Loading...
HomeMy WebLinkAbout16-10 Carmeuse Natural Chemi. - BERM - Back Creek - Backfile (2)THE ARCHEOLOGICAL SURVEY REQUIRED BY PARAGRAPH 3.2 OF THE APPROVED PROFFER HAS BEEN COMPLETED. THAT REPORT IS AVAILABLE FOR REVIEW AT THE CARMEUSE NA OFFICES IN STRASBURG, 1696 ORANDA ROAD, STRASBURG, VA 22657. GENERAL CONSTRUCTION NOTES 1. The contractor shall furnish all materials, labor and equipment and perform all work including restoration for the completed installation of the utility systems and all other improvements shown or implied as necessary for the completed facility ready for use. Unless otherwise noted, specifications for all work to be in accordance with applicable Standards and Construction Specifications of The Virginia Department of Transportation, The Frederick County Sanitation Authority and the contract documents. 2. The engineer has attempted to locate existing subsurface utilities; however, such may exist that are not shown. The contractor shall exercise care in this work so as to avoid damage to any utilities. Any damage shall be the contractor's responsibility. The contractor shall notify oil utility companies 72 hours prior to construction. Call "Miss Utility" 1-800-257-7777. 3. The contractor shall be responsible for all construction stakeout. All dimensions, elevations and locations shall be verified in the field by each contractor prior to beginning the work. The Engineer will approve all cut sheets. 4. Any unusual subsurface conditions encountered during the course of the work shall be immediately brought to the attention of the Engineer and/or the Owner. 5. All grading for improvements to be confined to the project area. Any work performed offsite is the Contractor's responsibility. 6. Contractor to obtain, at his expense, oil permits required of this work and shall faithfully adhere to the permit conditions imposed. 7. All unpaved areas of the site which are disturbed by this construction shall be provided with 6" topsoil, fertilized, seeded, compacted and mulched. Seed bed to be watered and cared for as necessary to provide a good lawn quality grass cover. Areas not graded shall be disced, leveled and seeded to achieve lawn conditions. 8. Water and sewer lines are to be constructed in accordance with these plans and specifications and shall additionally meet all requirements of the Frederick County Sanitation Authority The contractor shall coordinate with this agency and arrange for inspection as necessary. 9. Temporary termination of sewer lines shall be plugged watertight. The end of the line shall be marked with a treated 2 inch x 4 inch post extending at least 18 inches above the ground. The top 6 inches shall be painted green, and the cut depth to the line invert shall be shown. 12. After removal of all topsoil, the subgrade should be proofrolled with approved construction equipment prior to fill replacement. All subgrade areas shall be stable prior to fill placement. All fill and base material shall be compacted to 100% of the maximum dry density as determined by ASTM D 698 (Standard Proctor). Landscaped areas shall be compacted to 90% of the maximum dry density as determined by the some Standard. Compaction testing shall be performed by a qualified geotechnical engineer registered in the Commonwealth of Virginia or a qualified representative under direct supervision of the engineer. 13. Access for emergency vehicles must be maintained at all times. Temporary street signs must be posted as construction begins. Access to fire hydrants is not to be impeded at anytime by construction materials, parked cars etc.. 14. Manhole rims, valve boxes, etc. to be adjusted to match proposed elevations shown in these plans. 15. If blasting is required the contractor is responsible for obtaining the neccessary Frederick County Fire Marshall permits. 16. This project entails construction over and in close proximity to existing gas main. The contractor will notify Shenandoah Gas Company (Phone No. 869-1 1 1 1) before excavating near this gas main. 17. All outdoor lighting must be shielded to prevent glare onto adjoining properties. and road right—of—ways. 18. All utilities must be underground. FIRE & RESCUE 1. Burning of land clearing debris requires a permit from the Fire Marshal. Burning of construction debris on site is prohibited. 2. Access for emergency vehicles must be maintained at all times during construction. Temporary street signs and addresses must be posted as construction begins. Parked vehicles and staging of construction materials are prohibited within 20' of fire hydrants. Fire Hydrants are not to be obstructed at any time. EROSION CONTROL 1. Prior to initiating any land disturbing activity, it will be necessary to schedule an on —site pre —construction meeting with public works staff to discuss the approved erosion and sediment control plan. No pre —construction meetings will be scheduled prior to issuance of the land disturbance permit for the subject project. 2. Contractor to contact the public works department to schedule the required erosion and sediment control measures inspections as indicated by the program administrator. If the erosion and sediment control measurers have been installed in accordance with the approved plan, the Department of Public Works will grant approval to initiate land disturbing activities. 3. Prior to release of building permits, the following items shall be completed: a) Subdivision shall be stabilized in accordance with the approved plan (i.e., road surface, stormwater conveyance system, curb and gutter, sidewalks, channel linings, vegetative cover, stc.) b) Submittal of certified as —built of thr subdivision which contains the following items: stormwater conveyance system, curb and gutter, drainage channels and ditches, stormwater pond. A letter from the engineer —of —record shall be included with the as —built which states that the subdivision has been constructed in accordance with the approved plan. c) Individual subdivision lot grading plans shall be submitted by the builder at the time of the building permit application for each lot proposed for construction. 4. Temporary and permanent erosion control structures and methods to be in accordance with the Virginia Erosion Control Guidelines and local ordinances and to be utilized during the construction period. 5. All erosion control structures shown or as required during construction shall be continuously maintained throughout the period in which areas are denuded. Areas shown to be surfaced are to have stone base installed at the earliest possible date after establishing grade. No area is to remain denuded for more than 7 calendar days when construction is not in progress. 6. Contractor to clean up and restore disturbed areas immediately upon completion of pipe —laying in the affected area. 7. All unpaved areas of the site which are disturbed by this construction shall be provided with 6" topsoil, fertilized, seeded, compacted and mulched. Seed bed to be watered and cared for as necessary to provide a good lawn quality grass cover. Areas not graded shall be disced, leveled and seeded to achieve lawn conditions. 4 ,, ?• M , h.. �4 Back Creek Magisterial District T-1 Frederick Cue--%unyt , Vi__U_ rginia r`, Vicinity Map Scale 1 "= 2000' i 1 1119110 REVISED PER COUNTY COMMENT ND R.A.M. NO. I DATE I DESCRIPTION BY I CKD M LOCAL UTILITIES Town of d.d•,; P. t Box•• Middletown, Virginia '1 6 • AlleghenyPower 3463 ValleyPike Virgin i Verizon Winchester, Virginia r1'' •,• • Comcast Comunications 95 Rainville Road Virginia ihenandoah P. 1 Box 2400 • 1 869-1111 i H of r L A. MISLOWSKY, R. Z 0 NO. 020674 H R t� � t � 22645 P.O.C. Donald 22604 P.O.C. Cindy Laing 22602 P.O.C. Tint Kelly 22602 P.O.C. Art Coleman 22604 P.O.C.