No.: 1707044 Page - 1 4 0 1 2 SITE PLAN APPLICATION - Office Use Only - Date Application Received: e7 1 io I Application #: °o I� Fees Received: 3 16o ' Receipt #: 1 � y � � � Initials: Project Title: 135 Imboden Drive Project Description: Proposed Site Plan 3. Location of Property: 135 Imboden Drive (Street address) 4. Applicant/Designer: Name: Painter -Lewis, P.L.C. Telephone: 540-662-5972 Primary Point of Contact: John Lewis email: office@painterlewis.com Address: 817 Cedar Creek Grade, Suite #120, Winchester, VA, 22601 5. Property Owner (if different than above): Name: Jennings Investments, LLC Address: P.O. Box 3830 Winchester, VA 22604 6. Property Information: a. Property Identification Number: b. Total acreage of the parcel to be developed: C. Total disturbed area of the parcel: d. Present Use: e. Proposed Use: f. Magisterial District(s) 8 Telephone: 540-722-9395 54-7-14 3.03 2.165 M1 Commercial M1 Commercial Stonewall • 10 7. Site Plan Type: a. Is this an original or new site plan? Yes Iy I No b. Is this a revised site plan? Yes 1 r L No If yes provide all previous site plan numbers: C. Is this a minor site plan? Yes n No i • 1 If yes provide all previous site plan numbers: 8. Zoning Information: a. Current Zoning: (M1) Commercial b. Was this property Rezoned? Yes No C. If yes provide the rezoning number for this property: d. Are there any proffers for this property? Yes No e. Has a MDP been approved for this property? Yes No f. If yes provide the MDP number for this property: 9. Adjoining property zoning and use: USE ZONING North Mobil Home Park MH1 East Commercial M1 South Commercial M1 West Commercial M1 I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also der tand)hayall/jequired material will be complete prior to the submission of my site plan. r Signature: Name (Printed): J Lewis Date: 2-12-2018 9 • SITE PLAN APPLICATION CHECKLIST The checklist shown below specifies the information which is required to be submitted as part of the site plan application. The Department of Planning & Development will review the application to ensure that it is complete prior to accepting it. If any portion of the application is not complete, it will be returned to the applicant(s). (1) One (1) set of approved comment sheets are required from each relevant review agency prior to final approval of a site plan. It is recommended that applicants contact the Department of Planning & Development to determine which review agencies are relevant to their site plan application. A list of potentially relevant review agencies is shown below: Frederick County Department of Planning & Development Virginia Department of Transportation (VDOT) Department of GIS (Geographic Information Services) 21 Frederick Water 121 Frederick County Building Inspections Department Frederick County Department of Public Works Frederick County Fire Marshal Virginia Department of Health Frederick County Department of Parks & Recreation FCity of Winchester ElTown of Stephens City Town of Middletown Winchester Regional Airport Authority Frederick County Public Schools (for residential plans) ✓� (2) One (1) copy of the Site Plan application form. ❑✓ (3) Payment of the site plan review fee. (4) Two (2) copies of the site plan for review. (5) Completed Special Limited Power of Attorney (original). I r l (6) Traffic Impact Analysis (if applicable). 10 E • SITE PLAN CHECKLIST The Site Plan Checklist, shown below, lists the information which is required to be on each site plan. Site plans which are incomplete or missing information will be returned to the applicant (s) for revision. Project Information Section (1) A title that includes the name of the proposed or existing business and a subtitle which describes the proposed development. (2) The name, address, and phone number of the land owner, developer, and designer. (3) The Frederick County Property Identification Number (PIN) of all lots included on the site plan. (4) The number and type of dwelling units included on the site plan for residential uses. (5) The total land area and total developed land area of all lots included on the site plan. (6) A detailed description of the proposed use or uses of the development, as well as a description of the existing use or uses. (7) A reference to any other site plan, master development plan approved by the county for the site. (8) The date the site plan was prepared and a list of all revisions made, including the date and a description of why the site plan was revised. (9) A table of contents including all pages of the site plan. (10) A list of all proposed utility providers, with their address and phone number. (11) A location snap showing the location of the site, along with the location of streets, roads and land uses within five hundred (500) feet of the property. (12) A statement listing all requirements and conditions placed on the land included in the site plan resulting from approval of conditional zoning or a conditional use permit. (13) A description of setbacks or conditions placed on the site as a result of an approved variance. 