Loading...
HomeMy WebLinkAbout017-97 Eastern Supply -Gainesboro - Backfile (2)CASH Date 19 RECEIPT 002.5699 Received From Address Dollars $ For U. MY CL AMT OF CAS„ ACCOUN' AMT PAIV CHECK BALAWF MONEY DUE 1,-f*ER 713y SITE PLAN CHECKLIST The checklist below indicates all the information. -that needs to be -submitted as part of the site plan application. All required information must.be submitted prior to the final approval of any site plan. The Department of Planning and Development will review the application to ensure that it is complete. If any portion is not included or complete, the site plan application will not be accepted and returned to the applicant(s). Site Plan Package 1. One set of approved comment sheets are required from the following review agencies prior to final site plan approval. It is recommended that applicants contact the Department of Planning and Development to determine which review agencies are relevant to their site plan application. Virginia Department of Transportation (VDOT) Frederick County Sanitation Authority _y( Department of Planning and Development Inspections Department Frederick County Engineer (Public Works) __L/ Frederick County Fire Marshal _ Department of Parks and Recreation 2. One copy of the Site Plan application 3. Five Copies of the Final Site Plan for approval _ X County Health Department _Y City of Winchester _Z( Town of Stephens City _Z( Town of Middletown —X Airport Authority _ Soil & Water Conservation District 4. One reproducible copy of the Site Plan (if required) 5. A 35mm slide of the Site Plan (if required) s =16-- ? 7 s-16.17 7-3-� 7 �Drb ,�"nirft�� ��[�tttiti�t� �ti�ttict t�u»tnti��iutt "Serving the Northern Shenandoah Valley - A 21st Century Tele-Region." IAW Map & Data Center * Regional Partnership * Technical Assist:mce 103 E. Sixth St. Front Royal, VA 22630-3499 I'hone: (540) 636-8800 • Fax: (540) 635-4147 • E-mail: lfpdc@shentel.net TRIP Rideshare: (S40) 63S-4146 or (800) 74S-RIDE (7433) NOTES DATE n,�v LOU \A--� 7 Ow ILO PLEASE RECYCLE C FILE COPY COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 678-0682 July 2, 1997 Mr. Mark D. Smith Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 RE: Approval of Eastern Supply Site Development Plan Dear Mark: The Frederick County Planning Department administratively approved Site Plan #017-97 for the above referenced site plan on July 2, 1997. This site plan, for the construction of a 2,500 square foot addition to an existing building and the change of use to an office and fabrication shop with outdoor storage, meets all County requirements for development within the M1 (Light Industrial) zoning district. The outdoor storage of products, equipment and materials shall be limited to the area shown on the site plan and shall be completely screened from the view of the road right-of-way and adjoining properties by the methods identified on the site plan. I have provided you with three copies of the approved site plan. Please keep an approved copy for your files and provide the owner with the other two copies. The owner should keep an approved copy for their files and maintain an approved copy on the construction site. Once the site development has been completed, the owner should contact this office to schedule an on -site inspection. Please contact me if you have any questions regarding this letter. Sincerely, Michael T. Ruddy Planner II MTR/cc cc: Richard C. Shickle, Gainesboro District Supervisor T. Roy Jennings, Frederick County Real Estate Joe C. Wilder, Engineering Technician Garland Miller, Winchester/Frederick County E.D.C. 107 North Dent Street • Winchester, Virginia'_2601-5000 • • FILE COPY COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 678-0682 June 23, 1997 Mr. Mark D. Smith Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 RE: Second Review of Eastern Supply Site Development Plan Dear Mark: I have