HomeMy WebLinkAbout15-01 Northwestern Workshop - Stonewall - BackfileSITE PLAN CHECKLIST The checklist below indicates all the information that needs to be submitted as part of the site plan application. All required information must be submitted prior to the final approval of any site plan. The Department of Planning and Development will review the application to ensure that it is complete. If any portion is not included or complete, the site plan application will not be accepted and returned to the applicant(s). Site Plan Package 1. One set of approved comment sheets are required from the following review agencies prior to final site plan approval. It is recommended that applicants contact the Department of Planning and Development to determine which review agencies are relevant to their site plan application. Virginia Department of Transportation (VDOT) 6l� S/6 County Health Department Frederick County Sanitation Authority Department of Planning and Development Inspections Department Frederick County Engineer (Public Works) Frederick County Fire Marshal Department of Parks and Recreation 2. One copy of the Site Plan application 3. Five Copies of the Final Site Plan for approval 4. One reproducible copy of the Site Plan (if required) 5. A 35mm slide of the Site Plan (if required) City of Winchester Town of Stephens City Town of Middletown Airport Authority Soil & Water Conservation District Request for Street Name H., Date; V SITE PLAN TRACKING SHEET File opened Reference Manual updated/number assigned D-base updated File given to Renee' to update Application Action Summary CLOSE OUT FILE; Approval (or denial) letter mailed to applicant/copy made for file File stamped "approved", "denied" or "withdrawn" Reference Manual updated D-base updated File given to Renee' for final update to Application Action Summary U \Carol\Common\Sitc Plan Tracking wpd Revised 03/06/01 12 ✓lie��t' `g • SH RECEIPT Date l I 002188 rZ Received From; 1 Y, u Address o s$ CL > For W AMT. OF ACCOUNT / CASH W AMT. PAID GHECtk1 BALANCE 41 MONEY` ��.-'/� 1 BY ?1...�� DUE ORDER Site Plan Information Checklist The following information must be included on your site plan. If your site plan is incomplete or is missing information, it will not be reviewed and returned to you for revisions. Administrative Information Y N 1. Name of proposed development. .—P�uooi-t=A 2. Name, address, and phone number of owner. 3. Name, address, and phone number of developer. 4. Name, address, and phone number of designer. 5. Certificate of surveyor, engineer, or architect-J• c/ 6. Date plan prepared and date of revisions. ✓/,� 7. A listing of all conditions placed on the site as a result of a �li v conditional use permit or conditional zoning approval. `J,, �;5f°� A space labeled "Approved by the Zoning Administrator" for the 1c% r 3 L� zapproval signature and date of approval. Sdc•��+Y 9. A description of setbacks or conditions placed on the site as a result of a variance approval. (Reference the variance application number.) General Site Information Y N 10. Location map (scale 1:20010) Veld 11. Magisterial District 12. Scale of site plan (not to exceed 1:50) V 13. North Arrow 14. Zoning of site 15. Use, zoning, and Property Identification Number (PIN#) of all adjoining properties. This includes properties located across right- 9 of -ways, streams, and railroad tracks. 16. Surveyed boundaries for all lots and parcels. General Site (con't) Y N 17. Acreage of all lots included in the plan. V18. The location and dimensions of all required setbacks and yard areas. C / 64�,,��,� AllU� 19. The location and type of all dwelling units. 20. Location and description of all recreation facilities. 21. Location of sidewalks and pedestrian ways. 22. Location and area of common open space. 23. The location, height, and dimensions of all signs. 24. Location height, andspecifications of outdoor lighting fixtures. 