SITE PLAN CHECKLIST
The checklist below indicates all the information.that needs to be -submitted as part of the site plan
application. All required information must.be submitted prior to the final approval of any site plan.
The Department of Planning and Development will review the application to ensure that it is complete.
If any portion is not included or complete, the site plan application will not be accepted and returned
to the applicant(s).
Site Plan Package
1. One set of approved comment sheets are required from the following review
agencies prior to final site plan approval. It is recommended that applicants contact
the Department of Planning and Development to determine which review agencies
are relevant to their site plan application.
Virginia Department of Transportation (VDOT)
Frederick County Sanitation Authority
Department of Planning and Development
Inspections Department
l/ Frederick County Engineer (Public Works)
Frederick County Fire Marshal
Department of Parks and Recreation
2. One copy of the Site Plan application
3. Five Copies of the Final Site Plan for approval
_ < County Health Department
x City of Winchester
K Town of Stephens City
� Town of Middletown
>( Airport Authority
Y Soil & Water Conservation District
4. One reproducible copy of the Site Plan (if required)
5. A 35mm slide of the Site Plan (if required)
L
I
1
r-as 1W
8-a& - 9 �
Io-ao-9� G✓�G�.� Gil /�'�"`zci
�o z,
R CENTAddress
11
Received From
Mull M-
ACCOUNT HOW PAID
•
COUNTY of FREDERICK
Department of Planning and Development
540/665-5651
FAX: 540/ 678-0682
October 19, 1998
Dr. Richard Taliaferro
203 Salem Church Road
Stephens City, VA 22655
RE: Approval of Taliaferro Dental Practice Site Development Plan #055-98
Dear Dr. Taliaferro:
The Frederick County Planning Department administratively approved the above referenced site plan,
9055-98, on October 14, 1998. This site plan, for the development of a 2,704-square-foot dental office,
meets all County requirements for development within the B2 (Business General) Zoning District. The
site plan also calls for the provision of sixteen (16) parking spaces, parking lot landscaping, and a B
Category zoning district buffer adjacent to the RP(Residential Performance) zoned land to the west.
I have provided you with two copies of the approved site plan. Please keep an approved copy for your
files and maintain an approved copy on the construction site. Once the site development has been
completed, you should contact this office to schedule an on -site inspection. Upon the satisfactory
completion of all site improvements, a Certificate of Occupancy may be issued for the building.
Please contact me if you have any questions regarding this letter.
Sincerely,
Michael T. Ruddy
Planner 11
MTR/cc
cc: Robert M. Sager, Opequon District Supervisor
Joe Wilder, Public Works
Jane Anderson, Real Estate
Garland Miller, E.D.C.
John Lewis, Painter -Lewis, P.L.C.
UAN Iikc\Common\S rM P LiMTAL I FAP P. S P R
107 North Kent Street - Winchester, Virginia 22601-5000
ems+:
COMMONWEALTH of VIRGI VIAA
DEPARTMENT OF TRANSPORTATION
DAVID R GEHR EDINBURG RESIDENCY
COMMISSIONER 14031 OLD VALLEY PIKE
WMXNX
EDINBURG, VA 22824-0278
October 16, 1998
Mr. E. R. Neff, Jr.
C/O E. R. Neff Excavating, Inc.
P. 0. Box 1027
Stephens City, VA 22655
Dear Mr. Neff:
JERRY A. COPP
RESIDENT ENGINEER
TELE (540) 9845600
FAX (540)984.5607
Ref: Dr. Taliafferro
Route 1141
Frederick County
Enclosed is your approved Land Use Permit #855-04602 to cover the construction
and maintenance of one commercial entrance at the referenced location.
Please ensure a copy of the approved permit assembly is kept at the job site
whenever working within the Route 1141 right-of-way. I would also like to
remind you of the need to erect and maintain proper traffic control in
accordance with our Virginia Work Area Protection Manual.
Please give Mr. Dave Heironimus a call at (540) 722-3460 at least 48 hours in
advance of the start of construction to arrange for any necessary inspections.
If you have any questions concerning the permit requirements or during
construction, please give me a call.
Sincer�y,
J
Curtis J. Roy
Hwy. Permits & Subd. Specialist Sr.
CJR/rf a'J1�
Enclosure„
Xc: Mr. K. B. Downs (w/ copy of permit)
Mr. D. A. Heironimus (w/ three sets of plans)
17
Mr. W. L. Stover j[C�
Mr. Kris TierneyPLV
d�
WE KEEP VIRGINIA MOVING
AU WNk comfic" sl ►y 1 q�
Cf,,,Jc +.v 0. .x S 17/9f
ok�'co
w!
�aGUF��o
�/f < �> (�
c-MMOOJO
•
•
�.T 'I -7, S-q(o 6O nlb
ZoA.3'Jol- Oot�
Co
•ti' &.pear* Caf lip r fifU•
�SJt1i WWO 7424
44
li 4.1-0 -� rtAk
IF f(W. Hr,Yt AK . � j�.'fz. ;. rt S �0 •.tip; 7i16 i r� +d.:i�. ,
Y
• � K
1
a
A
(:•-� 1 ;
fir• .h
.,
...,�.u.. _ -
.,� .
..