had the opportunity to review the above referenced site plan resubmitted to our department on June 19, 1997. Based upon changes you have made to the plan, the following comments need to be addressed during the final revision of this site plan. The proposed screening that has been relocated in front of the parking area should contain a double row of evergreen trees. In addition, please revise the detail of the outdoor storage area screening to reflect that the double row of evergreen trees are staggered and planted a maximum of eight feet off center, and are a maximum of six feet in height when planted. The area of outdoor storage should not infringe upon the parking area in front of the building. It would be appropriate to define the limit of the outdoor storage area to the rear of a line from the front of the building to avoid any conflict with the parking area. Please revise your site plan to reflect the comments specified in this letter and resubmit one copy for my review. Once I have verified the information contained on the revised site plan, I will need all approved review agency comment sheets and five copies of the final site plan for approval. Please contact me if you have any questions regarding this letter. Sincerely, Michael T. Ruddy ' Planner I MTR/cc 107 North Bent Street • Winchester, Virginia 22601-;000 li SITE PLAN APPLICATION Department of Planning and Development r7 Use only. Q Date application received �� f 5-� 1 Application # nV iI 1 I Complete. Date of acceptance Incomplete. Date of retum. 1. Project Title: EA sTE�24N Su PPL i 2. Location of Property / 6 ( Mc 6 e �o�D (street address) 3. Property Owner. LE/VO/� G/ / 7 �• �F VA Address. 3'� -'7-7-S V(/I tiJGKESTEfZ , VA. Z Z tool Telephone: L 54r�� ,7 8 < 4. Applicant/Agent (%zEEAVwAY/ G Address /5/ wrndy H1 L1- �« lea z z 6oz Telephone: 5. Designer: /u fS C ratiJ� Address: Telephone. Contact: 6 • • or 6. Is this an original or revised site plan? 7a. Total acreage of parcel to be developed: 7b. Total acreage of parcel: 8. Property Information: a) Property Identification Number: b) Current Zoning: c) Present Use: d) Proposed Use: e) Adjoining Property Use(s) f) Adjoining Property Identification Number(s) g) Magisterial District(s) Original Revised se�70 SQ. FT 5.3/85 A<--re-s -.-1-3-1'7 - 39 Concnt�rc�a L --�T Fa b��c•� �Qi� Shop - S�c lcw I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to the submissi my s e plan. Signature: - Date: l' ��loI'MI as OO 4-3_ /7 zo ( 'nwmerux L �3- l q - /r4 �► 01 W� 'A0 7 CUMMOINWEALTI-I of VIRQINI -A DEPARTMENT OF TRANSPORTATION EDINBURG RESIDENCY DAVID R. GEHR Ia03t OLD VALLEY PIKE COPAmISSIONER P O, BOX 278 EDINBURG. VA 22824-0278 May 15, 1997 Mr. Mark D. Smith, P.E. C/O Greenway, Inc. 151 Wine; Nil! ! ?ne Winchester, VA 22602 Dear Mark: JERRY A. COPP RES10E1: f EN:GINEER TELL t5401 93a 5600 1-A r 1540) 984.560" Ref: Eastern Supply Route 861 Frederick County We have received your revised site plan dated May 5, 1997 for the referenced project. It appears all of our earlier review comments have been satisfactorily addressed. Please advise the owner of our approval. Please sketch or note the need for CG-12 handicap ramps on the radial entrance curbs (4 or as required by the VDOT Inspector). The appropriate land use permits may now be applied for to cover work within the Route 861 right-of-way. The permits are issued by this office and will require a minimum processing fee and surety bond coverage. Once satisfactory application has been made, a permit will normally take approximately thirty days to process and issue. Should you have any questions, please feel free to call. BJS/rf xc: Mr. R. B. Childress Mr. S. A. Melnikoff Mr. Kris Tierney Sinc re , Barry J. Sweitzer Trans. Roadway Engineer For: Robert B. Childress Trans. Permits & Subdivision Specialist Supervisor WE KEEP VIRGINIA MOVING 3 • May 23, 1997 Mr. Mark D. Smith Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 RE: Review of Eastern Supply Site Development Plan Dear Mark: • FILE COPY COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 678-0682 I have had the opportunity to review the above referenced site plan received by our department on May 15, 1997. The following are comments that need to be addressed during the revision of this site plan: 1) Please ensure that the Professional Engineer's Seal is signed and dated on the final site plan copies. 