SITE PLAN CHECKLIST
The checklist below indicates all the information -that needs to be submitted as part of the site plan
application. All required information must.be submitted prior to the final approval of any site plan.
The Department of Planning and Development will review the application to ensure that it is complete.
If any portion is not included or complete, the site plan application will not be accepted and returned
to the applicant(s).
Site Plan Package
1. One set of approved comment sheets are required from the following review
agencies prior to final site plan approval. It is recommended that applicants contact
the Department of Planning and Development to determine which review agencies
are relevant to their site plan application.
"'Virginia Department of Transportation (VDOT)
�� 'V \Nz�
�a 13 'Frederick County Sanitation Authority
Department of Planning and Development
)\ 4 °I� ' Inspections Department
\ Cif Frederick County Engineer (Public Works)
\o1U)Pf� • Frederick County Fire Marshal
Department of Parks and Recreation
2. One copy of the Site Plan application
3. Five Copies of the Final Site Plan for approval
4. One reproducible copy of the Site Plan (if required)
5. A 35mm slide of the Site Plan (if required)
County Health Department
City of Winchester
Town of Stephens City
Town of Middletown
Airport Authority
Soil & Water Conservation District,
NOTES
Ft
10-1.5- File opened
Reference Manual updated/number assigned
D-base updated
Q• f 5 Q File given to Renee' to update Application Action Summary
CLOSE OUT FILE:
Approval (or denial) letter mailed to applicant/copy made for file
z/ File stamped "approved", "denied" or "withdrawn"
Reference Manual updated
,/ D-base updated
,�• 18•DD File given to Renee' for final update to Application Action Summary
UACso1\Common\G ENERIC.TRK
Revised I IR198
�- 4p FILE COPY
COUNTY of FREDERICK
Department of Planning and Development
540/665-5651
FAX: 540/ 678-0682
February 22, 2000
Mr. Todd Wood
Triad Engineering, Inc.
P. O. Box 1448
Harrisonburg, VA 22801
RE: Approval of Kraft Foods Wastewater Treatment Building, Site Development Plan #54-99
Property Identification Number (PIN): 54-A-36H
Dear Todd:
The Frederick County Department of Planning and Development administratively approved the above -
referenced site plan on February 17, 2000. This site plan, for the addition of a wastewater treatment
building consisting of 2,312 square feet to the existing Kraft Foods, Inc. facility, meets all County
requirements for development within the M1 (Light Industrial) Zoning District. It is important to note that
no additional parking is required with this expansion given the surplus of spaces presently available.
I have provided you with several copies of the approved site plan. Please forward these approved plans
to the owner and advise the owner to keep an approved copy for their files. Furthermore, the owner should
ensure that an approved copy is maintained on the construction site throughout the development process.
Once site development has been completed, the owner should contact this office to schedule an on -site
inspection.
Please do not hesitate to contact me should you have any questions or need for elaboration regarding this
letter.
Sincerely,
Christopher M. Mohn
Planner II
CMM/rsa
Enclosure
cc: Charles W. Orndoff, Sr., Stonewall District Supervisor
June Wilmot, E.D.C.
Jane Anderson, Real Estate
Joe Wilder, Public Works
U: IChrisicommonlSite Planikrafl wastewater bldg #54-99.apr.wpd
107 North Kent Street • Winchester, Virginia 22601-5000
LETTER OF TRAOM ITT AL
•
971 Acorn Drive
L:11AID P. O. Box 1448
TRIAD ENGINEERING, INC. Harrisonburg, VA 22801
(540) 4 34 -4 13 5
Geotechnical, Civil, Environmental, (540) 434-5841 fax
Construction Consultants, Land Planning triad@rica.net
and Landscape Architecture
To : Frederick County Date : 2/16/2000
Attention : Chris Mohn
Job No: CD-042(H)
Re: Capri Sun
WE ARE SENDING YOU Attached ❑ Under separate cover via
❑ Shop Drawings ❑ Prints O Plans
❑ Copy of letter ❑ Change Order ❑
❑ Samples
the following items
❑ Specifications
COPIES
DATE
NUMBER
DESCRIPTION
5 sets
2/16/00
C-1 — C-3
Wastewater Treatment building addition
THESE ARE TRANSMITTED as checked below:
0 For Approval ❑ Approved as submitted ❑ Resubmit
❑ Samples ❑ Approved as noted ❑ Submit —
❑ As Requested ❑ Returned for corrections ❑ Submit ...
