Loading...
HomeMy WebLinkAbout62-99 ZM Sheetmetal, Inc. - Gainesboro - Backfile��O c70 3� �-c.Q. ____---- � �� of �,-s.so--z-5,�� �U 3."�'1 G..��-�. \w`�--�. \.d ,�L �--�=c � � ,3�� . ���� r a . ACCOUNT HOW PAID •w SITE PLAN CHECKLIST The checklist below indicates all the information --that needs to be submitted as part of the site plan application. All required information must -be submitted prior to the final approval of any site plan. The Department of Planning and Development will review the application to ensure that it is complete. If any portion is not included or complete, the site plan application will not be accepted and returned to the applicant(s). Site Plan Package 1. One set of approved comment sheets are required from the following review agencies prior to final site plan approval. It is recommended that applicants contact the Department of Planning and Development to determine which review agencies are relevant to their site plan application. 2. 3. 4. 5. Virginia Department of Transportation (VDOT) -Frederick County Sanitation Authority Department of Planning and Development Inspections Department Frederick County Engineer (Public Works) \�,1y Frederick County Fire Marshal Department of Parks and Recreation One copy of the Site Plan application Five Copies of the Final Site Plan for approval One reproducible copy of the Site Plan (if required) A 35mm slide of the Site Plan (if required) County Health Department City of Winchester Town of Stephens City Town of Middletown Airport Authority Soil & Water Conservation District r F. - NOTES File opened ' Reference Manual updated/number assigned D-base-updated jara File given to Renee' to update Application Action Summary CLOSE OUT FILE: Approval (or denial) letter mailed to applicant/copy made for file File stamped "approved", "denied" or "withdrawn" t/ Reference Manual updated D-base updated Q%.1 L, Gb File given to Renee' for final update to Application Action Summary palo� UACaro RCommon\G ENERIC.TRK Raviscd I IrB8 COUNTY OF FREDERICK, VIRGI DEPARTMENT OF INSPECTION Caller Time Called Phone No. __ _ Time Requested Received By PERMIT HOLDER NAME FIT. NO. Lot No. SEC. No STREET NAME DIRECTIONS - - - DISTRICT PERMIT FOR: -- - -- - -- Tyne of Inspection • Date Called Date Requested Date of Inspection SUBDIVISION BUILDING NO. _ PLUMBING NO. -_- ELECTRICAL NO. MECHANICAL NO. SIGN NO. Residential _ _ _ -- Commercial -- --_ - Footers - _ ___ Setbacks: FR BK L R Slab Draintile Gas Fire -up Final Electrical Water Service Framing Final Mechanical Sewer Rough Electric Final Site Plan Rough Plumbing Rough Mechanical Final Building Fire Marshall - - Groundworks Gas Piping/Test Final Plumbing Special/Complaint Other: -- --- - Time In: _ _- -_ _ _ Temperature - Cut in No. — Time Out: __---__ - - Weather ----- Results: Approved - --- - Rejected Comments: - - - - - _ -- - Signature _ Date_- • 0 COUNTY of FREDERICX Department of Planning and ;Development 540/665-5651 FAX: 540/ 673-0682 January 11, 2000 Mr. David Franks, P.E. Greenway Engineering 151 Windy Hill Lane Winchester, Virginia 22602 RE: Approval of ZM Sheetmetal, Inc. Building Expansion, Site Development Plan 962-99 Property Identification Number (PIN): 43-19-9 Dear David: The Frederick County Department of Planning and Development administratively approved the above - referenced site plan on January 10, 2000. This site plan, for the addition of 20,425 square feet of manufacturing space to the existing ZM Sheetmetal, Inc. facility, meets all County requirements for development within the M1 (Light Industrial) Zoning District. The expanded facility will be served by six (6) loading spaces and a paved parking lot consisting of ninety (90) parking spaces, of which four (4) will be designed for handicap accessibility. The site plan also delineates the provision of perimeter parking lot landscaping comprised of shade trees and evergreen