SITE PLAN CHECKLIST
The checklist below indicates all the information that needs to be submitted as part of the site plan
application. All required information must be submitted priorto the final approval of any site plan. The
Department of Planning and Development will review the application to ensure that it is complete. If
any portion is not included or complete, the site plan application will not be accepted and returned to
the applicant(s).
Site Plan Package
1. One set of approved comment sheets are required from the following review
agencies prior to final site plan approval. It is recommended that applicants contact
the Department of Planning and Development to determine which review agencies
are relevant to their site plan application.
Virginia Department of Transportation (VDOT)
Frederick County sanitation Authority
Department of Planning and Development
Inspections Department
717reclerick County Engineer (Public Works) /
Frederick County Fire Marshal
ep t ef-Perk&and-Roc rea 'on
2. One copy of the Site Plan application
3. Five Copies of the Final Site Plan for approval
County Health Department
City -of -Winch stater _
-----'Town-of-Stephans-Gity-
--Town oflGtid-dlethWn-
Airport Authority
-----Soil & Water-eo rs-ervatbn District
---:— tR gtrest-fdr' Street Name
4. One reproducible copy of the Site Plan (if required)
5. A 35mm slide of the Site Plan (if required)
I
SITE PLAN TRACKING SHEET
Date:
-'`''_ File opened
✓ Reference Manual updated/number assigned
✓ D-base updated
%C� -a0• 0z- File given to Renee' to update Application Action Summary
d�s4 .
CLOSE OUT FILE:
vo i )�C�
g 06 Approval (or denial) letter mailed to applicant/copy made for file
/ 0(, File stamped "approved", "denied" or `withdrawn' V O
C Reference Manual updated
D-base updated
File given to Renee' for final update to Application Action Summary
U Cud\Commmn Sire Plan Trsaing wpd
R—v d 03N6101
Received From
Address
"A-sL7\
U
o
Y
•
U
AW.. OF
j l
a
ACCOUNT
W
AMT RVO
Date --M- _ L
LT
CASH
CHECKy- I
I( Y ORN P r-
�902522
i�415
_ S
1\ 1 L-X'-
TRIAD ENGINEERING, INC.
Geotechnical, Civil, Environmental, Survey, Construction
Land Planning & Landscape Architecture Consultants
971 Acorn Drive, Harrisonburg, Virginia 22802
PH: (540) 434-4135
FAX: (540) 434-5841
www.triadengineering.net
'
ENGINEERING
ENGINEERING CALCULATIONS
'
Kernstown Crossing
Frederick County, Virginia
TRIAD Job Number CD-047
8 February, 2002
'
CIVIL, GEOTECHNICAL,
CONSTRUCTION, LAND PLANNING AND
LANDSCAPE ARCHITECTURE CONSULTANTS
V IIAD
ENGINEERING
Executive Summary
Kernstown Crossing plans to construct a multi -featured veterinary and kennel facility on
4+ acres immediately adjacent to Route 11. The existing lot has no buildings on it..
Initial development of the HP Hood stormwater management facilities accounted for
development of this lot, and stormwater engineering for this project required only that
stormwater be properly conveyed to the HP Hood system.
Only the 10-year design storm has been included in this report. Previous work was done
by TRIAD Engineering to validate the capacity of the I-IP Hood system to successfully
control stormwater. These calculations have been included as Appendix B.
No permanent sediment basins or stormwater ponds have incorporated into this design.
CIVIL, GEOTECHNICAL,
CONSTRUCTION, LAND PLANNING AND
LANDSCAPE ARCHITECTURE CONSUL TAWS
1
_
�. IIAD
1
ENGINEERING
1
Table of Contents
1
1
STORM WATER MANAGEMENT NARRATIVE ..........................................
1
1.1
Project Description................................................................................................I
1
1.2
Existing Site Conditions
........................................................................................1
1
1.3
Adjacent Properties & Offsite Areas...................................................................1
1.4
Summary................................................................................................................I
i2
ANALYSIS METHODS.................................................................................
1
1
2.1
Post -Development Conditions...............................................................................2
3
EROSION AND SEDIMENT CONTROL MEASURES
................................. 5
1
4
CONCLUSION..............................................................................................5
1
Post -Development Hydrographs for Sub-Basins...............................Appendix
A
1
Storm
Structure Sizing Information ..............................................Appendix
B
StormwaterControl
Basin Design................................................Appendix
C
ri
1
1
1
1 CIVIL, GEOTECHNICAL,
CONSTRUCTION, LAND PLANNING AND
1 LANDSCAPE ARCHITECTURE CONSULTANTS
%R1AD
ENGINEERING
I STORM WATER MANAGEMENT NARRATIVE
1.1 PROJECT DESCRIPTION
This project is defined as construction of a full service veterinary and kennel facility.
The area to potentially be disturbed is approximately 4.245 acres. However, the total area
necessary for storm water control is approximately 6.1 acres, as offsite stormwater from
an additional HP Hood lot crosses the Kernstown Crossing lot.
1.2 EXISTING SITE CONDITIONS
VEGETATIVE COVER The property is covered by intermittently maintained grasses.
There are no stands of timber. Please refer to Sheet C-3 of the construction plans for the
existing site conditions.
TOPOGRAPHY The topography is extremely flat, with an average slope of 2.3%. Slopes
near the Route 11 embankment are approximately 25%.
DRAINAGE PATTERNS The site drains toward the main HP Hood facility and the
existing stormwater facilities. There are no natural ponds on the site.
1.3 ADJACENT PROPERTIES & OFFSITE AREAS
The site is bounded on the south and east sides by I-IP Hood property developed as an
industrial facility. The site is bounded to the north by developed property owned by
Allegheny Power Company. The site is bounded to the west by Route 11. Offsite
borrowing is probable. E&S measures at the offsite source are the responsibility of the
contractor, and shall be coordinated with the County E&S Administrator.
1.4 SUMMARY
The hydrologic routing for post -developed conditions for the 10-year storm events as
computed by Hydraflow I Iydrographs is included in the calculations in Appendix A.
This model indicates that the 10-year storm sends 6.23 cfs into the Hood system.
2 ANALYSIS METHODS
It is inappropriate to utilize the Rational Method for large non -homogeneous areas. The
Kernstown Crossing site was broken into 13 separate sub -basins based on an evaluation
of slope and runoff coefficient. These basins were then combined to eventually reach the
total flow for the area. A graphic representation of the flow pattern is shown in the figure
below. The sketch shows the flow patterns for each sub -basin as it flows to create the
overall drainage pattern. In Hydraflow using the Rational Method, each individual sub -
basin's response appears as a simple peaked triangle. However, because each basin has a
different amplitude (flow in cfs) and period (time to concentration in minutes), the
combined response for the total area is an irregular curve. A more in-depth discussion of
the Rational Method is available in the Erosion and Sediment Control Handbook of the
CIVIL, GEOTECHNICAL,
CONSTRUCTION, LAND PLANNING AND
LANDSCAPE ARCHITECTURE CONSULTANTS
Page I
%R1AD
ENGINEERING
Virginia Department of Conservation and Recreation and other sources. A plot of each
individual hydrograph is available in Appendix A. Note that this appendix contains a
plot of each "base" zone, and a plot of the combined zones where they enter each storm
structure. Also note that in some cases (e.g. Zone 1) the effect of the runoff is "delayed"
due to conveyance through a storm structure or combination with another downstream
zone.
2.1 POST -DEVELOPMENT CONDITIONS
A description of the sub -basins is given in the table below. Each sub -basin is as large as
possible given that each sub -basin must be dominated by one type of ground surface and
one overall slope. The accompanying figure shows the layout of the zones. Note that the
buildings are not included in these stormwater calculations. A complete rainwater
collection and reuse plan (for washdown water) is included in the Architectural Plans.
CIVIL, GEOTECHNICAL,
CONSTRUCTION, LAND PLANNING AND
LANDSCAPEARCHITECTURE CONSULTANTS
Page 2
'
ENGINEERING
Zone
Acres
Land Type
Runoff
Hydraulic
Slope
Time of
'
ID
Coefficient
Length
(%)
Concentration
1
0.49
Lawn
0.4
335
2.70
18
2
0.36
Lawn
0.4
565
1.60
14
3
0.11
Parking
0.9
125
2.00
5
'
4
0.18
Parking
0.9
170
2.00
8
5
0.27
Lawn
0.4
370
2.70
6
6
1.85
Lawn
0.4
350
4.00
22
7
0.56
Lawn
0.4
350
3.70
25
8
0.23
Parking
0.9
130
2.30
2
9
0.08
Lawn
0.4
100
10.00
10
10
0.26
Parking
0.9
180
3.30
6
11
0.65
Lawi-dParking
0.55
135
2.00
14
12
0.35
Parking
0.85
165
2.00
7
'
13
0.12
Lawn
0.65
240
2.00
8
5.51
Total Acres
t
I
CIVIL,
GEOTECHNICAL,
'
CONSTRUCTION, LAND PLANNING AND
LANDSCAPE
ARCI-lI TECTURE CONSUL TANT S
'
Page 3
CRIAD
ENGINEERING
LAIVUJ(.AI'L L- MU-1/ I LG I UKL U U/VJUL / N/V / J
Page 4
I
U
L
L
E
C RIAD
ENGINEERING
3 EROSION AND SEDIMENT CONTROL MEASURES
Unless otherwise indicated, all vegetative and structural erosion and sediment control
practices shown on the accompanying Plans and in the Erosion and Sediment Control
Narrative will be constructed and maintained according to the minimum standards and
specifications of the VIRGINIA EROSION AND SEDIMENT CONTROL
HANDBOOK.
4 CONCLUSION
The measures and strategies depicted herein and the accompanying Plans will reduce the
storm -water impact on both this development and the adjoining properties. The existing
storm -water management basin will capture all flow from developed areas. Drainage on
site will be controlled by use of pavement, slopes, culverts, and overland channels
designed in full accordance with engineering practice and the laws and ordinances of the
state of Virginia and Frederick County.
CIVIL, GEOTECHNICAL,
CONSTRUCTION, LAND PLANNING AND
LANDSCAPE ARCHITECTURE CONSULTANTS
Page 5
' ENGINEERING
L'
Appendix A
' Post -Development Hydrographs for Sub -Basins
' CIVIL, GEOTECIINICAL,
CONSTRUCTION, LAND PLANNING AND
LANOSC,4PE ARcf//TECTURE CONSULTANTS
V VIAD
ENGINEERING
' This appendix includes an individual hydrograph for each of the 136 sub -basins in the
pre -development stage. Each hydrograph is presented for a 10-year storm. These
hydrographs were combined based on the method presented in Section 2 to generate the
over-all hydrograph for this storm, which is shown first in each section. Also, each
"partial combination" hydrograph that was used to size a storm structure is shown.
E
' CIVIL, GEOTECHNICAL,
CONSTRUCTION, LAND PLANNING AND
LANDSCAPE ARCHITECTURE CONSULTANTS
Hydrograph Plot
Final step to get full exit flow (added 13)
Hydrograph type = Combine
Storm frequency = 10 yrs
1 st inflow hyd. No. = 27
English
Peak discharge = 6.23 cfs
Time interval = 1 min
2nd inflow hyd. No.= 28
Total Volume = 9,873 cult
- Combine -10Yr-Qp=6.23ds
8
Hyd. 27
6
4
CY
/ Hyd. 28
2
/ Hyd. 29
0
0 10 20 30 40 50
Time (min)
L
Hydrograph
Plot
'
English
'
Max. flow at top of trench
dr. (1 &7)
Hydrograph type =
Combine
Peak discharge =
1.22 cfs
'
Storm frequency =
10 yrs
Time interval =
1 min
1st inflow hyd. No. =
7
2nd inflow hyd. No.=
24
'
Total Volume = 1,892 cult
- Combine -10
Yr - Qp = 1.22 cfs
1.5
-
Hyd.
CY
/
Hyd. 24
0.5
/
Hyd. 30
0.0
0
40 50 60
10 20 30
Time (min)
Hydrograph Plot
' English
Step 2 for flow from Zone 11 (9,10 M 1)
Hydrograph type = Combine Peak discharge = 4.51 cfs
' Storm frequency = 10 yrs Time interval = 1 min
1 st inflow hyd. No. = 21 2nd inflow hyd. No.= 20
' Total Volume = 7,090 cult
' -Combine -10Yr-Qp=4.51 cfs
5 --
'
4 Hyd. 21
— — — �% Y
3,_
stir / CY 2 Hyd. 20
— -
1
Hyd. 22
' 0
0 10 20 30 40 50
Time (min)
Hydrograph Plot
Step 3 for flow from Zone 9 (8,9,5,&6)
Hydrograph type = Combine
Storm frequency = 10 yrs
1st inflow hyd. No. = 17
English
Peak discharge = 3.60 cfs
Time interval = 1 min
2nd inflow hyd. No.= 6
Total Volume = 5,354 cult
-Combine -10Yr-Qp=3.60cfs
4
Hyd. 17
3
rn
U 2
/ Hyd. 6
1
/ Hyd. 18
0
0 10 20 30 40 50
Time (min)
Hydrograph Plot
Step 3 for flow from Zone 5 (2,3,4&5)
Hydrograph type = Combine
Storm frequency = 10 yrs
1st inflow hyd. No. = 14
English
Peak discharge = 1.46 cfs
Time interval = 1 min
2nd inflow hyd. No.= 5
Total Volume = 1,925 cuft
- Combine - 10 Yr - Qp = 1.46 cfs
1.5 ---
' Hyd. 14
1.0
CY / Hyd. 5
0.5
/ Hyd. 15
0.0
0 10 20 30 40
Time (min)
Hydrograph Plot
Zone 1
Hydrograph type
= Rational
Storm frequency
= 10 yrs
Drainage area
= 0.5 ac
Intensity
= 3.63 in
I-D-F Curve
= Frederick Co.-rev.IDF
English
Peak discharge = 0.71 cfs
Time interval = 1 min
Runoff coeff. = 0.4
Time of conc. (Tc) = 18 min
Reced. limb factor = 1
Total Volume = 768 cuft
- Rational -10 Yr - Qp = 0.71 cfs
0.8
0.6
� 0.4 / Hyd. 1
0.2
0.0
0 10 20 30 40
Time (min)
Hydrograph Plot
English
'
Zone 2
Hydrograph type
= Rational
Peak discharge =
0.60 cfs
'
Storm frequency
= 10 yrs
Time interval =
1 min
Drainage area
= 0.4 ac
Runoff coeff. =
0.4
Intensity
= 4.14 in
Time of conc. (Tc) =
14 min
'
I-D-F Curve
= Frederick Co.-rev.IDF
Reced. limb factor =
1
Total
Volume = 501 cuft
Rational
-10
Yr -
Qp = 0.60
cfs
0.6
—
0.5
--
—
0.4
—
'
0.3
/ Hyd. 2
_
C1
'
0.2
—
'
0.1
-
'
0.0
0
5 10
15
20
25
30
Time
(min)
Hydrograph Plot
Zone 3
Hydrograph type
= Rational
Storm frequency
= 10 yrs
Drainage area
= 0.1 ac
Intensity
= 6.15 in
-D-F Curve
= Frederick Co.-rev.IDF
English
Peak discharge = 0.61 cfs
Time interval = 1 min
Runoff coeff. = 0.9
Time of conc. (Tc) = 5 min.
