Loading...
HomeMy WebLinkAbout61-04 CFFW Reg. Deten. Center - Work Release Facility - Stonewall - BackfileEXF� eLr, No Fi�7E lC C Cu (,t--12 9� R SITE PLAN TRACKING SHEET Date: File opened D /S v Reference Manual updated/number assigned D-base updated /D./S,d V File given to Renee' to update Application Action Summary CLOSE OUT FILE: Approval (or denial) letter mailed to applicant/copy made for file File stamped ,approved", "denied" or 'withdrawn" Reference Manual updated I I D-base updated File given to Renee' for final update to Application Action Summary 1 N U•\Car 1\Common\Tratking sheea\Sim Plan Tm-Ung.wpd Reviscd 021010 SITE PLAN APPLICATION CHECKLIST The checklist shown below specifies the information which is required to be submitted as part of the site plan application. The Department of Planning & Development will review the application to ensure that it is complete prior to accepting it. If any portion of the application is not complete, it will be returned to the applicant(s). (1) One (1) set of approved comment sheets are required from each relevant review agency prior to final approval of a site plan. It is recommended that applicants contact the Department of Planning & Development to determine which review agencies are relevant to their site plan application. A list of potentially relevant review agencies is shown below: Frederick County Department of Planning & Development Department of GIS (Geographic Information Services) Frederick County Sanitation Authority Frederick County Building Inspections Department i/ Frederick County Department of Public Works v-- Frederick County Fire Marshal Frederick County Health Department Frederick County Department of Parks & Recreation Virginia Department of Transportation (VDOT) r f pi City of Winchester r! k Town of Stephens City r (� Town of Middletown Frederick County / Winchester Airport Authority (2) One (1) copy of the Site Plan application form. (3) Payment of the site plan review fee. `� (4) One (1) reproducible copy of the Site Plan (if required). gilbert Clifford & associates �, As utes, pc 4 January 2005 Mrs. Candice Perkins Frederick County Planning 107 N. Kent Street Winchester, Virginia 22601 RE: Regional Jail Work Release Facility Dear Candice, Pu R /� Once again we've revised the plans per your comments. l l I / The changes are: I. We've noted a possible access location for the future animal shelter. The animal shelter site plan will need to show any changes required at the Work Release parking lot. 2. We've revised the maintenance of landscaping note to reflect the correct ordinance paragraph. 3. We've clearly shown the existing and proposed access easement location. Two copies are enclosed here for your approval. I've also enclosed the approvals from the FCSA, Inspections, VDOT, Airport Authority and the Health Department. We are awaiting final approval from FCPW and the Fire Marshal. We expect those shortly. Additionally, the power of attorney form is attached. If you have additional questions, please let me know. Regards, PATTON I IARRIS RUST & ASSOCIATES, pc onald A. Mislowsky, P.E., Vice President , R.W/kf • Enclosure JAN - 5 2005 Ell FREDERICK COUNTY PLANNING & DEVELOPMENT FCSA filbert w. clifford & associates R. a division of LIDEC , Patton Harris Rust i Associates,pc .{_'Engineers 5urveyors. Planner. Landscape Architects P��� 117 East Piccadily Street, Sute 21]0 30 2��qHWnchester, Virginia 22601ST 540.667.2139 1F 540 665,0493 � To: Organization/Company: From: Date: Project Name/Subject: PHR+A Project file Number: cc: John Whitacre Frederick County Sanitation Authority Ron Mislowsky, P.utm December 28, 2004 CFFW Regional Detention Center We've revised the plans per your comments. I've attached two copies of sheets 2 and 5 here for your review. Please let me know if you have additional questions. 37�41 R,E-w 1- w - V,6o j �A -0 F- e 1 L S FT /UR1117Y AA YZII-A 6 �a ,1,t y, �,4A 51.�,E TS 1-3 Request For Site Plan Comments Frederick County Inspections Department Mail to: Frederick County Inspections Dept. Attn: Building Official 107 North Kent Street Winchester, VA 22601 (540) 665-5650 JAN - 5 2005 FREDERICK COUNTY P� AN�!IRG & DEVELOPMENT Hand deli 107 N. Kent Street, Suite 200 North Building, 2"d Floor Winchester, VA (540) 665-5650 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach one (1) copy of the site plan with this sheet. Applicant's Name: Patton Harris Rust & Associates Pr - Address: c/o Ronald A. Mislowsky 117 E. Piccadilly Street Winchester, VA 22601 Phone Number: (540) 667-2139 Name of development and/or description of the request: CFFW Re ional Jail Location of property: Fort Collier Industrial park east of existing detention center Inspections Department's Comments Inspections Dept. use only Date received Incomplete Date reviewed Signature and Date Signature and Date (revision) C (-� Vnmg I/s a v'F rr-;?,� a /"z Date reNision received Incomplete Date approved ! 4 6 16 � 1\\4=Icq & � I sjp-K Building shall comply with The Virginia Uniform Statewide Building Code and section,308 group I (Institutional) of the International Building Code/2000.0ther Code that applies is ICC/ANSI Al 17.1-98 Accessible and Usable Buildings and Facilities. Structural and system plans submitted for permit application shall be sealed by a Virginia Licensed Design Professional. Please note table 602 to determine if fire rating is required on exterior wall based on the construction type (some types require min. 30' for 0 rating). Note the requirements in Chapter 17 of BOCA for special inspection requirements on the type of structure.( Soils, concrete etc.) °All required egress from the new structure shall be HC Accessible to min. exterior landing. HC parking appears to be in compliance. The slopes shall not exceed 2% across the unloading area and min. 8' with 8' stripped Van Accessible space required. Request for Site Plan Comments Virginia Department of Transportation Mail to: Virginia Department of Transportation Attn: Resident Engineer P.O. Box 278 Edinburg, VA 22824-0278 (540) 984-5600 Hand deliver to: Virginia Department of Transportation 2275 Northwestern Pike Winchester, VA 22603 (540) 535-1818 5 2005 COUNTY FVFLOPMENT Please fill out the information as accurately as possible in order to assist the Virginia Department of Transportation with their review. Please attach five (5) copies of the site plan with traffic generation data and drainage calculations with this sheet. Applicant's Name Address: Phone Number: Patton Hams Rust & Associates, Pc c/o Ronald A. Mislowsky _ 117 E. Piccadilly Street Winchester, VA 22601 (540) 667-2139 Name of development and/or description of the request: CFFW Regional Jail Work Release Center Location of property: Fort Collier Industrial Park, east of existing detention center Virginia Department of Transportation Comments: VDOT use only Date received — Incomplete Date reviewed Signature and Date Sipature Date revision received Date approved Incomplete / Date reviewed i Date 5/o4 (revision) Request For Site Plan Comments Winchester Regional Airport FPE0EF;ICK COUhJTY P, Q'd`'''1G & HVELOPMENIT Mail to: Hand deliver to: Winchester Regional Airport 491 Airport Road Attn: Executive Director (Route 645, off of Route 522 