SITE PLAN CHECKLIST
The checklist below indicates all the information --that needs to be submitted as part of the site plan
application. All required information must.be submitted prior to the final approval of any site plan.
The Department of Planning and Development will review the application to ensure that it is complete.
If any portion is not included or complete, the site plan application will not be accepted and returned
to the applicant(s).
Site Plan Package
1. One set of approved comment sheets are required from the following review
agencies prior to final site plan approval. It is recommended that applicants contact
the Department of Planning and Development to determine which review agencies
are relevant to their site plan application.
_L Virginia Department of Transportation (VDOT)
Frederick County Sanitation Authority
\
Department of Planning and Development
Inspections Department
Frederick County Engineer (Public Works)
Frederick County Fire Marshal
Department of Parks and Recreation
2. One copy of the Site Plan application
3. Five Copies of the Final Site Plan for approval
County Health Department
City of Winchester
_ Town of Stephens City
^ Town of Middletown
4. One reproducible copy of the Site Plan (if required)
5. A 35mm slide of the Site Plan (if required)
Airport Authority
Soil & Water Conservation District
� is-7- qF
J�'1.746
,-) - - 4�� ' . "/-I"-,-C-e--
3 -17.qq . Z ia,)appuwd-,,,�6V �A-O. dUA---'
(COUNTY of FREDERICI
Department of Plnnnhng and Dev2loprn,ent
540/665-5r>51
FAX: 540/ r73-0632
March 10, 1999
Mr. Steve Patton
Triad Engineering, Inc.
P.O. Box 2397
Winchester, Virginia 22604
RR: Approval of Kraft Foods, Inc. Site Development Plan (#060-98)
Property Identification Number (PIN): 54-A-36H
Dear Steve:
The Frederick County Department of Planning and Development administratively approved the above -
referenced site plan on March 10, 1999. This site plan, for the expansion of the Kraft Foods, Inc. parking lot,
meets all County requirements for development within the M 1 (Light Industrial) Zoning District. Specifically,
the site plan delineates the addition of eighty-two (82) parking spaces to include one (1) additional handicapped
space adjacent to the facility's existing parking area. The site plan also includes the provision of perimeter
parking lot landscaping that consists of both shade trees and evergreen hedgerows.
I have provided you with several copies of the approved site plan. Please forward these approved plans to the
owner and advise the owner to keep an approved copy for their files. Furthermore, the owner should ensure
that an approved copy is maintained on the construction site throughout the development process. Once site
development has been completed, the owner should contact this office to schedule an on -site inspection.
Please do not hesitate to contact me should you have any questions or need for elaboration regarding this letter.
Sincerely,
0
Christopher M. Mohn
Planner H
CMM/rsa
cc: Charles W. Orndoff, Sr., Stonewall District Supervisor
Garland Miller, E.D.C.
Jane Anderson, Real Estate
Joe Wilder, Public Works
U.- tChrisMl common 0te Plan Uraftpark apr. wpd
107 North Kent Street - Winchester, Virginia 22601-50,8i0
�d
• Request For Site Plan Comments
Virginia Department of Transportation
Mail to:
Virginia Department of Transportation
Atten: Resident Engineer
P.O. Box 278
Edinburg, Virginia 22824-0278
(540) 984-5600
Hand deliver to:
Local VDOT Office
1550 Commerce Street
Winchester, VA
(540) 722-3460
Please f;l! cut the information as accurately as possible in order to assist the VDOT
with their review. Please attach four copies of your site plan with this sheet.
Appiicar.L's lia,ric
Address:
Phanr numner
Enqineer�nq, inc.
Post Office Box 2397 / 200 Aviation Drive
Winchester, VA 22604
540-667-9300 _
Name of development and/or descnption of the request: Kraft Foods, inc.
Parking Lot Expansion.
Location of development: West of the intersection of Park Center Drive
and West Brooke Road.
Virginia Department of Transportation's Comments:
No objection to this site plan. Present entrance(s) is adequate for proposed
improvements. Should usiness ever expand in e u ure eeni raTtZ�(Tr—boay
VDOT use only
Date received
incomplete
Date reviewed
Signature and Date
Signature and Date (revision)
,.w:
Date revision received Date approved` ' --�.
Incomplete
Date reviewedE t Transportation Engineer I2/14/
n
•
Request For Site Plan Comments
Frederick County Engineering Department
Mail to:
Frederick County Engineering Dept.
Attn: Director of Engineering
P.O. Box 601
Winchester, VA 22604
(540) 665-5643
Hand deliver to:
107 N. Kent Street
Fourth Floor
Winchester, VA
(540) 665-5643
Please fill out the information as accurately as possible in order to assist the agency with their
review. Please attach two (2) copies of the site plan with this sheet.
Applicant's Name
Address
Phone Number:
Triad Engineering, Inc.
Post Office Box 2397 / 200 Aviation Drive
Winchester, VA 22604
540-667-9300
Name of development and/or description of the request: Kraft Foods, Inc
Parking Lot Expansion
Engineering Department's Comments: West of the intersection of Park Center Drive
and West Brooke Road.
•
•
Request For Site Plan Comments
Frederick County Inspections Department
Mail to:
Frederick County Inspections Dept.
Attn: Building Official
P.O. Box 601
Winchester, VA 22604
(540) 665-5650
Hand deliver to:
107 N. Kent Street
Fourth Floor
Winchester, VA
(540) 665-5650
Please fill out the information as accurately as possible in order to assist the agency with their
review. Please attach one (1) copy of the site plan with this sheet.
Applicant's Name
Address:
Phone Number:
Post Office Box 2397 / 200 Aviation Drive
Winchester, VA 22604
540-667-9300
Name of development and/or description of the request
Parkinq Lot Expansion.
Location of property:
Kraft Foods, Inc.
Inspections Department's Comments: ADA parking and building access appears to be in
compliance. Please confirm the total n r o ADA parking spaces complys with code
requirements.
TRIAD ENGINEERING,4C.
Post Office Box 2397
Winchester, Virginia 22604
(540) 667-9300
FAX (540) 667-2260
TO Frederick Co. Department of Planning & Development
107 N. Kent Street, 4th floor
Winchester, VA
LETWR OF TRANs`IarrAL
DATE 03/08/99
JOB NO. CD-025
ATTENTION: Mr. Christopher M. Mohn, Planner II
RE: Kraft Foods, Inc. Parking Lot Expansion
WE ARE SENDING YOU X Attached — Under separate cover via
— Shop Drawings — Prints x Plans
— Copy of letter — Change order — Other -
— Samples
COPIES DATE NO. DESCRIPTION
5 sets Site Plan
1 copy Review Agency Approvals
The following items:
Specifications
THESE ARE TRANSMITTED as checked below:
— For approval — Approved as submitted — Resubmit Copies for approval
— For your use — Approved as noted — Submit Copies for distribution
— As requested — Returned for corrections — Return Corrected prints
X For review and comment — Other
FOR BIDS DUE 19 — PRINTS RETURNED AFTER LOAN TO US
REMARKS Attached please find the above references material for your review and final approval of the attached site plan.
COPY TO
RECEIVED BY
If enclosures are not as noted, kindly notify us at once.
COUNTY of FREDERICK
Department of Planning and Development
107 North Kent Street • Winchester, Virginia 22601-5000
Telephone: 540/665-5651 FAX 540/678-0682
FAX TRANSMISSION
Me
Date: 4 \C>�
Number of Pages (including cover sheet) Z
FAX #:
Remarks:
From the desk of
Request For Site Plan Comments
Department of Planning and Development
Mail to:
Hand deliver to:
Department of Planning and Development
107 N. Kent Street
Attn: County Planner
Fourth Floor
P.O. Box 601
Winchester, VA
Winchester, VA 22604
(540) 665-5651
(540) 665-5651
Please fill out the information as accurately as possible in order to assist the agency with their
review. Please attach two (2) copies of the site plan with this sheet.
Applicant's Name:
Address:
Phone Number:
Triad Engineering, Inc.
Post Office Box 2397 / 200 Aviation Drive
Winchester, VA 22604
540-667-9300
Name of development and/or description of the request: Kraft Foods, Inc.
Parking Lot Expansion.
Location of property: West of the intersection of Park Center Drive and West Brooke
Road.
Planning and Development's Comments:
11
TRIAD ENGINEERINGOMC.
Post Office Box 2397
Winchester, Virginia 22604
(540) 667-9300
FAX (540) 667-2260
TO Frederick Co. Department of Planning & Development
107 N. Kent Street, 4th floor
Winchester, VA
LE - R 'OF TRANSMITTAL'
DATE 03/08/99
JOB NO. CD-025
ATTENTION: Mr. Christopher M. Mohn, Planner II
RE: Kraft Foods, Inc. Parking Lot Expansion
WE ARE SENDING YOU X Attached _ Under separate cover via
_ Shop Drawings _ Prints x Plans
_ Copy of letter _ Change order _ Other _
COPIES DATE NO. DESCRIPTION
1 set Site Plan
HLULIVED
MAR 0 8.1999
E OPMENT
THESE ARE TRANSMITTED as checked below:
Samples
The following items:.
_ Specifications
_ For approval _ Approved as submitted _ Resubmit Copies for approval
For your use _ Approved as noted _ Submit Copies for distribution
_ As requested _ Returned for corrections _ Return Corrected prints
X For review and comment _ Other
FOR BIDS DUE 19 _ PRINTS RETURNED AFTER LOAN TO US
REMARKS Please review the enclosed material and return the Site Plan Comment sheet to us when you have completed
your review. All of your previous comments should be incorporated into this review set.
COPY TO
RECEIVED BY
If enclosures are not as noted, kindly notify us at once.
County of Frederick
Department of Planning and Development
107 North Kent Street
Winchester, VA 22601
(540) 665-5651
Fax: (540) 678-0682
E-mail: fcplan@shentel.net
FAX COVER SHEET
To: S -r � v r
Company: �� From: M K� _ti � � y
P Y�
Fax: 6 (? -
Date:
Phone:
# of pages (including cover): 3
Subject: ;�� F_ Cx P,g-,ems ( C-"
Message: ,4-rrA c H c iD i--, ,9 f- i(_ f C, 0 F"Y o r- -_� c
;2Ev(Ew C�E-ri—(572 /VIA1L,�D T� y0L1 U rj DE Ccr-tr_��i� Zl ►�i�lc�
d4 MA I&I E D VIP Copy O i- �r 'I'I C
0 ►� THc �} 3c> v C Dr; - C -H c S I--1 (ZLE D U P P(-A r�d
I N A N C r F 0 T1'r TG .q I /�> 1 r-I
Pc.0 5 C C /) c_ G 1- t 215 1 r y o CA f-{ Pr LJ F/
�}JD r1 o r-,J L c� UkCSS.
Fire COPY
COUNTY of FREDERICK
Department of Planning and Development
540/665-5651
FAX: 540/ 678-0682
December 21, 1998
Mr. Steve Patton
Triad Engineering, Inc.
P. O. Box 2397
Winchester, VA 22604
RE: Kraft Foods, Inc. Parking Lot Expansion, Site Development Plan #071-98
Dear Steve:
I have had the opportunity to review the above referenced site plan submitted to our department on
December 3, 1998. The following comments are offered and should be addressed during the revision
of this site plan. I have also marked the enclosed plan for your use.
1) On the cover sheet, please provide the name, address, and phone number of the developer.
2) Please state the parking lot setback requirements for the M1 Zoning District on the notes and
legend sheet and ensure that these setbacks are clearly delineated on the site plan.
Furthermore, the building setback line shown adjacent to West Brooke Road (Route 1320)
should be modified from twenty-five (25) feet to the correct requirement of seventy-five (75)
feet on the existing conditions sheet.
3) Please extend the sidewalk that is shown terminating just beyond the handicapped space to the
end of the south row of proposed parking spaces. It is recommended that this extension consist
of a four (4)-foot concrete sidewalk.
4) Please ensure that all lighting is controlled to prevent glare beyond the lot line. A statement to
this effect should be included within the plan. Furthermore, please include specifications of the
outdoor lighting fixtures identified on the site plan.
5) Please identify the state route numbers applicable to both Park Center Drive and West Brooke
Road on the site plan.
6) Please correct the calculation regarding the parking requirement for the 21,500 square -foot
office facility on the notes and legend sheet. The number of required parking spaces for this
use should be eighty-six (86) rather than one hundred (100). The total number of required
parking spaces should be adjusted to reflect this correction. Furthermore, please provide a
breakdown of the total number of spaces provided for the facility. Such a breakdown should
delineate both the number of existing spaces and the number of spaces proposed as part of this
expansion.
107 North Kent Street - Winchester, Virginia 22601-5000
ia
• 0
Kraft Foods, Inc. Site Plan Review
Page 2
December 21, 1998
7) Please state the required number of handicapped parking spaces for the subject site, as well as
the number provided through both previous development and the proposed expansion. The
location of all existing handicapped spaces should be shown on the existing conditions sheet.
8) Please increase the number of landscape plantings along the perimeter of the expanded parking
area to ensure the provision of shade trees at the required interval of one (1) per every forty
(40) feet of parking spaces. Specific attention should be given to the area located between the
existing parking area and the proposed expansion lot, which does not include any vegetation.
It is recommended that shade trees be planted along the requested sidewalk extension to
provide adequate shading for the parking spaces immediately adjacent to this area. As the area
in question constitutes a significant drainage -way, it may be necessary to modify the grading
of this area to accommodate both the sidewalk and landscape plantings. Furthermore, please
change the height of the boxwood shrubs identified in the plant schedule from one (I) -foot to
the required three (3) feet. The three-foot height is necessary to adequately mitigate the impact
of headlight glare on adjacent properties and rights -of -way.
After you have revised the site plan, please resubmit one copy so that I may verify the information
contained on the plan. I will then need all approved review agency comment sheets and five copies of
the final site plan for approval. Comment sheets are required from the following agencies: the Virginia
Department of Transportation, the Frederick County Sanitation Authority, the Frederick County'
Inspections Department, the Frederick County Engineer, and the Frederick County Fire Marshal.
Please contact me if you have any questions regarding this letter.
Sincerely,
,::: __� \ Q
� - -
Christopher M. Mohn
Planner II
CMM/cc
Enclosure
U:ICJ1is11v11connmo11 Ote Plan ikraftpark.spnwpd
0
•
•
SITE PLAN APPLICATION
Department of Planning and Development Use only.
Date application received s" Application #
_ Complete. Date of acceptance
_ Incomplete- Date of return.
1. Project Title:
Kraft Foods, Inc. Parking Lot Expansion
2. Location of Property
441 Park Center Drive
(street address)
Winchester, VA 22603
3 Property Owner:
Kraft Foods, Inc.
Address:
Three Lakes Drive
Northfield, IL 60093
Telephone:
847-646-2000
4. Applicant/Agent
Triad Engineering, Inc.
Address
Post Office Box 2397
200 Aviation Drive
Winchester, VA 22604
Telephone:
540-667-9300
5. Designer:
Triad Engineering, Inc.
