SITE PLAN TRACKING SHEET
Comment Sheets:
GIS . , VDOT /
Sanitation Authority N Winchester
Inspections ✓ Stephens City %
Public Work�7 Middletown
Parks & Rec A-- Airport
Health Dept. �- Fire
'l-' One copy of Site Plan application form
Payment of site plan review fee
One reproducible copy of Site Plan
OPEN FILE:
�/O 0 File Opened
,�- to hO Reference Manual updated/number assigned
/,�&,&D-base updated
1�Itollo Q--, Application Action Summary updated
CLOSE FILE:
Approved (or denied) letter mailed to applicant/copy to file and cc's
A4111File stamped "approved", "denied" or "withdrawn"
a Reference Manual updated
3 ck D-base updated
Application Action Summary updated
Sys ID# 0� q5
o ()L. NTy of Mi EDERICK
Department of Planning and Development
FAX: 540/ 665-6395
March 3, 2011
Mr. Ron Mislowsky
Patton Harris Rust & Associates, PC
117 E. Piccadilly Street, Suite 200
Winchester, Virginia 22601
RE: Approval of Site Plan 433-10; REMAC merica
Property Identification Number (PIN):
Dear Ron:
ict. Site
The above -referenced site plan was approved on March 3, 201 1. The site plan is approved for revisions
industrial site located at 205 Brick Kiln Road in thatet en parkiwall ng gspaces I(inclurding one
to the existing parking area to accommod
improvements include revisions to the curb, striping, and handicap access.
including p g�
handicap accessible), � in the roved site plan,
All requirements of the Frederick County Zoning Ordinance have been met ro idin you with five (5)
is to the appropriate representative(s).
including review agency comments from ase forward these cope
all relevant review agencies. 1 am p g n approved copy
ce, and
Furthermore, advise the owner(s) that a copy copies of the approved site plan. P1 be
shld development reprocess.renOnce site development is
must be kept on the construction site throughout
complete, th
e owner(s) should contact this office to schedule an on -site inspection. Do not hesitate to
contact me if you have any questions or concerns.
Sincerely,
Candice E. Perkins, AICP
Senior Planner
Attachment
CEP/bad
cc: Jane Anderson, Real Estate
Charles DeHaven, Jr., Stonewall District Supervisor
oners
Gary Oates and Stan Crockett, Stonewall District Planning Commissi
Commissioner of Revenue
60 Spring Knoll Dr., Potomac, MD 2085
REMAC America Inc., 108
treet, Suite 202 • Winchester, Virginia 22601-5000
107 North Kent S
Patton HarrRust 8 Associates •
7
25 January 2011
Candice Perkins, AICP
Frederick County Planning
107 N. Kent Street
Winchester, Virginia 22601
RE: Remac America
Dear Candice,
PR ^ \ We have received your comments regarding Remac America and we offer the following responses.
Plan�] 1 n'n
1 Add hatch to indicate open space to remain. Show in legend.
RESPONSE: Open space to remain is hatched and is shown in the legend. See sheet 2.
Inspections Department
Project shall comply with the Virginia Uniform Statewide Building Code, International and the
International Building Code/2006. Other code that applies is IBC/ANSI A117.1-03 Accessible and Usable
Buildings and Facilities
RESPONSE: Notes added. See sheet 2.
M:- ... 0�'
-G11
Additional parking area shall be included in number of total parking spaces provided.
RESPONSE: Additional parking space is included in the total number of spaces. See sheet 2.
'Minimum accessible parking spaces shall be provided per'I'1106.1 of IBC 2006. A minimum van accessible
parking spaces shall be provided as per section 1106.5. Accessible parking facilities shall be located on the
shortest route of travel from parking area to adjacent accessible entrance. Signage shall comply with USBC
1106.8. Accessible parking shall comply with IBC/ANSI Al17.1-03 for slopes, size, etc...
RESPONSE: Proposed accessible parldng space, which is a van accessible space, is compliant
with the specified codes. Note 7 added. See sheet 2.
Please indicate elevation marks along ANSI accessible parking and accessible route.
RESPONSE: Spot shots added. See sheet 2.
Public Works
Provide a profile of proposed storm sewer system, pipe size, and type, inverts, etc.
RESPONSE: Storm sewer removed. Area drains overland to the existing Swale behind the
building. See sheet 2.
Attached are three copies of the revised plan. Please call if you have any questions.
