Loading...
HomeMy WebLinkAbout31-07 Jr's Autobody - Automotive Repair - Stonewall - Backfile (2)LEGEND FCSA CONSTRUCTION NOTES V0 0 T GENERA L NO TES VICINITY MAP LL Rev. Mar 2006 EXIS77NG FEATURES 1, 7heAuthorit" Water and Sewer Standards and Specifications are available at www.fcsa-water.com V1, A# work on this project shall conform to the current editions and latest revisions to the Virginia Department of Transportation (VOOT) SCALE 1 2000' 'cgi 2. The water and sanitary sewer portion of these plans are valid for two years from date of FCSA approval Road and Bridge Specifications and Standards, the Virginia Erosion and Sediment Control Regulations, and any other applicable state, .-- �1' FP EXISTING EDGE OF PAVEMENT 3, The contractor shall adhere to standards and specifications in effect at the time of construction, federal, or local regulations applicable. In case of a discrepancy or conflict between the Standards or Specifications and Regulations, the V) �o EXISTING EDGE OF GRAVEL L E G 4. The contractor shall coordinate with, and arrange for Inspection by, the A uthority, most stringent shall govern. C: 0 5. The contractor shall tie-in a new sewer line to existing to an existing manhole by core drilling the manhole. V2. A# construction shall comply with the latest U.S. Department of Labor, Occupational Safety & Health Administration (OSHA), and Virginia Hood Dairy U 7 ­__-, " _..­___._­ EXISTING CURB AND GUTTER CC, 65 6. When an existing water main is tapped for the installation of a new line: Occupational Safety & Health (VOSH) Rules & Regulations. C: . .. .... a) The Authority shall furnish ail labor and material. V3. When working on VDOTright-of-way, all traffic- control, whether permanent or temporary, shall be in accordance with the current edition K-1 _11�1 (0 EX. INTERMEDIATE CONTOUR b) The contractor must., of VDOT's Work Area Protection Manual. Furthermore, all traffic control flaggers must be certified in accordance with Section 104.04(c) of ou 1, make application and pay deposit. the VDO T Road & Bridge Specifications. cz� EXISTING INDEX CONTOUR 2. mark the tap location. -6 EXISTING SPOT ELEVATION 3. coordinate installation with the engineering -assistant. V4. The developer shall be responsible for relocating, at h1s expense, any and all utilities, including traft signal poles, junction boxes, 7. locations lines Authority's Inspector. controllers� etc, owned by VDOT or private 1public utility companies. It is the sole responsibility of the developer to locate and identify L 5 Exact of water and sewer services on new are to be coordinated with the utility facilities or items that may be in conflict with the proposed construction activity. VDOT approval of these plans does not indemnify _Q EXISTING TELEPHONE LINE 8. The Authorfty�5 maintenance department shall furnish -and install all water meter through 2" in size. the developer from this responsibility. U Q) EXISTING SANITARY SEWER rt is the developer's1contractor's responsibility to have the meter box assembly installed correctly. Before a permanent meter is installed. box, its frame the V5, Design features relating to field construction, regulations, and control or safety of traffic may be subject to change as deemed EXISTING ELECTRIC SERVICE a) The meter with and cover, imust properly aligned with coppersetter. necessary by VDOr Any additional expense incurred as a result of any field revision shall be the responsibility of the developer. b) The fi-ame and cover shall be set to final grade, PROJECT INFOR MA TION EXISTING GAS LINE c) The distance between the top of the cover and the coppersetter shall be between 18 and 21 d) All components of the meter box assembly shall be in proper working order. V6, Prior to Initiation of work, the contractorsha# be responsible foracquiling allnecessary VDOTland use permits for any work on VDOT fight -of -way, EN'. 15 RC P EXISTING STORM SEWER 9, For water and sewer services that connect to existing Anes: a) The location of the service lateral is to be coordinated with the Authori" Engineering Assistant. V7. If required by the local VDOT Residency Offlce, a pre -construction conference shall be arranged and held by the engineer andlor Owner Contractor EXISTING FENCE LINE b) An Application for Service must be made and fees paid before work will begin, developer with the attendance of the contractor, various County agencies, utility companies and VDOTprior to initiation of work. Diehl F, & Deborah L. Wilson Construction Management, Inc. EXISTING DITCH LINE ----------- c) The Authority sha# furnish and install 51,7 "/ 314 ', and 1 " water services. 