for review and comment ❑
❑ FOR BIDS DUE: ❑ PRINTS RETURNED AFTER LOAN TO US
REMARKS:
COPY TO :
SIGNED
If enclosures are not as noted, kindly notify us at once
copies for approval
copies for distribution
copies for distribution
RECEIVED
F E 6 1 ;! 2000
DEPT, OF PLANNINGIDEVELOPMENT
12-16-99 16:43 VDOT EDINB RO
• 6
ID=54 845607 PO1/02
CHARLES D. NOTnNOHAM
COMMISSIONER
COMMONWEALTH of VIR
DEPARTMENT OF TRANSPORTATION
EDINBURG RESIDENCY
14031 Old VaYey Ftke
Edinburg, VA 22824
(540) 9"-5600 / (540) 9W5607 - fax
Mr. Jay K. Johnson, P.E.
c/o 'TRIAD Engineering, Inc.
971 Acorn Drive
P. O. Box 1448
Harrisonburg, VA 22801
Attn: Mr. Matt Robertson
Dear Matt
-
December 7, 1999
<P{ease E;�_�
[3- rfi
IA-ICG Q'�-3JS
r �
JERRY A. COPP
RESIDENT ENGINEER
Ref: Kraft General Foods
Capri Sun 2000
Route 1320 (Brook Road)
at Route 1323 (Pazk Center Drive)
Frederick County
We have received your revised site plan dated 12/2/99 for the referenced project_ It appears
all of our earlier review comments have been satisfactorily addressed_ Please advise the
owner of our approval. Also please provide six (6) sets of approved constlraction plans
with signed seal for VDOT distri-bution. - . ' --
Please be apprised that the Edinburg Residency ha_s confirmed the pavement striping as
shown on sheet C-2 with Traffic EngineeTingstriping
Se� only be provided on future plans
eir approval is
incorporated. We suggest a separate plan P g
The appropriate land use permit may now be applied for to cover work within the Route
1320/ 1323 right-of-way. The permit is issued by this office and will require a minimum
processing
fee, surety bond coverage, and the salary & expenses of a State assigned
Inspector. A copy of any/all plats of dedication for drainage casements or additional right-
of-way required for implementation of this proposed project should be provided to VDOT
prior to issuance of any land use permits. Dedication should be made to the
Commonwealth of Virginia.
Once satisfactory application has been made, a' permit will normally take approximately
thirty days to process and issue. Should you have any questions, do not hesitate to call.
Sincerely.
B J. Swei� am. Road?ayngineer
For: Steven A. Melnikoff, Transportation Engineer
BJS/v¢ I
"
Enclosure
xc: Mr_ D. A_ Heironimus WE KEEP VIRGINIA MOVING
Mr. Kris Tierney
g� 16:44 VDOT EDINBUG RO I D=54845697
Request for Site Plan Comments
Virginia Department of Trans ortation
Mail to:
Virginia Department of Transportation
Attn: Resident Engineer
14031 Old Valley Pike
Edinburg, Virginia 22824
(540) 984-5600
Hand deliver to:
Virginia Department of Transportation
1550 Commence Street
Winchester, VA
(540) 722-3460
P92/92
inia
Please fill out the information as accurately as possibfive 5e in rder to assist
the site 9plan Dweth traffic
partment
of Transportation with their review. Please attach () copies
generation data and drainage calculations with this sheet
�
App;icant s Name'.
Address:
Phone Number: C s{'� `� 3 -t 4 3 S
Nacre of development and/or description of the request:
Ge�c-- ► r��S /�oa�w.