South) 491 Airport Road (540) 869-2422 Winchester, VA 22655 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach one (1) copy of the site plan with this sheet. Applicant's Name Address: Phone Number: Patton Harris Rust & Associates, Pc c/o Ronald A. Mislowsky 117 E. Piccadilly Street Winchester, VA 22601 (540) 667-2139 Name of development and/or description of the request: CFFW Regional Jail Work Release Center Location of property: Fort Collier Industrial east of existing detention center Winchester Regional Airport Comments: r' Winchester Regional Airport use only Date received Date revision received Incomplete Incomplete Date reviewed 1 i $ JOy Date reviewed Signature and Date Signature and Date (revision) Date approved 1 l3 1 �� 1 Z, q ItJIg1(-,4 WINCHESTER REGIONAL AIRPORI I SEWING THE TOP OF VRGMA , October 18, 2004 491 AIRPORT ROAD WINCHESTER, VIRGINIA 22602 (540) 662-2422 Patton Harris Rust & Associates, PC °o Ronald A. Mislowsky 117 East Piccadilly Street Winchester, Virginia 22601 Re: Site Plan Comments CFFW Regional Jail Work Release Center Stonewall Magisterial District Dear Mr. Mislowsky: JAN - 5 2005 FREDERICK COUNTY PLANNING & DEVELOPMENT The above referenced site plan has been reviewed and it appears that it should not have an impact on operations at the Winchester Regional Airport since the site falls outside of the airport's Part 77 surfaces. Thank you for your cooperation and consideration in continuing safe operations of the Winchester Regional Airport. Sincerely, Serena R. Manuel Executive Director Request for Site Plan Comments Frederick Countv-Winchester Health Department Mail to: Frederick -Winchester Health Dept. Attn: Sanitation Engineer 107 N. Kent St., Suite 201 Winchester, VA 22601 (540) 722-3480 OCo ewi O93-cl JA 5Y-A-3&A Hand deliver to: " 107 N. Kent St. Suite 201 Winchester, VA (540) 722-3480 Please fill out the information as accurately as possible in order to assist the agency with their Please attach one (1) copy of the site plan with this sheet. Applicant's Name Address: Patton Hams Rust & Associates, Pc c/o Ronald A. Mislowsky 117 E. Piccadilly Street Winchester, VA 22601 Phone Number: (540) 667-2139 Name of development and/or description of the request: CFFW Regional Jail Work Release Center Location of property: Fort Collier Industrial Park, east of existing detention center Health Dept's Comments: li"fin n,,; 1-4 M7 .,a, t,, r,�„« LOLL &-41" a, ,le- +y &, 'v;d,Ah- &u. ft i,, i xw ✓e r wile "5"d Health Dept. use onl} Date received Incomplete Date reviewed Signature and Date Signature and Date (revision) Date revision received Incomplete Datc reviev 9/3 Date approved ,JAN - FREDERICK COUNTY PLANNING & DEVELOPMENT Sp .:I Limited Power of A _ - County of Frederick, Virg:..::, XF rederiek .:ginning Web Site. www.co.f- , Department of Planning &, Development, County of Frederick, 107 ?forth Ken: Strcet, Winchester, Virginia 2260! Phnne e410.66:•5651 Facsimile 540-665-6395 Know All Men By Those Present: That I (We) III IAN - 5 2M FREDERICK CO NTY PLANNING & DEVE PME -9 (Name) CFFW Regional Detention Facilitv (Phone)-10_665-6374 (Address) 141 Fort Collier Road Winchester VA 22603 the owner(s) of all those tracts or parcels of land ("Property") conveyed to rrc (us), iced recorded in the Clerk's Office of the Circuit Court of the County of Frcderick, Virginia, by Instrument No.708 on Page 101 and is described as Parcel:92B Lot: B1ock:A Section:54 Subdivision: Fort Collier ir. do hereby make, constitute and appoint: - (Name)Patton Hams Rust & Associates Pc Phone: 540-61,^-2 ; - (Address) 117 E. Piccadill Street Winchester. VA 2261 To act as my true and lawful attorney -in -fact for and in my (our) name, place, authority 1 (we) would have if acting personally to File Planning applications for m, r) full power and Property, including: P 8 pp r) above described Rezoning (including proffers) Conditional Use Permits Master Development Plan (Preliminary and Fin: Subdivision X Site Plan My attorney -in -fact shall have the authority to offer proffered conditiuns and to make ttme approved proffered conditions except as follows: ne,1ts to previously This authnrization shall expire one year from the day it is signed, or until it is otherwise r:•: modified. :lded or In witness thereof, I (we) have hereto set my (our) hand and seal this ly4' dayof r OC , 2U0�� State of Virginia. City/County of 1,��I�e.rl L. Wl�lsw, aforesaid, certif that th () Notary Public in a: :or the jurisdiction Y persons who s,glled to the foregoing instrument personally appe: •a befor me and has acknowledged the same before m% i1t the jurisdiction aforesaid this 14 day ol•f_L�-2UA� 2-d E6t,0-999-0b9 -posse R pjo3,}t10 •m•2 1`*B0 t,0 b1 z00 giIbert ,%. cIifford December 22, 2004 Mark Cheran Frederick County Planning 107 N. Kent Street Winchester, VA 22601 RE: CFFW Regional Jail Dear Mark, & associates pc R d� 23 FREDERICK COUNTY PLANNING & DEVELOPMENT PA I've enclosed here the plats associated with the work release facility. One is the H access easement from the Ft. Collier site, through the CFFW property to Ft. Collier Road. The other is the access easement from the Barber and Ross site, through the Ft. Collier site to the Arcadia Mobile Home Park site. C .. . The appropriate entities are preparing deeds to dedicate these easements. ~' Please let me know if you have comments. Regards, PATTON HARRIS RUST & ASSOCIATES, pc ona d A. �Mislo�wssky, P.E., �VP�� cc: Jeff Boehm Fred Hildebrand 7liKEi WF S- VRl,;- 1 NOTES: 1. THIS PLAT HAS BEEN PREPARED WITHOUT THE BENEFIT OF A TITLE REPORT AND DOES NOT THEREFORE NECESSARILY INDICATE ALL ENCUMBRANCES ON THE PROPERTY. T.M. 54-((A))-92B \ q COUNTY OF CLARKE, VIRGINIA, COUNTY OF FREDERICK, VIRGINIA AND CITY OF WINCHESTER, VIRGINIA SR �O�SO�i�r�gJJ D.B. 708, PG. 101`9 9 1 ZONE: M 1 W 8 a� \OS• p�. O N o T.M. 54—((A))-36A FORT COLLIER GROUP, L.C. / D.B. 766, PG. 73 / s •�`� ZONE: M 1 �o tij� j T � 0 DSO,6,68 ^r`SO L1 L3 to pT A 6� �\p3 EX. 50' ACCESS L2 '�� NOl T Q, p p°'b EASEMENT SS . /�`L �O� �OOV INST. 030025710 �>' \� / OT `�9 �' Q T.M. 54- (()) A -366 / SOT ��, A`- O BARBER & ROSS COMPANY �6 �Q O" INST. #030025711 �A• Q ZONE: M1 GRAPHIC SCALE 100 200 400 1 inch = 200 ft. LINE TABLE LINE BEARING LENGTH L1 S65'12'55"E 107.65' L2 S51.47'13"E 289.98' L3 S38'12'47"W 853.45' o RANDY A. SPOfERS y u No. 002342 OR- PLAT SHOWING A 50' ACCESS EASEMENT THROUGH THE PROPERTY OF FORT COWER GROUP, L.C. STONEWALL MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA SCALE: 1"=200' DATE: DECEMBER 9, 2004 PATTON HARRIS RUST & ASSOCIATES A PROFESSIONAL CORPORATION CONSULTING ENGINEERING - LAND SURVEYING - PLANNING 117 E. PICCADILLY STREET, WINCHESTER, VIRGINIA 22601 (540) 667-2139 SHEET 1 OF 1 v FRED K -\fF COUNly LOPMENT NOTES: 1. THIS PLAT HAS BEEN PREPARED WITHOUT THE BENEFIT OF A TITLE REPORT AND DOES NOT THEREFORE NECESSARILY INDICATE ALL ENCUMBRANCES ON THE PROPERTY. r� O �,S T.M. 54-((A))-36A FORT COLLIER GROUP, L.C. �� �� \`SHAD• D.B. 766, PG. 73 C, pp`� sty ZONE : MI �1QP<'L: �lb 1 � T.M. 54-((A))-92B Q, COUNTY OF CLARKE, VIRGINIA, s P COUNTY OF FREDERICK, VIRGINIA AND CITY OF WINCHESTER, VIRGINIA ���•• r�, D.B. 708, PG. 101-;13 0 ZONE: M1 �s• I �\ lS �c �J. �. C12 C7 C14 VARIABLE WIDTH /,�o 00 o_ O� C6 ACCESS EASEMENT <h°;��' Clo �1 ���oQo. lL O �+ �i C 15 52. 