Loading...
HomeMy WebLinkAbout28-11 Verizon Wireless - Stephen - Telecommunication Facility - Stonewall - Backfile (2)GENERAL NOTES VDOT GENERAL NOTES LEGEND VICINITY MAP z 1. Methods and materials used in the construction of the improvements herein shall conform to the current County construction standards and specifications and/or current VDOT standards and specifications. 2. Measures to control erosion and siltation, including detention ponds serving as silt basins during construction, must be provided prior to issuance of the site development perms . The approval of these plans or his agent of the responsibilities containe in no way relieves the developer d in the Virginia Erosion and Sediment Control Handbook. 3. A permit must be obtained from the Office of the Resident Engineer, Virginia Department of Trans ortation (VDOT and Frederick County prior to construction in existing State right-of-way. 4. Approval of this plan does not guarantee issuance of an entrance permit by VDOT when such permit is required under State law. 5. The exact location of all guard rails will be determined by VDOT personnel. "A °oint inspection will be held with the Develo er, Count Representatives, and Representatives of the Virginia I�e artment of Y P P g P Transportation (VDOT� to determine if and where guard rail and/of paved ditches will be needed. The developer will be responsible for providing guardrail and paved ditches as determined by this joint inspection. Refer to Virginia Department of Transportation (VDOT) Guard Rail and Paved Ditch Specifications. 6. An approved set of plans and all applicable permits must be available at the construction site. Also, a representative of the developer must be available at all times. 7. Warning signs, markers, barricades or flagmen should be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD). 8. All unsuitable material shall be removed from the construction limits of the roadway before placing embankment. 9. All pavement sections on the approved plans are based on a minimum CBR value of 6. CBR values less p than 6 will require revised pavement section prepared by Greenway Engineering and approved by the owner. 10. All roadside ditches at grades of more than 5% shall be paved with cement concrete to the limits indicated on the plans and as required at the field inspection. 11. All springs shall be capped and piped to the nearest storm sewer manholes or curb inlet. The pipe shall be minimum 6" diameter and conform to VDOT standard SB-1. 12. Construction debris shall be containerized in accordance with the Virginia Litter Control Act; no less than one litter receptacle shall be provided at the construction site. 13. The contractor shall provide adequate means of cleaning mud from trucks and/or other equipment prior to entering public streets, and it is the contractors responsibility to clean streets, allay dust, and to take whatever measures are necessary to insure that the streets are maintained in a clean, mud and dust free condition at all times. 14. Notification shall be given to the appropriate utility company prior to construction of water and/or sanitary sewer lines. Information should also be obtained from the appropriate authority concerning permits, cut sheets, and connections to existing lines. 15. All sanitary sewers and water mains and appurtenances shall be constructed in accordance with the current standards and specifications of the Frederick County Sanitation Authority. 16. The location of existing utilities shown in these plans are taken from existingg records. It shall be the contractors responsibility to verify the exact horizontal and vertical location of all existing utilities as needed prior to construction. The contractor shall inform the engineer of any conflicts arising from his existing utility verification and the proposed construction. 17. The developer will be responsible for an damage to the existing streets and utilities which occurs as a P Y g g result of his construction project within or contiguous to the existing right-of-way. 18. When grading is proposed within easements of utilities, letters of permission from all involved companies must be provided to Frederick County Public Works Department prior to issuance of grading and/or site development permits. 19. The developer will be responsible for the relocation of any utilities which is required as a result of his project. The relocation should be done prior to construction. 20. These plans identify the location of all known gravesites. Gravesites shown on this plan will be protected in accordance with state law. In the event gravesites are discovered during construction, the owner and engineer must be notified immediately. Vl. All work on this project shall conform to the current editions of and latest revisions to the Virginia Department of Transportation (VDOT) Road and Bridge Specifications and Standards, the Virginia Erosion and Sediment Control Regulations, and any other applicable state, federal or local regulations. In case of a discrepancy or conflict between the Standards or Specifications and Regulations, the most stringent shall govern. V2. All construction shall comply with the latest U.S. Department of Labor, Occupational Safety and Health , and Virginia Occupational y & Health (NOSH) Rules and Regulations. Administration (OSHA), Safety V3. When working within VDOT ri ht-of-wa all traffic control, whether ermanent or tem orar shall be g right-of-way, P temporary, in accordance with the current edition of VDOT's Work Area Protection Manual. Furthermore, all traffic control flaggers must be certified in accordance with Section 105.14(c) of the VDOT Road and Bridge Specifications. V4 The developer shall be responsible for relocating, at his expense, any and all utilities, including traffic signal poles, unction boxes, controllers, etc., owned by VDOT or private public utilit companies. g P J d � / P �p It is the sole responsibility of the developer to locate and i entify utility facilities or items hat may be in conflict with the proposed construction activity. VDOT approval of these plans does not indemnify the developer from this responsibility. V5. Design features relating to field construction, regulations, and control or safety of traffic may be subject to change as deemed necessary by VDOT. Any additional expense incurred as a result of any field revision shall be the responsibility of the developer. V6. Prior to initiation of work, the contractor shall be responsible for acquiring all necessary VDOT land use permits for any work within VDOT right-of-way. V7. If required by the local VDOT Residency Office, a pre -construction conference shall be arranged and held by the engineer and/or developer with the attendance of the contractor, various County agencies, utility companies and VDOT prior to initiation of work. V8. The contractor shall notify the local VDOT Residency Office when work is to begin or cease for any undetermined length of time. VDOT requires and shall receive 48 hours advance notice prior to any required or requested inspection. V9. The contractor shall be responsible for maintaining adequate access to the project from the adjacent t public roadway via a construction entrance that is constructed and maintained m accordance with Section 3.02 of the Virginia Erosion and Sediment Control Handbook. Furthermore, access to other properties affected by this project shall be maintained through construction. The Developer shall have, within the limits of the project, an employee certified by the Virginia Department of Conservation and Recreation (VDCR) in Erosion and Sediment Control who shall inspect erosion and siltation control devices and measures on a continuous basis for proper installation and operation. Deficiencies shall be, promptly rectified. V10. Contractor shall ensure adequate drainage is achieved and maintained on the site during and at the end of construction. Vll. All water and sewer lines within existing or proposed VDOT right-of-way shall have a minimum thirty-six (36) inches cover and when possible shall be installed under roadway drainage facilities at conflict points. P V12. Any unusual subsurface conditions (e.g , unsuitable soils, springs, sinkholes, voids, caves, etc.) encountered during the course of construction shall be immediately brought to the attention of the engineer and VDOT. Work shall cease in that vicinity until an adequate design can be determined by the engineer and approved by VDOT. V13. All fill areas, borrow material and undercut areas shall be inspected and approved by a VDOT representative prior to placement and fill. Where CBR testing is required, a VDOT representative shall be present to insure the sample obtained is representative of the location. When soil samples are submitted. to private laboratories for testing, the samples shall be clearly pidentified and labeled as belonging to a project to be accepted by VDOT and that testing shall be performed in accordance with all applicable VDOT standards and procedures. base, subgrade material, and backfill in utility/storm storm sewer trenches shall be V14. All roadway fill, g y/ compacted in six (6) inch lifts to 95% of theoretical maximum density as determined by AASHTO T-99 Method A, within plus or minus 2% of optimum moisture for the full width of any dedicated street right-of-way. At the direction of VDOT, density tests shall be performed by a qualified independent agency in accordance with VDOT Road and Bridge Specifications. Certified copies of test reports shall be submitted to VDOT daily, unless specified otherwise. EXISTING INTERMEDIATE CONTOUR EXISTING INDEX CONTOUR PROPOSED CONTOUR 400 EXISTING EDGE OF PAVEMENT ---- --- -- --- PROPOSED EDGE OF PAVEMENT EXISTING CURB AND GUTTER PROPOSED CURB AND GUTTER TRANSITION TO REVERSE CURB • •:•..._.x., ••.<.M. EXISTING TELEPHONE LINE _ _ " __ ___ PROPOSED TELEPHONE LINE EXISTING STORM SEINER :.: .. =L�_ - PROPOSED STORM SEWER EXISTING SANITARY SEWER---� PROPOSED SANITARY SEWER EXISTING ELECTRIC SERVICE - ---- - -- - - PROPOSED ELECTRIC SERVICE EXISTING GAS LINE--------------.-____..__�.___ PROPOSED GAS LINE PROPERTY LINE EXISTING EASEMENT LINE ---------- ----- --- PROPOSED EASEMENT LINE CENTERLINE EXISTING TREE LINE �^��•� -gyp' FLOW LINE FENCELINE EXISTING UTILITY POLE/GUIDE WIRE ' EXISTING TELEPHONE PEDESTAL EXISTING WATERLINE W/ TEE --� ----�~-~° ---�--~ -- Ti PROPOSED WATERLINE W/ TEE EXISTING FIRE HYDRANT/VALVE/METER ^� � p � PROPOSED FIRE HYDRANT/VALVE/METER GOa • PROPOSED REDUCER SIGNS '�" PARKING INDICATOR 12 INDICATES THE NUMBER OF TYPICAL PARKING SPACES HANDICAP PARKING VEHICLES PER DAY COUNT 100 SCALE: 1 = 2000 �. W iii o °° Z -. '° <r ::: � a w 44 Rom LU W W � GQ OLD C LES J� TOWN RD c�Q' w �`�'QO �� S �TE �0J'� � ROUTE 37 U n T �T SHEET T IND15'11 it .s > S o w w `� COVER SHEET 1 EROSION & SEDIMENT CONTROL PLAN 2 SITE PLAN AND DETAILS 3 VERIZON DETAILS 4 THESE PLANS ARE A MODIFICATION OF THE APPROVED SITE PLAN #20-10, AT&T TOWER. THE ORIGINAL SITE PLAN WAS ADMINISTRATIVELY APPROVED ON JULY 5, 2011 BY THE FREDERICK COUNTY DEPARTMENT OF PLANNING AND DEVELOPMENT. Z � W Q' Z p � � N ,_.., � rn +� q °� � 0 o N � � Z W o v z Z Z a py W Q r T' 01 o 21. The contractor is to verify field conditions prior to and during construction and notify Greenway Engineering at (540) 662-4185 immediately of any discrepancies between actual field conditions and the approved plan. 22. Controlled fills shall be compacted to 95% of maximum density as determined by method "A" per standard proctor AASHTO-T99, ASTM-D698, or VTM-1 as applicable. Density shall be certified by a registered professional engineer and results submitted to Frederick County prior to pavement construction. If a geotechnical report has been prepared, it should supersede the requirements in this note. 23. Contractors shall notify operators who maintain underground utility lines in the area of proposed excavating or blasting at least two (2) working days, but not more than ten (10) working days, prior to commencement of excavation or demolition. Names and telephone numbers of the and operators underground utility lines in Frederick County appear below. These numbers shall also be used to serve in an emergency condition. 