Loading...
HomeMy WebLinkAbout91-05 Bubblework Carwash - Additional Storage Bldg. - Opequon - Backfile (2)1 , n /? rrZm fig AAC.a A A C=ft eCO A A A R A A 1=4--= A n n ra A ra ra - 1 EROSION AND SEDIMENT CONTROL NARRATIVE PRWECT DEMPIION itds pmjxt outrras the comt ucttan d a 240 of Storage Wftg and Is ftdom exempt from cWm=tcr rMhments. 1. AN INSPECTIO14 BY THE FIRE MARSHALL'S OFFICE WILL DETERMINE WHERE CURBING MUST BE PAINTED YELLOW. 2. "NO PARKING - FIRE LANE" SIGNS WILL BE PLACED ON THE SITE AT THE FIRE MARSHALCS DISCRETION. 3. CONTRACTOR MUST ROTATE THE FIRE HYDRANT TO THE DIRECTION AS DETERMINED BY THE FIRE MARSHALL. T� NONE PROVIDED 1. BOUNDARY AND TOPOGRAPHY SHOWN HEREON WAS TAKEN FROM SITE PLAN APPROVED ON 5/21/91 (#006-91) BUBBLEWORKS CARWASH: GEORGE DOWERY (540) 678-8746 ENGINEERING FIRM: ARTZ & ASSOCIATES, PLC (540) 667-3233 ZONING ENFORCIEMENT: DEPARTMENT OF PLANNING (540) 665-5651 SITE INSPECTIONS: DEPARTMENT OF INSPECTIONS (540) 665-5650 EROSION AND SEDIMENT CONTROL: DEPARTMENT OF PUBLIC WORKS (540) 665-5643 SANITARY SEWER AND WATER: FREDERICK COUNTY SANITATION AUTHORITY (540) 868-1061 TELEPHONE: VERIZON (301) 954-6282 ELECTRIC: ALLEGHENY POWER (800) 654-3317 GAS: SHENANDOAH GAS COMPANY (540) 869-1111 MISS UTILITY: 1-800-257-7777 VDOT General Notes V1. All work. on. this project shall conform to the latest editions of the Virginia Department of Transportation (VDOT) Road and Bridge Specifications and Standards, the Virginia Erosion and Sediment ad Control Regulations and any other state, federal or local regulations applicable. , In the event 'of conflict between any of. these standards; specifications or plans, the most' stringentshall govern. V2. All construction shall comply with . the latest U.S. Department of Labor, Occupational Safety and Health Administration and VOSH Rules and Regulations. V3. When working on VDOT right=of-►ray, all traffic control, whether permanent or temporary, shall be in accordance with the current edition of VDOT's work area protection manual. 'Furthermore, all traffic control floggers must be certified in accordance' with the latest edition of the VDOT . Road and Bridge Specifications, Section 104.04-C. V4 The developer 'shall be responsible for relocating, at his expense, any and all utilities, including: traffic signal poles, junction boxes, controllers, etc. ormed by VDOT or .private utility" company. It is the sole responsibility of the developer to locate and ' identify utility facilities or items which -may be in conflict with the proposed construction activity. VDOt approval of these plans does ' 'not relieve the developer of this responsibility. V5. Design features relating to field construction, regulations, and control or safety of traffic may be. subject to change as deemed necessary by VDOT. Any additional expense incurred :as a result of any field revision will be the responsibility of the developer. V6. Prior to initiation of work, the contractor shall be'. responsible for acquiring all necessary VDOT land use permits for any work on VDOT right -of -slay, ' V7.. If required by the local VOOT Residency Office, a ore -construction conference must be arranged and held by the engineer and/or developer with the attendance of the contractor, various County agencies, utility companies and VDOT prior to initiationof work. V8. The contractor shall notify the local VDOT Residency Office when work is to. begin or cease for any undetermined length of time. VDOT will also require 48, hours notice for any inspection. V9. The contractor will be responsible for maintaining adequate access .to the project from the adjacent public roadway through .construction and maintenance of a construction entrance in accordance with the Yrinia Er_osion--andSe ' ! rQl Handbook, Section 3.02. Furthermore, access. to ' other properties affected by this project shall be maintained through construction. The Developer shall have, within the limits of the project, on employee certified by the:`. Department of Consetvation and Recreation in ' Erosion and Sediment Control who shall inspect erosion and siltation control devices and measures for proper installation and deficiencies immediately after each* rainfall, at least daily during prolonged - rainfall, and weekly when no rainfall event