121 Mercedes Court 360-2 McGhee Road d) For all .1 112 " and 2" water services, the A uthority shall make the tap and bring the piping to the V8, The contractor shall notify the local VDOT Residency Office when work is to begin or cease for any undetermined length of time. VDOT Winchester, VA 22603 Winchester, VA 22603 EXISTING WATERLINE W1 TEE propertyline. The contractor shall furnish and install the meter vault assembly, The Authority will requires 48 hours advance notice prior to any required or requested inspection, Phone - (540) 662-5202 Phone - (540) 665-0693 install the meter, EXISTING FIRE HYDRANT e) The Authority will install all sewer laterals, V9, The contractor shall be responsible for maintaining adequate access to the project from the adjacent public roadway via a construction entrance that is constructed and maintained In accordance with Section 3.02 of the Virginia Erosion & Sediment Control Handbook. 1A EXISTING WATER VALVE 10, Any water service line must have a backfiow prevention assembly (double check valve or RPZ, as required). The assembly must meet Furthermore, access to otherpropertles affected by this project shall be maintained through construction, 7he Developershall have, within Property Da Building Setbacks Per Code Existin EXISTING REDUCER .. . .... .... ASSE Standard No, 1015 or 1013, the limits of the project, an employee certified by the Virginia Department of Conservation and Recreation (V9CR) in Erosion and Sediment Control who shall inspect erosion and siltation control devices and measures on a continuous basis for proper installation and operation. Tax Map Number 43-(A)-52B Front: 501 506.4' Address 121 Mercedes Court Left Side: 15, 43.2' ca '�2 11, A# fire lines sha# have a backflow prevention assembly (detector double check valve or a RPZ, as required). The assembly shall meet Deficiencies shall be promptly rectified, Area 2.399 acres Right Side: 15' 15.01 0 0010 r-i EXISTING TREE DRIP LINE - 1 ­1 ­..- , -, -, 1_".. 11. '1, ASSE Standard No. 1048 or 1047. Any exterior, privately owned fire line shall also have a fire service meter. This assembly shall be installed immediately before the backflow prevention unit, Radio read remotes are required Zoning B-3 Rear: 50' (1-81) 55.2' Legal References 950009477 3: Ln D 1�� �__ -4 0 V1 0. Contractor shall ensure adequate drainage is achie ved and maintained on the site during and at the end of construction. Existing Use Automotive Repair ce 6 Q PROPOSED FEATURES 12, FCSA to reviewthe mechanicalplan(s) fordesign and materialapproval of- 1) the domestic water meter andits backfiow prevention Proposed Use Automotive Repair device, andlor 2) the fire service line's backf7ow prevention device. PROP EP V11. All water and sewer lines within existing orproposed VDOTright-of-waysha# have a minimum thirty-six (36) inches coverand when Parking Setbacks Per Code Existing PROPOSED EDGE OF PAVEMENT GENERAL NOTES possible shall be installed under roadway drainage facilities at conl7ict points. Zoning Data Front: 5f 419, 0' PROPOSED EDGE OF GRA VEL PROP EG V12. Any unusual subsurface conditions (ag., unsuitable soils, springs, sinkholes, voids, caves, etc.) encountered during the course of Open Space Minimum 25% = 26,125 sf Left Side: 51 3.5' 3.0' ck� ;�t tn U, (Z) Q) zc: �_� 1, Permits must be issued from VDO T prior to any construction in a public right- of- way. construction shall be immediately brought to the attention of the engineer and VDOT Work shall cease in that vicinity until an adequate Open Space Proposed 42.6010 44,556 sf Right Side: 51 t:� 0-- R, C-) design can be determined by the engineer and approved by VDO T F.A.R, Maximum 1.00 Rear: .51 8,7' F,A. R. Proposed cz) CQ ICQ� PROP. CURB & GUTTER PROP CG-6 2. The Manual on Uniform Traffic Control Devices (MUTCD) must be adhered to when working in a public right of way. V1 3. All fi// borrow be inspected by VDOT fill. 0.39 C�l �a 2 Z� - PROP. REVERSE CURB & GUTTER 3. 7he contractor will remove all mud and debris from the public right of way that is left by vehicles entering and leaving the site. areas, material and undercut areas shall and approved a representative prior to placement and Where C6R testing is required, a VDOT representative shall be present to insure the sample obtained is representative of the location. Building Da Parkin Ca/c. Require Fb,6 �G ///fl �R7771_ When soil samples are submitted to private laboratories for testing, the samples sha/I be clearly identified and labeled as belonging to a Type of Construction 2B - Metal Office - 720 sf 11250 3 LU projectto be acceptedby VDOT and that testing shall be performed in accordance with al(applicable VDOT standards and procedures, Existing Area 11,400 sf Service Bays - 7 3 per bay 21 LLA C< U� PROPOSED CONTOUR 50- 4, Any damage to neighboring properties including county roads and sidewalks, caused by the development of this site will be the Proposed Area 2,600 sf - Addition Showroom - 2,600 sf 11400 7 PROPOSED SPOT ELEVA TION + 50-QQ responsibility of the developer, All