SUE PLAN CHECKLIST
The checklist below indicates all the information that needs to be submitted as part of the site plan
application_ All required information must be submitted priorto the final approval of any site plan. The
Department of Planning and Development will review the application to ensure that it is complete. If
any portion is not included or complete, the site plan application will not be accepted and returned to
the applicant(s).
Site Plan Package
1. One set of approved comment sheets are required from the following review
agencies prior to final site plan approval. It is recommended that applicants contact
the Department of Planning and Development to determine which review agencies
are relevant to their site plan application.
i i artrrie�n+�Bon-(�
ea epa ent
Fredenc k un a '--city a€ �nctiestec
Department of Planning and Development'� Z, o taphen"itl
inspections Department �(Gl��fl2' /� ��o "Middlafo�
Frederick County Engineer (Public works)
redenck County F'ue 141arshal ���/�v Soil Wafer Conservation M
f Mt
e �ajion
------Requestfor Name
I/� 2. One copy of the Site Plan application
�3 Five Copies of the Final Site Plan for approval
4. One reproducible copy of the Site Plan (if required)
--� 5. A 35mm slide of the Site Plan (if required)
SITE PLAN TRACKING SHEET
Date:
�� File opened
—b� Reference Manual updated/number assigned
k�l D-base updated
File given to Renee' to update Application Action Summary
rsc�
CLOSE OUT FILE:
iQ - -' Approval (or denial) letter mailed to appliccnt/copy made for file
ti z File stamped "approved", "denied" or °,v drawn"
Reference Manual updated
D-base updated
)Q . 2i File given to Renee' for final update to Application Action Summary
U \Cm0f\C. mm6ilc Plan Trwkingwpd
R—,ed 0}AWOI
FILE Corr
COUNTY of FREDERICK
Department of Planning; and Development
540/665-5651
FAX: 540/ 665-6395
October 9, 2002
Mr. Mark Yonteff
General Electric, L.L.C.
125 Apple Valley Road
Winchester, Virginia 22602
RE: Administrative Approval of Site Plan #32-02; General Electric Flazardous Materials Storage
Building; Property Identification Number (PIN) 63-A-57
Dear Mark:
The Frederick County Department of Planning and Development administratively approved the above referenced
plan on October 8, 2002. The site plan meets all requirements for development in the M 1 Zoning District.
Specifically, the site plan is approved for the construction of a 24.75' x 5.2' hazardous materials storage building
at the existing General Electric facility on Apple Valley Road. Fire lanes and concrete paving are being provided
as part of this development. In addition, appropriate separation from other structures is provided for safety
purposes.
I am providing you with three copies of the approved site plan. Please forward these to the appropriate
representative. Furthermore, please advise the owner that a copy should be kept for future reference, and an
approved copy must be kept on the construction site throughout the development process. Once site development
is complete, the owner should contact this office to schedule an on -site inspection. Please do not hesitate to contact
me if you have any questions.
Sincerely,
Jeremy F. Camp
Planner II
JFC/rsa
Enclosure
CC'. Jane Anderson, Real Estate
Patrick Barker, Economic Deyclopment Commission
W. Harrington Smith, Jr., Sliaxvnee Magisterial District Supervisor
em: Robert A. Morris, Shawnee Magisterial District Supervisor t
William Rosenberry, Shawnee Magisterial District Supervisor -
U: Verrmv%Slto Plan Rmewi100111001 archtveOE ShedU pprovall etterSPb31_01. wpd
107 North Kent Street • Winchester, Virginia 22601-5000
r
C�
Request For Site Plan Comments
Frederick County Engineering Department
Mail to:
Frederick County Engineering Dept.
Attn: Director of Engineering
107 North Kent Street
Winchester, VA 22601
(540) 665-5643
Hand deliver to:
107 N. Kent Street
Fourth Floor
Winchester, VA
(540) 665-5643
Please fill out the information as accurately as possible in order to assist the agency with their
review. Please attach two (2) copies of the site plan with this sheet.
