HomeMy WebLinkAbout038-98 Sherando (Shenandoah Mobile Co.) Opequon - Backfile (2)C
i0 L-� pG _ /1131q
SITE PLAN CHECKLIST
The checklist below indicates all the information. -that needs to be submitted as part of the site plan
application. All required information must -be submitted prior to the final approval of any site plan.
The Department of Planning and Development will review the application to ensure that it is complete.
If any portion is not included or complete, the site plan application will not be accepted and returned
to the applicant(s).
Site Plan Package
1. One set of approved comment sheets are required from the following review
agencies prior to final site plan approval. It is recommended that applicants contact
the Department of Planning and Development to determine which review agencies
are relevant to their site plan application.
2.
3.
4.
5.
Virginia Department of Transportation (VDOT)
Frederick County Sanitation Authority
Department of Planning and Development
Inspections Department
Frederick County Engineer (Public Works)
Frederick County Fire Marshal
Department of Parks and Recreation
One copy of the Site Plan application
Five Copies of the Final Site Plan for approval
One reproducible copy of the Site Plan (if required)
A 35mm slide of the Site Plan (if required)
County Health Department
City of Winchester
Town of Stephens City
Town of Middletown
Airport Authority
Soil & Water Conservation District
l am- /�-9r
("-/a qa
i
�` 0,4
Receipt Date No.15801
RECEIVED FROM
DOLLARS
Q FOR RENT-
;� FOR
FROM. -- � -'L TO
ACCOUNT
Ocash
PAYMENT `1
check -
R10 ; va•iV! I �.� t�, �•!y
10 O order
Y TC1184
I -
BALANCE DUE
11
COUNTY of FREDERICK
Department of Planning and Development
S40/665-5651
FAX: 540/678-0632
June 29, 1998
Mr. Leonard Greisz
Shenandoah Mobile Company
P. O. Box 459
Edinburg, VA 22823
Re: Review and Approval of Shenandoah Mobile Company Telecommunication Facilities
Site Development Plans: #037-98, Little Timber Ridge; #038-98, Sherando; #039-98,
Hunting Ridge; and #040-98, Bowling Green Ridge
Dear Len:
The Frederick County Planning Department administratively approved the above referenced site plans
on June 29, 1998. These site plans, for the construction of a 1 00'monopole tower at the Little Timber
Ridge site, a 125' monopole tower at the Bowling Green Ridge site, a 350' lattice tower at the Hunting
Ridge site, and a 300' lattice tower at the Sherando site meet all County requirements for development
within the RA (Rural Areas) zoning district and are consistent with the conditions of the approved
Conditional Use Permits approved by the Frederick County Board of Supervisors on April 8, 1998.
I have provided you with three copies of each of the approved site plans. Please keep an approved copy
for your files and maintain an approved copy on the construction site. Once the site developments have
been completed, please contact this office to schedule an on -site inspection.
Please contact me if you have any questions regarding this letter.
Sincerely,
Michael T. Ruddy
Planner H
MTR/cc
cc: Richard C. Shickle, Gainesboro District Supervisor
Margaret B. Douglas, Back Creek District Supervisor
Robert M. Sager, Opequon District Supervisor
Garland Miller, Winchester/Frederick County E.D.C.
Robert Mongold, Frederick County Real Estate
107 North Kent Street - Winchester, Virginia 22601-5000
G 3 8 -� �' - .S �'�"� at a• /
SITE PLAN CHECKLIST
The checklist below indicates all the information that needs to be submitted as part of the site plan
application. All required information must be submitted prior to the final approval of any site plan.
The Department of Planning and Development will review the application to ensure that it is complete.
If any portion is not included or complete, the site plan application will not be accepted and retumed
to the appiicant(s).
Site Plan Package
1. One set of approved comment sheets are required from the following review
agencies prior to final site plan approval. It is recommended that applicants contact
the Department of Planning and Development to determine which review agencies
are relevant to their site plan application.
Virginia Ceoartment of 7 ransportation (VCOT)
Frederick County Sanrtanon Authority
Department of Planning and Development
Inspec;9ns Department
Freden& County Engineer (Public Works)
Frederick County Fire Marshal
Department of Parks and Recreation
2. One copy of the Site Plan application
3. Five Copies of the Final Site Plan for approval
4. One reproducible copy of the Site Plan (if required)
5. A 35mm slide of the Site Plan (if required)
ok" 6/2yIq g
g
County Health Department
C4 of Winchester
Town of Stephens City
Town of Midoletown
Airport Authority
Soil 3 Water Conservation Cistrtct
Site Plan Information Checklist
The following information must be included an your site plan. If your site plan is incomplete or
is missing information, it will not be reviewed and returned to you for revisions.
Administrative Information -
Y N
1.
Name of proposed development.
2.
Name, address, and phone number of owner.
3.
Name, address, and phone number of developer.
4.
Name, address, and phone number of designer.
5.
Certificate of surveyor, engineer, or architect.
