Loading...
HomeMy WebLinkAbout019-97 First United Methodist Church ERL - Gainesboro - BackfileFfREDERICK COUNTY, VIRGINIA ABBREVIATIONS ASS`Y. ASSEMBLY BF BASEMENT FLOOR BLK,. BLOCK BC BOTTOM OF CURB BSBID. BASEBOARD BW BOTTOM OF WALL C&G; CURB & GUTTER CMF' CONCRETE MONUMENT FOUND CPP' CORRUGATED POLYETHYLENE PIPE CMP'A CORRUGATED METAL PIPE ARCH CO CLEAN OUT DIA. DIAMETER EOP EDGE OF PAVEMENT FF FIRST FLOOR FFE FINISHED FLOOR ELEVATION F.C. FIRE CONNECTION FG FACE OF GUTTER FH FIRE HYDRANT Go. GAUGE GM GAS METER GV GAS VALVE HCR' HANDICAP RAMP HDR CURB 6" HEADER CURB HP HIGH POINT HTR. HEATER IPF IRON PIPE FOUND IPS IRON PIPE SET INV INVERT LP LOW POINT MPDI MULTI -PRODUCT DISPENSER MP METAL POST MH MANHOLE NDC NOSE DOWN CURB NP NO PARKING SIGN NTS NOT TO SCALE OHEI OVERHEAD ELECTRIC OHT OVERHEAD TELEPHONE PL PROPERTY LINE PP POWER POLE PVM'T PAVEMENT RCP REINFORCED CONCRETE PIPE RD ROOF DRAIN RED.. REDUCER R.O. ROCK OUTCROP SAN.. SANITARY STD., STANDARD T.B.D. TO BE DEMOLISHED T.B.F2. TO BE REMOVED T.B.P. TO BE PRESERVED TB THRUST BLOCK TC TOP OF CURB TEL. TELEPHONE TRB TELEPHONE RISER BOX TVRB TELEVISION RISER BOX TW TOP OF WALL TYP TYPICAL UGE UNDERGROUND ELECTRIC WL WATERLINE WM WATER METER WV WATER VALVE 5'R RADIUS IN FEET F11 UNITED METHODIST CHURCH APPLE PIE RIDGE PROPERTY FREDERIC COUNTY. VIRGINIA SITE DEV LOP ENT P ANS GENERAL NOTES 1. The property delineated on this plan is located on Route 739, Apple Pie Ridge Road in the Stonewall Magisterial District in the County of Frederick, Virginia. The owner of the property proposes to construct a picnic shelter and parking lot on the site for use by church members. 2. Property Owner/Developer. First United Methodist Church Contact: Dr. Stephen Hundley 308 North Braddock Street Winchester, VA 22601 Telephone: (540) 662-3151 3. Engineer: PAINTER-LEWIS, P.L.C. Contact: Mr. John Lewis 302 South Braddock Street ,Suite 200 Winchester, Virginia 22601 Telephone: (540) 662-5792 5. Property boundary information shown on these plans was provided by the Ritchie Surveys, Inc. 6. Site Data: Parcel Area: 15.6693 acres Zoning: RA, Rural Agricultural Use: Churc Related Outdoor Recreation Front Yard Setback @ ROW Required - 60' Provided - >60+' Rear Yard Setback: Required - 50' Provided - >50+' Side Yard Setback: @ ROW Required - 60' Provided - >60+' Maximum Building Height: Allowed - 35' Proposed - 20'+/- Maximum FAR: Allowed - 1.0 Proposed = 4,800 SF or 0.007 FAR Minimum Landscape Area: Required - 15% Proposed - 9'6%+/- Proposed Building/Pavement Area = 10,000 +/- SF Landscape/Woods/Lawn Area = 672,557 +/- SF 7. Parking Lot Requirements: Side Property Line Setback: Required - 5' Provided - >5' 8. Parking Space Requirements: Required Parking - 30 per Zoning Administrator Provided - 31 regular spaces including 2 Accessible Spaces per ADA 9. Handicap Accessibility: HC parking spaces shall have a maximum slope of 1:50. 10. Buffering Requirements: The adjacent zoning is also RA , therefore no buffer is required.. 11. Environmental Features: Wetlands - No wetlands have been identified on the site. Flood plains - No flood plains areas or flood hazard areas have been identified on the site. Sinkholes - No sinkholes have been identified wit in the project limits. Steep Slopes - No steep slopes have been identified on the site. Woodlands - No woodlands have been identified 3n the site. 12. No outdoor lighting is currently proposed for the site. CONSTRUCTION NOTES 1. The existing utilities shown on these plans ar based on available Information. The CONTRACTOR shall be responsible for determining the exact location of all utilities before commencing work and for any damages which occur by the failure to locate and preserve these utilities. If the CONTRACTOR should encounter utilities other than those shown on these plans, the CONTRACTOR shall immediately notify the engineer and take the necessary and proper steps to protect the facility and assure the continuance of service. 2. The CONTRACTOR shall have approved construction drawings prior to the start of construction. At least one copy of approved plans and revisions shall be k pt on -site at all times. 3: Cut and fill slopes shall not exceed 2-horizontal to 1-vertical unless otherwise called for on the plans. 