EROSION AND SEDIMENT CONTROL NARRATIVE
PRWECT DEMPIION
itds pmjxt outrras the comt ucttan d a 240 of Storage Wftg and Is ftdom exempt from cWm=tcr
rMhments.
1. AN INSPECTIO14 BY THE FIRE MARSHALL'S OFFICE WILL DETERMINE
WHERE CURBING MUST BE PAINTED YELLOW.
2. "NO PARKING - FIRE LANE" SIGNS WILL BE PLACED ON THE SITE
AT THE FIRE MARSHALCS DISCRETION.
3. CONTRACTOR MUST ROTATE THE FIRE HYDRANT TO THE DIRECTION
AS DETERMINED BY THE FIRE MARSHALL.
T�
NONE PROVIDED
1. BOUNDARY AND TOPOGRAPHY SHOWN HEREON WAS TAKEN FROM
SITE PLAN APPROVED ON 5/21/91 (#006-91)
BUBBLEWORKS CARWASH:
GEORGE DOWERY (540) 678-8746
ENGINEERING FIRM:
ARTZ & ASSOCIATES, PLC (540) 667-3233
ZONING ENFORCIEMENT:
DEPARTMENT OF PLANNING (540) 665-5651
SITE INSPECTIONS:
DEPARTMENT OF INSPECTIONS (540) 665-5650
EROSION AND SEDIMENT CONTROL:
DEPARTMENT OF PUBLIC WORKS (540) 665-5643
SANITARY SEWER AND WATER:
FREDERICK COUNTY SANITATION AUTHORITY (540) 868-1061
TELEPHONE: VERIZON (301) 954-6282
ELECTRIC: ALLEGHENY POWER (800) 654-3317
GAS: SHENANDOAH GAS COMPANY (540) 869-1111
MISS UTILITY: 1-800-257-7777
VDOT General Notes
V1. All work. on. this project shall conform to the latest editions of the Virginia Department of
Transportation (VDOT) Road and Bridge Specifications and Standards, the Virginia Erosion and Sediment
ad Control Regulations and any other state, federal or local regulations applicable. , In the event 'of
conflict between any of. these standards; specifications or plans, the most' stringentshall govern.
V2. All construction shall comply with . the latest U.S. Department of Labor, Occupational Safety and
Health Administration and VOSH Rules and Regulations.
V3. When working on VDOT right=of-►ray, all traffic control, whether permanent or temporary, shall be
in accordance with the current edition of VDOT's work area protection manual. 'Furthermore, all traffic
control floggers must be certified in accordance' with the latest edition of the VDOT . Road and Bridge
Specifications, Section 104.04-C.
V4 The developer 'shall be responsible for relocating, at his expense, any and all utilities, including:
traffic signal poles, junction boxes, controllers, etc. ormed by VDOT or .private utility" company. It is
the sole responsibility of the developer to locate and ' identify utility facilities or items which -may be in
conflict with the proposed construction activity. VDOt approval of these plans does ' 'not relieve the
developer of this responsibility.
V5. Design features relating to field construction, regulations, and control or safety of traffic may be.
subject to change as deemed necessary by VDOT. Any additional expense incurred :as a result of any
field revision will be the responsibility of the developer.
V6. Prior to initiation of work, the contractor shall be'. responsible for acquiring all necessary VDOT
land use permits for any work on VDOT right -of -slay, '
V7.. If required by the local VOOT Residency Office, a ore -construction conference must be arranged
and held by the engineer and/or developer with the attendance of the contractor, various County
agencies, utility companies and VDOT prior to initiationof work.
V8. The contractor shall notify the local VDOT Residency Office when work is to. begin or cease for
any undetermined length of time. VDOT will also require 48, hours notice for any inspection.
V9. The contractor will be responsible for maintaining adequate access .to the project from the
adjacent public roadway through .construction and maintenance of a construction entrance in
accordance with the Yrinia Er_osion--andSe ' ! rQl Handbook, Section 3.02. Furthermore,
access. to ' other properties affected by this project shall be maintained through construction. The
Developer shall have, within the limits of the project, on employee certified by the:`. Department of
Consetvation and Recreation in ' Erosion and Sediment Control who shall inspect erosion and siltation
control devices and measures for proper installation and deficiencies immediately after each* rainfall,
at least daily during prolonged - rainfall, and weekly when no rainfall event occurs...
V10. Contractor shall ensure adequate drainage is achieved and maintained on the , site during and at
the end of construction.
Vt1. All water and sewer lines within existing or proposed VDOT right-of-way are to have minimum
36" cover and when possible shall . be installed under ; roadway drainage facilities at .conflict points.
V12. Any unusual subsurface conditions encountered during the course of construction shall be
immediately brought to the attention of the engineer and VDOT. Work shall cease in that. vicinity until
an adequate design can be determined by the engineer and approved by VDOT.
V13. All fill areas, borrow material and undercut areas shall be inspected an approved by VDOT
representative prior to placement and fill. Where ' CBR testing is required, a VDOT representative. shall
be present to insure the sample obtained is representctive of the location. When soil samples are
submitted to private laboratories for testing, the samples shall be clearly - identified and labeled as
belonging to a project which will .be accepted by VOOT and that testing shall be conducted according
to all applicable VDOT standards.
V14. All roadway fill, base,' subsurface material and-backfill of utility/storm sewer trenches shall be
compacted in 6" lifts to 95% :of theoretical maximum density as 'determined by AASHTO T-99 Method
A, within plus or minus 27a of ' optimum . moisture for Ahe full width of any dedicated street .
right-of-way. At the direction of VDOT Inspector, dc:;Fity tests performed by a - qualified independent
agency shall be conducted as required in the VDOT Road and Bridge Specifications. A copy of all
tests shall be submitted to VDOT prior to final VDOT approval.. .
V15. VDOT Standard CD and UD under -drains shall be installed where indicated on these plans and
further where. determined necessary. by VOOT Inspector.
V16. The installation of any entrances. and mailbo= within any dedicated street right-of-way shall
meet VDOT minimum: design standards and is the responsibility of the : developer.
V17. Prior to acceptance by WIDT of any streets, an'y required street 'signage and/or pavement
markings must be installed -by the developer . or at V00T's discretion, by VDOT on an account
receivable basis. Stop signs shall be'thirty (30) ;'1clies. tall with high intensity sheeting. The bottom
of the sign shall be six (6) feet :above the edge os cuvement and the post shall be Installed a
minimum of four` (4) feet from the edge of pavement. Sign 'posts shall be of a type found on
VOOT's approved list. A copy. of : this list may be o&'.* d from. the District Material Section. Contact
the local VDOT residency office with any questions regarding sign material and placement.
V18. The developer must provide. to the, Iocol , VDOT office a list..$ all material sources` prior to
construction. Copies of all invoices for materials within any dedicated street right of'way must be
provided to the local VDOT residency .office prior to acceptance -of the work. Unit and total prices
may be obscured.
V19. Aggregate bases and sub -bases'., shall : be placed on the .sub -grade by means of a mechanical
spreader. Density will be determined using the density control. strip as specified in VDOT's "Road and
Bridge Specifications°(Section 304) and VW-10. A certified compaction technician shall perform these
tests. A certified copy of the test results shall be provided to the Residency Office. ' In addition to
checking stone depths, A VDOT representative shall be notified and given the opportunity .to be present
during the construction and testing of the density control strip:
V20. Asphalt concrete pavement shall be placed in accordance with the latest edition of VDOT's "Road
and Bridge Specifications"(Section 315).. Density will be determined using the density control strip as
specified in Section .315 and. VTM-76. A certified compaction technician shall perform these tests. A
certified copy of the test results shall be provided to the Residency Office. A VDOT representative
shall be notified and given the opportunity to be present during the construction and: testing of the
control strip.
V21. Approval of .these plans ' shall expire three (3) years from the date of the approval letter.
r=1•�/liaaa/11A It A& fir-, /.ten=m\G?AA PO& aeon /A/1n. nC.•�'1 rn m. n10:hC.WM1%*
GENERAL EROSION AND SEDIMENT CONTROL NOTES
ES-1: Unless othervise indicated, all vegetotive .and structural erosion and sediment control practices will be
constructed and maintained according to minimum standards and specifications of the inia Eroslor and
Sediment Control Handbook and.. Virginia, Regulations VR 625-02-00 Erosion and Sediment Control
Regulations.
