Loading...
HomeMy WebLinkAbout33-10 Remac America - Industrial - Stonewall - BackfileDATE �L f t l NO. J d RECEIVED FROM ADDRESS/� { G`-- �jT ��_,_ '� �U -DOLLARS S � Cl FOR RENT n {? / Cl FOR FOR ' ' "�+ `� 1�. ,, IQ d' ///��� J///�jj�/ ��rS AMT. OF � � � I CASH I � ACCOUNT AMT. PAID I CHECK -+ BALANCE "MONEY DUE I ORDER �r SITE PLAN TRACKING SHEET Comment Sheets: GIS . , VDOT / Sanitation Authority N Winchester Inspections ✓ Stephens City % Public Work�7 Middletown Parks & Rec A-- Airport Health Dept. �- Fire 'l-' One copy of Site Plan application form Payment of site plan review fee One reproducible copy of Site Plan OPEN FILE: �/O 0 File Opened ,�- to hO Reference Manual updated/number assigned /,�&,&D-base updated 1�Itollo Q--, Application Action Summary updated CLOSE FILE: Approved (or denied) letter mailed to applicant/copy to file and cc's A4111File stamped "approved", "denied" or "withdrawn" a Reference Manual updated 3 ck D-base updated Application Action Summary updated Sys ID# 0� q5 o ()L. NTy of Mi EDERICK Department of Planning and Development FAX: 540/ 665-6395 March 3, 2011 Mr. Ron Mislowsky Patton Harris Rust & Associates, PC 117 E. Piccadilly Street, Suite 200 Winchester, Virginia 22601 RE: Approval of Site Plan 433-10; REMAC merica Property Identification Number (PIN): Dear Ron: ict. Site The above -referenced site plan was approved on March 3, 201 1. The site plan is approved for revisions industrial site located at 205 Brick Kiln Road in thatet en parkiwall ng gspaces I(inclurding one to the existing parking area to accommod improvements include revisions to the curb, striping, and handicap access. including p g� handicap accessible), � in the roved site plan, All requirements of the Frederick County Zoning Ordinance have been met ro idin you with five (5) is to the appropriate representative(s). including review agency comments from ase forward these cope all relevant review agencies. 1 am p g n approved copy ce, and Furthermore, advise the owner(s) that a copy copies of the approved site plan. P1 be shld development reprocess.renOnce site development is must be kept on the construction site throughout complete, th e owner(s) should contact this office to schedule an on -site inspection. Do not hesitate to contact me if you have any questions or concerns. Sincerely, Candice E. Perkins, AICP Senior Planner Attachment CEP/bad cc: Jane Anderson, Real Estate Charles DeHaven, Jr., Stonewall District Supervisor oners Gary Oates and Stan Crockett, Stonewall District Planning Commissi Commissioner of Revenue 60 Spring Knoll Dr., Potomac, MD 2085 REMAC America Inc., 108 treet, Suite 202 • Winchester, Virginia 22601-5000 107 North Kent S Patton HarrRust 8 Associates • 7 25 January 2011 Candice Perkins, AICP Frederick County Planning 107 N. Kent Street Winchester, Virginia 22601 RE: Remac America Dear Candice, PR ^ \ We have received your comments regarding Remac America and we offer the following responses. Plan�] 1 n'n 1 Add hatch to indicate open space to remain. Show in legend. RESPONSE: Open space to remain is hatched and is shown in the legend. See sheet 2. Inspections Department Project shall comply with the Virginia Uniform Statewide Building Code, International and the International Building Code/2006. Other code that applies is IBC/ANSI A117.1-03 Accessible and Usable Buildings and Facilities RESPONSE: Notes added. See sheet 2. M:- ... 0�' -G11 Additional parking area shall be included in number of total parking spaces provided. RESPONSE: Additional parking space is included in the total number of spaces. See sheet 2. 