hedgerows. I have provided you with several copies of the approved site plan. Please forward these approved plans to the owner and advise the owner to keep an approved copy for their files. Furthermore, the owner should ensure that an approved copy is maintained on the construction site throughout the development process. Once site development has been completed, the owner should contact this office to schedule an on -site inspection. Please do not hesitate to contact me should you have any questions or need for elaboration regarding this letter. Sincerely, Christopher M. Mohn Planner H CMM/kac Enclosure cc: Sydney A. Reyes, Gainesboro District Supervisor June Wilmot, E.D.C. Jane Anderson, Real Estate Joe Wilder, Public Works U:IChrialcommonlSite Mnlm shcrlmeta! ff67-99.apr.,,pd 107 North Xent Street o Winchester, Virginia 22601-5000 Request for Site Plan Comments Virginia Department of Transportation Mail to: Hand deliver to: Virginia Department cf Transportation Virginia Department of Transportation Attn: Resident Engineer 1550 Commerce Street 14031 Old Valley Pike Winchester, VA Edinburg, Virginia 22824 (540) 722-3460 (540) 984-5600 Please fill out the information as accurately as possible in order to assist the Virginia Department of Transportation with their review. Please attach five (5) copies of the site plan with traffic generation data and drainage calculations with this sheet. Applicant's Name Address: 2 2cC. Z. Phcne Number. 54C r Z l �'- Name of develcoment and/or description of the request: Location of prcperty: L C T (-i Virginia Department of Transportaticn's Comments: No objection to site plan. If any work is performed on the State's rioter-nf—.,ay, n land use permit will need to be applied for and issued to cover said work. The permit is issued by this office and requires a tee and surety bond coverage. Please see attached letter dated 12 30 99. VDOT use only Date receiied t t ! 22 ! 9 9 Incomplete t 2 2 Date revie,%N*edaW 4q Signature and Date _ Signature and Date (revision) Date revision received Dat: approved 12 f -3 iQ 9 Incomplete �-� Date reVieWed j �1- C, i L • � ��.1 .� Imo} �. ,ram. 01. Z j IN --IARLES 0. 140TTINGHAM C0N1'y10N'VV'E.kLTH of vIRQJ-,LIA DEPARTMENT OF TRANSPORTATION EDINBURG RESIDENCY .,.ERRY J -',PD December 30, 1999 Mr. David Frank, D.S. c/o Greenway Engineering 1 5 1 Windy Hill lane Winchester, VA 22602 Dear David: Ref: ZM Sheetmetal, Inc. Stonewall Industrial Park Route F-732 (Lenoir Drive) Frederick County We have received your revised site plan dated 12/20/99 (received 12/27/99) for the referenced project. It appears all of our earlier review comments have been satisfactorily addressed. Please advise the owner of our approval. Also please provide five (5) sets of approved construction plans with signed seal for VDOT distribution. The appropriate land use permit may now be applied for to cover work within the Route F- 732 right-of-way. The permit is issued by this office and will require a minimum processing fee, surety bond coverage, and the salary & expenses of a State assigned Inspector. Once satisfactory application has been made, a permit will normally take approximately thirty days to process and issue. Should you have any questions, do not hesitate to call. Sincerely, �d Barry J. Sweirzer, Tuns. Roadway Engineer For: Steven A. Melnikoff, Transportation Engineer BJS/vcz Enclosure xc: Mr. D. A. Heironimus Mr. Kris Tierney WE KEEP VIRGINIA MOVING • 11 Request For Site Plan Comments Frederick County Inspections Department Mail to: Frederick County Inspections Dept. Attn: Building Official 107 North Kent Street Winchester, VA 22601 (540) 665-5650 Hand deliver to: 107 N. Kent Street Fourth Floor Winchester, VA (540) 665-5650 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach one (1) copy of the site plan with this sheet. Applicant's Name: t-r'r ti r,, r IC-1n1r t:,; Address: Phone Number: = �; Name of development and/or description of the request:_- r ELF, - ti 'x i . " - • ; J - Location of property L - _ :� F . c_ 1 Irspecticns Department's Comments: Inspections Dept use only Date received Incomplete Date revievied Signature and Date _ Signature and Date (revision) Comments are on the back of this form Date revision received Incomplete Date reviewed r. Date approved 17 1 Addition shall comply with the Virginia Uniform Statewide Building Code and section 306, use group F (Factory) of The BOCA National Building Code/1996. Other codes that apply are CABO A117.1-92 Accessible and Usable Buildings and Facilities. Please confirm compliance with table 507 of BOCA for height and area limitations for the type of construction. Section 507 Unlimited Areas will not apply with less than 30' to the property line however section 503.1.1 Special Industrial Occupancies may apply. Please confirm. Section 1110.2.1 exceptin #1 shall apply for renovation and additions.( The AAA_ 200 rule) Required egress is not shown at htis time and shall be accessible. (can use area of refuge on exterior landings with 4' wide stairways.) Please note section 108.10 Asbestos inspection and Chapter 17 special inapections that apply. r • r Request For Site Plan Comments Frederick County Sanitation Authority Mail to: Frederick County Sanitation Authority Attn: Engineer Director P.O. Box 1877 Winchester, VA 22604 (540) 868-1061 Hand deliver to: 315 Tasker Road Stephens City, VA (540) 868-1061 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the site plan with this sheet. Applicant's Name: ,F'�c,ti`wA/ i✓N�iti'C ������� Address: L-A,-vE y,,a 2 2 &, - z— Phone Number: 54C - Z 4/,55 Name of development and/or description of the request: 7l A-S' C - N 7704 N� �r rc-Fi ti�F�1 Location of property: L07- q 2 Lin Frederick County Sanitation Authority's Comments: Y .' • • lot\ GREENWAY ENGINEERING 151 'Windy Hill Lane 'Winchester, Virginia 22602 T R A N S M I T T A I. Proiect lame: ZM Sheetmetal, Inc File No.: 0053 Date: December 10, 1999 To: Frederick Co Sanitation Attn: John 'Whitacre From: David Frank GREENWAY ENGINEERING Phone: 540-662-4185 Fax: 540-722-9528 Copied: F:emarks f-" Urgern For Your Review i� As You Requested Message: John, Enclosed are 2 sets of the revised site plan for second submittal. Call with anv concerns. /Q r4'i T S — SETS f Please Comment Engineers Surveyors Telephone 540-662-4185 FAX 540-722-9528 greenwayOvisual link.com COUNTY OF FREDERICK, VIRGINIA FIRE MARSHAL'S OFFICE LAND DEVELOPMENT COMMENTS Control No. SP99-0061 R Date Received 12/10/99 Date Reviewed 12/14/99 Applicant Greenwav Engineering Plan Rev. Date: Address 1 5 1 Windy Hill Lane Winchester, Va. 22602 Project Name Z&Ivl Sheet Metal Phone No. 540-662-4185 Type of Application Site Plan Current Zoning M-1 1st Due Fire Co. 13 1st Due Rescue Co. 13 Election District Gainesboro Tax I.D. No. 43-19-9 RE COM'NIENDATIONS Automatic Sprinkler SystemXX Residential Sprinkler System Automatic Fire alarm SystemXX Other REQUIREMENTS Emergency Vehicle Access Adequate XX Inadequate Not Identified Fire Lanes Required Yes XX No Comments Requirements of Frederick County Chapter Code Chapter- 90. Roadway/Aisleway Widths Adequate XX Inadequate Not Identified Special Hazards Noted Yes No XX Comments Hydrant Locations Adequate XX Inadequate Not Identified Siamese Location Adequate Inadequate Not Identified XX Additional Comments Attached? Yes No XX Plan Approval Recommended? Yes XX No Title Signature >� • January 7, 2000 Mr. David Frank Greenway Engineering 151 Windy Hill Lane Winchester, Virginia 22601 RE: Z & M Sheet Metal, Inc. - Site Plan Comments Stonewall Industrial Park Frederick County, Virginia Dear David: CO' JNTY of FREDERICK Department of Public Works 540/ 665-5643 FAY: 540/673-0632 Upon review of the revised site plan dated January 5, 2000, it appears that all of our comments have been