Address:
Post Office Box 2397
Winchester, VA 22604
Telephone:
540-667-9300
Contact:
Steve Patton
•
•
6. Is this an original or revised site plan? Original Revised X
7a. Total acreage of parcel to be developed: 19.98
7b. Total acreage of parcel: 19.98
8. Property Information:
a) Property Identification Number:
b) Current Zoning:
c) Present Use:
d) Proposed Use:
e) Adjoining Property Use(s)
0 Adjoining Property Identification Number(s)
g) Magisterial- District(s)
54 ((A)) 36H
M-1
Manufacturing
Manufacturing
Vacant, Manufacturing, Retail
54((A))36A,.36G, 84, 85, 43((I))A, 43((A)) 36
Stonewall 36L
I have read the material included in this package and understand what is required by the
Frederick County Planning Department. I also understand that all required material will be
complete prior to the submission of my site plan.
Signature:��
Date: 1 f IL
7
Site Plan Information Checklist
The following information must be included on your site plan. If your site plan is incomplete or
is missing information, it will not be reviewed and returned to you for revisions.
Administrative Information
Y N
✓
1.
Name of proposed development.
2.
Name, address, and phone number of owner.
3.
Name, address, and phone number of developer.
✓
4.
Name, address, and phone number of designer.
✓
5.
Certificate of surveyor, engineer, or architect.
tS
Date Mail Im pared and date of revisions
N 1 171,
7.
A listing of all conditions placed on the site as a result of a
conditional use permit or conditional zoning approval.
8.
A space labeled "Approved by the Zoning Administrator" for
the approval signature and date of approval.
N I p,
9.
A description of setbacks or conditions placed on the site as a
result of a variance approval. (Reference the variance
application number.)
General Site Information
Y N
✓
10.
Location map (scale 1:2000)
11.
Magisterial District
✓
12.
Scale of site plan (not to exceed 1:50)
13.
North Arrow
✓
14.
Zoning of site
�✓
15.
Use, zoning, and Property Identification Number (PIN#) of all
adjoining properties. This includes properties located across
right-of-ways, streams, and railroad tracks.
�✓
16.
Surveyed boundaries for all lots and parcels.
9
•
•
General Site (con't
Y N
,/
17.
Acreage of all lots included in the plan.
✓
18.
The location and dimensions of all required setbacks and yard
areas.
ti I
19.
The location and type of all dwelling units.
N I N
20.
Location and description of all recreation facilities.
✓
21.
Location of sidewalks and pedestrian ways.
✓
22.
Location and area of common open space.
23.
The location, height, and dimensions of all signs.
24.
Location, height, and specifications of outdoor lighting fixtures.
N I
25.
Location and nature of outdoor storage areas.
✓
26.
Location of outdoor trash receptacles and dimensions of
structure (fencing, etc.) required to enclose receptacles.
Building Information
Y N
27.
The height of all buildings and structures.
28.
Location of all buildings, structures and uses.
29.
The proposed use of each building, structure and area.
✓
30.
Ground floor area and total floor area of all buildings with FAR
calculations for commercial and industrial zoning districts.
Roads
Y N
31. Name and number of existing and planned streets on and
adjoining the site.
32. Location of existing and planned streets on and adjoining the
site.
33. Posted speed limit of existing adjacent roads.
34. Location and dimensions of all proposed entrances from public
fight -of -ways.
•
•
35. Location of all entrances on adjoining roads within 200 feet of the
proposed or existing entrance.
✓ 36. Dimensions, boundaries, width, pavement, and construction of
planned roads.
Utilities
Y N
37. Location of all utilities, including sewer and water lines with the
size of lines, mains, and laterals.
✓ 38. Location and width of all easements, including access, utility,
and drainage easements.
�o I. ncatio-i and nature of fire lanef:, fire hydrants and nl! ^th--
facilities necessary to meet Fire Code requirements.
Parking
Y N
40. Calculations describing the required number of parking and
loading spaces.
✓ 41. Location and dimensions of all parking and loading spaces,
driveways, parking aisles, curbing and other features to be used.
✓ 42. Location and dimension of all disabled parking spaces and
ramps.
Natural Features
Y N
43. Existing and finished contour lines.
✓ 44. Location of steep slopes, woodlands, floodplains, wetlands,
sinkholes, and other environmental features.
✓ 45. Location of streams and drainage ways.
Landscaping
Y N
46. Landscaping plan describing location and types of plants to be
used.
✓ 47. Location of required buffers and screening with cross sections or
profiles.
Erosion and Sediment Control
Y N
48. A stormwater management plan with run off calculations and
location and description of facilities to be used.
49. Soil erosion and sedimentation control plan describing the
location and methods to be used to minimize erosion and
sedimentation during development.
Wj
•
•
Request For Site Plan Comments
Department of Planning and Development
Mail to:
Department of Planning and Development
Attn: County Planner
P.O. Box 601
Winchester, VA 22604
(540) 665-5651
Hand deliver to:
107 N. Kent Street
Fourth Floor
Winchester, VA
(540) 665-5651
Please fill out the information as accurately as possible in order to assist the agency with their
review. Please attach two (2) copies of the site plan with this sheet.
Applicant's Name
Address:
Triad Engineering, Inc. _
Post Office Box 2397 / 200 Aviation Drive
Winchester, VA 22604
Phone Number: 540-667-9300
Name of development and/or description of the request: Kraft Foods, Inc.
Parking Lot Expansion. _
Location of property: West of the intersection of Park Center Drive and West Brooke
Road.
Planning and Development's Comments
Planning and Development use only
Date received
Incomplete
Date reviewed
Signature and Date
Signature and Date (rcvision)
Date recision received Date approved 3 1b),on
Incomplete
ate revieW
TRIAD ENGINEERING, ING*
Post Office Box 2397
Winchester, Virginia 22604
(540) 667-9300
FAX (540) 667-2260
TO Frederick Co. Department of Planning & Development
107 N. Kent Street, 4th floor
Winchester, VA
LETTER'OF TRANSMITTAL
DATE 11/12/98
JOB NO. CD-025
ATTENTION: County Planner
RE: Kraft Foods, Inc. Parking Lot Expansion
r--
WE ARE SENDING YOU X Attached _ Under separate cover via
Shop Drawings _ Prints x Plans
_ Copy of letter _ Change order _ Other _
Samples
The following items:
Specifications
COPIES
DATE
NO.
DESCRIPTION
0 sets
Site Plan
1 copy
Erosion and Sediment Control Narrative
1 copy
Stormwater Management Narrative
THESE ARE TRANSMITTED as checked below:
For approval — Approved as submitted — Resubmit Copies for approval
For your use — Approved as noted — Submit Copies for distribution
— As requested — Returned for corrections — Return Corrected prints
X For review and comment — Other
FOR BIDS DUE 19 — PRINTS RETURNED AFTER LOAN TO US
REMARKS Please review the enclosed material and return the Site Plan Comment sheet to us when you have completed
your review.
COPY TO
RECEIVED BY
/f enclosures are not as noted, kindly notify us at once.
SITE PLAN CHECKLIST
The checklist below indicates all the information that needs to be submitted as part of the site plan
application. All required information must be submitted prior to the final approval of any site plan.
The Department of Planning and Development will review the application to ensure that it is complete.
If any portion is not included or complete, the site plan application will not be accepted and returned
to the applicant(s).
Site Plan Package
One set of approved comment sheets are required from the following review
agencies prior to final site plan approval. It is recommended that applicants contact
the Department of Planning and Development to determine which review agencies
are relevant to their site plan application.
Virginia Department of Transportation (VDOT)
Frederick County Sanitation Authority
Department of Planning and Development
Inspections Department
Frederick County Engineer (Public Works)
Frederick County Fire Marshal
Department of Parks and Recreation
2. One copy of the Site Plan application
3. Five Copies of the Final Site Plan for approval
4. One reproducible copy of the Site Plan (if required)
5. A 35mm slide of the Site Plan (if required)
County Health Department
City of Winchester
Town of Stephens City
Town of Middletown
Airport Authority
Soil & Water Conservation District
Request for Street Name
The following information must be included on your site plan. If your site plan is incomplete or
is missing information, it will not be reviewed and returned to you for revisions.
Administrative Information
Y
N
1.
Name of proposed development.
2.
Name, address, and phone number of owner.
3.
Name, address, and phone number of developer.
4.
Name, address, and phone number of designer.
5.
Certificate of surveyor, engineer, or architect.
6.
Date plan prepared and date of revisions.
7.
A listing of all conditions placed on the site as a result of a
conditional use permit or conditional zoning approval.
8.
A space labeled "Approved by the Zoning Administrator" for the
I
approval signature and date of approval.
9.
A description of setbacks or conditions placed on the site as a result
of a variance approval. (Reference the variance
application number.)
General
Site Information
Y
N
10.
Location map (scale 1:2000)
11.
Magisterial District
12.
Scale of site plan (not to exceed 1:50)
13.
North Arrow
14.
Zoning of site
15.
Use, zoning, and Property Identification Number (PIN#) of all
adjoining properties. This includes properties located across right-
of-ways, streams, and railroad tracks.
J16.
Surveyed boundaries for all lots and parcels.
9
General Site (con'tl
IQ
Wp"
N
Building Information
Y N
17.
18.
23.
25.
26.
27
28
29
30
31.
32
v
Acreage of all lots included in the plan.
The location and dimensions of all required setbacks anclyard
The location and type of all dwelling units.
� �y
Location and description of all recreation facilities.
Location of sidewak"nd pedestrian ways.��^�
Location and area of common open space.
The location, height, and dimensions of all signs.'^
Location, height, and ecifi of outdoor lig� htkg f ture N�'
Location and nature of outdoor storage areas.
Location of outdoor trash receptacles and dimensions of structure
(fencing, etc.) required to enclose receptacles.
The height of all buildings and structures.
Location of all buildings, structures and uses.
The proposed use of each building, structure and area.
Ground floor area and total floor area of all buildings with FAR
calculations for commercial and industrial zoning districts.
Name an�umbe f existing and planned streets on and adjoining
the site. \.N 4- ti, . \�-
Location of existing and planned streets on and adjoining the site.
33. Posted speed limit of existing adjacent roads.
L�r1ti
34. Location and 'mension of al ro entranl�s from public
right-of-ways.
35. Location of all entrances on adjoining roads within 200 feet of the
proposed or existing entrance.
36. Dimensions, boundaries, width, pavement, and construction of
planned roads.
Utilities
Y N
37. Location of all utilities, including sewer and water lines with the size
of lines, mains, and laterals.
38. Location and width of all easements, including access, utility, and
drainage easements.
39. Location and nature of fire lanes, fire hydrants, and all other
facilities necessary to meet Fire Code requirements.
Parking
Y N
I\/\\40./\/) Calculations describing the regwre'd number of parking'and loading
spaces.
41. Location and dimensions of all parking and loading spaces,
driveways, parking aisles, curbing and other features to be used.
42. Location and dimension of all disabled parking paces and
ramps. �?,�. ��� o` •��\
Natural Features
Y N
43 Existing and finished contour lines.
44. Location of steep slopes, woodlands, floodplains, wetlands,
sinkholes, and other environmental features.
45. Location of streams and drainage ways.
ram..- � � �' ,.rn►V
Landscaping plan describing location and types of plants to be'
used.
47 Location of required buffers and screening with cross sections or
profiles.
48. A stormwater management plan with run off calculations and
location and description of facilities to be used.
49. Soil erosion and sedimentation control plan describing the location
and methods to be used to minimize erosion and sedimentation
during development.
12
1
1
1
TRIAD ENGINEERING, INC.
'
Geotechnical, Environmental & Construction Consultants
P.O. BOX 2397
'
WINCHESTER, ER, VA 22604
Telephone: (540) 667-9300
FAX: (540) 667-2260
STORMWATER MANAGEMENT NARRATIVE
KRAFT FOODS, INC.
PARKING LOT EXPANSION
FREDERICK COUNTY, VIRGINIA
ISTORMWATER MANAGEMENT NARRATIVE
KRAFT FOODS INC. EXPANSION
FREDERICK COUNTY, VIRGINIA
' TRIAD PROJECT NO. CD-025
IProject Description
' The purpose of this project is to construct additional parking
to accommodate the increased parking requirements for the interior
building renovations. The site is located in the Fort Collier
' Industrial Park, west of the intersection of Park Center Drive and
West Brooke Road.
0
7
FI
Existing Site Conditions
The site consists of 19.98 acres and slopes from the west to
the east. The site currently consists of a manufactu.ring facility,
on -site parking lot and loading dock, stormwater management
facility, and associated underground utilities. Existing drainage
ditches convey stormwater runoff along the east, west, and south
sides of the site to the stormwater management pond located in the
southeast corner of the site.
Adjacent Areas
This site is bordered on the north by existing train tracks
with a vacant drive-in movie theater and Moore's lumber yard on the
north side of the train tracks. To the east, the site is bordered
by Park Center Drive with a vacant lot and Green Bay Packaging,
Inc. Manufacturing facility on the east of Park Center Drive. West
Brooke Road borders the site to the south with a vacant lot to the
south of West Brooke Road. The property is bordered to the west by
a vacant lot.
Pre -Devel amen t Runoff
The pre -development peak runoff was determined for the 2, 10,
and 25 year storms, using TR-55. The adjacent undeveloped areas
consist of a mixture of brush, weeds, and grass. We will assume
that the Kraft site consisted of similar ground cover prior to the
initial development of the site. Based on the existing topography,
it is assumed that 19.11 acres of the pre -developed site will flow
to the point where the stormwater management pond discharges.
Included in the 19.11 acres is 1.77 acres of VDOT right-of-way, and
' Stormwater Management Narrative
Kraft Food's Parking Lot Expansion
' Frederick County, Virginia
Page 2
railroad property. Computer print-outs for the pre -development
' runoff calculations are located in Appendix A. A summary of the
pre -development peak runoff follows:
' 2 Year storm = 5 cfs
10 Year storm = 19 cfs
' 25 Year storm = 26 cfs
Allowable Pond Discharge
' The allowable discharge from the stormwater management
facility is the pre -development peak runoff.
Post -Development Detained Runoff
' The post -development peak runoff was determined for the 2, 10,
and 25 year storms in the same method as the pre -development
runoff. Based on the existing site conditions and the proposed
' design for the parking lot expansion, the same 19.11 acres of the
site will be detained. The ultimate development of the site will
' consist of 10.62 acres of pavement or building, 0.25 acres of
gravel, and 8.24 acres of lawn. Computer print-outs for the post -
development detained runoff calculations are located in Appendix B.
' A summary of the post -development peak runoff follows:
2 Year storm = 28 cfs
' 10 Year storm = 55 cfs
25 Year storm = 68 cfs
I
Stormwater Routin
The stormwater routing was performed using the Pondpack
' computer program by Haestad Methods, Inc. Routing was performed on
the existing outlet structure which consists of a 15 inch inlet
' pipe in addition to a 4 foot square outlet box with 4 orifices.
Computer print-outs for the routings are located in Appendix C.
From the printouts the following peak stormwater discharges were
I
determined for the existing pond.
' Stormwater Management Narrative
Kraft Food's Parking Lot Expansion
' Frederick County, Virginia
Page 3
2-Year peak from pond = 0.70 cfs < 2-year allowable (5 cfs) OK
' 10-Year peak from pond = 5.04 cfs < 10-year allowable (19 cfs) OK
25-Year peak from pond = 9.31 cfs < 25-year allowable (26 cfs) OK
u
u
�I
APPENDIX A
H
r-
L
F
Quick TR-55 Ver.5.47 SIN:
Executed: 19:27:05 10-26-1998
KRAFT FOODS, INC.