'Minimum accessible parking spaces shall be provided per'I'1106.1 of IBC 2006. A minimum van accessible parking spaces shall be provided as per section 1106.5. Accessible parking facilities shall be located on the shortest route of travel from parking area to adjacent accessible entrance. Signage shall comply with USBC 1106.8. Accessible parking shall comply with IBC/ANSI Al17.1-03 for slopes, size, etc... RESPONSE: Proposed accessible parldng space, which is a van accessible space, is compliant with the specified codes. Note 7 added. See sheet 2. Please indicate elevation marks along ANSI accessible parking and accessible route. RESPONSE: Spot shots added. See sheet 2. Public Works Provide a profile of proposed storm sewer system, pipe size, and type, inverts, etc. RESPONSE: Storm sewer removed. Area drains overland to the existing Swale behind the building. See sheet 2. Attached are three copies of the revised plan. Please call if you have any questions. Sincerely, PATTON HARRIS RUST & ASSOCIATES J Norman P. Dixon \ PD/kf Enclosure 2. 4 5 SITE PLAN APPLICATION Department of Planning and Development Use only. Date application received: 1A,_ Application #� - �c Fees received: Initials: Project Title: ZVLIVA0, A,t,{6,,,;� 164 Location of Property 2625 K/LV LAAlif- _ (street address) GNC .e k1A . Property Owner: ' `C-/f,AC . AAi�101A lAl d-01--Z'ORA-TEa _ Address: _It) 61) 1� 11\/C kkOLL Lfl tl.- 4 AG 1,4o ;?o �r Telephone: Applicant/Agent PAMAI 11AKC/5 r f 455ocIAA!�7S Address /Z 7 L- . �' C1—AL1LJ- Y JT. iV., A1 ,NC-S rEi4�> 1/A . 2Z,;�. / Telephone: Designer: MM/�/ rV AfR,CS Rw T AA42 ASSO e /.4TES Address: Q 4L A 5 ASO r/L-L Telephone: Contact: • • 6a 6t 7a 7b 8. a) b) c) d) e) f) g) Is this a standard or 'minor' site plan? Is this an original or revised site plan? Total acreage of parcel to be developed: Total acreage of parcel: Property Information: Property Identification Number: Current Zoning: Present Use: Proposed Use. - Adjoining Property Use(s) Adjoining Property Identification Number(s) Magisterial District(s) Standard Minor Original _� Revised 9,110 , ZD 54 -A --6y M2 /S /A/Ov S Tie/ A L 54 -A 5"4- -A - 5G , 5 7. 5-Y T� STon/Ert/AL L I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to the submission of my site plan. Signature: Date: 7 • ..Littdted Puv er.of Cale.2ty 0.0rederid4 V>trowh Rre�ari�k �tb�l�w�ws�.�.l�.t�v�ts Dapastment orPIAW91% & De'Pdbplgext, CeOa Y o "ftedtrCQk, 1117 'W,!t( Kent 9tceet.'*Salt! 202 'WfeshvMrr V"k*.SWDI FacsiMi]o'Sd0�68SS Pltoltt 5ia6fs5-Sbal Know AllMor, By Thot+e Pmseut: That I (WO S � f e0,6f P55 ;OS-Brick Kill] 10", (y� REMAC Amerce, Inc.rI'#rcrnt) (800) 80C-9608 (AddMIj 10860 SDOng Knoll Drtve, Potcrymc MD 20854 .t the Ow t t) Of4w 1` se - t to ft Or parcafs: of Y+k�d _t'g'r ap "�' ax�re�d 1aT.e� t;�ask r-c�eed:r�oo> l-#31 tiro ClWs C3&e;of the.>r'ir z t-C bunt t C tc4QmUry Otfted6t ia; wgiN*. by xdd r e ss Instinvoi itt'IYd• 1181 pr pgp 54 • andi3 aril ` -a5 ��s�r�ct, 5}aNeWAI) Perctid: A Lotr 55 BJbW Secti'va: kul vrt~ do lrer4by Make Mi silty (w"d s2pitrt Record 1j 0.1 (Naytb) Patton Harris Rust & Associates ttsj (54,0) 667-2139 (;Address) 117 E. PiccedHIX Street, Suite 20C, Winchester, VA 2260' To. Rot w my woe and W.46l xtt®rncy-nt•fac't'ft and .in maf (but) name, �Iaee, and.--teak �: full' p,Qavar imd atit m(lity I (we). would bxve if acting persomIly to Sit Planning aMUcxtioml for MY (btu RDbve dewt*ed Property, utclud Ag: Iipao" (&ehWIhg4n DWers) tGtinsfitity� IIerc Pam_ if l�aat�erl[I�va*i*�tdit>ict )jiafl (P> eliaates *7A' h Ill sift -PINA _ Sula�ivisletR Variance. or Appeal Gampaehetudv�Paltcy Eln.tt .�rnen%t My atttrttsey-in-fact shell -ham: fire auxpoaity to offer prvMrCd m-u ticm artd to at&c sweitto prey; ly_sppt-bveti prof'Sbttd ear diarOfYs. I*as rbAow,& This aataorimtion s`.tail eVire one year th . dty it is ,*pv. , or vtm it is oI1e v*..t .t'CacitK6.01 ruodified. 4'S ;' D 1 O In wftm thereof: I (we) have brr (our).baT►d end soel tNs IC( ry of�aduQ r , 20�+ 94Mfure(s) tAI(-. uty & . � ; 1 l\, `P�jl �i i A static trt ' ,��1+'��Ca ! of Tina �YL . Toort: : - I. �Q 'er. �1 f f t TV a Nit terq ?abUc is and =hx The jalsdictiom Ab slrid, oerti p tltatslte pe son(a) v►hc:sip teckto fde Tiai ii >atittatt}t.:prr qy appe+!