Loading...
PC 10-02-24 Meeting Agenda1.Call to Order 2.Pledge of Allegiance 3.Adoption of Agenda – Pursuant to established procedures, the Planning Commission should adopt the Agenda for the meeting. 4.Committee Reports 5.Citizen Comments 6.Public Hearings 6.A.Conditional Use Permit #06-24 for Robert Molden - (Mrs. Peloquin) Submitted for a special event facility. The property is located at 230 Dependence Lane, Middletown, VA and is identified with Property Identification Numbers 91-A-47, 91-A-47, and 91-A-67 in the Opequon Magisterial District. 6.B.Conditional Use Permit #07-24 for Lynn Ramey Wolfe Trust (Brenda Edwards) - (Mrs. Feltner) Submitted for a special event facility. The property is located at 1261 N Hayfield Road, Winchester, VA and is identified by Property Identification Number 40-A-5 in the Gainesboro Magisterial District. 7.Action Item 7.A.Rezoning #08-24 for D & M Container Service - (Mr. Klein) Submitted to rezone approximately +/- 13-acres from the RA (Rural Areas) Zoning AGENDA PLANNING COMMISSION WEDNESDAY, OCTOBER 2, 2024 7:00 PM THE BOARD ROOM FREDERICK COUNTY ADMINISTRATION BUILDING WINCHESTER, VIRGINIA PC10-02-24CUP06-24_Redacted.pdf PC10-02-24CUP07-24_Redacted.pdf 1 District to the M1 (Light Industrial) Zoning District with proffers. The property is located at 1290 Fairfax Pike, White Post, VA and is identified by Property Identification Number 86-A-180 in the Opequon Magisterial District. 8.Other 8.A.Current Planning Applications 9.Adjourn PC10-02-24REZ08-24_Redacted.pdf 2 Planning Commission Agenda Item Detail Meeting Date: October 2, 2024 Agenda Section: Public Hearings Title: Conditional Use Permit #06-24 for Robert Molden - (Mrs. Peloquin) Attachments: PC10-02-24CUP06-24_Redacted.pdf 3 CONDITIONAL USE PERMIT #06-24 Robert Molden Special Event Facility Staff Report for the Planning Commission Prepared: September 18, 2024 Staff Contact: Kayla Peloquin, Planner Executive Summary: Meeting Schedule Planning Commission: October 2, 2024 Action: Pending Board of Supervisors: November 13, 2024 Action: Pending Property Information Property Identification Number (PIN) 91-A-47 & 91-A-47A & 91-A-67 Address 230 Dependence Lane, Middletown Magisterial District Opequon Acreage +/- 86.79 acres Zoning & Present Land Use Zoning: RA (Rural Areas) Land Use: Residential & Agricultural Adjoining Property Zoning & Present Land Use North: RA (Rural Areas) Land Use: Agricultural South: RA (Rural Areas) Land Use: Vacant/Agricultural East: RA (Rural Areas) Land Use: Residential/Agricultural West: RA (Rural Areas) Land Use: Vacant/Agricultural Proposed Use The applicant proposes utilizing an existing barn and the surrounding farm for a special event facility. 4 Page 2 of 4 Review Agency Comments: Review Agency Comment Date Comment Summary Virginia Department of Transportation (VDOT) July 17, 2024 Install a full commercial entrance meeting sight distance requirement. Frederick-Winchester Health Department June 20, 2024 1 portable toilet per 75 guests, at least 1 ADA compliant toilet. If building department requires a bathroom in the facility, an onsite sewage system will be needed. Frederick County (FC) Inspections August 19, 2024 Barn meets farm use exemption. FC Public Works July 9, 2024 No comments at this time. FC Fire Marshal July 10, 2024 Project shall comply with Fire Prevention Code. Planning & Zoning: Application Proposal: The applicant proposes using an existing barn to hold a total of 12-18 special events per year. The events will consist of 4-6 weddings, 4-6 private parties, and 4-6 music events per year. The proposed maximum is 250 people for weddings and private parties, and 500 people for music events. The applicant will bring in portable restroom facilities and allow food trucks on the property for events. The applicant’s sketch reflects parking along the existing driveway (Dependence Lane). There are several other gravel parking areas. There is at least 1,000’ of distance in all directions from the existing barn to the nearest dwelling. Staff Analysis: §165-103.02 of the Zoning Ordinance on standards for Conditional Use Permits states that the Planning Commission and Board shall consider the following standards when considering Conditional Use Permits: A. The conditional use shall not tend to change the character and established pattern of development of the area of the proposed use. • The proposed use would not significantly change the character and established pattern of development of the area as no new structures are proposed. B. The conditional use shall be in harmony with and shall not adversely affect the use and enjoyment of surrounding properties. 5 Page 3 of 4 • If properly managed and all conditions followed, the proposed use would not adversely affect the use and enjoyment of surrounding properties. C. The conditional use shall be in accord with the polices expressed in the Comprehensive Plan of the County and with the intent of this chapter. • The Comprehensive Plan provides guidance when considering any land use action. The property is located outside of the Urban Development Area (UDA) and is within the Reliance Road Sewer and Water Service Area (SWSA) per the Reliance Road Area Land Use Plan. The long-range land use is designated as Mixed-Use Industrial/Office, which is meant to encourage uses that would benefit from and be supported by close proximity to Interstate 81 Exit 302. • The proposed use generally does not aid the County in achieving the desired land use expressed in the Comprehensive Plan, however it may otherwise be an appropriate use in the near term as a special event facility is permitted in the RA (Rural Areas) Zoning District with an approved CUP and the proposal would not inhibit future development of the area. Furthermore, the current lack of Frederick Water infrastructure in the vicinity presents a large obstacle to industrial and office development in the area in the near term. D. The conditional use shall not adversely affect the natural character and environment of the County. • The proposed use would not adversely affect the natural character and environment of the County as the proposal would not alter the natural topography, add new structures, or add a significant amount of impervious area (gravel parking area only). E. The conditional use permit shall be approved only if adequate facilities, roads, safe access and drainage are provided. • More parking may be required for the use and will be addressed through the illustrative sketch plan. As requested by VDOT, a full commercial entrance must be constructed prior to establishing the use. Adequate septic facilities will need to be provided to accommodate the use in accordance with the Department of Health’s regulations. F. The conditional use shall conform with all applicable regulations of the district in which it is located. • The Zoning Ordinance defines a special event facility as “A facility or site utilized for events that are typically conducted on a single day, but which may be conducted for up to three consecutive days, for which attendance is permitted only by invitation or reservation; special events include, but are not limited to, meetings, conferences, banquets, dinners, weddings and private parties” (§165-101.02). The proposed use meets the definition of a special event facility. The music events must be ticketed in some manner to regulate the amount of people on the property, either through pre-purchased tickets or tickets purchased at the property prior to entering. 