22a ��,k der. fs. U�; ./�
Lccation of property: VA a 0 3
Virginia Department of Transportation's Comments:
No obiectinn
If any work is ver ormed on theate'
c �
Office and requires a fee and surety bond coverage.
is issued by this Off
,yjyy;'^a't^"'P _ ,N. S 1 Mr'ii k4, y..^'iwr 7. p - �' %.t"i �,.•_F M �V
"VDAT usCnnfi
VVMM
Sim .--
14
•
I COUNTY of FREDERICK
Department of Planning and Development
540/665-5651
FAX: 540/ 678-0682
107 North Kent Street • Winchester, Virginia 22601.5000
L E T T E R O F T RON S M I T T A L •
LMf1A11J
TRIAD ENGINEERING, INC.
Geotechnical. Civil, Environmental.
Construction Consultants, Land
Planning and Landscape Architecture
To: Dept of Planning and Development
107 North Kent Street
Winchester, VA 22601
971 Acorn Drive
P. O. Box 1448
Harrisonburg, VA 22801
(540) 434-4135
(540) 434-5841 fax
triad@rica. net
Date : 12/09/ 1999
Attention : County Planner
Job No.: CD-042
Re: Wastewater Treatment Building Addition
WE ARE SENDING YOU 0 Attached ❑ Under separate cover via
❑ Shop Drawings ❑ Prints 0 Plans
❑ Copy of letter ❑ Change Order ❑
❑ Samples
the following items
❑ Specifications
COPIES
DATE
NUMBER
DESCRIPTION
2
12/09/99
Kraft General Foods Wastewater Treatment Building Addition Site Plan
1
List of comment responses
THESE ARE TRANSMITTED as checked below
0 For Approval ❑ Approved as submitted ❑ Resubmit
❑ Samples ❑ Approved as noted ❑ Submit
❑ As Requested ❑ Returned for corrections ❑ Submit
❑ For review and comment ❑
❑ FOR BIDS DUE ❑ PRINTS RETURNED AFTER LOAN TO US
REMARKS
i
DEPT.OF c --
copies for approval
copies for distribution
copies for distribution
COPY TO
SIGNED
If enclosures are not as noted, kindly notify us at once
•
•
Mr. Christopher M. Mohn, Planner I1
Department of Planning and Development
107 North Kent Street
Winchester, VA 22601-5000
9 December 1999
RE: Kraft General Foods: Wastewater Treatment Building Addition, Site Plan
(TRIAD No. CD042)
Dear Mr. Mohn,
Following is an itemized list of our responses to your set of review comments dated
28 October 1999.
Comment #1 - Setbacks provided have been shown. (Notes #7 & #8, Sheet C-3)
Comment #2 — Note concerning signs has been provided. (Note #9, Sheet C-3)
Comment #3 — All outdoor lighting fixtures associated with this building addition are
surface mounted on the face of the building. The proposed fixtures and
bulbs will match the existing lighting scheme. Proposed lighting / fixture
style is "wall washer". (Note ##12, Sheet C-3)
Comment 44 — Note concerning outdoor storage has been provided.
(Note #10, Sheet C-3)
Comment 45 — Note concerning the correct provision of the Frederick County Zoning
Ordinance (Section 165-83A) regarding building height has been
provided. (Note #2, Sheet C-3)
Comment 96 — The office addition and related improvements per Site Development Plan
#50-99, and the Capri Sun 2000 building addition and related
improvements per Site Development Plan 452-99 have been included and
referenced as requested. (Sheet C-2)
Comment #7 — The use of the proposed building addition has been stated as requested.
(Sheet C-3)
Comment #8 — The floor area tabulation, FAR calculation and breakdown of uses have
been revised as requested. (Sheet C-1)
C Disregarded #9 — Disre dd telephone conversation with Chris Mohn on 29
per p
October 1999.
Comment #10 — We have coordinated our plans with the Fire Marshal.
