Loading...
HomeMy WebLinkAbout47-02 New Covenant Church - Stonewall - BackfileGENERAL NOTES VD0T GENERAL NOTES LEGEND VICINITY MAP a Z EXISTING INTERMEDIATE CONTOUR _ 332 4 8 1. Methods and materials used in the construction of the improvements herein shall conform to the current Vl. All work on this project shall conform to the latest editions of the Virginia Department of EXISTING INDEX CONTOUR � � -- 350 --- Ip County construction standards and specifications and/or current VDOT standards and specifications. Transportation (VDOT) Road and Bridge Specifications, and Standards, The Virginia Erosion 40 �, Al UJ and Sediment Control Regulations and any other state, federal, or local regulations PROPOSED CONTOUR a a �° '" 2. Measures to control erosion and siltation, including detention ponds serving as silt basins during construction, applicable. In the event of conflict between an of these standards, specifications or PP Y P EXISTING EDGE OF PAVEMENT _ -__ -_. EX E/P _ e Z must be provided prior to issuance of the site development permit. The approval of these plans in no way plans, the most stringent shall govern. PROP E/P relieves the developer or his agent of the responsibilities contained in the Virginia Erosion and Sediment PROPOSED EDGE OF PAVEMENT 3` Control Handbook. V2. All construction shall comply with the latest U.S. Department of Labor Occupational EXISTING CURB AND GUTTER - -- EX CtG -- - - ---= - - ---- -- 1° 11 3. A permit must be obtained from the Office of the Resident Engineer, Virginia Department of Transportation Safet & Health Administration and VOSH Rules & Regulations. Y g PROP C4G ° 'Z (VDOT) prior to construction in existing State right-of-way. PROPOSED CURB AND GUTTER " W C in 4. Approval of this plan does not guarantee issuance of an entrance permit by VDOT when such permit is V3. When working on VDOT right-of-way, all traffic control, whether permanent or temporary, shall be in accordance with the current edition of VDOT's work area protection manual. CG-6 TRANSITION FROM CG-6 TO CG-6R TRANS. CG-6R I I M 1, Z . 1 ,s ' ' '4 2 „a^' os > 01 00 1-4 It required under State law. Furthermore, all traffic control flaggers must be certified in accordance with VDOT's ' ' 10 a° Cat CO 5. The exact location of all guard rails will be determined by VDOT personnel. "A joint inspection will be held January, 1994 (or latest edition of) Road &Bridge Specifications, Section 104.04-C. EXISTING TELEPHONE LINE -- -- T -- --�-- ------ - -- T•� 3 4 2 1 17 +8 q '- � with the Developer, County Representatives, and Representatives of the Virginia Department of Transportation PROPOSED TELEPHONE LINE o (VDOT) to determine if and where guard rail and/of paved ditches will be needed. The developer will be V4. Design features relating to construction or to regulation, control and safety of traffic may EX. 15" RCP s x `�Cq '� responsible for providing guardrail and paved ditches as determined b this joint inspection." Refer to P P g g P Y j P Virginia Department of Transportation (VDOT) Guard Rail and Paved Ditch Specifications. be subject to change as deemed necessary by VDOT. EXISTING STORM SEWER 'I., : 15 RCP ,� ,�� _� �� W o �� � of 6. An set of and all applicable must be available at the construction site. Also, a V5. Prior to initiation of work, Contractor shall be responsible for acquiring all necessary VDOT PROPOSED STORM SEWER rW o ,0 approved plans permits land use permits for any work on VDOT right-of-way. EXISTING SANITARY SEWER -� - --� - -&3 °, ' o representative of the developer must be available at all times. V6. If by the local VDOT Residency Office, ° ,f a� d 7. Warning signs, markers, barricades or flagmen should be in accordance with the Manual on Uniform Traffic required t b f ti t c a preconsrucon conference muse PROPOSED SANITARY SEWER °2 w Control Devices (MUTCD). arranged and held by the engineer and/or developer with the attendance of the EXISTING ELECTRIC SERVICE ----�------- -� °, 17 2 8. All unsuitable material shall be removed from the construction limits of the roadway before placing embankment. contractor, various County agencies, utility companies and VDOT prior to initiation of work. V7. Contractor shall notify the local VDOT Residency Office when work is to begin or cease for PROPOSED ELECTRIC SERVICE �� .�� ry- , °7 •�. 15A2 \ a (5, o any undetermined length of time. VDOT will also require 48 hours notice for any EXISTING GAS LINE - ---- -- --- - -- "° + 12�3 19 �' 0 9. All pavement sections on the approved plans are based on a minimum CBR value of 6. CBR values less ti� �� 4)> than 6 will require revised pavement section prepared by Greenway Engineering and approved by the owner. inspection. PROPOSED GAS LINE ti° Z� -. '=- "° w ao 10. All roadside ditches at grades of more than 5% shall be paved with cement concrete to the limits indicated V8. The Contractor will be responsible for maintaining adequate access to the project from the '2 4' " d 2 ��' , � 1 � w on the plans and as required at the field inspection. adjacent public roadway through construction and maintenance of a construction entrance PROPERTY LINE S, �} Y 0 b $j 52C +S,"� in accordance with the Virginia Erosion & Sediment Control Handbook, Sec 3.02. �t. �� �, ka FLOW LINE n . Po=. ..ate 42 4� °� ry ,s, 11. All springs shall be capped and piped to the nearest storm sewer manholes or curb inlet. The pipe shall Furthermore, access to other properties affected by this project shall be maintained 41 e be minimum 6" diameter and conform to VDOT standard SB-1. through construction. EXISTING FENCELINE - - - - - - ^- -rt-- - --- .° 4a 3 ,21 a , ,52 12. Construc-tion debris shall be containerized in accordance with the Virginia Litter Control Act; no less than EXISTING POWER POLE 7 3a a 21 a� , 4U one litter receptacle shall be provided at the construction site. V9. Contractor shall ensure adequate drainage is achieved and maintained on the site during GAIN T 23 L+N and at the end of construction. EXISTING TELEPHONE POLE STONEWALL CT uNE u •✓ ,, 13. The contractor shall provide adequate means of cleaning mud from trucks and/or other equipment prior to entering public streets, and it is the contractors responsibility to clean streets, allay dust, and to take V10. All water and sewer lines within existing or proposed VDOT right-of-way are to have EXISTING WATERLINE W/ TEE whatever measures are necessary to insure that the streets are maintained in a clean, mud and dust free minimum 36" cover and, when possible, to be installed under roadway drainage facilities. PROPOSED WATERLINE W/ TEE y !Ti w SCALE 1 = 2000 ' zo condition at all times. 