Loading...
HomeMy WebLinkAbout024-97 Ellis Self Storage - Stonewall - BackfileCASH RECEIPT _ 0025l -• Received From,, } Address .' G Dollars $ rFor \. �'�', mil ; rN ACCOUNT• t t• ' � .iu'- PAT OF ACCOUNT � d 1` 1� AMT PAID E CHECK ` By BALANCE DUE MONEY `rnrn r SITE PLAN CHECKLIST The checklist below indicates all the information that needs to be submitted as part of the site plan application. All required information must be submitted prior to the final approval of any site plan. The Department of Planning and Development will review the application to ensure that it is complete. If any portion is not included or complete, the site plan application will not be accepted and returned to the applicant(s). Site Plan Package 1. One set of approved comment sheets are required from the following review agencies prior to final site plan approval. It is recommended that applicants contact the Department of Planning and Development to determine which review agencies are relevant to their site plan application. Virginia Department of Transportation (VOOT) Frederick County Sanitation Authority Department of Planning and Development Inspecions Department -7 Frederick County Engineer (Public Works) Frecenck County F,re Marshal x Department of Parks and Recreation 2. One copy of the Site Plan application 3. Five Copies of the Final Site Plan for approval County Health Department City of Winchester Town of Stephens City _X Town of Middletown _X Airport Authority _x Soil & Water Conservation District 4. One reproducible copy of the Site Plan (if required) 5. A 35mm slide of the Site Plan (if required) I -7-5-q7 0�� eta 6 xv,-, �7 L At-1 I q, /G. qgl exI #0�4'R7 •, January 14, 2002 ARTZ & ASSOCIATES Mr. Mike Artz 35 W. Boscawen Street Winchester, Virginia 22601-4740 RE: Ellis Self Storage Site Plan Revisions Dear Mike: 0 FILE COPY COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 665-6395 Thank you for meeting with John Trenary, Steve Melnikoff and me at the above site on January 10, 2002. I believe this site meeting certainly assists us in better understanding the various required site improvements illustrated on the site plan from 1998, as well as the improvements associated with the proposed addition of two storage buildings. For simplicity purposes, I'd like to briefly touch on the various agency requirements surfaced at this meeting. First, I'll briefly identify the improvements included on the site plan approved in 1998 that were required when the three storage buildings were constructed on the site's easternmost quadrant. These three additional storage buildings have been constructed but the other improvements identified on the site plan have not been addressed. 1. Complete the building Nnnit requirements for the three storage buildings. Records in the Building Inspections' office indicate that final inspections, as well as Certificate of Occupancies, have not been conducted/issued for these three structures. 2. Installation of the landscape buffer. This buffer was included on the approved site plan but the landscape buffer appears to have not been installed on the site. The buffer is to be installed along the road frontage and along the eastern property line. 3. Entrance improvements. The Department of Transportation does not have record that the necessary entrance permits were obtained, nor have the necessary entrance improvements been implemented. 4. Installation of the parking area. This parking was included on the site plan, but the improvement has not been completed on the site. 107 North Kent Street • Winchester, Virginia 22601-5000 Ellis Self -Storage Site Plan Revisions Page 2 January 14, 2002 Secondly, in order to construct two additional storage buildings at the rear of the site, a revised site plan must be approved by the county. Initial discussions indicate that a revised site plan should include the following improvements (in addition to all improvements identified on the 1998 approved site plan): 1. Extension of the landscape buffer along the eastern property line to fully screen the storage buildings located at the rear of the property. 2. Obtain the necessary Building Inspections permits for construction of the storage buildings. Construct a commercial entrance for the facility. All design and permitting shall comply with VDOT requirements. The site is currently in violation of the 1998 approved site plan. Therefore, as a minimum, those improvements identified on the approved plan should be installed. If the two additional storage buildings continue to be sought, a revised site plan must be submitted, addressing as a minimum the above mentioned issues. Please contact me with any questions regarding this letter. AICP Deputy Director ERL/ch cc: Kris Tierney, Assistant County Administrator John Trenary, Building Official Steve Melnikoff, Virginia Department of Transportation U:T ic\Common\FJlis Self Storage.wpd • • FILE COPY i, COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 678-0682 April 15, 1998 Mr. Leonard C. Ellis 10487 Washington Highway Glenn Allen, VA 23059 RE: Approval of Ellis Self -Storage Site Development Plan #024-97 Dear Mr. Ellis: The Frederick County Planning Department administratively approved Site Plan 9024-97 for the above referenced site plan on April 15, 1998. This site plan, for the construction of an additional 10,425 square feet of self-service storage space, meets all County requirements for the development of a self-service storage facility within the M1 (Light Industrial) zoning district. The development of this property also includes the provision of ten parking spaces and storage facility screening which includes the planting of 78 white pines that are a minimum of 6' in height at the time of planting. I have provided you with several copies of the approved site plan. Please keep an approved copy for your files and maintain an approved copy on the construction site. Once the site development has been completed, you should contact this office to schedule an on -site inspection and obtain a Certificate of Occupancy. Please contact me if you have any questions regarding this letter. Sincerely, Michael T. Ruddy, Planner II MTR/cc cc: Charles W. Orndoff, Sr., Stonewall District Supervisor Mr. Robert Pease, H. Aubrey Hawkins Associates, Ltd. Joe C. Wilder, Engineering Technician Garland Miller, Winchester/Frederick County E.D.C. Robert Mongold, Frederick County Real Estate 107 North Dent Street - Winchester. Virginia 22601-5001) 0 Mr. Robert P. Pease, P.E. H. Aubrey Hawkins Associates, Ltd. 500 Musselman Road Falmouth, Virginia 22405 RE: Ellis Self -Storage - Site Plan Comments Frederick County, Virginia Dear Robert: • December 5, 1997 COUNTY of FREDERICK Department of Public Works 540/665-5643 FAX: 540/ 678-0682 Upon review of the subject site plan dated October 30, 1997, we offer the following comments: 1.) The proposed 15 inch CMP culvert and the proposed dam need to be analyzed for a (10) year design storm. The 10-year storm needs to flow through the culvert without flooding the driveway and be contained within the proposed channel. 2.) We will need a copy of the signed drainage easement plat across Mr. Anderson's property. This needs to be on file at the time of the final site walk -over when the site work has been updated. 3.) At this time, stormwater management will not be required. However, at the time of further development, a stormwater management facility will be required. During that review, the pre -developed site conditions need to be analyzed as if no development has occurred on -site. Also, the 10- year post developed storm will need to be released at a two (2) year pre - developed rate. However, since these comments are minor in nature, we recommend approval of the subject site plan. We request that the additional information be submitted to this office as soon as possible. 