SITE PLAN CHECKLIST
The checklist below indicates all the information that needs to be submitted as part of the site plan
application. All required information must be submitted prior to the final approval of any site plan.
The Department of Planning and Development will review the application to ensure that it is complete.
If any portion is not included or complete, the site plan application will not be accepted and returned
to the applicant(s).
Site Plan Package
1. One set of approved comment sheets are required from the following review
agencies prior to final site plan approval. It is recommended that applicants contact
the Department of Planning and Development to determine which review agencies
are relevant to their site plan application.
C'I �(q � Virginia Department of Transportation (VDOT)
Frederick County Sanitation Authority
Department of Planning and Development
(f Z Inspectons Department
c
2`a Frederick County Engineer (Pudic `Norks)
5-Ls —7 Frederick County Fire Marshai
Department of Parks and Recreation
2. One copy of the Site Plan application
3. Five Copies of the Final Site Plan for approval
4. One reproducible copy of the Site Plan (if required)
5. A 35mm slide of the Site Plan (if required)
County Health Department
City of Winchester
Town of Stephens City
Town of Middletown
Airport Authority
Sod & Water Conservation District
COMMONWEALTH of VIRGI IA
DEPARTMENT OF TRANSPORTATION
DAVID R. GEHR EDINBURG RESIDENCY
COMMISSIONER 14031 OLD VALLEY PIKE
P.O. BOX 278
EDINBURG, VA 22824-0278
June 17, 1998
Ms. Denise Baker
C/O Perry Engineering Company, Inc.
1945 Millwood Pike
Winchester, VA 22602
Dear Denise:
JERRY A. COPP
RESIDENT ENGINEER
TELE (540) 984-5600
FAX (540)984.5607
Ref: First United Methodist Church
Route 739
Frederick County
Enclosed is your approved Land Use Permit #855-04477 to cover the construction
and maintenance of one commercial entrance at the referenced location.
Please ensure a copy of the approved permit assembly is kept at the job site
whenever working within the Route 739 right-of-way. I would also like to remind
you of the need to erect and maintain proper traffic control in accordance with
our Virginia Work Area Protection Manual.
Please give Mr. Dave Heironimus a call at (540) 722-3460 at least 48 hours in
advance of the start of construction to arrange for any necessary inspections.
If you have any questions concerning the permit requirements or during
construction, please give me a call.
Sincerely,
I
J 1
"v
William C. Gochenour
Hwy. Permits & Subd. Specialist Sr.
WCG/rf
xc: Mr. Dave Heironimus
Mr. Kris Tierney
WE KEEP VIRGINIA MOVING
COMMONWEALTH ®f VIRGINIA
DEPARTMENT OF TRANSPORTATION
DAVID R. GEHR
EDINBURG RESIDENCY
COMMISSIONER
14031 OLD VALLEY PIKE
P.O. BOX 278
EDINBURG, VA 22824-0278
June 16, 1998
Ms. Denise Baker
Ref
C/O Perry Engineering Company, Inc.
1945 Millwood Pike
Winchester, VA 22602
Dear Ms. Baker:
JERRYA. COPP
RESIDENT ENGINEER
TELE (540) 984-5600
FAX (540) 984-5607
First United Methodist Church
Route 739
Frederick County
In accordance with your request dated June 3, 1998 you are given permission to install a
temporary construction entrance at the referenced location. This letter is to be considered your
permit to do so. The following provisions will be required:
• Work area protection signage is to be in accordance with the current Work Area Protection
Manual while working on the right-of-way.
• All work on the right-of-way is to be confined to the temporary entrance location only.
• A minimum 6" depth of VDOT # 1 (2-3 inch stone) course aggregate by 30' in width will be
required. It is to be placed from the edge of pavement and extended back onto private
property for enough to prevent the carrying of mud onto the roadway.
• Positive drainage is to be maintained within the right-of-way at all times.
• A wash rack will be required.
• Any disturbed areas of the right-of-way or damages to the pavement structure adjacent to
this entrance will be repaired by you to our satisfaction.
• This permit is being issued for 180 days.
• All work is to be completed in accordance with the enclosed Virginia Erosion 8, Sediment
Control Handbook, Specification 3.02.
• The entrance is to be installed at the location shown on the site plan prepared by Painter -
Lewis, PLC dated June 2, 1997.
