Loading...
HomeMy WebLinkAbout031-98 McElroy Metal, Inc. - Stonewall - Backfile (2)TA►BI.L fp.I GENEKwL EKUMON ANU SLUIMIENT cumrkOL NOTLb E5 1: Unless otherwise indi"Lcd, all vejiclauvc .awl structural eru-on ./td sediment control practices will he constructed and rruunuuned a.cw Wr j to nurumum standards and Ipeciticauons of they u. Imo- ram•-_� ,jC.ttment C LLuj H..rwbuua and Virginia Wjkulruutu Vk 62S-W-W brusion and bcdonent Control Kegulauona. ES-2: 'Rte plan appiuvuig authority must be noulied one wcei, prior to ine prc- construction �onlcrence, one week prior to the 4;ommencerneo/ of !&W disturbing activity, and one week prior to the'iris' impecuoa ES-3: All erosion and sediment control measures arc to be pla,cal prior to or ab the first step in clearing. E&4: A copy of the approved erosion and sediment control p'an anal' be mainulned ou the site at all times. ES-S: Prior to commencing land disturbing acuvtues In areas outer tun indicated on il,esc plans (including, but nut lirttied to. till -sic burruw Of waste areas), ilic comractur shall subnut a suppiemeniary eruuuu a aitrul plan to the owner lot review and approval by the plan approving authutiy. L-:S-0: The cuntractut is responsible for uutallatiun ul sty audutunal etuatun control measures necessary to prevent erosion uttJ Iedimcntauu" a&. detcrutined by the plan approving authority. E-10: All disturbed area% are to drun to approved sediment control measures al all times durint, land disturbing acuvtues and during site ucveluprnent unul final stabllizauun Is achieved. ES-& During dewaterwi; utxrauua►, water will be pumped Into an approved filtering device. ES•9: The contractur shall impcct all croatun cunuul measures periu klai; Ly and after each runoff -producing rainfall event. Any necessary repass or cleanup to ni,intain the eflccuveness of the cro►lon Como' devices Inau be tnatfe tmnicdtalely. _1� SGF-Nt7l ---7z2----- ExI�iTING GoNTouFZ 72-z- PF-�SED GoNTt--UFZ E. P. El76.C' PAVEMENT -7z 3. oo x C-X. SP-7 ELF-VATI oN 7z5. o_ x SPOT ELEVATIoI.t X X X r'-c1P '5;4-T FENCE ( 3, 05� e DRAINAGE PIVIDE LOCArION 1 43- (( Icp)) -z7 ToAM :e A9SoGIATES/ LTC;,. PARTNE;-5HIp P G . 7- 7-C%NEC7: M-I Aumo PAK- _ --i�YizR,�11�1T- -'t/ EX. GA�;, MA I N 1 ,d0' ex. oP1F-"Ie.� FoWE E TeL- Iloi 50' E NT Ir-A NGe C-X. - VA I-ve- Iz s' r3. Fz . L_ . 3 IL PAC) vV FeN G� I 1 / 01 ukl I 722- o e \ -7Z2- N ZO I- d' I I 1 1 /-------rroj"3 y-5rz--�fi- -- - ----- - - r✓x. r=.P. l 3 I 15 _-_ / rr I i 1 1 / / � / � - _ _ - - - - -- - - - - - - - -- ----- - - - - 1 __F .F._= 7Z 3. oo Ex. r7u n.rF�TF-J� PP•�P. GA.T� / 11 � x HGI-IT. = 30' (To IDE i/ / / / Pl:'o .l.(SC: METAL FABFzICA-rl H REJ-oG�TED� j I �� n W 4- (IS' O W. AL WL• \ I ' 1� P�1-i. PA V e K4f N T J i I J\ _-----_____------- I �n12 EX I'iT ING 13UILDlNG / \J "' 7 -4'4:7, Z 0e9 5,62. FT. TA L- .1. / / \ I lip V bL N I �_ I I H_ t..G H T- 3 0' / / \ \ N, \ \ \ \ I i UriC- -. K4C-TAI- PAMF-ie-ATI-H J / J / / m i 1W. IZ' X 17. ' ;ke C7 D. 13. ri �7 , PC,. III f7o+oh S �� �' h / N / 3ZS MGGH(✓e me C2 �~ ^I lL IN EX . l7U m PsTe P- (To !x!� IZE LoCATE P� C 37, BCb SGL. FT. MANUF=AGTLJFz-ING t WAQEH--U1;e ry � CRH�AD EX. JloW FIz £ TEl-EPHdNE / I \ I I ( /'/� rEx•MAN GFz E ,.. F'stR-K.1N-rilGN4l I _ I� 72z.e5 rac.nrAN txulZ , ,/� -P P. 4e oi'-PIGE AFzEA HEI FiT- lrr' QQ v 10 �z,�FGJ SR. FT. Awl tW+oR ex. LIGHT I / -� / // 1 ♦� I QQ X I ii �' EX. HIGH M r ((C" '1--1 � N — Fx • Pt -ANTI N 65 ( 1 1 - _ .' 75' I,.Iz•L• // / I � - 2 4O 'll. i1� 'a.-!s ®X- rl�P.HG "F- Ex.-+GG.S1D-,.-\ -T ,H (TI� I I \ II 1 713.Z I/ / / I AR, I I• \� „ f= ��� '' i I I I I I► I I I► i l l l l l l I -�' n I EX, PAV�MeN I I / A� 1 I $T B 6 GKUSKEC%-iToNC� I I I I I l� I I - \ �ASE't/pr7`fSTb. zl- l,. O `' tt o.T. STD. ZI- A I 17ETENTIor1 IN°>TALL- / PJ. S'S� \ 1 \ ,-y,.L� y� X {' EX• PAVEMENT-.__L.__GFzUSHED STONE BA�iE (uR 1 I ' �A9 i 1 4o1-•F• - lo" //r a 1 G \ I�►zIMG AND Gl�uL31-(� SEAL_ �i \ \ I w �C , F/#E YDRAN T �? _- r' I �J � / \ `N � `---------------- 722---- 72/.95r•TYP.--------------------------- .�\ \ \ r 71INV.=_ i T ��y / �' . 'N \ EX. E.P. I I - ------ --- _ / I � ✓ � _ i _'-7/B- �� � \\ /NV.=7/B.50' ph � 7Go' -%NV. I-e 70'-/5"C.M.P.