SITE PLAN CHECKLIST
The checklist below indicates all the information that needs to be submitted as part of the site plan
application. All required information must be submitted prior to the final approval of any site plan.
The Department of Planning and Development will review the application to ensure that it is complete.
If any portion is not included or complete, the site plan application will not be accepted and returned
to the applicant(s).
Site Plan Package
1. One set of approved comment sheets are required from the following review
agencies prior to final site plan approval. It is recommended that applicants contact
the Department of Planning and Development to determine which review agencies
are relevant to their site plan application.
2
3
4
5
Virginia Department of Transportation (VDOT) '
Frederick County Sanitation Authority
Cepartment of Planning and Cevelopment
Inspections Cepartment �, • 10 -Oj
Frederick County Engineer (Public Works)
Frederick County rue Marshal
Department of Parks and Recreation
One copy of the Site Plan application
Five Copies of the Final Site Plan for approval
One reproducible copy of the Site Plan (if required)
A 35mm slide of the Site Plan (if required)
County Health Cepartment
Ctj of'Nnchester
Town of Stephens Ctj
Town of Midcletcwn
Airport Authority
Scii ?. Water Conservation District,
Date:
v'
00
NOTES
File opened
Reference Manual updated/number assigned
D-base updated
File given to Renee' to update Application Action Summary
CLOSE OUT FILE:
-/ -� Approval (or denial) letter mailed to applicant/copy made for file
14
GoUi`i T f aC,�IMIAcrn
OEF RTIiE�IT OF INSPECTIG,
IS
6 I1 i f of
—
Date Called
Caller , fi-S
Time Called
Phone No. r,2% %' _7_702
Time Requested 4SP P
Date Requested A S ��
Received By T'
C ayl\,
Date
of Inspection } 2-' C 1
K c Q V+
PERMIT HOLDER NAME
RT. NO. 13 3 Lot No.
6,v SEC. No. SUBDIVISION
STREET NAME P ca
1(f it
e
DIRECTIONS
O �` n—� L�� c �C�`-5
(P BUILDING N0.
1` w ✓N r f 6'v frT 8400 kkZ ��� �C-Ef
PLUMBING NO.
ELECTRICAL NO.
(� C�ti�re
�/• f �� P l�(i /1.//
( )
- MECHANICAL NO.
�Yl��
SIGN NO.
DISTRICT
S 46
ya pa-4
PERMIT FOR:
Type of Inspection
Residential
Footers
Setbacks: FR
Slab
Draintile .
Water
Service
Sewer
Rough Electric
Rough Plumbing Rough Mechanical
Groundworks Gas Piping/Test
0
Commercial `
7S' SK J s
L 0 5 , R .) 'S
Gas Fire -up Final Electrical
Framing Final Mechanical
Final Site Plan
Final Building Fire Marshall
Final Plumbing - Special/Complaint —
Other.
Time In: 1: 5 5 Temperature N 9,6 `' Cut in No.
Time Out:
Results: Approve( -
Comments: AI&
Rejected
s-
/i ��1� 5 r `a V6 � z".r/ M �? Q . % , irf F�-fay/
SA�C4r nv L
ieV4 p.
o�hc f�
Date
Signature
FROM • FAX 110. : 4n. 06 2001 10:38AM P1
GREENWAY ENGINEERING
151 Windy Bill lane
Winchester, Virginia 22002
'telephone 5,10-662-4185
PAX 540-722-9528
FACSIMILE TRANSM)TTAL SIII ET
TO:
FRO!A:
Jeremy Camp Jason Thomas
COMMNY; DATE:
Frederick County Planning JUN)✓ 6, 2001
PAX NUMnER: T(rrAL NO. Ov PAGBS INCLUDING COVER.
665-6395 3
PHONF. NumBEA: $fiNDER'S REFERFITE NUMnr-.R:
RE: YOUR REPPRENCE NUNMER-
Kraft Distribution Facility - Trees
❑ URGFNT FOR REVIEW ❑ PLEASI: COMMENT PLL'ASE REPLY ❑ PI. -EASE RRCYCLE
MOTHS/COMMENTS:
Due to availability, the landscape contractor would like to substitute the specified sugar
maples with the Cleveland Select (or Chanticleer) Pear. We specified,46 sugar maples for
perimeter and interior parking trees on the Site Plan.
Based on available informaticm, the Cleveland Select has a more compact, canopy, which
would keep the tree from interfering with truck traffic. Our landscape expert also says that the
branches are stronger than the Bradford Pear.
Please let me know what you think. �v
11(,�,
09� a as qV.
5�
1-h •�C�S tJ�
5 ,t
Engineers Surveyors ,( 4y
Founded in 1971�1�� Lt 5k�w�('l�
FROM : 0 FAX NO. : 4n. OG 2001 10:39A11 P2
578 Pyrus
combination treatments. The cuttings did not develop outstanding root systems and failed to
survive. I have attempted to root cuttings from Georgia campus trees and had two or three
which have overwintered. The next approach will be root cuttings. There are also plans to
try the cultivar in tissue culture; -the normal procedure is to bud 'Bradford' on P. calleryana
seedlings but this is expensive and the fact that incompatibilities are occurring on older trees
should be cause for alarm. Some nurserymen apparently have been successful rooting 'Brad.
ford' from cuttings.
OTHER CULTIVARS:
'Aristocrat' — Selection by Carlisle Nursery, Independence, Kentucky; basically pyramidal to
broad -pyramidal in outline, branches more horizontal and crotch angles wider, lustrous
dark green leaves with a wavy edge and for that reason quite distinct from other P.
calleryana selections; fall color is variable and ranges from yellow to red; trees I have
seen were not as good as 'Bradford' although it is advertised as having better fall color;
flowers are more sparsely borne but still quite attractive; tends to maintain a central
leader and shows great vigor for 6-year-old trees may be 12' high, 10' wide with a 3"
trunk diameter; thornless; shows about the same cold and heat tolerance as 'Bradford'.
'Autumn Blaze' — A new introduction by Dr. Westwood, Oregon State, for consistent reddish
purple fall color; it is also more cold hardy than Bradford; see HortScience 15(6):898.
1980.
'Capital' — New introduction from U.S. National Arboretum that is more upright than 'While -
house! and can be substituted for Lombardy Poplar; its leaves turn coppery in fall; see
HortScience 16(6):799-800. 1981; early reports indicate it is a good selection.
'Chanticleer' (same as 'Select' and probably 'Rancho') — A fine upright -pyramidal form that is
much narrower than 'Bradford'; it flowers heavily and fall color may be a good reddish
purple; the few times I have seen it in fall color It did not measure up to 'Bradford'; the
leaves are longer and more ovate (see drawing) than 'Bradford' and thinner in texture;
thornless; a fine tree and probably a better choice where lateral space to spread is limited;
interestingly 'Chanticleer' hardens off earlier than 'Bradford' and may be less susceptibl
to
Acso X,,.
e6svw"A
FROM • FAX NO. Jun. 11 2001 06:27AII P1
a
GREENWAY ENGINEERING
151 Windy I till lane
Winchester, Virginia 22602
Telephone 540-662-4185
FAX 540-722-9528
FACSIMILE TRANSMI'r1'AL SHEET
T0: FROM:
Jeremy Camp Jason Thomas
COMPANY: DATP:
Frederick Co. Planning JUNE 11, 2001
FAX NUMBER- TOTAL NO. OF PAGES INCLUDING COVPR:
S40-665-6395 3
PRONE NUMBER: gF.NI)HI'S RP.PERFNCP NIIMBPR:
RE: YOUR REFERENCE• NUMBER:
Changes to Landscaping Plan
❑ UROENT FOR REVIEW CJ PI.P.ASF. COMMENT PI.N.ASE REPLY ❑ PLEASE• RECYCLE
NOTESICON.NE•hTS:
Jeremy, please review alzd give me a call.
'blanks
Engineers SUrvoyorF
Founded in 1971
FROM
A06!Er3. ?uEl i`5:55
1: - .
TO:
DATE.
PROJECT N r:
PROJECT N0:
FROM:
DIRECT DAL:
E4AAJL
KO. OF *AOFS:
NO. cop:Eb
1
REMARKS: .
COPY:
FAX HO.
7069280
6�� R R I O P-
A S s O C I A T C S
A a K 1 _ C T
8C01 81ADDOC+. RCA:` Ath FLOOR
SPPIN Z�FIELU. V,RCINIA 22:51
Pf70 126 i05, ,:1 703.1126.9280
o , , _ . c c ,
FAX TRANSMITTAL
Bill'Thomae
Howard Shoc" Construction
Jason Thomas
GAEEWAY ENOINEE?RM
j 8 Juno ZOO
Kraft Build'oQ
Ft. Caller Indo ial Park, Wnche5ter, Vlr91ntp
M9
Rosana Keleher
703.249.7652
r ka 1eh c r� be e ry ri o .co m
DESCraPTION
ALTERNATE TREE PLANTING PROPOSAL
Bill and Jason,
Jun. 11 2001 06:27AII P2
,0.5313 l OO!
(ATE
JUNE B 2001
Plea -SO review the attached proposal, Our landscape archltact recomrnends using 1 i Red Maples
as pent tre—e- in the IocoWns shown. Cleveland Pears ern acceDMNA as a substhute for the
Sugar Mlop es. There will be thirty-fte 05). Ple"a check vrrM Jeremy Camp at the County.
Thanksl
0 O"eR -4W Todd, PmiWs -
0 CONTRACTOR -BJI Thomas. Howard Bhodrey
Q ENGINEER Hurm a A9todatn Tom Mwe, Grocrrway Egginttrinq
BUILDING INSPECTOR
OTHER- Kraft Crom Comev)
Fre
LK WKon„ MXVIU..e+e 19 YxArnd.:�F•�.+o-rr++r ewe
FROM .
PE i 06.'2001 : 5 : 59
FAX NO.