damage must be repaired to original conditions. V1 4. All roadway fill, base, subgrade material, and backAll in utifitylstorm sewer trenches shall be compacted in six (6) inch lifts to 95% of Height Maximum 35 feet zt 1�c C:S 5 A construction entrance must be installed in accordance with the "Virginia Erosion and Sediment Control Handbook" Section 3.02. The theoretical maximum density as determined by AASHTO T-99 Method A, within plus or minus 2% of optimum moisture for the full width of Height Proposed 28 feet Cn PROPOSED STORM SEWER PROP. 24 ADS--- contractor must maintain this access for the duration of the project any dedicated street right-of-way, At the direction of VDOT , density tests sha# be performed by a qualified independent agency in ------ accordance with VDOT Road and Bridge Specifications, Certified copies of a# test reports shall be submitted to VDOT daily unless specified I— PROPOSED SANITARY SEWER S S S 6. The contractor wIll be responsible for adequate and positive drainage of this site. otherwise, Sign Da Require Existin Propose Total PROPOSED TELEPHONE T T T 7. The contractor will obtain a Land Disturbance Permit prior to any site work or construction. V15. VDOT Standard CD and UD underdrains shall be installed where indicated on these plans andlor as specifled by VDOT Sign Area Allowed 100 sf Parking Spaces 31 55 same 55 Sign Area Existing 96 feet Handicap Spaces 2 2 same 2 U __J < U) �- PROPOSED ELECTRIC 8, Allconstruction willbe done following the laws and gaidefines set forth by0ShA and VOSH, Sign Height Allowed 35 sf Loading Spaces 1 1 same 1 = v) 2-1 LU 9. The contractor will notify engineer of recordof anydis-crepandes between the approvedplans andexIsting site conditions, V1 6. The installation of any entrances and mailboxes within any dedicated street right-of-way sha# meet VDOT minimum design standards and is Sign Height Existing 28 feet 0 U PROPOSED GAS LINE the responsibility of the developer. LU fie <c PROPOSED WATER LINE 10, The developer is responsible for the relocation of any utilities required by this site plan. V1 7. Prior to VDOTacceptance of any streets, all required street signage andlorpavement markings shall be installed by the developer or, at VDOPs discretionl by VDOT on an receivable basis following the Manual On Uniform Traffic Control Devices. Z 0 m C> 06 Contact Numbers SheetIndex I WM account --I > 6 PROPOSED WATER METER 11, A# Erosion and Sediment Control devices shown on this site plan shall be Installed prior to construction. LU LU Surveying & Engineering Firm: PROPOSED FIRE HYDRANT D& PROP. FH 12. All controlled fill must be compacted to a minimum of 95% density following Method A'of the Standard Proctor ASTV-D698 V1 8. The developer must provide to the VDOT Residency Office a list of all material sources prior to the start of construction. Copies of all AASHTO-T99, or VTN-1 as applicable. Any fill placed underbuildings, structures, orpavement must be inspected and approved by a invoices for materials utilized withIn any dedicated street right-of-way must be provided to the local VDOT Residency Office prior to Greyftlfe, Inc. (540) 667-2001 Cover Sheet& General Notes Sheet 1 LU Ui professional soils engineer. A geotechnical report supersedes this note if provided. acceptance of that work. Unit and total prices may be obscured. Building Contractor., Site Plan Sheet 2 COMMON LABELS & FEATURES V1 9. Aggregate base and subbase materials shall be placed on subgrade by means of a mechanical spreader Density will be determined using Construction Management, Inc. - (540) 665-0693 Zoning Enforcement- Erosion & Sediment Control Sheet 3 rl� 13, The contractor is responsible for contacting MISS U77LW prior to any site work. A# utilities shown on this plan are approximate the density control strip in accordance with Section 304 of the VDOT Road and Bridge Specifications and V7-M-1 0. A cettfied compaction Department of Planning (540) 665-5651 W r11 C11 zzr C) �� PROPERTY LINE OF PROJECT locations and not all utilities may be shown, technician shall perform these tests. Certified copies of test repolts shall be submitted to VDOT daily, unless specified otherwise. In addition Site Inspections: < -4 ro to checking stone depths, a VDOT representative shall be notified and given the opportunity to be present outing the construction and Department of Inspections (540) 665-5650 NEIGHBORING PROPER TY LINES 14, The contractor will contain all litter and debris on -site. The work must be left In an orderly manner at the end of each workday. testing of the density control strip. Erosion and Sediment Control. EA SEMEN T LINE Department of Public Works (540) 665-5643 15, An approved set of site plans must be on -site during the construction process. V20. Asphalt concrete pavement shall be placed in accordance with