@ 5 720 72/-,rL--___ _--------__ "� ____--------------�' / / _ + 71 is. 5/. --71C_ `�-5-- ' --7/9 ---fib R 7zo.o 50 I------------72/=-----722-----------_------------ - ---_ _-- 1 r--.K IGf l - 723-- - 7Z�j— - -- - - - �2c, I.X.P_P. +I5'xZ'X 5' HIGH / ----- - / 71 55- \ - •\_-�-,-_____--__-------------------- -- ZB. E--��• \_--l-----�-- 7�z2,- --_-- �zZ_SCALE 2,000, �7o0..c51o.4 - lls � -! Z APPROX. LOC. EX/STING B" SANT. SEWER - �T _, _-`-_ _ - _ - =- _ 0 _ ZOO /h/V.=717. _r �-�_ �zI f _ = _- Ex.'9AN . M• H i _ % 725 f /' I TOP = 71 .7s M G G� E i2,vA I7 FT-oU-T E5 S & I - / ►Jv I �� `� \\ �' FzJW) \ Nn PoSTE17 `�oiPEED l-IM1T `� �� \`� \ �X.E•P. r W. E.P. N _ = W : - W -::: :.: - W =::: — W WATER VALVES W APPROX. LOC, EXISTING /2" D. /. WA /NE STUB \ E.K. Em-rP-ANGi= FX f'I'. \ E.X. ENTIZANe-C t 7--VEP-HEAD PoWEs TeLE. �{ �5- (( I'� i� - 7- 3 _jNfifES �• c JE�iSIE S. WI1-S�rl F�DEFLT M. 13ARLowy r- �JoHH D. VAN WAC-e- - d. ZoIJ E D : Ivf - I U 5 ,Ez '. Tr-z-1 � iZ -Te F'-t�41 N A I- e"Y S"X I/4" 4TE E L PLATS-3 TO PCEGBIV E G" Ne. "T" HINCi69' G"x (v" G6DAIC ragT19 WITH 'ilMP50N C�p- N VVC-o -9TL. eaLU)vfN GA9E GICA ve 4-"1dZ--rTL. TUNING ALL GOPNEIZS /1ND GENTEIt4 TO BE 5iHOP w/ELpED WITH rI.ATE9 15E.141HD WELP FocoIHT9 I rv3,n, PC, - to ZONED : lu1 - 1 U'5E'. IIJ5L)GATr1) F3LJ1L1)lNU SyGTEMS pA r�•K I N G G-A 1-Gc.! LA'fl o N s 1"u6," KOUGH SAWN oFFIGE Z1-0C` = ZSO = -i. (o toF- (O SPACES GGCIA r- r L A H KS MAf-'UFAG7UF2-4NG Z(to EM X , -T S = I S o P- Z,o 5 PA c-E S 3o SrAC-- ES Pf2•oVIDED Tea 3" x 114-" x 7'tr" fi Z- HAND(GAPpe0 SPACES GATE rosT — NAC i-AT4-H • bZAGK6T'7 ILI II l/Z tt I I I l Zz l I I ,dU kA E'"I' TE EZ GAT E D E TA I L- (NoT To SGA LE 7�5Z T51TA1- SPACES PP-c>\/I17Ep DATE 12E VIS I oN 3 - G -7(o PL.4NN ING aEVrSrc=tits 3- 1 W . N\. _e'j H. BRUCE EDENS NO.0001 62$ 43 - (( Imo)) - za VA L L- I- WA L I- r3 A FZ i7 a. a. (oaS', Pr;• 5 3 z ZONED : M -1 USE : µ/ALL 80ARr> MAN U FACrUrl-k G Ex. P. P. W( G F-N e IZA L- t-1 o- -5 TAX MAP 4#- 43- (( Imo)) - 7-1 . TOTAL AFZEA • 4.ODV AGFZE S k719TUFZ-0,EID APLEA = IZ, Zano 54.10T oFZ o. ZS ACRE ZONED : fvi- I >=XISTING PFz-POSED Uo7E I N DU STFz( A I- F A . Iz• . ALLQW ED 12ATIo : I . O 47 0-7:3 J z I -7, PF2-1 P- F--ATr C7-> I-> )) - 7- 4-4- PG- 035 z.oNED'. Iv1- I ClriE'. VACANT N oTPI: s No ou-Rez02- STOPAG E PFzpPoiE r:-> No ENVIRoNMI NTAI- FEATUF2-6S 9P�FlFD b'i/ THe - C11NG C"�fZ-C>I WANGE E�CI-.=T d'N THIS SITE . -#Z/-,7j l I A t' V ZONING ADMINISTFzATaFz �/ 11 11 DA E hlo-rE : -T H 19 5, I T E 1l 1-,A N WA 5 P FL E V I ocJ S- L`� SUBMITTED I DATED JuNE -3 I�aS W(TH IZEV15(c;,t4 F->ATESoP (o- 10 - SS/ ,4--Z7- 80/ z-zl- 5V At4V 3-z3- OD. TilE 1-457-ARRROI/AG eY 7//Ig Pe4AIV/AJG DEPT. WAS MARCH Z7, /99G vwNefz- DEVF-I- raP7- M� G-LFZoY METAL- MIL-I-51 11-4G. 3ZS Me -GHEE P-,-:AD WINcHE,TER , VIFZC�INIA zz6o3 AMF-Nt7f=C.-- .S /TE Pe A Al P.POPOSl"o 1,16- N ADDirio v MSELROY METAL INC. STONEWALL D/STR/Cr FREDERICK COUNTY, VIRGINIA �JANUAr=z`i '< 0 3o Go SCALE IN FEET ,770 BA KEFZ I -AN E WINGHESTE121 VI!ZGINIAZZ6,C>3 41 8S H- BtZLIGE EDENSr L.S. , PEES . HE o F RARKIIUC CALCULATIOV5 EX 15 T1AJG 32 s P4 CES 2 VAN ACCESS/BCE HANDICAP SPACES RE -4Z eC19 OF,,=ICE 2400 = 250 = /O SP14CES �IANUFACTU/Z/itl6 34 EAIPLOjVEES @ 0.75= 24v 9PACE5 3Cp SPACES FAO(//DED /� - � x 20 ADD l T/Ot/AL TO TAC = 48 SPACES VC'rT N,9TE i I- E lsITFA N G ES TO f�,E l!, U I L-T Cc, GG- H STA NPA IzDS. -2. GG-IZ H.G. P-AMPS _To 5C- BUIL-T PEP- Vl_ 7 F1 EL C> I NSPEGToR - CX . I N V. _ %' 12.60 F?v0- INV. = 712,6 EX - 8" 5,AN. N N EX .SA N. I\A • H . TOP : 713. 75 % M 7:2-1 N Ill INS X PAP. Ep EoF P,4VE F F. EX. 6A00 nn lP my o o 2- IF:,'' B. R. L. P M (TO HAVE: P ��ING - FIi�EWAI-LS� ET P- lP>0t + zz ' 3' MA N CFL �5 EX. INV. = � 716, 50 EX . E . P. VJ tF:-X.I�-" WATeP- LINE _FA R EX. BU/LDIAIG = 46, /73 50. Fr. PROP. 4D0`/77,0A1 = 0/, 080 SQ. Fr. 5 67 253 SQ. Fr. AL.GOKIEO = /.0 PROPOSED = 67 253 - 2/7.364.4 = D. 34- 0 3 RE MO\/E EX • GAS M ETE R L-IGI-IT . Cam- --�-• � �' EX. LjUIL.DING / LJ # 3Z5 Me- GHEE PzoAD Fx - Q " Iv(G EL F ME-TAL_�i, It-4G. " i NTFz-ANGE ' C� F.F = 7•23.oaq 1:3t�KeN _ C_ R SAND EX. LIGH-T GX• / EX."AN boob J V i 9 EX. E. F, 4 _ i � 1 I (✓XMA . h1 Lam. F+ I.X. EX . P. F.--:—� \ SM- A y R ;T — ,- _ EX. oFFIGE ;; Dc�/z Ex. LIGHT W EX. E. P. 4B (� eX _ -- I N V. = 710. 5 20 FI F -E H (PPA N T (��� EX . 5 I G N- WATER METEP� EX . _ ... _-. jig' � _..... - f Ex . >✓ . P. h- - V� McGhee Road Rte 861 .