Loading...
HomeMy WebLinkAbout08-08 Sovereign Vill. Recrezation - Recreation Center - Red Bud - BackfilePlease note: The site plans associated with this file are located in the file room. I SITE PLAN TRACKING SHEET Date: LFile opened ;2,&0L/ Reference Manual updated/number assigned IL 4 D-base updated 42 68 File given to Renee' to update Application Action Summary CLOSE OUT FILE: 41aApproval (or denial) letter mailed to applicant/copy made for file i File stamped 'approved', 'denied" or 'withdrawn' 3 31 Of( Reference Manual updated VLL Lo K D-base updated 3 �08 Ilk -file given to Renee' for final update to Application Action Summary 9 (0-7 U lgevlCommoalTr�ekin; sFe u%Sht Plan Tta-b-9 WPd Revised 02M7103 SITE PLAN APPLICATION CHECKLIST The cbecklist shown below specifies the information -which is required to be submitted as part of the site plan application. The Department of Planning & Development will review the application to ensure that it is complete prior to accepting it If any portion of the application is not compl(,-te, it will be retarned to the applicant(s). (1) One (1) set of approved camment sheets are required from each relevant review agency prior to final approval of a site plan_ It is recommended that applicants contact the Department of Planning & Development to determine -which review agencies' are relevant to their site plan application_ A list of potentially relevant review agencies is shown below: Frederick County Department of Planning & Development Department of GIS (Geographic Information Services) ✓ Frederick County Sanitation Authority ✓ Frederick County Building Inspections Department Frederick County Department of Public Worlrs ✓ Frederick County Fire Marshal Frederick County Health Department C� Frederick County Department of Parks & R.ecreation Virginia Department of Transportation (VDOT) Y City of YTmnchester '( Town of Stephens City K Town of Middletown —� Frederick County / Winchester AirportAuthority (2) One (1) copy of the Site Plan application form. 1/ (3) Payment of the site plan review fee. 4 One 1 reproducible co of the Site Plan if required). O O eP PY ( q )• 0 m 00 cc 0 r r Y O O N ►i I►2'��l► �_ LA _ 'd cs [� O u,aC)3n DATE -- 1� () ?) NO. 10 J 0 RECEIVED FROM / G{4,d - ADDRESS G U �J- 1 / Q ac�i7 U i LLOth 0lU_ lX"V'-,& 02:1 LL V�d/v- 4 Acf <' " OLLARS S'Rl 0 5 5 Cl FOR RENT, "K ❑ FOR �J (��C . ��..C� �C ti/Y1l C. f (� Q i i(P CASH ACCOUO T AMT. PAID BALANCE DUE ORDER BY CD 140003032 ut �� w THIS DEED OF GIFT, made and dated this aT day of April, 2014, by and between °Q SOVEREIGN VILLAGE RECREATION CENTER, LLC, a Virginia limited Iiabiflty company party of the first part, hereinafter called the Grantor (indexed as Grantor), and N SOVEREIGN VILLAGE POOL, LLC, a Virginia limited liability company, party of the >� second part, hereinafter called the Grantee (indexed as Grantee), and SOVEREIGN VILLAGE o Q •s � ' 1 II HOMEOWNERS ASSOCIATION, INC., a Virginia non-profitnon-stock corporation, party s tl pp~gg of the third part, hereinafter called the Grantor (indexed as Grantor). RECITALS: s •• 6 R-l. Manning & Ross Developers, LLC, a Virginia limited liability company and the 93 i developer of Sovereign Village Subdivision in Red Bud Magisterial District, Frederick County, Virginia heretofore agreed by Proffers on rezoning to convey the hereinafter described property to Sovereign Village Homeowners Association, Inc.; and, R-2. Sovereign Village Homeowners Association, Inc., has requested that the conveyance be made to its wholly owned subsidiary known as Sovereign Village Pool, LLC, a Virginia limited liability company. NOW, THEREFORE in consideration of the love and affection and the benefits to accrue thereby, the Grantor, the Grantee, and the party of the third part, agree as follows: 1. That the recitals heretofore made are a substantive part of this Deed. $ 2. The Grantor does hereby grant and convey, with special warranty of title, Tinto the aN Grantee, in fee simple absolute, all of the following described tract or parcel of land, with mappurtenances thereunto pertaining, to -wit: m ? All that certain tract of land containing 3.03 acres, more or less, known as Sovereign g g b Village Section 3-A, Red Bud Magisterial District, Frederick County, Virginia and more X particularly described on the plat titled "Final Subdivision Plat Sovereign Village Section wW u = — 3 J: y 3-A" drawn by Richard A. Edens, L.S., Greenway Engineering, dated March 4, 2004 and am A > recorded as Instrument Number 040023123 in the Office of the Clerk of the Circuit Court of Frederick County, Virginia; AND BEING the same land conveyed to Sovereign Village Recreation Center, LLC, a Virginia limited liability company, by Deed dated July 1, 2009 ofrom Manning & Ross Developers, LLC a Virginia limited liability company, of record in the aforesaid Clerk's Office as Instrument Number 090007364. g o 2 M a The party of the third part, Sovereign Village Homeowners Association, Inc., hereby joins ._ o a eE a in this Deed to direct the Grantor herein, to convey the subject property to the Grantee, named Y herein above. Page l of 3 G:2014 Real Esl 62014-0001 Misc Real Fsmit%ovecip PooWcai of Gift 0 WITNESS the following signature and seal. SOVEREIGN VILLAGE RECREATION CENTER, LLC By: / (SEAL) Grc ry . B• croft, Me r/Managcr COMMONWEALTH OF VIRGINIA, CITY OF WINCHESTER, to -wit: The foregoing Deed was acknowledged before me this of day of April, 2014, by Gregory M. Bancroft, Member/Manager of Sovereign Village Recreation Center, LLC, a Virginia limited liability company. My commission expires 10 " 3 )' aO f Registration No. _ �, JI q L %0%ItMA IIt,l p�S�yj8N{G�?s0 !ti REGISTRATION Na': 311949 iNTYCoNm EVWS 10131/2017 14 `ARY P�00� �p�`• r� No Public Page 2 of 3 G: 2014 Real Estate12014-0001 Mlse Real Estate\Sovereign Pool\Deed orGin 0 cn cn WITNESS the following signature and seal. SOVEREIGN VILLAGE HOMEOWNERS ASSOCIATION, INC. By: (SEAL) 'fdfiii Rosenberger, President COMMONWEALTH OF VIRGINIA, CITY OF WINCHESTER, to -wit: The foregoing Deed was acknowledged before me this _ day of April, 2014, by John Rosenberger, President of Sovereign Village Homeowners Association, Inc., a Virginia corporation. My commission expires 1 0 - 31- of 01 `7 Registration No. 3 1 L 4� q oG 11, o"w0 ', RECZTRAT ON Na t 311949 —_ MYcomk E)CP4JEs. IM1/2011 "Mill 111110 L-1-9,10k4l" J�. .'*Nd1'"'M--) Notary Public vl Z(JINIA-. FR. DERICK COUNW SCl. This instrument of writing was produced to me on ��at and with certledgement thereto xntw was admitted to record.'fas imposed by See, S&I-f�" S nd 58.1-801 have been paid, if 'Clem Page 3 of 3 G: 2014 Real Gstntc\2014.0001 N isc Real FstatcVSovercign PoolkDeed of Gin L j \ , COU Y 'In `'Eb�.'," K or Department of'Planning and Development 5401/ 665-S651 FAX: 540/ 665-6395 April 1, 2009 Mr. Greg Bancroft Manning & Ross Developers 135 Featherbed Lane Winchester, Virginia 22601 RE: Approval of Revised Site Plan 408-08; Sovereign Village Recreation Center Revisions Property Identification Number (PIN): 651-I-13A-26A Dear Mr. Bancroft: The above -referenced site plan was approved on April 1, 2009 (sheets 1, 7, 7A, 8 and 13). This site plan is approved for revisions to Site Plan 408-08 which was approved on March 31, 2008. Specifically, this site plan is for revisions to the Sovereign Village Recreation Center to conform to the proffers of Rezoning # 14-08. Required site improvements include the following: • A 30 foot x 50 foot swimming pool, a 3,024sf pavilion with bath house areas, check in/storage area and four picnic tables. • Sidewalks and deck areas as indicated on the plan. • Construction of a parking lot with 39 spaces (including two handicap accessible), including curb and gutter, striping, handicap access and landscaping. • A wrought iron type fence surrounding the pool area. • A screened dumpster area. • Landscaping as shown on sheet 13 of the plan. All requirements of the Frederick County Zoning Ordinance have been met in the approved site plan, including review agency comments from all relevant review agencies. I am providing you with two (2) copies of the approved site plan. An approved copy of the site plan must be kept on the construction site throughout the development process. Once site development is complete, the owner(s) should contact this office to schedule an on -site inspection. Do not hesitate to contact me if you have any questions or concerns. Sincerely, andice E. Perkins, AICP Senior Planner Attachments CEP/bad cc: Jane Anderson, Real Estate Philip Lemieux, Red Bud District Supervisor Gregory Kerr and Christopher Mohn, Red Bud District Planning Commissioners Jane Anderson, Real Estate Commissioner of Revenue Greenway Engineering, Kurt Pennington 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 • 0 Eric Lawrence From: Matt Hott [mhott@co.frederick.va.us] Sent: Monday, July 21, 2008 8:35 AM To: Eric Lawrence; Jim Doran Subject: FW: Sovereign Village Recreation Center FYI -----Original Message ----- From: barbaralewis [mailto:ourpond@visual[ink.com] Sent: Monday, July 21, 2008 9:30 AM To: Matt Hott Subject: Re: Sovereign Village Recreation Center Mr. Hott: The Board of Directors of the Sovereign Village Homeowners' Association discussed your proposal at length at our last board meeting. We found nothing in it to cause us to change our position. Our letter reflects the kind of proposal we would be willing to take to our membership. Our main concern is and always has been with the size of the pool. The one in the proposal is still a full 30 feet short of the size your department determined would be adequate to serve our community. As for the recreation center, we have no complaints about the one as described in the original proffer. We consider it a very desireable feature of the whole center. We see no benefit in trading a private facility for the opportunity to use a public one. If Manning and Ross and the county are interested in the Sovereign Village Homeowners' Association accepting a recreation center, then they are going to have to make sure it contains enough desireable amenities to enable us to secure a membership adequate enough to operate it successfully. These proposed changes do nothing to further that end. Barbara Lewis ----- Original Message ----- From: Matt Hott To: ourpond(aNsuallink.com Cc: Eric Lawrence ; Jim Doran ; Matthew Hott Sent: Friday, July 18, 2008 11:38 AM Subject: Sovereign Village Recreation Center Ms. Lewis: Having received your letter dated July 14, 2008, 1 am somewhat confused as it does not reflect what we discussed on July 7, 2008. The developer Manning and Ross, and to my understanding, is legally