6.
Date plan prepared and date of revisions.
7.
A listing of all conditions placed an the site as a result of a
conditional use permit or conditional zoning approval.
a.
A space labeled "Approved by the Zoning Administrator" for
the approval signature and date of approval.
9.
A description of setbacks or conditions placed on the site as a
result of a variance approval. (Reference the variance
application number.)
General Site Information
Y N
10.
Location map (scale 1:2000)
11.
Magisterial District
12.
Scale of site plan (not to exceed 1:50)
13:
North Arrow
14.
Zoning of site
15.
Use, zoning, and Property Identification Number (PIN#) of all
adjoining properties. This includes properties located across
right-of-ways, streams, and railroad tracks.
16.
Surveyed boundaries for all lots and parcels.
9
•
•
General Site (can't)
Y N
17.
Acreage of all lots included in the plan.
18.
The location and dimensions of all required setbacks and yard
areas.
19.
The location and type of all dwelling units.
20.
Location and description of all recreation facilities.
21.
Location of sidewalks and pedestrian ways.
22.
Location and area of common open space.
23.
The location, height, and dimensions of all signs.
24.
Location, height, and specifications of outdo or. lighting fixtures.
25.
Location and nature of outdoor storage areas.
26.
Location of outdoor trash receptacles and dimensions of
structure (fencing, etc.) required to enclose receptacles.
Building Information
Y N
27.
The height of all buildings and structures.
28.
Location of all buildings, structures and uses.
29.
The proposed use of each building, structure and area.
30.
Ground floor area and total floor area of all buildings with FAR
calculations for commercial and industrial zoning districts.
Roads
Y N
31.
Name and number of existing and planned streets on and
adjoining the site.
32.
Location of existing and planned streets on and adjoining the
site.
33.
Posted speed limit of existing adjacent roads.
34.
Location and dimensions of all proposed entrances from public
right-of-ways.
Utilities
Y N
Parking
Y
Z
Natural Features
Y N
35. Location of all entrances on adjoining roads within 200 feet of the
proposed or existing entrance.
36. Dimensions, boundaries, width, pavement, and construction of
planned roads.
37. Location of all utilities, including sewer and water lines with the
size of lines, mains, and laterals.
38. Location and width of all easements, including access, utility,
and drainage easements.
39. Location and nature of fire lanes, fire hydrants, and all other
facilities necessary to meet Fire Code requirements.
40. Calculations describing the required number of parking and
loading spaces.
41. Location and dimensions of all parking and loading spaces;
driveways, parking aisles, curbing and other features to be used.
42. Location and dimension of all disabled parking spaces and
ramps.
43. Existing and finished contour lines.
44. Location of steep slopes, woodlands, fioodplains, wetlands,
sinkholes, and other enviranmental features.
45. Location of streams and drainage ways.
I
u
Landscaping
Y N
46. Landscaping plan describing location and types of plants to be
used.
47. Location of required buffers and screening with cross sections or
profiles.
Erosion and Sediment Control
Y . N
I
48. A stormwater management plan with run off calculations and
location and description of facilities to be used.
49. Soil erosion and sedimentation control plan describing the
location and methods to be used to minimize erosion and
sedimentation during development.
12
•
•
1
2.
3
4
5
SITE PLAN APPLICATION
Department of Planning and Development Use only.
Date application received - application # r
_ Complete_ Date of acceptance
_ Incomplete. Date of return.
Shenandoah Mobile Company
Telecommunications Facility
Project Title: TWR180 - Sherando
CUP #023-97
Location of Property Hudson Hollow Road (Route 636)
(street address) Stephens City. Virginia 22655
Property Owner:
Linwood D. Ritter and Elizabeth Ann Ritter
Address:
746 Double Church Road
Stephens City, VA 22655
Telephone:
(540) 869-4123
Applicant/Agent
Shenandoah Mobile Company
Address
Post Office Box 459
Edinburg, Virginia 22824
Telephone:
(540) 984-3003 Leonard L. Greisz, Project Manager
Designer:
Anderson and Associates
Address:
7722 Main Street
Middletown, VA 22645`
Telephone:
(540) 869-2501
Contact:
Robert Cummings
2
U
6. Is this an original or revised site plan?
7a. Total acreage of parcel to be developed
7b. Total acreage of parcel:
8. Property Information:
a) Property Identification Number:
b) Current Zoning:
c) Present Use:
d) Proposed Use:
e) Adjoining Property Use(s)
f) Adjoining Property Identification Number(s)
g) Magisterial District(s)
Original Revised x
4,900 snare feet
39 074 acres
86-A-209
Rural Area
Agricultural
Telecommunications facility
Park/Vacant/Residential
See -below
I have read the material included in this package and understand what is required by the _
Frederick County Planning Department. I also understand that all required material will be
complete prior to the submission of my site plan.
SHENANDOAH_MOBILE COMPANY
Signature: BY:
Leonard L. Greisz, Project Manager
Date:
Adjoining Property Identification Nos.
