02-23 Traffic Management PlanINTERSTATE 81 o11 VIRGINIA RTE 37 NB BERRYVILLE P I K E R T 7 TRAFFIC MANAGEMENT PLAN SET TURN LANE CLOSURE OPERATION (PHASE 1) INTERIOR LANE CLOSURE OPERATION ON A MULTI-LANE ROADWAY (PHASE-2) STONEWALL MAGISTERIAL DISTRICT MARTINSBURG PIKE (U.S. ROUTE 11) & SNOWDEN BRIDGE BLVD (ROUTE 883) FREDERICK COUNTY, VIRGINIA OWNER-DEVELOPER: SNOWDEN BRIDGE STATION, LLC ATTN:BILL HOLTZMAN 5534 SOUTH MAIN STREET MOUNT JACKSON, VA 22842 540-477-3131 TRAFFIC MANAGEMENT PLAN HOLTZMAN WINCHESTER (SNOWDEN BRIDGE BLVD.) GASOLINE STATION (W/MARKET) @ 1818 MARTINSBURG PIKE WINCHESTER, VA 22063 SHEET INDEX SHEET DESCRIPTION 1 TITLE SHEET 2 TURN LANE CLOSURE OPERATION (PHASE-1) 3 INTERIOR LANE CLOSURE OPERATION ON A MULTI-LANE ROADWAY (PHASE-2) 4 MAINTENANCE OF TRAFFIC PLAN 1 5 MAINTENANCE OF TRAFFIC PLAN 2 6 NOTES Blackwell Engineering A Trademark of AES Consulting Engineers 566 East Market Street Harrisonburg, Virginia 22801 Phone: (540) 432-9555 FAX: (540) 434-7604 Email: BE@BlackwellEngineering.com SITE JEFFREY D. OSWALD Lic. No.041950COMMONWEALTH OF V IRGINIAPROF E SSION A L E N G IN EER END ROAD WORK ROAD WORK AHEAD PCMS-2 SHADOW VEHICLE REQUIRED (TMA REQUIREMENT SEE NOTE 10) ILLUMINATED FLASHING AMBER (CAUTION MODE) TYPE B OR C 305' LF BUFFERGROUP I CHANNELIZINGDEVICES (10' SPACING)320' LF (TOTAL) TAPERGROUP I CHANNELIZINGDEVICES (10' SPACING)SPEED LIMIT 40 SPEED LIMIT 45 SPEED LIMIT 25 WORK ZONE ROAD WORK AHEAD INTERSTATE 81 ±350 LFROAD WORK AHEAD±350 LFEND ROAD WORK END ROAD WORK 500. 0 '500.0'MARTI NSB URG PIKE U.S. R O UTE 11(40 MPH P OSTED) ROAD WORK AHEAD INTERSTATE 81 INTERSTATE 81 SIDEWALK CLOSED R9-9 SNO W D E N B R I D G E B L V D . R O U T E 8 8 3 (35 M P H P O S T E D ) MER C H A N T S T R E E T R E D B U D R O A D ROAD WORK AHEAD END ROAD WORK END ROAD WORK ROAD WORK AHEAD 80.0'SIDEWALK CLOSED AHEAD CROSS HERE R9-11 (L) 48"x36" SPEED LIMIT 35 AHEAD RIGHT TURN LANE CLOSED END ROAD WORK ROAD WORK AHEAD WOR K Z O N E20' MIN.PCMS-1 GROUP II CHANNELIZING DEVICES (10' SPACING)JEFFREY D.OSWALDLic. No.041950COMMONWEALTH OF VIR G I N I A P R O FESSIONAL ENGINEERBlackwellEngineeringA Trademark of AES Consulting Engineers566 East Market StreetHarrisonburg, Virginia 22801Phone: (540) 432-9555 FAX: (540) 434-7604Email: BE@BlackwellEngineering.comEND ROAD WORK ROAD WORK AHEAD LEGEND SIDEWALK CLOSED AHEAD CROSS HERE SIDEWALK CLOSED (R9-9) END ROAD WORK (G20-2a) NO RIGHT TURN (R3-1) RIGHT TURN LANE CLOSED AHEAD (W20-V13R) ROAD WORK AHEAD (W20-1) WORK AREA TEMPORARY SIGN PORTABLE CHANGEABLE MESSAGE SIGN GROUP II CHANNELIZING DEVICE AHEAD RIGHT TURN LANE CLOSED SIDEWALK CLOSED R9-9 SIDEWALK CLOSED AHEAD CROSS HERE R9-11 (L) 48"x36" SPEED LIMIT 40 MARTI NSB URG PIKE U.S. R O UTE 11(40 MPH P OSTED) SNO W D E N B R I D G E B L V D . R O U T E 8 8 3 (35 M P H P O S T E D ) WOR K Z O N E 250 ' L F B U F F E R GR O U P I I C H A N N E L I Z I N G DE V I C E S ( 4 0 ' S P A C