6 Page 4 of 4 • Additional regulations are included for special event facilities in §165-204.30 and primarily state that all structures must be approved by the Building Official, all parking spaces and travel aisles shall be graveled, and portable toilets shall be permitted provided they are screened from all adjoining properties and roads. The gravel travel way and parking areas as well as the proposed location for portable toilets must be shown on the illustrative sketch plan. • A special event facility is allowed in the RA (Rural Areas) Zoning District with an approved CUP. Recommendation: Should the Planning Commission find the use to be appropriate, staff would suggest the following conditions for the CUP: 1. All review agency comments and requirements shall be complied with at all times. 2. Outdoor amplified music shall conclude by 10:00 PM. 3. No more than 500 people on the property at any one time. 4. No more than 18 events per year. 5. An illustrative sketch plan, addressing the additional regulations for special event facilities contained in in §165-204.30 shall be approved by Frederick County, and the improvements shown on the plan, including the commercial entrance required by VDOT, shall be completed prior to the establishment of the use. 6. Any expansion or change of use shall require a new Conditional Use Permit. Following a public hearing, staff is seeking a recommendation from the Planning Commission to forward to the Board of Supervisors on this CUP application. 7 LAMPS WATSON LANDSubdivision WARRENCOUNTYVIRGINIA 91 A 47A 91 A 47 91 A 67 668RELIANCE RD 694RELIANCE RD 797S BUCKTON RD 437S BUCKTON RD 572RELIANCE RD 639RELIANCE RD 550RELIANCE RD 566RELIANCE RD 510RELIANCE RD 563RELIANCE RD 511RELIANCE RD281S BUCKTON RD 458RELIANCE RD 454RELIANCE RD 398RELIANCE RD 439RELIANCE RD 396RELIANCE RD 448RELIANCE RD 420RELIANCE RD 350RELIANCE RD 406RELIANCE RD 415RELIANCE RD 280RELIANCE RD 388RELIANCE RD 383RELIANCE RD372RELIANCE RD 226RELIANCE RD 348RELIANCE RD344RELIANCE RD D EP E N D EN C E LN Application Sewer and Water Service A rea Parcels µ Frederick C ounty Planning & Development107 N Kent StWinchester, V A 22601540 - 665 - 5651Map Created: September 11, 2024 £¤11 §¨¦66 §¨¦81 RI LEYMI LL LNC H A P E L R D COVILLE STSEVENTH ST HUTTLE RDFIF T H S T LARRICK LNCOMMERCE STMAINSTHAZELMILL LNDEPENDENCELNVETERANS RDCONFIDENCE LNR ELIA N C E R D S B U C K T O N R DCATLETTLN N BUCKTON RDMiddletown 0 580 1,160290 Feet RELIANCE RD CUP # 06 - 24: Robert MoldenPINs: 91 - A - 47, 91 - A - 47A, 91 - A - 67Special Event FacilityZoning Map CUP #06-24 CUP #06-24 CUP #06-24 8 LAMPS WATSON LANDSubdivision WARRENCOUNTYVIRGINIA 91 A 47A 91 A 47 91 A 67 668RELIANCE RD 694RELIANCE RD 797S BUCKTON RD 437S BUCKTON RD 572RELIANCE RD 639RELIANCE RD 550RELIANCE RD 566RELIANCE RD 510RELIANCE RD 563RELIANCE RD 511RELIANCE RD281S BUCKTON RD 458RELIANCE RD 454RELIANCE RD 398RELIANCE RD 439RELIANCE RD 396RELIANCE RD 448RELIANCE RD 420RELIANCE RD 350RELIANCE RD 406RELIANCE RD 415RELIANCE RD 280RELIANCE RD 388RELIANCE RD 383RELIANCE RD372RELIANCE RD 226RELIANCE RD 348RELIANCE RD344RELIANCE RD D EP E N D EN C E LN Application Sewer and Water Service A rea Parcels µ Frederick C ounty Planning & Development107 N Kent StWinchester, V A 22601540 - 665 - 5651Map Created: September 11, 2024 £¤11 §¨¦66 §¨¦81 RI LEYMI LL LNC H A P E L R D COVILLE STSEVENTH ST HUTTLE RDFIF T H S T LARRICK LNCOMMERCE STMAINSTHAZELMILL LNDEPENDENCELNVETERANS RDCONFIDENCE LNR ELIA N C E R D S B U C K T O N R DCATLETTLN N BUCKTON RDMiddletown 0 580 1,160290 Feet RELIANCE RD CUP # 06 - 24: Robert MoldenPINs: 91 - A - 47, 91 - A - 47A, 91 - A - 67Special Event FacilityLocation Map CUP #06-24 CUP #06-24 CUP #06-24 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Planning Commission Agenda Item Detail Meeting Date: October 2, 2024 Agenda Section: Public Hearings Title: Conditional Use Permit #07-24 for Lynn Ramey Wolfe Trust (Brenda Edwards) - (Mrs. Feltner) Attachments: PC10-02-24CUP07-24_Redacted.pdf 27 CONDITIONAL USE PERMIT #07-24 Wolfe Lynn Ramey Trust (Brenda Edwards) Special Event Facility Staff Report for the Planning Commission Prepared: September 20, 2024 Staff Contact: Amy Feltner, Planner Executive Summary: Meeting Schedule Planning Commission: October 2, 2024 Action: Pending Board of Supervisors: November 13, 2024 Action: Pending Property Information Property Identification Numbers (PINs) 40-A-5 Address 1261 N. Hayfield Road, Winchester Magisterial District Gainesboro Acreage: +/- 65 acres Zoning & Present Land Use Zoning: RA (Rural Areas) Land Use: Residential & Agricultural Adjoining Property Zoning & Present Land Use North: RA (Rural Areas) Land Use: Residential & Agricultural South: RA (Rural Areas) Land Use: Residential & Agricultural East: RA (Rural Areas) Land Use: Residential & Agricultural West: RA (Rural Areas) Land Use: Residential & Agricultural Proposed Use The applicant proposes utilizing an existing structure and the surrounding farm for a special event facility. 28 Page 2 of 4 Review Agency Comments: Review Agency Comment Date Comment Summary Virginia Department of Transportation (VDOT) August 26, 2024 The existing entrance shall be upgraded to a Moderate Volume Entrance. A design shall be submitted & approved by VDOT. Virginia Department of Health (VDH) August 1, 2024 The existing onsite sewage system shall not be used by the venue. A least one portable privy shall be required per 100 attendees. Frederick County (FC) Inspections August 13, 2024 No comments: Property is farm exempt. FC Fire Marshal August 8, 2024 Fire Department access shall be maintained during events. Future development must comply with the Virginia Fire Code. Frederick Water August 5, 2024 No comments at this time. Planning & Zoning: Application Proposal: The applicant proposes utilizing a 20’ x 30’ open picnic shelter, a wooden low-rise platform, and a 10’ x 12’ low rise photo deck for the primary area of the special event facility. An existing 30’ x 60’ metal building is proposed to be utilized as the primary office, Bridal Ready Suite, and staging area. In the event of inclement weather, the building would serve as the event area. If the venue is successful, renovation of a second metal building may develop in the future, at which time