Loading...
HomeMy WebLinkAbout52-04 Titan VA Ready-Mix Railroad R-W, Mining - Stonewall - Backfile (2)5,40 - -72-2 11 q3 DATE 15Z1 1 S RKLIVED FROM ADDRESS rtc FOR -1LL ACCOUNT HOW PAID iEGINNING CASH SALANCE CHECK •AAMOUNT 3 BALANCE MONEY plit ORDER RECEIPT 022588 r. DOLLARS $ 3X "i' BY 602001 ® S1657N.CL f m m i O lm- RECEIVED FROM 'lJWl ADDRESS `DRESS ��-% 60: � "> FOR D . Ai- ` 1 L.f-o.YI DATE )-U`� NO. 3-186 1 1YaY�jLs s a.s .� d I r"1 l' y AL;CU;L; UNT 'I CASH AMT PAID j:y`; CHECK RAEANCF '?+�! MONEY ORDER 8Y N SITE PLAN TRACKING SHEET Date: i?,to File opened Reference Manual updated/number assigned "� p D-base updated b% 60q� Flie given to Renee' to update Application Action Summary CLOSE OUT FILE: / Id- LID � Approval (or denial) letter mailed to applicant/copy made for file File stamped "approved", "denied" or'Withdrawn" j oS� Reference Manual updated 1 % to S— D-base updated File given to Renee' for final update to Application Action Summary PaA-/ U.\Carol\Common\Tnd:ing shectslSite Plan Tacking wpd Reviscd 02/01/03 SITE PLAN APPLICATION CHECKLIST The checklist shown below specifies the information which is required to be submitted as part of the site plan application. The Department of Planning & Development will review the application to ensure that it is complete prior to accepting it. If any portion of the application is not complete, it will be returned to the applicant(s). (1) One (1) set of approved comment sheets are required from each relevant review agency prior to final approval of a site plan. It is recommended that applicants contact the Department of Planning & Development to determine which review agencies are relevant to their site plan application. A list of potentially relevant review agencies is shown below: Frederick County Department of Planning & Development Department of GIS (Geographic Information Services) Frederick County Sanitation Authority Frederick County Building Inspections Department Frederick County Department of Public Works Frederick County Fire Marshal Frederick County Health Department Frederick County Department of Parks & Recreation Virginia Department of Transportation (VDOT) City of Winchester Town of Stephens City Town of Middletown Frederick County / Winchester Airport Authority (2) One (1) copy of the Site Plan application form. (3) Payment of the site plan review fee. �J (4) One (1) reproducible copy of the Site Plan (if required). �n -�p�c,-s tube. t � le d COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 December 18, 2018 Thomas Moore Lawson, Esq. Lawson and Silek, P.L.C. 120 Exeter Drive, Suite 200 P.O. Box 2740 Winchester, VA 22604 RE: Titan Virginia Ready -Mix, LLC Site Plan #52-04 Dear Mr. Lawson: Thank you for your response letter regarding the site plan violation for Titan Concrete in the matter of paving Woodside Road (Rt. 671). Staff on December 4, 2018, met with VDOT, Supervisor McCann -Slaughter, and Frederick Water representatives to discuss your proposal of routing Titan trips to Brucetown Road (Rt. 672) and closing the entrance onto Woodside Road (Rt. 671) along with a site plan revision. There was consensus at the meeting that this would be an acceptable plan provided that the following issues can be addressed: 1. In your meeting with Staff, statements were made regarding how few trips Titan generates and also that there are fewer trips from Carmeuse onto Brucetown Road which as been improved with a signal since Titan opened. It would be appropriate to document the generation of trips and conduct a basic intersection analysis to substantiate the fact that placing all of Titan traffic on Brucetown Road will not have a significantly negative impact on roadway operations. To be clear, we are not requesting a full Traffic Impact Analysis (TIA), just an analysis of the intersection of Brucetown Road and Route 11. 2. It has been brought to our attention that the settlement agreement between Canneuse and Frederick Water requires that Frederick Water destroy the entrance that both Frederick Water and Titan currently use onto Brucetown Road and return it to grass by Spring 2020. The County will need documentation assuring that Titan will continue to have permanent and unimpeded access to Brucetown Road prior to approving a new site plan. 107 North Kent Street, Suite 202 9 Winchester, Virginia 22601-5000 Page 2 Thomas Moore Lawson, Esq. Re: Titan Virginia Ready -Mix, LLC December 18, 2018 3. It is the understanding of Staff that the entrance permit onto Brucetown Road is issued to Frederick Water. Addition of Titan Concrete to the entrance permit or written assurance of VDOT that Titian Concrete will be able to continue using the entrance after Frederick Watcr has vacated will be required. 4. A modified site plan would need to include the complete removal of the current access point onto Woodside Road to be acceptable. Provided these items can be met to the satisfaction of Supervisor McCann -Slaughter and Chairman DeHaven, VDOT and Staff, a site plan revision that removes the requirement to pave Woodside Road that is currently in violation and releases the performance bond will be acceptable. If you have any questions call me at (540) 665-5651. Sincerely, Mark R. Cheran Zoning Administrator MRC/dlw cc: Chuck DeHaven, Jr., BOS Chairman Judith McCann -Slaughter, Stonewall District Supervisor Gary R. Oates, Stonewall District Planning Commissioner COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 December 18, 2018 Thomas Moore Lawson, Esq. Lawson and Silek, P.L.C. 120 Exeter Drive, Suite 200 P.O. Box 2740 Winchester, VA 22604 RE: Titan Virginia Ready -Mix, LLC Site Plan #52-04 Dear Mr. Lawson: Thank you for your response letter regarding the site plan violation for Titan Concrete in the matter of paving Woodside Road (Rt. 671). Staff on December 4, 2018, nlet with VDOT, Supervisor McCann -Slaughter, and Frederick Water representatives to discuss your proposal of routing Titan trips to Brucetown Road (Rt. 672) and closing the entrance onto Woodside Road (Rt. 671) along with a site plan revision. There was consensus at the meeting that this would be an acceptable plan provided that the following issues can be addressed: In your meeting with Staff, statements were made regarding ]low few trips Titan generates and also that there are fewer trips from Ca1'111CL►sc onto Brucetown Road which as been improved with a signal since Titan opened. It would be appropriate to document the generation of trips and conduct a basic intersection analysis to substantiate the fact that placing all of Titan traffic on Brucetown Road will not have a significantly negative impact oil roadway operations. To be clear, we are not requesting a full Traffic Impact Analysis (TIA), just an analysis of the intersection of Brucetown Road and Route 11. 2. It has been brought to our attention that the settlement agreement between Carnleuse and Frederick Water requires that Frederick Water destroy the entrance that both Frederick Water and Titan currently rise onto Brucetown Road and return it to grass by Spring 2020. The County will need documentation assuring that Titan will continue to have permanent and unimpeded access to Brucetown Road prior to approving a new site plan. 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 Page 2 Thomas Moore Lawson, Esq. Re: Titan Virginia Ready -Mix, LLC December 18, 2018 3. It is the Understanding of Staff that the entrance permit onto Brucetown Road is issued to Frederick Water. Addition of Titan Concrete to the entrance permit or written assurance of VDOT that Titian Concrete will be able to continue using the entrance after Frederick Watcr has vacated will be required. 4. A modified site plan would need to include the complete removal of the current access point onto Woodside Road to be acceptable. Provided these items can be met to the satisfaction of Supervisor McCann -Slaughter and Chairman DeHavcn, VDOT and Staff, a site plan revision that removes the requirement to pave Woodside Road that is currently in violation and releases the performance bond will be acceptable. If you have any questions call me at (540) 665-565 L Sincerely, Mark R. Cheran Zoning Administrator MRC/dlw cc: Chuck Del-laven, Jr., BOS Chairman Judith McCann -Slaughter, Stonewall District Supervisor Gary R. Oates, Stonewall District Planning Commissioner COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 December 18, 2018 Thomas Moore Lawson, Esq. Lawson and Silek, P.L.C. 120 Exeter Drive, Suitc 200 P.O. Box 2740 Winchester, VA 22604 RE: Titan Virginia Ready -Mix, LLC Site Plan #52-04 Dear Mr. Lawson: Thank you for your response letter regarding the site plan violation for Titan Concrete in the matter of paving Woodside Road (Rt. 671). Staff on December 4, 2018, met with VDOT, Supervisor McCann -Slaughter, and Frederick Water representatives to discuss your proposal of routing Titan trips to Brucetown Road (Rt. 672) and closing the entrance onto Woodside Road (Rt. 671) along with a site plan revision. There was consensus at the meeting that this would be an acceptable plan provided that the following issues can be addressed: 1. In your meeting with Staff, statements were made regarding how few trips Titan generates and also that there are fewer trips from Cai'171eLIse onto Brucetown Road which as been improved with a signal since Titan opened. It would be appropriate to document the generation of trips and conduct a basic intersection analysis to substantiate the fact that placing all of Titan traffic on Brucetown Road will not have a significantly negative impact on roadway operations. To be clear, we are not requesting a full Traffic Impact Analysis (TIA), just an analysis of the intersection of Brucetown Road and Route 11. 2. It has been brought to our attention that the settlement agreement between Carmeuse and Frederick Water requires that Frederick Water destroy the entrance that both Frederick Water and Titan currently use onto Brucetown Road and return it to grass by Spring 2020. The County will need documentation assuring that Titan will continue to have permanent and unimpeded access to Brucetown Road prior to approving a new site plan. 107 North Kent Strcet, Suitc 202 • Winchester, Virginia 22601-5000 Page 2 Thomas Moore Lawson, Esq. Re: Titan Virginia Ready -Mix, LLC December 18, 2018 3. It is the understanding of Staff that the entrance permit onto Brucctown Road is issued to Frederick Water. Addition of Titan Concrete to the entrance permit or N-vritten assurance of VDOT that Titian Concrete will be able to continue using the entrance after Frederick Water has vacated will be required. 4. A modified site plan would need to include the complete removal Of the current access point onto Woodside Road to be acceptable. Provided these items can be met to the satisfaction of SL1I)Cl'V1SO1' McCann -Slaughter and Chairman DeHaven, VDOT and Staff, a site plan revision that removes the requirement to pave Woodside Road that is currently in violation and releases the performance bond will be acceptable. If you have any questions call me at (540) 665-5651. Sincerely, Mark R. Chcran Zoning Administrator MRC/dlw cc: Chuck DeHaven, Jr., BOS Chairman Judith McCann -Slaughter, Stonewall District Supervisor Gary R. Oates, Stonewall District Planning Commissioner THOMAS MOORE LAWSON, P.C. *Or COUNSM, - WILLIAMS MULLLN 120 ExFTER DRIVE, SUIT, 200 POST OFFICE Box 2740 1VINCIIESTER, VA 22604 TELEPHONE: (540) 665-OOSO FACSIMILE: (540) 722-4051 April 18, 2019 Mark R. Cheran, Zoning Administrator Department of Planning & Development 107 North Kent Street; Suite 202 Winchester, VA 22601 "TIIONIAS \4OORE LAWSON • TLAWSON n.ISPI.C.COD1 Re: Titan Virginia Ready -Mix, LLC 1383 Brucetown Road VIA E-MAIL Dear Mark: Enclosed please find a preliminary Amended Site Plan, which depicts that the existing entrances on Woodside Road are closed and locked and that after approval of the Amended Site Plan access to the site will be along the industrial access driveway, which connects to Brucetown Road with the existing hard surface entrance, along with acceleration and deceleration flares coming into and exiting the site. In addition to the preliminary Amended Site Plan, I also provide you the following narrative which relates to trips. As you may recall from our meeting, Titan records the number of trips. Currently those trips include mixers, delivery trucks and employees which arrive and depart for work via their own personal vehicles. Currently vehicles have used both Woodside Road and the industrial access driveway. Under the proposed Amended Site Plan, Woodside will no longer be used for any of those trips and all trips will be via the industrial access driveway which connects to Brucetown Road. On an average day there are 32 mixer truck trips and 20 employee trips (10 employees arriving and departing from work via their personal vehicles) for a total of 52 trips per day. Our review of the VDOT records reflect that there are a total of 49 trips per day on Woodside Road. With the approval of the Amended Site Plan, 73% of those trips will be removed from Woodside Road (assuming, of course, historically all vehicle trips to and from the plant have used Woodside Road). Our experience tells us otherwise because both entrances, Woodside and the industrial access driveway, have been used. Although it is difficult to estimate, we believe of those 52 trips historically half were using Woodside Road and the other half were using Brucetown. Assuming that estimate is correct, the increased number of trips of personal vehicles and cement mixers on Brucetown Road will be an additional 26 trips per day. There are also deliveries of aggregate and sand products from Carmeuse and other suppliers. Those deliveries do not occur on a daily basis and, therefore, any attempt to include those trips would be a fractional number if provided on a daily tally. We are also cognizant of Mark Cheran, Zoning Administrator April 18, 2019 Page 2 the fact that VDOT and the County focus heavily on a.m. and p.m. peak hour trips. Titan's shifts are scheduled such that Titan has no peak trips and while it is possible that a mixer could be leaving at the very end of an a.m. peak, Titan's drivers try to time their arrivals and departures so that they are traveling either before or after a.m. or p.m. rush. Our experience is that deliveries are also made during times that are not at the a.m. or p.m. peak. The net of all of this is that we do not anticipate having any impact on the a.m. or p.m. trips. Please review the enclosed preliminary Amended Site Plan and advise us of any comments. Consistent with our previous submittals, we are sending you this under a reservation of rights and in an effort to amicably resolve the County's concerns about traveling on Woodside Road. Thank you for your continued assistance and cooperation. I look forward to hearing from you at your convenience. TML:jk Enclosure cc: Titan Virginia Ready -Mix, LLC Nrl v PNDN754v."p-�1� D� L d ZCW_ W USE VACANT _ TTdy -----= 11 = ----- +- — L DdN2 , LA7 311A14 i LOT Loi 71 LOT 8 CLAS LOT 1 tAT i P14 33--A-124A DOUE R Dl1 868Po DO PC 1307ZONE - - I USE VACANT N ¢ w.va xw ro M wN A-1 cvAv 1. t•�' JAIIES A , N; M. Sf�,(11EL ZCHE. RA sat DS7k a mr USE- ADPoM 4Mr AL00 IT'�N 33-A-1248 ssii Iti xcn�m+xe mr. ro .UIX F. ROBl150N Vr / s EE °LAM1 N/F DD 762 Pc � _ Pt1 33-AA-ts Z �� FRFDEFCCK LAND COi�14Y• LC. (8M USE SFR /(� •'17Y WLUAi S. FREY k KrFM W. FREY (31%) PR133-2-A 11 USE. CLFlRMOCK KMASN6 CORP. DR 6m� 84� USE VACANT /2 PL4 I/FA-1LA 06STONE� ORATION LNsT. 990Jo63w USE. WATER TREATWU FACBJTY —F-,D'OSZD LASE ARE.