107 North Kent Street - Winchester, Virginia 22601-5000 0 • age 2 P. Pease ber 5, 1997 If you have any questions, do not hesitate to contact me. Sincerely, Joe C. Wilder Engineering Technician /rab Frederick County Planning Department file 0 * FILE COPY COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 678-0682 November 20, 1997 Mr. Robert Pease H. Aubrey Hawkins Associates, Ltd. 500 Musselman Road Falmouth, VA 22405 RE: Second review of Ellis Self -Storage Site Development Plan #024-97 Dear Mr. Pease: P,, �1 f� have had the opportunity to review the above referenced site plan resubmitted to our department on November 4, 1997. The following comments need to be addressed during the final revision of this site plan: 1) The plat showing the lot consolidation has been forwarded to Mr. Andrew Evans, Frederick County Zoning Administrator. Please contact him regarding its status. As you are aware, this consolidation must occur prior to approval of the site plan. / 2) Please provide the dimensions of the relocated sign and revise its new location. All freestanding signs shall be set back at least ten (10) feet from any property line. 3) Please revise the parking calculations. Ten spaces are required. This has been provided with the nine regular and one handicap space. The three parking spaces located in the driving aisle should be removed from the main driving aisle. It may, be appropriate to recess them within the grassed area that they currentiv abut. Please note that the proposed plantings are required to be a minimum of sir feet in height at the time of planting. .15) Please revise the detail of the proposed six-foot high opaque fence. A wooden stockade or board -on- board fence that is six -feet in height would be acceptable. Please revise your site plan to reflect the comments specified in this letter and resubmit one copy for my review Once I have verified the information contained on the revised site plan, I will need all approved review agency comment sheets and five copies of the final site plan for approval. Comment sheets are required from the following agencies: the Virginia Department of Transportation, the Frederick County Health Department. the Inspections Department. the Frederick County Engineer. and the Frederick Count, Fire Marshal. Please contact me if you have any questions regarding this letter. Sincerely. Michael T. Ruddy_ Planner II MTR;'cc Ill? North Kent Street • %%inchcstcr, Virginia 22601-5000 • • Ebert and Associates A H. Aubrey Hawkins Associates, Ltd. Company LAND SURVEYING LAND PLANNING DEVELOPMENT TRANSMITTAL SHEET TO: _ �2cor-_2��� Cam. FROM �. �EAS� SUBJECT: 6 Sz�elac.� REMARKS AT T N �A % AEA PURPOSE: WE ARE SENDING HEREWITH: FOR INFORMATION FOR REVIEW AND COMMENT J FOR APPROVAL / ❑ FOR REVISION ❑ YOUR REQUEST PLEASE RETURN BY DATE ❑ AGENCY COMMENTS ❑ BOND UNIT PRICE LIST ❑ COMMENT RESPONSE LETTER ❑ CORRESPONDENCE ❑ DEVELOPMEI f'f CONTROL FORM ❑ DRAINAGE QOt4aw. ❑ FEE ❑ FEE CALCULATION SHEET PRINTS C 1> ❑ QUALITY CONTROL FORM ❑ REPRODUCIBLES ❑ SITE DEVELOPMENT FEE ❑ SPECIFICATIONS ❑ SUMMARY LETTER ❑ OTHER 35 WEST BOSCAWEN STREET • WINCHESTER, VIRGINIA 22601-4740 540-667-3233 • FAX 540-667-9188 • TOLL FREE 1-800-755-7320 6 r�1 �.f M�„ • COMMONWEALTH of VIRQIN DEPARTMENT OF TRANSPORTATION EDINBURG RESIDENCY DAVID R. GEHR )40 i OLD VALLEY PIKE COMMISSIONCR P O BOX 278 EDINBURG, VA 22824.0278 July 24, 1997 Mr. Robert P. Pease, P.E. C/O H. Aubrey Hawkins Assoc. Ltd. 500 Musselman Road Falmouth, VA 22405 Dear Robert: a� 0� C� C) -e JE COPP �ENGivEER Rc 540) 98a5600 (540)984.5607 Ref: Ellis Self Storage Routes 664 & 761 Frederick County We have received your preliminary site plan dated November 25, 1996 for the referenced project. A review has been completed and we have the following comments shown in red on the plan sheet. 1. The VDOT General Notes should be a part of your plan assembly. Also, trip generation traffic volumes and source, i.e. I.T.E. Trip Generation Manual 51h Edition, is needed. 2. The existing entrance is substandard. It will need to be upgraded to current standards, copy attached. Also the entrance near the west property line and pipe culvert should be removed. 3. The existing topography should include the Route 664 and 761 pavement edges as shown. VDOT signs adjacent to the site should be shown. Also the current use of the existing cinder block building with I.T.E. data is needed. 4. Sight distance and distance to the nearest intersection should be shown. All notes shown in red on the site plan sheet should be addressed. Any changes in design features should meet or exceed the design standard. If you have any questions, please do not hesitate to call. Sincerely, Barry J. Sweiittzer, ans. Road y Engr. For: Robert B. Childress, Permits & Subd. Specialist Supervisor BJS/ rf Enclosures xc: Mr. R. B. Childress, Mr. S. A. Meln.ikoff, Mr. Kris Tierney WE KEEP VIRGINIA MOVING �LL 15 St S-rofZ,q C1 ►2�' ��2► I97 SITE PLAN CHECKLIST The checklist below indicates all the information that needs to be submitted as part of the site plan application. All required information must be submitted prior to the final approval of any site plan. The Department of Planning and Development will review the application to ensure that it is complete. If any portion is not included or complete, the site plan application will not be accepted and returned to the applicant(s). Site Plan Package 1. One set of approved comment sheets are required from the following review agencies prior to final site plan approval. It is recommended that applicants contact the Department of Planning and Development to determine which review agencies are relevant to their site plan application. J Virginia Department of Transportation (VDOT) Frederick County Sanitation Authority Department of Planning and Development Inspections Department ✓ Frederick County Engineer (Public Works) ✓ Frederick County Fire Marshal Department of Parks and Recreation 2. One copy of the Site Plan application 3. Five Copies of the Final Site Plan for approval 4. One reproducible copy of the Site Plan (if required) 5. A 35mm slide of the Site Plan (if required) County Health Department City of Winchester Town of Stephens City Town of Middletown Airport Authority Sod & Water Conservation District Site Plan Information Checklist The following information must be included an your site plan. If your site plan is incomplete or is missing information, it will not be reviewed and returned to you for revisions. Administrative Information Y N ✓ 1. Name of proposed development. 2. Name, address, and phone number of owner. ✓ 3. Name, address, and phone number of developer. 4. Name, address, and phone number of designer. 5. Certificate of surveyor, engineer, or architect. I ✓ 6. Date plan prepared and date of revisions. ✓ 7. A listing of all conditions placed on the site as a result of a conditional use permit or conditional zoning approval. A space labeled "Approved by the Zoning Administrator" for the approval signature and date of approval. TG "s- Y6Yq-2 S C r-T A description of setbacks or conditions placed on the site as a result of a variance approval. (Reference the variance application number.) S i EG c F7 Y --7 ' V ft2L t N C-c , General Site Information Y N ✓ 10. Location map (scale 1:2000) ✓ 11. Magisterial District ✓ 12. Scale of site plan (not to exceed 1:50) 13. North Arrow 14. Zoning of site 15. Use, zoning, and Property Identification Number (PIN#) of all adjoining properties. This includes properties located across right-of-ways, streams, and railroad tracks. C16. Surveyed boundaries for all lots and parcels. DATcr c.-.o7-S7 q, General Site (can't Y N 17. Acreage of all lots included in the plan. 0'12 C47NSOL . 18. The location and dimensions of all required setbacks and yard areas. CONSo(_. F2awT 5 Dc 19. The location and type of all dwelling units. 20. Location and description of all recreation facilities. 21. Location of sidewalks and pedestrian ways. JF�22. Location and area of common open space. 23. The location, height, and dimensions of all signs. (4? Location, height, and specifications of outdoor lighting fixture . Location and nature of outdoor storage areas. 5-r Location of outdoor trash receptacles and dimensions of structure (fencing, etc.) required to enclose receptacles. Building Information Y N 27 The height of all buildings and structures. 28. Location of all buildings, structures and uses. 29. The proposed use of each building, structure and area. 30. Ground floor area and total floor area of all buildings with PAR calculations for commercial and industrial zoning districts. Roads Y N 31 Name and number of existing and planned greets on and adjoining the site. 761 /761�66� i&X 32. Location of existing and planned streets on and adjoining the site. 33. Posted speed limit of existing adjacent roads. 34. Location and dimensions of all proposed entrances from public right-of-ways. • 35. Location of all entrances on adjoining roads within 200 feet of the proposed or existing entrance. VII 36. Dimensions, boundaries, width, pavement, and construction of planned roads. Utilities Y N V 37. Location of all utilities, including sewer and water lines with the size of lines, mains, and laterals. 38. Location and width of all easements, including access, utility, and drainage easements. 39 Location and nature of fire lanes, fire hydrants, and all other facilities necessary to meet Fire Code requirements. Eke Parkinq Y N Natural Features Y N 40. Calculations describing the required number of parking and loading spaces. 41. Location and dimensions of all parking and loading spaces; driveways, parking aisles, curbing and other features to be used. 42. Location and dimension of all disabled parking spaces and ramps. 43. Existing and finished contour lines. 44. Location of steep slopes, woodlands, floodplains, wetlands, sinkholes, and other environmental features. 45. Location of streams and drainage ways. 1 Landscaoin Y N 46. 