the applicant will submit for a new conditional use permit. The special event facility will operate from May to November (seasonally) with hours of operation limited to Fridays, Saturdays, and Sundays – dawn to dusk - but under no conditions, later than 29 Page 3 of 4 10:00 p.m. The applicant proposes no more than 10-26 total events per year with each event averaging 25-100 people in attendance. The applicant is proposing no amplified music. Staff Analysis: §165-103.02 of the Zoning Ordinance on standards for Conditional Use Permits states that the Planning Commission and Board shall consider the following standards when considering Conditional Use Permits: A. The conditional use shall not tend to change the character and established pattern of development of the area of the proposed use. • The Rural Area (RA) zoning district provides to preserve large, open parcels of land, scenic views, and to preserve prime agricultural and locally significant soils. The parcel contains 65+/- acres and is surrounded by other Rural Area (RA) parcels ranging from 6± acres to 47+/-acres. The special event facility is permitted as a conditional use permit in the Rural Area (RA) zoning district. B. The conditional use shall be in harmony with and shall not adversely affect the use and enjoyment of surrounding properties. • The zoning ordinance provides additional regulations for specific uses and address the special events facility in the Rural Areas (RA) zoning district. If the operation is operated as proposed and the conditions listed in the specific use section is followed, the operation should not adversely affect the use and the enjoyment of the surrounding properties. C. The conditional use shall be in accord with the polices expressed in the Comprehensive Plan of the County and with the intent of this chapter. • The Comprehensive Plan identifies this area to remain rural in nature. One goal in the Rural Areas section of the Comprehensive Plan is that the “County should continue to support and encourage new land uses in the rural areas” (pg. 14). Other land uses, in addition to agricultural uses, may allow property owners to keep properties intact rather than subdividing. The proposed use is generally consistent with the Comprehensive Plan. • The activities proposed are to reuse existing facilities and with minimal new structures. The use proposed does not adversely affect the natural character and environmental surroundings in the Rural Area (RA). The applicant proposes no amplified outdoor music. D. The conditional use permit shall be approved only if adequate facilities, roads, safe access and drainage are provided. • The applicant will be required to install a Moderate Volume Commercial Entrance to the property and the design shall be approved by VDOT, providing safe access to the property. Portable facilities will be provided. No drainage alterations are proposed to disturb the existing drainage. 30 Page 4 of 4 E. The conditional use shall conform with all applicable regulations of the district in which it is located. • The Zoning Ordinance defines a special event facility as “A facility or site utilized for events that are typically conducted on a single day, but which may be conducted for up to three consecutive days, for which attendance is permitted only by invitation or reservation; special events include, but are not limited to, meetings, conferences, banquets, dinners, weddings and private parties” (§165-101.02). The proposed use meets the definition of a special event facility. • Special event facilities are permitted in the Rural Area (RA) zoning district with an approved conditional use permit. Additional regulations are included for special event facilities in §165-204.30. All structures must be approved by the Building Official, all parking spaces and travel aisles shall be graveled, and that portable toilets shall be permitted provided they are screened from all adjoining properties and roads. The gravel travel way and parking area, as well as the proposed location for portable toilets, will be shown on the illustrative sketch plan. Recommendation: Should the Planning Commission find the use to be appropriate, staff would suggest the following conditions for the CUP: 1. All review agency comments and requirements shall be complied with at all times. 2. Operations shall begin no earlier than 6:00 a.m. and shall conclude by 10 p.m. 3. Special events shall be held on Friday, Saturday, and Sundays only. 4. No amplified music will be allowed at any time. 5. Special events may accommodate up to and not to exceed 100 persons. 6. Employees are limited to those that reside on the property. 7. An illustrative sketch plan, addressing the additional regulations for special event facilities contained in §165-204.30 shall be approved by Frederick County, and the improvements shown on the plan, including the commercial entrance required by VDOT, shall be completed prior to the establishment of the use. 8. Any expansion or change of use shall require a new Conditional Use Permit. Following a public hearing, staff is seeking a recommendation from the Planning Commission to forward to the Board of Supervisors on the CUP application. 31 INDIAN LAKESubdivision JOSHUASMOUNTAINSubdivision 40 A 5 161HANGINGTREE RD 127MOUNTAINVIEW RD 136INDIANLAKE RD 163MOUNTAINVIEW RD 152INDIANLAKE RD 180INDIANLAKE RD 180INDIANLAKE RD 421HUNTING RD 473MOONRIDGE LN 428HUNTING RD 2685INDIANHOLLOW RD 2435INDIANHOLLOW RD 2733INDIANHOLLOW RD 466HUNTING RD 2901INDIANHOLLOW RD 167INDIANLAKE RD 2880INDIANHOLLOW RD 2912INDIANHOLLOW RD 2870INDIANHOLLOW RD 180MOONRIDGE LN 3173INDIANHOLLOW RD 2850INDIANHOLLOW RD 2660INDIANHOLLOW RD 189MOONRIDGE LN2820INDIANHOLLOW RD 105MOONRIDGE LN1433N HAYFIELD RD 1375N HAYFIELD RD 1380N HAYFIELD RD 1356N HAYFIELD RD 1312N HAYFIELD RD 1266N HAYFIELD RD 1221N HAYFIELD RD 1121N HAYFIELD RD 227TUCKERSVALLEY DR 1184N HAYFIELD RD 1111N HAYFIELD RD 111LIZAKATES LN 1107N HAYFIELD RD 161TUCKERSVALLEY DR 146LIZA KATES LN MOON RIDGE LNTUCKERS VALLEY DRINDIAN LAKE RDN HAYFIELD RDINDIAN HOLLOW RD Application Parcels µ Frederick C ounty Planning & Development107 N Kent StWinchester, V A 22601540 - 665 - 5651Map Created: September 13, 2024 £¤50 N HAYFIELD RDINDIAN HOLLOW RDHANG INGTREE RDSIMPLEGIFTS LN TUCKERSVALLEY DRINDIAN LAKE RD D E V L A N D D RBROOKANNLEIGH DRLIZAKATES LNMOON RIDGE LN0 530 1,060265 Feet RELIANCE RD CUP # 07 - 24: Lynn Ramey Wolfe TrustPIN: 40 - A - 5Special Event FacilityZoning Map CUP #07-24 32 INDIAN LAKESubdivision JOSHUASMOUNTAINSubdivision 40 A 5 161HANGINGTREE RD 127MOUNTAINVIEW RD 136INDIANLAKE RD 163MOUNTAINVIEW RD 152INDIANLAKE RD 180INDIANLAKE RD 180INDIANLAKE RD 421HUNTING RD 473MOONRIDGE LN 428HUNTING RD 2685INDIANHOLLOW RD 2435INDIANHOLLOW RD 2733INDIANHOLLOW RD 466HUNTING RD 2901INDIANHOLLOW RD 167INDIANLAKE RD 2880INDIANHOLLOW RD 2912INDIANHOLLOW RD 2870INDIANHOLLOW RD 