ES-2: The plan approving authority must be notified one week prior .to the preconstruction conference, one
week prior to the commencement of land disturbing actil►ity, and one week prior to the final inspection.
ES-3: All erosion- and sediment' control measures are to be placed prior to or as first step in clearing.
ES-4: A copy of the approved erosion and sediment corilyd plan shall be maintained on the site at aU
times.
ES-5. Prior to commencing land disturbing activities in areas other. than indicated on these plans, (including,
but not limited to, .off -site borrowr;or waste areas), the contractor shall submit a supplementary erosion
control plan to the. owner for review and. approval by the; plan approving authority.
ES-6: The contractor is responsible for installation of any additional 'erosion control measuresnecessary to
prevent erosion and sedimentation as determined by' the plan approving authority.
ES-7: All disturbed areas are to drain to approved sediment control measures at all times during .land
disturbing activities and during site development until final stabilization is achieved.
ES-8: During dewatering operations, water will be pumped into approved filtering device.
ES-9: The contractor shall inspect, all erosion control measures periodically and after each runoff -producing
rainfall event. Any necessary repairs or cleanup to maintain the effectiveness of the erosion control devices
shall be made immediately.
Permanent or temporary soil stabilization shall be applied to deni ded a eas` within seven days after
final grade is reached on any portion of this site. Temporary s I stab ization shoal be applied within
seven; ,days to denuded areas that may not be at final grade bu will r imain dormant for longer
than 30, ;days. Permanent stabilization shall be applied to areas that ' re to be left dormant for
morn ' l`hot one year.
Durigg construction of the project, soil stockpiles and borrow are is sha I be stabilized or protected
with ;sediment trapping measures. The applicant is responsible f r the emporary protection and
permanent stabilization of all soil stockpiles ,on site as well as borrow i reas and soil intentionally
transportod from the project site.
Sediment, basins and traps, perimeter dikes, sediment barriers onJ othe mic-cures intended to trap
sediment k shall be constructed as a first step in any land. disturt ing ac ivity .and shall be made
funcV6nol before upslope land disturbance takes place.
Stabilisation measures shall be applied to eqrthen structures sucl as dims, dikes and diversions
immediately after installation.
Unde�jm and utility lines shall be installed in accordance with the follow ng standards in addition to
other gpplicable criteria:
-No,Y,more than 500 linear feet of trench may be opened at ode time.
-Excavated material shall be placed or the uphill side of the tench.
-146' from dewatering operations shall be filtered or passed th-ough an
approved sediment trapping divide or both, and discharged In a maniier that
does: not adversely affect flowing streams for off -site property.
-Mat.00:1 used for back filling trenches shall be properly compacted i order
to minimize erosion and promote stabilization.
-Res shall be accomplished in accordance with the r gulati ns.
-Aplicable safety regulations shall be complied with.
Whe s� construction vehicles access routed Jrtersect paved or public roads, provisions shall be made
to mirjdize the transport of sediment by vehicular tracking onto the p ved surface. Where sediment
is kransported onto a paved or public road ,'surface, the road su lace thall be cli;aned thoroughly at
the srld 'of each day. Sediment shall be removed from the roe s by hoveling or sweeping and
traimsParted to a sediment control disposal area. Street washing shall b allowed only after sediment
is removed in this manner. This provision shall apply to individual dev lopment Iats as well as to
larger: land -disturbing activities.
All temporary erosion and sediment control measures shall be removed within 30 days after final site
stabilisation or after the temporary measures are no longer neei ed, u less otherriise authorized by
the" local• program authority. Trapped sediment and the disturbs soil reas res►Iting from the
disposition of temporary measures shall be permanently stabilize to pi event furtl►er erosion and
sediiMentation.
F;,GENERAL NOTES
N PW
1. PFITMIXS MUST BE ISSUED FROM VDOT PRIOR 10 ANY CONSTR CTION
,ti? xA ,pl1BLIC, RIGHT 'OF WAY.
2. THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) MUST
B ADHERED TO WHEN WORKING IN A PUBLIC RIGHT OF .WAY.
3. 'ay„ E CONTRACTOR WILL REMOVE ALL MUD AND DEBRIS FROM E
h,P,84i RIGHT ,OF WAY THAT IS LEFT BY VEHICLES ENTERING ND
6��►MNG THE SITE.
4. 4 t„DAMAGE ON NEIGHBORING PROPERTY AND THE COUNTY ROADS
ffi11: SIDEWALKS CAUSED BY THE DEVELOPMENT OF THIS SITE WILL BE
'c RESPONSIBILITY OF THE DEVELOPER. ALL DAMAGE MUST B REPA RED
10'-< ORIGINAL CONDITIONS.
5. 'CONSTRUCTION ENTRANCE MUST BE INSTALLED IN ACCORDAN E WIT
I
'VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK" S CT10N2 t-THE t, )ATTRACTnR MUST MAINTAIN THIS P ^CESS FOR THE DUI
ON
OFF THE PROTECT:
6 TI:1E; ,CONTRACTOR WILL BE RESPONSIBLE FOR THE POSITIVE DF Altwm
QP?i THIS SITE.
7. V 'CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL REQUIRED IN D
DIMS RBANCE PERMITS PRIOR TO CONSTRUCTION.
8. "At CONSTRUCTION WILL BE DONE FOLLOWING THE LAWS AND
'40EUNES SET FORTH BY OSHA AND VOSH.
9.3 .,E;CONTRACTOR WILL NOTIFY ARTZ AND ASSOCIATES AT (540
:68 �43233 OF ANY DISCREPANCIES BMVEEN THE APPROVED P ANS A 4D
1XISTING SITE CONDITIONS.
10,� 5tIE. DEVELOPER IS RESPONSIBLE FOR THE RELOCATION OF A 1Y
ITUi3ES REQUIRED BY THIS SITE PLAN.
11 EROSION AND SEDIMENT CONTROL DEVICES SHOWN IN THIS SITE
h�LL.-
�;ARE TO BE INSTALLED PRIOR 10 CONSTRUCTION.12. CONTROLLED FILL MUST BE COMPACTED TO A MINIMUM F 957,
Oc-NSITY FOLLOWING METHOD ''A' OF THE STANDARD PROCTOR STM- 698,
WO-T99, OR VTM-1 AS APPLICABLE. 'AY FILL PLACED UN ER
-iWkDINGS, STRUCTURES, OR PAVEMENT Wsr BE INSPECTED D
APPROVED BY A. PROFESSIONAL SOILS ENGINEER. A GEOTECHNI AL
SUPERSEDES THIS NOTE IF PROVIDED.
1111HE CONTRACTOR IS RESPONSIBLE FOR CONTACTING MISS UT LITY
;CI�'OR TO ANY SITE WORK. ALL UTILITIES SHOWN ON THIS PLAIT ARE .
,APPROXIMATE LOCATIONS AND NOT ALL -UTILITIES MAY BE SHO N.
1 & .��Y WATER AND SANITARY SEWER CONSTRUCTION, MODIFICATI N, OR
C REPAIRS WILL BE IN ACCORDANCE WITH THEE CURRENT STAND DS AN
SPECIFICATIONS SET BY THE CITY OF WINCHES'fER DEPARTMEN OF P JBLIC
WORKS. THE CONTRACTOR WILL OBTAIN ALL NECESSARY PERMI S AND
COORDINATE THE WORK WITH PUBLIC WORKS.
15'.. THE CONTRACTOR WILL CONTAIN ALL . LITTER AND DEBRIS ON SITE.
VE'ilWORK MUST BE LEFT IN AN ORDERLY Ma'VNER AT THE E D OF
,C WORK DAY.
16..: A6L APPROVED SET OF SITE PLANS MUST BE ON SITE DURING THE
CONSTRUCTION PROCESS.
1 Tti' CONTRACTOR WILL NOTIFY ALL UTILITY COMPANIES PRIOF TO
EXCAVATION' WITHIN EASEMENTS.
