Loading...
57-23 Approval LetterCOUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 June 26, 2024 Seth Roderick, PE (sroderick@monteverdedesigns.com) Monteverde Engineering & Design Studio 250 E. Elizabeth Street Suite 114 Harrisonburg, VA 22802 Re: Approval for Site Plan #57-23 – Greenwood Medical Office Building Property Identification Numbers (PINs): Formerly 55-A-201D, 55-A-201E, and 55-A-201F, now consolidated into 1 lot per Instrument # 230007389 Dear Mr. Roderick: The above-referenced site plan was approved on June 26, 2024. The site plan is approved for the Greenwood Medical Office Building in three phases: Phase 1 (13,300 SF), Phase 2 (6,600 SF), and Phase 3 (12,100 SF) in the B2 (General Business) Zoning District in the Red Bud Magisterial District. All requirements of the Frederick County Zoning Ordinance have been met in the approved site plan, including review agency comments from all relevant review agencies. I am providing you with three (3) copies of each approved site plan. Please forward these copies to the appropriate representative(s). Furthermore, advise the owner(s) that a copy should be kept for future reference, and an approved copy must be kept on the construction site throughout the development process. Once site development is complete, the owner(s) should contact this office to schedule an on-site inspection. Do not hesitate to contact me if you have any questions or concerns. Sincerely, Kayla Peloquin/pt Planner cc: Blaine Dunn, Red Bud District Supervisor Tim Stowe & Charles Markert, Red Bud Planning Commissioners Mark Fleet, Building Official (email only) Adam Hounshell, Fire & Rescue (email only) Debra Bonarti, Real Estate Tonya Sibert, Commissioner of the Revenue Winchester Medical Center (220 Campus Blvd Suite 420 Winchester, VA 22601)