47. Erosion and Sediment Control Landscaping plan describing location and types of plants to be used. Location of required buffers and screening with cross sections or profiles. I 48. A stormwater management plan with run off calculations and location and description of facilities to be used. 49 Soil erosion and sedimentation control plan describing the location and methods to be used to minimize erosion and Csedimentation during development. IN • 0 Ebert and Associates A H. Aubrey Hawkins Associates, Ltd. Company LAND SURVEYING LAND PLANNING DEVELOPMENT TRANSMITTAL SHEET TO: -F Mr.flF Cc Lo. SUBJECT. 11-4_.L.S FROM 11 fib 19k-1 2. pa brtI& REMARKS: A-rTN 1. C rL.9- "We-ra',ae-F- PURPOSE: WE ARE SENDING HEREWITH: FOR INFORMATION ❑ AGENCY COMMENTS FOR REVIEW AND COMMENT ❑ BOND UNIT PRICE LIST FOR APPROVAL ❑ COMMENT RESPONSE LETTER FOR REVISION ❑ CORRESPONDENCE YOUR REQUEST ❑ DEVELOPMENT CONTROL FORM PLEASE RETURN BY ❑ DRAINAGE COMPS DATE ❑ FEE ❑ FEE CALCULATION SHEET E As t A G Q `L h � .3-t C �� ER- PRINTS 2t 4 2E rA Crj-[ s � QUALITY CONTROL FORM ] REPRODUCIBLES (] SITE DEVELOPMENT FEV',, SPECIFICATIONS [ ] SUMMARY LETTER ] OTHER 35 WEST BOSCAWEN STREET • WINCHESTER, VIRGINIA 22601-4740 540-667-3233 • FAX 540-667-9188 • TOLL FREE 1-800-755-7320 WEPHENSON INDUSTRIAL PARK • Stephenson, Virginia THIS AGREEMENT , dated this day of between LEONARD C. ELLIS., (the "Lessor"), and (the "Lessee", whether one or more) provides as follows; 19 , by and LESSEE hereby agrees to rent from LESSOR , located at Stephenson Industrial Park, Frederick County, Virginia (the "Premises"), on a month -to -month basis beginning The rent shall be $ per month payable in advance and due by the first day of each month. This agreement is made on the following terms and conditions. 1. DEPOSITS. Lessee shall pay in advance a security, cleaning and damage deposit in amount of lVienty-five dollars ($25.00). The deposit shall be refunded, less reasonable charges for cleaning or repairing the Premises and less any other sums due Lessor under this agreement, after Lessee vacates the Premises. 2. USE OF PREMISES. The Premises shall be used only for the storage of personal property. Lessee shall not use the Premises for automobile repair or the operation of any business or for human or animal occupancy. Lessee shall not store any hazardous, explosive or flammable materials, including fuel drivcn vchicics or equipment unless the fuel tanks are empty. Lessee shall not use the Premises in violation of any order or requirement imposed by any sanitation, police or other governmental agency or government or in a way which may create a nuisance. 3. EXTENSION AND TERMINATION. Unless terminated, this agreement shall be automatically renewed each month. This agreement may be terminated by either party upon thirty (30) days written notice of such party's intention to terminate the tenancy. If Lessee vacates prior to the end of the thirty (30) day period, Lessee must nevertheless pay for the entire thirty (30) day rent. 4. DEFAULT. If Lessee is in default under the terms of this agreement, Lessor shall notify Lessee of such default. If such default is not cured within ten (10) days, then Lessor shal..l have the inarediate right to terminate the lease, to re-enter the Premises, either by summary proceedings, force or otherwise, to remove and dispose of all property therein and to relet the Premises, all with or without further notice to Lessee and with or without resort to legal process. 5. ENTRY OF PREMISES BY LESSOR. Lessor may enter the Premises, remove the contents and store the same in times of emergency, when the Premises have been damaged by fire or other casualty, or when Lessee has abandoned the Premises or is in default of the terms of this agreement. Lessee shall indemnify and hold Lessor harmless for any loss or expense in connection with such removal and storage. 6. CONDITION, ALTERATION AND SURRENDER OF PREMISES. Lessee hereby accepts the Premises in "as in" condition suitable for the purposes for which they are rented. Lessee agrees to keep the Premises in good order and condition and to promptly pay Lessor for any rep -airs neceS7,ltatd by L 3see'5 negligence, m13usc -,r neglect. Lessee agrees to i.frediately notify Lessor of any defects, dilapidations or danagerous conditions in or on the Premises. Lessee shall make no alterations or improvements to the Premises without Lessor's prior written consent. Upon termination, Lessee shall surrender the Premises broom clean and in as good condition as when accepted, reasonable wear and tear exce;ted. 7. LIMITATION OF LIABILITIES. Lessee hereby acknowledges that Lessor does not have custody, control, possession or dominion over the contents of the Premises. Lessor shall not be responsible to Lessee, his invitees, guests, licensees, agent or employees for damage to person or property caused by water, fire, or any other casualty, actions of other tenants, thefts, vandalism or any other causes, and Lessee expressly agrees to indemnify and hold Lessor harmless for such damage, loss, cost or expense. (Continued - over, Page #2) Page it 2 8 . INSURANCE. Lessee ac*ledges that insurance is availoe from independent insurance- companies for personal injury and damage to Lessee's property. Lessee assumes sole responsibility for fire and extended coverage on the contents of the Premises and for insurance covering personal injury. 9. ASSIGNMENT OR SUBLETTING. Lessee shall not sublet or assign all or any portion of Lessee's interest in the Premises without Lessor's prior written consent, which consent Lessor shall have no obligation to give. 10. RULES AND REGULATIONS. Lessee hereby acknowledges receipt of rules and regulations posted by Lessor governing the Premises. Lessee agrees to abid, by these rules and regulations as they exist now and may exist from time to time. The rules and regulations governing the Premises are hereby incorporated by refer- ence and any breach thereof by Lessee shall constitute a default under this agreement. 11. ADMINISTRATIVE CHARGES. Lessee agrees to pay a Ten Dollar ($10.00) fee for each payment more than ten 10) days late and for each dishonored bank check. 12. ATTORNEY' S FEES. If legal action is brought by Lessor for unlawful detainer, to recover any sums due under this agreement, or for the breach of any covenant or con- dition under this agreement, Lessee shall pay Lessor all costs, expenses and reasonable attorney's fees incurred in such action. Lessee shall also pay all costs, expenses and reasonably attorney's fees incurred by Lessor in selling the property pursuant to paragraph 13. 13. LESSOR'S LIEN. LESSOR SHALL HAVE A LIEN ON ALL PERSONAL PROPERTY STORED ON THE PREMISES FOR RENT AND ALL OTHER SUMS DUE UNDER THIS AGREEMENT. IF LESSEE IS IN DEFAULT OF THIS AGREMENT, LESSOR SHALL NOTIFY LESSEE OF SUCI DEFAULT. IF SUCH DEFAULT IS NOT CURED WITHIN TEN (10) DAYS, THEN LESSOR, after giving such notice as may be required by law, may proceed to enforce SUCH LIEN BY SELLING ALL OR SO MUCH AS MAY BE NECESSARY OF LESSEE'S PERSONAI PROPERTY. LESSEE SHALL BE LIABLE FOR ANY DEFICIENCY REMAINING AFTER THE SALE OF THE PROPERTY. 14. NOTICES. Notices hereunder shall be in writing and shall be deemed to be dated and delivered whether actually received -or not, upon deposit in the U.S. mail, addressed to the party's last known address. 15. APPLICABLE LAW. This agreement shall be construed in accordance with the Virginia Self -Storage Act and any other applicable law of the Commonwealth of Virginia. 16. REK} DIES ARE CUMULATIVE. The rights and remedies herein reserved by or granted to Lessor are distinct, separate and cumulative, and the exercise of any one of them shall not be deemed to preclude, waive or prejudice Lessor's right to exercise any or all others. 1 7 . COMPLETE AGREEMENT. This agreement contains the complete agreement of both parties, and any modification of this agreement,except for amendments to the rules and regulations referred to in parapgraph 10, shall be in writing and signed by both parties. LESSEE: LESSOR: LEONARD C. ELLIS, JR. Paint name By Print Street Address City, State, Zip Code Agent Signature WEPHENSON INDUSTRIAL PARK • Stephenson, Virginia THIS AGREEMENT , dated this day of 19 , by and between LEONARD C. ELLIS., (the "Lessor"), and (the "Lessee", whether one or more) provides as follows; LESSEE hereby agrees to rent from LESSOR , located at Stephenson Industrial Park, Frederick County, Virginia (the "Premises"), on a month -to -month basis beginning The rent shall be $ per month payable in advance and due by the first day of each month. This agreement is made on the following terms and conditions. 1. DEPOSI`i'S. Lessee shall pay in advance a security, cleaning and damage deposit in amount of Twenty-five dollars ($25.00). The deposit shall be refunded, less reasonable charges for cleaning or repairing the Premises and less any other sums due Lessor under this agreement, after Lessee vacates the Premises. 