�
JG
` 14
t1 Owl
' 1
•-
/ �
ate. �a.r
_ _ _
- �
i % �..�
.. ..
�.. ....ter . ,. ... ... • .. � . - tir . r +•- ' .. —
:1 L F11, 9 0 P W
wr1` COUN'i'Y of FREDERICK
Department of Planning and Development
540166s-5651
TAX: 540/ 678-0682
September 18, 1998
Mr. John Lewis
Painter -Lewis, P.L.C.
302 South Braddock Street
Winchester, VA 22601
RE: Taliaferro Dental Practice Site Development Plan 9055-98
Dear John:
I have had the opportunity to review the above referenced site plan submitted to our department on
August 19, 1998. The following comments are offered and should be addressed during the revision of
this site plan. I have also marked the enclosed plan for your use.
1) In light of the recently approved subdivision, please update the property information for this
parcel. In addition, please ensure that the parcel shown on the site plan is revised to be
consistent with the acreage, and metes and bounds shown on the approved subdivision plat.
2) The Frederick County Parks and Recreation Department, in conjunction with the Virginia
Department of Transportation, received ISTEA funding for the Sherando Bicycle facility in
1993. This project is expected to go to bid in the very near future. The site plan for the
Sherando Bikeway provides an eight -foot bikeway along Warrior Drive, within the right-of-
way. The Taliaferro site plan currently does not provide for this bikeway. In addition, VDOT's
approval of the Taliaferro site plan does not take the bikeway into consideration. I have
provided you with information pertaining to the bikeway on the marked plan. The bikeway
should be accommodated into your design, in particular, at the entrance to your facility. In
contacting VDOT, they have expressed a willingness to expedite a review of the necessary
revisions to the commercial entrance. I would also be willing to discuss the details of the
bikeway further with you at your earliest convenience.
3) Please provide the location, height, and dimensions of any signage to be used on this site.
4) Please provide the state route number and speed limit of Warrior Drive.
5) Please show the 10' slope and drainage easement depicted on the subdivision plat.
6) Please widen the width of the driveway serving the parking lot to the required 24'. In addition,
the curb and gutter surrounding the parking lot should be extended across the rear of the
parking area at this time.
107 North Kent Street • Winchester, Virginia 22601-5000
•
k1
Taliaferro Site Plan Review
Page 2
September 18, 1998
7) Please ensure that the distance of the "B" category buffer is increased. It appears as though the
25' inactive buffer line is currently only 23' from the property line. In addition, the fence
provided as the full screen element should be located internal to the landscape plantings. It is
the intent of the screening to buffer the business use from the adjoining residentially zoned
properties. Placing the plantings behind the fence negates their effectiveness with regards to the
RP land.
After you have revised the site plan, please resubmit one copy so that I may verify the information
contained on the plan. I will then need all approved review agency comment sheets and five copies of
the final site plan for approval. Comment sheets are required from the following agencies: the Frederick
County Inspections Department, the Frederick County Engineer, the Frederick County Fire Marshal,
and the Frederick County Sanitation Authority. A revised approval from the Virginia Department of
Transportation reflecting the changes made regarding the bikeway is also required.
Please contact me if you have any questions regarding this letter.
Sincerely,
Michael T. Ruddy
Planner II
MTR/cc
Enclosures
U:\b1 ikc\C o mm o n\S rrE P LAMTA L I FE RO. S P R
COMMONWEALTH of VIRCjINIA
DEPARTMENT OF TRANSPORTATION
DAVID R. GEHR EDINBURG RESIDENCY
COMMISSIONER 14031 OLD VALLEY PIKE
P.O. BOX 278
EDINBURG, VA 22824-0278
September 23, 1998
Mr. E. R. Neff, Jr., President
E. R. Neff Excavating, Inc.
P. 0. Box 1027
Stephens City, VA 22655
Dear Mr. Neff:
JERRY A. COPP
RESIDENT ENGINEER
TELE (540) 984-5600
FAX (540) 984.5607
Ref: Taliafferro Dental Practice
Warrior Drive
Frederick County
In accordance with your request dated September 21, 1998 you are given permission to install
a temporary construction entrance at the referenced location. This letter is to be considered
your permit to do so. The following provisions will be required:
• Work area protection signage is to be in accordance with the current Work Area Protection
Manua/while working on the right-of-way.
• All work on the right-of-way is to be confined to the temporary entrance location only.
• A minimum 6 depth of VDOT #1 (2-3 inch stone) course aggregate by 30' in width will be
required. It is to be placed from the edge of pavement and extended back onto private
property far enough to prevent the carrying of mud onto the roadway.
• Positive drainage is to be maintained within the right-of-way at all times.
• A wash rack will be required.
• Any disturbed areas of the right-of-way or damages to the pavement structure adjacent to
this entrance will be repaired by you to our satisfaction.
• This permit is being issued for 180 days.
• All work is to be completed in accordance with the enclosed Virginia Erosion & Sediment
Control Handbook, Specification 3.02.
• The entrance is to be installed at the location shown on the site plan prepared by Painter -
Lewis dated August 24, 1998.
The Department of Transportation will not be held liable for suit should such result from this
operation nor is it granting permission to grade on the property of others or disturb
underground utility lines. If the above listed items are not followed this permit may be revoked.