14. • Notification shall be given to the appropriate utility company prior to construction of water and/or sanitary VI 1. Any unusual subsurface conditions encountered during the course of construction shall be EXISTING FIRE HYDRANT sewer lines. Information should also be obtained from the appropriate authority concerning permits, cut immediately brought to the attention of the engineer and VDOT. Work shall cease in that PROJECT INFORMATION i LJ sheets, and connections to existing lines. vicinity until an adequate design can be determined by the engineer and approved by VDOT. EXISTING WATER VALVE--w�-� 15. All sanitary sewers and water mains and appurtenances shall be constructed in accordance with the current VI 2. All undercut areas and borrow material shall be inspected and approved by VDOT Inspector PROPOSED WATER METER m PARCEL IDENTIFICATION NO. TAX MAP 43 ((A)) 86 F.A.R. CALCULATIONS: standards and specifications of Frederick County and/or the Frederick County Sanitation Authority. prior to placement of fill. EXISTING REDUCER v - - -r STREET ADDRESS: MIRACLE WAY (PRIVATE ROAD) PERMITTED: WINCNESTER, VA 11603 1.0 TOTAL 16. The location of existing utilities shown in these plans are taken from existing records. It shall be the PROPOSED REDUCER- - contractors responsibility to verify the exact horizontal and vertical location of all existing utilities as needed V13. All roadway fill, base, subsurface material and backfill of utility/storm sewer trenches shall TOTAL AREA: 22.414 ACRES PROVIDED: prior to construction. The contractor shall inform the engineer of any conflicts arising from his existing be compacted in 6" lifts to 95% of theoretical maximum density as determined b P Y Y STOP SIGN PROJECT AREA: 22.414 ACRES 0.17 AC. BLDG./22.414 AC. = 0.008 utility verification and the prope3ed construction. AASHTO T-99 Method A, within plus or minus 2% of optimum moisture for the full width HANDICAP RAMP (CG-12) �� r �i DISTURBED AREA: 2.92 ACRES GROSS FLOOR AREA of any dedicated street right-of-way. At the direction of VDOT Inspector density tests DENOTES LOCATION OF STD VDOT CURRENT ZONING: RA 17. The developer will be responsible for any damage to the existing streets and utilities which occurs as a performed by a qualified independent agency shall be conducted as required in the VDOT CG-12 AND/OR JURISDICTIONAL CURRENT USE: VACANT 71200 SF result of his construction project within or contiguous to the existing right-of-way. Road and Bridge Specifications. A copy of all tests shall be submitted to VDOT prior to STANDARD RAMP CONSTRUCTION PROPOSED ZONING: N/A SIGNS: ANY PROPOSED SIGN SHALL REQUIRED 18. When grading is proposed within easements of utilities, letters of permission from all involved companies final VDOT approval. PARKING INDICATOR INDICATES THE NUMBER OF TYPICAL PARKING SPACES 12 PROPOSED USE: CHURCHLLJ SEPARATE PERMIT must be provided to Frederick County prior to issuance of grading and/or site development permits. VI 4. VDOT Standard CD and UD underdrains shall be installed where indicated on these plans TEST PIT LOCATION � BUILDING SETBACKS: r� REQUIRED + ROVIpEp OUTDOOR LIGHTNING: IAPPLICANT DECIDED TO IF Q Q and further where determined necessary by VDOT Inspector. I 19, The developer will be responsible for the relocation of any utilities which is required as a result of his ! FRONT (INGRESS/ EGRESS): 60, 446' ADD PARKING LIGHTS, ALL LIGHTNING SHALL BE project. The relocation should be ('.one prior to construction. V15. The installation of any entrances and mailboxes within any dedicated street right-of-way EANDICAP PARKING I SIDE (RESIDENTAIL): 50' t58' DOWNCAST OR SHIELDED TO PREVENT GLARE ON ADJOINING PROPERTIES AND RIGHT-OF-WAY shall meet VDOT minimum design standards and is the developer's responsibility. �..- REAR FROM (I-81): 60 20. These plans identify the location of all known gravesites. Gravesites shown on this plan will be protected REAR (RESIDENTIAL): 50' 6417, in accordance with state law. In the event gravesites are discovered during construction, the owner and V16. If required by the local VDOT Residency Office, copies of all invoices for materials within VEHICLES PER DAY COUNT 100 OUTDOOR STORAGE: NONE PROPOSED engineer must be -notified immediately. any dedicated street right-of-way must be provided to the VDOT Inspector prior to r. L =��r'OSED BUILDING ENTRANCE �"'"" 21. The contractor is to verify field conditions prior to and during construction and notify Greenway Engineering acceptance of work. Unit and total prices may be obscured.HI PARKING SETBACKS: FRONT: 5' ;`21' BUILDING HEIGHT at (540) 662-4185 immediately of any discrepancies between actual field conditions and the approved plan. V17. Prior to acceptance by VDOT of any streets, any required street signage and/or pavement EXISTING STREET LIGHT �. -< 1- SIDE: 5' 113' 280' � r-'� MAXIMUM = 35' 22. Controlled fills shall be compacted to 95% of maximum density as determined by method "A" per standard markings must be installed by the developer or, at VDOT's discretion, by VDOT on an REAR: 5 y :4 PROP. HEIGHT = 18' proctor AASHTO-T99, ASTM-D698, or VTM-1 as applicable. Density shall be certified by a registered account receivable basis. PROPOSED STREET NAME SIGN LANDSCAPE CALCULATIONS professional engineer and results submitted to Frederick County prior to pavement construction. If a geotechnical report has been prepared, it should supersede the requirements in this note. V18. Final location of CG-12 Curb Ramps shall be determined by VDOT Inspector. � ROPOSED SANITARY LATERAL CLEANOUT PARKING CALCULATIONS 23. Contractors shall notify operators who maintain underground utility lines in the area of excavating SANITARY MANHOLE IDENTIFIER C REQUIRED: N/A QUIR ED: REQUIRED: proposed PROVIDED: N/A CHURCH: 1 E SEATS or blasting at least two (2) working days, but not more than ten (10) working days, prior to commencement 218/3 5F=73 SPACES of excavation or demolition. Names and telephone numbers of the and operators underground utility lines in Frederick County below. These be to STORM DRAIN STRUCTURE IDENTIFIER 12 INTERIOR REQUIRED: INTERIOR PROVIDED: appear numbers shall also used serve in an emergency condition. PROVIDED: NONE REQUIRED NONE PROVIDED 98 SPACES UTILITY CONTACTS FIRE MARSHALL 'S N DTE EASEMENT LINE - - - - - - - - GREEN AREA = N/A HANDICAP SREQUIRED: 0 CENTERLINE - PACES PER ADA = I SPACE/25 = E- U) Water/Sewer: Frederick County Health Department Power: Allegheny Power Y Fire lane markings and signage: EXISTING SPOT ELEVATION 12.1..% PERIMETER REQUIRED: NONE REQUIRED PERIMETER PROVIDED: NONE HANDICAP SPACES PROVIDED: Q � 107 N. Kent Street P.O. Box 1458 +, ,> PROPOSED SPOT ELEVATION 5 X 12 REQUIRED 6 SPACES +-+ Winchester, VA. 22604 Hagerstown, MD 21741 Any No Parking signs and yellow painted curb locations will be installed EXISTING TREE DRIP LINE E-+ (540) 722-3480 1-800-654-3317 by field inspection at the direction of the Fire Marshall's Office. Phone: Bell -Atlantic` Gas: Shenandoah Gas Co. EXISTING TREE 1 15" OAK P 15" PINE LOADING SPACES REQUIRED: N/A x co W E-+ E, Z P.O. Box 17398 Box a 0 MD 21297 WinP.O Baltimore, Winchester, VA 22604 r, V APPR0 VAL DLOCK o F O (301) 954-6282 (540) 869-1111 - - - MISS UTILITY 1 800 257 7777 PROPOSED TREE �, OAK PINE �� r y�.p � 2 LOADING SPACES PROVIDED: W Z O U � x APPROVED BY THE ZONING ADMINISTRATOR. SITE PLAN SHALL BE VALID FOR � PERIOD OF FIVE (5) YEARS FROM DATE OF APPROVAL. TONG N(KI hNKUSUIUTA906 '` 1`ial. 026715 N/A U > 0 O w FCSA CONSTRUCTION NOTES I J ANAL SA w Q 1. Water and sewer lines are to be constructed in accordance with these plans. The lines shall additionally meet all C G"�'' �j /7 / O requirements of the Frederick County Sanitation Authority. J FTI SIGNATURE DATE 2. The contractor shall coordinate with, and arrange for inspection by, the Authority. 3. Exact locations of water and sewer services on new lines are to be coordinated with the Authority's inspector. W TRIP GENERA TION DATA FREDERICK COUNTY COVER SHEET 4. T'ie Sanitation Authority's maintenance department is responsible for the installation of water meters through 2" in size. Before a permanent meter is set, they require; 1) the frame and cover to be roperly aligned with its meter box bar; �T Olp O ��� Z and yoke 2) the frame and cover to be set to the final grade of the lot; 3� the ditance between the top of CLASS USE GROSS SF TRIP RATE/1000GFA TOTAL VPD the cover and yoke bar be between 18 and 21 inches; and 4) all components of the meter box assembly to be in proper working order. IT IS THE DEVELOPER'S/CONTRACTOR'S RESPONSIBILITY TO HAVE THE METER BOX ASSEMBLY r +J Project Nave: Project Nur�ber: 5. INSTALLED CORRECTLY. For that to lines: 560 CHURCH 7,200 13.13 95 TUNG ADHIKUSUMA No. 026715 O j� I x I I V E Y V I l I I 1 COVENANT C i� V R C T-T 2 9 � 6 N water and sewer services connect existing a. The location of the service lateral is to be coordinated with the Autority's engineering An ITE 6th Ed �53 1l 0 assistant. application �~ Magisterial District: Date of Plan: (Month, Day, Year) for service must be made and fees paid before work will begin. Trip Ger eration SIGNAL b. The Autority shall furnish and install all 5/8", 3/4", and 1" water services. Vol. 2 o 3 C. For 1 1/2" and 2" water services, the Authority shall make the tap and bring the piping to the property line. STON ENA L L DISTRICT OCT OB ER 2002 The contractor is to furnish and install the meter vault assembly. The Authority shall install the meter. 