The Department of Transportation will not be held liable for suit should such result from this
operation nor is it granting permission to grade on the property of others or disturb underground
utility lines. If the above listed items are not followed this permit may be revoked.
Should you have any questions, please let me know.
jSincerely,
l,y� �uf J. Roy
.Hwy. Permit Subd. Specialist Sr.
CJR/rf�
Attachments �.; ` �F4,C"
xc: Mr. D. A. Heironimus
Mr. R. D. Hawkins
Mr. Kris Tierney
WE KEEP VIRGINIA MOVING
Cis cc���--,
COUNTY of FREDERICK
Department of Planning and Development
540/665-5651
FAX: 540/678-0682
June 17, 1997
Dr. Stephen Hundley
First United Methodist Church
308 North Braddock Street
Winchester, Virginia 22601
1
RE: Site Plan Approval - First United Methodist Church - Apple Pie Ridge Property
Site Plan 9019-97 Zoned: RA
Dear Dr. Hundley:
This letter is to inform you that the Frederick County Planning Department administratively approved
site plan 4019-97 on June 16, 1997. This site plan consists of a parking lot for 32 vehicles. This lot
will be treated with a bituminous concrete surface. In addition to the parking area, the site will contain
a softball field and an approximately 4,800 square -foot picnic shelter.
Attached are two copies of the approved plan. This will enable you to provide your contractor with
an approved copy, and maintain a copy for your records. Please have the contractor contact this
office to schedule an on -site inspection once all improvements are complete.
Please contact me if I may answer any questions regarding this letter.
Sincerely,
Eric R. Lawrence
Planner II
Enclosure
ERL\bah
cc: John Lewis, Painter -Lewis, P.L.C.
Jerry Copp, Virginia Department of Transportation
Public Works Department U:\ERIC\COMMOMSITEPLAMRJMCHU.APR
107 North Kent Street • Winchester, Virginia 22601-5000
0 •
COUNTY of FREDERICK
Department of Planning and Development
540/665-5651
FAX: 540/ 678-0682
June 3, 1997
Mr. John Lewis
Painter -Lewis, P.L.C.
302 South Braddock Street, Suite 200
Winchester, Virginia 22601
RE: Preliminary Site Plan Review #2 -- First United Methodist Church - Apple Pie Ridge
Site Plan #019-97
Dear John:
I have conducted review #2 of the above referenced site plan, received by this office on June 2, 1997.
It appears that you have addressed most of my concerns. The two remaining issues to be addressed
are:
1. Provide signage for the ADA parking spaces. The typical sign placement and detail
should be included on the plan.
2. Property Identification Numbers (PIN) for the adjoining properties. Two properties
on the west side of Route 739 have incomplete PINS.
Enclosed is a red -lined copy of this site plan. Once you address the above comments, you will have
gained the Planning Department's approval for this project.
When you receive approval comments from the review agencies, forward the comments and five
copies of the final site plan; sealed, signed, and dated. I will recommend this site plan for approval
upon receipt of the comments and plans.
Please contact me if I may answer any questions regarding this letter.
Since ly,
7
Eric R. Lawrence
Planner II
ERL\bah
Enclosure
107 North Kent Street - Winchester, Virginia 22601-5000
C0MMOTy1 ' EALTH of VIRQINIA
DEPARTMENT OF TRANSPORTATION
EDINBURG RESIDENCY
DAVID R. GEHR 14031 OLD VALLEY PIKE
CO: MISSIONER P O. BOX 278
EDINBURG. VA 22824.027A
June 3, 1997
Mr. John C. Lewis
C/O winter -Lewis, P.L.C.
302 South Braddock Street, Suite 200
Winchester, VA 22601
Dear John:
JERRY A. COPP
RESIDENT ENGINEER
TELE (540) 984-5GG0
FAX (540) 984�5607
Ref: First United Methodist Church
Route 739 (Apple Pie Ridge Road)
Frederick County
We have received your revised site plan dated May 30, 1997 for the referenced project.
It appears all of our earlier review comments have been satisfactorily addressed.
Please advise the owner of our approval.
Please provide three additional sets of plans for VDOT distribution needs.
The appropriate land use permit(s) may now be applied for to cover work within the
Route 739 right-of-way. The permit(s) is/are issued by this office and will require a
minimum processing fee and surety bond coverage.
Once satisfactory application has been made, a permit will normally take approximately
thirty days to process and issue.
Should yo11 have any questions, r le?se feel free to call.
