SITE PLAN CHECKLIST
The checklist below indicates all the information --that needs to be submitted as part of the site plan
application. All required information must -be submitted prior to the final approval of any site plan.
The Department of Planning and Development will review the application to ensure that it is complete.
If any portion is not included or complete, the site plan application will not be accepted and returned
to the applicant(s).
Site Plan Package
1. One set of approved comment sheets are required from the following review
agencies prior to final site plan approval. It is recommended that applicants contact
the Department of Planning and Development to determine which review agencies
are relevant to their site plan application.
2.
3.
4.
5.
Virginia Department of Transportation (VDOT)
-Frederick County Sanitation Authority
Department of Planning and Development
Inspections Department
Frederick County Engineer (Public Works)
\�,1y Frederick County Fire Marshal
Department of Parks and Recreation
One copy of the Site Plan application
Five Copies of the Final Site Plan for approval
One reproducible copy of the Site Plan (if required)
A 35mm slide of the Site Plan (if required)
County Health Department
City of Winchester
Town of Stephens City
Town of Middletown
Airport Authority
Soil & Water Conservation District
r
F. -
NOTES
File opened
' Reference Manual updated/number assigned
D-base-updated
jara File given to Renee' to update Application Action Summary
CLOSE OUT FILE:
Approval (or denial) letter mailed to applicant/copy made for file
File stamped "approved", "denied" or "withdrawn"
t/ Reference Manual updated
D-base updated
Q%.1 L, Gb File given to Renee' for final update to Application Action Summary
palo�
UACaro RCommon\G ENERIC.TRK
Raviscd I IrB8
COUNTY OF FREDERICK, VIRGI
DEPARTMENT OF INSPECTION
Caller Time Called
Phone No. __ _ Time Requested
Received By
PERMIT HOLDER NAME
FIT. NO. Lot No. SEC. No
STREET NAME
DIRECTIONS - - -
DISTRICT
PERMIT FOR: -- - -- - --
Tyne of Inspection
•
Date Called
Date Requested
Date of Inspection
SUBDIVISION
BUILDING NO. _
PLUMBING NO. -_-
ELECTRICAL NO.
MECHANICAL NO.
SIGN NO.
Residential _ _
_ --
Commercial
-- --_ -
Footers - _ ___
Setbacks: FR
BK
L R
Slab
Draintile
Gas Fire -up
Final Electrical
Water
Service
Framing
Final Mechanical
Sewer
Rough Electric
Final
Site Plan
Rough Plumbing
Rough Mechanical
Final Building
Fire Marshall - -
Groundworks
Gas Piping/Test
Final Plumbing
Special/Complaint
Other:
-- --- -
Time In: _ _-
-_ _ _ Temperature
-
Cut in No. —
Time Out: __---__
- - Weather
-----
Results: Approved - --- - Rejected
Comments: - - - - - _ -- -
Signature _ Date_-
• 0
COUNTY of FREDERICX
Department of Planning and ;Development
540/665-5651
FAX: 540/ 673-0682
January 11, 2000
Mr. David Franks, P.E.
Greenway Engineering
151 Windy Hill Lane
Winchester, Virginia 22602
RE: Approval of ZM Sheetmetal, Inc. Building Expansion, Site Development Plan 962-99
Property Identification Number (PIN): 43-19-9
Dear David:
The Frederick County Department of Planning and Development administratively approved the above -
referenced site plan on January 10, 2000. This site plan, for the addition of 20,425 square feet of
manufacturing space to the existing ZM Sheetmetal, Inc. facility, meets all County requirements for
development within the M1 (Light Industrial) Zoning District. The expanded facility will be served by six
(6) loading spaces and a paved parking lot consisting of ninety (90) parking spaces, of which four (4) will
be designed for handicap accessibility. The site plan also delineates the provision of perimeter parking lot
landscaping comprised of shade trees and evergreen hedgerows.
I have provided you with several copies of the approved site plan. Please forward these approved plans
to the owner and advise the owner to keep an approved copy for their files. Furthermore, the owner should
ensure that an approved copy is maintained on the construction site throughout the development process.