I N G ) 24 5 ' L F ( T O T A L ) T A P E R GR O U P I I C H A N N E L I Z I N G DE V I C E S ( 2 0 ' S P A C I N G ) KEEP RIGHT AHEAD LEFT LANE CLOSED ROAD WORK AHEAD END ROAD WORK 359.3 ' 351.6' 366.7' 352.2' 500.0 ' ROAD WORK AHEAD ROAD WORK AHEAD END ROAD WORK END ROAD WORK END ROAD WORK ROAD WORK AHEAD SIDEWALK CLOSED AHEAD CROSS HERE R9-11 (L) 48"x36" SPEED LIMIT 35 ROAD WORK AHEADONE LEFT TURN LANE TO BECLOSED DURING MEDIAN CONSTRUCTION OF SNOWDEN BLVD. GROUP II CHANNELIZINGDEVICES (20' SPACING)PCMS-3 PCMS-4 JEFFREY D.OSWALDLic. No.041950COMMONWEALTH OF VIR G I N I A P R O FESSIONAL ENGINEERBlackwellEngineeringA Trademark of AES Consulting Engineers566 East Market StreetHarrisonburg, Virginia 22801Phone: (540) 432-9555 FAX: (540) 434-7604Email: BE@BlackwellEngineering.comLEGEND LANE MERGE RIGHT (W4-2R) KEEP RIGHT (R4-V7R) LEFT LANE CLOSED AHEAD (W9-3L) ROAD WORK AHEAD (W20-1) ARROW BOARD (SINGLE) END ROAD WORK (G20-2A) WORK AREA TEMPORARY SIGN PORTABLE CHANGEABLE MESSAGE SIGN GROUP II CHANNELIZING DEVICE END ROAD WORK ROAD WORK AHEAD AHEAD LEFT LANE CLOSED KEEP RIGHT JEFFREY D.OSWALDLic. No.041950COMMONWEALTH OF VIR G I N I A P R O FESSIONAL ENGINEERBlackwellEngineeringA Trademark of AES Consulting Engineers566 East Market StreetHarrisonburg, Virginia 22801Phone: (540) 432-9555 FAX: (540) 434-7604Email: BE@BlackwellEngineering.com(TO BE INSTALLED PRIOR TO ANY WORK PERFORMED IN VDOT RIGHT OF WAY) Page 6F-12 September 2019 Figure 6F-1, Height and Lateral Location of Signs – Typical Post-Mounted Installations2 NOTE: FOR POST SIZE & INSTALLATION PROCEDURES SEE EITHER THE PLAN INSERTABLE SHEET OR VIRGINIA ROAD AND BRIDGE STANDARDS WSP-1 & ED-3 OR TEMPORARY SIGNS.1 1: Revision 1 – 4/1/2015 2: Revision 2 – 9/1/2019 September 2019 Page 6H-7 Figure 6H-1, Symbols Used In Typical Temporary Traffic Control Figures Application 1: Revision 1 – 4/1/2015 2: Revision 2 – 9/1/2019 Page 6F-62 September 2019 Figure 6F-8, Channelizing Devices 1 1: Revision 1 – 4/1/2015 JEFFREY D.OSWALDLic. No.041950COMMONWEALTH OF VIR G I N I A P R O FESSIONAL ENGINEERBlackwellEngineeringA Trademark of AES Consulting Engineers566 East Market StreetHarrisonburg, Virginia 22801Phone: (540) 432-9555 FAX: (540) 434-7604Email: BE@BlackwellEngineering.com(TO BE INSTALLED PRIOR TO ANY WORK PERFORMED IN VDOT RIGHT OF WAY) REFER TO TTC - 29.2 & TTC- 42.2 FOR ADDITIONAL DETAILS AND REQUIREMENTS TYPICAL TRAFFIC CONTROL DETAILS Page 6H-92 September 2019 Typical Traffic Control Interior Lane Closure Operation on a Multi-Lane Roadway (Figure TTC-42.2) NOTES Guidance: 1. Sign spacing distance should be 1300'-1500' for Limited Access highways, and on all other roadways 500'- 800' where the posted speed limit is greater than 45 mph, and 350'-500' where the posted speed limit is 45 mph or less. 2. Care should be exercised when establishing the limits of the work zone to insure maximum possible sight distance in advance of the transition, based on the posted speed limit and at least equal to or greater than the values in Table 6H-3. For Limited Access highways a minimum of 1000' is desired. Standard: 3. On divided highways having a median wider than 8', right and left sign assemblies shall be required. 