addressed. Therefore, we recommend approval of the subject site plan. JCW/kch Sincerely, 4C�Lc -)k'U-00Z/) Joe C. Wilder Engineering Technician Department of Public Works cc: Frederick County Planning Department file 1 107 North Kent Street o Winchester, Virginia 22(01-5000 GREENWAY ENGINEERING 151 Windy Hill Lane Winchester, Virginia 22602 rvmded m 19, I T R A N S M I T T A L Project Name: ZM SHEETMETAL File No.: 0053 Date: JANUARY 7, 2000 To: FREDERICK COUNTY DEPARTMENT OF PLANNING Attn: CHRIS MOHN From: DAVID L. FRANK GREENWAY ENGINEERING Phone: 540-662-4185 Fax: 540-722-9528 Copied: 5 COPIES OF FINAL SITE PLAN, APPROVAL FORMS Remarks: r- Urgent I— For Your Review r As You Requested r Please Comment Message: CHRI S, I AM FORWARDING TO YOU THE AGENCY APPROVAL NOTICES AND FIVE COPIES OF THE FINAL ZM SHEETMETAL SITE PLANS. IF THERE ARE ANY DETAILS THAT I HAVE FORGOTTEN PLEASE LET ME KNOW. I BELIEVE THAT THE CONTRACTOR IS PLANNING TO PULL THE BUILDING PERMIT AS SOON AS THEY CAN. THANKS FOR ALL THE HELP ON THIS PROJECT THE LAST COUPLE OF MONTHS. DAVID FRANK Engineers Surveyors Telephone 540-662-4185 FAX 540-722-9528 greenway@visuallink.com • 0 CHARLES D. NOTTINGHAM COMMISSIONER COMMONWEALTH of VIRCjINIA DEPARTMENT OF TRANSPORTATION EDINBURG RESIDENCY 14031 Old Valley Pike Edinburg, VA 22824 (540) 984-5600 / (5�0)� 07 - fax December , Mr. D.L. Frank c/o Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 Dear David: JERRY A. COPP RESIDENT ENGINEER Ref: ZM Sheetmetal, Inc. Lot 9 Stonewall Industrial Park Rte. F-732 (Lenoir Drive) Frederick County A VDOT review has been completed on the preliminary site. plan dated 11/99 (reed 11/22/99) for the referenced project. Our initial comments come as the result of a field visit to the site and VDOT road number F-732 (Lenoir Drive). A pattern of irregular radial curb offsets, primarily due to revisions in VDOT entrance standards, was discovered on the entire section of the road in the site vicinity. Our conclusion reached after discussion of the existing condition is to permit the construction of this site entrance at the curb offset dimensions shown on the plan. Evidence of water ponding at existing entrances along the roadway elevates VDOT concern for drainage flows. They should display the establishment of positive flow toward major drainage structures and natural drainage channels. Our concern for this item on this site is the potential of excessive spread at the southwest corner of the entrance. The following comments are enumerated and shown in red on plan sheets. Sheet 2 of 4 1. Drainage flow arrows should be shown to illustrate direction and positive drainage on site and for VDOT roadway and ditches. Please provide additional elevation spots along bottom of existing and proposed ditches to illustrate positive drainage. WE KEEP VIRGINIA MOVING Mr. D.L. Frank AM Sheetmetal, Inc. Lot 9 December 3, 1999 Page #2 2. The entire stippled area (portion of existing entrance) within right-of-way should be milled/scarified and overlain or restoration of entrie pavement structure should be accomplished at direction of VDOT inspector. A detail of pavement structure to be applied to that area should be shown in the event restoration is necessary. Also, the CG-6 should be shown. 3. The sight distance should be shown along with distance to nearest VDOT road inter- section and posted speed limit. The VDOT Route number should also be shown. 4. A half Typical Section should be provided, an example is attached. Sheet 3 of 4 5. Please add St'd CG-6 detail sketch to the plan. All comments and questions on the attached "Entrance Permit Plan Checklist" as well as all notes and comments shown in red on plan sheets should be given consideration. When all the above comments and questions have been addressed please provide this office with one set of revised plans for review and comment. If there are any questions, please do not hesitate to call. Sincerely, Bar . Sweitzer Transportation Roadway Engineer BJS/ch Attachments xc: Mr. D.A. Heironimus Mr. Kris Tierney COUNTIR FREDERICK Department of Planning and Development 540/665.5651 FAX: 540/ 678-0682 C. CD MUrV�al�rar�.y `yam` \ ✓��.