SITE PLAN CHECKLIST
The checklist below indicates all the information. -that needs to be -submitted as part of the site plan
application. All required information must.be submitted prior to the final approval of any site plan.
The Department of Planning and Development will review the application to ensure that it is complete.
If any portion is not included or complete, the site plan application will not be accepted and returned
to the applicant(s).
Site Plan Package
1. One set of approved comment sheets are required from the following review
agencies prior to final site plan approval. It is recommended that applicants contact
the Department of Planning and Development to determine which review agencies
are relevant to their site plan application.
Virginia Department of Transportation (VDOT)
Frederick County Sanitation Authority
_y( Department of Planning and Development
Inspections Department
Frederick County Engineer (Public Works)
__L/ Frederick County Fire Marshal
_ Department of Parks and Recreation
2. One copy of the Site Plan application
3. Five Copies of the Final Site Plan for approval
_ X County Health Department
_Y City of Winchester
_Z( Town of Stephens City
_Z( Town of Middletown
—X Airport Authority
_ Soil & Water Conservation District
4. One reproducible copy of the Site Plan (if required)
5. A 35mm slide of the Site Plan (if required)
s =16-- ? 7
s-16.17
7-3-� 7
�Drb ,�"nirft�� ��[�tttiti�t� �ti�ttict t�u»tnti��iutt
"Serving the Northern Shenandoah Valley - A 21st Century Tele-Region."
IAW
Map & Data Center * Regional Partnership * Technical Assist:mce
103 E. Sixth St. Front Royal, VA 22630-3499
I'hone: (540) 636-8800 • Fax: (540) 635-4147 • E-mail: lfpdc@shentel.net
TRIP Rideshare: (S40) 63S-4146 or (800) 74S-RIDE (7433)
NOTES DATE
n,�v LOU \A--�
7
Ow
ILO
PLEASE RECYCLE
C
FILE COPY
COUNTY of FREDERICK
Department of Planning and Development
540/665-5651
FAX: 540/ 678-0682
July 2, 1997
Mr. Mark D. Smith
Greenway Engineering
151 Windy Hill Lane
Winchester, VA 22602
RE: Approval of Eastern Supply Site Development Plan
Dear Mark:
The Frederick County Planning Department administratively approved Site Plan #017-97 for the
above referenced site plan on July 2, 1997. This site plan, for the construction of a 2,500 square foot
addition to an existing building and the change of use to an office and fabrication shop with outdoor
storage, meets all County requirements for development within the M1 (Light Industrial) zoning
district. The outdoor storage of products, equipment and materials shall be limited to the area shown
on the site plan and shall be completely screened from the view of the road right-of-way and adjoining
properties by the methods identified on the site plan.
I have provided you with three copies of the approved site plan. Please keep an approved copy for your
files and provide the owner with the other two copies. The owner should keep an approved copy for
their files and maintain an approved copy on the construction site. Once the site development has been
completed, the owner should contact this office to schedule an on -site inspection.
Please contact me if you have any questions regarding this letter.
Sincerely,
Michael T. Ruddy
Planner II
MTR/cc
cc: Richard C. Shickle, Gainesboro District Supervisor
T. Roy Jennings, Frederick County Real Estate
Joe C. Wilder, Engineering Technician
Garland Miller, Winchester/Frederick County E.D.C.
107 North Dent Street • Winchester, Virginia'_2601-5000
•
•
FILE COPY
COUNTY of FREDERICK
Department of Planning and Development
540/665-5651
FAX: 540/ 678-0682
June 23, 1997
Mr. Mark D. Smith
Greenway Engineering
151 Windy Hill Lane
Winchester, VA 22602
RE: Second Review of Eastern Supply Site Development Plan
Dear Mark:
I have had the opportunity to review the above referenced site plan resubmitted to our department
on June 19, 1997. Based upon changes you have made to the plan, the following comments need to
be addressed during the final revision of this site plan.
The proposed screening that has been relocated in front of the parking area should contain a double
row of evergreen trees. In addition, please revise the detail of the outdoor storage area screening to
reflect that the double row of evergreen trees are staggered and planted a maximum of eight feet off
center, and are a maximum of six feet in height when planted. The area of outdoor storage should not
infringe upon the parking area in front of the building. It would be appropriate to define the limit of
the outdoor storage area to the rear of a line from the front of the building to avoid any conflict with
the parking area.
Please revise your site plan to reflect the comments specified in this letter and resubmit one copy for
my review. Once I have verified the information contained on the revised site plan, I will need all
approved review agency comment sheets and five copies of the final site plan for approval.