Comment # I I — Note regarding parking stating addition will not involve an increase in
the number of employees engaged in manufacturing activities has been
added (Note # 1, Sheet C-3)
Comment #12 — Existing and proposed contours are not shown on this plan. The area
within the addition is flat and will require minimal grading operations.
Comment # 13 — Note concerning environmental features has been provided.
(Note #1 1, Sheet C-3)
If you have any questions or comments, please do not hesitate to call me at
540-434-4135.
Cordially,
Triad Engineering, Inc.
Dennie Dunlap
Staff Engineer
0 1, ;1 0 10001
9.7' Acc�rrl Drive
P 0. Boar 1448
VA 22801
-40) 4.34-4 1-35
-O) 43,1-:7641 fax
1 1:14 ing net
j I t t ; - ;_ , � P* � - . -. (,
0 1 R I'M Harl-I surlbo IM 002
It - ! Pi all Comments
ir-spectium Department
il--% wl) iheir
•
110 W Ila+rr I son b iir
Ql003
4004
riajp;t2t,,o,)n Authority
%n
Ll
4 1) 0
.,:;I It t, iu.i OM 01 ertts
L yitieorinE r
I's k'l 1—; 1 _--Lot
Z.1 006
, . , .. , 1 . � , 'j,
I I .
1, - - " , ,:, i I ! �,
Marsha!
Ir
C�
COUN'PY of FR iDERICK
Department of Planning and Development
5401665-5651
FAX: 540/ 67s-0632
October 28, 1999
Mr. Todd Wood
Triad Engineering, Inc.
P. 0. Box 1448
Harrisonburg, VA 22801
RE: Kraft Foods Wastewater Treatment Building Addition, Site Development Plan #54-99
Dear Todd:
I have had the opportunity to review the above referenced site plan submitted to our department on
October 12, 1999. The following comments are offered and should be addressed during the revision of
this site plan. I have also marked the enclosed plan for your use.
/) In the Site Plan Notes, please state the setbacks provided for the proposed addition relative to
those required in the M1 Zoning District.
✓2) Please include a note on the site plan stipulating that all signs located on the subject property will
conform with the standards of the Frederick County Zoning Ordinance.
/3) Please delineate the location, height, and specifications of any outdoor lighting fixtures proposed
in association with the subject building addition.
4) Please provide a note on the site plan indicating that no outdoor storage is proposed with the
subject addition.
5) Please ensure that the correct provision of the Frederick County Zoning Ordinance is referenced
in the note regarding building height (Section 165-83A).
6) On the existing conditions sheet, please include the office addition and related improvements
associated with Site Development Plan #50-99, which is pending administrative approval. The
Capri Sun 2000 building addition must also be shown as delineated via Site Development Plan
#52-99. These areas should be identified as proposed and the corresponding site plan number
must be referenced.
17) On the site plan, please state the use of the proposed building addition (i.e. wastewater
treatment).
8) Please include the floor areas of the additions proposed through site development plans 450-99
and #52-99 in both the building area tabulation and FAR calculation. The total floor area of the
facility must be broken down by use and further clarified in terms of what is existing and
proposed (i.e. office, manufacturing, etc.).
107 North Kent Street a Winchester, Virginia 22601-5000
n
LJ
n
U
Page 2
Mr. Todd Wood
Re: S.P. #54-99; Kraft Foods Wastewater Treatment Bldg. Addition
October 28, 1999
9) Please delineate the general location of all entrances on adjacent roads that are within 200 feet
of the facility's existing entrances.
10) Please ensure that all facilities necessary to satisfy the requirements of the Fire Marshal are
included on the site plan.
11) Please clarify the note regarding parking to state that the proposed addition will not involve an
increase in the number of employees engaged in manufacturing activities.
12) Please delineate existing and finished contour lines on the site plan.
13) Please indicate the location of any environmental features existing on the site. If none exist, a
note to that effect should be included on the site plan.