Reced. limb factor = 1
Total Volume = 183 cuft
- Rational -10 Yr - Qp = 0.61 cfs
0.8 - -
0.6 -
Ci
0.4 — — — / Hyd. 3
0.2 -
0.0
0 2 4 6 8 10
Time (min)
i
Hydrograph Plot
'
English
Zone 4
Hydrograph type
= Rational
Peak discharge =
0.86 cfs
'
Storm frequency
= 10 yrs
Time interval =
1 min
Drainage area
= 0.2 ac
Runoff coeff. =
0.9
Intensity
= 5.29 in
Time of conc. (Tc) =
8 min_
'
I-D-F Curve
= Frederick Co.-rev.IDF
Reced. limb factor =
1
Total
Volume = 411 cuft
- Rational
-10
Yr
- Qp
= 0.86 cfs
1.0
-
--
0.8
—
-
'
N 0.6
/ Hyd. 4
--
Ci
0.4
—
0.2
—
--
t
0.0
0 5
10
15
20
Time (min)
1
Hydrograph Plot
Zone 5
Hydrograph type
= Rational
Storm frequency
= 10 yrs
Drainage area
= 0.3 ac
Intensity
= 5.83 in
I-D-F Curve
= Frederick Co.-rev.IDF
English
Peak discharge = 0.63 cfs
Time interval = 1 min
Runoff coeff. = 0.4
Time of conc. (Tc) = 6 min-
Reced. limb factor = 1
Total Volume = 227 cuft
- Rational -10 Yr - Qp = 0.63 cfs
0.8 —
0.6 - — — -
C�
0.4 / Hyd. 5
0.2
0.0
0 5 10 15
Time (min)
Hydrograph Plot
Hydrograph type
= Rational
Storm frequency
= 10 yrs
Drainage area
= 1.9 ac
Intensity
= 3.23 in
I-D-F Curve
= Frederick Co.-rev.IDF
English
Peak discharge = 2.39 cfs
Time interval = 1 min
Runoff coeff. = 0.4
Time of conc. (Tc) = 22 min
Reced. limb factor = 1
Total Volume = 3,153 cuft
- Rational - 10 Yr - Qp = 2.39 cfs
2.5 1
2.0 - — --
1.5
/ Hyd. 6
C�
1.0 —
0.5
0.0
0 10 20 30 40 50
Time (min)
Hydrograph Plot
'
English
'
Zone 7
Hydrograph type
= Rational
Peak discharge =
0.67 cfs
Storm frequency
= 10 yrs
Time interval =
1 min
Drainage area
= 0.6 ac
Runoff coeff. =
0.4
Intensity
= 2.98 in
Time of conc. (Tc) =
25 min
'
I-D-F Curve
= Frederick Co.-rev.IDF
Reced. limb factor =
1
Total
Volume = 1,002 cuft
'
-
Rational
-10 Yr
- Qp =
0.67 cfs
0.8
—
'
0.4
/ Hyd. 7
C�
0.2
t
0.0
0 10
20
30
40
50
Time
(min)
Hydrograph Plot
Zone 8
Hydrograph type
= Rational
Storm frequency
= 10 yrs
Drainage area
= 0.2 ac
Intensity
= 7.36 in
I-D-F Curve
= Frederick Co.-rev.IDF
English
Peak discharge = 1.52 cfs
Time interval = 1 min
Runoff coeff. = 0.9
Time of conc. (Tc) = 2 min-
Reced. limb factor = 1
Total Volume = 183 cuft
- Rational - 10 Yr - Qp = 1.52 cfs
2.0 -
Hyd. 8
0.5 -
0.0
0 1 2 3 4
Time (min)
Hydrograph Plot
Zone 9
Hydrograph type
= Rational
Storm frequency
= 10 yrs
Drainage area
= 0.1 ac
Intensity
= 4.84 in
I-D-F Curve
= Frederick Co.-rev.IDF
English
Peak discharge = 0.15 cfs
Time interval = 1 min
Runoff coeff. = 0.4
Time of conc. (Tc) = 10 min
Reced. limb factor = 1
Total Volume = 93 cuft
-Rational-10Yr-Qp=0.15cfs
0.20 —
0.1
� 0.1
/ Hyd. 9
0.0
0.0
0 5 10 15 20
Time (min)
5
0
Hydrograph Plot
'
English
'
Zone 10
Hydrograph type
= Rational
Peak discharge =
1.36 cfs
'
Storm frequency
= 10 yrs
Time interval =
1 min
Drainage area
= 0.3 ac
Runoff coeff. =
0.9
Intensity
= 5.83 in
Time of conc. (Tc) =
6 min_
'
I-D-F Curve
= Frederick Co.-rev.IDF
Reced. limb factor =
1
Total Volume = 491 cult
'
- Rational
- 10 Yr
- Qp = 1.36
cfs
1.5
Hyd. 19
C�
0.5
—
0.0
'
0 5
10
15
Time
(min)
Hydrograph Plot
Zone 11
Hydrograph type
= Rational
Storm frequency
= 10 yrs
Drainage area
= 0.6 ac
Intensity
= 4.14 in
I-D-F Curve
= Frederick Co.-rev.IDF
English
Peak discharge = 1.48 cfs
Time interval = 1 min
Runoff coeff. = 0.55
Time of conc. (Tc) = 14 min
Reced. limb factor = 1
Total Volume = 1,245 cult
- Rational - 10 Yr - Qp = 1.48 cfs
1.5
1.0
/ Hyd. 20
0
0.5
0.0
0 5 10 15 20 25 30
Time (min)
Hyd og ap r r h Plot
'
English
'
Zone 12
Hydrograph type
= Rational
Peak discharge =
1.65 cfs
'
Storm frequency
= 10 yrs
Time interval =
1 min
Drainage area
= 0.3 ac
Runoff coeff. =
0.85
Intensity
= 5.55 in
Time of conc. (Tc) =
7 min_
I-D-F Curve
= Frederick Co.-rev.IDF
Reced. limb factor =
1
Total Volume = 693 cult
'
- Rational
- 10 Yr
- Qp = 1.65
cfs
2.0
'
1.5
—
—
'
1.0
—
/
Hyd. 23
�
'
0.5
0.0
'
0 5
10
15
Time
(min)
Hydrograph Plot
Zone 13
Hydrograph type
= Rational
Storm frequency
= 10 yrs
Drainage area
= 0.1 ac
Intensity
= 5.29 in
I-D-F Curve
= Frederick Co.-rev.IDF
English
Peak discharge = 0.41 cfs
Time interval = 1 min
Runoff coeff. = 0.65
Time of conc. (Tc) = 8 min_
Reced. limb factor = 1
Total Volume = 198 cuft
Rational -10 Yr - Qp = 0.41 cfs
0.5 --
0.4 —
0.3
U / Hyd. 28
C�
0.2
0.1 —
0.0
0 5 10 15 20
Time (min)
VHAID
ENGINEERING
Appendix B
Storm Structure Sizing Information
CIVIL, GEOTECHNICAL,
CONSTRUCTION, LAND PLANNING AND
LANDSCAPE 4 RCI-11 TEC TURE CONSULTANTS
VIIAD
' ENGINEERING
' This appendix includes sizing information for each culvert incorporated into the design.
Information is also included for the trench drain and the ditches and flumes.
E
CIVIL, GEOTECHNICAL,
CONSTRUCTION, LAND PLANNING AND
LANDSCAPE ARCHITECTURE CONSULTANTS
Cross Section
Cross Section for Circular Channel
Project Description
Project File
c:\windows\desktop\kernstow.fm2
Worksheet
Main drain under Hood Way extended
Flow Element
Circular Channel
Method
Manning's Formula
Solve For
Channel Depth
Section Data
Mannings Coefficient
0.013
Channel Slope
0.005700 ft/ft
Depth
1.00 ft
Diameter
18.00 in
Discharge
6.23 cfs
1.00 ft
1
V L
H 1
NTS
18.00 in
02/08/02
' 01:41:38 PM
FlowMaster v5.17
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
11
U
Main drain under Hood Way extended
Worksheet for Circular Channel
Project Description
Project File c:\windows\desktop\kernstow.fm2
Worksheet Main drain under Hood Way extended
Flow Element Circular Channel
Method Manning's Formula
Solve For Channel Depth
Input Data
Mannings Coefficient 0.013
Channel Slope 0.005700 ft/ft
Diameter 18.00 in
Discharge 6.23 cfs
Results
Depth
1.00
ft
Flow Area
1.25
ft2
Wetted Perimeter
2.87
ft
Top Width
1.41
ft
Critical Depth
0.96
ft
Percent Full
66.77
Critical Slope
0.006337 ft/ft
Velocity
4.97
ft/s
Velocity Head
0.38
ft
Specific Energy
1.39
ft
Froude Number
0.93
Maximum Discharge
8.53
cfs
Full Flow Capacity
7.93
cfs
Full Flow Slope
0.003518 ft/ft
Flow is subcritical.
02/08/02
' 01:41:45 PM
FlowMaster v5.17
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Trench drain
Worksheet for Rectangular Channel
Project Description
Project File c:\windows\desktop\kernstow.fm2
Worksheet Trench drain
' F
S
' R
D
FI
' T
C
C
' V
V
S
' F
A
02/08/02
' 02:02:38 PM
l
M
ow Element Rectangular Channel
ethod Manning's Formula
olve For Channel Depth
Input Data
Mannings Coefficient 0.013
Channel Slope 0.005000 fUft
Bottom Width 1.00 ft
Discharge 1.22 cfs
esults
epth
ow Area
Wetted Perimeter
op Width
ritical Depth
ritical Slope
elocity
elocity Head
pecific Energy
roude Number
ow is subcritical.
0.41 ft
0.41 ft2
1.82 ft
1.00 ft
0.36 ft
0.007130 ft/ft
2.99 ft/s
0.14 ft
0.55 ft
0.82
FlowMaster v5.17
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Cross Section
Cross Section for Rectangular Channel
Project Description
Project File
c:\windows\desktop\kernstow.fm2
Worksheet
Trench drain
Flow Element
Rectangular Channel
Method
Manning's Formula
Solve For
Channel Depth
Section Data
Mannings Coefficient
0.013
Channel Slope
0.005000 ftfft
Depth
0.41 ft
Bottom Width
1.00 ft
Discharge
1.22 cfs
1.00 ft
0.41 ft
1
VN
H 1
NTS
02/08/02
t02:02:26 PM
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.17
Page 1 of 1
Outflow from Zone 11
Worksheet for Trapezoidal Channel
Project Description
Project File
c:\windows\desktop\kernstow.fm2
Worksheet
Swale along Hood Way
Flow Element
Trapezoidal Channel
Method
Manning's Formula
Solve For
Channel Depth
Input Data
Mannings Coefficient
0.030
Channel Slope
0.020000 ft/ft
Left Side Slope
12.000000 H : V
Right Side Slope
12.000000 H : V
Bottom Width
5.00 ft
Discharge
4.51 cfs
Results
Depth
0.25
ft
Flow Area
2.01
ft2
Wetted Perimeter
11.03
ft
Top Width
11.01
ft
Critical Depth
0.24
ft
Critical Slope
0.023460 ft/ft
Velocity
2.25
ft/s
Velocity Head
0.08
ft
Specific Energy
0.33
ft
Froude Number
0.93
Flow is subcritical.
02/1 1 /02
08:16:47 AM
FlowMaster v5.17
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
� I
Cross Section
Cross Section for Trapezoidal Channel
Project Description
Project File
cAwi ndows\d esktop\kern stow. fm2
Worksheet
Swale along Hood Way
Flow Element
Trapezoidal Channel
Method
Manning's Formula
Solve For
Channel Depth
Section Data
Mannings Coefficient
0.030
Channel Slope
0.020000 ft/ft
Depth
0.25 ft
Left Side Slope
12.000000 H : V
Right Side Slope
12.000000 H: V
Bottom Width
5.00 ft
Discharge
4.51 cfs
5.00 ft
0.25 ft
1
V L
H 1
NTS
02/1 1 /02
08:16:33 AM
Haeslad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.17
Page 1 of 1
Cross Section
Cross Section for Circular Channel
Project Description
Project File cAwi n d ows\desktop\kern stow. fm2
Worksheet Pipe under entrance (Zone 9)
Flow Element Circular Channel
Method Manning's Formula
Solve For Channel Depth
Section Data
Mannings Coefficient
0.013
Channel Slope
0.005000 ft/ft
Depth
0.74 ft
Diameter
18.00 in
Discharge
3.60 cfs
0.74 ft
1
VL
H 1
NITS
18.00 in
02/08/02
' 01:46:07 PM
FlowMaster v5.17
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Pipe under entrance (Zone 9)
Worksheet for Circular Channel
Project Description
Project File c:\windows\desktop\kernstow.fm2
Worksheet Pipe under entrance (Zone 9)
Flow Element Circular Channel
Method Manning's Formula
Solve For Channel Depth
Input Data
Mannings Coefficient 0.013
Channel Slope 0.005000 ft/ft
Diameter 18.00 in
Discharge 3.60 cfs
Results
Depth
0.74
ft
Flow Area
0.86
ft2
Wetted Perimeter
2.33
ft
Top Width
1.50
ft
Critical Depth
0.72
ft
Percent Full
49.10
Critical Slope
0.005290 ft/ft
Velocity
4.17
ft/s
Velocity Head
0.27
ft
Specific Energy
1.01
ft
Froude Number
0.97
Maximum Discharge
7.99
cfs
Full Flow Capacity
7.43
cfs
Full Flow Slope
0.001175 ft/ft
Flow is subcritical.