6 4' �� h� �� �Q L3/ 4 �6 , i s ~C11 ° /C16 A A,,v 0- Cj C8, ! _ o Q � O Q z OS T.M. 54-((A))-36B s BARBER & ROSS COMPANY ---\\ INST. #030025711 / ZONE: M1 LINE TABLE LINE BEARING LENGTH L1 N51*53'48"W 367.96' L2 S38'22'21 "W 111.37' L3 N51*47'13"W 34.03' L4 I N10'11'41 "W 1 26.55' CURVE TABLE CURVE RADIUS DELTA LENGTH TANGENT BEARING CHORD Cl 60.00 85'56'53" 90.00 55.90 S16'26'20"W 81 80 C2 1215.09 21*05'57" 447.45 226.29 N48'52'17"E 444.93 C3 530.00 17'17'47" 160.00 80.61 N73'51'49"W 159.39 C4 60.00 73'40'05" 77.15 44.94 S45'40'47"E 71.94 C5 260.00 17-41" 9" 80.27 40.46 N17'41'30"W 79.95 C6 20507 46*12'58" 165.41 87.50 N54'07'12"E 160.97 C7 35.00 97'05'29" 59.31 39.62 S79'33'28"W 52.46 C8 75.00 89'43'51" 117 46 74.65 N83'14'17"E 105.82 C9 10000 22'14'24" 38.82 19.66 S21*18'53"E 38.57 C10 20.00 74-18'55" 2594 15.16 S63'41'39"E 24.16 C11 20.00 89'49'29" 3135 19.94 S18'22'33"W 28.24 C12 183.97 44'47'52" 143.84 75.82 N56'44'58"E 140.20 C13 271.29 32'47'10" 155.24 79.81 N46'53'42"E 153,13 C14 50.00 93*45'10" 81.81 53.39 S81*13'37"W 72.99 C15 20.00 97'36'04" 34.07 22.85 S79*18'10"W 30.10 C16 35.00 62*44'15" 38.32 21.34 SO7'00'14"W 36.44 C17 35.00 62'57'23" 38.46 21.43 S69'51'03"W 36.55 C18 20.00 73'48'44" 25.77 15.02 524*18'53"W 24.02 C19 1 2000. 70'17'48" 24 54 14.08 N46'30'32"W 23.03 mmab x of Nj o Y A. SPOWEM GRAPHIC SCALE No.002342 0 100 200 400 1 inch = 200 ft. PLAT SHOWING VARIABLE WIDTH ACCESS EASEMENT THROUGH THE PROPERTY OF )CONSULTING COUNTY OF CLARKE, VIRGINIA, COUNTY OF FREDERICK, VIRGINIA, AND CITY OF WINCHESTER, VIRGINIA STONEWALL MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA SCALE: 1"=200' DATE: DECEMBER 9, 2004 PATTON HARRIS RUST & ASSOCIATES A PROFESSIONAL CORPORATION ENGINEERING - LAND SURVEYING - PLANNING 117 E. PICCADILLY STREET, WINCHESTER, VIRGINIA 22601 (540) 667-2139 SHEET 1 OF 1 �D DEC 2 3 i i FREDERICK COUNTY PLANNING & DEVELOPMENT 0500ti3NNJ 0 Cn THIS DEED made and dated this 1 11 day of September, 2005, by and between FORT CCLUE$ GROUL L,C., a Virginia limited liability company, party of the fast part, hereinafter called the Grantor, and NQUEDMIERN REGIONAL JAIL AUTHORITY, party of the second part, hereinafter called the Grantee. WITNESSETH: That for and in consideration of the sum of Ten ($10.00) Dollars, cash in hand paid, and other good and valuable consideration, the receipt of which is hereby acknowledged, the Grantor does hereby grant and convey with general warranty and English Covenants of title unto the Grantee, in fee simple absolute, all of the following described tract or parcel of land: All of that certain tract or parcel of land, lying and being situate in Stonewall Magisterial District, Frederick County, Virginia, containing 11.784 acres, together with a 50-foot-wide access easement, all of which is shown on that certain plat of survey drawn by S. W. Marsh, L.S., dated August 26, 2005, and revised September 19, 2005, attached hereto and by this reference made a part hereof as if set out in full; AND BEING a portion of the same property conveyed to Fort Collier Group, L.C. by Deed dated September 18,1991, of record in the Clerk's Office of the Circuit Court of Frederick County, Virginia, in Deed Book 766 at Page 73. Page 1 of 3 co rn cn cn The easement granted hereby is a non-exclusive easement in order to be used in common with others having the joint right of usage, as the same was duly platted in Instrument No. 03-0025710 in the aforesaid Clerk's Office and subject to the reservation in the Grantor to dedicate said access easement and the land beneath the same to the Commonwealth as set forth in Instrument No. 03-0027510. This conveyance is made subject to all easements, rights of way and restrictions of record affecting the subject property. WITNESS the following signatures and seals. FORT COLLIER GROUP, L.C. By; /. f A r (SEAL) ames L. Mclly ' , Jr. anager By: (SEAL) they L.60agner, Manager STATE OF VIRGINIA CITY OF WINCHESTER, TO -WIT I, 4N,y 4 46 a Notary Public in and for the State and jurisdiction aforesaid, do hereby certify that James L. McIlvaine, Jr. and Whitney L. Wagner, Managers of Fort Collier Group, L.C., a Virginia limited liability company, whose name is signed to the foregoing DEED dated the 1 u day of September, 2005 has personally appeared before me and acknowledged the same in my State and jurisdiction aforesaid. Given under my hand this 9'+"'day of 2005. My Commission expires o y , \\\\``\,\"` 1l Bill 11 llff/!!!!•/'!' NOT Y PUB R• s�T x 2004-OWFon ColH\ &\MM • Fat Collier to AW Auth Mpd r � N w • l�.t�': 3' r U �� :• '': V OF Page 2 of 2RG .Q 0-7 Feb 08 I�05 06:01P PHRR WINCHESTER gilbei t w. clifford & associates a dnision of Patton H arris Rust A Associates,pc Engineers. Surveyors. Planners, Landacape Architects. 540-665-0493 P.1 PH/� 117 East Piccadilly Street, Suite 200 �{ + / \ Winchester, V iralnia 22601 RAi T 540.667.2139 F 540.665.0493 Fax Transmittal To: Mark Cheran Organization/Company: Fax Number: From Date: Project Name/Subject: Internal Project File Number: Comments: Frederick County County Zoning Administrator Ron MisIOWS� 2/8/05 CFFW Wurk Releasc Total Pages including cover: A hard copy of this fax ❑ will ❑ will not be mailed to you. Mark, I recently received the approved plans for the Work Release Center, now know as the Community Corrections Facility (CCF). It was great working with you and Candice on that one. We have the plats for the access easements ready to record and all owners are good to go. Whit Wagner is uneasy about the easement path not following exactly the route shown on the Master Plan. He does not care, and is .OK with the proposal to follow the property lines as we discussed, allowing the animal shelter room to locate. Whit wants some assurance that the easements locations shown on our site plan are acceptable to you. I've told him we met to work this out, but he would like something from you. Can you send me a note that indicates in your opinion the access casements shown on the CFFW site plan satisfy the requirements of the Ft Collier Master Plan. Let me know if you have questions. Thanks so much Ron NOTE: This message is intended for the use of the addressee and may contain information that is privileged and confidential If you are not the intended recipient, you are hereby notified that any dissemination of this communication is sttricdy prohibited. If you receive this facsimile in error, please notify us immediately at the number above. Thank you. Fii.E' S e'W • COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/665-6395 February 23, 2005 Mr. Ron Mislowsky Patton Harris Rust & Associates, PC 117 E. Piccadilly Street, Suite 200 Winchester, Virginia 22601 Re: Easement on the CFFW Regional Jail Work Release Facility Property Property Identification Number 54-A-36A Dear Ron: As you know, the Frederick County Department of Planning and Development administratively approved the CFFW Regional Jail Work Release Facility site plan on February 8, 2005. In addition to the building, parking and landscaping improvement associated with the site, an easement was shown on the plan. This easement runs through the Barber and Ross Company property