6. When an existing water main is tapped for the installation of a new line: a. The Autority shall furnish all labor and materials to make the tap. PROFESSIONAL SEAL &SIGNATURE Owner: Address, Including Zip Code & Telephone No. g p p SHEET INDEX '�. The developer/contractor must: (1) make application for the tap, (2) pay deposit (before work begins); (3) mark the location of the tap; (4) make final when the is NEN COVENANT CHURCH 432 SHADOW BROOK LANE WINCNESTER, VA 22�001 payment work completed. THESE PLANS ARE IN CONFORMANCE WITH (540) 888-4271 DATE: OCTOBER 2002 7. The contractor shall tie-in a new line to an existingmanhole b core drilling the manhole. Y g FREDERICK COUNTY STANDARDS AND 1 COVER SHEET Developer: Address, Including Zip Code Telephone No. ORDINANCES. ANY DEVIATION OR CHANGE 432 SHADOW BROOK LANE DESIGNED BY: DF 8. An water service line must have a double check valve or RPZ backflow y prevention assembly, as required, installed. 2 SITE PLAN 3 EROSION 4 SEDIMENT CONTROL PLAN IN THESE PLANS SHALL BE APPROVED BY N E N COVENANT CHURCH WINCH ESTER, VA 22601 CHECKED BY: NMA The assembly shall meet ASSE standard NO. 1015 or 1013. A remote readout is required. THE ZONING ADMINISTRATOR PRIOR TO (540) 888-4271 4 STORM DRAINAGE ANALYSIS PLAN CONSTRUCTION. Engineer Certifying Plan: Address, Including Zip Code & Telephone No, 9. All fire lines shall have a detector double check valve backflow prevention assembly or a RPZ backflow prevention STORM COMPS, E*S NARRATIVE, OVERALL DRAINAGE DIVIDES assembly as required. The assembly shall meet ASSE standard NO. 1048 or 1047. A remote readout is required. 5 DETAILS 151 WINDY HILL LANE JOB NO.2916W GREENNAY ENGINEERING WINCNESTER, VA 22602 (540) 662-4185 SHEET 1 OF 5 .. J, ±G(y IN NN LLI T/4'-1 0 0 22.4140 ACIR53 0 IC TA 5 §116 PROP. SEPT 01) co 1. VP LLJ C\2 01) BUILDING INSPECTION NOTES: LO BUILDINGS SHALL COMPLY WITH THE VIR61NIA CO UNIFORM STATEWIDE BUILDING CODE AND SECTION, SUBMIT UNDER SEPARATE LAICEv CO �A NATIONAL 503 &ROUP A (A55EMBLY) OF THE E30C Q0 LIMI OF CLEARING 4 GRADING _ki \BUILDING GODE/Icic'16. OTHER CODE THAT APPLIES IS cq tao CD Lo IN, (:�ABO All -c12 AGGE551BLE AND USABLE BUILDIN65 I cri Q- ,; , ` / \ ANb FACILITIES. STRUCTURAL PLANS SUBMITTED FOP, c\j PERMIT APPLICATION SHALL BE SEALED BY A VIR61NIA Z x Lo N 60 M-1 LIGENS�' DESIGN PR0FE55I0NAL., 0 (_d THE RAMP SHALL BE REQUIRED IF ADA ACCESSIBLE LJJ .5 0 a) 0 15 EXCEEDIN65% SLOPE. SEE DETAILS ON SHEET 5. C.) cr. Q) x A m THE APPLICANT StiALL PROVIDE SPECIAL INSPECTION CD 0 '5 Q) <4 24 FOR TYPE OFSTRUGTURE (5OIL5, CONCRETE, ETC.) " AS DESCRIBED IN CHAPTER 1-1 OF BOLA. O M PRO WATER /Z V4EL LOCATI PROPOSED ELECjRIGALVTILITY CONNECTION WILL BE LOCATED UNDER(5k, UND. 0 0 2 vs) I N RE 5/EGR SDOT- -4" YELLZX-L PAVEMENT MARKING EAS MENT _q (THEPr-10-PLA5TIC'CR-A-PP-�RO�ED EQUAL) TYP. "I, 'z X 10 4 30 q2- 912- EP T*Ruc'K P4 PAR ,;I NG 40 I Ito z 30 �ts. 10 0 l "6 `sue _. ' �i2 ;. % a� ` ;s^« iT, U) Y T C4, RUCK EX, PP .2 .20, PARKINiG �TO REMAIN 5, 5 It AS ".SAD �O p� . • ,�` F W P 44R EP A- -9, `�`� ..66 to 2 00 Ci v- PAVEMENT FLUSH• "N H 25" 10, MIN q�� A5 j -0 • 1__v 251 Ly N q0 Iw W WITH CONCRETE S/ RIP RA SIN I u 'e,' I .1 <2 .4.61k A, -OPOSED- DQUBLE� P 0�6 W11 PR A k y SIGN �we'- SIPS . i *SEAL-- PARKING. LOT DEST91AN�5�4LK.- HHEP 1' - x7 9 RO RG t EP k all bK Op ................. E 694 IN JQ TO REMAIN G 667 2 F= SiRASS • PROPOSED M1141.,MUrl" 6" AGGREGATES V41TH PRIME ANt� DOUBLE SEALS ISLAND .24'. 101 MI RIP p O 7,5-A (00 6 92• FROM STA.0+00 TO /o+25 MIRACLE TUNG W MA Takry 2 xq . I su 4 No 026715 80 z N% . . . I - . ' PROPOSED MINIMU!6" AGGREGATES ts EP ­70 11/03 NN WITH PRIME AND DPUBLE SEALS 2%. 5LOF�f 0 AC 4FZ� t�AX ad 12 -S, FOP, CHURCH 0 PARKING AS SHOWN WG'PARKtNG -AREA - P RKING Y E30 '00 op 0 l TR 94- PROP. ELECTRIC TO BE -PA ING NOTE. THEf-i4URCH V41LL-'RROVIDE SHUTTL4 SERVICE T(> LOCATED UNDERGROUND -­�V,11THOUT TRAILER) TW(fFIC 5R 94 P, /2 A, 51NIMIZE THE TRUCk --FROM ENTERING THE r"t ANGLE V4AY, EP. . . . . ....... . 00 90 x VDOT-4" WHITE PAVEMENT MARKING 4; BOARD PRESSURE D (0 694 3'X6'X4' HT. BOARD N TREATED TE VDOT-4" YELL -ON PAVEMENT MARKING 80 (THERMO-PLASTIC OR APPROVED EQUAL) TYP. \WOOD TRASH ENCLOSURE EP -PL OR APPROVED EQUAL) TYP. CLH ZMO d) (OPAQUE) mr ME sail mm am Em am ON 17 �' Lo C) G =PAVED ISLAND LIMITS OF CLJ5RING ADIN t G� Cc 50 BR L E.. y z WZ E- E, U) �D v 0 C) 76 005'03 c1q E 13. 73' I'lip F E F F L4 uJ E�f i L EXIST. BLDG. _j L_ J L_ -A I I O �Tl _Z9 z Q4 cl 0 0) uj J t�s I I I I t l ,rI:� I ! I z 03 jj Uj U) (a) Uj Tj jt W DATE: OCTOBER 2002 Q6 0_1 SCALE: 1" = 30' 30 15 0 30 60 PROP( WITH DESIGNED BY. DF SCALE: 1 = 50' `�i _ # FILE NO. 2916W SHEET 2 OF EROSION/SED I M ENT CONTROL LEGEND NO. KEY SYMBOL DESCRIPTION 3.02 CE mm TEMPORARY GRAVEL CONSTRUCTION ENTRANCE 3.05 X X X SILT FENCE 3.07 IP STORM DRAIN INLET PROTECTION 3.06 CIP CULVERT INLET PROTECTION 3.0q DD D TEMPORARY DIVERSION DIKE F t' p tI I P F 1 07' #3 IF 6T 3.0000 AC. CURVE RADIUS ARG LENGTH CHORD LENGTH CHORD BEARING GI 5829.58' 836.16 836.04' 5 3,8°1341" W 02 200.00' 88.56 81.84' N 48°0636" W C3 300.00' 245.46' 238.61' N 3-1°21'20" W lk �\ t x ti I \r LINE BEARING 015TANCE LI N 35°2526" W 133.5q' L2 N 60041'44" W 153.50' L3 N 13°5451" W ?1.00' L4 N 1600503" E 25.00, L5 N 13°541511 W 250.00' L6 N 16°05'03" E 60.00, L1 513°54 250.00' 3.10 F TEMPORARY FILL DIVERSION 3.11 W I''1 TEMPORARY RIGHT OF WAY DIVERSI N , / \ / i'' \ ` 1` `�7 AC. \ ° 3.12 DV DIVERSION 3.13 TEMPORARY SEDIMENT TRAP 3.18 OP OUTLET PROTECTION "� `\ 3.20 CD --` ---, --- ROCK CHECK DAMS 3.33 O --�-- SODDING 3.35 T O O TREE PROTECTION �� LC LIMITS OF CLEARING GRADING \� `l/'' �, \ �,! '+I,-. ti 74" a�' y �,2Gv. DRAINAGE DIVIDES CRITICAL 5LOPE - CRITICAL SLOPE TO BE SEEDED MULCHED AND TACKED `� / ��� .�� r P' ,--'` WITHIN 14 DAYS AFTER START OF GRADING OR SODDED AND PEGGEDWITHI / -� 14 DAYS AFTER START Ile f .. ..-"• ,mod'- "a7'..'r"": ' -s' >.•f `P A) � A. OF GLErAR(N� t / - ,.......... .... �� LCG Lit / i \ a ■ 3q-EVER{vRZI^N SHRUBS r o ( 1 lit I�y. 3�,',��##rGH iYP '`�' ~- ^ , RED MAPLE OR�h,4 ACUN 3 UGH BERM.`A \, ! f I \ \ f 1 { ! i" I I / f! { a. ' • ,: �. Tr M TJ 7, , ■ ■ I \. LCG. `1 1 J I LCG �!! ,� ■ _�: ■_ t µ If 4 / RED/�PLE ■'r 1 j` .. �_ _� _ —' 1 `' �y CE �, i � I -�°. �' -` �'' � )! j1 � � �/ ; % f, fi -� 1` ({II..I ■ ■ � � � ij � � �(...�, ■ t ^ \ � ,.� ��"�> _--,"-- ,}'1 /WASH RACK � � _ t j <n // ! J ��(� 1 /�. ` . ■ .\ oP 667 j t , _ W/STONE 2 :;� �t ''`COMB. 4-EVER�REEN SHRUBS t. } _ i ✓ Y i� j! i { i I I 1 y RED MAPLE Mffil.`3 HIGH 7YP. OR MINIMUM 3 HIGH BERM. f P' \� r, •� `F ; � 1 � LCG, I ,'. MAPLE / j - s - 7� °a OR MIN MUM 3' HIGHRBERM IN. 3 HIGH TYP. 6 w.C� ' f ^ ,�°. \ - LI";ETS C "a s�.'lPiC� I G ADING �° / f I 1 + 76 " f03't 13 qq. 73 ` � ,-_ -•,�,• _,,---•—--.�-�.�--'•,r v--,,� �f --1...,, � ■ ..--'_ .� r " i 3t \ iu Cii i�i 3� (s, y Li r to t Cu t -4 I I cu rU ►v s ra - 1 i < <`s , U I w �a I W I 1 t All NOTE: A LAND DISTURBANCE PERMIT MUST BE OBTAINED FROM THE DEPARTMENT OF PUBLIC NORKS PRIOR TO COMMENCING SITE GRADING WORK. ADDITIONALLY, A PRE —CONSTRUCTION MEETING SHALL BE HELD WITH FREDERICK COUNTY PUBLIC WORKS PRIOR TO INITIATING ANY SITE WORK. 