Once site development has been completed, the owner should contact this office to schedule an on -site
inspection.
Please do not hesitate to contact me should you have any questions or need for elaboration regarding this
letter.
Sincerely,
Christopher M. Mohn
Planner H
CMM/kac
Enclosure
cc: Sydney A. Reyes, Gainesboro District Supervisor
June Wilmot, E.D.C.
Jane Anderson, Real Estate
Joe Wilder, Public Works
U:IChrialcommonlSite Mnlm shcrlmeta! ff67-99.apr.,,pd
107 North Xent Street o Winchester, Virginia 22601-5000
Request for Site Plan Comments
Virginia Department of Transportation
Mail to: Hand deliver to:
Virginia Department cf Transportation Virginia Department of Transportation
Attn: Resident Engineer 1550 Commerce Street
14031 Old Valley Pike Winchester, VA
Edinburg, Virginia 22824 (540) 722-3460
(540) 984-5600
Please fill out the information as accurately as possible in order to assist the Virginia Department
of Transportation with their review. Please attach five (5) copies of the site plan with traffic
generation data and drainage calculations with this sheet.
Applicant's Name
Address:
2 2cC. Z.
Phcne Number. 54C r Z l �'-
Name of develcoment and/or description of the request:
Location of prcperty: L C T (-i
Virginia Department of Transportaticn's Comments: No objection to site plan. If any
work is performed on the State's rioter-nf—.,ay, n land use permit will need to be applied
for and issued to cover said work. The permit is issued by this office and requires
a tee and surety bond coverage. Please see attached letter dated 12 30 99.
VDOT use only
Date receiied t t ! 22 ! 9 9
Incomplete t 2 2
Date revie,%N*edaW 4q
Signature and Date _
Signature and Date (revision)
Date revision received Dat: approved 12 f -3 iQ 9
Incomplete �-�
Date reVieWed j �1- C,
i L
• � ��.1 .� Imo} �.
,ram.
01. Z
j
IN
--IARLES 0. 140TTINGHAM
C0N1'y10N'VV'E.kLTH of vIRQJ-,LIA
DEPARTMENT OF TRANSPORTATION
EDINBURG RESIDENCY
.,.ERRY J -',PD
December 30, 1999
Mr. David Frank, D.S.
c/o Greenway Engineering
1 5 1 Windy Hill lane
Winchester, VA 22602
Dear David:
Ref: ZM Sheetmetal, Inc.
Stonewall Industrial Park
Route F-732 (Lenoir Drive)
Frederick County
We have received your revised site plan dated 12/20/99 (received 12/27/99) for the
referenced project. It appears all of our earlier review comments have been satisfactorily
addressed. Please advise the owner of our approval. Also please provide five (5) sets of
approved construction plans with signed seal for VDOT distribution.
The appropriate land use permit may now be applied for to cover work within the Route F-
732 right-of-way. The permit is issued by this office and will require a minimum processing
fee, surety bond coverage, and the salary & expenses of a State assigned Inspector.
Once satisfactory application has been made, a permit will normally take approximately
thirty days to process and issue. Should you have any questions, do not hesitate to call.
Sincerely,
�d
Barry J. Sweirzer, Tuns. Roadway Engineer
For: Steven A. Melnikoff, Transportation Engineer
BJS/vcz
Enclosure
xc: Mr. D. A. Heironimus
Mr. Kris Tierney
WE KEEP VIRGINIA MOVING
•
11
Request For Site Plan Comments
Frederick County Inspections Department
Mail to:
Frederick County Inspections Dept.
Attn: Building Official
107 North Kent Street
Winchester, VA 22601
(540) 665-5650
Hand deliver to:
107 N. Kent Street
Fourth Floor
Winchester, VA
(540) 665-5650
Please fill out the information as accurately as possible in order to assist the agency with their
review. Please attach one (1) copy of the site plan with this sheet.
Applicant's Name: t-r'r ti r,, r IC-1n1r t:,;
Address:
Phone Number: = �;
Name of development and/or description of the request:_-
r ELF, - ti 'x i . " - • ; J -
Location of property L - _ :� F . c_
1
Irspecticns Department's Comments:
Inspections Dept use only
Date received
Incomplete
Date revievied
Signature and Date _
Signature and Date (revision)
Comments are on the back of this form
Date revision received
Incomplete
Date reviewed r.