2) Please show the location of the required setbacks and yard areas on sheet two of the site plan. 3) Please identify the location of the outdoor storage area on the site plan. A note to the effect "All outdoor storage to be located internal to privacy fence screening" should be placed in the area of the site plan identified for outdoor storage. 4) Please provide a detail of the privacy fence screening that will be used to enclose the outdoor storage. 5) The location and nature of all facilities necessary to meet Fire Code requirements shall be approved by the Fire Marshal. 6) The stormwater management plan, and the soil erosion and sedimentation control plan, shall be approved by the Department of Public Works. Please revise your site plan to reflect the comments specified in this letter and resubmit one copy for my review. Once I have verified the information contained on the revised site plan, I will need all approved review agency comment sheets and five copies of the final site plan for approval. Comment 107 North Bent Street - Winchester, Virginia 22601-5000 Eastern Supply Site Plan Page 2 May 23, 1997 sheets are required from the following agencies: the Virginia Department of Transportation, the Frederick County Sanitation Authority, the Inspections Department, the Frederick County Engineer, and the Frederick County Fire Marshal. Please contact me if you have any questions regarding this letter. Sincerely, '/ . k cwL� H a4 Michael T. Ruddy Planner I MTR/cc N SITE PLAN CHECKLIST The checklist below indicates all the information that needs to be submitted as part of the site plan application. All required information must be submitted prior to the final approval of any site plan. The Department of Planning and Development will review the application to ensure that it is complete. If any portion is not included or complete, the site plan application will not be accepted and returned to the applicant(s). Site Plan Package 1. One set of approved comment sheets are required from the following review agencies prior to final site plan approval. It is recommended that applicants contact the Department of Planning and Development to determine which review agencies are relevant to their site plan application. V Virginia Department of Transportation (VDOT) ✓ Frederick County Sanitation Authority �! Department of Planning and Development v Inspections Department JFrederick County Engineer (Public Works) Frederick County Fire Marshal _(, Department of Parks and Recreation 2. One copy of the Site Plan application 3. Five Copies of the Final Site Plan for approval k County Health Department _ k City of Winchester _ Town of Stephens City _x Town of Middletown V, Airport Authority _y, Soil & Water Conservation District 4. One reproducible copy of the Site Plan (if required) 5. A 35mm slide of the Site Plan (if required) 8 0 Site Plan Information Checklist The following information must be included on your site plan. If your site plan is incomplete or is missing information, it will not be reviewed and returned to you for revisions. Administrative Information Y N ✓ 1. Name of proposed development. 2. Name, address, and phone number of owner. ✓ 3. Name, address, and phone number of developer. 4. Name, address, and phone number of designer. ✓ 5. Certificate of surveyor, engineer, or architect. 6. Date plan prepared and date of revisions. 