25. Location and nature of outdoor storage areas. 26. Location of outdoor trash receptacles and dimensions of structure (fencing, etc.) required to enclose receptacles. Buildina Information Y N 27. The height of all buildings and structures. 8. Location of all buildings, structures and uses. , 29. The proposed use of each building, structure and area. f30. Ground floor area and total floor area of all buildings with FAR calculations for commercial and industrial zoning districts. Roads Y N Wd 31. Name and number of existing and planned streets on and adjoining the site. 32. Location of existing and planned streets on and adjoining the site. 33. Posted speed limit of existing adjacent roads. 41ct("L/ Me-Y S<-y.e 34. Location and dimensions of all proposed entrances from public U� right-of-ways. m 35. Location of all entrances on adjoining roads within 200 feet of the proposed or existing entrance. 36. Dimensions, boundaries, width, pavement, and construction of planned roads. Utilities Y N 37. Location of all utilities, including sewer and water lines with the size of lines, mains, and laterals. 38. Location and width of all easements, including access, utility, and drainage easements. 39. Location and nature of fire lanes, fire hydrants, and all other facilities necessary to meet Fire Code requirements. Parking Y N 40. Calculations describing the required number of parking and loading spaces. jC 41. Location and dimensions of all parking and loading spaces, / driveways, parking aisles, curbing and other features to be used. 42. Location and dimension of all disabled parking spaces and Natural Features Y N ramps. 43. Existing and finished contour lines. 44. Location of steep slopes, woodlands, floodplains, wetlands, sinkholes, and other environmental features. 45. Location of streams and drainage ways. Landscaping Y N da- 46. Landscaping plan descr Bing oca on an types of plants to be used. fo c� S�/r3 if C f/r 47. Location of required buffers and screening with cross sections or Erosion and Sediment Control V"S 48 49 profiles. A stormwater management plan with run off calculations and location and description of facilities to be used. Soil erosion and sedimentation control plan describing the location and methods to be used to minimize erosion and sedimentation during development. 12 1 { ��C�NJ' U � M H O 0 � Dv H H, 151 Windy I lill I anc \Vinchctitri, Virginia 22602 I June g, 2001 Frederick County Department of Planning and Development 107 North Kent Street Winchester, Virginia 22601-5000 A"IT: Jeremy Camp, Planner II RE: Northwestern Workshop — Warehouse Site Plan Dear Jeremy: Please accept this response to your comment letter dated May 9, 2001. 1. The site plan has been subtitled "Warehouse and Office Addition" for clarification. 2. We checked the vicinity map scale. I" = 2000' is correct. 3. The dumpster pad has been located on the plans. 4. No outdoor storage areas are proposed for this plan. A note to this effect was added to the cover sheet. 5. The proposed truck court will serve the clock doors. We added the clock doors for clarification. 6. No signs are proposed for this plan. A note to this effect was added to the cover sheet. 7. The height of all buildings was added to the plans. S. The use of all buildings was added to the plans. 9. The F.A.R. calculations were done correctly. We incorrectly labeled the calculation. The label has been revised. M. We are in the process of getting the casement plat recorded and will forward a copy to you when available. 11. "Maximum Safe Speed" is the posted maximum safe speed in the curve on Fort Collier Road. This item is added to the site plan to meet VDOT requirements. 12. Fire lane signs and hydrants have been added to the plans. The Dire Marshal has approved the revised plan. A copy of the approval will be forwarded to you. 13. The parking spaces have been revised. 