Please contact me if you have any questions regarding this letter.
Sincerely,
Michael T. Ruddy '
Planner I
MTR/cc
107 North Bent Street • Winchester, Virginia 22601-;000
li
SITE PLAN APPLICATION
Department of Planning and Development r7
Use only. Q
Date application received �� f 5-� 1 Application # nV iI 1 I
Complete. Date of acceptance
Incomplete. Date of retum.
1. Project Title: EA sTE�24N Su PPL i
2. Location of Property / 6 ( Mc 6 e �o�D
(street address)
3. Property Owner. LE/VO/� G/ / 7 �• �F VA
Address. 3'� -'7-7-S
V(/I tiJGKESTEfZ , VA. Z Z tool
Telephone: L 54r�� ,7 8 <
4. Applicant/Agent (%zEEAVwAY/ G
Address /5/ wrndy H1 L1-
�« lea z z 6oz
Telephone:
5. Designer:
/u fS C ratiJ�
Address:
Telephone.
Contact:
6
•
•
or
6. Is this an original or revised site plan?
7a. Total acreage of parcel to be developed:
7b. Total acreage of parcel:
8. Property Information:
a) Property Identification Number:
b) Current Zoning:
c) Present Use:
d) Proposed Use:
e) Adjoining Property Use(s)
f) Adjoining Property Identification Number(s)
g) Magisterial District(s)
Original Revised
se�70 SQ. FT
5.3/85 A<--re-s
-.-1-3-1'7 - 39
Concnt�rc�a L
--�T Fa b��c•� �Qi� Shop -
S�c lcw
I have read the material included in this package and understand what is required by the
Frederick County Planning Department. I also understand that all required material will be
complete prior to the submissi my s e plan.
Signature: -
Date:
l' ��loI'MI
as OO
4-3_ /7 zo ( 'nwmerux L
�3- l q - /r4 �►
01
W�
'A0
7
CUMMOINWEALTI-I of VIRQINI -A
DEPARTMENT OF TRANSPORTATION
EDINBURG RESIDENCY
DAVID R. GEHR Ia03t OLD VALLEY PIKE
COPAmISSIONER P O, BOX 278
EDINBURG. VA 22824-0278
May 15, 1997
Mr. Mark D. Smith, P.E.
C/O Greenway, Inc.
151 Wine; Nil! ! ?ne
Winchester, VA 22602
Dear Mark:
JERRY A. COPP
RES10E1: f EN:GINEER
TELL t5401 93a 5600
1-A r 1540) 984.560"
Ref: Eastern Supply
Route 861
Frederick County
We have received your revised site plan dated May 5, 1997 for the referenced
project. It appears all of our earlier review comments have been satisfactorily
addressed. Please advise the owner of our approval.
Please sketch or note the need for CG-12 handicap ramps on the radial entrance
curbs (4 or as required by the VDOT Inspector).
The appropriate land use permits may now be applied for to cover work within
the Route 861 right-of-way. The permits are issued by this office and will require
a minimum processing fee and surety bond coverage.
Once satisfactory application has been made, a permit will normally take
approximately thirty days to process and issue.
Should you have any questions, please feel free to call.
BJS/rf
xc: Mr. R. B. Childress
Mr. S. A. Melnikoff
Mr. Kris Tierney
Sinc re ,
Barry J. Sweitzer
Trans. Roadway Engineer
For: Robert B. Childress
Trans. Permits & Subdivision
Specialist Supervisor
WE KEEP VIRGINIA MOVING
3
•
May 23, 1997
Mr. Mark D. Smith
Greenway Engineering
151 Windy Hill Lane
Winchester, VA 22602
RE: Review of Eastern Supply Site Development Plan
Dear Mark:
•
FILE COPY
COUNTY of FREDERICK
Department of Planning and Development
540/665-5651
FAX: 540/ 678-0682
I have had the opportunity to review the above referenced site plan received by our department on
May 15, 1997. The following are comments that need to be addressed during the revision of this site
plan:
1) Please ensure that the Professional Engineer's Seal is signed and dated on the final site plan
copies.
2) Please show the location of the required setbacks and yard areas on sheet two of the site plan.
3) Please identify the location of the outdoor storage area on the site plan. A note to the effect
"All outdoor storage to be located internal to privacy fence screening" should be placed in
the area of the site plan identified for outdoor storage.
4) Please provide a detail of the privacy fence screening that will be used to enclose the outdoor
storage.