occurs... V10. Contractor shall ensure adequate drainage is achieved and maintained on the , site during and at the end of construction. Vt1. All water and sewer lines within existing or proposed VDOT right-of-way are to have minimum 36" cover and when possible shall . be installed under ; roadway drainage facilities at .conflict points. V12. Any unusual subsurface conditions encountered during the course of construction shall be immediately brought to the attention of the engineer and VDOT. Work shall cease in that. vicinity until an adequate design can be determined by the engineer and approved by VDOT. V13. All fill areas, borrow material and undercut areas shall be inspected an approved by VDOT representative prior to placement and fill. Where ' CBR testing is required, a VDOT representative. shall be present to insure the sample obtained is representctive of the location. When soil samples are submitted to private laboratories for testing, the samples shall be clearly - identified and labeled as belonging to a project which will .be accepted by VOOT and that testing shall be conducted according to all applicable VDOT standards. V14. All roadway fill, base,' subsurface material and-backfill of utility/storm sewer trenches shall be compacted in 6" lifts to 95% :of theoretical maximum density as 'determined by AASHTO T-99 Method A, within plus or minus 27a of ' optimum . moisture for Ahe full width of any dedicated street . right-of-way. At the direction of VDOT Inspector, dc:;Fity tests performed by a - qualified independent agency shall be conducted as required in the VDOT Road and Bridge Specifications. A copy of all tests shall be submitted to VDOT prior to final VDOT approval.. . V15. VDOT Standard CD and UD under -drains shall be installed where indicated on these plans and further where. determined necessary. by VOOT Inspector. V16. The installation of any entrances. and mailbo= within any dedicated street right-of-way shall meet VDOT minimum: design standards and is the responsibility of the : developer. V17. Prior to acceptance by WIDT of any streets, an'y required street 'signage and/or pavement markings must be installed -by the developer . or at V00T's discretion, by VDOT on an account receivable basis. Stop signs shall be'thirty (30) ;'1clies. tall with high intensity sheeting. The bottom of the sign shall be six (6) feet :above the edge os cuvement and the post shall be Installed a minimum of four` (4) feet from the edge of pavement. Sign 'posts shall be of a type found on VOOT's approved list. A copy. of : this list may be o&'.* d from. the District Material Section. Contact the local VDOT residency office with any questions regarding sign material and placement. V18. The developer must provide. to the, Iocol , VDOT office a list..$ all material sources` prior to construction. Copies of all invoices for materials within any dedicated street right of'way must be provided to the local VDOT residency .office prior to acceptance -of the work. Unit and total prices may be obscured. V19. Aggregate bases and sub -bases'., shall : be placed on the .sub -grade by means of a mechanical spreader. Density will be determined using the density control. strip as specified in VDOT's "Road and Bridge Specifications°(Section 304) and VW-10. A certified compaction technician shall perform these tests. A certified copy of the test results shall be provided to the Residency Office. ' In addition to checking stone depths, A VDOT representative shall be notified and given the opportunity .to be present during the construction and testing of the density control strip: V20. Asphalt concrete pavement shall be placed in accordance with the latest edition of VDOT's "Road and Bridge Specifications"(Section 315).. Density will be determined using the density control strip as specified in Section .315 and. VTM-76. A certified compaction technician shall perform these tests. A certified copy of the test results shall be provided to the Residency Office. A VDOT representative shall be notified and given the opportunity to be present during the construction and: testing of the control strip. V21. Approval of .these plans ' shall expire three (3) years from the date of the approval letter. r=1•�/liaaa/11A It A& fir-, /.ten=m\G?AA PO& aeon /A/1n. nC.