� \�C-- �Z;>..,�-.tom o -, S.�-c `Z�„� - J • , 107 North Kent Street • Winchester, Virginia 22601-5000 • • GREENWAY ENGINEERING 151 Windy Hill Lane Winchester, Virginia 22602 F�undeJ n 19,i T R A N S M I T T A L Project Name: ZM Sheetmetal, Inc File No.: 0053 Date: December 10, 1999 To: Frederick Co Planning Attn: Chris Mohn Copied: From: David Frank GREENWAY ENGINEERING Phone: 540-662-4185 Fax: 540-722-9528 Remarks: r Urgent R For Your Review W As You Requested r Please Comment Engineers Surveyors Telephone 540-662-4185 FAX 540-722-9528 greenway@vlsuallink.com COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 678-0632 December 8, 1999 Mr. David Franks, P.E. Greenway Engineering 151 Windy Hill Lane Winchester, Virginia 22602 RE: ZM Sheetmetal, Inc.; Site Development Plan 462-99 Dear David: I have had the opportunity to review the above referenced site plan submitted to our department on November 29, 1999. The following comments are offered and should be addressed during the revision of this site plan. I have also marked the enclosed plan for your use. 1) Please ensure that the engineer's certificate is signed on all final plan submissions. 2) Please include a space labeled "Approved by the Zoning Administrator" for the approval signature and date of approval. A statement should be provided with this space indicating that the site plan will be valid for a period of five (5) years from the date of approval. 3) Please specify the use, zoning, and Property Identification Number (PIN) of the property located adjacent to the east boundary of the subject parcel. 4) Please ensure that the use of the existing building stated on the site plan corresponds with the use of the facility specified on the cover sheet. Furthermore, please indicate the use of the proposed addition on the site plan. The floor area devoted to each component use of the facility (i.e. manufacturing, warehouse) must also be stated on the cover sheet. Please clarify the proposed use of the gravel area located adjacent to the subject building addition. 5) Please state the route number associated with Lenoir Drive on the site plan (F-732). 6) Please state the posted speed limit of Lenoir Drive. 7) Please show and identify the right-of-way located adjacent to the west boundary of the subject parcel. 8) Please clarify the location(s) of the water lines serving the facility. 107 North Kent Street o Winchester, Virginia 22601-5000 i . ^ n 0 Page 2 Mr. David Franks, P.E. Re: S. P. #62-99 ZM Sheetmetal, Inc. December 8, 1999 9) In the Parking Calculation, please differentiate between the employees associated with each component use of the facility (manufacturing, warehouse). The parking standard applicable to warehouse uses (1 space per employee) should be stated on the cover sheet and incorporated into the calculation as required. 10) It is noted that light pavement is shown as the surface treatment for each row of parking spaces shown on the westernmost portion of the site. Please indicate the surface treatment intended for the travel aisles serving these parking spaces as well as the row of eight parking spaces located east of the loading area. 11) Please show the location of the ramps intended to serve handicapped accessible parking spaces on the site plan. 12) Please add a note to the landscaping plan stipulating that all sizes specified in the Landscape Schedule are applicable at time of planting. Furthermore, the botanical name for Sugar Maple should be reviewed to ensure accuracy. Specifically, a landscaping guide used by staff identifies this shade tree as "Acer saccharum" rather than "Acer scharinum." After you have