?�692�D
•Jun. 11 2001 06:28AM P3
:, 539 PW2
rr
,01r F'n0_0Gi `? L E A
(T'JH) 5. 1'I11 100. 43626944 F
t
4 ;Vro, 12 9 aw *,%
010F
The 010a/ 0lttrlbutlan 801011a11
!Facsimile Transmittal Sheet
TO: '-e r-er-'- cJ{ CC Y " ! DATE: S I l D
FAX NO: v10 _ �� %� ' 1� (o �. TIME:
RE: �0 � _J�� ��i2 �� a� ���,-, �.�• FROM: Einette Padilla
FAX COPY TO: \ lR OF PAGES:
FAX NO:
Original Document(s) to f0II0W Vla: ❑ Mall ❑ Courier ❑ UPS ❑ Will Not Follow
COMMENTS: pV,'(
4 V-� "Z'Mv
please call Linette Padilla @ (303)576-2681 if you do not receive all pages or if you have
transmission problems. When replying by facsimile, our number is (303)576-2761
14100 E. nth Place, Aurora, (;0 80011
THIS MFSSAGE tS INTENDED ONLY FOR THE USE OF THE INDIVIDUAL OR ENTITY TO WHICH IT IS ADDRESSED AND
APPLICA LE WO� O READER OF TTW MESSAGEtIS�NOT THE IENTIAL NTEND D RECIPIENT, D EX"PT YOU ARE DISCLOSURE
NOTIFIED THAT ANY DISSEMINATION, I)ISTRIBUTION OR COPYING OF THIS COMMUNICATION IS STRICTLY
PRC"INTED, IF YOU HAVE RECEIVED THIS COMMUNICATION IN ERROR, PI -EASE NOTIFY Us IMMEUTATELY @Y
TELEPHONE AND DESTROY THE ORIGINAL MESSAGE. THANK YOU,
DT Cr 'F'L,6,? • ITUL, 1' C! 1�: !6Z �.
i • -
SUBMVISION BOND
Bond No. 103601273_
KNOW ALL MEN BY1'HESE PRESENTS, that wc PROLOGIS DEVELOPMENT SERVCES INCORPbRATED .-
1a1UC E. 35th Place Aurora Go—
as Principal, and TRAVELERS CASUALTY ANQ_SU13EI Y COt'APANY OF —AM ERICA _
authorized to do business in the State of VA , as Surety, are held and firmly bound unto
COUNTYcouNTY OF FKI=DERICK
as Obligm in the penal swn of _
our hundlten thousand nd 90� �Q4 ($ � noo.00 __ _..�
DOLLARS, lawful money of
the United States of America, for the payment of which wall and tnfly to be made, we bind ourselves, our heirs, ccxutors,
administrators, successors and assi,gns,,jointly and severally, fmlly bythosc presWt5.
WHFRI AS, PROLOGIS )EVrLOPMENT SERVICES INQ RO P4�7E[)
has agreed to constnrct in Kraft Distribution Facility
the follming improvements: all reguirod Uavement soil stabil zztion see lino ail required Ian r ap�IlQ _ t CL21 R
hff 5D3�eS -.—_
NOW THEREFORE, THE CONDRION OF THIS OBLIGA-1'101A 1S SUCH, that ,f the said Principal shall
constntCt, or have constructed, tl)c improvements herein described and shall save the Oblibec harmless frvrn any loss, coot or
damage by imson of its failure to complete said work, then this obligation shall be null and void; otirenvise to remain in full force
and effect.
Signed, sealed and dated this z5tt1 dAY
By:
By.
RS CASUALTY AND SUREI•Y GO'1MY OF
C. O'Leary
7-1
r �.1� ` .��•. r:.: • 11� \)�•I .!. �' T. i 1I , I•���`1�1. .% I l
ACKNOVArLEDG MENT BY SURFL I-Y
STATE OF ILLINOIS
COUNTY OF COOK
On this 251h day of Api71, 2001, before me, Jessica B. Yates, a notary Public,
within and for said County and State, personally appeared Mazy C. O'Leary
to me personally known to be the Attorney -in -fact of and for Travelers
Casualty' and Surety Company of America and tick -now Iedged that she
executed the said instrument as the free act and deed of said Company.
IN WITNESS )ATREPMOF, I have hereunto set my hand and affixed my
official seal, at my off ce in the aforesaid County, the day and year in this
certificate first above written.
NotaYin the State of inois
lcountkycook
OFFICID+I SEAL
Lg:"ICA 6. YATE�S
(*IMA►�}µ 8gjQt4 EXPIES U2ZD4
`.l i� it ITtJ L'� l� �r' ��..Ji {; .'i?l� 1����l J, u rilj .) r)7�L J4 r 4
I rIA�GL.Lr�J I,K*ASUALTY
I -Ulu Jur%z11 —WIlLr"eul Vf A311LI�IlM
TRAVELAND SURETY COMPANY
FARNMiGTON CASUALTY COMPANY
Hartford, Connet:tlCUt 06183.9062
POWER OF ATTORNEY AND CERTIFICATE OF AUTHORITY OF ATTORNEYS)-M-FACT
KNOW ALL PERSONS BY THESE PRESYNTS, THAT TRAVELERS CASUALTY AND SURETY CONWANY OIL
AMERICA, TRAVELERS CASUALTY AND SURETY COMPANY and FARMINGTON CASUALTY COMPANY,
corporations duly organized under the laws of the State of Connecticut, and hating their principal offices in the City of Hartford,,
County of Hartford, State of Connecticut, (hereinafter the "Companies") hatti made, constituted and appointed, and do by these
presents make, constitute and appoint: Thomas J. Joslin, Christine Marotta, Jim Ctithbertson, Karen Daniel, Kathleen J.
Malles, Linda Iser, Mary C. O'Leary, Sandra Martinez, Susan A. Welsh, Susan J. Preiksa, Geoffrey E, Heekin, Robert E.
Duncan, Patricia Thurmond, Jeunifer L, Jakaltis, Joanne M. Sloh,ik, of Chicago, Illinois, their true and lawful Attorney(s)-in-
Fact, Hith full power and authority hereby conferred to sign, execute and acknowledge, at any place witlun the United Slates, the
folloMrg insUUment(s): by hisfhcr We signature and act, any and all bonds, recogTuzances, contracts of indetnrtit),, and other
%v- itings obligatory in the nature of a bond, recognizance, or conditional widcrtaking and any rind all consent, incident thereto and to
bind tic companies, thereby as fully and to the same cxtpnt as d Lk same were signed by the duly authorized ollicers of the
Companies, and all the acts of said Attorneys) -in -Fact, pursuant to the authority herein given, arc hereby ratified and confirmed.
This appointment is made under and by authority of the following Standing Resolutions of said Companies, which Resolutions are
rniw in full fora and effect:
VOTED: That the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vncc President, any Vice President, any
Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or an)' Assistant Secretary may appoint Attorneys -in -Fact
and Agents to act for and on behalf of the company and may give such appointee such authority as his or her ufitificate of authority may prescribe
to sign with the Company's name and seal with the Company's seal bonds, rcwgrtizdti"s, contracts of indcrrutity, and other %%Things obligatory in
the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Director at any time may remove any such
appointee and revoke the power given him or her.
VOTED: That the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President
may delegate all or any part of the foregoing authority to one or more officers or ernployees of this Compare, provided that each such delegation is
in writing and a copy thereof is filed in the office of the Secretary.
VOTED: That any bond, recogni arice, contract of indemnity, or writing obligatory in the nature of a bond, rccopiizancc, or arnditional
undertaidng shall be valid and binding upon the Company %hen (a) signed by the President, any Vice Chairman, an) Executive Vice President, any
Senior Vice Presidrnt or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any
Assistant Secretary and duly attested and sealed %ith the Company's seal by a Secretarq or Assistant Secretary, or (b) duly executed (under seal• if
required) by ene or more Attorneys -in -Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or
by one or more Company officers pursuant to a written delegation of authority.
This Power of Attorney and Certificate of Authority Is signed and sealed by facsimile (mechanical or printed) under and by
authority of the Wowing Standing Resolution voted by the Boards of Directors of TRAVELERS CASUALTY AND SURETY
COMPANY OF AMERICA, TRAVELERS CASUALTY AND SURETY COMPANY and FARMINGTON CASUALTY
CONTPANY, which Resolution Is now In full force and effect:
VOTED: lhat the signature of each of the folloting officers. President, ant Executive Vice President, any Senior Vice President, any Vice
President, sny Assistant Vice Preaidetit, any Secretary, any Assistant Secretary, and the seal of the Company tray be affixed by facsimile to any
power of attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Sccrerancs or Attomevs-uo-Fact for
purfo= orJy of executing acid attesting bonds and undertakings mid other writings obhgatry irr die nature thereof, and any such paver of attorney
or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and
certified by such facsimile signature and facsimile seal shall bz valid and bprding upon the Company in the future aith respect to art%. bond or
wndertaking to which it is attached.
( 11-0Q SlmAud)
HOWAt SHOCKEY & SONS, INC,
I:STABLIS111:I) 1896
P. 0. BOX 2530, WINCI-IESTER, VIRGINIA 22604-1730
(540) 667-7700 FAX (540) 665-3211
April 25, 2001
Mr. Jeremy Camp
Fredrick County Department of Planning and Development
107 North Kent Street
Winchester, Virginia 22601-5000
Re: Kraft Distribution Facility
Site Plan 439-00
Winchester, Virginia
Dear Jeremy:
The following costs were prepared at the request of ProLogis Development Services
Incorporated in response to your inspection letter dated April 20, 2001.
1. Complete all required pavement and striping of all parking spaces as
depicted on Site Plan #39-00: $338,000.00
2. Stabilize and seed all disturbed areas of earth: $58,000.00
3. Complete planting of 55 deciduous trees in locations as specified on Site
Plan #39-00: $10,200.00
If you should have any questions or require further information regarding this issue
please contact Jeffrey Todd with ProLogis Development Services Incorporated.
Very truly yours,
Howard Shockey & Sons, Inc.
William H. Thomas, Jr.
Project Manager
S
T11f PART11ER 0T C1101OE
vIECEWED
APR 2 7 Z001
)FPT, 0= PLAN NiNG1nFVF10PNIENT
APR. 20, 2001 2:02PY
April 25, 2001
HOWARD SHOCKRY & SON
HOWAIP SHOC_KEY & SONS, INC,
':�TABLISHFI) 1896
r 0 11OX 25W. WIN(''HE�TER. VIRC:IINIA 22004.17)0
(540) h07-7700 FAX (i40) 665.1211
Mr. Jeremy Camp
Fredrick County Department of Planning and Development
107 North bent Street
Winchester, Virginia 22601-5000
Re: Kraft Distribution Facility
Site Plan #39-00
Winchester, Virginia
Dear Jeremy:
N0. H 39
0
The following costs were prepared at the request of ProLogis Development Services
Incorporated in response to your inspection letter dated April 20, 2001.
1. Complete all required pavement and striping of all parking spaces as
depicted on Site Plan 1139-00: $338,000.00
, 2, Stabilize and seed all disturbed areas of earth: $58,000.00
3. Complete planting of 55 deciduous trees in locations as specified on Site
Plan #39-00: 510,200.00
If you should have any questions or require further information regarding this issue
please contact Jeffrey Todd with ProLogis Development Services Incorporated,
1(/6, ono
Very truly yours,
Howard Shockey & Sons , Inc.
William H. Thomas, Jr.
Project Manager
Q/�� , 1— /, /��q, ifb0 &' rA.
AIIV71✓ilg-/-fU6/2UO Q%4C6tLfIJ
SHOCKEY
2. Ctl! Sr /e
Z. / c y3,' dc,c
/ , 5 50, 6co
• •FILE COPY
COUNTY of FREDERIC K
Department of Planning and Development
540/665-5651
FA \ : 540/ 678-0682
April 20, 2001
Prologis Development Services, Inc.