Applicant's Name:
Address:
Phone Number:
WIA)C��5I-f". L'I", PLO&r 6e cCS4�,xj c c�
L
1 a s y y�llry X,-,;�✓-
uJUg 6o-1-
5tb ^ 5 -331 3 C
Name of development and/or description of the request: &S(- F(Ukl,n4(oL
sF-o�ia o (_ocvPR -5i7-e 0(4,�J —'
Engineering Department's Comments: Gee
2
Engineering Dept use only
Date received f �`� Date revision received Date approved t0
Incomplete Incomplete
Date reviewed & � D to reviewed
Signature and Date
Signature and Date (revision) t�
18
0
0
SX c
Frbderick County Fire and Remle
:
Departrneni.. .
"0
..:'
;:.Office,of.the IVWshal
A
VIRCiINIA
.Ei6B
:Plan Review aid COr rents
Control number
Date received Date reviewed Date Revised
SP02.0051
08/12/2002 08/13/2002
Project Name
Applicant
GE Flammable storage locker Winchester lamp plant
Address
City State tip Applicant Ph
125 Apple Valley Road
Winchester VA 22602 540-665.3313
Type Application Tax ID Number Fire District
site plan 71
current zoning
Recommendations
Automatic Sprinkler System Automatic Fire Alarm Syste
Yes Yes
other recommendion
Emergency Vehicle Access
Adequate
Siamese Location
Not Identified
Requirements
Hydrant Location
Adequate
Roadway/Aisleway Width
Adequate
Emergency Vehicle Access Comments
Fire lane marking and signage required.
Access Comments
Fire ri-2partment access must be maintained at all times.
Additional Comments
Rescue District
11
Election District
Shawnee
Residential Sprinkler System
No
Fire Lane Required
Yes
Special Hazards
Yes
Plan Approval Recommended Reviewed By signiture
Yes Title SS / ` '
t
Request For Site Plan Comments
Frederick County Inspections Department
Mail to:
Frederick County Inspections Dept.
Attn: Building Official
107 North Kent Street
Winchester, VA 22601
(540) 665-5650
Hand deliver to:
107 N. Kent Street
Fourth Floor
Winchester, VA
(540) 665-5650
Please fill out the information as accurately as possible in order to assist the agency with their
review. Please attach one (1) copy of the site plan with this sheet.
Applicant's Name
bj i lvc�N sit' 4 L 4 t,,
,UT , Cc Lt,54il"� ; ((<:�
Address: cJx tll
t c1 �ivc4�pST -r4 09 a � G,
Phone Number: `EC) - 66 S —3 �/3 C- L , yoN ems,
Name of development and/or description of the request: iiS c' Fi l I
SR�L(,6k'PP\ sL
Location of property: Ia w/e UAI(Rl
CCU h -P
InspectJions Department's Comments: Cohi"tSt. fs urf dx
17
AUG 12 2002
FREDERICK COUNTY
PURIC WORK & INSPECTIONS
Structure shall comply with The Virginia Uniform Statewide Building Code and Section 307, use
group H (High Hazard) of The BOCA National Building Code/1996. Structural plans submitted
for permit application shall be sealed be a Va. Licensed Design Professional. Please note the
requirements in Chapter 17 Special Inspections for this type structure, soils, concrete, bolts, ect..
Storage of flammable containers shall comply with The BOCA Fire Prevention Code and NFPA
30 Flammable and Combustible Liquid Code.
r
3•
1
2
Q
4
I;
G VEED
AUG 1 2 2002
qM= PI AN APPI ICATION
Project Title: 9&5 F FtiI FL 0`q11n sLG Sr-UM6C L ocArf!
Location of Property
S /��=
U 6 LL r_ y
o Q (4.
(street address)
W l w C� c-5 (-c'
U l K 6( Zvi /►
Go Q
Property Owner:
Address:
�v t �Uc rY �, U j re Gc tit A
Telephone:
66 "1- 5`7g0
Applicant/Agent A-t rI rl L< l/ G J
Address l a S AAa/P VafleY
t,u I L/C11 ,05 dGeq
Telephone: to G 33t 3
Designer: �� co R CO t 1 ed-s ivG r"("Li-e rqsly L,, vve0s t� �
Address: (FU-1 Liqt(P stcf c q ,),p
C v-da vcl , O IF( o ql � /1� .