5) The location and nature of all facilities necessary to meet Fire Code requirements shall be
approved by the Fire Marshal.
6) The stormwater management plan, and the soil erosion and sedimentation control plan, shall
be approved by the Department of Public Works.
Please revise your site plan to reflect the comments specified in this letter and resubmit one copy for
my review. Once I have verified the information contained on the revised site plan, I will need all
approved review agency comment sheets and five copies of the final site plan for approval. Comment
107 North Bent Street - Winchester, Virginia 22601-5000
Eastern Supply Site Plan
Page 2
May 23, 1997
sheets are required from the following agencies: the Virginia Department of Transportation, the
Frederick County Sanitation Authority, the Inspections Department, the Frederick County Engineer,
and the Frederick County Fire Marshal.
Please contact me if you have any questions regarding this letter.
Sincerely,
'/ . k cwL� H a4
Michael T. Ruddy
Planner I
MTR/cc
N
SITE PLAN CHECKLIST
The checklist below indicates all the information that needs to be submitted as part of the site plan
application. All required information must be submitted prior to the final approval of any site plan.
The Department of Planning and Development will review the application to ensure that it is complete.
If any portion is not included or complete, the site plan application will not be accepted and returned
to the applicant(s).
Site Plan Package
1. One set of approved comment sheets are required from the following review
agencies prior to final site plan approval. It is recommended that applicants contact
the Department of Planning and Development to determine which review agencies
are relevant to their site plan application.
V Virginia Department of Transportation (VDOT)
✓ Frederick County Sanitation Authority
�! Department of Planning and Development
v Inspections Department
JFrederick County Engineer (Public Works)
Frederick County Fire Marshal
_(, Department of Parks and Recreation
2. One copy of the Site Plan application
3. Five Copies of the Final Site Plan for approval
k County Health Department
_ k City of Winchester
_ Town of Stephens City
_x Town of Middletown
V, Airport Authority
_y, Soil & Water Conservation District
4. One reproducible copy of the Site Plan (if required)
5. A 35mm slide of the Site Plan (if required)
8
0
Site Plan Information Checklist
The following information must be included on your site plan. If your site plan is incomplete or
is missing information, it will not be reviewed and returned to you for revisions.
Administrative Information
Y N
✓
1.
Name of proposed development.
2.
Name, address, and phone number of owner.
✓
3.
Name, address, and phone number of developer.
4.
Name, address, and phone number of designer.
✓
5.
Certificate of surveyor, engineer, or architect.
6.
Date plan prepared and date of revisions.
7.
A listing of all conditions placed on the site as a result of a
conditional use permit or conditional zoning approval.
8.
A space labeled "Approved by the Zoning Administrator" for
the approval signature and date of approval.
9.
A description of setbacks or conditions placed on the site as a
result of a variance approval. (Reference the variance
application number.)
General Site Information
Y N
10.
Location map (scale 1:2000)
✓
11.
Magisterial District
✓
12.
Scale of site plan (not to exceed 1:50)
13:
North Arrow
✓
14.
Zoning of site
L15.
Use, zoning, and Property Identification Number (PIN#) of all
adjoining properties. This includes properties located across
right-of-ways, streams, and railroad tracks.
16.
Surveyed boundaries for all lots and parcels.
11
l)
General Site (can't)
Y N
Building Information
Y N
Acreage of all lots included in the plan.
The location and dimensions of all required setbacks and yard
areas. +6 be. -,, "e. u-,�- p to ---
The location and type of all dwelling units.
Location and description of all recreation facilities.
Location of sidewalks and pedestrian ways.
Location and area of common open space.
The location, height, and dimensions of all signs.
Location, height, and specifications of outdoor lighting fixtures.
Location and nature of outdoor storage areas. D �� q c,c-
Location of outdoor trash receptacles and dimensions of
structure (fencing, etc.) required to enclose receptacles.
The height of all buildings and structures.
Location of all buildings, structures and uses. uc)c A-rn er,r l o r
O C.IT
The proposed use of each building, structure and area.
Ground floor area and total floor area of all buildings with PAR
calculations for commercial and industrial zoning districts.
Name and number of existing and planned streets on and
adjoining the site.
Location of existing and planned streets on and adjoining the
site.
Posted speed limit of existing adjacent roads.
Location and dimensions of all proposed entrances from public
right-of-ways.
•
•
35. Location of all entrances on adjoining roads within 200 feet of the
proposed or existing entrance.
36. Dimensions, boundaries, width, pavement, and construction of
planned roads.