5200 Eisenhower Ave.
���►r®ram 00-
Alexandria, Virginia 22304 �Ie.-grej
RE: Inspection of Kraft Distribution Facility,
Site Plan #39-00, Stonewall Magisterial District
Property Identification Number (PM 54-A-36M
Dear Sir or Madam:
On April 20, 2001, I conducted an inspection for an occupancy permit of the above referenced project
at the request of Bill Thomas of Howard Shockey & Sons, Inc. During my inspection of the
property, I noted several site improvements that are required before an occupancy permit may be
issued. These requirements are as follows:
All required pavement as depicted on Site Plan 439-00. This shall include a second layer of
pavement over those areas that are already paved, but incomplete; two employee parking
areas with landscaped islands, curbing, and sidewalks; the circular drive around the building;
and where elsewhere specified.
2. Soil stabilization and seeding. All disturbed areas of earth need to be stabilized and seeded.
All required landscaping. Site Plan #39-00 calls for the planting of 55 deciduous trees. These
trees wiii oe located as specified. Other plantings are also proposed on the site plan, but are
not required for an occupancy permit.
4. Stripingofall parkin. spaces. This shall include all loading spaces, regular parking spaces,
handicap spaces, and loading zones.
Staff will consider approval of a temporary occupancy permit with a bond or other security. If this
is the desire of the owner, please forward at least two estimates for all of the above -mentioned
Page 2
Prologis, Kraft Distribution Center
Site Plan #39-00
April 20, 2001
improvements. Once staff receives this information, we will contact you regarding the dollar amount
needed. Whereas you do have other options, staff is providing you with an example "Irrevocable
Letter of Credit Bank Agreement" for your convenience.
If you have any questions or concerns, please do not hesitate to contact staff.
Sincerely,
10,4kl� ,
Jeremy F. Camp
Planner II
JFC/rsa
Enclosures
CC: Ed Strawsnyder, Director; Frederick County Public Works
John Trenary, Building Official; Frederick County Inspection
Gary Dubrueler, Fire Marshal, Frederick County Fire & Rescue
Bill Thomas, Project Manager; Howard Shockey & Son's (Fax: 665-3201)
llSystem 211share with fiSite Plan RestiewUnspection LettersWroftDistributionCenterinspLatter.xnd
•
•
IRREVOCABLE LETTER OF CREDIT
BANK AGREEMENT
BENEFICIARY:
PERMITTEE:
Treasurer, County of Frederick
107 N. Kent Street
Winchester, VA 22601
DATE OF ISSUE:
EXPIRATION DATE:
ISSUING BANK ABA NO.:
AMOUNT:
ISSUING BANK:
ADDRESS:
We hereby issue our Irrevocable Letter of Credit No.
Treasurer, County of Frederick, Virginia, for the account of
its agents, successors or assigns for a sum not exceeding
in favor of the
U.S. dollars ($ ) available by your sight draft on the above stated Issuing Bank and
accompanied by documents stated below:
A certified statement signed by the Zoning/Subdivision Administrator or an authorized representa-
tive, stating that
has not satisfactorily completed the construction of, and/or satisfactorily maintained, all physical
improvements that includes, but is not limited to, streets, curbing, gutter, sidewalks, above ground
facilities, underground utilities and facilities, recreational facilities, drainage systems, designated
open space and other required improvements located in or on
the approved subdivision or site plan.
A statement signed by the Zoning/Subdivision Administrator or his representative that: "The drawing
is for the explicit purpose of providing for the completion or maintenance of a required facility or
function pursuant to the requirements of Chapter 144, Subdivision Ordinance, and/or Chapter 165,
Zoning Ordinance, of the Frederick County Code and pursuant to the agreement of the Subdivider,
Developer, or his agent to comply with said ordinance as a condition of the approval of the
subdivision or site plan to the satisfaction of the Zoning/Subdivision Administrator."
We hereby engage with drawers, endorsees and bona fide holders that all drafts drawn in compliance
with the terms of this credit shall be duly honored upon presentation and delivery of the above
documents. This Irrevocable Letter of Credit shall remain in full force and effect for a minimum
of one (1) year from the date hereof and shall be automatically extended for additional terms of six
(6) months from the present or future expiration dates, unless sixty (60) days prior to such date or
dates, the above named bank or financial institution issuing the instrument, notifies the County in
writing by certified mail, that they elect not to renew the instrument for such additional period.
During the last thirty (30) days while this Letter of Credit is in force and effect after notice of
termination has been given, the County may draw up to the full amount of the sum when
accompanied by a document stating that has
failed to provide an acceptable substitute Irrevocable Letter of Credit or deposit in escrow, and a
document stating that "The drawing will be held by the County for the sole purpose of providing for
the completion and/or maintenance of the site plan and/or subdivision requirements to the satisfaction
of the Zoning/Subdivision Administrator or his authorized representative." This credit shall be
terminated upon the Zoning/Subdivision Administrator or his authorized representative giving written
release to (Permittee or Developer)
stating that they have satisfactorily performed and fulfilled the obligations and requirements of the
subject site plan or subdivision.
Attest:
Authorized Signature
Typed or Printed Name
Title
File: OALANDUS-,- BAPPLIC—1\CREDIT3LT
•
HP OfficeJet
Persgnal Printer/Fax/Copier/Scanner
i •
Fax History Report for
Frederick County Planning
665-6395
Apr 20 2001 2:25pm
Last Fax
Date Time Twe Identification Duration Pages Result
Apr 20 2:23pm Sent 96653201 1:50 5 OK
Result:
OK - black and white fax
OK color - color fax
�o�J� �a�CecV� -�o � � � rt�0�5 On �I2f��0 f - �S�}•
COUNTY OF FREDERiCK. VIRGINIA
DEPARTMENT OF INSPECTIONS
Caller B i h orv) Q,-S Time Called / 3 ca Date Called
Phone No.
-7 7o O Time Requested 10 t OQ Date Requested 'y 62 0 1(0 /
Received By 73— C R ^" — Date of Inspection qbo _10/
PERMIT HOLDER NAME
�'!•tq
a,3 lei • 5� A'^ 3 M SUBDIVISION For-4• Coll:e r 1,48
>,3Par_
RT. NO. S:G
n
STREET NAME t'' a` r K Q kV 4,
DIRECTIONS
t�
(f No (4h o
Wi vc !66 42(7 'i" �
BUILDING NO. _
p�-�o
13roCKG RG�1.
1eBrae Ke
PLUMBING NO. _
(e Ce
ELECTRICAL NO.
MECHANICAL NO
SIGN NO.
DISTRICT 0, li
PERMIT FOR: C
Tvae of Inspection
In
Commercial
Residential
(requ i njD)
2 S,
Z s' R Z S
Footers
Setbacks: FR
7S B K L
Draintile
Gas Fire -up
Final Electrical
Slab
Water
Service
Framing
Final Mechanical
Final
Site Plan 1� .
Sewer
Rough Electric
Rough Plumbing
Rough Mechanical
9
Final Building
Fire Marshall
Groundworks
Gas Pi in /Test
P 9
Final Plumbing
Special/Complaint
Other: F
Time In: D g Temperature �0.224 Cut in No.
Time Out: la: 50 Weather � V
may be- c 0)15idtrW
Results. App
roved roved Rejected �Qr �,� o-Se ct�t' Vy
['ar+�o�iN i1J� i,c�orl�• ,_
Comments:
U re-f .
Signature
1C�naw1 Cls S, b0'CT Grr- p b yew �yr %�
at,C oa 4vi] C U tFb Ng 5'i d wa i7�s .
Date !xz zo/C
0 •
TO:
FROM:
SUBJECT:
DATE:
COUNTY of FREDERICK
Department of I'lanning and Development
540/665-5651
FAX: 540/ 678-0682
MEMORANDUM
Site Plan Pile # 39-00, Kraft Distribution Facility
Amy M. Lohr, Planner II
Building Plan Modification
January 3, 2001
A revised site plan for the above -referenced project has been submitted which delineates an additional
3200 square feet of building area. A building permit was issued for project which showed 5900
square feet of office. The revised site plan shows 6200 square feet of office space. As long as the
total amount of office space does not exceed 6200 square feet, additional parking will not be
required.
U. UlmylComnonlSite PlansUpprove&2000 Site plans-approvalsWraft Uistribulion Facilily_revision to SP.ivpd
107 North Kent Street • Winchester, Virginia 22601-5000
FILE COPY
COUNTY of FREDERICK
Department of Planning and Development
540/665-5651
FAX: 540/ 678-0682
October 18, 2000
Mr. Jason J. Thomas, P.E.
Greenw•ay Engineering
151 Windy Hill Lane
Winchester, Virginia 22602
RE: Approval of Kraft Distribution Facility, Site Development Plan 439-00
Property Identification Number (PIN): 54-A-36M
Dear Jason:
The Frederick County Department of Planning and Development administratively approved the above -
referenced site plan on October 18, 2000. This site plan, for the construction of a 344,700 square foot
distribution facility, meets all County requirements for development within the M 1 (Light Industrial) Zoning
District. Parking for the site has been provided in the form of 108 regular parking spaces, five handicap
accessible spaces, and 157 loading spaces. It is staffs understanding that a revised site plan, which includes
additional office space, will be submitted for administrative approval. At that time, the site plan should reflect
all landscaping as required by Section 165-27E.(11) of the zoning ordinance. In particular, the landscaping
scheme in the South parking lot should be reconfigured to meet the intent of the ordinance.
I have provided you with several copies of the approved site plan. Please forward these approved plans to the
owner and advise the owner to keep an approved copy for their files. Furthermore, the owner should ensure
that an approved copy is maintained on the construction site throughout the development process. Once site
development has been completed, the owner should contact this office to schedule an on -site inspection.
Please do not hesitate to contact me, should you have any questions or need for elaboration regarding this letter.
Sincerely,
n?-clek'�'
Amy M. Lohr
Planner II
AML/rsa
Enclosure
cc: Charles W. Orndoff, Sr., Stonewall District Supervisor
June Wilmot, Economic Development Commission
Jane Anderson, Real Estate
Joe Wilder, Public Works
John Trenary, Building Inspections
U:'AmvCommonLSite PlansUpprow&2000 Site plans-approvaLi Kraft Dismbueon FaciHry_apr. wpd
107 North Kent Street • Winchester, Virginia 22601-5000
ft\ GREENWAY ENGINEERING
%47 151 Windy Hill Lane
Winchester, Virginia 22602
Fourufed in 1971
T R A N S M I T T A L
Project Name: Kraft — Final Site Plan
File No.: 0795P
Date: October 12, 2000
To: Frederick County Planning
Attn: Amy Lohr
Copied: Bill Thomas, Shockey
From: Jason Thomas, P.E.
GREENWAY ENGINEERING
Phone: 540-662-4185
Fax: 540-722-9528
Remarks: r-- Urgent r: For Your Review r; As You Requested n Please Comment
Message:
We have revised the Site Plan based on our 10/11 meeting. Five copies are attached for your
approval.
Thanks
Jason
Engineers Surveyors
Telephone 540-662-4185 FAX 540-722-9528
greenway@visuallink.com
FRCM :
FAX ND. : Ocs.