7. A listing of all conditions placed on the site as a result of a conditional use permit or conditional zoning approval. 8. A space labeled "Approved by the Zoning Administrator" for the approval signature and date of approval. 9. A description of setbacks or conditions placed on the site as a result of a variance approval. (Reference the variance application number.) General Site Information Y N 10. Location map (scale 1:2000) ✓ 11. Magisterial District ✓ 12. Scale of site plan (not to exceed 1:50) 13: North Arrow ✓ 14. Zoning of site L15. Use, zoning, and Property Identification Number (PIN#) of all adjoining properties. This includes properties located across right-of-ways, streams, and railroad tracks. 16. Surveyed boundaries for all lots and parcels. 11 l) General Site (can't) Y N Building Information Y N Acreage of all lots included in the plan. The location and dimensions of all required setbacks and yard areas. +6 be. -,, "e. u-,�- p to --- The location and type of all dwelling units. Location and description of all recreation facilities. Location of sidewalks and pedestrian ways. Location and area of common open space. The location, height, and dimensions of all signs. Location, height, and specifications of outdoor lighting fixtures. Location and nature of outdoor storage areas. D �� q c,c- Location of outdoor trash receptacles and dimensions of structure (fencing, etc.) required to enclose receptacles. The height of all buildings and structures. Location of all buildings, structures and uses. uc)c A-rn er,r l o r O C.IT The proposed use of each building, structure and area. Ground floor area and total floor area of all buildings with PAR calculations for commercial and industrial zoning districts. Name and number of existing and planned streets on and adjoining the site. Location of existing and planned streets on and adjoining the site. Posted speed limit of existing adjacent roads. Location and dimensions of all proposed entrances from public right-of-ways. • • 35. Location of all entrances on adjoining roads within 200 feet of the proposed or existing entrance. 36. Dimensions, boundaries, width, pavement, and construction of planned roads. Utilities Y N 37. Location of all utilities, including sewer and water lines with the size of lines, mains, and laterals. ✓ 38. Location and width of all easements, including access, utility, and drainage easements. 39. Location and nature of fire lanes, fire hydrants, and all other facilities necessary to meet Fire Code requirements. Parking Y N 40. Calculations describing the required number of parking and loading spaces. 41. Location and dimensions of all parking and loading spaces; driveways, parking aisles, curbing and other features to be used. ✓ 42. Location and dimension of all disabled parking spaces and ramps. Natural Features Y N ✓ 43. Existing and finished contour lines. 44. Location of steep slopes, woodlands, floodplains, wetlands, sinkholes, and other environmental features. 45. Location of streams and drainage ways. I Landscaping Y N 46. Landscaping plan describing location and types of plants to be used. 47. Location of required buffers and screening with cross sections or profiles. Erosion and Sediment Control Y . N 11 48. A stormwater management plan with run off calculations and location and description of facilities to be used. 49. Soil erosion and sedimentation control plan describing the location and methods to be used to minimize erosion -and sedimentation during development. 