•�'1 rn m. n10:hC.WM1%* GENERAL EROSION AND SEDIMENT CONTROL NOTES ES-1: Unless othervise indicated, all vegetotive .and structural erosion and sediment control practices will be constructed and maintained according to minimum standards and specifications of the inia Eroslor and Sediment Control Handbook and.. Virginia, Regulations VR 625-02-00 Erosion and Sediment Control Regulations. ES-2: The plan approving authority must be notified one week prior .to the preconstruction conference, one week prior to the commencement of land disturbing actil►ity, and one week prior to the final inspection. ES-3: All erosion- and sediment' control measures are to be placed prior to or as first step in clearing. ES-4: A copy of the approved erosion and sediment corilyd plan shall be maintained on the site at aU times. ES-5. Prior to commencing land disturbing activities in areas other. than indicated on these plans, (including, but not limited to, .off -site borrowr;or waste areas), the contractor shall submit a supplementary erosion control plan to the. owner for review and. approval by the; plan approving authority. ES-6: The contractor is responsible for installation of any additional 'erosion control measuresnecessary to prevent erosion and sedimentation as determined by' the plan approving authority. ES-7: All disturbed areas are to drain to approved sediment control measures at all times during .land disturbing activities and during site development until final stabilization is achieved. ES-8: During dewatering operations, water will be pumped into approved filtering device. ES-9: The contractor shall inspect, all erosion control measures periodically and after each runoff -producing rainfall event. Any necessary repairs or cleanup to maintain the effectiveness of the erosion control devices shall be made immediately. Permanent or temporary soil stabilization shall be applied to deni ded a eas` within seven days after final grade is reached on any portion of this site. Temporary s I stab ization shoal be applied within seven; ,days to denuded areas that may not be at final grade bu will r imain dormant for longer than 30, ;days. Permanent stabilization shall be applied to areas that ' re to be left dormant for morn ' l`hot one year. Durigg construction of the project, soil stockpiles and borrow are is sha I be stabilized or protected with ;sediment trapping measures. The applicant is responsible f r the emporary protection and permanent stabilization of all soil stockpiles ,on site as well as borrow i reas and soil intentionally transportod from the project site. Sediment, basins and traps, perimeter dikes, sediment barriers onJ othe mic-cures intended to trap sediment k shall be constructed as a first step in any land. disturt ing ac ivity .and shall be made funcV6nol before upslope land disturbance takes place. Stabilisation measures shall be applied to eqrthen structures sucl as dims, dikes and diversions immediately after installation. Unde�jm and utility lines shall be installed in accordance with the follow ng standards in addition to other gpplicable criteria: -No,Y,more than 500 linear feet of trench may be opened at ode time. -Excavated material shall be placed or the uphill side of the tench. -146' from dewatering operations shall be filtered or passed th-ough an approved sediment trapping divide or both, and discharged In a maniier that does: not adversely affect flowing streams for off -site property. -Mat.00:1 used for back filling trenches shall be properly compacted i order to minimize erosion and promote stabilization. -Res shall be accomplished in accordance with the r gulati ns. -Aplicable safety regulations shall be complied with. Whe s� construction vehicles access routed Jrtersect paved or public roads, provisions shall be made to mirjdize the transport of sediment by vehicular tracking onto the p ved surface. Where sediment is kransported onto a paved or public road ,'surface, the road su lace thall be cli;aned thoroughly at the srld 'of each day. Sediment shall be removed from the roe s by hoveling or sweeping and traimsParted to a sediment control disposal area. Street washing shall b allowed only after sediment is removed in this manner. This provision shall apply to individual dev lopment Iats as well as to larger: land -disturbing activities. All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilisation or after the temporary measures are no longer neei ed, u less otherriise authorized by the" local• program authority. Trapped sediment and the disturbs soil reas res►Iting from the disposition of temporary measures shall be permanently stabilize to pi event furtl►er erosion and sediiMentation. F;,GENERAL NOTES N PW 1. PFITMIXS MUST BE ISSUED FROM VDOT PRIOR 10 ANY CONSTR CTION ,ti? xA ,pl1BLIC, RIGHT 'OF WAY. 2. THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) MUST B ADHERED TO WHEN WORKING IN A PUBLIC RIGHT OF .WAY. 3. 