Section 315 of the VDOT Road and Bridge Specifications. Density shall be Sanitary Sewer and Water., PROPERTY CORNER FOUND 16, The contractor will notify all utility companies prior to excavation within easements. determined using the density control strip as specified in Section 315 and VTV-76. A certified compaction technician shall perform these tests. Certified copies of the test reports shall be submitted to VDOT dally, unless specified otherwise, A VDOT representative shall be Fred. Co. Sanitation Authority (540) 869-1061 Telephone Verizon (301) 954-6282 PARKING SPACE TOTALS 17, The contractor will seed and straw, for soil stabilization, any disturbed areas that will be left for more than thirty days, notified and given the opportunity to be present during the construction and testing of the control strip. Electric: Alleghany Power (800) 654-3317 Gas: Shenandoah Gas Co. (540) 869-1111 ADA HANDICAP PARKING STALL DEPARTMENT OF INSPECTION GENERAL NOTES V21. In accordance with Section 302.03, the foundations for pipe culverts thirty-six (36) inches and larger shall be explored belo w the bottom MISS U77LrrY,, 1-800-552-7001 SIGNS of the excavation to determine the type and condition of the foundation. The contractor shall report findings of foundation exploration to Q) SA NITA R Y MANHOLE IDENTIFIER the engineer and VDOT for approval prior to placing pipe, Foundation designs shall comply with VDOT Road and Bridge Standard PB-1. Where soft, yielding, or otherwise unsuitable foundation is encountered, the foundation design andlor need for foundation stabilization shall Zoning General Notes C.) 1. Buildings shall comply with the Virginia Uniform Statewlole Building Code amd use group S, storage, and use group B, Business of the Intemational be determined by the by VDOT Maximum Environmental Existing Disturbance Proposed 1, Exterior lighting will be provided by wall -pack lights attached F11 IANSI Al 17.1-03 Accessible and the Usable Buildings & Facilities. Building Code12003. Other codes that apply are 1CC 2. A design professional licensed of the Commonwealth of Virginia shall seal the structural plans submitted for building pennits� Plans must show a# engineer and approved t.-4 C� STORM DRAIN STRUCTURE IDENTIFIER ingresslegress locations to the exterior per CABO 117,1-.92 and meet requirements of Chapter 17 of BOCA. to the building & fightpoles. U) 3. Maximum slope across handicap stalls shall not exceed 2%. A# required egress doors shall be accessible to a minimum exterior area for V22. Approval of this plan shall expire three (3) years from the date of the approval letter, Features Acreage Allowed Disturbance 2. All lights will be shielded or directed to prevent glare on 1_; C) LIGHT POLES parking assisted rescue, section 1003.2.13.7 18C. Note fire ratings around this door if this section is utilized. Floodolain 0 acres 0% 0 'YO neighboring properties. C� -ZZ' U 4. The International Plumbing code requires testing of the sewer pump station to the rim. V23. VDOT Standard CG-12 Curb Ramps shall be installed where indicated on these plans andlor as specified by VDOT Lakes & Ponds 0 OIYO 0% 3. Outdoor trash receptacles will be in an enclosed six (6) foot -J @ V24. VD07- Standard Guardrail shall be installed where warranted andlor as proposed on theseplans in accordance with VDOTsinstallation criteria. acres fence. LOCATION OF TEST PITS Final approval of guardrail layout to be given by VDOTafter grading is mostly complete. Wetlands >1AC 0 acres 0%, 0% Sinkholes 0 acres 0 'YO 0 'YO Natural S. W. 0 acres 10% 09/0 4, This project will not disturb any environmental features as deflned by the Frederick County Zoning Ordinance, 5. The owner will be responsible for obtaining or granting EROSION & SEDIMENT CONTROL FEATURES FIRE MARSHALL GENERAL NOTES TRIP GENERATION DATA Retention Areas easements shown on this plan, U� UZ �j Q) LIMITS OF CLEARING & GRADING - - - - - - - - - Steep Slopes >50010 0 acres 25016 0% Woodlands 0 acres 25% 0% 6. Easements will be recorded and copies sent to the parties involved. 7. A# that this be 80 Q) 1, An inspection by the Fire Marshall's office will determine where curbing must be painted yellow. utilities will service site must placed Q INLET PROTECTION 2. "No Parking - Fire Lane" signs will be placed on the site by the Fire Marshall!s direction. underground. Lu Z-b P� ITE I AM PEAK HOUR PM PEAK HOUR 3, The contractor must align the fire hydrants to the direction as determined by the Fire Marshall, no ro-? r_1 LLJ LJL: :Z) Z: CODE ITE USE Area IN I OUT I TOTAL IN ___TT___L I OUT OTA � F _�D_T APPROVALS SP # 31-07 OUTLET PROTECTION 00 4. Buming brush piles of natural vegetation requires a permit. Burning construction debris is prohibited. qq�Q (Z) �_7 5, Emergency vehicle access must be provided at all times, Fire hydrants will be always be left unobstructed. 