02/08/02
' 01:46:13 PM
FlowMaster v5.17
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Cross Section
Cross Section for Circular Channel
Project Description
Project File
cAwi ndows\d esktop\kern stow. fm2
Worksheet
Pipe under exit (Zone 5)
Flow Element
Circular Channel
Method
Manning's Formula
Solve For
Channel Depth
Section Data
Mannings Coefficient
0.013
Channel Slope
0.010000 fuft
Depth
0.40 ft
Diameter
15.00 in
Discharge
1.46 cfs
0.40 ft
1
VD
H 1
NTS
15.00 in
02/08/02
' 01:46:33 PM
FlowMaster v5.17
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Pipe under exit (Zone 5)
Worksheet for Circular Channel
' Project Description
Project File
c:\windows\desktop\kernstow.fm2
Worksheet
Pipe under exit (Zone 5)
Flow Element
Circular Channel
Method
Manning's Formula
Solve For
Channel Depth
U
Input Data
Mannings Coefficient 0.013
Channel Slope 0.010000 ft/ft
Diameter 15.00 in
Discharge 1.46 cfs
Results
Depth
0.40
ft
Flow Area
0.34
ft2
Wetted Perimeter
1.51
ft
Top Width
1.17
ft
Critical Depth
0.48
ft
Percent Full
32.32
Critical Slope
0.005301 ft/ft
Velocity
4.25
ft/s
Velocity Head
0.28
ft
Specific Energy
0.69
ft
Froude Number
1.38
Maximum Discharge
6.95
cfs
Full Flow Capacity
6.46
cfs
Full Flow Slope
0.000511 ft/ft
Flow is supercritical.
02/08/02
' 01:46:46 PM
FlowMaster v5.17
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Cross Section
Cross Section for Circular Channel
Project Description
Project File
c:\windows\desktop\kernstow.fm2 t L V W F D m o aI= 1
Worksheet
Pipe under building (1 of 2 flow is half)
Flow Element
Circular Channel
Method
Manning's Formula
Solve For
Channel Depth
Section Data
Mannings Coefficient 0.009
Channel Slope
0.006500 ft/ft
Depth
0.24 ft
Diameter
6.00 in
Discharge
0.31 cfs
0.24 ft
1
VD
H 1
NTS
6.00 in
02/08/02
' 01:44:48 PM
FlowMaster v5.17
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
PVC conduit under building (one of two)
Worksheet for Circular Channel
Project Description
Project File c:\windows\desktop\kernstow.fm2
Worksheet Pipe under building (1 of 2 flow is half
Flow Element Circular Channel
Method Manning's Formula
Solve For Channel Depth
Input Data
Mannings Coefficient
0.009
Channel Slope
0.006500 ft/ft
Diameter
6.00 in
Discharge
0.31 cfs
Results
Depth
0.24
ft
Flow Area
0.09
ft2
Wetted Perimeter
0.77
ft
Top Width
0.50
ft
Critical Depth
0.28
ft
Percent Full
48.49
Critical Slope
0.003946 ft/ft
Velocity
3.28
ft/s
Velocity Head
0.17
ft
Specific Energy
0.41
ft
Froude Number
1.33
Maximum Discharge
0.70
cfs
Full Flow Capacity
0.65
cfs
Full Flow Slope
0.001463 ft/ft
Flow is supercritical.
1
02/08/02
' 01:44:55 PM
FlowMaster v5.17
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Analysis of Existing Culvert
Worksheet for Circular Channel
Project Description
Project File
c:\windows\desktop\kernstow.fm2
Worksheet
Existing RCP
Flow Element
Circular Channel
Method
Manning's Formula
Solve For
Channel Depth
Input Data
Mannings Coefficient 0.013
Channel Slope 0.015000 ft/ft
Diameter 18.00 in
Discharge 2.39 cfs
Results
Depth
0.44
ft
Flow Area
0.43
ft2
Wetted Perimeter
1.71
ft
Top Width
1.36
ft
Critical Depth
0.58
ft
Percent Full
29.20
Critical Slope
0.005003 ft/ft
Velocity
5.57
ft/s
Velocity Head
0.48
ft
Specific Energy
0.92
ft
Froude Number
1.75
Maximum Discharge
13.84
cfs
Full Flow Capacity
12.86
cfs
Full Flow Slope
0.000518 ft/ft
Flow is supercritical.
i LOw I=ZOrA -Z-oNI �
02/05/02 FlowMaster v5.17
09:38:14 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Cross Section
Cross Section for Circular Channel
Project Description
Project File
c:\windows\desktop\kernstow.fm2
Worksheet
Existing RCP
Flow Element
Circular Channel
Method
Manning's Formula
Solve For
Channel Depth
Section Data
Mannings Coefficient
0.013
Channel Slope
0.015000 ft/ft
Depth
0.44 ft
Diameter
18.00 in
Discharge
2.39 cfs
0.44 ft
1
V N
H 1
NTS
18.00 in
02/05/02 FlowMaster v5.17
09:38:25 AM Haeslad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Ditch behind runs
Worksheet for Triangular Channel
Project Description
Project File
Owi n d ows\desktop\ke rn stow. fm2
Worksheet
Ditch behind runs
Flow Element
Triangular Channel
Method
Manning's Formula
Solve For
Channel Depth
Input Data
Mannings Coefficient
0.030
Channel Slope
0.020000 ft/ft
Left Side Slope
4.000000 H : V
Right Side Slope
4.000000 H : V
Discharge
0.67 cfs
Results
Depth
0.30
ft
Flow Area
0.35
ft2
Wetted Perimeter
2.44
ft
Top Width
2.36
ft
Critical Depth
0.28
ft
Critical Slope
0.026278 ft/ft
Velocity
1.92
ft/s
Velocity Head
0.06
ft
Specific Energy
0.35
ft
Froude Number
0.88
Flow is subcritical.
I_L-Ow Ff"0M SON►
02/04/02
02:56:40 PM
FIowMaster v5.17
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Cross Section
Cross Section for Triangular Channel
Project Description
Project File
c:\windows\desktop\kernstow.fm2
Worksheet
Ditch behind runs
Flow Element
Triangular Channel
Method
Manning's Formula
Solve For
Channel Depth
Section Data
Mannings Coefficient
0.030
Channel Slope
0.020000 ft/ft
Depth
0.30 ft
Left Side Slope
4.000000 H : V
Right Side Slope
4.000000 H : V
Discharge
0.67 cfs
0.30 ft
1
VN
H 1
NTS
02/04/02
' 02:56:30 PM
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.17
Page 1 of 1
Top of flume
Worksheet for Triangular Channel
Project Description
Project File c:\windows\desktop\kernstow.fm2
Worksheet Paved flume for central area (Zone 8)
Flow Element Triangular Channel
Method Manning's Formula
Solve For Channel Depth
Input Data
Mannings Coefficient
0.013
Channel Slope
0.005500 ft/ft
Left Side Slope
12.000000 H : V
Right Side Slope
12.000000 H : V
Discharge
1.52 cfs
Results
Depth
0.25
ft
Flow Area
0.73
ft2
Wetted Perimeter
5.93
ft
Top Width
5.91
ft
Critical Depth
0.25
ft
Critical Slope
0.004941 ft/ft
Velocity
2.09
ft/s
Velocity Head
0.07
ft
Specific Energy
0.31
ft
Froude Number
1.05
Flow is supercritical.
02/08/02
' 01:43:26 PM
FlowMaster v5.17
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Cross Section
Cross Section for Triangular Channel
Project Description
Project File c:\windows\desktop\kernstow.fm2
Worksheet Paved flume for central area (Zone 8)
Flow Element Triangular Channel
Method Manning's Formula
Solve For Channel Depth
Section Data
Mannings Coefficient
0.013
Channel Slope
0.005500 ft/ft
Depth
0.25 ft
Left Side Slope
12.000000 H: V
Right Side Slope
12.000000 H : V
Discharge
1.52 cfs
n
0.25 ft
1
V N
H 1
NTS
02/08/02
' 01:43:06 PM
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.17
Page 1 of 1
�� I
%RIAD
ENGINEERING
Appendix C
Storm Water Control Basin Design
(Existing HP Hood System)
CIVIL, GEOTECHNICAL,
CONSTRUCTION, LAND PLANNING AND
L ANDSCAFE /-I RCI-1I TECTURE CONSUL TANTS
E RIAD
ENGINEERING
' Included in this section are the supporting calculations for the storm water control basin.
In order to minimize soil disturbances, the sediment control basin has been utilized as the
storm water control basin. Additionally, the sediment control riser has been utilized as
' the storm drainage riser. The perforated plastic tube shall be removed and the 6" orifice
drilled out to a fill 12".
' One important note in the design of the storm water pond is to realize the impact of the
exit culvert's invert. An invert of 466.94' mandates a freestanding body of water in the
basin of nearly 3' depth. However, as the calculations in this report show, the basin has
' ample volume to contain a 100-year storm above this elevation. This is also why the
storage graphs begin at the 466.94' elevation.
' Given the nature of the existing topographical features in the vicinity of the proposed
basin, an emergency spillway is not provided. The basin is sized to adequately detain the
100-yr storm event without overtopping the earthen berm.
E
' CIVIL, GEOTECHNICAL,
CONSTRUCTION, LAND PLANNING AND
LANDSCAPE ARCHI TECTURE CONSUL TANTS
Erosion and Sediment Control Narrative
FOR
Kernstown Crossing
Date: February 8, 2002
Project No. CD-047
PREPARED BY:
V VIAD
ENGINEERING
CIVIL, ENVIRONMENTAL, GEOTECHNICAL, CONSTRUCTION, LAND
PLANNING AND LANDSCAPE ARcl //TECTURE CONSUL TANTS
971 ACORN DRIVE
HARRISONBURG, VIRGINIA 2280/
TEL E 54 0. 4 34.4 /35 FAX 54 0. 4 34.584 /
k
11
I
11
This narrative describes the erosion and sediment control measures to be constructed at
the proposed site located at the intersection of US Route 11 and Hood Way near Kernstown in
the County of Frederick, Virginia.
Project Description
The project consists of construction of entrance, parking, storm culverts, and other
associated items associated with the proposed business development. The property to be
developed is approximately 4.245 acres.
Existing Site Conditions
Vegetative Cover — The property is covered by intermittently maintained grasses. There are no
stands of timber. Please refer to Sheet C-3 of the construction plans for the existing site
conditions.
Topography — The topography is extremely flat, with an average slope of 2.3%. Slopes near the
Route 11 embankment are approximately 25%.
Drainage Patterns — The site drains toward the main HP Hood facility and the existing
stormwater facilities. There are no natural ponds on the site.
Adiacent Properties
The site is bounded on the south and east sides by HP Hood property developed as an
industrial facility. The site is bounded to the north by developed property owned by Allegheny
Power Company. The site is bounded to the west by Route 11.
Soils
According to the Frederick County Soil Survey prepared by the Soil Conservation
Service, the site sits on soil type 7C (Carbo-Oaklet-Rock Outcrop Complex). Erosion hazard
on this soil type is severe, and care was taken in the preparation of this E&S Plan and Narrative.
Bedrock occurs at depths to approximately 26 inches, and depth to bedrock is the primary
limitation to development in this soil type.
' Critical Erosion Areas
There are no critical erosion areas on the site. As always, points of concentrated flow
could present problems and are dealt with via outlet protection measures.
Erosion and Sediment Control Measures
Unless otherwise noted, the structural and vegetative practices shall be constructed and
maintained according to the Minimum Standards of the Virginia Erosion and Sediment Control
Law, Regulations and Certification Regulations and Specifications outlined in the latest edition of
the Virginia Erosion and Sediment Control Handbook.
The following summary(s) are for quick reference only and do not preclude any
requirements or standards listed in the Virginia Erosion and Sediment Control Handbook. Also,
other measures not specifically listed here or on the construction plans may be required to keep
the site within regulatory compliance during construction. The need for such items may not be
evident until the beginning of construction. The City Erosion and Sediment Control Administrator
will determine the need for additional erosion and sediment control measures.
STRUCTURAL PRACTICES
Temporary Construction Entrance - 3.02
One temporary construction entrance shall be constructed as shown on the Erosion and
Sediment Control Plan. The entrance shall be maintained in a condition that prevents
tracking or flow of mud onto public rights -of -way. This may require periodic top dressing
with additional stone or washing and reworking of existing stones as conditions demand
and repair and/or clean -out of any structures used to trap sediment. All materials spilled,
dropped, washed or tracked from vehicles onto roadways or into storm drains must be
removed immediately. During wet weather conditions, construction vehicle drivers will be
required to wash their wheels prior to entering the highway. During the washing process,
the contractor shall ensure that the runoff created by the washing process is passed
through one of the sediment removing devices such as a section of silt fence. Water for
washing operations shall be hauled to the site or shall be acquired from a hydrant
installed at the site. This hydrant shall be installed in accordance with the City of
Harrisonburg specifications. The use of water trucks to remove materials dropped,
washed or tracked onto the roadways will not be permitted under any circumstances.