through the Work Release Property to the Arcadia Mobile Home Park Property. This easement is also depicted on the preliminary plats provided to our department "Plat Showing 50' Access Easement Through the Property of Fort Collier Group, LC". The easement shown on the approved site plan is consistent with the preliminary plats provided to our department. If you have any further questions regarding this matter, please feel free to contact me. Sincerely, Candice E. Perkins Planner II CEP/bad cc: Mark Cheran, Subdivision and Zoning Administrator 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 r COUNTY of FREDERICK Department of Planning and Development 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 Telephone: 540/665-5651 FAX:540/665-6395 FAX TRANSMISSION TO: 'Bon COMPANY:P Iq FAX 4: 6 (/ S �) �i 93 Remarks: Date: / —Ci9r,4 CLJ c l_ a 3. ?CAS Number of Pages (incl mg cover sheet) From the desk of: P. 1 x x x Immoate TX Result Report ( Feb, 23. * 12:29PM ) x x x y Fax Header) File Date Time Destination Mode TXtime Page Result User Name NO. ---------------------------------------------------------------------------------------------------- Feb. 23. 12:28PM 540 665 0493 G3TES) 0"33' P. 2 OK 0625 # Batch M Memory L Send later 0 . Forwarding E ECM S Standard D Detail F Fine Reduction x LAN — Fax t Delivery O RX Notice Req. A RX Notice • O • COUQ o CK J Department of Planning and Development 540/665-5651 FAX: 540/665-6395 February 8, 2005 Mr. Ron Mislowsky Patton Harris Rust & Associates, PC 117 E. Piccadilly Street, Suite 200 Winchester, Virginia 22601 Re: Approval of Site Plan #61-04; CFFW Regional .Jail Work Release Facilih, Property Identification Number 54-A-36A Dear Ron: The Frederick County Department of Planning and Development administratively approved the above -referenced site plan on February 8, 2005. The site plan is approved for the construction of a 40,509 square foot work release building located behind the existing Regional Jail Facility, in the Stonewall Magisterial District. Landscaping, screening, buffering, parking, curb & gutter, handicap accessibility, stormwater management, and other improvements are required for this development as detailed on the approved site plan. All requirements of the Frederick County Zoning Ordinance have been met in the approved site plan, including review agency comments from all relevant review agencies. I am providing you with four (4) copies of the approved site plan. Please forward these copies to the appropriate representative(s). Furthermore, advise the owner(s) that a copy should be kept for future reference, and an approved copy must be kept on the construction site throughout the development process. Once site development is complete, the owner(s) should contact this office to schedule an on - site inspection. Do not hesitate to contact me if you have any questions or concerns. Sincerely, ��7 vjlk"� Candice E. Perkins Planner II CEP/bad cc: Jane Anderson, Real Estate Patrick Barker, Economic Development Commission Lynda J. Tyler, Shawnee District Supervisor John Light, Stonewall District Planning Commissioner Clarke -Frederick -Winchester Adult Detention Center, 141 Fort Collier Road, Winchester, VA 22603 em: Charles DeHaven Jr., Planning Commission Chairman 107 North Kent Street, Suite 202 - Winchester, Virginia 22601-5000 kilort A. clifford & associates • PH1ZA C �,PPI:P Pi[ LAB�)RAiUGiE', MAP, rr� O;; - W.. February 1, 2005 Candice Perkins Frederick County Planning 107 N. Kent Street Winchester, VA 22601 RE: CFFW Dear Candice, I've enclosed the Fire Marshal and FCSA approvals along with two sets of plans. This completes all agency reviews and I believe the plans can be approved. Please let me know when I can send over additional sets for signature or if you have questions. Regards, PATTON HARRIS RUST & ASSOCIATES, pc Ronald A Mislowsky, P.E., VP FOSA gilbert w. cllfford Passociates 11F-V16L.��...�f I a division of Patton If arras Rust & As socIates,pc JH� �,� Englneerscr . Surveyors. Planners. Landscape Archliects, 2005 RA117 East Piccadilly Street, Sulle 200 T 15410.667.211391n1a 22601 PH �� I F 540.665.0493 Memorandum To: ,John Whitacre, FCSA 'V' Tim Welsh, Fire Marshall From: Ron MislowslE Date: Tanuary 27, 2005 Project Name/Subject: CFFW PHR+A Project file Number: cc: Paul Garrison, HSMM We've formally revised the site plan for the work release facility to add the FDC vault. I've enclosed plans here for your approval. Please call if you have questions. ZI -7YZ Zjlt�- V114�— 11fl 0 5 A, Ikzi I-V �F r a / 5A,-;7- RR/,liTs C D O/c, tify1"Al 0 • F F9 I NIT cx 0 � x a a VIRGINIA Control number SP04-0063RR Project Name CFFW Work Release Address 117 E. Piccadilly Street Type Application Site plan Current Zoning M1 Automatic Sprinkler System Yes Other recommendation Emergency Vehicle Access Adequate Siamese Location Adequate Emergency Vehicle Access Comments Access Comments Frederick County Fire and Rescue Department Office of the Fire Marshal Plan Review and Comments Date received 1 /28/2005 City Winchester Tax ID Number 54-A-36A Date reviewed 1 /28/2005 Applicant PHRBA State Zip VA 22601 Fire District 13 Recommendations Automatic Fire Alarm System Yes Requirements Hydrant Location Adequate Roadway/Aisleway Width Adequate Date Revised 1 /26/2005 Applicant Phone 540-667-2139 Rescue District 13 Election District Stonewall Residential Sprinkler System No Fire Lane Required Yes Special Hazards No Additional Comments With the relocation of the FDC indicated on the plans and the existing fire hydrant on the Northwest side of the facility, the proposed fire hydrant at the Inmate Loading area may be deleted Plan Approval Recommended Reviewed By Signature`s\�l�+a�� ..a+r,ia�..... Yes Timothy L Welsh �>��� AfPR® Title F14F MAC HAL, i=REDERICK • _ 18" x 27' RCP e6NN, -70- EX-W/t== 8"x8" TAP BY FCSA,/� RELOCATE LIGHT CO CURB & CUTTER IiRO Z_& �X. ELEC EX ty ,a A.P it EX Y/ ! w w Y CONTROL �bX. ASP ALT RO � yy •..., b -- POP. 8" PVC DR 1 L RlM= E ____ I_INV. 677.45 'o 3 E E E j ) hQ� U/G ELEC. E — G G G UG (APPROX. LOCATION) G G G G G SILL NEW INVERT. KOR-N-SEAL ro N 3 �j�903.44' ;7$, j Q ° v 3' CONC FLUME ru 101spac�es I o 20' SAN. ESMT. N O O O ro' 0 0 ro (U 0 9.00' (TY ) N 0 spa es Co CG F o FLUME )NC FLUME INMATE" LOADIN� 1-FH ASMBY 20' WTR ESMT.. ro CG-6R N c 0 FIRE LANE 1-8" 90' EL — 8" PVC SDR 21 W/L 20'. WTR ESMT. I 0 v OD 00 . s 2.001 I C r 3 au S `20' WTR ESMT. 35.7' . . • 7CKADIrNG C4 o DUMPSTER PAD 5"'�-6' OPAQUE SCREENING FENCE 31.9' EL: ELEC SERVICE 45 EL.2W 2" 9C " ^9 FE3 • • o (OR COUN - f DERICK Department of Planning and Development 540/665-5651 FAX: 540/ 665-6395 December 28, 2004 Mr. Ron Mislowsky Patton Harris Rust & Associates 117 E. Piccadilly Street Winchester, VA 22601 Re: Second Review Comments for Site Plan #61-04 CFFW Adult Regional Detention Center Property Identification Number (PIN) 54-A-36A Dear Ron: Staff is in receipt of the site plan for the above -referenced project, accepted on October 14. 2004. At this time. the site plan is denied until the following comments are adequately addressed. Review Comments: 1) Animal Shelter Location. It is my understanding that the new Frederick County Animal Shelter will also be located on this property; please show how this site will be accessed through the jail parking lot. 2) Landscaping & Maintenance. Please change the notation on Sheet 4 to regarding plantings to § 165- 36B instead of "C". 