Utilities
Y N
37. Location of all utilities, including sewer and water lines with the
size of lines, mains, and laterals.
✓ 38. Location and width of all easements, including access, utility,
and drainage easements.
39. Location and nature of fire lanes, fire hydrants, and all other
facilities necessary to meet Fire Code requirements.
Parking
Y N
40. Calculations describing the required number of parking and
loading spaces.
41. Location and dimensions of all parking and loading spaces;
driveways, parking aisles, curbing and other features to be used.
✓ 42. Location and dimension of all disabled parking spaces and
ramps.
Natural Features
Y N
✓ 43. Existing and finished contour lines.
44. Location of steep slopes, woodlands, floodplains, wetlands,
sinkholes, and other environmental features.
45. Location of streams and drainage ways.
I
Landscaping
Y N
46. Landscaping plan describing location and types of plants to be
used.
47. Location of required buffers and screening with cross sections or
profiles.
Erosion and Sediment Control
Y . N
11
48. A stormwater management plan with run off calculations and
location and description of facilities to be used.
49. Soil erosion and sedimentation control plan describing the
location and methods to be used to minimize erosion -and
sedimentation during development.
12
rhVll LV 114VVM�
•
•
mail to:
Virginia Department of Transportauon
Attn: Resident Enginoer
P.O. Box 278
Edinburg, Virginia 22824-0278
(540) 984-4133
Hand deliver to:
Virginia Department of Tran. ;ipc4 auon
1550 Commerce Street
Winchester, -VA
(540) 722-3460
Please fill out taw information as accurately as posslbie in order to s4ast the Varyln,a DepwUnwont
of Traruportation wash chair review. Pteaae attach Lys (6) coplae, of the wwita pion with tratti`a
Qaneratlon data and drainage calculation with U la sheet.
Applicant's Name. -
Address:
Phone Number.
Name of development and/or description of tho request:
Location of property; oC A fc<�/eR-n. l70' we5-
A�G7i LZ>
Virginia Department of Transporwtion'i Comments:
14
t L Ju,71
v
O
J.
fcjuet>t For Site Plan Comments
Frederick County Enaineerina Deoar"ment,
Ma..` r
�rld dylly4 to: J
Frederick County Enginddrin �0� \ 107 N. Kd nt Strddt ; -•. •
Attn: Director of Engine J Fourth Floor
107 North Kent Street D VWinchoster, VA
Winchester, VA 22601
(540) 665-5643 ( ) 6t�5-5ti43
Plsarr►e fill out the information ccurdtuly ds poysibld in order to dss,st tnu a6aOCy with U-Ma
review. Please attach two (2) copies of the site plan with this sheet.
Applicant's Namd: 4:!;-' zeC—"PV'A ,/ ENG�NEEFi/NG
Address: /5/ W� "R
a Z ZlvOL
Phone Number. �5-�) /,4 z -
Name of development and/or description of thta request:
Engineering D
is Comments:
Ln*Inswing pcpL ww Vnly
Dl+tc't�xwvod �,� Uc mu' lon rmcived Dao OP WOVCJ LILO
1� ctc lncom�lctc
Datc mvicwW Datc rc
Signature Arid Data
Siguttiuo uixi lae►ec (reviai
16
•
u
COUNTY OF FREDERICK, VIRGINIA
FIRE MARSHAL'S OFFICE
LAND DEVELOPMENT COMMENTS
Control No.SP97-0030 Date Received 5/15/97 Date Reviewed 6/4/97
Applicant Greenway Engineering Plan Rev. Date: 5/5/97
Addreuu 151 Windy hill Lunt:
Winchester, Virginia
226U2
Project Name Eastern Supply
Type of ApplicationSite Plan
1st Due Fire Co. 13 1st Due Rescue Co. 13
Tax I.D. No. 43.19.39
RECOMMENDATIONS
Phone No. 540-662-4185
Current "Zoning M-1
Election DistrictSlonewall
Automatic Sprinkler SyytemXX Reuideutial Sprinkler Syutetn
Automatic Fire Alarm SyaAwnKX Othur "Kaux" l-'.U. Lintry Syrwmb
REQUIREMENTS
Emergency Vehicle Access
Adequate XX Inadequate Not Identified
Fire Laney Required Yes XX No
Comments Posted Fire Lanes required at all hydrant locations.