PARKING LOT EXPANSION
PRE -DEVELOPMENT
RUNOFF CURVE NUMBER DATA
Composite Area:
AREA CN
SURFACE DESCRIPTION (acres)
-------------------------------- --------- ----
IMPERVIOUS 0.55 98
GRAVEL 0.16 89
BRUSH 18.40 65
COMPOSITE AREA ---> 19.11 66.2 ( 66 )
I
'Quick TR-55 Ver.5.47 SIN:
Executed: 19:26:44 10-26-1998 s:\pondpack\cd025\PRE.TCT
KRAFT FOODS INC.
PARKING LOT EXPANSION
PRE DEVELOPMENT
Tc COMPUTATIONS FOR:
SHEET FLOW (Applicable to Tc only)
Segment ID
A-B
Surface description
BRUSH
Manning's roughness coeff., n
0.2400
Flow length, L (total < or = 300)
ft
300.0
Two-yr 24-hr rainfall, P2
in
3.000
Land slope, s
ft/ft
0.0150
0.8
.007 * (n*L)
T =--------------
hrs
0.66 = 0.66
0.5 0.4
P2 * s
SHALLOW CONCENTRATED FLOW
Segment ID
B-C
Surface (paved or unpaved)?
Unpaved
Flow length, L
ft
940.0
Watercourse slope, s
ft/ft
0.0191
0.5
Avg.V = Csf * (s)
ft/s
2.2298
where: Unpaved Csf = 16.1345
Paved Csf = 20.3282
T = L / (3600*V)
hrs
0.12 = 0.12
CHANNEL FLOW
Segment ID
Cross Sectional Flow Area, a
sq.ft
0.00
Wetted perimeter, Pw
ft
0.00
Hydraulic radius, r = a/Pw
ft
0.000
Channel slope, s
ft/ft
0.0000
Manning's roughness coeff., n
0.0000
2/3 1/2
1.49 * r * s
V =--------------------
ft/s
0.0000
n
Flow length, L
ft
0
T = L / (3600*V)
hrs
0.00 = 0.00
TOTAL TIME (hrs)......0.78.
Quick TR-55 Version: 5.47 SIN: Page 1
' Return Frequency: 2 years
TR-55 TABULAR HYDROGRAPH METHOD
Type II. Distribution
' (24 hr. Duration Storm)
Executed: 10-26-1998 19:27:32
Watershed file: --> S:\PONDPACK\CD025\POST MOP
Hydrograph file: --> S:\PONDPACK\CD025\POST2.HYD
' KRAFT FOODS, INC.
PARKING LOT EXPANSION
POST -DEVELOPMENT
I
>>>> Input Parameters
Used to Compute Hydrograph
<<<<
--------------
Subarea
------------------
AREA CN
--------------
Tc * Tt
---------------------
Precip.
-------
Runoff Ia/p
Description
(acres)
(hrs) (hrs)
(in)
(in) input/used
----------------------------------------------------------------------------
1 1
19.11 88.0
0.50 0.00
3.00 I
1.82 I.09 .10
------
----------------------------------------------------------------------
* Travel time from subarea outfall
to composite
watershed outfall point.
Subarea
where user specified
interpolation
between Ia/p
tables.
Total area = 19.11 acres or 0.02986 sq.mi
Peak discharge = 29 cfs
'>>>> Computer Modifications of Input Parameters <<<<<
-------------------------------------------------------------------------------
Input Values Rounded Values Ia/p
Subarea Tc * Tt Tc * Tt Interpolated Ia/p
Description (hr) (hr) (hr) (hr) (Yes/No) Messages
-------------------------------------------------------------------------------
0.53 0.00 0.50 0.00 No Computed Ia/p < .1
------------------------------------------------------------------
* Travel time from subarea outfall to composite watershed outfall point.
Quick TR-55 Version: 5.47 SIN:
Page 2
Return Frequency: 2 years
TR-55 TABULAR HYDROGRAPH METHOD
Type II. Distribution
(24 hr. Duration Storm)
Executed: 10-26-1998 19:27:32
Watershed file: --> S:\PONDPACK\CD025\POST MOP
Hydrograph file: --> S:\PONDPACK\CD025\POST2.HYD
KRAFT FOODS, INC.
PARKING LOT EXPANSION
POST -DEVELOPMENT
>>>> Summary of Subarea Times to Peak <<<<
Peak Discharge at Time to Peak at
Composite Outfall Composite Outfall
Subarea (cfs) (hrs)
----------------------------------------
1 29 12.4
----------------------------------------
Composite Watershed 29 12.4
Quick TR-55 Version: 5.47 SIN:
Page 1
Return Frequency: 10 years
TR-55 TABULAR HYDROGRAPH METHOD
Type II. Distribution
(24 hr. Duration Storm)
Executed: 10-26-1998 19:27:32
Watershed
file: --> S:\PONDPACK\CD025\POST MOP
Hydrograph
file: --> S:\PONDPACK\CD025\POSTIO.HYD
KRAFT FOODS, INC.
PARKING LOT EXPANSION
POST -DEVELOPMENT
>>>> Input
Parameters Used to Compute Hydrograph <<<<
Subarea
AREA
CN Tc *-Tt Precip. Runoff
Ia/p
Description
(acres)
(hrs)(hrs) (in)
(in)
---
input/used
---- ------
ill ------------------
19.11----88.0
----------------------------
0.50 0.00 4.90 f 3.5'7--
I.06 .10
F1
* Travel time from subarea outfall to composite watershed outfall point.
Subarea where user specified interpolation between Ia/p tables.
Total area = 19.11 acres or 0.02986 sq.mi
Peak discharge = 56 cfs
>>>> Computer Modifications
of Input
Parameters <<<<<
- - - ------------------------------------------------------------------
Input Values Rounded
Values
Ia/p
Tc * Tt Tc
* Tt
Interpolated Ia/p
'Subarea
Description
(hr) (hr) (hr)
(hr)
(Yes/No) Messages
------------------------------------------------------------
0.53 0.00 0.50
------------
0.00
No Computed Ia/p < .1
-------------------------------
_ ----------
* Travel time
-----------------
from subarea outfall to
composite
watershed outfall point.
Quick TR-55 Version: 5.47 SIN:
Return Frequency:
TR-55 TABULAR HYDROGRAPH METHOD
Type II. Distribution
(24 hr. Duration Storm)
Executed: 10-26-1998 19:27:32
Watershed file: --> S:\PONDPACK\CD025\POST MOP
Hydrograph file: --> S:\PONDPACK\CD025\POSTI0.HYD
KRAFT FOODS, INC.
PARKING LOT EXPANSION
POST -DEVELOPMENT
Page 2
10 years
>>>> Summary of Subarea Times to Peak <<<<
Peak Discharge at Time to Peak at
Composite Outfall Composite Outfall
Subarea (cfs) (hrs)
----------------------------------------
1 56 12.4
----------------------------------------
Composite Watershed 56 12.4
� I
Quick TR-55 Version: 5.47 SIN: Page 1
Return Frequency: 25 years
TR-55 TABULAR HYDROGRAPH METHOD
Type II. Distribution
(24 hr. Duration Storm)
Executed: 10-26-1998 19:27:32
Watershed file: --> S:\PONDPACK\CD025\POST MOP
Hydrograph file: --> S:\PONDPACK\CD025\POST25.HYD
KRAFT FOODS, INC.
PARKING LOT EXPANSION
POST -DEVELOPMENT
I
>>
>> Input Parameters Used to Compute Hydrograph <<<<
-------------------------------------------------------------------
Subarea
AREA CN Tc * Tt
Precip. Runoff Ia/p
Description
(acres) (hrs) (hrs)
(in)
(in) input/used
t4_43
1
19.11 88.0 0.50 0.00
5.80 --1.05 .10
------ - - - - --
-----------------------------------------------------------
* Travel time
from subarea outfall to composite
watershed outfall point.
Subarea
where user specified interpolation
between Ia/p tables.
Total area = 19.11 acres or 0.02986
sq.mi
'
Peak discharge = 70 cfs
>>
�-
>> Computer Modifications of Input
Parameters <<<<<
--------------------
- -
----------------------------------------
Input Values Rounded Values
Ia/p
Tc * Tt Tc * Tt Interpolated Ia/p
'Subarea
Description
(hr) (hr) (hr) (hr)
(Yes/No) Messages
---------------------------------------------------------------
0.53 0.00 0.50 0.00
-----------
---
No Computed Ia/p < .1
----------------------
--
-----
C-Travel time
---------------------
from subarea outfall to composite
watershed outfall point.------
Quick TR-55 Version: 5.47 SIN:
Return Frequency:
TR-55 TABULAR HYDROGRAPH METHOD
Type II. Distribution
' (24 hr. Duration Storm)
Executed: 10-26-1998 19:27:32
Watershed file: --> S:\PONDPACK\CD025\POST MOP
Hydrograph file: --> S:\PONDPACK\CD025\POST25.HYD
KRAFT FOODS, INC.
PARKING LOT EXPANSION
POST -DEVELOPMENT
Page 2
25 years
' >>>> Summary of Subarea Times to Peak <<<<
Peak Discharge at Time to Peak at
Composite Outfall Composite Outfall
' Subarea (cfs) (hrs)- --
---------------
-------------
1 70 12.4
----------------------------------------
Composite Watershed 70 12.4
11
' APPENDIX B
1
1
1
1
1
1
1
Quick TR-55 Ver.5.47 SIN:
Executed: 19:27:17 10-26-1998
KRAFT FOODS, INC.
PARKING LOT EXPANSION
POST -DEVELOPMENT
RUNOFF CURVE NUMBER DATA
Composite Area:
AREA CN
SURFACE DESCRIPTION (acres)
IMPERVIOUS 10.60 98
GRAVEL 0.27 89
LAWN 8.24 74
COMPOSITE AREA ---> 19.11 87.5 ( 88 )
I
'Quick TR-55 Ver.5.47 SIN:
Executed: 19:26:54 10-26-1998 s:\pondpack\cd025\POST.TCT
KRAFT FOODS, INC.
' PARKING LOT EXPANSION
POST -DEVELOPMENT
Tc COMPUTATIONS FOR:
SHEET FLOW (Applicable to Tc only)
Segment ID
A-B
Surface description
LAWN
Manning's roughness coeff., n
0.2400
Flow length, L (total < or = 300)
ft
300.0
Two-yr 24-hr rainfall, P2
in
3.000
Land slope, s
ft/ft
0.0377
0.8
.007 * (n*L)
T =--------------
hrs
0.46 = 0.46
0.5 0.4
P2 * s
SHALLOW CONCENTRATED FLOW
Segment ID
B-C
Surface (paved or unpaved)?
Unpaved
Flow length, L
ft
469.0
Watercourse slope, s
ft/ft
0.0224
0.5
Avg.V = Csf * (s)
ft/s
2.4148
where: Unpaved Csf = 16.1345
Paved Csf = 20.3282
T = L / (3600*V)
hrs
0.05 = 0.05
CHANNEL FLOW
Segment ID
C-D D-E
Cross Sectional Flow
Area, a
sq.ft
72.00
4.90
Wetted perimeter, Pw
ft
28.00
7.85
Hydraulic radius, r
= a/Pw
ft
2.571
0.624
Channel slope, s
ft/ft
0.0050
0.0050
Manning's roughness
coeff., n
0.2700
0.0130
2/3
1/2
1.49 * r *
s
V =--------------------
ft/s
0.7324
5.9194
n
Flow length, L
ft
306
100
T = L / (3600*V)
hrs
0.12 +
0.00 = 0.12
...............
TOTAL TIME
(hrs)......0.63.
e 1
Quick TR-55 Version: 5.47 SIN: Page
' Return Frequency: 2 years
TR-55 TABULAR HYDROGRAPH METHOD
Type II. Distribution
(24 hr. Duration Storm)
Executed: 10-26-1998 19:38:41
' Watershed file: --> S:\PONDPACK\CD025\PRE MOP
Hydrograph file: --> S:\PONDPACK\CD025\PRE2.HYD
KRAFT FOODS, INC.
PARKING LOT EXPANSION
PRE -DEVELOPMENT
>>
>> Input Parameters Used to Compute Hydrograph <<<<
-------------------
Subarea
AREA CN Tc * Tt Precip. I Runoff Ia/p
Description
(acres) (hrs) (hrs) (in)
(in) input/used
----------------------------------------------------------
1
19.11 66.0 0.75 0.00 3.000_54T_34 .34
--- -------
---------------------------
* Travel time
----------------------------------
from subarea outfall to composite watershed outfall point.
Subarea
where user specified interpolation between Ia/p tables.
Total area = 19.11 acres or 0.02986 sq.mi
'
Peak discharge = 5 cfs
>>>>
Computer Modifications of Input Parameters <<<<<
-------------------------------
----------
-----------------------------
Input Values Rounded Values Ia/p
Tc * Tt Tc * Tt Interpolated Ia/p
ISubarea
Description
(hr) (hr) (hr) (hr) (Yes/No) Messages
--------------------------------------------------------
0�78 0_00 0_75- 0.00 Yes --
--------------------------------------
_ -
* Travel time
from subarea outfall to composite watershed outfall point.
' Pa
Quick TR-55 Version: 5.47 SIN: e 2 g
' Return Frequency: 2 years
TR-55 TABULAR HYDROGRAPH METHOD
Type II. Distribution
' (24 hr. Duration Storm)
Executed: 10-26-1998 19:38:41
' Watershed file: --> S:\PONDPACK\CD025\PRE MOP
Hydrograph file: --> S:\PONDPACK\CD025\PRE2.HYD
' KRAFT FOODS, INC.
PARKING LOT EXPANSION
PRE -DEVELOPMENT
' >>>> Summary of Subarea Times to Peak <<
Peak Discharge at Time to Peal-, at
Composite Outfall Composite Outfall
' Subarea(cfs)-------(hrs)----
----------
-----
1 5 12.6
----------------------------------------
Composite Watershed 5 12.6
Quick TR-55 Version: 5.47 SIN: Page 1
' Return Frequency: 10 years
TR-55 TABULAR HYDROGRAPH METHOD
Type II. Distribution
(24 hr. Duration Storm)
Executed: 10-26-1998 19:38:41
' Watershed file: --> S:\PONDPACK\CD025\PRE MOP
Hydrograph file: --> S:\PONDPACK\CD025\PRE10.HYD
KRAFT FOODS, INC.
PARKING LOT EXPANSION
PRE -DEVELOPMENT
>>
>> Input Parameters Used to Compute Hydrograph <<<<
---------------
U-Subarea
------------------------------------------------------------
AREA CN Tc * Tt Precip. Runoff Ia/p
Description
(acres) (hrs) (hrs) (in)
(in) input/used
1----------------19.11----66.0----0.75----0.00----4.90---I---1.66
I.21 .21
-------------------------------------------------------------------
* Travel time
from subarea outfall to composite watershed outfall point.
'I -- Subarea
where user specified interpolation between Ia/p tables.
Total area = 19.11 acres or 0.02986 sq.mi
'
Peak discharge = 19 cfs
'
>>
>> Computer Modifications of Input Parameters <<<<<
--------------------
- --- --
--------------------------------------------
Input Values Rounded Values Ia/p
Tc * Tt Tc * Tt Interpolated Ia/p
ISubarea
Description
(hr) (hr) (hr) (hr) (Yes/No) Messages
---------------------------------------------------------------
Yes --
----------------0-78----0-00-----0-75----0-00------
* Travel time
from subarea outfall to composite watershed outfall point.
