Loading...
HomeMy WebLinkAbout027-96 (The Corners) Restaurant - Back Creek - Backfile (2)Date's ►,_c ��? 19 0024954 . l� Received From < ( 7 �i �l Address 1 1 -:l : i ♦l ' C (r\ T L f/� an ForACCOUNT •m r1 HOW PAID •u`� AM'OF ACCOUNT - [ .ASki �1 F •y R44' CHECK 1 By _ANCF f3AL .r /� MONEY OR[ R I _ . SITE PLAN CHECKLIST The checklist below indicates all the information that needs to be submitted as part of the site plan application. All required information must be submitted prior to the final approval of any site plan. The Department of Planning and Development will review the application to ensure that it is complete. If any portion is not included or complete, the site plan application will not be accepted and retumed to the applicant(s). Site Plan Package 1. One set of approved comment sheets are required from the following review agencies prior to final site plan approval. It is recommended that applicants contact the Department of Planning and Development to determine which review agencies are relevant to their site plan application. �hoJ� Virginia Department of Transportation (VDOT) County Health Department Frederick County Sanitation Authority City of Winchester Department of Planning and Development Town of Stephens City Inspections Department Town of Middletown Frederick County Engineer (Public Works) Airport Authority Frederick County Fire Marshal Soil & Water Conservation District Department of Parks and Recreation 2. One copy of the Site Plan application 3. Five Copies of the Final Site Plan for approval 4. One reproducible copy of the Site Plan (if required) 5. A 35mm slide of the Site Plan (if required) 8 d- IL / 6-0-96 p-.23-9( a,4 Y- 4 COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 678-0682 October 23, 1996 Marshall W. and Thelma L. Madigan 2526 Gravel Springs Road Star Tannery, Virginia 22654 RE: The Corners Restaurant - Site Plan Approval Site Plan #027-96 Dear Mr. and Mrs. Madigan: This letter is to inform you that the Frederick County Planning Department administratively approved site plan #027-96 on October 23, 1996. This site plan consists of a 1,232 square foot addition to the existing 2,315 square foot building, a split rail fence along Wardensville Pike, 28 stripped parking spaces, I handicap accessible space, and a trash dumpster with enclosure screening. Please note that this proposed addition maximizes the legal nonconformity of this property, as provided for in the Frederick County Zoning Ordinance. Attached are two copies of the approved plan. This will enable you to provide your contractor with an approved copy, and maintain a copy for your records. Please have the contractor contact this office to schedule an on -site inspection once all improvements are complete. Please contact me if I may answer any questions regarding this letter. Planner I Enclosure cc: Margaret Douglas. Back Creek District Supervisor Mark Smith. Green%tiay Engineering, Inc. T. Roy Jennings. Frederick County Real Estate Ill" \firth Kent Street - N%inchetiter. Nir inia 2261)1-5000 C/,Lt c SITE PLAN APPLICATION Department of Planning and Development Use only. Date application received 6-/=9Application # 02i V Complete. Date of acceptance -i� 6-9� u incomplete. Date of return. 1. Project Title: 11TV+E CO2N�2.S� PES 0W&(T- Apo i TO N 2. Location of Property 147_A S. Pi F C-k 0 (street address) 3. Property Owner: MA2S4ALL- % . # T4Ei-MA L. 8AAoi6Ptl1 Address: C-2aJP �i1g2 'T?