0 •
10 2000 01:36Pi1 P1
GREENWAY ENGINEERING
151 Windy Hill lane
Winchester, Virginia 22602
1'elephone 540-662-4185
FAX 540-722-9528
FACSIMILE TRANSMITTAL SHEET
10; FROM;
Array Lohr Juson'rhornas
CONUTANY: DATE:
Frederick County Planning OCTOBER 10, 2000
FAX NUMBER: TOTAL NO, OF PAGES INCLUDING COVER:
678-0682 � 7
PHONE NUMBER: SENDER'S REFERENCE NUMBER!
RE; YOUR REFERENCE NUMBER;
Kraft: Approvals
d URGENT X FOR RFVIFW lJ PLEASE COMMEN'r ❑ PLEASE REPLY ❑ PLEASE, RECYCLE
NOTESICOMMENTS:
Please see attached approvals for the above-roferenced project. Can we set up a meeting
tomorrow to discuss any Outstanding issues you may have?
Please contract me at your earliest convenience.
Thanks
Engineers Surveyors
Pounded in 1971
FROM : FAX 140. Oct.. 10 2000 01:38PIl P5
COUNTY OF FREDEMCK, VIRGYNIA
FIRE MARSHAL'S OFFICE
LAND DEVELOPMENT COMMENTS
Control No.S1000-0030R Date Received 9/25/2000 Date Reviewed 9/26/2000
Applicant Greenway Engineering Plan Rev. Date: 09/18/2000
Address 151 Windy Hill Lane
Winchester, Va. 22602
Project Name Kraft Warehouse Phone No. 340-662 4185
Type of Application Site Plan Current Zot7ing M-1
Ist Due Fire Co. 13 Ist Due Resette Co, 13 Election District Stonewall
Tax L D. No. 54-A-36M
RECOMMENDATIONS
Automatic Sprinkler SystcmXX ResidentLal Sprinkler System
Automatic Fire Alarm System, Other
Rr, QUIR.EMENTS
Emergency Vehicle Access
Adequate XX Inadequate Not Identified
Fire Lanes Required Yes XX NO
Comments : Fire Lane markings and signage at all fire hydrants and normal
& emergency access points to the structure, as well as Fast access road.
Roadway/Aisleway Widths Adequate XX Inadequate Not Identified
Special Hazards Noted Yes No XX
Comments
Hydrant Locations Adequate XX Inadequate Not Id(.11tified
Slamese Location Adequate XX frkadequate Not Identified
Additional Comments Attached? Yes No XX
Plan Approval Recommended? Yes XX No
Sibriaturo
FROM :
PX HD. :
Oct. 10 2000 01:39PM P6
•
GREENWAY ENGINEERING
151 Windy Hill Lane
Winchester, Virginia 22602
F�urta:gl •� 197(
T R A N S M I T T A L
Project Name:
Kraft.
File No.:
795P
Date:
October 5, 2000
To: Frederick Co Sanitation
Attn: John Whitacre
Copied:
From: .Jason Thomaskis
GREENWAY ENGINEERING
Phone: 540-662-4185
Fax: 540-722-9528
Remarks: C Urgent l'V For Your Review t`; As You Requested 1. Please Comirient
Message:
John,
Attached are 2 copies of the revised site plan for the above project.
Call with any concerns. ._--- — - --� — --
Engineers Surveyors
Telephone 540-662-4185 FAX 540-722-9528
greenway<cr�visuallink.coin
6 10 200e 01:37PM P3
Request For Site Plan Comments
Frederick County Inspections Cepartment
Mai to:
;:,ederick County trspect:crs CeFt.
Attn: Buildirg Official
4. 07 Noah Kent Street
'XYrcnester, VA 2260"
540) 865-5650
Hand deliver to:
107 N. Kent Street
Fourth Floor
Winchester, VA
(gW40)365-5660
Please `II cut the infcrmation as acc,_rately as pcssilrle in order tc assist the agercy with their
rev ew. Please attach one (1) copy of the site pian with this sheet
Accl;art's Name:�__�'�-C-��:
. ♦ � rrr �� r r . � �� i. % �iL
o -4-1R�
�cra Number. — l��cZ
Lame cf develcomert ar i- cr Cescr ctien of the request:
it +fir' L�
L::caticr, cf crcce ty �; . C2Gr,�^ ��,��rc—��.tu. _p�•�•t -
r �4
f SCec:',cr5 �;eCa�r-�ert's Ccmrnerts:
Corments are on tha rz=k Of _.--s =rn
r l
IAiptLtwas D�tpt_ u.se OnIv' f. ,
:eta Date rcrs F n mc�, t d Dsic appmv
Mor
_ _ -
FP.CM • WAY, IID, Oct. 10 2000 01:38PM P4
0
BL.i.ldirg shall ccTTl,,r wit' Vne Virgi:da (:nifir-n st awN Lde Bui.ldirg C:::ca and
Seddon 311, Use Groin S ( St --race ) of rite BCCA National Buildir-�- Ccda ; 1.96.
tither codes t.l.ac ap-c1v ar= G�BC AILI.1-92 rccessible aru: Usa:Dle rJLL11CGi 105 and
Fac_Ii aies .
?lease role sec--: on 507 of BCGy for Jr-.lL mi-ted area Build-inc, arO
�. cista ce t� �ronerty Lees ;riJho�t farerating the �rrr- r
snail r-cuir°- on St1.'Lk7tural plans suhmitted', and Chaprer 17
=erect=on of BCCA shall acrly-
=iC car'.tinc and wilding access aPcca s Lo .:.e in ccrrc�1iarce 3��ss door= s
: 11 with section 1007. 2 cf S=- ! f la ngs and? s:airwaya -e �rcv;.c.cr .
M?-%Y. travel - isra:ce ro shall nct excee~ 250' per BCC. .
�-1
•
Mr. Jason J. Thomas, P.E.
Greenway Engineering
151 Windy Hill Lane
Winchester, Virginia 22602
Re: Site Plan Comments - Kraft Distribution Facility
Fort Collier Industrial Park
Frederick County, Virginia
Dear Jason:
COUNTY of FREDERICK
Department of Public 'Works
540/665-5643
FAX: 540/ 673-0632
September 27, 2000
Upon review of the revised site plan dated September 18, 2000, all of our previous
comments have been addressed. Therefore, we recommend approval of the subject site plan.
We request a copy of the Corps of Engineers stream crossing permit be submitted to our
office, upon its approval, for our records.
If you have any questions, do not hesitate to contact me.
Sincerely,
Joe C. Wilder
Engineering Technician
jew
cc: Frederick County Planning Department '
file
107 North Kent Street • Winchester, Virginia 22601-5000
I51 client y I fill Virginia
\V'inchcstcr, Virginia 22602
1
Founded to 1971
September 25, 2000
Frederick County Department of Planning and Development
107 North Kent Street
Winchester, Virginia 22601-5000
ATT: Amy Lohr, Planner II
RE: Kraft Distribution Facility — Site Plan Comments
Dear Amy:
Please accept this response to your comment letter dated August 16, 2000.
1. The current owner of the parcel has been revised. We will revise the owner information once the
property is purchased from Prologis.
2. The use of adjoining parcels has been identified.
3. Survey coordinates have been added to the parcel.
— 4. The required 75' setback has been added to the Plans.
5. The sidewalk has been extended at the West Lot.
6. No signs are proposed at this time. A statement has been added to the cover sheet.
-7. Outdoor lighting has been identified on the architectural plans. We will add this information to
the Site Plan when made available by the architect. 1 i ; ;..,,;t
8. No outdoor storage areas are proposed. A statement has been added to the cover sheet.
9. No outdoor trash receptacles are proposed. A statement has been added to the cover sheet.
10. A statement on the maximum building height has been added to the cover sheet.
11. A statement has been added requiring all new utilities to be placed underground.
12. The office use has been indicated on the cover sheet.
13. Curb and gutter has been provided along the extended sidewalk. Since the west parking lot was
designed to drain as sheet flow, we propose the use of wheel stops as shown to allow stormwater
to pass into the swale.
14. The pavement sections were added to Sheet 2. These designs were provided by ECS and are
subject to field verification of CBR values.
15. The typical loading space dimensions have been added to the plans.
16. Information on the environmental features has been added to the cover sheet.
A revised copy of the Plans is attached for your review. In addition, we incorporated Swale B into Swale A
and eliminated the storm sewer. The revised stormwater calculations are attached. The performance of the
overall stormwater management plan was unchanged.
Please contact me if you require further information to approve this Plan.
Sincerely,
Greenway Engineering
Ja . Thom P.E.
Enginccrs Surveyors
File 11795P/1TT/dls Telephone 5,10-662-4185 FAX 540-722-9528
• .
GREENWAY ENGINEERING
151 Windy Hill Lane
Winchester, Virginia 22602
F7urkW !n 17%1
T R A N S M I T T A L
Project Name:
Kraft
File No.:
795P
Date:
September 25, 2000
To: Frederick Co Planning
Attn: Amy Lohr
Copied:
From: Jason Thomas/ds
GREENWAY ENGINEERING
Phone: 540-662-4185
Fax: 540-722-9528
Remarks: r" Urgent R For Your Review r- As You Requested r" Please Comment
Message:
Amy,
Attached are a copy of the storm water report, the revision letter, and a copy of the revised site
plan for the above project.
Call with any concerns.
RECEIVED
SEP 2 5 2000
DEPT, OF PLANNING/ DEVELOPMENT
Engineers Surveyors
Telephone 540-662-4185 FAX 540-722-9528
greenway@visuallink.com
0
0
I
Mr. Jason J. Thomas, P.E.
Greenway Engineering
151 Windy Hill Lane
Winchester, Virginia 22602
Re: Site Plan Comments - Kraft Distribution Facility
Fort Collier Industrial Park
Frederick County, Virginia
Dear Jason:
COUNTY of FREDERICK
Department of Public Works
540/665-5643
FAX: 540/ 678-0682
September 5, 2000
Upon review of the subject site plan, we offer the following comments:
1. All the erosion and sediment control comments for the mass grading plan dated August 2,
2000 shall be incorporated into this site plan.
2. Provide pavement sections for all proposed concrete and asphalt paving on -site.
3. Provide adequate grading from the existing stormwater pond on the Green Bay Packing
site to the new stream channel section created by this development.
4. Indicate if the existing 24 inch CMP below the proposed creek crossing will be removed.
Provide adequate grading within this area.
5. Provide a copy of the geotechnical engineering report for our files.
If you have any questions, do not hesitate to contact me.
cc: file
Sincerely,
Joe C. Wilder
"4Engineering Technician
107 North bent Street • Winchester, Virginia 22601-5000
STORM WATER MANAGEMENT
ANALYSIS
KRAFT DISTRIBUTION FACILITY
FORT COLLIER INDUSTRIAL PARK
FREDERICK COUNTY, VIRGINIA
July 20, 2000
Revised: September 19, 2000
GREENWAY ENGINEERING
i r
` • 0
STORM WATER MANAGEMENT ANALYSIS
KRAFT DISTRIBUTION FACILITY - FORT COLLIER
September 19, 2000
Description:
The Kraft Distribution Facility has been proposed for Lot 54-((A))-36M off Park Center
Drive in Fort Collier Industrial Park. The project consists of a 344,700 s.f. distribution
facility and associated truck courts. The site is vacant and covered with grass and
scattered trees.