Date approved
17
1
Addition shall comply with the Virginia Uniform Statewide Building Code and section
306, use group F (Factory) of The BOCA National Building Code/1996. Other codes that
apply are CABO A117.1-92 Accessible and Usable Buildings and Facilities.
Please confirm compliance with table 507 of BOCA for height and area limitations for
the type of construction. Section 507 Unlimited Areas will not apply with less than
30' to the property line however section 503.1.1 Special Industrial Occupancies may
apply. Please confirm.
Section 1110.2.1 exceptin #1 shall apply for renovation and additions.( The AAA_ 200
rule)
Required egress is not shown at htis time and shall be accessible. (can use area of
refuge on exterior landings with 4' wide stairways.)
Please note section 108.10 Asbestos inspection and Chapter 17 special inapections
that apply.
r • r
Request For Site Plan Comments
Frederick County Sanitation Authority
Mail to:
Frederick County Sanitation Authority
Attn: Engineer Director
P.O. Box 1877
Winchester, VA 22604
(540) 868-1061
Hand deliver to:
315 Tasker Road
Stephens City, VA
(540) 868-1061
Please fill out the information as accurately as possible in order to assist the agency with their
review. Please attach two (2) copies of the site plan with this sheet.
Applicant's Name: ,F'�c,ti`wA/ i✓N�iti'C �������
Address: L-A,-vE
y,,a 2 2 &, - z—
Phone Number: 54C - Z 4/,55
Name of development and/or description of the
request:
7l A-S' C - N 7704
N� �r rc-Fi ti�F�1
Location of property: L07- q
2 Lin
Frederick County Sanitation Authority's Comments:
Y .' • •
lot\ GREENWAY ENGINEERING
151 'Windy Hill Lane
'Winchester, Virginia 22602
T R A N S M I T T A I.
Proiect lame: ZM Sheetmetal, Inc
File No.: 0053
Date: December 10, 1999
To: Frederick Co Sanitation
Attn: John 'Whitacre
From: David Frank
GREENWAY ENGINEERING
Phone: 540-662-4185
Fax: 540-722-9528
Copied:
F:emarks f-" Urgern For Your Review i� As You Requested
Message:
John,
Enclosed are 2 sets of the revised site plan for second submittal.
Call with anv concerns.
/Q r4'i T S — SETS
f Please Comment
Engineers Surveyors
Telephone 540-662-4185 FAX 540-722-9528
greenwayOvisual link.com
COUNTY OF FREDERICK, VIRGINIA
FIRE MARSHAL'S OFFICE
LAND DEVELOPMENT COMMENTS
Control No. SP99-0061 R Date Received 12/10/99 Date Reviewed 12/14/99
Applicant Greenwav Engineering Plan Rev. Date:
Address 1 5 1 Windy Hill Lane
Winchester, Va. 22602
Project Name Z&Ivl Sheet Metal Phone No. 540-662-4185
Type of Application Site Plan Current Zoning M-1
1st Due Fire Co. 13 1st Due Rescue Co. 13 Election District Gainesboro
Tax I.D. No. 43-19-9
RE COM'NIENDATIONS
Automatic Sprinkler SystemXX Residential Sprinkler System
Automatic Fire alarm SystemXX Other
REQUIREMENTS
Emergency Vehicle Access
Adequate XX Inadequate Not Identified
Fire Lanes Required Yes XX No
Comments Requirements of Frederick County Chapter Code Chapter- 90.
Roadway/Aisleway Widths Adequate XX Inadequate Not Identified
Special Hazards Noted Yes No XX
Comments
Hydrant Locations Adequate XX Inadequate Not Identified
Siamese Location Adequate Inadequate Not Identified XX
Additional Comments Attached? Yes No XX
Plan Approval Recommended? Yes XX No
Title Signature >�
•
January 7, 2000
Mr. David Frank
Greenway Engineering
151 Windy Hill Lane
Winchester, Virginia 22601
RE: Z & M Sheet Metal, Inc. - Site Plan Comments
Stonewall Industrial Park
Frederick County, Virginia
Dear David:
CO' JNTY of FREDERICK
Department of Public Works
540/ 665-5643
FAY: 540/673-0632
Upon review of the revised site plan dated January 5, 2000, it appears that all of our
comments have been addressed.