revised the site plan, please resubmit one copy so that I may verify the information contained on the plan. I will then need all approved review agency comment sheets and five copies of the final site plan for approval. Comment sheets are required from the following agencies: the Virginia Department of Transportation, the Frederick County Sanitation Authority, the Frederick County Inspections Department, the Frederick County Engineer, and the Frederick County Fire Marshal. Please contact me if you have any questions regarding this letter. Sincerely, 'y Christopher M. Mohn Planner II CMM/bah Enclosure U:1ChrislconunonMte Planlzm sheetnretal #62-99.spr.wpd • • �M S�;E•�n�C:�CA,t, SITE PLAN CHECKLIST The checklist below indicates all the information that needs to be submitted as part of the site plan application. All required information must be submitted prior to the final approval of any site plan. The Department of Planning and Development will review the application to ensure that it is complete. If any portion is not included or complete, the site plan application will not be accepted and returned to the applicant(s). Site Plan Package 1. One set of approved comment sheets are required from the following review agencies prior to final site plan approval. It is recommended that applicants contact the Department of Planning and Development to determine which review agencies are relevant to their site plan application. Virginia Department of Transportation (VDOT) Fredenck County Sanitation Authority Department of Planning and Development Inspections Department Frederick County Engineer (Public Works) Frederick County Fire Marshal Department of Parks and Recreation 2. One copy of the Site Plan application 3. Five Copies of the Final Site Plan for approval 4. One reproducible copy of the Site Plan (if required) 5. A 35mm slide of the Site Plan (if required) County Health Department City of Winchester Town of Stephens City Town of Middletown Airport Authority Soil & Water Conservation District Request for Street Name 8 Site Plan Information Checklist The following information must be included on your site plan. If your site plan is incomplete or is missing information, it will not be reviewed and returned to you for revisions. Administrative Information Y N t4 JA 9. General Site Information Y N Name of proposed development. Name, address, and phone number of owner. Name, address, and phone number of developer. Name, address, and phone number of designer. Certificate of surveyor, engineer, or architect. Date plan prepared and date of revisions. A listing of all conditions placed on the site as a result of a conditional use permit or conditional zoning approval. A space labeled "Approved by the Zoning Administrator" for the approval signature and date of approval.`-' A description of setbacks or conditions placed on th2 site as result QQ* of a variance approval. (Reference the variance application number.) 10. Location map (scale 1:2000) 11. Magisterial District G3 J 12. Scale of site plan (not to exceed 1:50) V1' V_ 13. North Arrow .� 14. Zoning of site () Use, zoning, and Property Identification Number (PIN#) of all adjoining properties. This includes properties located across right- of-ways, streams, and railroad tracks. f16. Surveyed boundaries for all lots and parcels. General Site (con't) Y N f 17. Acreage of all lots included in the plan. J 18. The location and dimensions of all required setbacks and yard areas. alp 19. The location and type of all dwelling units. 141N 20. Location and description of all recreation facilities. 21. Location of sidewalks and pedestrian ways. N(P 22. Location and area of common open space. J 23. The location, height, and dimensions of all signs. J 24. Location, height, and specifications of outdoor lighting fixtures. J 25. Location and nature of outdoor storage areas. f 26. Location of outdoor trash receptacles and dimensions of structure (fencing, etc.) required to enclose receptacles. Building Information Y N J 27. The height of all buildings and structures. 