• • Owner/Developer: Carmeuse NaturalChemicals Strasburg, Virginia 22657 1 r =•. • RESPONSIBLE LAND DISTURBER: NAME: CERTIFICATION #: DATE: THE RESPONSIBLE LAND DISTURBER IS THAT PARTY RESPONSIBLE FOR CARRYING OUT THE LAND DISTURBING ACTIVITY AS SET FORTH IN THE PLANS. I e EXISTING CONDITIONS BERM B GRADING AND EROSION SEDIMENT CONTROL PLAN BEN B LMDSWEPLM MISCEIIANEOUS DEWLS Approved by SITE PLAN APPROVAL (NAME Ae==_DATE �- SITE PLAN NUMBER JS County Zoniqg Administrator Date Site Plan valid for five 5 years from date of Zoning Administrator Approval. Project Number: 16048-1-2 A Ow"heet Number 1 — Of 5 z -n /, i / i J a /' 9// j/ (� \ i �/� / ff j % /! , / // / j%f// i/j �r�/! 1�3! III I J rJf %/ //;j/�/ �� + li f�% `i �'.// / / /1/�.f; /ter � v��\�� ;� �, J It J` r ; ; ,, ../'/;���:1/ , ��\ , ''l III t �i a t!,1 jf/� //1 V� �f l r / l 1 fd' � /1�,, , ,/ ,': r // ((// /h $ I �� ;,/ / �� iris/�1 1� 1, n l]! 1t l i- , i \ v�� E 1/ %/'/'1 " 90,E h �f ��t' �'�� v` /� lJ , , i� r//iII, /;' � JI�,f, '+I1 ` ;j�.'\-.,��j i t��``,,` `1�1, a\\\ /^/( ` , ;'r'J /r / / /`!''"i tI'l,1 I _- r, it (` §`�}; �y113��� ! �..,.,: .fir ii (� / 1 f !?III 1'r �rl ( 1 !y i�i �I ��r iti` �►�� ����/� �1/�v �It�1� f' Jl �1 // / J i, r� r 1 i/ //I; I ))>it `� �..- ��N�rr,� i ��'}\1I ' `������5 fa % ll "lr'. / r/f/ f J�f v /�'O\ , r �//, r P � \1 11 }11 r - r -(, I I t,, l r� i i F i� ` I -- �� ,w\�) t �`' 1` J�-/ 1 i r r t /i i '� r ' r d�l i ( f r 7d r`n; X ; I, r,/ //� / ' / l \� \ ` v - , r 11� '\V C. rr1/l1�� ��; rfr �� �f(r ��f.��\.�V� �� Ii�\����lrfi�� f �,� f < \ r // , 1. f f A A / I. I j ' '/�rr`/ /1 ''r /% (f",j//' lr'f/�/�.///j �f �///' \\. \, \\k \.\ /! l , r t i ` \ //'�� .ate //i/ii/ / / �/ / r ' t / ,' ' ff 'ir l J ��j �jf ,,// y � / / v 4,-__ ,. / `�/ ,. �, / /t//ll;,) t, �isi4H "t.-\ III , , / 1 , ! f/ i '` /- - _ .� E /rl IF:1, l`�, iA� ttti _ t , J ! , / /i r !/" /" 1 t �+'1i�1\l� ,� ',\ [ i �\�i''" LI I!I,' t II , i ' '1�`\ \\• \ �1 / ` �%` /if i/ //`/ _.. __-.�__�� `'Nl !(�1 ,r ,t °'s\y\\,v '`iris 1 1 r,A \ -.,. '` // ! i- ,._.•�- / 1 \` a yv �� ,v , / / / I/1 //,l/r1/�i,/it I}�t ` v //r / % r /'� ! r \ \ \ \\ `�VrI�V� ! a //� , t{ \ V, , vvv� 1 / //I�// ' �i!/J" Ir �4, \ \.4 \, v A\. / / - _ __—_._ . ,,.7 %J 17 1I/, i v , / y �/ I ✓�f ,,/ //t�1 % . r + i l f 5 A vA�A ,� �- -- _ �---, .r'--�� i'I i {f 4 1 i ,_�. 1i r / - / / �(/ Av `� ��``+�- L� I 1 y\ \ / f /ffr// �' / ,/ a , \ \ cl `\ \,. �, ._._� - -, ` l i \ i.lr } // o/ / /' /// \ r/'f;, �: / ';� ,/ / r___ - < / */i, /�j, X, r / , __ / / % 1 .- - r' ,. _ ".= / /, - . , _ r :.� - ._._ ia ►- r ( _ �� /p�� �. /, t , - 4 _. .( \\ \ , h . w �,.. ,^ry _ �.Vv v J,IIt� Vv1Vv �L v _ _ _ ", �RES \� \, \\ ., \\,\;\ \\\ i , \\ \ \,' '\ \ ,, \ ! / i k \\ \ \ \ \\ \ \ \ / " , ,\, ' \`. \ \'. \, i 1 \ \ / \ \ / \ \ \ \ \ \ i \' \ \ \ 4 4 \ \ \ \ \ \ _ \ i _ i .♦ \ ,� ,,.{ ,G \ \ ti ti \ % I I \. �� 1 1 t t \ - i - / / ;;\_ \. \ / - \ 1, \ \ f / \ • \- / / \, / - - - \ / k _ •..\ \ , \ \ ... r \. \ / f \\ ✓ \ \ \ \ \, / \ \. \ r `4;, i \ \. \ r \\ w ;' i .. \\/ l \ \ ,\\ \ \. / �/ 1 \ V \ % 4 \\ f " ` \ \ \ \ t; \ \\ \ \ \ \ \ __.. t4 \ F �,\\ ? \ \\ �. \\`r `.` \. / \ \., \ \` _ \ __ \ , , i i / f r / _ f \ -_-: / 1 / fi \ r \. +l - /� % \ J % 0' a / % i / / \ / _ r i. i / t '\ ,\ _ i -� \ % 4, /r f \\ \\ ` , _ / _ - \: r i` _ \ / �, / j, C — _ / / /' \ , f r r //!//,,� // it i /"/� S1 t ,- - - �,. '\ / - / / / / `� \. _" _ :. , - _ - 1 e �� \ s , \ \_. - , °ti -.-M-- ,m.,...- °`\ i i 1 -. `\ \ . - `\ / � .\ - - ./i ... \ D 1 \, R01. .1 BERM , >,. \ `M 1 ,\. N R E EZ x. RA N \\: L \. \ \ \\, is \ M / \ .'1 T , \', O 11 .- r ''\ N \' \'. \\ / 90 \1 \\r -- \ \,; / f 23-\,\ \\,\�kj - ( , ,\ 4 _ .4 y. v , - Il E$ \ __- v',A\ -- , t I ; , v ,� v �_',� '� \ \ 1 f ijt y i l a t \.. / i -' / ' \ '11 f \ ,a "' 1 „ I , \ r , \ / _r ? .;; \ ✓ \\ \ , Z - \ , \a' l\ \ \ \ \ /1 1 \\\ ! \ \\\ \` �` `\ \q Y \ \lf`�\��rt fj w' ti �" \ 1 ram_ �' �\\ �� \ - -- _ - _ _ i \ \ ., _ s \ �., \ _ :' \ \ ,_ �� \. �/ v Ay �`v \� \ i , t\\.fyh_ / '� ` �-„ / ,, / r __..%� \ VAS";, Av A / , o 1 \v A '1A /;- `,, *''"'" r- �„/� / '. /' ,�`\ \ a\\ / `.,bra /J \`' �•` � . _ j SOILS CHART MAP UNIT SYMBOL SOIL NAME HYBRM99C CRDUP SLOPE 5C CARBO SILT LOAM C 7-15�C SLOPES 13C FRAWST17VN CHANAIERY SILT LRAM B 7-15/. SLOPES 14C FREDERICK-POPLIMENTU LOANS B 7-15/. SLOPES 15E FREDERICK-POPLIMENTO VERY GRAVELLY LOANS C 25-607. SL�'ES 17C FREDERICK-POPLINENTO ROCK OUTCROP COMPLEX C 2-15Z SLO'S 17E FREDERICK-POPLINENTO ROCK OUTCROP COMPLEX C 15-4-5Y SLOPES 39C SVIMLEY SILT LOAN C 7-15/. SLOPES ALL S❑ILS INF❑RMATI❑N PR❑VIDED WAS ❑BTAINED FR❑M THE NATURAL RES❑URGES C❑NSERVATI❑N SERVICE CNRCS) WEB S❑IL SURVEY 2.0, FREDERICK C❑UNTY, VIRGINIA. 0 -__ _. _ x / _ `� l J_ i _ \_ 1 _—__ i _ -� \ �a d , / _._ _— /'r _ __ f 1 f // i a\ 1 r - \ r r / / / / / / / __ /� — �~r / i/ i / 1 / h ' j / , ' 1' 1 � Y �. 1+. / 1 - r 1 J; / / a ✓ // r"� r i % g .l' r 1 r / ✓ M f N / , ^' +S r t, �, ^ r f�'p��,`j/ Wit' / 1' / =r r f ' .H /� r E / G. ,. ti MS ••� d� .rs T O N / E r x { I /1 x F. Q� _ y / 3` / K, i 1 5,4g�gJ " RE f// / . E /, M 11 1l T� yl fi. J Y� 1 e': I I,; I 4, r > w f '~z K '� �a t � �. E yi t is �I i-,1 1 ! �4 X G � c s, i'F } 1 /// P . '"a / . j � i.- 1 # 'is -a / \l,\ \, f. 0 \>. -fit. t:�r �,:_ _.:� R ^( / .\ I \ \ L \m `,\.. f� �l a. 4 r/ '\ -'' ?: _ r 1 r` r _ - D -, / U : _. AR �-,. �-- �,• Y /ti. \ /' ; ' - \ --._� tit a==: , / �' /` . 1 i 'f i ;/ / ,, J / /, ` /� I / % / / �, ,' f "``v 1 �; , r r r // ,, r i / r /'" i / \ _1 / t r; / . r / /f/ l / I( r / /` // /� / --_ , GA PIN 90-A-20 - _,_ __. , RRE77 FARM . S L - , . " ,/ - ,�/i 7��� S/ _./ , r/'_ ! J , \ '- --' / ,- I \._"_ //"\_ -, J 1 E: � . ` i � i 0 �,I 1" � '/(, :a u /,: ,,: , /' / \ , i t 1 f -. L 7 1J 1 1`":f .m x - - I �s-<j f i la %�` dr . % w Z J, 0 4 p F ff 1 f` ,.r J 1 L_ n� F n c r 1T __ i \\ x /, tl } t l i yt���l, \\���A� J 1, 1L `'[` 1' \ t �� �� �� v \ W v 1 ® Q t 1, !t1Rl,�}�,`k� .�'fj p ,r wz� Q wd �Ow , ( i„ J � �, � v�\ Vw COUNTY of FREDERICK z � Q � � �, z r ' ' `;1 , r 1 ��''4 . (n Y LL N . 5 Li Z t �� �` \,\ �� ` Department urf Planning and Tlcgelopmeut u> > ¢ W —� o w .,I , \ 540f665-5651 ; tW o v '�- a `t ` 7`� Itt i r ; ) . FAX: 54W665-6395 i O � , l ; t ! 1 / { ! Hand- Bred , . E 'j 11 l D ` ef, ,�i 1 ,{ ,� I +: t `l I jl , I i December 10, 2008 %' �' ; 1a� �il�;;`�i 1I/ `�'\� ;F Patrick Sowers, Planner Patton, Harris, Resit & Associates 117 East Piccadilly Strut, Suite 200 Wmehestm, VA 22601 RE: Zoning Determination- ?term Setbacks at Carmenlse Mining Operation (Chemstone) Deal' Mr..7iJ�r>�'ir. : This letter is in response to your convspondence slated November 12, 2008, to the Zoning Adminis�ator requesting a zoning d�rm�onth�e do County Board f S � rs oa�u 11ada�p 282 iltl�l8 #03-06 W-A3-06), approv by Landscape beasns designed acid planned for view shed mitigation are not required to meet the 100 foot setback from roadways as requiired for excavations. ?during excavations including ovefln r-dear and stockpiles would be subjectin the excavation setback requirements as=*-cd bythe Fred�eri�ck County Zoning Ordinance. The berms adjacent to Chapel Road X627) that were approved as pert of RZ#03- 06 would be considered view shed mitigation beans and are clearly ident ifted in the paoffer exhibits. Th,e view shed nutiption beans and associated landscaping are not sabject to the 100 foot setback fbr wwavations. You may have the right to appeal this zoning determination within thirty (30) days of the date of this letter in =ordance with Section 15.2 2311 of the Code of Virginia. This decision shall be final and unappeasable if itis not appeased within t Arty (30) days. Should you choose to appeal, the appeal must be filed- with the Zoning and the Board of Zoning (BZA) in accordance with Article XXI, Section 165-155A(1) ofthe ]Frederick Cormty Zoning Ordinance. This provision regxiir�es the submission of an. application form, written statement setting forth th,e decision being appealed, date , of decision, the grounds for the appeal, how tare appelluat is an aggrieved party, any other information you u�ay want to submit and a $300.00 filing fee, ($250.00 filing flee and.. a $50.00 refundable sign deposit). 