Loading...
HomeMy WebLinkAbout47-08 Westminster Canterbury - Chapel Addition - Gainesboro - Backfile (2)CENERAL NOTES VDOT GENERAL NOTES LEGEND VICINITY MAP Z Vl. All work on this project shall conform to the current editions of and latest revisions to the Virginia EXISTING INTERMEDIATE CONTOUR - - - - - _ _ SCALE V= 2000' 1. Methods and materials used in the construction of the improvements herein shall conform to the 33 - W Department of Transportation (VDOT) Road and Bridge Specifications and Standards, the Virginia Erosion and current County construction standards and specifications and/or current VDOT standards and Sediment Control Regulations, and any other applicable state, federal or local regulations. In case of a EXISTING INDEX CONTOUR 330 FW,.E 31 tu specifications. discrepancy or conflict between the Standards or Specifications and Regulations, the most stringent shall 40 \ jB°IM_13g govern. PROPOSED CONTOUR W 2. Measures to control erosion and siltation, including detention ponds serving as silt basins during EX E/P Z �---------- -- --- ----- construction, must be provided prior to issuance of the site development permit. The approval of these V2. All construction shall comply with the latest U.S. Department of Labor, Occupational Safety and Health EXISTING EDGE OF PAVEMENT Z plans in no way relieves the developer or his agent of the responsibilities contained in the Virginia Erosion Administration (OSHA), and Virginia Occupational Safety & Health (VOSH) Rules and Regulations. PROPOSED EDGE OF PAVEMENT PROP E/P and Sediment Control Handbook. EX C$6 3. A permit must be obtained from the Office of the Resident Engineer, Virginia Department of V3. When working within VDOT right-of-way, all traffic control, whether permanent or temporary, shall be in EXISTING CURB AND GUTTER = -- --_ -_-= -- - - -_ 5"Y610E �� Z STMINVER accordance with the current edition of VDOT's Work Area Protection Manual. Furthermore, all traffic control PROP C&G �� CC<w ERSURY LU Transportation (VDOT) and Frederick County prior to construction in existing State right-of-way. flaggers must be certified in accordance with Section 104.04(c) of the VDOT Road and Bridge Specifications. PROPOSED CURB AND GUTTER 0 iVE 00 ►n 4. Approval of this plan does not guarantee issuance of an entrance permit by VDOT when such permit is V4. The developer shall be responsible for relocating, at his expense, any and all utilities, including traffic EXISTING TELEPHONE LINE T k > � `t required under State law. 1U 0 signal poles, junction boxes, controllers, etc., owned by VDOT or private / public utility companies. It is the SITE sole responsibility of the developer to locate and identify utility facilities or items that may be in conflict PROPOSED TELEPHONE LINE T T M CD 5. The exact location of all guard rails will be determined by VDOT personnel. "A joint inspection will be with the proposed construction activity. VDOT approval of these plans does not indemnify the developer from _�_ EX. 15" RGP ao COI `n q held with the Developer, County Representatives, and Representatives of the Virginia Department of this responsibility. EXISTING STORM SEWER ��� 3 o 1 >, Transportation (VDOT) to determine if and where guard rail and/of paved ditches will be needed. The P y PROP. 15 RGP " > C\2 co developer will be responsible for providing guardrail and paved ditches as determined by this joint y o ae ej�R Z x LO � V5. Design features relating to field construction, regulations, and control or safety of traffic may be subject PROPOSED STORM SEWER of 0 0 p inspection." Refer to Virginia Department of Transportation (VDOT) Guard Rail and Paved Ditch Specifications. to change as deemed necessary by VDOT. Any additional expense incurred as a result of any field revision 'd +' 0 of shall be the responsibility of the developer. EXISTING SANITARY SEWERW r o . 6. An approved set of plans and all applicable permits must be available at the construction site. Also, a PROJECT INFORMATION aLO W representative of the developer must be available at all times. PROPOSED SANITARY SEWER S S P P V6. Prior to initiation of work, the contractor shall be responsible for acquiring all necessary VDOT land use Lo 7. Warning signs, markers, barricades or flagmen should be in accordance with the Manual on Uniform permits for any work within VDOT right-of-way. EXISTING ELECTRIC SERVICE E SITE LOCATION 300 WESTMINSTER CANTERBURY DR. E,r�, WINCHESTER, VIRGINIA Traffic Control Devices (MUTCD). V7. If required by the local VDOT Residency Office, a pre -construction conference shall be arranged and held PROPOSED ELECTRIC SERVICE E E by the engineer and/or developer with the attendance of the contractor, various County agencies, utility FREDERICK COUNTY 00, V3 Cl) e. All unsuitable material shall be removed from the construction limits of the roadway before placing companies and VDOT prior to initiation of work. EXISTING GAS LINE embankment. (( )) Q) o PARCEL IDENTIFICATION N0. 53- A -63A rr � � � V8. The contractor shall notify the local VDOT Residency Office when work is to begin or cease for any PROPOSED GAS LINE 5 5 LOT AREA 48.2747 AC. v 9. All pavement sections on the approved plans are minimum sections to be utilized when the actual undetermined length of time. VDOT requires and shall receive 48 hours advance notice prior to any required �- California BearingRatio CBR of the pavement subgrade is 6 or more. Soils tests of the subgrade shall be or re uested ins ection. PROPERTY L[NE DISTURBED AREA 532 S.F. (CBR) P g g q P � � wcn performed for actual determination of required pavement thickness prior to placement. All final pavement CURRENT ZONING RP (RESIDENTIAL PERFORMANCE) and base course thicknesses shall be designed in accordance with VDOT's "Pavement Design Guide for V9. The contractor shall be responsible for maintaining adequate access to the project from the adjacent FLOW LINE - •••� •••- •••-- Subdivision and Secondary Roads in Virginia", and shall be based on a sufficient number of CBR tests to public roadway via a construction entrance that is constructed and maintained in accordance with Section FENCELINE # -#- CURRENT USE RESIDENTIAL & ASSISTED LIVING FACILITY properties determine the true support values of the soils in the subgrade. Final pavement design shall be submitted 3.02 of the Virginia Erosion and Sediment Control Handbook. Furthermore, access to other ro erties affected- PROPOSED USE RESIDENTIAL & ASSISTED LIVING FACILITY during construction and prior to placement. by this project shall be maintained through construction. The Developer shall have, within the limits of the EXISTING POWER POLE project, an employee certified by the Virginia Department of Conservation and Recreation (VDCR) in Erosion SIGNS: NONE PROPOSED. ANY FUTURE SIGNAGE MUST CONFORM 10. All roadside ditches at grades of more than 5% shall be paved with cement concrete to the limits and Sediment Control who shall inspect erosion and siltation control devices and measures on a continuous EXISTING TELEPHONE POLE (�) WITH THE STANDARDS OF SECTION 1 OF indicated on the plans and as required at the field inspection. basis for proper installation and operation. Deficiencies shall be promptly rectified. THE FREDERICK COUNTY ZONING ORDINANCE. EXISTING WATERLINE W/ TEE � -� r-) OUTDOOR LIGHTING: ROAD AND PARKING LOT LIGHTING IS TO BE PROVIDED USING z 11. All springs shall be capped and piped to the nearest storm sewer manholes or curb inlet. The pipe V10. Contractor shall ensure adequate drainage is achieved and maintained on the site during and at the end �-�-� THE SAME LIGHT STANDARDS AND PATTERNS ESTABLISHED IN THE shall be minimum 6" diameter and conform to VDOT standard SB-1. of construction. PROPOSED WATERLINE W/ TEE -V -r�V- EXISTING PARKING LOT. ALL LIGHTS SHALL BE SHIELDED TO PREVENT ILLUMINATION OF ADJACENT PROPERTIES. U1 12. Construction debris shall be containerized in accordance with the Virginia Litter Control Act; no less V11. All water and sewer lines within existing or proposed VDOT right-of-way shall have a minimum EXISTING FIRE HYDRANT OPEN SPACE PROPOSED OPEN ILLUMINATION SPA37.24 AC.