24. All utilities to be located underground. 25, All outdoor lighting must be shielded from adjoining properties and road right-of-ways. Note: An lace within these plans statingGreenwayEngineering, shall represent GreenwayEngineering; Inc. V15. VDOT Standard CD and UD underdrains shall be installed where indicated on these plans and/or as specified by VDOT. V16. The installation of any entrances and mailboxes within any dedicated street right-of-way shall meet VDOT minimum design standards and is the responsibility of the developer. V17. Prior to VDOT acceptance of an streets, all required street si na e and/or pavement markings shall P Y q g g / P g be installed by the developer or, at VDOT's discretion, by VDOT on an account receivable basis following the Manual On Uniform Traffic Control Devices. V18. The developer shall providey all a invoices for mate Gals utilized list of all material sources prior to the start of construction. Copt y dedicated street right-of-way must be provided to the local VDOT Residency Office prior to acceptance of the work. Unit and total prices may be obscured. V19. Aggregate base and subbase materials shall be placed on subgrade by means of a mechanical spreader. Density will be determined using the density control strip in accordance with Section 304 of the VDOT Road and Bridge Specifications and VTM-10. A certified compaction technician shall perform these tests. Certified copies: of test reports shall be submitted to VDOT daily, unless specified otherwise. In addition to checking stone depths, a VDOT representative shall be notified and given the opportunity to be resent during the construction and testing of the density control strip. P g g Y P• V20. Asphalt concrete pavements shall be placed in accordance with Section 315 of the VDOT Road and Bridge Specifications. Density shall be determined using the density control strip as specified in Section 315 and VTM-76. A certified com action technician shall perform these tests. Certified copies of test p P reports shall be submitted to VD T daily; unless specified otherwise. A VDOT representative shall be notified and given the opportunity to be present during the construction and testing of the control strip. V21. In accordance with Section 302.03 the foundations for pipe culverts thirty-six 36 inches and P P Y ( ) larger shall be explored below the bottom of the excavation to determine the type and condition of the foundation. The contractor shall report findings of foundation exploration to the engineer and VDOT for approval prior to placing pipe. Foundation designs shall comply with VDOT Road and Bride Standard g P -1. Where soft, yielding, or otherwise unsuitable foundation is encountered, the foundation design and/or need for foundation stabilization shall be determined by the engineer and approved by VDOT. V22. The foundations for all box culverts shall be investigated by means of exploratory borings advanced below proposed foundation elevation to determine the type and condition of the foundation. The contractor shall submit copies of borehole togs and report findings of foundation exploration to the engineer and VDOT for approval prior to constructing box. Foundation designs shall comply with VDOT Road and Bridge Standard PB-1. Contrary to the Standard, where rock is encountered and cast -in -place box is proposed, the thickness of bedding shall be six (6) inches. Where soft, yielding, or otherwise unsuitable foundation is encountered, the foundation design and/or need for foundation stabilization shall be determined by the engineer and approved by VDOT. V23. Approval of these plans shall expire three 3 ears from the date of the approval letter. PP P P () Y PP V24. VDOT Standard CG-12 Curb Ramps shall be installed where indicated on these plans and/or as specified by VDOT. V25. VDOT Standard Guardrail shall be installed where warranted and/or as proposed on these plans in accordance with VDOT's installation criteria. Final approval of the guardrail layout to be given by VDOT after grading is mostly complete. PROPOSED BUILDING ENTRANCE PROPOSED SANITARY LATEIRAL CLEANOUT SANITARY MANHOLE IDENTIFIER �� O STORM DRAIN STRUCTURE IDENTIFIER O EXISTING SPOT ELEVATION �� PROPOSED SPOT ELEVATION X35 LIGHT PO -¢- THESE PLANS ARE IN CONFORMANCE WITH FREDERICK COUNTY STANDARDS AND ORDINANCES. ANY DEVIATION OR CHANGE IN THESE PLANS SHALL BE APPROVED BY THE ZONING ADMINISTRATOR PRIOR TO CONSTRUCTION j,T OF l U RA DY L, K PLER b LIC. N0.32809 �0 2q 9-A4 `�1Z `SS-toNAL � PROJECT INFORMATION SETBACK REQUIREMENTS: APPROVED CONDITIONS FRONT YARD: 35' I. ALL REVIEW AGENCY COMMENTS AND REQUIREMENTS SHALL SIDE YARD: 15' BE COMPLIED WITH AT ALL TIMES. REAR YARD: 50' 2. THE TOWER SHALL BE AVAILABLE FOR COLLOCATING PERSONAL WIRELESS SERVICES PROVIDERS. SITE PLAN SHALL BE APPROVED BY FREDERICK PARCEL TAX MAP No.: 43-A-130 C.A COUNTY. STREET ADDRESS: 2042 MARTINSBURG PIKE VA T INSB 4. PRIOR TO SITE PLAN APPROVAL, PROPERTIES MUST BE WMGHES042 CONSOLIDATED#. TOTAL AREA: 32185 AC 5. THE TOWER SHALL BE REMOVED BY THE APPLICANT OR PROJECT AREA: 32186 AC PROPERTY OWNER WITHIN TWELVE (12) MONTHS OF DISTURBED AREA; 023 AC ABANDONMENT OF OPERATION. OF TOWER IS NOT ZONED: RP 6. IN THE EVENT A 7LVE (12) MUN MONTHS � COMMUNICATIONS FACILITY ERECTED WITHIN TWELVE R MONTHS of THE APPROVAL OF TOWER HEIGHt: 120', THIS CONDITIONAL USE PERMIT, THE CUP WILL BE DEEMED o INVALID. TOWER TYPE: LATTICE TYPE 7. ANY EXPANSION OR MODIFICATION OF THIS USE WILL A WAIVER WAS APPROVED BY THE COUNTY BOARD OF SUPERVISORS REQUIRE A NEW CONDITIONAL USE PERMIT. AT THEIR NOVEMBER 10, 2010 MEETING TO ALLOW FOR LATTICE TOWER 8. AIRCRAFT WARNING LIGHTS (AWL) SHALL BE PLACED ON CONSTRUCTION. THE TOWER 9. THE TOWER SHALL BE LIMITED TO TWO MICROWAVE DISHES. LANDSCAPING REQUIREMENTS WITH THE ADDITION � ONLY THE TOWER NO LANDSCAPING IS REQUIRED. 1. INSPECTIONS CONDITIONS PREVIOUS SITE PLAN: 040-08 I. STRUCTURE SHALL COMPLY WITH THE VA UNIFORM STATEWIDE BUILDING GODS AND SECTION 312, USE GROUP U (UTILITY AND MISG) OF THE INTERNATIONAL BUILDING CODE 2006. THE REGIONAL P AIRPORT: STRUCTURE IS REQUIRED TO COMPLY WITH CHAP 15 t O 31 THE I. CONDITIONAL USE PERMIT (CUP) �95-10 REQUIRES AIRCRAFT WARNING LIGHTS IBC 2006 FOR STRUCTURAL LOAD, AS WELL AS, SECTION 3108 1. CONDITIONAL BE PLACE ON THE TOWER AS IDENTIFIED IN CONDITION •8 ON THIS PLAN. FOR TOWERS. 2. AIRCRAFT WARNING LIGHTING SHALL BE INSTALLED ON THE TOP OF THE 2. FENCING GREATER THAN 6 FEET IN HEIGHT WILL REQUIRE A TOWER BASED ON THE FOLLOWING SPECIFICATIONS: DUAL L-810 STEADY BUILDING PER IT. BURNING DOUBLE RED OBSTRUCTION LIGHTS AS DEFINED BY FAA ADVISORY CIRCULAR AC1011460-K CHG2, CH5, SECT 53. 3. THE NEW 120' TOWER SHALL BE LOCATED AND EQUIPPED WITH STEP BOLTS AND LADDERS SO AS TO PROVIDE READY 3. THE MICROWAVE TOWER AND AIRCRAFT WARNING LIGHTING SHALL BE ACCESS FOR INSPECTION PURPOSES. THE TOWER SHALL NOT REGISTERED WITH THE FAA AND APPROVED PRIOR TO INSTALLATION. CROSS OR ENCROACH UPON ANY STREET OR OTHER PUBLIC SPACE, OR ENCROACH UPON ANY PRIVATELY OWNED 4. ANY FAILURE OR MALFUNCTION THAT LASTS MORE THAN 30 MINUTES AND PROPERTY WITHOUT WRITTEN CONSENT OF THE OWNER OF THE AFFECTS A TOP LIGHT OR FLASHING OBSTRUCTION LIGHT ON THE TOWER ENCROACHED UPON PROPERTY (SEC 31062-LOCATION AND So A ACCESS). SHOULD o REPORTED IMMEDIATELY SU CALLING ON AS NOTICE IO AIRMEN INOTAM) CAN 11 ISSUED. AS Sooty AS NORMAL OPERATION IS RESTORED GALL Sl1-487-6861 SO THE NOTAM CAN BE 4. SPECIAL INSPECTIONS PER CHAP li IBC 2006 APPLY TO REMOVED. PLEASE CALL THE SAME NUMBER TD EXTEND THE OUTAGE DATE. THIS STRUCTURE. on SEE WEB SITE oeaaa.faa-eov/oeaaa/external/ctent/llghtoutagereportingjap for detarla. 5. SNOW BRIDGING REQUIRES A BUILDING PERMIT. RELOCATION/ADDITIONAL ANTENNAS REQUIRE A BUILDING 5. IN THE EVENT THAT CONDITION t8 OF THE APPROVED CUP IS NO LONGER PERMIT. PLANS SUBMITTED FOR REVIEW SHALL BE SEALED BY DESIRED BY THE COUNTY, A REQUEST MUST BE FILED WITH THE FAA To A VA REGISTERED DESIGN PROFESSIONAL. FENCES GREATER CONSIDER THE REMOVAL OF THE REGISTERED AIRCRAFT WARNING LIGHTING THAN 6 FEET REQUIRE A BUILDING PERMIT. ON THIS TOWER THE FAA HAS THE FINAL DETERMINATION REGARDING THIS REQUEST PER FAA ADVISORY CIRCULAR ACIO/i460-IK. W Y 0 pC m Z F- � � Q OO � C\1 Q > CM ; �, .. E-i W Z W � 0 W �D O Q U � V H W LL U O 0 � W Z � Q Z Q; W J W �' a � Z O 0 � Q V 0 FCSA CONSTRUCTION NOTES SURVEY AND TOPOGRAPHIC INFORIYIA TION 1. The Authority's Water and Sewer Standards and Specifications are available at www.fcsa-water.com <http://www.fcsa-water.com>. 2. The contractor shall adhere to the Authority's standards and specifications in effect at the time of construction. 3. The contractor shall coordinate with and arrange for inspection by the Authority. 4. The contractor shall connect a new sewer line to an existingmanhole b core drilling the Y gmapping manhole. 5. A new water (or forced sewer) main shall be connected to an existing main by a wet tap. The Authority shall furnish all needed material and make the tap. An Application for Wet Tap shall be submitted and the fee paid befor tap is made. 6. Exact locations of water and sewer services on new lines to be coordinated with the Authority's inspector. 7. The Authority's maintenance division shall furnish and install all water meters through 2 inch in size. It is the contractor's responsibility to have the meter box assembly installed correctly.Before a permanent meter is installed: P a. The meter box, with its frame and cover, must be properly aligned with the coppersetter. b. The frame and cover shall be set to final grade. C. The distance between the to of the cover and the co ersetter shall be between�9 P PP 18 and 21 inches. d. All components of the meter box assembly shall be in proper working order. 8. For services that connect to existing lines: a. The Authority shall furnish and install: 1. all 5/8"x3/4", 1", 1 Y2" and 2" water services 2. all sewer services. b. The owner/developer shall: 1. coordinate (or have the contractor coordinate) the location of the service lateral with the Authority's engineering assistant 2. submit an Application for Service and pay the required fees. 9. All water lines must have a backflow prevention assembly (double check valve or RPZ, as required). The assembly must meet ASSE standard number 1015 or 1013. 1. Boundary survey was performed by: GREENWAY ENGINEERING Dated: 7/16/10 2• Aerial, horizontal. and vertical control surveys were performed by: GREENWAY ENGINEERING 2010 Year (Year) 3. Aerial topographic ma in performed b P y' Dated: APPRO VAL ��G� f Z FREDERICK COUNTY ZONING ADMINISTRATOR DATE *APPROVAL OF THESE PLANS SHALL EXPIRE FIVE ( 5) YEARS FROM THE DATE OF PLANNING APPROVAL 6111 E PLAN( �'�p��1�� B �JAf�1F 13! 