18';1?E CONTRACTOR WILL SEED AND STRAW ANY DISTURB AREA THAT
t"fl!1' BE LEFT FOR MORE THAN THIRTY DAYS FOR SOIL STABIL ZATION
4 1y 1.
FI,
' Ir.
THERE ARE NOT ANY SINKHOLES RIVERS, STREAMS,
h A; STEEP SLOPES, WOODLANDS OR ANY ENVIRONMENTAL
ti FEATURES THAT WILL IMPACT THI SITE DEVELOPMENT
(OTHER THAN LIMES ONE OF COURSE)
i'
xr 5 r. �; •
t•
J 1' •
I.
,0
7
PROJECT DA1A:
r Jtt�7�.
41cd��f
TOTAL AREA OF SITE:
CURRENT ZONING:
CURRENT USE:
PROPOSEDSTRUCTURE:
BUILDING HEIGHT ALLOWED:
BUILDING HEIGHT PROPOSED:
F.A.R.:
FRONT:
LEFT:
RIGHT:
REAR:
BUILDIhO SETBACKS PROPOSED
FRONT:
LEFT:
RIGHT:
REAR:
VICINITY MAP 1 " = 500'
0.98 ACRES
131
CAR WASH
STORAGE SHED
35' MAX.
10,
1.0
131
50'
0
0
201.2'
53.1'
67.4'
51.1'
I PROJECT:
DUB
B
LEWOR
KS
CARWASH..
SITE INFORMATION:
ADDRESS: 1033 AYLOR ROAD
TM #74 . ((A)) 104
II ZONED: B-1
INSTRUMENT #030009698
USE: CARWASH (EXISTING)
OWNER/DEVELOPER:.
I�
UPPERC UST LLhC
112-A BRUCE DRIVE
WI CHESTER, VA 22601
540) 7678-8 746
SEAL AND SIGNATURE
MICHAEL M. ARTZ v
No. 1513
1,_ ® SURVE' O'�
UMICHAELM.
THESE PLANS ARE IN CONFORMANCE WITH COUNTY 0114
OF FREDERICK STANDARDS AND ORDINANCES. ANY DEVIATION
OR CHANGE IN THESE PLANS SHALL BE APPROVED BY
THE ZONING ADMINISTRATOR -, PRIOR TO CONSTRUCTION.
rUzl
FREDERICK COUNTY PUBLIC WORKS APPROVAL
v U
Z
Q
DIRECTOR DATE
FREDERICK COUNTY PLANNING DEPARTMENT APPROVAL o
Z
U3
PLAN REVIEWER DATE a
FREDERICK COUNTY ..ZONING APPROVAL UJ p Q a
n-n O
Mon 0
014 M.M a00
�da
ZONING ADMINISTRATOR DATE Z
/o
THIS SITE PLAN IS VALID FOR (5) FIVE
YEARS FROM THIS DATE OF APPROVAL ASub and AssociatesPL
A Subsidiary of Vallee EnslneerinR, PLC
LAND SURVEYING LAND PLANNING DEVELOPMENT
16 East Piccadilly Street
VANCHEM. VA 22601-4740
TEL 540-667-3233 FAX 540-667-9188
TOLL FREE 1-800-755-7320
OCTOBER 31, 2005
PROJECT #21521
SHEET 2 OF 2
L=192.68'Al
R=2819.79
6=03'54'54"�
/
C LEN=192.64
BRG=N 34'12'29" E
DI
if
1
1
11\
�
\
1
0
L.,
0
e
q
;i
.'1 c t S'r-'y *-1/v
�I� • I
T6v #74B-7-2-27
^�A' T 9 -ArMfl4,� �1L
f J f ZONED RP
USE: RESIDENTIAL
TPA0749-5-1-® ; j �I ' i i j I if
WILLIAInd �. STD �(�(�L
j" ZONED 81
USE: DENTIST OFFICE
I
rr...• dr.rrrrr—
• �•iGf.�. r....��—��..r rs wr, r,..,r-r. -..� •-�-.y r���r r..�._r�+ r.r ....... + •�!_..r. r....--...- ,caa`"•v-'.,,,,n. •.....
SECTION 2
EXISTING BUILDING ��
2,4 1 SF h
E AST \ \�
ZEE 4�7 i
\ SIR N 1 `�
\ N C PE
PROP. STORAG
240ESF ` �PIUi�N
vt
yl it BAY
SELF WASH a I
1,500 SF n I I I ,� "-`.`%•o
LOT o0 00
0O9 U V O CDO
rl ` i — 201.20' f
ov
El We. 1
X.
�r f '
1
TM 748-7-2-28
KEVIN R. 41 STACEY E.
CHAP14AN
003®02-3g195
ZONED RP
USE: RESIDENTIAL
ROSER Q. 8i C'VNTHIA A.
EXIST LAYMAN
b� Z
C&G \ 672/507
I ` \ ZONED RP
USE: RESIDENTIAL
IST r 1 1
I
41"W 9
00
cX,4 INC
�4 '36 545✓
I USE: VACANT 1 j
1 � �
i
f,
w
0
MICHAEL M. AP, T Z v
No. 1513
r05
SURVE-o�
�U
0\�
01141
o�
� � a
Q
a LLfl, V o
O a�
z��do
a ME()
c�
Artz and Associates, PLC
A Subsidiary of Volley Enpineering, PLC
AND SURVEYING LAND PLANNING DEVELOPMENT
16 East Piccadilly Street
UNCHESTER, VA 22601-4740
TEL 540-667-3233 FAX 540-667-9188
TOLL FREE 1-800-755-7320
OCTOBER 31, 2005
SCALE 1" = 20'
PROJECT #21521
SHEET 2 OF 2
VDOT GENERAL NOTES
SELECT MINIMUM STANDARDS
Fis
VDOT General Notes
SELECT MINIMUM STANDARDS
EROSION AND SEDIMENT CONTROL NARRATIVE
v1. All work on this project shall conform to the latest editions of the Virginia Department of
Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after
�'
3®,
��
PFAW oESCIOMM
Transportation (VDOT) Road and Bridge Specifications and Standards, the Virginia Erosion and Sediment
final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within
as> '�►
fhb projed MOM w0 00rAbUCUM of a 240 r sb°' W sump W ` 110610 mmpt horn ieori"'°"'"°'°°'""�
Control Regulations and any other state, federal or local regulations applicable. In the event of
seven days to denuded areas that may not be at final grade but will remain dormant for longer
��'''
conflict between any of these standards, specifications or plans, the most stringent shall govern.
than 30 days. Permanent stabilization shall be applied to areas that are to be left dormant for
�' 's 3 J
v2. All construction shall comply with the latest U.S. Department of Labor, Occupational Safety and
more that one year.
�, e S ,
Health Administration and VOSH Rules and Regulations.
V3. When working on VDOT right-of-way, all traffic control, whether permanent or temporary, shall be
During construction of the project, soil stockpiles and borrow areas shall be stabilized or protected
in accordance with the current edition of VDOT s work area protection manual. Furthermore, all traffic
with sediment trapping measures. The applicant is responsible for the temporary protection and
PP 9 PP P P ry P
control flaggers must be certified in accordance with the latest edition of the VDOT Road and Bridge
permanent stabilization of all soil stockpiles on site as well as borrow areas and soil intentionally
Specifications, Section 104.04-C.
transported from the project site.
�
�° 1 �'
Z
v4 The developer shall be responsible for relocating, at his expense, any and all utilities, including
traffic signal poles, junction boxes, controllers, etc. owned by VDOT or private utility company. It is
dikes, sediment barriers and other measures intended to erimeter , Sediment basins and traps, trap
s
P P P
�,' " � o �,
N
O
the sole responsibility of the developer to locate and identify utility facilities or items which may be in
sediment shall be constructed as a first step in any land disturbing activity and shall be made
conflict with the proposed construction activity. VDOT approval of these plans does not relieve the
functional before upslope land disturbance takes place.
developer of this responsibility.
V5. Design features relating to field construction, regulations, and control or safety of traffic may be
Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions
''�
subject to change as deemed necessary by VDOT. Any additional expense incurred as a result of any
immediately after installation.