I
' Pa
Quick TR-55 Version: 5.47 SIN: e 2 g
' Return Frequency: 10 years
METI-IOD
TR-55 TABULAR HYDROGRAPH
Type II. Distribution
(24 hr. Duration Storm)
Executed: 10-26-1998 19:38:41
Watershed file: --> S:\PONDPACK\CD025\PRE MOP
Hydrograph file: --> S:\PONDPACK\CD025\PREIO.HYD
KRAFT FOODS, INC.
PARKING LOT EXPANSION
PRE -DEVELOPMENT
>>>> Summary of Subarea Times to Peak <<<<
Peak Discharge at Time to Peak at
Composite Outfall Composite Outfall
--Subarea-----(cfs) (hrs)
-----------
1 19 12.7
Composite Watershed 19 12.7
Quick TR-55 Version: 5.47 SIN: Page 1
' Return Frequency: 25 years
TR-55 TABULAR HYDROGRAPH METHOD
Type II. Distribution
(24 hr. Duration Storm)
Executed: 10-26-1998 19:38:41
' Watershed file: --> S:\PONDPACK\CD025\PRE MOP
Hydrograph file: --> S:\PONDPACK\CD025\PRE25.HYD
' KRAFT FOODS, INC.
PARKING LOT EXPANSION
PRE -DEVELOPMENT
>>
>> Input Parameters Used to Compute Hydrograph <<<<
-------------------------------
Subarea
AREA CN Tc *-Tt
Preci I Runoff Ia/p
Description
(acres) (hrs) (hrs)
(in)
(in) input/used
�1
19.11 66.0 0.75 0.00
5.80 2_29 -I�18
-- - - - - --
--------------
* Travel time
-----------------------------------
from subarea outfall to composite
------------
watershed outfall point.
Subarea
where user specified interpolation
between Ia/p tables.
Total area = 19.11 acres or 0.02986
sq.mi
'
Peak discharge = 26 cfs
Computer Modifications of Input
Parameters <<<<<
--------------------
->>>>
-----------
------------------------------------------
Input Values Rounded Values
Ia/p
Tc * Tt Tc * Tt Interpolated
Ia/p
'Subarea
Description
(hr) (hr) (hr) (hr)
(Yes/No) Messages
-------------------------------------------------------------------------------
0.00
--
----0-78----0-00-----0-�5---------------Yes
* Travel time
from subarea outfall to composite
watershed outfall point.
7
Quick TR-55 Version: 5.47 SIN:
' Return Frequency:
TR-55 TABULAR HYDROGRAPH METHOD
Type II. Distribution
' (24 hr. Duration Storm)
Executed: 10-26-1998 19:38:41
' Watershed file: --> S:\PONDPACK\CD025\PRE MOP
Hydrograph file: --> S:\PONDPACK\CD025\PRE25.HYD
' KRAFT FOODS, INC.
PARKING LOT EXPANSION
PRE -DEVELOPMENT
Page 2
25 years
>>>> Summary of Subarea Times to Peak <<<<
Peak Discharge at Time to Peak at
Composite Outfall Composite Outfall
Subarea (cfs) (hrs)
----------------------------------------
1 26 12.6
----------------------------------------
Composite Watershed 26 12.6
' APPENDIX C
1
1
1
1
1
1
1
POND-2 Version: 5.21
SIN:
KRAFT FOODS, INC.
PARKING LOT EXPANSION
EXISTING POND
CALCULATED 10-26-1998 19:26:13
DISK FILE: S:\PONDPACK\CD025\POST VOL
Planimeter scale: 1 inch = 1 ft.
*
Elevation
Planimeter
Area
Al+A2+sgr(A1*A2)
Volume
Volume Sum
(ft)
(sq.in.)
(acres)
(acres)
(acre-ft)
(acre-ft)
---------------------------------------------------------------------------
673.60
0.00
0.00
0.00
0.00
0.00
674.00
1,766.00
0.04
0.04
0.01
0.01
676.00
16,344.00
0.38
0.54
0.36
0.36
678.00
46,861.00
1.08
2.09
1.39
1.76
680.00
74,207.00
1.70
4.13
2.76
4.51
* Incremental volume computed by the Conic Method for Reservoir Volumes.
Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Areal*Areal))
where: EL1, EL2 = Lower and upper elevations of the increment
Areal,Area2 = Areas computed for EL1, EL2, respectively
Volume = Incremental volume between ELl and EL2
Outlet Structure File: POST STR
POND-2 Version: 5.21 SIN:
Date Executed: Time Executed:
*************************
KRAFT FOODS, INC.
PARKING LOT EXPANSION
EXISTING OUTLET STRUCTURE
***** COMPOSITE OUTFLOW SUMMARY ****
Elevation (ft) Q (cfs) Contributing Structures
673.60
0.0
1
673.80
0.0
1
674.00
0.0
1
674.20
0.0
1
674.40
0.0
1
674.60
0.0
1
674.80
0.0
1
675.00
0.0
1
675.20
0.0
1
675.40
0.0
1
675.60
0.0
1
675.80
0.0
1
676.00
0.0
1
676.20
0.0
1
676.40
0.0
1
676.60
0.0
1
676.80
0.0
1
677.00
0.0
1
677.20
0.0
1
677.40
0.0
1
677.60
0.0
1
677.80
0.0
1
678.00
0.0
1
678.20
0.0
1
678.40
0.0
1
678.60
0.0
1
678.80
0.3
1
+2
679.00
1.8
1
+2
679.20
3.8
1
+2
679.40
6.2
1
+2
679.60
9.0
1
+2
679.80
12.2
1
+2
680.00
0.0
1
1
1
1
1
Outlet Structure File: POST STR
POND-2 Version: 5.21 SIN:
Date Executed: Time Executed:
KRAFT FOODS, INC.
PARKING LOT EXPANSION
EXISTING OUTLET STRUCTURE
*************************
Outlet Structure File: S:\PONDPACK\CD025\POST
Planimeter Input File: S:\PONDPACK\CD025\POST
Rating Table Output File: S:\PONDPACK\CD025\POST
STR
VOL
PND
Min. Elev. (ft) = 673.6 Max. Elev. (ft) = 680 Incr. (ft) = .2
Additional elevations (ft) to be included in table:
�c �; �c * �c is 9c �c �c * �c •k �c •k �c •k k ;F * * * �;
**********************************************
SYSTEM CONNECTIVITY
•k:��c�c•k�c�c�c*�c:F•k***�c�c�c�c�c�c•kit•�r�c�r�c•k�c�c�c:t*�r•k�c�c*�r•kk�r:��r�c�c
Structure No. Q Table Q Table
WEIR-VR 2 + 1 -> A
CULVERT-CR 1 -> 1
Outflow rating table summary was stored in file:
S:\PONDPACK\CD025\POST PND
Outlet Structure File: POST STR
POND-2 Version: 5.21 SIN:
Date Executed: Time Executed:
KRAFT FOODS, INC.
PARKING LOT EXPANSION
EXISTING OUTLET STRUCTURE
�c:F:F�c k*�c�c�c�cic�c�c**�ck kk�c�c kk�c�c
>>>>>> Structure No. 2 <<<<<<
(Input Data)
WEIR-VR
Weir - Vertical Rectangular
El elev. (ft) ? 678.7
E2 elev. (ft) ? 680
Weir coefficient? .67
Weir elev.(ft)? 678.7
Length (ft)? 16
Contracted/Suppressed (CIS)? C
'
Outlet Structure File: POST STR
'
POND-2 Version: 5.21 SIN:
Date Executed: Time Executed:
KRAFT FOODS, INC.
PARKING LOT EXPANSION
'
EXISTING OUTLET STRUCTURE
9ck;t*�cicic:ric�c�c:��cic;�:�*�ck�c�cJc�c�ck
>>>>>> Structure No. 1 <<<<<<
'
(Input Data)
CULVERT-CR
Circular Culvert (With Inlet Control)
El elev.(ft)? 673.6
E2 elev. (ft) ? 680
Diam. (ft) ? 1.25
Inv. el.(ft)? 673.6
'
Slope (ft/ft)? .061
T1 ratio?
T2 ratio?
K Coeff.? .0045
M Coeff.? 2
c Coeff.? .0317
Y Coeff.? .69
Form 1 or 2? 1
Slope factor? -0.5
�I
Outlet Structure File: POST STR
POND-2 Version: 5.21 SIN:
Date Executed: Time Executed:
*************************
KRAFT FOODS, INC.
PARKING LOT EXPANSION
EXISTING OUTLET STRUCTURE
Outflow Rating Table for Structure J[2
WEIR-VR Weir - Vertical Rectangular
***** INLET CONTROL ASSUMED *****
Elevation (ft) Q (cfs) Computation Messages
673.60
0.0
E
<
Inv.El.=
678.7
673.80
0.0
E
<
Inv.El.=
678.7
674.00
0.0
E
<
Inv.El.=
678.7
674.20
0.0
E
<
Inv.El.=
678.7
674.40
0.0
E
<
Inv.El.=
678.7
674.60
0.0
E
<
Inv.El.=
678.7
674.80
0.0
E
<
Inv.El.=
678.7
675.00
0.0
E
<
Inv.El.=
678.7
675.20
0.0
E
<
Inv.El.=
678.7
675.40
0.0
E
<
Inv.El.=
678.7
675.60
0.0
E
<
Inv.E1.=
678.7
675.80
0.0
E
<
Inv.El.=
678.7
676.00
0.0
E
<
Inv.El.=
678.7
676.20
0.0
E
<
Inv.El.=
678.7
676.40
0.0
E
<
Inv.El.=
678.7
676.60
0.0
E
<
Inv.El.=
678.7
676.80
0.0
E
<
Inv.El.=
678.7
677.00
0.0
E
<
Inv.El.=
678.7
677.20
0.0
E
<
Inv.El.=
678.7
677.40
0.0
E
<
Inv.E1.=
678.7
677.60
0.0
E
<
Inv.El.=
678.7
677.80
0.0
E
<
Inv.El.=
678.7
678.00
0.0
E
<
Inv.El.=
678.7
678.20
0.0
E
<
Inv.El.=
678.7
678.40
0.0
E
<
Inv.El.=
678.7
678.60
0.0
E
<
Inv.El.=
678.7
678.80
0.3
H
=.1
679.00
1.8
H
=.3
679.20
3.8
H
=.5
679.40
6.2
H
=.7
679.60
9.0
H
=.9
679.80
12.2
H
=1.1
680.00
0.0
E
=
or > E2=680
C = .67
L (ft) = 16
H (ft) =
Table elev. -
Invert
elev. ( 678.7 ft )
Q (cfs) =
C * (L-.2H) *
(H**1.5)
-- Contracted Weir
Outlet Structure File: POST STR
' POND-2 Version: 5.21 SIN:
Date Executed: Time Executed:
*************************
KRAFT FOODS, INC.
PARKING LOT EXPANSION
EXISTING OUTLET STRUCTURE
Outflow Rating Table for Structure 41
CULVERT-CR Circular Culvert (With Inlet Control)
***** INLET CONTROL ASSUMED *****
Elevation (ft) Q (cfs) Computation Messages
'
673.60
673.80
0.0
0.2
No headwater
Equ.l: HW =.2
do=.17
674.00
0.7
Equ.l. HW
.4
do=.319
674.20
1.3
Equ.1: HW =.6
do=.457
674.40
2.2
Equ.1: HW =.8
do=.59
'
674.60
3.1
Equ.l: HW =1.0
do=.714
674.80
4.2
Equ.l: HW =1.2
do=.828
675.00
5.2
Transition:
HW
=1.4
'
675.20
6.1
Submerged:
HW
=1.6
675.40
6.8
Submerged:
HW
=1.8
675.60
7.5
Submerged:
HW
=2.0
'
675.80
8.1
Submerged:
HW
=2.2
676.00
8.7
Submerged:
HW
=2.4
676.20
9.2
Submerged:
HW
=2.6
676.40
9.7
Submerged:
HW
=2.8
676.60
10.2
Submerged:
HW
=3.0
676.80
10.6
Submerged:
HW
=3.2
677.00
677.20
11.1
11.5
Submerged:
Submerged:
HW
HW
=3.4
=3.6
677.40
11.9
Submerged:
HW
=3.8
677.60
12.3
Submerged:
HW
=4.0
'
677.80
12.7
Submerged:
HW
=4.2
678.00
13.0
Submerged:
HW
=4.4
678.20
13.4
Submerged:
HW
=4.6
678.40
13.7
Submerged:
HW
=4.8
'
678.60
14.1
Submerged:
HW
=5.0
678.80
14.4
Submerged:
HW
=5.2
679.00
14.7
Submerged:
HW
'
679.20
15.1
Submerged:
HW
=5.4
=5.6
679.40
15.4
Submerged:
HW
5.8
679.60
15.7
Submerged:
HW
=6.0
Ac=.1
Ac=.247
Ac=.406
Ac=.570
Ac=.724
Ac=.863
Outlet Structure File: POST STR
POND-2 Version: 5.21 SIN:
Date Executed: Time Executed:
>>>>> CONTINUED from previous page <<<<<
Outflow Rating Table for Structure J#1
CULVERT-CR Circular Culvert (With Inlet Control)
***** INLET CONTROL ASSUMED *****
Elevation (ft) Q (cfs) Computation Messages
-------------- ------- ------------------------
679.80 16.0 Submerged: HW =6.2
680.00 0.0 E = or > E2=680
Used Unsubmerged Equ. Form (1) for elev. less than 674.93 ft
Used Submerged Equation for elevations greater than 675.06 ft
HW=Headwater (ft) dc=Critical depth (ft) Ac=Area (sq.ft) at do
Transition flows interpolated from the following values:
E1=674.93 ft; Q1=4.8 cfs; Dc=.89 ft; E2=675.06 ft; Q2=5.49 cfs
Outlet Structure File: POST STR
POND-2 Version: 5.21 SIN:
Date Executed: Time Executed:
KRAFT FOODS, INC.
PARKING LOT EXPANSION
EXISTING OUTLET STRUCTURE
*************************
Outflow Rating Table A
Table A = 1 + 2
Elevation (ft) Q (cfs) Contributing Structures
673.60
0.0
1
673.80
0.0
1
674.00
0.0
1
674.20
0.0
1
674.40
0.0
1
674.60
0.0
1
674.80
0.0
1
675.00
0.0
1
675.20
0.0
1
675.40
0.0
1
675.60
0.0
1
675.80
0.0
1
676.00
0.0
1
676.20
0.0
1
676.40
0.0
1
676.60
0.0
1
676.80
0.0
1
677.00
0.0
1
677.20
0.0
1
677.40
0.0
1
677.60
0.0
1
677.80
0.0
1
678.00
0.0
1
678.20
0.0
1
678.40
0.0
1
678.60
0.0
1
678.80
0.3
1
+2
679.00
1.8
1
+2
679.20
3.8
1
-+-2
679.40
6.2
1
+2
679.60
9.0
1
+2
679.80
12.2
1
+2
680.00
0.0
1
' POND-2 Version: 5.21 SIN:
EXECUTED: 10-26-1998 19:25:26 1
�c *
' * KRAFT FOODS, INC.
