Loading...
HomeMy WebLinkAbout13-02 Cross Junction Tower (Shared Towers, Inc.) - Gainesboro - BackfileI SITE PLATS CHECKLIST The checklist below indicates all the information that needs to be submitted as part of the site plan application. All required information must be submitted prior to the final approval of any site plan. The Department of Planning and Development will review the application to ensure that it is complete. if any portion is not included or complete, the site plan application will not be accepted and returned to the applicant(s). Site Plan Package 1. One set of approved comment sheets are required from the following review agencies prior to final site plan approval. It is recommended that applicants contact the Department of Planning and Development to determine which review agencies are relevant to their site plan application. 2. 3. 4. 5. v Virginia Department of Transportation (VDOT) ILA I ba Frederick County Sanitation Authority Department of Planning and Developmen I Inspections Department AAA ((� 11 ll Frederick County Engineer (Public Works) Frederick County Fire Marshal %\ \0- Department of Parks and Recreation One copy of the Site Plan application Five Copies of the Final Site Plan for approval One reproducible copy of the Site Plan (if required) A 35mm slide of the Site Plan (if required) County Health Department City of Winchester Town of Stephens City Town of Middletown Airport Authority W Sol & Water Conservation District Request for Street Name Date: SITE PLAN TRACKING SHEET File opened v Reference Manual updated/number assigned I'll D-base updated 3. -�t. File given to Renee' to update Application Action Summary J2 .A CLOSE OUT FILE: Approval (or denial) letter mailed to applicant/copy made for file File stamped "approved", "denied" or 'Withdrawn" Reference Manual updated D-base updated File given to Renee' for final update to Application Action Summary U `Grd\Cu m— S,te Plan rra k,ng.wpd R—s d 031W01 RECEIPT Date 002546 t Received From Address �� 1 L N V A` n For Un y.ACCOUNT HOW• AMT;r a ACCouHT fla AMT pMD rBALANCE BrKJE 0 COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 665-6395 June 4, 2002 Mr. Evan A. Wyatt Greenway Engineering 151 Windy Hill Lane Winchester, Virginia 22602 Re: Cross Junction Telecoinmunication'I'olver; Site Plan #13-02 Properly Identification Nunlbei• (PIN): 18-A-38 Dear Evan: The Frederick County Department of Planning and Development administratively approved the above - referenced plan on June 3, 2002. The site plan meets all requirenlentS for development in the RA Zoning District. Thereareno aciverseconlirients by any oftherequired reviewagencies; however, any futurecomments by these agencies shotilci be addressed promptly. Please remember to provide a copy of the access easements when they are recorded. Below is a list of the primary improvements of this development: • COnStrtlCt1011 of a 260-foot-high lattice -type U11111a1111M tCICCo111111tInicatlons tower, • Marking and lighting of the tower as required by the Winchester Regional Airport. • A 14.5-foot vertical clearance for emergency vehicle access as required by the Fire Marshal. • Construction of a six -foot -high stockade fence on the north, east, and west sides of the tower site. Additional screetung should be installed, if determined necessary by Planning Department staff to ensure facilities are not visible from adjoining properties and roadways. I all\ providing You with six copies of the approved site plan. Please forward these to the appropriate representatives. Ful1her111Ore, please advise the o1\11er that a Copy S110t1Id be kept for future reference and an appl'Oved COP)' illUSt be kept on file COIISII'llCtl011 Site 1111"OugIIOIlt the ClUCIOpillellt process. Once Site development is complete, the owim- Should contact this office to Schedule an on -site inspection. Thus is required prior to the issuance of in occupancy permit by the Department of Building Inspections. Sincerely, (&4 /4a'� Rebecca Ragsdale Planner I RAR/rsa Attaclullent cc: Sidney Reyes, Gainesboro District Supervisor em: -George J. Kriz, Gainesboro District Planning Commissioner Charles E. Triplett, Gainesboro District Planning Commissioner 11:\RebeccatSite Plans\Cell'I'o��ers',CJ:\ppro�al. cpd 107 North Kent Street • Winchester, Virginia 22601-5000 0 6 Request For Site Plan Comments Department of Planning and Develop►nenl Mail to: Department of Planning and Development Attn: County Planner 107 North Kent Street Winchester, VA 22601 (540) 665-5651 Hand deliver to: 107 North Kent Street Fourth Floor Winchester, VA (540) 665-5651. Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the site planwith this sheet. Applicant's Name: Greenway Engineering Address: 151 Wind Hill Lane, Winchester, Viranna 22602 Phone Number: (540) 662-4185 Name of development and/or description of the request: Cross Junction Unmanned Conununication Tower Location of property: Cross Junction Road Cross Junction Planning and Development's Comments: ,b) 16 • • ft\ GREENWAY ENGINEERING %47 151 Windy Hill Lane Winchester, Virginia 22602 Ajunded in 1971 T R A N S M I T T A L Project Name File No. Date Cross Junction Telecommunication Tower 3294 5/31 /02 To: FC Planning Attn: Rebecca Ragsdale Copied: From: GREENWAY ENGINEERING Phone: 540-662-4185 Fax: 540-722-9528 Renkarks: !— Urgent r- For Your Review f As You Requested r- Please Comment Message: I-Ii Rebecca, Please find attached 8 copies of the final site plan for approval. I have also attached copies of the approved comments from the Fire Marshal, Building Inspections and the Winchester Regional Airport. Please contact me when the plans are ready to pick up. Thank you for your assistance with this project! Evan I)f PT, OF PU�'i�`Ii�G!i Evuo1'MCNT Engineers Surveyors Telephone 540-662-4185 FAX 540-722-9528 greenway@visuallink.corn • Request For Site Plan Coininents Winchester Regional Airport Mail to: Winchester Regional Airport Attn: Executive Director 491 Airport Road Winchester, VA 22602 (540) 662-2422 Fax — (540) 722-9335 hand deliver to: 491 Airport Road (Route 645, off of Route 522 South) (540)662-2422 Please 1111 out the information as accurately as possible in order to assist the agency with their review. Please attacli one (1) copy of the site plan witli this sheet. Applicant's Name: Greenway Engineerin<g Address: 151 Windy Hill Lane Winchester, Virginia 22602 Phone Number: (540) 662-4185 Name of development and/or description of the request: Cross Junction Unmanned Communication Tower Location of property: Cross Junction Road, Cross Junction Wincicster Regional Airport's Comments: 25 OF 17LANNAG/i)FVELONiMENI' ,,.0 0 ,a REGIO/y� s_90 WINCHESTER REGIONAL AIRPORT SEWING THE 491 AIRPORT ROAD iOP CF VIRG.M WINCHESTER, VIRGINIA 22602 (540) 662.2422 \�HOR��� March 11, 2002 Greenway Engineering 151 Windy Hill Lane Winchester, Virginia 22602 RE: Site Plan Comments — Share Towers Cross Junction Unmanned Communication Facility CPU#18-01 Dear Sir: The Winchester Regional Airport Authority offers the following comments on the above referenced site plan as conditions to be complied with at all times: 1. Towers over 200 feet AGL are required by FAA to be lighted, for towers between 150 and 199 feet AGL, the Winchester Airport is requiring the structure to be marked and lighted in accordance with FAA Advisory Circular 70/7460-1 H, Obstruction Marking and lighting, Chapter 5. This comments is based on the review provided by our engineering firm, Delta Airport Consultants, Richmond, Virginia, and coordination with the Federal Aviation Administration Airports District Office, Washington, D.C. It has been determined that the proposed tower does not penetrate any FAR Part 77 surfaces therefore development of this site should have no impact on current or future operations at the Winchester Regional Airport. If the above referenced conditions along with any outlined in the FAA study are met, the Winchester Regional Airport Authority has no objections to the site plans. Should you have any questions or need additional information, please contact this office (430) 662-5786. Sincerely, g-( S. R. Manuel Executive Director • lex,-CEIVLD FIEB 2 a 2002 Request For Site Plan Comments Frederick County Fire Marshal Mail to: Frederick County Fire Marshal Attn: Fire Marshal 107 North Kent Street Winchester, VA 22601 (540) 665-6350 Hand deliver to: 107 North Kent Street First Floor Winchester, VA (540) 665-6350 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the site plan with this sheet. Applicant's Name: Greenway Engineering Address: 151 Windy Hill Lane, Winchester, Virginia 22602 Phone Number: (540) 662-4185 Name of development and/or description of the request: Cross Junction Unmanned Conununication Tower Location of property: Cross Junction Road, Cross .Junction Fire Marshal's Comments: 19 I Automatic Sprinkler System No Other recommendion Emergency Vehicle Access Adequate Siamese Location Not Identified Frederick County Fire and Rescue Department Office