`,r ?8 8o• P- w) EX . E. P- Ib W VVV- EX . P. P. CON5I'2UCT/OA/ ,UOrE: VALVE BOXES AQ6' UAIDER P4VCIW61J7- f. C•5. A. � E. P7. r0 611t/COtl6R ARID RAISE BOXES AS PART' OF I _ COAL s rRUCr10AI I FF SGA L-15 : I 30' H012-Z 8 z N f 71s Z w W clo A•b N i �p-� " p�,PN • o ° r•t P c l / V � dj 71511, p � � GoA �° i � Pc� 11 3 • �✓ N 1 + m + rx• S. LnrOAL !J r 5c' P+rO (� Ztr�o fir , ("= \/C—FLT. 72_ l Z 25 0% 715 Z 10 Q _Z N71Z 2 EXISTING WAF?•EHZ2USE "Ih15LILA;TED BUILDING Si5-C-MS• ING. Install 12" of 21-B behind ougb CG6 See Snuaoce IT Existing Pavement Section 'Tager Igoe Above rr, VDOT Field Inspector WW approve CG-I I antranca before construction Half Typical Secion of Entrance FP cc W W Z N N a 0 0 'J a00 z1 W " DPZzW A REA 0 54, 34/ SQ. FT. REQUIRED �N r-c, 250 SQ. Fr. PROVIDED >4 � n /L_/Oi�S W I. AJO 01_/TD00i2 STORAGE PROPOSED 0, GOCAT/OIL/ OF CG - /2'5 ro 8E VERIFIED ' p� BSA VDOr F/EGD /-(ISPECT0�2. 3. ALL EAIrRAAJCE5 ARE TO BE 8UIG.r TO VDOT CG - // 6r4AIDARDS. 4. A V Y PROPOSED .5I6AI WIL L MEET CUREEl/T ZONIAIG 5TA&DA205. � 1,A N D5G�4 PI N G GA I -GU L A TIoN S PP-0Po5ED PAP -DING l-a7 PE-GZU I P F_ D 17P2EE PEP- (o �iPAGE 5 = 2 17 P-e E Pe R 4c, ' PE P-I t-A E TE P- j 275 = 4O = 7 ►• 5 Flo CIF PA FZK 1 N G ,4 tz-EA Falz L A N DS��t PING Lu 7--)50 G/a.FT. x 5% - 3-D7. 5 SG2.FT. P•-E62'D. P��/1DEp Tt� E S -ToTA L LcAoo GiGZ.FT. &P-EEN AP-eA ® O IS PIMP. P-EP M A P 1. E (� 7P -6 E S� � ALL 7FEES TO 8-6 A MINIh�UM Z Z Q GALIPEI2 ATTIME OF PLANTING. Q � O U O LL00 ; 6 in to re/P 6eVEPAT/OAI X T E 67-9 ED/r/OAJ AVFe46 E RATE (/40 MAV rU2 /,UG - 3.82 PER 1000 5Q . F r. G7 053 SO Fr _ / wo X 3.8 2 = 25 7 VPD IZD�lOc�l ANP �iEPIMENT, , NTP-OL_ LEGEND OpPOpoSEL7 SILT FENGE IP PFLoPoSED INLET pP-07E�Tlot.1 op PPSPoieD OLJTLE-T PPaTEGTION PP�f�bSED GONS-fRL�GTIvN E N TLZA N G E V1. All work on this project shall conform to the latest editions of the Virginia Department of Transporta,".ion (VDO7T) Road and Bridge Specifications, and Standards, The Virginia Erosion and Sediment Control Regulations and any other state, federal, or local regulations applicable. In the event of conflict between any of these standards, specifications or plans, the most stringent shall govem. V2. All construction shall comply with the latest U.S. Department of Labor Occupational Safety & Health Administration and VOSH Rules & Regulations. V3. When work,ng on VDOT right—of—way, all traffic control, whether permanent or temporary, shall be in accordance with the current edition of VDOT's work area protection manual. Furthermore, all traffic control flaggers must be certified in accordance with VDOT's January, 11394 (or latest edition of) Road & Bridge Specifications, Section 104.04—C. V4. Design features relating to construction or to regulation, control and safety of traffic may be subject to change as deemed necessary by VDOT. V5. Prior to initiation of work, Contractor shall be responsible for acquiring all necessary VDOT land use permits for any work on VDOT right—of—way. V6. If required by the local VDOT Residency Office, a preconstruction conference must be arranged and held by the engineer and/or developer with the attendance of the contractor, various County agencies, utility companies and VDOT prior to initiation of work. V7. Contractor shall notify the local VDOT Residency Office when work is to begin or cease for any undetermined length of time. VDOT will also require 48 hours notice for any inspection. V8. The Contractor will be responsible for maintaining adequate access to the project from the adjacent public roadway through construction and maintenance of a construction entrance in accordance with the Virginia Erosion & Sediment Control Handbook. Sec 3.02. Furthermore, access to other properties affected by this project shall be maintained through construction. 00 o N N o - z 0 z DATE: 4/10/98 SCALE: 1' - _W DESIGNED BY: cRo SHEET 2 OF 3 T Erosion and Sediment Control Standards 1.Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant for longer than 30 days. Permanent stabilization shall be applied to areas that are to be left dormant for more than one year. 2.During construction of the project, soil stockpiles and borrow areas shall be stabilized or protected with sediment trapping measures. The applicant is responsible for the temporary protection and permanent stabilization of all soil stockpiles on site as well as borrow areas and soil intentionally transported from the project site. 3.A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieved that is uniform, mature enough to survive and will inhibit erosion. 