SITE PLATS CHECKLIST
The checklist below indicates all the information that needs to be submitted as part of the site plan
application. All required information must be submitted prior to the final approval of any site plan. The
Department of Planning and Development will review the application to ensure that it is complete. if
any portion is not included or complete, the site plan application will not be accepted and returned to
the applicant(s).
Site Plan Package
1. One set of approved comment sheets are required from the following review
agencies prior to final site plan approval. It is recommended that applicants contact
the Department of Planning and Development to determine which review agencies
are relevant to their site plan application.
2.
3.
4.
5.
v Virginia Department of Transportation (VDOT) ILA I ba
Frederick County Sanitation Authority
Department of Planning and Developmen I
Inspections Department AAA ((� 11 ll
Frederick County Engineer (Public Works)
Frederick County Fire Marshal %\ \0-
Department of Parks and Recreation
One copy of the Site Plan application
Five Copies of the Final Site Plan for approval
One reproducible copy of the Site Plan (if required)
A 35mm slide of the Site Plan (if required)
County Health Department
City of Winchester
Town of Stephens City
Town of Middletown
Airport Authority W
Sol & Water Conservation District
Request for Street Name
Date:
SITE PLAN TRACKING SHEET
File opened
v Reference Manual updated/number assigned
I'll D-base updated
3. -�t. File given to Renee' to update Application Action Summary
J2 .A
CLOSE OUT FILE:
Approval (or denial) letter mailed to applicant/copy made for file
File stamped "approved", "denied" or 'Withdrawn"
Reference Manual updated
D-base updated
File given to Renee' for final update to Application Action Summary
U `Grd\Cu m— S,te Plan rra k,ng.wpd
R—s d 031W01
RECEIPT
Date
002546
t Received From
Address �� 1 L N V A`
n
For
Un
y.ACCOUNT HOW•
AMT;r
a ACCouHT fla
AMT pMD rBALANCE BrKJE
0
COUNTY of FREDERICK
Department of Planning and Development
540/665-5651
FAX: 540/ 665-6395
June 4, 2002
Mr. Evan A. Wyatt
Greenway Engineering
151 Windy Hill Lane
Winchester, Virginia 22602
Re: Cross Junction Telecoinmunication'I'olver; Site Plan #13-02
Properly Identification Nunlbei• (PIN): 18-A-38
Dear Evan:
The Frederick County Department of Planning and Development administratively approved the above -
referenced plan on June 3, 2002. The site plan meets all requirenlentS for development in the RA Zoning
District. Thereareno aciverseconlirients by any oftherequired reviewagencies; however, any futurecomments
by these agencies shotilci be addressed promptly. Please remember to provide a copy of the access easements
when they are recorded. Below is a list of the primary improvements of this development:
• COnStrtlCt1011 of a 260-foot-high lattice -type U11111a1111M tCICCo111111tInicatlons tower,
• Marking and lighting of the tower as required by the Winchester Regional Airport.
• A 14.5-foot vertical clearance for emergency vehicle access as required by the Fire Marshal.
• Construction of a six -foot -high stockade fence on the north, east, and west sides of the tower site.
Additional screetung should be installed, if determined necessary by Planning Department staff to
ensure facilities are not visible from adjoining properties and roadways.
I all\ providing You with six copies of the approved site plan. Please forward these to the appropriate
representatives. Ful1her111Ore, please advise the o1\11er that a Copy S110t1Id be kept for future reference and an
appl'Oved COP)' illUSt be kept on file COIISII'llCtl011 Site 1111"OugIIOIlt the ClUCIOpillellt process. Once Site
development is complete, the owim- Should contact this office to Schedule an on -site inspection. Thus is
required prior to the issuance of in occupancy permit by the Department of Building Inspections.