* PARKING LOT EXPANSION
* POST -DEVELOPMENT
*
***************************
Inflow Hydrograph: S:\PONDPACK\CD025\POST2
Rating Table file: S:\PONDPACK\CD025\POST
--INITIAL
CONDITIONS ----
'
Elevation =
673.60 ft
Outflow =
0.00 cfs
Storage =
0.00 ac-ft
L�
GIVEN POND DATA
ELEVATION
OUTFLOW
STORAGE
(ft)
(cfs)
(ac-ft)
----------
---------
673.60
---------
0.0
0.000
673.80
0.0
0.001
674.00
0.0
0.005
674.20
0.0
0.015
674.40
0.0
0.029
674.60
0.0
0.048
674.80
0.0
0.072
675.00
0.0
0.101
675.20
0.0
0.138
675.40
0.0
0.182
675.60
0.0
0.234
675.80
0.0
0.295
676.00
0.0
0.365
676.20
0.0
0.445
676.40
0.0
0.537
676.60
0.0
0.640
676.80
0.0
0.756
677.00
0.0
0.885
677.20
0.0
1.028
677.40
0.0
1.186
677.60
0.0
1.360
677.80
0.0
1.549
678.00
0.0
1.756
678.20
0.0
1.976
678.40
0.0
2.209
678.60
0.0
2.452
678.80
0.3
2.708
679.00
1.8
2.976
679.20
3.8
3.257
679.40
6.2
3.551
679.60
------------------------------
9.0
3.857
Page 1
Return Freq: 2 years
HYD
PND
INTERMEDIATE
ROUTING
COMPUTATIONS
--------------------------
2S/t
2S/t + 0
(cfs)
(cfs)
-------------
------------
0.0
0.0
0.2
0.2
1.3
1.3
3.7
3.7
7.1
7.1
11.5
11.5
17.3
17.3
24.5
24.5
33.4
33.4
44.0
44.0
56.6
56.6
71.3
71.3
88.3
88.3
107.7
107.7
129.9
129.9
154.9
154.9
182.9
182.9
214.2
214.2
248.8
248.8
287.1
287.1
329.0
329.0
374.9
374.9
424.9
424.9
478.3
478.3
534.5
534.5
593.5
593.5
655.4
655.7
720.3
722.1
788.2
792.0
859.2
865.4
933.4
942.4
EXECUTED 10-26-1998 19:25:26
' DISK FILES: POST2 HYD ; POST
IGIVEN POND DATA
' ELEVATION
OUTFLOW
STORAGE
(ft)
(cfs)
(ac-ft)
' 679.80
12_-2
--
----4.177
rl
11
J
� I
� I
.PND
Page 2
INTERMEDIATE ROUTING
COMPUTATIONS
--------------------------
2S/t 2S/t + 0
(cfs) (cfs)
1010.9 1023.1
--------------------------
Time increment (t) = 0.100 hrs.
91
POND-2 Version: 5.21
' EXECUTED: 10-26-1998
Pond File:
Inflow Hydrograph:
' Outflow Hydrograph:
INFLOW HYDROGRAPH
TIME
INFLOW
(hrs)
(cfs)
I-11.000
1.00
11.100
1.00
11.200
1.00
11.300
1.00
11.400
1.00
11.500
2.00
11.600
2.00
11.700
2.00
11.800
3.00
11.900
3.00
12.000
5.00
12.100
9.00
17.00
112.200
12.300
25.00
12.400
29.00
12.500
28.00
22.00
112.600
12.700
16.00
12.800
12.00
12.900
10.00
13.000
8.00
13.100
6.00
13.200
5.00
13.300
4.00
13.400
4.00
13.500
4.00
13.600
3.00
13.700
3.00
13.800
3.00
13.900
3.00
14.000
3.00
14.100
3.00
14.200
2.00
14.300
2.00
14.400
2.00
14.500
2.00
14.600
2.00
14.700
2.00
14.800
2.00
14.900
2.00
15.000
2.00
15.100
2.00
15.200
2.00
15.300
2.00
15.400
------------------
2.00
S/N:
19:25:26 1
S:\PONDPACK\CD025\POST PND
S:\PONDPACK\CD025\POST2 HYD
S:\PONDPACK\CD025\20UT HYD
Page 3
Return Freq: 2 years
ROUTING COMPUTATIONS
I1+I2
2S/t - 0
2S/t + 0
OUTFLOW
ELEVATION
(cfs)
(cfs)
(cfs)
-----------
(cfs)
---------
(ft)
---------
---------
-----
------------
0.0
0.0
0.00
673.60
2.0
2.0
2.0
0.00
674.06
2.0
4.0
4.0
0.00
674.22
2.0
6.0
6.0
0.00
674.34
2.0
8.0
8.0
0.00
674.44
3.0
11.0
11.0
0.00
674.58
4.0
15.0
15.0
0.00
674.72
4.0
19.0
19.0
0.00
674.85
5.0
24.0
24.0
0.00
674.98
6.0
30.0
30.0
0.00
675.12
8.0
38.0
38.0
0.00
675.29
14.0
52.0
52.0
0.00
675.53
26.0
78.0
78.0
0.00
675.88
42.0
120.0
120.0
0.00
676.31
54.0
174.0
174.0
0.00
676.74
57.0
231.0
231.0
0.00
677.10
50.0
281.0
281.0
0.00
677.37
38.0
319.0
319.0
0.00
677.55
28.0
347.0
347.0
0.00
677.68
22.0
369.0
369.0
0.00
677.77
18.0
387.0
387.0
0.00
677.85
14.0
401.0
401.0
0.00
677.90
11.0
412.0
412.0
0.00
677.95
9.0
421.0
421.0
0.00
677.98
8.0
429.0
429.0
0.00
678.02
8.0
437.0
437.0
0.00
678.05
7.0
444.0
444.0
0.00
678.07
6.0
450.0
450.0
0.00
678.09
6.0
456.0
456.0
0.00
678.12
6.0
462.0
462.0
0.00
678.14
6.0
468.0
468.0
0.00
678.16
6.0
474.0
474.0
0.00
678.18
5.0
479.0
479.0
0.00
678.20
4.0
483.0
483.0
0.00
678.22
4.0
487.0
487.0
0.00
678.23
4.0
491.0
491.0
0.00
678.25
4.0
495.0
495.0
0.00
678.26
4.0
499.0
499.0
0.00
678.27
4.0
503.0
503.0
0.00
678.29
4.0
507.0
507.0
0.00
678.30
4.0
511.0
511.0
0.00
678.32
4.0
515.0
515.0
0.00
678.33
4.0
519.0
519.0
0.00
678.34
4.0
523.0
523.0
0.00
678.36
4.0
------------------------------------------------------
527.0
527.0
0.00
678.37
G
POND-2 Version: 5.21
' EXECUTED: 10-26-1998
Pond File:
Inflow Hydrograph:
' Outflow Hydrograph:
INFLOW HYDROGRAPH
------------------
TIME
(hrs)
15.500
15.600
15.700
15.800
15.900
16.000
16.100
16.200
16.300
16.400
16.500
16.600
16.700
16.800
16.900
17.000
17.100
17.200
17.300
17.400
17.500
17.600
17.700
17.800
17.900
18.000
18.100
18.200
18.300
18.400
18.500
18.600
18.700
18.800
18.900
19.000
19.100
19.200
19.300
19.400
19.500
19.600
19.700
19.800
19.900
20.000
INFLOW
(cfs)
2.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
SIN: Page 4
19:25:26 1 Return Freq: 2 years
S:\PONDPACK\CD025\POST PND
S:\PONDPACK\CD025\POST2 HYD
S:\PONDPACK\CD025\20UT HYD
I1+I2
(cfs)
4.0
4.0
4.0
3.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
ROUTING COMPUTATIONS
--------------
2S/t - 0
(cfs)
------------
531.0
535.0
539.0
542.0
544.0
546.0
548.0
550.0
552.0
554.0
556.0
558.0
560.0
562.0
564.0
566.0
568.0
570.0
572.0
574.0
576.0
578.0
580.0
582.0
584.0
586.0
588.0
590.0
592.0
594.0
596.0
597.9
599.9
601.8
603.7
605.6
607.4
609.3
611.1
612.9
614.7
616.5
618.2
620.0
621.7
623.4
-------------
2S/t + 0
(cfs)
531.0
535.0
539.0
542.0
544.0
546.0
548.0
550.0
552.0
554.0
556.0
558.0
560.0
562.0
564.0
566.0
568.0
570.0
572.0
574.0
576.0
578.0
580.0
582.0
584.0
586.0
588.0
590.0
592.0
594.0
596.0
598.0
599.9
601.9
603.8
605.7
607.6
609.4
611.3
613.1
614.9
616.7
618.5
620.2
622.0
623.7
OUTFLOW
(cfs)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.08
0.09
0.09
0.10
0.11
0.12
0.13
0.14
0.15
ELEVATION
(ft)
678.39
678.40
678.42
678.43
678.43
678.44
678.45
678.45
678.46
678.47
678.47
678.48
678.49
678.49
678.50
678.51
678.51
678.52
678.53
678.53
678.54
678.55
678.55
678.56
678.57
678.57
678.58
678.59
678.59
678.60
678.61
678.61
678.62
678.63
678.63
678.64
678.65
678.65
678.66
678.66
678.67
678.67
678.68
678.69
678.69
678.70
I�
POND-2 Version: 5.21 SIN: Page 5
' EXECUTED: 10-26-1998 19:25:26 1 Return Freq: 2 years
Pond File: S:\PONDPACK\CD025\POST PND
Inflow Hydrograph: S:\PONDPACK\CD025\POST2 HYD
' Outflow Hydrograph: S:\PONDPACK\CD025\2OUT HYD
INFLOW HYDROGRAPH
ROUTING
COMPUTATIONS
TIME
INFLOW
----------------------------------------------------
I1+I2
2S/t-- -O
2S/t + O
OUTFLOW
ELEVATION
(hrs)
(cfs)
(cfs)
(cfs)
------------
(cfs)
-----------
(cfs)
-
(ft)
--------
20.100
---------
1.00
---------
2.0
625.1
625.4
0.15
678.70
20.200
1.00
2.0
626.8
627.1
0.16
678.71
20.300
1.00
2.0
628.4
628.8
0.17
678.71
20.400
1.00
2.0
630.1
630.4
0.18
678.72
20.500
1.00
2.0
631.7
632.1
0.19
678.72
20.600
1.00
2.0
633.3
633.7
0.19
678.73
20.700
1.00
2.0
634.9
635.3
0.20
678.73
20.800
1.00
2.0
636.5
636.9
0.21
678.74
20.900
1.00
2.0
638.1
638.5
0.22
678.74
21.000
1.00
2.0
639.6
640.1
0.22
678.75
21.100
1.00
2.0
641.2
641.6
0.23
678.75
21.200
1.00
2.0
642.7
643.2
0.24
678.76
21.300
1.00
2.0
644.2
644.7
0.25
678.76
21.400
1.00
2.0
645.7
646.2
0.25
678.77
21.500
1.00
2.0
647.2
647.7
0.26
678.77
21.600
1.00
2.0
648.6
649.2
0.27
678.78
21.700
1.00
2.0
650.1
650.6
0.28
678.78
21.800
1.00
2.0
651.5
652.1
0.28
678.79
21.900
1.00
2.0
652.9
653.5
0.29
678.79
22.000
1.00
2.0
654.3
654.9
0.30
678.80
22.100
1.00
2.0
655.7
656.3
0.31
678.80
22.200
1.00
2.0
657.0
657.7
0.35
678.81
22.300
1.00
2.0
658.3
659.0
0.37
678.81
22.400
1.00
2.0
659.5
660.3
0.40
678.81
22.500
1.00
2.0
660.6
661.5
0.43
678.82
22.600
1.00
2.0
661.7
662.6
0.46
678.82
22.700
1.00
2.0
662.7
663.7
0.48
678.82
22.800
1.00
2.0
663.7
664.7
0.50
678.83
22.900
1.00
2.0
664.7
665.7
0.53
678.83
23.000
1.00
2.0
665.6
666.7
0.55
678.83
23.100
1.00
2.0
666.4
667.6
0.57
678.84
23.200
1.00
2.0
667.3
668.4
0.59
678.84
23.300
1.00
2.0
668.0
669.3
0.61
678.84
23.400
1.00
2.0
668.8
670.0
0.62
678.84
23.500
1.00
2.0
669.5
670.8
0.64
678.85
23.600
1.00
2.0
670.2
671.5
0.66
678.85
23.700
1.00
2.0
670.9
672.2
0.67
678.85
23.800
1.00
2.0
671.5
672.9
0.69
678.85
23.900
1.00
2.0
672.1
673.5
0.70
678.85
24.000
0.00
1.0
671.7
673.1
0.69
678.85
24.100
0.00
0.0
670.4
671.7
0.66
678.85
24.200
0.00
0.0
669.1
670.4
0.63
678.84
24.300
0.00
0.0
667.9
669.1
0.60
678.84
24.400
0.00
0.0
666.8
667.9
0.58
678.84
24.500
0.00
0.0
665.7
666.8
0.55
678.83
24.600
0.00
0.0
664.6
665.7
0.52
678.83
il�
L
POND-2 Version: 5.21 SIN:
' EXECUTED: 10-26-1998 19:25:26 1
Pond File: S:\PONDPACK\CD025\POST PND
Inflow Hydrograph: S:\PONDPACK\CD025\POST2 HYD
' Outflow Hydrograph: S:\PONDPACK\CD025\2OUT HYD
INFLOW HYDROGRAPH
TIME
INFLOW
(hrs)
(cfs)
---------
--------
24.700
0.00
24.800
0.00
24.900
0.00
25.000
0.00
25.100
0.00
25.200
0.00
25.300
0.00
25.400
0.00
25.500
0.00
25.600
0.00
25.700
0.00
25.800
0.00
25.900
-----------------
0.00
J
'J
J
Page 6
Return Freq: 2 years
ROUTING COMPUTATIONS
I1+I2
2S/t - O
2S/t + O
OUTFLOW
ELEVATION
(cfs)
(cfs)
(cfs)
(cfs)
---------
(ft)
---------
---------
0.0
------------
663.6
-----------
664.6
0.50
678.83
0.0
662.6
663.6
0.48
678.82
0.0
661.7
662.6
0.46
678.82
0.0
660.9
661.7
0.44
678.82
0.0
660.0
660.9
0.42
678.82
0.0
659.2
660.0
0.40
678.81
0.0
658.5
659.2
0.38
678.81
0.0
657.7
658.5
0.36
678.81
0.0
657.1
657.7
0.35
678.81
0.0
656.4
657.1
0.33
678.80
0.0
655.8
656.4
0.32
678.80
0.0
655.2
655.8
0.30
678.80
0.0
------------------------------------------------------
654.6
655.2
0.30
678.80
I
POND-2 Version: 5.21 SIN:
' EXECUTED: 10-26-1998 19:25:26
Page 7
1 Return Freq: 2 years
****************** SUMMARY OF ROUTING COMPUTATIONS ******************
Pond File: S:\PONDPACK\CD025\POST PND
Inflow Hydrograph: S:\PONDPACK\CD025\POST2 HYD
Outflow Hydrograph: S:\PONDPACK\CD025\20UT HYD
Starting Pond W.S. Elevation = 673.60 ft
***** Summary of Peak Outflow and Peak Elevation *****
Peak Inflow = 29.00 cfs
Peak Outflow = 0.70 cfs
Peak Elevation = 678.85 ft
***** Summary of Approximate Peak Storage *****
Initial Storage = 0.00 ac-ft
Peak Storage From Storm = 2.78 ac-ft
---------------
Total Storage in Pond = 2.78 ac-ft
Warning: Inflow hydrograph truncated on left side.