4.Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land —disturbing activity and shall be made functional before upstream land disturbance takes place. 5.Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. 6.Sediment traps and sediment basins shall be designed and constructed based upon the total drainage area to be served by the trap or basin. a.The minimum storage capacity of a sediment trap shall be 134 cubic yards per acre of drainage area and the trap shall only control drainage areas less than three acres. b.Surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three acres shall be controlled by a sediment basin. The minimum storage capacity of a sediment basin shall be 134 cubic yards per acre of drainage area. The outfall system shall, at a minimum, maintain tha structural integrity of the basin during a twenty—five year storm of 24—hour duration. Runoff coefficient3 used in runoff calculations shall correspond to a bare earth condition or those conditions expected to exist while the sediment basin is utilized. 7.Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slcpes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. 8.Concentrated runoff shall not flow down curt or fill slopes unless contained within an adequate temporary or permanent channel, flume or slope drain structure. 9.Whenever water seeps from a slope face, adequate drainage or other protection shall be provideli. 1O.Ail storm sewer inlets that are made operable during construction shall be protected so that sTdiment—laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. 11.Before newly constructed stormwater conveyance channels or pipes are made operations., adequate outlet protection and any required temporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel. 12.When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerelible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these s ructures if armored by nonerodible cover materials. 13.When a live watercourse must be crossed by construction vehicles more than twice in any six—nonth period, a temporary vehicular stream crossing constructed of nonerodible material shall be provided. 14.AII applicable federal, state and local regulations pertaining to working in or crossing live watercourses shall be met. 15.The bed and banks of a water course shall be stabilized immediately after work in the watercourse is completed. 16.Underground utility lines shall be installed in accordance with the following standards in odditior to other applicable criteria: a.No more than 500 linear feet of trench may be opened at one time. b.Excovated material shall be placed on the uphill side of trenches. c.Effluent from dewatering operations shall be filtered or passed through an approved sediment trapping device, or both, and discharged in a manner that does not adversely affect flowing streams or off —site property. d.Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote stabilization. e.Restabilization shall be accomplished in accordance with these regulations. f.Applicable safety regulations shall be complied with. 17.Where construction vehicle access routes intersect paved or public roads, provisions shall be made to minimize the transport of sediment by vehicular tracking onto the paved surface. Where sediment is transported onto a paved or public road surface, the road surface shall be cleaned thoroughly at the end of each day. Sediment shall be removed from the roads by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual deletopment lots as well as to larger land —disturbing activities. 18.AII temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after the temporary measures are no longer needed, unless otherwise authorized by the local program authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sedimentation. 