Loading...
HomeMy WebLinkAbout17-99 Apostolic United Pentecoastal Church - Stonewall - Backfile (2)GENERAL NOTES 1. Contractor shall furnish all materials, labor and equipment required and shall perform all work including restoration for the completed installation of utility systems and all other improvements shown or implied as necessary. Unless otherwise noted. specifications for all work will be in accordance with the applicable Standards and Contract Specifications of the Virginia Department of Transportation, Virginia Department of Health, County of Frederick, and the contract documents. 2. Contractor to verify the exact location of all existing utilities and notify the Engineer of any conflicts with existing and proposed utilities. Damage to existing utilities shall be the Contractor's responsibility. 3. Contractor shall be responsible for all construction stakeout. All dimensions and elevations shown on the contract documents shall be field verified by the Contractor prior to beginning work. 4. Contractor shall obtain. at his expense, all permits required prior to starting work and shall adhere to the conditions imposed. 5. Contractor is responsible for compliance with the requirements of SEC. 59.1-406. ET SEQ. Of the Code of Virginia (Overhead High Voltage Line Safety Act) . 6. Any unusual subsurface conditions encountered during the course of the work shall be brought to the attention of the Engineer. 7. Access by emergency vehicles must be maintained at all times. Access to fire hydrants must not be impeded at any time by parked cars. construction materials, soil stockpiles. etc. 8. Topographic and planimetric information shown on this plan was developed from a field run survey performed by Traid Engineering, Inc. dated December 3. 1998. Boundary information was taken from available records. CONSTRUCTION NOTES EARTHWORK NOTES: 1. Erosion and sediment control measures shall be in place prior to performing any significant earth disturbing activities. 2. Fill material placed below structures, controlled fill slopes, and the top one (1) foot of pavement subgrade shall be compacted to at least 98% of the laboratory maximum dry density as determined by the Standard Proctor method (ASTM D 698). Fill placed below the top one (1) foot of the pavement subgrade, and all other areas shall be compacted to at least 95% of the maximum dry density as determined by the same standard. The moisture content of the soil should be at or within three (3) percentage points of the optimum moisture content. Compaction of the subgrade shall be certified by a professional engineer or technician certified in the Commonwealth of Virginia. 3. Changes or revisions to these construction plans shall not be made unless first approved by the appropriate agency having jurisdiction over the change. 4. Traffic control signs shall comply with the standards of the Virginia Department of Transportation. 5. For erosion and sediment control notes see the erosion and sediment control detail sheet. ROAD NOTES: 1. Subgrades on cut shall be compacted for a minimum of one (1) foot in depth. Subgrade in fill shall meet the compaction requirements stated above at all levels. 2. Areas of wet or soft material under roads or buildings shall be partially over -excavated and replaced with suitable material. 3. Gravel used in base courses shall be constructed on a compacted subgrade free of organic matter. Gravel shall be VDOT type 21-B and shall be placed and compacted in a moist condition so that the fines remain mixed with the coarser material. 4. Asphaltic concrete. where applicable, shall be applied to the prepared gravel subbase following the application of a liquid asphalt prime coat. Asphalt shall consist of a plant -mixed bituminous material rolled smooth. The asphalt surface shall be smooth, seamless and of a uniform texture. Asphalt material shall comply with the minimum specifications required by the VDOT Road and Bridge Specifications. 5. The elevation of new pavement shall match the elevation of the existing pavement at all intersections. GENERAL ENTRANCE NOTES 1. All work on this project shall conform to the latest editions of the Virginia Department of Transportation (VDOT) Road and Bridge Specifications, and Standards, The Virginia Erosion and Sediment Control Regulations and any other state, federal or local regulations applicable. In the event of conflict between any of these standards. specifications or plans, the most stringent shall govern. 2. All construction shall comply with the latest U.S. Department of Labor Occupational Safety &, Health Administration and VOSH Rules & Regulations. 3. When working on VDOT right of way, all traffic control, whether permanent or temporary, shall be in accordance with the current edition of VDOT's work area protection manual. Furthermore, all traffic control flaggers must be certified in accordance with VDOT's January, 1994 (or latest edition of) Road & Bridge Specifications, Section 104.04-C. 4. Design features relating to construction or to regulation, control and safety of traffic may be subject to change as deemed necessary by VDOT. 5. Prior to initiation of work. Contractor shall be responsible for acquiring all necessary VDOT land use permits for any work on VDOT right of way. 6. If required by the local VDOT Residency Office, a preconstruction conference must be arranged and held by the engineer and/or developer with the attendance of the contractor. various County agencies. utility companies and VDOT prior to initiation of work. 7. Contractor shall notify the local VDOT Residency Office when work is to begin or cease for any undetermined length of time. VDOT will also require 48 hours notice for any inspection. 8. The Contractor will be responsible for maintaining adequate access to the project from the adjacent public roadway through construction and maintenance of a construction entrance in accordance with the Virginia Erosion & Sediment Control Handbook. Sec 3.02. Furthermore. access to other properties affected by this project shall be maintained through construction. SITE PLAN NOTES: 1. Parcel area: 2.87 acres 2. Zoning: RA 3. Use: Church 4. Property Identification #:43 ((A)) 90B 5. Magisterial District: Stonewall 6. Minimum Lot Size: 2.00 acres 7. Building Setbacks: Front=60' S i de=50' Rear=50' 8. Building Area: Ex. Church=4,413 S.F. Prop. Sunday School Bldg.=720 S.F. Prop. Shed=540 S.F. Total=5,673 S.F. 9. F.A.R.: 5,673/(2.87*43,560)--0.05 10. Maximum Building Height: 35' 11. Actual Building Height: Existing Church=28' Proposed Building=15' Proposed Shed=10' Future Expansion=28' 12. Parking Setback: 5' 13. Parking Space Requirements: 1 Space/3 seats 26 pews*6 seats/pew=156 seats Required number of spaces=156 seats*(1 space/3 seats)=52 Number of spaces provided=55 Required number of handicapped spaces=3 Number of handicapped spaces provided=3, w/2 van accessible 14. Parking Lot Green Space Requirements: Paved parking area=21,395 s.f. Required green space (5%)=21,395 s.f.*0.05=1,070 s.f. Provided green space=1.372 s.f. (6.41%) 15. Trip Generation Data: Information obtained from VDOT Secondary Traffic Section Tabulation Report, cir. 1995 Traffic volume on existing Rte. 661 (Welltown Pike) = 1359 TPD Information obtained from ITE Trip Generation, 6th ed., vol. 2, pg. 908. Fitted curve equation for TPD vs. 1000 sq. ft of floor area on a Sunday: Ln(T) = 0.593 Ln(X) + 4.766, where T = Avg. vehicle trip ends X = 1 000 sq. ft f I oor area Ln(T) = 0.593 Ln(5.13) + 4.766 Ln(T) = 5.74 T = 311 TPD Assume 50%50% left -right split Left turn = 155 TPD Right turn = 156 TPD EXISTING -- 2900-- ---- 2898 ---- 2876.3 ineLI�� PROPOSED 2900 2898 2893.66� ML41AD TRIAD ENGINEERING, INC. ROADS ROAD CENTERLINE CURB EI CURB TAPER z � O J Q SIDEWALKS o U rn .. 00 V) N OC U o BUILDINGS c° o � 0 o C O 0 0 U p U 0 FENCE -0T7 N � D C 0) � DECIDUOUS TREE �_ V o (n Q) 0 L 0 L U CONIFEROUS TREE CONIIFEROUS SHRUB PROPERTY LINE STORM SEWER MAJOR CONTOUR MINIOR CONTOUR SPOT ELEVATION LIMITS OF CLEARING AND/OR GRADING ABBREVIATIONS C/L OR ( CENTERLINE CONC. CONCRETE DIA• DIAMETER EL. ELEVATION ESMT. EASEMENT EX. EXISTING F.E. FOUNDATION ELEVATION F.H. FIRE HYDRANT F.W• TOP OF FOUNDATION WALL G.V. GATE VALVE HORIZ. HORIZONTAL INV. INVERT LAT. LATERAL LT. LEFT M.H. MANHOLE MIN. MINIMUM P.C. POINT OF CURVE P.I. POINT OF INTERSECTION P.T. POINT OF TANGENT PVC POINT OF VERTICAL CURVE PVI POINT OF VERTICAL INTERSECTION PVT POINT OF VERTICAL TANGENT R RADIUS RT. RIGHT SAN. SEW. SANITARY SEWER SEW. SEWER STD. STANDARD STM. SEW. STORM SEWER TPD TRIPS PER DAY VERT. VERTICAL W/L WATERLINE X-ING CROSSING U Z Z Z _ Z � r � w ¢ � 3 W 3 3, m 0 T W Z J Z o Z �0UJ 0 cr wW U ~ U W Z �_� w C7 U LLJ 3 V) `p4- OF v ULTON a 0.019Q14 �SIONAL E PROFESSIONAL SEAL Q I- Q 0 Ln O z Z LLJ Z 0 c L,J Z 0 5: L1J LLJ a_Q J ®w� 0 LLJ f- O Z Z = U Q D C) Y U O U w 0 L,LJ �- cn Iz O 0 LL_ Z Q Drawing Number: C - i MAT-CfHL//V E -- SEE SHEE7- C-3 / ROADWAY EASEMENT (RADIUS = 100') / I I I I I I I 1 1 \ \ \ I I I ' 1 I I W/OEN EXAST//VG� ROAD TOi 24- 1 1 1 1 N ' I 121 1 I I 0 0 4 lip I �, RELOCATED x81.3' % CHURCH t I 1 i 1 ! 1 % OWNER: ALFRED E. 3 VENDA C. DEHAVEN USE: SINGLE FAMILY ZONING: RA PIN: 43 ((A)) 90C _- ............ . - - ----------- LOT -- --- -- — E. 73 - - �' II ° to K \ �o % I \ _ -- 8' L/GH'Tf'T POLE N1C- 3 I I N <Y.OE 2> I t�0 BA K- I I F R NT _ _ _ 1 Q • , 6� - - /0 X2 I G, ---- - 14 P • I _ � I H SIGN---- ' _ 8'X Q- '� EX. TREES I L - y� ,F/RE ! •L4/� - :5AISLAISLEE 8e PLANTER i' -z@ c5'X20J / I T B l0 X2 14 1 2 1 \ \ 1 1\ 400' \ \ 1 \ GRAVEL L PARKI c ♦EX. WELL OWNER: TERRY A. COOPER USE: SINGLE FAMILY \ ZONING: RA ; ;' S I 4 PIN: 43 ((A)) 90A — / X D : D' : - ;• // / EX S/W TO / MC- D D D of BE EX. GRAVEL PARKING LOT I t II I r /I- _-_----------- ---- + / i ; lop -ARKING - SE63 P♦ ♦ r8'X/O' CONC. OUMPSTER PAD \ W//0' CONC. WHEEL /PAD o \ 1 TRASH/ROCK PILE / 6' /-•HIGH WOOD FENCE W//O' DOUBLE SWING GATE PK�; SHEd HEIGHT �/O' ST R GE AREA: / 0 C) too ! , i' D D D re. a ;b•• ; BE •REMOVED i r + T,o ems/ y.; / • /• STD. CG-l2 1 e' e' -e' • n' 'e' • O SHED 6' CO/VC. , 4 �♦'C�ONC. HC. RAMP / ' •,i! Q � / I , �' i• , Jo /�; %. HEIGHTU28H USE: SANCTUARY/ OFFICES I , ,2 AREA: 4.413 S.F. I O , /• ' ' ; /�� I I Ir — — — — _ /'/ % • INTERSTATE 81 ' !• ; ; ( --___ ' ; ;• POSTED SPEED LIM1T=65 M.P.H. /• i• : �l I I , i P/ /• of "I 111 OWNER: RICHARD R. DUNCAN I % ;' /• ; USE: SINGLE FAMILY ZONING: RA % % �O I , ( / / %• : / /' PIN: 43 ((A)) 96 ;' EX. DRAINFIELD 1 / % /• %• , , I 1 of / FUTURE � i � ;/ � ' i• '• BU% D/NG ! % + EX/`A/VS/ON I ,% ;' !+ /. All dlmenslons are to face of curb. %• , !• % f' ` i USE: SANCTUARY , /' /' i• 2. A// face of curb radl/ are 5' unless otherwlse i AREA: 4,800 S.F. of / ! CAI TO BE INCLUDED /N i %!• :i ,% i TH/S S/TE PLA/V.) f� ! i/ ! 3. All outdoor Iightingg fixtures shall be shlelded %. and dlrected so that the light element Is not visible i• !• i ; L _ _ I / % i from or casts glare on ad,Jacent P/-opertles or ; • , ; , /+ right-of-way. ' ! ' 4_ Thls site contains no steep slopes. woodlands, !. ----50' REAR SETBACK - i ,!' ! ! f/ooeplalns, slnkho/es, streams or dralnage ways", ;! or any other environmental features. ; 'f 5. Placement of CG-/2 curb ramps /ocatlon shoo/d 41. to be flna/lzed by VDOT lns,oector- and/or engineer. 6. For pavement details see sheet C-/O. ;• , , i 5' PARK//VG SETBACK % / /------------------------------------------ ! ! . x S 81.24'10" W 3 .10' •—••—••••—••—••—••—••—••1 ;• 20 O 20 40 60 80 OWNER: ALFRED E. & VENDA C. DEHAVEN USE: SINGLE FAMILY ' ZONING: RA PIN: 43 ((A)) 90 ; • sc a�E,i~-2o TRIAD ENGINEERING, INC. m� 0 z 0 0 (14 0 � Cy)U N 0 �n o 0 0 ('l 0 N U N 0 v 0 ' o 0 O 0 U T � O_ in a) 01 O_ (n c 0 O_ (n (1) U o U U z w 0 a z Za> z l� N > 3 a L LJ 3z > Z z LJ Z N U W Z �0dd o� 0 x � M w 0 w Z US W _Lo U W= 3 m 0 Q ry F— LTH of D ULTON 9 o. OM4 ti SIGNAL Eli' PROFESSIONAL SEAL Q E"' Q V ! 7 W Z If 0- > a_ Q >- 0 X 5 W W O ~ U � U Y ULLJ U 0 W a_ILL. Q Z Q L.J V) Drawing Number: C-2 Y a a EX. CONC. BRIDGE TRIAD ENGINEERING, INC. 3 I — WINCHESTER VIRGINIA 3►� I ► 60' ROADWAY EASEMENT i! J V� - T1 II ► I I TU -------"198.56------------------------ EX WOOD/ROCK WALLN77* 1200 — ---- — XISIG \ ~ ----------"W/OEN ET \ o lEX. ROCK L —_------ ROAD TO z4' a ——------- ----------- EXCONCPAD ---------- --- --------v EX. ROCK WALL I I EX. POSTSI) I(tI �p SECTION TO BE _—---_ --------- E'P -------- 1`9 \ (� ---- — — — _ o X_R�K WADS — -- SECT/O/V TO _ — E — — — ---_—_ — — --- ---- — — E.P_----------- ---- \\ \ ` (� B RLEORMEO 1 — /RELOCATED --------------_ _ — - — — - —— — - — �— — — — — O R.(T CURB CHURCH— S/GNS— —--------- O \\ \ \ \ Q I S7—R,�7E7r SIGN I�" — — E P_-- P• IV 4 \ I ST P. CG—// �I 1 3O' Z j \ _ — --•1 �. ENTRANCE <EE �DE7—A/LS �! I 197. 6' - ------------------------------------------_� Q 5, 1 �I �\ N77_ 12 0 E- _ - — EX. SHRUB LINE \ I I I 1l Z 00 Cn 0 I o l y l Q• i I I j I I N c 0 0 N I U p o � o 1 I I I I I U c o (TYf:::,.) � I I i I I I I j I I o Im I ml I U I I i I I j I I C a j I I z I j I I z z � 3 I j I I LLJ j�N W LAW cr a- M cr 1M z �oLJ cr _ (n 60' ROADWAY EASEMENT I I I I W 3 in I I I I I I I i I I I i I I 0 F-- II I� ROCK OU CROP PP N60757 I I I I I — -- m C LTH I I I or' r` I I I I I .� G I �X. DRIVEWAY Im II I I I I i j' Ir TON a 36 l I I I I SI41VAL E II I I I I I I I I I PROFESSIONAL SEAL l I I I WIDEN EXISTING I I I I ROAD TO .z4' I I I Q I I I II I I � Q I I i I I O 0 wz� II I I I I I O I i I I z cn Z + I i I I LdQ Q a- z J I I I I o x ch LiWO �� ►�II� I z=v W cn I I I I \\\ —�vw -+= I I I O p Lij O LL- 400� \\ r II E P I I \ � QL I / I EX. DRIVEWAY I 1 \ I _ I E.P. I 1 \ 20 O 20 40 60 BO ._ —� — \ /^ Drawing ' SCALEr/'-20' / I�//// A7—CH[/ �// /^\ / V E- -- S E- SHEET C —,2 Number. C-3 MAT-CIAHL/NE -- SEE- SHEET C—S 1 = + \ \ 1 1 1 I 1 \ I ` I 11 7. ='- 1 97.88 I \ /• / \ � \ \ T. \ � 98 8 I I C.- soft98.59 T.C.- rT:C. T.C. %• PP \ `. g0 N60758 /9 98.57 , I % 1 C.- , i• �� 9 .45 T.C. 11 T. 98.60 T C.- %• 99.4 / 9 .30 T.C.- / C H SIG _! l �' � T.C.- 98.34 I ; • 99.33 / �) oo T.C.- 1: T r` - l o� mac_ •T44 N P4RI T C \ OWNER: TERRY A. COOPER /!• /EX. LL T� \ USE: SINGLE FAMILY J i k- I / I 9 37 \ ZONING: RA /j / \\ PIN: 43 ((A)) 90A / o \ I \ 0 T. -- —EDGE EX. GRAVE T.0 i!• ` 99.5 _ T.0 - / .f 6 97.22 �(S$ oj /4 • o + \ I I z /O� \ I EX. CHURCH / / / / cp I ;-) j• �\ I I // I I r � / ` I I I / / /• \� I / , EX. DRAINFIELD // j• / I� EXPANS/ON I i �' // 1 / /• / / O / 1 / / i (D\\\ / o) I I % /• \��� ,// /l T ASH JACK l ��• / ��� j• ------------- 94 \ - I PVC @ 0.50% /• \�� 96 / I S 81.24,10" W 3a2.10' OWNER: ALFRED E. 6 VENDA C. DEHAVEN USE: SINGLE FAMILY ' x ZONING: RA I PIN: 43 ((A)) 90 I \ OWNER SHALL PERFORM PER/00/C OF- THE OUTLET STRUCTURE TO COLLECTED OEBR/S. INTERSTATE 81 POSTED SPEED LIMIT=65 M.P.H. •'1 ML41jill TRIAD ENGINEERING, INC. z CD 0 0 cc 0) U N 0 0 0 Ln C o N U N 0 o c 0 U - U7 � T � CL U) N o� d (n c 0 a- (n N v Q) 0 L 0 U U z w 0 a z ZLE a > z LL 3 a > L.LJ j 3 mor 0 Z W z Z boa -gym -�z W�W Z roW �� = J V, U N 3m W Z v) 0 Q /NSPECT/oA/S F— REMOVE ANY 94 I I I X. GRAOEC/L P/P ),.a 00 . WSE-9/ 2 YR. WSE-9/O YR. WSE-90 .5 YR. WSE-90 90 I I 90 PVC @ O. 01>.1 /+00 f�0/VO OUTF"ALL PROF -/LE SCALE /"-20' HOR/Z. /"-2' VERT. 2 O 2 4 6 8 SCALE,/'-2' 20 O 20 40 60 80 SCALE,/'-00' 0 Ld ,,I,TH OF qI Isl 61 10NAL E&i PROFESSIONAL SEAL 0 CIL X W U U Q Z 0 Drawing Number V Z TX---_ TRIAD ENGINEERING, INC. nue+1- - - - - - WINCHESTER VIRGINIA FEX. \ II ICONC II I II I II,-\ III �EXTEND EX. /5" CMEX. --------- EX. 4" PVC PIPE DITCH ----------p INV.�1.98 EXCONC. DITCH 7AT ANT --------_ ---GRADE - - o -- EX. ELLIPTICAL ------------ 60' X36" CMP I I I \ NEW /NV.-85.23 \ \ I ------ \ \ EX. ELLIPTICAL ----- - �I =k___= I_ -I\\\ = IRV3�5.06-- _ _---------- _ (-_--------- ----------- --- --- �/.�8/.80 \ EX. 4" PVC PIPE 84-- - 07' / \\ INV.=81.72 X. ELLIPTICAL ) /�+--__7_ _ I -�= =-Iv BT I I ^\----------� -\ ____-------- / 60' X36" CMP G' - _ /\� 1 - 84 \ v� - _ - - - _ _ _ _ — — — — — — I \ \\ EXT ENS EX. 6" CMP INV.�5.59 I -j _ r I �/ \-------------------- ------ \ �- ----_— ---- I ------------------------ \ \ \ '�- I I 86 -- — — — — — — —"— \ /' 6' AT CONSTANT LI1 IJ � EX. 15" GMP I � � // � _ / . ELUIPTICAL I INV.�5.3�' — 60"X3 CMP \ -'---------86- - - - - - - �-�— \ _ _- ----- - - -" -"- -- ------------ --- --- — -__-------/\/j/� _�� GRADE c 8 EX CMP INV.14.99 _ --__\INV 76 \\ q ------------------- - - _ --------------------- `/\ \`� + \ o Ij I I �/� ---I— —-----_—_ -- -- _____-- ------------------------ EXTEND EX.6" CMP � EX. DITCH ' AT CONS -FAN 86----- GRADE — _ - 1 �/ ------------------- //V I � N ( EX. SHRUB LINE ,/ \e9� I Z o EXTEND EX. /5" CM/�-a6- - _ \ \ - - II /O' AT CONSTANT o - GRADE W/ 22.5' BENO - I o 0 0 I I I I I N o ' N 7---EX.- NEW /NV.-86.05 7---EX. CONC. DITCH I // I I I I o O '- U (n .a C ry I I I I '` 3 `n �' �c 0 co N I I I I cr I I I I II I I I I U I I I I I Z I I I I I I I I I I Z I I I I I Z I I I I I I I I W 0 j z I V W I I I I Z xcr cr m WSW l i l I Zo Lj J cr I I \ I I L,__J I I I vi I I I'I I I � I li I ROCK OUJCROP I —PP I I I I N60757`S�LTH op D I I I I r Ii I I I I i i RIt I 'PON a I �Sj4NAL �. I l I I I I PROFESSIONAL SEAL I I I I I /r I Q I o I I I I o z it l i l I z cn J I I i I I LLJQ� a- z �ww5 C� o z II I I I v Of� / / 1\\ \ \ LLJ o v o C += I I I I � V) IL. Q 00 0 20 40 60 80 MA7—C1--1L11V E -- SEE SHEET C-4 Drawing Number C-5 I _ I I 1 I i I � I I—�I E•P• I I 1 I EX. DRIVEWAY I E.P. '1 1 I \ I 1 \ 1 I 1 = + _ I I I ? II !• / FO � Y I ; \ ;. I \ I /. I \ II %! 5 B \ I 1 % PP \ N60 \ • I / / Ic j • I J� B >l Alf CH H SIGN---->��' / s B \ FD \ \F fX / / n �► v v '� r� V I� WIN m n P ; X 27 / FB / EX. WELL i• \ � I /5 / PO /• I — I / SHED / I /5 BL_ / �/ o I I + I / o %• I I '• I I 0 /• I EX. CHURCH I ;• I I I , /• I I 1 t , 1 i I I '• 1 I /• 1 EX. DRAINFIELD I ' FUTURE I i ' • I BU/LO//VG ! 1 ' I + EXPANS/0/V , I I ' I 1 i i• i+ .4 • iC SIG Y ..... .. ...... .. ..1 X A RUBBER HOSE GROUND LINE TO BE 4" TO 5" BELOW GRADE 2" MULCH /N SAUCER i• / + zz SPRAY WIT f f W/LT-PROOF ACCORD/NG / TO MFR'S INSTRUCTIONS IF FOLL/AGE /� /S PRESENT. REMOVE CONTAINER / • FROM TOP OF BALL. % • PRUNE //5 OF LEAF i• AREA BUT RETAIN ' NATURAL FORM. GF?OUNO LINE TO BE BELOW GRADE 3" MULCH IN SAUCER. FLOOD WITH WATER TW/CE IN 24 HOURS. (� 3ACKF/LL W/TH (v rsgUWATER PLANTING SOIL /N 8" LAYERS. EACH LAYER UNTIL SETTLED. DO NOT TAMP. N "IN. LOOSEN SOIL /N BOTTOM OE P/T SHRUB RLA/V 7T //VG OET A/L NOT TO SC ALE RLA/VT SCHEDULE SYMBOL QUANTITY COMMON NAME HEIGHT CONOITION TYPE B /60 BOXW000 3' CONTAINER SHRUB FO /9 FLOWERING OOGWOOO 6' B 8e B TREE A /O IGRiEEIV ARBORV/TAE 3-4' I B 8e B 1 TREE NOTE: ALL HE/G/HTS SPEC/E/EL7 /N PLANT SCHEDULE ARE APPL/CABLE AT T/ME OF PLANT//VG. PRUNE //5 OE LEAF AREA BUT BETA//V NATURAL FORM. SPRAY WITH WILT -PROOF ACCORDING TO MFR'S. INSTRUCTIONS IF FOLIAGE /S PRESENT. �DOUBLE STRAND OF /2 GAUGE GALVAN/ZED W/RE TWISTED (THREE GUYS PER TREE, SPREAD /20 DEGREES APART). �2" x 2" WOOD STAKES DRIVEN AT LEAST 3' INTO Gf?OUNO. WRAP WITH WATERPROOF TREE WRAP AND SECURE W/TH TW/NE. REMOVE BURLAP FROM TOP OF BALL. CONSTRUCT EARTH SAUCER IN OEf'RESS/ON, FLOOD WITH WATER TWICE /N 24 HOURS. Mmf '�-,-BACKF/LL WITH PLANT/NG SOIL IN 8" LAYERS. WATER EACH LAYER UNTIL SETTLED. 