Therefore, we recommend approval of the subject site plan.
JCW/kch
Sincerely,
4C�Lc -)k'U-00Z/)
Joe C. Wilder
Engineering Technician
Department of Public Works
cc: Frederick County Planning Department
file
1
107 North Kent Street o Winchester, Virginia 22(01-5000
GREENWAY ENGINEERING
151 Windy Hill Lane
Winchester, Virginia 22602
rvmded m 19, I
T R A N S M I T T A L
Project Name: ZM SHEETMETAL
File No.: 0053
Date: JANUARY 7, 2000
To: FREDERICK COUNTY
DEPARTMENT OF PLANNING
Attn: CHRIS MOHN
From: DAVID L. FRANK
GREENWAY ENGINEERING
Phone: 540-662-4185
Fax: 540-722-9528
Copied: 5 COPIES OF FINAL SITE
PLAN, APPROVAL FORMS
Remarks: r- Urgent I— For Your Review r As You Requested r Please Comment
Message:
CHRI S,
I AM FORWARDING TO YOU THE AGENCY APPROVAL NOTICES AND FIVE
COPIES OF THE FINAL ZM SHEETMETAL SITE PLANS. IF THERE ARE ANY DETAILS
THAT I HAVE FORGOTTEN PLEASE LET ME KNOW. I BELIEVE THAT THE
CONTRACTOR IS PLANNING TO PULL THE BUILDING PERMIT AS SOON AS THEY
CAN. THANKS FOR ALL THE HELP ON THIS PROJECT THE LAST COUPLE OF
MONTHS.
DAVID FRANK
Engineers Surveyors
Telephone 540-662-4185 FAX 540-722-9528
greenway@visuallink.com
•
0
CHARLES D. NOTTINGHAM
COMMISSIONER
COMMONWEALTH of VIRCjINIA
DEPARTMENT OF TRANSPORTATION
EDINBURG RESIDENCY
14031 Old Valley Pike
Edinburg, VA 22824
(540) 984-5600 / (5�0)� 07 - fax
December ,
Mr. D.L. Frank
c/o Greenway Engineering
151 Windy Hill Lane
Winchester, VA 22602
Dear David:
JERRY A. COPP
RESIDENT ENGINEER
Ref: ZM Sheetmetal, Inc. Lot 9
Stonewall Industrial Park
Rte. F-732 (Lenoir Drive)
Frederick County
A VDOT review has been completed on the preliminary site. plan dated 11/99 (reed
11/22/99) for the referenced project.
Our initial comments come as the result of a field visit to the site and VDOT road
number F-732 (Lenoir Drive).
A pattern of irregular radial curb offsets, primarily due to revisions in VDOT entrance
standards, was discovered on the entire section of the road in the site vicinity.
Our conclusion reached after discussion of the existing condition is to permit the
construction of this site entrance at the curb offset dimensions shown on the plan.
Evidence of water ponding at existing entrances along the roadway elevates VDOT
concern for drainage flows. They should display the establishment of positive flow
toward major drainage structures and natural drainage channels. Our concern for this
item on this site is the potential of excessive spread at the southwest corner of the
entrance.
The following comments are enumerated and shown in red on plan sheets.
Sheet 2 of 4
1. Drainage flow arrows should be shown to illustrate direction and positive drainage
on site and for VDOT roadway and ditches. Please provide additional elevation
spots along bottom of existing and proposed ditches to illustrate positive drainage.
WE KEEP VIRGINIA MOVING
Mr. D.L. Frank
AM Sheetmetal, Inc. Lot 9
December 3, 1999
Page #2
2. The entire stippled area (portion of existing entrance) within right-of-way should be
milled/scarified and overlain or restoration of entrie pavement structure should be
accomplished at direction of VDOT inspector. A detail of pavement structure to be
applied to that area should be shown in the event restoration is necessary. Also,
the CG-6 should be shown.