3) Special Limited Pm%er of Alto rne,. Form. Please submit a completed Special Limited Power of Attorney. 4) Access Easement. Please use light shading for the new access easement on the property to distinguish it from the landscape buffer. Also, show the easement that the new 50' access easement connects to on the adjacent Barber & Ross property and provide the legal reference for the existing easement. 107 North Kent Street, Suite 202 - Winchester, Virginia 22601-5000 Mr. Ron Mislowsky Re: CFFW Adult Regional Detention Center December 28, 2004 Page 2 Once you have adequately addressed all of these comments, please resubmit a copy for my review. I Nvill need all approved review agency comment sheets and at least five copies of the final plan for approval. Comment sheets are required from the following agencies: The Frederick County Dept. of Building Inspections, the Frederick County Fire Marshal, the Frederick County Sanitation Authority, the Frederick County Engineer (Public Yi'orks), the Au port Authority, the Frederick County Health Department, and the Virginia Department of Transportation. Feel free to contact me if you have any questions. Sincerely, (37V c-e-� Candice E. Perkins Planner II CEP/dlw cc: Clarke -Frederick -Winchester Adult Detention Center, 141 Fort Collier Road, Winchester, VA 22603 a • • COUNTY of FREDERICK Department of Public Works 540/665-5643 FAX: 540/ 678-0682 January 5, 2005 Mr. Ronald A. Mislowsky, Jr., P.E. Vice President G. W. Clifford & Associates, Inc. a division of Patton Harris Rust & Associates, p.c. 117 East Piccadilly Street Winchester, Virginia 22601 RE: Site Plan Comments - CFFW Regional Detention Facility Frederick County, Virginia Dear Ron: Upon review of the revised site plan dated December 8, 2004, all of our previous comments have been addressed. Therefore, we recommend approval of the subject site plan. JCW/rls cc: Planning and Development file A:\ctRvrevspcom.wpd Sincerely, C Joe C. Wilder Deputy Director pECEC WE J A N - 6 2005 107 North Kent Street • Winchester Vir inia 22601-5000 FREDERiCK�COUNTY g I _ �i,1JP:IIJ(I R gilbert w. Clifford Asociates a division of Patton H arris Rust & Associates,pc Engineers. Surveyors. Planners. Landscape Architects. P�I � 117 East Piccadilly Street, Suite 200 H Winchester, Virginia 22601 T 540 667 2139 F 540 665 0493 E C E � U FREDERICK COUNTY ,NNING & DEVELOPM' Memorandum To: Candice Mills Organization/Company: Frederick County Planning From: Ron Misloa7sky Date: December 6, 2004 Project Name/Subject: Site Plan # 61-04 CFFW Adult Regional Detention Center PHR+A Project file Number: cc: Paul Garrison Fred Hildebrand PHR+A offers the follow responses for the Countycomrnents dated November 4, 2004. 1) Date. Provide the date the plan was prepared on the cover. The date has been added to the cover sheet. 2) Adjoiner Information. Please show all adjoiner information on sheets 2 and 4, including the use, deed book and page number. Adjoiner Information has been added to the plan. 3) Sewer Connection. On Sheet 2, it is unclear from where the building is getting its sewer connection. Sewer connection is provided at the west side of the building. 4) Access Road. Label the road that this site is being accessed. If it is a private road, please provided a legal reference for the right-of-way if one exists. Also, this access road is shown on the approved MDP (02-24-98) running through this site and along the back of this property to the Arcadia property. Please clarify if this access road has been relocated to a new location. Access to the work release facility will be over an access easement through the CFFW Regional Detention Facility Further, an access easement, meeting the intent of the Master Development Plan, to provide access to the Arcadia Mobile Home Park property, will be dedicated. These easements will be in place prior to issuance of an occupancy permit. �5) Animal Shelter Location. It is my understanding that the new Frederick County Animal Shelter will also be located on this property; please show how this site will be accessed. At this time, the actual location of the shelter and the means of access is not knonn. ` 6) Lot Consolidation. Since this parcel has no state road frontage and it is gaining its access through the existing jail parcel, the two lots must be consolidated. This lot and the C FFW properly are under separate ownership and therefore cannot be consolidated. 7) Loading/Unloading Area for Inmates. It is understood that this facility will be used for the work release inmates. Please provide a covered canopy area at the front of the building to accommodate the loading and unloading of inmate. A sidewalk to an inmate loading zone is provided. Patton Harris Rust & Assoetes, pc Memorandum Page 2 5/8) Parking Lot Screening. Please provide a fence, hedge, wall or berin along the parking area as indicated to screen the glare of headlights. Plantings have been provided to screen the glare of headlights from the parking lot. 9) Landscape Maintenance. Provide a notation on Sheet 4 that states all plantings shall conforin with 165- A6C of the Frederick County Zoning Ordinance. The note has been added to Sheet 4. V/10) Dunhpster Screening. Provide a detail for the dulnpster screening. A detail has been added to Sheet 6. V11) Zoning District Buffer. The approved MDP for Fort Collier Industrial Park shows a 100' Category C Zoning District Buffer with a full screen. The site plan submitted shows a distance buffer instead of the buffer shown on the approved MDP. Please revise this buffer to reflect what is shown on the MDP. Also, the site plan only calls for a 300' landscape screen; this needs to be a full screen and must continue along the entire Arcadia Mobile Home Park property and the entire Batteview Subdivision property. The district buffer required by the Master- Development Plan is provided along the north and east property lines. V/,'12) Sidewalk. Provide a detail for the sidewalk. A sidewalk detail has been added to Sheet 2. 