Sincerely,
(&4 /4a'�
Rebecca Ragsdale
Planner I
RAR/rsa
Attaclullent
cc: Sidney Reyes, Gainesboro District Supervisor
em: -George J. Kriz, Gainesboro District Planning Commissioner
Charles E. Triplett, Gainesboro District Planning Commissioner
11:\RebeccatSite Plans\Cell'I'o��ers',CJ:\ppro�al. cpd
107 North Kent Street • Winchester, Virginia 22601-5000
0
6
Request For Site Plan Comments
Department of Planning and Develop►nenl
Mail to:
Department of Planning and Development
Attn: County Planner
107 North Kent Street
Winchester, VA 22601
(540) 665-5651
Hand deliver to:
107 North Kent Street
Fourth Floor
Winchester, VA
(540) 665-5651.
Please fill out the information as accurately as possible in order to assist the agency with
their review. Please attach two (2) copies of the site planwith this sheet.
Applicant's Name: Greenway Engineering
Address: 151 Wind Hill Lane, Winchester, Viranna 22602
Phone Number: (540) 662-4185
Name of development and/or description of the request: Cross Junction Unmanned
Conununication Tower
Location of property: Cross Junction Road Cross Junction
Planning and Development's Comments:
,b)
16
• •
ft\ GREENWAY ENGINEERING
%47 151 Windy Hill Lane
Winchester, Virginia 22602
Ajunded in 1971
T R A N S M I T T A L
Project Name
File No.
Date
Cross Junction Telecommunication Tower
3294
5/31 /02
To: FC Planning
Attn: Rebecca Ragsdale
Copied:
From:
GREENWAY ENGINEERING
Phone: 540-662-4185
Fax: 540-722-9528
Renkarks: !— Urgent r- For Your Review f As You Requested r- Please Comment
Message:
I-Ii Rebecca,
Please find attached 8 copies of the final site plan for approval. I have also attached copies of the
approved comments from the Fire Marshal, Building Inspections and the Winchester Regional
Airport. Please contact me when the plans are ready to pick up.
Thank you for your assistance with this project!
Evan
I)f PT, OF PU�'i�`Ii�G!i Evuo1'MCNT
Engineers Surveyors
Telephone 540-662-4185 FAX 540-722-9528
greenway@visuallink.corn
•
Request For Site Plan Coininents
Winchester Regional Airport
Mail to:
Winchester Regional Airport
Attn: Executive Director
491 Airport Road
Winchester, VA 22602
(540) 662-2422
Fax — (540) 722-9335
hand deliver to:
491 Airport Road
(Route 645, off of Route 522 South)
(540)662-2422
Please 1111 out the information as accurately as possible in order to assist the agency with
their review. Please attacli one (1) copy of the site plan witli this sheet.
Applicant's Name: Greenway Engineerin<g
Address: 151 Windy Hill Lane Winchester, Virginia 22602
Phone Number: (540) 662-4185
Name of development and/or description of the request: Cross Junction Unmanned
Communication Tower
Location of property: Cross Junction Road, Cross Junction
Wincicster Regional Airport's Comments:
25
OF 17LANNAG/i)FVELONiMENI'
,,.0 0
,a REGIO/y�
s_90 WINCHESTER REGIONAL AIRPORT
SEWING THE 491 AIRPORT ROAD
iOP CF VIRG.M WINCHESTER, VIRGINIA 22602
(540) 662.2422
\�HOR���
March 11, 2002
Greenway Engineering
151 Windy Hill Lane
Winchester, Virginia 22602
RE: Site Plan Comments — Share Towers
Cross Junction Unmanned Communication Facility CPU#18-01
Dear Sir:
The Winchester Regional Airport Authority offers the following comments on the above
referenced site plan as conditions to be complied with at all times:
1. Towers over 200 feet AGL are required by FAA to be lighted, for towers
between 150 and 199 feet AGL, the Winchester Airport is requiring the
structure to be marked and lighted in accordance with FAA Advisory Circular
70/7460-1 H, Obstruction Marking and lighting, Chapter 5.
This comments is based on the review provided by our engineering firm, Delta Airport
Consultants, Richmond, Virginia, and coordination with the Federal Aviation
Administration Airports District Office, Washington, D.C. It has been determined that the
proposed tower does not penetrate any FAR Part 77 surfaces therefore development of
this site should have no impact on current or future operations at the Winchester
Regional Airport.