12 rhVll LV 114VVM� • • mail to: Virginia Department of Transportauon Attn: Resident Enginoer P.O. Box 278 Edinburg, Virginia 22824-0278 (540) 984-4133 Hand deliver to: Virginia Department of Tran. ;ipc4 auon 1550 Commerce Street Winchester, -VA (540) 722-3460 Please fill out taw information as accurately as posslbie in order to s4ast the Varyln,a DepwUnwont of Traruportation wash chair review. Pteaae attach Lys (6) coplae, of the wwita pion with tratti`a Qaneratlon data and drainage calculation with U la sheet. Applicant's Name. - Address: Phone Number. Name of development and/or description of tho request: Location of property; oC A fc<�/eR-n. l70' we5- A�G7i LZ> Virginia Department of Transporwtion'i Comments: 14 t L Ju,71 v O J. fcjuet>t For Site Plan Comments Frederick County Enaineerina Deoar"ment, Ma..` r �rld dylly4 to: J Frederick County Enginddrin �0� \ 107 N. Kd nt Strddt ; -•. • Attn: Director of Engine J Fourth Floor 107 North Kent Street D VWinchoster, VA Winchester, VA 22601 (540) 665-5643 ( ) 6t�5-5ti43 Plsarr►e fill out the information ccurdtuly ds poysibld in order to dss,st tnu a6aOCy with U-Ma review. Please attach two (2) copies of the site plan with this sheet. Applicant's Namd: 4:!;-' zeC—"PV'A ,/ ENG�NEEFi/NG Address: /5/ W� "R a Z ZlvOL Phone Number. �5-�) /,4 z - Name of development and/or description of thta request: Engineering D is Comments: Ln*Inswing pcpL ww Vnly Dl+tc't�xwvod �,� Uc mu' lon rmcived Dao OP WOVCJ LILO 1� ctc lncom�lctc Datc mvicwW Datc rc Signature Arid Data Siguttiuo uixi lae►ec (reviai 16 • u COUNTY OF FREDERICK, VIRGINIA FIRE MARSHAL'S OFFICE LAND DEVELOPMENT COMMENTS Control No.SP97-0030 Date Received 5/15/97 Date Reviewed 6/4/97 Applicant Greenway Engineering Plan Rev. Date: 5/5/97 Addreuu 151 Windy hill Lunt: Winchester, Virginia 226U2 Project Name Eastern Supply Type of ApplicationSite Plan 1st Due Fire Co. 13 1st Due Rescue Co. 13 Tax I.D. No. 43.19.39 RECOMMENDATIONS Phone No. 540-662-4185 Current "Zoning M-1 Election DistrictSlonewall Automatic Sprinkler SyytemXX Reuideutial Sprinkler Syutetn Automatic Fire Alarm SyaAwnKX Othur "Kaux" l-'.U. Lintry Syrwmb REQUIREMENTS Emergency Vehicle Access Adequate XX Inadequate Not Identified Fire Laney Required Yes XX No Comments Posted Fire Lanes required at all hydrant locations. Rolldway/Aislewlly Widths Adequate XX luadequwte Nut ldualiliud Special Hazards Noted Yes No XX Comments Hydrant Locations Adequate XX Inadequate Not Identified Siamese Location Adequate Inadequate Not Identified XX Additional Comments Attached? Yes No XX Plan Approval Recommended? Yes XX No Si1; natu � .. Titlef R • P Request For Site Plan Comments Frederick County Sanitation Authority Mail So: Frederick County Sanitation Authority Attn: Engineer Director P.O. Box 1877 Winchester, VA 22604 (540) 868-1061 Mond dulivor to: 315 Macedonia Church Road Stuphens City, VA (540) 868-1061 Plow fill out the information as accurately as po"ibie in orddr to 4"ibt Vw :rjdrtcy with chair review. Please attach two (2) copies of the site plan with this Shout, Applicant's Name:, Address: Phone Number: 67R-e0 1WA Y'O' EA A50-/EEA?/A/G A 0%41— VVIA -- cfSft/, VR 2ZlooZ &7-- -,j�7 05 Name of development and/or description of the request: AMENDED 5t7-e Pl&l — EA5.7-EPW Location of property: GHee p-P. il7o' wE ;T Frederick County Sanitation Authority's Commdnts: • • Request For Site Plan Comments Frederick County Inspections Department;, Mail to: Frederick County Inspections Dept. Attn: Building Official 107 North Kent Street Winchester, VA 22601 (540) 665-5650 Hand deliver tQ; �s 107 N. Kent Street Fourth Floor Winchester, VA (540) 665-5650 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach one (1) copy of the site plan with this sheet Applicant's Name: GgEEAjWAy" LNG/NE�i�NG Address: /5/ weZ—utix— /A/ /�G /'� c� ZZ<OOZ Phone Number: ra Jtc7'l Name of development and/or description of the request: t4M C--"0OQ S/T�-: P A Al - EAsTL-?