2. Construction Road Stabilization - 3.03
Construction road stabilization shall be utilized wherever stone -based roads or parking
areas are to be constructed, whether permanent or temporary, for use by construction
traffic. Treated areas are likely to require periodic top dressing with new gravel. Seeded
areas adjacent to road and parking areas shall be check periodically to ensure a
vigorous stand of vegetation is maintained. Roadside ditched and drainage structures
shall be checked regularly to ensure they do not become clogged with silt or other debris.
3. Silt Fence Barriers - 3.05
Silt fence barriers shall be installed at locations shown on the Erosion and Sediment
Control Plan to filter sediment -laden runoff and decrease the velocity of sheet flows and
low -to -moderate level channel flows. Wire reinforcement shall be used for all silt fence
barriers.
4. Culvert Inlet Protection - 3.08
All culvert inlets shall be protected during construction in order to prevent sediment from
entering storm drainage systems prior to permanent stabilization of the disturbed area.
Inlet protection shall be provided for all culvert inlets as shown on the Erosion and
Sediment Control Plan.
5. Temporary Diversion Dike - 3.09
Temporary diversion dikes shall be constructed at locations shown on the Erosion and
Sediment Control Plan in such a manner to facilitate positive drainage to the Sediment
Basins and Sediment Traps. Temporary diversion dikes shall also be utilized to divert
storm run-off from upslope drainage areas away from unprotected disturbed areas and
slopes to a stabilized outlet. Upon termination of these dikes, positive drainage to the
outflow point shall be maintained.
6. Temporary Sediment Trap - 3.13
4
Two temporary sediment traps shall be constructed at the locations shown on the
Erosion and Sediment Control Plan and in accordance with the construction details
shown on the Erosion and Sediment Control Details. The temporary sediment traps shall
detain sediment -laden runoff from disturbed areas long enough to allow the majority of
the sediment to settle out.
7. Outlet Protection - 3.18
All storm pipe outlets shall be protected with a stone apron per specifications outlined in
the latest edition of the Virginia Erosion and Sediment Control Handbook. When
installed properly, outlet protection should require very little maintenance. However, it
shall be inspected periodically for scour from high flows. Care must be taken to properly
control sediment -laden construction runoff draining to the outlet protection until all up -
gradient areas have been fully stabilized.
8. Surface Roughening - 3.29
All areas in which grading takes place and a slope greater than or equal to a 3:1 slope is
constructed shall be surface roughened by stair step grading, grooving, furrowing, or
tracking.
9. Soil Stabilization Blankets and Matting - 3.36
LandLok TRM 435 matting or an approved equivalent shall be installed in all ditch
sections shown on the Erosion and Sediment Control Plan and in accordance with the
detail shown on the Erosion and Sediment Control Details.
10. Dust Control - 3.39
The contractor shall take measures to reduce the surface and air movement of dust,
which may present health hazards, traffic safety problems or harm animal and plant life
during land disturbing and construction activities.
GRASS ESTABLISHMENT
Topsoil Stockpile - 3.30
Topsoil shall be stripped from areas to be graded and stockpiled for future use. The
County Erosion and Sediment Control Administrator shall approve stockpile locations.
Stockpiles shall be temporarily seeded and protected with silt fence. When the topsoil is
spread over the graded areas, it shall be placed in 2-4 inch compacted lifts. Topsoil
hauled offsite shall be disposed of in an approved area as directed by the County
Erosion and Sediment Control Administrator.
Temporary Seeding - 3.31
The topsoil stockpiles and all areas to be rough graded during the course of the project
shall be immediately seeded with temporary vegetation upon completion of grading
operations. The appropriate seed mixture will be dependent upon the time of year it is to
be sown. The typical seed mixture specification is shown on the Erosion and Sediment
Control Details. The Erosion and Sediment Control Administrator must approve any
deviation from these mixtures.
NOTE:
Stabilization measures shall be applied to earthen structures such as dams, dikes,
diversions, and sediment basin embankments immediately after construction of the said
structure.
3. Permanent Seeding - 3.32
Permanent seeding shall be completed within seven days from achieving final grade of
the site.
' MANAGEMENT STRATEGIES
The following guidelines shall be utilized in the planning of construction:
' 1. Temporary diversion dikes, the temporary sediment traps, silt fence, the construction entrance
and other measures intended to remove sediment shall be constructed as a first step in the land
disturbing activity and shall be functional before up slope land is disturbed. These measures
shall also be stabilized with vegetation prior to up slope land disturbance.
' 2. The contractor shall install inlet protection and outlet protection for all storm utilities immediately
after installation of said structures to prevent sediment from collecting in the said structures and
being deposited down stream.
' 3. Construction shall be sequenced so that grading operations can begin and end as quickly as
possible.
I
4. Temporary seeding and other stabilization shall follow immediately after the site is stripped of
topsoil if it is determined that final grading will not begin within 30 days.
' 5. The developer shall be responsible for the installation and maintenance of all Erosion and
Sediment Control practices.
' 6. The topsoil stockpile location shall be immediately protected by silt fence on the downslope side.
NOTE:
The contractor shall install sediment trapping measures as the first step in construction.
' Once in place, the contractor shall strip topsoil and begin grading operations. The
contractor shall ensure that at the end of each working day all erosion and sediment control
measures are in place and functioning properly. This will be strictly enforced.
t These controls shall be in effect during the remaining development, which includes final
grading, utility construction, and paving.
CONSTRUCTION SEQUENCING NOTES:
The following construction sequence shall be utilized to ensure that the proper erosion and
' sediment control practices are in place and fully operational prior to upslope land disturbance.
Sequence"A"
1 — install the Construction Entrance.
' 2 — construct Sediment Trap #1.
3 — install Diversion Dikes and Silt Fence leading to Sediment Trap #1.
4 — install Silt Fence along the lower side of the Topsoil Stockpile location.
' 7 — strip topsoil on roads as necessary.
6
� I
11
11
n
J
11
L
Sequence"B"
1 — construct Sediment Trap #2.
2 — install Diversion Dikes and Silt Fence associated with Sediment Trap 2.
Permanent Stabilization
Permanent stabilization shall be applied to denuded areas immediately after final grade
is achieved on any portion of the site. Temporary soil stabilization shall be applied within seven
days to denuded areas that may not be at final grade but will remain undisturbed for more than
30 days. Permanent stabilization shall be applied to areas left dormant for more than one year.
Seeding shall be conducted in accordance with the latest edition of the Virginia Erosion and
Sediment Control Handbook. Permanently seeded areas shall be protected during
establishment with straw mulch. Hydro -seeding also requires straw mulch protection.
Maintenance
In general, all erosion and sediment control measures shall be checked daily
and after each rainfall. The following items shall be checked in particular:
The silt fence, diversion dikes, ns, inlet and outlet protection areas and temporary
construction entrances shall be checked for undermining, deterioration, and functioning
ability.
2. The sediment traps shall be checked regularly and after each significant rainfall to
determine the deposited silt. When sediment reaches the clean out level, it is to be
distributed back on the site in such a manner as to prevent further erosion.
3. All seeded areas shall be checked for adequate growth. If adequate growth is not evident,
the area shall be re -seeded to prevent the soils from eroding.
4. All temporary erosion and sediment control measures shall be removed only when
authorized by the City Erosion and Sediment Control Administrator.
5. Trapped sediment and the disturbed soil areas resulting from the removal of the temporary
measures shall be permanently stabilized to prevent further erosion and sedimentation.
6. Lonq term maintenance of all stormwater associated items is the sole responsibility of the
owner or a property owner's association.
Stormwater Management
Multiple stormwater management basins are utilized on this site to ensure
predevelopment flows rates are not exceed in final post development configuration.
7
1
. ..... ... ....... ... ...... . . ..... ..... .........
..... .........::::.
......... ...............................
S D T:TRAR.............
#�I:......:......:.....
:::;TEMP..:... E...:IMEN:..:.:.............:::......:::::::.:::::.:..:::::::.
:.::>::.::.:::::.:.:.:::>::.:.:.;.:;>.;::;.;::,;:.;:.;» ;;;:;::<:;:.;::.;:;:::;:::.::.;:.:.;::,>;::.;;:.;;:;;;......:......
c::::::::
;: i RIAD;: n the
:::> <: < <:'>:...... :'i> <: <>:.. _ .......W ............... 9............:....::......
,.....
.�a... •.:;;;:;;
X.
'
Area Contributing to Sediment Trap :
2.68 Ac.
Total Basin Height:
5.5
ft
Wet Storage Height:
3.5
ft
Length of Basin Bottom (Long side) :
50
ft
'
Width of Basin Bottom (Short side) :
25
ft
Slope of long side of basin (SJ :
2 :1
'
Slope of short side of basin (Ss) :
2 :1
Length of top of Wet Storage :
64
ft
Width of top of Wet Storage :
39
ft
'
Length of top of Dry Storage :
72
ft
Width of top of Dry Storage :
47
ft
3 VA UMl..
...........................................................................
..........................................................................
.................................................................... .
Design
Required :
4848 ft' 179.6 yd3
O.K.
........................ :::.:...................... :.:.:.:.....................
Design
;,;;,.
'
Required:
4848 ft3 179.6 yd3
O.K.
s<%CIAL; 'T'C.I�pGI=17:LUlUI:>
Design
'
Required:
9696 ft' 359.1 yd3
O.K.
t
t
02/08/02
Sediment trap
SEDIMENTTRA
Ozi
Area Contributing to Sediment Trap : 1.52 Ac.
Total Basin Height:
3.5 ft
Wet Storage Height:
2 ft
Length ofBasin Bottom (Long side)
50 0
Width ofBasin Bottom (Short side)
25 ft
Slope oflong side ofbasin (SO:
2 1
Slope ofshort side ofbasin (Ss)
21
Length of top of Wet Storage
58 ft
Width oftop ofWet Storage:
33 ft
Length oftop ofDry Storage : 04 ft
Width oftop ofDry Storage: 38 ft
Design�
Required: 2750 ft, 101/8 yd,
Ad
Design�
O.K.
{lK
020802 Sediment trap
IIAD
ENGINEERING
Included in this section are the supporting calculations for the existing storm -water
management basin on the H.P. Hood property. For purposes of these calculations, the
basin utilized for this project will be designated as the North SWMB. For a more in-
depth analysis of the H.P. Hood site, refer to the H.P. Hood Engineering Calculations,
dated 27 June 2001, by Triad Engineering, Inc. This was approved by Joe Wilder on 8-
01-01.
The existing SWMB was designed to handle runoff from both the H.P. Hood site and
adjacent areas. The Kernstown Crossing site is contained in the North Roadway off -site
contributing area (see attached drainage divides map). The original calculations assumed
land parcels (totaling approx. 9.10 acres) on both sides of Hood Way to be fully
developed with a Rational runoff coefficient of 0.80, which is higher than that proposed
with the development of the Kernstown Crossing site. Additionally, the outfall from the
proposed storm sewer pipe entering the basin (733.00) is higher than the 25-year
maximum elevation of the basin (731.00). Given this fact, the SWMB is sized to
adequately and effectively convey the additional runoff from the Kernstown Crossing site
without any further modification.
CIVIL, GEO TECHNI CA!_,
CONSTRUCTION, LAND PLANNING AND
LANDSCAPE Al RCHI TECTURE CONSUL TANTS
':q[10
GEOTECHNICAL, CIVIL, ENVIRONMENTAL, CONSTRUCTION,
LAND PLANNING & LANDSCAPE ARCHITECTURE CONSULTANTS TRIAD ENGINEERING, INC.
Job No. G D- O(, 8
Item: S IN /11 CA L C S
By: D o 0-�
�at- Z
Project: P. P. /-I O O D
Sheet of
Check:
Date:
STT
- �4/A1
Ef� 6-ALCS'
_ S14C
's d"1
;.,4
I � StvM
a,Ptiz
�� N.,4'4
�2 �f 0
i
6ollle
SToin9¢
�IoJ.l:rn
�� r_. i. .
I- IT_.(I
1
_7'
di ci�
.4!r i i•i,
7/�I! J�
GyI/n!r �H.4 p/I I t
—` --� - - -- —
dark
doo;
-v .,Pld
,+ 4 i•.
V N i I p/.• .h 5
. H- .� J I k,
7de rl .
C, 17 C I
t
y
6' s:
I I
-- - - 0 R
N -
l 1�1
e I di,,;:; ,�exC:�
,
k
O ,ly
fi,;e o'er 's:
I
,
F
f4.
C..,ICS
T,G 14
..
,
— ----
4:i
I
•r/�/ i
�
I
�fo �,�
The
K.:e '4
r C c� wee., -� 4, Al. i44
_ �
I
61 °i a /o .r ✓ .1
dej
A e,
i
i
_
:D�+A. ,.o!
t J
lo, 6 A�. a P� �.� We:�1�•�1 �" -
7.3
U„de4a;�e.� •
3. S ac. a uhP�ve� tNe:J��c� ��� = 0.3�
O. 2 q C. -� �q ve�
":tIJO
GEOTECHNICAL, CIVIL, ENVIRONMENTAL, CONSTRUCTION,
LAND PLANNING & LANDSCAPE ARCHITECTURE CONSULTANTS TRIAD ENGINEERING, INC.
Job No. C D - 0 8
Item: < lv M C„1 s
By: DD D
Date: &/zz
Project: 14. p. 1400 D
Sheet of
Check:
Date:
i
i
•
N. 04 ; r: f c
-f. N, 8.,r_.
,16. 1 O.
I_
1
i
N•i R�^wax
= !`7T.
w i o.. o ,l4,f;. h
y_.�_,
- _..�^��-
;
- ,.
;* ; f?!
f. Fha
SwM S
..;.-.�,y ,c4
s
s'toi —4 ve'.. -f•s
• •'
+ .e i T.'
r V . d f ,
: n o►,5 C_.---Q S at - o/
..if/e
G'o r71Cc-�i/n7
I
J -Fe l,. f
fH�C'•11q �.. j, e/: vPo-1 Y..., +4c i
, le I / I
by- I-1 X Z //I') ..