3. The sight distance should be shown along with distance to nearest VDOT road inter-
section and posted speed limit. The VDOT Route number should also be shown.
4. A half Typical Section should be provided, an example is attached.
Sheet 3 of 4
5. Please add St'd CG-6 detail sketch to the plan.
All comments and questions on the attached "Entrance Permit Plan Checklist" as well as
all notes and comments shown in red on plan sheets should be given consideration.
When all the above comments and questions have been addressed please provide this
office with one set of revised plans for review and comment.
If there are any questions, please do not hesitate to call.
Sincerely,
Bar . Sweitzer
Transportation Roadway Engineer
BJS/ch
Attachments
xc: Mr. D.A. Heironimus
Mr. Kris Tierney
COUNTIR FREDERICK
Department of Planning and Development
540/665.5651
FAX: 540/ 678-0682
C.
CD
MUrV�al�rar�.y `yam` \
✓��.� \�C-- �Z;>..,�-.tom o -, S.�-c `Z�„� - J • ,
107 North Kent Street • Winchester, Virginia 22601-5000
• •
GREENWAY ENGINEERING
151 Windy Hill Lane
Winchester, Virginia 22602
F�undeJ n 19,i
T R A N S M I T T A L
Project Name: ZM Sheetmetal, Inc
File No.: 0053
Date: December 10, 1999
To: Frederick Co Planning
Attn: Chris Mohn
Copied:
From: David Frank
GREENWAY ENGINEERING
Phone: 540-662-4185
Fax: 540-722-9528
Remarks: r Urgent R For Your Review W As You Requested r Please Comment
Engineers Surveyors
Telephone 540-662-4185 FAX 540-722-9528
greenway@vlsuallink.com
COUNTY of FREDERICK
Department of Planning and Development
540/665-5651
FAX: 540/ 678-0632
December 8, 1999
Mr. David Franks, P.E.
Greenway Engineering
151 Windy Hill Lane
Winchester, Virginia 22602
RE: ZM Sheetmetal, Inc.; Site Development Plan 462-99
Dear David:
I have had the opportunity to review the above referenced site plan submitted to our department on
November 29, 1999. The following comments are offered and should be addressed during the revision
of this site plan. I have also marked the enclosed plan for your use.
1) Please ensure that the engineer's certificate is signed on all final plan submissions.
2) Please include a space labeled "Approved by the Zoning Administrator" for the approval
signature and date of approval. A statement should be provided with this space indicating that
the site plan will be valid for a period of five (5) years from the date of approval.
3) Please specify the use, zoning, and Property Identification Number (PIN) of the property located
adjacent to the east boundary of the subject parcel.
4) Please ensure that the use of the existing building stated on the site plan corresponds with the
use of the facility specified on the cover sheet. Furthermore, please indicate the use of the
proposed addition on the site plan. The floor area devoted to each component use of the facility
(i.e. manufacturing, warehouse) must also be stated on the cover sheet. Please clarify the
proposed use of the gravel area located adjacent to the subject building addition.
5) Please state the route number associated with Lenoir Drive on the site plan (F-732).
6) Please state the posted speed limit of Lenoir Drive.
7) Please show and identify the right-of-way located adjacent to the west boundary of the subject
parcel.
8) Please clarify the location(s) of the water lines serving the facility.
107 North Kent Street o Winchester, Virginia 22601-5000
i . ^
n
0
Page 2
Mr. David Franks, P.E.
Re: S. P. #62-99 ZM Sheetmetal, Inc.
December 8, 1999
9) In the Parking Calculation, please differentiate between the employees associated with each
component use of the facility (manufacturing, warehouse). The parking standard applicable to
warehouse uses (1 space per employee) should be stated on the cover sheet and incorporated
into the calculation as required.
10) It is noted that light pavement is shown as the surface treatment for each row of parking spaces
shown on the westernmost portion of the site. Please indicate the surface treatment intended
for the travel aisles serving these parking spaces as well as the row of eight parking spaces
located east of the loading area.
11) Please show the location of the ramps intended to serve handicapped accessible parking spaces
on the site plan.