�n1NE2u � �R, 22�54- Telephone SS40 4-6 S - 30 V3 4. Applicant/Agent 6;-R.r--Fr-KcDAU4 i l K1C Address '!�`7o C3AKEi2- i A-KF v0 ► 61 C�+ sT _2.- 0 Telephone: (o 2- 41 9, c) 5. Designer: 4, 8" C e C E-k(S Address: SPUME Ps a-ozJe Telephone: Contact: M 6. Is this an original or revised site plan? Original Revised 7a. Total acreage of parcel to be developed: 7b. Total acreage of parcel. 8. Property Information: O.1 O Ac. 112, Ar , a) Property Identification Number: (Q 9 -((A))- IS A b) Current Zoning: i? A c) Present Use: Resv J kA KL1- d) Proposed Use: (2P-S I-} 0Qa44 r e) Adjoining Property Use(s) A(,Q cdc.'WeP,L- _ a0S(.)f->kiTAI, f) Adjoining Property Identification Number(s) (p 15,1(o g) Magisterial District(s)c4L I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to the submission of my site plan. Signature: Date: 7 • Request For Site Plan Comments Department of Planning and Development Mail to: Hand deliver to: Department of Planning and Development 107 N. Kent Street Atten: County Planner Fourth Floor P.O. Box 601 Winchester, VA Winchester, VA 22604 (703) 665-5651 (703) 665 - 5651 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two copies of your site plan with this sheet. Applicant's name: rcpP-r,__EmuW()q lt.1 Address: 7 0 GA+e--P2. LK- C1 Phone number: G(DZ- 41 8 S Name of development and/or description of the request: 'uTgF_ ezu,e z ` Rz -TA 0 P-A 1 .T k-ob rT i o K( Location of development: Oti1 - M-F— C0 041-Ct" S tpE 0 F 2T. ES Planning and Development's Comments: • s'/)t RC I,y • a a COMMONWEALTH of ViRGINIA DEPARTMENT OF TRANSPORTATION EDINBURG RESIDENCY DAVID R. GEHR 14031 OLD VALLEY PIKE WILLIAM H. BUSHMAN, P.E. COMMISSIONER P.O. BOX 278 RESIDENT ENGINEER EDINBURG. VA 22824-0278 TELE (540) 984.56W FAX (540) 984-5607 October 11, 1996 Mr. Keith H. Burr Ref: "The Corners" Restaurant C/O Greenway, Inc. Routes 55 & 600 151 Windy Hill Lane Frederick County Winchester, VA 22602 Dear Keith: We have received your revised site plans dated September 30, 1996 for the referenced project. It appears all of our earlier review comments have been satisfactorily addressed. The plan is therefore approved with the understanding the proposed split rail fence along Route 55 will be extended all the way to the eastern property corner. Please advise the owner of our approval and that a land use permit may now be applied for to cover work within the Routes 55 and 600 rights -of -way. The permit will require a minimal processing fee and surety bond coverage. Once satisfactory application has been made, a permit of this nature will take approximately thirty days to process and issue. If you have any questions, please let me know. RBC/ rf Enclosure xc: Mr. S. A. Melnikoff �Mr. -Kris Tierney . - Sincerely, Robert B. Childress Trans. Permits & Subdivision Specialist Supervisor rya , 9 e c; OCTE j .DEP� �� �' r'. D ASS T OF p(A AND �_ ®fVECOPMfNr WE KEEP VIRGINIA MOVING qequest For Site Plan Comment• Virginia Department of Transportation • Mail to: Hand deliver to: t Virginia Department of Transportation Local VDOT Office Atten: Resident Engineer 1550 Commerce Street P.O. Box 278 Winchester, VA Edinburg, Virginia 22824-0278 (703) 722-3460 (703) 948-4133 Please fill out the information as accurately as possible in order to assist the VDOT with their review. Please attach four copies of your site plan with this sheet. Applicant's name: eEf--l.l EAU , 1 N C° Address: <--Inl-- EAK 2 L"E W t gCwZQ ciQ- ,y Q 7 ZG-�cQ Phone number (07- 4185 �I " Name of development and/or description of the request: T & "62� Location of development CAN T -+i-- cjc AZT. -bt)1J i ZT • C.