I
__• _ 2.-
2-_y•-
_
� 1'ie � Dev
Pi,+f
_ � 30_
6.3
6 �'•�s' � � � � ,
91 cl�s i eta,: ,Poll '
j 12
� C S-- '`a a •sane
:.. _ --
- :..:
3G
S- -.. _
03 c-pa.,j
o ,y r
Pi - De ir.
= 0 `1
Z c �S
pev.
= g 9.6
cPs (,�e-1-^:.,;.ol)
:lo I
P•s+ - Dr.
• = 7. 0
'10'b
All�c
- 50.�12
I�p iJ•
ACf J L7•sc�gs
bp
95�
P.rf -Dev.
- IQ`1.07
Dev. I
— &, 20
c r S' `N. �P�-/'c7. +ro+ /
2S J�
All .,,,5/c I
l
- S9./S
- 8.20 = 15-0. 9S' c rs
Pc +�c
y,-
�0-J
wl i✓�•�34
be/' ic)Pg
✓sc q T c/ 0c nc-7' 'lo exce-e
4 � e /Ire
d
clev. :SL4,,,5e
Tv,'
cl IG-YI S40i.-.• evenf,
Tr + 4"s
ell S e !
g . � `i' <
/T.�
S O. -1 c S cf P S . gn C v •-, 'f v i w. S
M
M
M
� � M M
M9rM1
rr
r!
171
NORTH BAS.lN. I - . i -
i
t*
..-..L__Area
Wtd.'C'
- _
Wtd.'C,
'
Tc'(P re)
. d
Tc (Post) 2 -yr (Pre 2-yr (Post
10-yr (P
10-yr (post)
25-yr (Pre) 25-yr (Post)
Drainage Area (acresL_l
(Pre-Dev.)
(Post-Dev.)
--0.38-
I (min.)
- -
(min f
(cfs).. (c
(cfs)
(cfs)
(Cfs) (Cfs)
On -site (undetained) 4.00
38.00
14.00 2.51 5,06
3.66
7.06
4.26 8.20
On -site (detained) 17.90
North Roadway 0
9.1
_0.35
L 0.35
0.57
0.80
38.00
4200
11.17 33.98
14-00 5.33 24.25
16.31
47.41
33.83
18.96 55.03
9.05 39.27
West Off -site 17.70
0.35
42.00.
42.00 10.37 10.37
15.15
15.15
17.61 17.61
North Off -site ir:'.10
0.50)
0.50
62.00
62.00 1.0.22
14.931
14.93 ______17.28
...... . ..... ...
17.28
-Combined Storm (Post-Dev. Flows do
not include undet2ined
area)
3086 63.99
59.15 10407
50.92
AllOW2ble Discharge (Pre-Dev. Combined
25.80
50.95
--- -7 -28.6-4-
- Post-Dev.
undetained)i
43.86
23.97
,Actu2l Discharge
18.03
NORTH BASIN
POST-DEV.
/
N. Roadway
N. Off -site I \ f — — — i , / \ /
— — W. Off -site �.� ` I \\ ' - A = 16.10 ac.`740/—
A=17.70ac. > / C=0.50 / J
�
-T
\ � i
I On -site (undetained)
PAID -
On -site (detained) \ \ \ \ \ I —
\ "� I A=17.90ac. `\�` �\ �\—� \
C = 0.57 \ \ \ 1 # l \ \ 1 V"
\ 1 I I \\
Alb
It
T617
71
746 ?so
,. r44 , \ 1 ` Icy ll� /
/Mit
740
Hvdroaraah Summary Renort
o
Hyd. Hydrograph Peak Time Time to Volume Return Inflow Maximum Maximum Hydrograph
No. type flow interval peak period hyd(s) elevation storage description
(origin) (cfs) (min) (min) (cuft) (yrs) (ft) (cuft)
1
Rational
13.68
1
38
31,180
2
--
---
----
Ex. on -site (2-yr)
2
Rational
5.33
1
42
13,429
2
---
----
-----
Ex. North Roadway
3
Rational
10.37
1
42
26.120
2
--
--
Ex. Vyest Off -site
4
Rational
10.22
1
62
38,018
2
—
---
Ex. North Off -site
5
Combine
15.85
1
38
38,236
2
1 + 2
6
Combine
15.81
1
42
60,407
2
3 + 4
--
--
7
Combine
30.86
1
42
98,643
2
5 + 6
--
----
Pre-Dev. In (2-yr)
8
Rational
5.06
1
14
4,252
2
—
--
--
Post-Dev. On -site
9
Rational
33.98
1
14
28,544
2
--
--
--
On -site detained (
10
Rational
24.25
1
14
20,367
2
—
---
N. Roadway out (2-
11
Rational
10.37
1
42
26,120
2
--
--
----
Ex. West Off -site
12
Rational
10.22
1
62
38,018
2
---
-----
---
Ex. North Off -site
13
Combine
58.23
1
14
48,911
2
9 + 10
----
------
14
Combine
17.29
1
42
64,138
2
11 + 12
----
---
15
Combine
63.99
1
14
113,049
2
13 + 14
--
----
Post-Dev. Det. (2-
16
Rational
19.97
1
38
45,527
10
--
---
---
Ex. on -site (10-yr
Rational
7.79
1
42
19,632
10
--
--
----
Ex. North Roadway
117
18
Rational
15.15
1
42
38,186
10
----
--
---
Ex. West Off -site
19
Rational
14.93
1
62
55,545
10
--
--
------
Ex. North Off -site
0
Combine
27.02
1
38
65,159
10
16 + 17
--
--
21
Combine
25.27
1
42
93,731
10
18 + 19
----
---
2
Combine
50.92
1
42
158,890
10
20 + 21
--
—
Pre-Dev. In (10-yr
23
Rational
7.06
1
14
5,933
10
—
----
---
Post-Dev. On -site
4
Rational
47.41
1
14
39,828
10
--
----
---
On -site detained
5
Rational
33.83
1
14
28,418
10
---
----
----
N. Roadway out (10
26
Rational
15.15
1
42
38,186
10
--
-----
---
Ex. West Off -site
7
Rational
14.93
1
62
55,545
10
--
------
----
Ex. North Off -site
28
Combine
81.25
1
14
68,247
10
24 + 25
—
----
9
Combine
25.27
1
42
93,731
10
26 + 27
------
---
30
Combine
89.67
1
14
161,977
10
28 + 29
------
----
Post-Dev. Det. (10
roj. file: Hood-North.GPW
OF file: Frederick Co..IDF
Run date: 06-27-2001
Hydrograph
Summary Report
Page 2
Hyd.
No.
'
Hydrograph
type
(origin)
Peak
flow
(cfs)
Time
interval
(min)
Time to Volume
peak
(min) (cult)
Return
period
(yrs)
Inflow
hyd(s)
Maximum
elevation
(ft)
Maximum
storage
(cuft)
Hydrograph
description
31
Rational
23.22
1
38
52.943
25
---
-----
----
Ex. on -site (25-yr
32
Rational
9.05
1
42
22,815
25
—
---
--
Ex. North Roadway
33
Rational
17.61
1
42
44,376
25
--
----
Ex. West Off -site
34
Rational
17.28
1
62
64,287
25
—
--
----
Ex. North Off -site
35
Combine
31.41
1
38
75,758
25
31 + 32
--
--
36
Combine
29.32
1
42
108,664
25
33 + 34
-----
--
37
Combine
I
59.15
1
42
184.421
25
35 + 36
—
--
Pre-Dev. In (25-yr
i 38
Rational
8.20
1
14
6,887
25
—
---
--
Post-Dev. On -site
39
Rational
55.03
1
14
46,229
25
—
--
On -site detained (
40
Rational
39.27
1
14
32,985
25
---
--
--
N. Roadway out (25
41
Rational
17.61
1
42
44,376
25
--
----
Ex. West Off -site
42
Rational
17.28
1
62
64,287
25
--
---
---
Ex. North Off -site
43
Combine
94.30
1
14
79,214
25
39 + 40
----
---
44
Combine
29.32
1
42
108,664
25
41 + 42
---
---
145
46
Combine
Reservoir
104.07
18.03
1
1
14
26
187,878
113,049
25
43 + 44
---
-----
Post-Dev. Det. (25
2
15
730.29
37,142
Post-Dev. Out (2-y
47
Reservoir
23.97
1
27
161,977
10
30
730.76
56,324
Post-Dev. Out (10-
48
Reservoir
28.64
1
26
187,878
25
45
731.00
66,275
Post-Dev. Out (25-
jDroj. file: Hood-North.GPW
OF file: Frederick COJDF
Run date: 06-27-2001
Hydrograph Plot
Hyd. No. 7
Pre-Dev. In (2-yr)
Hydrograph type = Combine
Storm frequency = 2 yrs
1 st inflow hyd. No. = 5
English
Peak discharge = 30.86 cfs
Time interval = 1 min
2nd inflow hyd. No.= 6
Total Volume = 98,643 cult
7 -
Combine
- 2 Yr
- Qp =
30.86 cfs
40
s� Hyd. 5
30
—
20
/ Hyd. 6
10
/ Hyd. 7
0
0.0
0.5
1.0
1.5
2.0
2.5
Time
(hrs)
1�
Hydrograph
Plot
'
English
Hyd. No. 8
'
Post-Dev. On -site Undet. (2-yr)
Hydrograph type
= Rational
Peak discharge =
5.06 cfs
I'
Storm frequency
= 2 yrs
Time interval =
1 min
Drainage area
= 4.0 ac
Runoff coeff. =
0.38
Intensity
= 3.33 in
Time of conc. (Tc) =
14 min-
'
I-D-F Curve
= Frederick Co..IDF
Reced. limb factor =
1
Total Volume = 4,252 cuft
t
'
8- Rational
-2Yr-Qp=5.06cfs
6
--
'
5
-
4
3
/ Hyd. 8
'
2
'
1
'
0
0
5 10
15
20
25
30
Time (min)
Hydrograph Plot
Hyd. No. 15
Post-Dev. Det. (2-yr)
Hydrograph type = Combine
Storm frequency = 2 yrs
1 st inflow hyd. No. = 13
English
Peak discharge = 63.99 cfs
Time interval = 1 min
2nd inflow hyd. No.= 14
Total Volume = 113,049 cult
15 - Combine - 2 Yr - Qp = 63.99 cfs
s0 -
Hyd. 13
60 —
CY 40 I
/ Hyd. 14
20
/ Hyd. 15
0
0 50 100 150
Time (min)
Hydrograph Plot
Hyd. No. 46
Post-Dev. Out (2-yr)
Hydrograph type = Reservoir
Storm frequency = 2 yrs
Inflow hyd. No. = 15
Max. Elevation = 730.29 ft
Storage Indication method used
English
Peak discharge = 18.03 cfs
Time interval = 1 min
Reservoir name = North Basin
Max. Storage = 37,142-cuft
Total Volume = 113,049 cult
46 - Reservoir - 2 Yr - Qp = 18.03 cfs
80
60 ___ / Hyd. 15
Cf
40
20
/ Hyd. 46
0
0.0 0.5 1.0 1.5 2.0 2.5
Time (hrs)
Hydrograph Plot
Hyd. No. 46
Post-Dev. Out (2-yr)
Hydrograph type = Reservoir
Storm frequency = 2 yrs
Inflow hyd. No. = 15
Max. Elevation = 730.29 ft
storage Indication method used.
Peak discharge
Time interval
Reservoir name
Max. Storage
English
= 18.03 cfs
= 1 min
= North Basin
= 37,142-cult
Total Volume = 113,049 cult
46 - Reservoir - 2 Yr - Max. El. = 730.29 ft
731.0
730.3 - —
729.5 —
a�
w 728.8
728.0-/
727.3
0.0 0.5 1.0 1.5 2.0 2.5
Time (hrs)
Hydrograph Plot
Hyd. No. 22
Pre-Dev. In (10-yr)
Hydrograph type = Combine
Storm frequency = 10 yrs
1st inflow hyd. No. = 20
English
Peak discharge = 50.92 cfs
Time interval = 1 min
2nd inflow hyd. No.= 21
Total Volume = 158,890 cult
22 - Combine - 10 Yr - Qp = 50.92 cfs
60
50- Hyd. 20
40 —
U 30
CY / Hyd. 21
20 OF
10
/ Hyd. 22
0
0.0 0.5 1.0 1.5 2.0 2.5
Time (hrs)
Hydrograph Plot
Hyd. No. 23
Post-Dev. On -site Undet. (10-yr)
Hydrograph type
= Rational
Storm frequency
= 10 yrs
Drainage area
= 4.0 ac
Intensity
= 4.65 in
I-D-F Curve
= Frederick Co..IDF
English
Peak discharge = 7.06 cfs
Time interval = 1 min
Runoff coeff. = 0.38
Time of conc. (Tc) = 14 min-
Reced. limb factor = 1
Total Volume = 5,933 cuft
23 - Rational - 10 Yr - Qp = 7.06 cfs
8
6 A-
4- / Hyd. 23
CY
2
0
0 5 10 15 20 25 30
Time (min)
Hydrograph Plot
Hyd. No. 30
Post-Dev. Det. (10-yr)
Hydrograph type = Combine
Storm frequency = 10 yrs
1 st inflow hyd. No. = 28
English
Peak discharge = 89.67 cfs
Time interval = 1 min
2nd inflow hyd. No.= 29
Total Volume = 161,977 cuft
30 - Combine - 10 Yr - Qp = 89.67 cfs
100
80 Hyd. 28
60 —
CY / 40 Hyd. 29
20
/ Hyd. 30
0
0 50 100 150
Time (min)
Hydrograph Plot
Hyd. No. 47
Post-Dev. Out (10-yr)
Hydrograph type = Reservoir
Storm frequency = 10 yrs
Inflow hyd. No. = 30
Max. Elevation = 730.76 ft
Storage Indication method used.