Sincerely,
PATTON HARRIS RUST & ASSOCIATES
J
Norman P. Dixon
\ PD/kf
Enclosure
2.
4
5
SITE PLAN APPLICATION
Department of Planning and Development Use only.
Date application received: 1A,_ Application #� - �c
Fees received:
Initials:
Project Title: ZVLIVA0, A,t,{6,,,;� 164
Location of Property 2625 K/LV LAAlif- _
(street address) GNC .e k1A .
Property Owner: ' `C-/f,AC . AAi�101A lAl d-01--Z'ORA-TEa _
Address: _It) 61) 1� 11\/C kkOLL Lfl tl.-
4 AG 1,4o ;?o �r
Telephone:
Applicant/Agent PAMAI 11AKC/5 r f 455ocIAA!�7S
Address /Z 7 L- . �' C1—AL1LJ- Y JT.
iV., A1 ,NC-S rEi4�> 1/A . 2Z,;�. /
Telephone:
Designer: MM/�/ rV AfR,CS Rw T AA42 ASSO e /.4TES
Address: Q 4L A 5 ASO r/L-L
Telephone:
Contact:
•
•
6a
6t
7a
7b
8.
a)
b)
c)
d)
e)
f)
g)
Is this a standard or 'minor' site plan?
Is this an original or revised site plan?
Total acreage of parcel to be developed:
Total acreage of parcel:
Property Information:
Property Identification Number:
Current Zoning:
Present Use:
Proposed Use. -
Adjoining Property Use(s)
Adjoining Property Identification Number(s)
Magisterial District(s)
Standard Minor
Original _� Revised
9,110
, ZD
54 -A --6y
M2
/S
/A/Ov S Tie/ A L
54 -A 5"4- -A - 5G , 5 7. 5-Y
T�
STon/Ert/AL L
I have read the material included in this package and understand what is required by the Frederick County
Planning Department. I also understand that all required material will be complete prior to the submission
of my site plan.
Signature:
Date:
7
•
..Littdted Puv er.of
Cale.2ty 0.0rederid4 V>trowh
Rre�ari�k �tb�l�w�ws�.�.l�.t�v�ts
Dapastment orPIAW91% & De'Pdbplgext, CeOa Y o "ftedtrCQk,
1117 'W,!t( Kent 9tceet.'*Salt! 202 'WfeshvMrr V"k*.SWDI
FacsiMi]o'Sd0�68SS Pltoltt 5ia6fs5-Sbal
Know AllMor, By Thot+e Pmseut: That I (WO S � f e0,6f P55
;OS-Brick Kill] 10",
(y� REMAC Amerce, Inc.rI'#rcrnt) (800) 80C-9608
(AddMIj 10860 SDOng Knoll Drtve, Potcrymc MD 20854 .t
the Ow t t) Of4w 1` se - t to ft Or parcafs: of Y+k�d _t'g'r ap "�' ax�re�d 1aT.e� t;�ask r-c�eed:r�oo> l-#31
tiro ClWs C3&e;of the.>r'ir z t-C bunt t C tc4QmUry Otfted6t ia; wgiN*. by
xdd r e ss Instinvoi itt'IYd• 1181 pr pgp 54 • andi3 aril ` -a5
��s�r�ct, 5}aNeWAI)
Perctid: A Lotr 55 BJbW Secti'va: kul vrt~
do lrer4by Make Mi silty (w"d s2pitrt Record 1j 0.1
(Naytb) Patton Harris Rust & Associates ttsj (54,0) 667-2139
(;Address) 117 E. PiccedHIX Street, Suite 20C, Winchester, VA 2260'
To. Rot w my woe and W.46l xtt®rncy-nt•fac't'ft and .in maf (but) name, �Iaee, and.--teak �: full' p,Qavar
imd atit m(lity I (we). would bxve if acting persomIly to Sit Planning aMUcxtioml for MY (btu RDbve
dewt*ed Property, utclud Ag:
Iipao" (&ehWIhg4n DWers)
tGtinsfitity� IIerc Pam_ if
l�aat�erl[I�va*i*�tdit>ict )jiafl (P> eliaates *7A' h Ill
sift -PINA
_ Sula�ivisletR
Variance. or Appeal
Gampaehetudv�Paltcy Eln.tt .�rnen%t
My atttrttsey-in-fact shell -ham: fire auxpoaity to offer prvMrCd m-u ticm artd to at&c sweitto
prey; ly_sppt-bveti prof'Sbttd ear diarOfYs. I*as rbAow,&
This aataorimtion s`.tail eVire one year th . dty it is ,*pv. , or vtm it is oI1e v*..t .t'CacitK6.01
ruodified. 4'S ;' D 1 O
In wftm thereof: I (we) have brr (our).baT►d end soel tNs IC( ry of�aduQ r , 20�+
94Mfure(s) tAI(-. uty & . � ; 1 l\, `P�jl �i i A