131 SITE PLAN NUMBER �� 1 I FIRE MARSHALS NOTE Fire lane markings and sienage: ' Any "No Parking" signs and yellow painted curb locations will be installed b field ins ection at the direction of the Fire Marshal's Office. Y P TRIP GENERATION DATA Project Name: A Tdc T T��' i' 1� � �,0CATI01� P�,�.1� C�. TI01� Project Number: 538'7NCLASS USE DWELLING UNITS * TRIP RATE TRIP RATE USE VPDW 10. All fire lines must have a backflow prevention assembly (detector double check valve or RPZ, as required). The assembly shall meet ASSE standard number 1048 or 1047. Any exterior, privately owned fire line shall also have a fire service meter. This assembly .1D1�I�I�'I Magisterial District: Date of Plan: (Month, Day, Year) shall be installed immediately before the backflow prevention unit. Radio read remotes are required. STONEWALL MAGISTERIAL DISTRICT OCTOBER 25, 2011 it. The Authority shall review the mechanical plan(s) for design and material approval of a building's: a. Domestic water meter and its backflow prevention device, and/or its b. Fire service line's backflow prevention device. 12. DEQ must also approve sewer pump stations. FCSA requires a copy of DEQ's Certification to Operate and a copy of the stations DEQ approved 0&M manual. These documents must be received before substantial completion is issued and water meters released. * TA EN FROM ITE TRIP GENERATION 7TH EDITION Owner: AT&T CORP. Address, Including Zip Code & Telephone No. ONE AT&T WAY BEDMINSTER, NJ 07921 908-234-8819 DATE: 10/25/11 UTILITY CONTACTS SCALE: AS NOTED Water/ Frederick County Sanitation Authority Phone: VerizonSewer: P.O. Box 1877 P.O. Box 17398 Winchester, VA. 22604 Baltimore, MD 21297 (540) 868-1061 (301) 954-6282 Power: Rappahannock Electric Coop. Gas: Shenandoah Gas Co. 137 Kelley Court P.O. Box 2400 Front Royal, VA 22630 Winchester, VA 22604 1-800-552-3904 (540) 869-1111 Virginia Utility Protection Service 1-800-552-7001 Developer: P VERIZON WIRELESS Address Including Zip Code & Telephone No. g P P 9000 JUNCTION DRIVE ANNAPOLIS, MD 20701 301-512-2186 DESIGNED BY: RLK FILE NO. 5387N Engineer Certifying Plan: GREENWAY ENGINEERING Address, Including Zip Code & Telephone No. 151 WINDY HILL LANE WINCHESTER, VA 22602 (540) 662-4185 HANDICAPPED PARKING NOTE SHEET 1 OF 4 Handicapped parking spaces and aisles shall slope no greater than 2% in all directions, 11-20 C.INVE I DELTA ANGLE RAL205 I ARC LENGTH I TAN5ENT all BEARING GIORD L66TH CI 01°0025` 11419.20' 22725' 113AV N 39'50Y95` E 22725' C2 0/'IOi ,5- 1139920' 232- 161B' N39'5/Y4`E 2'72' Qey� /.gT r•F �yt��'Rr WELL C4PI TOP . 6Tb.41 1 t i a 8 68'03'2113" 1 ALAll- 7*(*- 20, FIBER OPTIC C.181_E EA6E1-FNT- Fk.m� M1\ TM 44-A-24 RRA IUIIIACI l Hr. MIX evwMe" 20'FIBER OPTIC CAPJ.E EASEMENT 50 25 0 50 100 SCALE: 1" = 50' I MINIMUM CONSTRUCTION STANDARDS NARRATIVE AN EROSION AND SEDIMENT CONTROL PROGRAM ADOPTED WITH THIS PLAN MUST BE CONSISTENT WITH THE VSECH FOR 4VAC50-30-40 MINIMUM STANDARDS: 1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED +3_d AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE r+.wDm -►zrn r s�9'10'01"w_20174 `"rt..1lri SITE. TEMPORARY SOILS STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO N.-+ DENUDED AREAS THAT MAY NOT AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 30 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR 2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE _ CONTRACTOR IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT i STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SiTE. 3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT, IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. 4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. 3 TM 43-A-130 AT4T coPP. 5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS IN5T.No. III DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. 32185 AGt�S � Z 6. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN, A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS .VSGETATIN, ^* �t\ �� PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES. ..E C TFerE,I_IW V^ RF B \` . SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM u'�. DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A ` SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE / `. OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE \111L SADCLEAl .. _ BASIN DURING ATWENTY-FIVE YEAR STORM OF 24-HOUR DURATION. RUNOFF I �4 _ COEFFICIENTS USED IN RUNOFF A BARE EARTH CONDITION OF THOSE CONDITIONS �/ EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS UTILIZED. N ::77: v£,ETATittJ 1, CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTION A MANNER THAT r...�sg WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY - ' �- -- WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED. CONGFAI?9 POLE _ 8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS uu hETAL uvA caEFT1c// ,' /sue CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR r SLOPE DRAIN STRUCTURE. 9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED. -- co 0urr 20' 10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT ENTER THE _ °t / CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO r ' ! REMOVE SEDIMENT. oFa + 2✓J' i MAPLE 11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE waft 2A'" 3 / i/ � MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL. I2 /^ 12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND �% COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY ' -v NONERODIBLE COVER MATERIALS. CABLE 20' WIDE STRIP GONTAINW_ jr o �°4r EDER ACRE DEDICATED 13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE ro FREDERtENIW3CK F Tr FOR wruRE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING A-a� ROAD IUIDENINu PURP08E8 PER .�y/I,t iNST 110004902. CONSTRUCTION OF NONERODIBLE MATERIAL SHALL BE PROVIDED. 'W N 53'32'31" W 20.02' 14. ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO alkit WOWING OR CROSSING LIVE WATERCOURSES SHALL BE MET. 15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED. I(o. UNDERCxROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND D15CHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF -SITE PROPERTY. sygo \ D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN "%4 \� ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. N\ Y RFS f'Q`fD EROSION/SEDIMENT CONTROL. LEGEND NO. KEG' 51'Ml5i DE5GRIPTiI 302 CE TEMPORARY GRAVEL CONSTRUCTION 9M ENTRANCE 3.05 SF X- --- SILT FENCE LCG LIMITS OF CLEARING t GRADING DRAINAGE DIVIDES 11 WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC "OT s ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY OpTCSgF�gRFA VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR h�RfBrREF FNr THOROUGHLY AT THPUBLIC SURFACE, E END OF EACH DAY..SEDIMENT SHALL �BE REMOVED FROM TCLEANEDACE SHALL BE HE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL RE5PON515LE LAND DFURHR DEVELOPMENT LOTS AS WELL AS TO LARGER LAND -DISTURBING ACTIVITIES. NAME: 18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE CERTIFICATION #: TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY DATE: THE LOCAL PROGRAM AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. NO THE RESPONSIBLE LAND DISTURBER EROSION CONTROL MEASURE CAN BE CHANGED OR REMOVED WITHOUT THE 15 THE PARTY 1RE5P0N515LE FOR PERMISSION OF THE SHENANDOAH COUNTY INSPECTOR. CARRYING OUT THE LAND DISTURBING 19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE ACTIVITY A5 5ET FORTH IN THE PLAN5. PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF. 20. ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE EMPLOYED IN A MANNER WHICH MINIMIZES IMPACTS ON THE PHYSICAL, CHEMICAL AND BIOLOGICAL INTEGRITY OF RIVERS, STREAMS AND OTHER WATERS OF THE STATE. (ATAT Tow Location Plan) Eroolon and 6edWA t Control Narrative This project is located at 2060 Martinsburg Pike, Winchester, VA 221 After lot consolidation t e total site area shall be 3.2185 acres of which approximately 023 acres will be disturbed for construction. This project consists of the construction of a tower with a base of 10' x 10' square for AT4T. Date of oomtriicti re Construction will begin Following land disturbance permit approval. Lot 43-A-130 is currently occupied by an AT4T maintenance building with the associated driveways, parking area and systems typical for a such a structure. The lay of the land is relatively Flat with 2 to 39. grades with the exception of gently sloping terrain near the back of the lot. AdAaft The site is bounded by a church property to the south a private residence to the north and east and route II to the west. Offafte Areas No disturbance will be required off site. §21W The existing soil conditions were obtained from the web soil survey provided by the NCRS for Frederick County, VA. The soils on this site consist of 14D - Frederick-Poplimento looms, 2 to l percent slopes. Critical smogs No existing critical areas or slopes are located on this site. Erosion and oedirerit control se s4rMs Unless otherwise indicated, all vegetative and structural erosion and sediment control measures shall be constructed and maintained according to the minimum standards and specifications of the Virginia Erosion and Sediment Control Handbook 8tnx.`tiraI roar r«: Mole Is Construction entrance with wash racks (3D2) shall be provided to the project area from the existing entrance on Martinsburg Drive to minimize mud carried onto the road. The construction entrance and wash rack shall remain throughout all phases or construction. Install silt fence (3.05) as shown on the plans to intercept and detain small amounts of sediment from disturbed areas during construction in order to prevent sediment from leaving the site. Tree Save areas within or near area of disturbance must be protected to insure no damage occurs. Temporary seeding (331) and/or permanent seeding (332) shall be placed on all critical slopes (3:1 or greater), on diversion dikes, on sediment trap berms and as needed to stabilize disturbed areas. PheN Its All controls Installed in phase i to remain for the duration of the project, ftodpile ariffiV Stockpiles will be kept onsllts and are will be stabilized with temporary seeding and protected with silt fence. Vegetative stabilization shall be uniform, mature enough to survive and adequate to inhibit erosion. Permanent or temporary soiu stabilization shall be applied to denuded areas immediately after final grade it reached on any portion of the bite. Temporary boil stabilization shall be applied immediately to denuded areas that may not be at final grade but will remain dormant for longer than fourteen (14) days. Permanent soil stabilization shall be applied to all areas that are to be left dormant for more than six (6) months. Topeoil that has been etocll shall be surrounded with silt Fence and protected by mulch and/or temporary vegetation immediately after grading. Construction shall be sequenced such that grading operations will begin and end as quickly as possible. Dame, dikes and diversions shall be stabilized immediately after construction. Temporary seeding or other stabilization will follow immediately after grading. Areas which are not to be disturbed will be clearly marked by flags, signs, etc. Prior to the start of erosion and sediment control Installation. The site superintendent shaft be responsible For the installation and maintenance of all erosion and sediment control measures. Maintenance or these measures throughout the project Is critical to the effectiveness of the program. All temporary controls shall be removed within 30 days once no longer needed. Trapped sediment must be removed, graded and stbIllmed. After areas above controls have been stabilized, the controls shall be cleaned up and