�uaz \� ^ 2«,126,41 Sr 5.6D437 AC a �'--. (�� SFA-IIA 08AL STONE L990M5087 USE: WATER TREATMENT F=M ACCESS TO $ Rr- PIN 33-A-133 FRcZ`ERIU( LA�•0 CCuoAYY. LC (59Z) H•'aIAV S FREY k PUROCR W FREY (31--) INST. j 02CM2262 ZCR_: EV PARCEL 133 IOTA; AREA 1.738,4,159 SF -.905<8 AC Cim V$E PIN YA-87 c O. 902 PGS•RU SSELL ZONE: RA USE SFR PL4 33{ 1-R GLEN E k .UDY S RUSSEL D9 957 PG 1425 ZON---RA Um AC LK-A TA UJQA y'5 Gum-SJt A.A LMA—> i0YC |-CURW TABLE THOMAS MOORE LAWSON, P.C. *0F COUNSE►, - WILLIAMS MULLLN 120 ExFTEIi DRIVE, SUITE 200 POST OFFICE Box 2740 NVINCHESTER, VA 22604 TELEPHONE: (540) 665-00M FACSIMILE: (540) 722-4051 April 18, 2019 Mark R. Cheran, Zoning Administrator Department of Planning & Development 107 North Kent Street; Suite 202 Winchester, VA 22601 *1'II0NIAS MOORE LAWSON •'I'LANS'SONQ..I.SI'I.C.COM Re: Titan Virginia Ready -Mix, LLC 1383 Brucetown Road VIA E-MAIL Dear Mark: Enclosed please find a preliminary Amended Site Plan, which depicts that the existing entrances on Woodside Road are closed and locked and that after approval of the Amended Site Plan access to the site will be along the industrial access driveway, which connects to Brucetown Road with the existing hard surface entrance, along with acceleration and deceleration flares coming into and exiting the site. In addition to the preliminary Amended Site Plan, I also provide you the following narrative which relates to trips. As you may recall from our meeting, Titan records the number of trips. Currently those trips include mixers, delivery trucks and employees which arrive and depart for work via their own personal vehicles. Currently vehicles have used both Woodside Road and the industrial access driveway. Under the proposed Amended Site Plan, Woodside will no longer be used for any of those trips and all trips will be via the industrial access driveway which connects to Brucetown Road. On an average day there are 32 mixer truck trips and 20 employee trips (10 employees arriving and departing from work via their personal vehicles) for a total of 52 trips per day. Our review of the VDOT records reflect that there are a total of 49 trips per day on Woodside Road. With the approval of the Amended Site Plan, 73% of those trips will be removed from Woodside Road (assuming, of course, historically all vehicle trips to and from the plant have used Woodside Road). Our experience tells us otherwise because both entrances, Woodside and the industrial access driveway, have been used. Although it is difficult to estimate, we believe of those 52 trips historically half were using Woodside Road and the other half were using Brucetown. Assuming that estimate is correct, the increased number of trips of personal vehicles and cement mixers on Brucetown Road will be an additional 26 trips per day. There are also deliveries of aggregate and sand products from Carmeuse and other suppliers. Those deliveries do not occur on a daily basis and, therefore, any attempt to include those trips would be a fractional number if provided on a daily tally. We are also cognizant of Mark Cheran, Zoning Administrator April 18, 2019 Page 2 the fact that VDOT and the County focus heavily on a.m. and p.m. peak hour trips. Titan's shifts are scheduled such that Titan has no peak trips and while it is possible that a mixer could be leaving at the very end of an a.m. peak, Titan's drivers try to time their arrivals and departures so that they are traveling either before or after a.m. or pan. rush. Our experience is that deliveries are also made during times that are not at the a.m. or p.m. peak. The net of all of this is that we do not anticipate having any impact on the a.m. or p.m. trips. Please review the enclosed preliminary Amended Site Plan and advise us of any comments. Consistent with our previous submittals, we are sending you this under a reservation of rights and in an effort to amicably resolve the County's concerns about traveling on Woodside Road. Thank you for your continued assistance and cooperation. I look forward to hearing from YOU at your convenience. TMLJk Enclosure cc: Titan Virginia Ready -Mix, LLC �I�i LAT 11 LAT d�LAT 7 SLAT 6 � far 1 l.Or FIN 3.�gAp-l1�2�4A �- KADB E6a FC 1309 U �-- Z01{E RA (I�-- us• VACANT a cuv3 aw m ` o FIN 33-A-,3 3A1�9 A i rJRCLYN r. rnWa `1 q ZONE: RA ( Q ]cr ran DSAY� w1. USE. ALMA-WRr AL I PIN .'04-1248 Y (u v.¢uv, •vr ar. ]� 49X F. ROBf19di '1fr BE Mk-U) NC DB 702 PC 523 Pf( 33-J�-132 USE RA �� V FREDERCK LAND C ANY*LG (69� USE SFR /I� ; t' WWAI1 S. �. I i 6i � (31%) ZONE RA SL VACANT �— _-- N F PO( 3 -A-IiA 0.DBAL S 0H j \ a+�fsro E CORPO T.N n/ 1 1NST / T490�O11M • PIN 33-A-133 N�T ltg PCRR PAASE 1 ca5tvlc" j FR3)ER-CK U.vD CCV-0.R". LC (59� \ PL4 J3-2-A ' IS inn �'�" K:11A� S. FRST k P2CO02 6W.2 FR_Y (31� 1 _/ nra�rt I I.\5T. j O2CJ02262 DLEARB(20CK PURQ1A9N0 CORP. Y f. USE VACANT -KRTOTAL 33 TOUR A A /Pal 33-A-146 2 caszr'a � 1 1.736,e13r .59 (zY4'�'^_i 6 s.E) 3-s 90345 AC 73�PSD016z ` ZONE- Wl USE: VVACANT "C-OS:D LEASE AREA \ VAN ACCSS TO S- 214.125.41 SF RIZ / / ' .��a, 5,60437 AC �Fi�6ICK U PC J/ .•ram ` [Pia68l�rst ICIT 201i EL USE: WATER TREATMENT FACUTY CRK Tw call M MA-11A Z MDru USE WATER WAT� TWU FACSJTY PIN 3S-A-67 GLEN E. k XDY S R PMI DB 902 PC 1400 ZCNE RA DSc•. SFR P`4 34 1-B LIEN E k JAY S. RUSSELL DB 957 PC 1428 ZONE- RA USE: VACANT 34:A L9UlEn0N5 CURVE TABLE zl..vl , orc oP7 SDK FOR CONTINUATICN OF PLAN SEE SHEET 4_6 -I - - -- - - - - - - - - - - - - - - - -- ---/-- -�-- �-UllI LL ! a.it .fie`-T Y•J� --- ------- l.h,a-,� :�„e,,,,„„ :�Y�.�"�L: —�_-�_ ---- --- - --- _'. :; t - l• "< Cam'. ,. n. awT: n.x ra". i.. .P:Kc[uvo•eT^.n vu--__�__ .�•>�;--�---_.- `` _t___ I H _---- v rvU].•Oci-wLfw.W: __�.__-__-'---_- ~'� _ nY �� .v.'aY-�-=i�--C��-G .\i-�� I 1 � • � " uln�.32w..viu: 6;.r.FL tP'K rSC b 6 .2r rL4h" / ' - .."TSv W": `\` I _ ri � ti .tC[ -cRi •C.a: 0.- W2] ^, Yr+ ^--C.a S []. \ 4+�'✓] (]v.. ,, / QK."/R- ♦H. QU.t� uuCq 'CP17 —r ya'[J / r.,.,rr ;..: a an:n n as � Y� Rc�:t zsic tt n<n � .: j� / �m a w v.s .e -K .«✓.�-s W axe-ru I _ ni a r-v¢"u rw :vc •cma •cro 6'�,9t`Na .0 2 v.:G :K K1Tt.x ti^y R tur, nq. ' a•.•n ax .W u:a wv.'+.. uc sa. P :-.....s .e ••�v/zz x.� ... •a w �u > �.r.+t ,..-..o c.r..,c errrc s / f - w'pyYQTPI':U�..'P . i • .ts. ,v" u4!'nt M .0.,a'a�, P,• %irr+ w].�� J • I I 1 . o�.. w rUu .-. ^' _✓ � t+w�`: � ���.� I ..T, i 'n'=1 ���,T �i=�1{�"-_- � �I � a:n '.1 . C i • �-Z,� s --- - - — -+v v- � � a. �' ac !!^•-1.���s� tll frly .at I �xP n nl] / _ /� +� wn rrn• vim.-. / \ /� o.s Ir - _ •IrmJIL me }� ,rnanluK .c aw*c � ,_.-••.+l ui I�: �l�T �� trc!]1 I .tee:.•: •�:rcwl I a •1 � uxxu [! oMi-aa; Y7 +�`n VIA • .reaw ]urc naaar _ E J I I� nn I rraniu� tt -_\� i-y'_LL -Ix S[O1LN I65 7, 7 Ir [nnExn ro. E jt .y�rt W Ro w. a aK ci a as rs.+a. w••. .o 7c c THOMAS MOORE LAWSON, P.C. xOr CouNsEi. - WILLIAMS MULLLN 120 EXFTER DRIVE, SWU 200 POST OFFICE BOX 2740 WINCIIESTER, VA 22604 TELEPHONE: (540) 665-0050 FACSIMILE: (540) 722-4051 April 18, 2019 Mark R. Cheran, Zoning Administrator Department of Planning & Development 107 North Kent Street; Suite 202 Winchester, VA 22601 "I'HONIAS MOORE.. LAWSON • 1-LA15'SONn1.SP1.C.COA] Re: Titan Virginia Ready -Mix, LLC 1383 Brucetown Road VIA E-MAIL Dear Mark: Enclosed please find a preliminary Amended Site Plan, which depicts that the existing entrances on Woodside Road are closed and locked and that after approval of the Amended Site Plan access to the site will be along the industrial access driveway, which connects to Brucetown Road with the existing hard surface entrance, along with acceleration and deceleration flares coming into and exiting the site. In addition to the preliminary Amended Site Plan, I also provide you the following narrative which relates to trips. As you may recall from our meeting, Titan records the number of trips. Currently those trips include mixers, delivery trucks and employees which arrive and depart for work via their own personal vehicles. Currently vehicles have used both Woodside Road and the industrial access driveway. Under- the proposed Amended Site Plan, Woodside will no longer be used for any of those trips and all trips will be via the industrial access driveway which connects to Brucetown Road. On an average day there are 32 mixer truck trips and 20 employee trips (10 employees arriving and departing from work via their personal vehicles) for a total of 52 trips per day. Our review of the VDOT records reflect that there are a total of 49 trips per day on Woodside Road. With the approval of the Amended Site Plan, 73% of those trips will be removed from Woodside Road (assuming, of course, historically all vehicle trips to and from the plant have used Woodside Road). Our experience tells us otherwise because both entrances, Woodside and the industrial access driveway, have been used. Although it is difficult to estimate, we believe of those 52 trips historically half were using Woodside Road and the other half were using Brucetown. Assuming that estimate is correct, the increased number of trips of personal vehicles and cement mixers on Brucetown Road will be an additional 26 trips per day. There are also deliveries of aggregate and sand products from Carmeuse and other suppliers. Those deliveries do not occur on a daily basis and, therefore, any attempt to include those trips would be a fractional number if provided on a daily tally. We are also cognizant of Mark Cheran, Zoning Administrator April 18, 2019 Page 2 the fact that VDOT and the County focus heavily on a.m. and p.m. peak hour trips. Titan's shifts are scheduled such that Titan has no peak trips and while it is possible that a mixer could be leaving at the very end of an a.m. peak, Titan's drivers try to time their arrivals and departures so that they are traveling either before or after a.m. or p.m. rush. Our experience is that deliveries are also made during times that are not at the a.m. or p.ni. peak. The net of all of this is that we do not anticipate having any impact on the a.m. or p.m. trips. Please review the enclosed preliminary Amended Site Plan and advise us of any comments. Consistent with our previous submittals, we are sending you this under a reservation of rights and in an effort to amicably resolve the County's concerns about traveling on Woodside Road. Thank you for your continued assistance and cooperation. I look forward to hearing from you at your convenience. TML J k Enclosure cc: Titan Virginia Ready -Mix, LLC PIiA p-D1 00*(S SZCHE 111 USE. YACANT 1 1r --1 11II .JJ1 L1 A -- I _7��' vvn L'ay�p1.41A1lA1 1pr2, 3-A-124A DOUGLISNL MR Bau 8S 09 ZCNE: RA 1 USE. YAW(T N a W IS. TO ` II o PIN 33-A-ta 3A�S oe 9 Pc»ii. rnWa I PIN 33-A-1248 i vra sat txs-.� ar. USE: AA ILNRAI JACK F. RONNSCN ^ D9 USE PC 573 ' l' PN 33- AX- 1 J\\ ZCNE' RA /I\I,�FFSMD UND CO�ANY. LG (69� USE.- SFR 7/i i .. *.WAV S. FREY t PUF1 N_ FREY (31%) PIN 33-2-A CIXARSROOK PlPM SNG CORP. DB 6E0 PC 647 ZG(E� USE: YACAYT L. ,x ✓, P0i MA-11A awkCN ,OiNSTOW STOW USE. *PATER TREATWENT FACLO Rr PI.Y 33-A-133 FREDER;C< LAKO CQY�A\Y. LC (69%) V-UAV S. FREY & PL'ROGV W. FREY (31%) INST. j 02CO02262 ZC\-. EL ZCEL 133 TOTAL AR=A 1.738.413.59 - 39 SD648 AC �S:^llal 7:III � II N� S'1]r1 • SyryY UAV ACCESS TO S' yµb 1 PROPOSED LEASE A-flA Sr \ 1 5.E0437 AC �-- PI.4 IA-11A CH�NE�CORI RATION 9iSF. i,:9909M31S7 USE: WATER 1F671WENT FAaUTY MK TA3E sza i � s •. r YI i,t PIN 3i•A-87 Gut( E. 3 J1DY S. RUSMI DO 902 PG 1400 ZONE: RA USc: SFR P4 34-1-B GLEN E. i JUDY S RUSSE L DB 957 PG 14ZS ZONE. RA USE- YACA4T ARLA. TA'V,xr0S5 rMm to a21t. Au Vx. f slot k nu®a.^r aµnaa >. accv �c oil |aJRVE TABU THOMAS MOORE LAWSON, P.C. x0F COUNSEL - WILLIAMS MULLLN 120 ExFTER DRIVE, SUITE 200 POST OFFICE Box 2740 WINCHESTER, VA 22604 TELEPHONE: (540) 665-0050 FACSIMILE: (S40) 722-40S1 April 18, 2019 Mark R. Cheran, Zoning Administrator Department of Planning & Development 107 North Kent Street; Suite 202 Winchester, VA 22601 "TIIO,NIAS MOORE LAWSON • TLAWSON!WLSPI.C.COM Re: Titan Virginia Ready -Mix, LLC 1383 Brucetown Road VIA E-MAIL Dear Mark: Enclosed please find a preliminary Amended Site Plan, which depicts that the existing entrances on Woodside Road are closed and locked and that after approval of the Amended Site Plan access to the site will be along the industrial access driveway, which connects to Brucetown Road with the existing hard surface entrance, along with acceleration and deceleration flares coming into and exiting the site. In addition to the preliminary Amended Site Plan, I also provide you the following narrative which relates to trips. As you may recall from our meeting, Titan records the number of trips. Currently those trips include mixers, delivery trucks and employees which arrive and depart for work via their own personal vehicles. Currently vehicles have used both Woodside Road and the industrial access driveway. Under the proposed Amended Site Plan, Woodside will no longer be used for any of those trips and all trips will be via the industrial access driveway which connects to Brucetown Road. On an average day there are 32 mixer truck trips and 20 employee trips (10 employees arriving and departing from work via their personal vehicles) for a total of 52 trips per day. Our review of the VDOT records reflect that there are a total of 49 trips per day on Woodside Road. With the approval of the Amended Site Plan, 73% of those trips will be removed from Woodside Road (assuming, of course, historically all vehicle trips to and from the plant have used Woodside Road). Our experience tells us otherwise because both entrances, Woodside and the industrial access driveway, have been used. Although it is difficult to estimate, we believe of those 52 trips historically half were using Woodside Road and the other half were using Brucetown. Assuming that estimate is correct, the increased number of trips of personal vehicles and cement mixers on Brucetown Road will be an additional 26 trips per day. There are also deliveries of aggregate and sand products from Carmeuse and other suppliers. Those deliveries do not occur on a daily basis and, therefore, any attempt to include those trips would be a fractional number if provided on a daily tally. We are also cognizant of Mark Cheran, Zoning Administrator April 18, 2019 Page 2 the fact that VDOT and the County focus heavily on a.m. and p.m. peak hour trips. Titan's shifts are scheduled such that Titan has no peak trips and while it is possible that a mixer could be leaving at the very end of an a.m. peak, Titan's drivers try to time their arrivals and departures so that they are traveling either before or after a.m. or p.m. rush. Our experience is that deliveries are also made during times that are not at the a.m. or p.m. peak. The net of all of this is that we do not anticipate having any impact on the a.m. or p.m, trips. Please review the enclosed preliminary Amended Site Plan and advise us of any comments. Consistent with our previous submittals, we are sending you this under a reservation of rights and in an effort to amicably resolve the County's concerns about traveling on Woodside Road. Thank you for your continued assistance and cooperation. I look forward to hearing from you at your convenience. TML:jk Enclosure cc: Titan Virginia Ready -Mix, LLC 1 - :::: Ir 1}7--- ---- NLO; I _ vvn vx�n ` i�T 7�W4 B� /F Fv aulz LDr 1 LUr 2ilAJ 31-�'4 1 } 1 PIN 3z A-124A 1 a DUJa L D k BOMIE R BRILL 1 B 2 PC 309 �� N//r^ Lu a s ce Rr xw a !