After you have revised the site plan, please resubmit one copy so that I may verify the information
contained on the plan. I will then need all approved review agency comment sheets and five copies of
the final site plan for approval. Comment sheets are required from the following agencies: the Virginia
Department of Transportation, the Frederick County Sanitation Authority, the Frederick County
Inspections Department, the Frederick County Engineer, and the Frederick County Fire Marshal.
Please contact me if you have any questions regarding this letter.
Sincerely,
Christopher M. Mohn
Planner II
CMM/rsa
Enclosure
UICIOA-ommonlSlle PlanUrgfl wasteivater 6ldg 654-99.spr. pd
Aiza
SITE PLAN CHECKLIST C.•0�<>,)
The checklist below indicates all the information that needs to be submitted as part of the site plan
application. All required information must be submitted prior to the final approval of any site plan.
The Department of Planning and Development will review the application to ensure that it is complete.
If any portion is not included or complete, the site plan application will not be accepted and returned
to the applicant(s).
Site Plan Package
1. One set of approved comment sheets are required from the following review
agencies prior to final site plan approval. It is recommended that applicants contact
the Department of Planning and Development to determine which review agencies
are relevant to their site plan application.
Virginia Department of Transportation (VDOT)
' Frederick County Sanitation Authority
• Department of Planning and Development
• Inspections Department
• Frederick County Engineer (Public Works)
• Frederick County Fire Marshal
Department of Parks and Recreation
2. One copy of the Site Plan application
3. Five Copies of the Final Site Plan for approval
4. One reproducible copy of the Site Plan (if required)
5. A 35mm slide of the Site Plan (if required)
County Health Department
City of Winchester
Town of Stephens City
Town of Middletown
Airport Authority
Soil & Water Conservation Distnct
Request for Street Name
I
Site Plan Information Checklist
The following information must be included on your site plan. If your site plan is incomplete cr
is missing information, it will not be reviewed and returned to you for revisions.
Administrative Information
Y N
1.
Name of proposed development.
2.
Name, address, and phone number of owner.
3.
4.
Name, address, and phone number of developer.
Name, address, and phone number of designer.
.1
5.
Certificate of surveyor, engineer, or architect.
J6.
Date plan prepared and date of revisions.
7.
A listing of all conditions placed on the site as a result of a
conditional use permit or conditional zoning approval.
8.
A space labeled "Approved by the Zoning Administrator" for the
approval signature and date of approval.
NjA
9.
A description of setbacks or conditions placed on the site as a result
of a variance approval. (Reference the variance
application number.)
General Site Information
Y N
�I
10.
Location map (scale 1:2000)
1
11.
Magisterial District-
J
12.
Scale of site plan (not to exceed 1:50)
13.
North Arrow
f
14.
Zoning of site
_J
15.
Use, zoning, and Property Identification Number (PIN#) of all
adjoining properties. This includes properties located across right-
of-ways, streams, and railroad tracks.
J16.
Surveyed boundaries for all lots and parcels.
•
General Site (con't)
Y N
17.
Acreage of all lots included in the plan.
18.
The location and dimensions of all required setbacks and yard
areas.
WA
19.
The location and type of all dwelling units.
NIA
20.
Location and description of all recreation facilities.
NIA
21.
Location of sidewalks and pedestrian ways.
NIP
22.
Location and area of common open space.
23.
The location, height, and dimensions of all signs.
2
Location, height, and specifications of outdoor lighting fixtures.
2
Location and nature of outdoor storage areas.
26.
Location of outdoor trash receptacles and dimensions of structure
(fencing, etc.) required to enclose receptacles.
Buildina Information
Y N
L 27 The height of all buildings and structures..,,;
28 Location of all buildings, structures and uses. P-- $ .
The proposed use of each building, structure and area.
30 Ground floor area and total floor area of all buildings with FAR
calculations for commercial and industrial zoning districts.
Y N
J
31.
Name and number of existing and planned streets on and adjoining
j
the site.
32.
Location of existing and planned streets on and adjoining the site.
33.
Posted speed limit of existing adjacent roads.