removed. Electric power, telephone, storm, sanitary, water 4 gas supply trenches are to be compacted, seeded and mulched within five (5) days after backfilling. No more than 500 Feet are to be open at any one time. All cut and fill slopes are to be seeded and mulched immediately from completion of grading. Drainage ewales shall be stabilized with check dame until vegetation has been well established, at which time the check dams shall be removed. Devices listed above are consldered minimum erosion and sediment controls. Additional control measures may be necessary due to contractor phasing or other unforeseen conditions. It is the contractor's responsibility to provide additional measures to those shown, as needed, in order to control erosion and contain sediment on site. All measures shall be installed according to the standards and specifications in the virginla erosion and sediment control handbook etonwater ran "law t: No storm water management 1s necessary for this site since the Impervious area 15 not increasing. Matntonarlcr prog am: All control measures shall be inspected daily by the site superintendent or his representative and within 24 hours after any storm event ,greater than 0.5 Inches of rain per 24-hour period. Any damaged structural measures are to be repaired by the end of the day. Seeded areas shall be checked regularly to ensure that a good stand of grabs is maintained. All areas shall be fertilized and reseeded as needed until grass is established. Trapped sediment Is to be removed as required to maintain 50% trap efficiency and disposed of by spreading on site. Inlet protection shall be checked regularly for sediment build-up. If the gravel outlet is clogged by sediment, it shall be removed and cleaned or replaced immediately. The contractor Is responsiblle for keeping existing public roads in a clean, dust and mud Free, condition at all times. Also, it is the contractors responsibility For any cleaning/removal of any sediment on public or private roadways. Erosion and s diftlaft care ro'I progran I. Hold pre -construction meeting on site with inspector. 2. Clearing and grubbing For sediment control devices only (construction entrance, silt fence, tree save areas) 3. Placement of sediment control devices. 4. Obtain inspector's approval prior to beginning grading operations, 5. Clear and grub remainder of site. 6. Rough grade site. 7. Install drainage devices with sediment control. 6. Final grading. 9. Restoration and atabillizatlon of disturbed areas. 10. Remove erosion and sediment control measures with the approval of the inspector. Note: The Frederick county public works and engineering department retain the right to add and/or modify these erosion and sediment control measures during the construction process, within reason, to ensure adequate protection to the public and the environment. Seeding sdwdule (soil stabAlizationh I. All permanent seeding shall be in accordance with section 332 or the visti 2. Spread topsoll at a milnlmum depth of Four (4) inches. 3. Incorporate pulverized agricultural limestone into the topsoll at a rate of 92 Iba. Per 1)000 square Feet (2 tons per acre). 4. Fertilize with 10-10-10 fertilizer at a rate of 23 Iba per 1,000 square feet (1000 Iba per acre). 5. Seed all areas with a seed mix consisting of ii kentucky 31 tall fescue and 33% red top clover. 6. Mulch all seeded areas with straw mulch applied at a rate of 3,500 Ibb per acre anchored with cutback or emulsified asphalt applied at a rate of 200 gallons per acre. Dust Controls I. Temporary seeding shall be applied to all disturbed areas subject to little or no construction traffic. 2. All haul roads and other heavy traffic routes shall be sprinkled with water until the surface is wet and repeated as needed to control duet. f T I I I' 111 I I I � 1 , l I I• � ! I• `I I I DRIP LINE PROTECTIVE DEVICE A MAXIMUM LIMITS OF CLEARING AND GRADING A PROPOSED GRADING w r r dol MIN. 5' '•„, *- 'L 0101111! WHERE DRIPLINE IS LESS THAN 5' i CONSTRUCTION OPERATIONS RELATIVE TO THE LOCATION OF PROTECTED TREES Source: Public Facilities Manual, Vol. III, Fairfax Co., Va., 1976 Plate 3.38-1 STONE CONSTRUCTION ENTRANCE 70' MIN. EXISTINGNT J PAVEME A 5:1 FILTER CLOTH --"I 6" MIN. A (�) BERM SIDE ELEVATION EXISTING GROUND 70' MIN. 9 10' WASNRACK MIN. (OPT o-o 10, MIN. 12' MIN. R EXISTING PAVEMENT VDOT /l 1 POSIPVE DRAIN4GE 10' MIN. COURSE AGGREGATE 9 TO SEDIMENT 7R.4PPI.NC DENCE • MUST EXTEND FULL WIDTH OF INGRESS AND EGRESS P OPERATION LAN VIEW 12' MIN. J" MIN. J" MIN. FILTER CLOTH SECTION A - A B'-7• REINFORCED CONCRETE J DRAIN SPACE SECTION B-B SOURCE.- ADAPTED from 1983 Maryland Standards for Soll erosion and Sediment Control, and Vo. DSWL' Plote 3.02-1 CONSTRUCTION OF A SILT FENCE (WITH WIRE S UPPOR T) 1. SET POSTS AND EXCAVATE A 4`X4" 2''. STAPLE WIRE FENCING TO THE POSTS. TRENCH UPSLOPE ALONG THE LINE OF POSTS. l FLOW - III - I III 1 4 3. ATTACH THE FILTER FABRIC TO THE WIRE 4. BACKFILL AND COMPACT THE FENCE AND EXTEND IT INTO THE TRENCH. EXCAVATED SOIL. - -- II 1= r � FLOW � 4 EXTENSION OF FABRIC AND WIRE INTO THE TRENCH. FILTER FABRIC IIII WIRE SOURCE: Adapted from Installation of Straw and Fabric Filter Barriers for Sediment Control, PLATE. 3.05-1 - Imood k Ti Z W W aN ■� � ^, ct � a o0 N tw W W 0 ww� O i~ E� W a� O Q o 0 U WN o o z W N O N r+ Z �y� a � I � I C\1 I TH F l l f U RANDY L, KE ER LIC. NO. 32809 1 )'0NAL yCs W 0_ m Z E­ a C O O L' > I� CV Q p O N E 0 �D W06 W H ~ Q Cl)0 G � W Z Q O Z O 0 Q � � � Q W 0 J Ix 0 DATE: 10/25/11 SCALE: 1" = 50' DESIGNED BY: RLK FILE NO. 5387N SHEET 2 OF 4 11-20 I S I _. J.J " IA L _ -"V T b C UNICAI IONS T HIV R .:. bMM E "K C,(l� ,. %e0tf i �� .may W - �. / , I ✓ .:.x — ....°_. /� .f -. �.5.ak"S5S5t. \ m to .�. ICON . I ?CSC e✓ ,/.� ;�`"" �`'"% /,."� / r � / � � I�...^'f Y ,jr as '! � j ,or• ,,�`, jra..°�. ,a 1. / �. (�`\J� ��S+i � ��, RA }•t� � �A� i_^�f�+. , ,M r) PPP I ff �rt _ J� --... + j � ., *'^e ^ .,C. ! � •tiff'°tl�rK.-' ! i ,:i'rf, � i.:'�''. 4f �,µity. `_,�-� J.:r.�a�i 7 / "'.f.,,,,.:t,na: (( y y rakc a 1,} 210 ,Y �j �'l, fjl//I �- // �j � . �,.�� i_, � T�,i' _ 1p� i;`" ���Ta�i`r� 1 .•l v\� i t / 41 A,1 f Y� e ,t I 4} L � taa � 1f �`�� • 4 '" Y � � raj* � �_ '" � °� -'"" ���, r r;-� • � �� r- ,' NOTES: 1. THE EXISTING AT&T TELECOMMUNICATIONS TOWER LOCATION IS 5.7 MILES FROM THE yy• s' gam'"' ' j WINCHESTER AIRPORT MEASURED FROM THE a .' �;' _ -. .� .� c , � • • ' _ _- I APPROXIMATE CENTER OF THE AIRPORT PARCEL TO THE TOWER LOCATION. 2. FREDERICK COUNTY DIGITAL TAX MAPS USED FOR VICINITY MAP AND DISTANCE CALCULATION. 3. THE TOWER WILL BE 120' AGL. GROUND = 679' AMSL 14T oil TOP OF TOWER = 799' AMSL a'9 a WINCH _ 40RT �� MaM \ • M \ fi 2500 0 2500 5000 YA u i ` 5GALE: 1" = 2500' WINCHESTER REGIONAL AIRPORT VICINITY MAP NOTES 1. ALL EQUIPMENT FOR THE TELECOMMUNICATIONS TOWER WILL RESIDE INSIDE THE EXISTING POP FACILITY. (I -STORY CONCRETE BUILDING ON TM 43-A-130) 2. DRAINFIELD RESEARCH ON EXISTING PROPERTIES WAS INCONCLUSIVE OF EXACT LOCATION OF EXISTING DRAINFIELDS. CONTRACTOR TO FIELD LOCATE PRIOR TO CONSTRUCTION. 3' NON EXCLUSIVE EASEMENT 2.0' EX. FENCE EX. EGJ 11'-7x30' LESSEE BLDG. 9.4' \ EQUIPMENT BUILDING PROPOSED MESA CABINET DISCONNECT ill SWITCH MOUNTED ON 4 "x4" WOOD POST —� ` } PROPOSED MESA j CABINET MOUNTED ON 36 "W x 60"L x 36 "D HANDHOLE PROPOSED THREE (3) POSITION VERTICAL METERSTACK MOUNTED ON 4' ELECTRIC SERVICE BACKBOARD - PROPOSED UTILITY COMPANY GRADE MOUNTED TRANSFOFZ' m 1 EX. SHED 93' ] I EX. ECG l EX. TOWER DIMENSION PLAN 10 5 O 10 20 mmmmel SCALE: 1" = 10' • TO SCALE :—COMPACTED 5U—•D ON -•DOF . SOIL PAVEMENT SECTION THICKNE55 PRIOR TO CONSTRUCTION. OF THE 5UE3GRADE MUST 5U5MITTED FORACTUAL DETERMINATION OF REQUIRED i CURVE DELTA ANGLE RADIU5 ARC LENGTH TANGENT CHORD BEAR/N6 CHORD LENGTH Cl 0/ °08 25" 114/4.20' 227.25' 113.(03' N 3V50'05" E 227.25' 62 Ol °l0'08" 11394.20' 232.55' 11628' N 39051'14" E 232.54' T.M. 44-A-24 RITA WILSON INST. No. 010014065 fQ in S 29°I010111 uj OF TAR E AL RANpr R18 iNSM a '� TEES SAPTIST� H o. i0Wo'o666 Z_ Z W W o2 Z qjNa�o ZI � q CID N of Z3� � O 1E Lu Z W W U E 1 40$4$9 o 81 /YD( Q �Mc 03 70, m T.M.43-A-130 ' 1) 30" °'�— ATT CORP. I WHITE OAK k INST. No. 110004,382 t �, / 4" \ 3.2185 ACRES zo w z / WHITE OAK I \ E- W O Ca O \ jf� o U y 120' FALL ZONE W N z �\ IiZI x �wE�raT1` \ �\ \ \\ �\ m ° DBL. HOL L'1' 20" I MAPL l LESSEE 5<-1"x30QUIPMERT� 1 o I e s SHELTER WITW 3' WID ,ION 4k CQ - I . XCLUSIVE EA�I MENT (JFg SHEET 4) \ W I I ESSEE'S 4'X4' �ONC. TOOP 1.4LTH" I ' WIDE NON EXCLUSI EA SEh1ENT — —, EX. G44VEL AREA 24" LESSEE'S ICE A PGE WITH 3� � � \ \ _ _ LTH OF rBRICK I 1 \ E3FR 1 WIDE NON EXCLUS EASEMEik \ I ' I IGARAGE I 1 EG r . 1 \ ` — ` � I } u1 I _ `� � U NDY L. K PLER � / f C.aRAVI ! i ,� I - -- , Ex.SECURITX FENCE \ �. � 1 \ \� b Lic. No. 32809 EX TOWER Zp) Z w -- —`!� 134. - ---� EX. TOWER BASE �\ ENSE ``cS'�,IyCs� ROP. MESA CABINET D I OI NffG `/E £TATION ANAL o • I I i II _. • gE PROP. MESA CA NIBESCREEN . I r I- PROP. METERSTACK \ �\ 42 W / BEES UG I_ I �'�PROP. TRANSFORMER \ I / E NONE AY I -.-. --• CONC. PADS POLE / 0 / JJ W/ METAL LIDS /STy{b S / 1 13 F y. I-6TOR1' 15EPTIC71 ,*0-- / 1 :ONCRETE I i / ' 7g� U) ! I F3UILDING 1 1j FF. FLEV. = 680.18 I Z E-- LL 2052 1 I \ U) °i 1j!'yUIT N _AGj d.-�- 2mn H c ~ !—�GOD\ r—:)WELL CAP / I° ° GSLU S S �� MAPLE E�1 N TOP = 616.91 �Y�46GREEN o; � IJ TREES O Amilp/ 20" \� ' I MAPLE i \ TREES N H)=EL 1 / Z' Q Ei U 2011 0 06 I Q �\^\\ 0 20" �'\ 43 POE I ` `\\ MAPLE WQ Ci MAPLE \ o I / O 2411\ I 1 Q \ I I Iln MAPLE / �? Z ,� Q 1 1 z 201\,6� \� !Iris ` ° L`` I cc(-� I MAPLE I I I �I i I \ 8 `�. / / CL �+ S 60'03'43" E ��I I IiII11� \ PEAR,Z 21,013 c O w \ \ 2011) \ Ii� 2 VOLE\, TF�E r1 RS 6182 MAfj_.E j ~! I 6 SCREEN ` j 1 O I-12 SCREE 'I I I I TREES J Q rr .t,�65 x TREES ! I ! (� 20' FIBER OPTIC ! ` 1 0 / 6eo V / GABLE EASEMENT iRANSFO FR �� / Ekw i f i C POLE / 2o, FIBER OPTIC / O NC L� I I I I 1 CABLE EASEMENT 1 / F— G 20' WIDE STRIP CONTAINING \_ NFw1 0.1056 ACRE DEDICATED TO FREDERICK COUNTY FOR FUTURE 677 ROAD WIDENING PURPOSES PER DATE: 10/25/11 INST "110004982. SCALE: 1" = 30' 20.02 `\TELEPHONE �Ua,� 50 15 O 30 60 DESIGNED BY: RLK MARKER �0�� !I �j b�R „ FILE NO. 5387N SCALE: I = 30 — - SHEET 3 OF 4 c - 11-20 b - CABLE PLOW STAY VAlQD LOCATION P.4-Ijff*71 CAaLr=1 OR1 bPiION "An — Egg , RE ai4 F K154 ■ oilR, li 'TYP. \12PUZON AIRELESS SHOL70111t ELE04VATIONS DIF+IMl5IONS S40WH ARE FOR Rt�'tRt:WE ONLY+ - Know whmt's below. C81I betm you dig. ara rm VMRNLF, am rav" MUM DAYS 40= Tm uwvm*G ODES NDT N=UMX IE122&%lY O MEMMlENB FOR COi STMliCTIM S%FtN. All M9'R410W W9T K 041E IN VCI&L OM MW 7FE *=PAT1ON& SAFETY APO HMTH AM Of 11M AM All RLIM AM IE1oIJUMMs 7F1E]tE M AP"WD1A". AT4T TOWER LOCATION - 5TEPHEN50N ANT. DESIGN BYSECTOR ALPHA BETA GAMMA MODEL QTY MODEL QTY MODEL QTY 100 MODEL 4 QUANTITY 5XA-10063-8CF-2 1 5XA-10063-8CF-2 I 5XA-10063-8CF-2 I 850 MODEL 4 QUANTITY LPA-10063-8CF 2 LPA-10063-80F 2 LPA-10063-SCF 2 1900 MODEL 4 QUANTITY BXA-185063-12CF 1 5XA-185063-12CF I BXA-185Z63-12CF I ANTENNA AZIMUTHS 300 40 240 CABLE 51ZE AND QUANTITY 1-5/8 AVA 6 1-5/8 AVA 6 1-5/8 AVA 6 CABLE LENGTHS TBD TBD TBD TMA MODEL 4 QUANTITY N/A N/A N/A DETAILS ON THIS SHEET BY OTHERS AND SHOUJN FOR REFERENCE ONLY. U FA N X Lu U 0 C4AIN LINK TOP SEE-VA6E BARBW AND T`14J57D BOTTOM 51ELVA&= � EI,AgL�D AIM TYP. TIE l+'+�IRE FAIL5, G1.A55 B 5T=L TUBING, 11/41 17W (1 5/6" CAD) S6H 40 (TYP) ENIP F'DST, C-,L A6W $ t T�IIuuWr 2 142" PIA. (2 1/50 00) 5C4+ 40 tr P J r3" MIN. TEN5 ON AFX C',ONZFWM POOTINd "J 10'-O" MIH L-11 L 11-01 Rev: 06 /02 /11 LI1e P05T, C4-A55 