-N SUP -PLY Location of property: %H SIO6 e9P Mc 6HE 7 e—,,V of 2 Inspections Department's Comments: Inspections Dept. use only Dato roccivcd „ Pk Date ravimmd Signature and Date Signature and Data (revisi to %E . E5 6! l C Ments are on the back of this form Duto revision rtxcivod Datc approved 17 • • Addition shall comply with the Virginia Uniform Statewide Building Code and Section 306 Use Group F (Factory) of the BOCA Nation Building Code/1996. Other codes that apply are CABO A117.1-92 Accessible and Useable Buildings and Facilities. Note: 1110.2.1 Alterations affecting an area containing a prinkary function: Exception #1 20% rule for additions and renovations. • • Eastern Supply Greenway Engineering 151 Windy Hill Lane NN inchester, VA 22602 (540) 662-4185 • Eastern Supply Table of Contents a Narrative... 1 Predeveloped 2yr... 2 Post -developed 10yr... 3 Post -developed 10yr - routed... 4 Post -developed 100yr ... 5 Post -developed 100yr - routed... G Ditch Computations... 7 Drainage Divide... 8 Eastern Supply in the Stonewal Industrial Park Stormwater Management Analysis June 20,1997 Background The site is located along McGhee Road in the Stonewall Industrial Park in the Gainesboro District of Frederick County Virginia. The site has been developed in the past and was a trucking terminal for Roadway Express. The future occupants would like to improve the site with a 2500 sf .addition and an additional 57,300 sf of gravel storage area. Purpose The purpose of this analysis is to improve the existing SWM to accomodate the improvements. Conclusion The original SWM is over ten years old; therefore, the site was treated as a new development for the public's best interest. The ten year storm will be routed through a pond with a four foot concrete weir. The resultant release will drain into the same system as before. The release rate for the ten year routed storm wlll be lower than the predeveloped two year runoff; therefore, the SWM will be more than adequate and an improvment to the current SWM. Data Tabulation Predeveloped Conditions (2 yr Storm) Area3 = 19.07 acres (off site) Area(l 2 4) = 5.33 acres (on site) C = 0.3 12 = 5.3 In/hr Q2 = 38.8 cfs Post Deyelorted Conditions Areal = 1,23 acres C1 = 0.75 (Gravel Storage) Areal = 2.11 acres C2 = 0.9 (Buildings and Pavement) Area3 = 19.07 acres C3 = 0.3 (Sites upstream which have SWM) Area4 = 1.99 acres C4 = 0.3 (Lawn and undisturbed) 110 - 6.8 In/hr Q10 = 62.15 cfs Routed through pond - Peak = 17.4 cfs % Reduction Peak 2yr - Peak 10yr X 100 = (38.8 - 17.4) X 100 = 55% Peak 2yr 38.8 Rational -Formula • Area Number C Area (ac) CA ----------- ----------------------- 1 0.300 24.400 7.320 --------------- ----- --------- --------- Weighted Totals: 0.300 24.400 7.320� Time of concentration= 5 min Intensity Peak Flow (in/hr) (cfs) ------------------ 5.30 38.80 Z 11ational Formula ---------------- Area Number C Area (ac) --------- CA ----------- 1 -------------- 0.750 1.230 0.922 2 0.900 2.110 1.899 3 0.300 21.060 --------- --------- 6.318 --------------- Weighted Totals: ----- 0.375 24.400 9.139 Time of concentration= 5 min Intensity Peak Flow (in/hr) (cfs) ------------------ 6.80 62.15 Hydrograph Time of concentration = 5.0 min Storm duration = 5.0 min Time Q (min) (cfs) 0.0 0.00 1.0 12.43 2.0 24.86 3.0 37.29 4.0 49.72 5.0 62.15 6.0 54.71 7.0 47.26 8.0 39.82 9.0 32.38 10.0 24.93 11.0 17.49 12.0 10.05 13.0 2.61 r 3 ****************************************************************************** * ROUT VERSION 5.4 ** PROJECT: 10 YEAR ROUTED - POST-DEV ** DATE: 6/18/1997* ****************************************************************************** (Types: 1:Weir; 2:Pipe; 3:Riser) Structure 1 1: Type 1: Weir Weir: 2: Elevation (ft) 703.96 3: Length (ft) 4.00 4: Coefficient 3.33 Riser: 5: Elevation (ft) 0.00 6: Inlet Area (sf) 0.00 7: Inlet Perimeter (ft) 0.00 8: Orifice Elevation (ft) 0.00 9: Orifice Diameter (in) 0.00 10: Orifice Elevation (ft) 0.00 11: Orifice Diameter (in) 0.00 12: Orifice Elevation (ft) 0.00 13: Orifice Diameter (in) 0.00 Pipe: 14: Invert Elevation (ft) 0.00 15: Diameter (in) 0.00 16: Orifice Diameter (in) 0.00 17: Length (ft) 0.00 18: Manning's n 0.000 19: Slope (ft/ft) 0.000 20: Entrance Loss