►rw bebt' = {d-1>a8t�rnaar�e * the sa c before me in Htc�uriM*tionAfvo•w&dWs)) owy L d 99LZ-VZL-t70£ MY NaMRY MMIC STATE OF U RftMO My OrmameWOM Erp�qq S@VM g 17, 2MI I f 1NIOd iiiNNnS SIVi3 N OVVO2I e0b: L l 0 L 80 oeQ • 0 Request For Site Plan Comments Department of Planning and Development Mail to: Department of Planning and Development Attn: County Planner 107 North Kent Street Winchester, VA 22601 (540) 665-5651 Hand deliver to: 107 N. Kent Street North Building, 2nd Floor Winchester, VA (540) 665-5651 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the site plan with this sheet. Applicant's Name: Address: Phone Number: Patton Harris Rust & Associates 117 E. Piccadilly Street, Suite 200 Winchester, VA 22601 (540) 667-2139 Name of development and/or description of the request: Location of property: 205 Brick Kiln Lane, Winchester, VA Planning and Development's Comments: Planning and Development use only Date received Incomplete Date reviewed Signature and Date Signature and Date (revision) Date revision received Incomplete Date reviewed 15 REMAC America Paving Date approved Request for Site Plan Comments Virginia Department of Transportation Mail to:Hand deliver to: Virginia Department of TransportationVirginia Department of Transportation Attn: Resident Engineer2275 Northwestern Pike 14031 Old Valley PikeWinchester, Virginia 22603 Edinburg, Virginia 22824(540) 535-1818 (540) 984-5600 Please fill out the information as accurately as possible in order to assist the Virginia Department of Transportation with their review. Please attach five (5) copies of the site plan with traffic generation data and drainage calculations with this sheet. Applicant's Name: Patton Harris Rust & Associates C16 i�n P,7v(z/X0/j Address: 117 E. Piccadilly Street, Suite 200 Winchester, VA 22601 Phone Number: (640) 667-2139 Name of development and/or description of the request: REMAC America Paving Location of property: 205 Brick Kiln Lane, Winchester, VA Virginia Department of Transportation's Comments: .rr r. • • - piTis-proprelty .■•-. • - ■ .■ - ■. . '.■ E)G- - Before aRy werk is performed •. • -..■ - •- . •--• • ■- .•• -• • And -■ • • - . • r r- r- u -• r 1 •1 and requires • fee K11 surely r• • coverage. • - _ • • • two • -• hard copies • an electronic• •• • use permit application. Thank you for allowing us the opportunity to comment. 13 From:fred co fire • To:96650493 1J&/2010 09:32 #500 P.001/001 Control number SP10-0027 Project Name " Remac Atni:rica Address 205 Brick Kiln Rd. Type Application Site Plan Current Zoning M-2 Automatic Sprinkler System No Other recommendation Emergency Vehicle Access Adequate Siamese Location Not Identified Emergency Vehicle Access Comments Access Comments Additional Comments Date recervea 12/9/2010 City Winchester Tax ID Number 54 A 55 12/10/2010 Applicant PHR+A Stale Zip VA 22602 Fire District 13 Recommendations Automatic Fire Alarm System No a. Hydrant Location Not Identified Roadway/Alsieway Width Adequate Applicant Phone 540-667-2139 Rescue District 13 Election District Stonewall Residential Sprinkler System No Fire Lane Required Yes Special Hazards No Plan Approval Recommended Reviewed By Signature Yes J. Bauserman ���� � " �` APPROVED U� j �J • Request For Site Plan Comments Frederick County Inspections Department Mail to: Frederick County Inspections Dept. Attn: Building Official 107 North Kent Street Winchester, VA 22601 (540) 665-5650 Hand deliver to: 107 N. Kent Street, Suite 200 North Building, 2"d Floor Winchester, VA (540) 665-5650 Please fill out the information as accurately as possible in order to assist the agency with -their review. Please attach one (1) copy of the site plan with this sheet. Applicant's