S STEEL TU5IN6, 2- nlA- (2 " oon) Sc-H 40 ?L r J CHAIN L INK f OONCE POTA I L NC?T TO $CALF 11.2" Cn .5.2" ANTEL BXA 70063/8CF—EDIN VERIZON — ANTENNA DETAILS NOT TO SCALE LINE FMT TI E5 REV: 02/07/11 EXHIBIT A-3 TOPeRR ELEVATION SCALE: NTS 6.1 " 4.1" 0 N (\ ANTEL BXA 185063/12CF VER ZON ANTENNA DETAILS NOT TO SCALE 13.1" 15.2" 'I` ANTEL LPA 70063/8CF-EDIN VERIZON ANTENNA DETAILS NOT TO SCALE v Z Fft1 z FFFFfffi W W z4j o� °° z --, Lit 3 z W W v SL 2 o .o'I: �Y WW TH OF I U RANDY L PLER LiC. No. 32809 sIONAL W Y C7 cc to Z Qfy, HN N i�i d' Q H%.10CV E--i �, ~ z0 W Q 1- W o o NQ0 � W � Z 0 O Q U O J cc W O DATE: 10/25/11 SCALE: NONE DESIGNED BY: RLK FILE NO. 5387N SHEET 4 OF 4 11-20 CENERAL NOTES VOOT GENERAL NOTES LECEND VICINITY MAP C5 1. Methods and materials used in the construction of the improvements herein shall conform to the current V1. All work on this project shall conform to the current editions of and latest revisions to the Virginia SCALE: 1 = 2000 - County construction standards and specifications and/or current VDOT standards and specifications. Department of Transportation (VDOT) Road and Bridge Specifications and Standards, the Virginia Erosion In EXISTING INTERMEDIATE CONTOUR and Sediment Control Regulations, and any other applicable state, federal or local regulations. case of 2. Measures to control erosion and siltation, including detention ponds serving as silt basins during a discrepancy or conflict between the Standards or Specifications and Regulations, the most stringent EXISTING INDEX CONTOUR construction, must be provided prior to issuance of the site development permit. The approval of these plans in no way relieves the developer or his agent of the responsibilities contained in the Virginia Erosion and shall govern. PROPOSED CONTOUR 400 Sediment Control Handbook. V2. All construction shall comply with the latest U.S. Department of Labor, Occupational Safety and Health EXISTING EDGE OF PAVEMENT OLD C RI W 3. A permit must be obtained from the Office of the Resident Engineer, Virginia Department of Administration (OSHA), and Virginia Occupational Safety & Health (VOSH) Rules and Regulations. PROPOSED EDGE OF PAVEMENT Q� �J TOWN RD h W N00 Trans ortation V3. When working within VDOT right-of-way, all traffic control, whether permanent or temporary, shall be �5 N ! °�,° VDOT and and Frederick County prior to construction in existing State right-of-way. in accordance with the current edition of VDOTs Work Area Protection Manual. Furthermore, all traffic EXISTING CURB AND GUTTER _______�_ ._�..-__�___. _ ____ �� Z 4. Approval of this plan does not guarantee issuance of an entrance permit by VDOT when such permit is control flaggers must be certified in accordance with Section 105.14(c) of the VDOT Road and Bridge PROPOSED CURB AND GUTTERMCC-q�, N a N required under State law. Specifications. TO REVERSE CURB`SRp,� TRANSITION o 5. The exact location of all guard rails will be determined by VDOT personnel. "A Joint inspection will be Department V4 The developer shall be responsible for relocating, at his expense, any and all utilities, including POSTING TELEPHONE LINE ----------- -- W held with the Develo er, County Representatives, and Representatives of the Virginia of traffic signal poles, junction boxes, controllers, etc., owned by VDOT or private / public utility companies. O �o Transportation (VDOT� to determine if and where guard rail and/of paved ditches will be needed. The It is the sole responsibility of the developer to locate and identify utility facilities or items that may be the PROPOSED TELEPHONE LINE ,�� O SITE ,r � w developer will be responsible for providing guardrail and paved ditches as determined by this joint inspection. in conflict with the proposed construction activity. VDOT approval of these plans does not indemnify EXISTING STORM SEWER r�, w J�� 2 Refer to developer from this responsibility. � �O � Virginia Department of Transportation (VDOT) Guard Rail and Paved Ditch Specifications. V5. Design features relating to field construction, regulations, and control or safety of traffic may be PROPOSED STORM SEWER �J mROO 6. An approved set of plans and all applicable permits must be available at the construction site. Also, a sub)ect to change as deemed necessary by VDOT. Any additional expense incurred as a result of any field EXISTING SANITARY SEWER ~--�-- - representative of the developer must be available at all times. revision shall be the responsibility of the developer. PROPOSED SANITARY SEWER W 7. Warningsi ns, markers, barricades or flagmen should be in accordance with the Manual on Uniform Traffic g g V6. Prior to initiation of work, the contractor shall be responsible for acquiring all necessary VDOT land EXISTING ELECTRIC SERVICE ROUTE 37 W Control Devices (MUTCD). use permits for any work within VDOT right-of-way. 8. All unsuitable material shall be removed from the construction limits of the roadway before lacin p g V7. If required by the local VDO'T Residency Office, a pre -construction conference shall be arranged and PROPOSED ELECTRIC SERVICE - ---------__ ___.-_-_ �■� embankment. held by the engineer and/or developer with the attendance of the contractor, various County agencies, EXISTING GAS LINE - V 9. All pavement sections on the approved plans are based on a minimum CBR value of 6. CBR values less Engineering by the utility companies and VDOT prior to initiation of work. PROPOSED GAS LINE SHEET n INDEX than 6 will require revised pavement section prepared by Greenway and approved owner. V8. The contractor shall notify the local VDOT Residency Office when work is to be in or cease for any g PROPERTY LINE U awed with cement concrete to the limit 10, All roadsides at g p s afield � undetermined length of time. VDOT requires and shall receive 48 hours advance notice prior to any EXISTING EASEMENT LINE ---------_ ._-_.___.__..-__. ____.____..._ COVER SHEET 1 z indicated on the plane and asarequ red atethe inspection. required or requested inspection. EROSION & SEDIMENT CONTROL PLAN 2 11. All springs shall be capped and piped to the nearest storm sewer manholes or curb inlet. The pipe shall V9. The contractor shall be responsible for maintaining adequate access to the project from the adjacent q maintained PROPOSED EASEMENT LINE SITE PLAN AND DETAILS 3 be minimum 6" diameter and conform to VDOT standard SB-1. public roadway via a construction entrance that is constructed and in accordance with Virginia Control Handbook. Furthermore, to CENTERLINE VERIZON DETAILS 4 o Section 3.02 of the Erosion and Sediment access other The Developer have, EXISTING TREE LINE .2- 12. Construction debris shall be containerized in accordance with the Virginia Litter Control Act; no less than properties affected by this pro ect shall be maintained through construction. shall Virginia Department one litter receptacle shall be provided at the construction site. within the limits of the project, an employee certified by the of Conservation and FLOW LINE Recreation (VDCR) in Erosion and Sediment Control who shall inspect erosion and siltation control devices 13. The contractor shall provide adequate means of cleaning mud from trucks and/or other equipment prior to dust, to take and measures on a continuous basis for proper installation and operation. Deficiencies shall be promptly FENCELINE -- --- -- to entering public streets, and it is the contractors responsibility clean streets, allay and rectified . Ta } whatever measures are necessary to insure that the streets are maintained- in a clean, mud and dust free EXISTING UTILITY POLE/GUIDE WIRE condition at all times. V10. Contractor shall ensure adequate drainage is achieved and maintained on the site during and at the -j EXISTING TELEPHONE PEDESTAL C� H 14. Notification shall be given to the appropriate utility company prior to construction of water and/or end of construction. �_ �.� ,_� EXISTING WATERLINE W/ TEE ----- -- -- o Z w sanitarysewer lines. Information should also be obtained from the appropriate authority concerning permits, V11. All water and sewer lines within existing or proposed VDOT right-of-way shall have a minimum T 1 Z cut shets, and connections to existing lines. thirty-six (36) inches cover and when possible shall be installed under roadway drainage facilities at PROPOSED WATERLINE TEE / 0 Q � � 15. All sanitary sewers and water mains and appurtenances shall be constructed in accordance with the Authority. conflict points. EXISTING FIRE HYDRANT/VALVE/METER Y U oU current standards and specifications of the Frederick County Sanitation V12. Any unusual subsurface. conditions (e.g., unsuitable soils, springs, sinkholes, voids, caves, etc.) ��p � PROPOSED FIRE HYDRANT/VALVE/METER Dp� • m 5 Z � z 16. The location of existing utilities shown in these plans are taken from existing records. It shall be the encountered during the course of construction shall be immediately brought to the attention of the PROPOSED REDUCER W O N o ,� 11 contractors responsibility to verify the exact horizontal and vertical location of a existing utilities as needed inform the from his engineer and VDO Work shall cease in that vicinity until an adequate design can be determined by the T by VDOT. a N Z Z prior to construction. The contractor shall engineer of any conflicts arising existing engineer and approved SIGNS `� �' a utility verification and the proposed construction. y 17. The developer be for any damage to the existing streets utilities which occurs as a V13. All fill areas, borrow material and undercut areas shall be inspected and approved by a VDOT VDOT be P, will responsible and result of his construction project within or contiguous to the existing right-of-way. representative prior to placement and fill. Where CBR testing is required, a representative shall to insure the sample obtained is representative of the location. When soil samples are submitted PARING INDICATOR present to laboratories for testing, the shall be clearly identified and labeled as belonging to a 12 18. When grading is proposed within easements of utilities, letters of permission from all involved companies private samples to be accepted by VDOT and that testing shall be performed in accordance with all applicable INDICATES THE NUMBER OF TYPICAL PARKING SPACES THESE PLANS ARE A MODIFICATION OF THE APPROVED must be provided to Frederick County Public Works Department prior to issuance of grading and/or site pproject GOT standards and procedures. G SITE PLAN #20-10, AT&T TOWER. THE ORIGINAL SITE development permits. HANDICAP PARKING PLAN WAS ADMINISTRATIVELY APPROVED ON JULY 5 2011 19. The developer will be responsible for the relocation of any utilities which is required as a result of his V14. All roadway fill, base, subgrade material, and backfill in utility/storm sewer trenches shall be (� W inI20. project. The relocation should be done prior to construction. compacted in six (6) inch lifts to 95% of theoretical maximum density as determined by AASHTO T-99 BY THE FREDERICK COUNTY DEPARTMENT OF PLANNING L Method A, within plus or minus 2% of optimum moisture for the full width of any dedicated street direction tests b inde VEHICLES PER DAY COUNT 10® AND DEVELOPMENT. These lans identif the location of all known ravesites. Gravesites shown on this lan will be rotected p y g p p ri ht-of-wa At he of VDOT, densit shall be erformed a ualified endent g y t y p y q p in accordance with state law. In the event gravesites are discovered during construction, the owner and agency in accordance with VDOT Road and Bridge Specifications. Certified copies of test reports shall be o engineer must be notified immediately. submitted to VDOT daily, unless specified otherwise. PROPOSED BUILDING ENTRANCE THESE PLANS ARE IN CONFORMANCE WITH FREDERICK COUNTY STANDARDS AND ORDINANCES. ANY DEVIATION 21. The contractor is to verify field conditions prior to and during construction and notify Greenway Engineeriat (540) 662-4185 immediately of any discrepancies between actual field conditions and the plans and/ V15. VDOT Standard CD and UD underdrains shall be installed where indicated on these or as ;specified by VDOT. p / OR CHANGE IN THESE PLANS SHALL BE APPROVED BY THE ZONING ADMINISTRATOR PRIOR TO CONSTRUCTION LT OF f PROJECT INFORMA TION approved plan. PROPOSED SANITARY LATERAL CLEANOUT r� "A" V16. The installation of any entrances and mailboxes within any dedicated street right-of-way shall meet 22. Controlled fills shall be compacted to 95% of maximum density as determined by method per standard VDOT minimum design standards and is the responsibility of the developer. .