English
Peak discharge = 23.97 cfs
Time interval = 1 min
Reservoir name = North Basin
Max. Storage = 56,324_cuft
Total Volume = 161,977 cuft
47 - Reservoir - 10 Yr - Qp = 23.97 cfs
100
80 — / Hyd. 30
N 60 —
U
40
20 t`
/ Hyd. 47
op
0.0 0.5 1.0 1.5 2.0 2.5 3.0
Time (hrs)
Hydrograph Plot
'
English
Hyd. No. 47
Post-Dev. Out (10-yr)
Hydrograph type = Reservoir Peak discharge = 23.97 cfs
'
Storm frequency = 10 yrs
Inflow hyd. No. = 30
Time interval = 1 min
Reservoir name = North Basin
Max. Elevation = 730.76 ft
Max. Storage = 56,324-_cult
Storage Indication mothod used.
Total Volume = 161,977 cult
'
47
- Reservoir
-
10 Yr -
Max. El.
= 730.76
ft
731.0
—
730.3
$ 729.5
a�
w 728.8
—
728.0
727.3
'
0.0
0.5
1.0
1.5
2.0
2.5
3.0
Time
(hrs)
Hydrograph Plot
Hyd. No. 37
Pre-Dev. In (25-yr)
Hydrograph type = Combine
Storm frequency = 25 yrs
1 st inflow hyd. No. = 35
English
Peak discharge = 59.15 cfs
Time interval = 1 min
2nd inflow hyd. No.= 36
Total Volume = 184,421 cuft
37 -
Combine
- 25
Yr - Qp
= 59.15
cfs
60
50
—
-
/ Hyd. 35
40
30
Cf
/Hyd. 36
20
10
/ Hyd. 37
0
0.0
0.5
1.0
1.5
2.0
2.5
Time
(hrs)
Hydrograph
Plot
I'
English
Hyd. No. 38
'
Post-Dev. On -site Undet. (25-yr)
Hydrograph type
= Rational
Peak discharge =
8.20 cfs
'
Storm frequency
= 25 yrs
Time interval =
1 min
Drainage area
= 4.0 ac
Runoff coeff. =
0.38
Intensity
= 5.39 in
Time of conc. (Tc) =
14 min-
'
I-D-F Curve
= Frederick Co..IDF
Reced. limb factor =
1
Total
Volume = 6,887 cuft
■
■
38 - Rational
- 25 Yr - Qp = 8.20 cfs
10
8
'
N 6
—
/
Hyd. 38
Ci
4
— —
04
2'/
0
'
0
5 10
15 20 25 30
Time (min)
1
Hydrograph Plot
Hyd. No. 45
Post-Dev. Det. (25-yr)
Hydrograph type = Combine
Storm frequency = 25 yrs
1 st inflow hyd. No. = 43
English
Peak discharge = 104.07 cfs
Time interval = 1 min
2nd inflow hyd. No.= 44
Total Volume = 187,878 cult
45 - Combine - 25 Yr - Qp = 104.07 cfs
150 —
Hyd. 43
100
U
a / Hyd. 44
5
/ 0 Hyd. 45
0 50 100 150
Time (min)
Hydrograph Plot
Hyd. No. 48
Post-Dev. Out (25-yr)
Hydrograph type = Reservoir
Storm frequency = 25 yrs
Inflow hyd. No. = 45
Max. Elevation = 731.00 ft
Storage Indication method used.
English
Peak discharge
= 28.64 cfs
Time interval
= 1 min
Reservoir name
= North Basin
Max. Storage
= 66,275-cult
Total Volume = 187,878 cult
48 - Reservoir - 25 Yr - Qp = 28.64 cfs
150 —
/ Hyd. 45
100
Cf
50
00"/ Hyd. 48
0
0.0 0.5 1.0 1.5 2.0 2.5 3.0
Time (hrs)
Hydrograph Plot
Hyd. No. 48
Post-Dev. Out (25-yr)
Hydrograph type = Reservoir
Storm frequency = 25 yrs
Inflow hyd. No. = 45
Max. Elevation = 731.00 ft
Storage Indication method used.
Peak discharge
Time interval
Reservoir name
Max. Storage
English
= 28.64 cfs
= 1 min
= North Basin
= 66,275 -cult
Total Volume = 187,878 cult
48 - Reservoir - 25 Yr - Max. El. = 731.00 ft
731.0 —
730.3
729.5
a�
W 728.8 -
728.0
727.3
0.0 0.5 1.0 1.5 2.0 2.5 3.0
Time (hrs)
North Basin
8 —
6
0) 4
CO
2
0
0 100000 200000 300000 400000
Storage (cuft)
� I
� I
I I
� I
I I
I I
I I
Reservoir Report
Page 1
Reservoir No. 1 - North Basin English
Pond Data
Pond storage is based on known contour areas
Stage / Storage Table
Stage
Elevation
ft
ft
0.00
727.25
0.75
728.00
1.75
729.00
2.75
730.00
3.75
731.00
4.75
732.00
5.75
733.00
6.75
734.00
Contour area Incr. Storage Total storage
sqft cult cult
00
0
0
500
188
188
10,700
5,600
5,788
27,850
19,275
25,063
54,800
41,325
66,388
75,900
65,350
131,738
97,500
86,700
218,438
110,500
104,000
322,438
Culvert / Orifice Structures
[A] [B] [C] [D]
Rise in
= 48.0
24.0
15.0
0.0
Span in
= 48.0
24.0
15.0
0.0
No. Barrels
= 1
1
4
0
Invert El. ft
= 727.25
727.25
730.20 0.00
Length ft
= 40.0
0.0
0.0
0.0
Slope %
= 0.80
0.00
0.00
0.00
N-Value
= .013
.013
.013
.000
Orif. Coeff.
= 0.60
0.60
0.60
0.00
Multi -Stage
= ----
Yes
Yes
No
Weir Structures
[A] [B] [C] [D]
Crest Len ft
= 15.7
20.0
0.0
0.0
Crest El. ft
= 732.50
734.50
0.00
0.00
Weir Coeff.
= 3.00
3.00
0.00
0.00
Eqn. Exp.
= 1.50
1.50
0.00
0.00
Multi -Stage
= Yes
No
No
No
Tailwater Elevation = 0.00 ft
Note: All outflows have been analyzed under inlet and outlet control.
Stage / Storage / Discharge
Table
Stage
Storage
Elevation
Civ A
Clv B
Clv C
Clv D Wr A
Wr B Wr C
Wr D Discharge
ft
cuft
ft
cfs
cfs
cfs
cfs cfs
cfs cfs
cfs cfs
0.00
0
727.25
0.00
0.00
0.00
--- 0.00
0.00 ---
--- 0.00
0.75
188
728.00
4.92
2.68
0.00
--- 0.00
0.00 ---
--- 2.68
1.75
5,788
729.00
18.51
10.84
0.00
--- 0.00
0.00 ---
--- 10.84
2.75
25,063
730.00
32.68
16.63
0.00
--- 0.00
0.00 ---
--- 16.63
3.75
66,388
731.00
43.30
18.32
10.37
--- 0.00
0.00 ---
--- 28.69
4.75
131,738
732.00
80.09
16.98
25.62
--- 0.00
0.00 ---
--- 42.59
5.75
218,438
733.00
111.40
18.47
28.87
--- 16.66
0.00 ---
--- 64.01
6.75
322,438
734.00
131.85
13.77
21.51
--- 86.58
0.00 ---
--- 121.86
:,.FTC'•, ...' •�
1 i
�WIM.512WI -IN o R MM
Department of Planning and Development
540/665-5651
FAX: 540/665-6395
August 14, 2006
Mr. Dennie Dunlap
Triad Engineering
200 Aviation Drive
Winchester, Virginia 22602
Re: Voiding of Site Plan #06-02; Kernstown Crossing Veterina►y Clinic
Property Identification Number (PIN): 63-A-86C
Dear Dennie:
This correspondence is to inform you that we are voiding the above referenced application from our
system. This site plan was officially submitted in February of 2002 and has been inactive since July
of 2002. Also, since the above referenced property is no longer owned by the parties that submitted
the site plan, this plan is invalid.
If you have any questions or concerns please contact me.
Sincerely,
Candice E. Perkins
Planner II
CEP/blhd
107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000
COUNTY of FREDERICK
Department of Planning and Development
540/665-5651
FAX: 540/665-6395
July 30, 2002
Mr. John Garber
Triad Engineering, hic.
971 Acorn Drive
Harrisonburg, Virginia 22802
RE: Review Comments for Site Plan 406-02, Kernstown Crossing
Property Identification Number (PIN): 63-A-86C
Dear Mr. Garber:
Thank you for the revised site plan of the above -referenced project. I have reviewed the plan, and offer
the following continents:
Caliper of Deciduous Trees. Please state what the caliper of the Hedge Maples Trees will be at
the time of planting. You have shown that the Iedge Maples will be planted between five (5) and
six (6) feet tall; however, all deciduous trees must be at least 2 inches caliper.
Paddock. Please remove the language "(not roofed)" from the paddock area. As discussed
previously, all animals must be kept within a filly enclosed structure.
Signature. Please remember to sign and seal the final copies of the site plan.
Please prepare a revision ofthis site plan, which adequately addresses all comments, and submit one copy
for my second review. Once all of the above issues are adequately addressed, and all other agency
comments addressed, the site plan should be ready for approval. Approved comment sheets are still
required from the following, agencies: the Virginia Department of Transportation (VDOT), the
Inspections Departrrrent, the Frederick County Fire Marshal, the Frederick County Health Department,
and the Frederick County Sanitation Authority.
Please do not hesitate to contact me, if you have any questions or concerns regarding this letter.
Sincerely,
Jeremy F. Camp - Planner II
JFC/kac
U: Uerenrn.Gre Non Rei,002002WOVS101in Crnssingl3RcrieuCnnnnenisSP;!0602.xy)d
107 North Kent Street - Winchester, Virginia 22601-5000
4..- i k
• . ' 7"1,
COUNTY of FREDERICK
Department of Planning and Development
5401665-5651
FAX: 540/665-6395
May 8, 2002
Mr. John Garber
Triad Engineering, Inc.
971 Acorn Drive
Harrisonburg, Virginia 22802
RE: 2nd Review Comments for Site Plan #06-02, Kernstown Crossing
Property Identification Number (PIN): 63-A-86C
Dear Mr. Garber:
In order to clarify what is required, the Department of Planning and Development is adding the review
comment shown below to the list that was provided to you on March 6, 2002. Please make note of this
comment and prepare an appropriate revision of the site plan.
Review Comments:
Category A Buffer. A Category A buffer is required against all property lines which adjoin
property zoned M2. A Category A buffer requires 50 feet of distance. Since the kennel runs are
required to be indoors, they cannot be in the 25-foot inactive or the 25-foot active portion of the
required buffer. The equine facility/apartment must also be moved outside of this buffer.
Please prepare a revision of this site plan, which adequately addresses all comments, and submit one copy
for my re -review. Once all of the above issues are adequately addressed, and all other agency comments
addressed, the site plan should be ready for approval. Approved comment sheets are required from the
following agencies: the Virginia Department of Transportation (VDOT), the Inspections Department,
the Frederick County Engineer (Public Works), the Frederick County Fire Marshal, the Frederick
County Health Department, and the Frederick County Sanitation Authority.
Please do not hesitate to contact me, if you have any questions or concerns regarding this letter.
Sincerely,
Jeremy F. Camp - Planner II
JFC/kae
U: Jereniv Suc Plan Rmew 2002'Kenaunrn Crossing; 21n[IRcI'ne14'Conn/nenlsSP'.06_02.elnl
107 North Kent Street • Winchester, Virginia 22601-5000
LETTER O F T * N S M 1 T T A L
0
971 Acorn Drive
L 11A'' D!
Harrisonburg, VA 22802
INC.(540) 434-4 935
TRIAD ENGINEERING, (540) 434-5849 fax
Geotechnical, Civil, Environmental, office@triadenglneering.net
Construction Consultants, Land
Planning and Landscape Architecture
To
Re.
Department of Planning and Development Date: 07-09-02
107 North Kent Street
Winchester, VA 22601
Request for Site Plan Comments
Attention : Jeremy Camp
Job No.: CD-047
WE ARE SENDING YOU ❑ Attached ❑ Under separate cover via
❑ Shop Drawings ❑ Prints
❑ Copy of letter ❑ Change Order
the following items
CI Plans ❑ Samples ❑ Specifications
COPIES
DATED
NUMBER
DESCRIPTION
1
07-03-02
C-1:C-9
Kernstown Crossing Plans
1
07-03-02
Engineering Report
1
07-03-02
Comment Response Letter
THESE ARE TRANSMITTED as checked below:
❑ For Approval ❑ Approved as submitted ❑ Resubmit copies for approval
❑ Samples ❑ Approved as noted ❑ Submit copies for distribution
❑ As Requested ❑ Returned for corrections ❑ Submit copies for distribution
• For review and comment ❑
❑ FOR BIDS DUE: ❑ PRINTS RETURNED AFTER LOAN TO US
REMARKS:
J U L 1 1002
COPY TO : IAN'
i
SIGNED
If enclosures are not as noted, Ifindly notify us at orale
u
RIADENGINEERING
971 Acorn Drive, Harrisonburg, Virginia 22802 540.434,4135 tel540.434,5841 fax offlce@triadengineering.net a -mail
3 July 2002
Mr. Jeremy F. Camp, Planner II
Department of Planning and Development
107 North Kent Street
Winchester, VA 22601-5000
RE: Site Plan #06-02, Kernstown Crossing
Triad Engineering, Lic.
Triad # CD047
Dear Mr. Camp:
The following are an itemized list of our responses to the review comments received from Frederick County
agencies. To date, we have received approval of this project from Parks and Recreation and the Health
Department. Upon receipt of all approval sheets, I will forward an additional copy of the site plan with
appropriate approvals to you.
FREDERICK COUNTY DEPARTMENT OF PLANNING AND DEVELOPMENT
1. Proposed extension of Hood Way: All information regarding the extension of Hood 1Vay has been removed
from the plans following conversations with HP hood and VDOT.
2. Hood facility entrance: As #1 above.
3. Required front setback: Corrected on sheets C-4 and others.
4. VDOT blockade: As #1 above.
5. Approval box: Corrected on sheet C-1.
6. Proposed dwellings: Notes regarding proposed dwellings have been added to sheet C-4. 'There are
proposed apartments over• the central vet facility and the equine facility. Both are to be occupied by staff,
as the proposed facility will offer 24-hour emergency vet services.