Rolldway/Aislewlly Widths Adequate XX luadequwte Nut ldualiliud
Special Hazards Noted Yes No XX
Comments
Hydrant Locations Adequate XX Inadequate Not Identified
Siamese Location Adequate Inadequate Not Identified XX
Additional Comments Attached? Yes No XX
Plan Approval Recommended? Yes XX No
Si1; natu � .. Titlef
R
•
P
Request For Site Plan Comments
Frederick County Sanitation Authority
Mail So:
Frederick County Sanitation Authority
Attn: Engineer Director
P.O. Box 1877
Winchester, VA 22604
(540) 868-1061
Mond dulivor to:
315 Macedonia Church Road
Stuphens City, VA
(540) 868-1061
Plow fill out the information as accurately as po"ibie in orddr to 4"ibt Vw :rjdrtcy with chair
review. Please attach two (2) copies of the site plan with this Shout,
Applicant's Name:,
Address:
Phone Number:
67R-e0 1WA Y'O' EA A50-/EEA?/A/G
A 0%41—
VVIA -- cfSft/, VR 2ZlooZ
&7-- -,j�7 05
Name of development and/or description of the request:
AMENDED 5t7-e Pl&l — EA5.7-EPW
Location of property: GHee p-P. il7o' wE ;T
Frederick County Sanitation Authority's Commdnts:
•
•
Request For Site Plan Comments
Frederick County Inspections Department;,
Mail to:
Frederick County Inspections Dept.
Attn: Building Official
107 North Kent Street
Winchester, VA 22601
(540) 665-5650
Hand deliver tQ; �s
107 N. Kent Street
Fourth Floor
Winchester, VA
(540) 665-5650
Please fill out the information as accurately as possible in order to assist the agency with their
review. Please attach one (1) copy of the site plan with this sheet
Applicant's Name: GgEEAjWAy" LNG/NE�i�NG
Address: /5/ weZ—utix—
/A/ /�G /'� c� ZZ<OOZ
Phone Number: ra Jtc7'l
Name of development and/or description of the request:
t4M C--"0OQ S/T�-: P A Al - EAsTL-?-N SUP -PLY
Location of property:
%H SIO6 e9P Mc 6HE
7 e—,,V of 2
Inspections Department's Comments:
Inspections Dept. use only
Dato roccivcd „
Pk
Date ravimmd
Signature and Date
Signature and Data (revisi
to %E . E5 6! l
C Ments are on the back of this form
Duto revision rtxcivod Datc approved
17
•
•
Addition shall comply with the Virginia Uniform Statewide Building Code and Section
306 Use Group F (Factory) of the BOCA Nation Building Code/1996. Other codes that apply
are CABO A117.1-92 Accessible and Useable Buildings and Facilities.
Note: 1110.2.1 Alterations affecting an area containing a prinkary function: Exception #1
20% rule for additions and renovations.
•
•
Eastern Supply
Greenway Engineering
151 Windy Hill Lane
NN inchester, VA 22602
(540) 662-4185
•
Eastern Supply
Table of Contents
a
Narrative... 1
Predeveloped 2yr... 2
Post -developed 10yr... 3
Post -developed 10yr - routed... 4
Post -developed 100yr ... 5
Post -developed 100yr - routed... G
Ditch Computations... 7
Drainage Divide... 8
Eastern Supply
in the Stonewal Industrial Park
Stormwater Management Analysis
June 20,1997
Background
The site is located along McGhee Road in the Stonewall Industrial Park in the Gainesboro
District of Frederick County Virginia. The site has been developed in the past and was a trucking
terminal for Roadway Express. The future occupants would like to improve the site with a 2500 sf
.addition and an additional 57,300 sf of gravel storage area.
Purpose
The purpose of this analysis is to improve the existing SWM to accomodate the improvements.
Conclusion
The original SWM is over ten years old; therefore, the site was treated as a new development for
the public's best interest. The ten year storm will be routed through a pond with a four foot
concrete weir. The resultant release will drain into the same system as before. The release rate
for the ten year routed storm wlll be lower than the predeveloped two year runoff; therefore, the
SWM will be more than adequate and an improvment to the current SWM.