'�, 710 �, ►
e
field revision will be the responsibility of the developer.
V6. Prior to initiation of work, the contractor shall be responsible for acquiring all necessary VDOT
Underground utility lines shall be installed in accordance with the following standards in addition to
,
land use permits for any work on VDOT right-of-way.
PP criteria:
applicable other a
'� '� 7.4 J6 36 `� a
v7. If required by the local VDOT Residency Office, apre-construction conference must be arranged
-No more than 500 linear feet of trench may be opened at one time.
y P
�,
sa �> > ¢9C
and held by the engineer and/or developer with the attendance of the contractor, various County
-Excavated material shall be placed on the uphill side of the trench.
' �,' ° C D3
agencies, utility companies and VDOT prior to initiation of work.
-Flow from dewatering operations shall be filtered or passed through an
rfa P ke
v8. The contractor shall notify the local VDOT Residency Office when work is to begin or cease for
approved sediment trapping divide or both, and discharged in a manner that
'6.
any undetermined length of time. VDOT will also require 48 hours notice for any inspection.
V9. The contractor will be responsible for maintaining adequate access to the project from the
ff l d t adversely affect
does not flowing streams or off -site property.
-Material used for back filling trenches shall be properly compacted in order
.B
,�,e�� �� 1�
146q ., 6
10�
LLJ
adjacent public roadway through construction and maintenance of a construction entrance in
to minimize erosion and promote stabilization.
-Restabilization shall be accomplished in accordance with the regulations.
1a�F �� ' C..,12 1"14
I% V 3 15 a,
o
accordance with the Virginia Erosion and Sediment Control Handbook, Section 3.02. Furthermore,
access to other properties affected by this project shall be maintained through construction. The
-Applicable safety regulations shall be complied with.
Developer shall have, within the limits of the project, an employee certified by the Department of
Where construction vehicles access routed intersect paved or public roads, provisions shall be made
Conservation and Recreation in Erosion and Sediment Control who shall inspect erosion and siltation
to minimize the transport of sediment by vehicular tracking onto the paved surface. Where sediment
control devices and measures for proper installation and deficiencies immediately after each rainfall,
is transported onto a paved or public road surface, the road surface shall be cleaned thoroughly at
OF
at least daily during prolonged rainfall, and weekly when no rainfall event occurs.
the end of each day. Sediment shall be removed from the roads by shoveling or sweeping and
transported to disposal Street be
LTH
�•p
V10. Contractor shall ensure adequate drainage is achieved and maintained on the site during and at
a sediment control area. washing shall allowed only after sediment
"
the end of construction.
is removed in this manner. This provision shall apply to individual development lots as well as to
VICINITY MAP 1 = 500'
ti
V11. Al water and sewer lines within existing or proposed VDOT right-of-way are to have minimum
larger land -disturbing
largg activities.
o
o MICHAEL M. A TZ D
36' cover and when possible shall be installed under roadway drainage facilities at conflict points.
v12. Any unusual subsurface conditions encountered during the course of construction shall be
All temporary erosion and sediment control measures shall be removed within 30 days after final site
stabilization or after the temporary measures are no longer needed unless otherwise authorized by
No. 1 13
immediately brought to the attention of the engineer and VDOT. Work shall cease in that vicinity until
the local Trapped the disturbed from the
PROJECT DATA:
C
an adequate design can be determined by the engineer and approved by VDOT.
program authority. sediment and soil areas resulting
disposition temporary be to further and
PROJECT:
�
v13. All fill areas, borrow material and undercut areas shall be inspected an approved by VDOT
of measures shall permanently stabilized prevent erosion
TOTAL AREA OF SITE: 0.98 ACRES
� O�
SURVEY
representative prior to placement and fill. Where CBR testing is required, a VDOT representative shall
sedimentation.
CURRENT ZONING: 61
be present to insure the sample obtained is representative of the location. When soil samples are
CURRENT USE: CAR WASH
BUBBLEWORKS
submitted to private laboratories for testing, the samples shall be clearly identified and labeled as
PROPOSED STRUCTURE. STORAGE SHED
belonging to a project which will be accepted by VDOT and that testing shall be conducted according
GENERAL NOTES
BUILDING HEIGHT ALLOWED: 35' MAX.
CARWASH
to all applicable VDOT standards.
BUILDING HEIGHT PROPOSED: 10'
V14. Al roadway fill, base, subsurface material and backfill of utility/storm sewer trenches shall be
1. PERMITS MUST BE ISSUED FROM VDOT PRIOR TO ANY CONSTRUCTION
F.A.R.: 1.0
compacted in 6' lifts to 95% of theoretical maximum density as determined by AASHTO T-99 Method
IN A PUBLIC RIGHT OF WAY.
2. MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES MUTCD MUST
BUILDING SETBACK REQUIREMENTS B1
SITE INFORMATION:
A, within plus or minus 2% of optimum moisture for the full width of any dedicated street
right-of-way. At the direction of VDOT Inspector, density tests performed by a qualified independent
BE ADHERED TO WHEN WORKING IN A PUBLIC RIGHT OF
F WAY.)
FRONT:550'
ADDRESS: 1033 AYLOR ROAD
ons. A copy of all
agency shall be conducted as required in the VDOT Road and Bridge Specifications.
3. THE CONTRACTOR WILL REMOVE ALL MUD AND DEBRIS FROM THE
RIGHT OF WAY THAT
LEFT:
RIGHT: 0
TM #74 - ((A)) - 104
tests shall be submitted to VDOT prior to final VDOT approval.
PUBLIC IS LEFT BY VEHICLES ENTERING AND
V15. VDOT Standard CD and UD under -drains shall be installed where indicated on these plans and
LEAVING THE SITE.
REAR: 0
ZONED: B-1
further where determined necessaryb VDOT Inspector.
y
4. ANY DAMAGE ON NEIGHBORING PROPERTY AND THE COUNTY ROADS
BUILDING SETBACKS PROPOSED
INSTRUMENT #030009698
v16. The installation of any entrances and mailboxes within any dedicated street right-of-way shall
AND SIDEWALKS CAUSED BY THE DEVELOPMENT OF THIS SITE WILL BE
THE RESPONSIBILITY OF THE DEVELOPER. ALL DAMAGE MUST BE REPAIRED
FRONT: 201.2'
USE: CARWASH (EXISTING)
FIRE MARSHALL GENERAL NOTES
meet VDOT minimum design standards and is the responsibility of the developer.
v17. Prior to acceptance by VDOT of any streets, any required street signage and/or pavement
TO ORIGINAL CONDITIONS.
LEFT: 53.1'
RIGHT: 67.4'
OWNER/DEVELOPER;:
1. AN INSPECTION BY THE FIRE MARSHALL'S OFFICE WILL DETERMINE
markings must be installed by the developer or at VDOT's discretion, by VDOT on an account
5. A CONSTRUCTION ENTRANCE MUST BE INSTALLED IN ACCORDANCE WITH
`VIRGINIA
REAR: 51.1'
WHERE CURBING MUST BE PAINTED YELLOW.
receivable basis. Stop signs shall be thirty (30) inches tall with high intensity sheeting. The bottom
THE EROSION AND SEDIMENT CONTROL HANDBOOK» SECTION
UP'PERCRUST
»
2. NO PARKING - FIRE LANE SIGNS WILL BE PLACED ON THE SITE
of the sign shall be six (6) feet above the edge of pavement and the post shall be installed a
3.02. THE CONTRACTOR MUST MAINTAIN THIS ACCESS FOR THE DURATION
OF THE PROJECT.
LLC
AT THE FIRE MARSHALLS DISCRETION.
minimum of four (4) feet from the edge of pavement. Sign posts shall be of a type found on
6. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE POSITIVE DRAINAGE
112-A BRUCE DRIVE
VDOT's approved list. A copy of this list may be obtained from the District Material Section. Contact
of THIS SITE.
WINCHESTER, VA 22601
3. CONTRACTOR MUST ROTATE THE FIRE HYDRANT TO THE DIRECTION
the local VDOT residency office with any questions regarding sign material and placement.
7. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL REQUIRED LAND
(540) 7678-8746
AS DETERMINED BY THE FIRE MARSHALL
V18. The developer must provide to the local VDOT office a list of all material sources prior to
DISTURBANCE PERMITS PRIOR TO CONSTRUCTION.
construction. Copies of all invoices for materials within any dedicated street right of way must be
8. ALL CONSTRUCTION WILL BE DONE FOLLOWING THE LAWS AND
STEAL AND SIGNATURE
provided to the local VDOT residency office prior to acceptance of the work. Unit and total prices
GUIDELINES SET FORTH BY OSHA AND VOSH.
TRIP GENERATION DATA
maybe obscured.
V19. Aggregate bases and sub -bases shall be placed on the sub -grade by means of a mechanical
9. THE CONTRACTOR WILL NOTIFY ARTZ AND ASSOCIATES AT (540)
667-3233 OF ANY DISCREPANCIES BETWEEN THE APPROVED PLANS AND
NONE PROVIDED
spreader. Density will be determined using the density control strip as specified in VDOT's 'Road and
EXISTING SITE CONDITIONS.
T F
Bridge Specifications'(Section 304) an VTM-10. A certified compaction technician shall perform these
10. THE DEVELOPER IS RESPONSIBLE FOR THE RELOCATION OF ANY
tests. A certified copy of the test results shall be provided to the Residency Office. In addition to
UTILITIES REQUIRED BY THIS SITE PLAN.
�.
checking stone depths, A VDOT representative shall be notified and given the opportunity to be present
11. ALL EROSION AND SEDIMENT CONTROL DEVICES SHOWN IN THIS SITE
during the construction and testing of the density control strip.
PLAN ARE TO BE INSTALLED PRIOR TO CONSTRUCTION.
o MICHAEL M. ARTZ y
V J
v20. Asphalt concrete pavement shall be placed in accordance with the latest edition of VDOT's 'Road
315). Density be determined the density
12. ALL CONTROLLED FILL MUST BE COMPACTED TO A MINIMUM OF 95%
DENSITY FOLLOWING METHOD 'A' OF THE STANDARD PROCTOR ASTM-D698,
No. 1513
0
and Bridge Specifications'(Section will using control strip as
® 1_�! l
specified in Section 315 and VTM-76. A certified compaction technician shall perform these tests. A
AASHTO-T99, OR VTM-1 AS APPLICABLE. ANY FILL PLACED UNDER
certified copy of the test results shall be provided to the Residency Office. A VDOT representative
BUILDINGS, STRUCTURES, OR PAVEMENT MUST BE INSPECTED AND
1tip '�L
SURVE'TO
shall be notified and given the opportunity to be present during the construction and testing of the
APPROVED BY A PROFESSIONAL SOILS ENGINEER. A GEOTECHNICAL
control strip.
SUPERSEDES THIS NOTE IF PROVIDED.
V21. Approval of these plans shall expire three (3) years from the date of the approval letter.
13. THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING MISS UTILITY
THESE PLANS ARE IN CONFORMANCE WITH COUNTY
PRIOR TO ANY SITE WORK. ALL UTILITIES SHOWN ON THIS PLAN ARE
APPROXIMATE LOCATIONS AND NOT ALL UTILITIES MAY BE SHOWN.
OF FREDERICK STANDARDS AND ORDINANCES. ANY DEVIATION
14. ANY WATER AND SANITARY SEWER CONSTRUCTION, MODIFICATION, OR
OR CHANGE IN THESE PLANS SHALL BE APPROVED BY
REPAIRS WILL BE IN ACCORDANCE WITH THE CURRENT STANDARDS AND
SPECIFICATIONS SET BY THE CITY OF WINCHESTER DEPARTMENT OF PUBLIC
THE ZONING ADMINISTRATOR PRIOR TO CONSTRUCTION.
EROSION AND SEDIMENT CONTROL NOTES
WORKS. THE CONTRACTOR WILL OBTAIN ALL NECESSARY PERMITS AND
DC
FREDERICK COUNTY PUBLIC WORKS APPROVAL
GENERAL EROSION AND SEDIMENT CONTROL NOTES
COORDINATE THE WORK WITH PUBLIC WORKS.
�1
ES-1: Unless otherwise indicated, all vegetative and structural erosion and sediment control practices will be
15. THE CONTRACTOR WILL CONTAIN ALL LITTER AND DEBRIS ON SITE.
�`'
�
�+ J
constructed and maintained accordingto minimum standards and specifications of the j[rainia Erosion and''
Sediment Control Handbook and Virginia Regulations VR 625-02-00 Erosion and Sediment Control
Regulations.
THE WORK MUST BE LEFT IN AN ORDERLY MANNER AT THE END OF
EACH WORK DAY.
16. AN APPROVED SET OF SITE PLANS MUST BE ON SITE DURING THE
CONSTRUCTION PROCESS.
t I,'�i �` ; :�.. I'p.`,.
tb7
�.,z
Z
v
J
SURVEY NOTES
1. BOUNDARY AND TOPOGRAPHY SHOWN HEREON WAS TAKEN FROM
ES-2: The plan approving authority must be noted one week prior to the preconstruction conference, one
17. THE CONTRACTOR WILL NOTIFY ALL UTILITY COMPANIES PRIOR TO
.
DIRECTOR DATE
w
SITE PLAN APPROVED ON 5/21/91 (#006-91)
week prior to the commencement of land disturbing activity, and one week prior to the final inspection.
EXCAVATION WITHIN EASEMENTS.
0 �_:
H ® �--
18. THE CONTRACTOR WILL SEED AND STRAW ANY DISTURB AREA THAT
ES-3: All erosion and sediment control measures are to be placed prior to or as first step in clearing.
WILL BE LEFT FOR MORE THAN THIRTY DAYS FOR SOIL STABILIZATION.
FREDERICK COUNTY PLANNING DEPARTMENT APPROVAL
lyQ
ES-4: A copy of the approved erosion and sediment control plan shall be maintained on the site at all
® (Y ~
times.
Z V
ES-5: Prior to commencing land disturbing activities in areas other than indicated on these plans, (including,
but not limited to, off -site borrow or waste areas), the contractor shall submit a supplementary erosion
� � w
2 CL
V
CONTACT NUMBERS
P LAN REVIEWER DATE
BUBBLEWORKS CARWASH:
control plan to the owner for review and approval by the plan approving authority.
~
FREDERICK COUNTY ZONING APPROVAL
GEORGE DOWERY (540) 678-8746
ES-6: The contractor is responsible for installation of any additional erosion control measures necessary to
W 7)
prevent erosion and sedimentation as determined by the plan approving authority.
L11
_ O
v
ENGINEERING FIRM:
® o
ARTZ & ASSOCIATES, PLC (540) 667-3233
ES-7: All disturbed areas are to drain to approved sediment control measures at all times during land
THERE ARE NOT ANY SINKHOLES, RIVERS, STREAMS,
TJ
disturbing activities and during site development until final stabilization is achieved.
STEEP SLOPES, WOODLANDS, OR ANY ENVIRONMENTAL
�� �`��
Q[ ® O
w LU
ZONING ENFORCEMENT:
DEPARTMENT OF PLANNING (540) 665-5651
ES-8: During dewatering operations, water will be pumped into approved filtering device.
FEATURES THAT WILL IMPACT THIS SITE DEVELOPMENT
Z I NG AD I N I STRATO DATE
> Q CrAo
®
SITE INSPECTIONS:
ES-9: The contractor shall inspect all erosion control measures periodically and after each runoff -producing
rainfall event. Any necessary repairs or cleanup to maintain the effectiveness of the erosion control devices
(OTHER THAN LIMESTONE OF COURSE)
a
V J O LE
DEPARTMENT OF INSPECTIONS (540) 665-5650
shall be made immediately.