- S Virginia Department of Transportation's Comments: See attached letter dated October 11, 1996. V. 00T use only ,Date received to Date revision received 7G 4Sa Date approved IOtt( Incomplete Incomplete V Date reviewed -.�. Date reviewed Z k ;Signature and Date Signature and Date (revision) 96� NEC) ;�c�uNMEN.L 19 C)� Cn COMMONWEALTH of VIR QINIA DEPARTMENT OF TRANSPORTATION EDINBURG RESIDENCY DAVID R. GEHR 14031 OLD VALLEY PIKE WILLIAM H. BUSHMAN, P.E. C011AMISSIONER P.O. BOX 278 RESIDENT ENGINEER EDINBURG, VA 22824-0278 TELE (540) 984.5600 FAX (540)984.5607 July 22, 1996 Mr. Keith H. Burr Ref: "The Corners" Restaurant C/O Greenway, Inc. Routes 55 & 600 970 Baker Lane Frederick County Winchester, VA 22603 Dear Keith: . As requested, we have reviewed the above referenced projects site plan dated May 31, 1996. Our comments may be found on the enclosed plans marked in red and as follows: 1. An adequate barrier, either Standard CG-2 curb or permanent fence, will be needed along the right-of-way line to prevent access across the shoulder. If the owner elects to use CG-2 curb the entrance radii will have to be reconfigured. 2. The proposed 50' tapers on the advanced side of the entrances will need to be maintained. However, the opposite side tapers should reduced to standard 36'. 3. The proposed entrance curb Standard CG-6 on Route 55 will need to be changed to Standard CG-7 due to the posted speed limit. 4. Elevations need to be provided on the top of the proposed curb. 5. Typical sections of the entrances will need to be provided. 6. Due to wash and erosion caused from on site drainage flows, the existing shoulder and side ditch along Route 55 will need to be reconstructed in accordance with the typical section we have shown on the plan. 7. The Route 55 entrance culvert and culvert extension along Route 600 will need to be asphalt coated. The ends of the pipes will need to be mitered to conform to the adjacent slope. 8. Drainage calculations will need to be provided to support the proposed pipe sizes. WE KEEP VIRGINIA MOVING • Mr. Keith H. Burr Ref: "The Corners" Restaurant July 22, 1996 Page 2 9. Other miscellaneous comments as marked will need to be addressed. Please revise and resubmit six copies for final approval. Should any changes be deemed necessary, please design them to meet or exceed the above recommendations. If you have any questions or would like to discuss the above comments, please let me know. incerely, Robert B. Childress Trans. Permits & Subdivision Specialist Supervisor RBC/ rf Enclosure xc: Mr. J. B. Diamond - -Mr. S. A. Melnikoff Mr. Kris Tierney • • (�PQF 1-Dtpr �799& COMMONWEALTH of VIRCjINIA DEPARTMENT OF TRANSPORTATION EDINBURG RESIDENCY DAVID R. GEHR 14031 OLD VALLEY PIKE WILLIAM H. BUSHMAN, P.E. COMMISSIONER P.O. BOX 278 RESIDENT ENGINEER EDINBURG, VA 22824-0278 TELE (540) 984.5600 FAX (540) 984-5607 June 19, 1996 Mr. H. Bruce Edens Ref: "The Corners" Restaurant C/O Greenway, Inc. Routes 55 & 600 970 Baker Lane Frederick County Winchester, VA 22603 Dear Bruce: We have received your site plan dated May 31, 1996 for the referenced project. We have forwarded the plan to our District Office in Staunton for review. Once we receive any comments, we will forward them to you. In the meantime if you have any questions, please let me know. RBC/ rf xc: Mr. S. A. Melnikoff Mr. Kris Tierney Sincerely, 6?