If the above referenced conditions along with any outlined in the FAA study are met, the
Winchester Regional Airport Authority has no objections to the site plans.
Should you have any questions or need additional information, please contact this office
(430) 662-5786.
Sincerely,
g-(
S. R. Manuel
Executive Director
•
lex,-CEIVLD FIEB 2 a 2002
Request For Site Plan Comments
Frederick County Fire Marshal
Mail to:
Frederick County Fire Marshal
Attn: Fire Marshal
107 North Kent Street
Winchester, VA 22601
(540) 665-6350
Hand deliver to:
107 North Kent Street
First Floor
Winchester, VA
(540) 665-6350
Please fill out the information as accurately as possible in order to assist the agency with
their review. Please attach two (2) copies of the site plan with this sheet.
Applicant's Name: Greenway Engineering
Address: 151 Windy Hill Lane, Winchester, Virginia 22602
Phone Number: (540) 662-4185
Name of development and/or description of the request: Cross Junction Unmanned
Conununication Tower
Location of property: Cross Junction Road, Cross .Junction
Fire Marshal's Comments:
19
I
Automatic Sprinkler System
No
Other recommendion
Emergency Vehicle Access
Adequate
Siamese Location
Not Identified
Frederick County Fire and Rescue
Department
Office of the Fire Marshal
Plan Review and Comments
Control number Date received
SP02-0020 2/28/02
Project Name
Cross Junction Unmanned Tower
Address City
151 Windy Hill Lane Winchester
Type Application Tax ID Number
Site Plan 18-A-38
Current Zoning
RA Recommendations
Automatic Fire Alarm Syste
No
Date reviewed Date Revised
3/1/02
Applicant
Greenway Engineering
State Zip Applicant Ph
VA 22602 540.662.4185
Fire District
16
Requirements
Hydrant Location
Not Identified
Roadway/Aisleway Width
Adequate
Rescue District
16
Election District
Gainesboro
Residential Sprinkler System
No
Fire Lane Required
No
Special Hazards
No
Emergency Vehicle Access Comments
A 14.5ft verticle clearance over thewidth of the roadway is required per NFPA 299.
Access Comments
hlaintainence of the width and verticle clearances is required.
Additional Comments
Plan Approval Recommended
Reviewed By Slgniture
Yes Timothy L. Welsh
Title
•
0
Request For Site Plan Commnents
Frederick County Inspections Department
Mail to:
Frederick County Inspections Department
Attn: Building Official
107 North Kent Street
Winchester, VA 2260.1
(540) 665-5650
Hand deliver to:
107 North Kent Street
Fourth Floor
Winchester, VA
(540)665-5650
Please fill out the information as accurately as possible in order to assist the agency with
their review. Please attach one (1) copy of the site plan with this slieet.
Applicant's Name: Greenway Engineering
Address: 151 Windv I-lill Lane, Winchester, VirLyinia 22602
Phone Number: (540) 662-4185
Name of development and/or description of the request: Cross Junction Unmanned
Communication Tower
Location of property: Cross .function Road, Cross .Junction
Inspections Departm nt's Comments:
0119
Structure shall comply with The Virginia Uniform Statewide Building Code and Section 312, use
group U (Utility and Miscellaneous) of The BOCA National Building Code/1996. Structural plans
submitted for permit application shall be sealed be a Va. Licensed Design Professional. Please
note the requirements in Chapter 17 Special Inspections for this type structure.
GREENWAY ENGINEERING
151 Windy Hill Lane
Winchester, Virginia 22602
Founded in 1971
T R A N S M I T T A L
Project Name:
File No.:
Date:
Cross Junction Telecommunication Tower
3294
5/30/
To: FC Planning
Attn: Rebecca Ragsdale
Copied:
From: Evan Wyatt
GREENWAY ENGINEERING
Phone: 540-662-4185
Fax: 540-722-9528
Remarks: 1-- Urgent r- For Your Review r As You Requested F- Please Comment
Message:
Hi Rebecca,
Please find attached one copy of the final site plan for the Cross Junction Tower. This is the final
tower site plan from the four CUPS that were approved by the County. I made all revisions from
your previous continent letter to David Frank. Please contact me if you have any questions
regarding the revisions on this plan.