=77.1 than one litter receptacle shall be provided at the construction site. thirty-six (36) inches cover and when possible shall be installed under roadway drainage facilities at conflict - W points. EXISTING WATER VALVE 13. The contractor shall provide adequate means of cleaning mud from trucks and/or other equipment prior to entering public streets, and it is the contractors responsibility to clean streets, allay dust, and to V12. Any unusual subsurface conditions (e.g., unsuitable soils, springs, sinkholes, voids, caves, etc.) encountered PROPOSED WATER METER ® PARKING CALCULATIONS take whatever measures are necessary to insure that the streets are maintained in a clean, mud and dust during the course of construction shall be immediately brought to the attention of the engineer and VDOT. EXISTING REDUCER �- free condition at all times. Work shall cease in that vicinity until an adequate design can be determined by the engineer and approved TOTAL REQUIRED SPACES CITY & COUNTY = 245 by VDOT. PROPOSED REDUCER v TOTAL EXISTING SPACES CITY & COUNTY = 379 14. Notification shall be given to the appropriate utility company prior to construction of water and/or a PROPOSED SPACES PER SITE PLAN 37-08 = 61 sanitary sewer lines. Information should also be obtained from the appropriate authority concerning V13. All fill areas, borrow material and undercut areas shall be inspected and approved by a VDOT TRAFFIC SIGN permits, cut sheets, and connections to existing lines. representative prior to placement and fill. Where CBR testing is required, a VDOT representative shall be HANDICAP RAMP (CG-12) 1 TOTAL SPACES = 440 present to insure the sample obtained is representative of the location. When soil samples are submitted to DENOTES LOCATION -1 STD VDOT NO ADDITIONAL PARKING REQUIRED PER THIS PLAN W 15. All sanitary sewers and water mains and appurtenances shall be constructed in accordance with the private laboratories for testing, the samples shall be clearly identified and labeled as belonging to a project C 1122 AND OR JUR[SDICTIONA[ HANDICAP PARKING E' current standards and specifications of Frederick County and/or the Frederick County Sanitation Authority. to be accepted by VDOT and that testing shall be performed in accordance with all applicable VDOT standards STANDARD P CONSTRUCTION Q and procedures. 401 -500 = 9 SPACES REQUIRED P PARKING INDICATOR Ai2 TOTAL EXISTING SPACES CITY & COUNTY = 13 - EXCEEDS 1106.1 16. The location of existing utilities shown in these plans are taken from existing records. It shall be the INDICATES THE NUMBER OF TYPICAL PARKING SPACES contractors responsibility to verify the exact horizontal and vertical location of all existing utilities as V14. All roadway fill, base, subgrade material, and backfill in utility/storm sewer trenches shall be compacted 13 SPACES OF WHICH 6 SPACES IS VAN ACCESSIBLE - EXCEEDS 1106.4 needed prior to construction. The contractor shall inform the engineer of any conflicts arising from his in six (6) inch lifts to 95% of theoretical maximum density as determined by AASHTO T-99 Method A, within HANDICAP PARKING NONE PROPOSED PER THIS PLAN existing utility verification and the proposed construction. plus or minus 2% of optimum moisture for the full width of any dedicated street right-of-way. At the C I'TH O�T'I direction of VDOT, density tests shall be performed by a qualified independent agency in accordance with VDOT 17. The developer will be responsible for any damage to the existing streets and utilities which occurs as a Road and Bridge Specifications. Certified copies of test reports shall be submitted to VDOT daily, unless VEHICLES PER DAY COUNT 100 result of his construction project within or contiguous to the existing right-of-way. specified otherwise. PROPOSED BUILDING ENTRANCE -.- U A K D, SMITH 9 18. When grading is proposed within easements of utilities, letters of permission from all involved companies V15. VDOT Standard CD and UD underdrains shall be installed where indicated on these plans and/or as d N0,022SMI must be provided to Frederick County Sanitation Authority prior to issuance of grading and/or site specified by VDOT. 837 development permits. EXISTING STREET LIGHT � - ��.� �f V16. The installation of any entrances and mailboxes within any dedicated street right-of-way shall meet �s 1 �ZZ,(�� 19. The developer will be responsible for the relocation of any utilities which is required as a result of his VDOT minimum design standards and is the responsibility of the developer. s-'ONAL project. The relocation should be done prior to construction. SANITARY MANHOLE IDENTIFIER 1z V17. Prior to VDOT acceptance of any streets, all required street signage and/or pavement markings shall be 20. These plans identify the location of all known gravesites. Gravesites shown on this plan will be installed by the developer or, at VDOT's discretion, by VDOT on an account receivable basis following the protected in accordance with state law. In the event gravesites are discovered during construction, the Manual On Uniform Traffic Control Devices. STORM DRAIN STRUCTURE IDENTIFIER O owner and engineer must be notified immediately. V18. The developer shall provide the VDOT Residency Office with a list of all material sources prior to the 21. The contractor is to verify field conditions prior to and during construction and notify Greenway start of construction. Copies of all invoices for materials utilized within any dedicated street right-of-way EASEMENT LINE - - --�- Engineering at (540) 662-4185 immediately of any discrepancies between actual field conditions and the must be provided to the local VDOT Residency Office prior to acceptance of the work. Unit and total prices approved plan. may be obscured. CENTERLINE >_ 22. Controlled fills shall be compacted to 95% of maximum density as determined by method "A" per V19. Aggregate base and subbase materials shall be placed on subgrade by means of a mechanical spreader. EXISTING SPOT ELEVATION 12.0 � standard proctor AASHTO-T99, ASTM-D698, or VTM-1 as applicable. Density shall be certified by a registered Density will be determined using the density control strip in accordance with Section 304 of the VDOT Road + ENVIRONMENTAL FEATURES professional engineer and results submitted to Frederick County prior to pavement construction. If a and Bridge Specifications and VTM-10. A certified compaction technician shall perform these tests. Certified PROPOSED SPOT ELEVATION 115 3 geotechnical report has been prepared, it should supersede the requirements in this note. copies of test reports shall be submitted to VDOT daily, unless specified otherwise. In addition to checking EXISTING TREE LINE EXISTING PROPOSED PERCENT stone depths, a VDOT representative shall be notified and given the opportunity to be present during the "�" FEATURE ACREAGE DISTURBED ACREAGE DISTURBED 23. Contractors shall notify operators who maintain underground utility lines in the area of proposed construction and testing of the density control strip. rFLOODPLAINS 0 0 0 excavating or blasting at least two (2) working days, but not more than ten (10) working days, prior to r�- EXISTING TREE c J 1 15" OAK 0 0 0 commencement of excavation or demolition. Names and telephone numbers of the and operators V20. Asphalt