Name: Patton Harris Rust & Associates Address: 117 E. Piccadilly Street, Suite 200 reGenck Count ''=f'�iF�'"'U--t{is�t .TS�pEctions Winchester, VA 22601 Phone Number: (540) 667-2139 Name of development and/or description of the request: REMAC America Paving Location of property: 205 Brick Kiln Lane, Winchester, VA Inspections Department's Comments: (% G ►'x � � n Inspections Dept. use only Date received Incomplete Date reviewed Signature and Date Signature and Date (revision IDna�toe revision received mate approved .l! m/ I�t f� I�& 0 • Project shall comply with The Virginia Uniform Statewide Building Code, International and the International Building Code/2006. Other Code that applies is IBC/ANSI Al 17.1-03 Accessible and Usable Buildings and Facilities. Additional parking area shall be included in number of total parking spaces provided. Minimum accessible parking spaces shall be provided per T1106.1 of IBC 2006. A minimum van accessible parking spaces shall be provided as per section 1106.5. Accessible parking facilities shall located on the shortest route of travel from parking area to adjacent accessible entrance. Signage shall comply with USBC 1106.8. Accessible parking shall comply with IBC/ANSI Al 17.1-03 for slopes, size, etc... Please indicate elevation marks along. ANSI accessible parking and accessible route 2/10/11— revised ANSI accessible route, parking, and unloading as required per A117.1. Unloading and parking areas shall not exceed 2% slope i Request For Site Plan Comments Frederick County Inspections Department Mail to: Frederick County Inspections Dept. Attn: Building Official 107 North Kent Street Winchester, VA 22601 (540) 665-5650 Hand deliver to: 107 N. Kent Street, Suite 200 North Building, 2"d Floor Winchester, VA (540) 665-5650 Please fill out the information as accurately as possiole in order to assist the agency with -their review. Please attach one (1) copy of the site plan with this sheet. Applicant's Name: Patton Harris Rust & Associates - Address: 117 E. Piccadilly Street, Suite 200 Winchester, VA 22601 _- - Phone Number: (540) 667-2139 Name of development and/or description of the request: REMAC America Paving Location of property: 205 Brick Kiln Lane, Winchester, VA Inspections pepartment's Comments: ( ; o r t '.)S �� ,< -f'D�-V Inspections Dept. use only Dale received Incomplete Date reviewed Signature and Date Signature and Date (revision Date revision received mate annrnved °? /0 ll 16 'A Project shall comply with The Virginia Uniform Statewide Building Code, International and the International Building Code/2006. Other Code that applies is IBC/ANSI Al 17.1-03 Accessible and Usable Buildings and Facilities. Additional parking area shall be included in number of total parking spaces provided. Minimum accessible parking spaces shall be provided per T1106.1 of IBC 2006. A minimum van accessible parking spaces shall be provided as per section 1106.5. Accessible parking facilities shall located on the shortest route of travel from parking area to adjacent accessible entrance. Signage shall comply with USBC 1106.8. Accessible parking shall comply with IBC/ANSI Al 17.1-03 for slopes, size, etc... Please indicate elevation marks along ANSI accessible parking and accessible route 2/10/11 — revised ANSI accessible route, parking, and unloading as required per Al 17.1. Unloading and parking areas shall not exceed 2% slope C� J 0 I Mr, Norman P. Dixon Patton Harris Rust & Associates 117 East Piccadilly Street, Suite 200 Winchester, Virginia 22601 RE: Remac America Site Plan Comments Frederick County, Virginia Dear Mr. Dixon: COUNTY of FREDERICK Department of Public Works 5401665-5643 FAX: 540/678-0682 February 22, 2011 We have completed our review of the revised site plan dated January 21, 201 L All of our previous comments have been addressed. Therefore, we recommend approval of the subject plan. Sincerely, �•e C Gt1�f-f Joe C. Wilder Deputy Director of Public Works JCW/rls cc: Candice Perkins, Planning and Development file CADociunents and Settings\flynn\Local SettingsMinporary Internet Files\Content.Outlook\P8ILOJN3\RLMACAMERICAIZEVSPCOMS.doc • • Patton Harris Rust & Associates Memorandum Engineers. Surveyors. Planners. Landscape Architects. 