of the Fire Marshal Plan Review and Comments Control number Date received SP02-0020 2/28/02 Project Name Cross Junction Unmanned Tower Address City 151 Windy Hill Lane Winchester Type Application Tax ID Number Site Plan 18-A-38 Current Zoning RA Recommendations Automatic Fire Alarm Syste No Date reviewed Date Revised 3/1/02 Applicant Greenway Engineering State Zip Applicant Ph VA 22602 540.662.4185 Fire District 16 Requirements Hydrant Location Not Identified Roadway/Aisleway Width Adequate Rescue District 16 Election District Gainesboro Residential Sprinkler System No Fire Lane Required No Special Hazards No Emergency Vehicle Access Comments A 14.5ft verticle clearance over thewidth of the roadway is required per NFPA 299. Access Comments hlaintainence of the width and verticle clearances is required. Additional Comments Plan Approval Recommended Reviewed By Slgniture Yes Timothy L. Welsh Title • 0 Request For Site Plan Commnents Frederick County Inspections Department Mail to: Frederick County Inspections Department Attn: Building Official 107 North Kent Street Winchester, VA 2260.1 (540) 665-5650 Hand deliver to: 107 North Kent Street Fourth Floor Winchester, VA (540)665-5650 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach one (1) copy of the site plan with this slieet. Applicant's Name: Greenway Engineering Address: 151 Windv I-lill Lane, Winchester, VirLyinia 22602 Phone Number: (540) 662-4185 Name of development and/or description of the request: Cross Junction Unmanned Communication Tower Location of property: Cross .function Road, Cross .Junction Inspections Departm nt's Comments: 0119 Structure shall comply with The Virginia Uniform Statewide Building Code and Section 312, use group U (Utility and Miscellaneous) of The BOCA National Building Code/1996. Structural plans submitted for permit application shall be sealed be a Va. Licensed Design Professional. Please note the requirements in Chapter 17 Special Inspections for this type structure. GREENWAY ENGINEERING 151 Windy Hill Lane Winchester, Virginia 22602 Founded in 1971 T R A N S M I T T A L Project Name: File No.: Date: Cross Junction Telecommunication Tower 3294 5/30/ To: FC Planning Attn: Rebecca Ragsdale Copied: From: Evan Wyatt GREENWAY ENGINEERING Phone: 540-662-4185 Fax: 540-722-9528 Remarks: 1-- Urgent r- For Your Review r As You Requested F- Please Comment Message: Hi Rebecca, Please find attached one copy of the final site plan for the Cross Junction Tower. This is the final tower site plan from the four CUPS that were approved by the County. I made all revisions from your previous continent letter to David Frank. Please contact me if you have any questions regarding the revisions on this plan. Thank you for your assistance, Evan MAY 0 200Z DEPT. OF PLANNING/DEVELOPMENT. Engineers Surveyors Telephone 540-662-4185 FAX 540-722-9528 greenway@visuallink.com 0 I* Request For Site Plan Comments Frederick County Engineering Department Mail to: Frederick County Engineering Dept. Attn: Director of Engineering 107 North Kent Street Winchester, VA 22601 (540) 665-5643 Hand deliver to: 107 North Kent Street Fourth Floor Winchester, Virginia (540) 665-5643 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the site plan with this sheet. Applicant's Name: Greenway Engineering Address: 151 Windy Hill Lane Winchester Virginia 22602 Phone Number: (540) 662-4185 Name of development and/or description of the request: Cross Junction Unmanned Communication Tower Engineering Department's Comments: e ate'VV �'-✓ �� tL,� Cx FEB 2 8 2002 18 RMGCWo( 1N ?fogs `1""+ I 0 ''tie1 Tta'r COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION EDINBURG RESIDENCY 14031 OLD VALLEY PIKE EDINBURG, VA 22824 RAY D. PETHTEL INTERIM COMMISSIONER Mr. Mark D. Smith C/O Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 March 4, 2002 Ref: Cross Junction Unmanned Communications Facility Routes 770 and 522 Frederick County Dear Mr. Smith: JERRY A. COPP RESIDENT ENGINEER TEL (540) 984-5600 FAX (540) 984-5607 We have received your site plan dated February 11, 2002 for the referenced project. Please advise the owner of our approval. Also, please provide one (1) set of approved construction plans with signed seal for VDOT distribution. The date on the cover sheet states February 28, 2001. February 28, 2002? If we can be of further assistance, do not hesitate to call. Sincerely ,y,,. Philip A. Baker Hwy. Permits & Subdivision Specialist Sr. PAB/rf Enclosure — Comment Sheet xc: Mr. Dave Heironimus