0rice the appeal application is accepted, it wi71 bet scheduled for public bcarin4g and decision before the BZA_ Contact mo regarding any questions you may have at (540) 665-5651. Sincerely, 1Z.Ch ���� - Zonin A dminisfrator MRC/dlw 107 North gent Street, Smite 202 - Winchester,'Virginia 22.601-SWO A k» 1 i a 3 a l L �, ,: N x r� , °} � 'fix+ ; $/0 3T:f+' ' Lts �J ��l O �' - 2r--�^= sa a A 5 Q w �� 4 ee avz" ..n % �` s �A ,� PROJECT SUM MARY l 4 \. c vy ,�. , AX DEN11R TION >. _ CA NUMBER .S . �; _.� r .%4 4.""'Fi d�a ` p� - - . �,: o ^�� 14 .4 ac e ``s== \� EXISTING PARCE AR 5 9 r s r \ 1 � L + �� J :� c -��\ \ �I -�_ v v l- "+. wl \ �� �,. DEVELOPED PARC �---, EL AREA 0 cres r *� � tee. `�, a i r. -„ � � • _ � ZONING `�� -� x / z EM nl, ' via '•`"'11 1' . 1 ✓ -� \ - _ _- N. ��: �. � �.: ADDRE S �'�. `�`,: _�_ -� ��-�,, " McCUNE ROAD _ - _ ---' CURRENT USE UARRY �__ t — Q t. Y':- 4^ % _� r - PROPOSED USE �.==-�=-=. -_� UARRY r- - - - s� / -".."-_- - L - �- —�_, DISTURBE AR .---'. % D EA \_.- 25 ACRES u ..�. I , L_ -�f, = /� \ �` . �. r s L - s=^ 1 \. '�•� /�• �.. tit ""� -� �� ,* - �_._ s fi3� �7 �s \ ", �-' �' _ �_� �_ v / _ - %'. \' _`\ _ �, l `� -l` �"' =cam--_. /� >�� S \ I } i =*+, _'`.,\\,n\�,\`� f / y f 4 ; i �\./',yi'{rll `I .,- __ . - r Jr: (_ d r r. 'c'"`..`\.' \ t e \ �m, �.— _ 1 �t \. f h Y `` i, -\ ' \ ., r ,�.�,.�-. 1,;r,t w I d;,;,,f T l \ S ORMW, TER MANAGEMENT AND WATER (QUALITY IS PROVIDED S t 1 , , 1 </ r; ' t i rr 1'' nr l { L f � f .- 9 _ i _ I 1 \ � .;I� I / -r � , .,f -__ r UNDER AN IXISTING STORM WA P P , TER OLLUTION REVELATION PLAN 7w- �, 1 r � "( r i= i - ,.- 1; r� 5 fin^' * ,i ! I flr 1\ lr„11f11 !t { _ �,:,/, `c FOR TH \ E (QUARRY PROPERTY. Q p \u / _ �� r t � / / s- u (rJ' - 1 r -. ( l I - - J /. \ / / d :d J f t \\\�\�` ;\ \ G j .ems;\ / t 7 t r Y \\i� r ,j / ri�� i - ` \\\ \ \,�„`_ - _ _--_ - �._ t -. �. :- \ -� _,.. \ _ �^�_ � / '' J tom. ;, _ -. - / 3 , ' G3- -�_. _- �,_ ---_._ ` y ��t �, `�, �..� - _may/ � ,,;,_ ,/ ,r'�,- /,_...�-.:�---�'--��� ��. J 1-_-_,_._,-___ -. ,�RAPfi1CSCWF` 200 100 0 200 400 ( 1N FEET ) 1 inch = 200 ft. r ,_ . , - r--_ - - r /`"^- %f 1\� l� l ) /�+ ., j/f,!/////� r ^�\ __. __ - - _ - y C7 , F /�'a� SIP, �. KRt w TES =pP- �� I i '1 -�_- �_�__,v ' .. � -. i � ?r / jl ;r f / R A- / ( /, r x D C M C z nZ XI i�MD --tM C MO � U) _ �C V 9 �..__� ta_-,_-- _ _-____________..__---._,_._- ___.__. W g Z 5 5 ti, • 0 O U W �! � vv Q � i Y ca — o � W °a W U W Y gQ31 W v Q W it Q � o 0 0 � Z E O M � d � W o LLLJ T_ w O - v N Q� tt) o —' N D) � - w II LL_ > O //\W\// W W yam. � N � Z }'Q w� _j i j �2 t-_ Q W O � Q C) _ U a, cn o cn (n �U W Z W O o ZZ O o: �� W 0U (- � � W Q N to � � W I X � O 00 Z Z x Z It 1"— p cn Q w � 00 Z W af _ 0 rJ E �-- 7001- 650 ----------- --------- 00 00 00 0 0-) 00 r`) V-) 0') 0010 0 0)j(o roV-) CD Ln C'J - -,j- 00 0-), N to 0) f-) N (N'(N 0 rl-) (-o 00, CY) 0) 00 r'); r.,) -zt r-) -.I- Ln (01LO U-) r-,) � U") (D -t! (,o (D -t 1 (D (Dl(D (o (D (o co (.0 (D (-o (.0 (.0 Qo (o (o (D (0 0+00 1+00 2+00 FPf OPOSED GRDE A 3.7475% -3.5331% 5.B595%�_,-- - - - - - - - - - - - - 4.156.1% — ------------ — --T ----------------------- IS--ING GRADE pl) 03 00 r--jo to Lc) 0') r1 r- �!Lo 00 Lf) r1l) C-4 00 C4 LO Lc) co co LO 00 m olcr) It oir- 0 N; CIA OD to -t I,- r- -,t f-, r, Lo 0 00 Lo co 110 (30 U-) Q0 0 �t 00 0) Lr) (J) 0') 00 Lo 00 00 rl) 00 (Y) Co 0) C) CD 0 0 0 Lo 00 U-) 0 L0 N ,I- CN LO r- n rl) (o I-, �t r- -d- c\j .1 U-), r4-) (o r-)10 10 0� c� 00 Lf) 0-) Lf) (.D 1(-4 l< i I ff) U-) o -,I-;N 0),Lf) (o CN 06 It (Y)* 4 4 (-0-in c\j 41,-: c; (Y)- 06 C)')'; o6 co -6 6 4 4(f) 06l06 a) r-) to oTo r- n 00 m fc) - 00!N 0 oolo rl_ Ln � r- f-- Lf) I,- I-- (D fl- r- co I- Co (-0100 CO (0 00 00 CD'CO CO (D100 00 (c) 100 00 co r- r-, Lc) I- r- 70 r, 00 (D 100 00 (-o i oo OD (.0 1 oo 00 r-,10) 0) r, cy) (Y) (3) 0) co CY) cy) C) FD CD 0010 (D IDI(O (.0 (C) (C) Q0 (D (C) CD (D Q0 Q0(0 (D co (0 (D Qo QD (D (.D (0 (o co(o (.0 (o (j> (c) (01(o (D Qo (0i(o co 1 (D (.0 (DI(D (D (D (D (o co (.0 (0 (D (o CD, (o Qo (.0 r- - ----- ------ (^o I --- 1-1�...--------------,------L.---.---. ------------ 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 BERM B PLAN & PROFILE PROFILE SCALE: V-50" H V-50' V w z O V) LAJ 0 I Lij 0 Z Z 0 LLI _j 0 N 3:T— - 0 U) U) Ei Ir = to Ld z V) < LLJ < Ld I < cl) C) co cn ml 091 0 z O C) -0 C-4 C-) Of LLJ co 00 cn 3: < C) Ld LJ 0 W D� T -1 (.0 0 0 u LL- 'y �n 0 N Cp s z J O O N U 0 rn z no 0 Q (J� c i N v N z co i 0 Q `UlJ+�■' � i ' l D - o o- 4 P- 4, _r ! ' P ` 1 Insert bar at 45 degree angle.) Push forward to upright position. I I Hold seedling at correct depth, insert bar 3 inches from seedling. Push bar handle forward to close hole at top of roots. i Remove bar and place seedling j at correct depth. j 4 Pull bar handle toward planter to. close hole at bottom of roots. - Stomp with heel to fill in the last hole. 1 inch = 50 ft. PLANTING LIST PLANTING SPACING QUANTITY * Smell DEOMS )W L67- 15' O.C. 67 MN dr�ass lrsrd 109i M CRS1dWsPS' -M Aff""P.SPS' WWRNUd I'IW"SPS:' s�rl�scd,;Vd,�as�s I/flYU,l/ L!�G' !�'i4NT LIST /W9E4(/ AfJM CdrQf'IriP�6' C"Zl.Yld�i'd mnw",, fAmw gsTw AI�l�Yldlfrd CH/N,YM M TIM frl Id S4Sf1iAs sdrsdP.s dram PMA(" OIUSPl�?S' F/jVIA .d LW Dlr'GYGYiCW PLANT W.- our eflssPS /f9Pl� RfD dC A7s" 6�ACKGU,1/ APS�d SiZOdT1�el AWR MOlY, IULF rlR1011dXllhl9A'1f16OIZZ" SYAIT Awlaff & IlAAil'9" 5915ROV PLANT LU.- i P/#f£ HIIC# PIMeIS'Rl /M PNf,, YWR AF PIA�l�3' ",1%Pd a9&# N7IIIf PdYf jPi" MWAy AWW%T ARM Off QW " Od�Y"AGfS' EA5M RID QW ./UAMiff Yl9IAlMd SIZE SEEDLINGS 20' O. C. 41 SEEDLINGS 40' O. C. 41 SEEDLINGS 20' O. C. 81 SEEDLINGS 'i1 ME W� 0 z 0+00 1 +00 STORM CULVERT PROFILE GRAPHIC SCALE 50' 25' 0' 50' 100' 1 INCH = 50 ft. HOR/Z. 1 INCH = 5 ft VERT. 1r // 'l 16.96' 0 3.00 % " CMP U �f- cp n Z o — CD[> o z cn w \ N D. SEEDLING' &497NO INSTRIIMONS: MWAFff AW LEW AR SPX6 MIS M Pff OUT NO MY OW AM MY SOW's s 1 r1i U '0 • a �' // / /' // /�a' rah . AV Iftf, ALL" X& TO FALL /N A/rix/AV It/f ME TAMP NN IfW OF N N 1W hW- M MIN ".S E F NECfBW,, " TAB OW trl. 21 FRONT OF BERM 200.00' SEEDLING PLANTING DETAIL TYPICAL PLANTING SECTION A w J Y O -1 Z %UjZ� Q O 3 Wv_�Ow �z Lu (n r- c� z Q �0•...��L. > Lwi 6 C) �0- 0 CII on 00 _ v ui U �Q o� Cf)O UN � N Q U a> N O U) co �0 4- Q0 Q0 AW y w 9- o O U C Ln Ln rL U ■�. 0 L L. _ cn + i W O a� ♦+ N C IL W 43 Z C� g Z a 0 � W C� Q m V) 0 � Z wg wm z M w 0 w � U a ~ Y W LAJ � o WLLJ o U o zj O w \_ p LLJ 0d Z O V N O= tf) Ld zp _J (/) ( V) LL- > Q o W = LLJ w z >Q LB -j Lw 0 0 Q c<_ � U a. (n 0 cn Cn Ld U p 0 0 0—j U 0 0 �-- N w UU a g o Q N t> o o o z Q z z LA.)o W � coo z w � IL- 0 0 C) L� r rL J \� IIq L U7 J , hh J 3 OZ T7OZ ctf EROSION & SEDIMENT CONTROL MINIMUM STANDARDS z n R -� w SILT FENCE CUL YER T INLET CONSTRUCTION OF A SILT FENCE co ��'� z 1. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final TEMPORARY DIVERSION DIKE /'� (WITHOUT WIRE SUPPORT) � � � � � w grade is reached an any portion of the site. Temporary soil stabilization shall be applied within seven days to PR D TE CTI V N 6 a denuded areas that may not be at final grade but will remain dormant for longer than 30 days Permanent 1. SET THE STAKES. 2. EXCAVATE A 4'71; 4" TRENCH Or '� o yy o stabilization shall be applied to areas that are to be lets- dormant for more than one year. UPSLOPE ALONG THE LINE OF STAKES. 2. During construction of the project, soil stockpiles and borrow areas shall be stabilized or protected with ENDWALL sediment trapping measures. The applicant is responsible for the temporary protection and permanent 6�t�X Compacted Soil _ v stabilization of all soil stockpiles on site as well as borrow areas and soil intentionally transported from the / .� / (0 project site. 4- 18" min. 3. A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieved that is uniform, -Flow TOE OF FILL CULVERT %�- - -J mature enough to survive and will inhibit erosion. I 4. Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap 711111 milli I 10=11111- 1111101111=111111_ o PLO /r •� (1) sediment shall be constructed as a first step in any land -disturbing activity and shall be made functional before upstream land disturbance takes place. 4.5' min. (�"" O 0 C/) 0 5. Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions q • N N 0-) � immediately af�erInstallation. 3. STAPLE FILTER MATERIAL 4. BACKFUL AND COMPACT Q � o Q N 0 6. Sediment traps and sediment basins shall be designed and constructed based upon the total drainage area o 1 IT o STARS AND EXTEND THE EXCAVATED SOIL T INTO THE TRENCH. � °_ `- CD � to be served by the trap or basin. a. The minimum storage capacity of sediment trap shall be 134 cubic yards per acre of drainage area and o o TOE of FILL `. N C_ LJJ -C 0 0 the trap shall only control drainage areas less than three aces y ,. ' , C 0 � � b.Surface runoff from disturbed areas that is comprised of from drainage areas renter than or cal to SOURCE: VA. DSWC SILT FENCE o a _ !- LL P 9 9 equal PLATE 3.09-1 !Y I ` three acres shall be controlled by a sediment basin. The minimum storage capacity ofa sediment basin shall DISTANCE is s' MINIMUM IF FLOW be 134 cubic yards per acre of drainage area. The outfall system shall, at a minimum, maintain the structural IS TOWARD EMBANKMENT integrity of the basin during a twenty-five year storm of 24-hour duration. Runoff coefficients used in runoff /'/�� L •' 0 calculations shall correspond to a bare earth condition or those conditions expected to exist while the FLOWsediment basin is utilized. FLOC / 7.Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that OPTIONAL STONE COMBINATION - = _ + are found to be eroding excessively within one year of petmalient stabilization shall be provided with SHEET FLOW INSTALLATION additional slope stabilizing measures until the problem is corrected. (PERSPECTIVE VIEW)ui O 8. Concentrated runoff shall not Row down curt or fill slopes unless contained within an adequate temporary 1.0' 1.5' ,�, or permanent channel, flume or slope drain structure. I { FLOW .F•a C c�' 9. Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. A ZL A `\ C 10. All storm sewer inlets that are made operable during construction shall be protected so that h' sediment -laden water cannot enter the conveyance system without first being filtered or otherwise treated to FLOW remove sediment 2.5 11.Before newly constructed stormwater conveyance channels or pipes are made operations, adequate outlet ( i protection and any required temporary or permanent channel lining shall be installed in both the conveyance i channel and receiving channel. POINTS A SHOULD BE HIGHER THAN POINT B. e.• *VDOT #3, #357, #5, #56 OR #57 COARSE AGGREGATE CLASS i RIPRAP DRAINAGEWAY INSTALLATION Q 12. When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, TO REPLACE SILT FENCE IN " HORSESHOE ' WHEN (FRONT ELEVATION) control sediment transport and stabilize the work area to the greatest extent possible during construction. HIGH VELOCITY OF FLOW IS EXPECTED Nonerod/b/e material shall be used for the construction of causeways and cofferdams Earthen fill may be used dapted so= Afrom instaitatmn of Situ and Febdo litter Bantam far Sediment COUbD L DSWC PL�iB, 3.05-2 tj for these structures if armored bynonerod1b/e covermatena/s. SOURCE: ADAPTED from VDOT Standard Sheets and Va. DSWC PLATE. 3.08-1 $snood and Wyed 13. When a live watercourse must be crossed by construction vehicles more than twice in any six-month period, a temporary vehicular stream crossing constructed of nonerodib/e material shall be provided. 14. Alf applicable federal, state and local regulations pertaining to working in or crossing live watercourses PIPE 0 U TL E T C 0 ND I TIO �T S shall be met. STONE CONSTRUCTION ENTRANCE ROCK CHECK DAM. IS The bed and banks of a water course shall be stabilized immediately after work in the watercourse is A A completed. f� 70' MIN. EXISTING 2 ACRES OR LESS OF DRAINAGE AREA: w 16. Underground utility lines shall be installed in accordance with the following standards in addition to other I` A 1 elf 06��M_MJNTABLE PAVEMENT applicable criteria: 5'1 Z Iggm 3do a. No more than 500 linear feet of trench may be opened at One time. FILTER CLOTH 6" MIN. A BERM d 0 6(PTIONAL) b. Excavated material shall be placed on the uphill side of trenches PIPE OUTLET TO FLAT 3 SIDE ELEVATION AREA WITH NO DEFINED FILTER CLOTH c, Effluent from dewatering operations shall be filtered or passed through an approved sediment trapping EXISTING GROUND CHANNEL (OPTIONAL} PLAN VIEW device, or both, and discharged in a manner that does not adversely affect flowing streams or off -site property, 70' MIN. (DOWNSTREAM VIEW) ��•,�/ d. Material used for backtilfing trenches shall be properly compacted in order to min/m/ze erosion and promote stabilization. B (OPTIONAL) WASHRACK 1 MIN, L VDOT #1 W COARSE AGGREGATE J e. Restabilization shall be accomplished in accordance wfth these regulations a 1N 12' MIN, * �-EXISTING d FLOW 1 3' f.Applicable safety regulations shall be complied with. PAVEMENT I "I 17. Where construction vehicle access routes intersect paved or public roads, provisions shall be made to SECTION A -A FILTER NTH KEY IN 6"-9"; RECOMMENDED FOR ENTIRE PERIMETER minimize the transport of sediment by vehicular tracking onto the paved surface. Where sediment is transported onto a paved or public road surface, the road surface shall be deaned thoroughly at the end of VDOT #1 POSITIVE DRAINAGE 10' MIN. each day. Sediment sha!! be removed from the roads byshoveling orsweeping and transported to a COURSE AGGREGATE T❑ SEDIMENT B - A sediment control disposal area. Street washing shall be allowed only aftersediment is removed in this TRAPPING DEVICE manner. This provision shall apply to individual development lots as well as to larger land -disturbing activities MUST EXTEND FULL WIDTH I 2 -10 ACRES 0 F DRAINAGE AREA: •� U INGRESSOF AND EGRESS PLAN VIEW A 3d o (MIN.) W I8,All temporary erosion and sediment control measures shall be removed within 30 days after final site OPERATION = Z stabilization or after the temporary measures are no longer needed, unless otherwise authorized by the local 1 2' MIN. d ! program authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary 6" measures shall be permanently stabilized to prevent farther erosion and sedimentation. 3" MIN. PIPE OUTLET TO WELL � 0[ DEFINED CHANNEL 3 19. Properties and waterways downstream from development sites shall be protected from sediment _ I I I I , I 3' MiN. FILTER CLOTH deposition, erosion and damage due to increases in volume, velocity and peak flow rate ofstnrmwater runoff PLAN VIEW (OPTIONAL) All measures used to protect properties and waterways shall be employed in a manner which minimizes C:)impacts on the physical, chemical and biological integrity of rivers, steams and other waters of the state. FILTER CLOTH V SECTION A -A L a (DOWNSTREAM VIEW) w 6'-7" V 0 % -__ VDOT #1 W I t.. COARSE AGGREGATE W W W III - U W FLOW a err • ..P. SECTION A -A T 3' o U FILTER CLOTH KEY IN 6"-9"; RECOMMENDED FOR ENTIRE PERIMETER W NOTES: 1. APRON LINING MAY BE RIPRAP, GROUTED RIPRAP, GABION BASKET, OR CONCRETE. REINFORCED CONCRETE DRAIN SPACE 2. La IS THE LENGTH OF THE RIPRAP APRON AS CALCULATED U USING PLATES 3.18-3 AND 3.18-4. Lt p SECTION C3 - B 3. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER, BUT NOT CLASS I RIPRAP' 0 LESS THAN 6 INCHES. d SOURCE: ADAPTED from 1983 Maryland Standards for Soil erosion and Sediment Control, and Vo. DSWC Plate 3.02-1 $pw= VOL MW plane 9.1$-1 w SOURCE: VA. DSWC PLATE. 