�J /,3. ajL—� Robert B. Childress Trans. Permits & Subdivision Specialist Supervisor WE KEEP VIRGINIA MOVING r 0 C4121L Request For Site Plan Comments Frederick County Engineering Department Mail to: Hand lellvertm: ;rgg Frederick County Engineering Dept. 107 N. rIL'(Te�tIVED Atten. Director of Engineering Fourth loon • nF PLANNING P.O. Box 601 Winche r,AVA :LLOPMENT Winchester, VA 22604 (703) 66 643 -, (703) 665 - 5643 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two copies of your site plan with this sheet. Applicant's name: 2c E NyJ" ; I KI (�_, . Address: S10 24r_e,fL l._AtAE Phone number: (0 6 Z - 41 6r Name of development and/or description of the request: '1TNFr_ CcemCr2S AlJp1TIok1 SkTIC pl.Alll Location of development: 0" T4p- So OTI+jjc Z O DE of Ri. (00� 4 RoyTir,_: SS Engineering Department's Comments: 1 It rnC�_ V\A Engineering Dept. use only Date received Incomplete Date -reviewed Signature and Date Signature and Date �. s ef�6AJ-- dv . j ! 3 t Ll," UsAo us w.A o. c_oa, Cll Date revision received Date approved 11 of Incomplete /9XIZV COUNTY OF FREDERICK, VIRGINIA FIRE MARSHAL'S OFFICE LAND DEVELOPMENT COMMENTS Control No.0702960755 Date Received 060796 Applicant Greenway Inc. Address 970 Baker Lane Winchester, Virginia 22603 1 i� V,J� Date Reviewed 070 �'6�1�i 1 2°'�' Project Name The Corners Restaurant Phone No.540-662-4185 Type of ApplicationSite Plan Current Zoning RA 1st Due Fire Co. 17 1st Due Rescue Co. 19 Election DistrictBack Creek Tax I.D. No. 69-A-15A RECOMMENDATIONS Automatic Sprinkler SystemXX Residential Sprinkler System Automatic Fire Alarm SysterdXX Other REQUIREMENTS Emergency Vehicle Access Adequate XX Inadequate Not Identified Fire Lanes Required Yes No XX Comments Roadway/Aisleway Widths Adequate XX Inadequate Not Identified Special Hazards Noted Yes No XX Comments Hydrant Locations Adequate Inadequate Not IdentifiedXX Siamese Location Adequate Inadequate Not Identified XX Additional Comments Attached? Yes No XX Plan Approval Recommended? Yes XX No Signatu _��..-- Title"!12- 11/1 COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 FAX: 540/678-0682 June 18, 1996 Keith H. Burr Greenway, Inc. 970 Baker Lane Winchester, Virginia 22603 RE: Preliminary Site Plan Review of The Corners (Site Plan #027-96) Dear Keith: I have reviewed the above referenced site plan, received by this office June 10,1996. The following comments will need to be addressed in order to proceed with approval of this site plan. Please provide: 1) The owner's and developer's telephone numbers. 2) A space labeled "Approved by the Zoning Administrator" for the approval signature and date of approval. 3) The location, height, and dimensions of all signs. 4) The location and specifications of outdoor lighting fixtures. 5) A detail of the dumpster enclosure, including a latched gate system. 6) The height of all buildings. 7) The posted speed limits for Route 55 and 600. 8) A barrier between the parking facility and the adjoining state roads. This barrier is necessary to control vehicular access from this property to the state roads. 9) The property identification numbers (PIN) for the adjoining properties. 