'I! I � � j•, THIS SPEET FOR PHASEI 11 EROSION AND SEDIMENT CONTROL ONLY! 50 25 0 50 100 mmommummmall SGALE: 1" = 50' uj W Z Z WCQ 0 c 0 co cv cv co •�C=> CD to Z x I "t toCQ Lu W Go '� a ^ U tj 0� 0 CQ)f3 w U) pi 0 H w T °F� TUNGSUMA No. 026715 kkL () I'>I U H 46 �a Z �E-4 O a � LLJ Z > I-�H a� wQ U zQ4 w O w z DATE: OCTOBER 2002 SCALE: 1" = 50' DESIGNED BY: DF FILE NO. 2916W SHEET 3 OF 5 5 EROSION AND SEDIMENT CONTROL NARRATIVE: I Z 200 0 200 400 SCALE: 1 " = 200' pn�r-r POST -DEVELOPED DRAINAGE DIVIDES MAP It POINT e OF 5tU D 1T � FFORDRAINAGE,,-AN,LYE .� ''� +'ter �� f I✓ 1 1✓ +. _-IEA I _AREA-_8.65 Ac. Tc-� I7 x � _� _ �..< •swam.✓~ -^ tj s 1 ' ip .ram i 4 W �'' 200 0 200 400 1' POST -DEVELOPED SCALE: 1° = 200' DRAINAGE DIVIDES MAP Zi NEW COVENANT CHURCH STORM DRAINAGE ANALYSIS NARRATIVE STORM DRAINAGE CALCULATION IS USING FREDERICK COUNTY'S CRITERIA FOR REGULATING THE PEAK FLONS OF POST -DEVELOPED CONDITIONS FOR BOTH TNO- AND TEN-YEAR STORMS AND TO NOT EXCEED THE PRE -DEVELOPED PEAK FLONS. THE RATIONAL METHOD WAS USED IN DETERMINING THE PRE - AND POST -DEVELOPED RUNOFF RATES. HYDRAFLON 2002 PROGRAM WAS USED FOR ANALYZING THE STORM PEAK DISCHARGE AND CULVERT ROUTING. RAINFALL HYDROGRAPHS HERE COMPUTED USING FREDERICK COUNTY'S RAINFALL DURATION. THE POST -DEVELOPI" LENT CONDITIONS WERE TAKEN FROM THE PROPOSED BUILDING AND PARKING LAYOUT AS SHONN ON THE SITE PLAN. THE VIRGINIA EROSION AND SEDIMENT CONTROL HAND BOOK AND VIRGINIA DRAINAGE MANUAL HERE USED FOR DETERMINING THE COEFFICIENTS OF RUNOFF FOR BOTH PRE -DEVELOPED AND POST -DEVELOPED CONDITIONS. THE TIME OF CONCENTRATION WAS DETERMINED USING THE TR-55 FOR PRE -DEVELOPMENT OF SUB AREA A AND B. TN I S STORM DRAINAGE ANALYSIS 15 PROVIDED TO SHON THE TOTAL PEAK DISCHARGE AT THE POINT OF STUDY (PRIOR TO THE EXISTING TRIPLE BOX CULVERTS UNDER INTERSTATE 81. SEE THE OVERALL DRAINAGE DIVIDES PLAN) FOR BOTH PRE- AND POST -DEVELOPMENT. IN CONCLUSION: THE TOTAL POST -DEVELOPED PEAK DISCHARGE FOR SUB AREA A1, A2 AND B ARE CLOSE, EQUAL OR LESS COMPARED TO THE TOTAL PRE -DEVELOPMENT PEAK D1A$G14A&GHRckSEE COMPUTATION AND SUMMARY BOOKLET) . SMRK IYI{AIAAGF ANALYSIS AND SUMMARY -- Sub Area A & B �Total onsite and offsite_existin Residential Area at Existi Tri le Box Culverts under I-81 � PRE -DEVELOP ,-Sub Area�A.�� Storm -��` Area�ac) TW _�C--value Tc (mii- In_tensiV t 2 Year I lb.gl �0.33 25 m-i 2.36 10 Year ! 16.91 0.33 25 I 3.41 100 Year16.91 0.33 25 1 5.02 ! G? (cfsL_� 13.18 19.03 ; _ :28.00 - -Storm- 2 Year Area (ac) -� 8.90 - C-value - 0.34-- Tc (min) 20 - Intensity__ 2.71 �GJ (cfs)_ - 8.21� 1 10 Year I 8.90 0.34 20 3.88 11.73 i 100 Year _ S.gO 0.34 20 5.76 17.44 POST -DEVELOPED { Sub Area Al _ _.TArea (ac� Cyvalue Tc (min) _Storm �- _ 2 Year �� 8,32 _ _ _ 0.35 15 10 Year I 8.32 0.35 15 4.51 13.12 I 100 Year-1-8.32 0.35 15 6.67 i i 19.43 j Sub Area A2 Storm_ Area C-vale Tc (min) - Intensity Q cfs �2 Year _(ac) 8.84 0.35 _-^15 �� 1 3.21 _ t 9A2 _I i 10 Year i 8.84 0.35 ; 15 4.50 13.93 I 100 Year j 8.84 0.35 15 6.67 Sub Area B Storm _ � F-Area (ac) C-value Tc (min Int_ensi!y � -�20 - � 2 Yecr 8.65 0.35 I 2.71 8.21 I 10 Year L 100 Year 8.65 II 8.65 0.35 i 0.35 I 20 _ 20 3.88 5.76 11.73 j 17.45 t Summary: Comparison Pre Develop and Post Developed for Sub Area B ---Pre Develop Peak + Sub Area B Post Developed Peak Sub Area Storm Q (cfs) _B Q cfs) 2 Year _ _ 8.21 8.21 I� 10 Year 11.73 11.73 100 Year L _ 17,44 Comparison Pre Develop Sub Area A 4 B ax1 Post Developed Sub Area Al, A2 4 B Develop Peal -�'-- -To tal Post Developed __.I Sub Area A 4 B Peak Sub_Area Al, A2 4 5 Storm [____2 Year _1g.34 �j 18.62 1 10 Year 27.83 25.97 1 L loo Year _ 41.06 _ 41.40 cc PROJECT DESCRIPTION Uj r r R THE -IT- IS 1_ 1-r I►1 FIRE \'I '✓ /`/111►1Tv THIS PROPERTY t5 LOCATED OFF FAIR SANE, ><TE 66�. t He �t t c t� v1t t Htry rrc>=�crctw�tv t t j � j AND CONSISTS OF 22.4140 ACRES, OF THIS ONLY 2.805 ACRES WILL BE DISTURBED FOR W CONSTRUCTION FOR A CHURCH 4 PARKING LOT. Z EXISTING SITE CONDITIONS THE PORTION OF THE SITE WHICH WILL BE DISTURBED CONSISTS OF DENSE GRASSES AND CURRENTY HAS NO STORM HATER MANGAGEMENT. W ADJACENT PROPERTY ADJACENT PROPERTIES ARE ZONED RESIDENTIAL WITW EITHER ESTABLISHED USES OR RESIDENTIAL USES. THE PROPERTY TO THE SOUTH IS OWNED BY THE VIRGINIA DEPARTMENT OF TRANSPORTATION, NNICH CONTAINS A PORTION OF INTERSTATE 81. EROSION AND SEDIMENT CONTROL MEASURES Z UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT W CONTROL MEASURES SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO THE MINIMUM W STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. STRUCTURAL MEASURES 0 PHASE I: A CONSTRUCTION ENTRANCE WITH NASH RACK (3.02) SHALL BE PROVIDED TO THE PROJECT AT THE PROPOSED ENTRANCE TO MINIMIZE MUD CARRIED ONTO THE ROAD. THE CONSTRUCTION ENTRANCE AND WASH RACK SHALL REMAIN THROUGHOUT ALL PHASES OF CONSTRUCTION. A FORTY FOOT SECTION OF FIFTEEN INCH RCP STORM PIPE WILL BE INSTALLED IN THE NATURAL DRAINAGE SHALE AND PROTECTED WITH CIP MEASURES TO ENSURE CLEAN WATER IS DISCHARGED. A FIFTY FOOT SECTION OF FIFTEEN INCH RCP STORM PIPE HILL BE INSTALLED IN THE DRAINAGE DITCH ADJACENT TO THE EXISTING GRAVEL ROAD AND PROTECTED WITH GIP MEASURES TO ENSURE CLEAN WATER 15 DISCHARGED. SILT FENCE HILL BE INSTALLED AROUND THE PERIMETER OF THE DISTURBED GROUND ALONG THE DONN SLOPE SIDES OF THE SITE. TEMPORARY SEEDING (3.31) AND/OR PERMANENT SEEDING (3.32) SHALL BE PLACED ON ALL CRITICAL SLOPES (3:1 OR GREATER) AND AS NEEDED TO STABILIZE, DISTURBED AREAS. PHASE 11: ALL CONTROLS INSTALLED IN PHASE I TO REMAIN FOR THE DURATION OF THE PROJECT. CULVERT INLET PROTECTION DEVICES (3.08) INSTALLED IN PHASE I SHALL BE MAINTAINED TO PREVENT SEDIMENT FROM ENTERING, ACCUMULATING IN AND BEING TRANSFERRED BY THE PIPES. TEMPORARY SEEDING (3.31) AND/OR PERMANENT SEEDING (3.32) SHALL BE PLACED ON ALL CRITICAL SLOPES (3:1 OR GREATER) AND AS NEEDED TO STABILIZE DISTURBED AREAS. VEGETATIVE MEASURES PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN (7) DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN (7) DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT HILL REMAIN DORMANT FOR LONGER THAN FOURTEEN (14) DAYS. PERMANENT SOIL STABILIZATION SHALL BE APPLIED TO ALL AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN SIX (6) MONTHS. TOPSOIL THAT HAS BEEN STOCKPII ED SHALL BE SURROUNDED NITN SILT FENCE AND PROTECTED BY MULCH AND/OR TEMPORARY VEGETATION IMMEDIATELY AFTER GRADING. ALL EARTH BERMS, DIVERSIONS ANO SEDIMENT TRAP EMBANKMENTS ARE TO BE MACHINE -COMPACTED, SEEDED AND MULCHED (HAY MULCH OR STRAN) FOR TEMPORARY AND/OR PERMANENT VEGETATIVE COVER WITHIN FIVE (5) DAYS AFTER GRADING. MANAGEMENT STRATEGIES CONSTRUCTION SHALL BE SEQUENCED SUCH TWAT GRADING OPERATIONS WILL BEGIN AND END AS QUICKLY AS POSSIBLE. THE SITE SUPERINTENDENT SHALL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL MEASURES. MAINTENANCE OF THESE MEASURES THROUGHOUT THE PROJECT ARE CRITICAL TO THE EFFECTIVENESS OF THE PROGRAM. AFTER AREAS ABOVE CONTROLS HAVE BEEN STABILIZED, THE CONTROLS SHALL BE CLEANED UP AND REMOVED. ELECTRIC POWER, TELEPHONE, STORM, SANITARY, WATER $ GAS SUPPLY TRENCHES ARE TO BE COMPACTED, SEEDED AND MULCHED WITHIN FIVE (5) DAYS AFTER BACKFILLING. NO MORE THAN 500 FEET ARE TO BE OPEN AT ANY ONE TIME. ALL CUT AND FILL SLOPES ARE TO BE SEEDED AND MULCHED WITHIN FIVE (5) DAYS OF COMPLETION OF GRADING. DRAINAGE SHALES SHALL BE STABILIZED WITH CHECK DAMS UNTIL VEGETATION HAS BEEN NELL ESTABLISHED, AT WHICH TIME THE CHECK DAMS SHALL BE REMOVED. DEVICES LISTED ABOVE ARE CONSIDERED MINIMUM EROSION AND SEDIMENT CONTROLS. ADDITIONAL CONTROL MEASURES MAY BE NECESSARY DUE TO CONTRACTOR PHASING OR OTHER UNFORESEEN