Thank you for your assistance,
Evan
MAY 0 200Z
DEPT. OF PLANNING/DEVELOPMENT.
Engineers Surveyors
Telephone 540-662-4185 FAX 540-722-9528
greenway@visuallink.com
0
I*
Request For Site Plan Comments
Frederick County Engineering Department
Mail to:
Frederick County Engineering Dept.
Attn: Director of Engineering
107 North Kent Street
Winchester, VA 22601
(540) 665-5643
Hand deliver to:
107 North Kent Street
Fourth Floor
Winchester, Virginia
(540) 665-5643
Please fill out the information as accurately as possible in order to assist the agency with
their review. Please attach two (2) copies of the site plan with this sheet.
Applicant's Name: Greenway Engineering
Address: 151 Windy Hill Lane Winchester Virginia 22602
Phone Number: (540) 662-4185
Name of development and/or description of the request: Cross Junction Unmanned
Communication Tower
Engineering Department's Comments: e ate'VV
�'-✓ �� tL,�
Cx
FEB 2 8 2002
18 RMGCWo( 1N ?fogs
`1""+
I
0
''tie1 Tta'r
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
EDINBURG RESIDENCY
14031 OLD VALLEY PIKE
EDINBURG, VA 22824
RAY D. PETHTEL
INTERIM COMMISSIONER
Mr. Mark D. Smith
C/O Greenway Engineering
151 Windy Hill Lane
Winchester, VA 22602
March 4, 2002
Ref: Cross Junction Unmanned Communications Facility
Routes 770 and 522
Frederick County
Dear Mr. Smith:
JERRY A. COPP
RESIDENT ENGINEER
TEL (540) 984-5600
FAX (540) 984-5607
We have received your site plan dated February 11, 2002 for the referenced project.
Please advise the owner of our approval. Also, please provide one (1) set of
approved construction plans with signed seal for VDOT distribution.
The date on the cover sheet states February 28, 2001.
February 28, 2002?
If we can be of further assistance, do not hesitate to call.
Sincerely
,y,,.
Philip A. Baker
Hwy. Permits & Subdivision Specialist Sr.
PAB/rf
Enclosure — Comment Sheet
xc: Mr. Dave Heironimus
Mr. Greg Hoffman
Mr. Evan Wyatt
i A
t I& 1 "
` Y 6
Should this be
MAR 0 6 2002
"CPT. OF PLANNINGIDEVELOPMENT
WE KEEP VIRGINIA MOVING
L.J
0
Request For Site Plan Comments
Vir2iiiia Department of Transportation
Mail to:
Virginia Department of Transportation
Attn: Resident Engineer
14031 Old Valley Pike
Edinburg, Virginia 22824
(540) 984-5600
Hand deliver to:
Virginia Department of Transportation
1550 Commerce Street
Winchester, VA
(540) 722-3460
Please fill out the information as accurately as possible hi order to assist the agency with
their review. Please attacli five (5) copies of the site plan witli traffic generation data
and drainage calculations witli this sheet.
Applicant's Name: Greenway Enginguhig
Address: 151 Windy Hill Lane Winchester Virginia 22602
Phone Number: (540) 662-4185
Name of development and/or description of the request: Cross Junction Unmanned
Communication Tower
Location of property: Cross Junction Road Cross Junction
Virginia Department of Transoration Comments:
The application for site plan for this property appears to have little measurable
impact on Routes 770 and 522, the VDOT facilities which would provide access to
improvements. Should
the preperty.
business ever expand in the future, entrance(s) may need to be upgraded. Thank
you for allowing us the opportunity to comment. See attached letter dated 03/04/02
from VDOT to Greenway Engineering.