bound by the approved proffered plans to construct a 3,000 s.f. Community Center, Pool and outdoor multi -court play courts. If the Homeowners Association would like for the developer to construct a larger Pool, the developer has supported constructing a 30' x 50' pool with a bath house and a multi -purpose court as a revision for the Recreation Center. This revision would eliminate the 3,000 s.f. Community Center. As we also discussed, the Parks and Recreation Department will have Community Center space as part of the 12 the Elementary School. In addition, if the Homeowners Association is further interested in this revision, the Association would have to agree to take ownership of the facilities when completed. The developers would need a le f er of support from the Homeowners Associa"ion for the revised Recreation Center by July 31, 2008. If a letter is not received, the developer will have to proceed as per the approved proffered plans. Please contact me if you should have any further questions. Matthew G. Hott Superintendent of Parks Frederick County Parks and Recreation 107 N.Kent St. Winchester, VA 22601 Phone: 540.665.5678 Fax: 540.665.9687 mhott(d,)co.frederick.va.us • LJ Eric Lawrence From: Matt Hott [mhott@co.frederick.va.us] Sent: Friday, July 18, 2008 10:39 AM To: ourpond@visuallink.com Cc: Eric Lawrence; Jim Doran; Matthew Hott Subject: Sovereign Village Recreation Center Ms. Lewis: Having received your letter dated July 14, 2008, 1 am somewhat confused as it does not reflect what we discussed on July 7, 2008. The developer Manning and Ross, and to my understanding, is legally bound by the approved proffered plans to construct a 3,000 s.f. Community Center, Pool and outdoor multi -court play courts. If the Homeowners Association would like for the developer to construct a larger Pool, the developer has supported constructing a 30' x 50' pool with a bath house and a multi -purpose court as a revision for the Recreation Center. This revision would eliminate the 3,000 s.f. Community Center. As we also discussed, the Parks and Recreation Department will have Community Center space as part of the 12 the Elementary School. In addition, if the Homeowners Association is further interested in this revision, the Association would have to agree to take ownership of the facilities when completed. The developers would need a letter of support from the Homeowners Association for the revised Recreation Center by July 31, 2008. If a letter is not received, the developer will have to proceed as per the approved proffered plans. Please contact me if you should have any further questions. Matthew G. Hott Superintendent of Parks Frederick County Parks and Recreation 107 N.Kent St. Winchester, VA 22601 Phone: 540.665.5678 Fax: 540.665.9687 mhott6jDco.frederick.va. us • 0 Eric Lawrence From: Matt Hott[mailto:mhott@co.frederick.va.us] Sent: Monday, July 07, 2008 10:24 AM To: 'Eric Lawrence' Cc: Jim Doran Subject: RE: Sovereign Village Rec Center Eric, Met with Ms. Lewis this morning and gave her the information and what we needed from the HOA. We are waiting on them to get back to us. They have an HOA Board of Directors meeting on Wednesday. Thanks! Matt. -----Original Message ----- From: Eric Lawrence[ma iIto: elawrenc@co.frederick.va.us] Sent: Friday, June 27, 2008 12:22 PM To: 'Jim Doran' Cc: 'Matt Hott' Subject: Sovereign Village Rec Center Hi Jim and Matt - Dave Madison just called me to follow-up on our discussion yesterday. Dave is Greg Bancroft's partner in Manning & Ross Development.. Dave said they are supportive to a slight revision to the rec center site which would result in a mult-purpose court, and bath house and 30 by 50 pool. They, obviously, would want to obtain a letter of support from the HOA if indeed the HOA preferred this revised rec facility. Dave would like to resolve the rec center design within the next month so that they might move forward with any design changes and construction. Dave places the responsibility to secure the HOA support with us. Dave is available should you wish to communicate with him and you move forward with the 'compromise' effort. Please keep me informed, as appropriate, on any progress you're able to achieve. Thanks Eric R. Lawrence, AICP Director, Department of Planning and Development Frederick County 107 N. Kent Street Winchester, VA 22601 540-665-5651 540-665-6395 (fax) elawrenc(o)co.frederick.va. us http://www co frederick va us/PlanningAndDevelopmenUPlanningAndDev.htm www.co.frederick.va.us AMENDMENT Action: PLANNING COMIVIISSION: Recommended Approval on November 3 1999 BOARD OF SUPERVISORS: Approved December 8, 1999 AN ORDINANCE AMENDING THE ZONING DISTRICT MAP REZONING 415-99 OF CHANNING DRIVE WHEREAS, Rezoning 915-99 of Channing Drive was submitted to rezone 354.3 acres from RA (Rural Areas) to RP (Residential Performance) and of22.0 acres from RA (Rural Areas) to B2 (Business General) with the proffers submitted by the applicant. This property is located on the north side of Senseny Road (Route 657), on both sides of Bean's Pond Lane, and adjacent to the Bedford Village, Apple Ridge, Senseny Glen, and Carlisle Heights subdivisions, and is identified with Property Identification Numbers 55-A-206, 209, 211, 213 & 65-A-30, 31, 39, 40 in the Stonewall Magisterial District. WHEREAS, the Planning Commission held a public hearing on this rezoning on November 3, 1999; and WHEREAS, the Board of Supervisors held a public hearing on this rezoning on December 8, 1999; and WHEREAS, the Frederick County Board of Supervisors finds the approval of this rezoning to be in the best interest of the public health, safety, welfare, and in conformance with the Comprehensive Policy Plan; NOW, THEREFORE, BE IT ORDAINED by the Frederick County Board of Supervisors that Chapter 165 of the Frederick County Code, Zoning, is amended to revise the Zoning District Map to change 354.3 acres from RA (Rural Areas) to RP (Residential Performance) and of 22.0 acres from RA (Rural Areas) to B2 (Business General), as described by the application and plat submitted, and subject to the attached conditions voluntarily proffered in writing by the applicant and the property owner. :, PDRes '"(-99 This ordinance shall be in effect on the date of adoption. Passed this 8th day of December, 1999 by the following recorded vote: James L. Longerbeam, Chairman W. Harrington Smith, Jr. Charles W. Orndoff, Sr. Aye Richard C. Shickle Aye Margaret B. Douglas Aye Robert M. Sager A COPY ATTEST Jo . Riley, Jr. Frederick County Administrator O:Vigcnda NCOMMENfS\REZONING\RESOLUrMChanningDrivc.RES.wpd PDRu 031-99 Aye Aye Aye Greenwav Engineering • �.1 - • Channing Drive Rezoning J! F f 55 0 CIIANNING DRIVE REZONING PROPERTY ID NUMBERS 55-((A))-206, 209, 211, 213 & 65-((A))-30, 31, 39, 39A, 40 Pursuant to Section 15.2 - 2296 Et Seq., of the Code of Virginia, 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned applicant hereby proffers that in the event the Board of Supervisors of Frederick County, Virginia shall approve rezoning application 915-99 for the rezoning of approximately 354.3 acres from the Rural Areas (RA) zoning district to the Residential Performance (RP) zoning district, and the rezoning of 22.0 acres from the Rural Areas (RA) zoning district to the Business General (132) zoning district, development of the subject property shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the applicant and such be approved by the Frederick County Board of Supervisors in accordance with said code and zoning ordinance. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and of no effect whatsoever. These proffers shall be binding upon the applicant and their legal successors, heirs, or assigns. ADZ TICLE I • PIMS'ED CONSTI? UCTION PLAN This article shall apply to the following parcels: Lynnehaven, L.C.: 55-((A))-206, and 65-((A))-30, 31 Giles Farm: 65-((A))-39, 39A Sheppard/Futral: 55-((A))-209, 211, 213 and 65-((A))-40 The total number of residential building permits that may be issued for any parcel within the subject property in combination with all other above -referenced parcels shall not exceed the following phasing schedule: Greenway Engineering 1 ju 9 5 [} PiG 1 J , } / Channing Drive Re -zoning Year Permits Issued to Date 2000 79 2001 158 2002 237 2003 316 2004 395 2005 474 2006 553 2007 632 2008 711 2009 790 2010 846 ADZ TICLE II: L YNNEHA VEN, L. C. This article shall apply only to those properties currently owned by Lynnehaven, L.C., property identification numbers 55-((A))-206, and 65-((A))-30, 31. The subject properties are more particularly described as all of the land owned by Lynnehaven, L.C. as recorded in Deed Book 843 at Pages 415, 418, and 424 and reported to collectively contain 91.4 acres. The conditions proffered are as follows: A) AREA ZONED RP - 81.4 ACRES 1. MAXIMUM DENSITY The total number of lots shall be limited so as not to exceed a 2.5 unit per acre density for the entire subject area. 2. PROHIBITED UNIT TYPES Townhouses, weak -link townhouses, and garden apartments, as defined in the Frederick County Zoning Ordinance, shall not be permitted. 3. PEDESTRIAN WALKWAYS Pedestrian walkways shall be provided in the master development plan in addition to required - sidewalks. Nature trails shall be constructed by the applicant in open space areas, in dedicated easements, and in tandem with the regional stormwater management network. Said trails shall also link to similar trail systems in adjacent housing developments, and shall be six feet wide with a wood chip or mulched surface. See Exhibit A attached. 2 Greenway Engineering • • 'Channing Drive Rezoning ,D i� I !