Mr. Greg Hoffman Mr. Evan Wyatt i A t I& 1 " ` Y 6 Should this be MAR 0 6 2002 "CPT. OF PLANNINGIDEVELOPMENT WE KEEP VIRGINIA MOVING L.J 0 Request For Site Plan Comments Vir2iiiia Department of Transportation Mail to: Virginia Department of Transportation Attn: Resident Engineer 14031 Old Valley Pike Edinburg, Virginia 22824 (540) 984-5600 Hand deliver to: Virginia Department of Transportation 1550 Commerce Street Winchester, VA (540) 722-3460 Please fill out the information as accurately as possible hi order to assist the agency with their review. Please attacli five (5) copies of the site plan witli traffic generation data and drainage calculations witli this sheet. Applicant's Name: Greenway Enginguhig Address: 151 Windy Hill Lane Winchester Virginia 22602 Phone Number: (540) 662-4185 Name of development and/or description of the request: Cross Junction Unmanned Communication Tower Location of property: Cross Junction Road Cross Junction Virginia Department of Transoration Comments: The application for site plan for this property appears to have little measurable impact on Routes 770 and 522, the VDOT facilities which would provide access to improvements. Should the preperty. business ever expand in the future, entrance(s) may need to be upgraded. Thank you for allowing us the opportunity to comment. See attached letter dated 03/04/02 from VDOT to Greenway Engineering. 14 rr Clip REDER ICK Department of Planning and Development 540/665-565A FAX: 540/665-6395 March 25, 2002 Mr. David L. frank Greenway Engineering 151 Windy Hill Lane Winchester, CIA 22602 RE: Gross Junction Telecommunication Tower; Site Pl:ur: 13-02 Property identification # (PIM: 18-A-38 Dear Mr. Frank: Thank you for the recent submission of the above -referenced site plan. I have completed a review of the plan and would like you to address a few issues in a revision. I have enclosed a red -lined copy of the site plan to clarify the concerns of staff. Please note the comments I have made below: Please provide a space labeled, "Approved by the Zoning Administrator," and a statement that says the site plan is valid for five years. Please remove the owner's certificate space regarding a subdivision and Manning & Ross as the developers. 3. Please replace the CUP approval letter shown on the site plan with the most current approval letter, dated March 14, 2002. Please provide the PIN for all adjoining properties. Please add adjoining property information for those across roads or right-of-ways. Please correct the setback information included in the project information table to include the required setbacks and those proposed. Please indicate that a waiver was approved for reduced setbacks. Please label the setbacks for all property lines on the site plan. Please provide the location and specifications for any outdoor lighting. Please provide the proposed height of all buildings and structures on the property. Please include the maximum height allowed in the RA Zoning District. Please add the posted speed limit for adjoining roads. 9. Please add the location of all utilities on the property. 0 0 Page 2 k1r. David L. Frank, Greenway Engineering Re: Cross Junction Telecommunication Tower, S.P. 413-02 March 25, 2002 10. Please add the width of all easements on the property, including utility easements. Please clarify whether or not the leased area and access lanes are easements. 11. Please provide the location of any environmental features on the property or a statement that there are none. 12. Please provide any additional information relevant to accessory buildings that may be located with the tower, such as size and location. 13. Please provide the use of all other buildings on the site plan. 14. Opaque fencing or appropriate landscaping should be provided to ensure that equipment, buildings, and accessory structures are not visible from adjoining properties, roads, or other rights -of -way. The site plan proposes wire fencing which would not provide any screening. 15. Please include the surveyed boundaries of all lots and parcels on the site plan. After you have revised the site plan, please resubmit one copy so that I may verify the information on the plan. I will then need all approved review agency comments and five copies of the final site plan for approval. Comment sheets are required from the following agencies: Frederick County Engineer (Public Jfloilcs) Frederick County Tii"e Marshal Freclei"ick County Inspections Department Winchester Regional Aiiport Virginia Department of Transportation Please call if you have any questions or concerns. Sincerely, Rebecca Ragsdale Plainer I RAR/kac Attachment UARcl—a\Si[c P1ansCcll Te» crxlCro+-STuncliunTu�� er.irpd The following information must be included on your site plan. If your site plan is incomplete or is missing information, it will not be reviewed and returned to you for revisions. Administrative Information N) Y N V e \t3S 1. Name of proposed development 2. Name, address, and phone number of owner. 