'ay„ E CONTRACTOR WILL REMOVE ALL MUD AND DEBRIS FROM E h,P,84i RIGHT ,OF WAY THAT IS LEFT BY VEHICLES ENTERING ND 6��►MNG THE SITE. 4. 4 t„DAMAGE ON NEIGHBORING PROPERTY AND THE COUNTY ROADS ffi11: SIDEWALKS CAUSED BY THE DEVELOPMENT OF THIS SITE WILL BE 'c RESPONSIBILITY OF THE DEVELOPER. ALL DAMAGE MUST B REPA RED 10'-< ORIGINAL CONDITIONS. 5. 'CONSTRUCTION ENTRANCE MUST BE INSTALLED IN ACCORDAN E WIT I 'VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK" S CT10N2 t-THE t, )ATTRACTnR MUST MAINTAIN THIS P ^CESS FOR THE DUI ON OFF THE PROTECT: 6 TI:1E; ,CONTRACTOR WILL BE RESPONSIBLE FOR THE POSITIVE DF Altwm QP?i THIS SITE. 7. V 'CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL REQUIRED IN D DIMS RBANCE PERMITS PRIOR TO CONSTRUCTION. 8. "At CONSTRUCTION WILL BE DONE FOLLOWING THE LAWS AND '40EUNES SET FORTH BY OSHA AND VOSH. 9.3 .,E;CONTRACTOR WILL NOTIFY ARTZ AND ASSOCIATES AT (540 :68 �43233 OF ANY DISCREPANCIES BMVEEN THE APPROVED P ANS A 4D 1XISTING SITE CONDITIONS. 10,� 5tIE. DEVELOPER IS RESPONSIBLE FOR THE RELOCATION OF A 1Y ITUi3ES REQUIRED BY THIS SITE PLAN. 11 EROSION AND SEDIMENT CONTROL DEVICES SHOWN IN THIS SITE h�LL.- �;ARE TO BE INSTALLED PRIOR 10 CONSTRUCTION.12. CONTROLLED FILL MUST BE COMPACTED TO A MINIMUM F 957, Oc-NSITY FOLLOWING METHOD ''A' OF THE STANDARD PROCTOR STM- 698, WO-T99, OR VTM-1 AS APPLICABLE. 'AY FILL PLACED UN ER -iWkDINGS, STRUCTURES, OR PAVEMENT Wsr BE INSPECTED D APPROVED BY A. PROFESSIONAL SOILS ENGINEER. A GEOTECHNI AL SUPERSEDES THIS NOTE IF PROVIDED. 1111HE CONTRACTOR IS RESPONSIBLE FOR CONTACTING MISS UT LITY ;CI�'OR TO ANY SITE WORK. ALL UTILITIES SHOWN ON THIS PLAIT ARE . ,APPROXIMATE LOCATIONS AND NOT ALL -UTILITIES MAY BE SHO N. 1 & .��Y WATER AND SANITARY SEWER CONSTRUCTION, MODIFICATI N, OR C REPAIRS WILL BE IN ACCORDANCE WITH THEE CURRENT STAND DS AN SPECIFICATIONS SET BY THE CITY OF WINCHES'fER DEPARTMEN OF P JBLIC WORKS. THE CONTRACTOR WILL OBTAIN ALL NECESSARY PERMI S AND COORDINATE THE WORK WITH PUBLIC WORKS. 15'.. THE CONTRACTOR WILL CONTAIN ALL . LITTER AND DEBRIS ON SITE. VE'ilWORK MUST BE LEFT IN AN ORDERLY Ma'VNER AT THE E D OF ,C WORK DAY. 16..: A6L APPROVED SET OF SITE PLANS MUST BE ON SITE DURING THE CONSTRUCTION PROCESS. 1 Tti' CONTRACTOR WILL NOTIFY ALL UTILITY COMPANIES PRIOF TO EXCAVATION' WITHIN EASEMENTS. 18';1?E CONTRACTOR WILL SEED AND STRAW ANY DISTURB AREA THAT t"fl!1' BE LEFT FOR MORE THAN THIRTY DAYS FOR SOIL STABIL ZATION 4 1y 1. FI, ' Ir. THERE ARE NOT ANY SINKHOLES RIVERS, STREAMS, h A; STEEP SLOPES, WOODLANDS OR ANY ENVIRONMENTAL ti FEATURES THAT WILL IMPACT THI SITE DEVELOPMENT (OTHER THAN LIMES ONE OF COURSE) i' xr 5 r. �; • t• J 1' • I. ,0 7 PROJECT DA1A: r Jtt�7�. 41cd��f TOTAL AREA OF SITE: CURRENT ZONING: CURRENT USE: PROPOSEDSTRUCTURE: BUILDING HEIGHT ALLOWED: BUILDING HEIGHT PROPOSED: F.A.R.: FRONT: LEFT: RIGHT: REAR: BUILDIhO SETBACKS PROPOSED FRONT: LEFT: RIGHT: REAR: VICINITY MAP 1 " = 500' 0.98 ACRES 131 CAR WASH STORAGE SHED 35' MAX. 10, 1.0 131 50' 0 0 201.2' 53.1' 67.4' 51.1' I PROJECT: DUB B LEWOR KS CARWASH.. SITE INFORMATION: ADDRESS: 1033 AYLOR ROAD TM #74 . ((A)) 104 II ZONED: B-1 INSTRUMENT #030009698 USE: CARWASH (EXISTING) OWNER/DEVELOPER:. I� UPPERC UST LLhC 112-A BRUCE DRIVE WI CHESTER, VA 22601 540) 7678-8 746 SEAL AND SIGNATURE MICHAEL M. ARTZ v No. 1513 1,_ ® SURVE' O'� UMICHAELM. THESE PLANS ARE IN CONFORMANCE WITH COUNTY 0114 OF FREDERICK STANDARDS AND ORDINANCES. ANY DEVIATION OR CHANGE IN THESE PLANS SHALL BE APPROVED BY THE ZONING ADMINISTRATOR -, PRIOR TO CONSTRUCTION. rUzl FREDERICK COUNTY PUBLIC WORKS APPROVAL v U Z Q DIRECTOR DATE FREDERICK COUNTY PLANNING DEPARTMENT