THIS SITE PLAN IS VALID FOR (5) FIVE
Aand Asaociaee, PL
ub
A SSubsidiary of Valley Engineering, PLC
EROSION AND SEDIMENT CONTROL
YEARS FROM THIS DATE OF APPROVAL
DEPARTMENT OF PUBLIC WORKS (540) 665-5643
LAND SURVEYING LAND PLANNING DEVELOPMENT
16 East Piccadilly Street
SANITARY SEWER AND WATER:
WINCHESTER, VA 22601-4740
TEL 540-667-3233 FAX 540-667-9188
TOLL FREE 1-800-755-7320
FREDERICK COUNTY SANITATION AUTHORITY (540) 868-1061
OCTOBER 31, 2005
TELEPHONE: VERIZON (301) 954-6282
ELECTRIC: ALLEGHENY POWER (800) 654-3317
PROJECT #21521
GAS: SHENANDOAH GAS COMPANY (540) 869-1111
SHEET 2 OF 2
MISS UTILITY: 1-800-257-7777
L=192.68'
R=2819.79'
A=03'54'54"
C LEN=192.64'
BRG=N 34' 12'29" E
A�
1 r I
! 1
TM #74B-5-1-1)
WILLIAM L. STIEBEL
I r I !
558/382
ZONED 131
r
t
USE: DENTIST OFFICE
1 I �
t
I I 1
--
_
r Td j _ �—
aive
I �
1 J
NJ >
N
f i
II i it
� � I
d
I/
1
1/
�
I
EX.
DI-3B
/
I
/
r
/
/
r
� � I
I
I
1
X
�
�
r
Z
(
�
I
■ V�tC• ►
f
i
r
f
h'
l
EXIST
TING BUILDING
2,400 SF k
4 BAY
SELF WASH
- — 1,800 SF —
LOT "E"
0.98 AC.
114,:
EXIST
C&G
201.20'
l i yyltj POA10 I I
J
EXIST
C&G
r
v N
A �,.• J1
" 2g4 81,
'4� W
\
r
/
r
1
r
r
+
t
I
r
+
�X
/
/
I
1
I
I
I
I
I
\
\X. \\ ` L
\ SMIN
�1D� C PE
PROP. STORAG \� 1 BNLI FE
E` 240SF V)I I1AC,EX
z
D�
Cf)
2'
FT-1
C
rrl
70
0
0
/O. 1 1
_ r /
Q / i / 1 / 1 / TM 4474 A 105 1
/
W. H. EMMART & SON, INC. i
367/545
( ZONED 131 I
USE: VACANT I
/ r
� � t
J
TM #74B-7-2-27
TINA M. PEREZ, ETAL
#030014183
ZONED RP
USE: RESIDENTIAL
/
/
1 ' /
1
r
r f
r
I I
LPLYMN OWENS ESTATES
\ SECTION 2
N.
\
to
t a,
1 �
( \ 2
TM #74B-7-2-28
KEVIN R. & STACEY E.
CHAPMAN
#030023195
ZONED RP
USE: RESIDENTIAL
z
TM #74B-7-2-29
ROGER A. & CYNTHIA A.
LAYMAN
672/507
ZONED RP
USE: RESIDENTIAL
LiJ
p-1 H Or
9Xv — v 1 2
O MICHAEL M. Atv
No. 1513
O ~
(C D Q
r ` H
LL v
Z
Q Lli
w �c z
H LL H O
C)
111316 Q H
oz Z or o
H q Lu w
�mJo �
Artz and Associates, PLC
A Subsidiary of Valley Engineering, PLC
LAND SURVEYING LAND PLANNING DEVELOPMENT
16 Eost Piccadilly Street
WINCHESTER, VA 22601-4740
TEL 540-667-3233 FAX 540-667-9188
TOLL FREE 1-800-755-7320
OCTOBER 31, 2005
SCALE 1" = 20'
PROJECT #21521 1
SHEET 2 OF 2
MOT GENERAL NOTES
SELECT MINIMUM STANDARDS
FEROSIONAND In
VDOT General Notes
SELECT MINIMUM STANDARDS
SEDIMENT CONTROL NARRATIVE
All work on this project shall conform to the latest editions of the Virginia Department of
Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after
� as �'
i 3 ?®, ,
Q ��
Pffl= MEMMM
Transportation (VDOT) Road and Bridge Specifications and Standards, the Virginia Erosion and Sediment
final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within
7B > ' '�►
This p'oj'd auam ei owwb cil of a 240 of 9 wop INAft ad ` °"m =N* 4raiii m"maw "aw' "m
Control Regulations and any other state, federal or local regulations applicable. In the event of
seven days to denuded areas that may not be at final grade but will remain dormant for longer
`b
conflict between any of these standards, specifications or plans, the most stringent shall govern.
than 30 days. Permanent stabilization shall be applied to areas that are to be left dormant for
V2. Al construction shall comply with the latest U.S. Department of Labor, Occupational Safety and
more that one year.,
Health Administration and VOSH Rules and Regulations.
V3. When working on VDOT right-of-way, all traffic control' whether permanent or temporary, shall be
During construction of the project, soil stockpiles and borrow areas shall be stabilized or protected
°,� 4 y� a ' �''ti,°' ✓ e a 5 e
ffi
in accordance with the current edition of VDOT's work area protection manual. Furthermore, all traffic
with sediment trapping measures. The applicant is responsible for the temporary protection and
*'
control ftaggers must be certified in accordance with the latest edition of the VDOT Road and Bridge
permanent stabilization of all soil stockpiles on site as well as borrow areas and soil intentionally
� ...
Specifications, Section 104.04-C.
transported from the project site.
,
'� �e
V4 The developer shall be responsible for relocating, at his expense, any and all utilities, including
traffic signal poles, junction boxes, controllers, etc. owned by VDOT or private utility company. It is
Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap
, ' ��, F o �, '
>., 9
O
the sole responsibility of the developer to locate and identify utility facilities or items which may be in
sediment shall be constructed as a first step in any land disturbing activity and shall be made
,� � � z •�
conflict with the proposed construction activity. VDOT approval of these plans does not relieve the
functional before upslope land disturbance takes place.
developer of this responsibility.
V5. Design features relating to field construction, regulations, and control or safety of traffic may be
Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions
>9 Bo sq 'o ti
��
subject to change as deemed necessary by VDOT. Any additional expense incurred as a result of any
immediately after installation.
��, ''� Jog
B
field revision will be the responsibility of the developer.
V6. Prior to initiation of work, the contractor shall be responsible for acquiring all necessary VDOT
Underground utility lines shall be installed in accordance with the following standards in addition to
.,
,.,� ?
°
land use permits for any work on VDOT right-of-way.
other applicable criteria:
,s� '' '� � 49 �' „ " e
V7. If required by the local VDOT Residency Office, a pre -construction conference must be arranged
-x more than 500 linear feet of trench may be opened one time.
¢9C
and held by the engineer and/or developer with the attendance of the contractor, various County
-Excavated material shall be placed on the uphill side of the trench.
'�' � o, � o,
agencies, utility companies and VDOT prior to initiation of work.
-Flow from dewatering operations shall be filtered or passed through an
'� rfa P ke -- .- �'
V8. The contractor shall notify the local VDOT Residency Office when work is to begin or cease for
approved sediment trapping divide or both, and discharged in a manner that
any undetermined length of time. VDOT will also require 48 hours notice for any inspection.
✓9. The contractor will be responsible for maintaining adequate access to the project from the
does not adversely affect flowing streams or off -site property.
-Material used for back filling trenches shall be properly compacted in order
,B
J ,��� �� t z , a
r48q ,� �
<� s ,°�
w
adjacent public roadway through construction and maintenance of a construction entrance in
to minimize erosion and promote stabilization.
i� R,.
��� ' 87
accordance with the Section 3.02. Furthermore,
-Restabilization shall be accomplished in accordance with the regulations.
/ ,z 13 �• ,s
access to other properties affected by this project shall be maintained through construction. The
-Applicable safety regulations shall be complied with.