� PLV 31-A-1 N e>rAv t4 JAi(FS A. R CAROIIti N. S%�(111 1 HN 3.s-A-87 r. DB 902 PO 1 I GLEN E. k JUDY S. RUSSEL (7 11 ZG - RA DB 902 PC 1400 i r QQ cxT sort orx.¢ [ter. USE AMMLTURAL ZONE: RA I PIN 33-A-1248 S (u vcFTxro, rxv mrt. ro USE: SFR .{AOC F. ROBt150N yr j -` a cT"=) NC 1 DB ZONE. PR 673 Pfi 33 rAA-132 ZONE: FR �� FRED CK LAND 9;1 PA4Y, L.C. (691j t USE: SFR *.BAH S. DFREr. j PUROON 6W. FREY (31%) ZONE: RA -- •ann_� - _____ SE: VACANT �- N SL--_ 34IFA-11A afjlsiOh C ARON \ 915Y• 990EV R PIN 33-A-133 N� N USE POR71 x pus, `x' FR D,41C% LAND CW-A1r, L.C. (69� PL4 34-1-B X_ \ — , +,. X•-LIAV S FREY k PL'SpCH W. FR:Y (31.J _ PJi 2-A IS aai E k JURY S. RUSS].L QEARBFt00L( PURa1ASi!iC COFP. 1 // tcr�arz ' I.vST. j 02C0J2262 D3 957 PO 742b j- _- Q� i45PD PD 7 ,`Y/ I ZGVE Eli ZONE RA Z�HE71-- -ARCEL 133 Ltg YACWT L151:: VACA.4T TOTAL :R_A _ = F- PDi 33rA-14E / 2 mszrnt % 1.738.413-59 sr z Q z J M' (iEllA'�.'�Y o* s;39.90S~8 ACUSE: YACWT 5 W o SItY]]12`S i^Jlal ;.1Q �.e- may., 1 1t�) )• S1I']t] • SL•Ys: ]ate y•• PRE OSED LEASE ARj UAv ACCESS TO sr 244.125.41 SF N7' � 5.60437 AC LA 2- ANY. . ars Q PC adISTOW CORD CRATRki I— �� L45r.ZC/�f90oD3oe7 F USE �'Alc'R R�ATY7fT FACU Y 0111E T1dF %0 �7 1� � 1 �STDNE C9RPL�AT0.4 /� Z/pf� � USE; WATER TREA�NT FALSITY � 'F CURVE TABLE - ...>� erg �.: , •d v,µ � ti FOR CONTINUATION OF PLAN SEE SHEET fa_s INM, 1= I ' Z Liz I a: w.r. rsru .o-- >� Ia:K a a .oa � �rus sur �__ . ___.__ ..�..��- .,..,,>� r ��_---•��_*�Y_ _—_ ,. I _ u ra6 s,u a r1nJ a . O6C: aY T w K.T: ___--'--_ / / w /'- • •�.� ��� 1 I — i l SRC:F, T.o hr: S 1•Crub e• 0:6 (t _ -r ��SI W': I �' S<! >t ,+qr� I.w• r� _ � ti .L6ll •v5, nCt�.L R" v:G � W.+ f?Mi.c ¢L'.� � K"IILf 1`-.1'�+.'[ �cQt :l'A-S .'.Zf+:[ 'A+✓ :CGQ I • � _ M� Muni] mxt Ywl a w^.V tox ml E n-•is �Y Y wns] (�.•. / _ / ' / ¢K.'/rt• W XJ+.;x J -z•AS) r-..r >,ub �. T•C ! s n.r3 er c<a �/ / voxu .,. a •:�:au �w _vc .ma rr.� �r msi � ' 1 - 1 DS'a3� r 2 �µt 7.2 Y 'A.•n'n'L uT},D (�T.a�T (S1rIY�:OK / - 1 > �.:, uw•ax.•a .xa .0 x za-� r, :R .R.r..:a ra f i A ��s.' _ _ -- J rac.. s.c or.�s :.c .•�. e... czwt,+ s.a[ .c / �/ _ _ � / � � ' •+c •L x Ix: cu•..w. .vs Y c..+x'"° o`T`vc :...tP 1 - - i- = � � C' / ,aY VY>9`: cM nf. Mr•`4v^ .a.:5 Y �qwb tPt r— j ) �J � kx�q'a5Q _ � < I}- i IT e --•� Kam--! —'�°I R I' i Z o •, �- ���\�� \ ,LL-��t-C"J i I .�+� •=, rx ..:.a..rr. . ico.c :.x � :, i i_ .� / / � u.v.]�\�\ \ ' � a w�':`. "i- � •�-r y���=s;�• NI � c+n ..•t, �c�. M4 ~ � j - � / l_-'_XlGCL7.E•�+' __ . - \ �N[6 Wti V iEtD Knn - „s� - cwIM • 'WtI Q" -T IMF 1,a s� I {Yf cweia �w IfAai'rai x n111 ,rn tt ¢IMK •,o ow.o nr[ .... 'f t 4 tsu`}]. ,On 1 E g i ,�� / rout slxx rsz / am e..c a % i �tnlmx w[ n w r `II 1 '"^'1 :�.uc ln.•s] T„o° muoa wm�+xiy/\/1I 12 f1 PM124 .LfISS t%sh.+.r // /- • Gi(uL:J 6'z. _ SEC,CAI 165-A (7) rOH all:'. CYiGt`JGr rG� L)':41 1' /:Art .� \ "rV w.v ,.{•'uL ! r uu s]o Ks.l - w'. unl.co ea - •e' \` comic r..o eoscr xm+in yr �� - '. oa•n, a....a. - --- new JUNCTION BOX 1 JUNCTION BOX -`2 TURNHEAD L1411T 3NITCHES AGG BIN GATE VALVES HIGH LEVEL INDICATORS AGG BATCHER GATE VALVE AGG BATCHER VIBRATOR JUNCTION BOX `3 JUNCTION BOX 34 32'-6' CEMENTITOUS FILL CEMENT BIN HIGH LEVEL INDICATORS CEMENT BIN BUTTERFLY VALVES JUNCTION BOX 13 PIPE WEAR BOX AERATOR BLOWER TYP ALL FILL PIPES 12'-0" JUNCTION BOX 55 CEMENT BATCHER BUTTERFLY VALVE / \ ' CEMENT BATCHER VIBRATOR II I I I I III I I I II II 11 II II II II II n II In II II II II II II II n I� llavoeeeee ¢h �m>�= al ------ear NEWC M I it CE4NT it FLY i: H 125 TANS II 125 TONS jj 125 � CINS ROOF ACCESS HATCH OVER CONVEYOR MOTOR FREEZER STRIPS IN F.S. II II II II iI (1 II n II It It 11 I I LADDER OPTION OPENING TO CLOSE OPENING I I I I _____It __1i-41-____r(____-4F____T� ___ _ _ _ _ _ - _ - _ TO EMPTY BELT LINE_ B 11 I I 11 I I II I II II F1 II II aavemlpa.�Pd}._®emftee__d�,.,__ 32'-6" 6WN DOOR F.S. u II LJ 1171 JUNCTION BOX j T it IL ==1L��=== '___��__= :LER:.IOR BLOWER I JUNCTION BOX 14 I U iI N i l I I \ n \� n Q I I v I --A -1- 4— f `` i 0\D,IE O cf)- ,=;=. .:sir I II �_ �_ II I co (IIIJ ( 2 o I I we: III- ER TANK 450 GAL r. 0 x - I I I I MAN DOOR I \'� I --I I �I a IN F D ' I JUNCTION BOX 15 J: , JUNCTION BOX 12 0 �I I co - z I II W f7-1 I III 1535 S.F. o I 11 Q1 OF CLOTH O w OVERHEAD DOOR ' O i I I O F- AND MAN DOOR - .� Y, I I j Ili rn �, b+ � g � I �.0j, m O o MAN DOOR F.S. FREEZER STRIPS IN } > g 5'-11 5/8" 14'-0 3/8" TO EMPTY BELT UNE (PINCH VALVE CONTROL BOX OPTION) I1 -1 1/4" 6'-0" 6 -9 1/2" 0 20'-0' 19'-9 7/16" 20'-0" 0 L APPROVAL FOR CONSTRUCTION O WSTOMER DATE SIGNATURE DALE 0 PLEASE SIGN AND RETURN TO TREYCO MANUFACTURING INC. LL BY ASAP. . O O 0 scv[ 3/16" = 1'-0" Diw m: TWH oEprtn m: :9tA4➢ m: IgA14t TREYCO MANUFACTURING, INC arz 4-1- CLEARBROOK , VA. Isoo aEsn+ur sr. IEEu+DN, PA ITai nT-m-awe •� C B M M si-a -ll-q � 'a EDOPIIl\6p6 'HEs D—GS FONT N cDNFm N— ANo PROPRICTARY INFORMATON. UMANNUFMMI aslw� TITAN VIRGINIA READY MIX JOB N0. 240057 ym ar 1 3 L1.1 OORRPTHE GE OF PRODUCTS FROM THESE OR—INGS FOR USE QD I ANYONE OTHER THAN TREYOO MUNF/ONRIHO OF IUTI PA 6 NSERY '�I�BROOK CONCRETE BATCH PLANT DWG. No. D-1076001 C •O PgONI81TEp NiTHOUT WgITTEN CONSENT. Q. fTl VIEW A -A APPROVAL FOR CONSTRUCTION CUSTOUER DATE SIGNATURE DATE PLEASE SIGN AND RETURN TO TREYCO MANUFACTURING INC. BY AS A.P. YJLLE 3/16' = 1'-0' (11N11 Br: OEOFO RT: R+raen Br: UIGRIt TREYCO MANUFACTURING, INC Isoo a[sTNur sr. tm,wDN, PA naz m-m-uw. nyH CIEARBR00K , VA m 4-1-04 Tom ue6 �� H OHAWINCS ON uN CONNO NTUL D PROPRIETARY ESE D NGS REPRODUCTION OF THESE DRAWINGS OR THE MANUTHESE ADR—IN OF PRODUCTS FROM THESE DRAWINGS FOR USE B1' ANYONE OTHER THAN TREYCO YRNFALNRINC OT LLIDNCN, PA 6 SPoCTLY 06IDy[R TITAN VIRGINIA READY MIX JOB N0. 240057 y� 2 v 3 mPS lle� CLEARBROOK CONCRETE BATCH PLANT DWG. No. D — 07600 C ROnR6 PROHIBITEO 'MTHOUT WRITTEN CONSENT. 0 I 1 30'-0" 6'-D- 26'-0" 12'-0- ROLLED CURB c ----------------------- I I MIXER TRUCK LOPE r t ----------------------- ----------------------I = yr o 9' CCK t (BROOM FINISH) MIXER TRUCK LOPE ---------------JSZZl - - - - - p ]4 O 12" T&B O O o I H= o c I MIXER TRUCK I v1 U - - - - - - - FRESH WATER (TYP)- I OSLOPE --------------- 0 n I All%ER TRUCK I - REMOv<ABLESAFETY RAIL (TYP)�36 SLOPE t ( T/CONC 4 - ROLL'D CURB, ; o I PIT ]4 1 O 12 -------ulxcR T&3 TRUCK------- I i WEIR. TYP OF 6 14EIR, TYP CF 1 (SEE 4.S-2) c s (SEE 4.S-2) ----------- ----J - ACnc -------- �9" CONC. - - - - -- i 14 O 12" E.w., T&-B 1 (BROOM FINISH) I `72" CONC (BROOM FINISH)l MIXER TRUCK I \ -----FRESH WATER (TYP) -A ----- I I J $ PIT fl PIT :2 PIT p3 N Z SLOPE 0 o T/CONC T/CONC T/CONC F ~-- 1 m EL (-)3'-0- EL (-)3•_0• ---- I �1� In I L III MIXER TRUCK I 3 e IL Y U 1 - - - - - - - SLO—PE . O 12 " I � E.w.T&B - - - - - _ O MIXER TRUCK I o I z a ------------- J o� SLOPE I 4" ROLLED CURB J 12'-0- 14'-0" tt=jiT., EACH FACE HOWL. EACH FACE d d o d d I /4 • 12' D.C. HOWL, INSIDE FACE AOOL' µ . 12" 0.C.. a NOWL, EACH FACE d /. • 12' HpaL. EACH FACE Jam- a 2 - TYPICAL CORNER DETAIL (PLAN) 3/4--1'-0" REF: t.St k SHEARKEY - 2 DEEP z 1/3 WALL TH004M (4-) (W) 3 - WALL INTERSECTION (PLAN) 3/4--l'-0- REF: t.5-i µ•12"0.0 EACH WAY, EACH FACE EXPANSIVE WATERSTOP I ' 0 r it 2- d 5 - WALL INTERSECTION (SECTION) T/CONC c I 3/4--1'-0' 0. (txi-0 REF: T/, AUL T/DONC T/CONC 11 SLUDGE STORAGE SLUDGE STCRACE DRYING & DRYING 0 1 0 0 c i < �12" CONC - o c > o � (BROOM FINISH)vv _ d< 0 12" E.w., T&B I SLOPE SWALE SLOPE it 7.5-1 14•-0" /y 14•-D" 14•-0" 14•-p- 1'-0" 1•-0-/ 76'-0" \1-0" 1 - FOUNDATION PLAN REF: FINISHED GRADE, SEE SITE PLAN PLAN 04 . 12" D.C. EACH MAY, EAUi FACE 04 DOWELS • 12' D.C. EACH FACE 6- - TWO BULB CONT. WATERSTOP 2'-0- `FOR REIN. SEE PLANS (W) 4 - TYPICAL CORNER DETAIL (SECTION) 3/4"-1'-0- REF: SEE PLANS FOR RONIFORCC ENT "CCW- SLAB 6 - CONCRETE BERM (SECTION) 3/4--i'-0- W: 5'-0- PLANS FOR REINFORCEk'CNT 7 - CONCRETE SWALE (SECTION) ` SLAB 3/4-. ]'-0- REF: SEE PLANS FOR REM'ORCEIAENT IN40E OF CONTINUE MESH SiRUCi11RE TFRU JOINT 0 d d e 8 - CONSTRUCTION DETAIL (SECTION) 3/4-.l'-0- REF: g I A" • --� 11TAN/�MRGMNA READY -MIX. U DA E: YAT 04 SCALE C" BRM �T IYCE PRQI. , 2536-000! w.x xw I `�_'- GRANT! �. HORIZONTAL: i DESIGNED KA 448 Viking Drive, Suite 100 CHECKED WJE VERTICALS-� I Virginia Beach, Virginia 23452 PROD. MLR. MJC YA Phone: (7 EBDOOB-1002, Fax: (757)431-1032 F"DAMM PLAN I � evm rw s2 oma / Ter rw tvalaurna !-Io-w ! I I Ma00Z66] EB000669t STAIN •rvxi 1 �/�,� A \................... ............. .._........,.......................................... _.............................................................................................. .......................1.......................... ........................ ........� I .................................. www.mckimcreed.com................... ......... SE "S R DETALS .................... ... .. Ior....MIII��M...................................i RECYCLED WATER T/WALL EL e•-o• PROPOSED GRADE. FRESH WATER EXTEND PIT WALLS 36" REMOVEABLE SAFETY RAIL SLUDGE STORAGE SLUDGE STORAGE SEE SITE PLAN FOR ELEVATIONS ry > G ABOVE GRADE = _ _ _ _ _ &DRYING &DRYING L. SLOPE P/GRADE 0. 0'-0- PIT #1 PIT //2 PIT #3 T/CONC 9" CONC SLAB EL (-)S-0" 12" CONC SLAB W/ #4 O 12" E.W., T&S 5.5-1 1 PIT y4 1 W/ !'a O 12" E.W., T&B — ---------------- T/GONC t2" CONC SLAB W/ #4 O 12" E.W., T&S 1 - SECTION REF: TRUCK WASH STATIONS O/C STATIONS EXTEND PIT RECYCLED WATER (TIP) FRESH WATER WALLS t' PROPOSED GRADE, ABOVE GRADE (T'P)l 36" REMOVEABLE SAFETY RAIL •� FRESH WATER (TYP) SEE SITE PLAN FOR 1 o LLED CURB a' ROJL ELEVATIONS P/GRADE SLOPE REF. 0. 0'-0• PIT a2 0 o PIT 94 o / SCALE. SEE 7.S-t, I T/CONC EL (-)3'-0- o o � 9' CONIC SLAB i/GONG( N W/ #I O 12" E.W.. T&S 9" CONIC SLAB � EL - Y-O- ) 12- CONIC SLA9 45-1 14/ to O 12" E.W., T&B 2 - SECTION REF: SCH. 80 HANDRAIL POST COVER FLANGE G" NON GRODSH-NII •. '• I. � 1 'll1 5 - HANDRAIL DETAILS }/4-.V-0- REF: /i AL PL. WELD TO SLEEVE RFMOVABLF (IN CINC. WALL OR SLAB) SCH. 80 AL SLEEVE SIZED TO ALLOW HANDRAIL POST TO SLIDE IN OR OUT WITH A SNUC FIT CORE DRILL HOLE & ROUGHEN WALL OF HOLE PRIOR TO GROUTING SLEEVE: v�M�-TQM�GRE 448 Viking Orive, Smite 100 Virginio Beach, Yrginio 23452 I Phone: (757)431-1002, For. (757)43 AAOOOZ667 [11a006e9H ..w•^tcklmcread.com STEEL PLATE HONED TO V EDGE ON TOP, RETNNER AT ENDS r 4'-0' T/WALL EL 1'-0- (A.F,G.) OPEN - 0 iV OPTIONAL PLATE OR FILTER SCREEN A -A 3 - TYPICAL WEIR DETAIL 1/2--f.-O- REF: r DRILL IN E1PAH" / L SECTION A -A ANCHOR DOLTS (1'r)J LIGHT GAUGE SHEET L METAL STEEL (SHAPED) UG1HT GAUGE SHEET taM THIS DEVKX IS TO PREVENT FOAM AND METAL STEEL (SHAPED) OTHER UNOEStR£ADLE FLOTSAM FROM ENTERING FINAL PIT OF ENVIRONMENTAL PIT SYSTEMS. SECTION B-B 4 - SPECIAL WEIR DETAIL 1/2•-1•-0• REF: 71TAN■///�yy,�VINR.GDMM/�A/��/R�/E��A�DAY-•W)M LLC DATE: �A*D• SCALE °K ••� CLM WOM\ i��T MDRAHN CE PRam , 7i56-0CA U F i, ■ �ORIZOV iAL: i1✓ DEDCN03 NA OHEOCED sl( VERTICAL' S-2 PROJ .04. sJE NA t-tn32 SEMMS & DETAILS l srnlu� 11'-1 1/4" c.c. PEIRS 1 1/2" BASE PLATE 1'-8" x 1'-8" w/ 1" ANCHOR BOLTS 3/4" BASE PLATE 6" x 1'-3" jjl--I(jI� rw/ 3/4" ANCHOR BOLTS 4- '—� 6" 6" I CONVEYOR SUPPORT #1 DETAIL AGG BIN BASE PLATE DETAIL 11'-1 1/4" c.c. PEIRS 2" BASE PLATE 1'-10" x 1'-10" I w/ 1 1/2" ANCHOR BOLTS J I CEMENT BIN BASE PLATE DETAIL �I SEE GROUti'D HOPPER SUPPORT DETA$ J " (4) pum D.L. = 3.5 KIPS LL = 2.5 KIPS W.L =t 3/4" BASE PLATE 6" x 1'-1" 7'-3" c.c. ANCHOR BOLTS w/ 3/4" ANCHOR BOLTS 1/2" BASE PLATE 8" x 8" w/ 3/4" ANCHOR BOLTS w 5" 5" m 4" 10" CONVEYOR SUPPORT #2 DETAIL GROUND HOPPER SUPPORT DETAIL 5'-11 1/2" c.c. PIERS 1/2" BASE PLATE 8" x 8" w/ 3/4" ANCHOR BOLTS W I a 3" BAGHOUSE BASE PLATE DETAIL 3 1/2" 1 3/4" 4 -f I t 3/4" 4 ANCHOR BOLTS w/ 2" PRO,IECTIDN 8" _ BUILDING BASE PLATE DETAIL SEE BUILDING DWG A2 FOR ALL LOADS SEE CEMENT BIN BAS4 PLATE DETAIL (4) PLACES —%-------- I I I I SEE BAGHOOSE BASE PLATE DETAIL TYP (4) PLACES D.L. = 2.0 KIPS LL = 0.5 KIPS W.L. =t CFF err. PIN PACF PIATF nFTen D.L. = 35 KIPS LL = 200 KIPS W.L. =± C- lit 1 :�C �+..JG1-c C _ .�LC,.nc.11 U�f�OG;i�.�'i} r•� %� jLr.�c/1G c.: •� T / '.'