4. Controlled Fills: A. Controlled compaction shall occur in all f II sections for pavement, trenches for utilities and in other areas as designated on the plans. B. Controlled fills shall be compacted to 950/ density as determined by methods per standard proctor ASTM D 698. Density shall be verified by a qualifieJ soils engineer. C. Controlled fills shall be compacted in 8 i ch lifts (loose thickness) to the specified density, beginning from the existing ground surface, unless otherwise approved in writing by a qualified soils engineer. D. The surfaces directly beneath areas to r ceive controlled fill are to be cleared, grubbed, and stripped of topsoil. The area is then to be scarified and compacted to a depth of 6 inches to the same density as the controlled fill to be placed thereon. E. Fill material shall be taken from approved borrow areas. It shall be clean soil, free of roots, woody vegetation, oversized stones, rocks, sandy soil, or other objectionable material. 5. Blasting is not permitted within 25 feet of existir g utilities without owner permission. 6. Storm sewer and pavement materials called for on the plans refer to standard VDOT designations. 7. BENCHMARK: top of VDOT monument - a.ssu ied elevation = 836.00. 8. All radii indicate edge of gravel, edge of pavement or face of curb as applicable. 9. Where plans call for matching existing pavement in the public right of way, the CONTRACTOR shall provide cut joint or asphalt overlay as directed by VDOT. 10. All disturbed R.O.W. monuments are to ti replaced and verified by a certified land surveyor at the CONTRACTOR's expense. 11. All construction and materials proposed for the public right of way shall conform to VDOT standards and specifications. 12. The CONTRACTOR shall coordinate the relocation of the existing utilities with the appropriate utility company as necessary. 13. The CONTRACTOR is responsible for obtainin a Land Disturbance Permit from the Frederick County Public Works Department prior to commencement of a y site grading work. EROSION AND SILTATION CONTROL NARRATIVE Proiect Description The owner proposes to build a 5,000+/- square foot open shelter, a softball field and a small parking lot Ito allow access to and use of the site by church members on an intermittent basis. The building site is a 15.6 acre tract. The construction area consists of approximately 3.5 acres including the softball field. The parking area and shelter will cover about 18,900 square feet. The increase in runoff from the 15.6 acres attributable to this increase in impervious area will be negligible. No storm water detention is proposed for this project. Existing Site Conditions The site drains both toward the north and south. There are no nearby perennial streams. Slopes are generally less than 5.0%. Vegetation consists of open field. Adiacent Areas The site is bordered on three sides by residential land. To the west is the Route 739 right-of-way. Off-�site Areas bl s According to the Soil Survey of Frederick County, soils on the site are Frederick-Poplimento silt loam and Swimley silt loam. This soil is generally deep and formed from weathered limestone. Critical Areas There are no critical areas on the site to be developed. Erosion and Sediment Control Measures 3.05 Silt fence will be installed in s%Vgod locatioM5 downstream fron the construction area as a first measure of ill b i t the extent f disturbance c . to b rou h grading for the parking lot construction. Silt fence w e placed a t olea d y g g g p g and ball field. Silt fences shall bla tnepected after each rainfall and at it_ast daily during prolonged rainfall. Any required repairs shall be made immtdiztely. Damaged, dt,,composed or o%f .rwise ineffective silt fence shall be replaced. Sediment deposits should bo removed after each storm event. They must be removed when deposits reach approximately one-half the height of the barrier. Any sediment deposits remaining in place after the silt fence is no longer needed shall be dressed to conform with the existing grade and stabilized. 3.31 Temporary seeding in accordance with the E & S Std & Sped 3.31 will be applied to the topsoil stock pile and all areas which will not be brought to final grade within 30 days. Embankment or excavated slopes denuded for a period of greater than 30 days shall be temporarily seeded and mulched. To coincide with the anticipated construction dates, the seeding will consist of 50 pounds per acre of Annual Ryegrass. All temporary seeding areas will be mulched in accordance with the schedule included herein. 