4. Taper length (L) shall be at the following: Taper Length L Speed Limit (mph) Lane Width (Feet) Remarks Speed Limit (mph) Lane Width (Feet) Remarks91011129101112 25 95 105 115 125 L=S2W/60 50 450 500 550 600 L=SW 30 135 150 165 180 L=S2W/60 55 495 550 605 660 L= SW 35 185 205 225 245 L=S2W/60 60 540 600 660 720 L=SW 40 240 270 295 320 L=S2W/60 65 585 650 715 780 L=SW 45 405 450 495 540 L=SW 70 630 700 770 840 L=SW Limited Access highways shall use a 1000ʹ merging taper regardless of the posted speed. Shoulder Taper = ⅓ L Minimum 5. Channelizing device spacing shall be at the following: Channelizing Device Spacing Location Spacing Speed Limit (mph)Location Spacing Speed Limit (mph)Location Spacing Speed Limit (mph) 0 -35 36 +0 -35 36 +0 -35 36 + Transition 20ʹ40ʹTravelway 40ʹ80ʹ*Construction Access 80ʹ120ʹ *Construction access spacing may be increased to this distance, but shall not exceed one access per ¼ mile. 6. On roadways with paved shoulders having a width of 8 feet or more, channelizing devices shall be used to close the shoulder in advance of the merging taper to direct vehicular traffic to remain within the traveled way. 7. The buffer space length shall be as shown in Table 6H-3 on Page 6H-5 for the posted speed limit. 8. A shadow vehicle with either a Type B or C arrow board operating in the caution mode, or at least one high intensity amber rotating, oscillating, or flashing1 light shall be parked 80'-120' in advance of the first work crew. When the posted speed limit is 45 mph or greater, a truck-mounted attenuator shall be used. 9. For long-term work zones existing conflicting pavement markings and markers shall be removed and temporary pavement markings and markers shall be installed per Figure TTC-60. Option: 10. For short-term stationary work (less than 3 days duration), lanes may be delineated by channelizing devices or removable pavement markings instead of temporary pavement markings. 11. PTRS may be used on undivided roadways, see section 6F.99 for proper spacing of PTRS and Figures TTC- 17.2 Guidance: 12. When channelizing devices have the potential of leading vehicular traffic out of the intended traffic space, the channelizing devices should be extended a distance with 4 additional channelizing devices1 beyond the downstream end of the transition area as depicted. 