�3 4. SOLID WASTE The owners of the subject property shall pay $100.00/mo. to Frederick County for the use of the solid waste facility located on the Greenwood Volunteer Fire Company property and serving the Greenwood/Senseny Road area. Said payment shall be made from the time Frederick County encumbers and signs a new lease for the expansion of said facility, or acquires another facility serving this general area, and shall continue for a period of ten years, or the term of said lease, whichever is less. B) AREA ZONED B2 - 10.0 ACRES 1. PROHIBITED USES The following uses shall not be permitted on the subject property: Description SIC Automotive dealers 55 Hotels and motels 701 Organization hotels and lodging 704 Golf driving ranges & miniature golf courses 7999 Self-service storage facilities --- Commercial batting cages operated outdoors --- 2. MAXIMUM BUILDOUT In the B2 area established by this rezoning, the maximum cumulative floor area of all buildings in said B2 area shall not exceed 100,000 square feet. 3. BUILDING FACADES Commercial structures within the proposed B2 area shall be faced with brick, drivet, or architectural block on three (3) sides. C) ENTIRE PARCEL 1. CHANNING DRIVE Channing Drive is a new major collector which will be constructed along the eastern boundary of the subject property. Channing Drive shall consist of an 80' dedicated right-of-way with two 12' lanes, along with any associated turn lanes required by the Virginia Department of Transportation. This thoroughfare will be built in sections as warranted by adjacent development. The following criteria establish when the property owner is required to extend Channing Drive: 3 Greenway Engineering • , _ ( r r Channing Drn,e Rezoning 15Dts9 a) Each subdivision plan for residential housing adjacent to a portion of Channing Drive that has not yet been constructed shall include the construction of the adjacent portion of said drive in the subdivision plan. b) The construction of the first section of Channing Drive, from Senseny Road to the proposed B2 area, shall be included in the first site plan submitted for the B2 area if said road section has not yet been constructed. c) All of Channing Drive from Valley Mill Road to Senseny Road shall be constructed, open for traffic and dedicated to Frederick County before the 475th residential building permit is issued for any of the parcels listed in Article I of this proffer. 2. TRAFFIC SIGNALS a) The installation of a traffic. signal at the intersection of Senseny Road and Channing Drive shall be included in the first site plan submitted for the B2 area, if a traffic signal has not yet been installed at said intersection should residential traffic meet signalization warrants. The developer agrees to enter into a signal agreement with VDOT prior to final site plan approval. b) The owners shall make a $25,000 cash contribution towards the installation of a traffic signal at the intersection of Greenwood Road (Route 656) and Senseny Road (Route 657). This contribution shall be made to the Virginia Department of Transportation upon their request and upon approval by said department for the installation of this traffic. signal. In the event a traffic signal is installed at said intersection before this contribution is made, the Virginia Department of Transportation may request the transfer of said contribution towards signalization at the intersection of Greenwood Road (Route 656) and Valley Mill Road (Route 659). The developer agrees to enter into a signal agreement with VDOT prior to final subdivision and/or site plan approval. 3. BRIDGE IMPROVEMENTS There is currently a one -lane bridge on Valley Mill Road where it crosses Abrams Creek. The owners of the subject property shall pay towards feasibility studies, engineering, or construction of improvements to this crossing. These monies, paid to Frederick County, VA, are to be set aside for said improvements, and may be considered by the county for matching funds. Said payments shall be $100.00 per residential lot, at the time the initial building permit is issued for said lot. The owner of the subject property shall be required to pay said monies until the Virginia Department of Transportation awards a contract for a two lane expansion and construction of these improvements on said bridge. 4. TURN LANES AND RIGHT OF WAY DEDICATION a) Right and left turn lanes shall be constructed on Senseny Road at the intersection with Channing Drive. Said lanes shall be constructed by the applicant at the time Chaining Drive is connected to Senseny Road. b) Right and left turn lanes shall be constructed on Channing Drive at the intersection with the main entrance road into the Lynnehaven subdivision. 4 Greemvay En, ineering • Channing Drive Rezonin; LJX9'511PG 1 550 c) The installation of a total of two turn lanes at the intersection of Senseny Road and Greenwood Road shall be included in the first site plan submitted for the B2 area, if two turn lanes have not yet been installed at said intersection. The necessity of said turn lanes, and their configuration will be subject to later review by the Virginia Department of Transportation. The owners of the subject property shall install said turn lanes or pay to the Virginia Department of Transportation up to $15,000 per turn lane towards the installation of said turn lanes. d) This paragraph shall apply to parcels 55-((A))-206, and 65-((A))-39, 39A: The first site plan submitted for either of these parcels which will result in more than 120,000 sf of commercial area for both parcels collectively shall result in an updated traffic study to determine if additional offsite improvements are required. Said traffic study shall require approval by the Virginia Department of Transportation. 5. DRAINAGE AND WETLANDS DEVELOPMENT Sediment forebays shall be constructed upstream of Twin Lakes in order to decrease the siltation of said lake and settle out man-made impurities. These sediment forebays shall be constructed in such a way as to encourage their development into a wetland with locally indigenous vegetation and wildlife. 6. MONETARY CONTRIBUTION a) Residential: In the event rezoning application �k5-99is approved for rezoning, the owners of the subject property will pay to the Treasurer of Frederick County; Virginia, $3,278.31 per residential lot prior to the initial building permit being issued for said lot. This per lot monetary proffer provides for: $2,694.11 for Frederick County Public Schools $539.07 for Frederick County Parks and Recreation $45.13 for Frederick County Fire and Rescue These payments are intended to offset the additional cost to Frederick County due to an increased demand on public services. b) Commercial: In the event rezoning application q5-99is approved for rezoning, the owners of the subject property will pay to the Treasurer of Frederick County, Virginia, $3,245.60 prior to the initial building permit being issued within the B2 zoned area. This monetary contribution is intended to offset the additional capital costs to Frederick County for fire -and rescue services. 5 Greenway Engineerin, Channing Drive Rezoning rq ARTICLE 111. ROBERT A. AES, et als • This article shall apply only to those properties currently owned by Robert A. Giles, et als, and Manning and Ross, LLC, property identification numbers 65-((A))-39, 39A. The subject property includes all of the land described as being owned jointly by Wanda G. High, Janita Giles, Robert A. Giles, and Richard F. Giles as recorded in Will Book 79, page 317, and in Deed Book 889 at Page 741. Said property is further described by a survey by Curtis L. McAllister dated February 13, 1990 and is reported to contain in aggregrate a total of 152.20 acres. The subject property includes all of the land now owned by Manning and Ross, LLC as recorded in Deed Book 948 at page 1760, and contains 51.0 acres. The conditions proffered are as follows: A) AREA ZONED RP - 140.2 ACRES 1. MAXIMUM DENSITY The total number of lots shall be limited so as not to exceed a 2.5 unit per acre density for the entire subject area. 2. PROHIBITED UNIT TYPES Townhouses, weak -link townhouses, and garden apartments, as defined in the Frederick County Zoning Ordinance, shall not be permitted. 3. RECREATION CENTER A community recreation center shall be included in the master development of the subject site. This recreation center shall have a floor area of at least 3,000 square feet and shall include a pool and an outdoor multi -purpose playing court; the facade shall be constructed of brick, wood product, masonry, or drivet. Said facility shall be open for membership by residents of all subdivisions resulting from this Channing Drive Rezoning and shall also be open for membership to all other area residents. 4. PEDESTRIAN WALKWAYS Pedestrian walkways shall be provided in the master development plan in addition to required sidewalks. Nature trails shall be constructed by the applicant in open space areas, in dedicated easements, and in tandem with the regional stormwater management network. Said trails shall also link to similar trail systems in adjacent housing developments, and shall be six feet wide with a wood chip or mulched surface. See Exhibit A attached. 5. SOLID WASTE The owners of the subject property shall pay $100.00/mo. to Frederick County for the use of the solid waste facility located on the Greenwood Volunteer Fire Company property and serving the Greenwood/Senseny Road area. Said payment shall be made from the time Frederick County encumbers and signs a new lease for the expansion of said facility, or acquires another facility serving this general area, and shall continue for a period of ten years, or the term of said lease, whichever is less. 6 Greenway Engineering IChanning Drive Rezoning +i1a5LtPC- 1 j:J! B) AREA ZONED B2 - 12.0 ACRES 1. PROHIBITED USES The following uses shall not be permitted on the subject property: Description SIC Automotive dealers 55 Hotels and motels 701 Organization hotels and lodging 704 Golf driving ranges & miniature golf courses 7999 Self-service storage facilities --- Commercial batting cages operated outdoors --- 2. MAXIMUM BUILDOUT In the B2 area established by this rezoning, the maximum cumulative floor area of all buildings in said B2 area shall not exceed 120,000 square feet. 3. BUILDING FACADES Commercial structures within the proposed B2 area shall be faced with brick, drivet, or architectural block on three (3) sides. C) ENTIRE PARCEL 1. MANNING DRIVE Channing Drive is a new major collector which will be constructed along the western boundary of the subject property. Channing Drive shall consist of an 80' dedicated right-of-way with two 12' lanes, along with any associated turn lanes required by the Virginia Department of Transportation. This thoroughfare will be built in sections as warranted by adjacent development. The following criteria establish when the property owner is required to extend Channing Drive: a) Each subdivision plan for residential housing adjacent to a portion of Channing Drive that has not yet been constructed shall include the construction of the adjacent portion of said drive in the subdivision plan. b) The construction of the first section of Channing Drive, from Senseny Road to the proposed B2 area, shall be included in the first site plan submitted for the B2 area if said road section has not yet been constructed. 7 Greenway Engineering • P'/ c -.n -- �— . Channing Drive Rezoning 9,�!}I 0 i :�3 c) All of Channing Drive from Valley Mill Road to Senseny Road shall be constructed, open for traffic and dedicated to Frederick County before the 475th residential building permit is issued for any of the parcels listed in Article I of this proffer. 