concrete pavements shall be placed in accordance with Section 315 of the VDOT Road and Bridge a� 15 PINE LAKES & PONDS underground utility lines in Frederick County appear below. These numbers shall also be used to serve in Specifications. Density shall be determined using the density control strip as specified in Section 315 and WETLANDS OVER 1 AC. 0 0 0 W Z an emergency condition. VTM-76. A certified compaction technician shall perform these tests. Certified copies of test reports shall be g Y submitted to VDOT daily, unless specified otherwise. A VDOT representative shall be notified and given the PROPOSED TREE ��rjl 15" OAK 15" PINE NATURAL S.W.DETENTION AREAS 0 0 0 FCSA CONSTRUCTION NOTES opportunity to be present during the construction and testing of the control strip. � �' (� WOODLANDS 31.7 AC. 0.46 AC. 1.45 G V21. In accordance with Section 302.03, the foundations for pipe culverts thirty-six (36) inches and larger / ► in W W shall be explored below the bottom of the excavation to determine the type and condition of the foundation. OWNERS CERTIFICATE STEEP SLOPES 5.7 AC. 0 0 E, E 1. The Authority's Water and Sewer Standards and Specifications are available at www.fcsa-water.com The contractor shall report findings of foundation exploration to the engineer and VDOT for approval prior to OVER 50% placing pipe. Foundation designs shall comply with VDOT Road and Bridge Standard PB-1. Where soft, yielding, I HEREBY CERTIFY THAT THE PROPOSED DEVELOPMENT OF THE W Z W 2. The water and sanitary sewer portion of these plans are valid for two years from date of FCSA approval. or otherwise unsuitable foundation is encountered, the foundation design and/or need for foundation PROPERTY CONTAINED IN THIS SITE PLAN IS WITH THE FREE PREVIOUS APPROVED PLAN S P 6 3 - 0 4 stabilization shall be determined by the engineer and approved by VDOT. 0 3. Water and sewer lines are to be constructed in accordance with these plans and shall meet all Authority CONSENT AND IN ACCORDANCE WITH THE DESIRES OF THE J Z E- requirements. PLANS ARE IN CONFORMANCE WITH FREDERICK COUNTY STANDARDS AND ORDINANCES. ANY DEVIATION � � � requirements. V22. Approval of these plans shall expire three (3) years from the date of the approval letter. UNDERSIGNED OWNERS, PROPRIETORS OR TRUSTEES. OR CHANGE IN THESE PLANS SHALL BE APPROVED BY THE ZONING ADMINISTRATOR PRIOR TO CONSTRUCTION 4. The contractor shall coordinate with, and arrange for inspection by, the Authority. V23. VDOT Standard CG-12 Curb Ramps shall be installed where indicated on these plans and/or as specified >O W Q by VDOT. CO VER SHEET w o 5. When an existing water main is tapped for the installation of a new line: U co a) The Authority shall furnish all labor and material. DATE Project Name: V24. VDOT Standard Guardrail shall be installed where warranted and/or as proposed on these plans inCO 0 >, b) The developer/contractor must: accordance with VDOT's installation criteria. Final approval of the guardrail layout to be given by VDOT after WESTMINSTER CANTER13URY O E- 1. make application and pay deposit r � 2. mark the tap location. grading is mostly complete. Z � E-+ IL 6. The contractor shall tie-in a new sewer line to an existing manhole by core drilling the manhole. Owner: Address, Including Zip Code & Telephone No. 7. Exact locations of water and sewer services on new lines are to be coordinated with the Authority's 300 WESTMINSTER CANTERBURY DR. WESTMINSTER CANTERBURY OF WINCHESTER, INC. WINCHESTER, VA 22601 Inspector. UTILITY CONTA CTS ( ) ♦� o 540 665-0156 `/, 8. The Authority's maintenance department shall furnish and install all water meters through 2" in size. It Developer: Address, Including Zip Code & Telephone No. 124 is the developer's/contractor's responsibility to have the meter box assembly installed correctly. Before a Water/Sewer: Frederick County Sanitation Authority Gas: Shenandoah Gas Co. W 0 permanent meter is installed: P.O. Box 2400 W a) The meter box, with its frame and cover, must be properly aligned with the coppersetter. P.O. Box 1877 SAME AS ABOVE b) The frame and cover shall be set to final grade. Winchester, VA. 22604 Winchester, 22604 SHEET INDEX W c) The distance between the top of the cover and the coppersetter shall to be between 18 and 21 inches. (540) 868-1061 MISS UTILITY (540) 869-1111 Z d) All components of the meter box assembly shall be in proper working order. 1-800-552-7001 Engineer Certifying Plan: Address, Including Zip Code & Telephone No. Electric: Allegheny Power Phone: VERIZON 1.) COVER SHEET 151 WINDY HILL LANE 9. For water and sewer services that connect to existing lines: P.O. Box 1458 P.O. Box 17398 2.) OVERALL KEY MAP Hagerstown, MD 21741 Baltimore, MD 21297 GREENWAY ENGINEERING WINCHESTER, VA 226 2 a) The location of the service Lateral is to be coordinated with the Authority's Engineering Assistant. 1-800-654-3317 (301) 954-6282 3.) SITE PLAN N (540) 662-4185 b) An Application for Service must be made and fees paid before work will begin. PRiN �b c) The Authority shall furnish and install all 5/8", 3/4" and 1" water services. IMP d) For all 1 1/2" and 2" water services, the Authority shall make the tap and bring the piping to the FIRE MARSHAL'S NOTE s T APPROVAL SEP 2 2 2008 DATE: 08-04-08 property line. The contractor shall furnish and install the meter vault assembly. The Authority will install the meter. e) The Authority will install all sewer laterals. Fire lane markings and signage: Any "No Parking" signs and yellow painted curb locations will be installed by GREENWAY SCALE: N/A field inspection at the direction of the Fire Marshall's Office. SITE PLW° ° °'° 0' ENGINEERING 10. Any water service line must have a backflow prevention assembly (double check valve or RPZ, as required). The assembly must meet ASSE standard No. 1015 or 1013. NAME L"'ff ®�y��• pC� �� �-3 �� DESIGNED BY: AS/CLW HANDICAPPED PARKING NOTE FREDERICK COUNTY ZONING ADMINISTRATOR DATE 11. All fire lines shall have a fire service meter assembly and a backflow prevention assembly (detector SITEPLANNUMBER �� FILE NO. 2039 double check valve or RPZ, as required). The assembly shall meet ASSE standard No. 1048 or 1047. Radio • SITE PLAN VALID FOR (5) FIVE YEARS FROM DATE OF PLANNING DEPT. APPROVAL read remotes are required. Handicapped parking spaces and aisles shall slope no greater than 2% in all directions. SITE PLAN VALID FOR (2) TWO YEARS FROM DATE OF FCSA APPROVAL SHEET 1 OF 3 OLD r ,D N D G+ r► �;, j `\ / 4 53-A-64 III-3-C-I1 � WINIFRED W. IT / ANT14AN40106 \ O \ cis MARK G. \ HACK ET AL w ANTHON <O \ STEPHENSON II \ ZONED: RP 131-6-E-9 9 70 (� Cy,� 'a cr D �, CPT_ / ZONED: LR USE: RES. PAUL A LAMBERT►° r G w y ZONED: LR p / -, 7r0 �+ D r twit °' 70 70 t i USE= RES. USE: RES. \ D5.1W PGL 103 ZONED: LR 1 tt.- -!�� / ems; �g n ' L27 L INST. LR-03-242 .° INST. OLR-03-191 \ D5. 