12) Please add a note to the landscaping plan stipulating that all sizes specified in the Landscape
Schedule are applicable at time of planting. Furthermore, the botanical name for Sugar Maple
should be reviewed to ensure accuracy. Specifically, a landscaping guide used by staff identifies
this shade tree as "Acer saccharum" rather than "Acer scharinum."
After you have revised the site plan, please resubmit one copy so that I may verify the information
contained on the plan. I will then need all approved review agency comment sheets and five copies of
the final site plan for approval. Comment sheets are required from the following agencies: the Virginia
Department of Transportation, the Frederick County Sanitation Authority, the Frederick County
Inspections Department, the Frederick County Engineer, and the Frederick County Fire Marshal.
Please contact me if you have any questions regarding this letter.
Sincerely,
'y
Christopher M. Mohn
Planner II
CMM/bah
Enclosure
U:1ChrislconunonMte Planlzm sheetnretal #62-99.spr.wpd
•
•
�M S�;E•�n�C:�CA,t,
SITE PLAN CHECKLIST
The checklist below indicates all the information that needs to be submitted as part of the site plan
application. All required information must be submitted prior to the final approval of any site plan.
The Department of Planning and Development will review the application to ensure that it is complete.
If any portion is not included or complete, the site plan application will not be accepted and returned
to the applicant(s).
Site Plan Package
1. One set of approved comment sheets are required from the following review
agencies prior to final site plan approval. It is recommended that applicants contact
the Department of Planning and Development to determine which review agencies
are relevant to their site plan application.
Virginia Department of Transportation (VDOT)
Fredenck County Sanitation Authority
Department of Planning and Development
Inspections Department
Frederick County Engineer (Public Works)
Frederick County Fire Marshal
Department of Parks and Recreation
2. One copy of the Site Plan application
3. Five Copies of the Final Site Plan for approval
4. One reproducible copy of the Site Plan (if required)
5. A 35mm slide of the Site Plan (if required)
County Health Department
City of Winchester
Town of Stephens City
Town of Middletown
Airport Authority
Soil & Water Conservation District
Request for Street Name
8
Site Plan Information Checklist
The following information must be included on your site plan. If your site plan is incomplete or
is missing information, it will not be reviewed and returned to you for revisions.
Administrative Information
Y N
t4 JA 9.
General Site Information
Y N
Name of proposed development.
Name, address, and phone number of owner.
Name, address, and phone number of developer.
Name, address, and phone number of designer.
Certificate of surveyor, engineer, or architect.
Date plan prepared and date of revisions.
A listing of all conditions placed on the site as a result of a
conditional use permit or conditional zoning approval.
A space labeled "Approved by the Zoning Administrator" for the
approval signature and date of approval.`-'
A description of setbacks or conditions placed on th2 site as result QQ*
of a variance approval. (Reference the variance
application number.)
10. Location map (scale 1:2000)
11. Magisterial District G3
J 12. Scale of site plan (not to exceed 1:50) V1'
V_ 13. North Arrow
.� 14. Zoning of site
() Use, zoning, and Property Identification Number (PIN#) of all
adjoining properties. This includes properties located across right-
of-ways, streams, and railroad tracks.
f16. Surveyed boundaries for all lots and parcels.
General Site (con't)
Y N
f 17. Acreage of all lots included in the plan.
J 18. The location and dimensions of all required setbacks and yard
areas.
alp
19.
The location and type of all dwelling units.
141N
20.
Location and description of all recreation facilities.
21.
Location of sidewalks and pedestrian ways.
N(P
22.
Location and area of common open space.
J
23.
The location, height, and dimensions of all signs.
J
24.
Location, height, and specifications of outdoor lighting fixtures.
J
25.
Location and nature of outdoor storage areas.
f
26.
Location of outdoor trash receptacles and dimensions of structure
(fencing, etc.) required to enclose receptacles.
Building
Information
Y
N
J
27.
The height of all buildings and structures.
28.
Location of all buildings, structures and uses.
2�
The proposed use of each building, structure and area.,---N—
30.
Ground floor area and total floor area of all buildings with FARE ti� .
calculations for commercial and industrial zoning districts.