86-A-143
86-A-208
86-A-211
86-A-213
86-A-57F
7
86-A-207
86-A-210
86-A-212
86-A-57C
Request For Site Plan Comments
Department of Planning and Development
Mail to:
Hand deliver to:
Department of Planning and Development
107 N. Kent Street
Attn: County Planner
Fourth Floor
107 North Kent Street
Winchester, VA
Winchester, VA 22601
(540) 665-5651
(540) 665-5651
Please fill out the information as accurately as possible in order to assist the agency with their
review. Please attach two (2) copies of the site plan with this sheet.
Applicant's Name:
Address:
Phone Number:
Shenandoah Mobile Company
(540) 984-3003 Leonard L. Greisz, Project Manager (PCS)
Name of development and/or description of the request:
Tol p-mmmunicationst Facility - TWR180 - Sherando
Shenandoah Mobile Companv
Location of property: At intersection of Route 277 and 636, proceed south on Route 636
aInrokimarPly 0 4 mile to a sharp left in the rnad C'ontirnuP straight ahead on
clizavel road approximately Q 91� mile J-n tower site
Planning and Development's Comments:
16
0
•
April 15, 1998
Shenandoah Mobile Company
Attn: Leonard Greisz
P.O. Box 280
212 Piccadilly Street
Edinburg, VA 22824
RE: CUP #023-97 of Shei•ando, P.I.N. 86-A-209
Dear Mr. Greisz:
COUNTY of FRDDERICK
Department of Planning and Development
S401665-5651
FAX: 540/678-0682
This letter is to confirm action taken by the Frederick County Board of Supervisors at their meeting of
April 8, 1998.
Your Conditional Use Permit, #023-97 for a 300-foot, three -sided, self-supporting galvanized steel tower,
was approved with a waiver of the monopole requirement and with the following conditions:
1. All review agency comments shall be complied with at all times.
2. The tower shall be available for co -locating comparable communication service
providers.
3. The commercial telecommunications facility shall be removed by the applicant or
landowner within one year of the abandonment of operation.
4. A minor site plan is approved by the County.
If you have any questions regarding this action, please feel free to call this office.
Sincerely,
Michael T. Ruddy
Planner II
MTR/cc
cc: Commissioner of Revenue
O.'.%G E\DAS\.V PR V LT R\.910U,NDO.CUP
107 North Kent Street • Winchester, Virginia 22601-5000
r
•
Federal Aviation Administration
Eastern Region
',ir Traffic Division, AEA-531
2itzgerald Federal Building
John F. Kennedy
International Airport
Jamaica, NY 11430
ACKNOWLEDGEMENT OF NOTICE OF PROPOSED CONSTRUCTION OR ALTERATION
----------------------------------------------------------
CITY
STATE
LATITUDE/LONGITUDE
MSL
AGL
AMSL
STEPHENS CITY
----------------------------------------------------------
VA
39-04-05.79 078-11-08.64
730
300
1030
SHENANDOAH MOBILE COMPANY
LEONARD L. GREISZ
POST OFFICE BOX 459
EDINBURG, VA 22824
Type Structure: ANTENNA TOWER
AERONAUTICAL STUDY
No: 97-AEA-3918-OE
825-895/1850-1945MZ100-200W
The Federal Aviation Administration hereby acknowledges receipt of
notice dated 12/05/97 concerning the proposed construction or
alteration contained herein.
A study has been conducted under the provisions of Part 77 of the
Federal Aviation Regulations to determine whether the proposed
construction would be an obstruction to air navigation, whether it
should be marked and lighted to enhance safety in air navigation,
and whether supplemental notice of start and completion of
construction is required to permit timely charting and notification
to airmen. The findings of that study are as follows:
The proposed construction would not exceed FAA obstruction
standards and would not be a hazard to air navigation.
However, the following applies to the construction proposed:
The structure should be obstruction marked and lighted per FAA
Advisory Circular AC 70/7460-1J, 'Obstruction Marking and
Lighting. CHAPTERS: [] -3 H,-4 [] -5 [] -6 [) -7
-=---8 [] -9 [] -10 [] -11 [) -12 ��-13 .
Supplemental notice is required at least 10 days before the
start of construction and within five days after construction
reaches its greatest height (use the enclosed FAA form).
This determination expires on 08/09/98 unless application is
made, (if subject to the licensing authority of the Federal
Communications Commission), to the FCC before that date, or it
is otherwise extended, revised or terminated.
If the structure is subject to the licensing authority of the
FCC, a copy of this acknowledgement will be sent to that agency.
NOTICE IS REQUIRED ANYTIME THE PROJECT IS ABANDONED OR THE PROPOSAL IS MODIFIED
SIGNED &/Gamac `� M Specialist, Airspace Branch.
Wiiiiam E Merritt (718) 712-6659
ISSUED IN: Jamaica, New York ON 02/07/98