static trt ' ,��1+'��Ca ! of Tina �YL . Toort: : -
I. �Q 'er. �1 f f t TV a Nit terq ?abUc is and =hx The jalsdictiom
Ab
slrid, oerti p tltatslte pe son(a) v►hc:sip teckto fde Tiai ii >atittatt}t.:prr qy appe+!►rw bebt' =
{d-1>a8t�rnaar�e * the sa c before me in Htc�uriM*tionAfvo•w&dWs))
owy
L d 99LZ-VZL-t70£
MY
NaMRY MMIC STATE OF U RftMO
My OrmameWOM Erp�qq S@VM g 17, 2MI I
f
1NIOd iiiNNnS SIVi3 N OVVO2I e0b: L l 0 L 80 oeQ
•
0
Request For Site Plan Comments
Department of Planning and Development
Mail to:
Department of Planning and Development
Attn: County Planner
107 North Kent Street
Winchester, VA 22601
(540) 665-5651
Hand deliver to:
107 N. Kent Street
North Building, 2nd Floor
Winchester, VA
(540) 665-5651
Please fill out the information as accurately as possible in order to assist the agency with their
review. Please attach two (2) copies of the site plan with this sheet.
Applicant's Name:
Address:
Phone Number:
Patton Harris Rust & Associates
117 E. Piccadilly Street, Suite 200
Winchester, VA 22601
(540) 667-2139
Name of development and/or description of the request:
Location of property: 205 Brick Kiln Lane, Winchester, VA
Planning and Development's Comments:
Planning and Development use only
Date received
Incomplete
Date reviewed
Signature and Date
Signature and Date (revision)
Date revision received
Incomplete
Date reviewed
15
REMAC America Paving
Date approved
Request for Site Plan Comments
Virginia Department of Transportation
Mail to:Hand deliver to:
Virginia Department of TransportationVirginia Department of Transportation
Attn: Resident Engineer2275 Northwestern Pike
14031 Old Valley PikeWinchester, Virginia 22603
Edinburg, Virginia 22824(540) 535-1818
(540) 984-5600
Please fill out the information as accurately as possible in order to assist the Virginia
Department of Transportation with their review. Please attach five (5) copies of the site
plan with traffic generation data and drainage calculations with this sheet.
Applicant's Name: Patton Harris Rust & Associates C16 i�n P,7v(z/X0/j
Address: 117 E. Piccadilly Street, Suite 200
Winchester, VA 22601
Phone Number: (640) 667-2139
Name of development and/or description of the request: REMAC America Paving
Location of property: 205 Brick Kiln Lane, Winchester, VA
Virginia Department of Transportation's Comments:
.rr r. • • - piTis-proprelty .■•-. • - ■ .■ - ■. . '.■
E)G- - Before aRy werk is performed
•. • -..■ - •- . •--• • ■- .•• -• • And -■ • • - . • r r- r- u
-• r 1 •1 and requires • fee K11 surely r• • coverage. • - _ • • • two • -• hard
copies • an electronic• •• • use permit application.
Thank you for allowing us the opportunity to comment.
13
From:fred co fire • To:96650493
1J&/2010 09:32 #500 P.001/001
Control number
SP10-0027
Project Name
" Remac Atni:rica
Address
205 Brick Kiln Rd.
Type Application
Site Plan
Current Zoning
M-2
Automatic Sprinkler System
No
Other recommendation
Emergency Vehicle Access
Adequate
Siamese Location
Not Identified
Emergency Vehicle Access Comments
Access Comments
Additional Comments
Date recervea
12/9/2010
City
Winchester
Tax ID Number
54 A 55
12/10/2010
Applicant
PHR+A
Stale Zip
VA 22602
Fire District
13
Recommendations
Automatic Fire Alarm System
No
a.