00 NOT TAMP. �Ir iod I2.. LOOSEN SOIL /N BOTTOM OF P/T TREE PLANT /NG AND GUYING OET A/L NOT TO SCALE 20 0 20 40 60 80 SCALEi/'-20' TRIAD ENGINEERING, INC. WINCHESTER. VIRGINIA m' 0 z 0 0 O 00 rn I 0 O (V c OV � CV(c) I cD � N - O w 0 c 0 0 0 U V1 T >, 70 Q) CL 0 V) Cn (f) U U p • U Z �w �J a_ ZL z a > z 0 ~ w Q 3 L1J " Z ' W o m } Z~Z 7d z z 0)cDw %0 o, .0 -�m �rn w z w� L0� w� x vi v WZ 3 Q ry J,TH op 'PON 9 o. 019fL14 ` 1 SIGNAL E PROFESSIONAL SEAL ~ Q Z O Z Q W z 0- ty z to a_ Q v C) x Z LLJ W O U Q z �ryY = U U � -� 0 = " w C) Z w Q O � J 0 MI M n Drawing Number: i C-6 LEGEND N0. TITLE KEY SYMBOL TEMPARY 3.02 CONRSTTRRUE TION ONE ENT C E F3-05 SILT FENCE S F X—X X--X TEMPORARY 13-13SEDIMENT TRAP S T OUTLET PROTECTION OP 3.29 SURFACE ROUGHENING S R �—�• 3.30 TOPSOILING 3.32 PERMANENT SEEDING 3.35 MULCHING MAT-Cl-IL/NE- -- SEE \o 1 I 1 I 1 TRASH/ROCK PILE RL%'PRAP �� EE OETA/L�\ n I . ILL i• EDGE X. GRAVEL PARKING LOT�6 0 I 40, II + / / • EX. CHIURCH i I ♦• I I I I l i I , ' � I / SF ♦• \\ i �/ �` I / ,' %/ NOTE: �• I ,' l I , + CONTRACTOR (AGENT) SHALL NOT-1 ANY TYPE EX. DRAINFIELD i i OE CONSTRUCT/ON WITH/AI (ON) //NTERSTATE L/M/TEO ACCESS R/GHT—OE—WAY UNLESS.* UNTIL A VOOT LAND TO ' USE PERM/T TO PERFORM S4rCH WORK HAS BEEN ISSUED •i' �\ 6O'XBO' I II �' // l ,/ / TO CONTRACTOR (AGENT). i• ;• `�\ + ��\ EXPANS/ON TRAP CALCULATIONS: � I � l0 / /:?EO'O VOLUME — 3,6/8 C�. PER ACRE ORA/NAGS AREA ORA/NAGS AREA — /.59 ACRE /?EO'O VOLUME — 3,6/B iC.E.=/.59 AC. — 5,765 C.E. 98 ! \\ I ,' / l / / STORAGE VOLUME RR,OV/OEO — 7,0/2 C.E. %!• �\ /' -! /�/ /V071E> SEO/MENT TRAP !n/MENS/DNS: ;• �� / ♦� /� LENGTH - /0' ;•- - `�� // TOP ELEV.- 9t 00 , ♦ i 4 I , A, 40 60 80 I; ' SCALE,/"-20' I TRIAD ENGINEERING, INC. WINCHESTER. VIRGINIA -■ on Z CD t\ O U 00 N � O i t!� N 0 C U O N (D a) O w 0 a> c � 0 0 0 0 0 U In T � � T � V) a V) C o 0 cn 0 0 -c o U U z Uz za> > 3 a L1J ? 3 mor 0 W H n �ZZ V Z �0tL o V _�� 'o m z W�,w z x - 0 w �, 2 0 V WZ 3 m a cr ',TH OF -t �) �6A% SjONAL E� PROFESSIONAL SEAL J � Q z O - 11J L z of .> 1-0-z (n LLJ Q }- w 0 x 5 LLJ� W O _x W Z = U i Z U O U C) I-- w p V) cl:� ry Q LLJ Drawing Number C-7 Z Q J _ TRIAD ENGINEERING, INC. WINCHESTER VIRGINIA I s�--- -- ---------- — — — 1 _ �\✓\ III v I NV. �5. 61 I ---------------------- -------------------- - - - - - - - - - - - - - - - - - \ l INV. �5.06 11 I \ _ _ / �/ �/ /� / \ � \ INV. �1 .72 r_-__ I__I ---I __-\\ _\ - - - - -- r----------------- ---- _ � /� 8t� ^-_-,-----------84-------------- —_—_—� // Z/ \�, / INV.=85.59- //�-- II I } =_IU I , 1 &6 ` I-- ^1 ---------- —_-- =--r— G'—7— 1— V X 86 \ ------ ---- - - - - -- - - - - ---------__— - - I ----- ------------------ - - _ � \------__--— -— -—-— -— -— -—- —- — - —- I \\//// �\ o INN.�4.99 I — -- ---------- Q -- — — --- — — — _ — — _04 -------------------------------------- Ij / ----------- 0 --- --- ___:--- ___--- ------------------------- //VV.-8/.49 /------- _ ___---- ----- X \ \ _ - -- 1------ e Z0 ------------ \x '' I i I I o ,, j, _86 _, S/c eq___ 1 � /' Go °° I I I co I I /NV_-86.05 N I _ 1 M 0 ° o 0 0 0 0 U Ul I � ICL a) 0- c- 0- Q) J c � 3 J 1� I I I ► � In o U I I I I C I I I I I I I I I U I I I I I Z I I I I I I I I I Q; z I I I i I k l � Ewa � 3 I I I I W �3> I I I I i W z I (DW LAW I I I I ° z T�� I I I I I W �M N ' Q of I I I I I ULTON ---- --o.01M4 I 88 _ _ , , I �SI�NAL I I I I I PROFESSIONAL SEAL II I I I Q f— r-� � z Z II o I I I I o0 0� Z I i I J W z rz Q II I I'I it j z p J c> + I I I I Li Q>- W I� I i I I cl- z U� owe .J �----- O III - � I,I i � I � v � I,I � I '► I \ r z 0 II I i I rz v Z �_�-�/ 5- QZ \\I I I I I \ -j v LLB ( n Q p �J ` / ry cl� i O Imo. a_W I , rr SCALEe/"-20' M A 7— C L /V E -- SEE SHEET C-7 drawing Number: C-8 It + --- --------- -T — R�us�_66-------- --- ESP SIGHT- o/STANCE 550' S/GHT O/STANCE— ( I --- I (0 co --'— IOD I I 1 co I II II IIII I IIII I I� oo I II I I II I I I I r � ' I I 1 / SAD -� Z 1 I , III i � I I I Ico I I I IIII I / II It II ' I I - - - - T-- i I - - T- I I - T---T- I I I I - I I - I i I I I I - - I ---I-- I I I I - - T--T-->---- I I I I I I - T--T--T I I I I I I i I I I - - T--I-T-- I I - - T---�--�--�---T---r- I I I I I I I I I I - I I - - r---I- I I I I --�-- I I -T--T I i I I I I --l---F-- I --I---t-- ---t---t---�------�--�---�-- I I I I I I --�--I--�-- I I I --t---t---�-----�---t---�-- I I I I I I --�--I--�-- I ---t--�---�-----�----I----t--- --t---I---I-- ----�--t---t-------� --�-- ----�-- -- -- -- - -- ----�--- -� �ANCE --I---�--I------I--�----�-- I I --I---I--�-- I --T--�--�-----�----�---�--- I I I I I I --�--I--�-- I I I ---�---�--�-----�--�-- I I I I I I I I I I .S/GH or I I I I I I I I I I I I I I I I I I I I ----EEC 5' I I I I I I I I I I I I I I I I I I I _ 550'/GHT /STANI E I so so HE GH-r _ � �`' I--- —� � _ _ � T I — I � T � I OB _ _ _ F/N/Sl�-/Eo GI/�AOE I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I F/N/�SHEO IGRAOEj — III I II I I I I I I --I---t-- I --�---1----r-----C--�--�-- I I I I I I I --r--I--�-- I I ---f--- I fi-1---------fi--�---r-- I I I I I I I --fi---I---�-- I --�---�--�-------�--�--�-- I I I I I I --�--I--�-- I I I ---I----fi---�----�--�-- I I I 8o I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I ao I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I i i - I -- T--7--I- -- -1- -r-- --I--�-- I T--T--F--- I I I ---J--T I I I _F---I---1-- I -- I T-- I T---�- I _ I__ - T T- __ T _I T__ I-T --T T T T -T-- --I--�-- - fi-- --f- --- ---r-- fi I I I I I I I I I I I I I t--1- I I -fi------1---t--t-- I -----I---1-- -- t--- ------1- � - I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 70 I I 70 -2-vv ��!WA r�W A / -vv v-vv rvv 'Efl"vv 4.00 VERT. SCALE,/"-4' 5.00 40 O 40 BO /20 /60 HOF2/Z. SCALE,/"-40' ML41AD TRIAD ENGINEERING, INC. �I 0 Z CD O- O Cn U GO , n O N o U T Ow = > O L;7- o c v O 0 U 0 U --D In � T D _0 �, a o a- �, o c) U Z U a z ZLY a > z ry� r 3 a w jo LLJ ZFN 0�Z Z % W 0� m tz o w w Z w w = J vi LLJZ 3 m� v) J Q V) O w z a_ 0 LLJ A 1p P, ' �f OUL' I a 0.O191214 %-3019g i ti SIoNAL Elm PROFESSIONAL SEAL 0 V) Q X W U Of U z O w U Z W Q _j F- l.L. V) O 0 0�f F-- a- = 0 U Z V Drawing Number: C-9 50.0' MAX SPACING BETWEEN EXPANSION JOINTS CONTRACTION JOINTS (TYP) SEE NOTE 2 FOR SPACING I I I I I I I I r I I I I r I I I I I I I I I I I 1 I I 1 I I I I I I I I I I i I I 1 1 I I I I NOTES: 1. ALL SIDEWALKS SHALL BE 4" THICK UNLESS OTHERWISE NOTED. 2. CONTRACTION JOINTS SHALL BE SPACED 5.0' INTERVALS FOR 5.0' SIDEWALKS. STANDARD JOINT LAYOUT FOR CONCRETE SIDEWALKS NOT TO SCALE D D SUBGRADE @ 95X cO SIDEWALK SECTION 0.50" EXPANSION JOINT MATERIAL d N L SUBGRADE @ 95/ EXPANSION JOINT 0.1" 0 Q 6 SUBGRADE P 95X CONTRACTION JOINT TYI=ICAL SIDEWALK DETAILS NOT T O SCALE SEE PLANS BASE COURSE F'AVEME/VT SECT/O/V NOT TO SCALE REMOVE EXIST. ASPHALT PAVEMENT (SAW CUT) NEW 24'' MIN. TACK COAT PAVEMENT EXISTING PAVEMENT 12" MIN. r7T /7 ri7 BASE COURSE PRIME ----------- COAT SUB BASE COURSE 7 77/7TT/ /777- 7T?•7 T7T/T/7 SUB GRADE //VTERFACE NEW PAVEME/VT W/T/H EX/STING RAVEME/VT TYP/CAL SECT /O/V N07 —0 SCALE 2 8� 2.08% �y 8 A CC-t2 Permissible Taper curb height down Y 3' 0" Construction Joint to 0 at this point or continue at fullheight Pay Line ; Min where applicable. CG-12 z Pay Line CG-12 CG-12 pay Line x 8" Bara 0 0 0� •o12" c-c minimum oVor. 3'-O" W2- Var, width Sidewalk o• 4,_O Min• o.Sidewalk Var. width sidewalk concrete cover 11/2" mm Sidewalk Space o•o 0 or or Permissible Construction Joint S paceo. Pa Line CG-12 " x 8" Bars fi "0 z 0 12" c-c TYPICAL ALTERNATE RADIAL PLAN RADIAL PLAN Minimum concrete FOR USE AT APPLICABLE STREET For Commercial Entrance cover 1'/2" CONNECTIONS AND COMMERCIAL (Heavy Truck Traffic Anticipated) see Standard CG-13 sheet 203.10 A ENTRANCES. 3'-0" 6'_O" Alin. W-0" Permissible Construction Joint` — I a Fes, Var. width o- " o o" ,a Sidewalk or j B Sidewalk o o'o B ®Y Space :oo 0000000 . Slope 12:1 Maximum ISOMETRIC VIEW A� TANGENT PLAN Notes: Curb ramp floor to be class A-3 Concrete (4,000 psiif precast) with slip - resistant integral detectable warning surface covering the entire width of the ® 7" where St'd. CG-3 CG-7 is used. ramp floor (ramp floor may be precast or cast in place). The detactable warning shall be provided by an exposed aggregate finish. Ramp shall not Sidewalk Area ® _ 7'-4" is the minimum exceed a maximum slope of 12:1. requirement to Flared aides of curb ramp to be poured monolithically with romp floor or by S„ (with or without buffer strip) achieve a 12:1 slope using permissible construction joint with required bars. St'd. CG-2 7'-4" —i If ramp floor is precast, holes must be provided for dowel bars so that or CG-6 12,1 Max — adjoining flared sides can be cast in place after placement of precast ramp 4 floor. Precast concrete shall be class A-4. Required bars are to be %" x 8" placed 12" center to center along both aides of the ramp floor, mid -depth of ramp floor. Minimum 7" WHEN THE ENTRANCE RADIICANNOT concrete cover 11/2" mm. SECTION A -A ACCOMMODATE THE TURNING REQUIREMENTS Curb ramps wllbe measured and aid for at the contract unit prices for H drauGc OF ANTICIPATED HEAVY TRUCK TRAFFIC. rr'p p p y x 8" Bare 0 cement concrete sidewalk and Exposed aggregate sidewalk, complete -in -place. 