180MOONRIDGE LN 3173INDIANHOLLOW RD 2850INDIANHOLLOW RD 2660INDIANHOLLOW RD 189MOONRIDGE LN2820INDIANHOLLOW RD 105MOONRIDGE LN1433N HAYFIELD RD 1375N HAYFIELD RD 1380N HAYFIELD RD 1356N HAYFIELD RD 1312N HAYFIELD RD 1266N HAYFIELD RD 1221N HAYFIELD RD 1121N HAYFIELD RD 227TUCKERSVALLEY DR 1184N HAYFIELD RD 1111N HAYFIELD RD 111LIZAKATES LN 1107N HAYFIELD RD 161TUCKERSVALLEY DR 146LIZA KATES LN MOON RIDGE LNTUCKERS VALLEY DRINDIAN LAKE RDN HAYFIELD RDINDIAN HOLLOW RD Application Parcels µ Frederick C ounty Planning & Development107 N Kent StWinchester, V A 22601540 - 665 - 5651Map Created: September 13, 2024 £¤50 N HAYFIELD RDINDIAN HOLLOW RDHANG INGTREE RDSIMPLEGIFTS LN TUCKERSVALLEY DRINDIAN LAKE RD D E V L A N D D RBROOKANNLEIGH DRLIZAKATES LNMOON RIDGE LN0 530 1,060265 Feet RELIANCE RD CUP # 07 - 24: Lynn Ramey Wolfe TrustPIN: 40 - A - 5Special Event FacilityLocation Map CUP #07-24 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 Planning Commission Agenda Item Detail Meeting Date: October 2, 2024 Agenda Section: Action Item Title: Rezoning #08-24 for D & M Container Service - (Mr. Klein) Attachments: PC10-02-24REZ08-24_Redacted.pdf 49 REZONING #08-24 D&M Container Services (J. Johnson) Staff Report for the Planning Commission Prepared: September 26, 2024 Staff Contact: M. Tyler Klein, AICP, Senior Planner Executive Summary: Meeting Schedule Planning Commission: September 4, 2024 October 2, 2024 Action: Tabled to 10/2/24 Action: Pending Board of Supervisors: November 13, 2024 Action: Pending Property Information Property Identification Number (PIN) 86-A-180 Address 1290 Fairfax Pike, Stephens City Magisterial District Opequon Acreage +/- 13.0-acres Zoning & Present Land Use Zoning: RA (Rural Areas) Land Use: Residential Proposed Zoning M1 (Light Industrial) Adjoining Property Zoning & Present Land Use North: RA (Rural Areas) Land Use: Residential South: RA Land Use: Vacant East: RA Land Use: Residential West: RA Land Use: Residential Proposed Use This is a request to rezone one (1) parcel totaling 13-acres from the RA (Rural Areas) Zoning District to the M1 (Light Industrial) Zoning District with proffers for the purposes of establishing a container service facility and other M1 Zoning District uses. Positives Concerns The proposed rezoning proposes a use (container service facility) typically associated with the “industrial” land use designation as identified in the Comprehensive Plan. The revised proffer statement (9/25/24) limits the allowed M1 uses to those which impacts have been mitigated through other proffered Proffer 3.7 seeks to address “high quality architecture” as identified in Plan policy. Other recent rezoning application in the vicinity have committed to 100% of the road facing facades to be constructed of one or a combination of the following: cast stone, stone, brick, architectural block, glass, wood, dry vit or stucco. Whereas included in the 50 Page 2 of 9 commitments, addressing stated concerns from the Planning Commission. The proffer statement includes right-of-way (ROW) reservation for the future condition of Route 277 as an “improved minor arterial roadway,” including a 10’ wide multi-use trail. The revised proffer statement seeks to address stated concerns and area plan policy about implementing “high-quality architecture and site design” in this area of the County by including a landscape buffer along Route 277 and committing to building materials for the façade. revised proffer statement (9/25/2024) “a minimum surface area of twenty-five percent (25%) of the building façade facing Route 277 Fairfax Pike shall be constructed to contain one or a combination of the following: cast stone, stone, brick, architectural block, glass, wood, dry vit, or stucco.” 51 Page 3 of 9 Review Agency Comments: Review Agency Comment Date Comment Summary Status Frederick County (FC) County Attorney September 19, 2024 Legal Form. See revised comment letter. Addressed Virginia Department of Transportation (VDOT) June 11, 2024 “VDOT has reviewed our portion of the rezoning application of tax map 86- A-180 (Owner, Jimmy A Johnson). We have the following comment, while we do not see any issue with the proposed use, the rezoning of the parcel to M1, would not allow us to use the traffic data provided. M1 would allow many uses that would far exceed the 85 VPD, and we would have to look at the highest and best use for the parcel and use that to determine the traffic impact. The proffer statement did not proffer out any specific high traffic uses, so we would need to re-evaluate this based on the highest and best use of M1 which is not represented in this application.” Addressed FC Public Works May 20, 2024 No comments at this time. FC Fire Marshal May 13, 2024 “Any and all future development shall comply with the Frederick County Fire Prevention Code.” Frederick Water May 21, 2024 “The project parcel is located within the sewer and water service area (SWSA), and therefore by county policy, Frederick Water’s water and sewer services may be extended to the site at the user’s expense. A 12-inch water main traverses the property frontage along Fairfax Pike. Sanitary sewer service is not presently in the vicinity. The rezoning application package clearly intends to not pursue public sewer but proposes to utilize private on-site waste disposal. Frederick Water has not been in discussion with the applicant regarding this private on-site sewer disposal approach and will defer Addressed 52 Page 4 of 9 to the County and the Health Department on the appropriateness of utilizing private on-site sewer disposal.” See comment letter. Virginia Department of Health (VDH) May 1, 2024 “It appears the plan is to utilize the existing onsite waste sewage system and water supply currently connected to existing structures and use the dwelling at 1290 Fairfax Pike as a business office. Our concern is whether the existing onsite sewage system and private well are safe, adequate, and proper for proposed use.” See comment letter. Addressed Planning & Zoning Staff Analysis: Comprehensive Plan Conformance: The Comprehensive Plan (adopted November 2021) and the Southern Frederick Area Plan (SOFRED, 2017) provide guidance on the future development of the subject property. The Plan identifies the subject properties with a “industrial” land use designation and as being within the limits of the Sewer and Water Service Area (SWSA) and outside of the Urban Development Area (UDA). Further, the SOFRED plan identifies the subject properties within the “Route 277 Triangle – Centers of Economy” planning area (map inset below). The plan states: “The Route 277 Triangle Centers of Economy is designed to be a significant area of commercial and industrial opportunity that is fully supportive of the Frederick County Economic Development Authority’s targeted goals and strategies. The intent of the mixed- use designation is to further “enhance the County’s commercial and industrial areas and to provide focus to the County’s future regional employment centers. In specific areas a mix of flexible uses, with office uses in prominent locations, is encouraged. Such areas are supported by substantial areas of industrial and commercial opportunity and provide areas that are well designed with high quality architecture and site design. It is the intent of such areas to promote a strong positive community image. “ 53 Page 5 of 9 Further, the “Business Development” Chapter of the Comprehensive Plan includes several “targeted industries” for expansion of industrial land uses, this includes advanced manufacturing, headquarters and back office, professional and creative services, and agribusiness and food processing. The proposed rezoning proposes a use (container service facility) typically associated with the “industrial” land use designation in the Comprehensive Plan. However, the proposed rezoning application materials do not specifically address how the use supports the County’s targeted industries (identified above) or the area plan’s vision for “a mix of flexible uses.” In this respect, the application is not fully compatible with the Comprehensive Plan policies. Transportation & Site Access: The Plan also identifies transportation improvements in the vicinity of the subject properties. Fairfax Pike (Route 277) is identified as an “improved minor arterial roadway;” right-of-way will be required along the subject properties frontage to accommodate this future condition as well as any warranted turn lanes (subject to VDOT approval). Further, the Plan identifies a multi-use trail along the frontage. The proffer statement, revised September 25, 2024, provides for 52.5’ of right-of-way (ROW) reservation along Fairfax Pike for the future condition (widening), and to include the multi-use trail shown on the Plan. Further, the proffer statement includes a provision for a Traffic Impact Analysis (TIA) at the time of site plan for any uses that may generate more than 85 daily trips. Proffer Statement, Generalized Development Plan (GD)), & Impact Analysis: Following the Planning Commission public hearing on September 4, 2024, the applicant has revised the proffer statement. The proffer statement, revised September 25, 2024, proposes the following: 54 Page 6 of 9 Proffers (Summarized; Revised 9/25/24) Staff Comment Proffer 1 – Transportation: 1.1. The Owner shall reserve additional right- of-way along Fairfax Pike as necessary to construct future road frontage improvements. The reservation will locate the new Route 277 Fairfax Pike right-of- way line 52.5’ from the centerline of the existing roadway fronting the subject property. Said right of way shall be dedicated within 90 days of receiving written notice from Frederick County. 1.2. If the Applicant elects to develop the M1 Property with any permitted use that results in a higher net new trip generation from the Property than the proposed 85 daily trips (ADP) shown in the “General Development Plan”, prepared by Penonni Associates Inc, dated June 28, 2024 (the “GDP”), then as part of any conditional use permit or site plan approval process for those uses, the Applicant shall submit a Traffic Impact Analysis (TIA) to the County and the Virginia Department of Transportation (“VDOT”). Subject to County and VDOT acceptance of the submitted TIA, and the Applicant shall mitigate any additional impacts caused by such additional trips 1.3. In determining whether the uses collectively have an increased traffic impact for purposes of Proffer 1.2, the Applicant may use actual traffic counts for then existing uses on the Property in lieu of the estimates that were employed in the TIA, for determining background traffic at the time of site plan submission. Proffer 1.1 (revised), as proposed, the rezoning seeks to implement Comprehensive Plan policy for the future condition of Fairfax Pike (Route 277) as an “improved minor arterial roadway,” including the Plan identified 10-foot-wide multi-use trail along the roadway. Proffer 1.2 & 1.3, as proposed, seeks to address concerns with development of M1 allowed uses, specific to transportation impacts, beyond those uses studies (container service facility) and would aid to mitigate future transportation impacts depending on the use. Proffer 2 – Fire and Rescue: 55 Page 7 of 9 2.1. The Owner shall contribute to the Board the sum of $0.10 per square foot of gross floor area for fire and rescue purposes, payable upon the issuance of a building permit for each structure. Proffer 3 – Land Use: 3.1 M1- Light Industrial land uses are proposed in two (2) phases and shall be in conformance with the “General Development Plan”, prepared by Pennoni Associates Inc dated June 28, 2024. 3.2 The existing residential structure may be converted to a business use and will be allowed to remain as an existing nonconforming structure at time of Right- of Way dedication. Building gross square footage expansion will not be allowed for the existing nonconforming structure. All other future building construction and site improvements shall conform to current zoning requirements at time of permitting. 3.3 Existing on-site well and drain field facilities shall meet current Health Department design requirements and standards for the proposed business use. Necessary facility upgrades shall be required to be in place at time of building occupancy. 3.4 The following uses would be allowed, and all other M1 uses would be restricted: • Landscape and Horticultural Services • Offices and Storage Facilities for Building Construction Contractors, Heavy Construction Contractors and Special Trade Contractors • Professional, Scientific and Technical Services, including Business Offices not providing Proffers 3.4, 3.5, have been added to address stated concerns from the Planning Commission to limit potential allowed uses to reduce impact on adjoining properties. Proffer 3.6 has been added to mitigate potential impacts of the container service uses (hours of operation restrictions). Proffers 3.7 and 3.8 have been added to better address Plan policy specific to “high-quality architecture and site design.” Other recent rezoning application in the vicinity have committed to 100% of the road facing facades to be constructed of one or a combination of the following: cast stone, stone, brick, architectural block, glass, wood, dry vit or stucco. The buffer treatment along the roadway frontage is equivalent to other applications in the vicinity. 