253 PCs. 533 INLR-03-3061 l mL29 L30L24� CURVE DATA NUMBER DELTA RADIUS ARC TAN CHORD 5EARING CHORD CI 41'24'33" 40.00' 20.91' 15.12' N 45'12'10" E 28.2B' C2 221'24'11" 40.00' 154.51' 105.03, N 44"41'42" W 14.83' C3 11°I1'01" 50.00, 61.44' 39.98' N 52'42'21" E 62.45' N �'' � '^ ._mil � b �.J ^ •h ��i p,.,,� -'.. `� r` 0 pgA1lLY S�pARq / 132-01-4 ZONED: LRT� USE: UNDEVELOPED - - *- _ a I I l ` ° r / , Q GERALD F. SMITH .a• / 53Q-�- INST. LR-02-4131 ? , - �/\ _ _Tl?T'f (TT f TT(1-1'TT(, - T TTl'1 ( TT i°'t_f_ 6 "�.. i � \ /� \\ •. � �, /�- ��Q,�Q: '11q CNo \ SION d LINE DATA NUMEE DIRECTION DISTANCE LI S 15'56'31" E 210.00' L2 N 16'33'IS" E 372.91' L3 S 60'2To l'B" E 212.20' L4 N 29°33'41" E 150.00, L5 S 60'2619" E 400.00' L6 N 29'33'41" E 15.00' L1 S 59'36'20" E 225.00' L8 S 29'04'59" W 104.26' L9 5 11'14'41" E 514.43' L10 N 46'24'26" E 157.50' 1-11 S 49°01'34" E 222.50' L12 S 44'36'25" W 1231.56' L13 N 46 °02'04" W 32.3g' L14 S 40°40'IS" W 194.42' L 15 5 35 °32'20" W 140.81' L16 S 33°05'41" W 223.11' LI1 5 04'31'25" W 132.89' L16 N 52°22'09" W 356.31' LIS N 44°51'01" W 161.61' L20 S 81 °23'50" W 139.25' 1-21 N 14'44'44" W 38.34' L22 N 19`52'52" W 25.00' L23 N 19'52'10" W 128.59' L24 N 21"13'12" W 129.32' L25 N 18'43'51" W 92.55' 1-26 N 20`21'31" W 120.00' L21 N 15'36'22" W 50.04' L28 N 09`42'20" W 9.98' 1-29 N 09`36'06" W 58.10, L30 N 11.30'30" W 133.59, L31 N 14'12'21" W 105.31' L32 N 24'29'53" E 21.96' L33 N 14°12'21" W 94.56' L34 N 04°40'51" W 185.99' L35 N 04'I0'11" W 241.61' L36 S 18'41'30" E 308.34' L31 N 01-20'55" E 485.18' WESTMINSTER CANTERS AR`\. OF . WINCHESTER, INC. , \ \ \\' ,� \J. - i °! \ �- °``\� N E BURY DRIVE / / °:E: ASSISTED LIVING FACILITY / -D13_2W PG. 1202 \ \� o / \ \''�,, i I i�O 7 a ^� , -� ` `�`�'-- - o k- - ---� - •� _� ll�,s �\ 4. 2/1 4- 132-01-4 \ \ // V� _ r ,/ k 1' ri °�_ / i \ T.* L_ _ l J' / t 1 (I \ `• ?�aS�� " �'' ZONED: LR \ ,/ ". ,.w \✓fit Y j ` USE: UNDEVELOPED \\ \ Q�� / „-'�•�. r� \ f�\ , j� `_� ° I f 1 \ I �° P GERALD F. SMITH MST. LR-02-4131 ld U /. 53-A-63A �3 � i WESTMMSTER CANTERMW OF V V� WINCHESTER, INC. D: RP. USE: MS.4AASSISTED LIVING✓ /\ �� // / S4 `\ 49, r�I \ \ \ \ ter' \� � ' / � �� / \\ ! / ti'�PQ'� ���� �• \� '�'"'►'�'�.` . \/ A \ CZZ 1 �plN*4 \ V� / \,S, \ / / / h ey' -*INTEur-"- aU-1 \ \ \%y SOVERIGN SHOMEB \ \ \ \ \ \ \ \<6 l�idi �� 53-A-63 \ \ / / ZONED: 52 SG� t ���� GERALD F. SMITH \ \ / USE: COM•9 2 \ \ / , ZONED: RP \ / / INST. 002-16612 USE: MS. DB.151 PG. %S 3 RUSSELL 0 100 0 100 \ \ \ \ AM 5. HIETT \ /qh- \ \ 1 ZONED: RP \ ` pC s? GRAPHIC SCALE USE: RES. DB. 336 MPG. 39 % S3�a �'4,� (1N FEET) GREENWAY ENGINEERING a z o� W W Z - Z W o Ln CD CQ C\2 ap 1-4 I a � 00 U ' Lr) to Z~' �Ico I,i,l a� 0 to C U 0to n rr L N 0 W in w O 5 a N A A V� L) MARK D, SMITH No.022837 Is, E D U U W o w Q W Z W U Z E-, Q o cl) O a E w Z°�E - a W � w DATE: 08-04-08 SCALE: 1" = 100' DESIGNED BY: AS/CLW FILE NO. 2039 SHEET 2 OF 3 tvQvU �5( \ I (ate W Iz7- I << A (� I —A II W N �f EX AE)�IINI5TF,:IATION BUILDING r— \ . -- I I A r^--*)" I \� �0 C' \ V2 OA/ CONSTRUCTION OF A SILT FENCE (WITH WIRE SUPPORT) 1. SET POSTS AND EXCAVATE A 4'X4' 2. STAPLE WIRE FENCING TO THE POSTS. TRENCH UPSLOPE ALONG THE LINE OF POSTS. L R viQi FW ll_ • 3. ATTACH THE FILTER FABRIC TO THE WIRE 4. BACKFILL AND COMPACT THE FENCE AND EXTEND IT INTO THE TRENCH. EXCAVATED SOIL FLOW EXTENSION OF FABRIC AND fj/(J��'�WIRE INTO THE TRENCH. I FILTER FABRIC \11II\tl11 from InAaation of Straw and Fabric Filter Barriers for Sediment Contao4 PLATE. 3.05-I 45 MINIMUM CONSTRUCTION Z STANDARDS NARRATIVE AN EROSION AND SEDIMENT CONTROL PROGRAM ADOPTED WITH THIS PLAN MUST BE LV CONSISTENT WITH THE VSECH FOR 4VAC50-30-40 MINIMUM STANDARDS: W I. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED z AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOILS STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 30 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS Z THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR o W � 2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS to 00 c SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE CONTRACTOR IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT °' c" M C°-) STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND Cc c\j roo SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE. b.0 o °' �> c\2 3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS x tO NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE W b o CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT, IS UNIFORM, W Tn MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. 0 a`n 40 4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER E- w MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. cn cn 5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS Q] 0 DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. an (o. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE CONSTRUCTED BASED UPON THE O W TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN. A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES. B. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE ZO CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE Y) OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE 5A51N DURING A TWENTY-FIVE YEAR STORM OF 24-HOUR DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF A BARE EARTH CONDITION OF THOSE CONDITIONS (Y o EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS UTILIZED. 1. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTION A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED. \ 8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS ,\ CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR E- SLOPE DRAIN STRUCTURE. A 9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED. LTH OF 10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED 50 THAT SEDIMENT -LADEN WATER CANNOT ENTER THE r CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. U MARK D, SMITH No,022837 11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE A W MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED 0'e,e TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE S Cs CONVEYANCE CHANNEL AND RECEIVING CHANNEL. IS" 1ONAL \ 12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE \ TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY > -- _ NONERODIBLE COVER MATERIALS. -� 13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE E_ \ THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTION OF NONERODIBLE MATERIAL SHALL BE PROVIDED. O 14. ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO M WORKING OR CROSSING LIVE WATERCOURSES SHALL BE MET. W 15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE 15 COMPLETED. (� W o w 16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE I.M p Q FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: z Q cl A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. E- U� � \ B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. Z w H C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED G U x THROUGH APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A a' ? U) �I C. MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF -SITE w \ PROPERTY. E, W Q In \ D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN LLI O 1-4 \ ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. CID 0 \ \ 11. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC 0 �' E--4 ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY Z U \ VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED a ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED 1 THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL O P DEVELOPMENT LOTS AS WELL AS TO LARGER LAND -DISTURBING ACTIVITIES. � e I O W 18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE SEP REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE W TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY GREEN'S AY THE LOCAL PROGRAM AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL ENGINEERING AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE µ----- PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. NO EROSION CONTROL MEASURE CAN BE CHANGED OR REMOVED WITHOUT THE \ ' PERMISSION OF THE SHENANDOAH COUNTY INSPECTOR. \ ` 19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE DATE: 08-04-08 \ PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES 1 \ IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF. SCALE: 1" = 10' 20. ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE 10 O 10 20 EMPLOYED IN A MANNER WHICH MINIMIZES IMPACTS ON THE PHYSICAL, CHEMICAL AND BIOLOGICAL INTEGRITY OF RIVERS, STREAMS AND OTHER WATERS OF THE STATE. DESIGNED BY: AS/CLW 5GALE: I " = 10' FILE NO. 2039 SHEET 3 OF 3 i n 0 CENERAL NOTES VDOT CENERAL NOTES LEGEND VICINITY MAP 0 Z SCALE 1"= 2000' � V1. All work on this project shall conform to the current editions of and latest revisions to the Virginia - - - -` EXISTING INTERMEDIATE CONTOUR -� - - 33'^ _ ' "� 1. Methods and materials used in the construction of the improvements herein shall conform to the Department of Transportation (VDOT) Road and Bridge Specifications and Standards, the Virginia Erosion and current County construction standards and specifications and/or current VDOT standards and Sediment Control Regulations, and any other applicable state, federal or local regulations. In case of a EXISTING INDEX CONTOUR - 330FWU� W specifications. discrepancy or conflict between the Standards or Specifications and Regulations, the most stringent shall a� 19g 2. Measures to control erosion and siltation, including detention ponds serving as silt basins during construction, must be provided prior to issuance of the site development permit. The approval of these govern. V2. All construction shall comply with the latest U.S. Department of Labor, Occupational Safety and Health PROPOSED CONTOUR 40 EX E/P EXISTING EDGE OF PAVEMENT - - -- --- -- ---- Z in no way relieves the developer or his agent of the responsibilities contained in the Virginia Erosion PROP E/P'�s?? - plans Sediment Control Handbook. Administration (OSHA), and Virginia Occupational Safety & Health (VOSH) Rules and Regulations. PROPOSED EDGE OF PAVEMENT and EX G46 V3. When working within VDOT right-of-way, all traffic control, whether permanent or temporary, shall be in EXISTING CURB AND GUTTER =_ -_ ___ -- - =� -_ - OLMYSIoE Z 3. A permit must be obtained from the Office of the Resident Engineer, Virginia Department of in State accordance with the current edition of VDOT's Work Area Protection Manual. Furthermore, all traffic control PROP C&G �� CANTERBURY s� 01 Transportation VDOT and Frederick Count prior to construction existing right-of-way. p (VDOT) Y p g g y' flaggers must be certified in accordance with Section 104.04(c) of the VDOT Road and Bridge Specifications. PROPOSED CURB AND GUTTER o Ne O\ 0 4. Approval of this plan does not guarantee issuance of an entrance permit by VDOT when such permit is V4. The developer shall be responsible for relocating, at his expense, any and all utilities, including traffic EXISTING TELEPHONE LINE -- T o ;' > C required under State law. signal poles, junction boxes, controllers, etc., owned by VDOT or private / public utility companies. It is the PROPOSED TELEPHONE LINE T T k '' ,Q SITE I C\2 c 5. The exact location of all guard rails will be determined by VDOT personnel. "A joint inspection will be sole responsibility of the developer to locate and identify utility facilities or items that may be in conflict EX. 15" RGPCO � CO N `n CIO held with the Developer, County Representatives, and Representatives of the Virginia Department of with the proposed construction activity. VDOT approval of these plans does not indemnify the developer from EXISTING STORM SEWER ^=-0=-i Ron +an Transportation (VDOT) to determine if and where guard rail and/of paved ditches will be needed. The this responsibility. PROP. 15" RGP y C, 'r` o I LO Z 9 C `� x developer will be responsible for providing guardrail and paved ditches as determined by this joint V5. Design features relating to field construction, regulations, and control or safety of traffic may be subject PROPOSED STORM SEWER o e*E� e �; � U inspection." Refer to Virginia Department of Transportation (VDOT) Guard Rail and Paved Ditch Specifications. to change as deemed necessary by VDOT. Any additional expense incurred as a result of any field revision .ti +� p 0 6. An and all applicable must be available at the construction site. Also, a shall be the responsibility of the developer. EXISTING SANITARY SEWER S-- PROJECT INFORMATION of W p o 't so, V 4,0 to approved set of plans permits PROPOSED SANITARY SEWER S S 1 representative of the developer must be available at all times. V6. Prior to initiation of work, the contractor shall be responsible for acquiring all necessary VDOT land use SITE LOCATION 300 WESTMINSTER CANTERBURY DR. permits for any work within VDOT right-of-way. EXISTING ELECTRIC SERVICE --- E - Lo H r� 7. Warning signs, markers, barricades or flagmen should be in accordance with the Manual on Uniform WINCHESTER, VIRGINIA Traffic Control Devices (MUTCD). V7. If required by the local VDOT Residency Office, a pre -construction conference shall be arranged and held PROPOSED ELECTRIC SERVICE E E by the engineer and/or developer with the attendance of the contractor, various County agencies, utility FREDERICK COUNTY i 8. All unsuitable material shall be removed from the construction limits of the roadway before placing companies and VDOT prior to initiation of work. EXISTING GAS LINE - -G m embankment. PARCEL IDENTIFICATION NO. 53-((A))-63A Q) o /� V8. The contractor shall notify the local VDOT Residency Office when work is to begin or cease for any PROPOSED GAS LINE 5 5 LOT AREA 48.2747 AC. y 9. All pavement sections on the approved plans are minimum sections to be utilized when the actual undetermined length of time. VDOT requires and shall receive 48 hours advance notice prior to any required _ �n California Bearing Ratio (CBR) of the pavement subgrade is 6 or more. Soils tests of the subgrade shall be or requested inspection. PROPERTY LINE DISTURBED AREA 532 S.F. w performed for actual determination of required pavement thickness prior to placement. All final pavement "Pavement CURRENT ZONING RP (RESIDENTIAL PERFORMANCE) U) o and base course thicknesses shall be designed in accordance with VDOT's Design Guide for V9. The contractor shall be responsible for maintaining adequate access to the project from the adjacent FLOW LINE Subdivision and Secondary Roads in Virginia", and shall be based on a sufficient number of CBR tests to public roadway via a construction entrance that is constructed and maintained in accordance with Section CURRENT USE RESIDENTIAL & ASSISTED LIVING FACILITY determine the true support values of the soils in the subgrade. Final pavement design shall be submitted 3.02 of the Virginia Erosion and Sediment Control Handbook. Furthermore, access to other properties affected FENCELINE------# ----x- : PROPOSED USE RESIDENTIAL & ASSISTED LIVING FACILITY during construction and prior to placement. by this project shall be maintained through construction. The Developer shall have, within the limits of the EXISTING POWER POLE _(} SIGNS: NONE PROPOSED. ANY FUTURE SIGNAGE MUST CONFORM project, an employee certified by the Virginia Department of Conservation and Recreation (VDCR) in Erosion 10. All roadside ditches at grades of more than 5% shall be paved with cement concrete to the limits and Sediment Control who shall inspect erosion and siltation control devices and measures on a continuous EXISTING TELEPHONE POLE WITH THE STANDARDS OF SECTION 1 OF indicated on the plans and as required at the field inspection. basis for proper installation and operation. Deficiencies shall be promptly rectified. THE FREDERICK COUNTY ZONING ORDINANCE. EXISTING WATERLINE W/ TEE ---®----V OUTDOOR LIGHTING: ROAD AND PARKING LOT LIGHTING IS TO BE PROVIDED USING 11. All springs shall be capped and piped to the nearest storm sewer manholes or curb inlet. The pipe V10. Contractor shall ensure adequate drainage is achieved and maintained on the site during and at the end THE SAME LIGHT STANDARDS AND PATTERNS ESTABLISHED IN THE Z shall be minimum 6" diameter and conform to VDOT standard SB-1. of construction. PROPOSED WATERLINE W/ TEE _V ��v- EXISTING PARKING LOT. ALL LIGHTS SHALL BE SHIELDED TO H PREVENT ILLUMINATION OF ADJACENT PROPERTIES. U1 12. Construction debris shall be containerized in accordance with the Virginia Litter Control Act; no less Vii. All water and sewer lines within existing or proposed VDOT right-of-way shall have a minimum EXISTING FIRE HYDRANT U) than one litter receptacle shall be provided at the construction site. thirty-six (36) inches cover and when possible shall be installed under roadway drainage facilities at conflict - OPEN SPACE PROPOSED OPEN SPACE-37.24 AC.