2. STREETSCAPE The main entrance road into the residential subdivision established on the Giles Farm property shall have four travel lanes, and shall have a median strip at least 10 feet wide. Said roadway shall be streetscaped with deciduous trees (at least one tree per 80 lineal feet), ground cover and shrubbery as allowed by the Virginia Department of Transportation. 3. TRAFFIC SIGNALS a) The installation of a traffic signal at the intersection of Senseny Road and Channing Drive shall be included in the first site plan submitted for the 132' area, if a traffic signal has not yet been installed at said intersection should residential traffic meet signalization warrants. The developer agrees to enter into a signal agreement with VDOT prior to final site plan approval. b) The owners shall make a $25,000 cash contribution towards the installation of a traffic signal at the intersection of Greenwood Road (Route 656) and Senseny Road (Route 657). This contribution shall be made to the Virginia Department of Transportation upon their request and upon approval by said department for the installation of this traffic signal. In the event a traffic signal is installed at said intersection before this contribution is made, the Virginia Department of Transportation may request the transfer of said contribution towards signalization at the intersection of Greenwood Road (Route 656) and Valley Mill Road (Route 659). The developer agrees to enter into a signal agreement with VDOT prior to final subdivision and/or site plan approval. 4. BRIDGE IMPROVEMENTS There is currently a one -lane bridge on Valley Mill Road where it crosses Abrams Creek. The owners of the subject property shall pay towards feasibility studies, engineering, or construction of improvements to this crossing. These monies, paid to Frederick County, VA, are to be set aside for said improvements, and may be considered by the county for matching funds. Said payments shall be $100.00 per residential lot, at the time the initial building permit is issued for said lot. The owner of the subject property shall be required to pay said monies until the Virginia Department of Transportation awards a contract for a two lane expansion and construction of these improvements on said bridge. 5. TURN LANES AND RIGHT OF WAY DEDICATION a) Right and left turn lanes shall be constructed on Senseny Road at the intersection with Channing Drive. Said lanes shall be constructed by the applicant at the time Channing Drive is connected to Senseny Road. b) Right and left turn lanes shall be constructed on Senseny Road at the intersection with the main entrance road into the Giles Farm subdivision. 8 Greerrrva7� En�ineerin� • ��`/ 4 '� 1 (i^ ' i Ll 14 0 Channin; Drive Rezorrin; c) Right-of-way shall be dedicated to the Commonwealth of Virginia along the entire frontage of Senseny Road. Said right-of-way shall extend 40' from the existing road centerline. d) The installation of a total of two turn lanes at the intersection of Senseny Road and Greenwood Road shall be included in the first site plan submitted for the 132 area, if two turn lanes have not yet been installed at said intersection. The necessity of said turn lanes, and their configuration will be subject to later review by the Virginia Department of Transportation. The owners of the subject property shall install said turn lanes or pay to the Virginia Department of Transportation up to $15,000 per turn lane towards the installation of said turn lanes. e) This paragraph shall apply to parcels 55-((A))-206, and 65-((A))-39, 39A: The first site plan submitted for either of these parcels which will result in more than 120,000 sf of commercial area for both parcels collectively shall result in an updated traffic study to determine if additional offsite improvements are required. Said traffic study shall require approval by the Virginia Department of Transportation. 6. DRAINAGE AND WETLANDS DEVELOPMENT Sediment forebays shall be constructed upstream of Twin Lakes in order to decrease the siltation of said lake and to settle out man-made impurities. These sediment forebays shall be constructed in such a way as to encourage their development into a wetland with locally indigenous vegetation and wildlife. 7. MONETARY CONTRIBUTION TO OFFSET IMPACT OF DEVELOPMENT a) Residential: In the event rezoning application 915-9S1s approved for rezoning, the owners of the subject property will pay to the Treasurer of Frederick County, Virginia, $3,558.73 per residential lot prior to the initial building permit being issued for said lot This per lot monetary contribution provides for: $2,958.80 for Frederick County Public Schools $554.80 for Frederick County Parks and Recreation $45.13 for Frederick County Fire and Rescue These payments are intended to offset the additional cost to Frederick County due to an increased demand on public services. b) Commercial: In the event rezoning application A5-94s approved for rezoning, the owners of the subject property will pay to the Treasurer of Frederick County, Virginia, $3,898.68 prior to the initial building permit being issued within the B2 zoned area. This monetary contribution is intended to offset the additional capital costs to Frederick County for fire and rescue services. 9 Greenway Engineering Channing Drive Rezoning oK 9 5 �} i'i 15 5 5 (7WIA (,akes1 Over)ocX J ARTICLE IV: DRS. GEORGE SHEPPARD & ALLEN FUTRAL This article shall apply only to those properties currently owned by Drs. George Sheppard & Allen Futral, property identification numbers 55-((A))-209, 211, 213, and 65-((A))-40. The subject property is more particularly described as all of the land owned by Fu-Shep Farm Partnership as recorded in Deed Book 789 at Page 1022 and further described by a survey by Curtis L. McAllister dated February 13, 1990. The conditions proffered are as follows: 1. MAXIMUM DENSITY The total number of parcels shall be limited so as not to exceed a 2.2 unit per acre density for the entire collective area for parcels 55-((A))-209, 211, and 213, and a 2.5 unit per acre density for parcel 65-((A))-40. 2. PROHIBITED UNIT TYPES Townhouses, weak -link townhouses, and garden apartments, as defined in the Frederick County Zoning Ordinance, shall not be permitted. 3. PEDESTRIAN WALKWAYS Pedestrian walkways shall be provided in the master development plan in addition to required sidewalks. Nature trails shall be constructed by the applicant in open space areas, in dedicated easements, and in tandem with the regional stormwater management network. Said trails shall also link to similar trail systems in adjacent housing developments, and shall be six feet wide with a wood chip or mulched surface. See Exhibit A attached. 4. SOLID WASTE The owners of the subject property shall pay $100.00/mo. to Frederick County for the use of the solid waste facility located on the Greenwood Volunteer Fire Company property and serving the Greenwood/Senseny Road area. Said payment shall be made from the time Frederick County encumbers and signs a new lease for the expansion of said facility, or acquires another facility serving this general area, and shall continue for a period of ten years, or the term of said lease, whichever is less. 5. CHAINING DRIVE All of Channing Drive from Valley Mill Road to Senseny Road shall be constructed, open for traffic and dedicated to Frederick County before the 475th residential building permit is issued for any of the parcels listed in Article I of this proffer. 9 Greenrvay Engineering • 0 Channing Drive Rezoning 6. TRAFFIC SIGNAL The owners shall make a $25,000 cash contribution towards the installation of a traffic signal at the intersection of Greenwood Road (Route 656) and Senseny Road (Route 657). This contribution shall be made to the Virginia Department of Transportation upon their request and upon approval by said department for the installation of this traffic signal. In the event a traffic signal is installed at said intersection before this contribution is made, the Virginia Department of Transportation may request the transfer of said contribution towards signalization at the intersection of Greenwood Road (Route 656) and Valley Mill Road (Route 659). The developer agrees to enter into a signal agreement with VDOT prior to final subdivision and/or site plan approval. 7. BRIDGE IMPROVEMENTS There is currently a one -lane bridge on Valley Mill Road where it crosses Abrams Creek. The owners of the subject property shall pay -towards feasibility studies, engineering, or construction of improvements to this crossing. These monies, paid to Frederick County, VA, are to be set aside for said improvements, and may be considered by the county for matclung funds. Said payments shall be $100.00 per residential lot, at the time the initial building permit is issued for said lot. The owner of the subject property shall be required to pay said monies until the Virginia Department of Transportation awards a contract for a two lane expansion and construction of these improvements on said bridge. 8. DRAINAGE AND WETLANDS DEVELOPMENT Sediment forebays shall be constructed upstream of Twin Lakes in order to decrease the siltation of said lake and to settle out man-made impurities. These sediment forebays shall be constructed in such a way as to encourage their development into a wetland with locally indigenous vegetation and wildlife. 9. MONETARY CONTRIBUTION TO OFFSET IMPACT OF DEVELOPMENT In the event rezoning application #15-99 is approved, and the property is subsequently developed within an RP zone, the undersigned will pay to the Treasurer of Frederick County, Virginia $4,205.14 per residential lot prior to the initial building permit being issued for said lot. This per lot monetary contribution provides for: $3,568.94 for Frederick County Public Schools $591.07 for Frederick County Parks and Recreation $45.13 for Frederick County Fire and Rescue This payment is intended to offset the additional cost to Frederick County due to an increased demand on public services. Green may Engineering July 2, 1999 tanning Drive Rezoning i n r i{ 9 514 ;'t� I � r ARTICLE V: SIGNATURE'S The conditions proffered above shall be binding upon the heirs, executors, administrators, assigns and successors in the interest of the applicant and owner. In the event the Frederick County Board of Supervisors grants this rezoning and accepts the conditions, the proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County Code. Respectfully Submitted: Robert A. Giles, Executor, Giles Farm Commonwealth of Virginia, �1 U I Cit /Cou�� f 2��� To Wit: Q — g instrument was acknowledged before me this . _ day of .