56 Page 8 of 9 services to the general public on a primary basis. • Business, Professional, Labor, Political and Similar Organizations • Public Administration and Government Support Buildings including Fire and Ambulance Services • Public Utilities • Truck or Fleet Maintenance Facilities • Self-Service Storage Facilities • Flex-Tech 3.5 The following conditional uses shall be allowed: • Tractor Truck and Tractor Trailer Truck Parking 3.6 Hours of operations shall be limited to 6 am to 8 pm Monday through Saturday. The repair and servicing operations shall be limited to the hours of 7 am to 5 pm. 3.7 A minimum surface area of twenty-five percent (25%) of the building façade facing Route 277 Fairfax Pike shall be constructed to contain one or a combination of the following: cast stone, stone, brick, architectural block, glass, wood, dry vit, or stucco. The proposed materials will be submitted to the county for review, comment, and approval during the permitting process. 3.8 10’ Landscape screen along the frontage of Rt 277 Fairfax Pike with a minimum landscaping density of three plants per 10 linear feet. The generalized development plan (GDP) dated April 24, 2024, is included below and identifies Phase I and Phase II use of the property. 57 Page 9 of 9 Planning Commission Summary and Action From the 09/04/24 Meeting: The Planning Commission held a public hearing on September 4, 2024. One (1) member of the public spoke in support of the proposed rezoning application. The primary discussion among the Planning Commission was the potential impact of the rezoning that as proposed may allow for any allowed M1 Zoning District use, some of which may have an impact on adjoining properties. The application was tabled to October 2, 2024 and the applicant was directed to address allowed uses, future right-of-way (ROW) for Route 277 to accommodate a trail section, hours of operation for a container service facility, and architecture and site design. Following a public hearing, staff is seeking a recommendation from the Planning Commission to forward to the Board of Supervisors on this rezoning application. 58 ¬«277 86 A 180 1155HUDSONHOLLOW RD 270RIDINGS LN 260RIDINGS LN 280RIDINGS LN 201RIDINGS LN 201RIDINGS LN 1214FAIRFAXPIKE 1120FAIRFAXPIKE 1308FAIRFAXPIKE 1304FAIRFAXPIKE 1194FAIRFAXPIKE 1312FAIRFAXPIKE 1176FAIRFAXPIKE 1250FAIRFAXPIKE 1256FAIRFAXPIKE 1164FAIRFAXPIKE 1227FAIRFAXPIKE 1237FAIRFAXPIKE 1261FAIRFAXPIKE 1301FAIRFAXPIKE 1195FAIRFAXPIKE 1201FAIRFAXPIKE 1207FAIRFAXPIKE 1217FAIRFAXPIKE 1165FAIRFAXPIKE 1175FAIRFAXPIKE 1185FAIRFAXPIKE 1147FAIRFAXPIKE RIDINGS LNFAIRFAX PIKE Application Parcels Sewer and Water Service A rea M1 (Light Industrial District) M2 (Industr ial General Distr ict)µ Frederick C ounty Planning & Development107 N Kent StWinchester, V A 22601540 - 665 - 5651Map Created: August 16, 2024 H U D S O N H O L L O W R DLAKEVIEW CIRFAIRFAX PIKELINEDR P A R K D R FORESTLAKE DRCEDARLN WRIGHTSRUN LNAPPRENTICE LNRIDINGS LNWHITE OAK RD¬«277 0 330 660165 Feet REZ # 08 - 24: D and M Container ServicePIN: 86 - A - 180Rezoning from RA to M1Zoning Map REZ #08-24 59 ¬«277 86 A 180 1155HUDSONHOLLOW RD 270RIDINGS LN 260RIDINGS LN 280RIDINGS LN 201RIDINGS LN 201RIDINGS LN 1214FAIRFAXPIKE 1120FAIRFAXPIKE 1308FAIRFAXPIKE 1304FAIRFAXPIKE 1194FAIRFAXPIKE 1312FAIRFAXPIKE 1176FAIRFAXPIKE 1250FAIRFAXPIKE 1256FAIRFAXPIKE 1164FAIRFAXPIKE 1227FAIRFAXPIKE 1237FAIRFAXPIKE 1261FAIRFAXPIKE 1301FAIRFAXPIKE 1195FAIRFAXPIKE 1201FAIRFAXPIKE 1207FAIRFAXPIKE 1217FAIRFAXPIKE 1165FAIRFAXPIKE 1175FAIRFAXPIKE 1185FAIRFAXPIKE 1147FAIRFAXPIKE RIDINGS LNFAIRFAX PIKE Application Parcels Sewer and Water Service A rea µ Frederick C ounty Planning & Development107 N Kent StWinchester, V A 22601540 - 665 - 5651Map Created: August 16, 2024 H U D S O N H O L L O W R DLAKEVIEW CIRFAIRFAX PIKELINEDR P A R K D R FORESTLAKE DRCEDARLN WRIGHTSRUN LNAPPRENTICE LNRIDINGS LNWHITE OAK RD¬«277 0 330 660165 Feet REZ # 08 - 24: D and M Container ServicePIN: 86 - A - 180Rezoning from RA to M1Location Map REZ #08-24 60 ¬«277 86 A 180 1155HUDSONHOLLOW RD 270RIDINGS LN 260RIDINGS LN 280RIDINGS LN 201RIDINGS LN 201RIDINGS LN 1214FAIRFAXPIKE 1120FAIRFAXPIKE 1308FAIRFAXPIKE 1304FAIRFAXPIKE 1194FAIRFAXPIKE 1312FAIRFAXPIKE 1176FAIRFAXPIKE 1250FAIRFAXPIKE 1256FAIRFAXPIKE 1164FAIRFAXPIKE 1227FAIRFAXPIKE 1237FAIRFAXPIKE 1261FAIRFAXPIKE 1301FAIRFAXPIKE 1195FAIRFAXPIKE 1201FAIRFAXPIKE 1207FAIRFAXPIKE 1217FAIRFAXPIKE 1165FAIRFAXPIKE 1175FAIRFAXPIKE 1185FAIRFAXPIKE 1147FAIRFAXPIKE RIDINGS LNFAIRFAX PIKE Application Parcels Sewer and Water Service A rea Long R ange Land Use Neighborhood Village Mixed Use Commercial/O ffice Industrial Environmental & Recreational Resources µ Frederick C ounty Planning & Development107 N Kent StWinchester, V A 22601540 - 665 - 5651Map Created: August 16, 2024 H U D S O N H O L L O W R DLAKEVIEW CIRFAIRFAX PIKELINEDR P A R K D R FORESTLAKE DRCEDARLN WRIGHTSRUN LNAPPRENTICE LNRIDINGS LNWHITE OAK RD¬«277 0 330 660165 Feet REZ # 08 - 24: D and M Container ServicePIN: 86 - A - 180Rezoning from RA to M1Long Range Land Use Map REZ #08-24 61 62 63 64 65 66 67 68 69 70 COUNTY OF FREDERICK Austin K. Cano Acting County Attorney (540) 722-8383 E-mail austin.cano@fcva.us September 20, 2024 VIA E-MAIL Mr. Jeffrey Scott Hendrick D & M Waste Solutions, LLC dba D & M Container Service 312 West Main Street Luray, Virginia 22835 Re: Rezoning Application – D & M Waste Solutions Tax Parcel Numbers 86-A-180 (the “Property”) Dear Mr. Hendrick: You have submitted to Frederick County for review a proposed proffer statement (the “Proffer Statement”) for the proposed rezoning of the Property, 13.0± acres in the Opequon Magisterial District, from the RA (Rural Areas) Zoning District to the M1 (Light Industrial) Zoning District, with proffers. I have now reviewed the Proffer Statement and it is my opinion that the Proffer Statement would be in a form to meet the requirements of the Frederick County Zoning Ordinance and the Code of Virginia, and would be legally sufficient as a proffer statement, subject to the following comments: • Proffer 1.1 – Deletion of the words “as necessary” in the first sentence of this proffer to avoid ambiguity. • Proffer 3.6 – Replacing the word “The” at the beginning of the second sentence of this proffer to “Any,” such that it reads “Any repair and servicing operations shall be limited to the hours of 7 am to 5 pm,” to avoid ambiguity. 