Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
18-19 FCPS (Sherando High School) Addition to Front - PIN 86-A-117 - Opequon - Backfile (2)
Please note: The site plans associated with this file are located in the file room. FREDERICK COUNTY 107 N KENT ST AINCHESTER, VA 22601 SALE MID: 9950 Store: 4073 Term: 2901 REF#: BMW Batch #: 005 RRN: 913013603235 05110/19 09:29:14 Trans ID: 309130485548012 APPR CODE: 069864 VISA C AMO UNT $1,500.00 I APPROVED VISA CREDIT AID: A0000000031010 TVR: 00 00 08 80 00 TSI: F8 00 FREDERICK COUNTY PLANNING AND DEVELOPMENT 107 N. Kent St. Suite 202 Winchester, VA 22601 One Time Credit Card Payment Authorization Form Frederick County Imposes a Surcharge of 2.75% for the use of Credit Cards NO CHARGE FOR DEBIT Please complete the information below: CARDHOLDER NA ADDRESS �00vr.,Tl0170 DATE c� �/ C) -/ Please accept payment for the following fee(s) by credit card as noted below: © Description Codes Amount Sale of Planning Booklets (PCOI) - Sale of GIS Mapping (10DL) Miscellaneous Items (2009) Bond Management Fees (BMFEES) Zoning Applications i i (ZASP) S60 00 Septic Hauler Permit (10FY) Septic Hauler Permit (10FY) Sewage Installation (10FZ) Residential Pump & Haul (TOGA) Subtotal Oa $ 2.75% Surcharge + Total f QQ.. SITE PLAN TRACKING SHEET Comment Sheets: , GIS VDOT Frederick Water Winchester Inspections Stephens City Public Works Middletown Parks & Rec.port Health Dept. Fire One copy of Site Plan application form ✓ Payment of site plan review fee ✓ One reproducible copy of Site Plan OPEN FILE: < ll File Opened Reference Manual updated/number assigned to D-base updated ' �IL Scan documents to Planning S: drive Application Action Summary updated Scan additional items as needed (Project Planner to direct) CLOSE FILE: (JL a1 Approved (or denied) letter mailed to applicant/copy to file and cc's File stamped "approved", "denied" or "withdrawn' Lt Reference Manual updated D-base updated Scanning updated 1 L Application Action Summary updated , Sys ID # COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 June 27, 2019 Bill Shelton, PE OWPR 200 County Club Drive SW Plaza One Building E Blacksburg, VA 24060 Re: Approvals for: Site Plan #16-19 — FCPS Millbrook HS Security Enhancements Site Plan #17-19 — FCPS Apple Pie Ridge ES Security Enhancements Site Plan #18-19 — FCPS Sherando HS Security Enhancements Property Identification Number (PIN): 55-A-22, 42-6-A & 86-A-117 Dear Mr. Shelton: The above -referenced site plans were approved on June 27, 2019. The site plans are approved for security enhancements to existing public school facilities including: • Millbrook HS (279 Square Feet — Stonewall District); • Apple Pie Ridge ES (107 SF— Gainesboro District); and • Sherando HS (294 SF — Opequon District) All requirements of the Frederick County Zoning Ordinance have been met in the approved site plan, including review agency comments from all relevant review agencies. I am providing you with three (3) copies of each approved site plan. Please forward these copies to the appropriate representative(s). Furthermore, advise the owner(s) that a copy should be kept for future reference, and an approved copy must be kept on the construction site throughout the development process. Once site development is complete, the owner(s) should contact this office to schedule an on -site inspection. Do not hesitate to contact me if you have any questions or concerns. Sincerely, M. Tyler Klein, AICP Senior Planner MTK/pd 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 • • Attachments cc: Judith McCann -Slaughter, Stonewall District Supervisor J. Douglas McCarthy, Gainesboro District Supervisor Robert W. Wells, Opequon District Supervisor Gary R. Oates & William H. Cline, Stonewall District Planning Commissioners Kevin W. Kenney, Charles E. Triplett, Gainesboro Planning Commissioner Roger Thomas and Robbie Molden, Opequon District Planning Commissioners Jane Anderson, Real Estate Commissioner of Revenue Kenneth Scott, Frederick County Fire & Rescue (email) Frederick County School Board, 1415 Amherst St., Winchester, VA 22601 