3.20-1 Q O 0 � O O <L ¢ t- ZLLJ Z O Z � O � z > w O �� a w E_ Q 0 _ n_ Cn o U7 (n W 0 U) W on zO . O I- 0) <L CJ < c z 0 C() z � z Z w � = J (0 THE ARCHEOLOGICAL SURVEY REQUIRED BY PARAGRAPH 3.2 OF THE APPROVED PROFFER HAS BEEN COMPLETED. THAT REPORT IS AVAILABLE FOR REVIEW AT THE CARMEUSE NA OFFICES IN STRASBURG, 1696 ORANDA ROAD, STRASBURG, VA 22657. GENERAL CONSTRUCTION NOTES 1. The contractor shall furnish all materials, labor and equipment and perform all work including restoration for the completed installation of the utility systems and all other improvements shown or implied as necessary for the completed facility ready for use. Unless otherwise noted, specifications for all work to be in accordance with applicable Standards and Construction Specifications of The Virginia Department of Transportation, The Frederick County Sanitation Authority and the contract documents. 2. The engineer has attempted to locate existing subsurface utilities; however, such may exist that are not shown. The contractor shall exercise care in this work so as to avoid damage to any utilities. Any damage shall be the contractor's responsibility. The contractor shall notify all utility companies 72 hours prior to construction. Call "Miss Utility" 1-800-257-7777. 3. The contractor shall be responsible for all construction stakeout. All dimensions, elevations and locations shall be verified in the field by each contractor prior to beginning the work. The Engineer will approve all cut sheets. 4. Any unusual subsurface conditions encountered during the course of the work shall be immediately brought to the attention of the Engineer and/or the Owner. 5. All grading for improvements to be confined to the project area. Any work performed offsite is the Contractor's responsibility. 6. Contractor to obtain, at his expense, all permits required of this work and shall faithfully adhere to the permit conditions imposed. 7. All unpaved areas of the site which are disturbed by this construction shall be provided with 6" topsoil, fertilized, seeded, compacted and mulched. Seed bed to be watered and cared for as necessary to provide a good lawn quality grass cover. Areas not graded shall be disced, leveled and seeded to achieve lawn conditions. 8. Water and sewer lines are to be constructed in accordance with these plans and specifications and shall additionally meet all requirements of the Frederick County Sanitation Authority The contractor shall coordinate with this agency and arrange for inspection as necessary. 9. Temporary termination of sewer lines shall be plugged watertight. The end of the line shall be marked with a treated 2 inch x 4 inch post extending at least 18 inches above the ground. The top 6 inches shall be painted green, and the cut depth to the line invert shall be shown. 12. After removal of all topsoil, the subgrade should be proofrolled with approved construction equipment prior to fill replacement. All subgrade areas shall be stable prior to fill placement. All fill and base material shall be compacted to 100% of the maximum dry density as determined by ASTM D 698 (Standard Proctor). Landscaped areas shall be compacted to 907. of the maximum dry density as determined by the some Standard. Compaction testing shall be performed by a qualified geotechnical engineer registered in the Commonwealth of Virginia or a qualified representative under direct supervision of the engineer. 13. Access for emergency vehicles must be maintained at all times. Temporary street signs must be posted as construction begins. Access to fire hydrants is not to be impeded at anytime by construction materials, parked cars etc.. 14. Manhole rims, valve boxes, etc. to be adjusted to match proposed elevations shown in these plans. 15. If blasting is required the contractor is responsible for obtaining the neccessory Frederick County Fire Marshall permits. 16, This project entails construction over and in close proximity to existing gas main. The contractor will notify Shenandoah Gas Company (Phone No. 869-1 1 1 1) before excavating near this gas main. 17. All outdoor lighting must be shielded to prevent glare onto adjoining properties. and road right—of—ways. 18. All utilities must be underground. FIRE & RESCUE 1. Burning of land clearing debris requires a permit from the Fire Marshal. Burning of construction debris on site is prohibited. 2. Access for emergency vehicles must be maintained at all times duringg construction. Temporary street signs and addresses must be posted as construction begins. Parked vehicles and staging of construction materials are prohibited within 20' of fire hydrants. Fire Hydrants are not to be obstructed at any time. EROSION CONTROL 1. Prior to initiating any land disturbing activity, it will be necessary to schedule an on —site pre —construction meeting with public works staff to discuss the approved erosion and sediment control plan. No pre —construction meetings will be scheduled prior to issuance of the land disturbance permit for the subject project. 2. Contractor to contact the public works department to schedule the required erosion and sediment control measures inspections as indicated by the program administrator. If the erosion and sediment control measurers have been installed in accordance with the approved plan, the Department of Public Works will grant approval to initiate land disturbing activities. 3. Prior to release of building permits, the following items shall be completed: a) Subdivision shall be stabilized in accordance with the approved plan (i.e., road surface, stormwater conveyance system, curb and gutter, sidewalks, channel linings, vegetative cover, stc.) b) Submittal of certified as —built of thr subdivision which contains the following items: stormwater conveyance system, curb and gutter, drainage channels and ditches, stormwater pond. A letter from the engineer —of —record shall be included with the as —built which states that the subdivision has been constructed in accordance with the approved plan. c) Individual subdivision lot grading plans shall be submitted by the builder at the time of the building permit application for each lot proposed for construction. 4. Temporary and permanent erosion control structures and methods to be in accordance with the Virginia Erosion Control Guidelines and local ordinances and to be utilized during the construction period. 5. All erosion control structures shown or as required during construction shall be continuously maintained throughout the period in which areas are denuded. Areas shown to be surfaced are to have stone base installed at the earliest possible date after establishing grade. No area is to remain denuded for more than 7 calendar days when construction is not in progress. 6. Contractor to clean up and restore disturbed areas immediately upon completion of pipe —laying in the affected area. 7. All unpaved areas of the site which are disturbed by this construction shall be provided with 6" topsoil, fertilized, seeded, compacted and mulched. Seed bed to be watered and cared for as necessary to provide a good lawn quality grass cover. Areas not graded shall be disced, leveled and seeded to achieve lawn conditions. Back Creek Magisierial District Frederick County, i J 1 Virginia qf � b � Vicinity Map Scale 1 "= 2000' JUNE 141 2010 1 1119110 REVISED PER COUNTY COMMENT ND R. A. M. NO. DATE DESCRIPTION BY CKD Patton Harris Rust & Associates®pc Engineers. Surveyors. Planners. Landscape Architects. 