14. We moved handicap spaces to the new warehouse. 15. A note has been added indicating that the existing vegetation will be maintained to provide a full screen. 16. Sugar maples have been replaced with red maples. The red maple is recommended for streetscapes. We will forward all Agency approvals when available. I'lcase contact me if you require further information to approve this plan. Sincerely, Greenway Engineering Jason J. "1 somas, P.E. IN file42l27/JJT/dls 1?11ginccrs Sill vcyolS 'Icicphonc 5.10-602-4185 FAX 5•10-72 9528 COUNTY of ;C REDERICK Department of Public Works 540/665-5643 FAX: 540/678-0682 May 23, 2001 Mr. Jason J. Thomas, P.E. Greenway Engineering 151 Windy Hill Lane Winchester, Virginia 22602 Re: Site Plan Comments - Northwestern Workshop Addition Frederick County, Virginia Dear Jason: Upon review of the subject site plan, we offer the following comments: l . Provide an as -built survey of the area downstream of culvert number one and calculations indicating if an adequate channel exists in accordance with Minimum Standard 19 of the Virginia Erosion and Sediment Control law. Also, provide the calculations for the stormwater pond at Hampton Chase verifying your assumption concerning run-off. 2. Provide a wash rack with the proposed construction entrance. 3. Provide the calculations for the design of the sediment trap and provide a grading plan to ensure that the sediment trap is constructed properly. 4. The silt fence detail needs to be changed to indicate that wire support shall be required. Another option is using a diversion berm with a rock check dam outlet. 5. Specify the dimensions of the outlet protection. 6. The seeding schedule on sheet 4 of 5 is not practical. Sercia lespedeza is not typically specified for general seeding. Provide an a nurse seed crop such as rye or German millet for seeding during the summer months. 7. Provide a -note indicating that the contractor shall control dust on -site in accordance with Virginia Erosion and Sediment Control Handbook (vesch) standard 3.39. 8. Provide a detail for the culvert inlet protection. We are requiring the use of the rock check dam option specified in vesch standard 3.08. 107 North Kent Street - Winchester, Virginia 22601-5000 Northwestern Workshop Addition May 23, 2001 Page 2 9. Provide a note on the plan indicating that prior to commencing site grading work, a land disturbance permit shall be obtained from the Frederick County Public Works department. Also, an on -site pre -construction meeting will be required with our staff at this time. Once these comments are addressed, submit two (2) copies of the site plan for further review. If you have any questions, do not hesitate to contact me Sincerely, oe C. Wilder Engineering Technician cc: file -A- 5 � - A - �; t -D 6.07 — 5 4 - A- Q•7 Z cJ 0Cj -- 5'4- A — 3 (o 8 L L� (�.cv - �A - .3c, F sq- A _ 73 i� ; k1c,(es fey SS• Lf - - 79 (� u C,r z C GREENWAY ENGINEERING %47 151 Windy Hill Lane Winchester, Virginia 22602 Fvunded in 1971 T R A N S M I T T A L Project Name: Pile No.: Datc: Northwestern Workshop 2127 June 8, 2001 To: Frederick Co Planning Attn: Jeremy Camp Copied: From: Jason Thoinas/ds GREENWAY ENGINEERING Phone: 540-662-4185 Fax: 540-722-9528 Remarks: ri Urgent 1 For Your Review rJ As You Requested r Please Comment Message: Jeremy, Attached are the following for the above project: -1 copy of the site plan -Response letter to Planning comments Call with any concerns. RECEIVE® ,JUN 0 8 2001 DEPT, OF PLANNING/DEVELOPMENT I7nginecrs Surveyors Telephone 540-662-4185 FAX .540-722-9528 ,c)reciiway@visualliiilc.com visuallinlc.com COUNTY of Y+ REDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 665-6395 May 9, 2001 Mr. Jason Thomas, P.E. Greenway Engineering 151 Windy Hill Lane Winchester, Virginia 22602 RE: Review Comments, Northwestern Workshop; Site Development Plan #15-01, Property Identification