Loading...
HomeMy WebLinkAbout38-04 Valley Farm Credit - Parking Lot - Back Creek - BackfileA SITE PLAN TRACKING SHEET Date; o File opened 9 Reference Manual updated/number assigned zo� D-base updated Q q File given to Renee' to update Application Action Summary CLOSE OUT FILE; t6� Approval (or denial) letter mailed to applicant/copy made for file File stamped "approved", "denied" or 'withdrawn" p�G Reference Manual updated �10 D-base updated fS• (j File given to Renee' for final update to Application Action Summary pj-w-/ U \Carol\Common\Tnd:ing sh=tS\5 C Plan Tncling-pd Ktviscd 0V07103 SITE PLAN APPLICATION CHECKLIST The checklist shown below specifies the information which is required to be submitted as part of the site plan application. The Department of Planning & Development will review the application to ensure that it is complete prior to accepting it. If any portion of the application is not complete, it will be returned to the applicant(s). (1) One (1) set of approved comment sheets are required from each relevant review agency prior to final approval of a site plan. It is recommended that applicants contact the Department of Planning & Development to determine which review agencies are relevant to their site plan application. A list of potentially relevant review agencies is shown below: Frederick County Department of Planning & Development p Department of GIS (Geographic Information Services) Frederick County Sanitation Authority _ Frederick County Building Inspections Department 1/ Frederick County Department of Public Works Frederick County Fire Marshal rJ (L_ Frederick County Health Department N l Frederick County Department of Parks & Recreation Virginia Department of Transportation (VDOT) Ot N City of Winchester f Town of Stephens City Town of Middletown Frederick County / Winchester Airport Authority (2) One (1) copy of the Site Plan application form. (3) Payment of the site plan review fee. (4) One (1) reproducible copy of the Site Plan (if required). s 0 I zZpD 17� 7 I&Q- DATE 'V m RECEIVED FROM 0 — -- Q ADDRESS -- —� --- -- cr i f? LL FOR— ----- — — -- — — AMTCCO.OF CASH IrIjI I AMT. PAID CHECK BADDECE I � BY ORDER k m 0 0 i a DATE . NCL 3059 RECEIVED Mom ADDRESS A VCL �.t�l Qia rYl(iU rkpvMi ARS $ oc; FOR AMT OF �•49! �M M , ACCOUNT CASH u�- AMT PAID. CHECK 1 13ALANCE I ORDER I BY FREDERICK COUNTY DEPARTMENT OF PLANNIN DEVELOPMENT Site Inspection Form Permit Bolder Name Site Plan or SLybdivision Plan Number c Building Permit Number GWMPAL INFORMATION Property Identification Number (PIN) �•.�'A -,a i-N — I,ocat ion Contact Information INSPECTION OR ROADS, DRIVEWAYS & TRAVEL AISLES (Check when completed - note all incomplete work)' Street & Traffic Signs Striping Surface Material Comments i Inspector Inspector Sidewalks & Lighting v _— Dimensions — overall Layout Date verified Incomplete Date verified Complete INSPECTION Op PAMING. MANEUVERING AREAS a LOADING AREAS (Check when completed - note all incomplete work)+ Number nf Spaces - t. Striping -- Surface Materia' Comments Sidewalks & Lighting Dimension of Spaces T overall Layout Date verified Incomplete Inspector Date Verified Complete y Inspector Ii7SPECTIGi7 OF LANDSCApItZO INPRovENENTS (Check when completed - note all incomplete work s r/ Number of Shrubs Number of Trees ✓ Species of Plante Size of Plante Seeding Soil Stabilization Overall Layout Screens ------ comments Date Verified Incomplete Inspector Date verified Complete Inspector _ -- INSPECTION OF OTHER IMPROVEMENTS (Check when completed - note all incomplete work)' Recreational Facilities r "/ sethacks Preservation Areas '- Pr�ffered C.�n3it10119 Curb & Gutter :. lolly -- - --- Comments inspector-- r.st,e,-Cni — Date verified Incomplete Date verified Complete rpj=RICX COUNTY DXPARTtlENT OF PLANNING & DEVBLOPURNT - FINAL SITE APPROVAL Datd 6f Ap royal Signature is site approval contingent on a monetary guarantee? Yee* No � Bond Number —_--- (*if yes, all site improvements noted on this form must be complete prior to the release of a monetary guarantee. in addition, all relevant review agencies shall provide final site approval. A checklist of these agencies is provided below for documentation purposes.) Fire Marshal Virginia Department of Transportation Sanitation Authority Building Inspections City of Winchester Public F7orks ---- — Other ( Parks & Recreation __._ 'please date & initial when all site work is complete all relevantw agencies have approved) Initials Date Monetary Guarantee Released _ - �(ct1i-cq T76�nm C ►rff El+ The following information must be included on your site plan. If your site plan is incomplete or is missing information, it will not be reviewed and returned to you for revisions. Administrative Information Y N / 1. Name of proposed development. 2. Name, address, and phone number of owner. 3. Name, address, and phone number of developer. ✓ 4. Name, address, and phone number of designer. 5. Certificate of surveyor, engineer, or architect. 6. Date plan prepared and date of revisions. N p 7. A listing of all conditions placed on the site as a result of a conditional use permit or conditional zoning approval. V . 8. A space labeled "Approved by the Zoning Administrator' for - the approval signature and date of approval. F 9. A description of setbacks or conditions placed on the site as a - - result of a variance approval. (Reference the variance - application number.) General Site Information Y N 10. Location map (scale 1:2000) 11. Magisterial District 12. Scale of site plan (not to exceed 1:50) ✓" 13. North Arrow 14. Zoning of site 15. Use, zoning, and Property Identification Number (PIN#) of all adjoining properties. This includes properties located across right-of-ways, streams, and railroad tracks. r/ 16. Surveyed boundaries for all lots and parcels. E 7T I General Site CcorVt Y N ✓ 17. Acreage of all lots included in the plan. 18. The location and dimensions of all required setbacks and yard — — areas. fJ( I` 19. The location and type of all dwelling units. 