117 East Piccadilly Sheet P Winchester, Virginia 22601 HRA T 540.667.2139 F 540.665.0493 To: Candice Perkins Organization/Company: Frederick County Planning From: Ron Mislowsky, P.>II� Date: February 18, 2011 Project Name/Subject: REMAC — Brick Kiln Road cc: I have enclosed seven copies of the plans along with the approval sheets from review agencies. Please let me know when we can pick up approved sets. L Ij • • Patton Harris Rust & Associates Engineers. Surveyors. Planners. Landscape Architects. P117 East Piccadilly Street HR-A Winchester, Virginia 22601 T 540.667.2139 e sAn 4AS neoZ To: Candice Perkins Organization/Company: From: Date: Project Name/Subject: cc: Frederick County Planning Ron Mislowsky, P.E. February 11, 2011 REMAC Plans revised per Building Inspector and Inspection's approval attached. Please let me know when I can send plans over for signature approval. Memorandum • • Patton Harris Rust & Associates Memorandum Engineers. Surveyors. Planners. Landscape Architects. 1 17 East Piccadilly Street PH R AWinchester. Virginia 22601 T 540.667.2139 F 540.665.0493 To: Amy Feltener, Frederick County Inspections ,6andice Perkins, Frederick County Planning From: Ron Mislowsky, P. . , Date: February 3, 2011 Project Name/Subject: Remac — Brick Kiln Lane cc: We have revised the site plan to show the finished floor elevation and specified a minimum slope for the drainage flow path at the west end of the building. Two copies of revised sheet 2 are enclosed for your approval. Please call if you have any questions. • Patton Harris Rust & Associates Memorandum Engineers. Surveyors. Planners. Landscape Architects. 117 East Piccadily Street PH�f n Winchester, Virginia 22601 T 540.667.2139 F 540.665.0493 To: Mark Cheran Organization/Company: Frederick County Panning From: Ron Mislowsk , PKVN_ Date: December 9, 201 Project Name/Subject: REMAC — Smithfield Avenue PHR+A Project file Number: cc: Mark Soresi Harry Sisler We have enclosed the site plan for parking lot improvements at the REMAC site on Smithfield, just east of (tent Street. The plan shows new pavement to meet the County requirements with regard to employee parking. We also provide a handicap parking space and a small pad at the loading dock at the west side of the building. We do not anticipate much excavation to pave the gravel surface that exists now. The only new pavement is the ADA accessible space and the associated walkway. No other changes to the site are proposed. The building access and use remain the same. Currently, as a condition of the occupancy permit, these improvements have been bonded and they were supposed to be completed by January 2011. It is apparent that, with the weather, the new pavement cannot be installed until the spring. We request an extension of the temporary occupancy permit until 31 august 2011. The existing bond would remain in place until the improvements are completed. Please call me if you have questions. Two sets of plans, the POA, the completed application and the minor site plan fee are enclosed. 9. • 0 Document Approval Form PLEASE REVIEW THE ATTACHED DOCUMENT. IF THIS DOCUMENT MEETS YOUR APPROVAL PLEASE INITIAL AND PROVIDE THE DATE AND TIME OF YOUR APPROVAL. IF THIS DOCUMENT DOES NOT MEET YOUR APPROVAL PLEASE PROVIDE COKKEN-rSAS TO WHAT YOU WOULD I TO HAVE COMPLETED. INITIALS Candice Mark Dana Eric Mike John COMMENTS: DATE & TBIE Received by Clerical Staff (Date & Time): U:\Pam\Common\Document Approval Form.wpd