12" c-c Permissible Curb/curb and gutter elope transitions adjacent to curb ramps are included Slope 12:1 Maximum Construction Joint in payment for curb/curb and gutter. This item may be When used in conjunction with Standard CG-3 or CG-7, the curb face on o.o•o precast or cast in place. this Standard is to be adjusted to match the mountable curb configuration. Curb Romps are to be located as shown on the plans or as directed by the Engineer. They are to be provided at intersections wherever an accessible SECTION B'6 routeOwithin the right of way of highway facility crosses a curb regardless o•o. of whether sidewalk is existing, proposed or nonexistent. They may be offset Limits of exposed aggregate sidewalk from pedestrian crosswalks as shown on plans or as directed by the Engineer, but should not be located behind vehicle atop lines. Existing light poles, fire ® Treatment where width of sidewalk or sidewalk hydrants, drop inlets, etc. will also affect placement. space is less than 7'-4" Accessible route is defined as a continuous unobstructed, stable, firm and slip resistant path connecting all accessible elements of a facility that can be approached, entered and used by persons with mobility impairments. sPE EN CURB RAMP REFERENCE (PERSONS WITH MOBILITY IMPAIRMENTS) 502 504 VIRGINIA DEPARTMENT OF TRANSPORTATION UNLESS OTHERWISE NOTED. ALL 203.05 ON T IN TIERS - TIVE LL OF PARKING SPACE //V T E R/V AT /O/V AL /-1 A/V D/CAP SYMBOL NOT TO SCALE • USE 5' WIDE LOADING ZONE FOR ALL HANDI-CAP PARKING SPACES UNLESS NOTED AS "VAN ACCESSIBLE". USE 8' WIDE FOR "VAN ACCESSIBLE" SPACES. 5' 8' 00 �6" WIDE STRIPE, 2' � TO � 0 45° HA/VD/CAPPED /BARK//VG STR/f=>I/VG DETAILS NOT TO SCALE ENT RA/VCE ROAD T YR/CAL SECT ION NOT TO SCALE EDGE OF PAVEMENT CURB TAPER OET AIL NOT TO SCALE Concrete to be Class A3 71 cost to place, 4000 PS/ It recast CG-11 <Radius 7'0 be as shown on plans) Expansion Joint Note: W/dth "B" 2'-O' or as shown on typlca/ sect/on. PLAN VIEW Street approach same surfacIng as ma/n/lne A roadway MaInllne roadway 4 �2„ Class A3 �'� �: b:•----- COncret Expansion Jo/nt SECTION C-C NOT ES: When SYd. CG-/I Is used I -or entrances bullt /n con junction with VOOT protects, please Face of Curb Gutter /Ine of note the fol/owing: Curb S/de Street I. Maln/Ine pavement she// be constructed Gutter //ne to the F?/W /Ina Cexcept any subgrade Maln /Ine /_?oadway stab///zotton required for maln/!ne pavement which con be om/tted to — — — — — — — — — — — — — — — — ------ the entrance.) 2. Rad/a/ curb or combtnatlon curb and gutter shall not be constructed beyond the f?/W /lne except for rap/ocement purposes. SECTION A -A 3_ When used In conjunct/on with Standard CG-3 or CG-7, the curb face on this Standard is to be adjusted to match the mountable curb con7-/guratlon. 4. Sea Standard CG-/2 1-or Curb Ramp daslgn to be used with this Standard_ 5. Opt/one/ 1`/ow/lne may be used for entrances In cut sections. 6. OptIona/ 7-/ow/Ina may require warptng ol- a portion o>r gutter to preclude ponding of water_ CONNECTION FOR STREET INTERSECTIONS RUU04CE AND COMMERCIAL ENTRANCES ALL DIMENSIONS 203.04 ON THIS SHEET ARE INUNLESS OTHERWISE MILLIMETERS VIRGINIA DEPARTMENT OF TRANSPORTATION 502 CG-7 CURB DETAIL NOT TO SCALE CURB CUT OET A/L NOT TO SCALE 12" F AS REQUIRED 31/8. 3/8 INTERNATIONAL SYMBOL OF ACCESS (SEE NOTE 5) BLUE BACKGROUND 11/4 HOLES LOCATED FOR METAL POST ALIGN, WITH HOLE DRILLED ON 1" CENTERS IN METAL POST. (MOUNT WITH 5/16X 21/4 BOLTS, TOP AND BOTTOM OF SIGN.) METAL POST 12" NOTES. CONC. FOOTING I. METAL /COST TO BE GALVANIZED. ALL BOLTS, NUTS, WASHERS, AND SCREWS MUST BE RUSTPROOF. -2 - CONCRETE FOR FOOTI/VG SHALL BE OF PORTLA/VD CEMENT ANO HAVE A M/N. COMPRESS/VE STRENGTH OF 3000 P.S./. 3. SIGNS WILL BE FROM SHEET ALUMIIV/UM 2MM //V TH/CKNESS 4_ MESSAGE LETTERING SHALL BE CASE CWH/TE SER/ES B) 50MM HIGH 5. THE SYMBOL IS COMPOSED OF TWO ELEMENTS, A WH/TE WHEELC"AIf? F/GURE CWHICI-1 SHOULD ALWAYS FACE 1z_?IG1--/T) ON A SQUARE BACKGROUND, //VTER/VAT/ONAL BLUE COLOR CFED. STD. 59SA, COLOR-151SO)- 6. SIGN POST SHALL HAVE MIN, 600MM CLEARANCE FROM BACK OF CURB_ SIG/V FOR THE Ff-HYSICALLY /HA/VD/CAPRED NOT TO SCALE MC-3 ASRf-HALT" CURB DETAIL NOT T O SCALE R/R�?AR DETAIL NOT TO SCALE LM041A&D TRIAD ENGINEERING, INC. WINCHESTER. VIRGINIA E E M rn 110 CV cD O a) 0 0 Z O 0 o i O o O 41 -0 0 0 00 (N O 0 Ld J Q (n 0 I O Z o U (n C IZ o Cn (n 0 (n U � 0 � Q) r O U z CDa zQ> z Z 0� �w QyQ _._ 3 W "Z > O r W m 0 H z zd z Z z_ uj 0 O =tea- m ' w Z w 0 0 w zJJ (� xm U WZ 3 m H Q ,�40LTH OF D .019214 TON -70 (( ti SIGNAL PROFESSIONAL SEAL _J Q J z Q OCD — LIJ z _O /— \ LLJ 0 z � Q o X �LU O I— Li � �--� z = U — ry ry O U p �LJ (~/' � V J QL O < I U Drawing Number C 10 GENERAL EROSION AND SEDIMENT CONTROL NOTES ES-1: Unless otherwise indicated, all vegetative and structural erosion and sediment control practices will be constructed and maintained according to minimum standards and specifications of the Virginia Erosion and Sediment Control Handbook and Virginia Regulations VR 625-02-00 Erosion and Sediment Control Regulations. ES-2: The plan approving authority must be notified one week prior to the pre -construction conference, one week prior to the commencement of land disturbing activity, and one week prior to the final inspection. ES-3: All erosion and sediment control measures are to be placed prior to or as the first step in clearing. ES-4: A copy of the approved erosion and sediment control plan shall be maintained on the site at all times. ES-5: Prior to commencing land disturbing activities in areas other than indicated on these plans (including, but not limited to, off -site borrow or waste areas). the contractor shall submit a supplementary erosion control plan to the owner for review and approval by the plan approving authority. ES-6: The contractor is responsible for installation of any additional erosion control measures necessary to prevent erosion sedimentation as determined by the plan approving authority. ES-7: Site grading is to drain to the silt fences or sediment trap at all times during land disturbing activities and during site development until final stabilization is achieved. ES-8: During dewatering operations, water shall be pumped into sediment traps. ES-9: The contractor shall inspect all erosion control measures daily. Any necessary repairs or cleanup to maintain the effectiveness of the erosion control device shall be made by the close of the day. The contractor shall be responsible for the ultimate removal of all temporary sediment control devices. CONSTRUCTION NOTES 1. The contractor will be responsible for applying for and obtaining any necessary disturbance permits which may be required by Frederick County prior to the start of clearing and grading activities. 2. The contractor shall stabilize all disturbed areas within 7 days after the area is brought to final grade. 3. Stabilization shall be by permanent seeding and mulching as follows: a. Scarify the top 1" to 2" of soil after final grades have been achieved. b. Add pulverized agricultural limestone at the rate of 2 tons per acre. C. Seed with the following mixture: Seed Type Rate Min. Purity Min Germ. Tall Fescue 60 Ib./ac. 97% 85% Red Clover 8 Ib./ac. 95% 65% Landing Clover 8 Ib./ac. 95% 65% Annual Ryegrass 12 Ib./ac. 98% 85% d. Small grain straw mulch shall be spread at the rate of 1.5 tons per acre. e. 10-10-10 fertilizer shall be spread at the rate of 1.000 lbs. per acre. STONE CONSTRUCTION ENTRANCE LVDOT #1 COURSE AGGREGATE B I POSITIVE DRAINAGE TO SEDIMENT MUST EXTEND FULL WIDTH TRAPPING DEVICE OF INGRESS AND EGRESS OPERATION r r SECTION A —A SECTION B—B EXISTING PAVEMENT *5_:1 MOUNTABLE BERM (OPTIONAL) T 10'MIN. 'MIN. EXISTING PAVEMENT T 10'MIN. TEMPORARY SEDIMENT TRAP ORIGIONAL 1 WARIABL GROUND I ELEVATION VARIABLE II II VARIABLE 67 CU. YD/ACRE N r' 67 CU. YD/ACRE ORIGIONAL (EXCAVATED) GROUND 4' MAX. ELEVATION CLASS I RIPRAP FILTER CLOTH COARSE AGGREGATE** CROSS SECTION OF OUTLET CLASS I RIPRAP LENGTH (IN FEET)- 6 X DRAINAGE AREA (IN AC.) DIVERSION DIKE )))0 ARSE AGGREGATE** FILTER CLOTH EXCAVATED AREA ► COARSE AGGREGATE SHALL BE VDOT #3. #357 OR #5 OUTLET (PERSPECTIVE VIEW) PIPE OUTLET CONDITIONS 0 PIPE OUTLET TO FLAT AREA WITH NO DEFINED CHANNEL PLAN VIEW -� La 0% SECTION A —A d FILTER CLOTH KEY IN 6"-9": RECOMMENDED FOR ENTIRE PERIMETER 3do (MIN. ) OUTLET TO WELL INED CHANNEL I I 07. 1 SECTION A -A * � FILTER CLOTH KEY IN 6"-9 RECOMMENDED FOR ENTIRE PERIMETER NOTES: 1. APRON LINING MAY BE RIPRAP. GROUTED RIPRAP. GABION BASKET. OR CONCRETE. 2. La IS THE LENGTH OF THE RIPRAP APRON AS CALCULATED. 3. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER. BUT NOT LESS THAN 6 INCHES. TRIAD ENGINEERING, INC. o� o' E Z CD o W J Q U � rn n N U OC 00 No 0 U Cf) O F (D O a) o O Z c D o 0 O 0 U U (n T T � T � O_ pi 0 (n C 30 (Z (1)(n (n U o o C> U Z z za � z L.L j w Q 3 Li"Z' W Z O Z 7d" Z " a Z �0 o� Z z w w o r w Z �10 w = vi U W Z 3 m a n Q O~ 01,TH COULTON a No 01 4 G/30' �`SIDNAL Elm PROFESSIONAL SEAL I Q I— V / 7 0 w 7 7 NL- 1 5W _j Z O (n / 0 1 LLJ 0- Z n r^ v j Q Q X Z 5LLJ w O p�J ' Z� O Y Z o � o � Z O V) LL, 0:� 0 ch U O ILL. Q w Drawing Number: C-11 GENERAL NOTES 1. Contractor shall furnish all materials, labor and equipment required and shall perform all work including restoration for the completed installation of utility systems and all other improvements shown or implied as necessary. Unless otherwise noted. specifications for all work will be in accordance with the applicable Standards and Contract Specifications of the Virginia Department of Transportation, Virginia Department of Health, County of Frederick, and the contract documents. 