3. Name, address, and phone number of developer. v 4. Name, address, and phone number of designer. -� 5. Certificate of surveyor, engineer, or architect. V6. Date plan prepared and date of revisions. 7. A listing of all conditions placed on the site as a result of a hk conditional use permit or conditional zoning approval. 8. A space labeled "Approved by the Zoning Administrator" for the approval signature and date of approval. 9. A description of setbacks or conditions placed on the site as a ----, result of a variance approval. (Reference the variance application number.) General Site Information Y N ✓ 10. Location map (scale 1:2000) 11. Magisterial District 12. Scale of site plan (not to exceed 1:50) 13. North Arrow 14. Zoning of site 15. Use, zoning, and Property Identification Number (PIN#) of all adjoining properties. This includes properties located across right-of-ways, streams, and railroad tracks. 16. Surveyed boundaries for all lots and parcels. m General Site (con't Y N 17. Acreage of all lots included in the plan. 18. The location and dimensions of all required setbacks and yard areas. 19. The location and type of all dwelling units. 20. Location and description of all recreation facilities. 21. Location of sidewalks and pedestrian ways. 22. Location and area of common open space. 23. The location, height, and dimensions of all signs. 24. Location, height, and specifications of outdoor lighting fixtures. 25. Location and nature of outdoor storage areas. 26. Location of outdoor trash receptacles and dimensions of structure (fencing, etc.) required to enclose receptacles. Building Information Y N 27. The height of all buildings and structures. 28. Location of all buildings, structures and uses. 29. The proposed use of each building, structure and area. 30. Ground floor area and total floor area of all buildings with FAR calculations for commercial and industrial zoning districts. Roads Y N �L 31. Name and number of existing and planned streets on and — adjoining the site. 32. Location of existing and planned streets on and adjoining the site. 33. Posted speed limit of existing adjacent roads. 34. Location and dimensions of all proposed entrances from public right-of-ways. • • 11 Utilities Y N X- x 35 Location of all entrances on adjoining roads within 200 feet of the proposed or existing entrance. 36 Dimensions, boundaries, width, pavement, and construction of planned roads. Ockbu* q �_Ql►ttp 37. Location of all utilities, including sewer and water lines with the size of lines, mains, and laterals. 38. Location and width of all easements, including access, utility, and drainage easements. 39. Location and nature of fire lanes, fire hydrants, and all other facilities necessary to meet Fire Code requirements. Parkin Y N 40. Calculations describing the required number of parking and loading spaces. qJA 41. Location and dimensions of all parking and loading spaces, driveways, parking aisles, curbing and other features to be used. 42. Location and dimension of all disabled parking spaces and ramps. Natural Features Y N 43. Existing and finished contour lines. �C 44. Location of steep slopes, woodlands, floodplains, wetlands, iC sinkholes, and other environmental features. 45. Location of streams and drainage ways. I Landscaping Y N i 46. Landscaping plan describing location and types of plants to be used. 47. Location of required buffers and screening with cross sections or profiles. Erosion and Sediment Control Y N 48. A stormwater management plan with run off calculations and location and description of facilities to be used. 49. Soil erosion and sedimentation control plan describing the location and methods to be used to minimize erosion and sedimentation during development. Page 3 Cross Junction Tower, Revised CUP #18-01 March 6, 2002 Following discussions with the Planning Commission, the Board of Supervisors, and representatives from SunCom/Triton PCS, the applicant determined that an increase in tower height to 260 feet would