34.
Location and dimensions of all proposed entrances from public
right-of-ways.
35
Location of all entrances on adjoining roads within 200 feet of the
proposed or existing entrance.
t•1l P
36.
Dimensions, boundaries, width, pavement, and construction of
planned roads.
Utilities
Y N
37. Location of all utilities, including sewer and water lines with the size
of lines, mains, and laterals.
38. Location and width of all easements, including access, utility, and
drainage easements.
39. Location and nature of fire lanes, fire hydrants, and all other
facilities necessary to meet Fire Code requirements.
Parking
Y N
40. Calculations describing the required number of parking and loading
spaces. ����� 7..
41. Location and dimensions of all parking and loading spaces,
driveways, parking aisles, curbing and other features to be used.
CIA 42. Location and dimension of all disabled parking spaces and
ramps.
Natural Features
Y N
43. Existing and finished contour lines.
Location of steep slopes, woodlands, floodplains, wetlands,
sinkholes, and other environmental features.
45. Location of streams and drainage ways.
•
0
Landscaping
Y N
46. Landscaping plan describing location and types of plants to be
used.
47. Location of required buffers and screening with cross sections or
profiles.
Erosion and Sediment Control
Y N
48. A stormwater management plan with run off calculations and
location and description of facilities to be used.
49. Soil erosion and sedimentation control plan describing the location
and methods to be used to minimize erosion and sedimentation
during development.
12
9
•
SITE PLAN APPLICATION
1.
Project Title:
k�,-F.1 fF—), T,,4—,
2.
Location of Property
220 P.,,k Ce-4,?, D::ve
(street address)
VA 2 Z 6 o S
3.
Property Owner:
6 e, e,, 1 F, Js
Address:
�2 o Rl D
VA 2260
Telephone:
5 �� - o
4.
Applicant/Agent
'Tr E
Address
t ACC,
Y 8
V/A z2b'o1
Telephone:
Sy �� q 3 -f - v t 3 S
5.
Designer:
T.. ELL,
Address:P.O.
v,.., �`t`r8
vi3 —2 z f o t
Telephone:
(S L/ o) Y 3 -i - -t 13 E
Contact:
M r . I ,l.l W, - J
6
P
Original Revised
6.
Is this an original or revised site plan?
-�,z
7a.
Total acreage of parcel to be developed:
G • 0 3 , `
7b.
Total acreage of parcel:
-20 • O O '1 ,
8.
Property Information:
S `t (C A)) 3 H
a)
Property Identification Number:
b)
Current Zoning:
11 1
c)
Present Use:
M q
d)
Proposed Use:
e)
Adjoining Property Use(s)
- `t3((A))35,36,34-L
Adjoining Property Identification Number(s)
54((A»36A 366 t'i KS 1360)A
g)
Magisterial District(s)
I have read the material included in this package and
understand what is required by the
Frederick County Planning Department. I also understand
that all required material will be
complete
prior to the submission of my site plan.
Signature: .5a-7----C - -
Date:
) 0 / 8 / -1 9
`I
REC
DEPT. Cr
•
•
The following information must be included on your site plan. If your site plan is incomplete or
is missing information, it will not be reviewed and returned to you for revisions.
Administrative Information
Y N
General Site Information
Y N
1. Name of proposed development.
2. Name, address, and phone number of owner.
3. Name, address, and phone number of developer.
4. Name, address, and phone number of designer.
5. Certificate of surveyor, engineer, or architect.
6. Date plan prepared and date of revisions.
7. A listing of all conditions placed on the site as a result of a
conditional use permit or conditional zoning approval.
8. A space labeled "Approved by the Zoning Administrator" for
the approval signature and date of approval.
9. A description of setbacks or conditions placed on the site as a
result of a variance approval. (Reference the variance
application number.)
10. Location map (scale 1:2000)
11. Magisterial District
12. Scale of site plan (not to exceed 1:50)
13. North Arrow
14. Zoning of site
15. Use, zoning, and Property Identification Number (PIN#) of all
adjoining properties. This includes properties located across
right-of-ways, streams, and railroad tracks.