2. USE OF PREMISES. The Premises shall be used only for the storage of personal property. Lessee shall not use the Premises for automobile repair or the operation of any business or for human or animal occupancy. Lessee shall not store any hazardous, expl.osi.ve or f_larrarable materials, including fuel driven vehicles or equipmc--nt unless the fuel tanks are empty. Lessee shall not use the Premises in violation of any order or requireirent- imposed by any sanitation, police or other governmental agency or government or in a way which may create a nuisance. 3. EXTENSION AND TERMINATION. Unless terminated, this agreement shall be autorrtirtically renewed each month. This agreement may be terminated by either party upon thirty (30) days written notice of such party's intention to terminate the tenancy. If Lessee vacates prior to the end of the thirty (30) day period, Lessee must nevertheless pay for the entire thirty (30) day rent. 4. DEFAULT. If Lessee is in default under the terms of this agreement, Lessor shall notify Lcssee of such default. If such default is not cured within ten (10) days, then Lessor shall have the immediate right to terminate the lease, to re-enter the Premises, either by sumTo ry proceedings, force or otherwise, to remove and dispose of all property therein and to relet the Premises, all with or without further notice to Lessee and with r or without resort to legal process. 5. ENTRY OF PREMISES BY LESSOR. Lessor may enter the Premises, remove the contents and store the same in times of emergency, when the Premises have been damaged by fire or other casualty, or when Lesseehas abandoned the Premises or is in default of the terms of this agreement. Lessee shall indemnify and hold Lessor harmless for any loss or expense in connection with such removal and storage. 6. CONDITION, ALTERATION AND SURRENDER OF PREMISES. Lessee hereby accepts the Premises in as in condition suitable for the purposes for which they are rented. Lessee agrees to keep the Premises in good order and condition and to promptly pay Lessor fcr any repaz i_rs neces,itatd by Lossee' negligence, rri.suse or neglect. Lessee agrees to inn-ediately notify Lessor of any defects, dilapidations or danagerous conditions in or on the Premises. Lessee shall make no alterations or improvements to the Premises without Lessor's prior written consent. Upon termination, Lessee shall surrender the Premises broom clean and in as good condition as when accepted, reasonable wear and tear excezted. 7. LIMITATION OF LIABILITIES. Lessee hereby acknowledges that Lessor does not have custody, control, possession or dominion over the contents of the Premises. Lessor shall not be responsible to Lessee, his invitees, guests, licensees, agent or employees for damage to person or property caused by water, fire, or any other casualty, actions of other tenants, thefts, vandalism or any other causes, and Lessee expressly agrees to indemnify and hold Lessor harmless for such damage, loss, cost or expense. (Continued - over, Page #2) Page It 8. INSURANCE. Lessee ackiledges that insurance is availlse from independent insi,;�ance companies for personal injury and damage to Lessee's property. Lessee assumes sole responsibility for fire and extended coverage on the contents of the Premises and for insurance covering personal injury. 9. ASSIGNMENT OR SUBLETTING. Lessee shall not sublet or assign all or any portion of Lessee's interest in the Premises without Lessor's prior written consent, which consent Lessor shall have no obligation to give. 10. RULES AND REGULATIONS. Lessee hereby acknowledges receipt of rules and regulations posted by Lessor governing the Premises. Lessee agrees to abid. by these rules and regulations as they exist now and may exist from time to time. The rules and regulations governing the Premises are hereby incorporated by refer- ence and any breach thereof by Lessee shall constitute a default under this agreement. 11. ADMINISTRATIVE CHARGES. Lessee agrees to pay a Ten Dollar ($10.00) fee for each payment more than ten 10 days late and for each dishonored bank check. 12. ATTORNEY' S FEES. If legal action is brought by Lessor for unlawful detainer, to recover any suns due under this agreement, or for the breach of any covenant or con- dition under this agreement, Lessee shall pay Lessor all costs, expenses and reasonable attorney's fees incurred in such action. Lessee shall also pay all costs, expenses and reasonably attorney's fees incurred by Lessor in selling the property pursuant to paragraph 13. 13. LESSOR'S LIEN. LESSOR SHALL HAVE A LIEN ON ALL PERSONAL PROPERTY STORED ON THE PREMISES FOR RENT AND ALL OTHER SUMS DUE UNDER THIS AGREEMENT. IF LESSEE IS IN DEFAULT OF THIS AGREMENT, LESSOR SHALL NOTIFY LESSEE OF SUCK DEFAULT. IF SUCH DEFAULT IS NOT CURED WITHIN TEN (10) DAYS, THEN LESSOR, after giving such notice as may be required by law, may proceed to enforce SUCH LIEN BY SELLING ALL OR SO MUCH AS MAY BE NECESSARY OF LESSEE'S PERSONAI PROPERTY. LESSEE SHALL BE LIABLE FOR ANY DEFICIENCY REMAINING AFTER THE SALE OF THE PROPERTY. 14. NOTICES. Notices hereunder shall be in writing and shall be deemed to be dated and delivered whether actually received -or not, upon deposit in the U.S. mail, addressed to the party's last known address. 15. APPLICABLE LAW. This agreement shall be construed in accordance with the Virginia Self -Storage Act and any other applicable law of the Commonwealth of Virginia. 16. REfy=DIES ARE CUMULATIVE. The rights and remedies herein reserved by or granted to Lessor are distinct, separate and cumulative, and the exercise of any one of them shall not be deemed to preclude, waive or prejudice Lessor's right to exercise any or all others. 1 7 . COMPLETE AGREEMENT. This agreement contains the complete agreement of both parties, and any modification of this agreement, except for amendments to the rules and regulations referred to in par_apgraph 10, shall be in writing and signed by both parties. LESSEE: Print name Print Street Address City, State, Zip Code LESSOR: LEONARD C. ELLIS, JR. Agent Signature 0 OTEPHENSON INDUSTRIAL PARK • Stephenson, Virginia THIS AGREEMENT , dated this day of between LEONARD C. ELLIS., (the "Lessor"), and (the "Lessee", whether one or more) provides as follows; 19 , by and LESSEE hereby agrees to rent from LESSOR , located at Stephenson Industrial Park, Frederick County, Virginia (the "Premises"), on a month -to -month basis beginning The rent shall be $ per month payable in advance and due by the first day of each month. This agreement is made on the following terms and conditions. 1. DEPOSITS. Lessee shall pay in advance a security, cleaning and damage deposit in amount of Twenty-five dollars ($25.00). The deposit shall be refunded, less reasonable charges for cleaning or repairing the Premises and less any other sums due Lessor under this agreement, after Lessee vacates the Premises. 2. USE OF PREMISES. The Premises shall. be used only for the storage of personal property. Lessee shall not use the Premises for automobile repair or the operation of any business or for human or animal occupancy. Lessee shall not store any hazardous, expl.osi.ve or (lamii able materials, including fuel driven vehicles or equipment unless the fuel tanks are empty. Lessee shall not use the Premises in violation of any order or requirement imposed by any sanitation, police or other governmental agency or government or in a way which n-ay create a nuisance. 3. EXTENSION AND TERMINATION. Unless terminated, this agreement shall be automatically renewed each month. This agreement noy be terminated by either party upon thirty (30) days written notice of such party's intention to terminate the tenancy. If Lessee vacates prior to the end of the thirty (30) day period, Lessee must nevertheless pay for the entire thirty (30) day rent. 4. DEFAULT. If Lessee is in default under the terms of this agreement, Lessor shall notify Lessee of such default. If such default is not cured within ten (10) days, then Lessor shall. have the immediate right to terminate the lease, to re-enter the Premises, either by summary proceedings, force or otherwise, to remove and dispose of all property therein and to relet the Premises, all with or without further notice to Lessee and with or without resort to legal process. 5. ENTRY OF PREMISES BY LESSOR. Lessor may enter the Premises, remove the contents and store the same in times of emergency, when the Premises have been damaged by fire or other casualty, or when Lesseel-os abandoned the Premises or is in default of the terms of this agreement. Lessee shall indemnify and hold Lessor harmless for any loss or expense in connection with such removal and storage. 