POND-2 Version: 5.21
SIN:
1
'
Pond File:
S:\PONDPACK\CD025\POST
Inflow Hydrograph:
S:\PONDPACK\CD025\POST2
'
Outflow Hydrograph:
S:\PONDPACK\CD025\2OUT
Peak Inflow =
29.00 cfs
Peak Outflow =
0.70 cfs
'
Peak Elevation = 678.85
ft
Page 8
Return Freq: 2 years
.PND
.HYD
.HYD
EXECUTED: 10-26-1998
19:25:26
Flow (cfs)
0.0 3.0 6.0 9.0 12.0 15.0 18.0 21.0 24.0 27.0 30.0 33.0
1.7
-
x
x
1.8
-
x
�1.9
-
x
x
x
12.0
-
x
x
12. 1.
-
x
x
*
2.2
-
x
x
2.3
-
x
x
I2.4
-
x
x
12.5
-
x
X
�2.6
-
x
x
2.7
-
x
t2.
x
*
8
-
x
x
I2.9
-
x
x
13.0
-
x
x
F 3. 1
-
x
x
13.2
-
x
L.3
x
-
x
x
-
x
t3.4
x
13.5
-
x
�3.6
-
x
x
TIME
'
(hrs)
*
File:
S:\PONDPACK\CD025\POST2
'
x
File:
S:\PONDPACK\CD025\2OUT
*
*
*
*
*
*
*
*
*
*
*
.HYD Qmax = 29.0 cfs
.HYD Qmax = 0.7 cfs
POND-2 Version: 5.21
' EXECUTED: 10-26-1998
�1_
SIN:
19:25:26 2
***************************
* *
* KRAFT FOODS, INC.
* PARKING LOT EXPANSION
* POST -DEVELOPMENT
*
*
Inflow Hydrograph: S:\PONDPACK\CD025\POST10
Rating Table file: S:\PONDPACK\CD025\POST
----INITIAL
CONDITIONS ----
Elevation =
673.60 ft
Outflow =
0.00 cfs
Storage =
0.00 ac-ft
GIVEN POND DATA
ELEVATION
OUTFLOW
STORAGE
(ft)
(cfs)
(ac-ft)
673.60
0.0
0.000
673.80
0.0
0.001
674.00
0.0
0.005
674.20
0.0
0.015
674.40
0.0
0.029
674.60
0.0
0.048
674.80
0.0
0.072
675.00
0.0
0.101
675.20
0.0
0.138
675.40
0.0
0.182
675.60
0.0
0.234
675.80
0.0
0.295
676.00
0.0
0.365
676.20
0.0
0.445
676.40
0.0
0.537
676.60
0.0
0.640
676.80
0.0
0.756
677.00
0.0
0.885
677.20
0.0
1.028
677.40
0.0
1.186
677.60
0.0
1.360
677.80
0.0
1.549
678.00
0.0
1.756
678.20
0.0
1.976
678.40
0.0
2.209
678.60
0.0
2.452
678.80
0.3
2.708
679.00
1.8
2.976
679.20
3.8
3.257
679.40
6.2
3.551
679.60
------------------------------
9.0
3.857
Page 1
Return Freq: 10 years
HYD
PND
INTERMEDIATE
ROUTING
COMPUTATIONS
--------------------------
2S/t
2S/t + 0
(cfs)
(cfs)
0.2
0.2
1.3
1.3
3.7
3.7
7.1
7.1
11.5
11.5
17.3
17.3
24.5
24.5
33.4
33.4
44.0
44.0
56.6
56.6
71.3
71.3
88.3
88.3
107.7
107.7
129.9
129.9
154.9
154.9
182.9
182.9
214.2
214.2
248.8
248.8
287.1
287.1
329.0
329.0
374.9
374.9
424.9
424.9
478.3
478.3
534.5
534.5
593.5
593.5
655.4
655.7
720.3
722.1
788.2
792.0
859.2
865.4
933.4
--------------------------
942.4
EXECUTED 10-26-1998 19:25:26
' DISK FILES: POST10 HYD POST
.PND
Page 2
INTERMEDIATE ROUTING
GIVEN POND DATA COMPUTATIONS
------------------------------ -------------------
ELEVATION OUTFLOW STORAGE 2S/t 2S/t + 0
(ft) (cfs) (ac-ft) (cfs) (cfs)
------------------ ------
' 679.80 12.2------ 4177-----1010-91
------------�
Time increment (t) = 0.100 hrs.
POND-2 Version: 5.21 SIN: Page 3
' EXECUTED: 10-26-1998 19:25:26 2 Return Freq: 10 years
Pond File: S:\PONDPACK\CD025\POST PND
Inflow Hydrograph: S:\PONDPACK\CD025\POST10 HYD
' Outflow Hydrograph: S:\PONDPACK\CD025\10OUT HYD
INFLOW HYDROGRAPH ROUTING COMPUTATIONS
TIME
INFLOW
I1+I2
2S/t - O
2S/t + O
OUTFLOW
ELEVATION
(hrs)
(cfs)
(cfs)
(cfs)
------------
(cfs)
-----------
(cfs)
--
(ft)
--------
11.000
---------
2.00
---------
-----
0.0
0.0
0.00
673.60
11.100
2.00
4.0
4.0
4.0
0.00
674.22
11.200
2.00
4.0
8.0
8.0
0.00
674.44
11.300
2.00
4.0
12.0
12.0
0.00
674.62
11.400
2.00
4.0
16.0
16.0
0.00
674.75
11.500
3.00
5.0
21.0
21.0
0.00
674.90
11.600
3.00
6.0
27.0
27.0
0.00
675.06
11.700
4.00
7.0
34.0
34.0
0.00
675.21
11.800
5.00
9.0
43.0
43.0
0.00
675.38
11.900
6.00
11.0
54.0
54.0
0.00
675.56
12.000
10.00
16.0
'70.0
70.0
0.00
675.78
12.100
18.00
28.0
98.0
98.0
0.00
676.10
12.200
33.00
51.0
149.0
149.0
0.00
676.55
12.300
50.00
83.0
232.0
232.0
0.00
677.10
12.400
56.00
106.0
338.0
338.0
0.00
677.64
12.500
54.00
110.0
448.0
448.0
0.00
678.09
12.600
43.00
97.0
545.0
545.0
0.00
678.44
12.700
32.00
75.0
619.7
620.0
0.13
678.69
12.800
24.00
56.0
674.2
675.7
0.75
678.86
12.900
20.00
44.0
714.8
718.2
1.71
678.99
13.000
15.00
35.0
744.6
749.8
2.59
679.08
13.100
12.00
27.0
765.2
771.6
3.22
679.14
13.200
10.00
22.0
779.9
787.2
3.66
679.19
13.300
9.00
19.0
790.8
798.9
4.02
679.22
13.400
8.00
17.0
799.2
807.8
4.32
679.24
13.500
8.00
16.0
806.1
815.2
4.56
679.26
13.600
7.00
15.0
811.6
821.1
4.75
679.28
13.700
6.00
13.0
814.8
824.6
4.86
679.29
13.800
6.00
12.0
817.0
826.8
4.94
679.29
13.900
6.00
12.0
818.9
829.0
5.01
679.30
14.000
5.00
11.0
819.9
829.9
5.04
679.30
14.100
5.00
10.0
819.8
829.9
5.04
679.30
14.200
4.00
9.0
818.8
828.8
5.00
679.30
14.300
4.00
8.0
816.9
826.8
4.94
679.29
14.400
4.00
8.0
815.2
824.9
4.88
679.29
14.500
4.00
8.0
813.5
823.2
4.82
679.28
14.600
4.00
8.0
812.0
821.5
4.76
679.28
14.700
4.00
8.0
810.6
820.0
4.71
679.28
14.800
4.00
8.0
809.2
818.6
4.67
679.27
14.900
3.00
7.0
807.0
816.2
4.59
679.27
15.000
3.00
6.0
804.1
813.0
4.49
679.26
15.100
3.00
6.0
801.3
810.1
4.39
679.25
15.200
3.00
6.0
798.7
807.3
4.30
679.24
15.300
3.00
6.0
796.3
804.7
4.21
679.23
15.400
------------------
3.00
6.0
------------------------------------------------------
794.0
802.3
4.14
679.23
POND-2 Version: 5.21 SIN: Page 4
' EXECUTED: 10-26-1998 19:25:26 2 Return Freq: 10 years
Pond File: S:\PONDPACK\CD025\POST PND
Inflow Hydrograph: S:\PONDPACK\CD025\POST10 HYD
' Outflow Hydrograph: S:\PONDPACK\CD025\100UT HYD
INFLOW HYDROGRAPH ROUTING COMPUTATIONS
TIME
INFLOW
I1+I2
2S/t - O
2S/t + O
OUTFLOW
ELEVATION
(hrs)
(cfs)
(cfs)
(cfs)
------------
(cfs)
-----------
(cfs)
(ft)
--------
15.500
---------
3.00
---------
6.0
791.9
800.0
4.06
679.22
15.600
3.00
6.0
789.9
797.9
3.99
679.22
15.700
3.00
6.0
788.0
795.9
3.93
679.21
15.800
3.00
6.0
786.3
794.0
3.87
679.21
15.900
3.00
6.0
784.7
792.3
3.81
679.20
16.000
3.00
6.0
783.2
790.7
3.76
679.20
16.100
3.00
6.0
781.7
789.2
3.72
679.19
16.200
3.00
6.0
780.4
787.7
3.68
679.19
16.300
2.00
5.0
778.1
785.4
3.61
679.18
16.400
2.00
4.0
775.1
782.1
3.52
679.17
16.500
2.00
4.0
772.2
779.1
3.43
679.16
16.600
2.00
4.0
769.5
776.2
3.35
679.15
16.700
2.00
4.0
767.0
773.5
3.27
679.15
16.800
2.00
4.0
764.6
771.0
3.20
679.14
16.900
2.00
4.0
762.3
768.6
3.13
679.13
17.000
2.00
4.0
760.2
766.3
3.07
679.13
17.100
2.00
4.0
758.2
764.2
3.00
679.12
17.200
2.00
4.0
756.3
762.2
2.95
679.11
17.300
2.00
4.0
754.5
760.3
2.89
679.11
17.400
2.00
4.0
752.8
758.5
2.84
679.10
17.500
2.00
4.0
751.2
756.8
2.79
679.10
17.600
2.00
4.0
749.7
755.2
2.75
679.09
17.700
2.00
4.0
748.3
753.7
2.71
679.09
17.800
2.00
4.0
747.0
752.3
2.67
679.09
17.900
2.00
4.0
745.8
751.0
2.63
679.08
18.000
2.00
4.0
744.6
749.8
2.59
679.08
18.100
2.00
4.0
743.5
748.6
2.56
679.08
18.200
2.00
4.0
742.4
747.5
2.53
679.07
18.300
2.00
4.0
741.4
746.4
2.50
679.07
18.400
2.00
4.0
740.5
745.4
2.47
679.07
18.500
2.00
4.0
739.6
744.5
2.44
679.06
18.600
2.00
4.0
738.8
743.6
2.42
679.06
18.700
2.00
4.0
738.0
742.8
2.39
679.06
18.800
2.00
4.0
737.2
742.0
2.37
679.06
18.900
2.00
4.0
736.5
741.2
2.35
679.05
19.000
2.00
4.0
735.9
740.5
2.33
679.05
19.100
2.00
4.0
735.3
739.9
2.31
679.05
19.200
2.00
4.0
734.7
739.3
2.29
679.05
19.300
2.00
4.0
734.1
738.7
2.27
679.05
19.400
2.00
4.0
733.6
738.1
2.26
679.05
19.500
2.00
4.0
733.1
737.6
2.24
679.04
19.600
1.00
3.0
731.7
736.1
2.20
679.04
19.700
1.00
2.0
729.5
733.7
2.13
679.03
19.800
1.00
2.0
727.3
731.5
2.07
679.03
19.900
1.00
2.0
725.3
729.3
2.01
679.02
20.000
1.00
2.0
723.4
727.3
1.95
679.01
POND-2 Version: 5.21 SIN: Page 5
' EXECUTED: 10-26-1998 19:25:26 2 Return Freq: 10 years
Pond File: S:\PONDPACK\CD025\POST PND
Inflow Hydrograph: S:\PONDPACK\CD025\POST10 HYD
' Outflow Hydrograph: S:\PONDPACK\CD025\10OUT HYD
INFLOW HYDROGRAPH ROUTING COMPUTATIONS
TIME
INFLOW
I1+I2
2S/t - O
2S/t + O
OUTFLOW
ELEVATION
(hrs)
(cfs)
(cfs)
(cfs)
------------
(cfs)
----------
(cfs)
(ft)
--------
20.100
---------
1.00
---------
2.0
721.6
725.4
1.90
679.01
20.200
1.00
2.0
719.9
723.6
1.84
679.00
20.300
1.00
2.0
718.3
721.9
1.80
679.00
20.400
1.00
2.0
716.8
720.3
1.76
678.99
20.500
1.00
2.0
715.4
718.8
1.73
678.99
20.600
1.00
2.0
714.0
717.4
1.69
678.99
20.700
1.00
2.0
712.7
716.0
1.66
678.98
20.800
1.00
2.0
711.4
714.7
1.63
678.98
20.900
1.00
2.0
710.2
713.4
1.60
678.97
21.000
1.00
2.0
709.0
712.2
1.58
678.97
21.100
1.00
2.0
707.9
711.0
1.55
678.97
21.200
1.00
2.0
706.9
709.9
1.53
678.96
21.300
1.00
2.0
705.9
708.9
1.50
678.96
21.400
1.00
2.0
704.9
707.9
1.48
678.96
21.500
1.00
2.0
704.0
706.9
1.46
678.95
21.600
1.00
2.0
703.1
706.0
1.44
678.95
21.700
1.00
2.0
702.3
705.1
1.42
678.95
21.800
1.00
2.0
701.5
704.3
1.40
678.95
21.900
1.00
2.0
700.7
703.5
1.38
678.94
22.000
1.00
2.0
700.0
702.7
1.36
678.94
22.100
1.00
2.0
699.3
702.0
1.35
678.94
22.200
1.00
2.0
698.7
701.3
1.33
678.94
22.300
1.00
2.0
698.0
700.7
1.32
678.94
22.400
1.00
2.0
697.4
700.0
1.30
678.93
22.500
1.00
2.0
696.9
699.4
1.29
678.93
22.600
1.00
2.0
696.3
698.9
1.27
678.93
22.700
1.00
2.0
695.8
698.3
1.26
678.93
22.800
1.00
2.0
695.3
697.8
1.25
678.93
22.900
1.00
2.0
694.8
697.3
1.24
678.93
23.000
1.00
2.0
694.3
696.8
1.23
678.92
23.100
1.00
2.0
693.9
696.3
1.22
678.92
23.200
1.00
2.0
693.5
695.9
1.21
678.92
23.300
1.00
2.0
693.1
695.5
1.20
678.92
23.400
1.00
2.0
692.7
695.1
1.19
678.92
23.500
1.00
2.0
692.4
694.7
1.18
678.92
23.600
1.00
2.0
692.0
694.4
1.17
678.92
23.700
1.00
2.0
691.7
694.0
1.17
678.92
23.800
1.00
2.0
691.4
693.7
1.16
678.91
23.900
1.00
2.0
691.1
693.4
1.15
678.91
24.000
0.00
1.0
689.8
692.1
1.12
678.91
24.100
0.00
0.0
687.7
689.8
1.07
678.90
24.200
0.00
0.0
685.6
687.7
1.02
678.90
24.300
0.00
0.0
683.7
685.6
0.98
678.89
24.400
0.00
0.0
681.8
683.7
0.93
678.88
24.500
0.00
0.0
680.0
681.8
0.89
678.88
24.600
0.00
0.0
678.3
680.0
0.85
678.87
d
POND-2 Version: 5.21
' EXECUTED: 10-26-1998
Pond File:
'Inflow Hydrograph:
Outflow Hydrograph:
INFLOW HYDROGRAPH
TIME
INFLOW
(hrs)
(cfs)
--------
24.700
---------
0.00
24.800
0.00
24.900
0.00
25.000
0.00
25.100
0.00
25.200
0.00
25.300
0.00
25.400
0.00
25.500
0.00
25.600
0.00
25.700
0.00
25.800
0.00
25.900
-----------------
0.00
C
p
7
S/N:
19:25:26 2
S:\PONDPACK\CD025\POST PND
S:\PONDPACK\CD025\POST10 HYD
S:\PONDPACK\CD025\10OUT HYD
Page 6
Return Freq: 10 years
ROUTING COMPUTATIONS
I1+I2
2S/t - O
2S/t + O
OUTFLOW
ELEVATION
(cfs)
(cfs)
(cfs)
(cfs)
---------
(ft)
---------
---------
0.0
------------
676.7
-----------
678.3
0.81
678.87
0.0
675.2
676.7
0.77
678.86
0.0
673.7
675.2
0.74
678.86
0.0
672.3
673.7
0.71
678.85
0.0
670.9
672.3
0.67
678.85
0.0
669.6
670.9
0.64
678.85
0.0
668.4
669.6
0.61
678.84
0.0
667.2
668.4
0.59
678.84
0.0
666.1
667.2
0.56
678.83
0.0
665.0
666.1
0.54
678.83
0.0
664.0
665.0
0.51
678.83
0.0
663.0
664.0
0.49
678.83
0.0
------------------------------------------------------
662.1
663.0
0.47
678.82
L
POND-2 Version: 5.21 SIN:
' EXECUTED: 10-26-1998 19:25:26
Page 7
2 Return Freq: 10 years
****************** SUMMARY OF ROUTING COMPUTATIONS ******************
Pond File: S:\PONDPACK\CD025\POST PND
' Inflow Hydrograph: S:\PONDPACK\CD025\POST10 HYD
Outflow Hydrograph: S:\PONDPACK\CD025\10OUT HYD
Starting Pond W.S. Elevation =
673.60 ft
***** Summary of Peak Outflow
and Peak
Elevation *****
Peak Inflow =
56.00
cfs
Peak Outflow =
5.04
cfs
Peak Elevation =
679.30
ft
***** Summary of Approximate Peak Storage *****
Initial Storage = 0.00 ac-ft
Peak Storage From Storm =3�- 41ac_ft
-- -
Total Storage in Pond = 3.41 ac-ft
Warning: Inflow hydrograph truncated on left side.