13. For locations with a high volume of left turning movements, the graphic NO LEFT TURN (R3-2) signs should be used.1 1: Revision 1 – 4/1/2015 2: Revision 2 – 9/1/2019 September 2019 Page 6H-93 Interior Lane Closure Operation on a Multi-Lane Roadway (Figure TTC-42.2) 1: Revision 1 – 4/1/2015 2: Revision 2 – 9/1/2019 Page 6H-66 September 2019 Typical Traffic Control Turn Lane Closure Operation (Figure TTC-29.2) NOTES Guidance: 1. Sign spacing distance should be 350'-500' where the posted speed limit is 45 mph or less, 500'-800' where the posted speed limit is greater than 45 mph. Standard: 2. On divided highways having a median wider than 8', right and left sign assemblies shall be required. 3. To prevent accidental intrusion into the work area, channelizing device spacing shall not exceed 10' on centers or as directed by the Engineer.2 Option: 4. This layout may be used for either right or left turn lane closures. 5. For a high volume of turning movements, additional traffic control devices, such as signs (graphic NO LEFT TURN (R3-2) or LEFT LANE MUST TURN LEFT (R3-7L)), channelizing devices and vehicles may be used. Standard: 6. Taper length (L) shall be at the following: Taper Length L Speed Limit (mph) Lane Width (Feet) Remarks Speed Limit (mph) Lane Width (Feet) Remarks91011129101112 25 95 105 115 125 L=S2W/60 50 450 500 550 600 L=SW 30 135 150 165 180 L=S2W/60 55 495 550 605 660 L= SW 35 185 205 225 245 L=S2W/60 60 540 600 660 720 L=SW 40 240 270 295 320 L=S2W/60 65 585 650 715 780 L=SW 45 405 450 495 540 L=SW 70 630 700 770 840 L=SW Shoulder Taper = ⅓ L Minimum 7. Length of the Longitudional Buffer spacing shall be at the following: Posted Speed Limit (mph)Distance (Feet)Posted Speed Limit (mph)Distance (Feet) < 20 115 – 120 50 425 – 445 25 155 – 1651 55 500 – 5301 30 200 – 210 60 570 – 6001 35 250 – 260 65 645 – 675 40 305 – 3251 70 730 – 760 45 360 – 380 Guidance: 8. If the work space extends across a crosswalk, the crosswalk should be closed using the information and devices shown in Figure TTC-36. Support: 9. Turns can be prohibited as required by vehicular traffic conditions. Unless the streets are wide, it might be physically impossible to make certain turns, especially for large vehicles. 1: Revision 1 – 4/1/2015 2: Revision 2 – 9/1/2019 September 2019 Page 6H-67 Turn Lane Closure Operation (Figure TTC-29.2) 2: Revision 2 – 9/1/2019 JEFFREY D.OSWALDLic. No.041950COMMONWEALTH OF VIR G I N I A P R O FESSIONAL ENGINEERBlackwellEngineeringA Trademark of AES Consulting Engineers566 East Market StreetHarrisonburg, Virginia 22801Phone: (540) 432-9555 FAX: (540) 434-7604Email: BE@BlackwellEngineering.comTRANSPORTATION MANAGEMENT PLAN TMP GENERAL NOTES: 1.ANY REQUIRED LANE CLOSURES AND STOPPING OF TRAFFIC MUST BE APPROVED IN ADVANCE BY VDOT. 2.LANE CLOSURES AND STOPPING OF TRAFFIC SHALL ONLY BE ALLOWED ON (ROUTE 11) MARTINSBURG PIKE & (ROUTE 883) SNOWDEN BRIDGE BLVD, OR ANY OTHER CONNECTING ROAD BETWEEN THE HOURS OF 8:00 PM TO 6:00 AM, MONDAY THROUGH THURSDAY, UNLESS OTHERWISE DIRECTED BY THE ENGINEER. FOR MORE INFORMATION, SEE TEMPORARY TRAFFIC CONTROL IMPLEMENTATION ON THIS SHEET. 