13) Special Limited Power of Attorney Form. Please have the property owner sign the attached Special �\ Limited Power of Attorney Form prior to further review or approval. This form should be notarized and completed to grant the applicant (you) with authorization to represent them for this site plan. A copy of the Special Limited Power of Attorney Form is attached. I've attached two copies of the plan. Please call if you have further questions. • Request for Site Plan Comment • Frederick County -Winchester Health Department Mail to: Frederick -Winchester Health Dept. Attn: Sanitation Engineer 107 N. Kent St., Suite 201 Winchester, VA 22601 (540) 722-3480 Hand deliver to: 107 N. Kent St. Suite 201 Winchester, VA (540) 722-3480 CCo 90y 093cl .JA 5Y-A- 36A -� Please fill out the information as accurately as possible in order to assist the agency With their-fe"view. Please attach one (1) copy of the site plan with this sheet. Applicant's Name: Address: Phone Number: Patton Harris Rust & Associates, Pc c/o Ronald A. Mislowsky 117 E. Piccadilly Street Winchester, VA 22601 (540) 667-2139 Name of development and/or description of the request: CFFW Rezional Jail Work Release Center Location of property: Fort Collier Industrial Park, east of existing detention center Health Dept's Comments: 9,.A fh Dr )4 h t no ,6 ,'/ r kos fir, fhe „a,,,,. V, [u�^ X..,d Ae'ver wr1f vheot Health Dent. use only Date received Incomplete Date reviewed Signature and Date Signature and Date (revision) Vate revision Incomplete Date reviewo Date approved C E � W E �EiD DEC e FREDERICK COUNTY PLANNING & DEVELOPMENT • Mail to: Winchester Regional Airport Attn: Executive Director 491 Airport Road Winchester, VA 22655 Request For Site Plan Comments Winchester Regional Airport Hand deliver to: 491 Airport Road (Route 645, off of Route 522 South) (540) 869-2422 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach one (1) copy of the site plan with this sheet. Applicant's Name: Patton Harris Rust & Associates, Pc Address: c/o Ronald A. Mislowsky 117E Piccadilly Street Winchester, VA 22601 Phone Number: (540) 667-2139 Name of development and/or description of the request: CFFW Regional Jail Work Release Center Location of property: Fort Collier Industrial Park, east of existing detention center Winchester Regional Airport Comments: Winchester Regional Airport use only Date received Incomplete Date reviewed I Signature and Date Signature and Date (revision) Date revision received Incomplete Date reviewed Date approved l �' D C nr 8 FREDERICK COUNTY PLANNING & DEVELOPMENT • WINCHESTER REGIONAL AIRPORT SERVING THE TOP OF VRGINIA / October 18, 2004 491 AIRPORT ROAD WINCHESTER, VIRGINIA 22602 (540) 662-2422 Patton Harris Rust & Associates, PC % Ronald A. Mislowsky 117 East Piccadilly Street Winchester, Virginia 22601 Re: Site Plan Comments CFFW Regional Jail Work Release Center Stonewall Magisterial District Dear Mr. Mislowsky: The above referenced site plan has been reviewed and it appears that it should not have an impact on operations at the Winchester Regional Airport since the site falls outside of the airport's Part 77 surfaces. Thank you for your cooperation and consideration in continuing safe operations of the Winchester Regional Airport. Sincerely, Serena R. Manuel Executive Director 8 FREDERICK COUNTY PLANNING & DEVELOPMENT • Request for Site Plan Comments Virginia Department of Transportation Mail to: Virginia Department of Transportation Attn: Resident Engineer P.O. Box 278 Edinburg, VA 22824-0278 (540) 984-5600 Hand deliver to: Virginia Department of Transportation 2275 Northwestern Pike Winchester, VA 22603 (540) 535-1818 Please fill out the information as accurately as possible in order to assist the Virginia Department of Transportation with their review. Please attach five (5) copies of the site plan -*vith traffic generation data and drainage calculations with this sheet. Applicant's Name: Patton Harris Rust & Associates, Pc Address: c/o Ronald A. Mislowsky 117 E. Piccadilly Street Winchester, VA 22601 Phone Number: (540) 667-2139 Name of development and/or description of the request: CFFW Regional Jail Work Release Center Location of property: Fort Collier Industrial Park, east of existing detention center Virginia Department of Transportation Comments: use o Date received Incomplete Date reviewed Signature and Date Signature Date revision recei Incomplete Date reviewed Date approved Date 5fC4 (revision) FREDERICK COUNTY NNING & DEVELOPMI • Request For Site Plan Comm Frederick County Inspections Department Mail to, Frederick County Inspections Dept. Attn: Building Official 107 North Kent Street Winchester, VA 22601 (540) 665-5650 FREDERICK COUNTY Hand deliv r tOT)LANNING & DEVELOPME 107 N. Kent Street, Suite 200 North Building, 2"d Floor Winchester, VA (540) 665-5650 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach one (1) copy of the site plan with this sheet. Applicant's Name: Address: Phone Number: Patton Harris Rust & Associates Pc c/o Ronald A. Mislowsky 117 E. Piccadilly Street Winchester, VA 22601 (540) 667-2139 Name of development and/or description of the request: CFFW Regional Jail Location of property: Fort Collier Industrial Park east of P xi st i ng detention center Inspections D partmentIs Comments: Czwme 5 a k,e m» AD Zd Inspections Dept. use only Date received Incomplete Date reviewed Signature and Date , Signature and Date (revision Date re,6sion received Incomplete 16 Date approved ! $ 6 15� • E Building shall comply with The Virginia Uniform Statewide Building Code and section,308 group I (Institutional) of the International Building Code/2000.Other Code that applies is ICC/ANSI Al 17.1-98 Accessible and Usable Buildings and Facilities. Structural and system plans submitted for permit application shall be sealed by a Virginia Licensed Design Professional. "'Please note table 602 to determine if fire rating is required on exterior wall based on the construction type (some types require min. 30' for 0 rating). Note the requirements in Chapter 17 of BOCA for special inspection requirements on the type of structure.( Soils, concrete etc.) 'All required egress from the new structure shall be HC Accessible to min. exterior landing. HC parking appears to be in compliance. The slopes shall not exceed 2% across the unloading area and min. 8' with 8' stripped Van Accessible space required. �] Spmited Power of A County of Frederick, Virg;..; Frederick :':nnning Web Site: www.co.f-- Department of Planning & Development. County of Frederick. 107 North Ken! itrce(. Winchestcr, Virginia 2260i Phony cd0_6r;:_;G51 Facsimile 540-665-6395 Know All Men By Those Present: That I (We) (Name) CFFW Regional Detention Facility. (Phone) (Address) 141 Fort Collier Road Winchester VA 22603 the owner(s) of all those tracts or parcels of land ("Property") conveyed to r-, (us) Clerk's Office of the Circuit Court of the County of Tiede, ick, Virginia, by Instrument No.708 on Pabe 101 and is described as Parcel:92B Lot: B1ock:A Section:54 do hereby make, constitute and appoint: (Name)Patton Harris Rust & Associates Pc g i TY PLANNING &IC EVEG DPMENIT ^s -10-665-6374 iced recorded in the Subdivision: Fort Collier Industr-,, ark Phone: 540-6 (Address) 117 E. Plccadill Street Winchester. VA 2261 To act as my true and lawful attorney -in -fact for and in my (uur) name, place, authority 1 (we) would have if acting personally to file planning applications for rr Property, including: Rezoning (including proffers) Conditional Use Permits Master Development Plan (Preliminary and Fin: Subdivision X Site Plan ith full power and rr) above described My attorney -in -fact shall have the authority to offer proffered conditiuus and to make an -it, %�nents to previously approved proffered conditions except as follows: This authnnzation shall expire one year from the da) it is signed, or until it is otherwise rc: :ided or modified. In witness thereof, I (we) have hereto set m �i\ �--� ;�� ii y (purl hand and seal this )`� day o!' a4�.Nr2U0 `� Signature(s)�t -,,a UI/ 1 1c o rAnir .1 State of Virginia, City/County of��QL K"To-wit: 1, �vtlae.r l L• W aforesaid, ccrtif that th Notary Public in a: -er the jurisdiction y person(s) who signed to the foregoing instrument personally appe i befor me and has acknowledged the same before the in tile jurisdiction aforesaid this I day ofQ1?00 2-d E6b0-999-0bS posse 9 pJOJJTIv •tn-2 2:BO b0 41 100 • Request for Site Plan COmmenO Frederick County EnQineerin2 Department Mail to: Hand deliver t Frederick County Engineering Dept. 107 N. Kent St. Attn: Director of Engineering Fourth Floor 107 N. Kent Street Winchester, V.P Winchester, VA 22601 (540) 665-5643 (540) 665-5643 E C E I V E Nov 1 2004 FREDERICK INNING & DI Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the site plan with this sheet. Applicant's Name: Patton Harris Rust & Associates, Pc Address: c/o Ronald A. Mislowsky _ 117 E. Piccadilly Street Winchester, VA 22601 Phone Number: (540) 667-2139 Name of development and/or description of the request: CFFW Regional Jail Work Release Center Location of property: Fort Collier Industrial Park, east of existing detention center Engineering Dept. use only Date received i wlu Date revision received Incomplete Incomplete Date reviewed I 1 y Date reviewed Signature and Date ,) Ct.