117 East Piccadilly Street, Suite 200 Winchester, Virginia 22601 + T 540.667.2139 F 540.665.0493 LOCAL UTILITIES Town of Middletown P. 0. Box 696 Middletown, Virginia (540) 869-2226 Allegheny Power 3463 Valley Pike Winchester, Virginia (540) 722-5852 Verizon 404 Hillandale Lane Winchester, Virginia (540) 665-3156 Comcast Comunications 195 Rainville Road Winchester, Virginia (540) 504-0942 Shenandoah Gas P. 0. Box 2400 Winchester, Virginia (540) 869-1111 22645 P.O.C. Donald Riffey 22604 P.O.C. Cindy Laing 22602 P.O.C. Tim Kelly 22602 P.O.C. Art Coleman 22604 P.O.C. Tim Hockman Owner/Developer: Carmeuse Natural Chemicals 1696 Oranda Road Strasburg, Virginia 22657 (540) 465-5161 RESPONSIBLE LAND DISTURBER: NAME: CERTIFICATION #: DATE: THE RESPONSIBLE LAND DISTURBER IS THAT PARTY RESPONSIBLE FOR CARRYING OUT THE LAND DISTURBING ACTIVITY AS SET FORTH IN THE PLANS. SHEET INDEX 1 COVER SHEET 2 EXISTING CONDITIONS MAP 3 BERM B GRADING AND EROSION & SEDIMENT CONTROL PLAN 4 BERM B LANDSCAPE PLAN F5 I MISCELLANEOUS DETAILS SITE PLAN APPROVAL SITE PLAN NUIWBER Approved by Fred ' k County Zoning Admi ' trotor % F H aF � Date f Site Plan valid for five 5 years from date of Zoning Administrator Approval. c L A. MISLOWSKY, R. Z 160A Project Number:®1-2 NO. 020674 H z LC% � �FSsoNA � heat Number-1 f 5 1: J 7 95 (I ;J v J rn Lr.l i r� a) 0 J 00 0 v v 2 a- i ci SOILS CHAR' MAP UNIT SYMBOL SOIL NAME HYDROLOGIC GROUP SLOPE 5C CARBO SILT LOAM C 7-15Z SLOPES 13C FRAWST17VN CHAN ERY SILT LOAM B 7-15/. SLOPES 14C FREDERICK-POPLIMENTO LOANS B 7-15/. SLOPES 15E FREDERICK-POPLIMENTO VERY GRAVELLY LOANS C 25-60% SLOPES 17C FREDERICK-POPLIMENTO ROCK OUTCROP CLEX C 2-I5X SLOPES 17E FREDERICK-POP01ENTO ROCK OUTCROP COMPLEX C 15-457. SLOPES 39C SVIMLEY SILT LOAM C 7-15% SLOPES ALL S❑ILS INF❑RMATI❑N PR❑VIDED WAS ❑BTAINED FR❑M THE NATURAL RES❑URCES C❑NSERVATI❑N SERVICE CNRCS) WEB S❑IL SURVEY 2,0, FREDERICK C❑UNTY, VIRGINIA, i ,' �/' %i%r j %' /' ,� J/, // / , / / --- // /, _. / . r,, 1" i / , r / �� / , � -=-- --- --// / i �. f -z / i - / �. /' 1 �)��//Y�{�/■■ /� _ I / %-n r� _ ti - -- i/ , r �: -/ / t E �- - // / r f / \ 1� , _ ,, r fir,-- -=: r - - P / „' �'� _ 1, I _ _- 1\ �- - 1 l , 1 , � - _3= \. „ - \ \ - 4 1,., "w \ \'\. - \ \ \ ,4r \ - s ,„\ 1 a \ .I I �, 1 -/ I \ ,'. \ \ \ r \ \ \\ \ t \. \ \ \ \,\ \ \ \ 1 ( , \ \ � ,�.. ,t�\ \\ ,\\\\ \\\ ~ la\ , ,\\\\`\.\ 3 Y \ [\`�`„- l \ . , ' ,1, \ ,t\t\ \ \\, t ' t ', 1, / / /,,,.�' �: \ i r, `ti \ \ , \ .\, \ \. \. \n \ .. \ J 1 \ � \ `\ 1 t `t ' r' i ♦ 3 \ \.. \ \ \ \ i � / 1 I :\ \ \ \ .'. \ /' \' .: / \ __.- , - \ ✓ \ •' '\ r \ �' r \\ \: . / \.\ \ i �' / \ \ \ \. , \ \\ \ \ / / / \\ .\. \- \ \ \ , \', , \ :\_ \ \ \- i ) \ .\ ,\ \ -� \ , \ / / ' \ \ \ \ i / 3 `\\ r\'. \ \ / \, \ \ /� �,�,/,,, / /`i ' / �/Uri � / `', F/i'' � //. ' i'1 'lll/ � ���� ., I+ilr � �i /, ! ili !r/ 11 1 1 1 r . �!/� // //�_ %.// <"� / /��l i `'��l��i ' l l'71� i �r / /r .i i a� / i '/ ///l`p!//, 1�� "\! / ' 1 ' !( r i { yr �, r /�///,, v,, 4, �� v a 3 /!/ f "//// �� ,r , _ %lfr� _ f�,, w / / / 1 / r f l !, �' - / , 3t i 1i , kid //% r// I�i''('i/'�st('�111�''� --- ' �i(` tvvy , //,/,/ O . - \� ,, \ \\ CH��VItN RAL.S , �ti\ \�\\ \�\ '\ 1' I / /'lI 90 q. r /// ,,,V�t ��I ,� 'I . i `�l', R,v .: v\���II ,,C' ff�/ t / ! /!/i, /% / '� / /-i' I it Si�i�il Il��j/1 �/1 ! i ,!1II ; , /, I ' f 1 v -/j/�/ f�yii�� v00 ;� i f l {I' '/' //� v 1 QpA�. , 1%�`� �, tr l' / l�/ \ i , ' ��\ D,gRY l;',, +I II,f I i , , A ( `� liv' I, r r v v 11,!' , t �I / �;// 1/' / v v V v v `` 1`•� 1 �;, ' ! ; v) �i 1 I \ p \ \>/ Y / )l) /�, / //r v y J I / ;f ;; I•r)� \ i" l ,/1061 ,1. = „1, /,,,'ice,` vv i, ,�' r 1 7 �, / / �" //j -,%'� ``-� .ram+'_ // // %/fir js %� : � • i / t / ' - % ,: \ i i \ / / //�///,��/r/ [[I• i��+�. t ' ,\\1 ,I , A I'/ y. _---- / I f J i/I // ,fr , ,1 , A / I '✓///�/// /I/,'rJ�,I j,,l, /%yam " A '; A v V i \ �` '".e- \., ��\ _ /' ! / // 11 /1 '1 i r/'rJ �t �' AR l llii) C i �'\ \ \ \ \ :u , \'\` \ \ ~~?, I� I 1 f / \ — /��% , //' �� i}\�� �i. i' -N\\.\ \ \ \ �Q\\\� ` - _� /�/ _� .--___._ �/ teal l _ - a — 'fi i / 1 i'� I / _' 1 4 �l i f / _ i _ - / \ / / , 1� _ / i r� ! i "_ _ , - ��-` --- — - -- -- \ _ % , r / _ i - \ I - i \\\ \ \ \ _ \ \ \ \ .\ \ f \ / \\ „.� - / / _ O. -_ j \ \. \ �. \ /` \ _ 1, • ` � _ i'r i' f \ \, \\ i i / \, / / i / \ \' \ `� - � -_ _— it / - /� mac,, \,!' -� y % i , \` , \ \ �— • , \ ^.\\ / ! _ \ t \. / \\ \ ryt+ \ \ - \ //� ! • �\ \. \ / _� ... q �. \ - l I \ \\ \ \ \ J / --_ �\ \ \ \ \ / \. _ .H / \ - �- -- _ E \, / /� _ / \ \ % % / / % S \ / T \ \ \ i \ O -� - _ N \ - r \,\ i - _ - 'M} E /+ \, \ \ 1 \ / ' / \ \, y _ / _ iA \, / / - R \ _ S J \ \, , r: ♦ '�1/ __ \ _ % o \ - f 1 \ { ' i 1 ' - i- \ I a: 1 t. \'' .'+. �i ,y ^ .pry / ' ' , \\ ✓ \\ I rr \ \' n r \ ` /' r Ir I I \ �i \ \\ '�iI .''tr e � r: t 1 1- i , \ a\ \ s . J r P \ , 1 ,• ✓ 1.�: . a r� 'l. I 1 I \, \ �` t � at 1 i T r \ \,\ � ti „ \\,1I / _ ll\ \ \ \ y �_ t \ I ���\� �\ \ __ x \ � " "\ yv_,+r i, �, U, v� �/" ;,\ Ir si�%3 c� s �' �\ i� i ; P of :ll, //; ' % �' 't � . ((?-- / /f, "� . t,nl 1 , Iris ,i //ice ( �_ //a, �= — //,�== r�i [' �\ t `` A 1itl�ill A I i;, Ij'! cskf,�C� , t`, . ( l'� / t ��.'`t 111' , ( - 11 r J'r 1;; _ \ f ' �lr'1,1; , i / r _. - ' �\ \ .E \ / [ 55 I _ _ �" r ;' ' ' i' a+ m y ` s\ - '�'."�'."'- - ,'�"`+i ,• \ \'`z* ', a� r�^, 4 / �j// "t _ �. _ ry� .� ,�'l� It r _ ". . -a (�r3 `}J�" -1x. , _ .., - 1 { \'.�— �1•, .. ..' - \....�,.- 1 $ .T2 \ off--% -',I r r' .r_� - �, TAX M _�._, . r^ G, r' _ A ! p _ �_ C .` ��, I 11 LS _ `� �-\ w 7. O A , - 4 � w R S .r T , _ S _ - f , P N _ 8 ,,. 1 , // }; \ t R , ' r 9 _ �. O _ V _ _. .. / D ,� , C 1 O f 3 . -�. N S , J , , ._ , \ K �_ 2 • r , s / ,� i G .. -.. ^.. f i .•\ \; •fir" tr f d s - '6 he ,,,, 3 r /r� / �f \ _, _, w fT _- , _ ,_� _ _ _ _ _. -. __ _ _.'" r ! _ /l ! , t _ 5, _ r, - a I re / i , ti, \ , - - ... , . - t w: r C i , e _ - ,J . , .. % T - �. y c fi .. .m+- c. 5 C,c .. ., - \ _ ... .,. t x �' 1 r j a- 1 4 ._ N. , % _ _. _ ... . rs _._ _ .. _ ... .. � . __ i � �Ery _ru^c ) s. o ie ! x - 1 r }�i .. -__ .. _ _..v. tin-. _ __. r . ,. {{ n 4? \ T? Y 5 1 �• F� �. 1.. i \r „ `.,- - �. .� ma's ''" & �. i t �j' `� tI-�. s A' i �a, _ A S � t` -r \ /7 �1 T x \ i tl4 Q a {� _ - _l'- 4 ,;a Z _ �, - F ` = �r I �� _J "a: .sxa 7 -�: �\i ..- '-"" n, f ems—_.. +r a ., s L- �. , `+:.. '. C - _ r .� s \, yr '-tP 0 y `b8 . i,` ----_ �J =�. sue'. I - �_ ,, __ / _``_. `i f1', '`•..^,,,,.cam._ :� - - - .y L a r - ,.; � .__ -.�.- i^ .':=:ram .. y ' �.,..� _- '•ro. l> a. - 7 vl Y y.[s / -, k \ - /,� r��r, J �— � fi� r i:. ,� , u% F !'; , . } >G � f - i J F i/� r ./'\_ - / T -°wi . „r , n .,i `r r jf T �t { I { f, r J t 7 4 :: D 1 �! k ' , i i :, x v s Ida H' 1 y. l a ,� 9 ,l ,t / _ �, , •1 i ! \af `J, f � _ \', - 1 1 i r N 1' _ i \ \ __ /_ �- .` \, \ \ O- _ _, \. D : B RM----...= � \\\ R �R _ ` /eta / y ,`,1,\\\`{111i,,i,//: s \ i.,.�U.a\,\\ �\ .\•\\ . \ _._.__ \ r- \ '\ I j .r__ r J i \ \ - - 1 ' ` ♦ %, \,[\' 4 / / 4 r \ \\ 5" . \\ \ \' \ QQ C' C / / ,.z \.• ,\\ \ - - RE i • 1 X \ S \''. \ i \ / / / /jj/ r —_ 4 e R •\ 1 1 / l' \ / / l l t } ,', \ \''\\ \ \ \ \ r I I ; f �n \ \ I // 1 . , a,f•'r d' ,/'�� t\ `\ \\x + ; \ \ \ \ \ \' '\\'., \' �"'---_ i `r- -•✓/' %r / ``°' _-1' = - I y �> \\ �\ \ \\ \ \` -«.- ' e\, ,- ;, \\ \ 5 ♦ /"l \ \, ,I 1 i \ a r A � -� / / \ \ 4 v ,' \ t /' t' } /, `\ \ _ ,: -- _; a '' \ . !` ;' fit, \;,:\\ \ \`�`, ; { { ,\/.$_ -, \\ ``\ ,�\ i /" ..\ \, f'j /' -- - \ i J / _ \ Y+ \ I \ �\\-\ \, \ \� _ \ is \\�� \:.\� \ - \ ; i �`' _ \ \ \ y� —_ \ v \ '' A\V Awl �� - -�,v� _� y ��- _ \ / •� �, 4 / / tl A\A�� \ v , AV A ``�f v vA Yi'�'v /� �7 .. \� ,\y t ,,i �%r 9. �-/ :_ 7 \mac, ! v V `� v� f�rT%t,,.,h..e v+/_.- ,a '..,r,r / .',�' _ _ ,, 14 v %-" i r -•_ ,/ ---../ i'� )\:Am, ,1 l \ V } 1 VA1 \, A. ; ,,r- ",<\ ;i'' - ' `\ %1� \ `/ 1 / \\ Fe 1` // } (' �' f ' _�\� I 1 I , j t 1 ! r! l ,r' , �l :PIN g . � GARR P' F 0 A-20 ARMS, L. L. C. RA __� r r i. r y 5 � �. T Y \ r) r ./ I ti � 11, i I {� I� �, \ �.� / \�\,' ar _ , /� 1, - :./ .rr- \ i f %�1 4 y- t� - II .1 r l C ;1 I , u, 0 i \ f i �-f' 1, i i / /` t f ./ i i \ \. J 1 `\\, � � �, / �, 5 _..- 1 � - Y , .9 �i cYi \ 1 r \ 1 � r L � r , } it � .. i - i;- fP'9� \ \ \ _ t .. _ _>�� u _ _,.fie _ _. _,r•, y f ;z� _ . \ \ , _--^._�.;\ � �,: `-- -- ✓ \_ c 1_ x - Y t _ A f \\ t � r \ Y ! 'f __ t h hh W� li � 3 J!/ t 1 ' ,i ` i ,' f I / 1 F{ 1� 5 J 1 i u r i e. ,.. i• J „` �--- "X %� -z / / 4 r\- ", / L / i 1 / I` � /Yf f I 1 _% / b J _, __ / / i --�,,,,-.,... ll' �--._ � _ - 1 \'\ _ i l 3 / �_.— 1 % / n _ J c-`M1` r"" J /� % _ i� x...