Existing Conditions
The existing property is one of four remaining un-developed lots in the Fort Collier
Industrial Park. A railroad spur borders the site to the north and east, and Red Bud Run
borders the site to the south and west. The site drains to Red Bud Run, a perennial
stream, which has a 3,395-acre drainage area at the site. The stream has been diverted
along the west side of the site around Green Bay Packaging. A drainage area map is
included as Attachment A. Native soils on the site consist of Frederick Poplimento
Loams (14B) of hydrologic soil group C.
Storm Structure Sizing
All storm structures on site were sized to pass a 10-year storm. The Red Bud Run
crossing was sized to pass the 50-year storm. Part of this project includes the
channelization of a portion of Red Bud Run. The proposed channel was sized to carry
the 100-year storm. Based on the calculations provided in Attachment B, the 100-year
storm over -tops the driveway at elevation 674.16'.
5
Stormwater Management
In order to determine the effects of the Kraft development in the watershed, a model for
the 10-year storm was created for pre- and post -development using Hydraflow Version
5.01. Each model is described below.
Since the 22.2-acre site drainage area is less than 1% of the total upstream drainage area
(3,382.6 ac, AREA -A and AREA-B), no stormwater detention is proposed for this site.
However, in order to slow velocities and improve water quality, a series of grassed
swales are proposed. The swales have been sized to pass the 10-year storm at velocities
below 7 fps and 2-year storm velocities below 4 fps, in accordance with Virginia
Stormwater Management Handbook Minimum Standard 3.13. Rock check dams have
been specified for the swales to slow velocities and provide some detention.
Pre -development:
A total of three drainage areas were modeled. AREA -A was the Red Bud Run watershed
to the railroad spur culvert at World Wide Pasta, just upstream of the I81 culvert.
AREA-B represented the Red Bud Run tributary watershed. AREA-C was the watershed
located between the railroad spur culvert and I81. The 10-year peak flow is tabulated
below.
Post -development:
For post -development conditions, the Kraft site was divided into two drainage areas, each
discharging into a swale. To determine the detention effects of the swales, each was
modeled in the network. KRAFT-A drains to Basin A which discharges into Red Bud
Run upstream of the driveway culvert crossing. KRAFT-B drains to Basin B which
discharges into Red Bud Run below the driveway culvert crossing. The peak flow at
Node 7 was used to size the driveway culvert crossing (50-year storm). The Kraft
drainage area was removed from pre -development AREA -A. Results are tabulated
below.
1 • •
KRAFT
�Q" �1'ATTACHMENT A f i
ol
WS
*747
rp-&v
ZA�
(•, )) .1![,,��j'{_�,' ,.��X '�il� •.,• is \ �• �• • ,
814
I
,—
/ r
CD
Sla
ru
SUA
CD
Sunes `, . • I
228.7 o ram• �;
p �• 1,ow
y• '��t �.����i' .Yr - '�• dQ •�
cn
Ol
"ter
n�iCD
!� •• .' : it ) i , r f '�
cn
wLL-
"[UJ
cc
LA -
{I tr L * �• ,,•
x r e rom 1 1�CS �fi9 d8owm Ploduihons (www lopo tom
ATTACHMENT B
KRAFT DISTRIBUTION FACILITY
STORM STRUCTURE SIZING
HYDRAULIC CALCULATIONS
GRASSED SWALE CALCULATIONS
TZ-n
1.00IA :o3inoS
Z661 .
4r-=4f7 •
AVERAGE VELOCITIES FOR ESTIMATING TRAVEL TIME
FOR SHALLOW CONCENTRATED FLOW
.50
.20
c1 -
005 -
fififa ..�M.....f�fafafa O M f1 �INfafafa
fififafaftfifi/pfi'�fi--
fififififi�fi�■/�fi�fif ffff� fifi■■fi/■///fi�fi��
ttt�tt�t�� MEOW ass �i1110
0111010111011110111
■■mmm uumllll q�// n1i�■■■■■
■■■■■i0 11111111111 ■SWAG ,inmomme
MENNEMN ■m■■Uunli tttt N
■■■■■100011 UIII/J�iUUU■■■■
Nf hngliummmol
Sri =IIfff�ffi�fi
fifif�f��fi..it�f11/ f�f�1►. fff� ■fi�ffiffffiffffffifif.
�t»•�ii�uii�iiu�uiui�ii a�unn���Ai
saw,
�wwNwww .w����www
MM./..faf tN./ faN.fi�ffafififafafa
�R nni�a== �st��n
nst•���iNo�, r wiunns�aunNIt•NNOMMu
MEOE MEW =ni oannnt���■
�e�� anaau��a■
eggs=on aaaanm�mm
u��■�a■
j � di t U■■�■
�■/■■U�flilill■UB■U■�■■■
III ■�/■�/ ■1 U111 ■ U N Y it ■■■■■
��i■■■I�Iti111■q■■U■■■■
■►�►�■■■■u■ um n U n■e■n■■
1992
i t t t t t t t t t t t
1 2 4 6 10 20
Average velocity. (R./sec.)
Source: USDA-SCS Plate 5-2
V - 12
x
W
1 - AR OPENING AREA
*I-MCUT _URB)
2 ? Z 5 6 8
DIMAAgE n (FT 3/ s
- _ i J aC 5C Sc 9C CC
CHART 14 Grate inlet capacity in sump conditions.
d-60
Rev 6-85
r - w \\
.—w— _ ---
DISCHARGE Q (F' 3,'S)
CHART 17 Depressed curb —opening inlet capacity in Sump locations.
NOTE: For VDH&T Standard
Inlets use this chart for
weir flow only.
4-64
Rev 6-85
OCHART
2
— 180
,-
- 168
— 156
— 144
— )32
_
a
— 120
— 106
a
_
— 96
a
u
— 84
a
m
72
N
W
:J
Z
— 6C
Z
—
— 54
5
48
>
U
— 42
O
W
-
- 36
W
— 30
i
— 27
a
a
— 24
x,
wm-=7
W
a
•
r 10,000
8.000
EXAMPLE
(I,
- 6,000
D.36 -aches (3.0 root,
6.
_ `,000
0.66 ers
,
— 4,000
— 6,
— 3,000
0 (rooq
-
S.
6.
_
n) 1.e 5.4
- 2,000
(a 2.1 6.3
-
-
S.
(3) 2.2 6.6
`
4.
•D ,. foot
3.
_
4,
— 1,000
-
— 3_
-
— 8010
— 600
— 2.
-
- 500
-
-
- 400
r--�---�
500
— 200
-
1u
-
— 100
S
— so,
— 60
/
Z
_
— SO
—_ 1.0
— 1.0
— 40
W
0
-
0
-- —
= 30 MW SC{!tc
Ey'RPNCE
E
wi
1
—
- 20
a "
.9
_ (1
H44u.on
- (2)
chorea to co.fo l
a
T
.7
l — 6
4
3
Z
2
i
— 1.0
BU.EAU 0s PUBLIC ROADS jAh 1963
'o use •Colo 121 or :3) oreloct
ftw-roeN11) 10 SCSI@ (11. •hew —,6
•SS St'41901 Iwelrn44 1-6 .6
0 sac 0 stoles, o• rSgrso co .6
11YStlar.. -
5
182
HEADWATER DEPTH FOR
C. M. PIPE CULVERTS
WITH INLET CONTROL
DESIGII OF OUTIET PROTECTION FROM A ROUND PIPE FIOWING FLJI1.
Mll IMU11 TAIIWATER CONDITION (Tw � 0.5 DIAMETER)
3 --
fit)
{--
Outlet — W - Do r la
Pipe 2 Min.
Diameter, Do i ell-
Ili
�
I
--- La --
6(1 II I�il IIII li ,..
<��•
Tjilwater 0.5DO IIII
=-
r of
\e���. 50 I j IllII.�l
b T'
4) 1 1 {.( II,11 .... i........
i! j.,
31 , , I ; . IN.
11
{ Min.
1
fell In0 nn
Disl harelr-, it
Q
3
1-10
1000
tJ
-Al
C:)
PROJECT .,KRT_DlS711goTl )J —
STATION : 1p,(g{�Q
CULVERT DESIGN FORM
_xr,0 !300!::) Ab,.l G�n'�r/A•� _
SHEET Of
DESIGNER /DATE . /
REVIEWER/DATE: /
-HYDROLOGICAL DATA
Elnd It ROADWAY ELEVATION 673.761ii1
-
r ❑ METHOD
~ ❑ DRAINAGE AgEA. I STREAM SLOPE
C CHANNEL SHAPE
�s s
Itwi 11d - (H) So: I
1
W
aWi ❑ ROUTING ---- _ - -. OTHER
-
-i
Q�SIOt� fLOW3/TAILWAj�R
ELI �SS.6J ltll� FALLTw
R 1 (YEARS) FLOWIcIEI TW(It)
�EL
Sa. Sa-FALL/La
____Ilt)
9S
/rJy -4
La.
CULVERT DESCRIPTION:
-
TOTAL
FLOW
HEADWATER CALCULATIONS
MATERIAL - SHAPE -SIZE -ENTRANCE
FLOW
PER
IIARRE L
i
;
u u
INLET CONTROL
OUTLET CONTROL
O/N
c >
�u�
c
�u
COMMENTS
HIM/D
HWI
FALL
EL
TW
do
dctD
no
Ea
M
EL no
IcIDF)
i
3
•
S
2
u Y W
Oyx
TECHNICAL FOOTNOTES: (•) EI h,' HWI$ ELI(INVERT Of (6) na • IW at IdcFD/2)( WHICHEVER tS GREATER)
11) USE O/NB FOR BOX CULVERTS INLET CONTROL SECTION) (7) H•CL E•F 129R2
LI /R133 Vt/2Q
(2) HWI /D• HW /D OR HWt/D FROM DESIGN CIIA14TS U) IW BASEU ON DOWNSTREAM (0) Et.F�,o!• LLa. Hna
CONTROLOR FLOW DEPTHIN
(3) FALL- HWI-IELnd- EL.11, FALL IS ZERO CHANNEL.
FOR ADE
-SUBSCRIPT DEFINITIONS _
COMMENTS / DISCUSSION;
-- -- - - - -
CULVERT BARREL SELECTED
-
a APPROXIMATE
S I Z E
1 CULVERT FACE
hd DESIGN NEADWATER
EI HEADWAIER IN INLET CONTROL
he HEADWATER IN OUTLET CONTROL
SHAPE
1 INLET CONTROL SECTION
a OUTLET
o1 StAEAMBED AT CULVERI FACE
MATERIAL : n
ENTRANCE
0
0
2AFT
1
•-
-7 2 " 2CPS
•
0
CHART
1 0
—ISO
10,000
—
.- 168
8,000
EXAMPLE
(3)
—
6.
156
�- 6,000
0•42 acuae (3.5 fset)
r
6
- 5,000
0.120 cfe
S.