6. CONDITION, ALTERATION AND SURRENDER OF PREMISES. Lessee hereby accepts the Premises in "as in" condition suitable for the purposes for which they are rented. Lessee agrees to keep the Premises in good order and condition and to promptly pay Lessor for any rclaCj;.r, neces:�itat' by L�sse`'s negligence, misuse -r neglect. ;jessee agrees to immediately notify Lessor of any defects, dilapidations or danagerous conditions in or on the Premises. Lessee shall make no alterations or improvements to the Premises without Lessor's prior written consent. Upon termination, Lessee shall surrender the Premises broom clean and in as good condition as when accepted, reasonable wear and tear exce2ted. 7. LIMITATION OF LIABILITIES. Lessee hereby acknowledges that Lessor does not have custody, control, possession or dominion over the contents of the Premises. Lessor shall not be responsible to Lessee, his invitees, guests, licensees, agent or employees for damage to person or property caused by water, fire, or any other casualty, actions of other tenants, thefts, vandalism or any other causes, and Lessee expressly agrees to indemnify and hold Lessor harmless for such damage, loss, cost or expense. (Continued - over, Page #2) Page ## 2 8. INSURANCE. Lessee ac*ledges that insurance is availee from independent insurance companies for personal injury and damage to Lessee's property. Lessee assumes sole responsibility for fire and extended coverage on the contents of the Premises and for insurance covering personal injury. 9. ASSIGNMENT OR SUBLETTING. Lessee shall not sublet or assign all or any portion of - Lessee's interest in the Premises without Lessor's prior written consent, which consent Lessor shall have no obligation to give. 10. RULES AND REGULATIONS. Lessee hereby acknowledges receipt of rules and regulations posted by Lessor governing the Premises. Lessee agrees to abid, by these rules and regulations as they exist now and may exist from time to time. The rules and regulations governing the Premises are hereby incorporated by refer- ence and any breach thereof by Lessee shall constitute a default under this agreement. 11. ADMINISTRATIVE CHARGES. Lessee agrees to pay a Ten Dollar ($10.00) fee for each payment more than ten 0 days late and for each dishonored bank check. 12. ATTORNEY' S FEES. If legal action is brought by Lessor for unlawful detainer, to recover any stuns due under this agreement, or for the breach of any covenant or con- dition under this agreement, Lessee shall pay Lessor all costs, expenses and reasonable attorney's fees incurred in such action. Lessee shall also pay all costs, expenses and reasonably attorney's fees incurred by Lessor in selling the property pursuant to paragraph 13. 13. LESSOR'S LIEN. LESSOR SHALL HAVE A LIEN ON ALL PERSONAL PROPERTY STORED ON THE PREMISES FOR RENT AND ALL OTHER SUMS DUE UNDER THIS AGREEMENT. IF LESSEE IS IN DEFAULT OF THIS AGREMENT, LESSOR SHALL NOTIFY LESSEE OF SUCI DEFAULT. IF SUCH DEFAULT IS NOT CURED WITHIN TEN (10) DAYS, THEN LESSOR, after giving such notice as may be required by law, may proceed to enforce SUCH LIEN BY SELLING ALL OR SO MUCH AS MAY BE NECESSARY OF LESSEE'S PERSONAI PROPERTY. LESSEE SHALL BE LIABLE FOR ANY DEFICIENCY REMAINING AFTER THE SALE OF THE PROPERTY. 14. NOTICES. Notices hereunder shall be in writing and shall be deemed to be dated and delivered whether actually received -or not, upon deposit in the U.S. mail, addressed to the party's last known address. 15. APPLICABLE LAW. This agreement shall be construed in accordance with the Virginia Self -Storage Act and any other applicable law of the Commonwealth of Virginia. 16. REL/FEDIES ARE CUMULATIVE. The rights and remedies herein reserved by or granted to Lessor are distinct, separate and cumulative, and the exercise of any one of them shall not be deemed to preclude, waive or prejudice Lessor's right to exercise any or all others. 1 7 . COMPLETE AGREEMENT. This agreement contains the complete agreement of both parties, and any modification of this agreement, except for amendments to the rules and regulations referred to in parapgraph 10, shall be in writing and signed by both parties. LESSEE: LESSOR: LEONARD C. ELLIS, JR. Pint name By Agent Print Street Address City, State, Zip Code Signature COMMONWEALTH of VIRQINIA DEPARTMENT OF TRANSPORTATION EDINBURG RESIDENCY DAVID R. GEHR 14031 OLD VALLEY PIKE COMMISSIONER P.O. BOX 278 EDINBURG. VA 22824-0278 November 6, 1997 Mr. Robert P. Pease, P.E. C/O H. Aubrey Hawkins Assoc. Ltd. 500 Musselman Road Falmouth, VA 22405 Dear Robert: JERRY A. COPP RESIDENT ENGINEER TELE (540)984-5600 FAX (540) 984-5607 Ref: Ellis Self Storage Routes 664 & 761 Frederick County We have received your revised site plan dated 11/25/96 (received 11/05/97) for the referenced project. It appears all of our earlier review comments have been satisfactorily addressed. Please advise the owner of our approval. Please provide us with three additional sets of the current plans. The appropriate land use permit may now be applied for to cover work within the Routes 664 & 761 rights -of -way. The permit is issued by this office and will require a minimum processing fee and surety bond coverage. Once satisfactory application has been made, a permit will normally take approximately thirty days to process and issue. Should you have any questions, please feel free to call. BJS/rf Enclosure xc: Mr. R. B. Childress Mr. S. A. Melnikoff Mr. Kris Tierney Sincerely, f lam/ Bar lJ. Sweitze Trans. Roadway Engineer For: Robert B. Childress Transportation Engineer WE KEEP VIRGINIA MOVING • • Request For Site Plan Comments Virginia Department of Transportation Mail to: Virginia Department of Transportation Attem Resident Engineer P.O. Box 278 Edinburg, Virginia 22824-0278 (540) 984-5600 Hand deliver to: Local VDOT Office 1550 Commerce Street Winchester, VA (540) 722-3460 Please fill out the information as accurately as possible in order to assist the VDOT with their review. Please attach four copies of your site plan with this sheet. Applicant's name. E—i . ' +�� 3 P. C I 0 � w K � f ' S () -L L -I u . Address: M V s s A J vTH }y/>- zz4�,S Phone number. C z - 4 tj (b Name of development and/or description of the request: C L L_ i S L S 1 "T L C L A J Q_ 6_ .1 , t I a .� -T v A L U U v-) A^0 TQ(L. (SuLL0 1►)c—S Location of development: Y J-1 L z- s Q i o p r ;Lo T ks- -7 (0 1 r\ ,� n (_• A Virginia Department of Transportation's Comments: See attached letter from VDOT to fir. Robert P. Pease. VDOT use only Date received 7h f q 7 Incomplete Date reviewed "7,1244S-7 Signature and Date Signature and Date (revision) er 6. 19 RECEIVED EDINBURG RESIDENCY 7 p ,IAr ❑ NKS O NOS C7 KDC ❑ WLS Ll UVO E3 REF a RaC El MDY ❑ CRO Date revision received Date approved e-7 Incomplete Date reviewed 2IQy ,� � • FILE COPY COUNTY of FREDERICK Department of Planning and Development %40/665-5651 FAX: 540/678-0682 July 23, 1997 Mr. Robert Pease ff;kubrey Hawkins Associates, Ltd. 500 Musselman Road Falmouth, VA 22405 RE: Review of Ellis Self -Storage Site Development Plan Dear Mr. Pease: I have had the opportunity to review the above referenced site plan received by our department on July 2, 1997. The following comments, in addition to those marked on the plan, need to be addressed during the revision of this site plan: 1) Please include a statement to the effect that the approved site development plan shall be valid for five years from the official approval date of the plan, adjacent to the approval block. 2) Please specify the distance of the approved variance and the resulting front setback. 3) Please show the use of the adjoining properties and the property information for the properties located across the Route 664/761 right-of-way. 4) Please identify the surveyed boundaries for parcels 44-A-172 and 44-A-173. These two lots should be consolidated to accommodate the development of this property. This consolidation must occur prior to approval of the site plan. 5) Please show the separate acreage of each of the lots and the acreage for the consolidated lot. 6) Please show the location of the required setbacks and yard areas on the site plan. The end unit appears to be located too close to the adjoining property line. 7) Please provide the dimensions of the existing sign and show where its new location will be. 8) Please show the location and nature of any outdoor lighting and all outdoor storage areas. If none are planned, please make a statement to that effect on the site plan. 9) Please provide the height of the proposed buildings. 10) Please show the location of Route 761 in addition to Route 664. The intersection of these two roads should be clearly show on the plan. 107 North Kent Street - Winchester, Virginia 22601-5000 • • Ellis Self -Storage Site Plan Review Page 2 July 23, 1997 11) The location and nature of all facilities necessary to meet Fire Code requirements shall be approved by the Fire Marshal. 12) Please show the calculations describing the required number of parking spaces, their location, and the location a9d dimensions of the disabled parking spaces. The parking requirement for self service stdrage facilities is one space per 5,000 square feet of floor area. 13) Please ensure that all driving aisles are a minimum of twenty-two (22) feet in width. In addition, a thirty (30) foot distance between storage units must be maintained. v' 14) All parking areas, travel aisles and maneuvering areas associated with the self-service storage facility operations should be paved with asphalt. We would be willing to waive this requirement if the landscaped strip is extended and embellished into the southeastern corner of the property as marked on the enclosed plan. In addition, the proposed plantings are required to be a minimum of six feet in height at the time of planting. Please provide a count on the number of plantings that will be used. 15) Please provide a detail of the proposed six-foot high opaque fence. 