- -� r -- —1 _ _ ._ r rr ./t ./ / \ I f / I - I �. i , (, I / i r _ � I -..-- , , /i l - " 1. 1 / /r / / i ,� /� //� �/ �..� // I • /-r � � � � . i I r i i t I i i I ll I _ __. _-.-__.___._._._- a)WAV/CSCWE 200 100 0 200 400 ( 1N FEET ) 1 inch = 200 ft. ._ . _ _ �`l _ 111 I ; - �. _ --: I /• LJ �� r ! 1 i \. v. \ I �` _� �r T, �, - - _ _ -` - _ \� _ Y- ,,. -�Q f, i Mr - i \ ,- __\ •aY` . ll -. ; \ r c /, y r' I a / ru r r / `. n, / fl' J�r\l, \�- % - � \'�- ----o \\_ l' �,_-" \ - - " �% � � - s _,: 'A' / p, a _x J Wes, \\�.,_ J �- \'"' \ \ , �' \ \~x1 ro/ \ ` \ yam: + f////[]/fF . ` `k ��! /! / / i /J���/ — 1;. �iC3i\1-EX l_l SJl/E _. .� _/01)' 1N:3RES,. /CRESS RA lR0A �� Y _ ., — yr ��� } •r.. _ - ,..-.I�� . 1 �\ " ;/j %.., 4 � i t xa a — �' ^me ` Z ox I �m -i ;' -, -O � m o D � v COUNTY of FREDERICK Department of Planning and Development 5401665-5651 FAX: 54W665-6395 Hand,!IkWered ' December 10, 2008 Patrick Sowers, Planner Patton, Hams, Rust & Associates 117 East Piccadilly Street, Suite 200 Winchester, VA 22601 RE: Zoning Determination- Berm Setbacks at Car=euse Mining Operation (Chemdone) Dear Mr. Sowers: This letter is in response to your couespond�ence dated November 12, 2008, to the Zoning Administrator requesting a za,ning dete�m �nd�'on� F��� City 13oard of Supervisors oa� 28,�200�8. �g #0346 CRZ#03-06), appro by Landscape bemas designed and planned for view shed mitigation are not required to meet the 1 o0 foot setback from roadways as required for excavations. Mining excavations inchuft overburden and stockpiles would be subjectio the excavation setback requirements asrequired bythe Frede ick County Zoning OrdManc e. The berms adjacent to Chapel Road (Ri.627) that were approved as pant ofR7ZA3- 06 would be considered view shed mitigation bemis and are clearly identified in the proffer exhibits. The view shed untigation. germs and associated lands�ng are not subject to the 100 foot setback for excavations. You may have the right to appeal thus• zoning determination within thirty (30) days of the date of this letter in accordance with Section 15.2-2311 of the Code of Virginia. This decision shall be final and unappeasable if itis not appealed within. thirty (30) days. Should you choose to appeal, the appeal must be filed with the Zoning and the Board of Zoning Appeais (BZA) in. accordance with Article XXT, Section 165-155A(1) of the Frederick County Zoning Ordi�ce. This provision requires the submission of an application font, written statement setting forth th,e decision being appealed, date , of decision, the grounds for the appeal, b!ow the appellant is an aggdeved party, any oilier information you oaay want to submit and a $300.00 filing fee, ($250.00 filing flee and. a $50.00 refundable sip deposit). Once the appeal application is accepted, it wiill be schecluled for public timing and decision before the BZA.. Contact me regarding any questions you may have at (540) 665-5651. Sint'cerely, R.. Ch ~— -�� Zonning �r . MRC/dlw 107 North Rent Street, Suite 202 - WincheAer, Virginia 22601-StWO PROJECT SUMMARY T AX IDENTIRCATION NUMB ER 90-A-23 EXISTING P ARCEL AREA 145.49 acres DEVELOPED PARCEL AREA 0 acres ZONING RA EM ADDRESS McCUNE ROAD CURRENT USE — QUARRY PROPOSED USE QUARRY DISTURBED AREA 25 ACRES NOTES: STORMWATER MANAGEMENT A W ND ATER UALITY IS PROVIDED Q UNDER AN EXISTING STORM WATER PO UTI P T LL ON REVEN ION PLAN FOR THE UARRY PROPERTY. Q ��♦,� r`\ �'♦�rll,r r r rrr .: • - • • ; . % ;� ♦ • • :'E • : `. 0 u3 t2 U .Q) to 4) _C 4WL M Q .� Q) Q) 0 0 � O to l j ^ N N 0 N � M 0 0 Q N O J C) I I • O CO � �' c9 L f0 � I I w -c o 0 mot- -, = 0 r- c Ln Ln � a_ _ N ti 'i 0 LL. N to _ � + C vi 0 a) �� � C to 0) aW a a Y w J I— F_ k S i W z ern V t� M � W Ir V 0 U W Q Y Y _ o � U 0 � to W cr W � V �W ]C U W A � S 0. Q' F-- f o v 0 z fo�yr 0-1 `- W QQ t1J O r /�� V N O L 0 N � II L� 0 W W �-�{y�y� N Z jQ ' ) w I— W J LcJ O 0 � Q c¢J _ U a- co 0 cn cn U W O o Zz 0 U 0 �W_ Q W UU a- o Q N to .) � 0 1 � O 00 z z Y z,q 0 T O � Q w � c00 z w � z 0 o c� 700 --- 650-- r7IN� O U71N N!N O r'�j(O r7'r7 Olo �t O 17II� 010 0+00 � 9.4`Lbeio ' p -;O 00 rM+r7 M wl o O 0) Q 0o c� N U7 d 14) N i c0 (.D (0 O U) tf) U) r7 to cD d M c0 O co 0 � d I 00 c0 (D (fl i (o (o (o W QD (.0 1(,0 (D Q co 1+00 2+00 4.1561 %-3.5931 % J �Nlq T _t C) / J Q,3 Z WZ� Q W OW / ... - 7^� �f Y li N / - � O , TOP OF � L 6 F � �� a w 1 .-- --~ OPOSED GR 5.8595% ____ _--- ---- I---- _- T--_"- --_ i EXISTING GRADE 1 3.7475% --- -�--- L r) 00 100 I1-O (n Cn I o) r7 0) ; r- —IU') 00 U) r7 N 00 N U) U) 00 00 n' 0o CY) O m t O tom• O N N 0o Lo , - t r- q- � I U, I O r7 O o0 to 00 r7 00 U7 O O d 00 O a7 : � dy 00 00 00 ! 00 O (D 0) O O O O O a0 I O U7 N I r� �t N! I- M O d t- d N .- O d I U7 r7 p Cn O Cn N 00 � U) M I LO d- O� r7 r- N � U� .� O N to (D N _ 00 I t ! O N I� d d O ►') N d ! .- O C� 00 CA i 00 00 o3 O 4 N � `� 4 L6 (0- o0 00 M �' N h VM u7 I (0 i- M Co � t' O 00 N 1- CD' r_ � U) I, I� c0 � r- Co i U` 00 � 00 00 O 100 00 O 00 00 O 00 00 (Do0 00 O r- � U) O t\ 00 Co ! 00 00 O 00 00 co 00 00 r - i O 0) � O m 00 10) m 00 M M 00 O O 00 I O O O i CfD (D O I (.o O Co C0 (0 (D 1 CO (D co Co O O C� (D Co `(D Co CD (D (D CO (o Co CO Cfl Co CD cp CO Co CD (D O CO tip (0,1 Co O Co (O CD CD Q0 Co Co i Co Co C.0 (D (o Co I CU CO (D j ({� Co O' I� r- Co I I� r- r- I (T_ 1 --- I —� — ---- I ---- �. - - - -- --- ------ _ - - - i 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11 +00 12+00 13+00 PROFILE SCALE: V-50' H BERM B PLAN 8c PROFILE 1'=50' V PLAN SCALE: 1'=60' U Z v � a +' U N :t Q -c U Q •V Q O 0 N U (n N � Q 0 J Q) N U) n N (n •� 0 L (ll tC L _ (n L O a) i� Q a. W N N U O co a N N � � v Q N O � I I aD (-0 (D CD V) U) I I o W O O r-- c Lc) 3 H LL rwj U VJ z �o U Y Y W U M W on W O 0 O LLJ J ON 'd" O to V) Of f W z V) Q :IX w f- _j w Q 0 _ o cf) cf) LL O C3 zp Q N U U N Cif r Ld cj 00 c� U w _ cfl 0 0 U LL r- A Insert bar at 45 degree angle.) Push forward to upright position. - Hold seedling at correct depth, insert bar 3 inches from seedling. i { Push bar handle forward to close hole at bop of roots. / Loa a J 1 ; X. 1 f Remove boar and place seedling' at correct depth. j t 4 Pull bar handle toward planter to. close hole at bottom of roots. - Stomp with heel to fill in the last hole. I SEEDLING PLANTING DETAIL 1 A -J O _! I I A f I A M I f 1 inch = 50 ft. PLANTING LIST PLANTING SPACING QUANTITY * _W1MMUS PLANT UST 15' 0. C. 67 NM?, /AM Aaffmawd . 0111a Pl' Lff:irffdP sm. Y"I/# YIAI` "SPS.' Ram,, £AO N CM.T C/AVduNsls flAawbW sdi'AW 1"7 1�'OIPYSJs AIMM AFCI m PLANT W., h VhW,, £ASTERN amd PIAIrIAMY GimVMW C"".d jW" SASSgfRtS' xWYA Rds"" PERSIY/AOV lll6jSPPW RIAI;IAMW L#W AFi,''>aKXlS' PLANT LIST tw frmT1sm M PL4 RED le" "" & 40ral / Awd SYlW" IxAm Y GELTll5' oalwis S94VOW AW%W QrIDAff" I, MWMIEN RANT LUST PAVE, R/TCN HIAffjWIA P/N4 SfiURlI AF PIJW "JYMAd EASIfRN 011£ PNE PIAi7 MWA#IS AWW14 hWNW WIff GEW aw Gt 7 fITAff f4S7ERNN RED QW ✓ILA' AW PIAI:IAidAV' 20' 0. C. 40' 0. C. 20' 0. C. 41 41 81 SIZE SEEDLINGS SEEDLINGS SEEDLINGS SEEDLINGS i U) w i 16.96' 1 " CMP J U I O Z +> _ cp ~ rn � 0 CD 0+00 1+00 STORM CULVERT PROFILE GRAPHIC SCALE 50' 25' 0' 50' 100' 1 INCH = 50 ft. HOR1Z 1 INCH = 5 ft. ViERT. jr ' t L ti --- v_ _ 71 A• `•� lv�'�.� `. 71, NOES: A A ill/ GIB' 12' GYAIIPAC7,ED )W SLIL MaYRED IN ARFAS 70 BE PM70 MY hm 1M LF GIs• 8bW TO BE" LAN6tSCAPED. 17 TREESARE• Ph?{W fkDFY 1Gi? LF. 2jo TOTAL TREES 9AU K AwfiT. A1/NLl Y Of ,T fflfaS IO BE GAD fRO# E40Y PLANT MP. MN ARE TD BE RLANIFO /N (fir MPS Of J oR AKA' OF ONE Pfau ar PG .. &MM6 AND LWE DEUM5 70 Bf RANIED GW LOWER 211 ar 7h£E Bi7w SWI 70A/E7XWa44UTOXRGVIID/NAf-MAW 112GIs' LWSWE NOT, CS. ALL RG4NIlAVS 9ML Gl71 naw WITII 10-20JO16F)W hMW GY MY MAW OR(PLANT .SEL£clK MANW 73f1xEGW, AAD 99/MF4G4 ff) ANY 9W SifQSrIIUIXAt(5' U67 K APPh ;0 N #9W BY INE HI CK G aff RL4 )WAV AFPARI1lB S££DUNO R4N)WO /N6TRZ7ONS: AMASW MOW MUD' Il4 ER WAS LOU, GRASS9 BT, IT CW Ar6WV5£AND LEWENR SPACES: CIS M MY OUT #W Thy' 0ht7/f' IMO Aff SPACES QUARRY SIDE /' OF BERM WP 1ti� r 'i FRONTOF BERM ti I1 n-'PICAL PLANTING / JUj Q co J (� J Q O wv��OW O 2 LOi5LO r Q H O • W O W w W —�� O of a_ 0n 00 . V U) CL U N +' ly -C t0 Q U •� N N p a o UN U N N -0 a N t) O) Q p a> N O ve J U w `- C.O CO �.