�;lz�✓''J1�'r,�, 1999 by The foregoing rns b � My Commission Expires I n Scully, LynnehaveWL.0 / Notary Public l IC , -4) Commonwealth of Virginia, City County�of „� __ o;ti�c _2. To Wit: 4h (� �( 1 The foregoing instrument was acknowledged before me this day of /, 1999 by t / Notary Public t My Commission Expires 12 0 Greenwny Engineering July 2, 1999 cunning Drive Rezoning Dr. George Sheppard Commonwealth of Virginia, `— Mamie Sheppard un�I. �of ����1 4 �J 0 AA C' [- City�-qo To Wit: n � The foregoing instrument was acknowledged before me this day of 1 Jt uo i.� :1, 1999 by l_— Notary Public My Commission Expires `c..��r ,�1 Q C n'c� l c Aklj Dr. Allen Futral Commonwealth of Virginia, C ,I etty Futral City/C�o y of 2 �� o n U(- (� To Wit: The foregoing instrument was acknow ledged before me this h day of Ot .�"kc i 1 , 1999 by U v n�ak c-0/U . / Notary Public My Commission Expires �I '�� 1 -�r IN , 13 0 Greenway Engineering Channing Drive Rezoning it Q r'' C- i .,� „ •� is f l •J —, .� Mvid Madison, Manager, Manning and Ross, LLC Commonwealth of Virginia, c� City( ounce of cZ A i C, I•" To Wit: The foregoing instrument was acknowledged before me this ) n , day of 1999 by i Notary Public My Commission Expires Manager, Manning and Ross, LLC Commonwealth of Virginia, ,I Q-�) CityI Coun3of i (\ 9 �J Q N To Wit: The foregoing instrument was acknowledged before me thus day of � 1 , 1999 by Notary Public My Commission ExpiresL\ f —r 1>1 , l 14 UD put 10 'A IQ ROPOSED TR A I L Fla 0 11 T E— NOTE: Proposed Trail Route locations shown hereon are general in nature. Exact locations will be determined at time of4p' / / final subdivision construction design. TRAIL RC 9, 1999 EXI =1000' G �-c Engineer. Surveyon Founded in 1971 •( • Request For Site Plan Comments Frederick County Department of Parks and Recreation Mail to: Frederick County Department of Parks and Recreation Attn: Director of Parks and Recreation 107 North Kent Street Winchester, VA 22601 (540)665-5678 Hand deliver to: 107 North Kent Street Second Floor Winchester, VA (540) 665-5678 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach one (1) copy of the site plan with this sheet. Applicant's Name: Greenway Engineering Address: 151 Windy Hill Lane Winchester Virginia 22602 Phone Number: (540) 662-4185 Name of development and/or description of the request: Sovereign Village -Recreation Center. Section 3A. Outlot A Location of property: Intersection of Rossmann Boulevard and Farmington Boulevard in Sovereign Village Subdivision Parks and Recreation Dept's Comments: GPp at-t-arhpd Parks and Recreation;Dept.,use only Date received Date revision, received Incomplete: Incomplete Date reviewed. Date reviewed Signature and Date Signature and Date (revis 20 • i Sovereign Village- Recreation Center, Section 3A, Outlot A Site Plan Comments January 29, 2008 iff suggests that the minimum size pool to serve this development be 30' X go' or 2,400 square feet. This plan is recommending a 600 sq. ft pool which is smaller than many back yard pools designed to serve a single family. • The recreation center appears to be nothing more than an empty box with a small office and some space that is intended to be locker rooms. This department recommends detailed information relative to the size, design and quality of the amenities to be included. • Deck space appears to be adequate Z J? M. Doran, Director and Recreation • 0 Request For Site Plan Comments Fredericic County Department of Parks and Recreation Mail to: Frederick County Department of Parks and Recreation Attn: Director of Parks and Recreation 107 North Kent Street Winchester, VA 22601 (540)665-5678 Hand deliver to: 107 North Kent Street Second Floor Winchester, VA (540) 665-5678 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach one (1) copy of the site plan with this sheet. Applicant's Name: Greenway Engineerin Address: 151 Windy Hill Lane Winchester Virginia 22602 Phone Number: (540) 662-4185 Name of development and/or description of the request: Sovereign Village -Recreation Center. Section 3A. Outlot A Location of property: Intersection of Rossmann Boulevard and Farmington Boulevard in Sovereign Village Subdivision Parks and Recreation Dept's Comments: Rep a t to rh rd Parlcs and Recreation Dept. use only Date received Date revision received _ Incomplete Incomplete Date reviewed Date reviewed Signature and Date Signature and Date (revisi Date approved 20 11 Sovereign Village- Recreation Center, Section 3A, Outlot A Site Plan Comments January 29, 2008 • Staff suggests that the minimum size pool to serve this development be 30' X 80' or 2,400 square feet. This plan is recommending a 600 sq. ft pool which is smaller than many back yard pools designed to serve a single family. o The recreation center appears to be nothing more than an empty box with a small office and some space that is intended to be locker rooms. This department recommends detailed information relative to the size, design and quality of the amenities to be included. • Deck space appears to be adequate M. Doran, Director and Recreation Control number SP08-0003 Project Name Sovereign Village Recreation Center Address 151 Windy Hill Ln. Type Application Site Plan Current Zoning' ' RA • 4 Automatic Sprinkler Systen5 , Yes - Other recommendation Emergpncy Vehicle Access Adequate t Siamese Location Not Idehtified Emergency Vehicle Access Comments access Comments r. I Additional Comments 00 Date received Date reviewed Date Revised 1 /10/2008 1 /14/2008 Applicant Greenway Engineering City State Zip Applicant Phone Winchester VA 0 540-662-4185 Tax ID Number Fire District Rescue District 65H-13A-26A 18 18 Election District Recommendations Red Bud Automatic Fire Alarm System Residential Sprinkler System Yes No Requirements Hydrant Location Adequate Roadway/Aisleway Width Adequate Fire Lane Required Yes Special Hazards No Plans Approved As Submitted. ,....... Plan Approval Recommended i Reviewed By Signature Yes J.Bauserman s. Titles -- — -- -.: — 'a •end � ,� w li L 46 COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 FAX: 540/665-6395 March 31, 2008 Mr. Kurt Pennington Greenway Engineering 151 Windy Hill Lane Winchester, Virginia 22602 RE, Approval of Site Plan 908-08; Sovereign Village Recreation Center Property Identification Number (PIN): 65JI-13A-26A Dear Kurt: The above -referenced site plan was approved on March 31, 2008. "file site plan is approved for the construction of a recreation center within the Sovereign Village Development. The center is located at the corner of Rossmann Boulevard and Farmington Road in the Red Bud Magisterial District. Required site improvements include the following: • 3,024square foot recreation center building, a 640 square foot pool, and a multi purpose court. • Construction of a parking lot with 39 spaces (including two handicap accessible), including curb and gutter, striping, handicap access and landscaping. • A screened dumpster area. • Landscaping as shown on sheet 13 of the plan. All requirements of the Frederick County Zoning Ordinance have been met in the approved site plan, including review agency comments from all relevant review agencies. I am providing you with five (5) copies of the approved site plan. Please forward these copies to the appropriate representative(s). Furthermore, advise the owner(s) that a copy should be kept for future reference, and an approved copy must be kept on the construction site throughout the development process. Once site development is complete, the Owner(S) should contact this office to schedule an on -site inspection. Do not hesitate to contact me if you have any questions or Sincerely, C'z Candice E. Perkins, AICP Senior Planner Attachments CEP/bad cc: Jane Anderson, Real Estate Philip Lemieux, Red Bud District Supervisor Gregory Kerr and Christopher Mohn, Red Bud District Planning Commissioners Jane Anderson, Real Estate Commissioner of Revenue Manning & Ross Developers, P.O. Box 272, Winchester, VA 22602 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 • 9 - -, GREENWAY ENGINEERING 151 Windy Hill Lane Founded in 1971 Winchester, Virginia 22602 TRANSMITTAL Project Name: Sovereign Village -Recreation Center File No: 2185 Date: Thu, Mar 27, 2008 To: FC Planning Attn: Candice Perkins Copied Delivery: F Fed Ex Other_ U.S. Mail From: Kurt Pennington/dlm GREENWAY ENGINEERING Phone: 540-662-4185 Fax: 540-722-9528 FvJ Courier E] Pick Up Urgent a For Your Review R] As You Requested 171 Please Comment Message Candice, Per your request, attached is the following: -7 copies of the approved site plan for final signature Again, thank you for your assistance with this project. Call with any questions. Hand Delivery and Pick Ups Only: Received by: Date: Time; Please Print Name: MAR 2 7 K03 • • A GREENWAY ENGINEERING, 1NC. 151 eshill lanJ e `J J Winchester, Virginia 22602 I ibunded in 1971 February 27, 2008 County of Frederick Department of Planning and Development 107 North Kent Street, Suite 202 Winchester, VA 22601 Attn: Candice Perkins Re: Sovereign Village Recreation Center Comment Response Letter Dear Ms. Perkins: We are in receipt of your comments elated February 20, 2008, and offer the following responses Comments from Frederick County Department of'Planning and Development: Comment I: Special Limited Poiver of Allorney Form. Please have the properly owner sign the attacked Sheci(il 1_iillitecl Power ofAttor)ley l,ol•i)l l)i-ioi' to jiu•tlier 1•ei,ieN' or cipproval. This fibrin Should be notarized and completed to grant the applicant (you) with authorization to represent Illenl for this site plait. Response: Special Limited Power of Attorney Form is being completed and will be forwarded upon receipt. Comment 2: Proposed Use. Oil the coversheet under lie proposed use, list the actual componenis of the facility. Response: Proposed component uses have been added. Comment 3: Setbacks. This use would fall under the selhacks specifiecl hider §165-65N (35', 1 ', 50 ). Response: Setback information has been revised. Comment 4: Parking. The size being used_ibr the pool parking allotment is only 600 s f (just the pool); as the patio is part of this area, it needs to be included in the parking tabulation. Also, there are 31 Spaces Shown oil the silo, not 32 as Indicated oil the coversheel. Response: Parking calculations have been revised to provide the total of 39 spaces for the site as was agreed upon 111 or inecting last week. We have shown a total 15 spaces for the pool area with no calculatloll. Engineers Surveyors Planners 1?11vironmental Scientists "telephone 540-662-4185 FAX 5,10-722-9528 File 'QlS5/KP/reb www.grccnwaycng.c om Co1111)le)1t J: ProfferedAllowed Users. Include the pl'(?jjel' ,5'tC!