i
1
POND-2 Version: 5.21 SIN: Page 8
' 2 Return Freq: 10 years
Pond File: S:\PONDPACK\CD025\POST PND
Inflow Hydrograph: S:\PONDPACK\CD025\POST10 HYD
Outflow Hydrograph: S:\PONDPACK\CD025\10OUT HYD
' EXECUTED: 10-26-1998
Peak Inflow = 56.00 cfs 19:25:26
Peak Outflow = 5.04 cfs
Peak Elevation = 679.30 ft
Flow (cfs)
0.0 6.0 12.0 18.0 24.0 30.0 36.0 42.0 48.0 54.0 60.0 66.0
11 . 7 - x
x
1.8 - x
x
�1 . 9 - x
x
12.0 - x
x
12.1 x k
x
2.2 - x
*
x
*
2.3 - x
*
x
'2.4 - x x k
*
12.5 - x
*
x
2.6 - x
x
12.7 - x
x
_2.8 - x
x
�2.9 - x
x
13.0 - x
x
I3.1 - x
x
13.2 - x
x
13.3 - x
x
I3.4 - x
x
13.5 - x
x
N3.6 - x
TIME
' (hrs)
* File
S:\PONDPACK\CD025\POST10 HYD Qmax = 56.0 cfs
S:\PONDPACK\CD025\10OUT HYD Qmax = 5.0 cfs
POND-2 Version: 5.21
' EXECUTED: 10-26-1998
I
L
SIN:
19:25:26 3
***************************
*
* KRAFT FOODS, INC.
* PARKING LOT EXPANSION
* POST -DEVELOPMENT
*
*
***************************
Inflow Hydrograph: S:\PONDPACK\CD025\POST25
Rating Table file: S:\PONDPACK\CD025\POST
--INITIAL
CONDITIONS ----
Elevation =
673.60 ft
Outflow =
0.00 cfs
Storage =
0.00 ac-ft
GIVEN POND DATA
ELEVATION
OUTFLOW
STORAGE
(ft)
(cfs)
(ac-ft)
673.60
0.0
0.000
673.80
0.0
0.001
674.00
0.0
0.005
674.20
0.0
0.015
674.40
0.0
0.029
674.60
0.0
0.048
674.80
0.0
0.072
675.00
0.0
0.101
675.20
0.0
0.138
675.40
0.0
0.182
675.60
0.0
0.234
675.80
0.0
0.295
676.00
0.0
0.365
676.20
0.0
0.445
676.40
0.0
0.537
676.60
0.0
0.640
676.80
0.0
0.756
677.00
0.0
0.885
677.20
0.0
1.028
677.40
0.0
1.186
677.60
0.0
1.360
677.80
0.0
1.549
678.00
0.0
1.756
678.20
0.0
1.976
678.40
0.0
2.209
678.60
0.0
2.452
678.80
0.3
2.708
679.00
1.8
2.976
679.20
3.8
3.257
679.40
6.2
3.551
679.60
------------------------------
9.0
3.857
Page 1
Return Freq: 25 years
HYD
PND
INTERMEDIATE
ROUTING
COMPUTATIONS
--------------------------
2S/t
2S/t + 0
(cfs)
(cfs)
0.0
0.0
0.2
0.2
1.3
1.3
3.7
3.7
7.1
7.1
11.5
11.5
17.3
17.3
24.5
24.5
33.4
33.4
44.0
44.0
56.6
56.6
71.3
71.3
88.3
88.3
107.7
107.7
129.9
129.9
154.9
154.9
182.9
182.9
214.2
214.2
248.8
248.8
287.1
287.1
329.0
329.0
374.9
374.9
424.9
424.9
478.3
478.3
534.5
534.5
593.5
593.5
655.4
655.7
720.3
722.1
788.2
792.0
859.2
865.4
933.4
--------------------------
942.4
1
EXECUTED
' DISK FILES:
10-26-1998 19:25:26
POST25 HYD ; POST PND
GIVEN POND DATA
------------------------------
ELEVATION OUTFLOW STORAGE
(ft) (cfs) (ac-ft)
679.80 12.2 4.177
------------------------------
Page 2
INTERMEDIATE ROUTING
COMPUTATIONS
--------------------------
2S/t 2S/t + 0
(cfs) (cfs)
1010.9 1023.1
--------------------------
Time increment (t) = 0.100 hrs.
POND-2 Version: 5.21 SIN:
'EXECUTED: 10-26-1998 19:25:26 3
Pond File: S:\PONDPACK\CD025\POST PND
Inflow Hydrograph: S:\PONDPACK\CD025\POST25 HYD
'Outflow Hydrograph: S:\PONDPACK\CD025\25OUT HYD
INFLOW HYDROGRAPH
TIME
INFLOW
(hrs)
(cfs)
1-11.000
2.00
11.100
2.00
3.00
111.200
11.300
3.00
11.400
3.00
11.500
4.00
111.600
4.00
11.700
5.00
11.800
7.00
11.900
8.00
12.000
12.00
12.100
22.00
12.200
41.00
12.300
62.00
12.400
70.00
12.500
67.00
12.600
53.00
12.700
39.00
12.800
30.00
12.900
24.00
13.000
19.00'
13.100
16.00'
13.200
13.00'
13.300
12.00,
13.400
10.00
13.500
9.00
13.600
8.00
13.700
8.00
13.800
7.00
13.900
6.00
14.000
6.00
14.100
6.00
14.200
5.00
14.300
5.00
14.400
5.00
14.500
5.00
14.600
5.00
14.700
5.00
14.800
4.00
14.900
4.00
15.000
4.00
15.100
4.00
15.200
4.00
15.300
4.00
15.400
------------------
4.00
Page 3
Return Freq: 25 years
ROUTING COMPUTATIONS
I1+I2
2S/t - O
2S/t + O
OUTFLOW
ELEVATION
(cfs)
(cfs)
(cfs)
(cfs)
---------
(ft)
---------
---------
-----
------------
0.0
-----------
0.0
0.00
673.60
4.0
4.0
4.0
0.00
674.22
5.0
9.0
9.0
0.00
674.49
6.0
15.0
15.0
0.00
674.72
6.0
21.0
21.0
0.00
674.90
7.0
28.0
28.0
0.00
675.08
8.0
36.0
36.0
0.00
675.25
9.0
45.0
45.0
0.00
675.42
12.0
57.0
57.0
0.00
675.61
15.0
72.0
72.0
0.00
675.81
20.0
92.0
92.0
0.00
676.04
34.0
126.0
126.0
0.00
676.37
63.0
189.0
189.0
0.00
676.84
103.0
292.0
292.0
0.00
677.42
132.0
424.0
424.0
0.00
678.00
137.0
561.0
561.0
0.00
678.49
120.0
679.3
681.0
0.87
678.88
92.0
764.8
771.3
3.21
679.14
69.0
823.5
833.8
5.17
679.31
54.0
864.2
877.5
6.64
679.43
43.0
891.8
907.2
7.72
679.51
35.0
909.9
926.8
8.43
679.56
29.0
921.2
938.9
8.87
679.59
25.0
927.9
946.2
9.15
679.61
22.0
931.3
949.9
9.30
679.62
19.0
931.7
950.3
9.31
679.62
17.0
930.2
948.7
9.25
679.62
16.0
927.9
946.2
9.15
679.61
15.0
924.8
942.9
9.02
679.60
13.0
920.2
937.8
8.83
679.59
12.0
914.9
932.2
8.63
679.57
12.0
910.1
926.9
8.44
679.56
11.0
904.6
921.1
8.22
679.54
10.0
898.6
914.6
7.99
679.53
10.0
893.1
908.6
7.77
679.51
10.0
888.0
903.1
7.57
679.50
10.0
883.2
898.0
7.38
679.48
10.0
878.8
893.2
7.21
679.47
9.0
873.7
887.8
7.01
679.46
8.0
868.2
881.7
6.79
679.44
8.0
863.0
876.2
6.59
679.43
8.0
858.2
871.0
6.40
679.41
8.0
853.7
866.2
6.23
679.40
8.0
849.6
861.7
6.08
679.39
8.0
------------------------------------------------------
845.7
857.6
5.94
679.38
POND-2 Version: 5.21 SIN: Page 4
' EXECUTED: 10-26-1998 19:25:26 3 Return Freq: 25 years
Pond File: S:\PONDPACK\CD025\POST PND
Inflow Hydrograph: S:\PONDPACK\CD025\POST25 HYD
' Outflow Hydrograph: S:\PONDPACK\CD025\25OUT HYD
INFLOW HYDROGRAPH ROUTING COMPUTATIONS
TIME
INFLOW
I1+I2
2S/t - 0
2S/t + 0
OUTFLOW
ELEVATION
(hrs)
(cfs)
(cfs)
(cfs)
------------
(cfs)
------
(cfs)
(ft)
--------
15.500
---------
4.00
---------
8.0
842.0
853.7
5.82
679.37
15.600
4.00
8.0
838.7
850.0
5.70
679.36
15.700
4.00
8.0
835.5
846.7
5.59
679.35
15.800
3.00
7.0
831.6
842.5
5.45
679.34
15.900
3.00
6.0
827.0
837.6
5.29
679.32
16.000
3.00
6.0
822.7
833.0
5.14
679.31
16.100
3.00
6.0
818.7
828.7
5.00
679.30
16.200
3.00
6.0
815.0
824.7
4.87
679.29
16.300
3.00
6.0
811.5
821.0
4.75
679.28
16.400
3.00
6.0
808.2
817.5
4.63
679.27
16.500
3.00
6.0
805.2
814.2
4.53
679.26
16.600
3.00
6.0
802.3
811.2
4.43
679.25
16.700
3.00
6.0
799.7
808.3
4.33
679.24
16.800
3.00
6.0
797.2
805.7
4.25
679.24
16.900
3.00
6.0
794.8
803.2
4.16
679.23
17.000
3.00
6.0
792.7
800.8
4.09
679.22
17.100
3.00
6.0
790.6
798.7
4.02
679.22
17.200
3.00
6.0
788.7
796.6
3.95
679.21
17.300
3.00
6.0
786.9
794.7
3.89
679.21
17.400
3.00
6.0
785.3
792.9
3.83
679.20
17.500
3.00
6.0
783.7
791.3
3.78
679.20
17.600
3.00
6.0
782.2
789.7
3.73
679.19
17.700
3.00
6.0
780.9
788.2
3.69
679.19
17.800
3.00
6.0
779.6
786.9
3.65
679.19
17.900
3.00
6.0
778.3
785.6
3.62
679.18
18.000
3.00
6.0
777.2
784.3
3.58
679.18
18.100
3.00
6.0
776.1
783.2
3.55
679.17
18.200
3.00
6.0
775.0
782.1
3.52
679.17
18.300
3.00'
6.0
774.1
781.0
3.49
679.17
18.400
3.00
6.0
773.1
780.1
3.46
679.17
18.500
2.00
5.0
771.3
778.1
3.40
679.16
18.600
2.00
4.0
768.7
775.3
3.32
679.15
18.700
2.00
4.0
766.2
772.7
3.25
679.14
18.800
2.00
4.0
763.8
770.2
3.18
679.14
18.900
2.00
4.0
761.6
767.8
3.11
679.13
19.000
2.00
4.0
759.5
765.6
3.05
679.12
19.100
2.00
4.0
757.6
763.5
2.99
679.12
19.200
2.00
4.0
755.7
761.6
2.93
679.11
19.300
2.00
4.0
754.0
759.7
2.88
679.11
19.400
2.00
4.0
752.3
758.0
2.83
679.10
19.500
2.00
4.0
750.7
756.3
2.78
679.10
19.600
2.00
4.0
749.3
754.7
2.73
679.09
19.700
2.00
4.0
747.9
753.3
2.69
679.09
19.800
2.00
4.0
746.6
751.9
2.65
679.09
19.900
2.00
4.0
745.4
750.6
2.62
679.08
20.000
2.00
4.0
744.2
749.4
2.58
679.08
POND-2 Version: 5.21 SIN: Page 5
' EXECUTED: 10-26-1998 19:25:26 3 Return Freq: 25 years
Pond File: S:\PONDPACK\CD025\POST PND
Inflow Hydrograph: S:\PONDPACK\CD025\POST25 HYD
' Outflow Hydrograph: S:\PONDPACK\CD025\25OUT HYD
INFLOW HYDROGRAPH ROUTING COMPUTATIONS
TIME
INFLOW
I1+I2
2S/t - 0
2S/t + 0
OUTFLOW
ELEVATION
(hrs)
(cfs)
(cfs)
(cfs)
------------
(cfs)
-
(cfs)
(ft.)