3.VDOT HIGHLY RECOMMENDS THAT THE PROPOSED IMPROVEMENTS BE CONSTRUCTED DURING THE SUMMER MONTHS WHEN THE SCHOOLS NEAR THE SITE ARE NOT IN SESSION; IF THE CONSTRUCTION OCCURS DURING THIS TIME OF YEAR, THEN WORK HOURS WILL NOT BE RESTRICTED. HOWEVER, IF THE CONSTRUCTION OCCURS DURING THE SCHOOL SESSION, THE ALLOWABLE WORK HOURS SHALL BE 9:00AM TO 3:00PM. IF THESE SCHOOLS HAVE A SUMMER SESSION, THEN WORK HOURS WILL BE RESTRICTED. FOR MORE INFORMATION, SEE TEMPORARY TRAFFIC CONTROL IMPLEMENTATION ON THIS SHEET. 4.ALL AREAS EXCAVATED DEEPER THAN 2" (TWO INCHES) BELOW EXISTING GRADE, AT THE CONCLUSION OF EACH WORKDAY, SHALL BE BACK FILLED TO FORM AN APPROXIMATE 6:1 WEDGE FOR THE SAFETY AND PROTECTION OF VEHICULAR TRAFFIC. ALL COST PLACING, MAINTAINING, AND REMOVING THE 6:1 WEDGE SHALL BE INCLUDED IN THE PRICE BID FOR OTHER ITEMS IN THE CONTRACT AND NO ADDITIONAL COMPENSATION WILL BE ALLOWED. IN LIEU OF BACKFILLING EXCAVATED AREAS, THE CONTRACTOR MAY USE TEMPORARY STEEL PLATES FOR THE SAFETY AND PROTECTION OF VEHICULAR AND PEDESTRIAN TRAFFIC. THE PLACEMENT OF TEMPORARY STEEL PLATES SHALL BE PER VIRGINIA WORK AREA PROTECTION MANUAL SPECIFICATIONS, SECTION 6G.15. CONTRACTOR SHALL ONLY USE STEEL PLATES THAT ARE CERTIFIED FOR USE IN ROADWAYS AND PER INDUSTRY STANDARDS. 5.TRAFFIC SHALL NOT BE STOPPED ON (ROUTE 11) MARTINSBURG PIKE & (ROUTE 883) SNOWDEN BRIDGE BLVD OR ANY CONNECTOR ROAD FOR LONGER THAN FIVE MINUTES AT ANY TIME UNLESS OTHERWISE DIRECTED BY VDOT AND THE ENGINEER. 6.LANE CLOSURES WILL NOT BE PERMITTED ON HOLIDAYS , WEEKENDS, OR ON FRIDAY-SATURDAY-SUNDAY-MONDAY SURROUNDING HOLIDAY WEEKENDS UNLESS OTHERWISE APPROVED IN ADVANCE BY THE ENGINEER AND VDOT. ADDITIONALLY, LANE CLOSURES WILL NOT BE PERMITTED DURING SPECIAL EVENTS. 7.ANY CONTRACT ITEM(S) NOT SPECIFICALLY NOTED IN THE MAINTENANCE OF TRAFFIC MAY BE SCHEDULED FOR CONSTRUCTION AT THE CONTRACTOR'S OPTION, AS APPROVED BY THE ENGINEER AND VDOT. 8.VEHICULAR ACCESS TO ADJACENT PROPERTIES AND CONNECTING STREETS SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION. PROPERTY OWNERS AND BUSINESSES SHALL BE NOTIFIED A MINIMUM OF 48 HOURS PRIOR TO ANY ACTIVITIES WHICH WOULD IMPEDE ACCESS TO THEIR PROPERTIES. IN ALL CASES IN WHICH EXISTING OR ESTABLISHED TRAFFIC PATTERNS WILL BE DISRUPTED, THE CONTRACTOR WILL NOTIFY ALL AFFECTED RESIDENTS AND/OR BUSINESSES A MINIMUM OF 48 HOURS IN ADVANCE OF THE ANTICIPATED DISRUPTION BY DISTRIBUTING DOOR-TO-DOOR NOTICES. A COPY OF THE NOTICE SHALL BE FORWARDED TO THE PROJECT ENGINEER AND VDOT FOR REVIEW AND APPROVAL PRIOR TO THE BEGINNING OF WORK. 9.ALL TRAFFIC CONTROL SHALL BE SET UP AND SPACED ACCORDING TO THE VIRGINIA WORK AREA PROTECTION MANUAL, 2011 EDITION, (SEPTEMBER 1, 2019 REVISION). 10.CONTRACTOR SHALL PROVIDE ADDITIONAL TRAFFIC CONTROL AS DIRECTED BY VDOT, SHOULD FIELD CONDITIONS WARRANT. 11.CONTRACTOR MAY REDUCE LANE WIDTHS TO 10' MINIMUM DURING CONSTRUCTION. ANY TEMPORARY PAVEMENT MARKINGS THAT ARE REQUIRED ARE THE RESPONSIBILITY OF THE CONTRACTOR. 