Number 54-A-81D Dear Jason: Thank you for your recent submission of the site development plan for a warehouse and office addition at the above referenced property. Unfortunately, there are several errors and problems with the site plan you submitted. The following 16 comments should correlate with the red markings on the enclosed copy of the site plan. Please address each of these comments in a revised site plan. Review Comments 1) Staff requests that you add a subtitle to the site plan that identifies the project. For example, a more preferred title would be as follows: Northwestern Workshop: proposed warehouse and office addition. 2) Please recheck the scale of the provided location map. It appears to be a greater scale than 1:2000. Furthermore, please eliminate the two dots in the center of the location map. 3) Please provide the location of all outdoor trash receptacles. Furthermore, please provide a concrete dumpster pad, fence, and gate for all dumpsters. tl) Please show the location of all outdoor storage areas. If no such areas are proposed, please provide a statement to that effect. 1.Z5) Please clarify what the proposed concrete truck court will be used for. The Zoning Ordinance does not permit storage in temporary trailers. 6) Please show the location of all proposed signs. If no sign is proposed, please provide a statement to that effect. 7) Please provide the height of all buildings and structures. 8) Please provide the use of all buildings and structures. 107 North Kent Street • Winchester, Virginia 22601-5000 Page 2 Mr. Jason Thomas, P.E. Re: Site Development Plan #15-01; Northwestern Workshop May 9, 2001 9) Please correct your F.A.R. calculations and provide the total floor area and the total ground floor area. F.A.R. is calculated by dividing the total floor area by the total lot area. It is not calculated by dividing the total proposed building area by the total lot area you provided. 10) Please provide a recorded plat that shows an access easement for the entrance you are proposing to share with the adjoining property. 11) Please explain what "Maximum Safe Speed" means, and how it is different from the posted speed limit. 12) Please provide the location of all fire lanes, fire hydrants, and all other facilities necessary to meet Fire Code requirements. ,13) All parking spaces are required to be at least 180 square feet in area. Please correct the site plan so all proposed parking spaces meet this requirement. ,,14) Staff recommends that you provide better access for the disabled by establishing a handicap space in the rear parking lot. However, the proposed plan does meet the Zoning Ordinance's minimum standard. 15) Please provide a statement on the site plan to the effect that, the brush area in the southern corner of the lot will be maintained to provide a full screen. 16) Sugar Maples are a deep rooted tree that normally require a large area to grow. Their roots can also severely damage paved areas if planted too close. Staff recommends changing the species of tree to something with a less troublesome root base where area is a limiting factor. After you have revised the site plan, please resubmit one copy so that I may verify the information contained on the plan. I will need all approved review agency comment sheets and at least five copies of the final plan for approval. Comment sheets are required from the following agencies: the Frederick County Inspections Department, the Frederick County Engineer (Public Works), the Frederick County Fire Marshal, the Virginia Department of Transportation, and the Frederick County Sanitation Authority. Do not hesitate to contact me if you have any questions or concerns regarding this letter. Sincerely, �'' .vim, �v ��r��Z-✓ Jeremy Franklin Camp, Planner II JFC/bah Enclosure U: UeremylSite Plan Reriew12001WIV ff'orkslmplSP1115-OlReviewl.apd COMMONWEALTH of VIRGINIA