Should you have any questions, please let me know.
Sincerely, ~�
Curtis , P mits & Subd 'Specialist Sr. ;
CJR/rf '1
Attachment
xc: Mr. Dave Heironimus, Mr. Bill Stover, r. Kris Tierney
WE KEE IF�GINIA MOVI
COUNTY of FREDERICK
Department of Public Works
540/665-5643
FAX: 540/ 678-0682
July 2, 1998
Mr. John Lewis, P.E.
Painter -Lewis, P.L.C.
302 South Braddock Street, Suite 200
Winchester, Virginia 22601
RE: Proposed Rental Office for Doctof-Richard Taliaferro
Frederick County, Virginia
Dear John:
We have completed our review of the subject site plan and offer the following comments:
1. Sheet 2 of 4: Refer to General Note Number 10: Wetlands
The note indicates that there are no wetlands on site, when, in fact, a small wetland
does exist in the middle of the proposed building plan. I suggest that you rephrase
this statement to indicate that the wetland disturbance will be much less than one-
third of an acre.
2. Sheet 2 of 4: Refer to General Note Number 11
The reference is made to the existing stormwater pond which serves the Jefferson
Village subdivision. Verify that the design of this facility considered the
development of the subject site plan, or provide calculations to indicate that the
proposed development will not increase the storm runoff more than 1.5 cfs during
a ten-year event.
3. Sheet 3 of 4
The proposed site plan indicates a curb cut at the northwest corner of the parking
lot. The curb cut, in turn, diverts storm flows into a defined drainage swale.
Considering that this design concentrates the runoff, an off -site drainage easement
may be warranted to direct flows into the existing topographic drainage swale.
107 North Kent Street • Winchester, Virginia 22601-5000
•
h
Doctor Taliaferro
Page 2
July G, 1998
4. Sheet 3 of 4
A future parking area has been delineated along the northwest portion of the
property. What is the basis for this future development? If a future building
expansion is planned, I suggest that this expansion also be shown on the site plan.
5. Sheet 3 of 4
Correct the layout of the one (1) inch waterline to reflect an intersection with the
eight (8) inch sanitary sewer line.
Please contact me if you have any questions regarding the above comments.
HES/kch
cc: Frederick County Planning Department
file
Sincerely,
Harvey . trawsnyder, Jr., P.E.
Director Public Works
C� U 5 S Uv Pam/" '2 --;7--
`'���
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
DAVID R. GEHR EDINBURG RESIDENCY JERRYA. COPP
COMMISSIONER 14031 OLD VALLEY PIKE RESIDENT ENGINEER
P.O. BOX 278 TELE (540) 984-5600
EDINBURG. VA 22824-0278 FAX (540) 984-5607
August 26, 1998
Mr. John C. Lewis, P.E. Ref: Henry Property — Mini Warehouse Project
C/O Painter -Lewis, PLC Route 1322 (Fort Collier Road)
302 South Braddock Street, Suite 200 Frederick County
AMncttesLer._YA 22601.
Dear John:
We have received your revised site plan dated August 21, 1998 for the referenced project. It
appears all of our earlier review comments have been satisfactorily addressed. Please advise
the owner of our approval.
A copy of any/all drainage easement plat(s) required to implement this plan should be provided
to VDOT prior to issuance of any land use permit.
The appropriate land use permit may now be applied for to cover work within the Route 1322
right-of-way. The permit is issued by this office and will require a minimum processing fee,
surety bond coverage, and the salary & expenses of a State assigned Inspector. When applying
for this land use permit, please provide two sets of approved construction plans along with the
permit application.
Once satisfactory application has been made, a permit will normally take approximately thirty
days to process and issue. Should you have any questions, do not hesitate to call.
BJS/n`
Enclosure
xc: Mr. Dave Heironimus
Mr. Kris Tierney
Since ly,,-7
Barry J. Sweitzer
Trans. Roadway Engineer
For: Steven A. Melnikoff
Transportation Engineer
WE KEEP VIRGINIA MOVING
•
•
Request for Site Plan Comments
Virginia Department of Transportation
Mail to: Hand deliver to:
Virginia Department of Transportation Virginia Department of Transportation
Attn: Resident Engineer 1550 Commerce Street
P.O. Box 278 Winchester, VA
Edinburg, Virginia 22824-0278 (540) 722-3460
(540) 984-5600
Please fill out the information as accurately as possible in order to assist the Virginia Department
of Transportation with their review. Please attach five (5) copies of the site plan with traffice
generation . ata and drainage calculations with this sheei.
Applicant's Name:
Address:
Phone Number
�S o� Ce6 a - 5 -7 9 �
Name of development and/or description of the request*
\NIICV,�c-/;�gL'1C-1rC.,1,- -
Location of property:
Virginia Department of Transportation's Comments:
See attached letter from VDOT to Mr. John Lewis dated 08/26/9B
'DOT use only
Date received C I � 9 e
Incomplete
Date reVie%NrdCJ, i4 I 8
Signature and Date
Signature and Date (revision
Date revision received FALI'„A 1 q & Date approved $f_Z!�J Q g
Incomplete
Date reviewed $ CI $
O 08/26/98
•
n
U
PAINTER-LEWIS, P.L.C.
CONSULTING ENGINEERS Tel.