20. Location and description of all recreation facilities. 21. Location of sidewalks and pedestrian ways. ((� 22. Location and area of common open space. U (lam 23. The location, height, and dimensions of all signs. 24. Location, height, and specifications of outdoor lighting fixtures. 25. Location and nature of outdoor storage areas. A 26. Location of outdoor trash receptacles and dimensions of — — structure (fencing, etc.) required to enclose receptacles. Building Information Y N 27. The height of all buildings and structures. 28. Location of all buildings, structures and uses. ,/ 29. The proposed use of each building, structure and area. ✓ 30. Ground floor area and total floor area of all buildings with FAR — calculations for commercial and industrial zoning districts. Roads Y N 31. Name and number of existing and planned streets on and — adjoining the site. < 32. Location of existing and planned streets on and adjoining the — site. 33. posted speed limit of existing adjacent roads. ,i ✓ 34. Location and dimensions of all proposed entrances from public — — right-of-ways. a Utilities Y N Parking Y N Natural Features Y N t� c N 35. Location of all entrances on adjoining roads within 200 feet of the proposed or existing entrance. 36. Dimensions, boundaries, width, pavement, and construction of planned roads. 37. Location of all utilities, including sewer and water lines with the size of lines, mains, and laterals. 38. Location and width of all easements, including access, utility, and drainage easements. 39. Location and nature of fire lanes, fire hydrants, and all other facilities necessary to meet Fire Code requirements. 40. Calculations describing the required number of parking and loading spaces. 41. Location and dimensions of all parking and loading spaces, driveways, parking aisles, curbing and other features to be used. 42. Location and dimension of all disabled parking spaces and ramps. 43. Existing and finished contour lines. . 44. Location of steep slopes, woodlands, floodplains, wetlands, sinkholes, and other environmental features. 45. Location of streams and drainage ways. . .4. Landscaping Y N Ij t (,N 47. Erosion and Sediment Control Y N Landscaping plan describing location and types of plants to be used. Location of required buffers and screening with cross sections or profiles. 48. A stormwater management plan with run off calculations and location and description of facilities to be used. 49. Soil erosion and sedimentation control plan describing the location and methods to be used to minimize erosion and sedimentation during development. 12 Valle% Farm Credit Parking Lot Addition Subject: Valley Farm Credit Parking Lot :addition Date: Fri. 15 Oct 2004 08:33:54 -0400 From: "Baker. Philip (Staunton)"<Philip.Baker@VDOT.Virginia.gov> To: "'phenrya)howardshockey.com"' <phenry@howardshockey.com> CC: "Stover, William"<Bill.StovergVDOT.Virginia.gov>, "Hawkins. Dwight" <Dwight.Hawkins@VDOT.Virginia.gov>, I"mcherangco.frederick.va.us"' <mcheran@co.frederick.va.us>. "Baker. Philip (Staunton)" <Philip.Baker(a�VDOT.Virginia.gov> Ref: Valley Farm Credit Parking Lot Addition Route 1129, Frederick County In accordance with your request dated October 13, 2004 you are given permission to install a temporary construction entrance at the referenced location. This letter is to be considered your permit to do so. The following provisions will be required: • Work area protection signage is to be in accordance with the current Work Area Protection Manual while working on the right-of-way. • All work on the right-of-way is to be confined to the temporary entrance location only. • A minimum 6" depth of VDOT #1 (2-3 inch stone) at a minimum width of 12' is to be placed from the edge of pavement and extended a minimum of 70' with a filter fabric underliner. • All materials spilled, dropped, washed or tracked from vehicles onto the roadway or into storm drains must be removed immediately. • Positive drainage is to be maintained within the right-of-way at all times. • A wash rack will be required. • The existing culvert can be used for the proposed temporary construction entrance. • Any disturbed areas of the right-of-way or damages to the pavement structure adjacent to this entrance will be repaired by you to our satisfaction. • This permit is being issued for 180 days. • All work is to be completed in accordance with the enclosed Virginia Erosion & Sediment Control Handbook, Specification 3.02. «Temp. Constr. Entrance Permit Form Letter Attachment - Page #1.tif>> «Temp. Constr. Entrance Permit Form Letter Attachment - Page #2.tif>> «Temp Constr. Entrance Permit Form Letter Attachment - Page #3.tif>> «Temp Constr Entrance Permit Form Letter Attachment - Page #4 tif» • The entrance is to be installed at the location shown on the site plan prepared by Greenway Engineering dated August 18, 2004. The Department of Transportation will not be held liable for suit should such result from this operation nor is it granting permission to grade on the property of others or disturb underground utility lines. If the above listed items are not followed this permit may be revoked. Should you have any questions, please let me know. Philip A Baker Hwy Permits & Subd Specialist Sr. VDOT - Edinburg Residency Land Development 14031 Old Valley Pike Edinburg. VA 22824 (540)984-5633 of 2 10/25/2004 4:34 PM FRE0EF 8CK) COUNTY LANNING &DEVELOPMENT COMMONWEALTH ®f VIRCj Philip A. Shucet COMMISSIONER November 