CHARLES D. NOTTINGHAM COMMISSIONER Mr. Jason J. Thomas, P.E. C/O Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 DEPARTMENT OF TRANSPORTATION EDINBURG RESIDENCY 14031 OLD VALLEY PIKE EDINBURG. VA 22824 June 25, 2001 Ref: Northwestern Workshop Route 1322, Fort Collier Road Frederick County Dear Mr. Thomas: JERRY A. COPP RESIDENT ENGINEER TELE(540)984.5600 FAX (540) 984-5607 We have received your revised site plan dated 05/30/01 (received 06/22/01) for the referenced project. It appears all of our earlier review comments have been satisfactorily addressed. Please advise the owner of our approval. Also please provide six (6) sets of approved construction plans with signed seal for VDOT distribution. The appropriate land use permit may now be applied for to cover work within the Route 1322 right-of-way. The permit is issued by this office and will require a minimum processing fee, surety bond coverage, and the salary & expenses of a State assigned Inspector. A copy of any/all recorded plats of dedication for drainage easements or additional right-of-way required for implementation of this proposed project should be provided to VDOT prior to issuance of any land use permits. Dedication should be made to the Commonwealth of Virginia. Once satisfactory application has been made, a permit will normally take approximately thirty days to process and issue. Should you have any questions, do not hesitate to call. _ For Barry J. Sweitzer, Trans. Roadway EngTneer : Steven A. Melnikoff, Transportation Engineer BJS/rf Enclosure xc: Mr. Dave Heironimus, Mr. Evan Wyatt RECEIVED JUN 2 6 2001 DEPT, OF PLANNING/DEVELOPMENT WE KEEP VIRGINIA MOVING 0 Request for Site Plan Comments Virginia Department of Transportation Mail to: Virginia Department of Transportation Attn: Resident Engineer 14031 Old Valley Pike Edinburg, Virginia 22824 (540) 984-5600 Hand deliver to: Virginia Department of Transportation 1550 Commerce Street Winchester, VA (540) 722-3460 Please fill out the information as accurately as possible in order to assist the Virginia Department of Transportation with their review.. Please attach five (5) copies of the site plan with traffic generation data and drainage calculations with this sheet. Applicant's Name: Address: Phone Number: Name of development and/or description of the request: 77-ky('S7F—en ) (�J�►2-,�5 l-lC�r� ���-/�l � �l �17 /77ait � Location of property: 2; 5E (-T74 rI ELD A -ye . Virginia Department of Transportation's Comments: The application for site plan for this property appears to have some measurable impact on Route 1322, Independence Drive) the VDOT facility which would provide access to the property. If any work is performed on the State's right-of-way, a land use permit will need to be applied for and issued to cover said work. The T -.. _.. ..:::. t t a c h e d 14 r COMMONWEALTH of VIR QIN IA CHARLES D. NOTTINGHAM COMMISSIONER Mr. Jason J. Thomas, P.E. C/O Greenway Engineering 151 Windy Hill Lane Winchester, VA 22602 DEPARTMENT OF TRANSPORTATION EDINBURG RESIDENCY 14031 OLD VALLEY PIKE EDINBURG, VA 22824 May 21, 2001 Ref: Northwestern Workshop Route 1322, Fort Collier Road Frederick County Dear Jason: JERRY A. COPP RESIDENT ENGINEER TELE (5,10) 9&1-5600 FAX(510)981-5607 A VDOT review has been completed on the revised site plan dated 04/30/01 (received 05/18/01) for the referenced project. Several VDOT concerns addressed in our review letter dated 04/27/01 appear to have been omitted on the revised plan. Our comments are as follows and are shown in red on the plan sheets. Plan Sheet 2 of 5 1. A standard 12'x48' VDOT taper should be provided on the north side of the entrance. Erosion control should be placed at CG-6 end at 12' offset point, asphalt tied to back of curb. 2. The north arrow and adjoining property owner and land use should be restored on plan sheet. 