302 South Braddock Street, Suite 200 Fax
Winchester, VA 22601
August 31, 1998
Frederick County Department
of Planning & Developement
Attn: Mr. Mike Ruddy
107 N. Kent Street
Winchester, Virginia 22601
Dear Mr. Ruddy:
(540) 662-5792
(540) 662-5793
Please find enclosed, Comments from Virginia Department of "Transportation regarding The Kim
Henry Property - Mini Warehouse Project.
Please contact this office if you have any questions or concerns.
Thank you for your time.
Sincerely,
John Lewis, P.E.
Page 1
COMMONWEALTH of VIR QTNIA
DEPARTMENT OF TRANSPORTATION
DAVIDR.GEHR EDINBURG RESIDENCY JERRYA.COPP
COMMISSIONER 14031 OLD VALLEY PIKE RESIDENT ENGINEER
P.O. BOX 278 TELE (540) 984-5600
EDINBURG, VA 22824-0278 FAX (540) 984-5607
August 26, 1998
Mr. John C. Lewis, P.E. Ref: Henry Property — Mini Warehouse Project
C/O Painter -Lewis, PLC Route 1322 (Fort Collier Road)
302 South Braddock Street, Suite 200 Frederick County
Winchester, VA 22601
Dear John:
We have received your revised site plan dated August 21, 1998 for the referenced project. It
appears all of our earlier review comments have been satisfactorily addressed. Please advise
the owner of our approval.
A copy of any/all drainage easement plat(s) required to implement this plan should be provided
to VDOT prior to issuance of any land use permit.
The appropriate land use permit may now be applied for to cover work within the Route 1322
right-of-way. The permit is issued by this office and will require a minimum processing fee,
surety bond coverage, and the salary & expenses of a State assigned Inspector. When applying
for this land use permit, please provide two sets of approved construction plans along with the
permit application.
Once satisfactory application has been made, a permit will normally take approximately thirty
days to process and issue. Should you have any questions, do not hesitate to call.
BJS/rf
Enclosure
xc: Mr. Dave Heironimus
Mr. Kris Tierney
Since,ely
OAA-
/
Barry J. Sweitzer
Trans. Roadway Engineer
For: Steven A. Melnikoff
Transportation Engineer
WE KEEP VIRGINIA MOVING
•
•
Request for Site Plan Comments
Virginia Department of Transportation
Mail to: Hand deliver to:
Virginia Department of Transportation Virginia Department of Transportation
Attn: Resident Engineer 1550 Commerce Street
P.O. Box 278 Winchester, VA
Edinburg, Virginia 22824-0278 (540) 722-3460
(540) 984-5600
Please fill out the information as accurately as possible in order to assist the Virginia Department
of Transportation with their review. Please attach five (5) copies of the site plan with traffice
generation data and drainage calculations with this sheet.
Applicant's Name: c;
Address: 3C
Phone Number: c) LLa: - S -7 9 2-
. C.
Name of development and/or description of the request:
�1cN c�cnc>C • �>
Location of property: C�S�
Virginia Department of Transportation's Comments.
See attached letter from VDOT to Mr. John Lewis dated 08/26/9B.
VDOT use only
Date received "I $ Date revision received� j
� $ Date appro� ed 8�
Incomplete Incomplete
Date reviewed C,*IP4. q 8 Date reviewed $u,'.l CI $
Signature and Date —_ -
Signature and Date (revision) K 08/26/98
r
RP
�,�Cl1vL (PI
,.Ellc,IT
LnJunu.l
DRAINAGE
EASEMENT
F-
UN
IP
CUPIYF
KADIUS
LENGTH CHORV
BEAi"ING
C1
1030,00,
148.15' 148.02'
54300325V
C2
480.00'
220.09' 218.1T _
_ 525°4,8'02'W
CS
420.00'
103.00, 102,74'
619°--1'2T'W _
C4
1040.00'
150.64' 150.60'
_ N43005'09"E
F.I.N. 86-A-102C �oN
35,370 5. FT. 1,04
ZONED: B-2 ��& �.
18 j l
F.I.N. 86-A-102
13.7149 ACRE5
ZONED: B-2
0
LINE DIfRECT10N
DISTANCE
Li N63°1T01"W
10,00,
L2 526'42'59'W
40.00'
L3 571042'59'W
44.05'
10' SLOPE & DRAINAGE EASEMENT
C1
,--,1,494 60, FT.
HEREBY DEDICATED TO
COMMONWEALTH OF VIRGINIA
FOR FUTURE ROAD
/WIDENING PURPOSES
I
I CD
I Ca , o
I Oda
I cu J co
00
a
I
I
I
O I
N I
z EX. 10' SLOPE & ~� —
)RAINAGE EASEMENT I
TDB 887 - P 904 1
I �
0
N N
I �
I
I
I rJ
I 1
L
j L21
7 J.b1' i L3
FJR 86-A-102
13.7149 ACRE5
ZONED: B-2
O 50 100 200
Graphic Scale in Feet
1,,=100'
I NOTES:
I
I 1. NO TITLE REPORT FURNISHED.
2. EASEMENTS MAY EXIST THAT ARE NOT SHOWN
ON THIS PLAT.
3. IRON RODS FOUND OR SET AT ALL PROPERTY
CORNERS.