3.32 All disturbed areas will be stabilized by permanent seeding in accordance with the schedule included herein. The anticipated time for construction completion is August 1997, 3.35 All seeded areas will be mulched in accordance with the schedule included herein. Temporary Seedin SEED TYPE RATE MIN, PURITY(%) MIN. GERM.(%) Sept 1 - Feb 15: Annual Ryegrass 50 Ib/ac 98 85 Winter Rye . 50 Ib/ac 98 85 May 1 - Aug 31: German Millet 50 Ib/ac 98 85 or Feb 16 - Apr 30: Annual ryegrass 75 Ib/ac 98 85 Mulch: 1.5 ton/ac small grain straw Fertilizer: 1000 Ib/ac 10-10-10 Permanent Stabilization The contractor shall stabilize all denuded land within 7 days after the end of construction_ Permanent stabilization shall be applied to areas that are to be left dormant for more than one year. During construction of the project, soil stockpiles shall be stabilized or protected with sediment trapping measures. The contractor, is responsible for the temporary protection and permanent stabilization of all soil stockpiles on site as well as soil intentionally transported from the project site. The contractor shall establish vegetation on all areas not otherwise stabilized according the following specification: Seedbed Preparation: a. Scarify top 1" to 2" of soil after final grades have been achieved. b. Add 3 tons per acre pulverized agricultural limestone(t40lb/l000st). SEED TYPE .RATE MIN, PURITY(%) MIN, GESM,(%) Tall fescue 60 Ib.ac 97 85 Red clover 8 Ib/ac 95 65 Ladino clover 8 Ib/ac 95 65 Nurse Grass -(season dependent) Sept 1 - Feb 15: Annual Ryegrass 12 Ib/ac 98 85 Winter Rye 12 Ib/ac 98 85 May 1 - Aug 31: German Millet 12 Ib/ac 98 85 or Feb 16 - Apr 30: Annual ryegrass 12 Ib/ac 98 85 Mulch: 1.5 ton/ac small grain straw Fertilizer: 1000 lb/ac 10-10-10 1. Erosion control practices shall conform to the requirements of the Virginia Erosion and Sediment control Handbook. 2. All perimeter sediment control devices shall be erected prior to any land disturbing activities and shall remain in place until the site is fully stabilized. 3. The contractor shall perform overlot grading to provide positive drainage and preclude ponding of water. All off site grading and construction is to be done with the property owner's consent. 4. Cut and fill slopes shall be graded at a maximum of 2 horizontal to 1 vertical unless otherwise specified on the plans. 5. The limits of clearing and grading are restricted to the limits of the parcel. SEQUENCE OF CONSTRUCTION 1. establish construction entrance, if required " 2. establish perimeter controls as required 3. clear and grub site 4. strip, stockpile and stabilize top soil 5. perform rough grading 6. construct drainage controls 7. begin facilities construction 8. perform final grading and site stabilization 9. remove all temporary sediment control structures VDOT General Notes V1. All work on this project shall conform to the latest editions of the Virginia Department of Transportation (VDOT) Road and Bridge Specifications, and Standards, The Virginia'Erosion and Sediment Control Regulations and any other state, federal or local regulations applicable. In the event of conflict between any of these standards, specifications or plans, the most stringent shall govern. V2. All construction shall comply with the latest U.S. Department of Labor Occupational Safety & Health Administration and VOSH Rules & Regulations. V3. When working,on VDOT right of way, all traffic control, whether permanent or temporary, shall be �n accordance with the current edition of VDOT's work area protection manual. Furthermore, all traffic control flaggers must be certified in accordance with VDOT's January, 1994 (or latest edition of) Road & Bridge Specifications, Section 104.04-C. Va. Design features relating to construction or to regulation, control and safety of traffic may be subject to change as deemed necessary by VDOT. V5. Prior to initiation of work, Contractor shall be responsible for acquiring all necessary VDOT land use permits for any work on VDOT right of way. V6. If required by the local VDOT Residency Office, a- preconstruction conference must be arranged and held by the engineer and/or developer with the attendance of the contractor, various County agencies, utility companies and VDOT prior to initiation of work. V7. Contractor shall notify the local VDOT Residency Office when work is to begin or cease for any undetermined length of time. VDOT will also require 98 hours notice for any inspection. V8. The Contractor will be responsible for maintaining adequate access to the project from the adjacent public roadway through construction