3. The Arch Culvert dimension should be posted as 21"x15" (span x height) unless in rare condition of installing culvert vertical. Appropriate ES's should be provided on extended ends of culvert or Special Design #2045 may be used. Sheet 3 of 5 • See comments 1 & 3. MAY 2 3 2001 WE KEEP VIRGINIA MOVING DEPT. OF PLAN NI\IC'DEVELOP MENT Mr. Jason Thomas • • Ref Northwestern Workshop May 21, 2001 Page #2 Sheet 5 of 5 4. A recommended pavement structure for portion of entrance within right-of-way and to radius termini could be: 1 1/2" SM-12.5 2" IM-19.0 3" BM-25.0 8" 21-B Aggregate 5. The current VDOT Standard CG-12A; 12B or 12C should be selected for consideration of VDOT Inspector/Engineer. Whenever all the above comments have been addressed, please provide one set of revised plans for VDOT review. Should you have any questions, do not hesitate to call me at (540) 984-5631. Since , Barry . Sweitzer Trans. Roadway Engineer For: Steven A. Melnikoff Transportation Engineer BJS/rf Enclosures xc: Mr. Dave Heironimus Mr. Evan Wyatt E 3 4 SITE PLAN APPLICATION Project Title: (,�(or, l I ujcsregA U-be-m-%o Location of Property Z?) S (✓1l^EA I-LD ye (street address) \J6 2Z(o0 Z Property Owner: I�JO�TE4cc>�5"j F.f2l�� ty0►2KSf �� Address: AZR SMIT4C-(ieQ AVE ic)1r.kt—��STE�, VA ZZ�bZ Telephone: 150 — 0%% - 050 Applicant/Agent Address «( Wlu )z (+(l - LA&)r- Ly I OC L+CSTD2 \ A I-L-Z6,O2 Telephone: C540 _ co (o Z 4-18 5 - 5. Designer: _ �P i�1UJ 1W E&Y--,I �J C F-c, J Address: Telephone: S6r 4 E - Contact: ..j /A r 6. Is this an original or revised site plan? 7a. Total acreage of parcel to be developed: 7b. Total acreage of parcel: 8. -- Property Information: a) Property Identification Number: b) Current Zoning: c) Present Use: d) Proposed Use: e) Adjoining Property Use(s) f) Adjoining Property Identification Number(s) g) Magisterial District(s) Original Revised 54-(A) - 8l M1 M4�,IoFA(2;('UP.tN(z/pFF(cE - MAOQFACTQKJN& /oP4--rcr_ 54-A�q3) 64- 4 -4- , 64 -A --7 54a-?3 have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to the'submission of my site plan. Signature: Dater �) At ,k ni ng Prorrij �Ses �) TD -t�s S4-A-3(,,F) S4--A-3(,,() STORMWATER MANAGEMENT ANALYSIS NORTHWESTERN WORKSHOP FREDERICK COUNTY, VIRGINIA April 6, 2001 GREENWAY ENGINEERING STORMWATER MANAGEMENT ANALYSIS NORTHWESTERN WORKSHOP April 6, 2001 Description: A 12,000 s.f. warehouse has been proposed for the Northwestern Workshop site in Frederick County, Virginia. The project consists of a warehouse, truck court, associated parking, stormwater controls, utility extensions, and new entrance onto Fort Collier Road (to be shared with the adjacent Frederick County School facility). The project site is located adjacent to the existing facility. Existing Conditions The project site is currently vacant and covered with grass. Soils belong to the Frederick- Poplimento loams (16B and 16C), which have a hydrologic soil group B. The site drains to the stormwater management pond at Hampton Chase via the roadside ditch along Fort Collier Road. Storm Structure Sizing All storm structures on site were sized to pass a 10-year storm. Calculations are provided in Attachment A. Stormwater Management Quantity Control A regional stormwater detention pond was sized to handle off -site drainage from the site, up to 50% open space, based on a stormwater management plan (revised March 6, 1992) prepared by Gilbert W. Clifford & Associates. The regional detention pond at Hampton Chase was originally sized to provide detention of the post -development 10-year storm to below the pre -development 2-year storm rate. The pond intercepted the entire 22-acre off -site drainage area. A C-value of 0.55 was assigned to this drainage area, which equates to about 50% open space. The proposed layout has an open space of 56%. Therefore, the proposed improvements do not increase the amount of impervious area used to size the Hampton Chase Pond. 9 0 ATTACHMENT A NORTHWESTERN WORKSHOP Storm Sewer Sizing Calculations CHART 10 180 10,000 168 8,000 EXAMPLE (1) (2) (3) 156 6 000 D•42 Inches (3,5 feet) 6 — 6. `l 5 144 5,000 0.120 cfs � d � 4,000 hi * Mw . 