John Lee, Frederick County Public Schools (email) ov (PK ARCHITECTS AND ENGINEER! June 14, 2019 Frederick County Department of Planning and Development 107 North Kent Street, 2"d Floor Winchester, VA 22601 RE: Review Comments for Minor Site Plan #18-19 — Sherando High School Entrance Security Enhancements Property Identification Number (PIN): 86-A-117 A/E Comm: 2018-071 Dear Mr. Klein, Thank you for your review of the plan drawings for the above referenced project. The enclosed submittal package has been revised in accordance with the review comments dated May 13, 2019. The following is a comment response letter and a discussion of any changes required. 1. Site Plan Reference Number. Add the Site Plan #18-19, to the plan set. Site Plan #18-19 has been added to the plan set titleblock. 2. Previous Approvals. Add a note specifying "Previously Approved Plans" specifically Site Plan (SP) #22-91. General Note #16 regarding previously approved plans has been added to the drawings. 3. General Notes. Revise the note 12 regarding disturbance to existing landscaping as one Ti) tree is proposed to be removed as part of the demolition plans. On Sheet 2 further specify in a note that the tree will need to be relocated elsewhere on site. The Applicant may further demonstrate that the required landscaping for the site is exceeded by current plantings on -site and that the removal of one (1) tree does not impact the required landscaping. General Note #12 has been revised and the tree has been specified to be relocated. 4. Buildina Addition. Add a note specifying the total square footage (SF) of the building addition. The square footage of the addition has been added to the plan on Sheet C 102. 5. Agency Approvals. Comment sheets (approvals) are required from the following agencies: the Building Inspections Department, The County Engineer (Public Works), and the Fire Marshal. Approvals from all agencies have been forwarded via e-mail. ■ 200 Country Club Drive SW • Building E ■ Blacksburg, Virginia 24060 ■ P: 540-552-2151 ■ F: 540-951-0219 ■ • 5550 Winchester Avenue ■ Berkeley Business Park • Suite 5 ■ Martinsburg, West Virginia ■ P: 304.381.8541• - www.owpr.com ■ Ov (PR ARCHITECTS AND ENGINEERS Please review the attached revised plan drawings. If you have any questions, please do hesitate to contact me blawrence0owpr.com. Sincerely, & m4do A M U.-I Brendan T. Lawrence, P.E. ■ 200 Country Club Drive SW ■ Building E ■ Blacksburg, Virginia 24060 ■ P: 540-552-2151 ■ F: 540-951-0219 ■ ■ 5550 Winchester Avenue ■ Berkeley Business Park ■ Suite 5 ■ Martinsburg, West Virginia ■ P: 304.381.8541■ ■ www.owpr.com ■ REQUEST FOR SITE PLAN COMMENTS Frederick County Fire Marshal Comment Mail to: Frederick County Fire Marshal Attn: Fire Marshal 1080 Coverstone Drive Winchester, Virginia 22602 Hand deliver to: Public Safety Building 1080 Coverstone Drive Winchester, Virginia 22602 Phone: (540) 665-6350 Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the Site Plan with this sheet. Applicant's Name: William A. Shelton Email Address: bshelton@owpr.com Mailing Address: 200 Country Club Dr. SW Plaza One, Building E Blacksburg, VA 24060 Name of development and description of the request: FCPS - Entrance Security Enhancements - Sherando High School Addition to front entrance for security Location of Property: Sher ando High School 185 South Warrior Dr. Stephens City, VA 22655 Fire Marshal Comments: Telephone: (540) 552-2151 -FREDERICK COUNTY FIRE MARSHAL USE ONLY - Date Received _ Review Numbe 1 2 3 4 5 (circle one) Date Reviewed Revision Required Date Approved Signature &Date: ** Please Return Form/ to Applicant** 25 MAY 0 7 WS Frederick County Department of Fire and Rescue Office of the Fire Marshal 1080 Coverstone Drive Winchester, VA 22602 (540) 665-6350 Fax: (540) 678-4739 Email: fmo(feva. us Plan Review & Comments Date Received 5/7/2019 Plan/Permit Type Name Sherando High School Address 185 South Warrior DR Project Name Applicant Name & Number RE# Permit Number Site Plan 05-07-19 Stephens City Entrance Security Enhancements OWPR 540-552-2151 Emergency Vehicle Access: Adequate Inadequate A Hydrant Location: Adequate Inadequate A Siamese Location: Adequate Inadequate N Fire Lanes Required: Yes No N A Plan Approval Status Approve Comments Signature: Reviewed By: Kenneth Scott, Jr. Title: 6�� Date Reviewed 5/15/2019 VA 22655 COUNTY of FREDERICK Department of Public Works 540/ 665-5643 FAX: 540/678-0682 June 25, 2019 Mr. William A. Shelton, P.E. OWPR Architects and Engineers 200 Country Club Drive, SW Plaza One, Building E Blacksburg, Virginia 24060 RE: Site Plan Comments — Sherando High School Entrance Security Enhancements Dear Mr. Shelton: Upon review of the site plan dated May 2, 2019, we recommend approval of the subject plan. Joseph W. Johnson, P.E. Civil Engineer JCW/kco cc: Planning and Development file Sincerely, Joe C. Wilder Director of Public Works 107 North Kent Street, Second Floor, Suite 200 • Winchester, Virginia 22601-5000 8 RECE1 D REQUEST FOR SITE PLAN COMMENTS aiiblic Works e+!n9r59Ctions Frederick County Inspections Department Comment Mail to: Frederick County Inspections Department Attn: Building Official 107 North Kent Street Winchester, Virginia 22601 Hand deliver to: Frederick County Inspections Dept. 107 North Kent Street, 2nd Floor Winchester, Virginia 22601 Phone: (540) 665-5650 Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the Site Plan with this sheet. Applicant's Name: William A. Shelton Email Address: bshelton@owpr.com Mailing Address: 200 Country club Dr. SW Plaza One, Building E Blacksburg, VA 24060 Name of development and description of the request: FCPS - Entrance Security Enhancements - Sherando High School Addition to front entrance for security. Location of Property: Sherando High School 185 South Warrior Dr. VA 22655 Comments: Telephone: (540) 552-2151 -FREDERICK COUNTY INSPECTIONS DEPARTMENT USE ONLY - Date Received 511 o l 19 Date Reviewed Revision Required No Signature & Date: - �, Review Number 1 2 3 4 5J (circle one) D to Approved ** Please Return Form to Applicant** 18 • • Pam Deeter To: Judy McCann -Slaughter; J Douglas McCarthy; Robert Wells; Gary Oates; wcline.fredcogovpc@icloud.com; Kevin Kenney; ctriplet.fredcogovpc@icloud.com; Roger Thomas; Robert Molden (ipad) Subject: Approval of site plans for Millbrook H.S., Apple Pie Ridge E.S., Sherando H.S. Attachments: Approval Ltr - FCPS Security Enhancements.docx Good morning, Please find attached an approval letter from Mr. Klein for the schools list above. If you have any questions, please contact Mr. Klein. Pam Deeter, Secretary II Dept. Planning & Development 107 N. Kent St. Suite 202 540-665-5651 pdeeter@fcva.us 11 • Pam Deeter From: Microsoft Outlook To: Kevin Kenney Sent: Friday, June 28, 2019 8:28 AM Subject: Relayed: Approval of site plans for Millbrook H.S., Apple Pie Ridge E.S., Sherando H.S. Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: Kevin Kenney (kkenneybuildings(&gmail.com) Subject: Approval of site plans for Millbrook H.S., Apple Pie Ridge E.S., Sherando H.S. Pam Deeter From: Microsoft Outlook To: Judy McCann -Slaughter Sent: Friday, June 28, 2019 8:28 AM Subject: Delivered: Approval of site plans for Millbrook H.S., Apple Pie Ridge E.S., Sherando H.S. Your message has been delivered to the following recipients: Judy McCann -Slaughter (Isla ug hter(&fcva. us) Subject: Approval of site plans for Millbrook H.S., Apple Pie Ridge E.S., Sherando H.S. • • Pam Deeter From: Microsoft Outlook To: J Douglas McCarthy Sent: Friday, June 28, 2019 8:28 AM Subject: Delivered: Approval of site plans for Millbrook H.S., Apple Pie Ridge E.S., Sherando H.S. Your message has been delivered to the foifowing recipients: Douglas McCarthy (dmccarthyOfcva.us) Subject: Approval of site plans for Millbrook H.S., Apple Pie Ridge E.S., Sherando H.S. • • Pam Deeter From: Microsoft Outlook To: Robert Wells Sent: Friday, June 28, 2019 8:28 AM Subject: Delivered: Approval of site plans for Millbrook H.S., Apple Pie Ridge E.S., Sherando H.S. Your message has been delivered to the following recipients: Robert Wells (rwells( fcva.us) Subject: Approval of site plans for Millbrook H.S., Apple Pie Ridge E.S., Sherando H.S. Pam Deeter From: Microsoft Outlook To: Roger Thomas Sent: Friday, June 28, 2019 8:28 AM Subject: Relayed: Approval of site plans for Millbrook H.S., Apple Pie Ridge E.S., Sherando H.S. Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: Roger Thomas (Roger.L.Thomas@usace.army.mil) Subject: Approval of site plans for Millbrook H.S., Apple Pie Ridge E.S., Sherando H.S. • 0 Pam Deeter From: Microsoft Outlook To: Gary Oates Sent: Friday, June 28, 2019 8:28 AM Subject: Relayed: Approval of site plans for Millbrook H.S., Apple Pie Ridge E.S., Sherando H.S. Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: Gary Oates (oatesgr@aol.comj Subject: Approval of site plans for Millbrook H.S., Apple Pie Ridge E.S., Sherando H.S. CJ • Pam Deeter To: leejo@fcpsk12.net; Kenneth Scott Subject: FCPS site plan approvals Attachments: Approval Ltr - FCPS Security Enhancements.docx Good morning, Please find attached an approval letter from Mr. Klein for the FCPS security enhancements. If you have any questions, please contact Mr. Klein. Pam Deeter, Secretary II Dept. Planning & Development 107 N. Kent St. Suite 202 540-665-5651 pdeeter@fcva.us • • Pam Deeter From: Microsoft Outlook To: Kenneth Scott Sent: Friday, June 28, 2019 9:31 AM Subject: Delivered: FCPS site plan approvals Your message has been delivered to the following recipients: Kenneth Scott (kscott@fcva.us) Subject: FCPS site plan approvals 0 0 Pam Deeter From: Microsoft Outlook To: leejo@fcpsk12.net Sent: Friday, June 28, 2019 9:31 AM Subject: Relayed: FCPS site plan approvals Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: leejo fcpskl2.net (leejo(-afcpsk12.net) Subject: FCPS site plan approvals • 0 COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 May 13, 2019 Bill Shelton, PE OWPR 200 County Club Drive SW Plaza One Building E Blacksburg, VA 24060 Re: Review Comments for Minor Site Plan #18-19 — Sherando HS Security Enhancements Property Identification Number (PIN): 18-19 Dear Mr. Shelton: Planning Staff has reviewed the above -referenced minor site plan to determine if administrative approval can be granted. At this time, administrative approval cannot be granted. This site plan will not be approved until the issues in this letter, as well as all issues of the other review agencies, have been adequately addressed. Please review Staff s comments listed below and then prepare a revised site plan which adequately addresses each concern. Review Comments: 1) Site Plan Reference Number. Add the Site Plan #18-19, to the plan set. 2) Previous Approvals. Add a note specifying "Previously Approved Plans" specifically Site Plan (SP) #22-91. 3) General Notes. Revise the note 12 regarding disturbance to existing landscaping as one (1) tree is proposed to be removed as part of the demolition plans. On Sheet 2 further specify in a note that the tree will need to be relocated elsewhere on site. The Applicant may further demonstrate that the required landscaping for the site is exceeded by current plantings on -site and that the removal of one (1) tree does impact the required landscaping. 4) Building Addition. Add a note specifying the total square footage (SF) of the building addition. 5) Agency Approvals. Comment sheets (approvals) are required from the following agencies: the Building Inspections Department, the County Engineer (Public Works), and the Fire Marshal. After you have revised the site plan, please resubmit one (1) copy (email is sufficient) so that Staff may verify the information contained on the plan addresses the above comments. Staff 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 0 9 Re: SP #18-19, FCPS — Sherando HS Security Enhancements May 13, 2019 Page 2 will also need all approved review agency comment sheets and at least five (5) copies of the final plan for approval and a digital (PDF) copy. Do not hesitate to contact me if you have any questions or concerns regarding this letter. Thank you for your consideration. Sincerely, M. Tyler Klein, AICP Senior Planner MTK/pd cc: Frederick County School Board, 1415 Amherst St., Winchester, VA 22601 John Lee, Frederick County Public Schools (email) SITE PLAN APPLICATION Office Use Only- � Date Application Received: -� 10 1� Application #:may-7I Fees Received: diC� S�Q Receipt #: (—I(?