and maintenance of a construction entrance in -accordance with the Virginia Erosion & Sediment Control landbook,Sec 33.02. Furthermore, access to other properties affected by this project shall be maintained through construction_ a J 4� LLCM d ,., u Church of God �W9 f O 8 .W s W `earn W spRt G rAMgfO R - - hel --- - W uth 4,,a, N RTH FRE ERICK ' E E s TECE ,�nb Ay8 i ry'-a 7n 7 ESYe Q r -- DARViL ci - C'M Stines Chap Q AIOGE to 522 Oq�lf w� oQ - - s DGE8111 37 WM nE. Ot Fa C �- s N E . -1 73 9 AG ft 1OF00EeaY ,.., VICINITY MAP SCALE: 1" ® 2000' DA MtDIERICW COUNTY,VIRGINL4 SITE PLAN SHALL BE VALID FOR FIVE YEARS FROM DATE OF APPROVAL. LIST OF DRAWINGS: T. 1 /2 COVERSHEET T. 2/2 SITE PLAN :i tffROVED / AT 4'r$ ¢P�! FOB. tee': OP o JOHN C LEWIS U 11, 302 SOUTH BRADDOCK STREET, SUITE 200 Winchester, Virginia 22601 Telephone (540)662-5792 Facsimile (540)662-5793 No.021621 w d ,0NAL JOB NO.: 9704017 25APR97 SHEET: 1 e �(/MBERL Y ELL EN CAR TER TM 42—A —198B D. B. 527, PG. 489 II ZONED.• RA USE- RES/DENT/AL Iw BARNARD z9 McCL UNG & SALLY ✓. McCL UNG TM 42-,4 - r98C \ \ D. B. 5J5, PG. 401 50 0 50 ZONED.• RA USE- RES/DENT/AL „ LOT2 Scale 1 TM 42-A-798 869, PG. 115,3 ZONED. RA USE• RES/DENT/AL 40 1295.98ft _ DSO' BU/LD/NG SETBACK _ _ - / � � •� NXI \ \ \ \ \ \ r \ SHELTER TO BE CONSTRUCTED I \ \ \ \ -,_BY OTHERS. FIELD ADJUST fi1•IkH FLOOR ELEVATION TO PRO SOP ED \ \ \ \ \ ACHEI A\WORK BALANCE. PICNIC \ \ LIMITS OF GRADING \ \ \ SHELTER o / 1 V__/ / 8.00, eSF 00 Ch E(j� A R / B TB LL 4 i I / A DA I SIGNS I --PROVIDE STRIPING FIRST UNITED METHODIST CHURCH I P POSED FOR 32 STALLS AND LOT 1 / 800, - 1 ADA LOADING ZONE/ I FTBALL / ALL STALLS T;�ARTH 10' X 18' 15.6693 ACRES FIELD / o FIELD ADJUSTPAVED TM = 42-A-198-1 - --- +' I / _� -J o ; AREA ELEVAT TO ACHIEVE ZQNE$;--KA /--6 / _o A BALANCED WORK CONDITION. - / PROVIDE A/CONTINUOUS PAVEMENT rl CROSS SLOPE OF 2.0%. / I /-0} 5' HAM - ER(TYP) CE Z o N04Lr, \ \ ALIGN ENTER OF ENTRANC WITH \ 91 EXISTI G SCHOOL ENTRANCE / o 140 \ N06:Y8 '251F N0151 ¢ 100.12f 7 �'' E x NO,�yr62O E EX. CMP cawERT(T.B.R.) _ PROP SIGN _ Q0 O !\ I ��. Qfl� ��,• »,� �,o ,u 34 1O'L X 841 \ VDOT MONUMENT \ = x �y * TC 35.10 BENCHMARK O TOP OF C`Qj CRETE MONUMENT TM 42- Jc - DI ���_ - - I� �," 4 • �� 7q 5' N `� ASSUMED ELEVATION = 83 00 M 14+00 - -� _ x �. .� .R7 3s �E � P.P. N��Z 02 W LATTER DA Y SA/NTS CHURCH / - — — --' x _ 0 ZOAIED.• RA 00 _ _ _ - \ USE' CHURCH 12+oO - g _ _ . 00 _ x �s 02 -� \ 1 EX. FH EX. 6' �_ xT- 1-F x,31.69 /VQ�j ?O� r'� TAPEip _ 11+0 7 II TOP SA 836.94 10+o0�-- � ''-= ¢?S. 001? N211 qRY SEygR tfq/N EX 6 __ 9+0p_ -+ \31. B�� \ \ / ' 25.68t I I a'4S' TgPE-R EX. /z" 1y�4 �— 8+ \ \ EX. ENTRANCE TO 3 00>tR Mq/N 0 .' APPLE PIE RIDGE SCHOOL — \ SITE DISTANCE'f EX. SAN. MH 635'+ AISTANCE TOP = 832.92STqTE Rp�P - Ll�` 739APPLES1DSPEED LIMIT• 40 H= 550'+ _ n I0 5 MP 3:1 TAPER;` MATCH EX. EOP (VAPI A n� rjF QII1 ter- _ c CG-12 HANDICAP RAMPS WILL BE INSTALLED AT DISCRE11ON OF VDOT INSPECTOR. TM 42 - 6 - A APPLE PIE RIDGE SCHOOL ZONED RA USE: EL EMEIV TA R Y SCHOOL HANDICAP SIGN DETAIIL NOT TO SCALE 2" x 18' STND. 1l7dt�D K1dtYED STND. U-CHANNEL POST PA"r0N0 PAN0M0 v" ACCEINOM "ROP. GROUND VAN HC ACCESSIBLE SIGN SIGN • MI. 70 R 7.E• 522 EX. ENTRANCE TO APPLE PIE RIDGE SCHOOL EROSION & SEDIMENT CONTROL KEY I IVVI..I I IF) uv-v SEE ENTRANCE DETAIL THIS SHEET 3.02 TEMPORARY STONE CONSTRUCTION ENTRANCE 3.05 SILT FENCE . X x X-X 3.30 TOPSOILING - 3.32 PERMANENT SEEDING pS --7F73.35 MULCHING TM 42-6-B APPLE PIE- R/OGEE SCf /OOL ZONED.- RA USE: ATHLETIC FIELDS COMBINATION 6" CURB & GUTTER (CG-6) " NOT TO SCALE 6" 1 2'-0" ON SITE PAVEMENT DETAIL NOT TO SCALE = 50 ft °= �0 / i I 0 n rl rrI z I I I) 00 X I mrrlz I z rI r1 X 0 150 � o Z � w CL Cr- o V) U L1 } O U Z Q rn L-Lj o L U w 0 o_ Z CL O go O N a� Lo p U) N „^ N a� N +, - U) C 0 i J 0 p N m � -C -C +, U 0 C 0 (n N ,ny ` o N r0 Ln U7 1 1 N N c0 (0 cD c0 00 Ln Ln N N C O 0- .E aW 0 O N � 2" S-5 BITUMINOUS CONCRETE — SURFACE TREATMENT 6" 21-A -- STONE BASE P TH Op Dl COMPACTED SUBGRADE J EWIS No. 21621 W HALF TYPICAL SECTION AT ENTRANCE Z JssIONAL uj 0 NO TO SCALE of ce-I DATE: SURVEY: X. ROAD-11'+/� 14' - I CROSS SLOPE 25APR97 PLC CG-6 i i I I I__ I SCALE: DRAWN: ..:.......... -� I M 1,. - 50' JCL 1.5" SM-2A:.:...........:.:.........:....... ...... III —II r i Imo_; ; : ........:...:. ........