APPROVAL o Z U3 PLAN REVIEWER DATE a FREDERICK COUNTY ..ZONING APPROVAL UJ p Q a n-n O Mon 0 014 M.M a0­0 �da ZONING ADMINISTRATOR DATE Z /o THIS SITE PLAN IS VALID FOR (5) FIVE YEARS FROM THIS DATE OF APPROVAL ASub and AssociatesPL A Subsidiary of Vallee EnslneerinR, PLC LAND SURVEYING LAND PLANNING DEVELOPMENT 16 East Piccadilly Street VANCHEM. VA 22601-4740 TEL 540-667-3233 FAX 540-667-9188 TOLL FREE 1-800-755-7320 OCTOBER 31, 2005 PROJECT #21521 SHEET 2 OF 2 L=192.68'Al R=2819.79 6=03'54'54"� / C LEN=192.64 BRG=N 34'12'29" E DI if 1 1 11\ � \ 1 0 L., 0 e q ;i .'1 c t S'r-'y *-1/v �I� • I T6v #74B-7-2-27 ^�A' T 9 -ArMfl4,� �1L f J f ZONED RP USE: RESIDENTIAL TPA0749-5-1-® ; j �I ' i i j I if WILLIAInd �. STD �(�(�L j" ZONED 81 USE: DENTIST OFFICE I rr...• dr.rrrrr— • �•iGf.�. r....��—��..r rs wr, r,..,r-r. -..� •-�-.y r���r r..�._r�+ r.r ....... + •�!_..r. r....--...- ,caa`"•v-'.,,,,n. •..... SECTION 2 EXISTING BUILDING �� 2,4 1 SF h E AST \ \� ZEE 4�7 i \ SIR N 1 `� \ N C PE PROP. STORAG 240ESF ` �PIUi�N vt yl it BAY SELF WASH a I 1,500 SF n I I I ,� "-`.`%•o LOT o0 00 0O9 U V O CDO rl ` i — 201.20' f ov El We. 1 X. �r f ' 1 TM 748-7-2-28 KEVIN R. 41 STACEY E. CHAP14AN 003®02-3g195 ZONED RP USE: RESIDENTIAL ROSER Q. 8i C'VNTHIA A. EXIST LAYMAN b� Z C&G \ 672/507 I ` \ ZONED RP USE: RESIDENTIAL IST r 1 1 I 41"W 9 00 cX,4 INC �4 '36 545✓ I USE: VACANT 1 j 1 � � i f, w 0 MICHAEL M. AP, T Z v No. 1513 r05 SURVE-o� �U 0\� 01141 o� � � a Q a LLfl, V o O a� z��do a ME() c� Artz and Associates, PLC A Subsidiary of Volley Enpineering, PLC AND SURVEYING LAND PLANNING DEVELOPMENT 16 East Piccadilly Street UNCHESTER, VA 22601-4740 TEL 540-667-3233 FAX 540-667-9188 TOLL FREE 1-800-755-7320 OCTOBER 31, 2005 SCALE 1" = 20' PROJECT #21521 SHEET 2 OF 2 VDOT GENERAL NOTES SELECT MINIMUM STANDARDS Fis VDOT General Notes SELECT MINIMUM STANDARDS EROSION AND SEDIMENT CONTROL NARRATIVE v1. All work on this project shall conform to the latest editions of the Virginia Department of Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after �' 3®, �� PFAW oESCIOMM Transportation (VDOT) Road and Bridge Specifications and Standards, the Virginia Erosion and Sediment final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within as> '�► fhb projed MOM w0 00rAbUCUM of a 240 r sb°' W sump W ` 110610 mmpt horn ieori"'°"'"°'°°'""� Control Regulations and any other state, federal or local regulations applicable. In the event of seven days to denuded areas that may not be at final grade but will remain dormant for longer ��''' conflict between any of these standards, specifications or plans, the most stringent shall govern. than 30 days. Permanent stabilization shall be applied to areas that are to be left dormant for �' 's 3 J v2. All construction shall comply with the latest U.S. Department of Labor, Occupational Safety and more that one year. �, e S , Health Administration and VOSH Rules and Regulations. V3. When working on VDOT right-of-way, all traffic control, whether permanent or temporary, shall be During construction of the project, soil stockpiles and borrow areas shall be stabilized or protected in accordance with the current edition of VDOT s work area protection manual. Furthermore, all traffic with sediment trapping measures. The applicant is responsible for the temporary protection and PP 9 PP P P ry P control flaggers must be certified in accordance with the latest edition of the VDOT Road and Bridge permanent stabilization of all soil stockpiles on site as well as borrow areas and soil intentionally Specifications, Section 104.04-C. transported from the project site. � �° 1 �' Z v4 The developer shall be responsible for relocating, at his expense, any and all utilities, including traffic signal poles, junction boxes, controllers, etc. owned by VDOT or private utility company. It is dikes, sediment barriers and other measures intended to erimeter , Sediment basins and traps, trap s P P P �,' " � o �, N O the sole responsibility of the developer to locate and identify utility facilities or items which may be in sediment shall be constructed as a first step in any land disturbing activity and shall be made conflict with the proposed construction activity. VDOT approval of these plans does not relieve the functional before upslope land disturbance