4, 2004 Ms. Patty Henry C/O Howard Shockey & Sons 1057 Martinsburg Pike Winchester, VA 22603 DEPARTMENT OF TRANSPORTATION EDINBURG RESIDENCY 14031 OLD VALLEY PIKE EDINBURG, VA 22824 Ref: Valley Farm Credit Parking Lot Entrance Route 1129 Frederick County Dear Patty: JERRYA. COPP RESIDENT ENGINEER TEL (540) 984-5600 FAX (540) 984-5607 Enclosed is your approved Land Use Permit #855-7025 to cover the construction and maintenance of one commercial entrance at the referenced location. Please ensure a copy of the approved permit assembly is kept at the job site whenever working within the Route 1129 right-of-way. I would also like to remind you of the need to erect and maintain proper traffic control in accordance with our Virginia Work Area Protection Manual. Please give Mr. Dwight Hawkins a call at (540) 984-5616 at least 48 hours in advance of the start of construction to arange for any necessary inspections. If you have any questions concerning the permit requirements or during construction, do not hesitate to call. Sincere x f-1406 Philip A. Baker, Hwy Permits & Subd. Specialist Sr. PAB/rf Enclosure xc: Mr. C. B. Harris (w/ copy of permit) Mr. Dwight Hawkins Mr. Mark Cheran VirginiaDOT.org WE KEEP VIRGINIA MOVING 7 r E C E �111 E OCT 2 2 2004 FREDERICK COUNTY PLANNING & DEVELOPM • Request For Site Plan Comments Brick Countv Engineering Depart Mail to: Frederick County Engineering Dept Attn: Director of Engineering 107 North Kent Street Winchester, VA 22601 (540) 665-5643 Hand deliver to: 107 North Kent Street Fourth Floor Winchester, Virguiia (540) 665-5643 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the site plan with this sheet. Applicant's Name: Greenway Engineering Address: 151 Wine IIill Lane, Winchester. Virginia 22602 Phone Number: (540) 662-41.55 Name of development and/or description of the request: Valley Farm Credit Office Addition Location: 125 Prosperity Drive 01 1s 0 0 E FU COUNTY of FR DERICK Department of Planning and Development 540/665-5651 FAX: 540/ 665-6395 September 13, 2004 Mr. Evan Wyatt Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 Re: Approval of Site Plan #38-04 Valley Farm Credit: Parking Lot Property Identification Number (PIN) 75-A-2K Dear Evan: The Frederick County Department of Planning and Development administratively approved the above -referenced site plan on September 7, 2004. Approval is granted for the construction of a parking lot for use by Valley Farm Credit that will be built in two phases. The first phase of parking will consist of fifty (50) spaces and the second phase of parking will consist of twenty five (25) spaces. The second phase of the parking lot will initially be used for construction staging for the Valley Farm Credit Building Expansion. This parking lot will be fully bonded and completed immediately following the building expansion. All requirements of the Frederick County Zoning Ordinance have been adequately addressed in the site plan, including approvals from all relevant review agencies. I am providing you with six (6) copies of the approved site plan. Please forward these copies to the appropriate representative(s). Furthermore, advise the owner(s) that a copy should be kept for future reference, and an approved copy must be kept on the construction site throughout the development process. Once site development is complete, the owner(s) should contact this office to schedule an on -site inspection. Do not hesitate to contact me should you have any questions or concerns. Sincerely, Candice E. Mills - Planner II CEM/bad .Attachments cc: .,Jane Anderson, Real Estate /15atrick Barker, Economic Development Commission Shawnee Magisterial District Supervisor William C. Rosenberry, Shawnee District Planning Commissioner -9bert A. Morris, Shawnee District Planning Commissioner iValley Farm Credit, P.O. Box 2700, Winchester, VA 22604 107 North Kent Street - Winchester, Virginia 22601-5000 RUI-�11 W111 COUNTY of FREDERICK Department of Planning and Development S40/66S-S651 FAX: 540/ 66S-6395 MEMORANDUM TO: R. Wayne Corbett, Deputy Treasurer FROM: Mark R. Cheran, Zoning and Subdivision Administratorio/ (�:_. SUBJECT: Check #29616804 Valley Farm Credit Valley Farm Credit (Parking Lot, Phase II), Site Plan #38-04 DATE: September 13, 2004 Attached is Check 929616804 in the amount of $21,858.05 from Valley Farm Credit, ACA. This check will be adequate to cover the costs associated with the second phase of the parking lot at Valley Farm Credit. If you have any questions, do not hesitate to contact me. MRC/dlw Attaclunents 107 North Kent Street • Winchester, Virginia 22601-5000 VALLEY FARM CREDIT, ACA Payee: fter of Frederick County WINCHESTER, VA Street: Suite: City/State/Zip: 29616804 GL Account Center Net Number Number Description Amount Discount Amount $21,858.05 $21,858.05 Remarks: TOTAL PAID $21,858.05 FIRST UNION NATIONAL BANK IRE 29616804 CHAPEL HILL, NC VALLEY FARM CREDIT, ACA 74 t WINCHESTER, VA September 10, 2004 PAY Twenty one thousand eight hundredfiftyeight and O51100dollars Vold after 90 days $21,858.05 TO THE Treasurer of Frederick County ORDER OF 1) AUTHORIZED IGNATURE 296 III 6 iR 0 V -1: 0 5 3 10 156 1.1: 20.799000 1 t, 13 0 a Ill GREENWAY E INEERING 151 WindyHill lane Winchester, Virginia 22602 1 Founded in 1971 September 13, 2004 Frederick County Plaiuiing Department Attn: Mark Cheran, Zoning Administrator 107 North Kent Street Winchester, VA 22601 RE: Valley Farm Credit Parking Lot Site Plan Dear Mark: ECE D � SEP 1 3 2004 FREDERICK COUNTY PLANNING & DEVELOPMENT Please find attached the original bond estimate for the completion of the Phase II portion of the parking lot for Valley Farm Credit, a response from Joe Wilder, Public Works Deputy Director, which confirms