�IG"-'�--' { - . OCa U t o t3 -- FREDERICK COUNTY DEPARTMENT OF PLANNING & DEVELOPMENT Site Inspection Form GENERAL INMMKTIolt Permit bolder Name �' Property Identification ttumher (PII0 lt�+'an- ---- __'-l� -1_ ------------. Site Plan or Subdivision Plan Number Building permit Number. I,ocat i on Contact Information INSPICTIO11 OF ROADS, DRIVIWXYS & TRAVEL AISLIS (Check when completed - note all incomplete work): Street & Traffic Signs _T Striping Y Surface Material X Comments -q Inspector C Inspector Sidewalks & Lighting -4%1A Dimensions overall Layout --�— Date Verified Incomplete ,319-11n, Date Verified Complete INSPECTION OF PARKING. MANEUVERING AREAS & LOADING ARIAS (Check when completed - note all incomplete work)i Number of Spaces Y Striping --— Surface Material X Comments Inspector Ch P Inspector Sidewalks & Lighting itJ(A Dimension of Spaces Overall Layout Date Verified Incomplete 3/371 QLa, Date Verified Complete INSPECTION OF LANDSCAPING IMPROVEWENTS (Check when completed - note all incomplete work): Number of Shrubs Number of Trees Species of Plante Size of Plants ✓ Seeding Soil Stabilization %9 Overall Layout Screens Comments Date Verified Incomplete Inspector Date Verified Complete Inspector INSPECTION OF OTHER IMPROVEMENTS (Check when completed - note all incomplete work): V/ Recreational Facilities Setbacks -- r--- ," t Preservation Areas%__--- Proffered Conditions Curb & Gutter Signs AIZA Comments Inspector - inspector Date Verified Incomplete Date Verified Complete -51,2 OLr� FREDERICIC coulm DIPARTN&NT OF PLANNING & DIVELOMENT - FINAL SITE APPROVAL Signature Is site approval contingent on a monetary guarantee? Yee* A—/-- No _ Bond Number (*If yes, all site improvements noted on thin form must: he. complete prior to the release of a monetary In addition, all relevant review agencies shall provide final site approval. is checklist guarantee: of these agencies is provided below for documentation purposes.) Fire Marshal Virginia Department. of Trcly'sportatic;n Sanitation Authorit% Building Inspections City of Winchester' Public Works Parks & Recreation !please date & initial when all site work is complete & all relevmitt review agencies have approved) Date Monetary Guarantee Re -'eased ___ Pave 1 of 1 Eric Lawrence From: Wellington Jones [wjones@fcsa-water.com] Sent: Wednesday, November 21, 2007 12:04 PM To: Hetrick,Steven; elawrenc@co.frederick.va.us, Earl. Sutherland@phra.com-, edscoleman@verizon.net-, harold.eberly@vdh.virginia.gov, Bocchicchio Cliff Attached letter will be posted to the mail today. Wellington H. "Wendy" Jones, P.E. Engineer -Director Frederick County Sanitation Authority PO Box 1877 Winchester VA 22604-8377 Ph 540.868.1418 Ext 20 Fax 540.868.1429 1 1 /26/2007 FREDERICK COUNTY SANITATION AUTHORITY P.O. Box 1877 Winchester, VA 22604.8377 ROBERT P. MOWERY, C.P.A., Chairman Wellington H. Jones, P.E. JOHN STEVENS, Vice-chairman Engineer -Director RICHARD A. RUCKNIAN, P.E., Secdreastirer J. STANLEY CROCICIs rT Ph. - (540) 868-1061 DARWIN S. BRADEN Fax - (540) 868-1429 November 21, 2007 Mr. Clifford Bocchicchio Titan America LLC 1151 Azelea Garden Road Norfolk, VA 23502 RE: Storm Water Discharge Titan Ready -Mix Plant — Clearbrook VA Dear Mr. Bocchicchio: This will acknowledge our on -site visit, of the reference plant Thursday, November 8, 2007. The inspection increased concerns about the potential of storm water runoff from the site polluting the source water for our James T. Anderson Water Treatment Plant. The site is graded so the majority of the storm water runoff is directed to source water pit for our plant. It's certainly unfortunate, since the site engineer could have very easily designed the site so storm water would have flowed away from our source water pit. It appears the engineer was not aware that the site was adjacent to the source water for a water filtration plant serving over 15,000 people. As a result, any chemical or fuel leaks from the plant facilities will drain to the source water supply through two culverts located adjacent to the site. The waste area and drain field on the southern part of the site also drain to the source water supply through a third culvert located south of the site. The only way to satisfactorily to eliminate this problem is to redirect the storm water to the west, away from our source water pit. Otherwise mitigation measures should be installed that will detain and remove silt, oils, grease and harmful chemicals from storm water runoff. The foregoing recommendations are made on behalf of the Sanitation Authority with all parties' acknowledgement that your site has been graded to the potential detriment of the water treatment plant, but also in the spirit of cooperation so as to eliminate or mitigate the potential run off problem. Such recommendations are made without prejudice to the Authority's rights and remedies to promote and assure the Authority's and the public's interests in protecting the source water for the water treatment plant. Sincerely yours A� , W. . Jones, P.E. Engineer -Director /cf: Steven W. I-Ietrich, DEQ Earl Sutherland PHR&A Tom Eberly, VDH Eric Lawrence, Frederick County Planning H. Edmonds Coleman, III, Esq. Thomas M. Lawson, Esq. WATER AT YOUR SERVICE }1 John Bishop From: Funkhouser, Rhonda [Rhonda.Funkhouser@VDOT.Virginia.gov] Sent: Friday, October 23, 2009 9:43 AM To: Ronald. Mislowsky@phra.com; Cyrus S. Kump; tlawson@lsplc.com; samuel.w.mccoy@lowes.com Cc: Short, Terry; Alexander, Scott; Morris, David C., PE; Martin, Bruce; Ingram, Lloyd; Smith, Matthew, P.E.; Copp, Jerry; Carter, Edwin; Jackson, Terry, PE LS; Eric Lawrence; John Bishop; cdehaven@crosslink.net Subject: REVISED Agenda - VDOT/Engineer Meetings - Tuesday, October 27th, 2009 VDOT/Engineer Meetings 14031 Old Valley Pike Edinburg, VA 22824 Tuesday, October 27, 2009 10:00 a.m. Strasburci Commercial Review of VDOT roundabout comments. Ron Mislow.sky/Cyrus Kump i4V PHR&A 11:00 Ty Lawson 11:30 a.m. Lowe's - Stephens City Discussion of preliminary site plan. Sam McCoy tiv/ Lowe's 12:30 p.m. Adjourn Rhovuc cl �Lcv� n�oLtser �� vi,r�%vdn Depnrtvuent of Trav�,sportatEov, J Ec%Enburg ResCdev',cU — LPnc{ DeveLopmevLt 140SI Odd W Ue� P%2e Ec%Lv�b"n( , Vi,-givdn L w C,k D) T:'hov"e # (511-0) J- Fn/K �l (540)_q�'4-s0o7 4J I1Q � 1 Clifford Bocchicchio Environmental Manager Titan Virginia Ready Mix LLC TITAN T`,nu, 1151 Azalea Garden Road Roan"., c • '•• '.; Norfolk, VA 23502 Es1ea C• Tel. (757) 858-6537 Seua, �•o'oa -5 Fax (757) 853-1223 Mobile (757) 287-6672 A T�ta❑ cbocchicchioCsUtanamenca.com Safety is a Constant State of Mind, with Every Employee Feeling Responsible and Empowered to Act to cause him and others to vvork safely, on the belief that All Accidents are Preventable and that Zero Incidents is the Only Goal. ■ON 05/16/2007 12:32 FAX 12001/002 LAWSON AND SILEK, P.L.C. 120 EXETER DRrvu, SUITE 200 POST OFFICE Box 2740 WINCHES -TER, VA 22604 TELEPHONE: (540) 665-0050 FRCS VTU..: (540) 7224051 Date: To: From: Our File No: Number of pages including cover: Message: MAY 1 6 E-%IA1L: TLA"0,4. CPI.C'.rom1 FACSIMILE COVER SHEET May 16, 2007 Mr. Kris C. Tierney 667-0370 Mr. Mark R. Cheran 665-6395 Thomas Moore Lawson, Esquire 389.008 2 Please see the attached. Thank you. The information contained in this facsimile message is information intended only for the use of the individual or entity named above, and may be attorney/client privileged and confidential. If the reader of this message is not the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. If you have received this communication in error, please immediately notify us by telephone and return the original message to us at the above address via the U.S. Postal Service. Thank you. F'POMT ROVAL ADMM: ►OFT OFME Box 602, FnoNT Rot AL V MGV4A 224.14. TV-A"OW: (Sr0) 634-941 S, F.(,knou; (S40) 635-9421. F NWT: SUAkja Rx+o«u+r-Nrr 05/16/2007 12:32 FAX 0 002/002 MEMORANDUM TO: Kris C. Tierney, Assistant County Administrator Mark R. Cheran, Zoning and Subdivision Administrator FROM: Thomas Moore Lawson, Esquire DATE: May 16, 2007 RE; Titan Ready -Mix - Clearbrook Our File No. 389.008 Please be advised that I will be meeting with Lloyd Ingram of VDOT to discuss the bond issue with Titan Ready -Mix, LLC on Friday, May 18, 2007, at 8:00 a,m. in the Frederick County Planning Department conference room. 1 believe either or both of you should attend this meeting. Please let me know if you are available. Thank you for your assistance and cooperation- I look forward to hearing from you shortly. COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION EDINBURG RESIDENCY Philip A. Shucet 14031 OLD VALLEY PIKE COMMISSIONER EDINBURG, VA 22824 February 3, 2005 Ms. Kelli Richard C/O Pine Knoll Construction Co., Inc. 210 Ebert Road Winchester, VA 22603 Ref: Titan America Route 671, Frederick County Dear Kelli: JERRYA- COPP RESIDENT ENGINEER TEL (540) 984-5600 FAX (540) 984-5607 Enclosed is your approved Land Use Permit #855-7125 to cover the construction and maintenance of a street connection and a commercial entrance at the referenced location. Please ensure a copy of the approved permit assembly is kept at the job site whenever working within the Routes 671 and 11 rights -of -way. I would also like to remind you of the need to erect and maintain proper traffic control in accordance with our Virginia Work Area Protection Manual. For your information the account receivable number for this project is 00076250. Any inspection costs we incur will be billed to Titan -America monthly. You are required to contact Mr. Dwight Hawkins at (540) 984-5616 at least 48 hours in advance of the start of construction to arrange for any necessary inspections. If you have any questions concerning the permit requirements or dur "" constrttstio>a, do not n x , hesitate to call.' A� Sincerely, - FEB _ 4 PLAF- EOI� 4TY zv - Philip A. Baker, Rwy. Permits & Subd. Specialist Sr. PNT Enclosure xc: Mr. C.B. Harris (w/ copy of permit), Mr. Dwight Hawkins, Mr. Mark Cheran VirginiaDOT.org WE KEEP VIRGINIA MOVING 0 XF William H. Gordon Associates, Inc. To To: Department of Planning and Development Attn: Candice E. Perkins 107 North Kent Street Fourth Floor Winchester, VA 540-665-5651 ❑County No./❑Town No. • 24 West Piccadilly Street Suite A Winchester, Virginia 22601 Phone: (540) 542-1737 Fax: (540) 542-1923 Date December 21, 2004 Shipped Via Courier Plan Name Titan Virginia Ready -Mix LLC Project No. 2090-0101 /Task No. Subject Concrete Batch Plant From Scott Stickley We are sending you ® Print(s) ® Correspondence(s) ® Submission ❑ 1s` ❑ 2"d ® 3`d ❑ Other ❑Electronic Media ❑ Originals Copies Date Description 2 Site Plans 1 Comment Response Letter 1 Approval Letters from FCSA, GIS, Fire Marshall, Inspections, Engineering VDOT Airport Authority, Health Department, approval letter for MDP These are transmitted LJ For your use U As requested JL�J For approval U ror review ana cornrneni ❑Other Comments FRED� EROOUOT`f �ntivlNG & DE_�E_ E� INTERNAL PLAN PROCESSING USE ONLY Project Name Description Notes: Signature of Receipt Date cc: W-mom3 Engineers 9 Surveyors 9 Land Planners • Landscape Architects • • 24 West Piccadilly Street ' Suite A !f Winchester, Virginia 22601 540-542-1737 William H. Gordon Associates, Inc. (fax) 540-542-1923 December 21, 2004 County of Frederick Department of Planning and Development Attn: Candice E. Perkins — Planner II 107 North Kent Street Winchester, VA 22601-5000 RE: Review Comments for Site Plan #52-04 Property Identification Number (PIN) 33-A-133 Stonewall Magisterial District WHGA # 2090-0101 Dear Ms. Perkins: The following is in response to your comment letter dated December 8, 2004. Comment 1: Woodside Road Improvements: On Sheet 3 of 8, it states that the existing gravel road is to remain. Please provide a notation on the plan regarding the future improvements to be made to Woodside Road as required by VDOT as well as the timeframe that is applicable and the bond. Response: As part of VDOT's approval we have provided notes on Sheet 4 regarding the above information. Comment 2: Trailers. There appears to be trailers shown on the Titan Ready Mix site plan. The Frederick County Zoning Ordinance does not allow trailers to be used as structures in the EM Zoning District. Response: A note has been added to Sheet 5 clarifying that these units are modular spaces and will require design/plans for building permit application. Comment 3: Special Limited Power of Attorney. Please submit a completed power of attorney for Frederick Land Company and Titan Virginia Ready -Mix LLC. Engineers • Surveyors • Land Planners • Landscape Architects County of Frederick Department of Planning'�nd Development Attn: Ms. Candice E. Perkins — Planner II Third Review Comments for Site Plan #52-04 December 21, 2004 Page 2 Response: The property owner did sign the initial application for the project. Titan's attorney Mr. Ty Lawson has discussed this with the County's attorney, Mr. Lawrence Ambrogi, and they concurred that this comment is not applicable to this situation. It is our understanding that Mr. Ambrogi was to relay this understanding to staff. Enclosed are the approvals from the various agencies. Based on the submission of these comments, these are the final issues that need to be addressed in order to obtain site plan approval. Subsequently, we would expect to receive site plan approval within a week. If you have any questions, please contact us at your earliest convenience. Sincerely, WILLIAM H. GORDON ASSOCIATES, INC. Scott Stickle P. Director — Winc ster Office Attachment MSS:sm Cc: Titan Virginia Ready -Mix, LLC Ty Lawson, Lawson and Silek, PLC Patrick Barker, Economic Development Commission Engineers • Surveyors • Land Planners • Landscape Architects 6 0 COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 665-6395 December 8, 2004 Scott Stickley William H. Gordon Associates, Inc. 24 West Piccadilly Street Winchester, Virginia 22601 RE: MDP (Master Development Plan) Waiver Request Titan Virginia Ready -Mix, LLC Zoning District: EM (Extractive Mining); Stonewall Magisterial District Property Identification Number (PIN) 33-A-133 (5.6 acres) Dear Mr. Stickley: I am in receipt of your letter, dated November 24, 2004, which requests a waiver to the requirement for a master development plan for the development of a concrete batch plant facility on the above - referenced property. The property is located on Woodside Road in Clearbrook; the owner of this parcel is listed as Frederick Land Company, Inc. Section 165-134 of the Frederick County Zoning Ordinance gives the Director of Planning and Development the ability to waive the requirement for a master development plan under certain conditions. The proposed development meets these conditions. It does not contain any new streets, roads or right-of-ways; it does not propose any stormwater management system designed to serve more than one lot; is not an integral portion of a future development; it is planned to be developed in a manner that is harmonious with surrounding properties and land uses; and, the development does not substantially affect the purpose and intent of the Zoning Ordinance. Therefore, your request for a waiver to the master development plan requirement is appropriate in this situation. Please be advised that this waiver does not eliminate any applicable development and design requirements of the Frederick County Subdivision and Zoning Ordinances. Prior to the development of this property, a site plan must be reviewed and approved by Frederick County. Future subdivision of this parcel or other development of this property may require a Master Development Plan. Please�ontact me if you have any questions regarding this letter. 0 Et'ic . Lawrence, AICP Planning Director ERL/CEP/bad cc: Mark R. Cheran, Zoning & Subdivision Administrator 107 North Kent Street, Suite 202 - Winchester, Virginia 22601-5000 Titan Virginia Ready -Mix 16 • Page I of I Laura Gomez From: Scott Stickley Sent: Friday, December 17, 2004 10:11 AM To: Laura Gomez Subject: FW: Titan Virginia Ready -Mix LLC -----Original Message ----- From: Ingram, Lloyd [mailto:Lloyd. Ingram(�VDOT.Virginia.gov] Sent: Friday, December 17, 2004 10:08 AM To: 'sstickley@whga.com' Cc: Ingram, Lloyd Subject: Titan Virginia Ready -Mix LLC The application for site plan for this property appears to have a measurable impact on Route 671, the VDOT facility which would provide access to the property. Your recent resubmittal appears to address our previous comments and is acceptable. If any work is performed on the State's right-of-way, a land use permit will need to be applied for and issued to cover said work. The permit is issued by this office and requires a fee and surety bond coverage. Thank you for allowing us the opportunity to comment. Lloyd A. Ingram Transportation Engineer VDOT — Edinburg Residency Land Development 14031 Old Valley Pike Edinburg, VA 22824 (540)984-5611 (540) 984-5607 (fax) 12/21 /2004 0 0 �._ Requestfor Street Name Comments site Plan R ve iew Frederick County Department of GIS (Geographic Information Systems) Attn: Marcus Lemasters, GIS Manager 107 North Kent Street, Suite 200 Winchester, Virginia 22601 (540) 665-5651 The GIS Manager will review the proposed street names for this project to ensure their acceptability into the Frederick County street name system. Proposed street names will also be routed through the CommuniEation Center Supervisior for review tThis stohe planillprindicating prop sate street names from being entered. Please attach one copy names. Applicant's Name: aeadx_=mix-1,.I�� - Co la a Address: steKlin VA 20166 Phone Number: -1114 Name of development and/or description of the request: d LZC n rate Ia Location of property' 2418 Woodside Road, Clear Brook, VA 22624 5,7 miles North Ea t of Winchester, Vir inia GIS Manager Comments' NO ROAD NAME IS REQUIRED AT THIS TIME. And address of 1383 rucetown Road as been assigns Co—tTlis complex. 