Data Tabulation
Predeveloped Conditions (2 yr Storm)
Area3
= 19.07 acres (off site)
Area(l 2 4)
= 5.33 acres (on site)
C
= 0.3
12
= 5.3 In/hr
Q2
= 38.8 cfs
Post Deyelorted
Conditions
Areal = 1,23 acres
C1 = 0.75 (Gravel Storage)
Areal = 2.11 acres
C2 = 0.9 (Buildings and Pavement)
Area3 = 19.07 acres
C3 = 0.3 (Sites upstream which have SWM)
Area4 = 1.99 acres
C4 = 0.3 (Lawn and undisturbed)
110 - 6.8 In/hr
Q10 = 62.15 cfs
Routed through pond - Peak = 17.4 cfs
% Reduction
Peak 2yr - Peak 10yr X 100 = (38.8 - 17.4) X 100 = 55%
Peak 2yr 38.8
Rational -Formula
•
Area Number C Area (ac) CA
----------- -----------------------
1 0.300 24.400 7.320
--------------- ----- --------- ---------
Weighted Totals: 0.300 24.400 7.320�
Time of concentration= 5 min
Intensity Peak Flow
(in/hr) (cfs)
------------------
5.30 38.80
Z
11ational Formula
----------------
Area Number
C Area (ac)
---------
CA
-----------
1
--------------
0.750 1.230
0.922
2
0.900 2.110
1.899
3
0.300 21.060
--------- ---------
6.318
---------------
Weighted Totals:
-----
0.375 24.400
9.139
Time of
concentration= 5 min
Intensity Peak Flow
(in/hr) (cfs)
------------------
6.80 62.15
Hydrograph
Time of concentration = 5.0 min
Storm duration = 5.0 min
Time Q
(min) (cfs)
0.0 0.00
1.0 12.43
2.0 24.86
3.0 37.29
4.0 49.72
5.0 62.15
6.0 54.71
7.0 47.26
8.0 39.82
9.0 32.38
10.0 24.93
11.0 17.49
12.0 10.05
13.0 2.61
r
3
******************************************************************************
* ROUT VERSION
5.4 ** PROJECT: 10 YEAR ROUTED - POST-DEV ** DATE: 6/18/1997*
******************************************************************************
(Types:
1:Weir; 2:Pipe; 3:Riser) Structure 1
1: Type 1:
Weir
Weir:
2: Elevation (ft) 703.96
3: Length (ft)
4.00
4: Coefficient
3.33
Riser:
5: Elevation (ft)
0.00
6: Inlet Area (sf)
0.00
7: Inlet Perimeter (ft)
0.00
8: Orifice Elevation (ft)
0.00
9: Orifice Diameter (in)
0.00
10: Orifice Elevation (ft)
0.00
11: Orifice Diameter (in)
0.00
12: Orifice Elevation (ft)
0.00
13: Orifice Diameter (in)
0.00
Pipe:
14: Invert Elevation (ft)
0.00
15: Diameter (in)
0.00
16: Orifice Diameter (in)
0.00
17: Length (ft)
0.00
18: Manning's n
0.000
19: Slope (ft/ft)
0.000
20: Entrance Loss Coefficient
0.0
Surface:
21: Initial Elevation (ft) 703.96
Storage
Pond Characteristics: Section
Elevation Area
(ft) (sq ft)
------------------------------
1
703.96 0.00 (Calculated)
2
703.96 4.00
3
704.00 1710.00
4
705.00 23130.00
5
706.00 34560.00
Control:
RW = Riser acting as a weir
RO = Riser acting as an orifice
PI = Horizontal pipe in inlet
control
PO = Horizontal pipe in outlet control
Time Inflow Weir Total Elev
Storage
(min)
(cfs) (cfs) (cfs) (ft)
(cu ft)
-----------------------------------------------------
0.0
0.00 0.0 0.00 703.96
0.00
1.0
12.43 0.8 0.83 704.12
344.60
2.0
24.86 2.4 2.36 704.28
1,318.65
3.0
37.29 4.4 4.44 704.44
2,962.82
4.0
49.72 7.1 7.06 704.61
5,377.55
5.0
62.15 9.9 9.93 704.78
8,336.94
6.0
54.71 12.5 12.53 704.92
11,235.42
7.0
47.26 14.5 14.47 705.02
13,514.65
8.0
39.82 15.9 15.88 705.0815,230.60
9.0
32.38 16.8 16.84 705.13
16,420.73
10.0
24.93 17.2 17.24 705.15
16,924.41
11.0
17.49 17.4 17.38 705.15
17,093.55
12.0
10.05 17.1 17.10 705.14
16,745.49
q
ov - 14) 1-[) � 1�,jX, (
1
Rational -Formula
Area Number
C Area (ac)
------------------
CA
-----------
1
-----