the adequacy of this cash escrow, and check number 29616804 in the amount of $21,858.05 for this project. As you know, Valley Farm Credit plans to utilize this area for construction staging during the expansion of their existing office building located on Prosperity Drive. Please accept this cash escrow to guarantee the completion of this project and to allow for the release of the final Site Development Plan. Please do not hesitate to contact me if you have any questions regarding this information. Thank you once again for your assistance with this matter. Sincerely, Evan Wyatt, AICP Greenway Engineering Cc: Robert Carpenter, Valley Farm Credit President Engineers Surveyors Telephone 540-662-4185 FAX 540.722-9528 File 113937/EAW www.greenwayeng.com Evan Wvatt From: Joe Wilder owilder&o.frederick,va.us] Sent: Friday, September 10, 2004 3:36 PM C To: Evan Wyatt Subject: Re: FW: VFC Bond 3 2004 Evan, The subject amount appears to be adequate for the subject bo [OTSEP Joe FREDERICK COUNTY Wilder PLANNING & DEVELOPMENT Evan Wyatt wrote: > Hi Joe, > Please review the attached bond estimate for the second phase of the > parking lot at Valley Farm Credit. VFC plans to completely grade for > the parking lot and put down the base stone. They will then use the > second phase area for staging for their office building expansion and > will complete the parking lot at the end of that project. I spoke with > Mark Cheran this afternoon and advised him of the bond estimate amount. > Mark will issue the final site plan following your approval of the bond > estimate and receipt of the cash escrow. Please reply to this message > as to the adequacy of this bond amount. Thank you in advance for your > assistance regarding this matter. > Take care, > Evan > -----Original Message ----- > From: Jeremy Tweedie > Sent: Friday, September 10, 2004 11:00 AM > To: Evan Wyatt > Subject: VFC Bond > «3937-phase 2.pdf>> ------------------------------------------------------------------------ > Name: 3937-phase 2.pdf > 3937-phase 2.pdf Type: Acrobat (application/pdf) > Encoding: base64 1 GREENWAY ENGINEERING 151 Windy Hill Lane, Winchester, VA 22602 Telephone (540) 662-4185 Fax (540) 722-9528 Frederick County, Virginia PERFORMANCE BONDS PROJECT NA01E: VALLEY FARAI CREDIT PARKING LOT ADDITION Phase II DATE PREPARED: Septenrher 10, 2004 1. MOBILIZATION/ DEMOBILIZATION OF CONSTRUCTION EQUIPMENT Mobilization/ demobilization @ Lump Sum 2. STOR I DRAINAGE A. STRUCTURES QUANTITY DI-1 @ S1,200 EA DI-3 @ S1,700 EA DI-4 @ S2,100 EA YI-I @ S1,300 EA MH-I @ S1,400 EA MH-2 @ S1,900 EA JB-I @ S2,800 EA DI-7 @ $1,600 EA DI-12 @ S1,600 EA B. CONCRETE PIPES QUANTITY 12" Diam.@ S24 LF 15" Diarn.@ S28 LF 18" Diam.@ S32 LF 21" Diam.@ S36 LF 24" Diam.@ S40 LF 27" Diam.@ S44 LF 30" Diam.@ $48 LF 33" Diam.@ S56 LF C. END 1VALLS QUANTITY 12" Diam.@ $450 EA 15" Diam.@ S550 EA 18" Diam.@ S650 EA 21" Diam.@ S800 EA 24" Diam.@ S1,000 EA 27" Diam.@ S1,200 EA 30" Diam.@ S1,350 EA 33" Diam.@ $1,500 EA COST K9b 11 S0.00 S0.00 S0.00 S0.00 $0.00 S0.00 S0.00 S0.00 S0.00 S0.00 S0.00 S0.00 S0.00 S0.00 $0.00 S0.00 QUANTITY QUANTITY SUB -TOTAL 36" Diam.@ 42" Diam.@ 48" Diam.@ 54" Diam.@ 60" Diam.@ 66" Diam.@ 72" Diam.@ 36" Diam.@ 42" Diam.@ 48" Diam.@ 54" Diam.@ 60" Diam.@ 66" Diam.@ 72" Diam.@ COST $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 COST $68 LF $0.00 $80 LF $0.00 $96 LF $0.00 $112 LF $0.00 $128 LF $0.00 $144 LF $0.00 $164 LF $0.00 COST $1,700 EA $0.00 $1,950 EA $0.00 S2,200 EA S0.00 $2,500 EA $0.00 S2,850 EA $0.00 $3,250 EA S0.00 S3,700 EA S0.00 D. END SECTIONS (ES-1) QUANTITY COST 12" Diam.@ S300 EA S0.00 15" Diarn.@ S350 EA S0.00 18" Diam.@ S400 EA S0.00 21" Diarn.@ S450 EA S0.00 24" Diarn.@ $500 EA S0.00 E. CORRUGATED METAL PIPES QUANTITY COST 12" Diam.@ S20 LF S0.00 15" Diam.@ S25 LF S0.00 18" Diam.@ S35 LF S0.00 24" Diam.@ S45 LF S0.00 30" Diam.@ S55 LF S0.00 F. END SECTIONS (ES-2) QUANTITY COST 15" Diam.@ S250 EA S0.00 18" Diam.@ S300 EA $0.00 24" Diarn.@ S350 EA S0.00 30" Diam.@ $400 EA S0.00 SUB -TOTAL $0.00 G. STORriIR'ATER MANAGEMENT/BMP FACILITIES QUANTITY Excavation Embankment (Fill Material) " STORM DRAINAGE PIPE (RCP, CMP, PVC, Riser) 36" Diam. STORM DRAINAGE STRUCTURES Riser Modfied JB-I End Nall SPILLWAY LINING Seed, fertilize & Mulch (S200.00 Min.) Sod Rip - Rap Grouted Rip - Rap 4% QUANTITY COST 27" Diam.@ $600 EA $0.00 30" Diarn.@ S700 EA $0.00 33" Diam.@ $800 EA $0.00 36" Diam.@ $950 EA $0.00 QUANTITY COST 36" Diam.@ $65 LF $0.00 42" Diam.@ $75 LF S0.00 48" Diam.@ S85 LF $0.00 54" Diam.@ $100 LF S0.00 60" Diam.@ $115 LF $0.00 QUANTITY COST 36" Diam.@ $500 EA S0.00 42" Diam.@ $600 EA S0.00 48" Diam.@ $700 EA $0.00 SUB -TOTAL $0.00 COST $7.00 CY $0.00 $13.00 CY $0.00 $68.00 L.F. $0.00 $4,000.00 $0.00 $3,000.00 EA $0.00 $0.40 SY $0.00 $3.00 SY $0.00 $5.50 SF S0.00 $7.00 SF $0.00 SUB -TOTAL $0.00 • ft 3. CONSTRUCTION WITHIN THE RIGHT -Or -WAY AND/OR EASEMENTS A. SITE WORK Clear & Grub @ $7,500 Ac Excavation @ $6.00 CY Embankment (Fill Material) " @ $12.00 CY Rock Excavation @ $25.00 CY Slope Stabilization - Hydro seeding 0 SY @ $0.40 SY (3:1 or (latter) $1000 Min. Slope Stab. - lute Mesh @ S1.00 SY (Between 2:1 to 3:1) S200 Min. Slope Stab. - Sod @ $3.00 SY (Between 2:1 to 3:1) S200 Min. SUB -TOTAL $0.00 $0.00 $0.00 $0.00 S0.00 $0.00 $0.00 $0.00 B. SUBBASE AND BASE COURSE ITEMS QUANTITY COST Thickness (inch) Parking area Base Course 1,196 SM 9.5A 2 @ $2.50 SY Per Inch Depth $5,981.00 Bituminous Concrete 6 @ $2.50 SY Per Inch Depth $0.00 Rebecca & Braxton Subbase & Base Course Aggregate (21A or 21B) 8 @ $1.00 SY Per Inch Depth $0.00 Bituminous Concrete 4 @ $2.50 SY Per Inch Depth $0.00 Class A Prime & Double Seal Surface Treatment @ $4.00 SY S0.00 Gravel Shoulders @ $4.50 SY (4 