942 1 Automotive Care Centerl 14,000 sf 1 19,5 14.5 1 1�� 16.4 113.6F20,01 F115,2 Lr) CHECKDAM ­W @ RESPONSIBLE LAND DISTURBER !S� DIVERSION DIKE No. P_ (9 Frederick County Zoning Administrator Date DATA TAKEN FROM THE L T E, MANUAL 7th EDTIYON SILT FENCE W1 WIRE SUPPORT X - X - X - 0 NAME: Final Site Plan Approved by Frederick County Planning Department Reviewer Date LANDSCAPING NOTES RIP RAP CERTIFICATION #: 1, Miss Utility must be contacted prior to planting, Advise engineer of record of any conflicts in planting locations and utility markings. 1. Site Plan approval from VDOT will expire three (3) years from the date of the approval letter, SEDIMENT TRAP EXP. DATE Landscaper must stake and guy all trees. Stake locations must avoid utilities. 2. Trees and shrubs shall be healthy and free of insect eggs, larvag. and disease. The plants sha# have ample roots and be well branched. 2. Frederick County Zoning Administrator approval expires at five (5) years from the date of site plan approval. 3, The Frederick County Sanitation Authority approval is valid for two years from date of approval, IF construction is not in progress at the end DATE: APRIL 6, 2007 1. The Responsible Land Disturber is that party responsible for carrying out the land disturbing activity as set forth in the plans, The planter shall guarantee all plants for one year. of thisperiod, A uthofity approval shall be void, SCALE: N/A 4. The Frederick County Department of Public Works approval is not enough to begin site development. The owner/contractor must obtain a CONSTRUCTION ENTRANCE 2. Note: An on -site pre -construction meeting is required with the Owner, Site Contractor, Public Works, & Designer prior to commencing any 3, Landscaper shalt use shredded mulch in all planting beds and around trees, Tags from each plant will be provided to the owner. Land Disturbance Permit and agree to periodic Inspections, Shall be void. 5, The Frederick County Department of Inspections approval does not constitute a building peanit. Building plans must be submitted and FILE NO. 0173 site work, 4, Plant substitutions will be allowed with the written approval of the Frederick County Planning Department approved prior to constructing any structure, Furthermore, the site must meet all ADA requirements and be approved by Inspections. 3. The contractor will possess a Land Disturbance Permit prior to any site work or construction. SHEET 1 OF 3 8. # RADIUS LENGTH DELTA TANGENT BEARING CHORD 40' 19 40, — F15" E=-66.::�] FC- IL40.00' 179,12' 1113*19'_30'1 60.81' 1547056_ 8 -ALE GRAPH.FC SC 4j-(A)--5-?C 4) Y,11Ah,'14[Si`ER AYORT�,rl /A/C' 0OP14 204, JO 100 1,' 70 NED.- B-2 T \\N USLO MCANI re�sor -2.17 ACRES Nv Ait, 000000 & --708.70 1 '16 INV- L % a '00/` *10' I f 0 00 4,3 7) '2, (A) - 2 -)A C co ST(' LIC iWINI )A t- d Az \C� J040005j&3 401' !Sil 1, 7, 5 ZONED. B-5 I1VV=Z7.25' 00� EX. 516N USE.- S TOR4 GE 96 Sf 57 ACRES A; > ?8' T,311 -S P , 1 11 1 `_1­_,,_­i­, I � 1k X "x /./"` I VUL DOVINE TIC14i A BOX ASSOC. + rEtf_p�"Olvr c2 J, AL 0 E BLOCS [X. S 1`0RAC 11(9,300,z N =714-25' _D: IV INV= 708. - I N, 11 z 0A -z" 4 Im US.� Q� X + J. 4 A C`RFS Z 000 C) A 11*, Z5, '16 42' X", \1 I .- 1'* -0 .,A' rf04 W 'IJ2.05 XN" IV 15' ORL P:� 0. 2:, 15' ORL �>4 --- -------- 2� XI WWWA + moms=- 864.05 J E N 4ZIel E BOX TCCE i-H4j11 t . .............. -Z' T R.O.W. Jk:�- 4- i "� I 1! 1' . 60 Y' i?oilroad jq� 4 W hester & �fesjtem 4- in �I^V L [/VO/R CITY CO. J DB 60Z P(i' 255 ZONED.- V- I USE: VACANT Shed ACRES -Z RAILROAD _NTS OFFICES 7' K & J INVESIii,4If .lz_ - - DB 778, PG 645 ZONED.- tW- I IV- 76 "O� USE.- RAILROAD FREIGHT A­,1 Shed 111,25 ACRES 720 720 The purpose of this development is to remove the existing office and parts mom 6rom the automotive revair shop and place a new 40'x100'addition that wiff contain a new officeparts room, MAIN TAIN 24 SEPARA 77(�N FROM andshowrigom, The net gain on the building will be! 2,600 sf EXIS,77NG SANTrAR Y SEWER LA T5RAL z 24" select bac"11 All backfill to be compacted to 95% of ASTM D698 maximum density, 61 concrete pad 18* die. x 6'doep---1 -- finished grade, 4'sto ie f I screw ttype 48'm1n. adjustable location marker valve box JoInt _valverestralnedl alone restraints to maln STANDARD 1 Wile, 2,V ft 16- block general backfill 8`x solid for 12'va]vB 6"thru 12" ON rrm -pam zw U-7, W &Vmn rVe mt, i 3mim-, g X_- 1, 2 8. concrete pad IS' "I concrete concrete pad IS' d1a. x 6' deep dia. finished grade - x 6' deep 24'Wect 24'select backfill backflll W 4* atone screw adjustable Note: valve shall 4'stone 24'min. 112 O.R 1/2 0. D. 48* min. valve box be bevel gear type lw,. main L ....... ....... NoW valve shal 0oncre stone 61 screw be spur gear CONCRETE CRADLE CONCRETE ARCH type taibi� general backfill W min, .......... ovor-exc�avaflon vat Ve ...... ... .... ..... ...... .. . n IF 8. 