Coefficient 0.0 Surface: 21: Initial Elevation (ft) 703.96 Storage Pond Characteristics: Section Elevation Area (ft) (sq ft) ------------------------------ 1 703.96 0.00 (Calculated) 2 703.96 4.00 3 704.00 1710.00 4 705.00 23130.00 5 706.00 34560.00 Control: RW = Riser acting as a weir RO = Riser acting as an orifice PI = Horizontal pipe in inlet control PO = Horizontal pipe in outlet control Time Inflow Weir Total Elev Storage (min) (cfs) (cfs) (cfs) (ft) (cu ft) ----------------------------------------------------- 0.0 0.00 0.0 0.00 703.96 0.00 1.0 12.43 0.8 0.83 704.12 344.60 2.0 24.86 2.4 2.36 704.28 1,318.65 3.0 37.29 4.4 4.44 704.44 2,962.82 4.0 49.72 7.1 7.06 704.61 5,377.55 5.0 62.15 9.9 9.93 704.78 8,336.94 6.0 54.71 12.5 12.53 704.92 11,235.42 7.0 47.26 14.5 14.47 705.02 13,514.65 8.0 39.82 15.9 15.88 705.0815,230.60 9.0 32.38 16.8 16.84 705.13 16,420.73 10.0 24.93 17.2 17.24 705.15 16,924.41 11.0 17.49 17.4 17.38 705.15 17,093.55 12.0 10.05 17.1 17.10 705.14 16,745.49 q ov - 14) 1-[) � 1�,jX, ( 1 Rational -Formula Area Number C Area (ac) ------------------ CA ----------- 1 ----- 0.750 1.230 0.922 2 0.900 2.110 1.899 3 0.300 21.060 - - - - - - --------- 6.318 - - - - - - - - - - - - - - - Weighted Totals: - - - - - - - - 0.375 24.400 9.139 Time of concentration= 5 min Intensity Peak Flow (in/hr) (cfs) --------- --------- 9.30 85.00 Hydrograph - Time of concentration = 5.0 min Storm duration = 5.0 min Time Q (min) (cfs) 0.0 0.00 1.0 17.00 2.0 34.00 3.0 51.00 4.0 68.00 5.0 85.00 6.0 74.82 7.0 64.64 8.0 54.46 9.0 44.28 10.0 34.10 11.0 23.92 12.0 13.74 13.0 3.56 n J ****************************************************************************** * ROUT VERSION 5.4 ** PROJECT: 100 YEAR ROUTED -POST ** DATE: 6/18/1997* ****************************************************************************** n (Types: 1:Weir; 2:Pipe; 3:Riser) Structure 1 1: Type 1: Weir Weir: 2: Elevation (ft) 703.96 3: Length (ft) 4.00 4: Coefficient 3.33 Riser: 5: Elevation (ft) 0.00 6: Inlet Area (sf) 0.00 7: Inlet Perimeter (ft) 0.00 8: Orifice Elevation (ft) 0.00 9: Orifice Diameter (in) 0.00 10: Orifice Elevation (ft) 0.00 11: Orifice Diameter (in) 0.00 12: Orifice Elevation (ft) 0.00 13: Orifice Diameter (in) 0.00 Pipe: 14: Invert Elevation (ft) 0.00 15: Diameter (in) 0.00 16: Orifice Diameter (in) 0.00 17; Length (ft) 0.00 18: Manning's n 0.000 19: Slope (ft/ft) 0.000 20: Entrance Loss Coefficient 0.0 Surface: 21: Initial Elevation (ft) 703.96 Storage Pond Characteristics: Section Elevation Area (ft) (sq ft) ------------------------------ 1 703.96 0.00 (Calculated) 2 703.96 4.00 3 704.00 1710.00 4 705.00 23130.00 5 706.00 34560.00 Time 'Inflow Weir Total Elev Storage (min) (cfs) (cfs) (cfs) (ft) (cu ft) ----------------------------------------------------- 0.0 0.00 0.0 0.00 703.96 0.00 1.0 17.00 1.1 1.14 704.15 515.53 2.0 34.00 3.1 3.10 704.34 11868.75 3.0 51.00 5.8 5.75 704.53 4,136.14 4.0 68.00 9.1 9.09 704.74 7,438.65 5.0 85.00 12.8 12.77 704.93 11,508.20 6.0 74.82 16.1 16.12 705.10 15,516.84 7.0 64.64 18.6 18.63 705.21 18,695.34 8.0 54.46 20.5 20.48 705.29 21,112.50 9.0 44.28 21.8 21.76 705.35 22,815.13 10.0 34.10 22.3 22.34 705.37 231593.46 11.0 23.92 22.6 22.56 705.38 23,891.31 12.0 13.74 22.3 22.32 705.37 23,565.97 6 • • Trapezoidal Channel Analysis & Design Open Channel - Uniform flow Worksheet Name: Comment: DITCH LEADING AWAY FROM WEIR Solve For Depth Given Input Data: Bottom Width..... Left Side Slope.. Right Side Slope. Manning's n...... Channel Slope.... Discharge........ Computed Results: Depth............ Velocity......... Flow Area........ Flow Top Width... Wetted Perimeter. Critical Depth... Critical Slope... Froude Number.... 