28. Location of all buildings, structures and uses. 2� The proposed use of each building, structure and area.,---N— 30. Ground floor area and total floor area of all buildings with FARE ti� . calculations for commercial and industrial zoning districts. Roads�,��� Y N 31 Name and number of existing and planned streets on and adjoining (-F --) the site. 32 Location of existing and planned streets on and adjoining the site. ® Posted speed limit of existing 4djacent roads. 34. Location and dimensions of all proposed entrances from public right-of-ways. 35. Location of all entrances on adjoining roads within 200 feet of the proposed or existing entrance. 36. Dimensions, boundaries, width, pavement, and construction of planned roads. Utl l ltles Y N 37. Location of all utilities, including sewer and water lim,� with the size .per of lines, mains, and laterals. pd 38. Location and width of all easements, including access, utility, and RL�\� Q.: _ � S,t. ` \►..., - �-Chi-n.•„bl�il�. drainage easements. y 1J 39. Location and nature of fire lanes, fire hydrants, and all other facilities necessary to meet Fire Code requirements. Parking Y N 40. Calculations describing the required number of_parking and loading E�� ,spaces. � _ 41 Location and dimensions of a-ff parking antrloading spaces, driveways, parkinq aisles, curbing and other features to be used. 42 Location and dhriension o#aTI di abldid parking spaces a`nd"^� ramps.-20 Natural Features Y N 43. Existing and finished contour lines. 44. Location of steep slopes, woodlands, floodplains, wetlands, sinkholes, and other environmental features. 45. Location of streams and drainage ways. Landscaping Y N 46 Landscaping Klan describing locatio� and types of plants to be N. used. • �w."�,t � \\ NIA 47. Location of required buffers and screening wnth cross sections or profiles. Erosion and Sediment Control r Y N 48. A stormwater management plan with run off calculations and location and description of facilities to be used. 49. Soil erosion and sedimentation control plan describing the location and methods to be used to minimize erosion and sedimentation during development. 12 SITE PLAN APPLICATION 1. Project Title: 2 2. Location of Property ZW USAb1C.—I0?,W6, (street address) W (MC4t-srCCA- �jIA 1740Z. 3. Property Owner: Sc-vTr V, 2�V►R, Address: 246 L�ti.0k — v lyre — Gbh Telephone: ' 4. Applicant/Agent Address � G?s - 3L&Y Telephone: 5. Designer: Address: Telephone: W -H+Br Contact: ID&w F'P-Mril- 6. Is this an original or revised site plan? Original Revised 7a. Total acreage of parcel to be developed: 7b. Total acreage of parcel: 8. Property Information a) Property Identification Number: t pt y3 ((A 17oC,;A- b) Current Zoning: c) Present Use: w6treuouTefv d) Proposed Use: HMi) FAXT OXNP) e) Adjoining Property Use(s) 11,.1 hu yi�1ArL AcG Irl•l'1-" f) Adjoining Property Identification Number(s)►'�-- g) Magisterial District(s) I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to the submission of my site plan. Signature: Date:��_��t��yg 7 • C� J Request For Site Plan Comments Department of Planning and Development Mail to: Hand deliver to: Department of Planning and Development 107 N. KIRli .S.tre_et Attn: County Planner Fourth Floor 107 North Kent Street Winchester, VA Winchester, VA 22601 (540) 665-5651 (540) 665-5651 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the site plan with this sheet. Applicant's Name: GREAJiO qV jJ(,I NFF,ejn/6 Address: /Sl W/tiDV Nl-i— I-AivF W1n)C.HFsi Fe �/A ZZ ,02 Phone Number: 540- L&Z 4be Name of development and/or descrption of the request: Z-A4 SHFC-7- ME i AL5 SITE PLAri ry2 .�U1i-Qtl\16 ADiDrRa(�J Location of property: "i 9 Siatyeu),JL(- 2kc 260 LFaQl f TKNE Planning and Development's Comments: UIRO