— Initials: KD 1. Project Title: FCPS - Security Entrance Enhancements - Sherando High School 2. Project Description: Addition to front entrance for security. 3. Location of Property: Sherando High School (Street address)185 South Warrior Dr. Stephens City, VA 22655 4 Applicant/Designer: Name: OWPR, Inc. Telephone: (540) 552-2151 Primary Point of Contact: William A. Shelton email: bshelton@owpr.com Address: 200 Country Club Dr. SW Plaza One, Building E Blacksburg, VA 24060 5. Property Owner (if different than above): Name: Frederick County School Board Address: 1415 Amherst Street Winchester, VA 22601 6. Property Information: a. Property Identification Number: b. Total acreage of the parcel to be developed: c. Total disturbed area of the parcel: d. Present Use: e. Proposed Use: f. Magisterial District(s) 8 Telephone: (540) 622-3888 86-A-117 40.00 acres 0.02 acres Educational Educational Opequon 7. Site Plan Type: a. Is this an original or new site plan? Yes II No b. Is this a revised site plan? Yes No If yes provide all previous site plan numbers: c. Is this a minor site plan? Yes I v I No If yes provide all previous site plan numbers: 8. Zoning Information: a. Current Zoning: Higher Education (HE) b. Was this property Rezoned? Yes F] No _7 C. If yes provide the rezoning number for this property: d. Are there any proffers for this property? Yes No e. Has a MDP been approved for this property? Yes No f. If yes provide the MDP number for this property: 9. Adjoining property zoning and use: USE North Residential East Park South Residential West Vacant ZONING Rural Areas (RA) Rural Areas (RA) Rural Areas (RA) Rural Areas (RA) I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to the submission of my site plan. Signature: Name (Printed): William A. Shelton Date: May 2, 2019 0 SITE PLAN APPLICATION CHECKLIST The checklist shown below specifies the information which is required to be submitted as part of the site plan application. The Department of Planning & Development will review the application to ensure that it is complete prior to accepting it. If any portion of the application is not complete, it will be returned to the applicant(s). (1) One (1) set of approved comment sheets are required from each relevant review agency prior to final approval of a site plan. It is recommended that applicants contact the Department of Planning & Development to determine which review agencies are relevant to their site plan application. A list of potentially relevant review agencies is shown below: Frederick County Department of Planning & Development ❑ Virginia Department of Transportation (VDOT) ❑ Department of GIS (Geographic Information Services) ❑ Frederick Water ZFrederick County Building Inspections Department F • 1 Frederick County Department of Public Works F • 1 Frederick County Fire Marshal ❑ Virginia Department of Health _Q Frederick County Department of Parks & Recreation I� City of Winchester ❑ Town of Stephens City ❑ Town of Middletown ❑ Winchester Regional Airport Authority ❑ Frederick County Public Schools (for residential plans) ❑✓ (2) One (1) copy of the Site Plan application form. ❑✓ (3) Payment of the site plan review fee. ✓❑ (4) Two (2) copies of the site plan for review. (5) Completed Special Limited Power of Attorney (original). ❑ (6) Traffic Impact Analysis (if applicable). 