71 Mr. Jeffrey Scott Hendrick September 20, 2024 Page 2 I have not reviewed the substance of the proffers as to whether the proffers are suitable and appropriate for this specific development, as my understanding is that review will be done by staff and the Planning Commission. Sincerely, Austin K. Cano Acting County Attorney cc: John Bishop, Assistant Director of Planning & Development, Frederick County (via e- mail) Tyler Klein, Senior Planner, Frederick County (via email) 72 1 David Frank From:Spielman, Joseph (VDOT) <Joseph.Spielman@vdot.virginia.gov> Sent:Tuesday, June 11, 2024 10:54 AM To:David Frank; Cc:Johnson, Joseph (VDOT); Funkhouser, Rhonda (VDOT); Tyler Klein Subject:D&M Container Rezoning Attachments:D&M rezoning signed.pdf Mr. Hedrick / Mr. Frank, VDOT has reviewed our portion of the rezoning application of tax map 86-A-180 (Owner, Jimmy A Johnson). We have the following comment, while we do not see any issue with the proposed use, the rezoning of the parcel to M1, would not allow us to use the traffic data provided. M1 would allow many uses that would far exceed the 85 VPD, and we would have to look at the highest and best use for the parcel and use that to determine the traffic impact. The proffer statement did not proffer out any specific high traffic uses, so we would need to re-evaluate this based on the highest and best use of M1 which is not represented in this application. VDOT appreciates the opportunity to provide input on this potential rezoning. Please feel free to contact us with any questions. Ryan Joseph Ryan Spielman Land Development Engineer / Edinburg Residency Virginia Department of Transportation 540-535-1829 joseph.spielman@vdot.virginia.gov 73 74 26 Rezoning Comments Frederick Water Mail to: Frederick Water Attn: Engineer P.O. Box 1877 Winchester, Virginia 22604 (540) 868-1061 Hand deliver to: Frederick Water Attn: Engineer 315 Tasker Road Stephens City, Virginia Applicant's Name: _____________________________ Telephone: __________________ Mailing Address: _________________________________________ _________________________________________ _________________________________________ Location of property: _________________________________________ _________________________________________ _________________________________________ Current zoning: ___________ Zoning requested: ____________ Acreage: _______ Notice to Frederick Water - Please Return This Form to the Applicant Applicant: Please fill out the information as accurately as possible in order to assist the agency with their review. Attach a copy of your application form, location map, proffer statement, impact analysis, and any other pertinent information. Frederick Water Comments: __________________________________________________________________________________ Please see attached letter dated May 21, 2024 from Eric Lawrence to David Frank. Thank you ________________________________________________________________________________ Frederick Water Signature & Date: May 21, 2024 75 315 Tasker Road PH (540) 868-1061 Eric R. Lawrence Stephens City, Virginia 22655 Fax (540) 868-1429 Executive Director www.FrederickWater.com Water At Your Service May 21, 2024 David Frank Pennoni 117 East Piccadilly Street Winchester, Virginia 22601 RE: Rezoning Application Comment D&M Container Rezoning Tax Map Numbers: 86-A-180 13-acre parcel Dear Mr. Frank: Thank you for the opportunity to offer review comments on the D&M Container rezoning application package, dated April 2024, and received at Frederick Water on May 9, 2024. Frederick Water offers comments limited to the anticipated impact/effect upon Frederick Water’s public water and sanitary sewer system and the demands thereon. The project parcel is located within the sewer and water service area (SWSA), and therefore by county policy, Frederick Water’s water and sewer services may be extended to the site at the user’s expense. A 12-inch water main traverses the property frontage along Fairfax Pike. Sanitary sewer service is not presently in the vicinity. The rezoning application package clearly intends to not pursue public sewer but proposes to utilize private on-site waste disposal. Frederick Water has not been in discussion with the applicant regarding this private on-site sewer disposal approach and will defer to the County and the Health Department on the appropriateness of utilizing private on-site sewer disposal. Water and sanitary sewers are to be constructed in accordance with Frederick Water standards and specifications. Easements will be required to accommodate infrastructure that is dedicated to Frederick Water. Please be aware that Frederick Water is offering these review comments without the benefit or knowledge of a proffered proposed use and water and sewer demands for the site. 76 Page 2 D&M Container rezoning application David Frank May 21, 2024 Please keep in mind that water supplies and sanitary sewer conveyance capacities change daily; with each new customer connection bring additional demands and generated flows. Upgrades to the sanitary sewer system will be necessary for the project to connect and contribute to the system. This letter does not guarantee system capacities to accommodate your development proposal. Thank you for the opportunity to offer review comments. Sincerely, Eric R. Lawrence Executive Director Attachment: County Rezoning Comment Sheet for D&M Container Rezoning 77 78 79 80 81 82 83 FAIRFAX P IKE - RT -277 PIN 86-A-180 JIMMY A. JOHNSON, ET ALS INST# 2023-291 13.631 AC. ZONE: RA PIN 86-A-183 Elizabeth A. & Elwood L. Fletcher, Jr. Inst. #2001-1918 14.04 AC. Zoned: RA PIN 86-A-182 Roger E. Santos Molina Inst.#2020-10260 0.49 AC. Zoned: RA PIN 86-A-181 Cesar & Elvira Yong, ET ALS Inst.# 2022-786 0.51 AC. Zoned: RA PIN 86-A-179B Samuel Fletcher Inst.# 2018-8732 2.00 AC Zoned: RA PIN 86-A-179F Steven Thomas & Rebecca Y. Jenkins Inst.# 2003-8828 5.00 AC Zoned: RA PIN 86-A-179 Tamberla Jo & Vernon Carlson, Jr. Inst.# 2022-11968 29.00 AC. Zoned: RA PIN 86-A-217 Janet M. Barr DB 761, PG 763 42.00 AC. Zoned: RA REZONE TO M1 LIGHT INDUSTRIAL ±13 ACRES EXISTING HOUSE TO REMAIN AS BUSINESS OFFICE EXISTING ENTRANCE TO BE CLOSED AND ENTRANCE RELOCATED PROPOSED RELOCATED ENTRANCE PHASE II FUTURE M1 USE PHASE I M1 USE U:\Accounts\DMCON\DMCON24001 - D&M Rezoning Appl\DESIGN\CS\RZN\DMCON24001-CS-GDP.dwg PLOTTED: 4/30/2014 1:23 PM, BY: David Frank PLOTSTYLE: Pennoni NCS.stb BYNO.DATEREVISIONSDMCON24001 AS NOTED BEF ORIG: 04-24-2024 REV: __-__-____ DLFAPPROVED BY DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR ANDOWNER MUST BE NOTIFIED OF ANY DISCREPANCIES BEFOREPROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 00 60'120' GRAPHIC SCALE 1"=60'¬GENERAL DEVELOPEMENT PLAND&M CONTAINERTM# 86-A-180OPEQUON DISTRICT*'P TOTAL SHEETS 1       VICINITY MAP 1" = 2,000' SITE HUDSON HOLLOW ROADWHITE OAKROAD84 April 2024 D&M Container Rezoning II IMPACT ANALYSIS 85 April 2024 D&M Container Rezoning INTRODUCTION The subject +/- 13-acre property identified as Tax Map 86-A Parcel 180 is currently zoned RA Rural Areas District and located in the Opequon Magisterial District. It is located on the south side of Rt 277 Fairfax Pike immediately across from the +/- 6.8 acres tract recently rezoned to M1 in application RZ# 01-24 and less than 100’ east of PIN# 86-A-168 containing +/- 3 acres of M1 zoned property. Properties along this stretch of Fairfax Pike are mixed industrial and residential land uses. Most notably, the M1 zoned Berlin Steel (formerly Irongate) property is located +/- 700’ to the east of the subject site off Ridings Lane and M2 zoned Storage Solutions property just 525’ to the west. RA zoned residential tracts are currently mixed in with the industrial zoned land. The site is located wholly