81 1 .. ..... .1 to main _nfole i 4" select a,kfill 8'x Erx 16' solid block Water S-X SIX Is - sold block Forced Sewer dia. schedule 40 stool pipe filled with rn crato and ,r,,.d yellow finished 7' grade 2 01 0 T. 18'dia. ji Concrete, aricasoman, ",-TV. BOLLARD DETAIL NOTE! Weep holes shall not be subject to being S1.11[innergect If Installation 18 In an area thaving a high groundwater table, the AuthoiltYs engineer shalt be contscled for hydrant relocation. as required pad V-6' dia. x Er deep finished E_ grade �\ [concrete \9/ 2' min. - 6' max. 1"A V store, stone to be screw type minimum of (r above top of base adjustable Volvo box local Siena alone joint restraintn E marker WA TERLINE DIET41L 3.50' 2,00 1. 120' HUHBELL VIP-1 CUT --OFF rill, MODEL # IVP2CH175QT 47) r-R., -,tz) WXILL-PACK LIGHT DETAIL ISZ P)rl, zt Both joints of the ffIting shall be restrained. In addition, all joints within the recommended length (L) on tho large side of the reducer shall be restrained. RESTRUNED LENGTH OF PIPE (Ft) SM4LL LARGE SIDE JOINT SIVE PVC DIP JOINT 6' 8' 10' 12' 6' 8" 10, 12' 40 60 60 20 40 40 L, 80 40 60 20 40 20 REDUCER L L -I-- L 1--T A In addhion to restraining the connection, any joint that falls within the recommended length (L) shall be restrained. RESTRAINED LENGTH OF PIPE (F0 PVC DIP 6-Enlo. 12' 6. + 8. I IW 12* 60 100 40 40 1 60 60 7.t.5 r a,Fy DEP"I V JA1 R 7.10 WCO" : OF 1:4 705 Ru ur) Q) dE (Z) Z-) 0+00 i- Lr Lr I" [:::�N In addition to restadning each joint of the tee, (1) any joint that falls w�hin the recommended length on the branch outlet (Lb) piping shall be restrained, (2) any joint that falls within the recommended length of the run (straight through) outlets (Lr) shall bi-a restrained. A cross shall be retsirained per a tee's requirements for Lb. A wye shall be restrained per a IeE(s Lr and a 45' bendis 1. requirement. RESTRAINED LENGTH OF PIPE (Ft) TEE PVC DIP r X b Lr Lb Lf Lb 6 X 6 20 20 20 20 8 X 8 20 20 20 20 8 X 6 20 20 20 20 10 X 10 20 20 1 20 20 10 X 8 20 20 RESTRAINED LENGTH OF PIPE (Ft) TEE M(C DIP r X b Lr Lb Lr Lb 10 X 6 20 20 20 20 12 X f2 20 20 20 20 11 X 10 20 20 20 20 12 X 8 20 20 20 20 12 X 6 20 � 20 1 20 TEE, CROSS, WYE In addition to restraining each side of the bend, any joint that falls within the recommended lEingth on each side of the bend shall be restrained. iTYPE RESTRAINED LENGTH OF PIPE (Ft) RESTPAINED LENGTH OF PIPE (Ft) FITTING PVC DIP CEGREE 6" a. 10, 12* 6' 8. 10' 12' 90 20 20 40 $0 20 20 20 40 45 20 20 20 20 20 20 20 20 22.5 20 20 20 .20 20 20 20 20 11.25 20 20 20 ;?o 20 20 20 20 0+50 11100 4A TERUNE PROF1,LE 1 `1=5611 H, 1 lr�=51 I/ finished I U_ 1+50 715 710 7V5 DOWN BEND DEPTH 4 FT, MIN. Ld UP SIEND DEPTH DOWN BEND AESTRAJNED LENGTH Vertical offsets contain down and up bonds. On down bonds, one joint faces hoh7ontal and tl� other points down. On up bends, one joint faces horizontal and the obier points up. Each side of any I vertical offset bend shall be iostrained. In addition,any BEND RESTRAINED LENGTH joint that falls within the recommenclad length on each side cl the filling shall be restrained (Ld, Lu). RESTR41NED LENGTH OF PIPE (Ft) DEPTH OF BURY DEPTH OF BURY -f FT. MIN. 5_112 rT. -11 FT. MIN. 5-12 FT. .9/ZE/f)Pi- DEGREE OF BENDS td (DOWN) Lu (UP) SIZEIME DEGREE OF BENDS �d (DOWN) Lu (UP) 6 . PVC1001 45. 22.5 & 11.25 20 20 10, Pvc 22,5 & 1115 20 2V 8, FIX 45 40 20 10" 01P 45, 22.5 & 11.25 20 20 3, PW 22.5 & 11.25 20 1 20 1'2' MAYP 45 40 20 8, DIP 45, 22.5 & ? 1.25 20 1 21) 12- PW 22.5 & 11.25 20 2V 10* PVC 45 22.5 k 11.25 20 20 concrete mechanic I joint VALVE, DEAD END (PL.UG, FIRE HYDRANT)l HORIZONTAL BEND VERTICA L. OFFS E.7 CONCRETEENCASEMENT 14' thru 36' Swivel too' Ith (7 branch w TRENCH & BEDDING GATE VALVE FIRE HYDRANT ASSEMBLY RIESTRAINED JOINTS - 6" THRU 12" 1 OF 3 RESTRAINED JOINTS - 6"THRU 12" 2 OF 3 RESTRAINED JOINTS - 6"THRILI 12" 3 OF 3 .1- MAR 06 .9- MAR06 -10- APR 06 .2- MAR CIS -3- MAR 06 -4- MAR Of; 0 1 Q C: 81 Q> 4-J C: 0 CL) U a, C: fu (3) Q M > cl� i- 'to =3 :�� U-) _0 C: U r1n, fu Q) Q) U) F I Q, O� 0 (44- 0 ME U-) C/) 0 NOD 00"0+0 CV U-1 (Z) (Z) "T LU rz, n LLJ (n LO U4 ZK LIJ Qj V) Z!: Ll-.j C) ILLJ U4 IX) 'r C Ul 2: LU 0 _J V) LZU-1 < 2: 0 LLJ U �!;, 'r LL_ V) 0 (-) d5 . I z C6 L0 C) > UJ LLI UJ LU 0- CL 0� Ck� LLJ 11", 1r" C) C) zi� 8- < -4 rn 0 > 1�� ftft >0 IC cz, Lf rL Q) Q) Q) 'q7 LLJ LL1 Lij DATE: APRIL 6, 2007 SCALE: 1"=40' FILE NO. 0173 SHEET 2 OF 3 I EROSION & SEDIMENT CONTROL STANDARDS 1. Permanent or temporary soil stabilization shafl be applied to denuded areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant for longer than 30 days. Permanent stabilization shall be applied to areas that are to be left dormant for more than one year, 2, During construction of the project, soil stockpiles and borrow areas shall be stabilized or protected with sediment trapping measures. The applicant is responsible for the temporary protection and permanent stabilization of a# soil stockpiles on site as well as borrow areas and soil intentionally transported from the project site. 3. A permanent vegetative cover shall be established on denuded areas not othenvise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieved that is uniform, mature enough to survive and will inhibit erosion. 