in. Depth) S0.00 Underdrains: UD-4 @ $8.00 LF S0.00 Soil Cem. Stabilization (4%) @ $8.00 SY (6 in. Depth) $0.00 Lime Stabilization (10%) @ $7.00 SY (6 in. Depth) S0.00 Cement Treated Aggregate @ $1.50 SY Per Inch Depth S0.00 D. ENTRANCES AND PIPESTEMS QUANTITY COST CG-913 @ $1,700 S0.00 CG-II @ $1,500 EA $0.00 Valley Gutter @ $40 SY $0.00 E. MISCELLANEOUS CONSTRUCTION ITEMS QUANTITY COST Sidewalk (4' Width) @ $10 LF $0.00 Sidewalk (5' Width) @ $13 LF $0.00 Header Curb @ $15 LF $0.00 632 Curb & Gutter @ $18 LF $11,376.00 CG-12 (Exposed Aggregate) a $40 SY $0.00 Bicycle Trail/Walkway @ $2 SF S0.00 Street Name Sign @ $100 EA $0.00 Traffic Control Sign @ $100 EA $0.00 II Landscaping Trees @ $150 EA SUB $1,650.00 $19,007.00 -TOTAL QUANTITY COST Traffic Barricade (TB-1) @ $500 EA $0.00 Street Lighting @ $3,000 EA $0.00 SUB -TOTAL, •� $0.00 r ft 4. SANITARY SEWER & WATER LINE CONSTRUCTION QUANTITY Fire Hydrant Sanitary Sewer Manhole QUANTITY QUANTITY 4" Diam. DIP 6" Diam. DIP 8" Diam. DIP 12" Diam. DIP 16" Diam. DIP 18" Diam. DIP Meter Crock' @ $2,200 EA @ $2,200 EA @ $12 LF @ $16 LF @ $19 LF @ $27 LF @ $35 LF @ $50 LF @ $1,030 EA 8" Diam. PVC' @ $19 LF 8" Diam. DIP @ $24 LF 10" Diam. PVC* @ $22 LF 10" Diam. DIP @ $30 LF 12" Diam. PVC` @ $27 LF 12" Diam. DIP @ $33 LF 15" Diam. DIP @ $35 LF For sizes larger than 15" diameter, add $3.00 per inch ojimcrease in ciometer 5. SILTATION AND EROSION CONTROL QUANTITY Diversion Dike Straw Bale Barrier Clean out SWM Facilities and Silt Basins Silt Fence Sod Seed, fertilize & Mulch $200 Min. Coarse Aggregates (41 or H 57) Inlet Protection Check Dam Temp. Construction Entrance Wash Rack Temp. Sediment Trap (For disturbed area up to I acre) Temp. Sediment Trap Inclusive of Pipe Outlet ( For disturbed area 1-3 acres) Temp. Sediment Basin: By Itemized Cost SUB -TOTAL @ $4 LF @ $4 LF @ $250 /Hr Lump Sum (Min. $2,000) @ $5 LF @ $3.00 SY 0 SY @ $0.40 SY 0 SY @ $0.40 SY 0 SY @ $0.30 SY @ $20.00 TON @ $120 EA @ $100 EA @ $1,000 EA @ $2,000 EA @ $200 EA @ $500 EA @ $500 Lump Sum modified SWM riser SUB -TOTAL COST $0.00 $0.00 COST $0.00 S0.00 $0.00 $0.00 $0.00 $0.00 $0.00 COST $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 COST $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1 r to TOTAL CONSTRUCTION COST CONTINGENCY COST - 15% Or TOTAL CONSTRUCTION COST O � v TUNE N KI ADHIKUSUMA -b No. 26715 �clr �o�f SIGNAL � SEAL TOTAL PERFORMANCE BOND AMOUNT I hereby certify that the above is my best estimate of the quantities and current cost of bondable improvements and siltation & Erosion Control Cost in this subdivision or site plan. $19,007.00 S2,851.05 $21,858.05 /7* GREENWAY ENGINEERING clicsty1Iii inia \V'inchcster, Virginia 22602 I founded in 1971 August 25, 2004 Frederick County Department of Planning and Development 107 North Kent Street Winchester, VA 22601 Attn: Candice Mills Re: Valley Farm Credit Comments Dear Ms. Mills: We are in receipt of the continents and offer the following responses. Responses are in order of Planning's comments. Comments from Frederick County Planning Department Response 1: A Phasing Narrative has been added to the coversheet. Response 2: See Site Plan. Response 3: 75 parking spaces have been denoted on the covershcet and the site plan. Response 4: See Site Plan. Response 5: Total impervious area has been corrected. Response 6: "file planting scliedule has been corrected. Response 7: A shrub legend has been added to the landscape plan. Response 8: A note has been added stating, "All raised islands within the parking area shall be landscaped with shade trees and grass." Response 9: All easements shown on the Valley Farm Credit site plan by Painter -Lewis have becn added to the plan. Response 10: Uses have been added to adjoining property owners' information. Response 1 1: See detail slieet for pavement section areas. Response 12: Concrete wheel stops have been moved. Response 13: A note has been added to the site plan. Response 14: Steps have been labeled and handrails added. Response 15: See note on site plan. Engineers Surveyors Telephone 5,10-662-4185 FAX 5,10-722-9528 Pile 83937/PG/dlm +vnnv.greemvayeng.com E c E � V E AUG 5 11 FREDERICK COUNTY PLANNING & DEVELOPMENT • Response 16: Open space calculations have been corrected. Response 17: Owner's Certificate has been corrected. i.r,''!4 Response 18: Property owner contact has been added to Owner's Certificate. Response 19: The road construction note has been removed from the coversheet. Response 20: Engineer will sign Plans. Response 21: Subtitle has been added to title block. Response 22: Lighting details have been added to detail sheet. Note has been added to site plan. Response 23: Note has been added to site plan. Response 24: Date has been added. Response 25: Building setback line has been added to the plans. Response 26: See note on the site plan. Please contact us at your convenience if you have any questions or need additional information. Thank you for your time in this matter. Sincerely, Greenway Engineering Eric Gottshall Enclosures File #3937/EG/dlm 2 • u pECE WE AUG 2 5 FREDERICK COUNTY PLANNING & DEVELOPMENT u Request For Site Plan Comments Frederick County Engineering Department Mail to: Frederick County Engineering Dept. Attn: Director of Engineering 107 North Kent Street Winchester, VA 22601 (540)665-5643 Hand deliver to: 107 North Kent Street Fourth Floor Winchester, Virginia (540) 665-5643 E C 1-1 E � W E 10 FREDERICK COUNTY ANNING & DEVELOPMI Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the site plan with this sheet. Applicant's Name: Greenway Engineering Address: 151 Windy Hill Lane, Winchester, Virginia 22602 Phone Number: (540) 662-4185 Name of development and/or description of the request: Valley