_ 144
-
- 4,000
'�R • mw
r 6.
r
5.
+
- 132
o faat
`
4.
- 3,000
(1) L.S �.�
~ 5'
4
— i20
-
(2) 2.1 . 4
i
-
-
- 2,000
(3) 2.2 '.7
��4.
-106
-
F
-3.
r
teat
6-
- 96
- 1 ,000
1- 3.
-
- 800
-84
/
2—�2
600
-
�- 500
-
-
400-
w
`
•+�
=
-.5
_ 1.5
60
v
- 200
---�_W
,.S
J
_
- 54
a
�/'
<
_
L
W
- 48
= 100
z -
-
>
/
c
— 80
D
60
W
- ;.0
.0
- SO
HW ENTRANCE
SCALE
0
tr
- 4o
D TYPE
W
t—
36
— 30
(1) Severe at"
<
- 9
- .9
W
-
neaaeran
30 — .9
-
a
— 33
=
a
_— 20
(2) Gessee e04 —114
W
— 30
-
;31 Grecse sea
— '8
PraNclla�
—
IC
24
6
To -se scale (2) or (3) Protect
-
— 21
` 5
nerliontellf to &sale (I), Thee
^
— 4
aat &tralyM uCltnsa Ilse tere"IT
F
0 one 0 scale&, of lowered as
.6
—
— 3
nmetraua.
6
.6
— 18
-
2
-
-
_ 15
.
r
C
- .5
L I.0
L .S
12 HEADWATER DEPTH FOR
HEADWATER SCALES 2153 CONCRETE PIPE CULVERTS
REVISED MAY 1964 WITH INLET CONTROL
BUREAU OF ► LIC ROAOa JAM 1N3
181
KRAFT DISTRIBUTION FACILITY
Red Bud Run Stream Crossing
Road Over-topping/Weir flow analysis
Avail Capacity before over -topping 1550
cfs
100-yr Peak 1646.75
cfs
(see storm calcs)
Q over -topping road 96.75
cfs
Q = Cs ' b ' (H)1(3/2)
Cs = 3
Low Point of Road = 673.76
HW ELEV.
HW DEPTH
ROAD WIDTH
Q
673.76
0.00
0.00
0.00
674.01
0.25
98.98
37.12
674.06
0.30
108.9
53.68
674.14
0.38
124.45
87.46
674.16
0.40
128.34
97.40
674.26
0.50
147.80
156.77
674.76
1.00
245.00
735.00
675.26
1.50
342.90
1889.84
WEIR FLOW
Inlets.xls
9/19/00
W N
INLET NO.
m o rn
N
PE
LENGTH (fl)
I I I
Station
Street
I I I
m
I N I
RIM
b
0
D.A. (acres)
- o
0 0 0
is is m
O O N
C
CA
o
o t
N W
CA ACCUM.
O0 o �
A. -+
1 (In/hr)
91 m W
0 INCR (cfs)
N
0 0 o
8ge
O CARRYOVER
Ot GUTTER FLOW
8m N�;�l
N
S, GUTTER SLOPE
I I
0 0 0
oO g
Sx CROSS SLOPE
T (SPREAD)
I I
I I I
W (n)
I I
T1W
I I I
WIT
Sw (run)
I i I
I I I
SW/Sx
Eo (No. 10)
I I I
a
Sw = a/(12W)
So (fufl) = Sx + Sw'
Ll (fl) formula
P Effective Lonpth, ft
ULt
I I I
O
(N�
M N N
d(ft)
E formula
N J
(Qp)
O N -+l
O Intercepted (cfs)
d/h (if < 1.2, weir flow
I I
Ob carry-ovor (cfs)
w m
am
_
Z(4n n 8
T Spread Q Sap (0)
A
m
r�-
N
0
X
3
n
m
m
z
r
0
O
3
0
c
n
O
z
rn
STORM SEWER DESIGN COMPUTATIONS
nlRCDI = n mz nfr&AD% - n mZ
CULVERT
FROM
POINT
TO
POINT
D.A.
D.A.
(acres)
RUNOFF
COEF. (C)
CA
INLET Tc
(MIN)
1
(IN/FIR)
0 (10)
(CFS)
INV. IN
INV. OUT
LENGTH
(FT)
SLOPE
(FT/FT)
HEIGHT, B
(IN)
WIDTH, W
(IN)
DES. CAP.
(CFS)
VEL.
(FT/SEC)
FLOW
TIME (MIN)
NOTES
Cap. Chk
INCR.
ACCUM.
1
STR 1 TOUTLET
Al-B2
1.83
0.62
1.13
1.13
5.0
6.8
7.71
674.10
670.00
120
0.034
16
1B
10.99
6.22
0.3
cM=
o.k
2
STR 2
OUTLET
D
0.46
0.90
0.41
0.41
5.0
6.8
2.82
671.00
670.50
60
0.008
1 15
15
3.34
2.72
0.4
cMv
c.k.
3
STIR 3
OUTLET
E
1.13
0.90
1.02
1.02
5.0
6.8
6.90
674.20
672.00
40
0.055
1 15
15
8.58
6.99
0.1
cm,
o.k.
0
•
LD-229
Iniets.xis
9/19/00
Channel Sizing Calculations
0
0
KRAFT
RED BUD DIVERSION
MAIN CHANNEL
LOW FLOW
SWALE A
SWALE B
Area (ac)
9.03
7.10
C
0.75
0.71
Tc (min)
7.4
5
1(2) (in/hr)
4.7
5.3
1(10) (in/hr)
6.2
6.8
Q(2)cfs
215.08
31.83
26.78
Q(10)cfs
826.06
1.90
41.99
34.36
Ditch Type
TRAP
TRAP
TRAP
TRAP
Invert In
669.0
669.0
674.0
662.0
Invert Out
663.9
668.5
671.3
659.8
Length(ft)
449.99
100
1345.3
488
Channel Slope(%)
1.13%
0.50%
0.20%
0.45%
Width(ft)
40
1
35
25
SS (x:1)
3
1.5
3
3
Manning's n
0.035
0.035
0.04
0.04
Flow Area (sqft)
47.63
1.28
25.58
16.08
Wetted Perimeter (ft)
46.96
3.34
39.36
28.79
Trial Q (cfs)
217.7
2.0
32.0
27.2
Trial Depth (ft)
1.10
0.65
0.69
0.60
2-Yr Velocity (fps)
4.57
1.59
1.25
1.69
10-Year Depth (ft)
2.40
1.05
0.82
0.69
10-Yr Velocity (fps)
1.39
1.85
RIP RAP APRON DIMENSIONS
CULVERT
Q(10)
La (ft)
W (ft)
RIP RAP
1
7.71
5
5
CLASS 1
2
2.82
4
4
CLASS Al
3
6.90
4
4
CLASS Al
REFER TO OUTLET PROTECTION DETAIL.
DITCH
Inlets.xls
9/19/00
Legend
Runoff
Hydrograph Summary *port Page 1
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(cfs)
Time
interval
(min)
Time to
peak
(min)
Volume
(cuft)
Return
period
(yrs)
Inflow
hyd(s)
Maximum
elevation
(ft)
Maximum
storage
(cuff)
Hydrograph
description
1
SCS Runoff
833.51
2
810
12,122,330
10
—
AREA -A
2
SCS Runoff
683.36
2
780
7,443,127
10
—
AREA-B
3
SCS Runoff
185.69
2
750
1,306,271
10
—
AREA-C
4
Reach
681.26
2
784
7.443.124
10
2
REACH-B
5
Combine
1461.27
2
806
19,565,480
10
1 + 4
RR X-ING
6
Combine
1523.70
2
802
20,871,750
10
3 + 5
1-81 CULVERT
ATTACHMENT D
KRAFT DISTRIBUTION FACILITY
POST -DEVELOPMENT ANALYSIS
Legend
Runoff
Combined
Channel Reach
• Diversion
Pond Route
Project: POST-100-ALT2. WDF: Fredcova.idf 17 hyd's 09-19-2000
Hydrograph Summary 10port io—Y/L • Page 1
Hyd.
No.
Hydrograph
type
(origin)
Peak
flow
(cfs)
Time
interval
(min)
Time to
peak
(min)
Volume
(cuft)
Return
period
(yrs)
Inflow
hyd(s)
Maximum
elevation
(ft)
Maximum
storage
(cuft)
Hydrograph
description
1
SCS Runoff
827.11
2
810
12,029,16
10
—
AREA -A
2
SCS Runoff
683.36
2
780
7,443,127
10
—
AREA-B
3
Reach
681.26
2
784
7,443,124
10
2
—
REACH-B
4
SCS Runoff
52.59
2
718
127,348
10
--
KRAFT A
5
Reservoir
47.85
2
720
96,309
10
4
673.14
42,260
ROUTE-KRAFT-A
6
SCS Runoff
43.45
2
716
93,871
10
--
--
—
KRAFT-B
7
Combine
829.35
2
810
12,125,46
10
1 + 5
—
CROSSING
8
Combine
1457.22
2
806
19,568,59
10
3 + 7
—
ADD TRIBUTARY
9
Combine
86.90
2
716
187,743
10
6 + 6
ADD TO KRAFT-B
10
Reservoir
84.85
2
718
184.161
10
9
660.68
12,720
ROUTE BASIN-B
11
Combine
1460.54
2
804
19,752,76
10
8 + 10
--
TRIBUTARY AND BASI
12
Reach
1461.53
2
806
19,752,76
10
11
—
RED BUD BELOW KRAF
13
SCS Runoff
185.69
2
750
1,306,271
10
--
AREA-C
14
Combine
1520.39
2
804
21,059,02
10
12 + 13
181 CULVERT
15
SCS Runoff
11.68
2
726
38,433
10
—
PRE -A
16
SCS Runoff
13.76
2
726
45,290
2
—
PRE-B
17
SCS Runoff
32.61
2
718
78,975
10
—
—
KRAFT-B
Proj. file: POST-10-ALT2.GPW
IDF file: Fredcova.idf
Run date: 09-19-2000
Hydrograph Summary Isport Page 1
Hyd.