12.CONTRACTOR IS RESPONSIBLE FOR PLACEMENT AND MAINTENANCE OF ALL TEMPORARY PAVEMENT MARKINGS AND SIGNAGE THAT ARE REQUIRED OR IMPLIED IN THE CONSTRUCTION PHASING SHEETS THAT FOLLOW. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL TRAFFIC CONTROL DEVICES, SIGNAGE, EQUIPMENT, PERSONNEL, INCLUDING CERTIFIED TRAFFIC CONTROL PERSONNEL, ETC. TO CONTROL TRAFFIC DURING CONSTRUCTION WITHIN VDOT MAINTAINED RIGHT-OF-WAY. ALL TRAFFIC CONTROL SHALL BE IN STRICT ACCORDANCE WITH THE STANDARDS, GUIDELINES, POLICIES, AND OBJECTIVES OF THE LATEST EDITION OF THE VIRGINIA WORK AREA PROTECTION MANUAL, 2011 EDITION, (SEPTEMBER 1, 2019 REVISION), MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), AND ALL VDOT PERMITS. 13.AT NO TIME SHALL CONSTRUCTION TAKE PLACE ON BOTH THE RIGHT AND LEFT SIDES OF VEHICLES, UNLESS OTHERWISE SPECIFIED BY VDOT AND THE ENGINEER. 14.ALL CONSTRUCTION MATERIALS AND EQUIPMENT SHALL BE STORED OFF-SITE. ALL CONTRACTOR AND SUBCONTRACTOR EMPLOYEES SHALL PARK OFF-SITE. 15. EMERGENCY VEHICLE, BUS, AND MAIL ROUTES SHALL BE MAINTAINED AT ALL TIMES. 16.THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING/COORDINATING WITH FREDERICK COUNTY PUBLIC SCHOOL OFFICIALS, IN THE EVENT OF EARLY SCHOOL RELEASES, SCHOOL EVENTS, ETC. ALL LANE CLOSURES SHALL BE REMOVED A MINIMUM OF 30 MINUTES PRIOR TO THE DISMISSAL OF STUDENTS. GENERAL 1.THIS PROJECT IS CLASSIFIED AS TYPE A, UNDER THE VDOT CLASSIFICATION SYSTEM. 2.THE TOTAL PROJECT LENGTH IS APPROXIMATELY ± 890 FEET. THE WIDTH OF THE WORK ZONE IS LESS THAN 30'. 3.THE PURPOSE OF THIS PROJECT IS TO PROVIDE A NEW RIGHT-IN ONLY AND RIGHT-IN/RIGHT-OUT ENTRANCE FOR PROPOSED SITE CONSTRUCTION AND PUBLIC SIDEWALK. WORK WILL TAKE PLACE IN THE VICINITY OF (ROUTE 11) MARTINSBURG PIKE & (ROUTE 883) SNOWDEN BRIDGE BLVD. WORK IS ANTICIPATED TO BE COMPLETED WITH MINOR ENCROACHMENT INTO THE EXISTING TRAFFIC PATTERN. 4.TRAFFIC ALONG (ROUTE 11) MARTINSBURG PIKE & (ROUTE 883) SNOWDEN BRIDGE BLVD. CONSISTS OF THRU AND ACCESS FOR BUSINESS, SCHOOL AND LOCAL RESIDENTS. 5.THE EXISTING POSTED SPEED LIMIT FOR (ROUTE 11) MARTINSBURG PIKE IS 40 MPH AND FOR (ROUTE 883) SNOWDEN BRIDGE BLVD. IS 35 MPH. ALL EXISTING SPEED LIMITS ARE EXPECTED TO BE MAINTAINED DURING ALL PHASES OF CONSTRUCTION. TEMPORARY TRAFFIC CONTROL (TTC) / MAINTENANCE OF TRAFFIC (MOT): 1. TURN LANE CLOSURE OPERATION AND LANE CLOSURE OPERATIONS ARE ANTICIPATED FOR THIS PROJECT AND SHALL BE PROVIDED IN ACCORDANCE WITH THE VIRGINIA WORK AREA PROTECTION MANUAL, 2011 EDITION, (SEPTEMBER 1, 2019 REVISION). SPECIFICALLY, THE FOLLOWING 2011 VA WAPM TEMPORARY TRAFFIC CONTROL MEASURES SHALL BE USED REGULARLY: 1.1 (TTC-29.2) TURN LANE CLOSURE OPERATION. 