1' c� [E GUMGr---", P V%EG10Nq . • [� �V ����D �_ 90 WINCHESTER REGIONAL AIRPORT 491 AIRPORT ROAD SEP0 THE TOP of V1 M.WINCH ESTER, VIRGINIA 22602 w. _J (540) 662-2422 August 12, 2004 William H. Gordon Associates, Inc. 24 West Piccadilly Street, Suite A Winchester, Virginia 22601 Re: Site Plan Comments Titan Virginia Ready -Mix, LLC Stonewall Magisterial District Dear Sir/Madam: The above referenced site plan has been reviewed and it appears that it should not have an impact on operations at the Winchester Regional Airport since the site falls outside of the airport's Part 77 surfaces. Thank you for your cooperation and consideration in continuing safe operations of the Winchester Regional Airport. Sincerely, Serena R. Manuel Executive Director • • Request For Site Plan Comments Frederick County Sanitation Authority Mail to: Hand deliver to: Frederick County Sanitation Authority 315 Tasker Road Attn: Engineer Director Stephens City, VA P.O. Box 1877 (540) 868-1061 Winchester, VA 22604 (540) 868-1061 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the site plan with this sheet. Applicant's Name Address: Phone Number: Titan Virginia Ready - Mix LT.0 22963 Concrete Plaza Sterling, VA 20166 - (703) 234-1314 Name of development and/or description of the request: Titan Virginia Read M;x. TIC' concrete batch plant Location of property: 2418 Woodside Road Clear Brook VA 22624 5.7 miles North East of Winchester, VA Frederick County Sanitation Authority's Comments: Sanitation Authority Date received Incomplete Date reviewed Signature and Date Signature and Date (revision) Date revision received Il_ ' I� �pt��TV Lyv iv -Ulu � •0 Request For Site Plan Comments Frederick County Inspections Department Mail to: Frederick County Inspections Dept. Attn: Building Official 107 North Kent Street Winchester, VA 22601 (540) 665-5650 Hand deliver to: 107 N. Kent Street Fourth Floor Winchester, VA (540) 665-5650 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach one (1) copy of the site plan with this sheet. Applicant's Name: 'Titan Virginia Ready - Mix I.LC 22963Concrete Plaza Address: Sterling, VA 20166 Phone Number- (703) 234-1314 Name of development and/or description of the request: Titan Virg inia Read -Mix LLC Location of property: 2418 Woodside Road Clear Brook VA 22624 5.7 miles North East of Winchester, VA Inspections Department's Comments: K m-e-4-T-5 u v'e a-n Inspections Dept. use only, Date received Incomplete Date reviewed Signature and Date Signature and Date (revision) Date revision received Incomplete Die TI v�zj�bed �r% - Date approved B j 501 0 0 Wj VV-, SEP tl. 2004 • // DEPA}iTMENT OF HEALTH Protecting You and Your Environment Frederick County Health Department 107 N. Kent St Winchester, VA (540) 722-3480 Septic Tank.- Soil Absorption System Construction Permit Health Department ID Number: 069040818 Owner Information Titan America • Phone: (757) 85.M537 1151 Azalea Garden Rd. Norfolk, Virginia 23502 Location Information Subdivision Name: Tax Map, 33-A-133 Property Address: Woodside Rd. GPIN: County: Frederick Legal Description: Section Block Lot Directions: General Information System Type: Puraflo Number of Bedrooms: Type of Property: Non -Residential Daily Flow: 220 gallons Conditions: Notes d, Comments: Install as per the attached engineered plans and specifications for a,puraflo Biofilter Pretreatment with Trench Extensions System by Michael S. Stickley (P.E.), Titan America•datsd 3/24/04. Proper function of the system hydraulics is the responsibility of the engineer, -Final construction must be inspected and approved by written comments from the designing engineer. The Health Department must be notified after the engineer's final construction inspection; to verify proper setbacks for the sewage disposal system to the house and well were maintained as per the state of Virginia's SH&D regulations. This sewage disposal system construction permit is null and void if conditions are changed from those shown on the application or construction permit. No part of any installation may be covered or used until inspected, corrections made if necessary and the system is approved. The inspection will normally. be made by the system designer, who may be an AOSE, PE, or EHS. Any part of any installation which has been covered prior to approval shall be uncovered, if necessary, upon direction of the Department or the system designer. System Design By: Site Evaltat on Conducted By, Steve Lee Michael S. Stickley Bruce L. Legge 09/13/04 Issue pate 09/13/04 Issue Date FREDE2TCKCDt,TNCY HEALUT DEPARTMENT CLHARANC$ FOR A B t111. D I N G PE121vjr 03/13/06 Expiration Date 03/13/06 Expiration Date 0 0 H ECEOV D Request For Site Plan Comments_ Frederick CoqptyFire Marshal Mail to: Frederick County Fire Marshal Attn: Director of Engineering 107 North Kent Street Winchester, VA 22601 (540) 665-6350 Hand deliver to: 107 N. Kent Street First Floor Winchester, VA (540) 665-6350 Please fill out the information as accurately as possible in order to assist the agency with ;heir review. Please attach two (2) copies of the site plan with this sheet. Applicant's Name: Titan Virginia Ready - Mix LI.0 Address: 22S63 Concrete Plaza Sterling, VA 20166 Phone Number: (703) 234-1314 _ Name of development and/or description of the request: Titan Virginia Ready Mix - .Lc concreve hatch plant Location of property: 2418 Woodside Rnaci_, CiPar Brook. VA 22624 _- �i.7 miles North East of Winchester_ VA Fire Marshal's Comments: p Ca, C p, t� ev Fire and Rescue Dept. use only Date received �I- a- I Incomplete Date reviewed Signature and Date Signature and Date (revision) Date revision received Incomplete Date reviewed Date approved 1� -It--if 0 0 � x a� �4 VIRGINIA Control number SP04-0048R Project Name Titan Virginia Ready Mix Address 22963 Concrete Plaza Type Application Site Plan Current Zoning EM Automatic Sprinkler System No Other recommendation Emergency Vehicle Access Adequate Siamese Location Not Identified Emergency Vehicle Access Comments Access Comments Additional Comments • • Frederick County Fire and Rescue Department Office of the Fire Marshal Plan Review and Comments Date received Date reviewed 11 /5/2004 11 /18/2004 Applicant Titan Virginia Ready Mix City State Zip Sterling VA 20166 Tax ID Number Fire District 33-A-133 13 Recommendations Automatic Fire Alarm System No Requirements Hydrant Location Not Identified Roadway/Aisleway Width Adequate Date Revised 10/28/2004 Applicant Phone 703-234-1314 Rescue District 13 Election District Stonewall Residential Sprinkler System No Fire Lane Required No Special Hazards No Plan Approval Recommended Reviewed By Signature ����9�� Yes Timothy L Welsh Titled _tr'rn� - ly%Air -MARSHAL,�RC�1�Rii 1 � aG�— • • COUNTY of FREDERICK ..q liW r'c d Department of Public Works 540/665-5643 FAX: 540/ 678-0682 December 1, 2004 Mr. Scott Stickley, P.E. William H. Gordon & Associates, Inc. 24 West Piccadilly Street, Suite A Winchester, Virginia 22601 RE: Site Plan Comments - Titan Virginia Ready -Mix, LLC Frederick County, Virginia Dear Scott'. Upon review of the revised site plan dated October 26, 2004, all of our previous comments have been addressed. Therefore, we recommend approval of the subject site plan. Sincerely, C Joe C. Wilder Deputy Director JCW/ris cc. Planning and Development file A:\revtitanvaread 'Ili x rcv cum.vcpd 107 North Kent Street - Winchester, Virginia 22601-5000 0 • • o 0 CO - o OVIRICK Department of Planning and Development 540/665-5651 FAX: 540/ 665-6395 2005 Mr. Scott Stickley William H. Gordon Associates, Inc. 24 West Piccadilly Street, Suite A Winchester, VA 22601 Re: Approval of Site Plan #52-04 Property Identification Number (PIN) 33-A-133 Stonewall Magisterial District Dear Mr. Stickley: The above -referenced site plan was approved on January 12, 2005. The site plan is approved for the construction of a new concrete batch plant located on the Frederick Land Company Property and is accessed off of Woodside Road. Required site improvements include the following: A paved parking lot with vehicle and truck parking spaces. This parking lot includes one handicap accessible space. A board -on -board fence along Woodside Road to screen the operation from the road right-of-way. Paving of the entrance of Woodside Road onto Martinsburg Pike. I am providing you with six (6) copies of the approved site plan. Please forward these copies to the appropriate representative(s). Furthermore, advise the owner(s) that a copy should be kept for future reference, and an approved copy must be kept on the construction site throughout the development process. Once site development is complete, the owner(s) should contact this office to schedule an on -site inspection. Do not hesitate to contact me if you have any questions or concerns. Sincerely, Candice E. Perkins, Planner 11 cc: Jane Anderson, Real Estate Patrick Barker, Economic Development Commission Lynda J. Tyler, Stonewall Magisterial District Supervisor John Light and Charles S. DeHaven, Jr., Stonewall District Planning Commissioners Frederick Land Company, P.O. Box 1624, York, PA 17404 Titan Virginia Ready -Mix, 22963 Concrete Plaza, Sterling, VA 20166 CEP/bad 107 North Kent Street, Suite 202 - Winchester, Virginia 22601-5000 0 COUNTY of FREDERICK �J December 1, 2004 Mr. Scott Stickley, P.E. William H. Gordon & Associates, Inc. 24 West Piccadilly Street, Suite A Winchester, Virginia 22601 RE: Site Plan Comments - Titan Virginia Ready -Mix, LLC Frederick County, Virginia Dear Scott: Department of Public Works 540/665-5643 FAX: 540/678-0682 Upon review of the revised site plan dated October 26, 2004, all of our previous comments have been addressed. Therefore, we recommend approval of the subject site plan. Sincerely, Joe C. Wilder Deputy Director JCW/rls cc: Planning and Development file V E i D 2 FREDERICK COUNT`( Ptgi\NI4IS & DEVELOPMENT A:\revtitanvareadwtia revcum.wpd 107 North Kent Street 9 Winchester, Virginia 22601-5000 FW: Titan Virginia Ready -Mix LLC - Frederick County ,5 2 - t1` I • • Subject: FW: Titan Virginia Ready -Mix LLC - Frederick County Date: Thu, 18 Nov 2004 08:55:41 -0500 From: "Ingram, Lloyd" <Lloyd.Ingram @ VDOT.Virginia.gov> To: 'Eric Lawrence (E-mail)" <elawrenc@co.fi-ederick.va.us> CC: "Ingram, Lloyd" <Lloyd.Ingram @ VDOT.Virginia.gov> -----Original Message ----- From: Funkhouser, Rhonda On Behalf Of Ingram, Lloyd Sent: Thursday, November 18, 2004 8:42 AM To: sstickley@whga.com' Cc: Ingram, Lloyd Subject: Titan Virginia Ready -Mix LLC - Frederick County The application for site plan for this property appears to have a measurable impact on Route 671, Woodside Road, the VDOT facility which would provide access to the property. The following items need to be noted on the site plan: • The proposed sight distance easement located between Station 16+00 and Station 20+00 needs to be a recorded easement with deed book and page number. • It is noted on the plans you say the existing gravel road is to remain. This is only for a period of two (2) years. At which time Titan will be required to pave the road or participate in a realignment of Woodside Road if additional industrial development occurs. Therefore, a $100,000 bond will need to established with Frederick County to be utilized for paving this roadway or as a matching fund for revenue sharing improvements on the roadway as deemed appropriate by Frederick County. • Please extend the curb & gutter between the two (2) proposed entrances so we will have continuous curb & gutter. • Titan will be responsible for maintaining the Route 671 gravel roadway (between Route 11 and the proposed entrance) to an acceptable surface, including dust control until such time it is paved. If any work is performed on the State's right-of-way, a land use permit will need to be applied for and issued to cover said work. The permit is issued by this office and requires a fee and surety bond coverage. Thank you for allowing us the opportunity to comment. Should you have any questions, do not hesitate to give me a call. Lloyd A. Ingram Transportation Engineer VDOT --- Edinburg Residency Land Development 14031 Old Valley Pike Edinburg, VA 22824 (540)984-5611 1 of2 11/18/2004 9:05 ANI • CK Department of Planning and Development 540/ 665-5651 FAX: 540/ 665-6395 per 8, 2004 Mr. Scott Stickley William H. Gordon Associates, Inc. 24 West Piccadilly Street, Suite A Winchester, VA 22601 Re: Third Review Comments for Site Plan #52-04 Property Identification Number (PIN) 33-A-133 Stonewall Magisterial District Dear Mr. Stickley: Planning Staff has reviewed the above -referenced site plan to determine if administrative approval can be granted. At this time, administrative approval cannot be granted. This site plan is denied until the issues in this letter, as well as all issues of the other review agencies, have been adequately addressed. Please review Staff s comments listed below and then prepare a revised site plan which adequately addresses each concern. Review Comments: 1. Woodside Road Improvements. On Sheet 3 of 8, it states that the existing gravel road is to remain. Please provide a notation on the plan regarding the future improvements to be made to Woodside Road as required by VDOT as well as the timeframe that is applicable and the bond. 2. Trailers. There appears to be trailers shown on the Titan Ready Mix site plan. The Frederick County Zoning Ordinance does not allow trailers to be used as structures in the EM Zoning District. 