--------
20.100
---------
2.00
---------
4.0
743.1
748.2
2.55
679.07
20.200
2.00
4.0
742.1
747.1
2.52
679.07
20.300
2.00
4.0
741.1
746.1
2.49
679.07
20.400
2.00
4.0
740.2
745.1
2.46
679.07
20.500
2.00
4.0
739.3
744.2
2.43
679.06
20.600
2.00
4.0
738.5
743.3
2.41
679.06
20.700
2.00
4.0
737.7
742.5
2.38
679.06
20.800
2.00
4.0
737.0
741.7
2.36
679.06
20.900
2.00
4.0
736.3
741.0
2.34
679.05
21.000
2.00
4.0
735.7
740.3
2.32
679.05
21.100
2.00
4.0
735.1
739.7
2.30
679.05
21.200
2.00
4.0
734.5
739.1
2.29
679.05
21.300
2.00
4.0
734.0
738.5
2.27
679.05
21.400
2.00
4.0
733.5
738.0
2.25
679.05
21.500
2.00
4.0
733.0
737.5
2.24
679.04
21.600
2.00
4.0
732.5
737.0
2.23
679.04
21.700
2.00
4.0
732.1
736.5
2.21
679.04
21.800
2.00
4.0
731.7
736.1
2.20
679.04
21.900
2.00
4.0
731.3
735.7
2.19
679.04
22.000
2.00
4.0
731.0
735.3
2.18
679.04
22.100
2.00
4.0
730.6
735.0
2.17
679.04
22.200
2.00
4.0
730.3
734.6
2.16
679.04
22.300
2.00
4.0
730.0
734.3
2.15
679.03
22.400
2.00
4.0
729.7
734.0
2.14
679.03
22.500
2.00
4.0
729.5
733.7
2.13
679.03
22.600
2.00
4.0
729.2
733.5
2.13
679.03
22.700
2.00
4.0
729.0
733.2
2.12
679.03
22.800
2.00
4.0
728.8
733.0
2.11
679.03
22.900
2.00
4.0
728.5
732.8
2.11
679.03
23.000
2.00
4.0
728.3
732.5
2.10
679.03
23.100
1.00
3.0
727.2
731.3
2.06
679.03
23.200
1.00
2.0
725.2
729.2
2.00
679.02
23.300
1.00
2.0
723.3
727.2
1.95
679.01
23.400
1.00
2.0
721.5
725.3
1.89
679.01
23.500
1.00
2.0
719.9
723.5
1.84
679.00
23.600
1.00
2.0
718.3
721.9
1.79
679.00
23.700
1.00
2.0
716.7
720.3
1.76
678.99
23.800
1.00
2.0
715.3
718.7
1.72
678.99
23.900
1.00
2.0
713.9
717.3
1.69
678.99
24.000
1.00
2.0
712.6
715.9
1.66
678.98
24.100
1.00
2.0
711.3
714.6
1.63
678.98
24.200
1.00
2.0
710.1
713.3
1.60
678.97
24.300
1.00
2.0
709.0
712.1
1.57
678.97
24.400
1.00
2.0
707.9
711.0
1.55
678.97
24.500
1.00
2.0
706.8
709.9
1.52
678.96
24.600
1.00
2.0
705.8
708.8
1.50
678.96
POND-2 Version: 5.21
' EXECUTED: 10-26-1998
Pond File:
'Inflow Hydrograph:
Outflow Hydrograph:
INFLOW HYDROGRAPH
TIME
INFLOW
(hrs)
(cfs)
--------
24.700
---------
1.00
24.800
1.00
24.900
1.00
25.000
0.00
25.100
0.00
25.200
0.00
25.300
0.00
25.400
0.00
25.500
0.00
25.600
0.00
25.700
0.00
25.800
0.00
25.900
---- -------------
0.00
SIN:
19:25:26 3
S:\PONDPACK\CD025\POST PND
S:\PONDPACK\CD025\POST25 HYD
S:\PONDPACK\CD025\25OUT HYD
Page 6
Return Freq: 25 years
ROUTING COMPUTATIONS
I1+I2
2S/t - O
2S/t + O
OUTFLOW
ELEVATION
(cfs)
(cfs)
(cfs)
(cfs)
---------
(ft)
---------
---------
2.0
------------
704.9
-----------
707.8
1.48
678.96
2.0
704.0
706.9
1.46
678.95
2.0
703.1
706.0
1.44
678.95
1.0
701.3
704.1
1.39
678.95
0.0
698.6
701.3
1.33
678.94
0.0
696.1
698.6
1.27
678.93
0.0
693.7
696.1
1.21
678.92
0.0
691.4
693.7
1.16
678.91
0.0
689.2
691.4
1.11
678.91
0.0
687.0
689.2
1.06
678.90
0.0
685.0
687.0
1.01
678.89
0.0
683.1
685.0
0.96
678.89
0.0
------------------------------------------------------
681.3
683.1
0.92
678.88
POND-2 Version: 5.21 SIN:
' EXECUTED: 10-26-1998 19:25:26
Page 7
3 Return Freq: 25 years
I
****************** SUMMARY OF ROUTING COMPUTATIONS ******************
Pond File: S:\PONDPACK\CD025\POST PND
Inflow Hydrograph: S:\PONDPACK\CD025\POST25 HYD
Outflow Hydrograph: S:\PONDPACK\CD025\25OUT HYD
Starting Pond W.S. Elevation = 673.60 ft
***** Summary of Peak Outflow and Peak Elevation *****
Peak Inflow = 70.00 cfs
Peak Outflow = 9.31 cfs
Peak Elevation = 679.62 ft
***** Summary of Approximate Peak Storage *****
Initial Storage = 0.00 ac-ft
Peak Storage From Storm = 3.89 ac-ft
---------------
Total Storage in Pond = 3.89 ac-ft
Warning: Inflow hydrograph truncated on left side.
1
POND-2 Version: 5.21 SIN:
Page 8
3
Return Freq: 25 years
'
Pond File: S:\PONDPACK\CD025\POST
PND
Inflow Hydrograph: S:\PONDPACK\CD025\POST25
HYD
Outflow Hydrograph: S:\PONDPACK\CD025\25OUT
HYD
'
EXECUTED: 10-26-1998
Peak Inflow = 70.00 cfs
19:25:26
Peak Outflow = 9.31 cfs
'
Peak Elevation = 679.62 ft
Flow (cfs)
0.0 7.0 14.0 21.0 28.0 35.0 42.0 49.0
56.0 63.0 70.0 77.0
1.7
-
x
x
1. 8
-
x
x
'1 . 9
-
x
x
12 . 0
-
x
x
12.1
-
x
x
2.2
-
x *
0
x
2.3
-
x
*
x
*
I2.4
-
x
x
12.5
-
x
*
x
*
'2 . 6
-
x
*
x
2.7
-
x
12.8
x
-
x
x
-
x
I2.9
x
13 . 0
-
x
I3.1
-
x
x
x
13.2
-
x
13.3
x
-
x
x*
3 . 4
I
-
x*
x
13.5
-
x
*x
'3 . 6
-
*x
TIME
'
(hrs)
*
File: S:\PONDPACK\CD025\POST25 HYD Qmax =
70.0 cfs
' x
File: S:\PONDPACK\CD025\25OUT HYD Qmax =
9.3 cfs
rI
F
1
I
ML:;IdD
TRIAD ENGINEERING, INC.
Gcolechnical, Environmental & Construction Consultants
P.O. BOX 2397
WINCIIESI'ER, VA 22604
Telephone: (S40) 667-9300
FAX: (S40) 667-2260
Erosion and Sediment
Control Narrative
KRAFT FOODS, INC.
PARKING LOT EXPANSION
Frederick County, Virginia
Triad Project No. CD-025
r
11
n
� I
� I
EROSION AND SEDIMENT CONTROL NARRATIVE
KRAFT FOODS, INC. PARKING LOT EXPANSION
FREDERICK COUNTY, VIRGINIA
TRIAD PROJECT NO. CD-025
Project Description
The purpose of this project is to construct two additions
parking lots to support the increased parking requirements of the
renovated building. The two parking lots will be on either side of
the truck drive. The site is located west of the intersection of
Park Center Drive and West Brooke Road.
Existing Site Conditions
The site consist of the existing Kraft Foods, Inc.
Manufacturing facility. The areas where the new parking lots are
to be constructed consist of open space. The site slopes gently
from the west to the east. An existing drainage ditch and storm
sewer culverts convey the stormwater runoff to the existing
detention pond.
Adjacent Areas
This site is surrounded on the north and east by Park Center
Drive and West Brooke Road respectively. The property to the north
of Park Center Drive consists of a vacant lot and the Green Bay
manufacturing facility. The property to the east of West Brooke
Drive is vacant. A vacant lot exists to the south to the Kraft
Foods, Inc. site. The property is bordered on the west by the CSX
railroad. To the west of the railroad is Moores Lumber Yard and
the abandoned Dirve-In Movie Theater.
Soils
The area of proposed construction is situated within the
Opequon-Chilhowie silty clay, very rocky (33C) soils according to
the Soil Survey of Frederick County, Virginia published by the U.S.
Department of Agriculture, Soil Conservation Service. This soil is
found on narrow to moderately broad, convex valley sides. The
� I
Erosion and Sediment Control Narrative
Kraft Foods, Inc. Parking Lot Expansion
Frederick County, Virginia
Page 3
slopes for this soil type range from 3 to 15 percent.
Typically,
the surface layer of Opequon soil is a dark yellowish
brown silty
rclay
loam about 3 inches thick. The subsoil is brown
silty clay
loam and reddish brown clay to a depth of about
15 inches.
'
Limestone bedrock is at a depth of about 15 inches.
Typically, the surface layer of Chilhowie soil
is a dark
yellowish brown silty clay loam about 7 inches thick.
The upper
'
part of the subsoil is a brown clay to a depth of about
12 inches.
The lower subsoil is a dark yellowish brown clay. The
substratum
'
is yellowish brown very channery silty clay to a depth
of about 27
inches. Limestone bedrock is at a depth of about 27 inches.
' The soil type is shallow to moderately deep, gently to
strongly sloping, and well drained. The permeability rate of the
soil is 0.2 to 2.0 inches per hour. The erodibility factor (K) is
' 0.32, the hydrological group is C and the depth to the high water
table is greater than 6 feet.
iCritical Areas
Due to the relative flatness of the site, the only apparent
area which may potentially will be the steep slope areas around the
perimeter of the parking areas.
Erosion and Sediment Control Measures
' Unless otherwise indicated, all vegetative and structural
erosion and sediment control practices will be constructed and
maintained according to minimum standards and specifications of the
' Virginia Erosion and Sediment Control Handbook. The minimum
standards of the VESCR will be adhered to unless otherwise waived
or approved by a variance.
Erosion and sediment control practices will be in place along
' the low side of all disturbed areas. These practices are to remain
in place and maintained until stabilization has been achieved on
the construction site.
F
Erosion and Sediment Control Narrative
Kraft Foods, Inc. Parking Lot Expansion
Frederick County, Virginia
Page 4
' Structural Practices
' 1. Silt Fence Barrier (3.05)
' Silt fence sediment barriers will be installed down slope of all
graded areas and any topsoil stockpile area to filter sediment -
laden runoff from sheet flow as indicated on the Erosion and
' Sediment Control Plan.
3. Culvert Inlet Protection (3.08)
' Culvert inlet protection will be installed around the existing
culverts that may receive sediment laden runoff from the
' construction areas. Sediment -laden runoff will be filtered before
entering the storm sewer culvert.
Management Strategies
1. Construction will be sequenced so that grading operations can
' begin and end as quickly as possible.
' 2. The contractor will be responsible for the installation and
maintenance of all erosion and sediment control practices as
shown on the plans. Any additional erosion and sediment
' controls required by the Owner or the approving authority
shall be installed by the contractor.
' 3. After achieving adequate stabilization, or final site
stabilization, the temporary erosion and sediment control
measures will be cleaned up and removed. All areas of
deposited sediment and disturbed soil resulting from the
removal of temporary sediment control measures will be seeded
in accordance with the permanent stabilization measures as
' described below.
' Permanent Stabilization
Erosion and Sediment Control Narrative
Kraft Foods, Inc. Parking Lot Expansion
Frederick County, Virginia
Page 5
All disturbed areas are to be stabilized within 7 days after
the final grade is established. Stabilization will consist of the
following:
1. Scarifying the top two inches of the topsoil.
2. Adding pulverized agricultural limestone at a rate of 2
tons per acre.
3. Seeding according to the following permanent and temporary
seed mixtures.
4. Fertilizing with 10-10-10 fertilizer spread at a rate of
1,000 pounds per acre.
S. Mulching with straw at a rate of 1.5 tons per acre.
Permanent seeding shall be spread at a rate of 200 pounds per
acre and shall consist of the following seed mixture.
Seed Type
Rate
Minimum
Minimum
Purity
Germination
lb/ac
o
0
Tall Fescue
180
98
85
Improved Perennial Ryegrass
10
98
90
Kentucky Bluegrass
10
97
85
Areas which remain denuded for a period of 30 days or longer
will be seeded and mulched. Temporary seeding shall vary according
to the time of year that the temporary seeding shall take place.
Temporary seeding shall be in accordance with the following seed
mixture.
SEPTEMBER 1 - FEBRUARY 15
IL
L
H
I
7
� I
� I
Erosion and Sediment Control Narrative
Kraft Foods, Inc. Parking Lot Expansion
Frederick County, Virginia
Page 6
Seed Type Rate Minimum Minimum
Purity Germination
lb/ac o 0
Annual Ryegrass 50 97 90
Cereal Rye 50 98 85
FEBRUARY 16 - APRIL 30
Seed Type Rate Minimum Minimum
Purity Germination
Annual Ryegrass 100 97 90
MAY 1 - AUGUST 31
Seed Type Rate Minimum Minimum
Purity Germination
German Millet 50 98 85
Maintenance
The contractor will inspect all erosion control devices daily
and after each significant rainfall. The following items will be
checked and any repairs made by the end of the day:
1. Silt fence barriers will be checked for undermining and
deterioration of the fabric. Fabric for silt fence will be
replaced promptly if the fabric has deteriorated or become
ineffective. Sediment deposits should be removed after each
storm event. Deposits must be removed when they reach
approximately one-half of the height of the barrier.
2. Culvert
inlet
protection will be
checked for deterioration of
filter fabric
and excess sediment
accumulation. Filter fabric
will be
repaired
or replaced as
necessary. Sediment will be
removed
when
it has accumulated
to one-half the design depth
and the
trap
restored to its original dimensions. Removed
� I
F1
Erosion and Sediment Control Narrative
' Kraft Foods, Inc. Parking Lot Expansion
Frederick County, Virginia
Page 7
' sediment will be deposited in a suitable area and in such a
manner that it will not erode and cause sedimentation
' problems.
C.
I
11
n
u
U
n