takes place. developer of this responsibility. V5. Design features relating to field construction, regulations, and control or safety of traffic may be Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions ''� subject to change as deemed necessary by VDOT. Any additional expense incurred as a result of any immediately after installation. '�, 710 �, ► e field revision will be the responsibility of the developer. V6. Prior to initiation of work, the contractor shall be responsible for acquiring all necessary VDOT Underground utility lines shall be installed in accordance with the following standards in addition to , land use permits for any work on VDOT right-of-way. PP criteria: applicable other a '� '� 7.4 J6 36 `� a v7. If required by the local VDOT Residency Office, apre-construction conference must be arranged -No more than 500 linear feet of trench may be opened at one time. y P �, sa �> > ¢9C and held by the engineer and/or developer with the attendance of the contractor, various County -Excavated material shall be placed on the uphill side of the trench. ' �,' ° C D3 agencies, utility companies and VDOT prior to initiation of work. -Flow from dewatering operations shall be filtered or passed through an rfa P ke v8. The contractor shall notify the local VDOT Residency Office when work is to begin or cease for approved sediment trapping divide or both, and discharged in a manner that '6. any undetermined length of time. VDOT will also require 48 hours notice for any inspection. V9. The contractor will be responsible for maintaining adequate access to the project from the ff l d t adversely affect does not flowing streams or off -site property. -Material used for back filling trenches shall be properly compacted in order .B ,�,e�� �� 1� 146q ., 6 10� LLJ adjacent public roadway through construction and maintenance of a construction entrance in to minimize erosion and promote stabilization. -Restabilization shall be accomplished in accordance with the regulations. 1a�F �� ' C..,12 1"14 I% V 3 15 a, o accordance with the Virginia Erosion and Sediment Control Handbook, Section 3.02. Furthermore, access to other properties affected by this project shall be maintained through construction. The -Applicable safety regulations shall be complied with. Developer shall have, within the limits of the project, an employee certified by the Department of Where construction vehicles access routed intersect paved or public roads, provisions shall be made Conservation and Recreation in Erosion and Sediment Control who shall inspect erosion and siltation to minimize the transport of sediment by vehicular tracking onto the paved surface. Where sediment control devices and measures for proper installation and deficiencies immediately after each rainfall, is transported onto a paved or public road surface, the road surface shall be cleaned thoroughly at OF at least daily during prolonged rainfall, and weekly when no rainfall event occurs. the end of each day. Sediment shall be removed from the roads by shoveling or sweeping and transported to disposal Street be LTH �•p V10. Contractor shall ensure adequate drainage is achieved and maintained on the site during and at a sediment control area. washing shall allowed only after sediment " the end of construction. is removed in this manner. This provision shall apply to individual development lots as well as to VICINITY MAP 1 = 500' ti V11. Al water and sewer lines within existing or proposed VDOT right-of-way are to have minimum larger land -disturbing largg activities. o o MICHAEL M. A TZ D 36' cover and when possible shall be installed under roadway drainage facilities at conflict points. v12. Any unusual subsurface conditions encountered during the course of construction shall be All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after the temporary measures are no longer needed unless otherwise authorized by No. 1 13 immediately brought to the attention of the engineer and VDOT. Work shall cease in that vicinity until the local Trapped the disturbed from the PROJECT DATA: C an adequate design can be determined by the engineer and approved by VDOT. program authority. sediment and soil areas resulting disposition temporary be to further and PROJECT: � v13. All fill areas, borrow