0.750 1.230
0.922
2
0.900 2.110
1.899
3
0.300 21.060
- - - - - - ---------
6.318
- - - - - - - - - - - - - - -
Weighted Totals:
- - - - - - - -
0.375 24.400
9.139
Time of
concentration= 5 min
Intensity Peak Flow
(in/hr) (cfs)
---------
---------
9.30 85.00
Hydrograph
- Time of concentration = 5.0 min
Storm duration = 5.0 min
Time Q
(min) (cfs)
0.0 0.00
1.0 17.00
2.0 34.00
3.0 51.00
4.0 68.00
5.0 85.00
6.0 74.82
7.0 64.64
8.0 54.46
9.0 44.28
10.0 34.10
11.0 23.92
12.0 13.74
13.0 3.56
n
J
******************************************************************************
* ROUT VERSION 5.4 ** PROJECT: 100 YEAR ROUTED -POST ** DATE: 6/18/1997*
******************************************************************************
n
(Types: 1:Weir; 2:Pipe; 3:Riser) Structure 1
1: Type 1:
Weir
Weir:
2: Elevation (ft) 703.96
3: Length (ft)
4.00
4: Coefficient
3.33
Riser:
5: Elevation (ft)
0.00
6: Inlet Area (sf)
0.00
7: Inlet Perimeter (ft)
0.00
8: Orifice Elevation (ft)
0.00
9: Orifice Diameter (in)
0.00
10: Orifice Elevation (ft)
0.00
11: Orifice Diameter (in)
0.00
12: Orifice Elevation (ft)
0.00
13: Orifice Diameter (in)
0.00
Pipe:
14: Invert Elevation (ft)
0.00
15: Diameter (in)
0.00
16: Orifice Diameter (in)
0.00
17; Length (ft)
0.00
18: Manning's n
0.000
19: Slope (ft/ft)
0.000
20: Entrance Loss Coefficient
0.0
Surface:
21: Initial Elevation (ft) 703.96
Storage
Pond Characteristics: Section
Elevation
Area
(ft)
(sq ft)
------------------------------
1
703.96
0.00 (Calculated)
2
703.96
4.00
3
704.00
1710.00
4
705.00
23130.00
5
706.00
34560.00
Time 'Inflow Weir Total Elev
Storage
(min)
(cfs) (cfs) (cfs) (ft)
(cu ft)
-----------------------------------------------------
0.0
0.00 0.0 0.00 703.96
0.00
1.0
17.00 1.1 1.14 704.15
515.53
2.0
34.00 3.1 3.10 704.34
11868.75
3.0
51.00 5.8 5.75 704.53
4,136.14
4.0
68.00 9.1 9.09 704.74
7,438.65
5.0
85.00 12.8 12.77 704.93
11,508.20
6.0
74.82 16.1 16.12 705.10
15,516.84
7.0
64.64 18.6 18.63 705.21
18,695.34
8.0
54.46 20.5 20.48 705.29
21,112.50
9.0
44.28 21.8 21.76 705.35
22,815.13
10.0
34.10 22.3 22.34 705.37
231593.46
11.0
23.92 22.6 22.56 705.38
23,891.31
12.0
13.74 22.3 22.32 705.37
23,565.97
6
•
•
Trapezoidal Channel Analysis & Design
Open Channel - Uniform flow
Worksheet Name:
Comment: DITCH LEADING AWAY FROM WEIR
Solve For Depth
Given Input Data:
Bottom Width.....
Left Side Slope..
Right Side Slope.
Manning's n......
Channel Slope....
Discharge........
Computed Results:
Depth............
Velocity.........
Flow Area........
Flow Top Width...
Wetted Perimeter.
Critical Depth...
Critical Slope...
Froude Number....
4.00 ft
3.00:1 (H:V)
3.00:1 (H:V)
0.030
0.0100 ft/ft
17.40 cfs
0.80 ft
3.39 fps
5.13 sf
8.81 ft
9.07 ft
0.70 ft
0.0169 ft/ft
0.78 (flow is Subcritical)
m
Open Channel Flow Module, Version 3.42 (c) 1991
Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708
�LOt 19
•
•
Request For Site Plan Comments
Department of Planning and Development
Mail to:
Hand deliver to:
Department of Planning and Development
107 N. Kent Street
Attn: County Planner
Fourth Floor
107 North Kent Street
Winchester, VA
Winchester, VA 22601
(540) 665-5651
(540) 665-5651
Please fill out the information as accurately as possible in order to assist the agency with their
review. Please attach two (2) copies of the site plan with this sheet.