7 (14) The name of the Magisterial District the property is located within. Calculations Section (15) Calculations showing the Floor Area Ration (FAR) of the site, including the maximum allowed FAR, total ground floor area, total floor area, and total lot area. (16) Calculations showing the total number of required and proposed parking spaces, 11 E • Application Process Evaluation We would like to learn how we might improve this process. Please complete this form and submit it to the Planning Department. You can submit it to us separately from the application if you wish. You may submit it anonymously. Which type of application did you com lete? Rezoning Site Plan ✓ Master Development Plan Subdivision Conditional Use Permit �_ Variance 2. Which part, if any, of the application process did you find particularly difficult? (Check as many as you wish) Completing the application form Tax verification Agency review comments Adjoiner identification information Other (Please Specify) 3. Did you have a discussion with a staff member before submitting the application? Yes_❑_ Not_ 4. Were you able to receive the assistance or information that you needed from the staff? Yes ❑ NoF—I 5. What portion of this process took the longest for you? Completing plans Completing the application Tax Verification Agency review comments Other (Please Specify) 6. What do you think could have been done differently to make this process quicker? 7. Do you have any suggestions about what we could do to make this process work better? including the total number of existing and proposed spaces. (17) Calculations showing the total number of required handicap spaces, including the total number of existing and proposed spaces. (18) Calculations showing the total number of required loading spaces, including the total number of existing and proposed spaces. (19) Calculations showing the total number of required perimeter and interior trees required, including the number of provided trees. (20) Calculations showing the percentage of the property that will be landscaped and the percentage of woodlands disturbed. (19) Calculations showing the total number of required perimeter and interior trees required, including the number of provided trees. Site Plan & Details Section (21) The location of all adjoining lots with the owner's name, specific use, zoning, and zoning boundaries shown. (22) The location of all existing or planned right-of-ways and easements that are located on or adjoin the property, with street naives, widths, and speed limits shown. (23) All nearby entrances that are within two hundred (200) feet of any existing or proposed entrances to the site. I r l (24) All existing and proposed driveways, parking and loading spaces, parking lots and a description of surfacing material and construction details to be used. The size and angle of parking spaces, aisles, maneuvering areas, and loading spaces shall be shown. (25) A North arrow. (26) A graphic scale and statement of scale. A legend describing features description. (27) all symbols and other that need (28) A boundary survey of the entire parcel and all lots included with distances described at least to the nearest hundredth of a foot. (29) The present zoning of all portions of the site, with the location of zoning boundaries. (30) The location of all existing and proposed structures, with the height, specific use, ground floor area, and total floor area labeled. (31) The location of all existing and proposed outdoor uses, with the height, specific use, and land area labeled. (32) Existing topographic contour lines at intervals acceptable to the Zoning Administrator. Proposed finished grades shall be shown by contour. 12 (33) The location of the front, side, and rear yard setback lines required by the applicable zoning district. (34) The location and boundaries of existing environmental features, including streams, floodplains, lakes and ponds, wetlands, natural stormwater retention areas, steep slopes, and woodlands. W(35) The location of outdoor trash receptacles with details for all required screening elements. _W (36) A Photometric Plan per § 165-201.07. 7— (37) The location, dimensions, and height of all signs. (38) The location of required buffers, landscaping buffers, and landscaped screens, including examples, typical cross sections or diagrams of screening to be used. The location and dimensions of required fencing, berms, and similar features shall be specified. Fv—(]— (39) The location of recreational areas and common open space. I I (40) The location of all proposed landscaping with a legend. The caliper, scientific name, and common name of all deciduous trees. The height at planting, scientific name, and common name of all evergreen trees and shrubs. ❑� (41) The height at planting, caliper, scientific name, and common name shall be provided for all proposed trees. The height at planting, scientific name and common name shall be provided for all shrubs. FVI(42) The location of sidewalks and walkways, including all sidewalks or bicycle paths required along any road right of way. FVI(43) The location and width of proposed easements and