4. A CATEGORY "B" BUFFER IS REQUIRED AGAINST
RP ZONING. I
N75, 1T01"W FAIRFAX PIKE
VA, ROUTE 277 N
YARIABLI✓ WIDTH RNJ
,NbTH 01,'
7
DOUGLAS C.ly
No. 0011
� O�
,i, SURv�'
FINAL FLAT OF 5U13DIV1510N
OF A PORTION OF THE LAND OF
J.E.J.i'. COkF'OFATION
OPEQUON MAGISTERIAL DISTRICT
FREDERICK COUNTY, VIRGINIA
DATE: 24 AUGUST 1998 SCALE: 1"=100' SHEET 2 OF 2
198-399
I -and Starveyors, P.L.C.
189 North Cameron Street Winchevter, Virginia 22601
(540) 6G7-04GG rox (540) s67-046s
i
PROPOSED MAN 1101-E 1
RIM = 750.00
INV. IN = 744.20
INV. OUT = 744.00
I SANITARY SEWER AND WATER SE
MAINS TO BE INSTAL LED BY OTH
SEE PLANS FOR WARRIOR DRIVE
I WATER BY CLIFFORD k ASSOCIAI
qpl 5/19/98; PROJECT NO. 92.10
+t
a
C•`�a}11 MATCH EX. CURB
_ 10' ROW
39.29• � � \ n
DEDICATION `\
PS TO MU
A • % It
/
J • �
m • e C�4 ���P
v) C 77_ /
b\
+ /D
TC
±. 50.10�d`
- _51.80
+`A1 , 1
3 •T�1 \� I` 1 L (`
_ \ y
r TC +
51 80 AR
F R I I
1 4
5•R�
1
i AA, Ir;l� �
1 n
T �0.7U END OAD SE 11ON
AT P OPERTY LINE
le
51.20 ,� 3: 1 TAPER \
�1•
MATCH EX. P�MT..,`
n�
Y
FH
ASSY
F.C.S.A. INSTALL 4" 1
BENEATH ROAD BY
MEANS ACCEPTABLE
INSTAI L LATFRAL A'
OF 2.08% TO WITHIN
BUILDING. COORDINA
CONNECTION WITH C
SEWER INSTALLATION
F.C.S.A. INSTA
BENEATH RON
MEANS ACCEP
INSTALL LINE
CONTINUE LINE
BUILDING. COO
CONNECTION N
WATERLINE INS
PROPOSED M�
RIM - 753.81
INV. IN = 741
INV OUT = 71
I
I
1
PROPOSED MAN HOLE 1
RIM = 750.00
INV. IN = 744,20
INV. OUT = 744.00
I SANITARY SEWER AND WATER SE
MAINS TO BE INSTALLED BY OTH
SEE PLANS FOR WARRIOR DRIVE
WATER BY CLIFFORD do ASSOCIAI
5/19/98; PROJECT NO. 9210
a I
1
MATCH EX. CURB
�\ F.C.S.A. INSTALL 4" 1
BENEATH ROAD BY
MEANS ACCEPTABLE
INSTALL LATERAL_ A-
39
2
9• 1 ROW ��\ n OF 2.08% TO WITHIN
DEDICATION �\ .; BUILDING COORDINA
/ s CONNECTION WITH C
SEWER INSTALLATION
F.C.S.A. INSTA
BENEATH ROA
1 MEANS ACCEP
�/ �>a\°\ INSTAI L LINE
��
1 �� n CONTINUE LINE
,Nn C t `I l BUILDING. COO
CONNECTION N
\ " r WATERLINE INS
v TC�
50.10
3 • :z \ T
TC'�,
F R I I
N
PROPOSED MI�I
7 ' '� END ROAD SECTION RIM - 753.8
AT PROPERTY LINE ��;\ `✓ INV. IN = 741
INV. OUT - 7i
51.20 3:1 TAPER f
MATCH EX. P, MT.'. FH
ASSY.-
ti
`h1
\ 1f h1\ +
Y
s
off v,& -0q)r6ia8
SITE PLAN CHECKLIST
The checklist below indicates all the information that needs to be submitted as part of the site plan
application. All required information must be submitted prior to the final approval of any site plan.
The Department of Planning and Development will review the application to ensure that it is complete.
If any portion is not included or complete, the site plan application will not be accepted and returned
to the applicant(s).
Site Plan Package
1. One set of approved comment sheets are required from the following review
agencies prior to final site plan approval. It is recommended that applicants contact
the Department of Planning and Development to determine which review agencies
are relevant to their site plan application.
Virginia Department of Transportation (VCOT)
Frederick County Sanrtanon Authority
ol Cepartment of Planning and Development
10� Inspections Department
-**' Frederick County Engineer (Public Works)
/ Frederick County Fire Marshai
Cepartrnent of Parks and Recreation
2. One copy of the Site Plan application
3. Five Copies of the Final Site Plan for approval
_ County Hearth Ceoartment
City of Winchester
Town of Stephens Cty
X Town of Middletown
Airport Authority
_ Sod 3 Water Conservation Cisttict
4. One reproducible copy of the Site Plan (if required)
5. A 35mm slide of the Site Plan (if required)
8
Site Plan Information Checklist
The following information must be included on your site plan. If your site plan is incomplete or
is missing information, it will not be reviewed and returned to you for revisions.