14
rr
Clip REDER ICK
Department of Planning and Development
540/665-565A
FAX: 540/665-6395
March 25, 2002
Mr. David L. frank
Greenway Engineering
151 Windy Hill Lane
Winchester, CIA 22602
RE: Gross Junction Telecommunication Tower; Site Pl:ur: 13-02
Property identification # (PIM: 18-A-38
Dear Mr. Frank:
Thank you for the recent submission of the above -referenced site plan. I have completed a review of the plan
and would like you to address a few issues in a revision. I have enclosed a red -lined copy of the site plan to
clarify the concerns of staff. Please note the comments I have made below:
Please provide a space labeled, "Approved by the Zoning Administrator," and a statement that says
the site plan is valid for five years.
Please remove the owner's certificate space regarding a subdivision and Manning & Ross as the
developers.
3. Please replace the CUP approval letter shown on the site plan with the most current approval letter,
dated March 14, 2002.
Please provide the PIN for all adjoining properties. Please add adjoining property information for
those across roads or right-of-ways.
Please correct the setback information included in the project information table to include the required
setbacks and those proposed. Please indicate that a waiver was approved for reduced setbacks. Please
label the setbacks for all property lines on the site plan.
Please provide the location and specifications for any outdoor lighting.
Please provide the proposed height of all buildings and structures on the property. Please include the
maximum height allowed in the RA Zoning District.
Please add the posted speed limit for adjoining roads.
9. Please add the location of all utilities on the property.
0 0
Page 2
k1r. David L. Frank, Greenway Engineering
Re: Cross Junction Telecommunication Tower, S.P. 413-02
March 25, 2002
10. Please add the width of all easements on the property, including utility easements. Please clarify
whether or not the leased area and access lanes are easements.
11. Please provide the location of any environmental features on the property or a statement that there are
none.
12. Please provide any additional information relevant to accessory buildings that may be located with the
tower, such as size and location.
13. Please provide the use of all other buildings on the site plan.
14. Opaque fencing or appropriate landscaping should be provided to ensure that equipment, buildings,
and accessory structures are not visible from adjoining properties, roads, or other rights -of -way. The
site plan proposes wire fencing which would not provide any screening.
15. Please include the surveyed boundaries of all lots and parcels on the site plan.
After you have revised the site plan, please resubmit one copy so that I may verify the information on the plan.
I will then need all approved review agency comments and five copies of the final site plan for approval.
Comment sheets are required from the following agencies:
Frederick County Engineer (Public Jfloilcs)
Frederick County Tii"e Marshal
Freclei"ick County Inspections Department
Winchester Regional Aiiport
Virginia Department of Transportation
Please call if you have any questions or concerns.
Sincerely,
Rebecca Ragsdale
Plainer I
RAR/kac
Attachment
UARcl—a\Si[c P1ansCcll Te» crxlCro+-STuncliunTu�� er.irpd
The following information must be included on your site plan. If your site plan is incomplete or
is missing information, it will not be reviewed and returned to you for revisions.
Administrative Information N)
Y N V
e \t3S
1. Name of proposed development
2. Name, address, and phone number of owner.
3. Name, address, and phone number of developer.
v 4. Name, address, and phone number of designer.
-� 5. Certificate of surveyor, engineer, or architect.
V6. Date plan prepared and date of revisions.
7. A listing of all conditions placed on the site as a result of a
hk conditional use permit or conditional zoning approval.
8. A space labeled "Approved by the Zoning Administrator" for
the approval signature and date of approval.
9. A description of setbacks or conditions placed on the site as a
----, result of a variance approval. (Reference the variance
application number.)
General Site Information
Y N
✓ 10. Location map (scale 1:2000)
11. Magisterial District
12. Scale of site plan (not to exceed 1:50)
13. North Arrow
14. Zoning of site
15. Use, zoning, and Property Identification Number (PIN#) of all
adjoining properties. This includes properties located across
right-of-ways, streams, and railroad tracks.