-A SETBACK REQUIREMENTS: APPROVED CONDITIONS I. ALL AGENCY COMMENTS AND REQUIREMENTS SHALL proctor AASHTO-T99, ASTM-D698, or VTM-1 as applicable. Density shall be certified by a registered professional engineer and results submitted to Frederick County prior to pavement construction. If a SANITARY MANHOLE IDENTIFIER 12 U RA DY L, K PLER geotechnical report has been prepared, it should supersede the requirements in this note. V17. Prior to VDOT acceptance of any streets, all required street signage and/or pavement markings shall FRONT YARD: 35' REVIEW BE COMPLIED WITH AT ALL TIMES. , d LIC. NO. 32809 be installed by the developer or, at VDOT s discretion, by VDOT on an account receivable basis following SIDE YARD: 15' 23. Contractors shall notify operators who maintain underground utility lines in the area of proposed days, but than ten (10) days, to the Manual On Uniform Traffic Control Devices. STORM DRAIN STRUCTURE IDENTIFIER O REAR YARD: 50' 2. THE TOWER SHALL BE AVAILABLE FOR COLLOCATING PERSONAL WIRELESS SERVICES PROVIDERS. O 24 excavating or blasting at least two (2) working not more working prior Names telephone the V18. The developer shall the VDOT Residency Office with a list of all material sources prior to the MINOR SITE PLAN SHALL BE APPROVED BY FREDERICK `rsIpNAL � commencement of excavation or demolition. and numbers of and operators underground provide invoices for dedicated PARCEL TAX MAP No 43-A-130 Co Y. utility lines in Frederick County appear below. These numbers shall also be used to serve in an emergency condition. start of construction. Copies of all materials utilized within any street right-of-way must be provided to the local VDOT Residency Office prior to acceptance of the work. Unit �13 .4 T INSB STREET ADDRESS: 2042 MARTINSBURG PIKE 2042, 4. PRIOR To SITE PLAN APPROVAL, PROPERTIES MUST BE and total prices may be obscured. EXISTING SPOT ELEVATION WINOS: VA CONSOLIDATED@. 24, All utilities to be located underground. TOTAL AREA: 32165 AG 5. THE TOWER SHALL BE REMOVED BY THE APPLICANT OR V19. Aggregate base and subbase materials shall be placed on subgrade by means of a mechanical PROJECT AREA: 32185 AC PROPERTY OWNER WITHIN TWELVE (12) MONTHS OF ABANDONMENT OF OPERATION. 25. All outdoor lighting must be shielded from adjoining properties and road right-of-ways. spreader. Density will be determined using the density control strip in accordance with Section 304 of PROPOSED SPOT ELEVATION X35 DISTURBED AREA: 023 AC b. IN THE EVENT A TELECOMMUNICATIONS TOWER IS NOT the VDOT Road and Bridge Specifications and VTM-10. A certified com action technician shall perform ZONED: RP ERECTED WITHIN TWELVE MONTHS OF THE APPROVAL OF W these tests. Certified copies of test reports shall be submitted to VD T daily, unless specified otherwise. In to depths, a VDOT representative shall be notified and the opportunity USE. COMMUNICATIONS FACILITY TOWER HEIGHT: 120'- THUS CONDITIONAL USE PERMIT, THE CUP WILL BE DEEMED R Y addition checking stone given LIGHT POLE INVALID. Q_ Note: An lace within these plans statingGreenwayEngineering, shall represent GreenwayEngineering, Inc. to be resent during the construction and testing of the density control sari P g g y P• V20. Asphalt concrete pavements shall be placed in accordance with Section 315 of the VDOT Road and Bridge Specifications. Density shall be determined using the density control strip as specified in Section 315 and VTM-76. A certified corn action technician shall perform these tests. Certified copies of test ppP TOWER TYPE: LATTICE TYPE - A WAIVER WAS APPROVED BY THE COUNTY BOARD OF SUPERVISORS AT THEIR NOVEMBER 10, 2010 MEETING TO ALLOW FOR LATTICE LOWER CONSTRUCTION. i. ,ANY EXPANSION OR MODIFICATION OF THIS USE WILL REQUIRE A NEW CONDITIONAL USE PERMIT. 8. AIRCRAFT WARNING LIGHTS (AWL) SHALL BE PLACED ON THE TOWER THE TOWER SHALL LIMITED TO TU10 MICROWAVE DISHES. (} cc FCSA CONSTRUCTION NOTES SURVEY AND TOPOGRAPHIC INFORMATION be to VMT daily; -otherwise. A VDOT be 9. BE m 1. Boundary reports shall submitted unless specified representative shall the to be during the testing the U0 notified and given opportunity present construction and of control strip. survey was performed by: Z V21. In Section 302.03, the foundations for thirty-six (36) inches GREENWAY ENGINEERING Dated: 7/16/10 LANDSCAPING REQUIREMENT F- E-+ 1. The Authority's Water and Sewer Standards and Specifications are available at accordance with pipe culverts and larger shall be explored below the bottom of the excavation to determine the type and condition of the WITH THE ADDITION OF ONLY THE TOWER No LANDSCAPING IS REQUIRED. U www.fcsa-water.com <http://www.fcsa-water.com>. foundation. The contractor shall report findings of foundation exploration to the engineer and VDOT for 2• Aerial, horizontal and vertical control surveys were INSPECTIONS CONDITIONS Q � 2. The contractor shall adhere to the Authority's standards and specifications in effect at the approval prior to placing pipe. Foundation designs shall comply with VDOT Road and Bride Standard pg performed by: GREENWAY ENGINEERING 2010 PREVIOUS SITE PLAN: a40-08 I. STRUCTURE SHALL COMPLY WITH THE VA UNIFORM STATEWIDE 1. BUILDING CODE AND SECTION 312, USE GROUP U (UTILITY AND time of construction. PB-1. Where soft, yielding, or otherwise unsuitable foundation is encountered, the foundation design (Year) MISC) OF THE INTERNATIONAL BUILDING CODE 2006. THE H 3. The contractor shall coordinate with and arrange for inspection by the Authority. and/or need for foundation stabilization shall be determined by the engineer and approved by VDOT. REGIONAL AIRPORT: STRUCTURE IS REQUIRED TO COMPLY WITH CHAP 15 t 16 OF THE CV d. Q > 4. The contractor shall connect a new sewer line to an existingmanhole b core drilling the y gmapping 3. Aerial topographic ma. in performed b p y' 1. CONDITIONAL I. CONDITIONAL USE PERMIT (CUP) "-10 REQUIRES AIRCRAFT WARNING LIGHTS IBC 2006 FOR STRUCTURAL LOAD, AS WELL AS, SECTION 3108 manhole. V22. The foundations for all box culverts shall be investigated by means of exploratory borings advanced Dated: BE PLACE ON THE TOWER AS IDENTIFIED IN CONDITION 08 ON THIS PLAN. FOR TOWERS. N 5. A new water (or forced sewer) main shall be connected to an existing main by a wet tap. below proposed foundation elevation to determine the type and condition of the foundation. The E� The Authority shall furnish all needed material and make the tap. contractor shall submit copies of borehole logs and report findings of foundation exploration to the VDOT for to box. Foundation designs VDOT 2. AIRCRAFT WARNING LIGHTING SHALL BE INSTALLED ON THE TOP OF THE 2. FENCING GREATER THAN 6 FEET IN HEIGHT WILL REQUIRE A W Z H An Application for Wet Tap shall be submitted and the fee paid befor tap is made. engineer and approval prior constructing shall comply with Bridge Standar PB-1. Contrary to the Standard, -in d d Road is TOWER BASED ON THE FOLLOWING SPECIFICATIONS: DUAL L-810 STEADY BUILDING PERMIT. �l 6. Exact locations of water and sewer services on new lines to be coordinated with the and where rock encountered an cast -place BURNING DOUBLE RED OBSTRUCTION LIGHTS AS DEFINED BY FAA ADVISORY , W Authority's inspector. box is proposed, the thickness of bedding shall be six (6) inches. Where soft, yielding, or otherwise CIRCULAR AC10/1460-1K CHG2, CH5, SECT 53. 3. THE NEW 120 TOWER SHALL BE LOCATED AND EQUIPPED WITH STEP BOLTS AND LADDERS SO AS TO PROVIDE READY E, Q APPROVAL 7. The Authority's division furnish install through 2 unsuitable foundation is encountered, the foundation design and/or need for foundation stabilization shall ACCESS FOR INSPECTION PURPOSES. THE TOWER SHALL NOT Q maintenance shall and all water meters be determined by the engineer and approved by VDOT. 3. THE MICROWAVE TOWER AND AIRCRAFT WARNING LIGHTING SHALL BE CROSS OR ENCROACH UPON ANY STREET OR OTHER PUBLIC U inch in size. It is the contractor's responsibility to have the meter box assembly installed REGISTERED WITH THE FAA AND APPROVED PRIOR TO INSTALLATION. W LL correct! Before a permanent meter is installed: y p a. The meter box, with its frame and cover, must be properly aligned with the coppersetter. V23. Approval of these Tans shall expire three 3 ears from the date of the approval letter. pp p p• ( ) y pp V24. VDOT Standard CG-12 Curb :Ramps shall be installed where indicated on these plans and/or as 4. ANY FAILURE OR MALFUNCTION THAT LASTS MORE THAN 30 MINUTES AND AFFECTS A TOP LIGHT OR FLASHING OBSTRUCTION LIGHT ON THE TOWER SPACE, OR ENCROACH UPON ANY PRIVATELY OWNED PROPERTY WITHOUT WRITTEN CONSENT OF THE OWNER OF THE ENCROACHED UPON PROPERTY (SEC 31082-LOCATION AND Q � O d U 0 H by VDOT. � SHOULD BE REPORTED IMMEDIATELY BY CALLING 811-481-6861 SO A ACCESS). b. The frame and cover shall be set to final grade. specified �i C_ %'�� �,� Z NOTICE To AIRMEN CAN ISSUED. AS SOON CAL Q C. The distance between the to of the cover and the co ersetter shall be between P PP 18 and 21 inches. V25. VDOT Standard Guardrail shall be installed where warranted and/or as proposed on these plans in FRED RICK COUNTY ZONING ADMINISTRATOR DATE 11 O AM OPERATION IS RESTORED GALL 811-481-6861 SO THE NOTAM CAN BE RESTORED 4. SPECIAL INSPECTIONS PER CHAP 11 IBC 2006 APPLY To THIS STRUCTURE- Q W d. All components of the meter box assembly shall be in proper working order. accordance with VDOT's installation criteria. Final approval of the guardrail layout to be given by VDOT *APPROVAL OF THESE PLANS SHALL EXPIRE FIVE 5 ( ) REMOVED. PLEASE CALL THE SAME NUMBER TO EXTEND THE OUTAGE DATE. SEE WEB SITE osaaa.Faar3ov/oaaaa/external/content/lightoutagereportingjsp J R� 8. For services that connect to existing lines: a. The Authority shall furnish and install: shall l after grading is most! complete. g g y p YEARS FROM THE DATE OF PLANNING APPROVAL AL for details. 5. SNOW BRIDGING REQUIRES A BUILDING PERMIT. RELOCATION/ApDITIGNAL ANTENNAS REQUIRE A BUILDING a W � 9 1. all 5/8"xy 1 and 2 water services FIRE MARSHAL'S NOTE PI -AN N APrlor q. 5. IN THE EVENT THAT CONDITION 08 OF THE APPROVED CUP IS NO LONGER PERMIT. PLANS SUBMITTED FOR REVIEW SHALL BE SEALED BY Z Z 2. all sewer services. NAME DESIRED BY THE COUNTY, A REQUEST MUST BE FILED WITH THE FAA TO CONSIDER THE REMOVAL OF THE REGISTERED AIRCRAFT WARNING LIGHTING A vA REGISTERED DESIGN PROFESSIONAL. FENCES GREATER THAN 6 FEET REQUIRE A BUILDING PERMIT. E-' Fire lane markings and signage: b. The owner/developer shall: „ 'No 1 � JAI `�� ���•� THIS TOWER THE FAA HAS THE FINAL THIS Any Parking signs and yellow painted curb locations will be installed ON DETERMINATION REGARDING Q 1. coordinate (or have the contractor coordinate) the location of the service lateral the Authority's by field inspection at the direction of the Fire Marshal's Office. SITE PLAN NUMBER .