/C'Illell/ regarding the permitted users oj1his.jClcillty (ei,eryone III.Sithd isions res'!/hlllg jl'oln the Chat ning DrNe Rezoning and ,S1l1'1'O1/IlCllll �' ,S'1lbahYl.S'lOIl,SJ. Resl)ollsc: We have illClllded reCl'catlon center language from the al)l)I'ovccl 1)1'offcCs concerning the facilities use as well as sire, facade, and additional con-ilmlcllts. Comment 6: Adjoiners. Revise the adjoiner as indicated on sheel 2. Response: Adjoiner info has been revised. Comment 7: Building Facade. On the coi,ers'heel, proNde a statement regarding the type of fa(wde being used on the building per the rezoning proffers. Response: See response #5. Coll ment & Pool Fencing. It (appears that (! chain link mce is shown as the securll) jellcing around the pool. As the building fagade is required to be of a higher grade material, a chain link fence should not be used around the pool. Response: Pool fencing cletail has been revised. Chain link detail has been removed. Comment 9: Crosswalks. Provide crosswalks at each entrance as indicated on sheet 7. Response: Crosswalks have been addccl. Comment 10: Sidewalk. The sidewalk needs to be extended to the multi -else court and the pool as indicated on sheet 7. Response: Sidewalks have been added. Comment II. Legal References. Legal references need to be proi,ided fat' all easenlenls. Response: Legal referciiecs have been provicled. Comment 12: Dumpster Detail. A gate needy to be included on the dumpster detail onsheet 10. Response: Gate has been added to the dumpster detail. Comment 13: Lighting. ProI'Ide the location of anyfi-eeslanding of wall pack lighting proposed and provide a detail of the lighling in the site plan. Response: Lighting information and cletails have been added. Comment 14: Landscaping Calculations. On sheet 13, the parking space lolal.for the inferior landscaping does not match the actual Dumber of spaces. Response: Parking space information has been corrected and Calculation revisccl. Pile Q 1 SS/KP/reb 2 • Continent 1 J: Plant Size and Numbers. inn sheet 13, the evergreen shrubs need to be 36 cnl time o,planlnng. fldditionol shrubs need to be provided os mdnculed. Response: A 1.5' berm has been added along the west side of the parking area. The berm plus the 1.5', 3 gal. container plant will achieve the requircdl 36" height. Additional Sill-ubs have been added along the east side and will be planted at an elevation which is 1.5' higher than the parking lot surface. Comment 1 6: Landscnping Notes. (fin sheet 13, notes need to he provided that .tole (1) all planting shall conform with §165-36B of the Frederick County Zoning Ordinunc•e (Plant selection, planting procedure, and ln(nNencince), and (2) any plan! sithslitittlons must be approved in writing by the Frederick Connnly Plunning Depcnrtment. Response: Landscaping note has been added. Thank you for your assistance with this project. Contact us with any questions or need for additional information. Sincerely, Greenway � leering, Inc. Kurt Pennington Pile 112135/KP/h-eb i • 011 GREENWAY ENGINEERING [-Ti'! 2 151 Windy Hill Lane o 3 Founded in 1971 Winchester, Virginia 22602 TRANSMITTAL Project Name: Sovereign Village - Recreation Center File No: 2185 Date: Thu, Feb 28, 2008 To: FC Planniniz Attn: Candice Perkins Copied From: Kurt Pennington/reb GREENWAY ENGINEERING Phone: 540-662-4185 Fax: 540-722-9528 Delivery: F Fed Ex ❑ U.S. Mail F-71 Courier FJ Pick Up Other I=J Urgent F] For Your Review F-j As You Requested F] Please Comment Message Candice, Please find attached the following: -- 2 sets of revised Sovereign Village - Recreation Center - Sec. 3, Outlot A plans -- Comment Response Letter per your comments of February 20, 2008 -- Copy of FCSA Approval Letter -- Copy of Frederick County Fire Marshal Approval Letter Thank you for your assistance with this project. Contact us with any questions or need for additional information. Hand Delivery and Pick Ups Only: Received by: Date: Time: Please Print Name: FREDEAK COUNTY SANITATION AUGHORITY SITE PLAN REVIEW COMMENTS PO Box 1877, Winchester, VA 22604 315 Tasker Road, Stephens City, VA 22655 540.868.1061 Voice 540.868.1429 Fax Project di��/'��/�/Y V/LL445—C — /�'�' i�'iS� T/j' Q',CciY%L�ii Applicant Te �6— �/V l/S/!C/��a REVIEW STATUS review number correct & resubmit approved approved as noted attention k?1 A % AP,��iyNI416—TG,iV number of items to be corrected DRAWINGS send me by/� d 1. print of sheets 7 2. two CDs: each disc shall contain the following plan sheets 7 a. One CD (containing all of the above noted sheets) shall be in PDF format. Each sheet shall be in its own file and be in landscape orientation. Each file shall be titled with the project name and appropriate sheet number. b. One CD (containing all of the above noted sheets) shall be in DWG format. Each sheet shall be in its own file and each file shall be titled with the project name and appropriate sheet number. Each sheet shall (1) be in landscape orientation, (2) be without a border, (3) be in state plane coordinate system NAD 83, and (4) be compatible with AutoCAD 2006. c. Each of the two CDs shall be labeled with its format and project name, and placed in its own paper CD envelope. EASEMENTS Y I need a copy of the recorded onsite water and / or sewer easement(s). Y �I % I need a copy of the recorded offsite water and / or sewer easement(s). I need a copy of the recorded deed(s) of easement before service will be authorized. OTHER Y /t) This project also requires DEQ - Valley Region approval. 4411 Early Road, P.O. Box 3000, Harrisonburg, VA 22801 (540-5 74- 7814) Y /o This project also requires VDH — Lexington Office approval. 131 Walker St., Lexington, VA 24450 (540-463-7136) — Date: I FEB 2 6 200,8 John G. Whitacre - Senior Engineer a GREENWAY ENGINEERING t 151 Windy IIill Lane d Founded in 1971 Winchester, Virginia 22602 TRANSMITTAL Project Name: Sovereign Village -Recreation Center File No: 2185 Date: Tue, Mar 11, 2008 To: FC Planning Attn: Candice Perkins Copied Delivery: Fed Ex Odier_ [j U.S. Mail From: Kurt Pennington/dlm GREENWAY ENGINEERING Phone: 540-662-4185 Fax: 540-722-9528 Courier E1 Pick Up r-1 Urgent rvj For Your Review FVj As You Requested rj Please Comment Message Candice, Per your request, attached is the following: -Signed/notarized Special Limited Power of Attorney form We will send signature sets with the VDOT approval letter once we receive from VDOT. Thank you for your assistance. Call with any questions. Hand Delivery and Pick Ups Only: Received by: Date: Time: Please Print Name: RECEIVED H AR 0 5 2000 Special Limited Power of Attorney �11x County of Frederick, Virginia Frederick Planning Web Site: www.c0.[1-ederiA.VI. LIS Department of Planning & Development, County of Frederick, Virginia, 107 North Kent Street, Suite 202 Winchester, Virginia 22601 Phone 540-665-5651 Facsimile 540-665-6395 Planning office, County of Frederick, Virginia, 107 Kent Street, Winchester, Virginia 22601 Phone 540-665-5651 Facsimile 540-665-6395 Know All Men By These Presents: That I (We) (Name) Manning &. Ross Developers LLC-Gres; Bancroft Manudw, Member (Phone) (540) 723-9868 (Address) P. O. Box 27 Winchester, VA 22604 tile owner(s) Of all those tracts or parcels of land ("Property") conveyed to me (us), by deed recorded in the Clerk's Office of the Circuit Court of the County of Frederick, Virginia, by Instrument No. 040023123 on Page 0168, and is described as Parcel: 65I-I Lot: 26A Block:. 3A Section do hereby make, constitute and appoint: (Name) Greenway Engineering, hlc. Subdivision: (Phone) (540) 662-4185 (Address) 151 Windy Hill Lane Winchester VA 22602 To act as my true and lawful attorney -ill -fact for and ill Illy (OLH-) name, place and stead with full power and authority I (we) would have if acting personally to file planning application for my (our) above described Property, including: ❑ Rezoning (Including pt•offers) ❑ Conditional Use Permits ❑ Master Development Plan (Preliminary and Final) ❑ Subdivision ® Site Plan ❑ Comprehensive Policy Plan Amendment autliorlty to offer proffered conditions and to make amendments to My attorney -Ill -filet shall have the previously approved proffered conditions except as follows: This authorization shall expire one year from the day it is signed, or until it is otherwise rescinded of `tttltllll modified.N`' Missi O C.') ' � n �,;° In witness thereof, I �) have hereto set my (our) hand and seal this 1 day Of )�ar. , 200 g ,/�/ / COMMO NW GfiU U� GLCG� = OF mm Sio natul-C(S) COMMm 1�eS Imo( # 3119 State of Virginia lacounty County of w ln� , To -wit: Jo.3t- 1, L,oi5 C. %i4da Notary Public in and for thejurisdiction aforesaid, certify that the persons) who//�,AR1'11 signed to the foregoing instrument and who I (are) known to me, personally appeared before me and has acknowledged the same before me in the jurisdiction aforesaid this 74'1 clay of ar , 2008_. Notar My Commission Expires: Public 0 • i MAR 1 0 2(1Q�i A$� GREENWAY ENGINEERING 151 Windy Hill Lane Founded in 1971 Winchester, Virginia 22602 TRANSMITTAL Project Name: Sovereign Village -Recreation Center File No: 2185 Date: Thu, Mar 20, 2008 To: FC Planning Attn: Candice Perkins Copied Delivery: r Fed Ex ❑ Other_ ❑ U.S. Mail From: Kurt Pennington/dlm GREENWAY ENGINEERING Phone: 540-662-4185 Fax: 540-722-9528 [j Courier ❑ Pick Up ❑ Urgent❑ For Your Review a As You Requested IF Please Comment Message Candice, Per your request, attached is the following for your review: -1 copy each of the approval letters from FCSA, Public Works, and VDOT NOTE: We are still waiting Inspections approval and will forward to you once we receive Thank you for your assistance. Call with any questions. Hand Delivery and Pick Ups Only: Received by: Date: Time: Please Print Name: FREDEWK COUNTY SANITATION A#HORITY SITE PLAN REVIEW COMMENTS PO Box 1877, Winchester, VA 22604 315 Tasker Road, Stephens City, VA 22655 540.868.1061 Voice 540.868.1429 Fax Project Applicant REVIEW STATUS review number "� correct & resubmit approved as noted (a:pproved DRAWINGS send me by /69 /YeM 1. print of sheets &//� attention k (//?T number of items to be corrected 2. two CDs: each disc shall contain the following plan sheets '2-� 7 a. One CD (containing all of the above noted sheets) shall be in PDF format. Each sheet shall be in its own file and be in landscape orientation. Each file shall be titled with the project name and appropriate sheet number. b. One CD (containing all of the above noted sheets) shall be in DWG format. Each sheet shall be in its own file and each file shall be titled with the project name and appropriate sheet number. Each sheet shall (1) be in landscape orientation, (2) be without a border, (3) be in state plane coordinate system NAD 83, and (4) be compatible with AutoCAD 2006. c. Each of the two CDs shall be labeled with its format and project name, and placed in its own paper CD envelope. EASEMENTS Y 49 I need a copy of the recorded onsite water and / or sewer easement(s). Y Alp I need a copy of the recorded offsite water and / or sewer easement(s). I need a copy of the recorded deed(s) of easement before service will be authorized. OTHER Y 19 This project also requires DEQ - Valley Region approval. 