4, Sediment basins and traps, perimeter dikes, sediment barriers and other measures Intended to trap sediment shall be constructed as a first step In any land -disturbing activity and shall be made functional before upstream land disturbance takes place. 5. Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions Immediately after installation. 6. Sediment traps and sediment basins shall be designed and constructed based upon the total drainage area to be served by the trap or basin, a. The minimum storage capacity of a sediment trap shall be 134 cubic yards per acre of drainage area and the trap shall only control drainage areas less than three acres. b,Sufface runoff from disturbed areas that is comprised of flow from drainage areas greaterthan or equal to three acres shall be controlled by a sediment basin. The minimum storage capacity of a sediment basin shall be 134 cubic yards per acre of drainage area, The ouffall system shall, at a minimum, maintain the structural integrity of the basin during a twenty-five year storm of 24-hour duration. Runoff coeffrWents used in runoff calculations sha# correspond to a bare earth condition or those conditions expected to exist while the sediment basin is utilized. 7. Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion, Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is con-ected 8. Concentrated runoff shall not flow down curt or fill slopes unless contained within an adequate temporary or permanent channel, flume or slope drain structure. 9. Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. 10. All storm sewer inlets that are made operable during construction shall be protected so that sediment -laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. 11. Before newly constructed storm water conveyance channels or pipes are made operations., adequate outlet protection and any required temporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel. 12. When work In a live watercourse Is performed, precautions shall be taken to minimize encroachment, control sediment transport and stabilize the work area to the greatest extent possible during construction, Nonerodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structures if armored by nonerodible cover materials, 13. When a live watercourse must be crossed by construction vehicles more than twice in any six-month period, a temporary vehicular stream crossing constructed of nonerodible material sha# be provided. 14. AH applicable federal, state and local regulations pertaining to working in or crossing live watercourses shall be met. 15. The bed and banks of a water course shall be stabilized immediately after work in the watercourse is completed. 16, Underground utility lines shall be installed in accordance with the following standards in addition to other applicable criteria: a. No more than 500 linear feet of trench may be opened at one time. b. Excavated material shaH be placed on the uphffl side of trenches. c, Effluent from dewaterIng operations shall be filtered or passed through an approved sediment trapping device, or both, and discharged in a manner that does not adversely affectflowing streams or off -site property, d, Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote stabilization. e, Restabilization shall be accomplished in accordance with these regulations. f Applicable safety regulations shall be complied with, 17, Where construction vehicle access routes Intersect paved or public roads, pro visions shall be made to minimize the transport of sediment by vehicular tracking onto the paved surface, Where sediment is transported onto a paved or public road surface, the road sufface shall be cleaned thoroughly at the end of each day. Sediment shall be removed from the roads by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner, This provision shall apply to individual development lots as well as to larger land -disturbing activities, 18.A# temporary erosion and sediment control measures sha# be removed within 30 days after final site stabilization or after the temporary measures are no longer needed, unless othelw1se authorized by the local program authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures sha# be permanently stabilized to prevent Anther emsion and sedimentation. 