better accommodate the needs of the community and personal wireless service providers. Therefore, the applicant has requested the ability to increase the tower's height by 65 feet, bringing the tower height to 260 feet. The applicant contends that the increased tower height will enable personal wireless carriers to provide a more efficient service to the community as topographical restrictions will be lessened. The applicant is requesting a reduction of the setbacks pursuant to Section 165-48.6(B).1 of the Zoning Ordinance as the proposed increase in height would require an increase in structural setback distances. Based on the proposed 260-foot height, the setbacks would be as follows: Required Proposed Requesting a Setback Setback Setback Setback from: Reduction of: Northwest Property line 275 ft 220 ft 55 ft (Collins property) Northeast Property Line 275 ft —1_ 35 ft r — 135 ft (Hoffman - property L; owned by applicant) � East Property Line 275 ft 40 ft 235 ft (Hoffman - property owned by applicant) Southwest Property Line 285 ft 28_4 ft_ 1 ft (Route 522 North) �0-51 The Planning Commission may reduce the required setback distance for commercial telecommunication facilities if it can be demonstrated that the location is of equal or lesser impact. The applicant has attempted to place the facility in the middle of the site (property under common ownership), maximizing the structural setback. The applicant has provided a letter (dated January 2, 2002) certified by the Tower Manufacturers Professional Engineer indicating that the tower can be built with a safety stress point to reduce its fall zone. The applicant is also requesting the ability to continue to utilize lattice -type material construction pursuant to Section 165-48.6(B)2 of the Zoning Ordinance. The Zoning Ordinance requires that new commercial telecommunication facilities be of monopole -type construction. The Planning Commission may allow lattice -type construction for new commercial telecommunication facilities that are located �.:�'rvt�u`:�SR4�x� :.hsldt�+YY.•iL.3: -' -•x.:: :i; "t:. "1�`i! '+= .'•t9$fY��•�.�Fi1�R'dt:e2: '41s4i +'k-'. • • SITE PLAN APPLICATION 1. Project Title: 2. Location of Property (street address) 3. Property Owner: Address: Telephone 4. Applicant/Agent Address Telephone 5. Designer: Address: Telephone: Contact: Cross .Iunction Unmanned Communication Tower Cross .function Road Cross .function .Jeanette IIoffman PO I3ox325 Cross Junction, VA 22625 Greenway L?ngincering 151 Wincl,y I-Iill Lane Winchester, VA 22602 .540-662-4185 Greenway Engineering Same David L. F'rank CE V DERI', OF PLANNINGIDEVELOPMENT 6 0 G. Is this an original or revised site plan? Original X 7a. Total acreage of parcel to be developed: "10,000 SF 7b. Total acreage of parcel: 96.41 acres 8. Property Information: a) Property Identification Number: b) Current Zoning: c) Present Use: d) Proposed Use: c) Adjoining Property Use(s) f) Adjoining Property Identification Number(s) g) Magisterial Distric(s) Revised 18-((A))-38 RA Single I"amilyNacant Un111a1111CC1 C0111111LInication Tower Residential, I3usiness 18-((A))-42A, 41, 32C, 37, 29 Gainesboro I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete to the submi, sion of my site plan. Signature: .� Date: 2 ' 20 U2� 7 10. NAMEShawnee Canning Co PROPERTY ID# 18-A42A NAME Shawnee Canning Co PROPERTY ID# 18-A-41 NAME Jearldean D. Collins PROPERTY ID# 18-A-32C NAME Jeanette Hoffman PROPERTY ID# 18-A-37 NAME Jeanette Hoffiman PROPERTY ID# 18-A-39 ADDRESS PO Box 657 Cross Junction, 22625 ADDRESS PO Box 657 Cross Junction, 22625 .ADDRESS 198 Chestnut Grove Rd, Winchester 22603 ADDRESS PO Box 325 Cross Junction, 22625 ADDRESS PO Box 325 Cross Junction, 22625 0 0 GREENWAY ENGINEERING 151 Windy Hill Lane Winchester, Virginia 22602 Fowvtcd in 1971 T R A N S M I T T A L Project Name: Cross Junction Unmanned Communication Tower File No.: 3294 Date: February 28, 2002 To: FC Planning Attn: Jeremy Camp Copied: From: David Frank/ds GREENWAY ENGINEERING Phone: 540-662-4185 Fax: 540-722-9528 Remarks: ❑ Urgent D For Your Review ❑ As You Requested ❑ Please Comment Message: Jeremy, Attached are the following for the above site plan: -2 copies of the site plan -Site plan application -Site plan application fee check -FC Planning comment sheet When we have received all Agencies comment sheets, we will forward them to you. Call with any concerns pEPT, OF PI�,NNINGIOEVELOPMENT Engineers Surveyors Telephone 540-662-4185 FAX 540-722-9528 greenway@visuallink.com