16) The stormwater management plan, and the soil erosion and sedimentation control plan, shall be approved by the Department of Public Works. Please revise your site plan to reflect the comments specified in this letter and resubmit one copy for my review. Once I have verified the information contained on the revised site plan, I will need all approved review agency comment sheets and five copies of the final site plan for approval. Comment sheets are required from the following agencies: the Virginia Department of Transportation, the Frederick County Health Department, the Inspections Department, the Frederick County Engineer, and the Frederick County Fire Marshal. Please contact me if you have any questions regarding this letter. Sincerely, ,�� k cL ct Michael T. Ruddy Planner 11 MTR/cc 2 3. 4 5 SITE PLAN APPLICATION Department of Planning and Development Use only. �-1 Date application received 7-3-�� Application # 1 _ Complete. Date of acceptance _ Incomplete_ Date of return_ Project Title: L L S S E ST o a A C, E Location of Property STd- f r+ �, s •-► \�• (street address) Property Owner: Q--D C - -E L,`\s T!L- Address: iu 4 1 W Ac-Tc-(. Telephone: Applicant/Agent H. A 0 h � -( A fI ti, �J 11 oe Address f=�,.tiJ a VA _ z-L 4, v � Telephone: Designer: 4�q, j t y 19Ii j Addres „�' ac' � Teleph e: AZO Contact: l �LO f--k-Z- 4U'�a-I Kam'"ii12T ��kS� f7\ P. • 6. Is this an original or revised site plan? 7a. Total acreage of parcel to be developed: 7b. Total acreage of parcel: 8. Property Information: a) Property Identification Number: b) Current Zoning: c) Present Use: d) Proposed Use: e) Adjoining Property Use(s) f) Adjoining Property Identification Number(s) g) Magisterial District(s) Original Revised ✓ AA - a 1"AZCLLs N-12 -4 1-1 3 M-1 st;LF eTC.,/Z P STnAG-E 1Z�S �Q1 iJT NAB u._, e-- LVa 44 _ A tL-i VI ` I7c.4% 1"/C-S 1"l4 STo NEwA"— I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to the submission of my site Signature-.�"f'` Date: 7 � r • f +�' Y Yt DEVELOPMENT REVIEW FEESCHEDULE REZONING: $550 plus $35.00 per acre $25.00 refundable fee for sign A ER DEVELOPMENT PLAN: $1300 plus $40 per acre (to 50 acres) plus $30 per acre for each acre over 50 acres NON RESIDENTIAL SITBDMSIONS: $800 plus S90 per lot (to 10 lots) plus $30 per lot for each lot over 10 lots. Iri the case of a minor subdivision (4 lots or less) the fee shall be $250.00 plus $35.00 per lot. RESIDENTIAL SU 3DD95LM: S1000 plus $90 per lot (to 10 lots) plus $45.00 per lot for each lot over 10 lots. In the case of a minor subdivision (4 lots or less) the fee shall be $250.00 plus $35.00 per lot. NON RESIDENTIAL SITE PLANS: $1000.00 plus $100.00 per acre (to 5 acres) plus $30, 00 per acre for each acre over 5 acres. MINOR SITE PLAN: (.A, Z.l\ Y-"30� +CS � 100� � �QGcl - 33 $500.00 A revision that increases the existing structure area by 2017a or less and does not exceed 5000 square feet. RESIDENTIAL SITE PLANS: $1000 plus S40 per unit (to 20 units) plus S25 per unit for each unit over 20 units CONDITIONAL USE PERMIT: $75.00 plus S25.00 refundable fee for a sign. VARIANCE OR APPEAL: S250.00 plus $25.00 refundable fee for a sign. SOIL, EROSION AND SEDIMENTATION CONTROL PLAN (NOT PART OF SITE OR SUBDIVISION PLAN - LAND D15TURBANCE PERMIT): $200.00 plus S25.00 per acre of disturbed area FLOODPLAIN STUDY: $400.00 plus S2.50 per acre of drainage area (to 200 acres) plus $1.50 per acre of drainage area over 200 acres (to 1,000 acres) Structures used for fire and rescue services are exempt from design review fees. u • Ebert and associates A H. Aubrey Hawkins Associates, Ltd. Company LAND SURVEYING LAND PLANNING DEVELOPMENT i (,z, I q'1 TRANSMITTAL SHEET TO: _ F"'�L�s!?.Lti`t�� Co, FROM: SUBJECT. C': SF�� sT .3f --, REMARKS - kTL_ P`�� L16.lts.o J PURPOSE: ❑ FOR INFORMATION FOR REVIEW AND COMMENT FOR APPROVAL ❑ FOR REVISION ❑ YOUR REQUEST ❑ PLEASE RETURN BY 799'� �vvo o0'r EEOpM �yC WE ARE SENDING HEREWITH: AGENCY COMMENTS ❑ BOND UNIT PRICE LIST ❑ COMMENT RESPONSE LETTER ❑ CORRESPONDENCE ❑ DEVELOPMENT CONTROL FORM ❑ DRAINAGE COMPS DATE ❑ FEE ❑ FEE CALCULATION SHEET ❑ PRINTS ❑ QUALITY CONTROL FORM ❑ REPRODUCIBLES ❑ SITE DEVELOPMENT FEE ❑ SPECIFICATIONS ❑ SUMMARY LETTER ❑ OTHER 35 WEST BOSCAWEN STREET • WINCHESTER, VIRGINIA 22601-4740 540-667-3233 • FAX 540-667-9188 • TOLL FREE 1-800-755-7320 • • Request For Site Plan Comments Department of Planning and Development Mail to: Nand deliver to: Department of Planning and Development 107 N. Kent Street Attn: County Planner Fourth Floor P.O. Box 601 Winchester, VA Winchester, VA 22604 (540) 665-5651 (540) 665-5651 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the site plan with this sheet. Applicant's Name: H, a v r>r, cy V1 rx %, s u� A s s o Address: sow n v SS UL "A a k o. —Ashv�y A . z-zgv� Phone Number: V oc,> S% z- 4 o Y)3 Name of development and/or description of the request: 1F_t-U II . S r L_ F S-r o 2q(,-E S T L P` A &'4% S% 13 J Z b A L v v �,-%/L. T ►-t'L tS C- (>n, Nz 1 5 j AL �LL(- 6r0rZ� VC�k-0 k.) L�_j Location of property: t T ��s o „� �, r— T 6 t pP�---, r, ("A Planning and Development's Comments: Planning and Development use only Date received Incomplete Date reviewed Signature and Date _ Signature and Date (revision) Date revision received Incomplete Date reviewed �, d�t_19g1 Ft�c�N ED -,• DEPT• OF PLANNING ��. PryD DE�1ElOPMENt Date approved 5 SITE PLAN CHECKLIST The checklist below indicates all the information that needs to be submitted as part of the site plan application. All required information must be submitted prior to the final approval of any site plan. The Department of Planning and Development will review the application to ensure that it is complete. If any portion is not included or complete, the site plan application will not be accepted and returned to the applicant(s). Site Plan Package J 1 One set of approved comment sheets are required from the following review agencies prior to final site plan approval. It is recommended that applicants contact the Department of Planning and Development to determine which review agencies are relevant to their site plan application. Virginia Department of Transportahon (VDOT) County Health Department Frederick County Sanitation Authority City of Winchester Department of Planning and Development Town of Stephens City Inspections Department Town of Middletown Frederick County Engineer (Public Works) Airport Authonty Frederick County Fire Marshal Sod & Water Conservation Distnct Department of Parks and Recreation 2. One copy of the Site Plan application A 3. Five Copies of the Final Site Plan for approval I., I a 4. One reproducible copy of the Site Plan (if required) , I 5. A 35mm slide of the Site Plan (if required) f4 JdL'997 rp RECEIVED �2 J DEPT. OF PLELQEGD i^ AND DEVJME M �V f'MENZ 9 Site Plan Information Checklist The following information must be included on your site plan. If your site plan is incomplete or is missing information, it will not be reviewed and returned to you for revisions. Administrative Information Y N ✓ 1. Name of proposed development, 2. Name, address, and phone number of owner. ✓ 3. Name, address, and phone number of developer. ✓ 4. Name, address, and phone number of designer. ✓ 5. Certificate of surveyor, engineer, or architect. 6. Date plan prepared and date of revisions. 7. A listing of all conditions placed on the site as a result of a conditional use permit or conditional zoning approval. ✓ 8. A space labeled "Approved by the Zoning Administrator' for the approval signature and date of approval. 9., A description of setbacks or conditions placed on the site as a result of a variance approval. (Reference the variance application number.) General Site Information Y N ✓ 10. Location map (scale 1:2000) 11. Magisterial District ✓ 12. Scale of site plan (not to exceed 1:50) ✓ 13. North Arrow IL 14. Zoning of site ✓ 15. Use, zoning, and Property Identification Number (PIN#) of all adjoining properties. This includes properties located across right-of-ways, streams, and railroad tracks. f 16. Surveyed boundaries for all lots and parcels. 01 General Site (con't Y N 17. Acreage of all lots included in the plan. 18. The location and dimensions of all required setbacks and yard areas. / 19. The location and type of all dwelling units. ✓ 20. Location and description of all recreation facilities. 21. Location of sidewalks and pedestrian ways. 22. Location and area of common open space. f 23. The location, height, and dimensions of all signs. 24. Location, height, and specifications of outdoor lighting fixtures. 