16. Surveyed boundaries for all lots and parcels.
m
General Site (con't
Y N
17.
Acreage of all lots included in the plan.
18.
The location and dimensions of all required setbacks and yard
areas.
19.
The location and type of all dwelling units.
20.
Location and description of all recreation facilities.
21.
Location of sidewalks and pedestrian ways.
22.
Location and area of common open space.
23.
The location, height, and dimensions of all signs.
24.
Location, height, and specifications of outdoor lighting fixtures.
25.
Location and nature of outdoor storage areas.
26.
Location of outdoor trash receptacles and dimensions of
structure (fencing, etc.) required to enclose receptacles.
Building Information
Y N
27.
The height of all buildings and structures.
28.
Location of all buildings, structures and uses.
29.
The proposed use of each building, structure and area.
30.
Ground floor area and total floor area of all buildings with FAR
calculations for commercial and industrial zoning districts.
Roads
Y N
�L 31. Name and number of existing and planned streets on and
— adjoining the site.
32. Location of existing and planned streets on and adjoining the
site.
33. Posted speed limit of existing adjacent roads.
34. Location and dimensions of all proposed entrances from public
right-of-ways.
•
•
11
Utilities
Y N
X-
x
35 Location of all entrances on adjoining roads within 200 feet of the
proposed or existing entrance.
36 Dimensions, boundaries, width, pavement, and construction of
planned roads. Ockbu* q �_Ql►ttp
37. Location of all utilities, including sewer and water lines with the
size of lines, mains, and laterals.
38. Location and width of all easements, including access, utility,
and drainage easements.
39. Location and nature of fire lanes, fire hydrants, and all other
facilities necessary to meet Fire Code requirements.
Parkin
Y N
40. Calculations describing the required number of parking and
loading spaces.
qJA 41. Location and dimensions of all parking and loading spaces,
driveways, parking aisles, curbing and other features to be used.
42. Location and dimension of all disabled parking spaces and
ramps.
Natural Features
Y N
43. Existing and finished contour lines.
�C 44. Location of steep slopes, woodlands, floodplains, wetlands,
iC sinkholes, and other environmental features.
45. Location of streams and drainage ways.
I
Landscaping
Y N
i
46. Landscaping plan describing location and types of plants to be
used.
47. Location of required buffers and screening with cross sections or
profiles.
Erosion and Sediment Control
Y N
48. A stormwater management plan with run off calculations and
location and description of facilities to be used.
49. Soil erosion and sedimentation control plan describing the
location and methods to be used to minimize erosion and
sedimentation during development.
Page 3
Cross Junction Tower, Revised CUP #18-01
March 6, 2002
Following discussions with the Planning Commission, the Board of Supervisors, and representatives
from SunCom/Triton PCS, the applicant determined that an increase in tower height to 260 feet
would better accommodate the needs of the community and personal wireless service providers.
Therefore, the applicant has requested the ability to increase the tower's height by 65 feet, bringing
the tower height to 260 feet. The applicant contends that the increased tower height will enable
personal wireless carriers to provide a more efficient service to the community as topographical
restrictions will be lessened.
The applicant is requesting a reduction of the setbacks pursuant to Section 165-48.6(B).1 of the
Zoning Ordinance as the proposed increase in height would require an increase in structural setback
distances. Based on the proposed 260-foot height, the setbacks would be as follows:
Required
Proposed
Requesting a
Setback
Setback
Setback
Setback from:
Reduction of:
Northwest Property line
275 ft
220 ft
55 ft
(Collins property)
Northeast Property Line
275 ft
—1_ 35 ft r
— 135 ft
(Hoffman - property L;
owned by applicant) �
East Property Line
275 ft
40 ft
235 ft
(Hoffman - property
owned by applicant)
Southwest Property Line
285 ft
28_4 ft_
1 ft
(Route 522 North)
�0-51
The Planning Commission may reduce the required setback distance for commercial
telecommunication facilities if it can be demonstrated that the location is of equal or lesser impact.