3. Special Limited Power of Attorney. Please submit a completed power of attorney for Frederick Land Company and Titan Virginia Ready -Mix LLC. Once you have adequately addressed all of these comments, please resubmit a copy for my review. I will need all approved review agency comment sheets and at least five copies of the final plan for approval. Comment sheets are required from the following agencies: the Frederick County Sanitation Authority, the Frederick County Department of Building Inspections, the Frederick County Fire Marshal, the Frederick County Engineer, the Frederick County Health Department, the Frederick County GIS Department, the Airport Authority, and the Virginia Department of 107 North Kent Street, Suite 202 - Winchester, Virginia 22601-5000 Mr. Scott Stickley, William H. Gordon Associates, Inc. RE: Titan Virginia Ready -Mix, Site Plan 52-04 Page 2 December 8, 2004 Transportation. Feel free to contact me if you have any questions. Sincerely, Candice E. Perkins P1armer II Attachment cc: Titan Virginia Ready -Mix, LLC, 22963 Concrete Plaza, Sterling, VA 20166 CEP/bad • P FRE COP COUNTY of FREDERICK �) Department of Planning and Development 540/665-5651 FAX: 540/ 665-6395 December 8, 2004 Scott Stickley William H. Gordon Associates, Inc. 24 West Piccadilly Street Winchester, Virginia 22601 RE: MDP (Master Development Plan) Waiver Request Titan Virginia Ready -Mix, LLC Zoning District: EM (Extractive Mining); Stonewall Magisterial District Property Identification Number (PIN) 33-A-133 (5.6 acres) Dear Mr. Stickley: I am in receipt of your letter, dated November 24, 2004, which requests a waiver to the requirement for a master development plan for the development of a concrete batch plant facility on the above - referenced property. The property is located on Woodside Road in Clearbrook; the owner of this parcel is listed as Frederick Land Company, Inc. Section 165-134 of the Frederick County Zoning Ordinance gives the Director of Planning and Development the ability to waive the requirement for a master development plan under certain conditions. The proposed development meets these conditions. It does not contain any new streets, roads or right-of-ways; it does not propose any stormwater management system designed to serve more than one lot; is not an integral portion of a future development; it is planned to be developed in a manner that is harmonious with surrounding properties and land uses; and, the development does not substantially affect the purpose and intent of the Zoning Ordinance. Therefore, your request for a waiver to the master development plan requirement is appropriate in this situation. Please be advised that this waiver does not eliminate any applicable development and design requirements of the Frederick County Subdivision and Zoning Ordinances. Prior to the development of this property, a site plan must be reviewed and approved by Frederick County. Future subdivision of this parcel or other development of this property may require a Master Development Plan. Please ontact me if you have any questions regarding this letter. Sinc rely, E is . awrence, AICP P anning Director ERL/CEP/bad cc: Mark R. Cheran, Zoning & Subdivision Administrator 107 North Kent Street, Suite 202 - Winchester, Virginia 22601-5000 William H. Gordon Associates, Inc. To Frederick County Planning and Development 107 North Kent Street, 2nd Floor Winchester, Va 22601 [—]County No./❑Town No. • 24 West Piccadilly St. Suite A Winchester, Virginia 22601 540-542-1737 (fax) 540-542-1923 Date November 24. 2004 Shipped Via Courier Plan Name Titan Virginia Ready -Mix Project No. 2090-0101 [Task No. Subject From Scott Stickley, P.E. We are sending you ® Print(s) ® Correspondence(s) ❑Electronic Media ❑ Originals Submission ❑ 1'' 2nd ® 3rd ❑ Other Copies Date Description 1 Site Plan 1 Comment Response Letter 1 Waiver Request Letter These are transmitted ❑ For your use LJ As requested LJ For approval L:� For review and comment ❑Other Comments Please call with any questions. Thank you. Laura Gomez INTERNAL PLAN PROCESSING USE ONLY Project Name Description Notes: Signature of Recei Date E C E 0 V E FREDERICK COUNTY PLANNING & DEVELOPMENT ` cc: I, Engineers 9 Surveyors • Land Planners • Landscape Architects • • 24 West Piccadilly Street Suite A Winchester, Virginia 22601 540-542-1737 William H. Gordon Associates, Inc. (fax) 540-542-1923 November 24, 2004 County of Frederick Department of Planning and Development Attn: Candice E. Mills — Planner II 107 North Kent Street Winchester, VA 22601-5000 RE: Review Comments for Site Plan #52-04 Property Identification Number (PIN) 33-A-133 Stonewall Magisterial District WHGA # 2090-0101 Dear Ms. Mills: RD FREDERICK COUNTY PI ANNiNG 8 DEVELOPMENT The following is in response to your comment letter dated November 5, 2004. Comment 1: Right -of -Way Dedication. On the previously submitted plan there was a dedication to VDOT for Woodside Road. The revised plan does not show any dedications: please clarify why this was removed from the plan. Response: Based on the meeting between the developer and VDOT, what is currently shown on the plans is what VDOT considered the minimum needed to provide access from Woodside Road. VDOT has provided comments to us and is not requesting a dedication at this time. Comment 2: Proposed Access Road. On Sheet 3 of 8 the "proposed access road" is still shown. It is understood that trucks might cross the Global Stone Property; however, this road will not be approved without a Master Development Plan. Please remove the 'proposed access road" and provide a notation on the plan that Woodside Road is the main access to this site. Response: The referenced note was a typo left over from the previous layout when access was proposed from Brucetown Road. The note has been removed and a note added that Woodside Road is the main access to the site. Comment 3: Master Development Plan: In accordance with Section 165-133 of the Frederick County Zoning Ordinance, a Master Development Plan is required prior to any development in the EM (Extractive Mining) Zoning District. However, in accordance with Section 165- Engineers • Surveyors • Land Planners 9 Landscape Architects County of Frederick . Department of Planni and Development Attn: Ms. Candice E. Mills — Planner II Second Review Comments for Site Plan #52-04 November 24, 2004 Page 2 13413, this property may be eligible for a waiver of the Master Development Plan. To obtain a waiver of this requirement, you must provide this department with correspondence requesting a waiver and explaining why this property is eligible. If this property is subdivided in the future or additional development occurs on the site, a Master Development Plan will be required. Please note that this property will only be eligible if the "proposed access road" is removed. Response: A letter requesting a waiver of Section 165-133 is provided with our resubmission. Comment 4: Special Limited Power of Attorney. Please submit a completed power of attorney for Frederick Land Company. Response: As you know, because the owner in fee simple signed the application, a Power of Attorney is not needed. Should you have any questions in regard to these responses, please feel free to contact us. Sincerely, WILLIAM H. GORDON ASSOCIATES, INC. Scott Stickley, Director —Winchester Office Attachment MSS:sm Cc: Titan Virginia Ready -Mix, LLC Thomas Moore Lawson, Lawson and Silek, PLC Engineers 9 Surveyors • Land Planners • Landscape Architects Gif William H. Gordon Associates, Inc. November 24, 2004 Frederick County Department of Planning and Development Attn: Mr. Eric R. Lawrence 107 North Kent Street Winchester, VA 22601 Subject: Master Development Plan Waiver Request Site Plan #52-04, PIN 33-A-133 Dear Mr. Lawrence: • 24 West Piccadilly Street Suite A Winchester, Virginia 22601 540-542-1737 (fax) 540 , V�.► 2 4 FREDERICK COUNTY PLANNING & DEVELOPMENT On behalf of our client, Titan America, we hereby request a waiver of the Master Development Plan requirement of Section 165-133 for the Titan Virginia Ready -Mix, LLC site plan. The subject property is located in the Clearbrook area between Martinsburg Pike, Route 11 and Brucetown Road, Route 672. The site plan proposes a lease area of 5.6 acres to construct and operate a concrete batch plant. This request is made in accordance with Section 165-134B specifically with the following requirements: 1. No new streets, roads or rights -of -way are being proposed. Access to this site will be from Woodside Road, Route 671, an existing road within the state system. 2. There is no regional stormwater management system proposed with this project. 3. This is not an integral portion of a property planned for future development. The lease area comprises 14% of the total parcel area. 4. This property is planned to be developed in a manner harmonious with surrounding properties. Global Stone Chemstone Corporation owns the land surrounding the lease area. It is our understanding that a similar batch plant is proposed on Global's property off of Brucetown Road, Route 672. 5. This development does not substantially affect the purpose and intent of Chapter 165 of the Zoning Ordinance. We understand that if the subject property is subdivided in the future or additional development occurs on the site, a Master Development Plan may be required. Thank you for your consideration of this matter. If you have any questions, please contact us at your convenience at (540) 542-1737. Sincerely, iVvlliam_H. Gordon Associates, Inc. Cott Sticklerr�� Director, Wincht4r Office cc: Mr. Bob Odom, Titan America Mr. Thomas Moore Lawson, Lawson & Silek, PLC Engineers • Surveyors • Land Planners • Landscape Architects r. COU Department of Pla 5, 2004 Mr. Scott Stickley William H. Gordon Associates, Inc. 24 West Piccadilly Street, Suite A Winchester, VA 22601 Re: Second Review Comments for Site Plan #52-04 Property Identification Number (PIN) 33-A-133 Stonewall Magisterial District Dear Mr. Stickley: 540/ 665-5651 FAX: 540/ 665-6395 Planning Staff has reviewed the above -referenced site plan to determine if administrative approval can be granted. At this time, administrative approval cannot be granted. This site plan is denied until the issues in this letter, as well as all issues of the other review agencies, have been adequately addressed. Please review Staff s comments listed below and then prepare a revised site plan which adequately addresses each concern. Review Comments: 1. Right -of -Way Dedication. On the previously submitted plan there was a dedication to VDOT for Woodside Road. The revised plan does not show any dedications; please clarify why this was removed from the plan. 2. Proposed Access Road. On Sheet 3 of 8 the "proposed access road" is still shown. It is understood that trucks might cross the Global Stone Property; however, this road will not be approved without a Master Development Plan. Please remove the "proposed access road" and provide a notation on the plan that Woodside Road is the main access to this site. 3. Master Development Plan. In accordance with Section 165-133 of the Frederick County Zoning Ordinance, a Master Development Plan is required prior to any development in the EM (Extractive Mining) Zoning District. However, in accordance with Section 165-13413, this property may be eligible for a waiver of the Master Development Plan. To obtain a waiver of this requirement, you must provide this department with correspondence requesting a waiver and explaining why this property is eligible. If this property is subdivided in the future or additional development occurs on the site, a Master Development Plan will be required. Please note that this property will only be eligible if the "proposed access road" is removed. 107 North Kent Street, Suite 202 - Winchester, Virginia 22601-5000 Mr. Scott Stickley, William I-1. Gordon Associates, Inc. RE: Titan Virginia Ready -Mix, Site Plan 52-04 Page 2 November 5, 2004 4. Special Limited Power of Attorney. Please submit a completed power of attorney for Frederick Land Company. Once you have adequately addressed all of these comments, please resubmit a copy in for my review. I will need all approved review agency comment sheets and at least five copies of the final plan for approval. Comment sheets are required from the following agencies: The Frederick County Sanitation Authority, The Frederick County Department of Building Inspections, The Frederick County Fire Marshal, The Frederick County Engineer, The Frederick County Health Deparhnent, The Frederick County GIS Departmenl, The Air1,)ort Authority, and fhe Virginia Department of Transporfation. Feel free to contact me if you have any questions. Sincerely, Candice E. Mills Planner II Attachment cc: Titan Virginia Ready -Mix, LLC, 22963 Concrete Plaza, Sterling, VA 20166 CEM/bad D� rE C Eod William H. Gordon Associates, Inc. To Frederick County Department of Planning and Development Attn: Candice E. Mills -- 1 3 24 West Piccadilly St. Suite A Winchester, Virginia 22601 540-542-1737 (fax)540-542-1923 Date Oct. 13, 2004 Shipped Via Pick -Up Plan Name Titan Virginia Ready -Mix Project No. 2090-0101rTask No. Subject From Scott Stickley, P.E. ❑County No./❑Town No. We are sending you ® Print(s) ❑ Correspondence(s) ❑Electronic Media ❑ Originals Submission ❑ 1" ® 2nd ❑ 3Id ❑ Other Copies Date Description 1 set Revised Site Plan per Planning comments dated Sept. 17, 2004 1 Comment/Response Letter 1 Copy of Recorded Plat of Subject Property These are transmitted ❑ For your use L ] As requested ❑ For approval � For review and comment [—]Other Comments Comments 1 and 2 will be addressed at a future date as described in the commenUresponse letter. INTERNAL PLAN PROCESSING USE ONLY Project Name Description Notes: Signature of Receipt Date cc: Engineers 9 Surveyors • Land Planners • Landscape Architects 24 West Piccadilly Street '2 Suite A Winchester, Virginia 22601 540-542-1737 William H. Gordon Associates, Inc. (fax) 540-542-1923 October 13, 2004 County of Frederick Department of Planning and Development Attn: Candice E. Mills — Planner II 107 North Kent Street Winchester, VA 22601-5000 RE: Review Comments for Site Plan #52-04 Property Identification Number (PIN) 33-A-133 Stonewall Magisterial District Dear Ms. Mills: The following is in response to your comment letter dated September 17, 2004 Comment 1: Master Development Plan. In accordance with Section 165-133 of the Frederick County Zoning Ordinance, a Master Development Plan is required prior to any development in the EM (Extractive Mining) Zoning District. Before this department reviews this application further, a Master Development Plan for this property must be submitted and approved by Frederick County. Response: A meeting is scheduled for Thursday, October 141' with the county, VDOT, the developers, their land use attorney and WHGA to discuss access and the MDP process. The plans will be revised accordingly base on the outcome of this meeting. Comment 2: Special Limited Power of Attorney. Please submit a completed power of attorney for Frederick Land Company as well as Global Chemstone, since the access road is going through their property. Response: We will provide a revised application form with the signatures of all parties who own land involved with this plan. On past projects, the county has not required the special limited power of attorney if the owner(s) sign the application. Comment 3: Adjoining Properties. On Sheet 3 of 12, some of the adjoiner information is incorrect. Please include the zoning and use for each property as indicated. Response: The adjoining property information has been corrected. Engineers • Surveyors 9 Land Planners • Landscape Architects County of Frederick • 0 Department of