1.2 (TTC-42.2) INTERIOR LANE CLOSURE OPERATION ON A MULTI-LANE ROADWAY. ACCESS TO ADJACENT PROPERTIES SHALL BE MAINTAINED AT ALL TIMES. THE CONTRACTOR SHALL MAKE ARRANGEMENTS TO STORE EQUIPMENT AND MATERIALS OUTSIDE OF THE DESIGNED CLEAR ZONE. THIS IS A COMPLEX OPERATION IN AN URBAN SETTING, THE TTC FIGURES ABOVE ARE FOR REFERENCE ONLY. ANY COMBINATION OF THE ABOVE OR TTC'S NOT LISTED ABOVE MAY BE NECESSARY. PHASED TRAFFIC CONTROL PLANS ARE PROVIDED IN THIS PLAN SET. HOWEVER THE CONTRACTOR SHALL INSTALL ALL NECESSARY SIGNS, MARKINGS, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES IN ACCORDANCE WITH THE LATEST REVISION OF THE 2011 VA WAPM, (SEPTEMBER 1, 2019 REVISION). PUBLIC COMMUNICATIONS PLAN: 1. IF ANY MAJOR TRAFFIC CHANGES ARE TO TAKE PLACE (LANE CLOSURES, DETOURS, ETC.), THE CONTRACTOR SHALL NOTIFY LOCAL NEWSPAPERS AND RADIO STATIONS AT LEAST 5 DAYS IN ADVANCE OF THE CHANGES. ALSO ENSURE THAT THE VDOT DISTRICT PUBLIC AFFAIRS OFFICER IS INFORMED A MINIMUM OF 72 HOURS IN ADVANCE OF THE CHANGE. 2.PORTABLE CHANGEABLE MESSAGE SIGNS (PCMS) SHALL BE USED TO NOTIFY THE TRAVELING PUBLIC OF ANY SUCH MAJOR TRAFFIC CHANGES 72 HOURS IN ADVANCE OF THE CHANGE. 3.PRIOR TO IMPLEMENTING ANY SHOULDER CLOSURE, LANE CLOSURE, AND/OR SIDEWALK CLOSURE, THE CONTRACTOR SHALL NOTIFY LOU HATTER AND WILL MERRITT OF VODT A MINIMUM OF 120 HOURS IN ADVANCE OF THE ANTICIPATED IMPLEMENTATIONS. DISTRICT PUBLIC AFFAIR OFFICER (LOU HATTER): 540-727-3201, LOUIS.HATTER@VDOT.VIRGINIA.GOV WILL MERRITT: 540-829-7370, WILLIAM.MERRITT@VDOT.VIRGINIA.GOV TRANSPORTATION OPERATION PLAN: 1.THE CONTRACTOR SHALL INFORM THE “REGIONAL TRAFFIC OPERATIONS CENTER” (RTOC) WHEN A LANE OR ROAD CLOSURE IS PLANNED, IMPLEMENTED, AND AGAIN WHEN IT IS REMOVED. THE RTOC WILL IN TURN PLACE THE INFORMATION INTO THE “511 VIRGINIA" TRAFFIC ALERT SYSTEM (A SERVICE OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION TRAFFIC SYSTEM). 2.IN CASE OF EMERGENCY, CALL 911. THE FOLLOWING IS A LIST OF LOCAL NON-EMERGENCY NUMBERS: WINCHESTER-FREDERICK COUNTY EMERGENCY COMMUNICATIONS CENTER: (540) 662-4131 FREDERICK COUNTY DEPARTMENT OF FIRE AND RESCUE : (540) 665-5618 FREDERICK COUNTY SHERIFF: 540-662-6162 FREDERICK COUNTY PUBLIC SCHOOLS: 540-662-3888 VIRGINIA STATE POLICE (AREA 13): (540) 662-3313 VDOT DISTRICT PUBLIC AFFAIR OFFICER (KELLY HANNON) : 540-374-3344, 540-656-0321 REGIONAL TRANSPORTATION OPERATIONS CENTER (TOC): (540) 332-9500 DISTRICT WORK ZONE SAFETY COORDINATOR (ADRIAN BLACKSTONE): (540) 256-5262 3.ANY TRAFFIC INCIDENT (IF APPLICABLE) THAT OCCURS DURING THE LIFE OF THIS PROJECT WILL BE DISCUSSED BY THE CONTRACTOR, VDOT, AND THE ENGINEER OF RECORD TO DETERMINE WHETHER ANY CHANGES NEED TO BE MADE TO THE TRAFFIC CONTROL ON THE PROJECT. PROJECT PERSONNEL: ENGINEER CONTACT: TBD INSPECTOR: TBD VDOT RESIDENCY OFFICE-CLARKE, FREDERICK, SHENANDOAH, WARREN: (ED CARTER) 540-984-5600 WORK ZONE SIGN SIZING: G20-2A 48" X 24" R3-1 24" X 24" R4-V7R 24" X 24" R9-9 30" X 18" R9-11(L) 48" X 36" W4-2R 48" X 48" W9-3R 48" X 48" W20-1 48" X 48" W20-V13R 48" X 48" ADVANCE MESSAGE ROAD WORK XX-XX* DAY OF MESSAGE ROAD WORK AHEAD PCMS-1 ADVANCE MESSAGE ROAD WORK XX-XX* DAY OF MESSAGE SIGN OFF DURING WORK HRS. PCMS-2 ROAD WORK AHEAD *DATE WHEN WORK