The applicant has attempted to place the facility in the middle of the site (property under common
ownership), maximizing the structural setback. The applicant has provided a letter (dated January
2, 2002) certified by the Tower Manufacturers Professional Engineer indicating that the tower can
be built with a safety stress point to reduce its fall zone.
The applicant is also requesting the ability to continue to utilize lattice -type material construction
pursuant to Section 165-48.6(B)2 of the Zoning Ordinance. The Zoning Ordinance requires that new
commercial telecommunication facilities be of monopole -type construction. The Planning Commission
may allow lattice -type construction for new commercial telecommunication facilities that are located
�.:�'rvt�u`:�SR4�x� :.hsldt�+YY.•iL.3: -' -•x.:: :i; "t:. "1�`i! '+= .'•t9$fY��•�.�Fi1�R'dt:e2: '41s4i +'k-'.
•
•
SITE PLAN APPLICATION
1. Project Title:
2. Location of Property
(street address)
3. Property Owner:
Address:
Telephone
4. Applicant/Agent Address
Telephone
5. Designer:
Address:
Telephone:
Contact:
Cross .Iunction Unmanned
Communication Tower
Cross .function Road
Cross .function
.Jeanette IIoffman
PO I3ox325
Cross Junction, VA 22625
Greenway L?ngincering
151 Wincl,y I-Iill Lane
Winchester, VA 22602
.540-662-4185
Greenway Engineering
Same
David L. F'rank
CE V
DERI', OF PLANNINGIDEVELOPMENT
6
0
G. Is this an original or revised site plan? Original X
7a. Total acreage of parcel to be developed: "10,000 SF
7b. Total acreage of parcel: 96.41 acres
8. Property Information:
a) Property Identification Number:
b) Current Zoning:
c) Present Use:
d) Proposed Use:
c) Adjoining Property Use(s)
f) Adjoining Property Identification Number(s)
g) Magisterial Distric(s)
Revised
18-((A))-38
RA
Single I"amilyNacant
Un111a1111CC1 C0111111LInication Tower
Residential, I3usiness
18-((A))-42A, 41, 32C, 37, 29
Gainesboro
I have read the material included in this package and understand what is required by the
Frederick County Planning Department. I also understand that all required material will
be complete to the submi, sion of my site plan.
Signature:
.�
Date: 2 ' 20 U2�
7
10.
NAMEShawnee Canning Co
PROPERTY ID# 18-A42A
NAME Shawnee Canning Co
PROPERTY ID# 18-A-41
NAME Jearldean D. Collins
PROPERTY ID# 18-A-32C
NAME Jeanette Hoffman
PROPERTY ID# 18-A-37
NAME Jeanette Hoffiman
PROPERTY ID# 18-A-39
ADDRESS PO Box 657 Cross Junction, 22625
ADDRESS PO Box 657 Cross Junction, 22625
.ADDRESS 198 Chestnut Grove Rd, Winchester 22603
ADDRESS PO Box 325 Cross Junction, 22625
ADDRESS PO Box 325 Cross Junction, 22625
0 0
GREENWAY ENGINEERING
151 Windy Hill Lane
Winchester, Virginia 22602
Fowvtcd in 1971
T R A N S M I T T A L
Project Name: Cross Junction Unmanned Communication Tower
File No.: 3294
Date: February 28, 2002
To: FC Planning
Attn: Jeremy Camp
Copied:
From: David Frank/ds
GREENWAY ENGINEERING
Phone: 540-662-4185
Fax: 540-722-9528
Remarks: ❑ Urgent D For Your Review ❑ As You Requested ❑ Please Comment
Message:
Jeremy,
Attached are the following for the above site plan:
-2 copies of the site plan
-Site plan application
-Site plan application fee check
-FC Planning comment sheet
When we have received all Agencies comment sheets, we will forward them to you.
Call with any concerns
pEPT, OF PI�,NNINGIOEVELOPMENT
Engineers Surveyors
Telephone 540-662-4185 FAX 540-722-9528
greenway@visuallink.com