19.Properties and waterways downstream from development sites shall be protected from sediment deposition, erosion and damage due to increases in volume, velocity and peak flow rate of stormwater runoff for the stated frequency storm of 24—hour duration in accordance with the following standards and criteria: a.Concentrated stormwater runoff leaving a development site shall be discharged directly into an adequate natural or man—made receiving channel, pipe or storm sewer system. For those sites where runoff is dschorged into a pipe system, downstream stability analyses at the outfall of the pipe or pipe system shall be performed. b.Adequacy of all channels and pipes shall be verified in the following manner: 1)The applicant shall demonstrate that the total drainage area to the point of analysis within the channel is one hundred times greater than the contributing drainage area of the project in question: or 2) a) Natural channels shall be analyzed by the use of a two—year storm to verify that stormwater will not overtop channel banks nor cause erosion of channel bed or banks; and b)AII previously constructed man—made channels shall be analyzed by the use of a ten—year storm to verify that stormwater will not overtop its banks and by the use of a two—year storm to demonstrate that stormwater will not cause erosion of channel bed or banks; and c)Pipes and storm sewer systems shall be analyzed by the use of a ten year storm to verif that stormwater will be contained within the pipe or system. c.lf existing natural receiving channels or previously constructed man—made channels or pipes ore not adequate, the applicant shall: 1)Improve the channel to a condition where a ten-year storm will not overtop the banks and a two-year storm will not cause erosion to the channel bed or banks; or 2)Improve the pipe or pipe system to a condition where the ten-year storm is contained within the appurtenances; or 3)Develop a site design that will not cause the pre -development peak runoff rate from a two -gear storm to increase when runoff outfolls into a natural channel or will not cause the pre -development peak runoff rate from a ten-year storm to increase when runoff outfolls into a man-made channel; or 4)Provide a combination of channel improvement, stormwater detention or other measures which is satisfactory to the plan -approving authority to prevent downstream erosion. d.The applicant shall provide evidence of permission to make the improvements. e.All hydrologic analyses shall be based on the existing watershed characteristics and the ultirr. ke development of the subject project. f.lf the applicant chooses an option that includes stormwater detention he shall obtain approval from the locality of a plan for maintenance of the detention facilities. The plan shall set forth the maintenance requirements of the facility and the person responsible for performing the maintenance. g.Outfoll from a detention facility shall be discharged to a receiving channel, and energy dissipaters shall be placed at the outfall of all detention facilities as necessary to provide a stabilized transition from the facility to the receiving channel. h.All on —site channels must be verified to be adequate. i.increased volumes of sheet flows that may cause erosion or sedimentation on adjacent property shall be diverted to a stable outlet, adequate channel, pipe or pipe system, or to a detention facility. j.ln applying these stormwater runoff criteria, individual lots or parcels in a residential, commercial or industrial development shall not be considered to be separate development projects. Instead, the development, as a whole, shall be considered to be a single development project. Hydrologic parameters that reflect the ultimate development condition shall be used in all engineering calculations. k.All measures used to protect properties and waterways shall be employed in a manner which minimizes impacts on the physical, chemical and biological integrity of rivers, streams and other waters of the state. (EROSION AND SEDIMENT CONTROL REGULATIONS VR 625-02-00) CO 1T .' i R U tM T ON OF A :U71.7 FENCE CE (117THOUT' R,_' RE ti>ETPPOR'T) CULVERT INLET ,SEDIMENT TRAP ?. S%'?' THE 3-mIZ.F11. 2. UCAVATE A 4'?; 4' TPXNNCf: ' STAVE,t; ALONO 7 t1F NSF 3. OrAPLE: t7LTER MATLI 1S TO S-WES AND KNU14D IT (MID? THE TUNCH. ' Eu rWeat fro, I1"M 4. P,ACfiF U AND COWPAC T Tit£ LXCAtATED SOIL. 