Hydrant Location
Not Identified
Roadway/Alsieway Width
Adequate
Applicant Phone
540-667-2139
Rescue District
13
Election District
Stonewall
Residential Sprinkler System
No
Fire Lane Required
Yes
Special Hazards
No
Plan Approval Recommended Reviewed By Signature
Yes J. Bauserman ���� � " �` APPROVED U� j
�J
•
Request For Site Plan Comments
Frederick County Inspections Department
Mail to:
Frederick County Inspections Dept.
Attn: Building Official
107 North Kent Street
Winchester, VA 22601
(540) 665-5650
Hand deliver to:
107 N. Kent Street, Suite 200
North Building, 2"d Floor
Winchester, VA
(540) 665-5650
Please fill out the information as accurately as possible in order to assist the agency with -their
review. Please attach one (1) copy of the site plan with this sheet.
Applicant's Name: Patton Harris Rust & Associates
Address: 117 E. Piccadilly Street, Suite 200 reGenck Count
''=f'�iF�'"'U--t{is�t .TS�pEctions
Winchester, VA 22601
Phone Number: (540) 667-2139
Name of development and/or description of the request: REMAC America Paving
Location of property: 205 Brick Kiln Lane, Winchester, VA
Inspections Department's Comments: (% G ►'x
� � n
Inspections Dept. use only
Date received
Incomplete
Date reviewed
Signature and Date
Signature and Date (revision
IDna�toe revision received mate approved
.l! m/ I�t f� I�& 0
•
Project shall comply with The Virginia Uniform Statewide Building Code, International and the
International Building Code/2006. Other Code that applies is IBC/ANSI Al 17.1-03 Accessible
and Usable Buildings and Facilities.
Additional parking area shall be included in number of total parking spaces provided.
Minimum accessible parking spaces shall be provided per T1106.1 of IBC 2006. A minimum
van accessible parking spaces shall be provided as per section 1106.5. Accessible parking
facilities shall located on the shortest route of travel from parking area to adjacent accessible
entrance. Signage shall comply with USBC 1106.8. Accessible parking shall comply with
IBC/ANSI Al 17.1-03 for slopes, size, etc...
Please indicate elevation marks along. ANSI accessible parking and accessible route
2/10/11— revised ANSI accessible route, parking, and unloading as required per A117.1.
Unloading and parking areas shall not exceed 2% slope
i
Request For Site Plan Comments
Frederick County Inspections Department
Mail to:
Frederick County Inspections Dept.
Attn: Building Official
107 North Kent Street
Winchester, VA 22601
(540) 665-5650
Hand deliver to:
107 N. Kent Street, Suite 200
North Building, 2"d Floor
Winchester, VA
(540) 665-5650
Please fill out the information as accurately as possiole in order to assist the agency with -their
review. Please attach one (1) copy of the site plan with this sheet.
Applicant's Name: Patton Harris Rust & Associates -
Address: 117 E. Piccadilly Street, Suite 200
Winchester, VA 22601 _- -
Phone Number: (540) 667-2139
Name of development and/or description of the request: REMAC America Paving
Location of property: 205 Brick Kiln Lane, Winchester, VA
Inspections pepartment's Comments: ( ; o r t
'.)S �� ,< -f'D�-V
Inspections Dept. use only
Dale received
Incomplete
Date reviewed
Signature and Date
Signature and Date (revision
Date revision received mate annrnved °? /0 ll
16
'A
Project shall comply with The Virginia Uniform Statewide Building Code, International and the
International Building Code/2006. Other Code that applies is IBC/ANSI Al 17.1-03 Accessible
and Usable Buildings and Facilities.
Additional parking area shall be included in number of total parking spaces provided.
Minimum accessible parking spaces shall be provided per T1106.1 of IBC 2006. A minimum
van accessible parking spaces shall be provided as per section 1106.5. Accessible parking
facilities shall located on the shortest route of travel from parking area to adjacent accessible
entrance. Signage shall comply with USBC 1106.8. Accessible parking shall comply with
IBC/ANSI Al 17.1-03 for slopes, size, etc...
Please indicate elevation marks along ANSI accessible parking and accessible route
2/10/11 — revised ANSI accessible route, parking, and unloading as required per Al 17.1.
Unloading and parking areas shall not exceed 2% slope
C� J
0
I
Mr, Norman P. Dixon
Patton Harris Rust & Associates
117 East Piccadilly Street, Suite 200
Winchester, Virginia 22601
RE: Remac America Site Plan Comments
Frederick County, Virginia
Dear Mr. Dixon:
COUNTY of FREDERICK
Department of Public Works
5401665-5643
FAX: 540/678-0682
February 22, 2011
We have completed our review of the revised site plan dated January 21, 201 L
All of our previous comments have been addressed. Therefore, we recommend approval
of the subject plan.