✓ Signature and Date (revisions) Date approved _ • • o yy C0tJ&8=Y1CK Department of Planning and Development 540/665-5651 FAX: 540/ 665-6395 November 4, 2004 Mr. Ron Mislowsky Patton Harris Rust & Associates 117 E. Piccadilly Street Winchester, VA 22601 Re: Review Comments for Site Plan #61-04 CFFW Adult Regional Detention Center Property Identification Number (PIN) 54-A-36A Dear Ron: Staff is in receipt of the site plan for the above -referenced project, accepted on October 14, 2004. At this time, the site plan is denied until the following comments are adequately addressed. Review Comments: 1) Date. Provide the date the plan was prepared on the cover sheet. 2) Adioiner Information. Please show all adjoiner information on sheets 2 and 4, including the use, deed book and page number. ►3,y' Sewer Connection. On Sheet 2, it is unclear from where the building is getting its sewer connection. 4) Access Road. Label the road that this site is being accessed. If it is a private road, please provide a legal reference for the right-of-way if one exists. Also, this access road is shown on the approved MDP (02-24-98) running through this site and along the back of this property to the Arcadia property. Please clarify if this access road has been relocated to a new location. 5) Animal Shelter Location. It is my understanding that the new Frederick County Animal Shelter will also be located on this property; please show how this site will be accessed. Lot Consolidation. Since this parcel has no state road frontage and it is gaining its access through the existing jail parcel, the two lots must be consolidated. Loadinp-/Unloadini! Area for Inmates._ It is understood that this facility will be used for the work release inmates. Please provide a covered canopy area at the front of the building to accommodate the loading and unloading of inmate. 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 4 • • Mr. Ron Mislowsky Re: CFFW Adult Regional Detention Center November 4, 2004 Page 2 8) Parking Lot Sc►•eening. Please provide a fence, hedge, wall or berm along the parking area as indicated to screen the glare of headlights. ,9f Landscaping Maintenance. Provide a notation on Sheet 4 that states all plantings shall conform with § 165-36C of the Frederick County Zoning Ordinance. 1,0) Dumpster Screening. Provide a detail for the dumpster screening. 111.) Zoning District Buffer. The approved MDP for Fort Collier Industrial Park shows a 100' Category C Zoning District Buffer with a full screen. The site plan submitted shows a distance buffer instead of the buffer shown on the approved MDP. Please revise this buffer to reflect what is shown on the MDP. Also, the site plan only calls for a 300' landscape screen; this needs to be a full screen and must continue along the entire Arcadia Mobile Home Park property and the entire Battleview Subdivision property. Sidewalk. Provide a detail for the sidewalk. it,3-( Special Limited Power of Attorney Form. Please have the property owner sign the attached Special Limited Power of Attorney Form prior to further review or approval. This form should be notarized and completed to grant the applicant (you) with authorization to represent them for this site plan. Once you have adequately addressed all of these comments, please resubmit a copy for my review. I will need all approved review agency comment sheets and at least five copies of the final plan for approval. Comment sheets are required from the following agencies: The Frederick County Dept. of Building Inspections, the Frederick County Fire Hm-shal, the Frederick County Sanitation Authority, the Frederick County Eu?gineer (Public ff orks), the Ah port Authority, the Freclerick County Health Deparhnent, and the Virginia Department of Transportation. Feel free to contact me if you have any questions. Sincereyly, ' C Candice E. Mills Planner II CEM/blhd i cc: Clarke-Frederick-Winclester Adult Detention Center, 141 Fort Collier Road, Winchester, VA 22603 I The following information must be included on your site plan. If your site plan is incomplete or is missing information, it will not be reviewed and returned to you for revisions. Administrative Information Y N ✓ 1. Name of proposed development. r% 2. Name, address, and phone number of owner. ✓� 3. Name, address, and phone number of developer. !/ 4. Name, address, and phone number of designer. % 5. Certificate of surveyor, engineer, or architect. 6. Date plan prepared and date of revisions. tilt 7. A listing of all conditions placed on the site as a result of a conditional use permit or conditional zoning approval. / 8. A space labeled "Approved by the Zoning Administrator' for _ - the approval signature and date of approval. 9. A description of setbacks or conditions placed on the site as a _ result of a variance approval. (Reference the variance _ — application number.) General Site Information Y N 10. Location map (scale 1:2000) 11. Magisterial District 12. Scale of site plan (not to exceed 1:50) ✓ 13. North Arrow 14. Zoning of site 15. Use, zoning, and Property Identification Number (PIN#) of all adjoining properties. This includes properties located across right-of-ways, streams, and railroad tracks. 16. Surveyed boundaries for all lots and parcels. N • • General Site (con't Y N 17. Acreage of all lots included in the plan. 18. The location and dimensions of all required setbacks and yard — areas. ,J f 19. The location and type of all dwelling units. �J A 20. Location and description of all recreation facilities. 21. Location of sidewalks and pedestrian ways. w ( 22. Location and area of common open space. ✓ 23. The location, height, and dimensions of all signs. 24. Location, height, and specifications of outdoor lighting fixtures. 25. Location and nature of outdoor storage areas. ✓ 26; Location of outdoor trash receptacles and dimensions of structure (fencing, etc.) required to enclose receptacles. ��uilding Information Y N 27. The height of all buildings and structures. 