10 SITE PLAN CHECKLIST The Site Plan Checklist, shown below, lists the information which is required to be on each site plan. Site plans which are incomplete or missing information will be returned to the applicant (s) for revision. Project Information Section (1) A title that includes the name of the proposed or existing business and a subtitle which describes the proposed development. (2) The name, address, and phone number of the land owner, developer, and designer. (3) The Frederick County Property Identification Number (PIN) of all lots included on the site plan. (4) The number and type of dwelling units included on the site plan for residential uses. [Y/] _ (5) The total land area and total developed land area of all lots included on the site plan. ❑✓ _ (6) A detailed description of the proposed use or uses of the development, as well as a description of the existing use or uses. (7) A reference to any other site plan, master development plan approved by the county for the site. (8) The date the site plan was prepared and a list of all revisions made, including the date and a description of why the site plan was revised. (9) A table of contents including all pages of the site plan. (10) A list of all proposed utility providers, with their address and phone number. (11) A location map showing the location of the site, along with the location of streets, roads and land uses within five hundred (500) feet of the property. F-1_ (12) A statement listing all requirements and conditions placed on the land included in the site plan resulting from approval of conditional zoning or a conditional use permit. (13) A description of setbacks or conditions placed on the site as a result of an approved variance. _1 (14) The name of the Magisterial District the property is located within. Calculations Section (15) Calculations showing the Floor Area Ration (FAR) of the site, including the maximum allowed FAR, total ground floor area, total floor area, and total lot area. 7 (16) Calculations showing the total number of required and proposed parking spaces, 11 • including the total number of existing and proposed spaces. (17) Calculations showing the total number of required handicap spaces, including the total number of existing and proposed spaces. (18) Calculations showing the total number of required loading spaces, including the total number of existing and proposed spaces. (19) Calculations showing the total number of required perimeter and interior trees required, including the number of provided trees. ❑ _ (20) Calculations showing the percentage of the property that will be landscaped and the percentage of woodlands disturbed. (19) Calculations showing the total number of required perimeter and interior trees required, including the number of provided trees. Site Plan & Details Section (21) The location of all adjoining lots with the owner's name, specific use, zoning, and zoning boundaries shown. _F (22) The location of all existing or planned right-of-ways and easements that are located on or adjoin the property, with street names, widths, and speed limits shown. F—I— (23) All nearby entrances that are within two hundred (200) feet of any existing or proposed entrances to the site. (24) All existing and proposed driveways, parking and loading spaces, parking lots and a description of surfacing material and construction details to be used. The size and angle of parking spaces, aisles, maneuvering areas, and loading spaces shall be shown. (25) A North arrow. (26) A graphic scale and statement of scale. Z(27) legend A describing all symbols and other features that need description. _❑ (28) A boundary survey of the entire parcel and all lots included with distances described at least to the nearest hundredth of a foot. (29) The present zoning of all portions of the site, with the location of zoning boundaries. ❑ (30) The location of all existing and proposed structures, with the height, specific use, ground floor area, and total floor area labeled. ❑ (31) The location of all existing and proposed outdoor uses, with the height, specific use, and land area labeled. ❑ (32) Existing topographic contour lines at intervals acceptable to the Zoning Administrator. Proposed finished grades shall be shown by contour. 