Sincerely,
�•e C Gt1�f-f
Joe C. Wilder
Deputy Director of Public Works
JCW/rls
cc: Candice Perkins, Planning and Development
file
CADociunents and Settings\flynn\Local SettingsMinporary Internet
Files\Content.Outlook\P8ILOJN3\RLMACAMERICAIZEVSPCOMS.doc
• •
Patton Harris Rust & Associates Memorandum
Engineers. Surveyors. Planners. Landscape Architects.
117 East Piccadilly Sheet
P Winchester, Virginia 22601
HRA T 540.667.2139
F 540.665.0493
To:
Candice Perkins
Organization/Company:
Frederick County Planning
From:
Ron Mislowsky, P.>II�
Date:
February 18, 2011
Project Name/Subject:
REMAC — Brick Kiln Road
cc:
I have enclosed seven copies of the plans along with the approval sheets from review agencies.
Please let me know when we can pick up approved sets.
L
Ij
• •
Patton Harris Rust & Associates
Engineers. Surveyors. Planners. Landscape Architects.
P117 East Piccadilly Street
HR-A Winchester, Virginia 22601
T 540.667.2139
e sAn 4AS neoZ
To: Candice Perkins
Organization/Company:
From:
Date:
Project Name/Subject:
cc:
Frederick County Planning
Ron Mislowsky, P.E.
February 11, 2011
REMAC
Plans revised per Building Inspector and Inspection's approval attached.
Please let me know when I can send plans over for signature approval.
Memorandum
• •
Patton Harris Rust & Associates Memorandum
Engineers. Surveyors. Planners. Landscape Architects.
1 17 East Piccadilly Street
PH R
AWinchester. Virginia 22601
T 540.667.2139
F 540.665.0493
To: Amy Feltener, Frederick County Inspections
,6andice Perkins, Frederick County Planning
From: Ron Mislowsky, P. . ,
Date: February 3, 2011
Project Name/Subject: Remac — Brick Kiln Lane
cc:
We have revised the site plan to show the finished floor elevation and specified a minimum slope for the
drainage flow path at the west end of the building.
Two copies of revised sheet 2 are enclosed for your approval. Please call if you have any questions.
•
Patton Harris Rust & Associates Memorandum
Engineers. Surveyors. Planners. Landscape Architects.
117 East Piccadily Street
PH�f n Winchester, Virginia 22601
T 540.667.2139
F 540.665.0493
To: Mark Cheran
Organization/Company: Frederick County Panning
From: Ron Mislowsk , PKVN_
Date: December 9, 201
Project Name/Subject: REMAC — Smithfield Avenue
PHR+A Project file Number:
cc: Mark Soresi
Harry Sisler
We have enclosed the site plan for parking lot improvements at the REMAC site on Smithfield, just east of (tent
Street. The plan shows new pavement to meet the County requirements with regard to employee parking. We
also provide a handicap parking space and a small pad at the loading dock at the west side of the building. We
do not anticipate much excavation to pave the gravel surface that exists now. The only new pavement is the
ADA accessible space and the associated walkway. No other changes to the site are proposed. The building
access and use remain the same.
Currently, as a condition of the occupancy permit, these improvements have been bonded and they were
supposed to be completed by January 2011. It is apparent that, with the weather, the new pavement cannot be
installed until the spring. We request an extension of the temporary occupancy permit until 31 august 2011. The
existing bond would remain in place until the improvements are completed.
Please call me if you have questions.
Two sets of plans, the POA, the completed application and the minor site plan fee are enclosed.
9.
•
0
Document Approval Form
PLEASE REVIEW THE ATTACHED DOCUMENT. IF THIS DOCUMENT MEETS YOUR
APPROVAL PLEASE INITIAL AND PROVIDE THE DATE AND TIME OF YOUR
APPROVAL.
IF THIS DOCUMENT DOES NOT MEET YOUR APPROVAL PLEASE PROVIDE
COKKEN-rSAS TO WHAT YOU WOULD I TO HAVE COMPLETED.
INITIALS
Candice
Mark
Dana
Eric
Mike
John
COMMENTS:
DATE & TBIE
Received by Clerical Staff (Date & Time):
U:\Pam\Common\Document Approval Form.wpd