HomeMy WebLinkAbout01-23 Comments
315 Tasker Road PH (540) 868-1061 Eric R. Lawrence
Stephens City, Virginia 22655 Fax (540) 868-1429 Executive Director
www.FrederickWater.com
Water At Your Service
MEMORANDUM
TO: John Maddra, Valley Engineering
CC: Wyatt Pearson, Director, Frederick County Planning Department
John Bishop, Assistant Director, Frederick County Planning Department
FROM: Eric R. Lawrence, Executive Director
SUBJECT: Comment on CPPA #01-23 Madison II, LLC
UDA/SWSA and Land Use revision Request
Parcel 87-A-15
DATE: October 4, 2023
Thank you for the opportunity to provide comments on CPPA #01-23 for Madison II,LLC.
Comments are provided for this Comprehensive Plan amendment application and in
recognition that a future rezoning could follow at which time additional details for the project
will be provided.
This property is captured in the Southern Frederick Area Plan. The property is more specifically
located south of Route 277, west of Route 522, and adjacent to the Lake Frederick
development.
Changes to land uses and UDA boundaries which result in similar water and sewer demands
than are currently planned for would be accommodated within Frederick Water’s recently
designed sanitary sewer infrastructure improvement plans. The proposed addition of a
projected 800 residential units within the Neighborhood Village land use designation will result
in additional water and sewer demands above what is currently anticipated in the existing land
use plan.
Page 2
Comment on CPPA #01-23 for Madison II, LLC
October 4, 2023
Water supply for the Madison II project would be via an existing 12-inch water main which
parallels the south side of Route 277 (Fairfax Pike). Adequate water capacities and pressures
are currently available to meet the project’s projected demands. The developer will need to
extend adequately sized water lines throughout the subject property, and interconnect with
adjacent properties, as part of their development program. Adequate water treatment
capacity is currently available to meet the projected water demands of the proposal.
Sanitary sewer conveyance and treatment capacities are currently limited in this area, and
warrant conveyance system upgrades to meet long term planned land uses that are captured in
the current Southern Frederick Area Plan. Frederick Water is designing and will construct a
sanitary forcemain improvement that could serve the area including the subject property
(target completion 2026). The developer will need to construct the necessary on-site gravity
collection system, pump station, and forcemain and extend said forcemain to an appropriate
off-site connection with Frederick Water’s planned/future sanitary sewer system.
As planned land uses advance into construction, the developer will be expected to: Design,
fund, and construct the necessary infrastructure extend water services to the site and to
convey future sanitary sewer flows to Frederick Water’s sanitary sewer infrastructure; Dedicate
the necessary water and sanitary sewer easements; and Contribute financially to the
infrastructure upgrades that are warranted to accommodate the development’s water and
sanitary sewer demands.
Thank you.
Planning Office Wayne Lee, Coordinator of Planning and Development
leew@fcpsk12.net
1415 Amherst Street https://www.frederickcountyschoolsva.net/ 540-662-3889 ext. 88249
P.O. Box 3508
Winchester, Virginia 22604-2546
October 24, 2023
Mr. John Maddra
Valley Engineering
4901 Crowe Drive
Mount Crawford, VA 22841
Re: Madison II, LLC Property comprehensive plan amendment application
Dear Mr. Maddra:
Frederick County Public Schools has reviewed the Madison II, LLC Property comprehensive plan
amendment application submitted to us on October 2, 2023. We offer the following comment:
1. We note that this proposed change would increase the yield of residential units by 290, thereby
increasing the demand on the schools that would serve this development. Those schools include
Sherando High School, Aylor Middle School, and Armel Elementary School. Sherando and Armel
are both currently over capacity.
Please feel free to contact me at leew@fcpsk12.net or 540-662-3888 x88249 if you have any questions or
comments.
Sincerely,
K. Wayne Lee, Jr., ALEP
Coordinator of Planning and Development
cc: Dr. George Hummer, Superintendent of Schools
Mr. Shane Goodwin, Assistant Superintendent for Administration
Mr. Logan Sheppard, Director of Transportation
Mr. Calvin Davis, Assistant Director of Transportation
Mr. Wyatt Pearson, Director, Frederick County Planning
Mr. Tyler Klein, Senior Planner, Frederick County Planning
Comprehensive Plan Amendment Comments
Frederick County Economic Development Authority
Mail to:
45 E. Boscawen Street, 2nd Floor
Winchester, Virginia 22601
(540)665-0973
Hand deliver to:
45 E. Boscawen Street, 2nd Floor
Winchester, Virginia 22601
(540) 665-0973
Applicant's Name: _____________________________ Telephone: __________________
Mailing Address: _________________________________________
_________________________________________
_________________________________________
Location of property: _________________________________________
_________________________________________
_________________________________________
Frederick County Economic Development Authority Comments:
No comment
Signature & Date: ___________________ October 19, 2023______________________________
Notice to Planning Department - Please Return Form to Applicant
Applicant: Please fill out the information as accurately as possible in order to assist the Department of
Planning with their review. Attach one copy of your request form, justification and proposed
changes, existing characteristics analysis, and trip generation analysis.
Current Land Use: ___________ Land Use requested: ____________ Acreage: _______