BJS/rf
Enclosure
xc: Mr. R. B. Childress
Mr. S. A. Melnikoff
Mr. Kris Tierney
Sincerel ,
8VI6 U
Barry ISweitzer
Trans. Roadway Engineer
For: Robert B. Childress
Trans. Permits & Subdivision
Specialist Supervisor
WE KEEP VIRGINIA MOVING
Request For Site Plan CoMents
Virginia Department of Transportation
Mail to: Hand deliver to: C; o
Virginia Department of Transportation Local VDOT IRC ce
Atten: Resident Engineer 1550 Commerce' treet
P.O. Box 278 Winchester, VA
Edinburg, Virginia 22824-0278 (540) 722-3460
(540) 984-5600
Please fill out the information as accurately as possible in order to assist the VDOT
with their review. Please attach four copies of your site plan with this sheet.
Applicant's name: �al0 F i
Address: 309 Sou ih 1) itad-d ek S t4 o f
I&LLE 4p- ,- ( (1A "a c, d i
Phone number: Al oZ
Name of development and/or description of the request:
Location of development: ' u ��
Virginia Department of Transportation's Comments: See attached letter from
VINOT to 141E .JohI'i C, Lewis datcd June ? � QQ%
PAINTER-LEWIS, P.L.C.
CONSULTING ENGINEERS tel.: (540)662-5792
302 South Braddock Street, Suite 200 fax.: (540)662-5793
Winchester, VA 22601
30 MAY 1997
Mr Eric Lawrence
Frederick County Department of Planning and Development
107 North Kent Street
Winchester. VA 22601
Re: FIRST UNITED METHODIST CHURCH
SITE PLAN
Dear Eric:
Along with this letter you will find two copies of the site plan showing revisions addressing the
comments dated May 27, 1997. 1 have addressed your comments as follows:
1. The application is included.
2. The certification is on the plans.
3. The date and revisions are on the plans.
4. No outdoor lighting is proposed.
5. Trash storage on the site will be temporary and occur during church events. No trash
pick-up contract service is proposed.
Sheet 1 of 2
1. Note 6 has been changed.
2. Note 8 has been changed.
Sheet 2 of 2
1. The parking lot has been expanded to include 31 stalls.
2. Two ADA spaces are shown on the plans.
3. The field has been rotated to provide for a minimum of 300' down the left field line to the
public right-of-way.
4. The topsoil stockpile will be stabilized using the permanent seeding specification.
If you have any questions, please call me.
8 91DJj��
Sincerely;
cr
J n C. Lewis, P.E., C.L.A. C_ �� �o �cb
�� °
file: 9704017 9�s�62f7.Z�1�'v�
PAINTER-LEWIS. P.L.c
• i
COPY
SITE PLAN APPLICATION
1. Project Title:
2. Location of Property
(street address)
3. Property Owner.
Address:
Telephone:
4. Applicant/Agent
Address
/rI/�Jor�iz/
Telephone:
Designer:
Address:
Telephone:
Contact:
A
7a.
7b.
8.
a)
b)
c)
d)
e)
0
g)
Is this an original or revised site plan?
Total acreage of parcel to be developed:
Total acreage of parcel:
Property Information:
Property Identification Number:
Current Zoning:
Present Use:
Proposed Use:
Adjoining Property Use(s)
Adjoining Property Identification Number(s)
Magisterial District(s)
Original X Revised
I have read the material included in this package and understand what is required by the
Frederick County Planning Department. I also understand that all required material will be
complete prior to the submission of my site plan.
Signature: ,
Date: -a!- '7-4P;, -
7
COUNTY of FREDERICK
Department of Planning and Development
540/665-5651
FAY: 540/678-0682
May 27, 1997
Mr. John Lewis
Painter -Lewis, P.L.C.
302 South Braddock Street, Suite 200
Winchester, Virginia 22601
RE: Preliminary Site Plan Review -- First United Methodist Church - Apple Pie Ridge
Site Plan 4019-97
Dear John:
I have reviewed the above referenced site plan, received by this office on April 28, 1997. The
following comments will need to be addressed in order to proceed with approval of this site plan.
Please provide:
1. A complete site plan application (pages 6 and 7 of the application package, signed).
2. Certificate of Professional Engineer, signed and dated to reflect most recent revisions.
3. Date plan prepared and date of all revisions.
4. Location, height, and specifications of outdoor lighting fixtures.
5. Location of trash receptacles to accommodate trash associated with athletic field uses.
Sheet 1 of 2
1. "General Notes," Item #6, `Use' should be `church -related outdoor recreation.'