7. Magisterial district: Correction made to sheet C-1 and Sheet C-4.
S. Owner's phone number: Added to sheet C-1.
9. Entrance loop: One-way entrance and exit is proposed. Changes to entrance dimensions have been made
in accordance with verbal instructions from VDOT. One-way signs have been added. "Fire Lane -No
Parking " signs have also been added.
10. Landscape plan: New sheet C-6 has been added as a landscape plan.
11. "No animals permitted outdoors": Detailed plans to be provided by architect. However, all animals are
fully contained. Note added to sheet C-4.
12. Utilities: Electric added to sheet C-4. Note regarding underground placentent added to sheet C-4.
13. Signs: Continent added to sheet C-4.
FREDERICK COUNTY DEPARTIMENT OF PUBLIC WORKS (W&S)
1. Phone number for owner: Added to sheet C-1.
2. FCSA construction notes: Added to sheet C-2.
3. Show existing water and sewer easements on I-IP Hood: Added to sheets C-3 and C-4.
4. Modify note on existing waterline: Added to sheets C-3 and C-4.
5. Modify note on existing sanitary sewer: Added to sheets C-3 and C-4.
6. Easement on new hydrant: Easement on new hydrant now extends 10' past c•enterpohtt of lrydrant shown on
sheet C-4.
7. Change new sanitary sewer to 6": Change made on sheet C-4.
S. Remove gate valve at hydrant: Change made on sheet C-4.
Civil, Geotechnical, Environmental,
Construction and Landscape
Architect Consultants
9. Remove gate valve at wet tap: Change made on sheet C-4.
10. Need profile on sanitary lateral: New sheet C-7 includes this information.
11. Need profile on water lateral: New sheet C-7 includes this information.
12. Private easement required to fire hydrant: Easement in process. Note added to sheet C-4.
13. Remove dual meter element of detail: Change made to sheet C-8.
FREDERICK COUNTY FIRE MARSHALL:
1. Change to signs: Signs on sheet C-4 now read "lire Lune No Parking
2. Access to back of building: Per conversation on 516, this comment met by relocating fire hydrant.
3. Additional hydrant to access training facility: Per conversation on 516, this comment met by lowering
n•ainirtg facility footprint and consu•uctirtg with 2-hour septeration. Fire wall will2 liour protection.
Constructiant type will be 3B. See detailed building plans frann architect.
4. Proposed hydrant within 300' of vet facility: Hydrant has been moved. Hy(b-am is 3 ' front edge of curb,
40' (mi)7) f •onn building, and 300' (nnax) ft•onn any point in the training facility or vet facility.
FREDERICK COUNTY DEPARTMENT OF PUBLIC WORKS (E&S)
1. Provide "Responsible Land Disturber" title block. Added to sheet C-1.
2. Place note on plan requiring land disturbance permit. This note has been added to sheet C-5.
3. Change details for culvert and inlet protection. Details on sheet C-7 have been changed. Gravel filters are
now specifier/.
FREDERICK COUNTY INSPECTIONS OFFICE
1. Building additions shall comply with VA USBC and BOCA: Noted on sheet C-4.
2. Max 2% slope on handicapped parking and unloading. Mark egress on plan: nb1ax slope at handicapped
parking is 2%. Nlain egress shown on sheet C-4 and others.
3. Table 503 of BOCA requirements: Noted on sheet C-4,
4. Architect shall be licensed in Virginia: Noted on sheet C-4.
If you have any questions or comments, please do not hesitate to contact me at 540.434.4135.
Cordially,
Triad Engincen g, Inc.
l�.
Jonathan Garber
Staff Engineer
Civil, Geotechnical, Environmental,
Construction and Landscape
Architect Consultants
COUNTY of FREDERICK
Department of Planning and Development
540/665-5651
FAY: 540/665-6395
March 6, 2002
Mr. John Garber
Triad Engineering, Inc.
971 Acorn Drive
Harrisonburg, Virginia 22802
RE: Review Comments for Site Plan W-02, Kernstown Crossing
Property Identification Numbers (PIN): 63-A-86C
Dear Mr. Garber:
I have had the opportunity to review the site plan that you prepared for the proposed veterinary facility named,
Kernstown Crossing, and I offer the following comments:
Review Comments
1) Proposed Extension of Hood Way. It is my understanding that the proposed extension of Hood Way is not
planned to be constructed with this project. With this being the case, please provide a narrative on the site
plan which explains the intent of the future road extension that is shown. Furthermore, please distinguish
the future extension from what is being proposed during Phase One of the development. I could easily look
at the plan as it is today and require that the owner construct the road extension prior to occupancy.
2) Hood Facility Entrance. If possible, show the future entrance and driveway for the Hood Facility after the
future road is constructed. Otherwise, please provide a statement to the effect that a site plan shall be
submitted for review and approval for the future road extension prior to construction.
3) Required Front Setback. You have labeled the front setback as 50 feet, but have drawn it at 35 feet from
the front property line. Please make the necessary changes to correct this discrepancy. The required front
setback for a B2 property is 50 feet, when adjoining a primary or arterial highway, and 35 feet when
adjoining a minor or collector street.
4) VDOT Blockade. I suggest that you show a blockade acceptable to VDOT at the end of the proposed
extension of Hood Way.
5) Approval Box. Please provide a space for the Zoning Administrator's Signature and approval date.
Remove the space for the Planning Director from the site plan.
6) Proposed Dwellings. Please show the location of all proposed dwellings. Furthermore, please provide a
statement to the effect that the residents of the dwellings must be directly associated with the on -site
business, such as an employee.
7) Magisterial District. The Magisterial Districts were changed this past year. The subject property is now
within the Shawnee Magisterial District. Please make the necessary changes.
107 North Kent Street • Winchester, Virginia 22601-5000
Page 2
Review Comments for Site Plan 906-02
Mr. John Garber
March 6, 2002
8) Owner's Phone Number. Please provide a phone number for the owner on the site plan.
9) Entrance Loop. The proposed loop entrance to the property may prompt people to park directly in the
driveway for short periods of time. If this is the intent, please provide a loading area in front of the
building for this purpose. Otherwise, please provide striped no -parking lanes in front of the entrance to
the building. You should also provide measures to prevent vehicles from entering the incorrect entrance,
if you are proposing a one-way entrance and exit.
10) Landscape Plan. Please provide a landscape plan which meets all requirements of the Frederick County
Zoning Ordinance. This would include perimeter landscaping, interior landscaping, parking lot
landscaping calculations, open space calculations, and details for all other proposed landscaping. The
landscape plan should also provide the species of trees and shrubs to be used, the diameter of all trees at
the time of planting, and the location of all trees and shrubs.
11) No Animals Permitted Outdoors. The Zoning Ordinance requires that all animals be kept indoors within
the B2 Zoning District for veterinary offices and other related animal speciality services. The outdoor,
kennel runs are not permitted unless they are fully enclosed and part ofthe primary structure. Please make
all necessary changes.
12) Utilities. Please show the location of the proposed electric connection and utilities. In addition, provide
a statement to the effect that all proposed utilities will be located underground.
13) Signs. Please provide a statement to the effect that all future signs are required to be permitted through
the Department of Building Inspections prior to installation.
Please prepare a revision of this site plan, which adequately addresses all of the above comments, and submit one
copy for my re -review. I am providing you with a red -lined copy of the site plan to assist you in preparing a
revision. Once all of the above issues are adequately addressed, and all other agency comments addressed, the site
plan should be ready for approval. Approved comment sheets are required from the following agencies: the
Virginia Department of Transportation (VDOT), the Inspections Department, the Frederick County Engineer
(Public Works), the Frederick County F ire Marshal, the Frederick County Health Department, and the Frederick
County Sanitation Authority.
Please do not hesitate to contact me, if you have any questions or concerns regarding this letter.
Sincerely,
Je/my'�F/Camp - Planner II
JFC/kae
Enclosure
U:Veremy6Site Plan RaWew 2002Wiernstown CrossingV2eviu%CommentiSPiIO6_02.wpd
1 � �OVSyN
I -�`J ostEb S�o�
II
LOT 3
THE ESTATE OF
LOT 2 �I NAOMI POOLE ADAMS
THE ESTATE OF i 935/739 I
\ NAOMI POOLE ADAMS
-82YE I 935/739 zl
f
582 3
vIERCIAL
— I I
TER
=SMT..II I I
EX, 21'
l WATERLINE ESMT.
II 923/1171
PK AIL
N57'38'40"W
15.78'
N33'08'27"E
45.45'
N34'42'53"E
29.46'
NAIL FOUND ----
IN CONC.
I �
j1$TING
. i
77.32'
I
I �
I
m
_�
{
S i S34 42 58"W _
IRF S34'42'S8"W — &_ — — — •' — —
295�' — IRF
- 7(
120 SAN. SEW. ESMT. - - — — SET&4CK .
II (F.C.SA) FUTURE 75' BUILDING
II I I Il I I I ICI Irl I I I 1 U I 1 I I I I� I_I I I I I V I 1 I I
IIIIly � Illtlll'l n IIIII IIIII II,I n ,I I1111I
I �\
i101 �C/L NORTHERN VA Fi' H I-H+11+1 I-ti'i I -I 11POWERCO.R1I UII I IIIJJI231/90 I I
0
{ {
{
\ POTOMACNEDISON CO.
63-A-81
746/543
USE: COMMERCIAL
10' TEMP.
AIL FOUND rCONSTRUCTION ESMT.
IN CONC. /ICJ 923/1171 FUTURE 20' WATER OH FOUNI
rAND SAN. SEW. ESMT. IN ROCK
r. ,An• 0R"T7 d
Ply zo
BOUNDARY LINE TO
EXISTING ALLEGHENY POWER HEDGE MAPLE
� f
�
2. 10 I ��5 2 t� v✓i
a r� .
p r (� 5e'
PROPOSED 10' SPREADING
LANDSCAPING EASEMENT
ENGLISH YEW
CRANBERRY
COTON EASTER
m @
Qm mQ
0
0
0
0
i
EDGE OF PROPOSED BUILDING AUSTRIAN
PINE DWARF ALBERTA SPRUCE
CD-047 Kernstown Crossing
Frederick County, VA
S c c l e. 1" —
1 0' UVAD PLATE NO.
Triad Engineering, Inc. 1
L E T T E R ❑ F TOA N S M I TTAL
•
.. 971 ,Acorn Drive i: Harrisonburg, VA 22802
TRIAD ENGINEERING, INC. (540) 434-4135
(540) 434-584 f fax
Geotechnical, Civil, Environmental, office@triadengineering.net
Construction Consultants, Land
Planning and Landscape Architecture
To : Department of Planning and Development Date : 07-09-02
107 North Kent Street Attention : Jeremy Camp
Winchester, VA 22601 Job No.: CD-07-02-0055
Re: Request for Site Plan Comments
WE ARE SENDING YOU ❑ Attached ❑ Under separate cover via
❑ Shop Drawings ❑ Prints 0 Plans
❑ Copy of letter ❑ Change Order ❑
❑ Samples
the following items
❑ Specifications
COPIES
DATED
NUMBER
DESCRIPTION
2
07-09-02
C-1:C-3
Airport Warehousing Construction Plans
1
Request for Site Plan Comments
1
Submittal Letter
THESE ARE TRANSMITTED as checked below:
❑ For Approval
❑ Samples
❑ As Requested
0 For review and comment
❑ FOR BIDS DUE:
REMARKS:
❑ Approved as submitted ❑ Resubmit
❑ Approved as noted ❑ Submit _
❑ Returned for corrections ❑ Submit
❑ PRINTS RETURNED AFTER LOAN TO US
SIGNED:
copies for approval
copies for distribution
copies for distribution
JUL 1 0 2002
DEPT. OFPiAiNN1NG,,[) .vtl.i'r'%iENT
if enclosures are not as noted, kindly notify us at once
Request For Site Plan Comments
Department of Planning and Development
CIL
Mail to: Hand deliver to: JUL ! 1•U01
Department of Planning and Development 107 N. Kent Street
Attn: County Planner Fourth Floor
107 North Kent Street Winchester, -VA
Winchester, VA 22601 (540) 665-5651
(540) 665-5651
Please fill out the information as accurately as possible in order to assist the agency with their
review.
Applicant's Name:, Triad Engineering, Inc. for Kernstown Crossing
Address: 971 Acorn Drive
Harrisonburg, VA 22802
Phone Number: 540.434.4135
Name of development and/or description of the request:
Location of property:
Kernstown Crossing
Hood Way at US 11 in Kernstown
Planning and Development's Comments:
16
2,J
Request For Site Plan Comments
Frederick County Engineering Department
Mail to:
Frederick County Engineering Dept.-
Attn: Director of Engineering
107 North Kent Street
Winchester, VA 22601
(540) 665-5643
Hand deliver to:
107 N. Kent Street
Fourth Floor
Winchester, -'VA
(540) 665-5643
Please fill out the information as accurately as possible in order to assist the agency with their
review.
:Applicant's Name:. Triad Engineering, Inc. for Kernstown Crossing
Address:. 971 Acorn Drive
Harrisonburg, VA 22802
Phone Number: 540.434.4135
Name of development and/or description of the request: Kernstown Crossing
Engineering Department's Comments: Hood way at U5 11 in Kernstown
18
05/23/02 TIIU 15:20 FAX 540 4345841
0
a 001
FACSIMILE TRANSMITTAL
971 Acorn Orive
Harrisonburg, VA
Y- ZZOO 1
(v" 40) 434-413M
TRIAD ENGINEERING, INC. (S4O) 434-5841 fax
Civil, Survey, Geotechnical, Environmental, office@triadengineering.net
Construction Consultants, Land Planning and
Landscape Architecture Consultants
To: Jeremy Camp
Fax: (540) 665-6395
From: Jon Garber
Pages: 3 (including cover)
Phone: (540) 665-5651 Date: 05/23/02
Re: Buffer Category "A" CC:
❑ Urgent ❑ For Review ❑ Please Comment ❑ Please Reply ❑ As Requested
e Comments:
05/23/02 THU 15: 20 FAX 540 4345841 Ia 002
11.0. Box 1448
Harrisonburg, VA 22803
Phone: 540-4344135
Fax: 540-434-5841
Department of Planning and Zoning
Frederick County, Virginia
May 23, 2002
Re: Buffer Category "A"
To Whom It May Concern:
Triad Engineering is pleased to provide public comment regarding the interpretation of Frederick
County Code Section 165-37 "Buffer and Screening Requirements".