25. Location and nature of outdoor storage areas. 26. Location of outdoor trash receptacles and dimensions of structure (fencing, etc.) required to enclose receptacles. Building Information Y N 27. The height of all buildings and structures. 28. Location of all buildings, structures and uses. 29. The proposed use of each building, structure and area. J 30. Ground floor area and total floor area of all buildings with FAR calculations for commercial and industrial zoning districts. Roads Y N .� 31. Name and number of existing and planned streets on and adjoining the site. 32. Location of existing and planned streets on and adjoining the site. 33. Posted speed limit of existing adjacent roads. 34. Location and dimensions of all proposed entrances from public right-of-ways. 10 ✓ 35. Location of all entrances on adjoining roads within 200 feet of the proposed or existing entrance. ✓ 36. Dimensions, boundaries, width, pavement, and construction of planned roads. Utilities Y N 37. Location of all utilities, including sewer and water lines with the size of lines, mains, and laterals. ✓ 38. Location and width of all easements, including access, utility, and drainage easements. 7— 39. Location and nature of fire lanes, fire hydrants, and all other facilities necessary to meet Fire Code requirements. Parkinq Y N ✓ 40. Calculations describing the required number of parking and loading spaces. ✓ 41. Location and dimensions of all parking and loading spaces, driveways, parking aisles, curbing and other features to be used. 42. Location and dimension of all disabled parking spaces and ramps. Natural- Features Y N 43. Existing and finished contour lines. ✓ 44. Location of steep slopes, woodlands, floodplains, wetlands, sinkholes, and other environmental features. 45. Location of streams and drainage ways. • Landscaping Y N J 46. Landscaping plan describing location and types of plants to be used. 47. Location of required buffers and screening with cross sections or profiles. Erosion and Sediment Control Y N J 48. A stormwater management plan with run off calculations and location and description of facilities to be used. 49. Soil erosion and sedimentation control plan describing the location and methods to be used to minimize erosion and sedimentation during development. 12 C� • Ellis Self Storage SWM Computations November 25, 1996 Stormwater management for this site will be provided at the northeast corner of the site in an above ground pond. These computations are based upon the total amount of post -developed impervious area on the site. The routing computations were performed utilizing Pond-2 software by Haestad Methods, Inc. of Waterbury, CT. INDEX Page No. Description 1 SWM Summary, Index 2 Outlet Structure Detail 3 Offsite Drainage Divide 4 Storm Intensity Chart (VDOT) 5-6 SWM Computations 7 Pond Volume Comps 8-9 25 & 100 year Hydrographs 10-14 Outlet Structure Computations 15-19 25 year Storm Routing 20-24 100 year Storm Routing ■ LTN rr r Zv ROBERT P. PEASE s �Q NO. 021731 %5 S&/ONAL Ee"�\'r ti0000** JUL 1997 RECEIVED DEPT. OF PLANNING ML) DEVELOPMENT i\v� fi ' " 40 Mr o . AUB KINS • 84 • o v ri- E r s revc rueE DE Tw /L (itvO T 7,1 SCA L E j 7 75' n SECT/D// A TOP 6ECr/Oti A sEC T/a/l/ B OF 404M Z ow O FF5 17TE 0Oe4 I A14 GE A,�lq SC4 L [_ - / "r e000' 0E6L00ItAL SURVEY 78`g7'30" !19"�D- 1Nµ'o0o a -.', 6i 1 39.15,• - �'. 50 L.,n:,.r ,• . ,r. 151 5' '52 1 Bch 431800°' N i• � � �t' n� 1 nr l' 'Q C,- Re t Area t o. i o7`+ _" .•L 633 A1G)�'� FreyT/ 1p a Ary Not; \ ro �. 1 EmmanuelCh •. o�uo ? '- tieiier <` V Sbephettson /•/� `1. `�1 / Quarry ParA. . .�� ✓ n • y;� / racer ° 10 / OF FS I T Part 1 �9 A IDEA = 1574 C - Z- `� 'ell �i0 4-1 4345 12'30" % BM 631' a 1 burn Ye Jr- r Up . - � �/ �l ' xis 1"- s .•' t \ _ �•�J, �, C Springs, Pit 10 ick •'[.i �' �"�(" ^mil,_ )fls_ —..�% � c.: ���n r�_ ., \ � � \ l 1 \\• �'t ..� i� . \' ��L'3U !� U� �• �f� f �a �,'` - !•1• rt— r � 1•, j HJaJ T►iuity� ,<� `.. J 7=� \ l JNia■ion Fienrinrry , jF{r r -- - - -- - - -- --_ co. uo: 34 0 StormwaLer Management Computations Predeveloped Runoff Site Area 9.211 acres C = 0.30 Tc = 10 min. I10 = 5.5 I25 = 6.4 Q10 = (.30) (9.211) (5.5) = 15.2 cfs Q25 = (.30) (9.211) (6.4) = 17.7 cfs Postdeveloped Runoff Site Area = 9.211 Cw = Bldg., Conc. 0.86 ac @ c = 0.90 = 0.7740 Gravel 2.19 ac @ c = 0.70 = 1.5330 Open space 6.16 ac @ c = 0.30 = 1.8483 Total 4.1553 = 4.1552/9.211 = 0.45 Tc = 10 min I10 = 5.5 I25 = 6.4 I100= 7.8 Q10 = (0.45) (5.5) (9.211) = 22.8 cfs Q25 = (0.45) (6.4) (9.211) = 26.5 cfs Q100= (0.45) (7.8) (9.211) = 32.3 cfs Detention Required Det. Req'd = Post Dev. Q25 onsite Pre Dev. Q10 onsite Runoff to Pond Offsite to pond 15.70 ac @ 0.40 = 6.280 Onsite to pond Bldg 0.38 ac @ 0.90 = 0.3420 Gravel 1.32 ac @ 0.70 = 0.9240 Open space 5.59 ac @ 0.30 = 1.6770 Total 22.99 ac 9.2230 = 9.2230/22.99 = 0.40 Tc = 10 min I10 = 5.5 I25 = 6.4 I100= 7.8 Q10 = (0.40) (22.99) (5.5) = 50.6 cfs Q25 = (0.40) (22.99) (6.4) = 58.9 cfs Q100= (0.40) (22.99) (7.8) = 71.7 cfs E 0 Allowable Outflow From Pond Allowable Outflow = Q,J to Pond - Det. Req'd 58.9cfs - 11.3 cfs = 47.6 cfs Outflow from Pond Taken from routing computations 25 year storm = 43.6 cfs 100 year storm = 50.8 cfs Site will be in compliance since outflow from pond < allowable outflow from pond 25 year storm 43.6 < 47.6 I 0 POND-2 Version: 5.17 SIN: ELLIS SELF STORAGE CALCULATED 11-22-1996 17:07:02 DISK FILE: c:\swm\ELLIS VOL Planimeter scale: 1 inch = 30 ft. * Elevation Planimeter Area Al+A2+sgr(Al*A2) Volume Volume Sum (ft) (sq.in.) (sq.ft) (sq.ft) (cubic-ft) (cubic-ft) --------------------------------------------------------------------------- 20.10 0:00 0 0 0 0 22.00 38.70 34,830 34,830 22,059 22,059 24.00 68.60 61,740 142,942 95,295 117,354 * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Areal*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 _ POND-2 Version: 5.17 S/• >>>>> HYDROGRAPH PRINTOUT <<<<< 11-25-1996 12:12:58 Hydrograph file: c:\swm\ELLIS25 HYD HYDROGRAPH ORDINATES (cfs) Time Time increment = 5.00 Minutes Minutes Time on left represents time for first Q in each row. 0.00 0.00 34.00 58.90 44.10 31.30 23.90 20.20 35.00 16.60 13.80 12.00 10.10 9.20 8.30 POND-2 Version: 5.17 SIN: >>>>> HYDROGRAPH PRINTOUT <<<<< 11-22-1996 17:05:11 Hydrograph file: c:\swm\ELLISl00.HYD HYDROGRAPH ORDINATES (cfs) Time Time increment = 5.00 Minutes Minutes -Time on left represents time for first Q in each row. -------- 0.00 ------------------------------------------- 0.00 41.40 71.70 54.30 ------------------- 37.70 29.40 23.90 35.00 20.20 16.60 14.70 12.90 11.00 10.10 0 0 0 Outlet Structure File: ELLIS STR POND-2 'Version: 5.17 SIN: Date Executed: Time Executed: ***** COMPOSITE OUTFLOW SUMMARY **** Elevation (ft) Q (cfs) Contributing Structures 20.10 0.0 1 20.20 0.7 1 20.30 2.1 1 20.40 3.8 1 20.50 5.9 1 20.60 8.2 1 20.70 10.8 1 20.80 13.6 1 20.90. 16.6 1 21.00 19.9 1 21.10 23.3 1 21.20 26.8 1 21.30 30.6 1 21.40 34.5 1 21.50 38.5 1 21.60 42.7 1 21.70 47.1 1 21.80 51.5 1 21.90 56.1 1 22.00 60.9 1 22.10 65.8 1 22.20 70.8 1 22.30 75.9 1 22.40 81.1 1 22.50 86.4 1 22.60 91.9 1 22.70 97.5 1 22.80 103.1 1 22.90 108.9 1 23.00 114.8 1 23.10 120.8 1 23.20 126.9 1 23.30 133.1 1 23.40 139.4 1 23.50 145.8 1 23.60 152.2 1 23.70 158.8 1 23.80 165.5 1 23.90 172..2 .1_ 24.00 0.0 w • Outlet Structure File: ELLIS POND-2 Version: 5.17 Date Executed: STR SIN: Time Executed: Outlet Structure File: c:\swm\ELLIS STR Planimeter Input File: c:\swm\ELLIS VOL Rating Table Output File: c:\swm\ELLIS PND Min. Elev. (ft) = 20.1 Max. Elev. (ft) = 24 Incr. (ft) = 1 Additional elevations (ft) to be included in table: * * * * * * * * * * * * * * * * * * * * * * * * * * ********************************************** SYSTEM CONNECTIVITY �cic k*�k**�c�c�c9r****�c�r�c�ck****�rklrkkkk�c�t�cick�cic**kk�r�c** Structure No. WEIR-VR 1 Q Table Q Table -> 1 Outflow rating table summary was stored in file: c:\swm\ELLIS PND • Outlet Structure File: ELLIS POND-2 Version: 5.17 Date Executed: 40 .STR SIN: Time Executed: >>>>>> Structure No. 1 <<<<<< (Input Data) WEIR-VR Weir - Vertical Rectangular E1 elev. (ft) ? 20.1 E2 elev. (ft) ? 24.0 Weir coefficient? 3 Weir elev.(ft)? 20.1 Length (ft)? 7.75 Contracted/Suppressed (CIS)? S IZ • Outlet Structure File: ELLIS POND-2 Version: 5.17 Date Executed: 11 .STR SIN: Time Executed: Outflow Rating Table for Structure ##1 WEIR-VR Weir - Vertical Rectangular ***** INLET CONTROL ASSUMED ***** Elevation (ft) Q (cfs) Computation Messages 20.10 0.0 H =0.0 20.20 0.7 H =.1 20.30 2.1 H =.2 20.40 3.8 H =.3 20.50 5.9 H =.4 20.60 8.2 H =.5 20.70 10.8 H =.6 20.80- 13.6 H =.7 20.90 16.6 H =.8 21.00 19.9 H =.9 21.10 23.3 H =1.0 21.20 26..8 H.