6 5. 132 D feet 4. I' 120 (2) 2.1 7.4 Q � 2,000 (3) 2.2 7.7 4' 3 108 >l AD in feet 3 Z 96 1,000 3' 800 _ 64 600 500 / 72 400 / 2. = 300 / 1.5 1.5 z to / Z 60 200 w 1.5 _ Z / W 0 54 Q a / W 100 Z 48 / 80 J / Q 2 a c=j / 42 0 60 W 1.0 1.0 0 - 50 HW ENTRANCE I.0 Ir 40 SCALE p TYPE z W W ►— W 36 30 (I) 54aer• Nye with �" 3 .9 9 a 33 headwallGrooveO .9 20 (z) Groove ••d with Q 30 headw•II 8 ,8 (3) Groove end 8 27 pro)ectl 10 8 .T .7 24 .7 6 Tom stele (2) or (3) pre)oct 21 5 6rl:ontallr to scale (1).then 4 us• straight Inclined Ilne throagh _ D and 0 scales, or reverse as 6 3 illustrated. 6 .6 18 2 15 5 .5 .5 1.0 12 HEADWATER DEPTH FOR CONCRETE PIPE CULVERTS HEADWATER SCALES 2a3 REVISED MAY 1964 WITH INLET CONTROL BUREAU OF PU.LIC ROADS JAN. 1943 181 it/OiGT�1.l,.JES��iLti.l !.-�ati�.s�JoP • 10------ - .- 9 --'--- - ,--� - «, 3 I -�---rr-+-� ,� / A. / I , I 2 - --_ t __ -� r •. /I I i 1 I i I 0.8 0.6 0.3 CURB 0.4 ilk w C2 Z� 0.3 Q 0 1 --1 0.2 �O I A : CLEAR OPENING AREA P:2W+L (WITH CURB) I P = 2(W + L) (WITHOUT CURB) I I 0.1 I 2 3 4 S 8 10 20 30 40 SO 60 80 100 � Y auHAROE a IFT 3/31 CHART 14 Grate inlet capacity in sump conditions. STD YJ S S 77C 4-60 Rev 6-85 NORTHWESTERN WORKSHOP PROPOSED SWALE CALCULATIONS SWALE A Area (ac) 2.26 C-value 0.9 I, 2-yr (in/hr) 5.3 I, 10-yr (in/hr) 6.8 Q(2)cfs 10.77 Q(10)cfs 13.81 Ditch Type V Invert In 703.2 Invert Out 700.0 Length(ft) 300 Channel Slope(%) 1.07% Width(ft) 0 SS (x:1) 3 Manning's n 0.04 Flow Area (sqft) 4.18 Wetted Perimeter (ft) 7.46 Trial Q (cfs) 10.9 Trial Depth (ft) 1.18 2-Yr Velocity (fps) 2.61 10-Year Depth (ft) 1.30 DITCH Inlets.xls 4/10/01 STORM SEWER DESIGN COMPUTATIONS n(i41_C) rppi = n M3 FROM POINT TO POINT D.A. D.A. (acres) RUNOFF COEF. (C) CA INLET Tc (MIN) 1 (IN/I-IR) Q (10) (CFS) INV. IN INV. OUT LENGTH (F1) SLOPE (FT/FT) HEIGHT, B (IN) WIDTH, W (IN) DES. CAP. (CFS) VEL (FT/SEC) FLOW TIME (MIN) NOTES Cap. Chk INCR. ACCUM. 1 2 D 0.82 0.55 0.45 0.45 5.0 6.8 3.05 702.40 700.50 80 0.024 15 15 9.97 8.13 0.2 HI-OcPP o.k 3 4 B 0.18 0.90 0.90 0.90 5.0 6.8 6.12 703.60 703.20 50 0.008 18 18 9.41 5.33 0.2 MoUP o.k 5 6 C 0.74 0.90 0.67 0.67 5.0 6.8 4.55 710.30 710.00 52 0.006 15 15 4.92 4.01 0.2 MaCPP a.k INLET NO. TYPE RIM 1 ES - 2 ES - 3 ES - 4 DI-1 705.6 5 ES - 6 DI-1 712.3 LD-229 Inlets.xls 4/10/01 Request For Site Plan Comments Department of Planning and Development Mail to: Hand deliver to: Department of Planning and Development 107 N. Kent Street Attn: County Planner Fourth Floor 107_.North Kent Street Winchester, VA Winchester, VA 22601 (540) 665-5651 (540) 665-5651 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the site plan with this sheet. Applicant's Name: G(Zeco J Address: (GI U)oj l:)�4 FI-(LL- LrlW , U-)IIjr,Nr"s-r" 2, VA 7? it,oZ Phone Number: `54-0-VoZ- AIPZ Name of development and/or description of the request: I�D�Ti FW�s T,e,J Wo2�s� IoP BUIL-ht,)Cz Ado MorL� Location of property: GZ8 Stit ("r- c 6-LD AU(c . Planning and Development's Comments: M LJ i 1JN GREENWAY ENGINEERING %47 151 Windy Hill Lane Winchester, Virginia 22602 Fvundcd in 19T1 T R A N S M I T T A L Project Name: Northwestern Workshop File No.: 2127 Date: Anril 13, 2001 To: Frederick Co Planning From: Jason Thomas/ds Attn: Jeremy Camp GREENWAY ENGINEERING Phone: 540-662-4185 Fax: 540-722-9528 Copied: Remarks: r Urgent r; For Your Review r As You Requested ❑ Please Comment Message: Jeremy, Attached are the following for the above site plan: A copy of the stormwater management analysis -Site plan application -Application fee check -2 copies of the site plan Call with any concerns. ,', CEIVED Hr-k152001 DEPT.OF PLANN,NaDEVELOPMENT. Engineers Surveyors Telephone 540-662-4185 FAX 540-722-9528 greenway@visuallink.com