Administrative Information
Y N
1.
Name of proposed development.
2.
Name, address, and phone number of owner.
3.
Name, address, and phone number of developer.
4.
Name, address, and phone number of designer.
5.
Certificate of surveyor, engineer, or architect.
6.
Date plan prepared and date of revisions.
7.
A listing of all conditions placed on the site as a result of a
conditional use permit or cenditionai zoning approval.
8.
A space labeled 'Approved by the Zoning Administrator" for
the approval signature and date of approval.
9.
A description of setbacks or conditions placed on the site as a
result of a variance approval. (Reference the variance
appticaticn number.)
General Site Information
Y N
10.
Locabcn map (scale 1:2000)
11.
Magisterial Distnc:
12.
Scale of site plan (not to exceed 1:50)
13.
North arrow
14.
Zoning of site
15
Use, zoning, and Property Identification Number (PIN#) of all
adjoining properties. This includes properties located across
right-of-ways, streams, and railroad tracks.
16
!�J
Surveyed boundaries for all lots and parcels.
G�NJ (/� f✓.
L4^ - aA-+- Pam,
°�
General Site (con't
Y N
17
fttA > A-rV i
Acreage of all lots included Tn the plan.
8.
The location and dimensions of all required setbacks and yard
areas. G e'C'k ph '4""t ;"" a g4t"`, P. O - c-.-)
IS.
The location and type of all dwelling units.
0.
_
Location and description of all recreation faciides. �pe�
Ell" -)
Location of sidewalks and pedestrian ways. �/W
22.
Location and area of common open space.
9
The location, height, and dimensions of all signs.
24.
Ns c on height' and specifications of outdoor lighting fixtures.
25.
Location and nature of outdoor storage areas.
26.
Location of outdoor trash receptacles and dimensions of
structure (fencing, etc.) required to enclose receptacles.
Building Information
i/eC�p � t(�(fi/J rr�'yj ��.G�, �-v �•%,�/�� t:tjQ.
r
Y N
✓
27.
The height of all buildings and structures.
23.
Location of all buildings, structures and uses.
24.
The proposed use of each building, structure and area.
30.
Ground floor area and total floor area of all buildings with PAR
calculations for commercial and industrial zoning distncts.
Roads
Y N
/ 3y: Name and number of existing and planned streets on and
adjoining the site. - %
✓ 32. Location of existing and planned streets on and adjoining the
site.
33 Posted speed limit of existing adjacent roads.
34. Location and dimensions of all proposed entrances from public
right-of-ways.
Utilities
Y
N
35. Location of all entrances on adjoining roads within 200 feet of the
proposed or existing entrance.
36. Dimensions, boundaries, width, pavement, and construction of
planned roads.
37. Location of all utilities, including sewer and water lines with the
size of lines, mains, and laterals.
38. Location and width of all easements, including access, utility,
and drainage easements. �G� 5 / j,
39. Location and nature of fire lanes, fire hydrants, and all other /
facilities necessary to meet Fire Code requirements.
Parking
Y N
40. Calculations describing the required number of parking and
loading spaces. Z""Y^"Qg'
41. Location an dimensions of all parking and loading spaces,
C- c P C e�l�t w•-� qq 1.Lr c c,
/ driveways, parkin aisles, curbing and other features to be used.
r✓ 42. Location and dimension of all disabled parking spaces and
ramps.
Natural Features
Y N
43. Existing and finished contour lines.
44. Location of steep slopes, woodlands, flcodplains, wetlands,
sinkholes, and other environmental features.
45. Location of streams and drainage ways.
Landscaping
Y N
L
46. Landscaping plan describing location and types of plants to be
used.
47 Location of required buffers and screening with cross sections or
profiles.
Erosion and Sediment Control r
Y N �
48. A stormwater management plan with run off calculations and
location and description of facilities to be used.
49. Soil erosion and sedimentation control plan describing the
location and methods to be used to minimize erosion and
sedimentation during development.
12
r-
0 •
PAINTER-LEWIS, P.L.C.
CONSULTING ENGINEERS Tel.: (540) 662-5792
302 South Braddock Street, Suite 200 Fax.: (540) 662-5793
Winchester, VA 22601
September 11, 1998
Mr. Mike Ruddy
107 N. Kent Street
Winchester, VA 22601
Dear Mr. Ruddy:
Please find enclosed the final approval for the Proposed Dental Office for
Doctor Richard Taliaferro Frederick County, Virginia.
Please contact this office if you have any questions or concerns.
Thank you for your time.
Sincerely,
Monica Butts
Office Assistant
Page 1
r—
COUNTY of FREDERICK
Department of Public Works
540/665-5643
FAX: 540/678-0682
September 9, 1998
Mr. John Lewis, P.E.
Painter -Lewis, P.L.C.
302 South Braddock Street, Suite 200
Winchester, Virginia 22601
RE: Proposed Dental Office for Doctor Richard Taliaferro
Frederick County, Virginia
Dear John:
Your revised site plans dated August 18, 1998, have adequately addressed our previous
review cornments. Therefore, we grant our approval of the proposed site plan.