Planning and Development Attn: Ms. Candice E. Mills — Planner II October 13, 2004 Page 2 Comment 4: Handicap Parking and Access. The handicap parking space on the property needs to be revised to be twelve inches wide and a three-foot wide curb ramp must be provided for access into the building. Response: The handicap parking has been revised to depict an 8' wide space and an 8' wide stripped aisle (van accessible) per ADA requirements. A curb ramp is not needed due to the parking and sidewalk being at the same elevation. An accessible route and ramp has been provided to the trailer. Comment 5: Additional Building Restriction Lines. On Sheets 2 and 4 of 12, the extended BRL Zoning Ordinance reference is incorrect; it is 165-24 (7). Response: The reference has been corrected. Comment 6: Aggregate Storage Area/Hopper Area. Please specify if the area where the aggregate storage area and hopper area is proposed gravel. Also, it is unclear how truck traffic will flow through this area. Specify how trucks will get from the main entrance road to this area and back onto the main road. Response: A note has been added to the plans specifying gravel as the finished surface in this area. Traffic flow around the plant consists of the following: 1. Mixer truck will enter the plant through the first entrance off the main entrance road, drive under the plant, get loaded, hit the wash down area, drive around the front of the plant and exit onto the main entrance road. 2. Tanker trucks hauling cement and fly ash will drive around the front of the plant, back-up, unload and leave the same way. 3. Dump trucks hauling aggregates will enter through the first entrance off of the main entrance road, dump their material into the respective aggregate storage bin and leave the same way. Comment 7: Existing Dirt Road. Is the existing dirt road that they are improving a deeded right of way? If it is, please provide a legal reference. If it is not a right of way, it will have to be platted, giving this property access through the Global Chemstone Property. Engineers • Surveyors • Land Planners 9 Landscape Architects r County of Frederick • Department of Planning and Development Attn: Ms. Candice E. Mills — Planner II October 13, 2004 Page 3 Response: The existing dirt road is currently not a deeded right-of-way. The right-of-way will be platted to provide access across Global Stone's property. Comment 8: Right of Way Dedication. For the purposed 50' right-of-way dedication on Woodside Road, specify that this is to VDOT. Response: The note has been revised to specify that the dedication is to VDOT. Comment 9: Total Acreage. The total acres for the site are listed on the plan as 39.9 acres; however, the Frederick County Commissioner of the Revenue has this property as being 58+ acres. Please explain this discrepancy. Response: After researching the tax maps and reviewing the plans with the surveyor, Marsh & Legge Land Surveyors, PLC, there are discrepancies between the tax maps and the actual boundaries. The boundaries shown on the plans are correct based on the most recent, recorded subdivision/BLA plats. It appears that the tax map does not have the most current boundaries and areas. The actual area of the subject property is 39.90848 acres. A copy of the recorded plat is attached for your reference, sheets 10 and 11 of the plat depict the subject property. Comment 10: Outdoor Storage and Processing. This site appears to have a significant amount of outdoor storage and outdoor processing. These areas must be completely screened from the view of the road and street right-of-ways and adjoining properties by a fence, wall or by screening. Response: Notes have been added to show the height of the proposed walls for the aggregate storage and the sludge drying pads. The aggregate storage walls will be 6' in height and the sludge drying pad walls will be 8' in height. A 6' board -on -board fence has been provided along the frontage of Woodside Road as indicated on the marked up plan set to provide the required screening. Comment 11: Tanker Truck Area. There is an area labeled on the plan as "tanker trucks". Please specify if this area is planned as tanker truck storage or parking area. Engineers • Surveyors • Land Planners 9 Landscape Architects E County of Frederick • • Department of Planning and Development Attn: Ms. Candice E. Mills — Planner II October 13, 2004 Page 4 Response: The note had been revised to indicate temporary parking for the tanker trucks to unload. There is no permanent tanker truck parking or storage proposed. Comment 12: Power Line Easement: On Sheet 4 of 12, label the power line easement adjacent to the lease lot. Response: The power line easement has been labeled on Sheet 4 as requested. Should you have any questions in regard to these responses, please feel free to contact us. Sincerely, WILLIAM H. GORDON ASSOCIATES, INC. Scott Stickley, P. Director — Winchester Office MSS:sm Cc: Titan Virginia Ready -Mix, LLC Engineers • Surveyors • Land Planners • Landscape Architects 0 • From:MARSH AND LEGGE 15406670469 10/13/2004 14:13 M P.002/015 _ t(W�-b AZ PLAT ouL`i Is pill IPF,IIAI �p BOUNDARY LINE ADJUSTMENT PLAT BETwEEN THE LANDS OF S. FREY COMPANY, INC., CEDAR LAND COMPANY, L.C. AND FREDERICK LAND COMPANY, L.C. STONE FFALL DISTRICT, FREDERICK COUNTY, VIRICNIA MARCH 12 1999 �o COWAK RAMROAD s/FE 67 NC/MTY. l '-4000' OWNER'S CERTIFICATE THE ABOVE' AND fDREM WVG BOUNDARY LINE ADJUSTMENT OF THE' LANDS OF W. S. f7?£Y COMPANY, INC., CEDAR LAND COMPANY, L.C. AND FREDERICK LAND COMPANY, L.C. AS APPEARS ON THE ACCOMPANYING PLATS, IS WITH THE FREE CONSENT AND IN ACCORDANCE WITH 7H£ DESIRES OF 7HE UNDERSIGNED OWNERS, PROPRIETORS PROPRIETORS AND TRUSTEES IF ANY. W. S. FREY COMPANY, /NC. BY. ei i� �► Q /'�"�{ p� 1 Cant Presideft ct W.S. lTrY CET.l4R LAND COMPANY, L.C., BY wn Ty- • , Lauld cpeny, L.C. FREDERICK LAND COMPANY, L C., HY. � eaic}azit of W.S. Fray STA7E OF TA ' ,AT LARCE F-eclerlcX 'AM CCapa" y, CITY/CHUMP OF V/Mok_ TO - WIT.• 7NE FOREGOING WAS ACKNOWLEDGEP WJVRE ME, A NOTARY PUBLIC AN AND FOR MW SPATE AND JURISDICTION AFORESAID, 81 All k 0- L1 &X 5H, 3*42 /N MY STA�•��Q4• JUR/SD/C170N AFtMEWD, [HIS Th WY OF AZ 19Qt `: •• .., MY COMMISSION EXPIRES O wAmber, ftAmoomb AmmiWon r NOTARY PURL , )'' SURVEYOR'S CERTIFICATE l hOMW COPl7fY 7IMT 7HE LAAV CaV/AV" AY PAU BOUZ1 " LAVE AWUSTkYW CONWVS 7N£ LAND C71,NLEY£D AS nlLLONS P.LM JJ-A-140 NW 14J AVD J4-A-1J3 AND A POR170V OF P.I.M. 3J-A-139 AND 34-4-10 COWY£YED l0 W. & fXEY 00AAR4M: oc AS RmarD LN ITMT 61MAW DEED Or CORREC7KAV D47ED OC706CR Ja 1982 OF RECORD UV 7H£ DESK£ Or W alW Of 7HE C#CWT COURT 0' FR£DERACK COLANJY N DEFD 500K 2aJ AT PACE 275 P.LAL JJ-A-145 CONWM 7V W. S fREY COANWVY M BY DEED [SHED ,A2Y /J, 1971 OF RECORD IN 7N£ agrf Or pC CY£RA( OF iw apcLA'T COURT QF fXRV 1KK COUNTY N DEED 90ON J79 AT RAG£ 9S A fKRMN OF PLAL E4-A-96 R 97 AND ALL OF 44-A-98 & 99 CONWTED M Caw LAID COAFAWn LC. BY DEED LYI717D AMY 1A 1996 OF RECLWD AV THE OFf)C£ ar ?HE CIDW LAB NE CiPCLA'/ COLg r L1F FRF OMW COWY MN DE70 8009 LJSO AT RACE IJ91 P.LM M-A-144 .JJ-A-146 MD A PORWN Ar .N-A-II COAHWD 7V 1H OP fREL1EWK LAND COMPANY,, LG 8Y DEED LNTED ACW R /, 1995 OF RECORD yJ AV TILE acrOf LY INf OF THE CAPCL#7 COURT Of fREZCRKX COGMY A'V WD 646 AT �y APP AL �C > 3 (1co I� Now. s0011 ae FR K COl/NI'Y LW TLC t,R SUBD ACkIN57RA7OR 0 such SHd147' 1 Of 14 560 CHEST 1oun0vC sr280r MARSH & LEGGE WI WINCHESTER, VIRaIMA 22801 Land Surveyors, P.L.C.PHONE: (540) 667-0468 y FAX: (540) 667--0469 E-MAIL: mllaiehentel.net 0 • Fran:MARSH AND LEGGE 15406670469 10/13/2004 14:13 P.003/015 • 93 1 t'G I 1 68 O SHEET LA MUT U4P BOUAfWY LING ADJUSTMENT UT"IN r" LANDS Or W. S. FREY COMPANY, INC., CEDAR LAND COMPANY, L.C. AND FREDERICK LAND COMPANY, L.C. M"FILL DISTRICT FM,DA'RJCX COUNTY YII crv! DArr 3/12/08 SjC1Ld:1�+1600' SH91" t Or 14 � 0 9ooi1 t�D euxvs��v 660 NORTH LOUDOUN STREET MARSH & LEGGE WIrrCHESTER, VIFtOINIA z2601 Land Surveyors, P.L.C. PHONE: (640) E67-D486 FAX (540) 667-0489 E-1[AIL mUnDshentel.net 0 0 From:MARSH AND LEGGE 15406670469 10/13/2004 14:13 #065 P.004/015 • r AI.N. M-A-- ra Twn N M-A-144 myIft �v_ 4. A(ATi7H LINE TO SHEET 10 OF 14 PARCEL ONE „�ylk�f' VE NEW P.I.N. zow 34 A-1 M 132.1930 ACRES /Rs i1 L7.7 AIM 34-A-11 fRE7)ERA^K LAW COMPANY, La I80' /MGRE'SS-ECRESSQ�, a aw. AREA-21• .9166 ACRES i EASBWNT HEREBY A[Y AREA-9�7768 ACRES CREATED PAMJ4-A20 A S MY COWANr M rw �_ L85 28J/275 �5 IRE OW ARE1� 9127 ACRES PLM 34-A-15 ALU AREA=JO4M ACRES ,414E5 G: at VIOU K A, 7TT,/138 9 � FIN. 34-A-131 49d ••• — SaWa R. & BREIVL31 G WLWN AIN 34-A-27A P.LM 31-�4-p1 a7dJ/8BD oWWU Eu womw 5 $141570 � PARCEL 7W k R/.N. M A-144 1 200 OR/G. ARFA-98.4847 ACRES AW, AREA-492.080 ACRES 40' RA/U&W AW 4a 272 AC 569 EX RIR MMC `clb � IRS Ltd? //RS � /L,IC,l� 7 •A107E: LEMAV,, LWE AND CUR4E' . rNUES ON SI1 fiVY 15 AND 14 BOUNDARY LINN ADJUS7'YBNT JITMJ Al tits WDSr of �H oP W. S. FREY COMPANY, INC., CEDAR LAND COMPANY, L.C. AND FREDERICK LAND COMPANY, L. C. S"NZEAU DTsr1u�' PUDINCx MUM; MUM DATE: J/L4/89 b'GALd P-400' SHEET 3 Of 14 o. 0011 tA�►rD g��� From:MARSH AND LEGGE 15406670469 10/13/2004 14:13 #%5 P-005/015 Fran:MARSH AND LEGGE 15406670469 10/13/2004 14:13 #065 P.006/015 • • Al( q I I Nf; 117 MARCH LINE TO SHEET 8 OF 14 1211[RG14D OB. 263 PG 429 l x � P.LM 44-A-97 1 I 1/[RC1t0 SIG104G — % — — — R— ti AAOROXPROPOSED RRElOGI 1F BJ6 N OF 1"95 _�J � f'.MH A-9C IRS _D4 L16 (A�.1?? �% 4. �E �'`j fEN� AM 44-A-97 (Jf. CETNR LAND GY O r LC. 1 LR5l J99 a OR1C AREA-/64,"5 ApPfT IRS Aa4 ARM-1R78M ACAS PARCEL TWO O/A/ ZZ_A—fL,d 0 L' Fran:MARSH AND LEGGE 15406670469 10/13/2004 14:14 #065 P.007/015 • • A4 7CH LINE TO SHEET 7 OF 14 PARCEL TWO P.I.N. 3J—A 144 ORIG. AREA=98.4847 ACRES ADJ. AREA=492.0896 ACRES APPROX. PROPOSED Ra0C4 PON OF PrE 8J6 OlLr POST ti ` RAILRW R/W 08. 265 PC. 419 L IRS /RS PIN. 44-A-96 � cry AWE 0 � av w BOUNDARY LING AWUSTMENT BS7=N "M UNDS OF e W. S. FREY COMPANY, INC.,CEDAR LAND COMPANY) L.C. AND FREDERICK LAND COMPANY, L.C.srOXKVALL DISNUCr PJWSRICJC COUNn. MOINU DA7Z a/l7/v9 SCLLC:i"-400' slim? a 0r f MARSH & LEGGE WI NORTH I,o IRGU41 STREET RI?ICHES'fER, VIRGINIA 22801 Land Surveyors, P.L.C. PFAXE(540) )867-04698 E—HAIL mlls@shentel.net From:MARSH AND LEGGE 15406670469 10/13/2004 14:14 #065 P.008/015 • • BK93 I PG 1 173 P.LAC 44-A-96C PM. 44 A-96B ✓£RLO & AKEFN AL" W. it cllfsmw Sf/SW ✓. C11157i4w 7481380 Sd7/290 193 .-_ L16iS 00 i � � O POST v L10S P.LA 44A--W 11 1 L 1 f0 ROWD Wd I I .pAOCF F. MTF POS AND RtA04U S d 1 � IRS DbWIW L. CUPSIOW L23 367%194 a 11 W- • AiOr W PARM 4 `� 44A-9Q0 CMW WO COMAWK,, LC. Qr \ \PQ 1.? 1714 ACRES PARCEL TWO \� \ P.I.N. JJ A-144 0 ORIG. AREA=98.4847 ACRES ADtI. AREA= 492.0896 ACRES P./.N. 44-A-961 t CREVORY GRORDM n 5721372 / 2 P.LN. 44-A-8,i O RUDOLPH C d nWVCfS G. AMR7W L111 6041466 -L24 0, --4�5 /RS � P.M N. 44-A-96 AMTCH LINE 70 SHEFT 6 OF 14 BOUNDARY LING ADJUSTMENT BMrzN rAa LtXD9 OF iH OJP D W. S. FREY COMPANY, INC., CEDAR LAND COMPANY, L. C. AND > FREDERICK LAND COMPANY, L. C. 3rONSIALL D19TRICT 40,0011197 MDERICX COUNTY; VIRCINIA DAFT: 9/1Z199 SCALP 1"-400' `4,yD at71���oP SHElr 7 OF 14 MARSH & LEGGE Wr NORTH I,o MN STREET 1PNCHESTER, VII2a1GTNU 22e01 Lend Surveyors, P.L.C. PHONE: (540) 887-0488 FAX: (540) 887-0469 E-MAIL- mlls4shenLoLnet 0 9 \ j � OJ�� Fran:MARSH AND LEGGE 15406670469 10/13/2004 14:14 #065 P.009/015 • • pft Ptnt 44-d-eJ i /ode AlGW AM 44-A-97 i P.LM 44-r1-96 PARCEI. TWO P.1. N. JJ A —144 OR10. AREA=98.4847 ACRES AGV AREA=492.0896 ACRES 1 1 P.I.IK 44ti1-9.1 MATCH LINE TO SHEET 5 OF 14 BOUNDARY LINE ADJUMENT TH Op BBTwrsm THE 1"DS of 7 W. S. FREY COMPANY, INC, '�.� CEDAR LAND COMPANY, L.C. AND FREDERI CK LAND COMPANY, L.C. $g C STONlIlLL DISTRICT No. �001197gge rR8D6721CX COUNTY, MWINIA IUM 3/12/99 SCAIJ:1'-400' I,ND dUR���4 SHIJU 8 OF 14 MARSH & LEGGE WI NORTH . VIRGIN I9rREEP �PNCHE9TERVIRGINIA 22801 Land Surveyors, P.L.C. PHONE: (540) 607-0488 FAX: (840) 887-0489 E-"Ii mlldgdbentel.net From:MARSH AND LEGGE 15406670469 10/13/2004 14:14 #065 P.010/015 • • w � U.B. RU 11 - WARTMBURG FM ^21 06 AOV ~O O _ � O � G 4 AM 44--A-07 A PARCEL IWO P.I.N. JJ—A-144 OR/C. AREA=98.4847 ACRES t 1RS 1J0 AREA =492.0896 ACRES `. PJ.N. M-A-146 MATCH UNE TO SHEET 4 OF 14 BOUNDARY LINE ADJUSTMENT A97wszx MR LANDS or TH Op W. S. FREY COMPANY, INC., CEDAR LAND COMPANY, L.C. AND > FREDERICK LAND COMPANY, L.C. r001167 .Sflo rVAU afS=T o. FRaDe1UCx COUMT, MUNIA DATE: 3/1P/9g SCALr.-t'-400' t4Mo SUIST 8 OF t4 su8����9 680 NORTH LOUDOUN STREET MARSH & LEGGE MNCHESM, ViRGMA 22801 Land Surveyors, P.L.C. PHONE: (640) 887-0468 FAX (540) ee7-0486 F-IWL: mpe®shentel.net From:MARSH AND LEGGE 15406670469 10/13/2004 14:14 #065 P.011/015 • clo I a � n � w. S. fREr cD,uPavr, mac � 2&V275AOaV ? Q — 1 LAC 53-A-132 `MAW WP1AlPCEZ 132.19" ACRES vp r fWNY Ar a isff LSL59 r, 40' RAl RG4D R/►i' ACW PUAI W 272 PC 569 M-A-166 ti14 ,ti / fREDERrx LAAD6ca~y,, L.C.. PARCEL ONE 4QB63 ACRES Nf-W P.1. N. J4 —A —11A S45046 1,32.1930 ACRES 0) fP.LA( M-A-146 %* RrB 672 - BRUCIMWH ROAD A[ATCH LINE TO SHEET .3 OF 14 BOUNDARY LINE ADJUSTMRNT I1I OP ` esrvssN mr ums or ** W. S, FREY COMPANY, INC., •� CEDAR LAND COMPANY, L.C. AND > FREDERICK LAND COMPANY, L.C. 97'OMZYALL DISnUCr o. 001197 FRZDSPJCX COUNT, PLRCDCA DAM: 3/18/ 9 SCAMC-400' C�yD svAa�°� BXSar 10 or 14 MARSH & LEGGE 880 NORTH . VTRGIN s2260r nNCHE9TER, VIRatrru 22801 Land Surveyors, P.L.C. PHONE: (540) 887-0488 y FAX: (540) 887-0469 E-?JAIL: n3l1a9shentel.net From:MARSH AND LE(GE 15406670469 10/13/2004 14:14 #065 P.012/015 31i'GI 117 w COLLEEN E ogrD? P.IN. M-A- IJI \ `� 77 741 M. S FREY C044PANY A-- \ ORG AREA -00.082 ACRES \ AOI. AREA-.i9."4 ACM !RS Leo 161 IRS \ �i ��*07 \. IRS `rrs PARCEL ONE MW P.1. N. SL J4 A-11A 132. 19JO ACRES J4—A-10 i4S WXLAM M d D. NRC/WL4 REET£ IRS 770/1192 L� _ IRS MATCH LINE TO SHEET 12 OF 14 BOUNDARY LINE ADJUSTMENT e BYf'1rd6N w GADS of W. S. FREY COMPANY, INC.,CEDAR LAND COMPANY, L.C. ANDFREDERICK LAND COMPANY, L.C.0. STONEWALc DISTRICT lRl )UCK COUNTY KBONNUDAIT. 9/12/99 SCALP: I'-400' SLlEzr 11 0/ 14 MARSH & LEGGE WI 226 NORTH .VIRGIN s01 NINCHE9TER. VIRGINU 2280 es ors. P.L.C. PHONE: (540) 867-0488 Land Surveyors. FAX: (540) 887-0459 - E MAIL: mllsoshentel.nst From:MARSH AND LEGGE 15406670469 10/13/2004 14:15 #065 P.013/015 • • V 0 2 nu n n i nn , i ti n MATCH LINE TO SHEET 11 OF 14 F I PARCEL ONE I� NEW P. 1. N. J4—A-11A IRS 1 J2.19J0 ACRES L71 IRS IRS O 1.N. 34-A- l f F)PEDDWCK LAND CO"R4N/: LLB8441606 LARla AREA 14KRIM ACRES ACV AREA-M 7768 ACRES i L85 LB4 IRF /R-1 AM J4-A-24F BEM AMV£ BUTUR W1807 P.M J4—A-24E KEW X4RREN 8 Pf= S VVWw mj/mm P.LK J4-A-10 *IL" x & D. V1RU/A44 RE SE 77011192 BOUNDARY LJN6 ADJUSTMENT BlrrBaN TAB LANDS OF TH OF L f W, S. FREY COMPANY, INC., '�•� CEDAR LAND COMPANY, L.C. AND FREDERICK LAND COMPANY, L.C. ° S"MSWAU DlSMCT a, oolls7 nWDZIUCK COUM V7PCENU DArl: 3/12/88 SCALd:1'-400' t4ND 8URv6�ci4 SHEET is OP 14 MARSH & L,EGGE WT HESNORrx VIRGDrr sTTt�r WIIdCIiESt'ER, VIF2CIMA 22801 Land Surveyors, P.L.C.PHONIC: , (640) 667-0468 FAX (640) 667-0469 E-1IATI - rnlls®ahentelmot • C� From:MARSH AND LEGGE 15406670469 10/13/2004 14:15 M065 P.014/015 Fran:MARSH AND LEGGE 15406670469 10/13/2004 14:15 #065 P.015/015 • 16 LME TABLE UNE TABLE NUMBER LYREC110N D CLAW£ 544E GSTAKCf NUI/BfR A'1�'CTION DVfSTANf.E NLYfBE7P Odlo T uff Rboily Arr C:havd Cl Ob�lS'+U" 58.BD' 1121�[aD' I1� 69 7 S 14427" Zr11D.Ci?' C? .T?'4eSD" 89.D1 3GtxA0 174e9S O10?49' E IT1.Jl CJ 6.J'1 4lT 107.ad /71xQ7 15U.x2 S 16'1 11 E 11�xe4 CI /r1e /75�a1 1/A1QJp 25a�S N es132d W ?SQfe a �Js oe" far�a9' le�ano 1D9.Ri s erf�sso w /DAe1' Ce OT36?L+ ' 214;? .X790.25 �90' N Jd'09 I5 .xi E �',�d C7 2J'f1 �1.LX1' 199.1e' dRae S Jl:x?49 w dRJI CV /0'4S' N.I1 PS9.le Id N J73049 E 46te0 C9 QD'LU 1 lS,�eb 7RTble�e J0K S 84'13�J" w JOB,2S clo � 1 e1.88 /e7+�ea le;xer s eriz w 1e:xs7 cl 1 19 u S J?9,.A2 75lz AO psa 12 N de'?I 2J w 25I� 87' C71 Qe•J ?8.65 109.12 Sbt 10N 42?t+J �" W SD. ff' C1J IJ?T SSR 19 I?.I?6 N JONPA w I1JC2 C14 QY1J40 44148 2287.3� edSt'f N Od'f0 " E ed9!' C15 OD31 J7" 475t95' S7xR63 QT7.6�V N JT17:x5 f D56..59 71 � C1e 2J111(Od �aa eae ?