=77.1 W points. EXISTING WATER VALVE W 13. The contractor shall provide adequate means of cleaning mud from trucks and/or other equipment prior to entering public streets, and it is the contractors responsibility to clean streets, allay dust, and to V12. Any unusual subsurface conditions (e.g., unsuitable soils, springs, sinkholes, voids, caves, etc.) encountered PROPOSED WATER METER take whatever measures are necessary to insure that the streets are maintained in a clean, mud and dust during the course of construction shall be immediately brought to the attention of the engineer and VDOT. EXISTING REDUCER �° '�� PARKING CALCULATIONS free condition at all times. Work shall cease in that vicinity until an adequate design can be determined by the engineer and approved TOTAL REQUIRED SPACES CITY & COUNTY = 245 by VDOT. PROPOSED REDUCER v TOTAL EXISTING SPACES CITY & COUNTY = 379 14. Notification shall be given to the appropriate utility company prior to construction of water and/or TRAFFIC SIGN PROPOSED SPACES PER SITE PLAN 37-08 = 61 sanitary sewer lines. Information should also be obtained from the appropriate authority concerning V13. All fill areas, borrow material and undercut areas shall be inspected and approved by a VDOT permits, cut sheets, and connections to existing lines. representative prior to placement and fill. Where CBR testing is required, a VDOT representative shall be HANDICAP RAMP (CG-12) TOTAL SPACES = 440 present to insure the sample obtained is representative of the location. When soil samples are submitted to - DENOTES LOCATION OF STD VDOT NO ADDITIONAL PARKING REQUIRED PER THIS PLAN W 15. All sanitary sewers and water mains and appurtenances shall be constructed in accordance with the private laboratories for testing, the samples shall be clearly identified and labeled as belonging to a project CG 12AND/OR JUR[SDICTI0&N RAMP HANDICAP PARKING E" current standards and specifications of Frederick County and/or the Frederick County Sanitation Authority. to be accepted by VDOT and that testing shall be performed in accordance with all applicable VDOT standards STANDARD CONSTRUCTIO and procedures. Al2 -500 = 9 SPACES REQUIRED q 16. The location of existing utilities shown in these plans are taken from existing records. It shall be the PARKING INDICATOR401 INDICATES THE NUMBER OF TYPICAL PARKING SPACES TOTAL EXISTING SPACES CITY & COUNTY = 13 - EXCEEDS 1106.1 contractors responsibility to verify the exact horizontal and vertical location of all existing utilities as V14. All roadway fill, base, subgrade material, and backfill in utility/storm sewer trenches shall be compacted 13 SPACES OF WHICH 6 SPACES IS VAN ACCESSIBLE - EXCEEDS 1106.4 needed prior to construction. The contractor shall inform the engineer of any conflicts arising from his in six (6) inch lifts to 95% of theoretical maximum density as determined by AASHTO T-99 Method A, within HANDICAP PARKING NONE PROPOSED PER THIS PLAN existing utility verification and the proposed construction. plus or minus 2% of optimum moisture for the full width of any dedicated street right-of-way. At the LTH OF�,j direction of VDOT, density tests shall be performed by a qualified independent agency in accordance with VDOT 17. The developer will be responsible for any damage to the existing streets and utilities which occurs as a Road and Bridge Specifications. Certified copies of test reports shall be submitted to VDOT daily, unless VEHICLES PER DAY COUNT 100 result of his construction project within or contiguous to the existing right-of-way. specified otherwise. PROPOSED BUILDING ENTRANCE --__� � A K D, SMITH � 18. When grading is proposed within easements of utilities, letters of permission from all involved companies V15. VDOT Standard CD and UD u.nderdrains shall be installed where indicated on these plans and/or as must be provided to Frederick County Sanitation Authority prior to issuance of grading and/or site specified by VDOT. EXISTING STREET LIGHT N0,022837 OAS development permits. dedicated I.Z Z/ be for the is his V16. The installation of any entrances and mailboxes within any street right-of-way shall meet VDOT design standards and is the responsibility of the developer. 1 SIGNAL 19. The developer will responsible relocation of any utilities which required as a result of minimum project. The relocation should be done prior to construction. SANITARY MANHOLE IDENTIFIER 12 V17. Prior to VDOT acceptance of any streets, all required street signage and/or pavement markings shall be 20. These plans identify the location of all known gravesites. Gravesites shown on this plan will be installed by the developer or, at VDOT's discretion, by VDOT on an account receivable basis following the protected in accordance with state law. In the event gravesites are discovered during construction, the Manual On Uniform Traffic Control Devices. STORM DRAIN STRUCTURE IDENTIFIER O owner and engineer must be notified immediately. V18. The developer shall provide the VDOT Residency Office with a list of all material sources prior to the 21. The contractor is to verify field conditions prior to and during construction and notify Greenway start of construction. Copies of all invoices for materials utilized within any dedicated street right-of-way EASEMENT LINE --- - ------ - Engineering at (540) 662-4185 immediately of any discrepancies between actual field conditions and the must be provided to the local VDOT Residency Office prior to acceptance of the work. Unit and total prices approved plan. may be obscured. CENTERLINE 22. Controlled fills shall be compacted to 95% of maximum density as determined by method "A" per V19. Aggregate base and subbase materials shall be placed on subgrade by means of a mechanical spreader. EXISTING SPOT ELEVATION X 12.0 E- standard proctor AASHTO-T99, ASTM-D698, or VTM-1 as applicable. Density shall be certified by a registered Density will be determined using the density control strip in accordance with Section 304 of the VDOT Road + ENVIRONMENTAL FEATURES � professional engineer and results submitted to Frederick County prior to pavement construction. If a and Bridge Specifications and VTM-10. A certified compaction technician shall perform these tests. Certified PROPOSED SPOT ELEVATION 115 s O geotechnical report has been prepared, it should supersede the requirements in this note. copies of test reports shall be submitted to VDOT daily, unless specified otherwise. In addition to checking EXISTING PROPOSED PERCENT U stone depths, a VDOT representative shall be notified and given the opportunity to be present during the EXISTING TREE LINE f FEATURE ACREAGE DISTURBED ACREAGE DISTURBED 23. Contractors shall notify operators who maintain underground utility lines in the area of proposed excavatingor blasting at least two 2 workingdays, but not more than ten 10 workingdays, prior to g ( ) Y ( ) Y P construction and testing of the density control strip. r� LAANS 0 0 0 � U commencement of excavation or demolition. Names and telephone numbers of the and operators V20. Asphalt concrete pavements shall be placed in accordance with Section 315 of the VDOT Road and Bridge EXISTING TREE ���'.