'Flow SHEET FLAB TNSTALL TiO' (PL,R4PFCT1ViE THEW) t'O1h"TS A SHOULD 1IE; HIGH ?'IU"N POUT B. D 1iNAGEWAY .NSfiALTATION (FRONT ELEt...EYs1- "A ; r..,v.auA *STORAGE RE)XWMWENTS EDUVAIFNI TO THAT OF TEMPORARY SEDWENT TRAP, SM. 3 SPEC. 3,13 67 C.Y./ACRE MET STORAGE (BELOW BASE OF MOMS) 67 C.Y✓/:CRE DRY STORAGE (BASE OF STONE Tn TOR Or STONE BERM) AREAS TO BE DISTURBED / (CUT. FILLED. ETC.) 'V CLASS I RP RAP VDOT /3, #357. OR /a SED"Drr STORAGE AREA / / CG4t5E AGGREGATE PERSPECTWE VIEW PPE NIVUR NATURAL GROUND RPWP NEADMNIL \ FLOW AP . f557. S I #5 CO vDor /3. �:@7. OR � COURSE AGGREGATE AT 1/ VOLUME DOF (Cs RN�IA� AT 1 2 VOLUMDNE"TE Or MfY ELEVATION t IW2 rx 0/ 1i OUTLET CO:ND1770A 1 adb a i L.Lti- rn v nurti:l 01 ! 11 ��^C4N/A FI111 , � IY {INlt 1 IIANAl I. I "IYTN,y A :1 r•1 11m.1 Y, n A In,AFIr Y:., ! r 1'<IN r�•w,llr 1 Iql IMI, 1 t i t a :I, 1 is rR•{ , •,III I . : VIAN VIEW . r• •ECTION 1 a . I,rY I,.><Y .!, Y . •, b,.INNI,I., I ,. L�,LL II IIFI II Vlms 1 AI'NIN IIAIWI MAY1W' laN cPWmJI MPYA' 1d 1 NA+MI nN tV.]TgIY. nlc 011Ar II,IM. 11AR" In 1 01, , a , m!s FLY: uA,uleY moral. axN{�{Y url ••n I INea1 11NY Y Iw'NII S.,V-: Va, ONVA, Ylutc 1 Is I A land disturbance permit will be required prior to construction from the Frederick County Department of Public Works. Seeding Schedule 1. Topsoil will be spread at a minimum of depth of 4". 2.Pu verized agricultural limestone will be incorporated into the soil at a rate of 92 Ibs per 1000 sf. ( 2 tons per acre ) 3. Fertilize with 10-10-10 at a rate of 23 lbs per 1000 sf ( 1000 Ibs per acre ) 4. Seed mix will consist of 67% Kentucky 31 Tall Fescue and 33% Red Top Clover. 5. Straw mulch will be applied to all seeded areas at the rate of 3500 lbs per acre and anchored with cut— back, or emulsified asphalt applied at a rate of 200 gallons per acre. V Z W W Z V Z W T N O C° (� pp N N I N �'E N U7 Z _J aT � I I O0 N W _ W 0 a) �+' I CO c O d- ain1 V -C O O X t\ a) V) L O O c i C 7 W U7 Z 0 W W Q 0 1,11. m E 1� �E Qo Eor Q �� w F+••I Z o � ww � w C.� DATE: 4/10/98 SCALE: N/A DESIGNED BY: GRO JOB NO. 2190 CD SHEET 3 OF 3 PARKIAJ6 CAZMATIOVS EX I5r11GG 32 5P4CE5 2 VAN ACCESSIBLE 914,VOIC14P 5PACCE �'EQU/,QEO OFf=1C'E 2400 _ 250 = /O 6PRCES 1%41VUFACT6/,e1A(6 34 E/1fPWY,ee5 (P 0.75 = ZG 5 PACE 5 3a SPACES )C W VWEO /G - 9 x 20 ADD I r10,UA(- TO rAG = 48 SPACES �✓doT L E1,47F-ANGE9 To 1�,E E5U►L7 -(o CG- li 5TANDAf2-D5,. Z. GG-1Z H.G. RAMPS To r�C- BLAILT PEJJP- Vt>C>7 F1El�D I►JSPPGT�-�1� . \\ OUT DO o fZ STD l2AC C SGW2 6 E N I" 1 .\ EX. FH N �O� 2�` 28„ PbP. ED EoF VE1_ / EX. 6A5 �\ A ✓ �y� � -� yE(�•VIGE .-------_-_ _. _ U'400 >M (To HAVE �WA�-L-S) PRoP GA ME7EI2- + REMovE Ex GAS-, METE R i� � �! n CAS'"` ►� �•.�' � . W Lop ex LIGHT / EX K fA N bC>6>Pt- -"---� EX MAN V �.� T -- 'A 6 'FL I �' Ex . V/T�1 ZS 13. F2.L . EX. BUILDING # 3Z5 M�GHEE I�AD " MG E L tom( ETA L S, 1 F. F = 7-23.on FI-I ex. V-1F h i r lei tl^ i W rAP- EX. LEAN - To EX. E. P- - X m W aQ 3 - - m . �/ f'n � GG - I I EN71zANGE C) CFLEPLAG E + �►�oKEN � � �' X. Gc_lRt3AND '4 EX. E. P _ I E X . F. P + � Q _T 14 -�X. 4' G S1l3�WAl. - P-X F. H . W. To bE _ ii CAP v�P 7o tz �XuT P. k _722 . Ike, � 6' EX. E.P. A7Efl -to r EX.INV. = 7113. 5 �-' - IMP. fZeLo�ATe0 11 z RP•E HYDf2ANT u`'� EEC . S 1 C' (gsP4ALT p �zs'R- �2 oo - EX ..f S" ��0 — - -A qG E - - 7 INV -717. s� -72-+ EX. It4v _ / 12 EX E. P 7 I6.50 N r II McGhee Road Rte 861 < N .? W V. �>?e ego• P.(w) �- - — �- EX. E. P Top 713.75 I >=x. I--:2" WATEP LINE -\ EX_I5"GIMP \ EX. ENS NGE VJ EX. PP. coAl5 rRuc r/ov ,vorc VANE BOXES ARE IAIDER PAvelovevr F C. 5. A � - Ex F=-H . 727 41A1C0VER AND RAISE BOXES .4S PART- OF I -� COAL 5 rR41Cr10 GALE: I": 3 ' H012-Z. (" = 3' VEFLT ( r:7 I it } N n1 A 'I 7 n 3 u 3 a 3 v Z w? 0 710, ? ►u li N n 0Io k.b w ppvt'. biD L `iC ^4PH ° V dj 715 A `� r N „ C RR 0 cX ; S. LnT[A�L o Df 50 l+eb I t tx� U - - --T- - -- L_ 7Z /� f718 Zr 2• J 7l5 lbr n " 7 �Z N -71 Z I+ 50 2 ra✓b EX IS -TING WA(2EHOu5E "INSULATED BUILDING 5`11S-TE-M57 ING 1n.1au I of (°b Vow Z 1-0 biiod asb CG-6 See IT lave mm 11e106oa Tom Igoe Abu" ra VDOT NOW MWOCW rJ will approve CG-11 eetrenoe beu«e coaftw6m Half Typical Secion of Entrance Itn W Z a � Q W I Ii 1 oC2 A = 7 a. 5t FA R BU/G D1k16 = 46, / 73 SQ . F r PROP. ADOIr10A1 = 21, OBO SQ. FT. ALGOK/ED /.O PROPOSED = 67 4 53 - r- 364.4 - U. -7 g h N 00 N OPE"ti A teEA t h � 54, 341 SQ. FT. REQUIRED 6G, 250 SQ, Fr. PROVIDED � IS /vOTES X M g jU /. AJO OfJTDOO#Q 57ORAGE PROPOSED 2. ,-,ocAT✓OAJ of CG - i2'5 7v BE VER/F✓ED 6,V VDOr FIELD WSPECrOe. 