Developer shall have, within the limits of the project, an employee certified by the Department of
Where construction vehicles access routed intersect paved or public roads, provisions shall be made
Conservation and Recreation in Erosion and Sediment Control who shall inspect erosion and siltation
to minimize the transport of sediment by vehicular tracking onto the paved surface. Where sediment
control devices and measures for proper installation and deficiencies immediately after each rainfall,
is transported onto a paved or public road surface, the road surface shall be cleaned thoroughly at
the day. Sediment be from the by
TH of
OFF -
at least daily during prolonged rainfall, and weekly when no rainfall event occurs.
end of each shall removed roads shoveling or sweeping and
P�
Contractor shall ensure adequate drainage is achieved and maintained on the site during and at
transported to a sediment control disposal area. Street washing shall be allowed only after sediment
is removed in this manner. This provision shall apply to individual development lots as well as to
VICINITY MAP 1 " = 500'
the end of construction.
the
VI I - All water and sewer lines within existing or proposed VDOT right-of-way are to have minimum
larger land -disturbing activities.
Q MICHAEL M. ARTZ r
36" cover and when possible shall be installed under roadway drainage facilities at conflict points.
All temporary erosion and sediment control measures shall be removed within 30 days after final site
No. 513
PROJECT DATA:
V12, Any unusual subsurface conditions encountered during the course of construction shall be
immediately brought to the attention of the engineer and VDOT. Work shall cease in that vicinity until
stabilization or after the temporary measures are no longer needed unless otherwise authorized by
Lfl �l
an adequate design can be determined by the engineer and approved by VDOT.
the local program authority. Trapped sediment and the disturbed soil areas resulting from the
disposition temporary be to further
PROJECT:
�
'9 0
��
v i 3. All fill areas, borrow material and undercut areas shall be inspected an approved by VDOT
of measures shall permanently stabilized prevent erosion and
TOTAL AREA OF SITE: 0.98 ACRES
O�
SURVE'i
representative prior to placement and fill. Where CBR testing is required, a VDOT representative shall
sedimentation.
CURRENT ZONING: B1
be present to insure the sample obtained is representative of the location. When soil samples are
CURRENT USE: CAR WASH
BUBBLEWORKS
submitted to private laboratories for testing, the samples shall be clearly identified and labeled as
PROPOSED STRUCTURE. STORAGE SHED
belonging to a project which will be accepted by VDOT and that testing shall be conducted according
GENERAL NOTES
BUILDING HEIGHT ALLOWED: 35' MAX.
CARWASH
to all applicable VDOT standards.
BUILDING HEIGHT PROPOSED: 10'
V14. All roadway fill, base, subsurface material and backfill of utility/storm sewer trenches shall be
1. PERMITS MUST BE ISSUED FROM VDOT PRIOR TO ANY CONSTRUCTION
F.A.R.: 1.0
compacted in 6' lifts to 95% of theoretical maximum density as determined by AASHTO T-99 Method
IN A PUBLIC RIGHT OF WAY.
2. MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES MUTCD MUST
BUILDING SETBACK REQUIREMENTS B1
SITE INFORMATION:
A, within plus or minus 2% of optimum moisture for the full width of any dedicated street
right-of-way. At the direction of VDOT Inspector, density tests performed by a qualified independent
BE ADHERED TO WHEN WORKING IN A PUBLIC RIGHT OF
F WAY.)
FRONFTT: 550'
ADDRESS: 1033 AYLOR ROAD
agency shall be conducted as required in the VDOT Road and Bridge Specifications. A copy of all
3. THE CONTRACTOR WILL REMOVE ALL MUD AND DEBRIS FROM THE
WAY THAT
RIGHT: 0
TM #74 - ((A)) - 104
tests shall be submitted to VDOT prior to final VDOT approval.
PUBLIC RIGHT OF IS LEFT BY VEHICLES ENTERING AND
V15. VDOT Standard CD and LID under -drains shall be installed where indicated on these plans and
THE SITE.
REAR: 0D
ZONED: B-1
further where determined necessaryb VDOT Inspector.
y
4. ANY DAMAGE ON NEIGHBORING PROPERTY AND THE COUNTY ROADS
BUILDING SETBACKS PROPOSED
INSTRUMENT #030009698
V16. The installation of any entrances and mailboxes within any dedicated street right-of-way shalt
AND SIDEWALKS CAUSED BY THE DEVELOPMENT OF THIS SITE WILL BE
THE RESPONSIBILITY OF THE DEVELOPER. ALL DAMAGE MUST BE REPAIRED
FRONT: 201.2'
USE: �CARWASH (EXISTING)
FIRE MARSHALL GENERAL NOTES
meet VDOT minimum design standards and is the responsibility of the developer.
v17. Prior to acceptance by VDOT of any streets, any required street signage and/or pavement
TO ORIGINAL CONDITIONS.
LEFT: 53.1'
RIGHT: 67.4'
OWNER/DEVELOPER:
1. AN INSPECTION BY THE FIRE MARSHALL'S OFFICE WILL DETERMINE
markings must be installed by the developer or at VDOT's discretion, by VDOT on an account
5. A CONSTRUCTION ENTRANCE MUST BE INSTALLED IN ACCORDANCE WITH
*VIRGINIA
REAR: 51.1'
WHERE CURBING MUST BE PAINTED YELLOW.
receivable basis. Stop signs shall be thirty (30) inches tall with high intensity sheeting. The bottom
THE EROSION AND SEDIMENT CONTROL HANDBOOK" SECTION
3.02. THE CONTRACTOR MUST MAINTAIN THIS ACCESS FOR THE DURATION
UPPERCRUST LLC
M M
2. NO PARKING - FIRE LANE SIGNS WILL BE PLACED ON THE SITE
of the sign shall be six (6) feet above the edge of pavement and the post shall be installed a
OF THE PROJECT.
112-A BRUCE DRIVE
AT THE FIRE MARSHALL'S DISCRETION.
minimum of four (4) feet from the edge of pavement. Sign posts shall be of a type found on
6. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE POSITIVE DRAINAGE
VDOT's approved list. A copy of this list may be obtained from the District Material Section. Contact
OF THIS SITE.
WINCHESTER, VA 22601
3. CONTRACTOR MUST ROTATE THE FIRE HYDRANT TO THE DIRECTION
the local VDOT residency office with any questions regarding sign material and placement.
7. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL REQUIRED LAND
(540) 7678-8746
AS DETERMINED BY THE FIRE MARSHALL.
V18. The developer must provide to the local VDOT office a list of all material sources prior to
DISTURBANCE PERMITS PRIOR TO CONSTRUCTION.
construction. Copies of all invoices for materials within any dedicated street right of way must be
8. ALL CONSTRUCTION WILL BE DONE FOLLOWING THE LAWS AND
SEAL AND SIGNATURE
provided to the local VDOT residency office prior to acceptance of the work. Unit and total prices
GUIDELINES SET FORTH BY OSHA AND VOSH.
TRIP GENERATION DATA
may be obscured.
V19. Aggregate bases and sub -bases shall be placed on the sub -grade by means of a mechanical
9. THE CONTRACTOR WILL NOTIFY ARTZ AND ASSOCIATES AT (540)
667-3233 OF ANY DISCREPANCIES BETWEEN THE APPROVED PLANS AND
NONE PROVIDED
spreader. Density will be determined using the density control strip as specified in VDOT's 'Road and
EXISTING SITE CONDITIONS.
Li H OF
Bridge Specifications'(Section 304) and VTM-10. A certified compaction technician shall perform these
10. THE DEVELOPER IS RESPONSIBLE FOR THE RELOCATION OF ANY
tests. A certified copy of the test results shall be provided to the Residency Office. In addition to
UTILITIES REQUIRED BY THIS SITE PLAN.
��
�••i�
checking stone depths, A VDOT representative shall be notified and given the opportunity to be present
11. ALL EROSION AND SEDIMENT CONTROL DEVICES SHOWN IN THIS SITE
during the construction and testing of the density control strip.
PLAN ARE TO BE INSTALLED PRIOR TO CONSTRUCTION.