There has been some uncertainty regarding the most appropriate interpretation of the
requirements of Buffer Category "A" as described in Table (a) of subsection D.1. As noted on
this table Full Screen and Landscape Screen requirements are described by dashes ("-"), and No
Screen is described as having a total of 50 feet of buffer.
Triad interprets the dashes in Full Screen and Landscape Screen to be equivalent to 0 feet of
buffer distance based on the following observations:
1. Section 165-37.B.(1) explicitly states "The higher the level of screening provided, the
lower the level of distance buffer required". If No Screen has a distance requirement of
50 feet, then higher levels of screening must, as noted by the above section of ordinance,
have lower distance requirements.
2. Table (b) of subsection D gives buffer requirements between zoning categories. This
table clearly uses the dash symbol to indicate "not required". i.e. there is no buffer
requirement between two RP -zoned sites.
These points combine to clearly and without bias establish the meaning of the dash to be "0" or
"not required".
There are additional considerations that may be derived from the apparent intent of the
ordinance. A particular applicant, Kernstown Crossing, is required to provide Category A buffer
between a B-2 development and existing M-1 sites. This applicant proposes a Landscape Screen
in accordance with 165-37.B.(1), and in fact the proposed screen exceeds the minimum
requirements of this section of the ordinance. This screen will not only separate the new facility
from the existing M-1 lots, it will lower the energy required to heat and cool the applicant`s
building, it will slow storm water runoff, and it will provide visual relief in the context of the
larger industrial park —all appropriate goals in tine with the intent of the ordinance. Requiring a
minimum of 50 feet of distance buffer in all Category "A" situations removes any impetus on the
part of a developer to incur additional landscaping costs, and this is apparently contrary to the
larger goals of Frederick County. Accepting reduced or eliminated buffer distances in the Full
Screen or Landscaped Screen types encourages the establishment of "green strips", thereby
lowering the impact of development on the overall environment.
Triad Engineering, Inc.
Morgantown • St. Albans Winchester • Harrisonburg
West Virginia Virginia
05/23/02 TIIU 15:20 FAX 540 4345841 Ia003
In summary, Triad believes that interpreting the dashes in Table (a) of Section 165-37.D.(1) to be
"0" or "not required" is both accurate and appropriate, and we urge Frederick County
Department of Planning and Development to do so.
Very Sincerely,
�4JV�
Jonathan Garber
Project Engineer
Triad Engineering
0 .0
SITE PLAN APPLICATION
1.
Project Title:
KERNSTOWN CROSSING
2.
Location of Property
Hoodway at US 11
(street address)
Winchester, VA 22602
3.
Property Owner:
Estate of Naomi Poole Adams
Address:
5223 12th Street North
Arlington, VA 22205
Telephone:
540.667.1266
4.
Applicant/Agent
Kernstown Crossing
Address
P.O. Box 220
Stephenson, VA 22658
Contact: Cheryl Anderson
Telephone:
540.636.0291
5.
Designer:
Triad Engineering, Inc.
Address:
971 Acorn Drive
Harrisonburg, VA 22802
Telephone:
540.434.4135
Contact:
Jon Garber
6
s
6. Is this an original or revised site plan? Original X Revised
7a.
Total acreage of parcel to be developed:
4.245
7b.
Total acreage of parcel:
4.245 "
8.
Property Information:
a)
Property Identification Number:
63-A-86C
b)
Current Zoning:
B-2
c)
Present Use:
Vacant.
d)
Proposed Use:
Full Service.Veterinary & Kennel
e)
Adjoining Property Use(s)
Industrial/Vacant/Residential
f)
Adjoining Property Identification Number(s)
see attached
g)
Magisterial District(s)
Back Creek
I have read the material included in this package and understand what is required by the
Frederick County Planning Department. I also- understand that all required material will be
complete prior to,the submission of my site plan.
Signature: 4w,_1_V/�
Date:
7
DEPT, OF P'.-,� �!^'�^�r �r���1FI OPMFlv11'
d
•
Adjoining Property Owners Rezoning
For the purpose of this application, adjoining property is any property abutting the requested
property on the side or rear or any property directly across a public right-of-way, a private
right-of-way, or a watercourse from the requested property.
Name and Property Identification Number
Address
Name: Schenk Foods Company, Inc.
P.O. Box 2398
Winchester, VA 22604
Property 9 63-A-67
Name: Schenk Foods Company, Inc.
P.O. Box 2298
Winchester, VA 22604
Property 11 63-A-68
Name: Schenk Foods Company, Inc.
P.O. Box 2298
Winchester, VA 22604
Property 11 63-A-69
Name: William 1-1. (Jr.) and Barbara W. Black
220 Clayhill Drive
Winchester, VA 22602
Property 11 63-A-70
Name: Edgar C. and Lucy M. Baker
3514 Valley Pike
Winchester, VA 22602
Property 11 63-A-71
Name: Kenneth W. Turner
3510 Valley Pike
Winchester, VA 22602
Property # 63-A-72
Name: Margaret D. Bloxom
113 King Lane
Winchester, VA 22602
Property 11 63-A-73
Name: Allegheny Power Company
10435 Downsville Pike
Hagerstown, MD 21740
Property 11 63-A-80
Name: Allegheny Power Company
10435 Downsville Pike
Hagerstown, MD 21740
Property 11 63-A-81
Name: Carl E. and Ann Lee Frye
P.O Box 2467
Winchester, VA 22604
Property It 63-A-82
Name: HP I lood, Inc.
90 Everett Avenue 11200
Chelsea, MA 02150
Property 11 63-A-86A
SITE PLAN CHECKLIST
The checklist below indicates all the information that needs to be submitted as part of the site plan
application. All required information must be submitted prior to the final approval of any site plan.
The Department of Planning and Development will review the application to ensure that it is complete:..,
If any portion is not included or..complete, the site plan application will not be accepted and returned:
to the applicant(s).
Site Plan Package
One set of approved comment sheets are required from the following review
agencies prior to final site plan approval. It is recommended that applicants contact
the Department of Planning and Development to determine which review agencies
are relevant to their site plan application.
A Virginia Department of Transportation (VDOT)
X Frederick County Sanitation Authority
X Department of Planning and Development
R Inspections Department
Frederick County Engineer (Public Works)
Frederick County Fire Marshal
Department of Parks and Recreation
One copy of the Site Plan application
Five Copies of the Final Site Plan for approval
One reproducible copy of the Site Plan (if required)
A 35mm slide of the Site Plan (if required)
County Health Department
City of Winchester
Town of Stephens City
Town of Middletown
Airport Authority
Soil & Water Conservation District
Request for Street Name
•
The following information must be included on your site plan. If your site plan is incomplete or
is missing information, it will not be reviewed and returned to you for revisions.
Administrative Information
Y
N
X
1.
X
2.
X
3.
X
4.
x
X
N/A
x
x
General Site Information
Y N.
X
X
X
X
X
X
X
0
91
Name of proposed development.
Name, address, and phone number of owner.
Name, address, and phone number of developer.
Name, address, and phone number of designer.
Certificate of surveyor, engineer, or architect.
Date plan prepared and date of revisions.
A listing of all conditions placed on the site as a result of a
conditional use permit or conditional zoning approval.
A space labeled "Approved by the Zoning Administrator" for
the approval signature and date of approval.
A description of setbacks or conditions placed on the site as a
result of a variance approval. (Reference the variance
application number.)
10. Location map (scale 1:2000)
11. Magisterial District
12. Scale of site plan (not to exceed 1:50)
13. North Arrow
14. Zoning of site
15. Use, zoning, and Property Identification Number (PIN#) of all
adjoining properties. This includes properties located across
right-of-ways, streams, and railroad tracks.
16. Surveyed boundaries for all lots and parcels.
9
General Site (con't
Y N
_ X
17.
Acreage of all lots included in the plan.
X
18.
The location and dimensions of all required setbacks and yard
areas.
NIA
19.
The location and type of all dwelling units.
N/A
20.
Location and description of all recreation facilities.
X
21.
Location of sidewalks and pedestrian ways.
N/A
22.
Location and area of common open space.
N/A
23.
The location, height, and dimensions of all signs.
N/A
24.
Location, height, and specifications of outdoor lighting fixtures.
N/A
25.
Location and nature of outdoor storage areas.
N/A
26.
Location of outdoor trash receptacles and dimensions of
N/A
structure (fencing, etc.) required to enclose receptacles.
Building Information
Y N
X
27.
The height of all buildings and structures.
X
28.
Location of all buildings, structures and uses.
X
29.
The proposed use of each building, structure and area.
X
30.
Ground floor area and total floor area of all buildings with FAR
calculations for commercial and industrial zoning districts.
Roads
Y N
X 31. Name and number of existing and planned streets on and
adjoining the site.
X 32. Location of existing and planned streets on and adjoining the
site.
X 33. Posted speed limit of existing adjacent roads.
X 34. Location and dimensions of all proposed entrances from public
right-of-ways.
I
N/A 35. Location of all entrances on adjoining roads within 200 feet of the
X proposed or existing entrance.
36. Dimensions, boundaries, width, pavement, and construction of
planned roads.
Utilities
Y N
X 37. Location of all utilities, including sewer and water lines with the
size of lines, mains, and laterals.
X 38. Location and width of all easements, including access, utility,
and drainage easements.
39. Location and nature of fire lanes, fire hydrants, and all other
X facilities necessary to meet Fire Code requirements.
Parkin
Y N
X 40. Calculations describing the required number of parking and
loading spaces.
X 41. Location and dimensions of all parking and loading spaces,
driveways, parking aisles, curbing and other features to be used.
X 42. Location and dimension of all disabled parking spaces and
ramps.
Natural Features
Y N
X 43. Existing and finished contour lines.
X 44. Location of steep slopes, woodlands, floodplains, wetlands,
sinkholes, and other environmental features.
X 45. Location of streams and drainage ways.
Landscaping
Y N
N/A 46. Landscaping plan describing location and types of plants to be
used.
N/A 47. Location of required buffers and screening with cross sections or
profiles.
Erosion and Sediment Control
Y N
x 48. A stormwater management plan with run off calculations and
location and description of facilities to be used.
x 49. Soil erosion and sedimentation control plan describing the
location and methods to be used to minimize erosion and
sedimentation during development.
I
12
LETTER0
O F T R A N S I T T A L
i i � Rei 971 Acorn Drive
Harrisonburg, VA 22802
TRIAD ENGINEERING, INC. (540) 434•-4135
(540) 434-5841 fax
Geotechnical, Civil, Environmental, office@triadengineering.net
Construction Consultants, Land
Planning and Landscape Architecture
To : Department of Planning and Development Date: 2/12/02
107 North Kent Street Attention : County Planner
Winchester, VA 22601 Job No.: CD-047
Re : Request for Site Plan Comments
WE ARE SENDING YOU ❑ Attached ❑ Under separate cover via the following items
❑ Shop Drawings ❑ Prints Z Plans ❑ Samples ❑ Specifications
❑ Copy of letter ❑ Change Order ❑
COPIES
DATED
NUMBER
DESCRIPTION
2
2-08-02
C-1:C-7
Kernstown Crossing Plans
2
2-08-02
Engineering Report
1
Request for Site Plan Comments
THESE ARE TRANSMITTED as checked below:
❑ For Approval
❑ Samples
❑ As Requested
0 For review and comment
❑ FOR BIDS DUE:
REMARKS:
❑ Approved as submitted ❑ Resubmit
❑ Approved as noted ❑ Submit _
❑ Returned for corrections ❑ Submit
❑ PRINTS RETURNED AFTER, LOAN TO US
E CE
COPY TO :
2002
SIGNED:
DFPI. 0` PL',NNINGONFLOPMENT.
If enclosures are not as noted, kindly notify us at once
copies for approval
copies for distribution
copies for distribution
4 0
i�
Request For Site Plan Comments
Department of Planning and Development
Mail to:
Hand deliver to:
Department of Planning and Development
107 N. Kent Street
Attn: County Planner
Fourth Floor
107 North Kent Street
Winchester, -VA
Winchester, VA 22601
(540) 665-5651
(540) 665-5651
Please fill out the information as accurately as possible in order to assist the agency with their
review. Please attach two (2) copies of the site plan with this sheet.
Applicant's Name:.
Address:
Triad Engineering, Inc. for Kernstown Crossing
971 Acorn Drive
Harrisonburg, VA 22802
Phone Number: 540.434.4135
Name of development and/or description of the request: Kernstown Crossing
Hood Way at US 11 in Kernstown
Location of property: . .
��B1.5"Z
Planning and Development's Comments:
16
DEPT, OF PLANhllNirinrUFI OPMENT .
• •
COUNTY of I+ REDERICK
Department of Public Works
540/665-5643
FAX: 540/678-0682
August 26, 2004
Mr. Gary Oates, L.S.
N/Imitgomery Engineering Group, Inc.
180-9 Prosperity Drive
Winchester, Virginia 22602
RE: Site Plan Comments - Prosperity Properties, LLC - II
Lot 6 - Kernstom Business Park
Frederick County, Virginia
Dear Gary:
Upon review of the subject site plan, we offer no comments at this time. Therefore, we
recommend approval of the subject site plan.
JCW/rls
cc: Planning and Development]
file
A: I prasperilpprnpllcIL upul
Sincerely,
Joe C. Wilder
Deputy Director
107 North Kent Street • Winchester, Virginia 22601-5000
AUG 3 1 2004 1�
FREDERICK COU