Farm Credit -Parking Lot Addition Location: Prosperity Drive-Kernstown Business Park Engineering Department's Continents: 12g:eL, at '�� c,�4 -th Late rcceivcd I)ale rcvi•ion reucivrd L ale applowd incompicte In�t�ml1tcle )]ate rc%iewed k3 je '/ Uate rt:%iewct# Signature and Dale SigiiaturC and Dale (rCVISit' l ,� Valley Farm Credit Page 1 of 1 Eric Gottshall From: Ingram, Lloyd[Lloyd.Ingram@VDOT.Virginia.gov] Sent: Wednesday, September 01, 2004 1:18 PM To: Eric Gottshall Cc: Hawkins, Dwight; Eric Lawrence (E-mail) Subject: Valley Farm Credit Ref: Valley Farm Credit Route 1129, Frederick County We have received your revised site plan dated August 18, 2004 for the referenced project. It appears all of our earlier review comments have been satisfactorily addressed. Please note on Sheet 8 of 9, the mix types of asphalt are incorrect; should be BM-25 and SM-9A. Please advise the owner of our approval. Also please provide five (5) sets of approved construction plans with signed seal for VDOT distribution. The appropriate land use permit may now be applied for to cover work within the Route 1129 right-of-way. The permit is issued by this office and will require a minimum processing fee, surety bond coverage, and the salary & expenses of a State assigned Inspector. A copy of any/all recorded plats of dedication for drainage easements or additional right-of-way required for implementation of this proposed project should be provided to VDOT prior to issuance of any land use permits. Dedication should be made to the Commonwealth of Virginia. Once satisfactory application has been made, a permit will normally take approximately thirty days to process and issue. Should is you have any questions, do not hesitate to call. Dwight W. Hawkins, Contract Administrator For: Lloyd A. Ingram, Transportation Engineer VDOT — Edinburg Residency 140:1 Old Valley Pike Edinbura, VA 22824 (540) 984-5616 (540) 984-5607 (fax) 9/7/2004 Request For Site Plan Comments Frederick County Fire Marshal Mail to: Frederick County Fire Marshal Attn: Fire Marshal 107 North Kent Street Winchester, VA 22601 (540) 665-6350 Iland deliver to: 107 North Kent Street First Floor Winchester, VA (540)665-6350 C E j P 7 2004 FREDERICK COUNTY PLANNING & DEVELOPMENT Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the site plan with this sheet. Applicant's Name: Greenway En ing eering Address: 151 Windy Hill Lane, Winchester, Virginia 22602 Phone Number: (540) 662-4185 Name of development and/or description of the request: Valley Farm Credit -Parking, Lot Addition Location of property: Prosperity Drive-Kernstown Business Park Fire Marshal's Comments: t-ire :iiid Rescue 1)vwt use only L)atc Icccivcd 1)atc rcvishet rccrivcd E?;ttc ::hhrcn'cd % Incomplete incnmi kit Date reviets2(t r)atc rrviQMIA Signature and Date' Signature and Datc (revi ion) 's 19 �tca o yq y G AIRGINI i A Control number SP04-0039 Protect Name Valley Farm Credit Parking Address 151 Windy Hill Lane Type Application Site Plan Current Zoning 82 Automatic Sprinkler System No Other recommendation Emergency Vehicle Access Adequate Siamese Location Not Identified Emergency Vehicle Access Comments Access Comments Additional Comments Frederick County Fire and Rescue 'p ------ Department Office of the Fire Marshal 7 2V Plan Review and Comments FREDERICK COUNTY PLANNLOPMENT Date received Date reviewed Date Revised 6/30/2004 7/2/2004 Applicant Greenway Engineering City State Zip Applicant Phone Winchester VA 22602 540-662-4185 Tax ID Number Fire District Rescue District 75-A-2K 11 11 Election District Recommendations Back Creek Automatic Fire Alarm System Residential Sprinkler System No No Requirements Hydrant Location Adequate Roadway/Aisleway Width Adequate Fire Lane Required Yes Special Hazards No Plan Approval Recommended Reviewed By Signature � 1. � Yes Timothy L Welsh A WD Title PUM FIRS MARSHAL, FREDERICK COUNTY ) VV CO N Y of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 665-6395 July 26, 2004 Mr. Evan Wyatt Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 Re: Review Comments for Site Plan #38-04 Valley Farm Credit: Parking Lot Property Identification Number (PIN) 75-A-2K Dear Evan: Staff is in receipt of the site plan for the above -referenced project, accepted on July 7, 2004. This site plan proposes a parking lot on the parcel adjoining Valley Farm Credit. This parking lot is intended to be used by Valley Farm Credit, and may accommodate parking for a future building addition to the existing Valley Farm Credit building. At this time, the site plan is denied until the following comments are adequately addressed. Review Comments: ,/ I) Phasing Intent Narrative. Please provide a narrative on the cover page of the site plan which describes the intent behind the proposed phasing plan. This narrative should clearly describe when each phase will be initiated. Please also include within this narrative what the proposed parking lot is intended to be used for. 2) Handicap Parking. Please provide handicap parking calculations on the site plan which describe the total number of required handicap parking spaces for both parcels. Based on a total of 123 parking spaces for both of Valley Farm Credit's parcels, a total of five handicap parking spaces are required per Section 165-27 E (6) of the Zoning Ordinance. Please provide the required number of parking spaces. ✓3) Number of Parking Spaces. There are only 75 parking spaces illustrated on the site plan. However, the parking calculations on page 1 of 9 and the phasing note on page 4 of 9 indicates that there are a total of 76 parking spaces. Please correct this discrepancy as necessary. /4) Updated Parking Calculations For Eastern Parcel. Please provide updated parking calculations