2. Contractor to verify the exact location of all existing utilities and notify the Engineer of any conflicts with existing and proposed utilities. Damage to,existing utilities shall be the Contractor's responsibility. 3. Contractor shall be responsible for all construction stakeout. All dimensions and elevations shown on the contract documents shall be field verified by the Contractor prior to beginning work. 4. Contractor shall obtain, at his expense, all permits required prior to starting work and shall adhere to the conditions imposed. 5. Contractor is responsible for compliance with the requirements of SEC. 59.1-406, ET SEQ. Of the Code of Virginia (Overhead High Voltage Line Safety Act) . 6. Any unusual subsurface conditions encountered during the course of the work shall be brought to the attention of the Engineer. 7. Access by emergency vehicles must be maintained at all times. Access to fire hydrants must not be impeded at any time by parked cars, construction materials, soil stockpiles. etc. 8. Topographic and planimetric information shown on this plan was developed from a field run survey performed by Traid Engineering, Inc. dated December 3. 1998. Boundary information was taken from available records. CONSTRUCTION NOTES EARTHWORK NOTES: 1. Erosion and sediment control measures shall be in place prior to performing any significant earth disturbing activities. 2. Fill material placed below structures, controlled fill slopes, and the top one (1) foot of pavement subgrade shall be compacted to at least 98% of the laboratory maximum dry density as determined by the Standard Proctor method (ASTM D 698). Fill placed below the top one (1) foot of the pavement subgrade, and all other areas shall be compacted to at least 95% of the maximum dry density as determined by the same standard. The moisture content of the soil should be at or within three (3) percentage points of the optimum moisture content. Compaction of the subgrade shall be certified by a professional engineer or technician certified in the Commonwealth of Virginia. 3. Changes or revisions to these construction plans shall not be made unless first approved by the appropriate agency having jurisdiction over the change. 4. Traffic control signs shall comply with the standards of the Virginia Department of Transportation. 5. For erosion and sediment control notes see the erosion and sediment control detail sheet. ROAD NOTES: 1. Subgrades on cut shall be compacted for a minimum of one (1) foot in depth. Subgrade in fill shall meet the compaction requirements stated above at all levels. 2. Areas of wet or soft material under roads or buildings shall be partially over -excavated and replaced with suitable material. 3. Gravel used in base courses shall be constructed on a compacted subgrade free of organic matter. Gravel shall be VDOT type 21-B and shall be placed and compacted in a moist condition so that the fines remain mixed with the coarser material. 4. Asphaltic concrete, where applicable, shall be applied to the prepared gravel subbase following the application of a liquid asphalt prime coat. Asphalt shall consist of a plant -mixed bituminous material rolled smooth. The asphalt surface shall be smooth, seamless and of a uniform texture. Asphalt material shall comply with the minimum specifications required by the VDOT Road and Bridge Specifications. 5. The elevation of new pavement shall match the elevation of the existing pavement at all intersections. GENERAL ENTRANCE NOTES 1. All work on this project shall conform to the latest editions of the Virginia Department of Transportation (VDOT) Road and Bridge Specifications, and Standards, The Virginia Erosion and Sediment Control Regulations and EXISTING any other state. federal or local regulations applicable. In the event of - - - - - - conflict between any of these standards, specifications or plans. the most stringent shall govern. 2. All construction shall comply with the latest U.S. Department of Labor Occupational Safety 8. Health Administration and VOSH Rules & Regulations.------------- 3. When working on VDOT right of way, all traffic control, whether permanent or temporary, shall be in accordance with the current edition of VDOT's work area protection manual. Furthermore, all traffic control flaggers must be certified in accordance with VDOT's January, 1994 (or latest edition of Road & Bridge Specifications. Section 104.04-C. ------------- 4. Design features relating to construction or to regulation, control and------------- sof ety of traffic may be subject to change as deemed necessary by VDOT. 5. Prior to initiation of work. Contractor shall be responsible for acquiring all necessary VDOT land use permits for any work on VDOT right of way. 6. If required by the local VDOT Residency Office, a preconstruction conference must be arranged and held by the engineer and/or developer with -X x the attendance of the contractor. various County agencies. utility companies and VDOT prior to initiation of work. 0 7. Contractor shall notify the local VDOT Residency Office when work is to begin or cease for any undetermined length of time. VDOT will also require 48 hours notice for any inspection. 8. The Contractor will be responsible for maintaining adequate access to the project from the adjacent public roadway through construction and maintenance of a construction entrance in accordance with the Virginia Erosion & Sediment Control Handbook. Sec 3.02. Furthermore. access to other properties affected by this project shall be maintained through construction. SITE PLAN NOTES: 1. Parcel area: 2.87 acres 2. Zoning: RA 3. Use: Church 4. Property Identification #:43 ((A)) 90B 5. Magisterial District: Stonewall 6. Minimum Lot Size: 2.00 acres 7. Building Setbacks: Front=60' Side=50' Rear=50' 8. Building Area: Ex. Church=4.413 S.F. Prop. Sunday School Bldg.=720 S.F. Prop. Shed=540 S.F. Total--5,673 S.F. 9. F.A.R.: 5.673/(2.87*43,560)=O.05 10. Maximum Building Height: 35' 11. Actual Building Height: Existing Church=28' Proposed Building=15' Proposed Shed=10' Future Expansion=28' 12. Parking Setback: 5' 13. Parking Space Requirements: 1 Space/3 seats 26 pews*6 seats/pew=156 seats Required number of spaces=156 seats*(1 space/3 seats)=52 Number of spaces provided=55 Required number of handicapped spaces=3 Number of handicapped spaces provided=3, w/2 van accessible 14. Parking Lot Green Space Requirements: Paved parking area=21,395 s.f. Required green space (5%)=21,395 s.f.*0.05=1,070 s.f. Provided green space=1.372 s.f. (6.41%) 15. Trip Generation Data: Information obtained from VDOT Secondary Traffic Section Tabulation Report. cir. 1995 Traffic volume on existing Rte. 661 (Welltown Pike) = 1359 TPD Information obtained from ITE Trip Generation, 6th ed., vol. 2, pg. 908. Fitted curve equation for TPD vs. 1000 sq. -Ft of floor area on a Sunday: Ln(T) = 0.593 Ln(X) + 4.766, where T = Avg. vehicle trip ends X = 1 000 sq. ft floor area Ln(T) = 0.593 Ln(5.13) + 4.766 Ln(T) = 5.74 T = 311 TPD Assume 50%50% left -right split Left turn = 155 TPD Right turn = 156 TPD -- 2900-- ----2898---- 2876.3 PROPOSED ROADS ROAD CENTERLINE CURB M641AD TRIAD ENGINEERING, INC. WINCHESTER. VIRGINIA I CURB TAPER SIDEWALKS BUILDINGS FENCE rn cO o 0 0 z 0 p o U o w 0 U N 0 0 0 w J Q U 0 o 0 (n ,, a c DECIDUOUS TREE U) V o o p U CONIFEROUS TREE ( , U CONIFEROUS SHRUB z PROPERTY LINE ^ a Z Z Cr STORM SEWER a> Z 5,-, N > 3 a z900 MAJOR CONTOUR W Z M 0 -- W oiz 28s8 MINOR CONTOUR �Cra Z SPOT ELEVATION m 2893..86� U En z W U W ------------ LIMITS OF CLEARING AND/OR GRADING z T;� U WZ 3 mCA CA ABBREVIATIONS C/L OR CENTERLINE CONC. CONCRETE DIA. DIAMETER EL. ELEVATION ESMT. EASEMENT EX. EXISTING F.E. FOUNDATION ELEVATION F.H. FIRE HYDRANT F.W. TOP OF FOUNDATION WALL G.V. GATE VALVE I,,TH OF G'✓ OUL'9 o.019 4 PON SI®NAL E PROFESSIONAL SEAL HORIZ. HORIZONTAL INV. INVERT J LAT. LATERAL Q ~ LT. LEFT V) Q M.H. MANHOLE _Z Z MIN. MINIMUM O 0 bi P.C. POINT OF CURVE LLJ Z cr- 0 P.I. POINT OF INTERSECTION z 0 5 W P.T. POINT OF TANGENT Z J PVC POINT OF VERTICAL CURVE W >_ PVI POINT OF VERTICAL INTERSECTION PVT POINT OF VERTICAL TANGENT 0 X :5 0 R RADIUS Lv W O Z RT. RIGHT ~ = C) Q SAN. SEW. SANITARY SEWER Z U SEW. SEWER )) Y STD. STANDARD U D U v n STM. SEW. STORM SEWER :J- _ ct� W TPD TRIPS PER DAY O U W VERT. VERTICAL 0 W/L WATERLINE V) (if O X-ING CROSSING 0 LL_ Z Q Drawing Number* C - i 58 'I / I P-1 X I< EX. WELL 14 I ' 3 He sP. N i SIGN-- r ; 8'x Q= ---- ;/ ___-- :AISLE EX. TREES I L - y_/RE L�/V� - 1-5' AISLE PLANTER /% �� F c5'X20' /\� T B /O X2 i \F�, G RE OV D /4 P• D 4 - D i P k •� I 0 Mc_ C�oN c -5 1, D —/ X 0� D D• • •' 4 / e, ,e, — —E GE EX. GRAVEL PARKING LOT , 10 ---------------- RKING SET B AC A -5 P , / i• , i� r8'XIO' CONC. DUMPSTER PAD \ W//0' CONC. WHEEL PAO ! 11 , Ol \ ! r , , / / ' i TRASH/ROCK PILE ;1 6' H/G1-/ WOOD FENCE It //O' DOUBLE SW//VG GATE / F I ,: ED HE" GHT �lO ST RAGE AREA: , o •+• , , 0P ,ym a.•/ EX. SHED T,d T BE REMOVfL`O I P%Q e / SHED , ; I j. , G,/ , i I oo A/ IfS- j�. ;. '• C / I l� �/ /• INTERSTATE 81 '• ! ' G % I I 0 l — — _ _ ' ' POSTED SPEED L IMI T=65 M.P.H. /• of of 11 If I ( If ;• to 'l/, • ' �• OWNER: RICHARD R. DUNCAN •;' / �� / �OV I i �' �0 // /• ;• USE: SINGLE FAMILY / / %• ZONING: RA ,• ; ; /„� I I i' %' /%+ / PIN: 43 ((A)) 96 ,f EX. DRAINFIELD 1 % ' /• ;• J/0of I I 1 / i /• // Vf FUTURE I iI ;/ ;/ 41 ;' / / I 60'X80' I � � �' /' ;• NOTES: ' BU/LD/NG I I EXPA/VS/ON i ;' �/ !