No,
Hydrograph
type
(origin)
Peak
flow
(cfs)
Time
interval
(min)
Time to
peak
(min)
Volume
(cuft)
Return
period
(yrs)
Inflow
hyd(s)
Maximum
elevation
(ft)
Maximum
storage
(cuft)
Hydrograph
description
1
SCS Runoff
1506.50
2
808
20,621,42
50
—
—
AREA -A
2
SCS Runoff
1243.55
2
780
12,759,66
50
—
—
AREA-B
3
Reach
1241.71
2
782
12,759,66
50
2
—
REACH-B
4
SCS Runoff
72.22
2
718
178.558
50
--
KRAFT A
5
Reservoir
68.46
2
720
147,519
50
4
673.23
45,177
ROUTE-KRAFT-A
6
SCS Runoff
59.60
2
716
131,620
50
—
KRAFT-B
7
Combine
1509.59
2
808
20,768,92
50
1 + 5
—
CROSSING
8
Combine
2630.48
2
804
33,528,57
50
3 + 7
ADD TRIBUTARY
9
Combine
119.19
2
716
263,240
50
6 + 6
ADD TO KRAFT-C
10
Reservoir
116.64
2
718
259,657
50
9
660.84
14,911
ROUTE BASIN-B
11
Combine
2634.98
2
804
33,788,24
50
8 + 10
TRIBUTARY AND BASI
12
Reach
2635.89
2
804
33,788,22
50
11
RED BUD BELOW KRAF
13
SCS Runoff
336.56
2
750
2,239,321
50
—
AREA-C
14
Combine
2739.86
2
800
36,027,52
50
12 + 13
—
181 CULVERT
15
SCS Runoff
11.68
2
726
38,433
10
—
—
PRE -A
16
SCS Runoff
13.76
2
726
45,290
2
—
PRE-B
17
SCS Runoff
32.61
2
718
78,975
10
--
--
KRAFT-B
Proj. file: POST-50-ALT2.GPW
OF file: Fredcova.idf
Run date: 09-19-2000
Hydrograph Summary leport Page 1
Hyd.
Hydrograph
Peak
Time
Time to
Volume
Return
Inflow
Maximum
Maximum
Hydrograph
No.
type
flow
interval
peak
period
hyd(s)
elevation
storage
description
(origin)
(cfs)
(min)
(min)
(cuft)
(yrs)
(ft)
(cuft)
1
SCS Runoff
1643.51
2
808
22,345,78
100
—
—
AREA -A
2
SCS Runoff
1355.80
2
778
13,826,60
100
—
AREA-B
3
Reach
1354.16
2
782
13,826,60
100
2
REACH-B
4
SCS Runoff
75.88
2
718
188,218
100
—
KRAFT A
5
Reservoir
72.19
2
720
157,179
100
4
673.24
45,610
ROUTE-KRAFT-A
6
SCS Runoff
62.61
2
716
138,740
100
—
KRAFT-B
7
Combine
1646.75
808
22,502,97
100
1 + 5
CROSSING
8
Combine
2
804
36,329,54
100
3 + 7
ADD TRIBUTARY
2865.59
9
Combine
125.21
2
716
277,480
100
6 + 6
ADD TO KRAFT-B
10
Reservoir
122.51
2
718
273,899
100
9
660.87
15,280
ROUTE BASIN-B
11
Combine
2870.31
2
804
36,603,46
100
8 + 10
TRIBUTARY AND BASI
12
Reach
2871.82
2
804
36,603,41 C
100
11
--
RED BUD BELOW KRAF
13
SCS Runoff
366.69
2
750
2,426,573
100
—
—
AREA-C
14
Combine
2985.25
2
800
39,029,97
100
12 + 13
—
181 CULVERT
15
SCS Runoff
11.68
2
726
38,433
10
—
—
PRE -A
16
SCS Runoff
13.76
2
726
45,290
2
—
PRE-B
17
SCS Runoff
32.61
2
718
78,975
10
—
KRAFT-B
Proj. file: POST-100-ALT2.GPW
OF file: Fredcova.idf
Run date: 09-19-2000
FRCH cW, N0, 0 ?. 10 2000 01:40PH P7
t
1
COMMONWEAM-1 of VIRGINIA
DEPARTMENT OF TRANSPORTATION
EOINBURG RESIDENCY
14. ,' (A.D vALLEY �IKF_
CHARLES O..NOT-INGHAM FCINFIJ�G /A 2-1$1d ';ERi2Y A. (;QPP
.:; nPngSPiN[R ".i)CENT _NGINFFR
August 16, 2000 ,.1l).f-I,'E,.-507
Mr. Jason J. Thomas, P.E. Reis: Kraft Distribution Facility
C/0 Greenway Engineering Route 1323, Park Centre Drive
151 Windy Hill Lane Frederick County
Winchester, VA 22602
Dear Jason;
We have received your revised site plan dated 07/20/00 (received 07/26/00)
for the referenced project, It appears all of our earlier review comments
have been satisfactorily addressed. Please advise the owner of our
approval. Also please provide 7 sets of approved construction plans
with signed seal for VDOT distributioti.
Plans should be provided with cover Sheet 1 of 7 accompanying each set.
The appropriate land use permit may now be applied For to cover work
within the Route 1323 right-of-way, The permit is issued by this office and
will require a minimum processing fee, surety bond coverage, and the salary
& expenses of a State assigned Inspector.
Once satisfactory application has been made, a permit will normally take
approximately thirty days to process and issue. Should you have any
questions, do not hesitate to call.
Sinreerely, ,
Barry J, Sweltzer, Trans. Roadway Engineer
For; Steven A. Melnikoff, Transportation Engineer
BJS/rf
xc: Mr, Dave Heironimus
Mr. Kris Tierney
WE KEEP VIRGINIA MOVING
f
14
• FILE COPY •
COUNTY of FREDERICK
Department of Planning and Development
540/665-5651
FAX: 540/678-0682
August 16, 2000
Mr. Jason J. Thomas, P.E.
Greenway Engineering
151 Windy Hill Lane
Winchester, Virginia 22602
RE: Kraft Distribution Facility, Site Development Plan #39-00
Dear Jason:
I have had the opportunity to review the above -referenced site plan submitted to our department on
July 21, 2000. The following comments should be addressed and included in a revision of this site
plan. The enclosed plan is also marked with these comments.
Real Estate records indicate the owner of the subject parcel to be Fort Collier Group, LLC,
of 6231 Leesburg Pike STE 600, Leesburg, Virginia 22044. Please insure that all owner and
developer information is correct.
2. Please include the use (i.e. industrial, commercial, vacant) and zoning of each adjoining parcel
cited on Sheet 7. In addition, please include Parcels 43-A-44 and 43-A-154 on the adjoiners
map and provide their use and zoning as well.
— 3. Please provide survey coordinates for the subject parcel. I have enclosed a photocopy of the
revised Master Development Plan for Fort Collier Industrial Park (approved February 24,
1998) which contains survey coordinates. Please ensure that this information is accurate
before including it on the site plan.
_ 4. Please delineate the required 75' front setback from Park Center Drive.
5. Please extend the sidewalk on the West Lot. Please refer to Sheet 5 of the mark-up plan for
IV details regarding the location of the sidewalk.
6. Please show the location, height, and dimensions of all proposed signs. If no signs are
proposed, please provide a statement to that effect.
107 North Kent Street - Winchester, Virginia 22601-5000
4
•
Page 2
Mr. Jason J. Thomas, P.E., Greenway Engineering
Re: Kraft Distribution Facility, S.P. #39-00
August 16, 2000
•
7. Please provide information regarding the location and specifications of all outdoor lighting.
Outdoor lighting should be directed to avoid casting light on adjoining properties and
roadways. If no outdoor lighting is proposed, please provide a statement to that effect.
8. Please show the location of all outdoor storage areas. If no such areas are proposed, please
provide a statement to that effect.
9. Please show the location of all proposed outdoor trash receptacles. If no such receptacle is
`" proposed, please provide a statement to that effect.
10. Please state the maximum height for the M1 Zoning District and the proposed building height
of the distribution facility.
11. Please provide a statement ensuring the underground placement of all new utilities. If
possible, please show the location of the proposed electric service.
12. Within the proposed uses stated on the site plan, please include "office" as a proposed use.
13. Please note that curb and gutter are required for the parking areas in the West Lot. Please
refer to the mark-up plan for details regarding the location of the required curbing.
14. It appears as though different grades of pavement are proposed for both the loading and
v parking areas. Please provide a pavement detail which specifies the surface treatments to be
used.
15. Please provide a typical detail showing the dimensions for the loading spaces.
16. Although information has been provided with regard to the 100-year floodplain, additional
information is needed concerning the existence of other environmental features on site. Please
provide the location of steep slopes, woodlands, wetlands, sinkholes, and drainage ways. If
no other environmental features are present on site, please provide a statement to that effect.
After you have revised the site plan, please resubmit one copy so that I may verify the information
contained on the plan. I will then need all approved review agency comment sheets and five copies
of the final site plan for approval. Comment sheets are required from the following agencies: the
Page 3
Mr. Jason J. Thomas, P.E., Greenway Engineering
Re: Kraft Distribution Facility; S.P. #39-00
August 16, 2000
Vrginia Department of Transportation, the Frederick County Sanitation Authority, the Frederick
County Inspections Department, the Frederick County Engineer, and the Frederick County Fire
Marshal.
If you have any questions or if any of the numbered items are unclear, do not hesitate to contact me.
Sincerely,
0
Amy M. Lohr
Planner II
AML/rsa
Enclosure
File: U: Ix1n,ylConinronlSite PlanslKraft Dist,ibution facility spr 39-OO.wpd
131 91 FT Q /
b 54-((A))-36A
\ �y� ,6° 4.737 ACRE r 1 f
cp
1
54-((A)d-36L \ .�
3 �►� GREEN BAY PACKAGING INC.
DB 789 PG 1533
S 4613.3r E ZONE: M-1 USE: IND.
11.05 FT D. 01 ' 12 '20'
D. 72• SS 43' D• 70' 04. 20' R• 1616.93 FT
N 4613.37' w R. 25,00 FT R- 260.00 FT A. 34.02 FT
3.82 FT A. 31.81 FT A• 317.98 FT T. 17.01 FT
T• 18.46 FT T• 152.30 FT CH- S 89*05.34" E 1
CH• N 82.40'29' W CH- S 81'15.47' E 34.02 FT 1
29.70 FT 298.53 FT
_ D• 162' 53' 43'
80.00 FT
o� A• 170.58 FT �W
a, T- 398.98 FT
CH. N 3r40'29' w
118.67 FT
/!m". sue•'•','. •.ma's,
QQ
1.0
� A
54 - ((A)d - 36M
m y�
DB 868 PG 426 z
25499, ACRES •
Jul/ •:•::;•::::;:::•::;::.::::•;;;;:::•:•;::•: i
4.42'54' E �� 1
50 FT ^ D► 79 165•'33'
Pr 453.36 FAT
T
N' 24�
D► 23' 12 079.91 FT
R. 4534' .3
.37 FT . CHI N• 4;•48.05'•w'
/ \9e • A- J99.41 PT
SBZ_S8
F. C. S.A. J • CH 101,3409
f?' CHI K 09.4r •'.�• E ' .
% 24097 F r w PU P STATION ; , 97 s,, FT
0. 517 ACRE
/ ' N Ot50'11' i 219.05 FT
COMMONWEALTH ®f VIRGI IA
DEPARTMENT OF TRANSPORTATION
EDINBURG RESIDENCY
14031 OLD VALLEY PIKE
CHARLES D. NOTTINGHAM EDINBURG. VA 22824
COMMISSIONER
August 16, 2000
Mr. Jason J. Thomas, P.E.