Roads�,���
Y
N
31
Name and number of existing and planned streets on and adjoining
(-F --)
the site.
32
Location of existing and planned streets on and adjoining the site.
®
Posted speed limit of existing 4djacent roads.
34.
Location and dimensions of all proposed entrances from public
right-of-ways.
35.
Location of all entrances on adjoining roads within 200 feet of the
proposed or existing entrance.
36.
Dimensions, boundaries, width, pavement, and construction of
planned roads.
Utl l ltles
Y N
37. Location of all utilities, including sewer and water lim,� with the size
.per of lines, mains, and laterals.
pd 38. Location and width of all easements, including access, utility, and
RL�\� Q.: _ � S,t. ` \►..., - �-Chi-n.•„bl�il�.
drainage easements. y 1J
39. Location and nature of fire lanes, fire hydrants, and all other
facilities necessary to meet Fire Code requirements.
Parking
Y N
40. Calculations describing the required number of_parking and loading
E��
,spaces. � _
41 Location and dimensions of a-ff parking antrloading spaces,
driveways, parkinq aisles, curbing and other features to be used.
42 Location and dhriension o#aTI di abldid parking spaces a`nd"^�
ramps.-20
Natural Features
Y N
43. Existing and finished contour lines.
44. Location of steep slopes, woodlands, floodplains, wetlands,
sinkholes, and other environmental features.
45. Location of streams and drainage ways.
Landscaping
Y N
46 Landscaping Klan describing locatio� and types of plants to be
N.
used.
• �w."�,t � \\
NIA 47. Location of required buffers and screening wnth cross sections or
profiles.
Erosion and Sediment Control
r
Y N
48. A stormwater management plan with run off calculations and
location and description of facilities to be used.
49. Soil erosion and sedimentation control plan describing the location
and methods to be used to minimize erosion and sedimentation
during development.
12
SITE PLAN APPLICATION
1. Project Title: 2
2. Location of Property ZW USAb1C.—I0?,W6,
(street address) W (MC4t-srCCA- �jIA 1740Z.
3. Property Owner: Sc-vTr V, 2�V►R,
Address: 246 L�ti.0k — v lyre —
Gbh
Telephone:
' 4. Applicant/Agent
Address
�
G?s - 3L&Y
Telephone:
5. Designer:
Address:
Telephone: W -H+Br
Contact: ID&w F'P-Mril-
6. Is this an original or revised site plan? Original Revised
7a. Total acreage of parcel to be developed:
7b. Total acreage of parcel:
8. Property Information
a) Property Identification Number: t pt y3 ((A 17oC,;A-
b) Current Zoning:
c) Present Use: w6treuouTefv
d) Proposed Use: HMi) FAXT OXNP)
e) Adjoining Property Use(s) 11,.1 hu yi�1ArL AcG Irl•l'1-"
f) Adjoining Property Identification Number(s)►'�--
g) Magisterial District(s)
I have read the material included in this package and understand what is required by the
Frederick County Planning Department. I also understand that all required material will be
complete prior to the submission of my site plan.
Signature:
Date:��_��t��yg
7
•
C� J
Request For Site Plan Comments
Department of Planning and Development
Mail to:
Hand deliver to:
Department of Planning and Development
107 N. KIRli .S.tre_et
Attn: County Planner
Fourth Floor
107 North Kent Street
Winchester, VA
Winchester, VA 22601
(540) 665-5651
(540) 665-5651
Please fill out the information as accurately as possible in order to assist the agency with their
review. Please attach two (2) copies of the site plan with this sheet.
Applicant's Name: GREAJiO qV jJ(,I NFF,ejn/6
Address: /Sl W/tiDV Nl-i— I-AivF
W1n)C.HFsi Fe �/A ZZ ,02
Phone Number: 540- L&Z 4be
Name of development and/or descrption of the request: Z-A4 SHFC-7- ME i AL5
SITE PLAri ry2 .�U1i-Qtl\16 ADiDrRa(�J
Location of property: "i 9 Siatyeu),JL(- 2kc
260 LFaQl f TKNE
Planning and Development's Comments:
UIRO