+ /. A// dlmenslons are to face of curb. i• %• i ; USE: SANCTUARY I i / If i 2. A// face of curb rad!! are S' unless otherwise ;• % AREA: 4,800 S.E. / % % noted. � ! (NOT TO BE INCLUDED IN I I � , � r IfI TI-11S S/TE I=LAN> I i !• 3. A// outdoor lighting fixtures shall be stile/ded !• i I I ! ;/ and directed so that the /Jght element Is not vlslb/e i ' • i i — — _ _ / ! /• from or casts glare on ad Jacent ,orooerttes or � • i i —' -- — — _. — I I i / ,+ to right-of-way. ; . -----J i' / / 4. This site contains no steep slopes. woodlands, l!• -SO' REAR SETBACK i / ! /• i -- f/oodP/olns• snkho/es• streams or drotnoge ways;i or any other envlronmenta/ features. j • S. Placement of CG-/2 curb ramps locatlon s/�ou/d / ;' !• be flna/lzed by VDOT lnsoector and/or engineer. ,i i • 6. Eor ,pavement deta!/s see sheet C-/0. j , j /, , , i i' / i • % (D S' PARKING SETBACK 4--------------------------------------------------------------------------------------- ' 00 S 81.24'10- W 332.10, x Y .4 r OWNER: ALFRED E. d VENDA C. DEHAVEN , 20 0 20 ao so ao USE: SINGLE FAMILY XPM ZONING: RA ' PIN: 43 ((A)) 90 ;• SCALE,/-20 : MAT-CI—IL/AVE— -- SEE SHEE7— C-3 / / ROADWAY EASEMENT (RADIUS = 100') I I I I I i \ I =+_ I \ 1 \ OWNER: ALFRED E. d VENDA C. DEHAVEN USE: SINGLE FAMILY ZONING: RA PIN: 43 ((A)) 90C \ f\ \ 7.SO �.r-�' A. E 40 — W/DEN EXAST//VG \ 1 _ •�•-'' N 73'25'2 -- -� ROAD T01 24' �Ns _ - - • — — — _ • - - 1 ` \ _ — = • — AVEL P ARK I GLOT ____— II _ • • y „_ _ -- -_-__ -- _-- C go n 10, o \ !• i \ \ 0 to n \ \ \\ \o 1 0j, ___ fE ?LOC�TED i• � _--- _ � _ 8' L/GOLN1C--3 .S'x.3' i / %/ HT PE 281\ N -- CTYP.OF- 2> I 1 CHURCH i S/G/JV OWNER: TERRY A. COOPER ' USE: SINGLE FAMILY ! ZONING: RA PIN: 43 ((A)) 90A ' If ;• of , .' /, IInn / EX. S/w TO D• D D e' • e 'e' �J' BE REMOVED Io— to I� ' `• :e• , : :e. :e• 6' CONC. STD. CG-/2 4/ C_ HRP _C_AM /` .. .' .' ',i'D-;• -'• O O /N/S/W , / I to I . 1 , I S_ coZQ� I I , /� �'•'''•� NWT ' I EX. CHURCH I / HEIGHT=281 USE: SANCTUARY/OFFICES I AREA: 4.413 S F (A , �o , , I / , M641AD TRIAD ENGINEERING, INC. m� 0 �1 z 0 N co 0) U N 0 O i C N cV U o L-= 0 a� 70 10 - o 0 U 7) (n T � O V) 0 V) O_ U) U � o � U Z w a za� Z � 3 a W m o>- WZ~Z U ¢ Z 0c�w Z %Oa MMX Z - M ' w m V pf �z W Z 3 ~�W 0 U, J 1E T U U, LILJ Z GF G TON 9 o. OM4 �o � ti �SI�NAL Eli' PROFESSIONAL SEAL Q ,n� Q V J 7 O 0 W z U z LLJ a_ Q C) X LLJ W O F-- U U Y cr- U 7-) — W 0 U C) F- LIJ 0 ILL. a_ Q Drawing Number z Q a- LLJ U) C-2 Y d a Llj:� Ex. CONC. BRIDGE TRIAD ENGINEERING, INC. 3 WINCHESTER VIRGINIA Ji„~r I31� I I ' i-60ROADWAY EASEMENT w 1 9856' --- EXWOOD/ROCK WALL .�( U . N77.12'OO"E - "-- \ _ W/OE/V EXISTING W 1- o EX. ROCK �A L I------------- _ _ / I EX CONC. _-------- I EX. ROCK WALL ------------ E.P. ----/ � \\ Ex. Posrs �if v SECT/O/V TO ` I � irI•.' BE REMOVED ------------- _—_—_-------------------_ \ 0 �lrcTl' <APPROX. 5'> ------------- —— — — --- —— ----- -- --- — \ WALK to { ` B RFORMEO I 7 — 1-?`ELOCATEO E.P. — — — —------------- 0 O E,(T CURB ! CHUF?CH— SIG/VS— — — — --- — —------------- O �\ \ RELOC.gTEL7— I;I — —_—_— — — ------ — lz Q ST RE7t S/G/V I ^ �" — — — E. P_ — — — — P• \ � ENTRANCE /! 197. 6' _ - ---------------------------------- \ �` 1 \ a° n I I GL� N77.12' p"E_ -- I EX. SHRUB LINE \\ I I I I I 00 � U I •• o j i �• I I I j I I Ln ° 0 0 o o N I 0 0 T >, I II I II II II ��p Y �cU •3 U o s o U I I j I I j I I I Im I ml I U I I j I I I I I j I Z ry 5; a 3� I j I I W z> mop I I II j W 0 a I I I I I wpUJ m z NoLLJ Ir W 60' ROADWAY EASEMENT m I I I I II I \ ROCK OU I CROP Y PP I I \ GUY_ _ N60757 I I o r m r�lll 0 I I A I III I I FX. DRIVEWAY n 000' I — < TON 9' I i I I I ✓ I o. 0191214 I I I I I �� G 3�j9R tip' III I I I I �SI�NAL E II I I I I I I I I I I PROFESSIONAL SEAL III I I I W/OE/V EXISTING l I I I I ROAZD TO 24' I I I Q II I II I I � Q I'I I I i I I o wz� QLQ� Q I I I I I J I i I I o X LLJ_ w O U� W I� I I I I \ U V) - += I ► I w 0 / — R \ a_I 40 E.P I Q I I \ / I EX. DRIVEWAY 1 of I c 20 O 20 40 60 BO- c SCALE./"-20' A11 AT CHL//V E -- SEE SHEET C-� Drawing Number: C-3 MATTCl—ILINE -- SEE SHEET C-5 I += 1 I I 1 1 \ \ ` 1 1 1 \ i ` � 7 �47\ 1 97.88 -_ ='— I o -4 ♦• % \ \ T. \ \ 98 8 • `sa I / ' C.- .56 !T'C' \ • \ T.C. \ I VV ` P A0 /--N60758 /9 \ �V 98.57 �' !• i C.- �� l 9 .4s ♦ • 1 T.C.- I 4f 1 T. T C. ♦ 99.4 / 9 .30 ♦• j T .C.- C H s I c ' `_ T.C.- 98.34 too T.C.- 1: T r` _ l c» cc / / OWNER: TERRY A. COOPER i / / (�EX. LL K T N I I l I 9 37 \\ USE: SINGLE FAMILY \ ZONING: RA \ PIN: 43 ((A)) 90A / 0 _ \ \ I \ / O 7-. EDGE EX. GRAVEL PARKID I T-C % N, I o + W Al o lz / ♦ \ I EX. CHURCH I � I / • m\ i I I � \ 1 I �A iivv.- / / / 1 ' j• \�I I �' /,' EX. DRAINFIELD // ;• / / VL'96 ` I `AE3UILOING 0) � EXPANSION I �\\ -_____-_`_% ;• /�//, % � / O;• /ems T ASH JACK -------------- % �'----------""------------------- `, /' /' /i• PVC o.soi / I S 81.24'10- W 3a2. 10' i x ,C _ .._.._..-.--.---._..-.•4 OWNER: ALFRED E. 6 VENDA C. DEHAVEN I X USE: SINGLE FAMILY ' ZONING: RA I PIN: 43 ((A)) 90 ' OWNER SHALL PERFORM PER/00/C OE THE OUTLET STRUCTURE TO COLLECTED DEB/?/S. INTERSTATE 81 POSTED SPEED LIMIT=65 M.P.H. IMM41AD TRIAD ENGINEERING, INC. m 0 U n E z U 0 C4 O) U N � u� o 0 0 N c U N (o N o w o a v O O U V) T T aa) 0- c 3o � U) a) Ne V N Q L p U U Z � Q z Z z > L.LJ z w 7d z w z ��a o� m wow = J z Ld -Ld V N LLJ Z 3m Q Q ry INSPECTIONS REMOVE ANY / rn l I (A — — — — — — — — — — — — — — — — X. GRADE ' I — — — — — — io C/L P/PE , i oo . WSE-9/ o PR P. GRADE 5 )'R. WSE-9/ YR. WSE-90 90 I I 90 Pvc 82 o. Ox - �38 ? Op ? Op 88 /+00 PO/VO OU7—F.4LL PROF/LE SCALE /"=20' HOR/Z. 2 O 2 4 6 8 .SCALES/'-2' .SCALE,/'-00' so so ,LTH op7 G Mo'.OM4 TON �0 L� ti S'Ip AL E1 0 LLJ U_ J 0 O CL Q PROFESSIONAL SEAL O Q X Ld U U Q Z U Z 0 U Drawing Number z Q a_ C-4 TRIAD ENGINEERING, INC. WINCHESTER VIRGINIA Ex. coNc. I 1 EXTEND EX. /s" CMP _ WINGWALL ___ r --_ / — — EX. -�-- — -y._._ ._--_ - _ EX. 4" PVC PIPE I I / ------- - ----- ----_ ________ / \ �\\✓/mot`\ \ni of INV.�1.98 I I 7 AT CONSTANT -------- I I 1 Ex. CONC. DITCH GRADE ______ _ _ _ _ _ _ l I \III EX. ELLIPTICAL ��\ I _ _ 60"x36" CMP I I I I I\ \\ NEW /NV.-85.23 I '- EX 4 PVC PIPE r1 _ _ _ ------------------- EX. ELLIPTICAL - --------------- - --------------------- �L�L \ \ 60"x36" S,1�P_--- / _ V.-B/.80 \ ___— I --I _\ "iRy_5.06 __---------- _ /—'------------- ----------- --- — / \ / I } 84 -84-- g2' \ INV.=81.72 X. ELLIPTICAL - I 1 I� es _ /\ I� ^\---84----------� '\\ y\—__---------------- --_ _ ` �\ 60' x36" CMP — _ — — _ _ — — — / INV.�5.59 I -�-__ I- TI I ```/ �� �_--------- _ _-_- I ------ ---------------- ---_ \ AE-XTENO EX.6" CM 86-------------------- ------ _ _ _ 6' AT CONSTANT 1 IJ EX. 15" 6MP ___ ----- L ELIIPTICAL I INV.�5.31'\ _-T----- \ 3� 60„x3j' CMP - ---- 86= \ -- --- --- ____ -------- --- - ------------ _ gA \\--------- �./>% i` EX. "CMP"_i'' \ o INV. 4.99 _ \ _ _ --�'— _// / \INV. =8 76 \ co 1 \'\ '� I ---------- \ ------ -- --------------_ ------ _-- CMP INV. \/' � \ \ o / \ \ + \ -- ------ ---- �`—__---- --------------------------------------------\\ ----------- ---___--- ------------------------- EXTEND EX.6" CMP — - - 84 AT CONSTA/V I � iDo I / // — �I _—_._----- _---- �-------- Ex. DITCH GRADE � \ 1 i — \ 1 E 1/ X. ' _ 1 i INV. I595 "" \ ._ --- -- - - -- - - - _ ► I EX. SHRUB LINE � I EXTEND EX. 5P-_ - \ I XX. /" CM�86� .8q \ .� ,/ I I I � _ � o (V G/O' AT CONSTANT `_-_ � RADE W/ 22.5' BEND I o I I I I N o 0 0 I I i I N I NEW /1VV.-86.05 r—EX. CONC. DITCH 0 w 0 _ � c � I I I I I I t i l I 0 " 0 c a_ J C J J V' I I I I o I I I I I I I I 11 I I I I U I I I I I I I I I C a I I I I I I I i l I Z z> " � �W~< I '3- I W > I z�V) I �- LJ Z I► I I z o m I wow I `"o� = J V I I I I W 3M t I\\ I V' 0 _ I I I I \ \ ROCK OUTCROP 07 E - - I N60757LTH OF G I I I I I 'I I --- -- o.OM4 It I i I�I�SI�NAL E I I I I I PROFESSIONAL SEAL I I I I I I o I I I I o z C) z I I I I I I--_. 0 Q I I I i I I z cn _1 lil + I i I I a_ < Q- z �w� C� I � o — = c) z �vY 0 d U Q W c + C) V I I I 1 W z / O ILL. 20 O 20 40 60 80 MAT CHI//V E -- SEE SHEET C-4 drawing Number: C-5 I _ + _ I ► i I �%I I\�� � ► I I I — J ► I r —I E•P• I I I EX. DRIVEWAY i 11 1 � 1 I I E.P. 1 I \ I 1 I 1 I = + _ S / / i • � w A y y /,� • �`' J� ' � A y v y y � ► V I /OIB' I 1 II I 1 I IO A- 3 B I I I I I I c� I a m r z / \ X2�/SHE / ,,,,EX. WELL // IB 1=0 FO 7 /• , / /• I— I� / \I SHED / I + + %• I I o I I � / I EX. CHURCH I j• I L I I I I I I 1 / I I , / RUBBER HOSE---� EX. DRAINFIELD 1 I / FUTURE I I 1 / • GROUND LINE ' I 60'X80' I I �• TO BE 4" TO 5" BUILD//VG � , / BELOW GRAOE I + EXPA/VS/O/V(D I � / I I I , 1 i I 1 j 2" MULCH /N SAUCER / LmM41AILI TRIAD ENGINEERING, INC / d Jr • • % I• %• • o / V m ;• v SPRAY WITH WILT -PROOF ACCOR,D/NG TO MFR'S INSTRUCTIONS IF FOLL/AGE /S PRESENT. REMOVE CONTAINER FROM TOP OF BALL. PRUNE //5 OF LEAF AREA BUT BETA/N NATURAL FORM. GROUN,D LINE TO BE 2"-3" BELOW GF?A,De NI� SH14UB 3" MULCH /N SAUCER. FLOOD WITH WATER TWICE IN 2.4 HOURS. Mr " MM Pp., /N 8" LAYERS. — WATER EACH LAYER UNTIL SETTLED. OO NOT TAMP. LOOSEN SOIL /N BOTTOM OF P/T PLANT//VG OETA/L NOT TO SCALE PLANT SCHEOULE SYMBOL QUANTITY COMMON NAME HEIGHT COIVOITIOIV TYPE B /60 BOXW000 3' CONTAINER SHRUB /c0 /9 FLOWERING 00GW000 6' B 8e B TREE A /0 GREEN ARBORVITAE 3-4' B & B TREE NOTE: ALL HEIGHTS //V /::>LA/VT 5C1--1E0ULE ARE APF'L/CABLE AT T/ME OF PLA/VT//VG. /2" PRUNE //5 OF LEAF AREA BUT F?ET,A/N NATURAL FORM. SPRAY WITH WILT --PROOF- ACCORDING TO MFR'S_ INSTRUCTIONS IF FOLIAGE /S PRESENT. ,DOUBLE STRANO OF /2 GAUGE GALVANIZED W/RE TW/STEO (THREE GUYS PER TREE, SPREAD /20 ,DEGREES APART). '-" x 2" W000 STAKES OR/VEN AT LEAST 3' /NTO GROUND. WRAP WITH WATERPROOF TREE WRAP A/VO SECURE WITH TWINE. REMOVE BURLAP FROM TOP OF BALL. CONSTRUCT EARTH SAUCER IN ,DEPRESS/ON• FL000 WITH WATER TWICE /N 24 HOURS. BACKF/LL W/7-1-Y PLANTING SOIL //V 8" LAYERS. WATER EACH LAYER U/\/T/L SETTLED. 