CONDITIONS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADDITIONAL MEASURES TO THOSE SHOWN, AS NEEDED, IN ORDER TO CONTROL EROSION AND CONTAIN SEDIMENT ON SITE. ALL MEASURES SHALL BE INSTALLED ACCORDING TO THE STANDARDS AND SPECIFICATIONS IN THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. MAINTENANCE ALL CONTROL MEASURES SHALL BE INSPECTED DAILY BY THE SITE SUPERINTENDENT OR HIS REPRESENTATIVE AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN 0.5 INCHES OF RAIN PER 24 HOUR PERIOD. ANY DAMAGED STRUCTURAL MEASURES ARE TO BE REPAIRED BY THE END OF THE DAY. SEEDED AREAS SHALL BE CHECKED REGULARLY TO ENSURE THAT A GOOD STAND OF GRASS IS MAINTAINED. ALL AREAS SHALL BE FERTILIZED AND RESEEDED AS NEEDED UNTIL GRASS 15 ESTABLISHED. TRAPPED SEDIMENT IS TO BE REMOVED AS REQUIRED TO MAINTAIN 50% TRAP EFFICIENCY AND DISPOSED OF BY SPREADING ON SITE. GRAVEL OUTLETS SHALL BE CHECKED REGULARLY FOR SEDIMENT BUILD-UP. IF THE GRAVEL OUTLET IS CLOGGED BY SEDIMENT, IT SHALL BE REMOVED AND CLEANED OR REPLACED IMMEDIATELY. I _low _1 THE CONTRACTOR IS RESPONSIBLE FOR KEEPING EXISTING PUBLIC ROADS IN A CLEAN, DUST AND MUD FREE, CONDITION AT ALL TIMES. U all, oc _ z r �4Q w 3 O k-i >J� 5 14 W A CQ O to CO c\2 It I �Lo Lo I rn 4 � � x LoC\2 �) 0 00 .tea �!- E-� N V H Op �, v TUNG NIM ADHUSUMA9 No. 026715 SIGNAL z O � E-+ Q , E-+ U a O O W U �> Q � O Z U) U) W w z DATE: OCTOBER 2002 SCALE: 1" = 200' DESIGNED BY: DF FILE NO. 2916 W SHEET 4 OF 5 CONSTRUCTION OF A SILT FENCE (WITH WIRE SUPPORT) 1. SET POSTS AND EXCAVATE A 4"X4" 2. STAPLE WIRE FENCING TO THE POSTS. TRENCH UPSLOPE ALONG THE LINE OF POSTS. FLOW III I 3. ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND IT INTO THE TRENCH. 4 4. BACKFILL AND COMPACT THE EXCAVATED SOIL FLOW EXTENSION OF FABRIC AND WIRE INTO THE TRENCH. SOURCE: Adapted from Installation of Straw and Fabric Filter Barriers for Sediment Control, PLATE. 3.05-1 &mood & i'an STONE CONSTRUCTION ENTRANCE EXISTING 70' MIN. 006nNG - I A I ;, PAVEMENT F70ER CLOTH--� 6• MIN. I A SIDE ELEVATION • 12' MIN. L VDOT / 1 COURSE AGGREGATE • MUST &`TEND FULL WIDTH OF INGRESS AND EGRESS OPER4nON RFl 70' MIN. B WASHRACK r(OPTIOML) -POSITIVE DRNNAG£ B TO SEDIMENT TRAPPING DEVICE PLAN VIEW SECTION A —A SECTION B—B 'MOUNTABLE BERM (OP'770ML) 10' MIN. 10' MIN. EXISTING PAVEMENT 10' MIN. SOURCE • ADAPTED from 1983 Maryland Standards for S011 erasion and Sediment Control, and Va. DSWC Plate J02-1 or KIM WIN •• • 1 ' I I I • I 1 ii ii0•i� • a • • • , 1 • I , • a •' • • 1 fll� •.'. •1 •• • - 1 1 I RECOMMENDED DESIGN FOR OPTIONAL PRIME & DOUBLE SEAL TREATMENTS FOR UNSTABILIZED AGGREGATE MATERIAL PRIME INITIAL SEAL FINAL SEAL LIQUID COVER LIQUID COVER LIQUID COVER ASPHALT MATERIAL ASPHALT MATERIAL ASPHALT MATERIAL MATERIAL AGGREGATE MATERIAL AGGREGATE MATERIAL AGGREGATE CRS-2, CMS-2 or No. 8P Stone, CRS-2 or CMS-2, No. 8P Stone, RC-70, RC-250 No. 68 Stone, Slag CMS-2h Slag or Crushed CMS-2h Slag or Crushed or MG250 or Crushed Gravel @ 1.2 Um2 Gravel @ 1.2 Um2 Gravel @ 10 @1.8 Um2 @ 16 kg/m2) (0.26 @ 10 kg/m2 (0.26 kg/m2 (0.40 gals.Sq.Yd.) (30 IbsJSq.Yd.) galsJSq.Yd.) (18lbs./Sq.Yd.) galsJSq.Yd.) (18lbsJSq.Yd.) LITERS METRIC TONS LITERS METRIC TONS LITERS METRIC TONS (GALLONS) (TONS) (GALLONS) (TONS) (GALLONS) (TONS) LITERS METRIC TONS LITERS METRIC TONS LITERS METRIC TONS (GALLONS) (TONS) (GALLONS) (TONS) (GALLONS) (TONS) IPE— 1 SILT FENCE CULVERT INLET PROTECTION DISTANCE IS 6' MINIMUM IF FLOW IS TOWARD EMBANKMENT FLOW OPTIONAL STONE COMBINATION �j�Ti/•t .�Ila VDOT #3, #357, #5, #56 OR #57 TO REPLACE SILT FENCE IN " HORSESHOE WHEN HIGH VELOCITY OF FLOW IS EXPECTED SOURCE: ADAPTED from VDOT Standard Sheets and Va. DSWC 1 RIPRAP PLATE. 3.08-1 Note: All entrance grades shall start back of the shoulder line. If drainage is necessary, the ditch line may be moved back to provide at least g" of cover over pipe, as shown at right. • 12' or existing width whichever is greater Nolte: Lengths of culverts shown on road plans for entrances are approximate Entrances in fill to be some as above and shall be adjusted to obtain above roadway widths. except location of culvert (when necessary) STANDARD PRIVATE ENTRANCES PIPE OUTLET CONDITIONS A A 'IPE OUTLET TO FLAT .REA WITH NO DEFINED :HANNEL L a 0%-- d T SECTION A -A FILTER CLOTH KEY IN 6"-9', RECOMMENDED FOR ENTIRE PERIMETER I 3do (MIN.) 'IPE OUTLET TO WELL )EFINED CHANNEL d SECTION A -A FILTER CLOTH KEY IN 6"-9"; RECOMMENDED FOR ENTIRE PERIMETER (NOTES: 1. APRON LINING MAY BE RIPRAP, GROUTED RIPRAP. GABION BASKET, OR CONCRETE. 2. La I9 THE LENGTH OF THE RIPRAP APRON AS CALCULATED USING PLATES 3.18-3 AND 3.10-4. 9. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER, BUT NOT LESS THAN 6 INCHES. Source: Va. DSWC Plate 3.18-1 �C L U U ar � v � N j > o of Z V) w U Z z W w 0 z In Ld 0 z U g 0_ 0 LL- (n 0 0 W Z af Ld J < LIY01 Landing Surface of Ramp Level Landing Horizontal Projection or Run Maximum Rise Maximum Horitontal Projection Slope in mm ft m 1:12 t0 < 1:16 30 760 30 9 1:16 to < 1.20 30 760 40 12 Components of a Single Ramp Run 4.8.3 Clear Width. The minimum clear width of a ramp shall be 36 in (915 mm). 4.8.40 I•andings. Ramps shall have level landings At bottom and top of each ramp and each ramp run. Landings shall have the follow- ing features: (1) The landing shall be at least as wide as the ramp nun leading to it. (2) 7te landing length shall be a :minimum of 60 in (1525 mm) clear. (3) If ramps change direction at landings, the minimum landing size shall be 60 in by 60 in (1525 mmn by 1525 mm). (4) If a doorway is located at a landing. then the area in front of the doorway shall comply with 4.13.6. 4.8.5• Handrails. If a ramp run has a rise greater than 6 in (150 mum) or a horizontal projection greater than 72 in (1830 mum), then It shall have handrails on both sides. Handrails are not required on curb ramps or adjacent to seating in assembly areas. Handrails shall comply with 4.26 and shall have the following features: 16 dnd Sample Ramp Dimensions (1) Handraffia shall be provided along both sides of ramp segments. The inside handrail on switchback or dogleg ramps shall always be continuous. (2) If handrails are not continuous, they shall extend at least 12 in (305 mm) beyond the top and bottom cif the ramp segment and shall be parallel with the floor or ground surface (see Fig. 17). (3) The clear sp• ace between the handrail and the wall shall be 1 - 1/2 in (38 mm). (4) Gripping surf aces shall be continuous. (5) Top of handra tl gripping surfaces shall be mounted between 3 4 in and 38 &1(865 mm and 965 mnO above rano surfaces. (6) Ends of handn ails shall be either rounded or returned smoothly to f x)r, wcull- or post. (7) Handrails shall not rotate within their f mugs. 4.8.6 Cross Slope i end Surfaces. The cross slope of ramp surface; s shall be no greater than 1:50. Ramp surfaces s than comply with 4.5. W LLJ o N CQ to CO nI d' Q in 300 to cD in 1 CA Zx �y I 1O C\2 W -J 10 � a W ran) 0 It 4 to 1-4 � 10 1., .�—I f� ) E- Cz. rn rn rn aQi o � G W � U) w O H I 1 TH OF vJ� TUNG NRG- DHXlJSUMA No. 026715 SIONAL U E\ L l Z wE- U)�D o �Q ow E-+ W Z DATE: OCTOBER 2002 SCALE: N/A DESIGNED BY: DF FILE NO. 2916W SHEET 5 OF 5 GENERAL NOTES VDOT GENERAL NOTES LECEND VICINITY MAP Z EXISTING INTERMEDIATE CONTOUR - -- a- _� __332,,-, ,_.a. ,�,- - n-.