within the Sewer and Water Service Area (SWSA). The applicant is confident that the proposed rezoning is consistent with the land use policies of the Comprehensive Policy Plan, and development of the rezoned property under the M1 zoning district will not result in negative net impacts. COMPREHENSIVE PLAN The subject property is located within the Southern Frederick Land Use Plan (SFLUP) and is wholly within the Sewer and Water Service Area (SWSA). These documents are intended to serve as a guide for the intended future land uses within the SWSA as properties within those growth boundaries develop. The plans identify the subject property as industrial and adjacent to other property also intended to be a industrial. Consequently, the proposed rezoning of a portion of the subject property to M1 is in conformance with the Comprehensive Plan, as the property would develop as an extension of the existing and future commercial land uses intended by the plan. LAND USE The subject property seeks to rezone from the RA zoning district to the M1 Light Industrial District. The property is bounded on all sides by RA zoned properties. However, on the North, West and East the neighboring properties are bordered by Industrial zoned land. M1- 86 April 2024 D&M Container Rezoning Light Industrial District is to the North and East (Berlin Steel Property) while M2-Industrial General District is just to the West in the existing WP Business Park. The adjacent property to the South is currently zoned RA and is bisected by the new Minor Arterial Road identified in the comprehensive plan. The proposed land use will be compatible with the existing and planned commercial development along the Route 277 Fairfax Pike corridor and is in conformance with the Industrial land use planned for the property in the comprehensive plan. The applicant proposes to utilize the front half of the property for operating the applicants existing container service facility. The rear half of the property is planned for future expansion and similar low traffic generating land uses. The applicant will meet all required Zoning and subdivision requirements at the time of Site Plan or Subdivision application. ACCESS AND TRANSPORTATION The Property has approximately 460’ of frontage on Route 277 – Fairfax Pike. The proposed land use will be for the applicant’s waste container business. This facility anticipates a maximum 10 employees and will generate a low level total daily trip. We have calculated a total generation of 85 ADT’s for the uses in this application. These trip counts result in no need for a right turn taper or a left or right turn lane. The applicant acknowledges any land uses proposed with a site plan application will require full compliance with VDOT access management design standards. Future Site Plan applicants will need to provide calculated ADTs generated by the proposed land uses. Land uses that require additional roadway and turn lane improvements will need to be constructed per the current VDOT design requirements at the time of development application. This rezoning application includes a proffer statement committing to the reservation of Right-of-Way for future road widening improvements to Fairfax Pike should they be initiated. We are not aware of any plans to widen this segment of the roadway at this time but have anticipated that this may occur in the future based on recent improvements completed to the west of Warrior Drive. 87 April 2024 D&M Container Rezoning SITE SUITABILITY The site conditions relate very positively to the proposed development activities. The proposed rezoning would not result in impact on areas of steep slopes, stream channels, lakes, ponds, flood plain, or wetlands. The site lies on a ridgeline sloping away to the east and west from 2-5%. During the engineering phase of the project, a stormwater management plan will be created to adequately and effectively retain stormwater in a manner that will avoid negative impacts on adjacent properties. The existing soils on the subject property are predominantly identified as 3B - Blairton Silt Loam at 2-7% slopes. There are small areas of Blairton Silt loam with 7-15% slope and Weikert-Berks Channery silt loam with 7-15% slopes in the southernmost end of the property. None of these soils present any significant challenges to potential commercial land development. SEWAGE CONVEYANCE AND WATER SUPPLY The subject property has access to the existing watermain located on the south side of Route 277 Fairfax Pike. There are no current sanitary sewer facilities serving this property or other properties in the subject property’s vicinity. The applicant plans to continue to utilize the existing septic and water facilities operating for the existing structures. These facilities will be maintained in conformance with Health department requirements. HISTORIC SITES AND STRUCTURES The Frederick County Rural Landmarks Survey does not identify any structures of historic importance on the subject site. It is also observed that the previous land use and development of the property has resulted in the loss of any historical integrity. As such, the re-development of the subject property will not impact historical sites and structures. It is the desire of the applicant to preserve the existing residential building and convert its use to the general office and meeting facility for the future business land use. The property will reserve the necessary Right-of-Way for the widening or improving of Route 277 Fairfax Pike provided continued use and occupancy of the existing building will not be compromised by any potential nonconformity due to revised building setbacks from 88 April 2024 D&M Container Rezoning the roadway expansion. This structure will not be allowed to expand its footprint in the future as a condition of the rezoning approval. IMPACT ON COMMUNITY FACILITIES The development of the property for the allowed commercial uses under the proposed M1 zoning will result in a net positive fiscal impact for Frederick County. Furthermore, this application recognizes a potential increase in services for the Frederick County fire and rescue services. The proffer statement associated with this application secures a provision for a $0.10 per building square foot monetary contribution, specifically directed to the Frederick County fire and rescue services. 89 90 91 92 93 94 95 X X X X X X X X X 96 97 98 PARCEL ID NUMBER USE ZONING 86-A-179B Vacant Commercial RA 86-A-179F Residential RA 86-A-179 Vacant Agricultural RA 86-A-217 Vacant Agricultural RA 86-A-181 Residential RA 86-A-183 Residential RA 86-A-170 Residential RA 86-A-172 Vacant Residential RA 86-A-173 Residential RA 86-A-176 Vacant Commercial M1 99 100 101 102 103 104 105 106 107 Planning Commission Agenda Item Detail Meeting Date: October 2, 2024 Agenda Section: Other Title: Current Planning Applications Attachments: 108