MICHAEL M. A TZ P
V j
V20. Asphalt concrete pavement shall be placed in accordance with the latest edition of VDOT's 'Road
12. ALL CONTROLLED FILL MUST BE COMPACTED TO A MINIMUM OF 95%
'A'
No. 1513
and Bridge Specifications'(Section 315). Density will be determined using the density control strip as
DENSITY FOLLOWING METHOD OF THE STANDARD PROCTOR ASTM-D698,
specified in Section 315 and VTM-76. A certified compaction technician shall perform these tests. A
AASHTO-T99, OR VTM-1 AS APPLICABLE. ANY FILL PLACED UNDER
certified copy of the test results shall be provided to the Residency Office. A VDOT representative
BUILDINGS, STRUCTURES, OR PAVEMENT MUST BE INSPECTED AND
SURVE'IO
shall be notified and given the opportunity to be present during the construction and testing of the
APPROVED BY A PROFESSIONAL SOILS ENGINEER. A GEOTECHNICAL
control strip.
SUPERSEDES THIS NOTE IF PROVIDED.
V21. Approval of these plans shall expire three (3) years from the date of the approval letter.
13. THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING MISS UTILITY
THESE PLANS ARE IN CONFORMANCE WITH COUNTY
(Y
PRIOR TO ANY SITE WORK. ALL UTILITIES SHOWN ON THIS PLAN ARE
APPROXIMATE LOCATIONS AND NOT ALL UTILITIES MAY BE SHOWN.
OF FREDERICK STANDARDS AND ORDINANCES. ANY DEVIATION
14. ANY WATER AND SANITARY SEWER CONSTRUCTION, MODIFICATION, OR
OR CHANGE IN THESE PLANS SHALL BE APPROVED BY
Q
REPAIRS WILL BE IN ACCORDANCE WITH THE CURRENT STANDARDS AND
SPECIFICATIONS SET BY THE CITY OF WINCHESTER DEPARTMENT OF PUBLIC
THE ZONING ADMINISTRATOR PRIOR TO CONSTRUCTION.
EROSION AND SEDIMENT CONTROL NOTES
WORKS. THE CONTRACTOR WILL OBTAIN ALL NECESSARY PERMITS AND
(y
GENERAL EROSION AND SEDIMENT CONTROL NOTES
FREDERICK COUNTY PUBLIC WORKS APPROVAL
COORDINATE THE WORK WITH PUBLIC WORKS.
ES-1: Unless otherwise indicated, all vegetative and structural erosion and sediment control practices will be
15. THE CONTRACTOR WILL CONTAIN ALL LITTER AND DEBRIS ON SITE.
L.L
constructed and maintained according to minimum standards and specifications of the Virginia Erosion and
THE WORK MUST BE LEFT IN AN ORDERLY MANNER AT THE END OF
EACH WORK DAY.
z
SURVEY NOTES
Sediment Control Handbook and Virginia Regulations VR 625-02-00 Erosion and Sediment Control
Regulations.
16. AN APPROVED SET OF SITE PLANS MUST BE ON SITE DURING THE
Q
CONSTRUCTION PROCESS.
J
1. BOUNDARY AND TOPOGRAPHY SHOWN HEREON WAS TAKEN FROM
ES-2: The plan approving authority must be notified one week prior to the preconstnuction conference, one
17. THE CONTRACTOR WILL NOTIFY ALL UTILITY COMPANIES PRIOR TO
''' ;,
DIRECTOR DATE
W
SITE PLAN APPROVED ON 5/21 /91 (#006-91)
week prior to the commencement of land disturbing activity, and one week prior to the final inspection.
EXCAVATION WITHIN EASEMENTS.F-
18. THE CONTRACTOR WILL SEED AND STRAW ANY DISTURB AREA THAT
,
NS161
ES-3: All erosion and sediment control measures are to be placed prior to or as first step in clearing.
WILL BE LEFT FOR MORE THAN THIRTY DAYS FOR SOIL STABILIZATION.
FREDERICK COUNTY PLANNING DEPARTMENT APPROVAL
c
H
ES-4: A copy of the approved erosion and sediment control plan shall be maintained on the site at all
/
® II Z
Z
times.
Z v
ES-5: Prior to commencing land disturbing activities in areas other than indicated on these plans,(including,
9 g pPLAN
(ID
W
CONTACT NUMBERS
but not limited to, off -site borrow or waste areas), the contractor shall submit a supplementary erosion
REVIEWER DATE
BUBBLEWORKS CARWASH:
control plan to the owner for review and approval by the plan approving authority.
CL V
GEORGE DOWERY (540) 678-8746
ES-6: The contractor is responsible for installation of any additional erosion control measures necessary to
Z
W �- ::)
FREDERICK COUNTY ZONING AP P R OVAL
prevent erosion and sedimentation as determined by the plan approving authority.
W LL kn O
ENGINEERING FIRM:
ARTZ &ASSOCIATES, PLC (540) 667-3233
ES-7: All disturbed areas are to drain to approved sediment control measures at all times during land
disturbing activities and during site development until final stabilization is achieved.
THERE ARE NOT ANY SINKHOLES, RIVERS, STREAMS,
_ Q v
o Y
� tj
® ZO
ZONING ENFORCEMENT:
STEEP SLOPES, WOODLANDS, OR ANY ENVIRONMENTAL
�� �� ����
W:D Z LL,
DEPARTMENT OF PLANNING (540) 665-5651
ES-8: During dewatering operations, water will be pumped into approved filtering device.
FEATURES THAT WILL IMPACT THIS SITE DEVELOPMENT
ONING ADMINISTRATOR DATE
> C1 a
Qww
SITE INSPECTIONS:
ES-9: The contractor shall inspect all erosion control measures periodically and after each runoff -producing
rainfall event. Any necessary repairs or cleanup to maintain the effectiveness of the erosion control devices
(OTHER THAN LIMESTONE OF COURSE)
® �
V _1 O �
DEPARTMENT OF INSPECTIONS (540) 665-5650
shall be made immediately.
THIS SITE PLAN IS VALID FOR (5) FIVE
Aend Associates, PLC
EROSION AND SEDIMENT CONTROL:
YEARS FROM THIS DATE OF APPROVAL
DEPARTMENT OF PUBLIC WORKS (540) 665-5643
Sub
A Subsidiary of Valley Engineering, PLC
LAND SURVEYING LAND PLANNING DEVELOPMENT
16 East Piccadilly Street
SANITARY SEWER AND WATER:
WINCHESTER, VA 22601-4740
TEL 540-667-3233 FAX 540-667-9188
FREDERICK COUNTY SANITATION AUTHORITY (540) 868-1061
TOLL FREE 1-800-755-7320
OCTOBER 31, 2005
TELEPHONE: VERIZON (301) 954-6282
ELECTRIC: ALLEGHENY POWER (800) 654-3317
PROJECT #21521
GAS: SHENANDOAH GAS COMPANY (540) 869-1111
SHEET 2 OF 2
MISS UTILITY: 1-800-257-7777
L=192.68'
R=2819.79'
,L=03'54'54"
C LEN=192.64'
BRG=N 34' 12'29" E
q
TM #74B-5-1-D
WILLIAM L. STIEBEL
558/382
ZONED 131
USE: DENTIST OFFICE
41
/ TM #74-A-105
W. H. EMMART & SON, INC. 1
3ZONED B5 f
' ► USE: VACANT I
I �
I I r f
N
TM #74B-7-2-27
TINA M. PEREZ, ETAL
#030014183
ZONED RP
USE: RESIDENTIAL
i
r
r
,
/
— --
\ \\
\ PLYMN OWENS ESTATES
\� SECTION 2
Lp
?Li
TM #74B-7-2-28
KEVIN R. & STACEY E.
CHAPMAN
#030023195
ZONED RP
USE: RESIDENTIAL
TM #74B-7-2-29
ROGER A. & CYNTHIA A.
LAYMAN
672/507
ZONED RP
USE: RESIDENTIAL
w
0
H OF �/p
MICHAEL M. ATZ v
No. 1513 y
0
� SURV03��
Artz and Associates, PLC
A Subsidiary of Valley Engineering, PLC
LAND SURVEYING LAND PLANNING DEVELOPMENT
16 East Piccadilly Street
WINCHESTER, VA. 22601-4740
TEL 540-667-3233 FAX 540-667-9188
L TOLL FREE 1-800-755-7320
OCTOBER 31, 2005
SCALE 1" = 20'
PROJECT #21521 1
SHEET 2 OF 2