- -� A v ` � $ p 1. terials used in the construction of the im rovements herein shall conform to the current Methods and ma P V1. All work on this project shall conform to the latest editions of the Virginia Department of EXISTING INDEX CONTOUR -���- 330 �- -- ""- " ""- ,a e / W County construction standards and specifications and/or current VDOT standards and specifications. Transportation (VDOT) Road and Bridge Specifications, and Standards, The Virginia Erosion PROPOSED CONTOUR 40 p 43 Al W and Sediment Control Regulations and any other state, federal, or local regulations EX E�P ° ," 2. Measures to control erosion and siltation, including detention ponds serving as silt basins during construction, applicable. In the event of conflict between any of these standards, specifications or EXISTING EDGE OF PAVEMENT ~- - ---- --- --- e must be provided prior to issuance of the site development permit. The approval of these plans in no way plans, the most stringent shall govern. PROP E/P J relieves the developer or his agent of the responsibilities contained in the Virginia Erosion and Sediment PROPOSED EDGE OF PAVEMENT EX CMG 3, to /�■� Control Handbook. V2. All construction shall comply with the latest U.S. Department of Labor Occupational EXISTING CURB AND GUTTER =-- -- --- = = - - - --- - - -PROP ,e ` Z 3. A permit must be obtained from the Office of the Resident Engineer, Virginia Department of Transportation Safety & Health Administration and VOSH Rules & Regulations. Y g CMG- 3 e 'Z/ e� (VDOT) prior to construction in existing State right-of-way. PROPOSED CURB AND GUTTER o 4. Approval of this plan does not guarantee issuance of an entrance permit by VDOT when such permit is V3. When working on VDOT right-of-way, all traffic control, whether permanent or temporary, shall be in accordance with the current edition of VDOT's work area protection manual. P CG-6 TRANSITION FROM CG-6 TO CG-6R TRANS CG 6R Z 3 1S '+ s ,,�"� 4 ' C\2 It required under State law. Furthermore, all traffic control flaggers must be certified in accordance with VDOT's ' '° �° ' 'G a t cop 5. The exact location of all guard rails will be determined by VDOT personnel. "A joint inspection will be held January, 1994 or latest edition of Road & Bride Specifications, Y> ) g p Section 104.04-C. EXISTING TELEPHONE LINE - --- - -- - _ + z ,> ,e '° �n co C� with the Developer, County Representatives, and Representatives of the Virginia Department of Transportation V4. Design features relating to construction or to regulation, control and safety of traffic may PROPOSED TELEPHONE LINE T T EX. 15 RCP `� r, .� ^' rn o C\2 mine if and where ward rail and of awed ditches will be needed. The developer will be (VDOT) to deter g / P EXISTING STORM SEWER - _ :- :- Z x C2 responsible for providingguardrail and paved ditches as determined b this joint inspection." Refer to be subject to change as deemed necessary by VDOT. . 15 RCP �'� �M to Virginia Department of Transportation (VDOT) Guard Rail and Paved Ditch Specifications. V5. Prior to initiation of work, Contractor shall be responsible for acquiring all necessary VDOT PROPOSED STORM SEWER - �� z W 0 o 6. Ana roved set of plans and all applicable permits must be available at the construction site. Also, a PP P Y land use permits for an work on VDOT right-of-way.63 EXISTING SANITARY SEWER A.� representative of the developer must be available at all times. LO H 7. Warning signs, markers, barricades or flagmen should be in accordance with the Manual on Uniform Traffic V6. If required by the local VDOT Residency Office, a preconstruction conference must be PROPOSED SANITARY SEWER 04 ,+ Control Devices (MUTCD). arranged and held by the engineer and/or developer with the attendance of the EXISTING ELECTRIC SERVICE - ��-^- - _ 1176,3 8. All unsuitable material shall be removed from the construction limits of the roadway before placing contractor, various County agencies, utility companies and VDOT prior to initiation of work. PRDPDSED ELECTRIC SERVICE .� .Ae ry- ea47 e7 ""\ � � o embankment. V7. Contractor shall notify the local VDOT Residency Office when work is to begin or cease for any undetermined length of time. VDOT will also require 48 hours notice for any EXISTING GAS LINE - -- - E - -- °° '° 's ` 0 0 y 9. All pavement sections on the approved plans are based on a minimum CBR value of 6. CBR values less inspection. n n s� �� an b the u 110 than 6 will require revised pavement section prepared b Greenwa Engineering and approved owner. q P P P Y Y g g PP Y PROPOSED GAS LINE Ci ..a W 10. All roadside ditches at grades of more than 5% shall be paved with cement concrete to the limits indicated g P V8. The Contractor will be responsible for maintaining adequate access to the project from the PROPERTY LINE ^, 2 on the plans and as required at the field 'inspection. adjacent public roadway through construction and maintenance of a construction entrance .� .� 81 � m b � in accordance with the Virginia Erosion & Sediment Control Handbook, Sec 3.02. �+ ¢zco.�axr� ame �xoem ..es ca�a. mxa aera., asn � FLOW LINE b +Z +7 11. All springs shall be capped and piped to the nearest storm sewer manholes or curb inlet. The pipe shall be 6" diameter to VDOT standard SB-1. Furthermore, access to other properties affected by this project shall be maintained EXISTING FENCELINE------- --=---�--- minimum and conform through construction. 12. Construction debris shall be containerized in accordance with the Virginia Litter Control Act; no less than EXISTING POWER POLE E ,�-''- J6 '� 21 �`' �44 one litter receptacle shall be provided at the construction site. V9. Contractor shall ensure adequate drainage is achieved and maintained on the site during TELEPHONE POLE CNN�, + u" µ A and at the end of construction. EXISTING �j 13. The contractor shall provide adequate means of cleaning mud from trucks and/or other equipment prior to entering public streets, and it is the contractors responsibility to clean streets, allay dust, and to take V10. All water and sewer lines within existing or proposed VDOT right-of-way are to have EXISTING WATERLINE W/ TEE __+__C, - m whatever measures are necessary to insure that the streets are maintained in a clean, mud and dust free minimum 36" cover and, when possible, to be installed under roadway drainage facilities. PROPOSED WATERLINE W/ TEE "� ' V- SCALE 1 "= 2000' Z condition at all times. 14. Notification shall be given to the appropriate utility company prior to construction of water and/or sanitary V11. Any unusual subsurface conditions encountered during the course of construction shall be EXISTING FIRE HYDRANT _o �-' sewer lines. Information should also be obtained from the appropriate authorit concerning permits, cut Y g P immediately brought to the attention of the engineer and VDOT. Work shall cease in that PROJECT INFORMATION > sheets, and connections to existing lines. vicinity until an adequate design can be determined by the engineer and approved by VDOT. EXISTING WATER VALVE PARCEL IDENTIFICATION NO, TAX MAP 43 ((A)) 86 F.A.R. CALCULATIONS: 15. All sanitary sewers and water mains and appurtenances shall be constructed in accordance with the current V12. All undercut areas and borrow material shall be inspected and approved by VDOT Inspector PROPOSED WATER METER ® standards and specifications of Frederick County and/or the Frederick County Sanitation Authority. prior to placement of fill. EXISTING REDUCER STREET ADDRESS: MIRACLE WAY (PRIVATE ROAD) PERMITTED: NINC WINCHESTER, VA 22603 1.0 TOTAL 16. The location of existing utilities shown in these plans are taken from existing records. It shall be the V13. All roadway fill, base, subsurface material and backfill of utility/storm sewer trenches shall PROPOSED REDUCER --` TOTAL AREA: ACRES PROVIDED: contractors responsibility to verify the exact horizontal and vertical location of all existing utilities as needed be compacted in 6" lifts to 95% of theoretical maximum density as determined by STOP SIGN -zr PROJECT AREA: 22.414 ACRES O AC. 5LDG./22.414 AC. = 0.008 prior to construction. The contractor shall inform the engineer of any conflicts arising from his existing AASHTO T-99 Method A, within plus or minus 2% of optimum moisture for the full width HANDICAP RAMP (CG-12) DISTURBED AREA: 2.q2 ACRES .li7 utility verification and the proposed construction. �-. CURRENT ZONING: RA GROSS FLOOR AREA of any dedicated street right-of-way. At the direction of VDOT Inspector density tests DENOTES LOCATION OF STD VDOT 17. The developer will be responsible for any damage to the existing streets and utilities which occurs as a performed by a qualified 'independent agency shall be conducted as required in the VDOT CG-12 AND/OR JURISDICTIONAL CURRENT USE: VACANT 71200 SF result of his construction project within or contiguous to the existing right -off -way. Road and Bridge Specifications. A copy of all tests shall be submitted to VDOT prior to STANDARD RAMP CONSTRUCTION N/A PROPOSED ZONING: SIGNS: ANY PROPOSED SIGN SHALL REQUIRED 18. 