IS TO OCCUR TEMPORARY TRAFFIC CONTROL IMPLEMENTATION: PHASE 1-(ROUTE 11) MARTINSBURG PIKE & (ROUTE 883) SNOWDEN BRIDGE BLVD.) (SEE SHEET 2) CONSTRUCTION CONSISTS OF THE INSTALLATION OF THE PERMANENT RIGHT-IN ONLY & RIGHT-IN/RIGHT-OUT SITE ENTRANCE, INCLUDING THE INSTALLATION OF CURB AND GUTTER, THE PLACEMENT OF PAVEMENT AND MARKINGS ALONG THE INTERSECTION OF (ROUTE 11) MARTINSBURG PIKE & (ROUTE 883) SNOWDEN BRIDGE BLVD. WHEN CONSTRUCTION ACTIVITIES OCCUR ALONG (ROUTE 11) MARTINSBURG PIKE & (ROUTE 883) SNOWDEN BRIDGE BLVD. OUTSIDE THE CLEAR ZONE, DURING WORKING HOURS AND NON-WORKING HOURS, VEHICULAR TRAFFIC SHALL BE MAINTAINED AS PRESCRIBED IN THE GENERAL NOTES AND TTC/MOT NOTES THROUGH THE USE OF GROUP II CHANNELIZING DEVICES, AND PROPER SIGNAGE IN ACCORDANCE WITH TTC-29.2, SEE SHEET 2 FOR PHASE I OF CONSTRUCTION DETAILED PLAN VIEW. IF TRENCH AND/OR BORING/RECEIVING PITS ARE TO BE LEFT OPEN DURING NON-WORKING HOURS, THE CONTRACTOR SHALL BACKFILL ALL OPEN EXCAVATIONS OR PLACE STEEL PLATES OVER THE OPEN PITS, PER GENERAL NOTE 4, AS PRESCRIBED IN THE GENERAL NOTES, TTC/MOT NOTES, AND THROUGH THE USE OF GROUP II CHANNELIZING DEVICES AND PROPER SIGNAGE. PHASE 2-(ROUTE 883) SNOWDEN BRIDGE BLVD. (SEE SHEET 3) CONSTRUCTION CONSISTS OF THE PLACEMENT OF A DIRECTIONAL MEDIAN OPENING AND MARKINGS ALONG (ROUTE 883) SNOWDEN BRIDGE BLVD. WHEN CONSTRUCTION ACTIVITIES OCCUR ALONG (ROUTE 883) SNOWDEN BRIDGE BLVD. OUTSIDE THE CLEAR ZONE, DURING WORKING HOURS AND NON-WORKING HOURS, VEHICULAR TRAFFIC SHALL BE MAINTAINED AS PRESCRIBED IN THE GENERAL NOTES AND TTC/MOT NOTES THROUGH THE USE OF GROUP II CHANNELIZING DEVICES, AND PROPER SIGNAGE IN ACCORDANCE WITH TTC-42.2, SEE SHEET 3 FOR PHASE 2 OF CONSTRUCTION DETAILED PLAN VIEW. IF TRENCH AND/OR BORING/RECEIVING PITS ARE TO BE LEFT OPEN DURING NON-WORKING HOURS, THE CONTRACTOR SHALL BACKFILL ALL OPEN EXCAVATIONS OR PLACE STEEL PLATES OVER THE OPEN PITS, PER GENERAL NOTE 4, AS PRESCRIBED IN THE GENERAL NOTES, TTC/MOT NOTES, AND THROUGH THE USE OF GROUP II CHANNELIZING DEVICES AND PROPER SIGNAGE. PORTABLE CHANGEABLE MESSAGE SIGNS 1.PORTABLE CHANGEABLE MESSAGE SIGNS (PCMS) SHALL BE USED TO NOTIFY THE TRAVELING PUBLIC OF ANY SUCH MAJOR TRAFFIC CHANGES FOR TWO WEEKS IN ADVANCE OF BEGINNING CONSTRUCTION OR THE IMPLEMENTATION OF ANY SHOULDER CLOSURE, LANE CLOSURE, AND/OR SIDEWALK CLOSURE AND IN COORDINATION WITH THE PUBLIC NOTICES. 2.PCMS BOARDS SHALL BE PLACED WITHIN VDOT RIGHT-OF-WAY AND FOLLOW ALL VDOT REQUIREMENTS, AS OUTLINED IN SECTION 6F.71 OF THE VIRGINIA WORK AREA PROTECTION MANUAL, 2011 EDITION, (SEPTEMBER 1, 2019 REVISION). 3.SUGGESTED PCMS LOCATIONS CAN BE FOUND ON PLAN SHEETS 2 AND 3. PCMS MESSAGES RIGHT LANE CLOSURE ADVANCE MESSAGE ROAD WORK XX-XX* DAY OF MESSAGE INTERIOR LANE CLOSURE PCMS-3 INTERIOR LANE CLOSURE ADVANCE MESSAGE ROAD WORK XX-XX* DAY OF MESSAGE ONE LEFT TURN LANE CLOSURE PCMS-4 LEFT TURN LANE CLOSURE AFTER HOURS RIGHT LANE CLOSED