dedications. (44) A stormwater management plan describing the location of all stormwater management facilities with design calculations and details. (45) A soil erosion and sedimentation plan describing methods to be used. I V I (46) The location and size of sewer and water mains and laterals serving the site. 13 (47) Facilities necessary to meet the requirements of the Fire Code. (48) A signed seal of the certified Virginia land surveyor, architect, or engineer who prepared the plan. The seal and signature of the engineer, surveyor or architect shall be on each sheet of the site plan. ❑� (49) A space labeled "Approved by the Frederick County Zoning Administrator" for the signature of the Zoning Administrator, approval date, and a statement that reads "site plan valid for five (5) years from approval date." (50) All requirements specified elsewhere in the County Code, including but not limited to the Subdivision Ordinance. 14 REQUEST FOR SITE PLAN COMMENTS Frederick County Department of Planning & Development Mail to: Frederick County Department of Planning & Development 107 North Kent Street Winchester, Virginia 22601 Phone: (540) 665-5651 Hand deliver to: Frederick County Department of Planning & Development 107 North Kent Street, 2nd Floor Winchester, Virginia 22601 Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the Site Plan with this sheet. Applicant's Name: Painter -Lewis, P.L.C. Telephone: 540-662-5792 Email Address: office@painterlewis.com Mailing Address: 817 cedar creek Grade Suite #120 Winchester, Virginia 22601 Name of development and description of the request: 135 Imboden Drive Site Plan Feesability Location of Property: 135 Imboden Drive, Winchester, VA 22604 Department of Planning & Development Comments: -PLANNING DEPARTMENT USE ONLY - Date Received Review Number 1 2 3 4 5 (circle one) Date Reviewed Revision Required Date Approved Signature & Date: ** Please Return Form to Applicant** 16 Special Limited Power of Attorney County of Frederick, Virginia Frederick Planning Website: www.fcva.us Department of Planning & Development, County of Frederick, Virginia 107 North Kent Street, Winchester, Virginia 22601 Phone (540) 665-5651 Facsimile (540) 665-6395 Know All Men By These Presents: That I (We) (Name) Jennings Investments, LLC - Chris Jennings (Address) P.O. Box 3830 Winchester, VA 22604 (Phone) 540-722-9395 the owner(s) of all those tracts or parcels of land ("Property") conveyed to me (us), by deed recorded in the Clerk's Office of the Circuit Court of the County of Frederick, Virginia, by Instrument No. on Page Parcel: 54 Lot: Block: Section: do hereby make, constitute and appoint: (Name) Painter -Lewis, P.L.C. and is described as Subdivision: (Address) 817 Cedar Creek Grade, Suite #120, Winchester, Virginia, 22601 (Phone) 540-662-5792 To act as my true and lawful attorney -in -fact for and in my (our) name, place and stead with full power and authority I (we) would have if acting personally to file planning applications for my (our) above described Property, including: _=Rezoning (including proffers) _Conditional Use Permit Master Development Plan (Preliminary and Final) Subdivision F Site Plan Variance or Appeal My attorney -in -fact shall have the authority to offer proffered conditions and to make amendments to previously approved proffered conditions except as follows: This authorization shall expire one year from the day it is signed, or until it is otherwise rescinded or modified. In witness thereof, we) have hereto set my (our) hand and seal this 12 day of February 2018 Signature(s)er� State of Virginia, City/County of Frederick To -wit: I, _ �t,a Lfc-1 ',, A rr bunse , a Notary Public in and for the jurisdiction aforesaid, certify that the�gperson(s) who signed to the foregoing instrument personally appeared before me and has ackn/gct same before me in the jurisdiction aforesaid this 211i& day of 2018_. 1(0) 4 l Public JENNIFER R AMBROSE NOTARY PUBLIC REGISTRATION k 7511207 Commission Expires: Qt 'em p &, Q09 Y MY COMMISSION EXPIRES DECEMBER 31, 2019 u • Rccument Approval ForIn L �D Y i F F 9 1 F 2ntg PLEASE REVIEW THE ATTACHED DOCBfEh'T: YOUR IF TKISDOCUI�I�T'h�IEETS APPROVAL PLEASE IfaITFA.I, ,�]� PROVIDE THE DATE AND�,i-�,i.E QE YOUR APPROVAL. T Initials Date & Time Candice Mark have � 1 Tyler, 2 i 6 18 Mike John COMMENTS: Sp -�( 0q -~ l8 .- CC lk-�K I /A dfc�;e - Received by Clerical Staff (Date & Time): (S:OtrIce on MckborlFormsWocument Approvstporm-61712016) OK 0Lf 7, 0 TILANSIIITTAL 2/12/2018 Job # : 1707044 Jennings Investment DISTRIBUTE TO: Frederick County Painter -Lewis, P.L.C. 817 Cedar Creek Grade, Ste. 120 Winchester, VA 22601 P:540-662-5792 F:540-662-5793 officegpainterlewis.com FROM: Mr. John C. Lewis FOR: ( )Submittal, Review & Comments ( )Revisions ( )Approval & Signature ( ) Other: QUANTITY DESCRIPTION 1 Site Plan Application 1 Site Plan Application Checklist 1 Special Limited Power of Attorney 1 Check: from CS,3e4Nv\ty� a Check # .37(o7 Amount $3,100.00 1 Application Process Evaluation 2 Copies of the Site Plans 1 Request for Comments SIGNATURE LINE STAFF JCL JCL JCL JCL JCL JCL JCL