18. When is within easements of utilities, letters of from all involved companies final VDOT approval. PARKING INDICATOR INDICATES THE NUMBER OF TYPICAL PARKING SPACES 12 PROPOSED USE: CHURCH SEPARATE PERMIT F- grading proposed permission must be provided to Frederick County prior to issuance of grading and/or site development permits. V14. VDOT Standard CD and UD underdrains shall be installed where indicated on these plans TEST PIT LOCATION j3UILDING SETBACKS: REQUIRED PROVIDED OUTDOOR LIGHTNING: IF APPLICANT DECIDED TO Q and further where determined necessary by VDOT Inspector. ADD PARKING LIGiHTS, ALL LIGHTNING SHALL BE 19. The developer will be responsible for the relocation of any utilities which is required as a result of his project. The relocation should be done prior to construction. V15. The installation of any entrances and mailboxes within any dedicated street right-of-way FRONT (INGRESS/ EGRESS): 60, 440 SIDE (RESIDENTAIL): 50, 158' DOWNCAST OR SHIELDED TO PREVENT GLARE HANDICAP PARKING L ON ADJOINING PROPERTIES AND RIGHT-OF-WAY shall meet VDOT minimum design standards and is the developer's responsibility. REAR FROM (1-81): 60, 4V 20. These plans identify the location of all known gravesites. Gravesites shown on this plan will be protected _6 -0-> REAR (RESIDENTIAL): 50, 667' in accordance with state law. In the event gravesites are discovered during construction, the owner and V16. If required by the local VDOT Residency Office, copies of all invoices for materials within VEHICLES PER DAY COUNT F1 OUTDOOR STORAGE_ NONE PROPOSED engineer must be notified immediately. any dedicated street right-of-way must be provided to the VDOT Inspector prior to p;>�7pOSED BUILDING ENTRANCE acceptance acceptance of work. Unit and total prices may be obscured. PARKING SETBACK.; �, 21. The contractor is to verify field conditions prior to and during construction and notify Greenway Engineering 511211 BUILDING HEIGHT at (540) 662-4185 immediately of any discrepancies between actual field conditions and the approved plan. V17. Prior to acceptance by VDOT of any streets, any required street signage and/or pavement EXISTING STREET LIGHT r SIDE: 5' 11311 280' MAXIMUM = 35' : 22. Controlled fills shall be compacted to 957 of maximum density as determined by method "A" per standard markings must be installed by the developer or, at VDOT's discretion, by VDOT on an T REAR: 5 574 PROP. HEIGHT = 18' proctor AASHTO-T99, ASTM-D698, or VTM-1 as applicable. Density shall be certified by a registered i b bl i receivable ass. accountPROPOSED STREET NAME SIGN -� LANDSCAPE CALCULATIONS professional engineer and results submitted to Frederick County prior to pavement construction. If a V18. Final location of CG-12 Curb Ramps shall be determined by VDOT Inspector. PROPOSED SANITARY LATERAL CLEANOUT - LANDSCAPED AREA: PARKING CALCULATIONS geotechnical report has been prepared, it should supersede the requirements in this note. - 23. Contractors who maintain underground lines in the area excavating SANITARY MANHOLE IDENTIFIER O REQUIRED: N/A REQUIRED: shall notify operators utility of proposed PROVIDED: N/A CHURCH: 1 SPACE/3 SEATS or blasting at least two (2) working days, but not more than ten (10) working days, prior to commencement 218/3 SF=73 SPACES of excavation or demolition. Names and telephone numbers of the and operators underground utility lines STORM DRAIN STRUCTURE IDENTIFIER � INTERIOR REQUIRED: INTERIOR PROVIDED: in Frederick Count appear below. These numbers shall also be used to serve in an emergency condition. Y PP g Y PROVIDED: E-4q8 EASEMENT LINE - - - - - - - NONE REQUIRED NONE PROVIDED SPACES GREEN AREA = N/A HANDICAP SPACES REQUIRED P P R R D UTILITY CONTACTS FIRE MARSIIALL S NOTE CENTERLINE - : PER ADA = 1 SPACE/25 = '4 U2 � Water/Sewer: Frederick County Health Department Power: Alle hen Power Allegheny Fire lane markings and signage: EXISTING SPOT ELEVATION 12.0 PERIMETER REQUIRED: PERIMETER PROVIDED: HANDICAP SPACES PROVIDED. NONE (2) � 107 N. Kent Street P.O. Box 1458 „ „ PROPOSED SPOT ELEVATION X 125 REQUIRED NONE REQUIRED 6 SPACES Winchester, VA. 22604 Hagerstown, MD 21741 Any No Parking signs and yellow painted curb locations will be installed EXISTING TREE DRIP LINE 540 722-3480 ( ) 1-800-654-3317 by field inspection at the direction of the Fire Marshall's Office. Phone• Bell -Atlantic Gas: Shenandoah Gas Co. EXISTING TREE 15" OAK LOADING SPACES REQUIRED: N/A W E- E� APPROVAL BLOCK P.O. Box 17398 P.O. Box 2400 15" PINE Baltimore, MD 21297 Winchester, VA 22604 OAK PINE � (301) 954-6282 (540) 869-1111 PROPOSED TREE Z O _ MISS UTILITY 1 800-257-7777 APPROVED BY THE ZONING ADMINISTRATOR. SITE PLAN SHALL BE VALID FOR A LOADINGSPACES PROVIDED: TONG NfKi ADHiKUSUIVi� P O Ul PERIOD OF FIVE (5) YEARS FROM DATE OF APPROVAL. N/A .� No.026715 U FCSA CONSTRUCTION NOTES °��s ��r I C� ' O Q J G�. �GMAL >Y� � W RW'I 1. Water and sewer lines are to be constructed in accordance with these plans. The lines shall additionally meet all , O 41 requirements of the Frederick Count Sanitation Authority. q Y Y 2. The contractor shall coordinate with, and arrange for inspection by, the Authority. SIGNATURE DATE 3. Exact locations of water and sewer services on new lines are to be coordinated with the Authority's inspector. TRIP GENE DATA FR���RICK COVER SHEETLU 4. The Sanitation Authority's maintenance department is responsible for the installation of water meters through 2" in size. Before a permanent meter is set, they require; 1) the frame and cover to be properly aligned with its meter box and bar; 2) the frame to be to the final the lot; 3) the ditance LATION ,,,�t, � ,T Opt O I COUNTY yoke and cover set grade of between the top of CLASS USE GROSS SF TRIP RATE/1000GFA TOTAL VPD r� the cover and yoke bar be between 18 and 21 inches; and 4) all components of the meter box assembly to be in proper working order. IT IS THE DEVELOPER'S/CONTRACTOR'S RESPONSIBILITY TO HAVE THE METER BOX ASSEMBLY r, U MA ��� Project Nave: Project Number: INSTALLED CORRECTLY. 560 CHURCH 7,200 13.13 95 I I I I �TUNG 1do.02I6715 1� NEN COVENANT C ,Ci U � (� ,C"T 2 � � % W 5. For water and sewer services that connect to existing lines: a. The location of the service lateral is to be coordinated with the Autority's engineering assistant. An application ITE 6th d ,�wl `�t! 103 1y Magisterial District: Date of Plan: (Month, Day, Year) for service must be made and fees paid before work will begin. Trip Generation NAL� b. The Autority shall furnish and install all 5/8", 3/4", and 1" water services. Vol. 2 0 3 c. For 1 1/2" and 2" water services, the Authority shall make the tap and bring the piping to the property line. STONENALL DISTRICT OCTOBER 2002 The contractor is to furnish and install the meter vault assembly. The Authority shall install the meter. 