00 NOT TAMP. j `LOOSEN SOIL /N ;• ;' BOTTOM OF P/T + % TREE iLANT /NG ANO GUYING OET A/L %• /' NOT TO SCALE • � x x �r X 20 0 20 40 60 80 SCALE,/"-20' z CD 0 cD 0 rn c� a0 N 1 O Ln N 1 o C � 0 U 0 N N O 0 ' c O v 0 Q U (n � T a_ N V) 0) (n p 0_ N (n U U p 0.LTH oF"� �y 'PON a No.019Z4 `Sj�NAL E PROFESSIONAL SEAL ~ Q Z 0 Z Q L1J Z 0 a- �— ZLLJ (n j a_Q r V oXZZ LLJ w 0 a- Z = U Q � � Y U U_ D — V) 0 L' W 0 r Z F— LJ (If 0 .__1 Drawing Number C-6 LEGEND N0. TITLE KEY SYMBOL TEMPORARY STONE 3.02 CONSTRUCTION ENTRANCE C E 3.05 SILT FENCE S F X—i( X—X ❑TEMPORARY 3.13 SEDIMENT TRAP S T O 3.18 OUTLET PROTECTION O P 3.29 SURFACE ROUGHENING 3.30 TOPSOILING 3.32 PERMANENT SEEDING F3.35] MULCHING MU �--�• MAT-CHL//V E- -- SE-E SHEET C-8 LL IVG / O EDGE E / i \ I / i + I I I / /• \\ I EX. HURCH / I / cp / I / / / J j• �\ I I I /� I I r 'r / I � r / EX. DRAINFIELD .96 BUILDING `\ I + `� EXPA/VSIOW //0) 0 / f ----------------- \ -7 94-- /• \\\ 96 / rx . _.c_.._.... _....... I X- 1 t/ / / / , 00 / / / / / / / / I I I I I I I I I I I I i I \ 0 R�PRAP \\ EE OETA/U\\ n \ / / / / / TRIAD ENGINEERING, INC. WINCHESTER. VIRGINIA Z C' I] 0) U 00 N Ln N c p U O N i � u O 0 � c 0 O 0 U 0 U -3 (n T T (n N 0 (1 (n Q) U Q) � � o U Z ;+ ZCkf > I ry v~i I/ �WQ ZZ > Z j LLJm0 rn Z Z LLJ Z %06 — _� m /¢ C� w0= w le Ul i /. Z % LLJ • 3 m H p /• / i OUL'PON a o. Ol 4 /. �SIpIVAL E i / • PROFESSIONAL SEAL NOTE: ; CONTRACTOR <AGEWT> SHALL NOT %.PERFORM ANY TYPE Q OE CONSTRUCT/OW WITH/N (0/V) /,iVTEF?STATE L/MITEO F— ACCESS R/GHT-OE-WAY UNLESS,1UNT/L A VOOT LANO U) z Z USE PERM/T TO PERFORM S!/%CH WORK HAS BEEN /SSUEO O Z TO CONTRACTOR <AGE/V7->. i U Z CD L LLJ Z cn Q J SEO/MENT TRAR CALCULATIONS: w }- W a- ' REO'O VOLUME - 3,6/8 C�. PER ACRE ORA/NAGE Q AREA Of?A/WAGE AREA - /.59 4CRE Q x /4E0'O VOLUME - 3,GI8 iC.E. /.59 AC. - 5,765 C.E. W Li O _x O STORAGE VOLUME PRpV/OEO - 7,0/2 C.E. aC! SEO/MENT TRAP �(•�/HENS/DNS: _U U O Z i• -J U LLd O HE/GI-IT O U W/OT/H - 2' j!. � O LENGTH - /0' (n 1� N TOP ELEV. - 9t.00 O LL Q LLJ i % Drawing ' Number ' 20 0 20 40 60 80 '• C-7 TRIAD ENGINEERING, INC. WINCHESTER VIRGINIA I1- - - - - -- ---- _ IINV.=81.98 ------ - X 1 I t --------- IN V. �5.61 Sal I a 2-3-" - - - - - - - - -------------------- X INV. 85.06 -------------------- ------------ --------- 1 ` 1 / X /�1\ INV. �1 . 72 INV.�5.59 BED -r--�--__ �I ' 1 X '-----X------------- ------ ___---------- ___—_- ------------ - \ \ ---- — IN1=84.99 I \\ --- -T— ----------------- - \ N \/-- --- - - \ - 00' o1------- ____--- ----- X X \ I o X- -- - - - \ I / _-------------- - - - - - _ _ \ I i \�� X / I I ,B9\ 0 00 111 \ '86 84__--- /// 00 I , N o � I o .� - 1I i I /NVr86.05 II _ •. ' 11 I' I i I ► 0 ° C I I I i I I �°° c I i I I I i I I � 1!j cl- 'q I I I I oJ c J 3 -1� � Q) I I I I I I I I U I ► i I ► Z I I i I l i l I z I ► , I Z a> z I �WQ Ik I i I I W �3J I I I I I W off? ) W m N c,Z W N0� = J C I i LL UI 3 co I II Q I i I s,Q.ti of P� 'I I I I I TON a II ---- --- I 019214 - I 30 9g �SI�NAL 1 11 I I I I I PROFESSIONAL SEAL F— �I o I I I o z Z I I Lli w z� � z 11 I i I I �0> — Q z cn ^ p J � Q >- W a - I I I I I o w 5 o o6 O v Y z �— I of-94 I O +''� II II II \ \ o v o LLJ V) Ld O U V) O L� Q W 20 0 20 40 60 80 -j drawingSCALE.,-zO- CHI//M14T C-7 r Number: C-8 \ I --------- T -- �0�1h_661 ----------- -{----- — —"---------- — — — — — — I_ --- — SIGHT /STANCE OGD \ ,--- S� = _ I 550' S/GHT O/STANCE --'-- --__ — — — 550' _ — /LIco cb OD co 0 f0 1 I I I I II 11 1111 111 I� co I I I I � II 1 I I I 1 � I / 1 I II I II I / I I I I co I Ililoo I / j � I � I I ►ICI � ; I I T— I I I —I I I I I _ I I I I I I __I I I I i I I I I -- I I I I I I I I I I I I I I I I I I I _I I I I I I I — I I _ I T-- I I --�--- I I I I -1 I I -T--T-- I I I I F--F I I I I -1 I I --T--T--F----- I I I I i I ---T I I --I--�-- -- t-------------t I I I I I I I -- I -- I ------�-- I I I ----I--�-- I I ---t--t--------1---�- I I I I I I ----I---�-- I I I ---t----------I---t I I I -- -----I-- -- -- I -- I - -- ---I--- IANCE --T----I----�-- ---T-- I ----I---�-- I I --T- I I--------�---� I I I I --T-- I --I---I---a-- I I I --T-----------�-- I I I I I I I I I I s/G/! O/S I I I I I I I I I I I I I I I I I I I I I ----EEC 2 90 -----1___ I I I I I I I I I HE/GH OF I I I I I I �/GHT /STANI E I EYE-.sO- 90 H /GHT F 1 OB CT-4. 5' ----- -----I--------___L_ ___ F/N/S o-/Eo GI RAOE I I I I I I I I I I I I i I I I I I I I I I I I I I I i IS i T 8o I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 80 --I---�-- --I-- -- ----- -- --�- -L--I---J I I I --I-- I I --I------1--�-- I I I I I I I I �-- I I i --L--I---1-- I I I I I -- --- I I --1----- I I I I ---� I T-- --L -L -1 --T--L--I------ � - I -f -- T--T- -�--- � -r-T- �--I--�-- I __ I -�--T--I- I I I I --- I _ -�---r--�--- I I �--I--�-- �---T--I-----�-----1---T T I T-- --T--T--T T -T-- --I---t- ---t---�--I----�--�-- fi-- --I--i--�-- I -�-t---I------t--�--1--- I I I I I I I --r--I-�-- I I ---fi- I fi--t----t---t---r- I i --t---I--�- ---t----t----�----�-�-- I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 70 i 70 ��WA-=-'J rt-olt-If -L"L./ / -C.JCJ v-vv FALWLWA G•UU -5 "UU GQ�l�J VERT. SCALE./'-4' 5�00 40 O 40 80 /20 /60 "OR/Z. SCALE./"-40' IMM41A&D TRIAD ENGINEERING, INC. o of E z CD 0 � O O U 00 N = _ O) O Lr) O 0 N_ N c U O' ch O w O 0 _ > � c a 0 0 U C) U -3 (/) >1 >1 a 0_ c: a_ V cn (n U N p L p U • U Z U ac Zcr Q> a- ry >3a j3 W W Z�Z ��_ Z �0d o � _ cr ' ^ mMo c `) V w Z U z w NIA w J C� = Vl W 3m v) Q O w z a_ 0 Lli IN doo') 0 "r_SIONAL E�� PROFESSIONAL SEAL O V) Q r2 x w U f� U Q z U rr z O Y _U Ld LLJ Of f Ll— U Z W Q J cn O 0 clf a- Z p U Z V I Drawing Number C-9 50.0' MAX SPACING BETWEEN EXPANSION JOINTS nnK1T0ArT1(­,n1 Ir)IKITC (TVD) NOTES: 1. ALL SIDEWALKS SHALL BE 4" THICK UNLESS OTHERWISE NOTED. 2. CONTRACTION JOINTS SHALL BE SPACED 5.0' INTERVALS FOR 5.0' SIDEWALKS. STANDARD JOINT LAYOUT FOR CONCRETE SIDEWALKS NOT TO SCALE SUBGRADE @ 95/ SIDEWALK SECTION 0.50" EXPANSION JOINT n1(( MATERIAL IN�Q Q N SUBGRADE @ 95/ EXPANSION JOINT 0.1" SUBGRADE @ 95/ CONTRACTION JOINT TYP/CAL SIDEWALK 0E7-AILS NOT 7-0 SCALE SEE PLANS F'AVEME/VT SECT/O/V NOT TO SCALE REMOVE EXIST. ASPHALT PAVEMENT (SAW CUT) NEW 24'' MIN. TACK COAT PAVEMENT 12EXISTING PAVEMENT " MIN. !'7T /7T/7 ululul BASE COURSE PRIME ----------- COAT SUB BASE COURSE T/777 T/7 7/7 T/7,—/777 7/7 7/7 SUB GRADE //V T ERFACE NEW PAVEME/VT WITH EX/ST//VG I=>AVEME/VT TY1=>/CAL SECT/O/V NOT TO SCALE 2.08% 8\ - Permissible 3'-0'° Construction Joint 'ay Line CG-12 Pay Line CG-12 Vor. width Sidewalk or®Var. ? 4' 0" Min• Sidewalk S_ 000 .o. RADIAL PLAN A 1 6'-0" 1 Min. 6'-0" I —T �— %" x 8" Bars C 12" c-c Minimum concrete cover Permissible Construction Joint Taper curb height down Y 0 to 0 at this point or Pay Line o continue at full height CG 12 .- where applicable. z in %" x 8" Bars a o:o. •o �o•o 12" c-c minimum .;,Var. 3'-0" Min., o Var. width sidewalk concrete cover 1 1/2" mm o . o 0 0 • o o or Sidewalk Space o Permissible Construction Joint u Pay Line CG-12 0 U 6 0 zo TYPICAL ALTERNATE RADIAL PLAN FOR USE AT APPLICABLE STREET For Commercial Entrance CONNECTIONS AND COMMERCIAL (Heavy Truck Traffic Anticipated) see Standard CG-13 sheet 203.10 ENTRANCES. Var. width o. c o00 Sidewalk or o o�' j B Sidewalk oo B Space I o ®o Slope 12:1 Maximum ISOMETRIC VIEW ZD ATANGENT PLAN Notes: Curb ramp floor to be class A-3 Concrete (4,000 psiif precast) with slip - resistant integral detectable warning surface covering the entire width of the ramp floor (ramp floor may be precast or cast in place). The detactable ® 7" where St'd. CG-3 CG-7 is used. warning shall be provided by an exposed aggregate finish. Ramp shall not _ 7'-4" is the minimum exceed a maximum slope of 12:1. (ithSidewalk orr Area requirement to Flared sides of curb ramp to be poured monolithically with ramp floor or by ® 6„ (with without buffer strip) achieve a 12:1 slope using permissible construction joint with required bars. St'd. CG-2 7'-4" — If ramp floor is precast, holes must be provided for dowel bars so that or CG-6 12;1 Mox — adjoining flared sides can be cast in place after placement of precast ramp 4 • floor. Precast concrete shall be class A-4. Required bars are to be %" x 8" placed 12" center to center along both sides of the ramp floor, mid -depth of romp floor. Minimum 7" WHEN THE ENTRANCE RADIICANNOT concrete cover 11/2" mm. SECTION A -A ACCOMMODATE THE TURNING REQUIREMENTS Curb romps willbe measured and aid for at the contract unit prices for Hydraulic % x 8" Bars Q OF ANTICIPATED HEAVY TRUCK TRAFFIC. mP P P Y cement concrete sidewalk and Exposed aggregate sidewalk, complete -in -place. 