4411 Early Road, P.O. Box 3000, Harrisonburg, VA 22801 (540-574-7814) Y /P This project also requires VDH — Lexington Office approval. 131 Walker St., Lexington, VA 24450 (540-463-7136) Date: fWA Co .GCJQ_ MAR 0 2008 John G. Whitacre - Senior Engineer ; _0 i)I.(' 07 • 0 March 12, 2008 Mr. Kurt Pennington Greenway Engineering 151 Windy Hill Lane Winchester, Virginia 22602 COUNTY of FREDERICK Department of Public Works 540/665-5643 FAX: 540/ 678-0682 RE: Revised Site Plan Comments — Sovereign Village — Recreation Center Frederick County, Virginia Dear Mr. Pennington: Upon review of the revised site plan dated February 28 2008, all of our previous comments have been addressed. Therefore, we recommend approval of the subject site plan. Sincerely, jc�- C. Joe C. Wilder Deputy Director JCW/mlr cc: Planning and Development file S O V EREIGNV ILLLAGERECCTR MAR 1 3 2008 107 North Kent Street • Winchester, Virginia 22601-5000 a\&J WD Sovereign Village - Recre9 Center 0 Page 1 of 2 Kurt D. Pennington From: Funkhouser, Rhonda [Rhonda.Funkhouser@VDOT.Virginia.gov] on behalf of Smith, Matthew, P.E. [Matthew.Smith@vdot.virginia.gov] Sent: Friday, March 14, 2008 7:27 AM To: Kurt D. Pennington Cc: Ingram, Lloyd; Baluch, Stephen; Hottle, Cathy; Eric Lawrence Subject: Sovereign Village - Recreation Center This is to acknowledge receipt of your revised plans with latest revisions dated March 11, 2008 for the referenced project. The plans appear satisfactory and are approved. Please advise the developer accordingly. Please provide 4 sets of approved construction plans with signed seal for VDOT distribution. I offer the following comments: . A preconstruction conference be held by the engineer and/or developer with the attendance of the contractor, various County agencies and VDOT prior to initiation of work. . Materials used and method of construction shall apply to current observed VDOT Road & Bridge Specifications applicable during construction of this development. . Our review and comments are general in nature. Should conditions in the field exist such that additional measures are warranted, such measures shall be completed to the satisfaction of the Department. . All drainage is to be carried within the right-of-way in ditch lines or gutters along the street to a pipe or drainage easement. . The contractor shall notify VDOT when work is to begin or cease for any undetermined length of time. VDOT will also require 48 hours notice for inspections. . The appropriate land use permits shall be obtained before any work is performed on the State's right-of-way. The permit is issued by this office and will require a minimum processing fee, surety bond coverage, and the salary & expenses of a State assigned Inspector. . Any entrances constructed from the referenced street(s) shall meet VDOT minimum standards. This is the developer's responsibility. . Any signs to be installed will be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and the approved plans. . I suggest any utilities and/or storm sewer placed within the proposed right-of-way be backfilled completely with C.R. Type 21-B Stone. This will greatly reduce the possibility of any pavement settlement. . A copy of any/all recorded plats of dedication for drainage easements or additional right- of-way required for implementation of this proposed project should be provided to VDOT prior to issuance of any land use permit. Dedication should be made to the Commonwealth of Virginia. . A copy of any/all RECORDED PLATS of dedication to public use (the County of Frederick) for drainage easements or additional right-of-way required for implementation of this proposed project should be provided for VDOT review prior to issuance of any 3/20/2008 J 4Sovereign Village - Recre* Center • Page 2 of 2 land use permit. Should you need additional information, do not hesitate to call me, or contact Mr. Stephen Baluch in our Winchester office at 535-1829. Matthew B. Smith, P.E. Residency Staff Engineer VDOT - Edinburg Residency 14031 Old Valley Pike Edinburg, VA 22824 Phone # (540) 984-5615 Fax # (540) 984-5607 3/20/2008 GREENWAY ENGINEERING 2 6 151 Windy Hill Lane Founded in 1971 Winchester, Virginia 22602 TRANSMITTAL Project Name: Sovereign Village -Recreation Center -Site Plan File No: 2185 Date: Wed, Mar 26, 2008 To: FC Planning From: Kurt Pennington/dim Attn: Candice Perkins GREENWAY ENGINEERING Copied Phone: 540-662-4185 Fax: 540-722-9528 Delivery: F Fed Ex ❑ U.S. Mail ❑ Courier FJ Pick Up Other Greg Bancroft to hand -deliver Urgent FvJ, For Your Review Etl] As You Requested ❑ Please Comment Message Candice, Per your request, attached is the following for your review and approval: -I copy of revised sheet 8 per Inspections comments dated March 21, 2008 (revision bubbled) -Copy of Inspections approval letter dated March 21, 2008 Thank: you for your assistance. Call with any questions. Hand Delivery and Pick Ups Only: Received by: Date: Time: Please Print Name: Request For Site Plan Comments Frederick County Inspections Department Mail to: Frederick County Inspections Department Attn: Building Official, 107 North Kent Street Winchester, VA .2260.1 . (540) 665-5650 ITand deliver to: 107 North Kent Street Fourth Floor Winchester, VA (540) 6.65-5650 r�. Please fill out the information as accurately as possible in order to. assist the agency with . their review. Please attach one (1) copy of the site plan with this sheet., Applicant's Name: Greenway En ineering Address: 151 Windy Hill Lane Winchester Virginia 22602 Phone Number;. (540) 662-4185 Name of development and/or description of the request: Soverei n Village -Recreation Center Section 3A, Outlot A Location of property: Intersection of Rossmann Boulevard and Farmington Boulevard in Sovereign Village Subdivision Inspections Department's Comments: k0Q c, l` IZ S�oP-A Inspections Department use only. Date received bafe ' is n1complete Date reviewed � AW tie Signature and Date Signature and Date evision iceived Date approved 3' incomplete .r MAR 2, 5 2008 15 al� (� �Y i Buildings shall comply with The Virginia Uniform Statewide Building Code and section 303 - A,Assembly Use Group of the International Building Code/2003. Other Code that applies is ICC/ANSI A117.1-03 Accessible and Usable Buildings and Facilities. Structural plans submitted for permit application shall be sealed by a Virginia Licensed Design Professional. Please note the requirements in Chapter 17 of BOCA for special inspection requirements on the type of structure.( Soils, concrete ect..). V/ated Pool area shall have two required exitZDoors shall swing in direction of egress. Public Swimming pools are required to be accessible and shall meet ANSI Al 17.1-03. Pool Barriers per section All required egress shall be Handicap Accessible. Handicap parking shown on site plan. Van accessible space as required. Curb ramp shall have a mien 36x36 landing as per ANSI See 406.10. Handicap parking signs shall meet USBC 1106.8 requirements. Access from parking to entrances appears to be aTicase ssible, however, % of slope across parking space and walk to building is not indicated. show spot elevations at the corner of the accessible parking and slopes on walks to building. Pool exit added. Please see attached for curb ramp. Question on point elevation on access aisle -1 eff between HC parking and elevation of ramp. March 12, 2008 Mr. Kurt Pennington Greenway Engineering 151 Wind), Hill Lane Winchester, Virginia 22602 COUNTY of hREI)ERICK Department of fuhlic Works 540/665-56413 FAX: 5=10/678-0682 RL: Revised Site Plan Continents — Sovereign Village — Recreation Center Frederick County, Virginia Dear Mr. Pennington: Upon review of the revised site plan dated February 28 2008, all of our previous comments have been addressed. Therefore, we recommend approval of the subicet site plan. Sincerely, 1 .Joe C. Wilder Deputy Director 'I C `V/11111' cc: Planning and Development file SOVEREIGNVILI_,LAGLRECCTR 107 North Kent Street o Winchester, Virginia 22601-5000 COU c f� <=' J R C�K Department of Planning and Development 540/665-5651 FAX: 540/665-6395 February 20, 2008 Mr. Kurt Pennington Greenway Engineering 151 Windy Hill Lane Winchester, Virginia 22602 Re: Review Comments for SP908-08; Sovereign Village Recreation Center Property Identification Number (PIN): 6SH-13A-26A Dear Kurt: Planning Staff has reviewed the above -referenced site plan to determine if administrative approval can be granted. At this time, administrative approval cannot be granted. This site plan is denied until the issues in this letter, as well as all issues of the other review agencies, have been adequately addressed. Please review Staffs comments listed below and then prepare a revised site plan which adequately addresses each concern. Review Comments: 1. Special Limited Power of Attorney Form. Pleasc have the property owner sign the attached Special Limited Power of Attorney Form prior to further review or approval. This form should be notarized and completed to grant the applicant (you) with authorization to represent them for this site plan. 2. Proposed Use. On the coversheet under the proposed use, list the actual components of the facility. 3. Setbacks. This use would fall under the setbacks specified under § 165-65N (35', 15', 50'). 4. Parking. The size being used for the pool parking allotment is only 600sf (just the pool); as the patio is part of this area, it needs to be included in the parking tabulation. Also, there are 31 spaces shown on the site, not 32 as indicated on the coversheet. 5. Proffered Allowed Users. Include the proffer statement regarding the permitted users of this facility (everyone in subdivisions resulting from the Channing Drive Rezoning and surrounding subdivisions). 6. Adjoiners. Revise the adjoiner as indicated on sheet 2. 7. Building Facade. On the coversheet, provide a statement regarding the type of fagade being used on the building per the rezoning proffers. 