` REQUEST PER FAA ADVISORY CIRCULAR AC10/146o-IK with engineering assistant O 2. submit an Application for Service and pay the required fees. TRIP GENERATION DATA J 9. All water lines must have a backflow prevention assembly (double check valve or RPZ, as Project Name: Project Number: required). The assembly must meet ASSE standard number 1015 or 1013. ATdcT TOWER LOCATION PLAN MODIFICATION 538'7N WCLASS USE DWELLING UNITS * TRIP RATE TRIP RATE USE VPDW 10, All fire lines must have a backflow prevention assembly (detector double check valve or RPZ, as required). The assembly shall meet ASSE standard number 1048 or 1047. Any O Magisterial District: Date of Plan: (Month, Day, Year) exterior, privately owned fire line shall also have a fire service meter. This assembly I-- shall be installed immediately before the backflow prevention unit. Radio read remotes STONEWALL MAGISTERIAL DISTRICT OCTOBER 25, 2011 arerequired. 11. The Authority shall review the mechanical plan(s) for design and material approval of a * TA EN FROM ITE TRIP GENERATIO 7TH EDITION DATE: 10 25 11 / / Owner: Address, Including Zip Code & Telephone No. g P P building's: ONE AT&T WAY UTILITY CONTACTS a. Domestic water meter and its backflow prevention device, and/or its AT&T CORP. BEDMINSTER, NJ 07921 b. Fire service line's backflow prevention device. 908-234-8819 SCALE: AS NOTED Water/ Frederick County Sanitation Authority Phone: Verizon Sewer: P.O. Box 17398 12. DEQ must also approve sewer pump stations. FCSA requires a copy of DEQ's Certification to Developer: Address, Including Zip Code & Telephone No. DESIGNED BY: RLK Operate and a co of the stations DE approved 0&M manual. These documents must be p copy Q pp P.O. Box 1877 9000 JUNCTION DRIVE received before substantial completion is issued and water meters released. Winchester, VA. 22604 Baltimore, MD 21297 VERIZON WIRELESS ANNAPOLIS, MD 20701 (540) 868-1061 (301) 954-6282 301-512-2186 Power: Rappahannock Electric Coop. Gas: Shenandoah Gas Co. FILE N0. 5387N Engineer Certifying Plan: Address, Including Zip Code & Telephone No. 137 Kelley Court P.O. Box 2400 HANDICAPPED PARKING NOTE SHEET 1 OF 4 Front Royal, VA 22630 Winchester, VA 22604 1-800-552-3904 (540) 869-1111 GREENWAY ENGINEERING 151 WINDY HILL LANE WINCHESTER, VA 22602 Handicapped parking spaces and aisles shall slope no greater than 2% in all directions. Virginia Utility Protection Service 1-800-552-7001 (540) 662-4185 11 -20 O+ w c4,FvE Pa TA AMSLE RAD105 ARC LENGTH TAntSENr CHORD BEAR/N5 GFKJRD LElNSTH cl 01°0e25' 114/420' 227.25' 113b3' N 39'5oV5' E 22725' c2 Ol°1008' I139920' 23255' 116-28' N39°5174=E 1 23254' "TA km,"I III'T.1 m G "Ae*1 t 37,0' t t ! LL{11TE OAK ` i 4" ,� Y aI = oaJc 24" 112" } 1 �. �s f A x P o ! THEE 5AVE �t EAUIPhiEM 1` � EX C1fikY'iHlAatrEA AkEAEMCK 6 GRAV$L --- 134� .- ILI eA MINIMUM CONSTRUCTION STANDARDS NARRATIVE AN EROSION AND SEDIMENT CONTROL PROGRAM ADOPTED WITH THIS PLAN MUST BE CONSISTENT WITH THE VSEGH FOR 4VAC50-30-40 MINIMUM STANDARDS: 1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED rn4s.A.MM AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE 20114, as ► er,a1 _ SITE. TEMPORARY SOILS STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO te*►,.ft,a�uax� DENUDED AREAS THAT MAY NOT AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 30 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR 2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS - SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE CONTRACTOR IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SiTE, 3, A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT, IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. 4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE l LAND DISTURBANCE TAKES PLACE. 11"1. 43 - A-1.30 � At<T CORP. I N 5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS INBT.No.narJ�4932 DAMS DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. 3.2165 ACRE5 Ili` `"•. ,.. z 6. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN. A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS VEGETATION �� PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES. 1 .FXTME,LM B. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM ' DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE ` �' CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A ", '�..H SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE `, OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE LIMITS OF CLEAR -- --. ,�,MCiPADtS BASIN DURING A TWENTY-FIVE YEAR STORM OF 24-HOUR DURATION. RUNOFF I exfl`,�Y PENCE COEFFICIENTS USED IN RUNOFF A BARE EARTH CONDITION OF THOSE CONDITIONS EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS UTILIZED. t - Ei'- RJwER "M 1 -� Ve ATIGN 1. GUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTION A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY NIS a'I _ WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH it +� {j I I o �� �� ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED. 1 $7 _A I ccrlc rT,.3 ` "OLF• '` ` x' �i 8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS `IDg 1 '9r a",`` CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR 1 0.a Ex.1-B10RY F tT!cv ' ' coILDWS I T } SLOPE DRAIN STRUCTURE. � � / �I BUILDMG I 1 gg k I Sr 1 FF. ELEV. = 68M.11-1 0 ,° I 9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED. -- � �.,eer+DulT ', 20, eel CAP1 i° ° ° Oew- ~sir As o MAPLE 10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION TCP=6"16.91 , 14scRM f I 1 + / SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT ENTER THE i. ®2�iF�Es 0 1 I �� / / CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO isMAPLE + /' 1° / REMOVE SEDIMENT. 1 I MAPL£ x / 21E re E - ° / �''..�` 11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE 24"�� MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED \ �A MAPLE ,. / TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IP: BOTH THE (./ I Ih � p i nAPLE CONVEYANCE CHANNEL AND RECEIVING CHANNEL. 8 68.03'33" E > .� \ I r FEAR / 21 t 20"I nq LIE; .'� z _ 12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE eo.REEN I III 1 T1R£F9 �� ' / / '9 TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE TREEs i ; ;1,+ R THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. 20'FIBEROPTIC �,., Mks-, 0 1 9,'6, ;'�° ,_ NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND CAME EASEr ENT--- COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY i Tw�1eFo1�1� , OLE �_, ! 1_2m FIEWRcflTIG NONERODIBLE COVER MATERIALS. ,_V Cr 1 `� i CABLE EA&ErIENTf447' 10' WIDE STRIP GGNTAINING � 4, �• 0,1056 ACC DEDICATED 13. WHEN A LIVE WATERCOURSE MUST BE GROSSED BY CONSTRUCTION VEHICLES MORE TO F'RZEDERICK COUNTY FOR RJTURE `'�� ROAD WIDENING f'URfOSEB PERTHAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING INST "110004982. CONSTRUCTION OF NONERCD15LE MATERIAL SHALL BE PROVIDED. r- 4` t N 53'32'31' W 20.02 14. ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO WORKING OR CROSSING LIVE WATERCOURSES SHALL BE MET. 15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED. b'` \`\ 16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE ,* FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: \ ` \ A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. 2PJ' PIMR OPTIC CA171.F EASEMNT �- B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A \_ MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF -SITE �, PROPERTY. °Dr sy�nFOAR� \, \ D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. 50 25 O 50 100 11. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC SG?�LE: I" = 50' F�os�oaFo ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT CF SEDIMENT BY ppr, SSA ARC VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED NF��Q� R sF� o FNr THOROUGHLY TO A PAVEDOROUGHLY A ORPUBLIC E END OFF EADCH DAY..CE, THE SEDIMENT SD ALL�BE REMOVED FROM TACE SHALL BE CLEANED HE ERO510N/5ED IMENT CONTROL LEeEND NO. KEG' 51'M5OL 3.02 CE 3.05 LCG 1DE5GRIPTiON TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SILT FENCE LIMITS OF CLEARING t GRADING DRAINAGE DIVIDES ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL RE5FON5 5LE LAND D15TUR5ER DEVELOPMENT LOTS AS WELL AS TO LARGER LAND -DISTURBING ACTIVITIES, NAME: 18, ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE GERTII=IC,4TION #: TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY DATE: AREAS LOCAL PROGRAM AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. NO THE REEF CNSIBLE LAND DISTURBER EROSION CONTROL MEASURE CAN BE CHANGED OR REMOVED WITHOUT THE I5 THE f >4RT1' RE5PON515LE FOR PERMISSION OF THE SHENANDOAH COUNTY INSPECTOR. GARRiING CUT THE LAND DISTURBING 19, PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE ACTIVITY /�5 SET FORTH IN THE PL>4NS, PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF. 20. ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE EMPLOYED IN A MANNER WHICH MINIMIZES IMPACTS ON THE PHYSICAL, CHEMICAL AND BIOLOGICAL INTEGRITY OF RIVERS, STREAMS AND OTHER WATERS OF THE STATE. (AUT Tauar Location Plan) Erosion and Sediment Control Narrative This project is located at 2060 Martinsburg Piles, Winchester, VA 22604. After lot consolidation t e total site area shall be 32185 acres of which approximately 023 acres will be disturbed for construction. This project consists of the construction of a tower with a base of 10' x 10' square for AT4T. Data of eanatnmtiam Construction will begin Following land disturbance permit approval. Exia�g alte eanditiara: Lot 43-A-130 is currently occupied by an ATtT maintenance building with the associated driveways, parking area and systems typical for a such a structure. The lay of the land is relatively flat with 2 to 3% grades with the exception of gently sloping terrain near the back of the lot. The site is bounded by a church property to the south a private residence to the north and east and route 11 to the west. Offalts aroma, No dlisturbance will be required off site. fi21IM The existing soil conditions were obtained from the web soil survey provided by the NCRS For Frederick County, VA. The soils on this site consist of 145 - Frederick-Poplimento loams, 2 to 1 percent slopes. Critical areas: No existing critical areas or slopes are located on this site. F-roston mind sediment control sedarms Unless otherwise indicated, all vegetative and structural erosion and sediment control measures shall be constructed and maintained according to the minimum standards and specifications of the Virginia Erosion and Sediment Control Handbook 8trvctaral measures.. Phase I� Construction entrance with wash racks (3-02) shall be provided to the project area from the existing entrance on Martinsburg Drive to minimize mud carried onto the road- The construction entrance and wash rack shall remain throughout all: phases of construction. Install silt Fence (3.015) as shown on the plans to intercept and detain small amounts of sediment from disturbed areas during construction in order to prevent sediment From leaving the site. Tree Save areas within or near area of disturbance must be protected to insure no damage occurs. Temporary seeding (331) and/or permanent seeding (332) shall be placed on all critical slopes (3:1 or greater), on diverson dikes, on sediment trap berms and as needed