10) A handicapped parking space that complies with ADA requirements. 11) A statement that reflects the original building square footage and the proposed percentage increase. Also state that the property is maximizing its legal nonconformity expansion rights. Enclosed is a red -lined copy of this site plan. Please revise your site plan to address these comments, and the comments provided to you by the review agencies. 107 North Kent Street - Winchester. Vir;;inia 22601-5000 9 Page 2 The Corners site plan Mr. Keith Burr June 18, 1996 You will also need to provide this office with the completed comment sheets from all required review agencies. Once all comments have been addressed, please resubmit one copy of the revised site plan to this department for final review. If the revised site plan satisfies all agency comments, we will request five copies of the final site plan and recommend the site plan for approval. Please contact me if I may answer any questions regarding this letter. Sincerely, Z_/7 Eric R. Lawrence Planner I • Ll Vf�� GREENWAY, INC. 970BakerLane • Winchester, Virginia • 22603 ��ta)(.�•z-41BS L��� U �111] �� �WUUW�UJLJD U �G;�L� �1 O-lb-gG AT ToHTIoH LA Q 2E tlCll- R E K5 4 GCNTLENIEN W E A IC E S E N t71 r-I G l(o g T I► c H E D PRINT S l�PIaS t7ATF- No. PF- ICIPTior1 II q ii� 4 r - I�A � t,� cATcQN �F'sE THESE AiZE TKANSM17TED AS GHEGKCP' BEL-ovV ❑ F o 6- A PP F[.o VA L-. ❑ PaW- `�vcaFc U5E Cl A-ii iZEG?UESTED OLJ F o ►z iZ E V I E V4 A N L G O M NI E N T PC e MA V- KS ❑ I_E-iU0MITTED IES FOR APPrc-oVAL- ❑ :�-WMMITTED GoP1E5 FoR [715TIe15UTloN ❑ 9F-TU RN E P PFZI HT9 L • • GREENWAY ENGINEERING 19PI WINDY Hit-L- LANE WIN4--HE5TEK 14IRC71HIA Z2tip 0z LETTEF'i tlF TRANSMITTAL VAT t �A dIe NI . A7TaHTi.0P4 1-A- Ll /� F rc a GENTLEMEN WE AICE SENDING `(oU 7H5 ATTACHED PKINTS 41-4w MATE No PF- MCIPTioH // �vrsed lc' Z- THESE ARE TICANSM177ED AS GHEGKeC7 BELOW '. ❑ FOFZ APPfCoVAL ❑ 2E�iU13MITTED COPIES Fo1� APP1�oVIL Cl FaFZ Yr,'L.49 USE ❑ SUBMITTED GoPIES FoR DISTRI�UTIoN ❑ A S iZ EG?U E--iTE C7 ❑ iZETU fzN E D GoKR�GTE PRI NT`i ❑ FOR iZEV1EW AND COMMENT ❑ PZE MA;ZK 5 GONTAFT PER5oN SUMMITTED ISY • • GREENWAY ENGINEERING NP V 151 WINvY HILL .LANE WINGHESTER , VIRGINIA zztvoZ �G♦�) 662- 41>i5 Lf T T of TI ' ANSMITTAI ttA-t, VAT L ATT/NTIiN GL'NTLr-NIEN WE AlCa SENt71NG `(oU 7H6 ATTACHED PIZINT5 4-/rle,9 VATS Ho. PF-Is- IPTIoN C- Urn THESE AFZE TKAHSMITTEC:;P AS GHHGKCP BEL.oW '. ❑ FoFt APPKc,VAL �IZESUISMITTE� GvrIES FOR A►r1«VAL► ❑ Pvrz �(OLIR USE ❑-sWgF,"ITTEp GO/IE5 FoR pISTn[I��TION ❑ A-9 iZEG?cJE--iTED Cl $ZETUKNeP GORKEGTEC� PFEAH79 ❑ Fo2 lZEVIEW ANp GVMMENT ❑ !AIL D tit,e%� GoNTAFT PErR5orJ 5u6MITTED BY • ,`.� • '4... Ile COMMONWEALTH COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION EDINBURG RESIDENCY DAVID R. GEHR 14031 OLD VALLEY PIKE WILLIAM H. BUSHMAN, P.E. COMMISSIONER P.O. BOX 278 RESIDENT ENGINEER EDINBURG, VA 22824.0278 TELE (540) 984.56W FAX (540) 984.5607 October 11, 1996 Mr. Keith H. Burr Ref: "The Corners" Restaurant C/O Greenway, Inc. Routes 55 & 600 151 Windy Hill Lane Frederick County Winchester, VA 22602 Dear Keith: We have received your revised site plans dated September 30, 1996 for the referenced project. It appears all of our earlier review comments have been satisfactorily addressed. The plan is therefore approved with the understanding the proposed split rail fence