+ ai I I N w o U c Ln u-) U. rn Ui •L O L � L = cn + C U O a� 4W ,W Cc � a W z 55 m • U w I- o U Q LAJ o U ix o C.V LLJ z o w W � 0 L0 zO J (7) �t c� n � `— r� o w Q W w,' z >Q w� J LLJ O Q W O Q U _ U Q cn o cn to it U 0 wp J U O 0 I— N w UU CL g :2 M w Q N U7 "� 7 a w o o z Y z o0 6 ( w CEO z w _ r_ EROSION & SEDIMENT CONTROL MINIMUM STANDARDS 1. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant for longer than 30 days. Permanent stabilization shall be applied to areas that are to be belt dormant for more than one year. 2. During construction of the project, soil stockpiles and borrow areas shall be stabilized or protected with sediment trapping measures. The applicant is responsible for the temporary protection and permanent stabilization of all soil stockpiles on site as well as borrow areas and soil intentionally transported from the project site. 3. A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieved that is uniform, mature enough to survive and will inhibit erosion. 4. Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land -disturbing activity and shall be made functional before upstream land disturbance takes place. 5. Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. 6.Sediment traps and sediment basins shall be designed and constructed based upon the total drainage area to be served by the trap or basin. a. The minimum storage capacity of a sediment trap shall be 134 cubic yards per acre of drainage area and the trap shall only control drainage areas less than three acres. b. Surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three acres shall be controlled by a sediment basin. The minimum storage capacityof a sediment basin shall be 134 cubic yards per acre of drainage area. The outfa/l system shall, at a minimum, maintain the structural integrity of the basin during a twenty-five year storm of 24-hour duration. Runoff coefficients used in runoff calculations shall correspond to a bare earth condition or those conditions expected to exist while the sediment basin is utilized. 7.Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. 8. Concentrated runoff shall not flow down curt or fill slopes unless contained within an adequate temporary or per channel, flume or slope drain structure. 9. Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. 10. All storm sewer inlets that are made operable during construction shall be protected so that sediment -laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment 11.Before newly constructed stonmwater conveyance channels or pipes are made operations, adequate outlet protection and any required temporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel. 12. When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structures if armored by nonerodible cover materials. 13.When a live watercourse must be crossed by construction vehicles more than twice in any six-month period, a temporary vehicular stream crossing constructed of nonerodible material shall be provided. 14. All applicable federal, state and local regulations pertaining to working in or crossing live watercourses shall be met. 15, The bed and banks of a water course shall be stabilized immediately alter work in the watercourse is completed. 16. Underground utility lines shall be installed in accordance with the following standards in addition to other applicable criteria: a. No more than 500 linear feet of trench may be opened at one time. b. Excavated material shall be placed on the uphill side of trenches. c, Effluent from dewatering operations shall be filtered or passed through an approved sediment trapping device, or both, and discharged in a manner that does not adversely affect flowing streams or off -site property. d. Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote stabilization. e. Restabilization shall be accomplished in accordance with these regulations. f.Applicable safety regulations shall be complied with. 17. Where construction vehicle access routes intersect paved or public roads, provisions shall be made to minimize the transport of sediment by vehicular tracking onto the paved surface. Where sediment is transported onto a paved or public road surface, the road surface shall be leaned thoroughly at the end of each day. Sediment shall be removed from the roads by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed /n this manner. This provision shall apply to individual development lots as well as to larger land -disturbing activities. 18,A/1 temporary erosion and sediment contra/ measures shall be removed within 30 days after final site stabilization or after the temporary measures are no longer needed, unless otherwise authorized by the local program authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sedimentation. 19. Properties and waterways downstream from development sites shall be protected from sediment deposition, erosion and damage due to increases in volume, velocity and peak flow rate ofstormwater runoff. All measures used to protect properties and waterways shall be employed in a manner which minimizes impacts on the physical, chemical and biological integrity of rivers, steams and other waters of the state. TEMPORARY DIVERSION DIKE 4.5' min. SOURCE: VA. DSWC ComDacted Soil PLATE 3.09-1 STONE CONS T R UCTION ENTRANCE EXISTING GROUND 70' MIN. FILTER CLOTH 6" MINI AI SIDE ELEVATION 12' MIN. 70' MIN. B WASHRACK (OPTIONAL) ) ~\ POSITIVE DRAINAGE VDOT #I I COURSE AGGREGATE D I TO SEDIMENT TRAPPING DEVICE MUST # OF INGRON ESS FULL WIDTH PLAN VIEW OF INGRESS AND EGRESS SECTION A -A REI .r u.... .ui.... i. 1JKMIN JYMI L EXISTING PAVEMENT 5:1 Z MOUNTABLE BERM (OPTIONAL) T 10' MIN. SECTION B-B SOURCE: ADAPTED from 1983 Maryland Standards for Sail erosion and Sediment Control, and Va. DSWC Plate 3.02-1 SIL T FENCE CUL VER T INLET PROTECTION �- ENDWALL DISTANCE IS 6' MINIMUM IF FLOW FLOW IS TOWARD EMBANKMENT OPTIONAL STONE COMBING TION 1.0' 1.5' FLOW *VDOT #3, #357, #5, #56 OR #57 CUAKSL AUUNLUAIL TO REPLACE SILT FENCE IN " HORSESHOE " WHEN HIGH VELOCITY OF FLOW IS EXPECTED SOURCE: ADAPTED from VOOT Standard Sheets and Va. DSWC 2.5 CLASS 1 RIPRAP PLATE. 3.08-1 PIPE OUTLET CONDITIONS A A, 'IPE OUTLET TO FLAT LREA WITH NO DEFINED :HANNEL L a 0% �. d SECTION A -A FILTER CLOTH KEY IN 6"-9"; RECOMMENDED FOR ENTIRE PERIMETER ado (MIN.) 1 'IPE OUTLET TO WELL )EFINED CHANNEL u r md ea SECTION A -A t F- FILTER CLOTH KEY IN 6"-9"; RECOMMENDED FOR ENTIRE PERIMETER NOTES: 1. APRON LINING MAY BE RIPRAP, GROUTED RIPRAP, GABION BASKET, OR CONCRETE. 2. La IS THE LENGTH OF THE RIPRAP APRON AS CALCULATED USING PLATES 3.18-3 AND 3.18-4. 3. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER, BUT NOT LESS THAN 6 INCHES. SOMMIC Va. D= P�e�te S&18-1 CONSTRUCTION OF A SILT FENCE (WITHOUT WIRE SUPPORT) 1. SET THE STAKES. 2. EXCAVATE A 4"$ 4" TRENCH UPSLOPE ALONG THE LINE OF STAKES. 6'" r FLOW 3. STAPLE FILTER MATERIAL TO STAKES AND EXTEND IT INTO THE TRENCH. FLOW 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. SHEET FLOW INSTALLATION (PERSPECTIVE VIEW) POINTS A SHOULD BE HIGHER THAN POINT B. DRAINAGEWAY INSTALLATION (FRONT ELEVATION) SOORCS: Adapted from bdaUatm aI Strav and Fabric FI'tter Barriers for Sediment CemtroM DS#C PIS. 305--E $ta wd aM Tyant SOURCE: VA. DSWC PLATE. 3.20-1 w Q 0 4 oz eJ o Q Up �wZ Li n1tl Z 0 W �,� 0- w U �` VI G O to U) U (D U) et �Q 0 O rn O N >, CN O) r7 U) _U N r�l Q 0 tJ > CV O J I I 06 n L CO CD L N C L-LJ -c o O _0 r` Ln 3- - 3�: H LL •i O L + O 4.0 0 ++ O. LL H U W M E m m W M W I- v W D O O O Cq Ln ' - s, O Z LLJ Z Z) ,^ L , LJ I- W� I F- Q LW Q O = 0 (n (n 7) z 0 z Z w o � 0 00 z0 O I- 0) Q U U Q N MT O 00 0 O = J_ CO U W T-