2. "General Notes," Item #8, `Required Parking' should reflect that which was
previously discussed with the Zoning Administrator; 30 parking spaces should be
provided.
Sheet 2 of 2
1. Parking lot use. A minimum of 30 parking spaces should be provided and dedicated
for parking use. The minimal parking requirement should not be included in the
combined parking and basketball court use.
2. Locate handicap parking spaces (two are required) and provide specifics of space
delineation and signage.
3. A barrier between the softball field and Apple Pie Ridge Road. The distance provided
107 North Kent Street - Winchester, Virginia 22601-5000
First United Methodist Church - Apple Pie Ridge
Mr. John Lewis
Page 2
May 27, 1997
from `home plate' to the road appears to be a minimal distance, based on the
Department of Parks and Recreation's criteria. The department utilizes a minimum
distance of 300 feet to the fence line for softball fields. As provided on this plan,
there is no fence line and the distance is shorter. I would recommend that the field
either be rotated so that the ball is hit into the property, or the distance be increased
to at least 300 feet with a fence line. This action is necessary to restrict softballs from
gaining access onto the road.
4. The topsoil stockpile should be stabilized. Because of it's proximity to the planned
facilities, I would anticipate that people may climb the stockpile and use it as a
viewing location for softball games (bleachers). Therefore, it should be prepared for
such activities.
Enclosed is a red -lined copy of this site plan. Please revise your site plan to address the above
comments, those on the red -lined copy, and those comments provided to you by the review agencies.
You will need to provide this office with the complete approved comment sheets from all required
review agencies. The required review agencies include: Virginia Department of Transportation,
Inspections Department, County Engineer, Fire Marshal, and the Planning Department. Once all
agency comments have been addressed, please resubmit one copy of the revised site plan to this
department for final review. If the revised site plan satisfies all agency comments, we will request five
copies of the final site plan and recommend the site plan for approval.
Please contact me if I may answer any questions regarding this letter.
Since r y,
Eric R. Lawrence
Planner II
ERLVsa
Enclosure
U:\ERIC\COMMON\SrTEPLAN\FUMCHU.REV
��(�0-C• .
E0IT',113URG fi:-SUENC."Y . • .
AKI Request For Site Plan Comments
Virginia Department of Transportation
f 1�7 �iii�i Ma_'�
Virginia Department of Transportation
Atten: Resident Engineer
P.O. Box 278
Edinburg, Virginia 22824-0278
(540) 984-5600
Hand deliver to:
Local VDOT Office
1550 Commerce Street
Winchester, VA
(540) 722-3460
Please fill out the information as accurately as possible in order to assist the VDOT
with their review. Please attach four copies of your site plan with this sheet.
Applicant's name: Palty j S t? ���' S �•Le
Address: J 0 a So-,_i•h I itGdD, CC SCI-2
(I i rn 'r (M ;) O (p � l
Phone number: (2t) G �
Name of development and/or description of the request: G
/7
Location of development: f Ku uk-
Virginia Department of Transportation's Comments:
See attached letter fr W
VIX)T to ML Jolui C. Lewis dated unc 3 1997
VDOT use only
Date received �Eq 9 -7
incomplete
Date reviewed LQ7
Signature and Date
Signature and Date (revision)
Date revision received Gjaf_q7
Incomplete t,, „,
Date reviewed C
Date approvedq tB7
r
COMMONWEALTH of VII QINIA
DEPARTMENT OF TRANSPORTATION
EDINBURG RESIDENCY
DAVID R. GEHR 14031 OLD VALLEY PIKE
JERRY A. COPP
COMMISSIONER P O. BOX 278
RESIDENT ENGINEER
EDINBURG. VA 22824-0278
TELE (540) 984 56M
FAX (540) 984 5607
June 3, 1997
Mr. John C. Lewis Ref: First United Methodist Church
C/O Painter -Lewis, P.L.C. Route 739 (Apple Pie Ridge Road)
302 South Braddock Street, Suite 200 Frederick County
Winchester, VA 22601
Dear John:
We have received your revised site plan dated May 30, 1997 for the referenced project.
It appears all of our earlier review comments have been satisfactorily addressed.