3. AL L EiV rPA AJ C E 5 AA? E TO BE BUILT TO V'DO T CG -/ I STAAJOARD S. a e 4. A AUV PROPOSED ,516AI WILL MEET CUQEEUr 8 ZO.V/,(✓G 5TANDARDS. !,A N D5G�4 P(N 6 GA t<Gl1 L A T(oN S P F�PoSE � PA R-f� t N G !-oT RE-Z;zu I P-F- D 1 TP EE FeP- to FA 6 E 5 z I -f P••E E PC-F- 40 ' PE P-(t-A E TER c0 275 -= -,}o - 7 5wlo eF PAR-�NG AFC A Ft-P LAND5,CAPING �11 h 7-n50 �Q -FT. x 5 o 4, " 3--)7. 5 5Gz, FT � o0 V W •.� Ppbv'I DE D � 1►. -TP--e E s ToTa L x jl v ( caoo e7eR . F T. C- P-E E N A P-E-: a 3 V � � PPoP. R-ED MAPLE (� 7;`z-EES ) AL,L-T'FLC-E5 To be A ►,AIN11,-4uM GALiPEf2 AT -TIME OF PLANTING. Q � 0 � V FD m � � N � 1�! in V1 relP 66-AJc2AT✓OV I TE (oTN ED/T/0IU AVEQgG E Z4 TE (00 140 MA Al TUQ lllG - 3 . 8 2 PEQ I000 . F r 67 253 4. Fr. 1, 000 x 3. 8 2 = 25 7 VPD �. 1 o N Z o C;�i �►ZOS(ON AND �iEDIMEI�1-T GON-TFtoL LEGEND D Rt'o f'DSEC7 5G 1L-7 FENE S PPoPo�iED INLE-T PF�o-1"EGTlor.l OFP-OPoSED OUTLET PPoTEGTIoN PIFz,-,�SED GoN779U6,71caN E N 7FLAN G E V1. All work on this project shall conform to the latest editions of the Virginia Department of Transportation (VDOT) Road and Bridge Specifications, and Standards, The Virginia Erosion and Sediment Control Regulations and any other state, federal, or local regulations applicable. In the event of conflict between any of these standards, specifications or plans, the most stringent shall govern. V2. All construction shall comply with the latest U.S. Department of Labor Occupational Safety do Health Administration and VOSH Rules & Regulations. V3. When working on VDOT right-of-woy, all traffic control, whether permanent or temporary, shall be in accordance with the current edition of VDOT's work area protection manual. Furthermore, all traffic control floggers must be certified in accordance with VDOT's January, 1994 (or latest edition of) Road & Bridge Specifications, Section 104.04-C. V4. Design features relating to construction or to requlotion, control and safety of traffic may be subject to change as deemed necessary by VDOT. V5. Prior to initiation of work, Contractor sholl be responsible for acquiring oil necessary VDOT land use permits for any work on VDOT right-of-way. V6. If required by the local VDOT Residency Office, a preconstruction conference must be arranged and held by the engineer and/or developer with the attendance of the contractor, various County agencies, utility companies and VDOT prior to initiation of work. V7. Contractor shall notify the local VDOT Residency Office when work is to begin or cease for any undetermined length of time. VDOT will also require 48 hours notice for any inspection. V8. The Contractor will be responsible for maintaining adequate access to the project from the adjacent public roadway through construction and maintenance of a construction entrance in accordance with the Virginia Erosion do Sediment Control Handbook. Sec 3.02. Furthermore, access to other properties affected by this project sholl be maintained through construction. U �i U O Ems., �D OU r�-r T/ j U DATE: 4/ 10/" SCALE; 1 • - -W DESIGNED BY: (mo SHF.Sr 2 OP 3 PARKIIUG CAZMATIO,US EX 15TIVG 32 5P4CE3 2 V,4AI ACCESS/BLC HANDICAP SPACCS RF_ QU,�EO 0/c, 'CC-- 2400 = 050 = /O SPACES _N,,4, 41FACrU,e1A(6 34 E/yl PGOj/EE5 O. 75 = 24, 5 PAC E 5 3(�, SPACES f;201�/DED /G - 9 K 20 ADD I T/Ot/AL TO 7-44 = 48 SPACES VC7oT NoTEs I . ENTRANCES To lSE t5U I L-T -To G G - I I STA N PA ice- O5 . Z. GG I Z H. G. P-A PA Ps To PJC- BUILT PER- V Dp7 FiEI,(> Iti1SPEGToR _ FaN- IMV - 712.E EX. 0" SAW. .ry N t� �t,stry r�} i� tR/zcfv� D 3 f� �r r0 r I / q l exN 40Z^ z8_ w - 66b. too' ' = 7r 1 r' PbP. E E of Pit V EL EX. 6A 5 SEP-VIGE ; 1�� J A " m Ex. P P PP'aP� 22�Gp M (To HAvE FIPLeWA�--S) PFtop. GA 5 / METEF'- + ZZ . 5 REMO\/E EX GA , METE fZ ex. t3UILPING 3Z5 M--GHEE PAD MG ELFC'Y Mr-�-TAt-�i, y F. F = 7 -23. ctp Ex LIGHT EX MA N Dio+O ft w Qr 3 X to a t- _ rA D F-'(* LEAN - 70 EX. E. P X m W T - ; p 2 ., SM- A MAID 5 6R I? Q EX. oFFIGE 1' I� I EX LIGHT k � T101. i _ /V / TYPE - 7 t3.R L r X 4 GONG. ..SI17�WA� EX. F. H. W. W P� 'N Pit✓ �.P- w 6' E x . E. P. _ EQ B• r EX.INV. _ 710. 