12 • (33) The location of the front, side, and rear yard setback lines required by the applicable zoning district. (34) The location and boundaries of existing environmental features, including streams, floodplains, lakes and ponds, wetlands, natural stormwater retention areas, steep slopes, and woodlands. (35) The location of outdoor trash receptacles with details for all required screening elements. (36) A Photometric Plan per § 165-201.07. ❑ (37) The location, dimensions, and height of all signs. ❑ (38) The location of required buffers, landscaping buffers, and landscaped screens, including examples, typical cross sections or diagrams of screening to be used. The location and dimensions of required fencing, berms, and similar features shall be specified. ❑ (39) The location of recreational areas and common open space. ❑ (40) The location of all proposed landscaping with a legend. The caliper, scientific name, and common name of all deciduous trees. The height at planting, scientific name, and common name of all evergreen trees and shrubs. ❑ (41) The height at planting, caliper, scientific name, and common name shall be provided for all proposed trees. The height at planting, scientific name and common name shall be provided for all shrubs. (42) The location of sidewalks and walkways, including all sidewalks or bicycle paths required along any road right of way. (43) The location and width of proposed easements and dedications. (44) A stormwater management plan describing the location of all stormwater management facilities with design calculations and details. ❑ (45) A soil erosion and sedimentation plan describing methods to be used. (46) The location and size of sewer and water mains and laterals serving the site. 13 (47) Facilities necessary to meet the requirements of the Fire Code. (48) A signed seal of the certified Virginia land surveyor, architect, or engineer who prepared the plan. The seal and signature of the engineer, surveyor or architect shall be on each sheet of the site plan. (49) A space labeled "Approved by the Frederick County Zoning Administrator" for the signature of the Zoning Administrator, approval date, and a statement that reads "site plan valid for five (5) years from approval date." (50) All requirements specified elsewhere in the County Code, including but not limited to the Subdivision Ordinance. 14 REQUEST FOR SITE PLAN COMMENTS Frederick County Department of Planning & Development Mail to: Frederick County Department of Planning & Development 107 North Kent Street Winchester, Virginia 22601 Phone: (540) 665-5651 Hand deliver to: Frederick County Department of Planning & Development 107 North Kent Street, 2nd Floor Winchester, Virginia 22601 Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the Site Plan with this sheet. Applicant's Name: William A. Shelton Telephone: (540) 552-2151 Email Address: bshelton@owpr.com Mailing Address: 200 Country club Dr. SW Plaza One, Building E Blacksburg, VA 24060 Name of development and description of the request: FCPS - Entrance Security Enhancements - Sherando High School Addition to front entrance for security. Location of Property: Sherando High School 185 South Warrior Dr. Stephens City, VA 22655 Department of Planning & Development Comments: Date Received _ Date Reviewed _ Revision Required Signature & Date: -PLANNING DEPARTMENT USE ONLY - Review Number 1 2 3 4 5 (circle one) Date Approved ** Please Return Form to Applicant** 16 OV (PIK, ARCHITECTS AND ENGINEERS Letter of Transmittal TO Regarding Frederick County Frederick County Public Schools Department of Planning & Development Entrance Security Enhancements 107 North Kent Street, 21d Floor Sherando High School Winchester, VA 22601 Attention: Tyler Klein Commission #: 2018-071 1 Date: 05/02/19 We are sending you: X Attached ❑ Via: The following: X Prints ❑ Specs ❑ Copy of Letter ❑ Change Order X Other Copies Date No. Description Site Plan Application 1 Site Plan Application Checklist 1 Request for Site Plan Comments 2 Site Plans 1 Minor Site Plan Review Fee ($500) If enclosures are not as noted, please notify us at once. These items are transmitted: ❑ For Signature ❑ For Your Use Remarks: Copy to: File, John Lee ❑ As Requested ❑ For Approval X For Review and Comment ❑ Signed: William A. Shelton, P.E. 200 Country Club Drive SW a Plaza One • Building E • Blacksburg, VA 24060 • P: 540-552-2151 • F: 540-951-0219 a www.owpr.com J42018 Projects%2018-071 Wdmin\Design\Transmittals%SHS%2018-071 - SHS - Planning - 2019-05-02.doc