6. When an existing water main is tapped for the installation of a new line: Owner: Address, Including Zip Code & Telephone No. a. The Autority shall furnish all labor and materials to make the tap. PROFESSIONAL SEAL &SIGNATURE 432 SHADOW BROOK LANE b. The developer/contractor p; ( just: (1) al p application for the tap, (2) pay deposit (before work begins); (3) mark the location of the to 4 make final the is n V SHEET INDEX I ' I I NEN COVENANT CHURCH WINCHESTER, VA 22601 DATE: OCTOBER 2002 payment when work completed. INDE1l THESE PLANS ARE IN CONFORMANCE WITH (540) 888-4271 7. The contractor shall tie-in a new line to an existing manhole by core drilling the manhole. FREDERICK COUNTY STANDARDS AND 1 COVER SHEET Developer, p Address, Including Zip Code &Telephone No. ORDINANCES. ANY DEVIATION OR CHANGE 432 SHADOW BROOK LANE DESIGNED BY: DF .8. An water service Pane must have a double check valve or RPZ backflow y prevention assembly, as required, installed. 2 SITE PLAN IN THESE PLANS SHALL BE APPROVED BYWINCHESTER NEW COVENANT CHURCH VA 22601 CHECKED BY: NMA The assembly shall meet ASSE standard NO. 1015 or 1013. A remote readout is required. 3 EROSION 4 SEDIMENT CONTROL PLAN THE ZONING ADMINISTRATOR PRIOR TO (540) 888-4271 4 STORM DRAINAGE ANALYSIS PLAN CONSTRUCTION. Engineer Certifying Plan: Address, Including Zip Code & Telephone No, 9. All fire lines shall have a detector double check valve backflow prevention assembly or a RPZ backflow prevention STORM COMPS, E*S NARRATIVE, OVERALL DRAINAGE DIVIDES assembly as required. The assembly shall meet ASSE standard NO. 1048 or 1047. A remote readout is required. 5 DETAILS 151 WINDY HILL LANE JOB NO.2916W GREENNAY ENGINEERING WINCHESTER, VA 22602 (540) 662-4185 SHEET 1 OF 5 t \ a \ ............ i 43-((A))-36 0 0 22.4140 A CIRES PROP. SEPTIC TA S �ni cp . - 41A \ \ o/ \ ` BUILDING INSPECTION NOTES: Z_ *SUBMIT UNDER ..... — / `� ,d'f � .•--••'-" � '� `�� f �� `� BUILDINGS SHALL COMPLY WITH THE VIR6INIA \ -- ''Y `.��,\ \ UNIFORM STATEWIDE BUILDING CODE AND SECTION, SEPARATE LAIC ��� y ��\ 505 GROUP A (ASSEMBLY) OF THE BOLA NATIONAL LIMI OF CLEARING 4 GRADING YAW GORE/Icfci&. OTHER CODE THAT APPLIES 15 \`. L` O \� � AW AII-7.I-92 AGGESSIBLE AND USABLE BUILDINGS 4� r ANb FACILITIES. STRUCTURAL PLANS SUBMITTED FOR 3`F;g W s �� s.a' - .• '� � .�- � ` - PERMIT APPLICATION SHALL BE SEALED BY A VIR6INIA ; LIGEN5t1� DE516N PROFE5510NAL. '( tw f \ `ti - \ �\ �+•, THE RAMP SHALL BE REQUIRED IF ADA ACCESSIBLE ��`_ ' `r �` �\ \ IS EXCEEDIN6 5% SLOPE. SEE DETAILS ON SHEET 5. »- -- --. ' f"w .,•h rs / THE APPLICANT SHALL PROVIDE SPECIAL INSPECTION FOR TYPE OF STRUCTURE (SOILS, CONCRETE, ETC) •\ \\ PRO WATER � `� � \ � AS DESCRIBED IN CHAPTER 1-7OFBOGA. h V, W EL LOCA'T I ��0 . , ��+ \ p J 4,`� \ ,s PROPOSED ELECTRICAL IVTILITY CONNECTION J �, \ \ WILL BE LOCATED UNDEROP, UND. INGRE S/EGF DOT-4" YELL23l-1, PAVEMENT MARKING ' \ EA S MENT '� I ,Y , Ao (THERMO-PLASTIC OR A-PI;ON ED EQUAL) TYP. , 1 l :: , \ 10 30 q2- q2— SRx PAR ING' 40' � n`3 93 \ q2 . • - . �. ' - - ' - - •, • • . '. ' � . '• ... - • - ' • t-�S• �'�5' • q2 \ � �`,�^•--�.,-;A I : � - - • � �\ � 30 NC 10 q2 A? 6 0'. 247 PARKIRG r 9 93ZS 9 2 --1 �, 1 ,TO REMAIN j ' 3 kO� 3 4:51 4.5R' E1? \ ov W uj z Z W o CO LO CO COLO 1 rn 0CQ LiJ W U Lo., a) E-w � G � w rn 9 F—i H W m l Q V Q k (<i P i. 2 \ PAVEMENT FLUSH • ' -�'$ ' ' -• ..!- . �. ' �.o - - •• . �- -• . ' •N"' Io MIN eo \ 94 - 4 - .. �5 A WITH CONCRETE S1W 25 qio\ om h 1 N ' RIP RAP q0 JNV U ry q3 °. �2 x \ m O 0` k=�q S/W /� ��• 17_O. 5R : PI . ' ' (.0 \ '. \ r q cv •4.5R 4:5R ' `, ' ' _EP Pizo>?oSED DO uBLE i'Rrm�' I-I.C.- SIGN •(They` 1? DESTI IAN GR SINALK' `�� SEAL- PARKING- 'LOT • y q3' ti x.. WHEEL:, S 5 "-•6qq ' ' �_ ' bo I w 2 5't-- (TTP :) 4:5R q3- \El.-(� . ` E>, E. 8 _ 5R I ` �� TO REMAIN Ggo 1 �, // •-� 3- - - T . - - '� _ '• . �- _ � , (010 / Iy�y�� b 2.- --}-- 2O- - .:<. a GRASS' ` x(o 24 ISLAND 2'. 10 MIN. ` z \� PROPOSED MINIMUM 8 AGGREGATE q3� e PJ RIP RAP O� WITH PRIME AN DOUBLE SEALS \Ar \ o , qT `� FROM STA.0+00 TO 6+25 MIRACLE NAT 2 TUNG HIKUSUMA �.'. w. JT_rt•�,p at i ro No. 026715 --` o` • . q E . g�. PROPOSED MINIMU„" 6" AGGREGATES --.. MAX '2q. 4.R• . ...�,t WITH PRIME AND i? UBLE SEALS l aLOPE.AC>zpSS' 0 FOR CHURCH PARKIG AS SHOWN � l �'I9 WC'. PAR KLNC AREA v- 1RKING 'X40 t f �MAI. 6~j '•ate ��� , k�� F ' \ - - ty - 9$ i �a NG SR q4 PROP. ELECTRIC TO BE NOTE: THE AURCH WILL ROVIDE SHUTTL SERVICE T LOCATED UNDERGROUND t'INIMIZE THE TRUC< WITHOUT TRAILER) T1 l C I cv 20 I '• . ' ' ' EP A..-t3.t3,5 p-'FROM ENTERING THE 1"fi�%ACE WAY. ,~~ 00 3'X6'X4' HT. BOARD ON ��� q6 xao/ \\ q5 VDOT-4" WHITE PAVEMENT MARKING �� BOARD PRESSURE TREATED VDOT-4 YELLOV PAVEMENT MARKING q5 6q4 (THERMO-PLASTIC OR APPROVED EQUAL) TYP. WOOD TRASH ENCLOSURE �� � ERMO-PLASTIF OR APPROVED EQUAL) TYP. -. (OPAQUE) — _ _ -t,� t y 1 77 R ls% �. .y p i LIMITS OF CL ARING G ADING f �, -1 PI PAVED ISLAND F-' N 7,0 05 03 F 13 ci�. 73 `pp I"IPF { W O E I. FY.IwT. ESLDG. � I � ! J W F•j� O � Q U) I J I W i I Fi Itin Oj T DATE: OCTOBER 2002 :,k �,�e, ` E ` SCALE: 1" = 30' 30 15 0 30 60 I I I I I I ( PROP( �� W ITN DESIGNED BY: DF SGALE: 1 = 30 I' ! : FILE NO. 2916W SHEET 2 OF 5 EROSION/SEDIMENT CONTROL LEGEND NO. KEY SYMBOL DESCRIPTION 3.02 CE TEMPORARY ENTRANCE GRAVEL CONSTRUCTION 3.05 X X X SILT FENCE 3.07 IP STORM DRAIN INLET PROTECTION 3.06 CIP CULVERT INLET PROTECTION 3.09 DD D TEMPORARY DIVERSION DIKE 3.10 F� F TEMPORARY FILL DIVERSION 3.11 I'1 TEMPORARY RIGHT OF WAY DIVERSI N 3.12 DV DIVERSION 3.13 TEMPORARY SEDIMENT TRAP 3.18 OP OUTLET PROTECTION RE5PON51BLE LAND D15TURBER NAME: GERTIFIGRTION #: DATE: THE RE5PON51BLE LAND DISTURBER 15 THE PARTY RE5PON51BLE FOR GARBING OUT THE LAND DISTURBING ACTIVITY A5 5ET FORTH IN THE PLANS. 3.20 CD ROCK CHECK DAMS oz� 3.33 O ---�— SODDING r \ 1 r, / ti`l CURVE R,NDIU5 ARC LENGTH GHORD LENGTH CHORD BEARING GI 5529.56' 53636' 556.04' 5 35°13'41" W C2 200.00' &6.56' 51.54' N 48°06'36" W 03 300.00' 245.46' 236.67' N 3l°21'20" W LINE BEARING P15TANCE LI N 35025'26" W 133.5q' L2 N 60°4144" W 155.50' L3 N 13°545l" W -n.00' L4 N 76°05'03" E 25.00' L5 N 13°545l" W 250.00' L6 N l6°05'03" E 60.00' Ll 513°54 , 250.00' ;11 3.38 T� 0-0-0 TREE PROTECTION LC LIMITS OF CLEARING 4 GRADING '� lam. / �, - S 74e" tti `'��•" .- --'"� `�\ 1 DRAINAGE DIVIDES CRITICAL SLOPE - CRITICAL SLOPE TO BE SEEDED MULCHED AND TA KEQ / 40 WITHIN 14 DAYS AFTER START OF GRADING, OR SO / �' - r �� �� �'� -' G G, SODDED AND PEGGED WITHI � \._ _ -_..�'`-_-.�-�.:� ,P,'° 14 DAYS AFTER START'� i 44690 I I f ! \ \ f �. ,da, / • /� .a..'�d., . 't"i`' d 4L� ✓ : j Cu� '+ ,,,,r '°r \ ••'', _ `' x 00 OF CLEARfNri . 0 LCG 00 1q� 3�,}�RTGTYSHRU RED MAPLE Oi1TNIMUH P. M 3�-14,16H BERM.Tr � 1 �- I � �� � �� ' • ;. `. ~` - � � I LnGG I LG PED#PLEGE �� � j � �� +' r f ,- ,� / � \ ��' ,� �' - --•, / j�' •c , �! . � I � � �`�I- ■ �l - � �-' � Yop J / `\ �i �;.� `•� _ ( / �.'` / � � y- �� ,�*� � Sri � � � f � � t/ � i� ,� � �` ` % i /Y / I � � ■ ■ ■ �+`, _....--' � S .,`� i1`� � � }" U) 50BR .. 0 r-4 P I (lr_ t� � I t � i � � � � U I � � ► � � t � � � C3� I �} t i t, i rj b I _► I i y I ! t ' '� Us CS1 t �l � t •. I NOTE: A LAND DISTURBANCE PERMIT MUST BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS PRIOR TO COMMENCING SITE GRADING WORK. ADDITIONALLY, A PRE -CONSTRUCTION MEETING SHALL BE HELD WITH FREDERICK COUNTY PUBLIC WORKS PRIOR TO INITIATING ANY SITE WORK. RE� MAPLE 11 THIS SHEET FOR PPASEI * II EROSION AND SEDIMENT CONTROL ONLY! 50 25 0 50 100 ummmid SGALE: 1" = 50' Z W W Z C'3 Z W cQ O CO iQ LO CO >— CQ It 5 tow �� I rn Z' x 4 cvI �C\2 W�) Lo E� w vi 7 W r4 A 7w-fj�" Op i° TT1�ryT � C nl � 1UNG No. 026715 SIONAL or U cc N H DH z = E V Q� as �� �a Z �F, :14 Q U az W� Z > Q O aZ wQ V z� W O G� W Z DATE: OCTOBER 2002 SCALE: 1" = 50' DESIGNED BY: DF FILE NO. 2916W SHEET 3 OF 5