Please advise the owner of our approval.
Please provide three additional sets of plans for VDOT distribution needs.
The appropriate land use permit(s) may now be applied for to cover work within the
Route 739 right-of-way. The permit(s) is/are issued by this office and will require a
minimum processing fee and surety bond coverage.
Once satisfactory application has been made, a permit will normally take approximateiy
thirty days to process and issue.
Should you have any questions, please feel free to call.
BJS/rf
Enclosure
xc: Mr. R. B. Childress
Mr. S. A. Melnikoff
Mr. Kris Tierney
Sincerel ,
0,
Barry . Sweitzer rn
Trans. Roadway Engineer
r
For: Robert B. Childress
Trans. Permits & Subdivision
Specialist Supervisor
WE KEEP VIRGINIA MOVING
COUNTY OF FREDERICK, VIRGINIA
FIRE MARSHAL'S OFFICE
LAND DEVELOPMENT COMMENTS
Control No.SP97-0028 Date Received 4/29/97 Date Reviewed 5/25/97
Applicant Painter -Lewis P.L.C. Plan Rev. Date: 4/25/97
Address 302 S. Braddock St.
Winchester, Virginia
22601
Project Name First United Methodist Church
Type of ApplicationSite Plan
1st Due Fire Co. 15 1st Due Rescue Co. 15
Tax I.D. No. 42-A-198-1
RECOMMENDATIONS
Phone No.540-662-5792
Current Zoning RA
Election District Stonewall
Automatic Sprinkler System Residential Sprinkler System
Automatic Fire Alarm System Other
REQUIREMENTS
Emergency Vehicle Access
Adequate XX Inadequate Not Identified
Fire Lanes Required Yes No XX
Comments
Roadway/Aisleway Widths Adequate XX Inadequate Not Identified
Special Hazards Noted Yes No XX �? �s� +✓
Comments
Hydrant Locations Adequate Inadequate Not IdentifiedXX (jJ� j
Siamese Location Adequate Inadequate Not Identified XX
Additional Comments Attached? Yes No XX 4
Plan Approval Recommended? Yes XX No
Signature Title
I
L
P 2
Request For Site Plan Comments
Frederick County Engineering Department
Mail to:
Frederick County Engineering Dept.
Attn: Director of Engineering
P.O. Box 601
Winchester, VA 22604
(540) 665-5643
Hand deliver to:
107 N. Kent Street
Fourth Floor
Winchester, VA
(540) 665-5643
Please fill out the information as accurately as possible in order to assist the agency with their
review. Please attach two (2) copies of the site plan with this sheet.
Applicant's Name: TI fi I n-rE (� - LL 0' S P LC.
C.
Address*
Phone Number: '-V0
Name of development and/or description of the request:
i
Engineering De art nt's Comments�
Engineering Dept. use only
Date received
Incomplete
Date reviewed
Signature and Date
Signaturc and Date (revisi
Date revision received Date approved 7
Incomplete
Request For Site Plan Comments
Frederick County Inspections Department
Mail to:
Frederick County Inspections Dept.
Attn: Building Official
P.O. Box 601
Winchester, VA 22604
(540) 665-5650
Hand deliver to:
107 N. Kent Street
Fourth Floor
Winchester, VA
(540) 665-5650
Please fill out the information as accurately as possible in order to assist the agency with their
review. Please attach one (1) copy of the site plan with this sheet.
Applicant's Name
Address:
Phone Number:
Name of development and/or description of the request:
Location of property:
Inspections Department's Comments: CcmTents are on the back of this form
Inspections Dept. use only
Date received
Incomplete
Date reviewed
Signature and Date
Signature and Date (revision),
I�
Date revision received
Incomplete�r�
n.,t �ir,vf�ci
Date approved
Building shall with the Virginia Uniform Statewide Building Code
Group U (Uility) of the BOCA National Building Code/1996, Other
CABO A117.1-92 Accessibile and Useable Buildings and Facilities.
ADA parking and unloading is not shown on site plan.
and section 312, Use
codes that apply are
Ilvm Ceunc"•-1 / 9 - 97
SITE PLAN CHECKLIST
The Checklist below indicates all the inform aticn that needs to be submitted as part of the site plan
application. All required information must be submitted prior to the final approval of any site plan.
The Department of Planning and Develcpment will review the application to ensure that it is Complete.
tf any portion is not included or complete, the site plan application will not be accepted and returned
to the applicant(s).