along Route 55 will be extended all the way to the eastern property corner. Please advise the owner of our approval and that a land use permit may now be applied for to cover work within the Routes 55 and 600 rights -of -way. The permit will require a minimal processing fee and surety bond coverage. Once satisfactory application has been made, a permit of this nature will take approximatelirty, days to process and issue. If you have any questions please let me know. C. ; =' `: 1 Sincerely, j•' �'',I RBC/ rf Enclosure xc: Mr. S. A. Melnikoff Mr. Kris Tierney Robert B. Childress Trans. Permits & Subdivision Specialist Supervisor D `S Y OCT Ir3n* WE KEEP VIRGINIA MOVING -COUNTY OF FREDERICK, VIRGINIA .FIRE MARSHAL'S OFFICE LAND DEVELOPMENT COMMENTS Control No.0702960755 Date Received 060796 Date Reviewed 070296 Applicant Greenway Inc. Address 970 Baker Lane Winchester, Virginia 22603 Project Name The Corners Restaurant Phone No. 540-662-4185 Type of ApplicationSite Plan Current Zoning RA 1st Due Fire Co. 17 1st Due Rescue Co. 19 Election DistrictBack Creek Tax I.D. No. 69-A-15A RECOMMENDATIONS Automatic Sprinkler SysteniXX Residential Sprinkler System Automatic Fire Alarm SystemYX Other REQUIREMENTS Emergency Vehicle Access Adequate XX Inadequate Fire Lanes Required Yes No XX Comments Roadway/Aisleway Widtlui Adequate XX Special Hazards Noted Yes No XX Comments Not Identified Inadequate Not Identified , Hydrant Locations Adequate Inadequate Siamese Location Adequate Inadequate Additional Comments Attached? Yes No Not Identified Not Identified XX Plan Approval Recommended? Yes XX No Signatu 6�;.�._r / T i t I e�Eir�F�� •r11 1") q ,, COMMONWEALTH Of VIRC-jINIA DEPARTMENT OF TRANSPORTATION EDINBURG RESIDENCY DAVID R. GEHR 14031 OLD VALLEY PIKE WILLIAM H. BUSHMAN, P.E. COMMISSIONER P.O. BOX 278 RESIDENT ENGINEER EDINBURG, VA 22824.0278 TELE (540) 984.5600 FAX (540)984.5607 September 25, 1996 Mr. Keith H. Burr Ref: "The Corners" Restaurant C/O Greenway, Inc. Routes 55 & 600 151 Windy Hill Lane Frederick County Winchester; VA 22602 Dear Keith: We are returning your site plan dated September 17, 1996 for the referenced project. Please revise the plans in accordance with our earlier comments of July 22, 1996. Additionally, there appears to be some confusion over the entrance and profile cross sections. If you have any questions, please let me know. RBC/ rf Enclosures xc: Mr. S. A. Melnikoff Mr. Kris Tierney Sincerely, 6&16, d"J9,_ Robert B. Childress Trans. Permits & Subdivision Specialist Supervisor WE KEEP VIRGINIA MOVING Request For Site Plan Comments Frederick County -Winchester Health Department Mail to: Hand deliver to: Frederick -Winchester Health Department 800 Smithfield Ave. Atten: Sanitation Engineer Winchester, VA P.O. Box 2056 (703) 665-3480 Winchester, VA 22604 (703) 665 - 3480 -TTI#-6� Please fill out the information as accurately at. po5s1bld in oroer to assist the dUdncy with their review. Please attach one copy of your site plan with this sheet. Applicant's name:-Ei.1t,3PM % k ►S C Address: (:�s`i O a4a ea- lA N F Phone number: (06-� - 41 5 Name of development and/or description of the request: "TK W" 60.3%' (Zc- '�-tp 0 a_)a, q T- Location of development: C)►A -Trt E so Cri't4kJW QbP- a� 6;n7 boo o d 2T SS Health Dept.'s Comments. - Health Dept. use only ,Date received ,a��� Incomplete Hate reviewed Signature and Date Signature and Date (revisi Date revision received lncomplets Date reviewed Date approved • OREENWAY ENGINEERING ISI WINDY H ILL -ILA N E WINGHESTER NIRGINIA 2ZfrOZ LETTER (lf T ANP . MITTAI orA T t MTo 2 FREDERICK CO. INEERING & INSPECTIONS G L' N T L. Ir N1 E f4 W`c AlCe THE6 ATTACHED PFZINTS WE LI THESE AXE TKAHSMITTED A5 GHEGKCP 13EL-oVV 4 O Q. ' r iV o� ;v ❑ Fo2 AP/FcoVA L IZG sU&MITTED GOrIEs FOOL Arr-PLA A4,/ ❑ POPE 'fOWR USE ❑ A9 KeQue,Te-D ❑ Fvlz lZEVIEW AhlC�' GOMn.