Sincerely,
Harvey Strawsnyder, Jr., P.E.
Director of Public Works
HES/rls
cc: Frederick County Planning Department
file
107 North Kent Street • Winchester, Virginia 22601-5000
•
E
COUNTY of FREDERI CK
Department of Public Works
540/665-5643
FAX: 540/ 678-0682
Mr. John Lewis, P.E.
Painter -Lewis, P.L.C.
302 South Braddock Street, Suite 200
Winchester, Virginia 22601
September 9, 1998
RE: Proposed Dental Office for Doctor Richard Taliaferro
Frederick County, Virginia
Dear John:
Your revised site plans dated August 18, 1998, have adequately addressed our previous
review comments. Therefore, we grant our approval of the proposed site plan.
Sincerely,
1
Harvey Strawsnyder, Jr., P.E.
Director of Public Works
HES/rls
cc: Frederick County Planning Department
file
107 North Kent Street • Winchester, Virginia 22601-5000
r 16
PAINTER-LEWIS, P.L.C.
CONSULTING ENGINEERS Tel.: (540) 662-5792
302 South Braddock Street, Suite 200 Fax.: (540) 662-5793
Winchester, VA 22601
August 26, 1998
Frederick County Planning Dept.
Attn: Mr. Mike Ruddy
107 N. Kent Street
Winchester, VA 22601
Dear Mr. Ruddy:
Please find enclosed the review comments from the Commonwealth of Virginia for the
Taliaferro Dental Practice.
If you have any questions please do not hesitate to contact this office.
Sincerely,
Monica Butts
Office Assistant
Page l
� y
a� �},y.
i�'
c
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
DAVID R. GEHR EDINBURG RESIDENCY JERRYA. COPP
COMMISSIONER 14031 OLD VALLEY PIKE RESIDENT ENGINEER
P.O. BOX 278 TELE (540) 984.5600
EDINBURG, VA 22824-0278 FAX (540) 984.5607
August 25, 1998
Mr. John C. Lewis, P.E. Ref: Taliaferro Dental Practice
C/O Painter -Lewis, PLC Warrior Drive (near Route 2??)
302 South Braddock St., Suite 200 Frederick County
Winchester, VA 22601
Dear John:
We have received your revised site plan dated August 18, 1998 for the referenced
project. It appears all of our earlier review comments have been satisfactorily
addressed. Please advise the owner of our approval.
The appropriate land use permit may now be applied for to cover work within the
Warrior Drive right-of-way. The permit is issued by this office and will require a
minimum processing fee, surety bond coverage, and the salary & expenses of a State
assigned Inspector. Please provide two additional sets of approved construction plans
for VDOT use.
Once satisfactory application has been made, a permit will normally take approximately
thirty days to process and issue. Should you have any questions, do not hesitate to
call.
BJS/rf
Enclosure
xc: Mr. Dave Heironimus
Mr. Kris Tierney
Sinc+;rely,
b �, o
.Barry J. Sweitzer
Trans, Roadway Engineer
For: Stevel I.A. Melnikoff
Transportation Engineer
WE KEEP VIRGINIA MOVING
It
•
•
Request for Site Plan Comments
Virginia Department of Transportation
Mail to:
Virginia Department of Transportation
Attn: Resident Engineer
P.O. Box 278
Edinburg, Virginia 22824-0278
(540) 984-5600
Hand deliver to:
Virginia Department of Transportation
1550 Commerce Street
Winchester, VA
(540) 722-3460
Please fill out the information as accurately as possible in order to assist the Virginia Department
of Transportation with their review. Please attach five (5) copies of the site plan with traffice
generation data and drainage calculations with this sheet.
Applicant's Name: �,�,� `"e_wti 4� .� •C .
Address:
Phone Number:
Name of development and/or description of the request:
Location of property: �n c o_� ��. rx»�]� ac c:o c \J v C\-�C-C Ly
Virginia Department of Transportation's Comments: See attached letter from UDDT
to fl'� . John Lewis dated August 25, 1998,
VDOT use only
Date received Ca 9 8
lcte Date ren jq8
Date reti7e�v j
Signature and Date
Signature and Date (revision)_
Date revision rece' ede1Zo'Qa Date approvede eA 98
Incomplete
Date revie% ed
_4 7 (J 08/25/96
CoM V OINWEALTH ®f VIRQI IA
DEPARTMENT OF TRANSPORTATION
DAVID R. GEHR EDINBURG RESIDENCY
14031 OLD VALLEY PIKE
COMMISSIONER P O BOX 278
EDINBURG, VA 22824-0278
August 25, 1998
Mr. John C. Lewis, P.E.
C/O Painter -Lewis, PLC
302 South Braddock St., Suite 200
Winchester, VA 22601
Dear John:
JERRY A. COPP
RESIDENT ENGINEER
TELE (540) 984-5600
FAX (540) 984-5607
Ref: Taliaferro Dental Practice
Warrior Drive (near Route 277)
Frederick County
We have received your revised site plan dated August 18, 1998 for the referenced
project. It appears all of our earlier review comments have been satisfactorily
addressed. Please advise the owner of our approval.
The appropriate land use permit may now be applied for to cover work within the
Warrior Drive right-of-way. The permit is issued by this office and will require a
minimum processing fee, surety bond coverage, and the salary & expenses of a State
assigned Inspector. Please provide two additional sets of approved construction plans
for VDOT use.