to stabilize disturbed areas- Phase III All controls Installed in phase i to remain for the duration of the project. ftiadpille sues, Stockpiles will be kept onelte and are will be stabilized with temporary seeding and protected with 811t fence. Vegetative stabilizaltion shall be uniform, mature enough to survive and adequate to inhibit erosion. Permanent or temporary soil stabilization shall be applied to denuded areas immediately after Final grade 15 reached on any portion of the site. Temporary soil stabilization shall be applied immediately to denuded areas that may not be at final grade but will remain dormant for longer than fourteen (14) days. Permanent soil stabilization shall be applied to all areas that are to be left dormant For more than six ((o) months. Topsoil that has been stockpiled shall be surrounded with silt Fence and protected by mulch and/or temporary vegetation immediatesly after grading. Construction shall be sequenced such that grading operations will begin and end as quickly as possible. Dame, dikes and diversions shall be stabilized immediately after construction. Temporary seeding or other stabilization will follow immediately after grading. Areas which are not to be disturbed will be clearly marked by flags, signe, etc. Prior to the start of erosion and sediment controll installation. The site superintendent shall be responsible for the installation and maintenance of all erosion and sediment control measures. Maintenance of these measures throughout the project is critical to the erfer-tiveness of the program. All temporary controls shall be removed within 30 days once no longer needed. Trapped sediment must be removed, graded aned stbilized. After areas above controls have been stabilized, the controls shall be cleaned up and removed. Electric power, telephone, storm, sanitary, water 4 gae supply trenches are to be compacted, seeded and mulched within Five (5) days after backfilling. No more than 500 feet are to be open at any one time. All cut and Fill sloped are to be seeded and mulched immediately from completion of grading. Drainage swales shalll be stabilized with check dams until vegetation has been well established, at which time the check dams eha II be (removed. Devices listed above are considered minimum erosion and sediment controls. Additional control measures may be necessary due to contractor phasing or other unforeseen conditions. It is the contractor's responsibility to provide additional measures to those shown, as needed, in order to control erosion and contain sediment on site. All measures shall be installed according to the standards and specifications in the vlrginia erosion and sediment control handbook Stawwatw management. No storm water management Is necessary For this site since the impervious area Is not increasing. Maintenance program: All control measures shall be inspected daily by the site superintendent or his representative and within 24 hours after any storm event greater than 0.5 inches of rain per 24-hour period. Any damaged structural measures are to be repaired by the end of the day. Seeded areas shall be checked regularly to ensure that a good stand of grass Is maintained. All areas shall be fertilized and reseeded as needed until grass Is established. Trapped sediment Is to be removed as required to maintain 50% trap efficiency and disposed of by spreading on site. Inlet protection shall 'be checked regularly for sediment build-up. If the gravel outlet is clogged by sediment, it shall be removed and cleaned or replaced immediately. The contractor 1s responsible for keeping existing public roads in a clean, dust and mud free, condition at all times. Also, it Is the contractors responsibility For any cleaning/removal of any sediment on public or private roadways. Erosion and sed!WaN, control program= 1. Hold pre -construction meeting on site with Inspector. 2. Clearing and grubbing For sediment control devices only (construction entrance, silt fence, tree save areas) 3. Placement of sediment control devices, 4. Obtain inspector's approval prior to beginning grading operations. 5. Clear and grub remainder of site. 6. Rough grade site. 1. Install drainage devices with sediment control. 8. Final grading. 9. Restoration and stabilizatlon of disturbed areas. 10. Remove erosion and sediment control measures with the approval of the fnepector. Note: The. Frederick county public works and engineering department retain the right to add and/or modify these erosion and sediment control measures during the construction process, within reason, to ensure adequate protection to the public and the environment. Seeding achodl,le (soil stabilisationA 1. All permanent seeding shall be in accordance with section 332 of the vesch 2. Spread topsoil at a minimum depth of Four (4) inches. 3. Incorporate pulverized agricultural limestone into the topsoil at a rate of 92 Ibs. Per 1,000 square feet (2 tons per acre). 4. Fertilize with 10-10-10 fertilizer at a rate of 23 Ibs per 1,000 square Feet (1,000 Ibs per acre). 5. Seed all areas with a seed mix consisting of 61% kentucky 31 tall Fescue and 33% red top clover. 6. Mulch all seeded areas with straw mulch applied at a rate of 3,500 Ibs per acre anchored with cutback or emulsified aephalt applied at a rate of 200 gallons per acre. Dust controlk 1. Temporary seeding shall be applied to all disturbed areas subject to little or no construction traffic. 2. All haul roads and other heavy traffic routes shall be sprinkled with water until the surface is wet and repeated as needed to control dust. FOIE EROSION AND SED IMENT CONTRfjL IF 11 DRIP LINE PROTECTIVE MAXIMUM I CLEARING PROPOSED IS LESS THAN 5 r� CONSTRUCTION OPERATIONS RELATIVE TO THE LOCATION OF PROTECTED TREES Source: Public Facilities Manual, Vol. III, Fairfax Co., Va., 1976 Plate 3.38-1 STONE CONSTRUCTION ENTRANCE ExlsnNG 70' MIN. A FILTER CLOTH-- 6- MIN. I A I SIDE ELEVATION 12' MIN. 70' MIN. B WASHRACK /-(OP770144L) -VDOT /1 I I POSITIVE DRAINAGE COURSE AGGREGATE 6 TO SEDIMENT TRAPPING DEVICE • MUST EXTEND FULL WIDTH OF INGRESS AND EGRESS PLAN VIEW OPERATION FILTER CLOTH-� SECTION A -A RE SECTION B-B 10' MIN. EXISTING - PAVEMENT MOUNTA6LE BERM (OPTIONAL) 0' fIMIN EXISTING PAVEMENT IO' MIN. SOURCE ADAPTED from 198,E Mor�tond Standards for 5617 erosion and Sediment Control and 14D. DSWC Plots 3.01-1 CONSTRUCTION OF A SILT FENCE (WITH WIRE S UPPOR T) 1. SET POSTS AND EXCAVATE A 4°X4" 2. STAPLE WIRE FENCING TO THE POSTS. TRENCH UPSLOPE ALONG THE LINE OF POSTS. FLOW 3. ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND IT INTO THE TRENCH FLOW 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. �Ilul' I EXTENSION OF FABRIC AND WIRE INTO THE TRENCH. SOURCE: Adapted from Installation of Strae and Fabric Filter Barriers for Sediment Control, PIATE. 3.05-1 Sherwood k 11ye t� Z anaom W 110 - - N y Zzs� �o ui '11- � W W rr I ** -S o Z � .2 o WWI z 0 G z Z I~ o 0 U N O z W N z y a a e1 C\1 I Lo TH F O f f U RANDY L KE ER Lic, NO 32809 W sSIONAL W EL cc � m Z Z E-H U O � � 04 Co Q O O N E F 0 W E�-i W06 Q � O QFn UL- Q_� -:::I, U � � Z W Q O Z 0 O 0 F'- Cl) W Q 0 J W 3.0 DATE: 10/25/11 SCALE: 1" = 50' DESIGNED BY: RLK FILE NO, 5387N SHEET 2 OF 4 11-20 1"itif VA r �/X to � , � 4�.. �.� . � " � ��� �•� I, I� PROPOSED AT&T _ TatdOMMUNIIONS TbWER _ r ION IA \ 7 d! 1 1 - T ♦ � 5 I 1 tP".R k t t Y FfTP1 - NOTES: or cti srrrt !�1 THE EXISTING AT&T TELECOMMUNICATIONS TOWER LOCATION IS 5.7 MILES FROM THE WINCHESTER AIRPORT MEASURED FROM THE - I APPROXIMATE CENTER OF -i HE AIRPORT PARCEL TO THE TOWER LOCATION. I s�,"' �,� .�+ d � 2. FREDERICK COUNTY DIGITAL TAX MAPS USED « _ n I FOR VICINITY MAP AND DISTANCE CALCULATION. 3. THE TOWER WILL BE 120' AGL. GROUND = 679' AMSL \ - ; Cl ,�, /1' o ��:, 'xh r � TOP OF TOWER = 799' AMSL • p� WI GHc FF. AIRFORT st<�l r� ` me �,/' `` r\Y�7 � f•f � ".,.�. ++ ii, '� � v !" �.� eat 7nr C ��eC •� �„, "o mom �0 - 2500 0 2500 5000 AT� > _ / u " '`� ;` 5GALE: 1" = 2500' WINCHESTER REGIONAL AIRPORT VICINITY MAP NOBS 1. ALL EQUIPMENT FOR THE TELECOMMUNICATIONS TOWER WILL RESIDE INSIDE THE EXISTING POP FACILITY. (I -STORY CONCRETE BUILDING ON TM 43-A-130) 2. DRAINFIELD RESEARCH ON EXISTING PROPERTIES WAS INCONCLUSIVE OF EXACT LOCATION OF EXISTING DRAINFIELDS. CONTRACTOR TO FIELD LOCATE PRIOR TO CONSTRUCTION. 3' NON EXCLUSIVE EASEMENT 2.0' - EX. FENCE -- ---- ---- EX. EGJ 11'-7x30' LESSEE BLDG. 9.3' EX. SHED -- EX. 9"4 Ilk EQUIPMENT BUILDING EX. TOWER PROPOSED MESA CABINET DISCONNECT , FTF] SWITCH MOUNTED ON 4"x4" WOOD POST PROPOSED MESA CABINET MOUNTED ON 36 "W x 60"L x 36 "D HANDHOLE PROPOSED THREE (3) o--- - ---.-- POSITION VERTICAL METERSTACK MOUNTED ON 4' ELECTRIC SERVICE BACKBOARD PROPOSED UTILITY COMPANY GRADE MOUNTED TRANSFORMER DIMENSION PLAN 10 5 0 10 20 SGALE: 1" = 10' NOT • SCALE _611 21-A VDOT STONE —COMPACTEDc -. PAVEMENT DE51GN BASED ON -•D_- DE51GN VALVE OF • OF -•DFOR ACTUAL DETERMINATIONOF REQUIRED PAVEMENT SECTIOPRIOR • CONSTRUCTION. S 2g°10'01r1 . W= 201.14' t�E��00 u IL Pp AR �P5 G TI•I 43-A-13213 �1"L4RIgN,4j g AL TRUgTEEB NST No. 866 c►.�p;�r, V W W o� W o CURVE DELTA ANGLE RAD05 ARC, LENGTH TANGENT GHORO BEARIN61 CHORD LENGTH Gl 0/ OD25 /14/9.20 227.25 113fo3 N 3cf 5005 E 227.25 62 0/ °lO 08 " ll399.20' 232.55' 116.28' N 39 °SJ'l4 1 W 1 W T.M. 44-A-24 RITA WILSON ' INST. No. 01001406D w 4) N fQ 81 / Qti.Nc I03 70 0 w w 3�" ° TM. 43-A-130 ll -6 AT 4T CORP. WHITE OAK � '� INST. No. 110004982 / 4" 3,2185 ACRES z z / , WHITE OAI". k \ \4 O o 120' FALL ZONE o z a "I z i 1 5P ;,_' E --; 'I,� — '- '•, � DES � � � \ \ � \ \ i � y Q, ' 112" DBL. HOLILY 201' I MAPL // k LESSEE a�,-i"x30�, QUIPMERT,, I ° i pp� SHELTER WITH 3' WIDE�ION EXCLUSIVE EA ('Mg SHEE'C 4) \ .� Cu I I ESSEE'S 4'X4'ONC. TOOP lU.1Tl=4 \ \ \ \ \ I I I WIDE NON ECLUSI EA�SEFiENT \\ \ �� �' I � I u r -- —1 / Ex. GF14vEL AREA � 2411 LESSEE'S ICE 5�VGE WITH 3k `\ \ _ _ _ TH 0- BRICK WIDE NON EXCLUSIYE EA5EMEi� I I � 1 � � - ' (GARAGE 1 ` EG - - r.. —'I \ NDY L, K PLLR C•sRAVffI 1 " r_ _-- EX.5ECUR(TX FENCE \ 1 Lic. No. 32809 EX. TOWER \ O 24f DA- 2.0) Z I _, _ / _�, EX. TOWER BA'E ` ENSEcS'" Cs 113 --- �t- 134. ---n _.�.. } — --i_ `_7�.._ ROP. MESA CABINET D I O TN GZ vE ETATION `SIGNAL 010 _ w / �. - -_'m _ , _ _ EG PROP. MESA CABINET -- -- - - h SCREEN I LGEN, 1 PROP. METERSTACK ` � \ � \ � O A- 11 � ► vsjiREEs I _ �'�PROP. TRANSFORMER \ �� N w �. uGT)— t1 --- x Y TEL _ HONE POLE /� JJ 0 W/ METAL LIDS �tb .5 \ _per �� PAC.1-5TORY " (CE:PTIC7) � _/ �ST��Y \\ / Q CONCRETE: BUILDING 11 - zPA , 6R Tp�r 1 // o ;ut FE. ELEV. _ 6�.18 � u F_ CC / - CCINDUIT WELL CAP ,' 1° •. c5u1,.�.. _. Sfi>5 �' MAPLE / N N TOP = 616.91 141 SCREEN / � i c 1 \ j �" ` � w � E�-I / DO TREES - I �' I �.. Q O 1 11 • / / �- ' Q O 11 MAPLE , \ TREES � N I` ll HEEL / � / E--+ I � ° r HEEL 1 2011 w � d+ (� Fm x 1 ` MAPLE W @� O / E 2(a"� POE 1 MALE: O fr"I j r ,, II III 2411 3 W 11 IN MAPLE - 1 MAPLE �I i 11 \ all S 68°03'3" E u7 _ o �� I illll� \ PEAR ,1j Zo 21.09 ua c\ 2m,1I I~W \ 2 �. O ti 1I N F b18� ° MAf E ,1 I 6 SCREEN ` N04 [12 5CREE..Fa I I I I TREES / Q �765 x( TREES I I' �1 I G iq r I I I II �`, �\ \ 0 20' FIBER OPTIC '�.,Ir,` � J, \ \ •• I I 1 CABLE EASEMENT -^- wT 5u/ ! TRAN5FORiIER X W C POLE I 20' FIBER OPTIC O GABLE EASEMENT ,r 20.105STRIP CONTAINING 6EACRE DEDICATED ti� �uCp�`` •, 1 I�'o� �/ s[u �! TO FREDERICK COUNTY FOR FUTURE ROAD WIDENING PURPOSES PER INST *110004982. DATE: 10/25/11 \ ` i✓Tom` ` (( QO �! x = 61� SCALE: 1" 30' TELEPHONE 4g \� S � p ' po 50 15 O 30 60 DESIGNED BY. RLK `\MAW,ER SGALE: 1" = 30' FILE NO. 5387N SHEET 3 OF 4 I E 11-20 � n