-1ENT IC a N/ A IC K y ❑-5rW0OAlT-TED GOrIE7 Fo![ D0irT1[ISkJTIPH ❑ R6Tu FCN e v GvR.KCGTc o rRI P1T9 r MW-.k- SMtrFFLA/ GONTAGT PF.K5oN 5uoMIT7EP BY Inspection Department Comments: Building shall comply with Virginia Uniform Statewide Building Code and Section 303, Use Group A (Assembly) of the BOCA National Building Code/1993. Other codes that apply are title 24 Code of Federal Regulation, Part 36 Nondiscrimination on the Basis of Disability by Public Accommodations and in Commercial Facilities. License A/E Seal required on building plans submitted for permit application. ADA parking and building access appears ok. Shall comply with ADA 20% rule for additions or renovation. Section 36.403 Title III r • • Request For Site Plan Cor7unents Frederick County Engineering Department Mail to: Hand deliver to: Frederick County Engineering Dept. 107 N. Kent Street Attem Director of Engineering Fourth Floor P.O. Box 601 Winchester, VA Winchester, VA 22604 (703) 665-5643 (703) 665 - 5643 Please fill out the information as accurately as possible in oraer to assist the agency with their review. Please attach two copies of your site plan with this sheet Applicant's name. C C--- G: E NWAu . 1 tti (! . Address. 9'`f D l_A t4e W , ► I C-►+ F -i,- t-F—k- � �i A-, 27_ Phone number: (n 6 Z - 41 6E), Name of development and/or description of the request. °i ce CCe..nl&?-S n Location of cevelopment. C)" T6}2- So JT1rtK t l 4 RoVT-G-7 S Engineering Department's Comments::11L C}rA (w, rnG. v�auµ�nnu-� Engineering Dep use only Date received Incomplete Date- reviewed Signature and Date Signature and Date (revision 6 1. C to Date revision received Incomplete D� re a eded 1 wI Jr\A Ddlb Upproved 111 ` r • • GREENWAY ENGINEERING; Isi WINDY HIL-LL LANE WINGHESTEW. VIRGIHIA ZZtvoZ r,+") t. f. Z- 4 I S 5 LIEUTEa ®IF lrlk a ZODUL VA i E .mot! N� . A r r.N71iN EQ.cC, L"a"CE --a G!'►NTLeM E ►4 WE AZE: SENDING `(oLJ THE ^TTAcHEP FFZIHT5 ✓ `-Jo lvO cn Cv s se ` �• • •� r► �• �� THEME AFZE-rKAH-iMITTE� AS GHEGKOP BELoVV '. ❑ FOFz f F-F-CoVAL Iz ZE,-iU95MITTEDC-4'PIrIES Fort ArrPtoVAL ❑ Fo2 USE ❑ A9 Ke4WLJI;7TCD ❑ FOFL FZEVIEvy AHL2 GOrnMENT ❑ SUBMITTEf7 GOPIE5 FoOC pISTIZIBUTIUN ❑ Kt�TU KN ev GoRnccGTC P PI[I NT9 U MA,Q- t Ct4k I iT 44k �ua NTAGT FEF-17 4 MITTED BY • Site Plan Information Checklist The following information must be included on your site plan. If your site plan is incomplete or is missing information, it will not be reviewed and returned to you for revisions. Administrative Information Y N 1. Name of proposed development 2. Name, address, and phone number of owner. 3. Name, address, and phone numbgr of developer. 4. Name, address, and phone number of designer. 5. Certificate of surveyor, engineer, or architect. 6. Date plan prepared and date of revisions. _! /1 7. A listing of all conditions placed on the site as a result of a conditional use permit or conditional zoning approval. 