•.::::..... i= OR MATCH 3" BM-2 Ii 1��IIIiiI�lI1►1IIIIIIIIIIIIIIIi-T'i�„���iii ��—,►II1- C. I.: EXISTING I II 8" 21-6 2"-...JJJ 2' COMPACTED SUBGRADE JOB NO.: SHEET: 9704017 2/2 FREDERICK COUNTY, VIRGINIA ABBREVIATIONS ASSY. ASSEMBLY BF BAISEMENT FLOOR BLK. BLOCK BC BOiTTOM OF CURB BSBD. BAISEBOARD BW BOTTOM OF WALL C&G CUIRB & GUTTER CMF CONCRETE MONUMENT FOUND CPP CORRUGATED POLYETHYLENE PIPE CMPA CORRUGATED METAL PIPE ARCH CO CLIEAN OUT DIA. DIAMETER EOP EDIGE OF PAVEMENT FF FLOOR F C FFFIRiST �S&NFkC0 FI IDNELEVATION FIG FA(CE OF GUTTER FH FIFRE HYDRANT Go. GAUGE GM GALS METER GV GAIS VALVE HCR HANDICAP RAMP HDR CURB 6" HEADER CURB HP HIGH POINT HTR. HEATER IPF IRON PIPE FOUND IPS IRON PIPE SET INV INVERT LP LOW POINT MPD MULTI -PRODUCT DISPENSER MP METAL POST MH MANHOLE NDC NOSE DOWN CURB NP NO PARKING SIGN NTS NOiT TO SCALE OHE OVERHEAD ELECTRIC OHT OVERHEAD TELEPHONE PL PROPERTY LINE PP POWER POLE PVMT PAVEMENT RCP REINFORCED CONCRETE PIPE RD ROiOF DRAIN RED. REIDUCER R.O. ROICK OUTCROP SAN. SAINITARY STD STANDARD T.B.D. TO BE DEMOLISHED T.B.R. TO BE REMOVED T.B.P. TO BE PRESERVED TB THRUST BLOCK TC TOP OF CURB TEL. TELEPHONE TRB TELEPHONE RISER BOX TVRB TELEVISION RISER BOX TW TOP OF WALL TYP TYPICAL UGE UNDERGROUND ELECTRIC WL WKTERLINE WM WA',TER METER WV WAITER VALVE 5'R RAIDIUS IN FEET 'FIRST UN111!NWJMlkTHODIST CHURCH APPLE PII I E R7,,1mDGE PROPERTY FREDERICK COUNTY, VIRGINIA SITE DEVELOPMENT PLANS GENERAL NOTES 1. The property delineated.on this plan is located on Route 739, Apple Pie Ridge Road in the Stonewall Magisterial District In the County of Frederick, Virginia. The owner of the property proposes .to construct a picnic shelter and parking lot on the site for use by church members. 2. Property Owner/Developer: First United Methodist Church Contact: Dr. Stephen' Hundley 308 North Braddock Street Winchester, VA 22601 Telephone' (540) 662�3151 3. Engineer: PAINTER-LEWIS, P.L.C. Contact: Mr. John Lewis 302 South Braddock Street ,Suite 200 Winchester, Virginia 22601 Telephone: (540) 662.5792 5. Property boundary information shown on these plans was provided by the Ritchie Surveys, Inc. 6. Site Data: Parcel Area: 15.6693 acres Zoning: RA, Rural Agricultural Use: Churc Related Outdoor Recreation Front Yard Setback@ q ROW Required - 60' Provided - >60+' Rear Yard Setback: Required - 50 Provided 50 Side Yard Setback: @ ROW Required - 60' Provided - >60+' Maximum Building Height: Allowed - 35' Proposed - 201+/- Maximum FAR: Allowed - 1.0 Proposed = 4,800 SF or 0.007 FAR Minimum Landscape Area: Required - 15% Proposed - 98%0+/- Proposed Building/Pavement Area = 10,000 +/- SF Landscape/Woods/Lawn Area = 672,557 +/- SF 7. Parking Lot Requirements: Side Property Line Setback: Required - 5' Provided - >5' 8. Parking Space Requirements: Required Parking - 30 per Zoning Administrator Provided - 31 regular spaces including 2 Accessible Spaces per ADA 9. Handicap Accessibility: HC parking spaces shall have a maximum slope of 1:50. 10. Buffering Requirements: The adjacent zoning is also RA , therefore no buffer is required.. 11. Environmental Features: Wetlands - No wetlands have been identified on the site. Flood plains - No flood plains areas or flood hazard areas have been identified on the site. Sinkholes - No sinkholes have been identified within the project limits. Steep Slopes - No steel) slopes have been identified on the site. Woodlands -'No woodlands have been identified on the site. 11 No outdoor fighting is currently proposed for the site. CONSTRUCTION NOTES 1. The existing utilities shown on these plans are based on available information. The CONTRACTOR shall be responsible for determining the exact location of all utilities before commencing work and for any damages which occur by the failure to locate and preserve these utilities. If the CONTRACTOR should encounter utilities other than those shown on these plans, the CONTRACTOR shall immediately notify the engineer and take the necessary and proper steps to protect the facility and assure the continuance of service. 2. The CONTRACTOR shall have approved construction drawings prior to the start of construction. At least one copy of approved plans and revisions shall be kept on -site at all times. 3. Cut and fill slopes shall not exceed 2-horizontal to 1-vertical unless otherwise called for on the plans. 