Site Plan Package
1. One set of approved comment sheets are required from the following review
agencies prior to final site plan approval. It is recommended that applicants contact
the Department of Planning and Development to determine which review agencies
are relevant to their site plan application.
Virginia Cecartment of Transoortation (VCOT)
Frederick County Sanrta,:on Autnorrty
Cepartrnent of Planning and Development
Inspections Cepartment
Frederick County Engineer (Pudic Works)
Frederick County Fire Marsnat
Cecartment of Parks and Recreation
County Heattri Cecartment
C'ty of Wincnester
Town of Stecnens City
Town of Midc!etown
Airport Autnonty
Sod & Water Conservation Cistno;
2. One ccpy of the Site Plan application(0 q) f.,r 2
3. Five Ccpies of the Final Site Plan fcr approval
4. One reproducible copy of,he Site Plan (if required)
5. A 35mm slide of the Site Plan (if required)
8
•
Site Plan Information Checklist
The fcilcwing information must be inCuded on your site plan. If your site plan is inc--mplete or
is missing information, it will not be reviewed and returned to you for revisions.
Administrative Information
Y N
1
1.
2.
Name of proposed development.
Name, -
address, and phone number of owner.
3.
Name, address, and phone number of developer.
4.
Name, address, and phone number of designer.
5.
Certificate of surveyor, engineer, or architect.
✓
6.
Oate plan prepared and date of revisions.
NIA
7.
A listing of ail conditions placed on trie site as a result of a
conditional use permit or conditional zoning approval.
8.
A space labeled 'Approved by the Zoning Administrator" for
the approval signature and date of approval.
NjA
S.
A desc-ipden of settacks or conditions placed on the site as a
result of a variance approval. (Reference the variance
application number.)
General Site Information
Y N
10. Location map (scale 1:2000)
11. Magisterial District Z-ox)fWALL .
12. Scale of site plan (not to exceed 1:50)
12. North Arrow
14. Zoning of site
15. Use, zoning, and Property Identification Number (PINT) of all
adjoining properties. This inc!udes properties Icc3ted across
right-of-ways, streams, and railroad tracks.
16. Surjeyed bcundanes for all 'cts and parca!s.
1
9
• 0
General Site (con't)
Y N
/
/
17.
Aceage of all lots inducted in the plan.
18.
The location and dimensions of all required setbacks and yard
areas.
1�
�G
19.
The location and type of all dwelling units.
20.
Location and descipdcn of all recreation fadlities.
21.
Location of sidewalks and pedestrian ways.
22-
Location and area of common open space.
23.
The location, height, and dimensions of all signs.
24.
Location, height, and spedfIcadons of outdecr fighting fixtures.
25.
Location and nature of outdoor storage areas.
26.
Location of outdoor trash receptac!es and dimensions of
structure (fendng, etc.) required to enclose receptacles.
Building Information
ro 4cco�-'-.-
Y N
27.
The height of all buildings and structures.
23.
Location of all buildings, structures and uses.
29.
The proposed use of earn building, struc'ure and area.
30.
Grcund floor area and total floor area of all buildings with PAR
calc%laticns for co mmerdal and industrial zoning distric'.s.
Roads
Y N
31. Name and number of existing and planned itreets on and
adjoining the site.
32. Lccadcn of existing and planned streets on and adjoining the
site.
33. Pasted speed limit of existing adjacent reads.
34. Lecaticn and dimensions of all proposed entrances from public
right-of-ways.
I
•
•
35. Location of all entrances an adjoining roads within 2C0 feet of the
proposed or existing entrance.
36. Cimensicns, boundaries, width, pavement, and ccrtstrurwcn of
planned roads.
Utilities
Y N
37. Lecatien of all utilities, including sewer and water lines with the
size of lines, mains, and laterals.
38. Lecaticn and width of all easements, including access, utility,
and drainage easements.
39. Location and nature of fire lanes, fire hydrants, and all other
face Jes necessary to meet Fire Cade requirements.
Parking
Y N
Natural Features
Y N
40. Cal=laticns describing the required number of parking and
loading spaces. SO s()Kvi A'V4,0
41. Location and dimensions of all parking and loading spaces,
driveways, parking aisles, curbing and other features to be used.
42. Location and dimension of all disabled parking spaces and
ramps.