16. Surveyed boundaries for all lots and parcels.
9
tilities
Y N
Parking
Y N
Natural Features
Y N
•
35. Location of all entrances on adjoining roads within 200 feet of the
proposed or existing entrance.
36. Dimensions, boundaries, width, pavement, and construction of
planned roads.
37. Location of all utilities, including sewer and water lines with the
size of lines, mains, and laterals.
38. Location and width of all easements, including access, utility,
and drainage easements.
39. Location and nature of fire lanes, fire hydrants, and all other
facilities necessary to meet Fire Code requirements.
40. Calculations describing the required number of parking and
loading spaces.
41. Location and dimensions of all parking and loading spaces,
driveways, parking aisles, curbing and other features to be used.
42. Location and dimension of all disabled parking spaces and
ramps.
43. Existing and finished contour lines.
44. Location of steep slopes, woodlands, floodplains, wetlands.
sinkholes, and other environmental features.
45. Location of streams and drainage ways.
Landscaping
Y N
46. Landscaping plan describing location and types of plants to be
used.
47. Location of required buffers and screening with cross sections or
profiles.
Erosion and Sediment Control
Y N
48. A stormwater management plan with run off calculations and
location and description of facilities to be used.
49. Soil erosion and sedimentation control plan describing the
location and methods to be used to minimize erosion and
sedimentation during development.
12
r�
u
Mail to:
Department of Planning
Attn: County Planner
107 North Kent Street
Winchester, VA 22601
(540) 665-5651
Request For Site Plan Comments
Department of Planning and Development
and Development
Hand deliver to:
107 N. Kent Street
Fourth Floor
Winchester, VA
(540) 665-5651
Please fill out the information as accurately as possible in order to assist the agency with their
review. Please attach two (2) copies of the site plan with this sheet.
Applicant's Name: Triad Engineering Inc
Address: 971 Acorn Drive
P.O. Box 1448
Harrisonburg VA 22801
Phone Number: (540) 434-4135
Name of development and/or description of the request:
Kraft General Foods Wastwater Treatment Buildinq Addition
Location of property: 220 Park Center Drive
Winchester VA 22603
Planning and Development's Comments:
Date received
Incomplete
Date reviewed
Signature and Date
Signature and Date (revision)
Planning and Development use only
Date revision received
Incomplete
Date reviewed
Date approved
L E T T E R O F T R AN SO1 T T A L
•
971 Acorn Drive
L:11AIi) P. O. Box 1448
Harrisonburg, VA 22801
TRIAD ENGINEERING, INC. (540) 434-4135
Geotechnical, Civil. Environmental. (540) 434-5841 fax
Construction Consultants. Land triad@rica.net
Planning and Landscape Architecture
To: Dept of Planning and Development Date : 10/08/1999
107 North Kent Street Attention : County Planner
Winchester, VA 22601 Job No.: CD-042
Re: Wastewater Treatment Building Addition
WE ARE SENDING YOU El Attached ❑ Under separate cover via
❑ Shop Drawings ❑ Prints 0 Plans ❑ Samples
❑ Copy of letter ❑ Change Order ❑
the following items
❑ Specifications
COPIES DATE NUMBER I DESCRIPTION
2 10/8/99 1 Kraft General Foods Wastewater Treatment Building Addition Site Plan
THESE ARE TRANSMITTED as checked below
0 For Approval ❑ Approved as submitted ❑ Resubmit copies for approval
❑ Samples ❑ Approved as noted ❑ Submit copies for distribution
❑ As Requested ❑ Returned for corrections ❑ Submit copies for distribution
❑ For review and comment ❑
❑ FOR BIDS DUE : ❑ PRINTS RETURNED AFTER LOAN TO US
RECrI� ,�.
REMARKS `D
/Og9
DEPT
ENT
COPY TO
SIGNED
If enclosures are not as noted, kindly notify us at once