C/O Greenway Engineering
151 Windy Hill Lane
Winchester, VA 22602
Dear Jason:
Jq-oo
JERRY A. COPP
RESIDENT ENGINEER
TELE (540) 984-5600
FAX(540)984-5607
Ref: Kraft Distribution Facility
Route 1323, Park Centre Drive
Fre%erick County
We have received your revised site plan dated 07/20/00 (received 07/26/00)
for the referenced project. It appears all of our earlier review comments
have been satisfactorily addressed. Please advise the owner of our
approval. Also please provide 7 sets of approved construction plans
with signed seal for VDOT distribution.
Plans should be provided with cover Sheet 1 of 7 accompanying each set.
The appropriate land use permit may now be applied for to cover work
within the Route 1323 right-of-way. The permit is issued by this office and
will require a minimum processing fee, surety bond coverage, and the salary
& expenses of a State assigned Inspector.
Once satisfactory application has been made. a permit will normally take
approximately thirty days to process and issue. Should you have any
questions, do not hesitate to call.
Sin ,relly,
Barry J. Sweitzer, Trans. Roadway Engineer
For: Steven A. Melnikoff, Transportation Engineer-
BJS/rf
xc: Mr. Dave Heironimus
Mr. Kris Tierney
WE KEEP VIRGINIA MOVING
COUNTY of FREDERILCK
Department of Public Works
540/665-5643
FAX: 540/ 673-06s2
August 2, 2000
Mr. Jason J. Thomas, P.E.
Greenway Engineering
151 Windy Hill Lane
Winchester, Virginia 22602
Re: Grading Plan Comments - Kraft Distribution Facility
Fort Collier Industrial Park
Frederick County, Virginia
Dear Jason:
Upon review of the subject grading plan, we offer the following comments:
1. Revise the outlet detail for the three sediment basins as we discussed last week. We
recommend using gabion baskets for the rip rap in lieu of placing the rip rap in a berm.
During high flow conditions, the rip rap would erode away and become ineffective. Also,
in lieu of using coarse gravel, we recommend placing a geotextile or silt fence on the
upstream side of the gabion baskets to provide erosion control. Provide a detail of the
proposed outlet structure.
2. Provide a temporary and permanent seeding schedule in accordance with the Virginia
Erosion and Sediment Control Handbook (vesch) specifications 3.31 and 3.32.
3. Provide a wash rack in conjunction with the proposed construction entrance.
4. Provide the documentation concerning the creek crossing, stream alignment and
stormwater discharge permit for our files.
If you have any questions, do not hesitate to contact me.
cc: file
Sincerely,
oe C. Wilder
Engineering Technician
107 North bent Street • Winchester, Virginia 2260.1-5000
A
krAFt D: S tr; 6L.J .6 mac . I, ty
4t '39-Ov
SITE PLAN CHECKLIST
The checklist below indicates all the information that needs to be submitted as part of the site plan
application. All required information must be submitted prior to the final approval of any site plan.
The Department of Planning and Development will review the application to ensure that it is complete.
If any portion is not included or complete, the site plan application will not be accepted and returned
to the applicant(s).
Site Plan Package
1. One set of approved comment sheets are required from the following review
agencies prior to final site plan approval. It is recommended that applicants contact
the Department of Planning and Development to determine which review agencies
are relevant to their site plan application.
Virginia Department of Transportation (VDOT)
County Health Department
Frederick County Sanitation Authority
City of Winchester
Department of Planning and Development
Town of Stephens City
Inspections Department
Town of Middletown
Frederick County Engineer (Public Works)
Airport Authority
Frederick County Fire Marshal
Soil & Water Conservation District
Department of Parks and Recreation
Request for Street Name
2. One copy of the Site Plan application
3. Five Copies of the Final Site Plan for approval
4. One reproducible copy of the Site Plan (if required)
5. A 35mm slide of the Site Plan (if required)
•
Site Plan Information Checklist
The following information must be included on your site plan. If your site plan is incomplete or
is missing information, it will not be reviewed and returned to you for revisions.
Administrative Information
Y N
1.
Name of proposed development.
2.
Name, address, and phone number of owner.
3.
Name, address, and phone number of developer.
4.
Name, address, and phone number of designer. I
5.
Certificate of surveyor, engineer, or architect. �j
6.
Date plan prepared and date of revisions.
�J1
7.
A listing of all conditions placed on the site as a result of a
conditional use permit or conditional zoning approval.
✓
8.
A space labeled "Approved by the Zoning Administrator" for the
approval signature and date of approval.
9.
A description of setbacks or conditions placed on the site as a result
of a variance approval. (Reference the variance
application number.)
General Site Information
Y N
10. Location map (scale 1:2000)
11. Magisterial District S T
12. Scale of site plan (not to exceed 1:50) bwfr ok
13. North Arrow
14. Zoning of site 1'Y1- I -p its .
15. Use, zoning, and Property Identification Number (PIN*) of all
adjoining properties. This includes properties located across right-
of-ways, streams, and railroad tracks. Inclv.6Q uSE
Y � thos6 I .no
16. Surveyed boundaries for all lots and parcels. a"Cr"-
�
include y3,AA4
43- Pt- (is
9
f
General Site
(con't)
Y
N
17.
Acreage of all lots included in the plan.
18.
The location and dimensions of all required setbacks and yard
�,tr
areas. � �,,,� i.ov,r
-=J a
19.
The location and type of all dwelling units.
O/A,
20.
Location and description of all recreation facilities.
21.
Location of sidewalks and pedestrian ways. ext-e -•d s , de�.��+-�•
�a
22.
Location and area of common open space.
23.
The location, height, and dimensions of all signs.
24.
Location, height, and specifications of outdoor lighting fixtures.
✓
25.
Location and nature of outdoor storage areas.
• 26.
Location of outdoor trash receptacles and dimensions of structure
(fencing, etc.) required to enclose receptacles.
Buildina Information
Y N
27.
The height of all buildings and structures.
28.
Location of all buildings, structures and uses.
29.
The proposed use of each building, structure and area. 1'sr 3�6�
30.
Ground floor area and total floor area of all buildings with FAR
calculations for commercial and industrial zoning districts.
Roads
Y N
31.
Name and number of existi g and planned streets on and adjoining
the site.
32.
Location of existing and planned streets on and adjoining the site.
33.
Posted speed limit of existing adjacent roads.
34.
Location and dimensions of all proposed entrances from public
right-of-ways.
35.
Location of all entrances on adjoining roads within 200 feet of the
proposed or existing entrance.
36.
Dimensions, boundaries, width, pavement, and construction of
planned roads. r,-D r"-- �t y,�"
10
Utilities
Y
Parking
Y
N
N
Natural Features
Y N
v
37. Location of all utilities, including sewer and water lines with the size
of lines, mains, and laterals.
38. Location and width of all easements, including access, utility, and
drainage easements.
39. Location and nature of fire lanes, fire hydrants, and all other
facilities necessary to meet Fire Code requirements.
T.nn - hart
40. Calculations describing the required number of parking and loading
spaces. kt-ft-- 4•p,7i-
41. Location and dimensions of all parking and loading spaces,
driveways, parking aisles, curbing and other features to be used.
42. Location and dimension of all disabled parking spaces and *a c1 ed
1
ramps.
sP�
43. Existing and finished contour lines
44. Location of steep slopes, woodlands, floodplains, wetlands,
sinkholes, and other environmental features. cor,s;s��
ate
45. Location of streams and drainage ways.
Landscaping
Y N
46. Landscaping plan describing location and types of plants to be
used.
47. Location of required buffers and screening with cross sections or
profiles.
Erosion and Sediment Control
Y N
48. A stormwater management plan with run off calculations and
location and description of facilities to be used.
49. Soil erosion and sedimentation control plan describing the location
and methods to be used to minimize erosion and sedimentation
during development.
C ass; sf q MD e
12
•
0
3
.19
SITE PLAN APPLICATION
Project Title: K2AF-1- -(QIG> r(2i b0-npi\i E'ACILLrK
Location of Property PAP-K JW-i\E
(street address) I tK)C1AC5 I Ee, \/A
Property Owner: -IDRo LOGI S
Address: 6200 AUF
AL FX/-\N D Z i A I Val 2-Z30 —
Telephone: •7 D 3 7'5 1 —q 2-q 2-
Applicant/Agent (-,2 PF F cJU)A\/ n1C�� OFF �I�JC�
Address 115( Wttj4 l-Ilt-IL l..ANC,
Telephone: C54-0-- (�O&Z— 4- I p�
Designer: Gt?�E1J�yA�I G1JC���1F(�J�
Address: 1,51 k t'-) u HILL LAA-• '
0 I, J GH- ESTE2, VA 7 7 6 GZ
Telephone: JA -4,yt\l 0 C -
Contact: 134o -- 6 b 2 -mil 18
•
•
l�
7a.
7b.
8.
a)
b)
c)
d)
e)
0
g)
Is this an original or revised site plan?
Total acreage of parcel to be developed:
Total acreage of parcel:
Property Information:
Property Identification Number:
Current Zoning:
Present Use:
Proposed Use:
Adjoining Property Use(s)
Adjoining Property Identification Number(s)
Magisterial District(s)
Original Revised
23,8Z% Ac-e6-,
2c:� ,4cl q /-\cac�--,
r _(A)-3G
UlAr2Ei�0,SF— I
-5TD&JEW A L L 01S7Y (C r"
I have read the material included in this package and understand what is required by the _
Frederick County Planning Department. I also understand that all required material will be
complete prior to the submission of my site plan.
Signature:
Date: a
7
•
Request For Site Plan Comments
Department of Planning and Development
Mail to:
Hand deliver to:
Department of Planning and Development
107 N. Kent Street
Attn: County Planner
Fourth Floor
107..North Kent Street
Winchester, VA
Winchester, VA 22601
(540) 665-5651
(540) 665-5651
Please fill out the information as accurately as possible in order to assist the agency with their
review. Please attach two (2) copies of the site plan with this sheet.
Applicant's Name: GKC&JWl-\� �rJ(�INkF.P i/J
Address: VS 1 DUI \J 0Y H IU- Lgf Je
-- c11►Jc c 1 r2 \/A ZZ&02_
Phone Number: Gq 0— &(oZ- 4-1 Br;
Name of development and/or description of the request: )«A F-F 01!!�iV(P,U ilo�
FAC t L t-tV -
Location of property: F-F. eoL.0 Ci2
(')FF Pry _r_ C N-i -(.---
Planning and Development's Comments:
16
0
GREENWAY ENGINEERING
151 Windy Hill Lane
i Winchester, Virginia 22602
Founded in 011
T R A N-1- S -M- I T T A L
Project Name: Kraft
File No.: 795P
Date: July 20, 2000
To: Frederick Co Planning
Attn: Amy Lohr
Copied:
From: Jason Thomas/ds
GREENWAY ENGINEERING
Phone: 540-662-4185
Fax: 540-722-9528
Remarks: r Urgent r For Your Review r..--. As You Requested r Please Comment
Message:
Amy,
Attached are 2 copies of the site plan for the above project, the site plan application, and the
comment sheet. -Thz -Fee Cheek. i-�' also
Call with any concerns.
Engineers Surveyors
Telephone 540-662-4185 FAX 540- 722-9528
greenway@visuallink.com