8. A space labeled "Approved by the Zoning Administrator" for the approval signature and date of approval. 9. A description of setbacks or conditions placed on the site as a result of a variance approval. (Reference the variance application number.) General Site Information Y N 10. Location map (scale 1:2000) 11. Magisterial District „L.. 12. Scale of site plan (not to exceed 1:50) i 13. North Arrow 14. Zoning of site 15. Use, zoning, and Property Identification Number (PIN#) of all adjoining properties. This includes properties located across �- 16. right-of-ways, streams, and railroad tracks. Surveyed boundaries for all lots and parcels. ,) General Site con't Y N 17. Acreage of all lots included in the plan. 18 The location and dimensions of all required set b and yard _ 19. The location and type of all dwelling units. 20. Location and description of all recreation facilities. ►`� 21. Location of sidewalks and pedestrian ways. 22. Location and area of common open space. 23. The location, height, and dimensions of all signs. 24. Location, height, and specifications of outdoor lighting fixtures. 25. Location and nature of outdoor storage areas. 26. Location of outdoor trash receptacles and dimensions of structure (fencing, etc.) required to nclose receptacles. a L "yam J..J' Building Information Y N 27. The height of all buildings and structures. 28. Location of all buildings, structures and uses. _.� 29. The proposed use of each building, structure and area. 30. Ground floor area and total floor area of all buildings with FAR calculations for commercial and industrial zoning districts. Roads Y N —� 31. Name and number of existing and planned streets on and adjoining the site. 32. Location of existing and planned streets on and adjoining the site. 33. Posted speed limit of existing adjacent roads. 34. Location and dimensions of all proposed entrances from public right-of-ways. m • • Utilities Y Parking Y W N Natural Features Y N 35. Location of all entrances on adjoining roads within 200 feet of the proposed or existing entrance. 36. Dimensions, boundaries, width, pavement, and construction of planned roads. 37. Location of all utilities, including sewer and water lines with the size of lines, mains, and laterals. 38. Location and width of all easements, including access, utility, and drainage easements. 39. Location and nature of fire lanes, fire hydrants, and all other facilities necessary to meet Fire Code requirements. 40. Calculations describing the required number of parking and loading spaces. 41. Location and dimensions of all parking and loading spaces, driveways, parking aisles, curbing and other features to be used. 42. Location and dimension of all disabled parking spaces and ramps. 43. Existing and finished contour lines. 44. Location of steep slopes, woodlands, floodplains, wetlands, sinkholes, and other environmental features. 45. Location of streams and drainage ways. Landscaping Y N 46. Landscaping plan describing location and types of plants to be used. •47. Location of required buffers and screening with cross sections or profiles. Erosion and Sediment Control Y N 48. A stormwater management plan with run off calculations and location and description of facilities to be used. 49. Soil erosion and sedimentation control plan describing the location and methods to be used to minimize erosion and sedimentation during development. 12