for the Valley Faun Credit property to the east. These parking calculations should account for the reduction of one parking space on Valley Farm Credit's eastern parcel (due to the proposed pedestrian access area). ✓5) Landscape Calculations. In regards to the landscaping calculations found on page 1 of 9, please clarify why the total impervious area (31,080.9) is different than the impervious area used to calculate the total number of required perimeter trees for the proposed parking lot (33,762). If the 107 North Kent Street • Winchester, Virginia 22601-5000 reason is an error, please change as necessary so the two numbers are the same and the correct number of required perimeter trees are accounted for. ✓6) Planting Schedule / Landscape Calculations. The total number of proposed trees shown on page I of 9 (39 trees) in the landscaping calculations is different than the total number of trees shown in the planting schedule on page 6 of 9 (33 trees). Please correct as necessary so all information is consistent. To note, the total number of trees illustrated on the landscaping plan is the same as shown on page 1 of 9 (39 trees). 7) Evergreens. There appears to be 26 shrubs illustrated on the landscape plan, found on page 6 of 9; however, these shrubs are not accounted for in the planting schedule. If these shrubs are proposed, please provide their species name, quantity, and container size at planting in the planting schedule. 8) Landscaped Islands. Please provide a note at each landscaped island shown on the site plan so it is clear that these areas shall be top soiled and seeded. 9) Utility Lines and Easements. No easements are shown for the existing water, electric and gas lines. Please ensure that all easements and utility lines are shown on the site plan. ✓10) Adioinine Property Information. Please provide the uses of the adjoining properties for parcels 75- A-21- and 75-A-2J. It may also be appropriate to be more descriptive than simply saying "commercial" for the description of the adjoining uses. For example, for the property owned by Horton Investments, Inc., it would be appropriate to describe the use of this property as a nursery. vl 1) Light or Heavy Pavement. Please clarify which of the two pavement types, as shown in the detail on page 8 of 9, will be used for the pavement surface of the parking lot. ✓12) Concrete Wheel Stops. Please move the proposed temporary concrete wheel stops at least two feet further to the south of the parking lot so all proposed parking parking spaces in Phase 1 are a minimum of 180 square feet in area. Please also label the proposed spacing between the concrete wheel stops. 13) Outdoor Storage Display or Inoperable Vehicles. Please provide a note on the site plan to the effect that there shall be no outdoor storage, outdoor display, vehicles awaiting repair, or inoperable vehicles parked in the proposed parking lot. 14) Steps. Please label the proposed stairs as concrete and add handrails for pedestrian safety. X 15) Pedestrian Access Areas. For adequate pedestrian access, it appears appropriate to extend the proposed pedestrian access areas through the parking lot on the eastern parcel to the office complex of Valley Farm Credit. Otherwise, please demonstrate how pedestrians will conveniently and safely access the Valley Farm Credit Building from the proposed parking lot. ✓ 16) Open Space. Please change the reference that the required amount of open space is 30% of the lot area. The Zoning Ordinance requires that parcels within the B2 District include a minimum of 15% open space. 1,-17) Owner's Certificate. Please change the statement in the Owner's Certificate Box to indicate that the owner's signature represents authorization of the site plan, not for a subdivision of the land. t/18) Owner's Name. Please provide the contact person for the property owner, Valley Farm Credit. The signature on the Special Limited Power of Attorney Form is not legible. ✓19) Road Construction Note. The road/street construction note found on the bottom of the "Project Information" Box on the cover page appears not to be relevant with this project because no roads are proposed. Thus, please remove this note. ,✓20) Engineer's Seal and Revision Dates. Please ensure that the final copies of the site plan are signed by the Engineer and all revision dates noted. v21) Subtitle. Please provide a subtitle on the site plan which explains the proposed development (i.e., Valley Farm Credit: Proposed Parking Lot). ✓22) Outdoor Lighting. Please show and provide details for all proposed outdoor lighting. If outdoor lighting is proposed, please provide a statement on the site plan that all outdoor lighting shall be projected downward and shielded to prevent glare on adjoining properties and roads. If no outdoor lighting is proposed, please clarify this on the site plan. 23) Outdoor Trash Receptacles. Please show the location of all proposed outdoor trash receptacles. If no outdoor trash receptacles are proposed, please provide a statement to this effect on the site plan. ,/24) Date of Plan. Please provide the specific day in June on which the plan was prepared. ✓25) Building Setbacks. Please note the required building setback lines for this parcel. 