Once satisfactory application has been made, a permit will normally take approximately
thirty days to process and issue. Should you have any questions, do not hesitate to
call.
BJS/rf
Enclosure
xc: Mr. Dave Heironimus
Mr. Kris Tierney
Sincerely,
Barry J Sweitzer
Trans. Roadway Engineer
For: Steven A. Melnikoff
Transportation Engineer
WE KEEP VIRGINIA MOVING
•
•
Request for Site Plan Comments
Virginia Department of Transportation
Mail to:
Virginia Department of Transportation
Attn: Resident Engineer
P.O. Box 278
Edinburg, Virginia 22824-0278
(540) 984-5600
Hand deliver to:
Virginia Department of Transportation
1550 Commerce Street
Winchester, VA
(540) 722-3460
Please fill out the information as accurately as possible in order to assist the Virginia Department
of Transportation with their review. Please attach _five (5) copies of the site plan with traffice
generation data and drainage calculations with this sheet.
Applicant's Name: � o:\ r � .
Address: 3DIan�
\1�11 . cv-� 612.� —I-, 1--�- \4
Phone Number: �Stio) _5 7 9 a
Name of development and/or description of the request.
of\ _ L s- \`1 ,c\V, sc ,
Location of property:
Virginia Department of Transportation's Comments: See attached letter fromyDOT
to Mr. John Lewis dated August 25, 1998.
0
gilbert w. clifford & associates, inc
INCORPORATED 1972
Engineers — Surveyors — Land Planners — Water Quality
5 May 1998
Mr. Barry Sweitzer
Virginia Department of Transportation
P.O. Box 278
Edinburg, Virginia 22824
RE: Sherando Walkway
Dear Barry,
Iioard or Directors:
President:
Thomas J. O'Toole. P.E.
Vice Presidents:
Charles E. Maddox, Jr.. P.E.
Earl R. Sutherland, P.E.
Ronald A Mislowskv. P.E.
David J. Saunders. P.E.
Directors:
P. Dunne Brown, L.S.
William L. Wriglht
Michael A. Hammer
Thhomas W. Price:
Frederick County Parks and Recreation has just about secured all of the easements required to complete the
Sherando Walkway. Before they go to bidding with the plans they asked that we evaluate one change along
existing Warrior Drive. Currently, the plans require a pavement widening along both sides of existing
Warrior Drive. We would like to install an 8 ft. wide asphalt bike trail inside of the western right-of-way line
instead of the pavement widening. I've marked up a set of plans to show the proposed route. Before
finalizing this layout, we would like to get VDOT's thoughts and concerns.
If during your review, you should have any questions, please do not hesitate to call.
Regards,
gilbert rv. clifford & associates, inc.
�y,---R�trfal A. is ows P. ,Vic President
RAM/kf
Enclosure
cc: Jim Doran
c:\nisofficc\coati•\lt rs\shNN'alk
/ a200 North Cameron Strcct. Winclicstcr. Virginia 22601
540) 667-2139 Fax (540) 665-0493 c-mail givdiff;nulsinc.com
Hemher. lmerican Consulling Engineers Council
•
2
3
111
5
SITE PLAN APPLICATION
Department of Planning and Development Use only.
Date application received Application # tl,�
_ Complete. Date of acceptance
_ Incomplete. Date of retum.
Project Title: a��io.� �ccc� dam.C_C_
Location of Property
(street address)
a...-17
Property Owner:
Address:
\ c
Telephone 10(b7- I8
Applicant/Agent
Address IC)
Telephone
Designer \� o..CN�e.c- •C_ .
Address
\ly \ cy
Telephone. ���octc : 574;-
—
Contact: Cc�� . �cw�5 c Q.E .
n
•
6. Is this an original or revised site plan?
7a. Total acreage of parcel to be developed:
7b. Total acreage of parcel:
8. Property Information:
a) Property Identification Number:
b) Current Zoning:
c) Present Use:
d) Proposed Use:
e) Adjoining Property Use(s)
f) Adjoining Property Identification Number(s)
g) Magisterial District(s)
Original , '- Revised
a . VJ ,/ 0.c.ce -,
O . tic 6'Y O'c.ce-s
I have read the material included in this package and understand what is required by the _
Frederick County Planning Department. I also understand that all required material will be
complete prior to the submission of my site plan.
Signature:
Date: l
7
PALNWER-LEWIS, P.L. C.
Letter of Transmittal
From: Mr. John Lewis Date: August 19, 1998
To: Mr. Evan Wyatt Time: 9:11 AM
Company: Deputy Planning Director
RE: Proposed Office for Dr. Taliaferro
Mr. Wyatt:
Please find enclosed the Site Plan Application, two (2) blueline copies of the
Proposed Rental Office for Mr. Richard Taliaferro along with the fee for the
amount of $1081.00 being sent for the Final Submission. If you have any
questions or need assistance, please don't hesitate to contact me.
Thank you,
/oh Lewis, P. E.
t lxvU .
'" 1,11U � •,1 j
VOICE: (540) 662-5792 FAX: (540) 662-5793
302 S. Braddock Street, Suite 200, Winchester, VA 22601