43. Existing and finished contour lines.
44. Lec3ticn of steep slopes, woodlands, flcedplains, wetlands,
sinkholes, and ether environmental features.
45. Location cf streams and drainage ways.
t
0
•
Landscaping
Y N
48. Landscaping plan describing location and types of plants to be
used.
47. Location of required buffers and screening with cross sections or
profiles.
Erosion and Sediment Control
Y . N
I
48. A stormwater management plan with run off calculations and
location and description of facilities to be used.
49. Sail erosion and sedimentation control plan describing the
location and methods to be used to minimize- erosion and
sedimentation during development.
12
•
SITE PLAN APPLICATION
Department of Planning and Development Use only.
Date application received Application
_ Complete_ Date of acceptance
_ Incomplete. Date of return.
1. Project Title:
2. Location of Property
(street address)
3
4
Property Owner:
Address:
Telephone:
Applicant/Agent
Address
/A J- 1 /\ /
Telephone: 5VO -
5. Designer:
Address:
Telephone
Contact:
Request For Site Plan Comments
Department of Planning and Development
Mail to:
Department of Planning and Development
Attn: County Planner
P.O. Box 601
Winchester, VA 22604
(540) 665-5651
Hand deliver to:
107 N. Kent Street
Fourth Floor
Winchester, VA
(540) 665-5651
Please fill out the information as accurately as possible in order to assist the agency with their
review. Please attach two (2) copies of the
//site plan //with this sheet.
Applicant's Name: �P to Te ,
Address-.
Phone Number
S�/G - 60
Name of development and/or description of the request: --1,al .L/7" z�clI,*
Location of property. Bch. W 7 � n 2_� r, C
Planning and Development's Comments
Planning and Development use only
Date received Date revision received
Incomplete Incomplete
Date reviewed Date reviewed
Signature and Date
Signature and Date (revision)
Date approved
COMA/10 � WEA- LTI-I of VIRCII�, I,
DEPARTMENT OF TRANSPORTATION
EDINBURG RESIDENCY
DAVID R. GEHR Ia031 OLD VALLEY PIKC JERRY A. COPP
CO. 'ISSIONER P 0 BOX 278 RES10crif E%Gr•.CEIt
EDINBURG. VA 2282-1-0278 TOLE 5•I3l 1)3a ;G)9
FAX i5-IC1 784 5647
May 8, 1997
Mr. John C. Lewis, P.E. Ref: First United Methodist Church
Painter -Lewis, P.L.C. Route 739 (Apple Pie Ridge Road)
302 South Braddock Street, Suite 200 Frederick County
Winchester, VA 22601
Dear John:
We have received your preliminary site plans dated April 25, 1997 for the referenced
project. A plan review has been completed and we offer the following comments as
shown in red on the plan:
1. The tapered pavement needs to be tied to curb & gutter at the first edge of gutter as
shown.
2. The width of the paved entrance should be shown from the edge of gutter to the
edge of gutter (30' of pavement). (See Page 27 of the Miniinuin Standards of State
Highways.)
3. Additional slope grading along Route 739 would increase sight distance, especially
during tall grass season.
4. The reverse gutter concept is not an available option inside VDOT right-of-way.
5. The entrance pavement should be graded with Swale so surface water will drain
away from Route 739 toward the roadway ditch.
All miscellaneous notes shown in red on the plans will need to be addressed.
When all the above comments have been addressed, please submit five copies of the
revised plans for final approval. ; p�
If you have an questions, lease call.
Y any p Cn
Since y r w
cc U
Barry J. Sweitzer, rans. Roadw y Engineer l� 8 L 9 C v cu
For: Robert B. Childress, Permits & Subd. Specialist Supervisor
BJS/ rf
xc: Mr. R. B. Childress, Mr. S. A. Melnikoff, Mr. Kris Tierney
WE KEEP VIRGINIA MOVING
0
From: John Lewis Date: 05/16/97
To: Eric Lawrence Time: 10:02 AM
Company: Fredco Planning & Zoning
107 North Kent St
Winchester, VA
JOB: First United Methodist Church
Eric:
Plan review fee of $1350.00 for FUMC at Apple Pie Ridge.
VOICE: 540-662-5792 FAX: 540-662-5793
............
..... ......... ....
... . ..... ...... ........ .
d UUX: S e
2 SO ::Bra k St*e.66C'�;*8 Uite-: 2 2�6
0C
........... ............ ........