12" c-c Permissible Curb/curb and gutter slope transitions adjacent to curb ramps are included Slope 12:1 Maximum Construction Joint in payment for curb/curb and gutter. This item may be When used in conjunction with Standard CG-3 or CG-7, the curb face on o•o•o•o•o•o•o precast or cast in place. this Standard is to be adjusted to match the mountable curb configuration. Curb Romps are to be located as shown on the plans or as directed by the SECTION B-� Engineer. They are to be provided at intersections wherever an occessable route within the right-of-way of highway facility crosses a curb regardless o•o• of whether sidewalk is existing, proposed or nonexistent. They may be offset oho from pedestrian crosswalks as shown on plans or as directed by the Engineer, Limits of exposed aggregate sidewalk but should not be located behind vehicle stop lines. Existing light poles, fire ® Treatment where width of sidewalk or sidewalk hydrants, drop inlets, etc. will also affect placement. space is less than 7'-4" ❑+ Accessible route is defined as a continuous unobstructed, stable, firm and slip resistant path connecting all accessible elements of a facility that can be approached, entered and used by persons with mobility impairments. SPECIFICATION C REFERENCE URB RAMP 502 (PERSONS WITH MOBILITY IMPAIRMENTS) 504 VRGNNA DEPARTMENT OF TRANSPORTATIONON THIS SHEET ARE IMILLIETERS 203.05 'TIVE F-= ! LOF PARKING SPACE I //V T ER/V AT IONAL I--1A/VO/CA)=> SYMBOL NOT TO SCALE — USE 5' WIDE LOADING ZONE FOR ALL HANDI-CAP PARKING SPACES UNLESS NOTED AS "VAN ACCESSIBLE". USE 8' WIDE FOR "VAN ACCESSIBLE" SPACES. 5' 8' '--6" WIDE STRIPE, 2' � TO � C 450 I--1A/VO/CA1=>f="`EO PARK//VG STRIP//VG OETA/LS NOT TO SCALE ENT RA/VCE ROAD T YP/CAL SECT ION NOT TO SCALE EOGE OE PAVEMENTS CURB T AF'ER OET A/L NOT TO SCALE Concrete to be Class A3 If cost In place, 4000 P'Sl If recost CG-11 (Radius to be as Street approoc/h soma surroOlr7g os m(9in/lne shown on plans.) roadway -----------------C C cu�//ba COMB n on I I � I I I I � Expansion Joint A- i C� Note: Width "B" 2'-O' or as Malnllne roadway 2" ri C/ass A3 �'�Is • . p, ti, �' — — — — — 6,. Concret Expans/on Joint SECTION C-C shown on typlcal section. PLAN VIEW NOTES: When SYd. CG-/1 Is used for entrances built In conjunction with VOOT projects,,o/ease Eace or Curb Gutter Ilne or note the f•oI/owing: Curb Slde Street /_ Malnllne paVement shall be constructed Gutter line to the f?/W /!ne <except any subgrade Maln line Roadway stabl/lzo lon required for maln/!ne _ ,00veMent which con be omitted In _ -- ------ ------- ------ the entrance..) 2. f?adla/ curb or combination curb and gutter shall not be constructed beyond the f?/W line except for replacement purposes. SECTION A- A 3. When used !n con junction with Stondard CG-3 or CG-7, the curb face on this Standard !s to be adjusted to match the mountable curb conrlguratlon. 4_ See Standard CG-I2 for Curb Ramp design to be used with this Standard. 5. Optional flowline may be used for entrances In cut secflons. 6. Optional I-lowllne may require warping or o portlon or gutter to preclude ponding or water. CONNECTION FOR STREET INTERSECTIONS SPECFICAnD" REFERDICE AND COMMERCIAL ENTRANCES ALL DIMENSIONS 203.04 ON THIS SHEET ARE INUNLESS OTHERWISE MILLIMETERS VIRGINIA DEPARTMENT OF TRANSPORTATION 502 CG-7 CURB OETA/L NOT TO SCALE CURB CUT DETAIL NOT TO SCALE 12" 3/8 INTERNATIONAL SYMBOL OF ACCESS _ (SEE NOTE 5) aQ BLUE BACKGROUND 11/4 HOLES LOCATED FOR METAL POST vlw ALIGN, WITH HOLE DRILLED ACE ON 1" CENTERS IN METAL POST. (MOUNT WITH 5/16X 21/4 BOLTS, AS REQUIRED Tow--ATMwAr DONE TOP AND BOTTOM OF SIGN.) - Z METAL POST �t N I � 1211 NOTES CONC. FOOTING I. METAL POST TO BE GALVAN/ZED. ALL BOLTS, NUTS, WASHERS, ANO SCREWS MUST BE RUSTPROOF. 2• CONCRETE FOR FOOTING SHALL BE OF= PORTLANO CEMENT ANO HAVE A M/N. COMPRESS/VE STRENGTH OF 3000 P.S./. 3. SIGNS WILL BE FROM SHEET ALUMINIUM 2MM IN THICKNESS 4. MESSAGE LETTERING SHALL BE UPPER CASE (WHITE SER/ES B.) 50MM HIGH S. THE SYMBOL /S COMPOSED OF TWO ELEMENTS. A WHITE WHEELCl-IA/f ` FIGURE (WHICH SHOULO ALWAYS FACE /c?/Gl-/T.)ON A SQUARE BACKGROUND, I/VTEf?NAT/ONAL BLUE COLOR (FED. STD. 595A, COLOR 1"/5/80.)_ 6. S/G/V POST SHALL HAVE MIN, 600MM CLEARANCE FROM BACK OF CURB_ SIGIV FOR THE `0 PHYSICALLY IHA/VOICAR)1=>EO NOT TO SCALE MC-3 ASPHALT CURB DETAIL NOT TO SCALE RIPFRAR OET AIL NOT TO SCALE LmIqlAill TRIAD ENGINEERING, INC. WINCHESTER VIRGINIA 0 o� �A E Z CD w o Q O U rn 00 No O CV O U O m w 0 O Z a) D C o 0 U (n T T a) (L C � U) a) V) o (� cn N p W -C U U z a Z z " a > Z w a 3 L1J " Z � 3 � W mar Z o F Z z z z_ C, w 0� o� =moo_ ' A U co m z � � N z w r-ow W J x U � WZ 3 m Q H I__L ilrgNVD LTH OF Gj'TA' # TON D19214 AL E PROFESSIONAL SEAL v Q J U) z Q O — F., CD w z LLJ O_ - 0 > zcn o X : O z=v U �ofU D — of ry O U p /~� I— L� �J 1 (n cr_ z a `L. O � U Drawing Number: C - 10 GENERAL. EROSION AND SEDIMENT CONTROL NOTES ES-1: Unless otherwise indicated, all vegetative and structural erosion and sediment control practices will be constructed and maintained according to minimum standards and specifications of the Virginia Erosion and Sediment Control Handbook and Virginia Regulations VR 625-02-00 Erosion and Sediment Control Regulations. ES-2: The plan approving authority must be notified one week prior to the pre -construction conference. one week prior to the commencement of land disturbing activity, and one week prior to the final inspection. ES-3: All erosion and sediment control measures are to be placed prior to or as the first step in clearing. ES-4: A copy of the approved erosion and sediment control plan shall be maintained on the site at all times. ES-5: Prior to commencing land disturbing activities in areas other than indicated on these plans (including, but not limited to. off -site borrow or waste areas). the contractor shall submit a supplementary erosion control plan to the owner for review and approval by the plan approving authority. ES-6: The contractor is responsible for installation of any additional erosion control measures necessary to prevent erosion sedimentation as determined by the plan approving authority. ES-7: Site grading is to drain to the silt fences or sediment trap at all times during land disturbing activities and during site development until final stabilization is achieved. ES-8: During dewatering operations, water shall be pumped into sediment traps. ES-9: The contractor shall inspect all erosion control measures daily. Any necessary repairs or cleanup to maintain the effectiveness of the erosion control device shall be made by the close of the day. The contractor shall be responsible for the ultimate removal of all temporary sediment control devices. CONSTRUCTION NOTES 1. The contractor will be responsible for applying for and obtaining any necessary disturbance permits which may be required by Frederick County prior to the start of clearing and grading activities. 2. The contractor shall stabilize all disturbed areas within 7 days after the area is brought to final grade. 3. Stabilization shall be by permanent seeding and mulching as follows: a. Scarify the top 1" to 2" of soil after final grades have been achieved. b. Add pulverized agricultural limestone at the rate of 2 tons per acre. c. Seed with the following mixture: Seed Type Rate Min. Purity Min Germ. Tall Fescue 60 Ib./ac. 97% 85% Red Clover 8 Ib./ac. 95% 65% Landing Clover 8 Ib./ac. 95% 65% Annual Ryegrass 12 Ib./ac. 98% 85% d. Small grain straw mulch shall be spread at the rate of 1.5 tons per acre. e. 10-10-10 fertilizer shall be spread at the rate of 1,000 lbs. per acre. STONE CONSTRUCTION ENTRANCE EXISTING GROUND 70' MIN. A FILTER CLOTHS 6" MIN-1 A SIDE ELEVATION 12'MIN.� 70' MIN. B-WASHRACK i I (OPTIONAL) LVDOT #1 COURSE AGGREGATE B I \ POSITIVE DRAINAGE TO SEDIMENT MUST EXTEND FULL WIDTH TRAPPING DEVICE OF INGRESS AND EGRESS OPERATION PLAN VIEW 11=II-11=1� ♦Ir_�!i,,1,r., i �,�t� �,��i Ilollcll_I1=1�.� r��. .,,��� _�/.y� 1�!i. t��. ��+.�► FILTER • SECTION A —A SECTION B—B EXISTING PAVEMENT .3' :1 ti 5 MOUNTABLE BERM (OPTIONAL) -77 10'MIN. _E O'MIN. EXISTING PAVEMENT T 10'MIN. L TEMPORARY SEDIMENT TRAP ORIGIONAL 1 1-VARIABL GROUND I ELEVATION �VARIABLEJ 67 CU. YD/ACRE ORIGIONAL (EXCAVATED) GROUND 4' MAX. ELEVATION CLASS I RIPRAP FILTER CLOTH COARSE AGGREGATE CROSS SECTION OF OUTLET CLASS I RI LENGTH (IN FEET)= 6 X DRAINAGE AREA ( IN AC-) DIVERSION DIKE / �OA SE AGGREGATES / FILTER CLOTH-�� EXCAVATED AREA *k COARSE AGGREGATE SHALL BE VDOT #3. #357 OR #5 OUTLET (PERSPECTIVE VIEW) CONSTRUCTION OF A SILT FENCE (WITHOUT WIRE SUPPORT) 1.SET THE STAKES. 2.EXCAVATE A 4"X4" TRENCH UPSLOPE ALONG THE LINE OF STAKES. 'MAX j FLOW / 3.STAPLE FILTER MATERIAL TO STAKES AND EXTEND IT INTO THE TRENCH. 4.BACKFILL AND COMPACT THE EXCAVATED SOIL. FL( .OW INSTAL )f PcrTTVC VTCW POINTS A SHOULD BE HIGHER THAN POINT B. DRAINAGEWAY INSTALLATION (FRONT ELEVATION) PIPE OUTLET CONDITIONS A A o 3do- - - - - - - - - a a do N -___---_PIPE OUTLET TO FLAT AREA WITH NO DEFINED CHANNEL PLAN VIEW La 0% SECTION A —A I d FILTER CLOTH KEY IN 6"-9": RECOMMENDED FOR ENTIRE PERIMETER A A _T 0 a a 3do (MIN.) - OUTLET TO WELL. INED CHANNEL SECTION A -A II d FILTER CLOTH KEY IN 6"-9": RECOMMENDED FOR ENTIRE PERIMETER NOTES: 1. APRON LINING MAY BE RIPRAP, GROUTED RIPRAP. GABION BASKET. OR CONCRETE. 2. La IS THE LENGTH OF THE RIPRAP APRON AS CALCULATED. 3. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER. BUT NOT LESS THAN 6 INCHES. LMM41AD TRIAD ENGINEERING, INC. Z U LiJ o c U rn CV cD O U o C o 00 p U 0 O F- O Z c 0 0 0 U D V) CU 0_ 0 0_ N Q s o o U U Z r ^� V Q z Z z L.J_ LK LK 3 g W "Z_j mo} W Z ~ZZ Z o Q Z z ��a o� Z v) w Z r z 0LJ 0 W NJaf w 0 _ vi U WZ 3 m a V, 0�&13H of G� TON a 0.O1 4 NAL E� PROFESSIONAL SEAL. Q V) Z 0 w 7 7 �— J- W _j Z O (n LLJ Z >_ I W I, '.W I Q 12- X Z Ld LLJ O z� O Y Z C)f U=0Of- o � o � Z O w of O a� U O L- Q L,J Drawing Number C-11