28. Location of all buildings, structures and uses. 29. The proposed use of each building, structure and area. ✓✓ 30. Ground floor area and total floor area of all buildings with FAR — — calculations for commercial and industrial zoning districts. Roads Y N ✓ 31. Name and number of existing and planned streets on and — adjoining the site. 32. Location of existing and planned streets on and adjoining the — — site. 33. Posted speed limit of existing adjacent roads. 34. Location and dimensions of all proposed entrances from public �— — right-of-ways. a Utilities Y Parking Y 35. Location of all entrances on adjoining roads within 200 feet of the proposed or existing entrance. 36. Dimensions, boundaries, width, pavement, and construction of planned roads. N 37. Location of all utilities, including sewer and water lines with the size of lines, mains, and laterals. 38. Location and width of all easements, including access, utility, and drainage easements. 39. Location and nature of fire lanes, fire hydrants, and all other facilities necessary to meet Fire Code requirements. 1 Natural Features Y N 40. Calculations describing the required number of parking and loading spaces. 41. Location and dimensions of all parking and loading spaces, driveways, parking aisles, curbing and other features to be used. 42. Location and dimension of all disabled parking spaces and ramps. 43. Existing and finished contour lines. . 44. Location of steep slopes, woodlands, floodplains, wetlands, sinkholes, and other environmental features. 45. Location of streams and drainage ways. Landscaping Y N 46. Landscaping plan describing location and types of plants to be used. 47. Location of required buffers and screening with cross sections or profiles. Erosion and Sediment Control Y N 48. A stormwater management plan with run off calculations and location and description of facilities to be used. 49. Soil erosion and sedimentation control plan describing the location and methods to be used to minimize erosion and sedimentation during development. 12 • 0 7 3 4. SITE PLAN APPLICATION Department of Planning and Development Use only. application received / 0 / 4 0Y Application # _ Complete. Date of acceptance Incomplete. Date of return. Project Title: CFFW Adult Regional Detention Center Work Release Facility Location of Property: 141 Fort Collier Road (Address): East of existing Regional Jail Property Owner: CFFW Regional Jail Address: 141 Fort Collier Road Winchester, VA 22603 Telephone: 540-665-6374 Applicant/Agent: Patton Hams Rust & Associates, Pc Address: 117 E. Piccadilly Street Winchester, VA 22601 Telephone: 540-667-2139 Designer: Patton Harris Rust & Associates, Pc Address: 117 E. Piccadilly Street Winchester, VA 22601 Telephone: 540-667-2139 Contact: Ron Mislowsky E C E 0 V E n,"T 1 A ^nnn 15 FREDERICK COUNTY ,NNI_NG_& DEVELOPMI • 6a. Is this a standard or `minor' site plan? Standard X 6b. Is this an original or revised site plan? Original X 7a. Total acreage of parcel to be developed: 3.9 acres 7b. Total acreage of parcel: 11.8 acres 8. Property Information: a) Property Identification Number: b) Current Zoning c) Present Use: d) Proposed Use: e) Adjoining Property Use(s) 0 Adjoining Property Identification Number (s) g) Magisterial District (s) 54-A-36A Minor Revised M1 Vacant Work release facility Manufacturing/vacant/residential 54-A-3613,9213,91 & 54J-2-15-69 &54J-1-4-28A I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to the submission of my site plan. Signature Date d O pEC—EoWE 44 , FREDERICK COUNTY PLANNING & DFVF1 OPRAMT • • Request For Site Plan Comments Department of Planning and Development Mail to: Hand deliver to: Department of Planning and Development 107 N. Kent St. Attn: County Planner Fourth Floor 107 N. Kent Street Winchester, VA Winchester, VA 22601 (540) 665-5651 (540) 665-5651 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the site plan with this sheet. Applicant's Name: Address: Phone Number: Patton Hams Rust & Associates, Pc c/o Ronald A. Mislowsky 117 E. Piccadilly Street Winchester, VA 22601 (540) 667-2139 Name of development and/or description of the request: CFFW Regional Jail Work Release Center Location of property: Fort Collier Industrial Park, east of existing detention center Planning and Development's Comments: Planning and Development use only Date received Date revision received Incomplete Date reviewed Signature and Date Signature and Date (revision) Incomplete Date reviewed p W L RICK COUNTY & DE�.'r10",AFNT Date approved gilbert •ifford & associates • Associates, pc October 13, 2004 Mark Cheran Frederick County Planning 107 N. Kent Street Winchester, VA 22601 RE: Regional Jail Work Release Center Dear Mark, Pi R ` \ I've enclosed here copies of our site plan for a 204 bed Community Corrections j—j Center at the CFFW Regional Jail. The 4 acre site is located immediately east of the current facility, and just north of the Barker & Ross site. There is no direct public right-of-way frontage. Access to the site will be from the existing service drive. ` °" " In addition to the plans, I've enclosed the completed application. We are in the process of having the Power of Attorney signed. I understand from Eric Lawrence that the application fee has been waived. If you or your staff have any questions, please call. Regards, PATTON HARRIS RUST & ASSOCIATES, pc Jnald A. Mislowsky, P.E. VP �; g d VY L� OCT 1 4 FREDERICK COUNTY INNING b DEVELOPM ci-ilbert w. chfford & assAtes a division of Patton Harris Rust & Associates,pc Engineers. Surveyors. Planners. Landscape Architects. RAWinchester, 117 East Piccadilly Street,StDte200 H Virginia22601P T 54R667.2139 F 540.665.0493 Memorandum To: Lloyd Ingram, Virginia Department of Transportation John Whitacre, Frederick County Sanitation Authority Tire Welsh, Frederick County Fire and Rescue John Trenary, Frederick County Inspections John Dailey, Frederick County Health Department Joe Wilder, Frederick County Public Works Mark Cheran, Frederick County Zoning Administrator From: Date: Project Name/Subject: PHR+A Project file Number: Ron Mislov�,sky September 28, 2004 CFFW Regional Jail, Work Release Facility cc: Steve O'Donnell, Shockey Companies Fred Hildebrand, CFFW Regional Detention Center Fred Ash, Perry Engineering Paul Gan-ison, HSNM We've prepared plans for construction of an --- bed work release facility on a 12 acre parcel immediately east of the existing Regional Jail. Plans and County Site Plan comment sheets are provided here. The developed area of 4 acres includes the building and parking lot area. Access to the site is from the existing detention center access road. Sewer and water are provided from existing adjacent FCSA lines. The site drains to the south, to the Barber and Ross Industrial development. A detention pond is designed to mitigate flows from this development and a possible Animal Shelter which may be constructed on the same site. The required buffer yards and setbacks are shown. In addition to the onsite landscaping required by the ordinance, a landscapeed screen is proposed along the eastern property line to mitigate visual impacts to the adjoining residential uses. To increase the effectiveness of the screen, a berm will be constructed along the residential boundary with available topsoil. Should questions arise during plan review, please do not hesitate to call. D E C E o W E OCT 1 4 2004 FREDERICK COUNTY PLANNING & DEVELOPMENT