Telephone:
Contact:
6
0
6a.
6b.
7a.
7b.
8.
a)
b)
c)
d)
e)
f)
g)
Is this a standard or 'minor' site plan?
Is this an original or revised site plan?
Total acreage of parcel to be developed:
Total acreage of parcel:
Property Information:
Property Identification Number:
Current Zoning:
Present Use:
Proposed Use:
Adjoining Property Use(s)
Adjoining Property Identification Number(s)
Magisterial District(s)
Standard Minor
Original Revised
r a *7 ,)- c R t--.s
(�365?
m, —
jtit - I
M —
I have read the material included in this package and understand what is required by the Frederick
County Planning Department. I also understand that all required material will be complete prior to the
submission of my site plan.
Signature:
Date:
WM
C9
C,,EI�/E
AUG 1 � 200?.
7
a
DEPT, OF PLANNINKEVELOPMENT.
•
Environmental
�a Products, Inc.
A Division of Qenko Products Inc.
5350 Evergreen Pkwy.
Sheffield Village, OH 44054
(440) 934-2180 Fax (440) 934-4052
www.benkoproducts.com
E-mail: benko@ix.netcom.com
DATE: July 8, 2002
ATTN: Mark Yonteff
END USER: General Electric, Winchester VA
PROPOSED SHIPPING DATE: 4-5 weeks
TERMS: N/30
DEPOSIT: None required
remit to: Environmental Products, Inc.
c/o Benko Products, Inc.
5350 Evergreen Parkway
Sheffield Village, OI-I 44054
SALES TAX: Customer is responsible for all applicable sales or use taxes; these taxes are
not included in the price quoted.
F.O.B.: Factory
TO BE SHIPPED VIA: Flatbed truck with tarps
EPI NON OCCUPANCY, PALLETIZED STORAGE BUILDING
MODEL EP1248
12 TOTE STORAGE BUILDING
FM APPROVED, 2-HR FIRE RATED
A freestanding relocatable 297"W x 62"D x 144"H chemical storage and containment
structure.
STANDARD FEATURES:
*Non-combustible exterior and interior walls consisting of 12 guage carbon steel
sheathing with 14 guage formed steel supports.
*Steel floor grating pallet platform in removable sections for easy access to the
spill containment sump. Supports 3501bs/sq.ft..
*490 gallon sump capacity surpasses regulatory and FM requirements. Sumps
located in mid shelf and bottom of building. Sump fabricated from
continuously welded heavy guage steel sheets. Lightweight steel
sump skins are not used. Mechanical fasteners are not used to connect the steel
sump to the sheet walls.
:':Four 2-hour fire rated swinging type doors. hlcludes heavy duty welded hinges,
truck type door locking mechanists, interior safety latch, outside lock and hold
open devices. Doors access the entire front of the building. Each tote is
accessible.
*Interior and exterior surfaces coated with a corrosion resistant two part epoxy
primer and tan corrosion resistant acrylic enamel. All metal to metal surfaces
prime painted prior to assembly for added weather protection. All exterior seams
caulked.
11
Quotation number E104702b
*Static grounding and bonding angles.
*Eight (8) foot grounding rod and cable shipped loose for customer installation.
*Hazard labeling.
*Forklift pockets and lifting lugs for unolading and placement.
*Passive ventilation in accordance with NFPA 30 to ensure six (6)air changes per
hour. Air inlet vents equipped with louvers and screens to provide air flow but
prevent bird and animal entry. Vertical shutter type 1 '/2 hour fire rated held
open by fusible links.
:1`Insulation and explosion proof electric heating system.
*Dry chemical fire suppression system with alarm.
TOTAL BUILDING PRICE: $18,120
____Freight charge to Winchester, VA: $1,475 ___
• 0
Pa letized Drum
Storage Systems
c i4 4.
77
1
t
Pallets easily accessible with forklift
Environmental
Products, Inc.,,,,
1
'
t
Safely Handle Hazardous Materials
and Increase Your Storage Area
Systems offer convenient and efficient forklift
loading and unloading. Capacities range from
1 pallet to 16 pallets and can be equipped for
single or dual sided access. Single or 2-tiered
storage is available. 2-hour fire rated and non -
fire -rated models available.