Applicant's Name: GZEENWA Y" n5M W %-,f--r%
Address: /5/
La n t e_
a . 2ZlooZ
Phone Number: ( ) &,/, Z - -1-/ 8s
Name of development and/or description of the request:
AMEN LEL) /TELPLAlV e7A STEP-N uPPL-
Location of property: M7ALTH '510E &f o' WEs
OF= I NTEp-SF�Tio >F-
ac ( fH f2oAp - E B6
Planning and Development's Comments:
Planning and Development use only
C a ..-
Date received Date revision received Date approved �;� t
Incomplete Incomplete en > g 3
Date revicvred Date reviewed
Signature and Date 2 U
Signature and Date (revision)
16
• •
GROMAY MONUANrG
151 Windy Ifill Line
Winchester, Virp,inia 22602
R?unded in 1971
May 15, 1997
County of Frederick
Planning Dept.
107 N. Kent St.
Winchester, Va. 22601
ATT: Eric Lawrence / � "1 K
RE: Eastern Supply (Previously known
as Roadway Express, Inc.)
Dear Eric:
Please accept this submittal of a site plan entitled, "Eastern Supply" for your review and
comment. It is located at 161 McGhee Road and consists of a 2,500 sq. ft. building
addition and a 6' high privacy screening fence.
Two copies of the plan are attached as well as the submittal fee check. If you have any
question, please feel free to contact me.
Sincerely,
Greeennwal Engine
V,
Mark D. Smith, P.E., L.S.
President
Engineers Surveyors
lelephone540-662-4185 FAX 540-722-9528
• •
Request For Site Plan Comments
Frederick County Engineering Department
Mail to:
Frederick County Engineering Dept.
Attn: Director of Engineering
107 North Kent Street
Winchester, VA 22601
(540) 665-5643
Hand deliver to:
107 N. Kent Street
Fourth Floor
Winchester, VA
(540) 665-5643
Please fill out the information as accurately as possible in order to assist the agency with their
review. Please attach two (2) copies of the site plan with this sheet.
Applicant's Name: GiQEEA1WA',/ ENG�/NEEfz/NG
Address: /5/ wed", /-I,, // Ga f-�
l/Q . Z 2-&oZ
Phone Number:
Name of development and/or description of the request:
M E�/DE 5/ % Lf} — STE
Engineering Department's Comments:
�CO Deo �i cue e tS G.n -i�'-v2
PPL
s�
Z) F��, f'i /
�ivt cz ,moo L
G v
�zVrr<5s
Engineering DcpG use only
Date rmcived
Incomplete
Date reviewed
Sigma re and Date
Sigia=e and Date (r is4xf�
n
Date revision received Date approved � // 9�
Incomplete
Datz vi
18
COUNTY of FREDERICK
Department of Public Works
540/665-5643
FAX: 540/ 678-0682
July 9, 1997
Mr. Mark D. Smith, P. E.
Greenway Engineering
151 Windy Hill Lane
Winchester, VA 22602
RE: Eastern Supply -Revised Site Plan Comments
Stonewall Industrial Park
Frederick County, Virginia
Dear Mark:
Upon review of the revised site plan dated July 2, 1997, we offer no further comments.
Therefore, we recommend approval of the subject site plan.
cc: file
If you have any questions, do not hesitate to contact me.
Sincerely,
oe C. Wilder
Engineering Technician, Public Works
107 'North Kent Street - Winchester. Virginia 22601-5000
❑ Urgent For your review
i
GREENWAY ANEERING
151 Windy I fill lane
Winchester, Virginia 226U2
1
lvuruled in 1971
-TRANSMITTAL
TO.
ATT:
RE:
REMARKS:
89
Qi
91�ztz��2�`�
•
[DATE:
PROJECT: S
FROM:
Gtili[
GREENWAY
ENGINEERING
151 Windy Hill Lane
Winchester, Va. 22602
Phone
540-662-4185
Fax Phone
540-722-9528
❑ Reply ASAP ❑ Please Comment
Ick I'l„.1w',.tn -11 M" ins ,•n, ,—
GRUNWAY RGINHRMG
1 ISI windy I fill Lute
winchcster, Virginia 22602
TRANSMITTAL
TO:
ATT.' YYL�atc ( �rc
[RE:
•
DATE: �2 - I 0 - l
PROJECT:1_7st,,. v�
FROM:
�K a�t �_ �,YYt-t- `- L,
GREENWAY
ENGINEERING
151 Wltidy Hill Lane
Winchester, Va. 22602
Phone
540-662-4185
Fax Phone
540-722-9528
REMARKS: n Ument E] For your review ❑ Ruply ASAP ❑ Please Comment