4. Controlled Fills: A. Controlled compaction shall occur in all fill sections for pavement, trenches for utilities and in other areas as designated on the plans. B. Controlled fills shall be compacted to 95% density as determined by methods per standard proctor ASTM D 698. Density shall be verified by a qualified soils engineer. C. Controlled fills shall be compacted in 8 inch lifts (loose thickness) to the specified density, beginning from the existing ground surface, unless otherwise approved in writing by a qualified soils engineer. D. The surfaces directly beneath areas to receive controlled fill are to be cleared, grubbed, and stripped of topsoil. The area is then to be scarified and compacted to a depth of 6 inches to the same density as the controlled fill to be placed thereon. E. Fill material shall be taken from approved borrow areas. It shall be clean soil, free of roots, woody vegetation, oversized stones, rocks, sandy soil, or other objectionable material. 5. Blasting is not permitted within 25 feet of existing utilities without owner permission. 6. Storm sewer and pavement materials called for on the plans refer to standard VDOT designations. 7. BENCHMARK: top of VDOT monument - assumed elevation = 836.00. 8. All radii indicate edge of gravel, edge of pavement or face of curb as applicable. 9. Where plans call for matching existing pavement in the public right of way, the CONTRACTOR shall provide cut joint or asphalt overlay as directed by VDOT. 10. All disturbed R.O.W. monuments are to be replaced and verified by a certified land surveyor at the CONTRACTOR's expense. 11. All construction and materials proposed for the public right of way shall conform to VDOT standards and specifications. 12. The CONTRACTOR shall coordinate the relocation of the existing utilities with the appropriate uti9ity company as necessary. 13. The CONTRACTOR is responsible for obtaining a Land Disturbance Permit from the Frederick County Public Works Department prior to commencement of any site grading work. EROSION AND SILTATION CONTROL NARRATIVE Project pescriution The owner proposes to build a 5,000+/- square foot open shelter, a softball field and a small parking lot to allow access to and use of the site by church members on an intermittent basis. The building site is a 15.6 acre tract. The construction area consists of approximately 3.5 acres including the softball field. The parking area and shelter will cover about 18,900 square feet. The increase in runoff from the 15.6 acres attributable to this increase in impervious area will be negligible. No storm water detention is proposed for this project. Existing_Site Conditions The site drains both toward the north and south. There are,,no nearby perennial streams. Slopes are generally less than 5.0 /o. Vegetation consists of open field. Adlacent Areas The site is bordered on three sides by residential land. To the west is the Route 739 right-of-way. y. Offis' reas of . d According to the Soil Survey of Frederick County, lolls on the site are Frederick PopHrnento silt loam an Swi'mle y silt loam. This soil is generally deep and frsrmed from weathered limestone. Critical Areas There are no critical areas on the site to be developed. Erosion and Sediment Control. Measures 3.05 Silt fence will be installed in se*"t d locatiolzs downstream frol ,,the construction area as.a first measure of construction. Silt fence will be 11I t"' at the exte,11, of disturbance 6i? ated by rough grading for the parking lot and ball field. Silt fences shall �01Lacted after each rainfall.andat ' st daily during prolonged rainfall. Any required repairs shall be made imrticd!Wely. Damaged, --docomposed or ottietwise ineffective silt fence shall be replaced. Sediment deposits should be removed after each storm event. They must be removed when deposits reach approximately one-half the height of the barrier. ,Any sediment deposits remaining in place after the silt `' fence is no longer needed shall be dressed to conform with the existing grade and stabilized. 3.31 Temporary seeding in accordance with the E & S Std & Sped 131 will be, applied to the topsoil stock pile and all areas which will not be brought to final grade within 30 days. Embankment or excavated slopes denuded for a period of greater than 30 days shall be temporarily seeded and mulched. To coincide with the anticipated construction dates, the seeding will consist of 50 pounds per acre of Annual Ryegrass. All temporary seeding areas will be mulched in accordance with the schedule included herein. 3.32 All disturbed areas will be stabilized by permanent seeding in accordance with the schedule included herein. The anticipated time for construction completion is August 1997. 