Standard Features
10 Rugged, welded steel construction
• First tier secondary containment
• Chemical resistant coated surfaces
• Forklift openings for ease of relocation
• Exterior grounding connection
• Hold-down brackets
• Custom colors available
• Passive ventilation
440-934-2180 Fax 440-934-4052 www.benkoproducts.com E-mail: benko@ix.netcom.com
•The Palletized Drum Storage System is comwly port-
able -requires no additional foundation or support. The
containment system features a heavy duty steel con-
-tainment floor with steel grating. The walls and roof are
constructed of welded steel sections for lasting strength
and durability. Features louvered openings for cross -
flow gravity ventilation and provisions for front or rear
fork lift access. Hold-down points furnished for areas
susceptible to high winds or seismic activity.
Containment Floor
• One-piece, factory tested leakproof construction,
certified and serialized.
Characteristics
Maximum Wind Load
20 PSF (90 mph)
Floor Loading (steel)
350 PSF live load capacity
Exterior Paint
Weather resistant
Interior Paint
Corrosion resistant
Roof Snow Loading
40 PSF static loading
Electrical System
All UL rated/classified
WARRANTY
Contact Environmental Products Inc. or your local repre-
sentative for details on our 2 year limited warranty.
Roof •
• Steel formed beams and roof panels
• Finished both sides
Walls
• Walls incorporate a welded steel panel design
• Finished both sides
Options Available
• UL listed, dry chemical fire suppression system
• Emergency eye/face cleansing system
• Exterior lighting-UL Listed
• Spill Detector
• Static bonding system
• Fiberglass floor grating -
• Additional protective coating in sump for enhanced
chemical security
• Heating or cooling capabilities
r't
Environmental
,yK Products Inc,
Division of Benko Products Inc.
5350 Evergreen Pkwy
Sheffield Village, OH 44054
m
RECEIVED
W G 12 2002
per, OF PLANNNGIDEVELOPMENT
Request For Site Plan Comments
Department of Planning and Development
Mail to:
Hand deliver to:
Department of Planning and Development
107 N. Kent Street
Attn: County Planner
Fourth Floor
107 North Kent Street
Winchester, VA
Winchester, VA 22601
(540) 665-5651
(540) 665-5651
Please fill out the information as accurately as possible in order to assist the agency with their
review. Please attach two (2) copies of the site plan with this sheet.
Applicant's Name
Address:
Phone Number:
Wr�c'tPs�fR L► p /���N' 6E Lt�Sjt�) tL(—
I kT- M011. U�u�j Road
w I V(Li-5rek vg Raze),
5-10 - , 6 s — 3313
Name of development and/or description of the request:
Location of pro erty: Ia S AlfCI -(" 1/0411'*Y )q0ac1, SO1) A St`le
S)v1u CFOK
Planning and Development's Comments:
Planning and Development use only
Date received
Incomplete
Date reviewed
Signature and Date
Signature and Date (revisi
Date revisiion received
Incomplete
Date reviewed
V tl IV
,UG 13 2002 16
PERT. OF FIANNNGIDEVELOINM .
I-
Date approved
RECEIVED
AUG 12 2002
DEFT, OF PIANMNG DEVELOPMENT;
T/ CONC. BASE
EL. SEE SITE PLAN
FIN. GRADE
VARIES
B❑TTOM ❑F FOOTING
TO BE 6' MIN.
BELOW FROST DEPTH
SCALE 1i2 " V -0'
4000 PSI CONC.
BROOM FINISH
FILL USED TO ATTAIN DESIRED SUBGRADE ELEVATIONS UNDER SLAB
SHALL BE CLEAN, FREE OF ❑RGANIC CONTAMINATION, PLACED IN 8' MAXIMUM LIFTS
(LOOSE THICKNESS), AND SHALL BE COMPACTED T❑ 100% ❑F STANDARD PROCTOR MAXIMUM
DENSITY (ASTM D698) .
•
RECEIVED
ALIG 12 2002
DEPL OF PLANNI NGIDEVELOPMENT