�, I-" " a. i� OAT: 15 PINE LAKES LAKES & PONDS 0 0 0 underground utility lines in Frederick County appear below. These numbers shall also be used to serve in Specifications. Density shall be determined using the density control strip as specified in Section 315 and WETLANDS OVER 1 AC. 0 0 0 W an emergency condition. VTM-76. A certified compaction technician shall perform these tests. Certified copies of test reports shall be submitted to VDOT daily, unless specified otherwise. A VDOT representative shall be notified and given the PROPOSED TREE r� 151 OAK 15" PINE t NATURAL S.W. 0 0 0 DETENTION AREAS Z W opportunity to be present during the construction and testing of the control strip. `�1 �. W FCi�l SA CONSTRUCTION NOTES WOODLANDS 31.7 AC. 0.46 AC. 1.45 Z OWNERS CERTIFICATE V21. In accordance with Section 302.03, the foundations for pipe culverts thirty-six (36) inches and larger shall be explored below the bottom of the excavation to determine the type and condition of the foundation. STEEP SLOPES 5.7 AC. 0 0 Q W E- ` E- 1. The Authority's Water and Sewer Standards and Specifications are available at www.fcsa-water.com The contractor shall report findings of foundation exploration to the engineer and VDOT for approval prior to OVER 50% W U) 2. The water and sanitary sewer of these are valid for two from date of FCSA approval. placing pipe. Foundation designs shall comply with VDOT Road and Bridge Standard PB-1. Where soft, yielding, I HEREBY CERTIFY THAT THE PROPOSED DEVELOPMENT OF THE w 0 W U V Z portion plans years or otherwise unsuitable foundation is encountered, the foundation design and/or need for foundation PROPERTY CONTAINED IN THIS SITE PLAN IS WITH THE FREE PREVIOUS APPROVED P LAN S P 6 3 - 0 4 stabilization shall be determined by the engineer and approved by VDOT. U) Ifl U 3. Water and sewer lines are to be constructed in accordance with these plans and shall meet all Authority CONSENT AND IN ACCORDANCE WITH THE DESIRES OF THE J Z E--+ requirements. V22. Approval of these plans shall expire three (3) years from the date of the approval letter. UNDERSIGNED OWNERS, PROPRIETORS OR TRUSTEES. THESE PLANS ARE IN CONFORMANCE WITH FREDERICK COUNTY STANDARDS AND ORDINANCES. ANY DEVIATION x 3 H OR CHANGE IN THESE PLANS SHALL BE APPROVED BY THE ZONING ADMINISTRATOR PRIOR TO CONSTRUCTION W in 4. The contractor shall coordinate with, and arrange for inspection by, the Authority. V23. VDOT Standard CG-12 Curb Ramps shall be installed where indicated on these plans and/or as specified Q > COVER SHEET(�'/� 5. When an existing water main is tapped for the installation of a new line: by VDOT. UJ O Project Name: , a) The Authority shall furnish all labor and material. V24. VDOT Standard Guardrail shall be installed where warranted and/or as proposed on these plans in DATE '-' > ® �' !� b) The developer/contractor must: 1. make application and pay depositWESTMINSTER accordance with VDOT's installation criteria. Final approval of the guardrail layout to be given by VDOT after CANTERBURY 0. E2. mark the to location. P grading is mostly complete. o �, U CC U) 6. The contractor shall tie-in a new sewer line to an existing manhole by core drilling the manhole. 0. U' Owner: Address, Including Zip Code & Telephone No. 7. Exact locations of water and sewer services on new lines are to be coordinated with the Authority's 300 WESTMINSTER CANTERBURY DR. Inspector. UTILITY CONTA CTS WESTMINSTER CANTERBURY OF WINCHESTER, INC. WINCHESTER, VA 22601 8. The Authority's department furnish install through 2" in It (540) 665-0156 O � maintenance shall and all water meters size. Developer: p Address, Including Zip Code & Telephone No. �' is the developer's/contractor's responsibility to have the meter box assembly installed correctly. Before a O permanent meter is installed: Water/Sewer: Frederick County Sanitation Authority Gas: Shenandoah Gas Co. UJ � a The meter box, with its frame and cover, must be properly aligned with the co ersetter. ) P p Y g pp P.O. Box r, V P.O. Box 2400 Winchester, VA. 22604 Winchester, VA 22604 SHEET INDEX SAME AS ABOVE � w b) The frame and cover shall be set to final grade. c) The distance between the top of the cover and the coppersetter shall to be between 18 and 21 inches. (540) 868-1061 MISS UTILITY (540) 869-1111 Z Engineer Certifying Plan: Address, Including Zip Code & Telephone No.,._,_._ g P P d) All components of the meter box assembly shall be in proper working order. 1-800-552-7001 Electric: Allegheny Power Phone: VERIZON 9. For water and sewer services that connect to existing lines: P.O. Box 1458 P.O. Box 17398 1.) COVER SHEET 2.) OVERALL KEY MAP s 151 WINDY HILL LANE k. WINCHESTER, VA 2260RINTEU; a) The location of the service lateral is to be coordinated with the Authority's Engineering Assistant. Hagerstown, MD 21741 Baltimore, MD 21297 3.) SITE PLAN GREENWAY ENGINEERING b) An Application for Service must be made and fees paid before work will begin. 1-800-654-3317 (301) 954-6282 N 540 662-4185 ( ) c) The Authority shall furnish and install all 5/8", 3/4" and 1" water services. SEP Clam d) For all 1 1/2" and 2" water services, the Authority shall make the tap and bring the piping to the FIRE MARSHAL'S NOTE APPROVAL DATE: 08-04-08 property line. The contractor shall furnish and install the meter vault assembly. The Authority will install � gg B i� the meter. e) The Authority will install all sewer laterals. GREE➢�91Fyr°'� ENGINEERING SCALE: N/A Fire lane markings and signage: Any "No Parking" signs and yellow painted curb locations will be installed by field inspection at the direction of the Fire Marshall's Office. ���(� p��( ��p�®��(� 10. Any water service line must have a backflow prevention assembly (double check valve or RPZ, as �*vl�`��` required). The assembly must meet ASSE standard No. 1015 or 1013. HANDICAPPED PARKINC NOTE NAME '-�DATE � �Q% DESIGNED BY: AS CLW / FREDERICK COUNTY ZONING ADMINISTRATOR DATE 11. All fire lines shall have a fire service meter assemblyand a backflow prevention assembly detector P Y ( �6T� �� �INd��E� �,-� �� FILE N0. 2039 double check valve or RPZ, as required). The assembly shall meet ASSE standard No. 1048 or 1047. Radio • SITE PLAN VALID FOR (5) FIVE YEARS FROM DATE OF PLANNING DEPT. APPROVAL read remotes are required. Handicapped parking spaces and aisles shall slope no greater than 2% in all directions. * SITE PLAN VALID FOR (2) TWO YEARS FROM DATE OF FCSA APPROVAL SHEET 1 OF 3 C-` N w { i i ` �' III-3-E-16 .�`III-3-C-Il WINIFRED W. i m 70 !U m / NdTHANA310$ C3 /cP MARK G. NACK ET AL - - - 5.. 6 i ANTHON <d \ STEPHENSON 11 ZONED: RP 131 b E 9 1 9 70 n m �° I �' 70 D N 3 % ZONED: LR '� / ZONED: LR \ USE: RES. PAUL A LAMBERT r p, r T4 e w_ 0 q° ZONED: LR / ' % " USE: MS. \ DB.180 PCs.103 u, r rn rs 70 � • 70 � USE= RES. '�'j• '�. / �g �' % m MST. LR-03-242 INST.'LR-03-IS1 \ DB. 253 PG. 533 MST. LR-03-3061 I Ls L2 L26 - L27 L L29 ` L3� �_ L31 3 \ L33Lij 24 34 CURVE DATA NUMBER DELTA RADIUS ARC TAN CHORD BEARING CHORD CI 41'24'33" 40.00' 20.131' 15.12' N 45'12'10" E 25.28' C2 221'24'11" 40.00' 154.51' 105.03, N 44'41'42" W 14.83' C3 -111-110-1" 50.00' 67.44' 39.98' N 52 °42'21" E 62.45' - ------ L21 L220_ o e - 132-01 ZLR USE: UNDEVELOPED I ��r - -+-�4 J I �VJ i /\ /O , \ , .�"' / g,`-''D GERALD F. SMITH // INST. LR-02 -4131 / J / .' ; - --- cp_ \� \ rrTITrTTTrm rrr rrr rn F �, �- `; . 