=1.1 21.30 30.6 H =1.2 21.40 34.5 H =1.3 21.50 38.5 H =1.4 21.60 42.7 H =1.5 21.70 47.1 H =1.6 21.80 51.5 H =1.7 21.90 56.1 H =1.8 22.00 60.9 H =1.9 22.10 65.8 H =2.0 22.20 70.8 H =2.1 22.30 75.9 H =2.2 22.40 81.1 H =2.3 22.50 86.4 H =2.4 22.60 91.9 H =2.5 22.70 97.5 H =2.6 22.80 103.1 H =2.7 22.90 108.9 H =2.8 23.00 114.8 H =2.9 23.10 120.8 H =3.0 23.20 126.9 H =3.1 23.30 133.1 H =3.2 23.40 139.4 H =3.3 I"> Outlet Structure File: ELLIS STR POND-2 Version: 5.17 SIN: Date Executed: Time Executed: >>>>> CONTINUED from previous page <<<<< Outflow Rating Table for Structure #1 WEIR-VR Weir - Vertical Rectangular ***** INLET CONTROL ASSUMED ***** Elevation (ft) Q (cfs) Computation Messages -------------- ------- ------------------------ 23.50 145.8 H =3.4 23.60 152.2 H =3.5 23.70 158.8 H =3.6 23.80 165.5 H =3.7 23.90 172.2 H =3.8 24.00 0.0 E = or > E2=24.0 C = 3 L (ft) = 7.75 H (ft) = Table elev. - Invert elev. ( 20.1 ft ) Q (cfs) = C * L * (H**1.5) -- Suppressed Weir K • • POND-2 Version: 5.17 SIN: EXECUTED: 11-25-1996 12:17:10 * * * ELLIS SELF STORAGE * 25 YR. STORM ROUTING * * * * * * ************************** Inflow Hydrograph: c:\swm\ELLIS25 HYD Rating Table file: c:\swm\ELLIS PND ----INITIAL CONDITIONS ---- Elevation = 20.10 ft Outflow = 0.00 cfs Storage = 0 cu-ft GIVEN POND DATA ELEVATION OUTFLOW STORAGE (ft) (cfs) (cu-ft) --------- 20.10 --------- 0.0 ---------- 0 20.20 0.7 3 20.30 2.1 26 20.40 3.8 87 20.50 5.9 206 20.60 8.2 402 20.70 10.8 695 20.80 13.6 1,103 20.90 16.6 1,647 21.00 19.9 2,344 21.10 23.3 3,216 21.20 26.8 4,281 21.30 30.6 5,557 21.40 34.5 7,066 21.50 38.5 8,825 21.60 42.7 10,854 21.70 47.1 13,173 21.80 51.5 15,801 21.90 56.1 18,756 22.00 60.9 22,059 22.10 65.8 25,600 22.20 70.8 29,258 22.30 75.9 33,036 22.40 81.1 36,935 22.50 86.4 40,957 22.60 91.9 45,103 22.70 97.5 49,377 22.80 103.1 53,780 22.90 108.9 58,313 23.00 114.8 62,979 23.10 ------------------------------ 120.8 67,779 Page 1 INTERMEDIATE ROUTING COMPUTATIONS -------------------------- 2S/t 2S/t + 0 (cfs) (cfs) ------------ 0.0 ------------- 0.0 0.0 0.7 0.2 2.3 0.6 4.4 1.4 7.3 2.7 10.9 4.6 15.4 7.4 21.0 11.0 27.6 15.6 35.5 21.4 44.7 28.5 55.3 37.0 67.6 47.1 81.6 58.8 97.3 72.4 115.1 87.8 134.9 105.3 156.8 125.0 181.1 147.1 208.0 170.7 236.5 195.1 265.9 220.2 296.1 246.2 327.3 273.0 359.4 300.7 392.6 329.2 426.7 358.5 461.6 388.8 497.7 419.9, 534.7 451.9 -------------------------- 572.7 • EXECUTED DISK FILES 11-25-1996 12:17:10 ELLIS25 HYD ; ELLIS GIVEN POND DATA ELEVATION OUTFLOW STORAGE (ft) --------- (cfs) (cu-ft) 23.20 --------- 126.9 ---------- 72,716 23.30 133.1 77,792 23.40 139.4 83,007 23.50 145.8 88,365 23.60 152.2 93,867 23.70 158.8 99,515 23.80 165.5 105,311 23.90 ------------------------------ 172.2 111,257 . m Page 2 INTERMEDIATE ROUTING COMPUTATIONS 2S/t 2S/t + 0 (cfS) ------------ (cfS) ------------- 484.8 611.7 518.6 651.7 553.4 692.8 589.1 734.9 625.8 778.0 663.4 822.2 702.1 867.6 741.7 -------------------------- 913.9 Time increment (t) = 5.0 min. POND-2 Version: 5.17 SIN: EXECUTED: 11-25-1996 12:17:10 Pond File: c:\swm\ELLIS PND Inflow Hydrograph: c:\swm\ELLIS25 HYD Outflow Hydrograph: c:\swm\OUT HYD INFLOW HYDROGRAPH TIME INFLOW (min) -------- (cfs) 0.0 --------- 0.00 5.0 34.00 10.0 58.90 15.0 44.10 20.0 31.30 25.0 23.90 30.0 20.20 35.0 16.60 40.0 13.80 45.0 12.00 50.0 10.10 55.0 9.20 60.0 ----------------- 8.30 Page 3 ROUTING COMPUTATIONS I1+I2 2S/t - 0 2S/t -+- 0 OUTFLOW ELEVATION (cfs) --------- (cfs) ------------ (cfs) (cfs) (ft) ----- -0.0 ----------- 0.0 --------- 0.00 --------- 20.10 34.0 -4.5 34.0 19.27 20.98 92.9 15.9 88.4 36.22 21.44 103.0 31.8 118.9 43.56 21.62 75.4 25.5 107.2 40.84 21.56 55.2 12.2 80.7 34.26 21.39 44.1 2.1 56.3 27.10 21.21 36.8 -3.4 38.9 21.15 21.04 30.4 -5.7 27.0 16.35 20.89 25.8 -6.2 20.1 13.18 20.78 22.1 -6.2 15.9 11.02. 20.71 19.3 -5.8 13.1 9.48 20.65 17.5 ------------------------------------------------------ -5.6 11.7 8.65 20.62 I -7 • • POND-2 Version: 5.17 SIN: EXECUTED: 11-25-1996 12:17:10 Page 4 ****************** SUMMARY OF ROUTING COMPUTATIONS ****************** Pond File: c:\swm\ELLIS PND Inflow Hydrograph: c:\swm\ELLIS25 HYD Outflow Hydrograph: c:\swm\OUT HYD Starting Pond W.S. Elevation = 20.10 ft ***** Summary of Peak Outflow and Peak Elevation ***** Peak Inflow = 58.90 cfs Peak Outflow = 43.56 cfs Peak Elevation = 21.62 ft ***** Summary of Approximate Peak Storage ***** Initial Storage = 0 cu-ft Peak Storage From Storm = 11,306 cu-ft --------------- Total Storage in Pond = 11,306 cu-ft Warning: Inflow hydrograph truncated on right side. 16 POND-2 Version: 5.17 SIN: Page 5 ' Pond File: c:\swm\ELLIS PND Inflow Hydrograph: c:\swm\ELLIS25 HYD Outflow Hydrograph: c:\swm\OUT HYD EXECUTED: 11-25-1996 Peak Inflow = 58.90 cfs 12:17:10 Peak Outflow = 43.56 cfs Peak Elevation = 21.62 ft Flow (cfs) 0.0 .------I 6.0 12.0 18.0 ----- I ----- I 24.0 30.0 ----- I ----- I ----- 36.0 42.0 I ----- I ----- 48.0 54.0 60.0 66.0 I ----- I ----- I ----- I- 0.0 - x x 5.0 - x x 10.0. - x - x 15.0 - x * x 20.0 - * x * x 25.0 - * x * x 30.0 - * x * x 35.0 - * x * x 40.0 - * x * x 45.0 - *x *x 50.0 - *x x 55.0 - x x TIME (min) * File: c:\swm\ELLIS25 HYD Qmax = 58.9 cfs x File: c:\swm\OUT HYD Qmax = 43.6 cfs • 1] POND-2 Version: 5.17 SIN: EXECUTED: 11-25-1996 12:21:23 *************************** * * * ELLIS SELF STORAGE * 100 YR. STORM ROUTING * * * * * * Inflow Hydrograph: c:\swm\ELLIS100.HYD Rating Table file: c:\swm\ELLIS PND ----INITIAL CONDITIONS ---- Elevation = 20.10 ft Outflow = 0.00 cfs Storage = 0 cu-ft GIVEN POND DATA ELEVATION OUTFLOW STORAGE (ft) (cfs) (cu-ft) 20.10 0.0 0 20.20 0.7 3 20.30 2.1 26 20.40 3.8 87 20.50 5.9 206 20.60 8.2 402 20.70 10.8 695 20.80 13.6 1,103 20.90 16.6 1,647 21.00 19.9 2,344 21.10 23.3 3,216 21.20 26.8 4,281 21.30 30.6 5,557 21.40 34.5 7,066 21.50 38.5 8,825 21.60 42.7 10,854 21.70 47.1 13,173 21.80 51.5 15,801 21.90 56.1 18,756 22.00 60.9 22,059 22.10 65.8 25,600 22.20 70.8 29,258 22.30 75.9 33,036 22.40 81.1 36,935 22.50 86.4 40,957 22.60 91.9 45,103 22.70 97.5 49,377 22.80 103.1 53,780 22.90 108.9 58,313 23.00 114.8 62,979 23.10 ----------- 120.8 ------------------- 67,779 Page 1 INTERMEDIATE ROUTING COMPUTATIONS -------------------------- 2S/t 2S/t + 0 (cfs) (cfs) 0.0 0.0 0.0 0.7 0.2 2.3 0.6 4.4 1.4 7.3 2.7 10.9 4.6 15.4 7.4 21.0 11.0 27.6 15.6 35.5 21.4 44.7 28.5 55.3 37.0 67.6 47.1 81.6 58.8 97.3 72.4 115.1 87.8 134.9 105.3 156.8 125.0 181.1 147.1 208.0 170.7 236.5 195.1 265.9 220.2 296.1 246.2 327.3 273.0 359.4 300.7 392.6 329.2 426.7 358.5 461.6 388.8 497.7 419.9 534.7 451.9 -------------------------- 572.7 Zo • EXECUTED DISK FILES 11-25-1996 12:21:23 ELLIS100.HYD ; ELLIS GIVEN POND DATA ELEVATION OUTFLOW STORAGE (ft) (cfs) (cu-ft) --------- 23.20 --------- 126.9 ---------- 72,716 23.30 133.1 77,792 23.40 139.4 83,007 23.50 145.8 88,365 23.60 152.2 93,867 23.70 158.8 99,515 23.80 165.5 105,311 23.90 ------------------------------ 172.2 111,257 Time increment (t) _ Page 2 INTERMEDIATE ROUTING COMPUTATIONS 2S/t 2S/t + 0 (cfs) (cfs) ------------ 484.8 ------------- 611.7 518.6 651.7 553.4 692.8 589.1 734.9 625.8 778.0 663.4 822.2 702.1 867.6 741.7 -------------------------- 913.9 5.0 min. Z� • POND-2 Version: 5.17 SIN: Page 3 EXECUTED: 11-25-1996 12:21:23 Pond File: Inflow Hydrograph: Outflow Hydrograph: INFLOW HYDROGRAPH TIME INFLOW (min) -------- (cfs) 0.0 --------- 0.00 5.0 41.40 10.0 71.70 15.0 54.30 20.0 37.70 25.0 29.40 30.0 23.90 35.0 20.20 40.0 16.60 45.0 14.70 50.0 12.90 55.0 11.00 60.0 ----------------- 10.10 c:\Swm\ELLIS PND c:\swm\ELLIS100.HYD C:\Swm\OUT HYD ROUTING COMPUTATIONS I1+I2 2S/t - 0 2S/t + O OUTFLOW ELEVATION (cfs) --------- (cfs) ------------ (cfs) (cfs) (ft) ----- -0.0 ----------- 0.0 --------- 0.00 --------- 20.10 41.4 -2.7 41.4 22.07 21.06 113.1 27.2 110.4 41.59 21.57 126.0 51.7 153.2 50.77 21.78 92.0 45.9 143.7 48.85 21.74 67.1 28.6 113.0 42.22 21.59 53.3 12.8 81.9 34.58 21.40 44.1 2.3 56.9 27.27 21.21 36.8 -3.3 39.1 21.22 21.04 31.3 -5.6 28.0 16.76 20.90 27.6 -6.1 22.0 14.09 20.82 23.9 -6.2 17.8 11.98 20.74 21.1 ------------------------------------------------------ -6.1 14.9 10.50 20.69 27- •POND-2 Version: 5.17 SIN: EXECUTED: 11-25-1996 12:21:23 Page 4 ****************** SUMMARY OF ROUTING COMPUTATIONS ****************** Pond File: c:\swm\ELLIS PND Inflow Hydrograph: c:\swm\ELLIS100.HYD Outflow Hydrograph: c:\swm\OUT HYD Starting Pond W.S. Elevation = 20.10 ft ***** Summary of Peak Outflow and Peak Elevation ***** Peak Inflow = 71.70 cfs Peak Outflow = 50.77 cfs Peak Elevation = 21.78 ft ***** Summary of Approximate Peak Storage ***** Initial Storage = 0 cu-ft Peak Storage From Storm = 15,363 cu-ft --------------- Total Storage in Pond = 15,363 cu-ft Warning: Inflow hydrograph truncated on right side. 23 POND-2 Version: 5.17 SIN: Page 5 " Pond File: c:\swm\ELLIS PND Inflow Hydrograph: c:\swm\ELLIS100.HYD Outflow Hydrograph: c:\swm\OUT HYD EXECUTED: 11-25-1996 Peak Inflow = 71.70 cfs 12:21:23 .Peak Outflow = 50.77 cfs Peak Elevation = 21.78 ft Flow (cfs) 0.0 .------I 8.0 16.0 24.0 ----- I ----- I 32.0 40.0 ----- I ----- I ----- 48.0 56.0 I ----- I ----- 64.0 72.0 80.0 88.0 I ----- I ----- I ----- I- 0.0 - x x 5.0 - x x 10.0 - x x 15.0 - x * x 20.0 - * x * x 25.0 - * x * x 30.0 - * x * x 35.0 - * x * x 40.0 - * x * x 45.0 - *x *x 50.0 - *x *x 55.0 - *x x TIME (min) * File: c:\swm\ELLIS100.HYD Qmax = 71.7 cfs x File: c:\swm\OUT HYD Qmax = 50.8 cfs C0