4.00 ft 3.00:1 (H:V) 3.00:1 (H:V) 0.030 0.0100 ft/ft 17.40 cfs 0.80 ft 3.39 fps 5.13 sf 8.81 ft 9.07 ft 0.70 ft 0.0169 ft/ft 0.78 (flow is Subcritical) m Open Channel Flow Module, Version 3.42 (c) 1991 Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708 �LOt 19 • • Request For Site Plan Comments Department of Planning and Development Mail to: Hand deliver to: Department of Planning and Development 107 N. Kent Street Attn: County Planner Fourth Floor 107 North Kent Street Winchester, VA Winchester, VA 22601 (540) 665-5651 (540) 665-5651 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the site plan with this sheet. Applicant's Name: GZEENWA Y" n5M W %-,f--r% Address: /5/ La n t e_ a . 2ZlooZ Phone Number: ( ) &,/, Z - -1-/ 8s Name of development and/or description of the request: AMEN LEL) /TELPLAlV e7A STEP-N uPPL- Location of property: M7ALTH '510E &f o' WEs OF= I NTEp-SF�Tio >F- ac ( fH f2oAp - E B6 Planning and Development's Comments: Planning and Development use only C a ..- Date received Date revision received Date approved �;� t Incomplete Incomplete en > g 3 Date revicvred Date reviewed Signature and Date 2 U Signature and Date (revision) 16 • • GROMAY MONUANrG 151 Windy Ifill Line Winchester, Virp,inia 22602 R?unded in 1971 May 15, 1997 County of Frederick Planning Dept. 107 N. Kent St. Winchester, Va. 22601 ATT: Eric Lawrence / � "1 K RE: Eastern Supply (Previously known as Roadway Express, Inc.) Dear Eric: Please accept this submittal of a site plan entitled, "Eastern Supply" for your review and comment. It is located at 161 McGhee Road and consists of a 2,500 sq. ft. building addition and a 6' high privacy screening fence. Two copies of the plan are attached as well as the submittal fee check. If you have any question, please feel free to contact me. Sincerely, Greeennwal Engine V, Mark D. Smith, P.E., L.S. President Engineers Surveyors lelephone540-662-4185 FAX 540-722-9528 • • Request For Site Plan Comments Frederick County Engineering Department Mail to: Frederick County Engineering Dept. Attn: Director of Engineering 107 North Kent Street Winchester, VA 22601 (540) 665-5643 Hand deliver to: 107 N. Kent Street Fourth Floor Winchester, VA (540) 665-5643 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the site plan with this sheet. Applicant's Name: GiQEEA1WA',/ ENG�/NEEfz/NG Address: /5/ wed", /-I,, // Ga f-� l/Q . Z 2-&oZ Phone Number: Name of development and/or description of the request: M E�/DE 5/ % Lf} — STE Engineering Department's Comments: �CO Deo �i cue e tS G.n -i�'-v2 PPL s� Z) F��, f'i / �ivt cz ,moo L G v �zVrr<5s Engineering DcpG use only Date rmcived Incomplete Date reviewed Sigma re and Date Sigia=e and Date (r is4xf� n Date revision received Date approved � // 9� Incomplete Datz vi 18 COUNTY of FREDERICK Department of Public Works 540/665-5643 FAX: 540/ 678-0682 July 9, 1997 Mr. Mark D. Smith, P. E. Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 RE: Eastern Supply -Revised Site Plan Comments Stonewall Industrial Park Frederick County, Virginia Dear Mark: Upon review of the revised site plan dated July 2, 1997, we offer no further comments. Therefore, we recommend approval of the subject site plan. cc: file If you have any questions, do not hesitate to contact me. Sincerely, oe C. Wilder Engineering Technician, Public Works 107 'North Kent Street - Winchester. Virginia 22601-5000 ❑ Urgent For your review i GREENWAY ANEERING 151 Windy I fill lane Winchester, Virginia 226U2 1 lvuruled in 1971 -TRANSMITTAL TO. ATT: RE: REMARKS: 89 Qi 91�ztz��2�`� • [DATE: PROJECT: S FROM: Gtili[ GREENWAY ENGINEERING 151 Windy Hill Lane Winchester, Va. 22602 Phone 540-662-4185 Fax Phone 540-722-9528 ❑ Reply ASAP ❑ Please Comment Ick I'l„.1w',.tn -11 M" ins ,•n, ,— GRUNWAY RGINHRMG 1 ISI windy I fill Lute winchcster, Virginia 22602 TRANSMITTAL TO: ATT.' YYL�atc ( �rc [RE: • DATE: �2 - I 0 - l PROJECT:1_7st,,. v� FROM: �K a�t �_ �,YYt-t- `- L, GREENWAY ENGINEERING 151 Wltidy Hill Lane Winchester, Va. 22602 Phone 540-662-4185 Fax Phone 540-722-9528 REMARKS: n Ument E] For your review ❑ Ruply ASAP ❑ Please Comment