7 T� zp '�q NO At / L INE DATA NUMBS DIRECTION D15TANCE L1 5 15'56'31" E 210.00' L2 N 16'3316" E 312.91' L3 5 60'26'19" E 212.20' L4 N 29'33'41" E 150.00, L5 5 60'26'19" E 400.00' L6 N 29'33'41" E -15.00' L1 5 59'36'20" E 225.00' L8 5 29'04'59" W 104,26' L9 5 1114'41" E 514.43' L10 N 46'24'26" E 151.50, LII 5 49'01'34" E 222.50' L12 5 44'36'25" W 1231.56' L13 N 46'02'04" W 32.39' L 14 5 40' 40' 18" W 194.42' L15 5 35'32'20" W 140.81' L16 5 33'05'41" W 223.11' L11 5 04'31'25" W 132.89' L18 N 52'22'09" W 356.31' L19 N 44'51'01" W 161.61' L20 5 81'23'50" W 139.25' L21 N 14'44'44" W 36,34' L22 N 19'5252" W 25.00' L23 N 19'52'10" W 128.59' L24 N 21'13'12" W 129.32' L25 N I0'4351" W 92.55' L26 N 20'21'31" W 120.00' L21 N 15'36'22" W 50.04' L20 N 09'42'20" W 9.98' 1-29 N 09'36'08" W 58.10' L30 N 11'30'30" W 133.59' L31 N 14'12'21" W 105.31, L32 N 24'29'53" E 21.96' L33 N 14°12'21" W 94.56' L34 N 04'40'51" W 165.99' L35 N 04'I0'11" W 241.61' L36 5 18'41'30" E 308.34' L31 N 01'20'55" E 405.18' / WESTMMSTER CANTERBIIRy'\OF \ � � \� i �.'°� _ \ i i i i ' f - \r ----------� ,.. � T� wINCHESTER MC. \ �• '�i �' ,-` ` \ b �-\_ - a-NDRIVE f PE: ASSISTED LIVING FACILITI' �' \ �! k �\ -7 - \ � BIaRY , DB.. 288 PG.1202 4.17 IL LLLIjil h\ r b ` ° �1i j� /� • -/J \ems, 10 132-01-4 ZONED: LR\ \ \ '� ,�� / ' -E... *>��,. w, --� - L F/ \ C� JD " USE: UNDEVELOPED \'_ '\� r \ GERALD F. SMITH MST. LR-02-4131 IX \ / 53-A-63A WESTMINSTER CANTERBURY OF \3 V� WINCHESTER, INC. [ ZONED: RPLL/ ' USE: MS. 4 ASSISTED LIVING \ Q� DB. W5 M. 1018 a, \ \ \ mac'' // ¢ _ L-, � / /-/. � \Z C ,/ O �'� � �°�`j ;y' J���'�'�j Qz�b •��ir \ ox ne - / ` \ o N14 4/19 53-A-53 \ \ \ \ \ <6 / SOVERIGN HOMES \ �,.� 53-A-63 \ \� / \ \ \ \ CSERALD F. SMITH \\ \ \ / / / ZONED: M \ USE: cowl \ \ \ % % PRN�41 ZONED: RP / / INST. �2-Ibbl2 \ / \ USE: MS, 05.151PG.ws \ \ / /> \ \ 53-A-61 RUSSELL O t \ Ilk \ \ \ \ \ ANN B. HIETT q \ \ \ \ DB. 336 MM 3S � .3evl 1> 100 0 100 GRAPHIC SCALE (IN FEET) CMEEN AY ENGINE C- ��ek 43 z W W z Z W O 0 � CD C\2 00 `t a N c� 0 C\2 co U C +� ZLoC\2 tip I � � W� � a� o4a) � to CD U � -,.= a i rn N O bn w H A v �' MARK- D. SMITH v No,022837 W `SI0NAl, E Z D O U c U W O w �Zow� Q E W Z Z_ E W Q > O 0 co 0 a E w Z°�E - a VJ W W DATE: 08-04-08 SCALE: 1" = 100' DESIGNED BY: AS/CLW FILE NO. 2039 SHEET 2 OF 3 X 4DMINI5Tf ,4TION 5 lLpIN --- EX C N A FE L. I i I Q ® OPZS�p �C3 APEL ADDI�P<f� kit A j, 3.00, SF CANOf'T- �� 00 1f �~ '/y/ \ I 1 � x i1 a .2 N.C. CONSTRUCTION OF A SILT FENCE (WITH WIRE SUPPORT) 1. SET POSTS AND EXCAVATE A 4'X4' 2. STAPLE WIRE FENCING TO THE POSTS. TRENCH UPSLOPE ALONG THE LINE OF POSTS. J. ATTACH THE FILTER FABRIC TO THE WIRE 4. BACKFILL AND COMPACT THE FENCE AND EXTEND IT INTO THE TRENCH. EXCAVATED SOIL E�X N.C. lPAf„ F \ 1 \ e 1 10 O 10 5GALE: 1 " = 10' EXTENSION OF FABRIC AND ((�/J��)MRE INTO THE TRENCH. 911\�11 FILTER FABRIC �A '==iiR,, ennjii c— - from lasUflation of Straw and Fabric Filter Barriers for Sediment Control PLATE. 0.05-1 J 20 a MINIMUM CONSTRUCTION z STANDARDS NARRATIVE AN EROSION AND SEDIMENT CONTROL PROGRAM ADOPTED WITH THIS PLAN MUST BE W CONSISTENT WITH THE VSECH FOR 4VAC50-30-40 MINIMUM STANDARDS: W I. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED z AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOILS STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 30 (DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS z THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. c\l la o 2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS Ln 65 C SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE CONTRACTOR 15 RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT � I N Co C) 5TA51LIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND cC°o to +- SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE. R: of �� z � 3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS x NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE W >' au 1 0 o CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT, IS UNIFORM, W q MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. 4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER H w MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UP5LOPE LAND DISTURBANCE TAKES PLACE. m 5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS M o Q) DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION.co b w 6. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN. A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LE56 THAN THREE ACRES. B. SURFACE RUNOFF FROM DISTURBED AREAS THAT 15 COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE Z CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE OUIFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE T BASIN DURING A TWENTY-FIVE YEAR STORM OF 24-HOUR DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF A BARE EARTH CONDITION OF THOSE CONDITIONS p; EXPECTED TO EXIST WHILE THE SEDIMENT BASIN 15 UTILIZED. 1. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTION A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM 15 CORRECTED. 8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR E-i SLOPE DRAIN STRUCTURE. Q 9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED. H OF 10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED 50 THAT SEDIMENT -LADEN WATER CANNOT ENTER THE t CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. U ARK D, SMITH No022837 � � `t 11. BEFORE NEWLY CONSTRUCTED 5TORMWATER CONVEYANCE CHANNELS OR PIPES ARE , W 0AA MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED SHALL �TZZJG� Cs TEMPORARY OR PERMANENT CHANNEL LINING BE INSTALLED IN BOTH THE S 10 CONVEYANCE CHANNEL AND RECEIVING CHANNEL. AL 12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT P05SIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY > NONERODIBLE COVER MATERIALS. >. 13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE E' THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM GROSSING Z CONSTRUCTION OF NONEROD15LE MATERIAL SHALL BE PROVIDED. O 14. ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO M WORKING OR GROSSING LIVE WATERCOURSES SHALL BE MET. W 15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED. W Z W C Q 16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE �"� H w FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: Zow� A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. 6 E- B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL 51DE OF TRENCHES. Z pq E- U _Z C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED a G U x THROUGH APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A J E. MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF -SITE w PROPERTY. E-, 111 I� D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN I--+ Lil p � uJ O ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. O 11. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC a E- w ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY Z U VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED n„ ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED O THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND -DISTURBING ACTIVITIES. W O 18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE Cf) REMOVED WITHIN 30 DAYS AFTER FINAL 51TE STABILIZATION OR AFTER THE w TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY Z THE LOCAL PROGRAM AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED 501L AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. NO EROSION CONTROL MEASURE CAN BE CHANGED OR REMOVED WITHOUT THE PERMISSION OF THE SHENANDOAH COUNTY INSPECTOR. 19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE DATE: 08-04-08 PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF 5TORMWATER RUNOFF. SCALE: 1" = 10' 20. ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE EMPLOYED IN A MANNER WHICH MINIMIZES IMPACTS ON THE PHYSICAL, CHEMICAL AND DESIGNED BY: AS/CLW BIOLOGICAL INTEGRITY OF RIVERS, STREAMS AND OTHER WATERS OF THE STATE. FILE NO. 2039 SHEET 3 OF 3