8. Pool Fencing. It appears that a chain link fence is shown as the security fencing around the pool. As the building fagade is required to be of a higher grade material, a chain link fence should not be used around the pool. 9. Crosswalks. Provide crosswalks at each entrance as indicated on sheet 7. 10. Sidewalk. The sidewalk needs to be extended to the multi -use court and the pool as indicated on sheet 7. 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 Mr. Kurt Pennington . Greenway Engineering RE: Site Plan 1108-08 February 20, 2008 Page 2 1 l . Legal References. Legal references need to be provided for all easements. 12. Dumpster Detail. A gate needs to be included on the dumpster detail on sheet 10. 13. Lighting. Provide the location of any fi-eestanding or wall pack lighting proposed and provide a detail of the lighting in the site plan. 14. Landscaping Calculations. On sheet 13, the parking space total for the interior landscaping does not match the actual number of spaces. 15. Plant Size and Numbers. On sheet 13, the evergreen shrubs need to be 36" at time of planting. Additional shrubs need to be provided as indicated. 16. Landscaping Notes. On sheet 13, notes need to be provided that state (1) all planting shall conform with §165-36B of the Frederick County Zoning Ordinance (Plant selection, planting procedure, and maintenance), and (2) any plant substitutions must be approved in writing by the Frederick County Planning Department. After you have revised the site plan, please resubmit two copies so that I may verify the information contained on the plan. I will need all approved review agency comment sheets and at least five copies of the final plan for approval. Comment sheets are required from the following agencies: the Virginia Department of Transportation, the Frederick County Inspections Deparhnent, the Frederick County Engineer, the Freclerick County Fire Altarsllal, and the Freclerick County Sanitation Authority. Do not hesitate to contact me if you have any questions or concerns regarding this letter. Sincerely, i Candice E. Perkins; AICP Senior Planner cc: Manning & Ross Developers, P.O. Box 272, Winchester, VA 22602 CEP/blid Attachment • • SITE PLAN APPLICATION Department of Planning and Development Use Only. Og�U� Date application received cQM10(1 Application ## ❑ Complete Date of Acceptance ❑ Incomplete Date of return 1. Project "fitic: 2. Location oi' Property 3. Property Owner: Address: Telephone 4. Applicant/Agent Address Telephone 540-662-4185 5. Designer: Address: Telephone: Contact: Sovereign Village — Recreation Center — Sec. 3, Outlot A North of Senseny Road (Rt.657) at corner of Rossmann Blvd. and l"armington Blvd. Manning & Ross Developers P. O. Box 27. Winchester, VA 22604 540-723-9868 Grecnway Engineering, Ing_ 151 Wincly I -Jill Lane Winchester, VA 222602 540-662-4185 Greenway IEnginccring, Inc. 151 Wincly Hill Lane Winchester, VA 22602 540-662-4185 Kurt Pennill ton 6 6. Is this an original or revised site plan? 7a. Total acreage of parcel to be developed: 7b. Total acreage of parcel: 8. Property Information: a) Property Identification Number: b) Current Zoning: c) Present Use: d) Proposed Use: e) Adjoining Property Use(s) fJ Adjoining Property Identification Number(s) g) Magisterial District(s) Original X Revised ❑ 0.5963 ac. 3.0279 651-140 3A))-26A RP Vacant Recreation Center RP 65H-13A-1, 65H-13A-2, 65H-13A- 3, 65H-13A-4, 651-1-13A-5, 651-1- 13A-6, 651-1-13A-7, 651-1-13A-8, 651-1-13A-9, 651-1-13A-10, 65-A- 39A, 65-A-39, 651-1-1-1-1, 651-1-1- 1-76, 651-1-1-1-64, 651-1-1-1-63, 651-1-1-1-62, 651-1-1-1-76A Red Bud I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to t e subm' f my_ site plan. Signature: c Date: 7 O b 7 0 • Request For Site Plan Comments Department of Planning and Development Mail to: Department of Planning and Development Attn: County Planner 107 North Kent Street Winchester, VA 22601 (540) 665-5651 Hand deliver to: 107 North Kent Street Fourth Floor Winchester, VA (540) 665-5651 Please I711 out the information as accurately as possible in order to assist the agency with their review. Please attach hvo (2) copies of the site plan with this sheet. Applicant's Name: Greenway Enginecring Address: 151 Windy Hill Lane, Winchester, Virginia 22602 Phone Number: (540) 662-4185 Name of development and/or description of the request: Sovereign Village -Recreation Center -Section 3A, Outlot A Location of property: Intersection of Rossmann Boulevard and Farmington Boulevard in Sovereign Village Subdivision Planning and Development's Comments: I'lannine and Development use only Date received Incomplete Date reviewed Signature and Date Signature and Date (revision Date revision received Date approved Incomplete Date reviewed 16 • GREENWAY ENGINEERING '�- 151 Wincly I -Jill Lane Founded in 1971 Winchester, Virginia 22602 TRANSMITTAL Project Name: Sovereign Village -Recreation Center File No: 2185 Date: Mon, Feb 11, 2008 To: 1'C P1a11nim" Attn: Copied Candice Perkins I. Coll,: Kllrt PC1111111gtO11/C11171 GREENWAY ENGINEERING Phone: 540-662-4185 1- ax: 540-722-9528 Delivery: F Fed Ex U.S. Mail Courier Pick Up Other FI Urgent [7 For Your Review M As You Requested F] Please Comment Message Candice, Attached is the following for your review and comments: -Site Plan Application -2 copies of the site plan -Application review fee check for $2,105.58 -Planning comment sheet NVe are in the process of obtaining all review agency comments and will forward to you when we receive. As always, thallk you for your assistance. Call with any questions. l-Find Delivery and Picic Ups Only: Received by: Date_ Please Print Name: Time: COUNTY of FREDERICK Parks and Recreation Department James M. Doran, Director 540-665-5678 FAX: 540-665-9687 www.co.fi-cdcrick.va.us c-mail: fcprd@co.f-rcderick.va.us Memo To: Eric Lawrence, Director Frederick County Plann- Department From: Matthew G. Hott, Superintendent of Parks Date: January 9, 2009 Re: Sovereign village Recreation Center After review of the site plan dated December 18, 2008 and received on January 7, 2009, the Parks and Recreation Department would offer the following comments. • The swimming pool size and decking would be of adequate size to serve the residents of the Sovereign Village, Lynnhaven and Twin Lakes Subdivisions. However, we are unable to comment on the pool design due to the lack of detailed information. • The support facilities would appear to be of adequate size. However, the developer may want to separate the "check -in "component from the "storage/ utilities and mechanical "functions and combine with the "bath house". • The developer may want to consider increasing the height of the fencing and the style of fencing to deter unauthorized usage of the facility. • The swimming pool design and support facilities should meet all Local, State and Federal Standards and Guidelines. 107 North Kent Street Winchester, VA 22601 COUNTY of FR-EDEP'JCK Department of Planning and Development 107 North (Cent Strect, Suite 202 (D Winchester, Virginia 22601-5000 "I'dephone: 540/665-5651 17AX: 540/665-6395 FAZYK, � �!=,ViR�Y�Jid��9fi�699 TO: CONMPANY: NnO nn c\� \1 4 ll)10 ss FAX 59C)-12-3-9Z(D9 Remarks: Date:24—PJ,cs0('i�lI,Cl Numuding cover sheet) 0L- From the desk of: C Q-9� � P, 1 x x x Immediate TX Result Report ( Jan. 9. 2009 3:15PM ) x 9 Fax Header) File Date Time Destination Mode TXtime Page Result User Name No. ---------------------------------------------------------------------------------------------------- Jan. 9. 3:15PM 540 723 9869 G3TES 0'22" P. 2 OK 8829 — Batch M Memory L Send later @ Forwarding E ECM S Standard D Detail F Fine Reduction x LAN —Fax + Delivery O RX Notice Req. A RX Notice Sovereign Village Home Owners Association ; PO Box 3478, Winchester, VA 22604 — sovereisnvillaoelhoa (»vahoo.corn = 540-667-6177 pEC .� 1i December 8, 2008 To Whom It May Concern: 1. The Sovereign Village Homeowner Association's Board of Directors has been briefed by the Frederick County Board of Supervisors, Frederick County Parks & Recreation, Frederick County Planning Conunission, and the community's developer (Manning & Ross) on proposed revisions to the original proffer for the Channing Land Bay. After considering the revisions, the SVHOA Board would like to state that it would not oppose any proffer revision that included the following points: Pool open by July 4, 2009 Manning & Ross will own and operate pool Luntil at least January 1, 2011 Right of First Refusal for ownership transfer given to SV HOA for $0 fee simple, no sooner than January 1, 2011. • Records & accounting of monies and time required to run pool given at offer time to SV HOA for review during 90 day decision period • .SV HOA will accept or decline ownership within 90 days of offer. $40-000-ftunds (1 year's estimated operating expenses) turned over with Pool ownership • 30'x50' Swimming Pool • Zero depth entry for Handicap ramp only • Pool depth, excluding ramp, to range from three feet to six feet. Includes (2) two 50' lap lanes • Saltw-a.ter-Filtration-System-- • Increase in decking size from original plan to a size appropriate to new pool size • (2) Two Bathhouses with showers, changing areas, toilets sirLks; appropriate to pool size • Covered breezeway with check in counter between bath houses • Wrou .It. Iron Fence around pool decking adjoining to bathhouses and entrance breezeway. • (4) Four no maintenance decking picnic tables on remaining 3000 sq ft foundation, unfenced ® Enclosed storage area for pool supplies No Recreation Center G No Multi -Purpose Court It should be noted that while the SVHOA Board believes the above points are the best that can be achieved through negotiation with all parties, there has not been adequate time to present and receive feedback on the points to the full membership of the SVHOA. The SVHOA board will summarize the points in the December issue of its newsletter that should arrive mid -December to the SVHOA members. It is recommended within that newsletter that if individuals do not agree, then they should exercise their right to be heard by their county government and make public coT.nment. The Sovereign Village Homeownier Association Board of Directors, Barbara Lewis Jay Moran Brit Reyes Rick Churchil Aaron Trompeter • • Document Approval Form - PLEASE REVIEW THE ATTACHED DOCUMENT. IF THIS DOCUMENT MEETS YOUR APPROVAL PLEASE INITIAL AND PROVIDE THE DATE AND TIME OF YOUR APPROVAL. IF THIS DOCUMENT DOES NOT MEET YOUR APPROVAL PLEASE PROVIDE COMMENTS AS TO WHAT YOU WOULD LIKE TO HAVE COMPLETED. INITIALS DATE & TIME Candj,c� � A Angie Mark Dana Eric Mike John Amber COMMENTS: Received by Clerical Staff (Date & Time): U:\Pam\Common\Document Approval Form.wpd