3.35 All seeded areas will be mulched in accordance with the schedule included herein. Temoorary Seedin SEED TYPE RATE MIN. PURITY(%) MIN. GERM.(%o) Sept 1 - Feb 15: Annual Ryegrass 50 Ib/ac 98 85 Winter Rye 50 Ib/ac 98 85 May 1 - Aug 31: German Millet 50 Ib/ac 98 85 or Feb 16 - Apr 30: Annual ryegrass 75 lb/ac 98 85 Mulch: 1.5 ton/ac small grain straw Fertilizer: 1000 ib/ac 10-10-10 Permanent Stabilization The contractor shall stabilize all denuded land within 7 days after the end of construction. Permanent stabilization shall be applied to areas that are to be left dormant for more than one year. During construction of the project, soil stockpiles shall be stabilized or protected with sediment trapping measures. The contractor is responsible for the temporary protection and permanent stabilization of all soil stockpiles on site as well as soil intentionally transported from the project site. The contractor shall establish vegetation on all areas not otherwise stabilized according the following specification: Seedbed Preparation: a. Scarify top 1" to 2" of soil after final grades have been achieved. b. Add 3 tons per acre pulverized agricultural limestone(140lb/1000sf). SEED TYPE RATE MIN. PURITY(%) MIN. GERM.(%) . Tall fescue 60 Ib.ac 97 85 Red clover 8 Ib/ac 95 65 Ladino clover 8 Ib/ac 95 65 Nurse Grass -(season dependent) Sept 1 - Feb 15: Annual Ryegrass 12 Ib/ac 98 85 Winter Rye 12 Ib/ac 98 85 May 1 - Aug 31: German Millet 12 Ib/ac 98 85 or Feb 16 - Apr 30: Annual ryegrass 12 Ib/ac 98 85 Mulch: 1.5 ton/ac small grain straw Fertilizer: 1000 Ib/ac 10-10-10 1. Erosion ,control practices shall conform to the requirements of the Virginia Erosion and Sediment control Handbook. 2. All perimeter sediment control devices shall be erected prior to any land disturbing activities and shall remain in place until the site is fully stabilized. 3. The contractor shall perform overlot grading to provide positive drainage and preclude ponding of water. All off site grading and construction is to be done with the property owner's consent. 4. Cut and fill slopes shall be graded at a maximum of 2 horizontal to 1 vertical unless otherwise specified on the plans. 5. The limits of clearing and grading are restricted to the limits of the parcel. SEQUENCE OF CONSTRUCTION 1. establish construction entrance, if required 2. establish perimeter controls as required 3. clear and grub site 4. strip, stockpile and stabilize top soil 5. perform rough grading 6. construct drainage controls 7. begin facilities construction 8. perform final grading and site stabilization 9. remove all temporary sediment control structures VDOT General Notes l work - editions on this project shall conform to the latest Vl. Al P J ditions of the Virginia DepartMen� of Transportation e g . ds , (VDOT) -Road and Bridge Spec�.ficatrons , and Standar The Virginia Erosion and Sediment Control Regulations and any other state, federal or local regulations applicable. In the event of conflict between any of these standards, specifications or plans, the most stringent shall govern. V2. All construction shall comply with the latest U.S. Department of Labor Occupational Safety & Health Administration and VOSH Rules & Regulations. V3. When working. on VDOT right of way, all traffic control, whether permanent or temporary, shall be in accordance with the current edition of VDOT's work area protection manual. Furthermore, all traffic control flaggers must be certified in accordance with VDOT's January, 1994 (or latest edition of) Road & Bridge Specifications, Section 104.04-C. Va. Design features relating to construction or to _ regulation, control and safety of traffic may be subject to change as deemed necessary by VDOT. V5. Prior to initiation of work,' Contractor shall be acquiring all necessary VDOT land use responsible for acqu g ry , permits for any work on VDOT right of way. V6. If required by the local VDOT Residency Office, a preconstruction conference must be arranged and held by the engineer and/or developer with the attendance of the contractor, various County agencies, utility companies and VDOT prior to initiation of work. V7. Contractor shall notify the local VDOT Residency Office when work is to begin or cease for any undetermined length of time. VDOT will also require 48 hours notice for any inspection. Va. The Contractor will be responsible for maintaining adequate access to the project from the adjacent public roadway through construction and maintenance of a