19. Properties and waterways downstream from development sites shall be protected from sediment deposition, erosion and damage due to increases in volume, velocity and peak flow rate of stormwater runoff for the stated frequency storm of 24-hour duration in accordance with the following standards and criteria: EROSION & SEDIMENT CONTROL NARRATIVE Piviect DesCriDdon This site is located at 121 Mercedes Court on the west side of the Interstate 81 southbound off -ramp at exit 317. The purpose of this development is to remove the existing office and parts room from the automotive repair shop and place a new 40�400'addltion that will contain the new offices, parts room, and showroom. The net gain on the building will be 2,600 sf There is not any additional site work planned since the parking, water, sewer, and stormwater management pond are Installed, Existing Site Conditions This area has been developed over the years, This project is primarily a remodeling pmject, A diacent Parcels The surrounding areas are industrial or business zoned lots that are fully developed. The runoff from the site drains to the existing pond on site. Off -Site Areas All work will remain on site. soils The soils types determined from the USDA's "Soils Survey of Frederick County, VA shows Oaklet Silt Loams (#328) with rock outcroppIngs Indicating Fredick Pop limento These soils have medium erodibility and runoff Critical Erosion Areas This area is known for Karst topography and contains limestone outcmppings and clay that can be managed by silt fence. Special attention should be paid for evidence of any sinkholes on this site during the construction process. Erosion & Sediment Control Measures All vegetative and structural erosion and sediment controlpractIces shall be constructed and maintained according to minimum standards and specifications of the handbook. Structural Practices install silt fence Grade site and seed all exposed surfaces immediately upon reaching final grade General Erosion and Sediment Control Notes (VESH Table 6-1) ES-1, Unless otherwise indicated, all vegetative and structural erosion and sediment control practices will be constructed and maintained according to minimum standards and specifications of the Virginia Erosion and Sediment Control Handbook and Virginia Regulations 4VAC50-30 Erosion and Sediment Control'Regulations, ES-2, The plan approving authority must be notified one week prior to the pre -construction conference, one week prior to the commencement of land disturbing activity, and one week prior to the final inspection. ES-3, All erosion and sediment control measures are tv be placed prior to or as the first step in clearing. ES-4, A copy of the approved erosion and sediment control plan Shall be maintained on the site at all times. ES-5. Prior to commencing land disturbing activities in areas other than indicated on these plans (including, but limited to, off -site borrow or waste areas), the contractor shall submit a supplementary erosion control plan to the owner for review and approval by the plan approving authofity� ES-6. The contractor is responsible for Installation of any additional erosion control measures necessary to prevent erosion and sedimentation as determined by the plan approving authodty� ES-7. All disturbed areas are to drained to approved sediment control measures at a# times during land disturbing activities and during site development until final stabilization is achieved. ES-8. During de watering operations, water will be pumped into an approved filtering device. ES-9, The contractor shall inspect a# erosion control measures periodically and after each runoff -producing rainfall event, Any necessary repairs or cleanup to maintain the effectiveness of the erosion control devices shall be made immediately. General Note: The Erosion & Sediment Control Inspector will retain the fight to add to or modify these erosion and sediment control measures during the construction process, within reason, to ensure adequate protection to the public and environment. (WITH WIRE SUPPORT) 1. SET POSTS AND EXCAVATE A 4X4' 2. STAPLE WIRE FENCING TO THE POSTS. TRENCH UPSLOPE ALONG THE LINE OF POSTS. ;__10 FLOW 3. ATTACH THE FILTER FABRIC TO THE YARE FENCE AND EXTEND IT INTO THE TRENCH. I-, FLOW 4. BACKFILL AND COMPACT THE EXCAVATED SOIL EXTENSION OF FABRIC AND YARE INTO THE TRENCH. FILTER FABRIC VARE SOURCE: AdODted from Jostaktion of Straw and Fobdc Filter Barrim for Sedimnt Cont 9mocd A ** PLATE. 3.05-1 —1, — I- I - Total land disturbance will be less man 4500 sf. IU-) (Z) CZ1 (Z� (:) =3 W C Ln 0 CD U I C 0 C (Z) 'U:7) "0 r'4 >1 M C3 N Roo Q� CDQ) i5 Z C� 06 0 r_J Ln C' CX ;�E ci� ;3Z Q 4 LA' In -'T ;z- ck� tij :K t'J CZ, �_J Z Z--. L4 14- --J ;E iz cc �E Q) Ln 0 2: 0 LU 0 Z'_ C6 U) C)o > UJ LU cx� 3- Ln Cr LU U-1 Of W LU ty C1. C.) 75 C, C�11 Z) LLj �jc QJ UJ C) P4 Lc o U) Ck� _4 11-S DATE: APRIL 6, 2007 SCALE: 1" = 20' FILE NO. 0173 SHEET 3 OF 3 .. \ r'.