�eS S OT5?6e w ?�IZ96' C17 10'1I 40 JCU 116Q Ll7' 2RSi Q? S GiTf0.7<i E 1IRx.x1 Cfd 10'yd �2 STS9eJ 71Lxx0 N ?77J?.xS f 110J. CIO [70'11 1 .x10 1Ax9.ad e,10 S e�Jl Lt2 w S40' Cil� /J'S 06 1T1. 1�/2.70 J4�00 N eew1�S' w J4x13 c11 1T/1:19 lax nsaJv .A'SLtL70 s 79'39 /e w J+�etbv' LEGEND BOUNDARY IRF-/RON ROAR fO1/ND IRS -A" SET ANON=CONCRE7F AIIDNUA/ENT ------------ BOl/NLLtRr UN£ NER£LJY ✓�fG1ED o BOUMQAWY Gu' RNER LINE ADJUSTMENT � 9Yf1IlSN Mr LANDS 0I W C' li'ATi'V FT1 'AlDAl1TV rf►rl"40�pls LEGEND BOUNDARY IRF-/RON ROAR fO1/ND IRS -A" SET ANON=CONCRE7F AIIDNUA/ENT ------------ BOl/NLLtRr UN£ NER£LJY ✓�fG1ED o BOUMQAWY Gu' RNER LINE ADJUSTMENT � 9Yf1IlSN Mr LANDS 0I W C' li'ATi'V FT1 'AlDAl1TV rf►rl"40�pls 0 • • M BILE COPY COUNTY of FREDERICK , 2004 Mr. Scott Stickley William H. Gordon Associates, Inc. 24 West Piccadilly Street, Suite A Winchester, VA 22601 Re: Review Comments for Site Plan #52-04 Property Identification Number (PIN) 33-A-133 Stonewall Magisterial District Dear Mr. Stickley: Department of Planning and Development 540/665-5651 FAX: 540/ 665-6395 Planning Staff has reviewed the above -referenced site plan to determine if administrative approval can be granted. At this time, administrative approval cannot be granted. This site plan is denied until the issues in this letter, as well as all issues of the other review agencies, have been adequately addressed. Please review Staff comments listed below and then prepare a revised site plan which adequately addresses each concern. Review Comments: 1) Master Development Plan. In accordance with Section 165-133 of the Frederick County Zoning Ordinance, a Master Development Plan is required prior to any development in the EM (Extractive Mining) Zoning District. Before this department reviews this application further, a Master Development Plan for this property must be submitted and approved by Frederick County. X 2) Special Limited Power of Attorney. Please submit a completed power of attorney for Frederick Land Company as well as Global Chemstone, since the access road is going through their property. Adjoining Properties. On Sheet 3 of 12, some of the adjoiner information is incorrect. Please include the zoning and use for each property as indicated. ✓4) Handicap Parking and Access. The handicap parking space on the property needs to be revised to be twelve inches wide and a three foot wide curb ramp must be provided for access into the building. f5) Additional Building Restriction Lines. On Sheets 2 and 4 of 12, the extended BRL Zoning Ordinance reference is incorrect; it is 165-24 (7). V,6) Aggregate Storage Area/Hopper Area. Please specify if the area where the aggregate storage area and hopper area is proposed gravel. Also, it is unclear how truck traffic will flow through this area. Specify how trucks will get from the main entrance road to this area and back onto the main road. 107 North Kent Street - Winchester, Virginia 22601-5000 1 • 0 Mr. Scott Stickley, William H. Gordon Associates, Inc. RE: Titan Virginia Ready -Mix, Site Plan 52-04 Page 2 September 17, 2004 x 7) Existing Dirt Road. Is the existing dirt road that they are improving a deeded right of way? If it is, please provide a legal reference. If it is not a right of way, it will have to be platted, giving this property access through the Global Chemstone property. 8) Right of Way Dedication. For the proposed 50' right-of-way dedication on Woodside Road, specify that this is to VDOT. ✓9) Total Acreage. The total acres for the site are listed on the plan as 39.9 acres; however, the Frederick County Commissioner of the Revenue has this property as being 58+ acres. Please explain this discrepancy. V,"I 0) Outdoor Storage and Processing. This site appears to have a significant amount of outdoor storage and outdoor processing. These areas must be completely screened from the view of road and street right-of-ways and adjoining properties by a fence, wall or by screening. V/11) Tanker Truck Area. There is an area labeled on the plan as "tanker trucks". Please specify if this area is planned as a tanker truck storage or parking area. ✓12) Power Line Easement. On Sheet 4 of 12, label the power line easement adjacent to the lease lot. Once you have adequately addressed all of these comments, please resubmit a copy in for my review. I will need all approved review agency comment sheets and at least five copies of the final plan for approval. Comment sheets are required from the following agencies: The Frederick County Sanitation Authority, The Frederick County Department of Building Inspections, The Frederick County Fire Marshal, The Frederick County Engineer, The Frederick County Health Department, The Frederick County GIS Department, The Air port Authority, and the Virginia Deparhnent of Transportation. Feel free to contact me if you have any questions. Sincerely, Candice E. Mills Planner II cc./Titan Virginia Ready -Mix, LLC, 22963 Concrete Plaza, Sterling, VA 20166 CEM/ Enclo 1 ✓i ` The following information must be included on your site plan. If your site plan is incomplete or is missing information, it will not be reviewed and returned to you for revisions. Administrative Information Y N 1. Name of proposed development. 2. Name, address, and phone number of owner. ,i 3. Name, address, and phone number of developer. 4. Name, address, and phone number of designer. 5. Certificate of surveyor, engineer, or architect. ✓ 6. Date plan prepared and date of revisions. 7. A listing of all co ditions placed on the site as a result of a conditional use permit or conditional zoning approval. 8. A space labeled "Approved by the Zoning Administrator" for — — the approval signature and date of approval. g. A description of setbacks or conditions placed on the site as a - — result of a variance approval. (Reference the variance _ -- application number.) General Site Information Y N �✓ 10. Location map (scale 1:2000) ✓" 11. Magisterial District 12. Scale of site plan (not to exceed 1:50) 13. North Arrow ✓ 14. Zoning of site l✓ 15. Use, zoning, and Property Identification Number (PIN#) of all — — adjoining properties. This includes properties located across — _ right-of-ways, streams, and railroad tracks. v� 16. Surveyed boundaries for all lots and parcels. General Site (con't) Y. N 17. Acreage of all lots included in the plan. 18. The location and dimensions of all required setbacks and yard ✓ areas. 19. The location and type of all dwelling units. _ N 20. Location and description of all recreation facilities. 21. Location of sidewalks and pedestrian ways. 0 I A 22. Location and area of common open space. 23. The location, height, and dimensions of all signs. 24. Location, height, and specifications of outdoor lighting fixtures. 25. Location and nature of outdoor storage areas. 26. Location of outdoor trash receptacles and dimensions of structure (fencing, etc.) required to enclose receptacles. Buildinq Information Y N 27. The height of all buildings and structures. 28. Location of all buildings, structures and uses. 29. The proposed use of each building, structure and area. N 1 30. Ground floor area and total floor area of all buildings with FAR -- — calculations for commercial and industrial zoning districts. Roads Y N 31. Name and number of existing and planned streets on and adjoining the site. 32. Location of existing and planned streets on and adjoining the site. 33. Posted speed limit of existing adjacent roads. 34. Location and dimensions of all proposed entrances from public right-of-ways. E ,✓ 35. Location of all entrances on adjoining roads within 200 feet of the proposed or existing entrance. 36. Dimensions, boundaries, width, pavement, and construction of planned roads. Utilities Y N :✓ 37. Location of all utilities, including sewer and water lines with the size of lines, mains, and laterals. ✓ 38. Location and width of all easements, including access, utility, and drainage easements. 1% 39. Location and nature of fire lanes, fire hydrants, and all other facilities necessary to meet Fire Code requirements. Parkin Y N Natural Features Y N 40. Calculations describing the required number of parking and loading spaces. 41. Location and dimensions of all parking and loading spaces, driveways, parking aisles, curbing and other features to be used. 42. Location and dimension of all disabled parking spaces and ramps. 43. Existing and finished contour lines. 44. Location of steep slopes, woodlands, floodplains, wetlands, sinkholes, and other environmental features. 45. Location of streams and drainage ways. Landscaping Y N @J ( 46. 47. Erosion and Sediment Control Y N Landscaping plan describing location and types of plants to be used. Location of required buffers and screening with cross sections or profiles. ✓ 48. A stormwater management plan with run off calculations and location and description of facilities to be used. 1j 49. Soil erosion and sedimentation control plan describing the location and methods to be used to minimize erosion and sedimentation during development. 12 TL+ Aj k� / AJ( • • Request For Site Plan Comments Frederick County Engineering Department Mail to: Frederick County Engineering Dept. Attn: Director of Engineering 107 North Kent Street Winchester, VA 22601 (540) 665-5643 Hand deli e S E P 1 3 2004 LU U 107 N . Ke t S Fourth FI Or FREDERICK COUNTY PLANNING &DEVELOPMENT Winchester, (540) 665-5643 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the site plan with this sheet. Applicant's Name: Titan Virginia Ready - Mix LLC _ Address: 22963 Concrete Plaza Sterling, VA 20166 Phone Number: (703) 234-1314 Name of development and/or description of the request: Titan Virginia Ready - Mix LLC concrete batch plant 5.7 miles North East of Winchester, VA Engineering I)ept. use only Date received 9l 3 / Cc/ Incomplete ✓ Date reviewed Signature and Date Signature and Date (revision Date revision received Incomplete Date reviewed Date approved Shockey's Batch Plant 33-A-1 44 IAI�I+orc- RAill DrnnA • • SITE PLAN APPLICATION I� CEOWE AUG 1 7 2004 FREDERICK COUNTY PLANNING & DEVELOPMENT Department of Planning and Development Use only. Date application received: 05 Application n0 Fees received: 16- Initials 1. Project Title: —Titan Virginia Rend= Mix, T.T.0 2. Location of Property _2418 Woodside Road (street address) _GJear_Hrp�k. VA 22624 3. Property Owner: Frederick Land Company LLC -------- Address: P.O. Box 1624 York, PA 17405 Telephone: _ 4. Applicant/Agent _Titan Virginia Ready - Mix LLC Address _22963 Concrete Plaza— _Sterlin , VA 20166— _PhonP: (703) 234_1314_— Telephone: _Fax: __C703Z 471-9348 5. Designer: William H. Gordon Associates, Inc. Address: -24 West Piccadilly Street, Suite A Winchester, VA 22601 Telephone: _15AW_ __5_4_-LZ3L--------------------------- Contact: _�s9�kl�x------—---- -------------- 6 6a. Is this a standard or 'minor' site plan? 6b. Is this an original or revised site plan? 7a. Total acreage of parcel to be developed 7b. Total acreage of parcel: 8. Property Information: a) Property Identification Number: b) Current Zoning: c) Present Use: d) Proposed Use: e) Adjoining Property Use(s) 0 Adjoining Property Identification Number(s) g) Magisterial District(s) Standard x Original x Min FREDERICK COU- h— Ty LANDEVELOPMENT Revised 5.49 acres_ 58.67 acres —_ 3-A-133 vacant ready -mix concrete batch plant! Railroad R/W, Mining RWRR, 34A 11A Stonewall I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to the submission of my site plan. FREDERICK LAND COMPANY, L.C., Signature: William S. Frey, resident of W.S. Frey Company, Inc., Manager of Frederick Land Company, L.C. -Bete -- - Date: 7 • , Request For Site Plan Cojve E LS 0 V k Department of Planningand D0 AN 17 01 Mail to: De artment of Plannin and Develo ment 107t- fREDr. JL n COUNTY p g P PLANNING & DEVELOPMENT Attn: County Planner Fourth Floor 107 North Kent Street Winchester, VA Winchester, VA 22601 (540) 665-5651 (540) 665-5651 Please fill out the information as accurately as possible in order to assist the agency with *heir review. Please attach two (2) copies of the site plan with this sheet. Applicant's Name: Address: Phone Number: Titan Virginia Ready -Mix LLC 22963 Concrete Plaza (703) 234-1314 Name of development and/or description of the request: Titanyiruiuia Ready -Mix 1,1,C concrete hatch plant Location of property: 2418 Woodside Road Clear Brook VA 22624 5.7 miles North East of Winchester, VA Planning and Development's Comments: Planning and Development use only Date received Incomplete Date reviewed Signature and Date Signature and Date (revision) Date revision received Incomplete Date reviewed Date approved 1s A) William H. Gordon Associates, I Dft E C E � W E To Department of Planning and Development Attn: County Planner 107 North Kent Street Fourth Floor Winchester, Va 22601 ❑County No./❑Town No. AUG 17 W Date Shipped Via Plan Name Project No. Subject From 24 West Piccadilly Street Suite A Winchester, Virginia 22601 Phone: (540) 542-1737 Fax: (540) 542-1923 August 17, 2004 Hand Delivered Titan Virginia Ready -Mix, LLC 2090-0101[Task No. Concrete Batch Plan Scott Stickley We are sending you ® Print(s) ❑ Correspondence(s) ❑Electronic Media ❑ Originals ® Submission ® 1s' ❑ 2nd ❑ 3rd ❑ Other Copies Date Description 1 Request for Street Name Comments- Site Plan Review 2 Site Plan 1 Signed Site Plan Application c, Cn a These are transmitted U For your use U As requested U For approval U For review and comment ❑Other Comments INTERNAL PLAN PROCESSING USE ONLY Project Name Description Notes: Signature of Recei Da cc: D „-a r" Engineers • Surveyors • Land Planners • Landscape Architects Document Approval Form PLEASE REVIEW THE ATTACHED DOCUMENT. IF THIS DOCUIv1ENT MEETS YOUR APPROVAL PLEASE INITIAL AND PROVIDE THE DATE AND TIME OF YOUR APPROVAL. IF THIS DOCUJYIENT DOES NOT MEET YOUR APPROVAL PLEASE PROVIDE C0111AIIENTS AS TO WIIA T YOU WOULD LIKE TO LIA VE COMPLETED. INITIALS DATE & TIME Candice David Mark Susan Eric COMMENTS: Received by Clerical Staff (Date & Time): P S D