5 �5 Y aQ 3 N � i W � I 0 EX.GG- II E N-TIZA N GC Q CF1,FPLA6 E + o bPOKEN , GUR•t3AND vl GU�TTEFi� Z . - E X . P I' w Z J 1 1� i Q C9 L I I 1 , 74- PPvP. hE LoGATE D I I 7 2 2: A( 7 a. FIRE HY�ANT u __� EX. SIG E ATE METE2� '1st _ qzl E - -- O- EX . ftvV 717 5-72A- - EX. E.P EX. InlV = 1 71&. So -� McGhee Road Rte -gbl EX . I- . P. I v✓ 0/ 0 � EX. e. f EaX.SAN. M.H . I- -- W - -- -roP ' 71-3.75 I max. Imo" wATeP L 1NE - EX 15" G MF' EX. ENTPL-ANGE / EX P P. TON 5 T,QUC r/O,U ,vorE : VALVE 80)(eS A R 6 41AIDFP PAVE V5VT F C. 5. A 727 cht/CO✓ER AAJO RAISE BoxeS .45 PART of CON 5 rRUCr/0" e3 To a ►/i S E vv E F- PIS <=- I I- E S I 3 A- p t` N N Z ►� � Z vi Z 718 _ N W Its V hyP' L� 3'S o N t7c S L m f# L Dt rjG t,A P „ m Irk ( r�' I SCALE : I"= 30' HCP-7- (" _ \,/EF-T. N_ N 7 z N i, �. / 2-. 72. f_- 2 ZC 7(5 „ LNG P ►n �o lie, O r t�b „ 7 N 712- 2 "Co EXISTING WAREHOUSE "INSULATED 5UILDING SYS-TENS. ING. lnafsil i r of doh � U 21-8 bdiiod amb Ut3_-6 see Kokomo IT EX16ms lavumt 5006 a Taps Laos � vnoT Field brpma1or wW approve 00-11 aelnooe boil" aoaaRuodm Half Typical Secion of Entrance F. A. RP EX. BU/CD/,UG = 4G, i73 50. Fr. PROP. ADOI-rI ! = 2/, 080 50. Fr. 67,253 SO. Fr. ALLOWED _ /. D Q PRO P0560 = 6 7 253 - Z / 7 164.4 = 0. 34- ty g b h go N N A REA 25 170 REQUIRED 54, 341 SQ . FT. REQUIRED 6G, Z50 so, Fr. PRO VIDEO IUorCS ° g /. d!O OUTDOOR 570R,46E PROPOSED 2. GOCAT/OAJ OF CG - /2'5 rO BE VER/F/ED � in 8y Voor- F/ELp AUSPA=0O e 3. ALL E-XIrRAAJCE5 ARE TO 8E BUILT TO VDOT CG - // 6r4AJ0,4ieDS. tN a 1C 4. A 41 V PROPOSED 516A/ WILL MEET C4Re&.Ur � ZOAlIX16 57AA/9APOS, ( -A N D5GA PI N G GA LGU L A TIoN S I�P�PoSE D PA P-I�I N G Lod' I TP-EE PEP- to 1iPAG E 5 = 2 I -f R-E E PER PE P-tM E TE P-' Q z 275 � � - 7 V 5 % of PA R-il4 N G AR -EA Fri L-A N DSe::�A PING W z 7--,)50 410.F7. x 5% 3--)7. 5 SGt.FT. L PPvVIDIS: C> -rf2-a e s ?oTA L z y o v t caOp SQ . F T- C� R-E E N A P� A ® O (Piv1J P PflP. R-EP MAPLE (� T F2- E E AL•L. TREES To A MiNlt.,IUM GAL•IPER AT -TIME of PLANTING. Q e; raj � n �r G � in N � T,e / P 6,5xiE-vA r/O,t/ -T T E Co TN ED / T/O IU = j AVFe46 E ,eATIE (/40 MAAU(/FACTU,e1VG - 3.82 PER 1000 3Q.Fr 00 ,7 253 50 . FT. I, 0oo x 3.8 2 = Z 5 7 VPD ' o N Z Nc o z �O 0 PR0� �tZOsloN AND �7EDIMENT e', -7RoL LEGEND OFRO M5,5C- SI LT FENCE � tP PP�PoSED INLET t' Po-TEG-Tlof�l \'J PP-oPosED oUTI✓E7 PP�TEGTIoN �� PROF�SED GONSTRcJG TIG�N E N 7r-LA N G E 2 0 V1. All work on this project shall conform to the latest editions of the Virginia Department of Transportation (VDOT) Road and Bridge Specifications, and Standards, The Virginia Erosion and Sediment Control Regulations and any other state, federal, or local regulations applicable. In the event of conflict between any of these standards, specifications or plans, the most stringent shall govem. V2. All construction shall comply with the lotest U.S. Deportment of Labor Occupational Safety dt Health Administration and VOSH Rules & Regulations. V3. When working on VDOT right-of-way, all traffic control, whether permanent or temporary, shall be in accordance with the current edition of VDOT's work area protection manual. Furthermore, all traffic control flaggers must be certified in accordance with VDOT's January, 1994 (or latest edition of) Rood k Bridge Specifications, Section 104.04-C. V4. Design features relating to construction or to regulation, control and safety of traffic may be subject to change as deemed necessary by VDOT. V5. Prior to initiation of work, Contractor shall be responsible for acquiring all necessary VOOT land use permits for any work on VDOT right-of-way. V6. If required by the local VDOT Residency Office, a preconstruction conference must be arranged and held by the engineer and/or developer with the attendance of the contractor, various County agencies, utility companies and VDOT prior to initiation of work. V7. Contractor shall notify the local VDOT Residency Office when work is to begin or cease for any undetermined length of time. VDOT will also require 48 hours notice for any inspection. vs. The Contractor will be responsible for maintaining adequate access to the project from the adjacent public roadway through construction and maintenance of a construction entrance in accordance with the Virginia Erosion do Sediment Control HandboaL Sec 3.02. Furthermore, access to other properties affected by this project shall be maintained through construction. DATE: 4/10/" - SCALE: 1' - -W - DESIGNBD BY: ato SH " 2 of 3 r-