26) Lot Consolidation. Staff "recommends" that the two lots be consolidated. Once you have adequately addressed all of these comments, please resubmit a copy for my review. I will need all approved review agency comment sheets and at least five copies of the final plan for approval. Comment sheets are required from the following agencies: The Frederick County Dept. of Building Inspections, the Frederick County Fire Mcn-shal, the Frederick Coznzty Sanitation Azahority, the Frederick County Engineer (Public RRorks), and the Virginia Department of Transportation. Feel free to contact me if you have any questions. Sincerely, j Jeremy F. Camp - Planner II JFC/bad cc: Xalley Farm Credit, P.O. Box 2700, Winchester, VA 22604 0 • SITE PLAN APPLICATION Project Title: Location of Property (street address) Property Owner: Address: Telephone Applicant/Agent Address Telephone Designer: Address: Telephone: Contact: Valley Farm Credit Parkins Lot Addition Prosperity Drive Kernstown Business Park Valley Farm Credit PO I3ox 2700 Winchester, VA 22604 540-662-3473 Grcenway F.ng.inee ring 151 Windy Hill Lane Winchester, VA 22602 540-662-4185 Grccnway Lnginecring Same Same Evan Wyatt, AICP 6. Is this an original or revised site plan? Original X Revised ❑ 7a. Total acreage of parcel to be developed: 1.28 acres 7b. Total acreage of parcel: 1.22 acres 8. Property Information: a) Property Identification Number: b) Current Zoning: c) Present Use: d) Proposed Use: e) Adjoining Property Use(s) I) Adjoining Property Identification Numbe(s) g) Magisterial District(s) 75-A-2I< 132 Vacant 132-Parking Lot I32-Commercial, 133-Commercial 75-A-2, 75-A-2.1, 75-A-21), 7.5-A-2L, 75-A-21-?, 75-A-2G Back Creek I have read the material included in this package and understand What Is required by the Frederick County Planning Department. I also understand that all I-CCILlired material WLII be complete prior to the submission of my site plan. i::� a- . Signature: Date: ►7 JUL-01-04 01;OOPM FROM -GREED ENGINEERING P.C. 6407229 T-445 P.002/002 F-157 Special Limited power of Attorney County of Frederick, Virginia Virginia, -- Nortb lent Street, Winebester, Virginia 2Z601 Office, County of Frederick, Virg , Planning phone 540-665-5651 Facsimile 540-665-6395 T{now .All Men By These Presents: That r (We) (Phone) a - - (Name) (Address) PO $Ox 2700 Winchester VA 2 60 �� conveyed to me (us), by deed recorded in the the owners) of all those tracts or parcels of land ("Property )' inia, by Clerk's Office of the Circuit Court of the County of Frederick, Virg Instrument No. _D on Page and is described as Parcel: _75.._Lot: _2.Y__Block: A Section: ,_ Subdivision: _ - do hereby make, constitute and appoint: 540-662-4185 (Phone) (Name) G (Address) 151- Wind Hill Lane Winchester VA 22602 lace and stead with full power and To act as my true and lawful attorney -in -fact for and in my our name, p authority 1(we) would have if acting personally to file planning applications for my (our) above described Property, including: ❑ Rezoning (Iincluding proffers) ❑ Conditional Use Permits ❑ Master Development Plan (Prelimiz<arS' and Final) D Subdivision [A Site Plan ake M attorney -in -fact shall have the authority too ed�c p d coeditions except asfo and amendments man ents to y previously approved proffere This authorization shall expire one year from the day it is signed, or until it is otherwise rescinded or modified. 200 in witness thereof, T (we) have hereto set my (our) hand and seal this ��day of � —J Stale of virginia,4it+'Couny al .�, that the persons) � a Notary Public in and for the jurisdiction aforesaid, certify before me who signed to th foregoing instrument and who is (are) known to me, p I ' L as acknowledged the same before me in the jurisdiction aforesaid this I day of �11LL� 200 an h / , My Commission F_xpires: Notary Public • Mail to: Request For Site Plan Comments Department of Planning and Development Department of Planning and Development Attn: County Planner 107 North Kent Street Winchester, VA 22601 (540) 665-5651 Hand deliver to: 1.07 North Kent Street Fourth floor Winchester, VA (540) 665-5651 Please Pill out the information as accurately as possible in order to assist tine agency with them review. Please attacli two (2) copies of the site plan with this slieet. Applicant's Name: Grccnwa, I ngincering Address: 151 Windy Hill Lane, Winchester, Virginia 22602 Phone Number: (540) 662-4185 Name of development and/or description of the request: Valley Farm Credit -Parking. Lot Addition Location of property: Prosperity Drive-Kernstown Business Park Planning and Development's Comments: 5ir,..�...�....!.:;i%;,. .:,/•.!�//a.F'a!r:%a;r: ;>C•.•.••a': /'..;;/'9///%i%�//� ,fig %../�i`':',,/•.r.•;/i:%!: �i///�.////i Fi/�� � i.///if Pfilni[r"ilittl%.I YGo 21]it iTii4�:f12i1jF ;/�� i•//• ;fj; //f // /i/1 i /: 16 • • GREENWAY ENGINEERING 147 151 Windy Hill Lane ;ou„ndca in tr, t Winchester, Virginia 22602 T R A N S M I T T A L Project Name: File No: Date —Valley Farm Credit - New Parkling Lot 3937 July 1, 2004 To: FC Planning From: Evan Wyatt Ann: Jeremy Camp GREENWAY ENGINEERING Phone: 540-662-4185 Copied Robert Carpenter Fax: 540-722-9528 ❑ Urgent ❑ For Your Review ❑ As You Requested ❑ Please Comment Message: Hi Jeremy, Please find attached the Site Plan application, application review fee, Special Limited Power of Attorney agreement and site plan for the new parking lot at the Valley Farm Credit site in the Kemstown Business Park. As we discussed, VFC has decided to expand the existing building on the lower lot instead of building a new office on the upper lot. Therefore, the site plan has been modified to provide for a two- phase parking lot construction only. As agreed, VFC will provide an acceptable guarantee for the cost associated with developing the undeveloped portion of the parking lot as a condition of site plan approval. VFC will be working with the Public Works Department to obtain a land disturbance permit for initial site grading in the near future. Please contact me if you have any questions at this time, or if you need any additional information. Thank you for your assistance with this project! Evan Greenway Engineering Telephone 540-662-4185 FAX 540-722-9528 www.greenwayeng.com