construction entrance in -accordance with the Virainia Erosion & Sediment Control Handbook,Sec 3.02. Furthermore, access.to other properties affected by this project shall be maintained through construction. Cq A a ftl W Church of fad f h(AW A s-4) yw� SPRI G TAWq Brttfial 789 679 o N y A RTH t b �unh Z0 FRE ERICtt E VE R TE RACE T �. E ., • G+ifl DARVII Stines Chap �i Q FG GE to 522 - s 9 DGEl il 37 '"'EST REH _ Fqu %A H _ � p a S. iaf N_ E\ 73 At tOEFHENTY VICINITY MAP SCALE: 1" = 2000' i •' •' DATE APPROVED ( ill DERIt K COIlNl,. � VMiCIi^ l SITE PLAN SHALL BE VALID FOR FIVE YEARS FROM DATE OF APPROVAL. .r n HT. 1 /2 COVERSHEET HT. 2/2 SITE PLAN MITT-' PT3 7 ,- ol7-?7 ��p LTH 0�, JOHN C. WIS & No.021611 ,i,IONAL EOM RMHTEH=LEW18, P.L.L. 302 SOUTH BRADDOCK STREET, SUITE 200 Winchester, Virginia 22601 Telephone (540)662-5792 Facsimile (540)662-5793 JOB NO.: 9704017 25APR97 SHEET: 1i /2 Cc K/MBERL Y EL L EN CAR TER TM 42-A -198B D.5 527, PG. 483 ZONED. RA USE- RES/DENT/AL HARNA RD D. Mc CL UNG & SALL Y J. Mc CZ UNG TM 42-A -198C \ \ \ D. B. 5J5, PG. 401 50 0 50 ZONED. RA - - --- - \ USE-RES/DENT/AL » \ LOT2 Scale 1 l TM 42-A -199 869, PG. 1151 ZONED.- RA USE: RES/DENT/AL 6 0 T BUILDING SET6gCK \ %%—� _ SHELTER TO BE CONSTRUCTED \ \ \ \ BY OTHERS. FIELD ADJUST \ / _� -- 1 t FiN H FLOOR ELEVATION TO PROPOSED \ \ \ \ \ \ ACHEIAWORK BALANCE. PICNIC + II \ SHELTER \ \ \ \ LIMITS OF GRADING \ FF = 841.00 CIA 0/ / / \ a / i � / �1l�TB LL A � o rs row BASKS PROP ADA SIGNS PROVIDE STRIPING FIRST UNITED METHODIST CHURCH / /�= —"� >� / P�POSED 8.00' 1 OADA2STALLS AND LOADING ZONES LOT 1 I / / / SOFTBALL I ALL STALLS TXI 10' X 18' 15.6693 ACRES FIELD PAVED / AREA ELDEVATI0 ACHIEVE ZONE$: "-f(A 8 1 I o / A BALANCEDWORK CONDITION. j — / ♦ PROVIDE A ONTINUOUS PAVEMENT -000/ ♦ ��, / CROSS SLOPE OF 2.0%. ILI \ — 6p�L0/= S. � � ♦ / i ' ;: 5' HAM . ER(TYP) L —� vv �c�� ♦� CE./ I� N04Lr91 "' \ / 01 EXIh GN �ENTER OF SCHOOL ENTRANCE � I N06:7 ' " 8O5 \ IV0131 '47"E' �. 100 'r2ft a — � ���"' — x NO O�`6'20 E% ex 34. PROPSIGN EX. CMP t a�vERT(T.B.R.) OOP \ — _ — — ��—� PP N; ,u 10'L X 8�1 VDOT MONUMENT \ � _ = x =_'y� „y * TC 35.10 ' BENCHMARK ® TOP OF C�CRETE MONUMENT — I �-- '9 _ 5' ASSUMED ELEVATION = 83 00 TM 2- - D I +00 — �'K'ii24—�� x --_ 9 __ 3 . A7 35 -16 N� ♦,r F• /r✓ 22'02 "!t'{� L A T7rER DA Y SAINTS CHURCH ��_ _ x 4.55ft \ � _ . • sue' 3i ZQ x -_ ZONED.• RA 'too \ �_ _ `` _ z _ 1' .00 x.35. v2 —_ x T J 47 _/ _ 9 �66a.5 NO.�!V �► \ r USE: CHURCH 1 EX. FH EX 6, �-' �00 E� r � S T — 0 � x i0. 9' x- B ¢� E \ 4 I EX. SAN. MH x4S gpov J _ _� 11+ .31.0? �5 \ � -�-_ oft TOP = 836.94 B' S4N/TARP ��+00 —{ '� _8ft I SEAR Mq/N �' _ _ 9+00�— -{ \x�31.�` 1 125.6 IEX. 6 r45' rgpE-R EX. � � — \ EX. ENTRANCE TO 3 .00' z H'�'1 ZF7P Mq/N 8+00 _ APPLE PIE RIDGE SCHOOL SI TE I' EX. SAN. MH DISTA 'STANCE = 635 + _ `Ef TOP = 832.92 S TA TE R D TE POSIFD SPEED LI1Nf7:DI STANCE _04P 550'+ _ ��9 AP ' \ Fi 3:1 TAPER; MATCH EX. EOP 0.5 M1. TO RTE. 1' NDC(TYP) CG-6 (VARIABLE �E PEE RIDGE -- - * CG-12 HANDICAP RAMPS WILL BE INSTALLED 522 SEE ENTRANCE DETAIL THIS SHEET R/W) ROAD AT DISCRETION OF VDOT INSPECTOR. EX ENTRANCE TO TM 42 - 6 - 4 APPLE PIE RIDGE SCHOOL ZONED: RA USE: EL EMEIV TA R Y SCHOOL HANDICAP SIGN DETAIL NOT TO SCALE 2" x 18* STND. STND. U-CHANNEL POST "ROP. GROUND owdrsw PAw a wu+ VAN ACCESSIBLE SIGN PAPOW a HC SIGN APPLE PIE RIDGE SCHOOL EROSION & SEDIMENT CONTROL KEY 3.02 TEMPORARY STONE CONSTRUCTION ENTRANCE (',E .:............................. 3.05 SILT FENCE X X X x 3.30 TOPSOILING 3.32 PERMANENT SEEDING �1 3.35 MULCHING �1 TM 42-6-B APPLE PIE RIDGE SCHOOL ZONED.- RA USE ATHLETIC FIELDS COMBINATION 6" CURB & GUTTER (CG-6) NOT TO SCALE 4" ON SITE PAVEMENT DETAIL NOT TO SCALE 2" S-5 BITUMINOUS CONCRETE — SURFACE TREATMENT 6" 21—A STONE BASE COMPACTED SUBGRADE M01 HALF TYPICAL SECTION �I AT ENTRANCE ul 0 NO TO SCALE X. ROAD-11'+/ — 14' CROSS SLOPE 1.5" SM-2A i. i .L _. i'...'. I T I_... .... . I' 1. OR MATCH I --I I (--I I —i I --I 111mi 150 = 50 ft / / I O rri rrl IUD m z I rTj rl X O 0 3 BM-2 i11--i i— —'EXISTING 7--i— -- I 8" 21—B COMPACTED SUBGRADE v) Z 1-- o Z r W CL o � U W r o U W Q C) U w 0 0- a. Z CL O go o N,, W 0 o :3 (0 � � N „^ N N v V) C L U O L 0 v a) m � L +, U � C 0 U) N o rok M N V� Q) Q) [�_ r1_ L() to 1 1 N N cD cD cD cD 0 0-q- to Un N N C O -C .— av N LL F- �y'TH OF /1 `I IN C. LEWIS No. 21621 0�, Gti "�I,.,sIONAL zi DATE: SURVEY: 25APR97 PLC SCALE: DRAWN: 1 " = 50' JCL C. I.: 2' JOB NO.: SHEET: 9704017 2/2