material and undercut areas shall be inspected an approved by VDOT of measures shall permanently stabilized prevent erosion TOTAL AREA OF SITE: 0.98 ACRES � O� SURVEY representative prior to placement and fill. Where CBR testing is required, a VDOT representative shall sedimentation. CURRENT ZONING: 61 be present to insure the sample obtained is representative of the location. When soil samples are CURRENT USE: CAR WASH BUBBLEWORKS submitted to private laboratories for testing, the samples shall be clearly identified and labeled as PROPOSED STRUCTURE. STORAGE SHED belonging to a project which will be accepted by VDOT and that testing shall be conducted according GENERAL NOTES BUILDING HEIGHT ALLOWED: 35' MAX. CARWASH to all applicable VDOT standards. BUILDING HEIGHT PROPOSED: 10' V14. Al roadway fill, base, subsurface material and backfill of utility/storm sewer trenches shall be 1. PERMITS MUST BE ISSUED FROM VDOT PRIOR TO ANY CONSTRUCTION F.A.R.: 1.0 compacted in 6' lifts to 95% of theoretical maximum density as determined by AASHTO T-99 Method IN A PUBLIC RIGHT OF WAY. 2. MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES MUTCD MUST BUILDING SETBACK REQUIREMENTS B1 SITE INFORMATION: A, within plus or minus 2% of optimum moisture for the full width of any dedicated street right-of-way. At the direction of VDOT Inspector, density tests performed by a qualified independent BE ADHERED TO WHEN WORKING IN A PUBLIC RIGHT OF F WAY.) FRONT:550' ADDRESS: 1033 AYLOR ROAD ons. A copy of all agency shall be conducted as required in the VDOT Road and Bridge Specifications. 3. THE CONTRACTOR WILL REMOVE ALL MUD AND DEBRIS FROM THE RIGHT OF WAY THAT LEFT: RIGHT: 0 TM #74 - ((A)) - 104 tests shall be submitted to VDOT prior to final VDOT approval. PUBLIC IS LEFT BY VEHICLES ENTERING AND V15. VDOT Standard CD and UD under -drains shall be installed where indicated on these plans and LEAVING THE SITE. REAR: 0 ZONED: B-1 further where determined necessaryb VDOT Inspector. y 4. ANY DAMAGE ON NEIGHBORING PROPERTY AND THE COUNTY ROADS BUILDING SETBACKS PROPOSED INSTRUMENT #030009698 v16. The installation of any entrances and mailboxes within any dedicated street right-of-way shall AND SIDEWALKS CAUSED BY THE DEVELOPMENT OF THIS SITE WILL BE THE RESPONSIBILITY OF THE DEVELOPER. ALL DAMAGE MUST BE REPAIRED FRONT: 201.2' USE: CARWASH (EXISTING) FIRE MARSHALL GENERAL NOTES meet VDOT minimum design standards and is the responsibility of the developer. v17. Prior to acceptance by VDOT of any streets, any required street signage and/or pavement TO ORIGINAL CONDITIONS. LEFT: 53.1' RIGHT: 67.4' OWNER/DEVELOPER;: 1. AN INSPECTION BY THE FIRE MARSHALL'S OFFICE WILL DETERMINE markings must be installed by the developer or at VDOT's discretion, by VDOT on an account 5. A CONSTRUCTION ENTRANCE MUST BE INSTALLED IN ACCORDANCE WITH `VIRGINIA REAR: 51.1' WHERE CURBING MUST BE PAINTED YELLOW. receivable basis. Stop signs shall be thirty (30) inches tall with high intensity sheeting. The bottom THE EROSION AND SEDIMENT CONTROL HANDBOOK» SECTION UP'PERCRUST » 2. NO PARKING - FIRE LANE SIGNS WILL BE PLACED ON THE SITE of the sign shall be six (6) feet above the edge of pavement and the post shall be installed a 3.02. THE CONTRACTOR MUST MAINTAIN THIS ACCESS FOR THE DURATION OF THE PROJECT. LLC AT THE FIRE MARSHALLS DISCRETION. minimum of four (4) feet from the edge of pavement. Sign posts shall be of a type found on 6. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE POSITIVE DRAINAGE 112-A BRUCE DRIVE VDOT's approved list. A copy of this list may be obtained from the District Material Section. Contact of THIS SITE. WINCHESTER, VA 22601 3. CONTRACTOR MUST ROTATE THE FIRE HYDRANT TO THE DIRECTION the local VDOT residency office with any questions regarding sign material and placement. 7. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL REQUIRED LAND (540) 7678-8746 AS DETERMINED BY THE FIRE MARSHALL V18. The developer must provide to the local VDOT office a list of all material sources prior to DISTURBANCE PERMITS PRIOR TO CONSTRUCTION. construction. Copies of all invoices for materials within any dedicated street right of way must be 8. ALL CONSTRUCTION WILL BE DONE FOLLOWING THE LAWS AND STEAL AND SIGNATURE provided to the local VDOT residency office prior to acceptance of the work. Unit and total prices GUIDELINES SET FORTH BY OSHA AND VOSH. TRIP GENERATION DATA maybe obscured. V19. Aggregate bases and sub -bases shall be placed on the sub -grade by means of a mechanical 9. THE CONTRACTOR WILL NOTIFY ARTZ AND ASSOCIATES AT (540) 667-3233 OF ANY DISCREPANCIES BETWEEN THE APPROVED PLANS AND NONE PROVIDED spreader. Density will be determined using the density control strip as specified in VDOT's 'Road and EXISTING SITE CONDITIONS. T F Bridge Specifications'(Section 304) an VTM-10. A certified compaction technician shall perform these 10. THE DEVELOPER IS RESPONSIBLE FOR THE RELOCATION OF ANY tests. A certified copy of the test results shall be provided to the Residency Office. In addition to UTILITIES REQUIRED BY THIS SITE PLAN. �. checking stone depths, A VDOT representative shall be notified and given the opportunity to be present 11. ALL EROSION AND SEDIMENT CONTROL DEVICES SHOWN IN THIS SITE during the construction and testing of the density control strip. PLAN ARE TO BE INSTALLED PRIOR TO CONSTRUCTION. o MICHAEL M. ARTZ y V J v20. Asphalt concrete pavement shall be placed in accordance with the latest edition of VDOT's 'Road 315). Density be determined the density 12. ALL CONTROLLED FILL MUST BE COMPACTED TO A MINIMUM OF 95% DENSITY FOLLOWING METHOD 'A' OF THE STANDARD PROCTOR ASTM-D698, No. 1513 0 and Bridge Specifications'(Section will using control strip as ® 1_�! l specified in Section 315 and VTM-76. A certified compaction technician shall perform these tests. A AASHTO-T99, OR VTM-1 AS APPLICABLE. ANY FILL PLACED UNDER certified copy of the test results shall be provided to the Residency Office. A VDOT representative BUILDINGS, STRUCTURES, OR PAVEMENT MUST BE INSPECTED AND 1tip '�L SURVE'TO shall be notified and given the opportunity to be present during the construction and testing of the APPROVED BY A PROFESSIONAL SOILS ENGINEER. A GEOTECHNICAL control strip. SUPERSEDES THIS NOTE IF PROVIDED. V21. Approval of these plans shall expire three (3) years from the date of the approval letter. 13. THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING MISS UTILITY THESE PLANS ARE IN CONFORMANCE WITH COUNTY PRIOR TO ANY SITE WORK. ALL UTILITIES SHOWN ON THIS PLAN ARE APPROXIMATE LOCATIONS AND NOT ALL UTILITIES MAY BE SHOWN. OF FREDERICK STANDARDS AND ORDINANCES. ANY DEVIATION 14. ANY WATER AND SANITARY SEWER CONSTRUCTION, MODIFICATION, OR OR CHANGE IN THESE PLANS SHALL BE APPROVED BY REPAIRS WILL BE IN ACCORDANCE WITH THE CURRENT STANDARDS AND SPECIFICATIONS SET BY THE CITY OF WINCHESTER DEPARTMENT OF PUBLIC THE ZONING ADMINISTRATOR PRIOR TO CONSTRUCTION. EROSION AND SEDIMENT CONTROL NOTES WORKS. THE CONTRACTOR WILL OBTAIN ALL NECESSARY PERMITS AND DC FREDERICK COUNTY PUBLIC WORKS APPROVAL GENERAL EROSION AND SEDIMENT CONTROL NOTES COORDINATE THE WORK WITH PUBLIC WORKS. �1 ES-1: Unless otherwise indicated, all vegetative and structural erosion and sediment control practices will be 15. THE CONTRACTOR WILL CONTAIN ALL LITTER AND DEBRIS ON SITE. �`' � �+ J constructed and maintained accordingto minimum standards and specifications of the j[rainia Erosion and'' Sediment Control Handbook and Virginia Regulations VR 625-02-00 Erosion and Sediment Control Regulations. THE WORK MUST BE LEFT IN AN ORDERLY MANNER AT THE END OF EACH WORK DAY. 16. AN APPROVED SET OF SITE PLANS MUST BE ON SITE DURING THE CONSTRUCTION PROCESS. t I,'�i �` ; :�.. I'p.`,. tb7 �.,z Z v J SURVEY NOTES 1. BOUNDARY AND TOPOGRAPHY SHOWN HEREON WAS TAKEN FROM ES-2: The plan approving authority must be noted one week prior to the preconstruction conference, one 17. THE CONTRACTOR WILL NOTIFY ALL UTILITY COMPANIES PRIOR TO . DIRECTOR DATE w SITE PLAN APPROVED ON 5/21/91 (#006-91) week prior to the commencement of land disturbing activity, and one week prior to the final inspection. EXCAVATION WITHIN EASEMENTS. 0 �_: H ® �-- 18. THE CONTRACTOR WILL SEED AND STRAW ANY DISTURB AREA THAT ES-3: All erosion and sediment control measures are to be placed prior to or as first step in clearing. WILL BE LEFT FOR MORE THAN THIRTY DAYS FOR SOIL STABILIZATION. FREDERICK COUNTY PLANNING DEPARTMENT APPROVAL lyQ ES-4: A copy of the approved erosion and sediment control plan shall be maintained on the site at all ® (Y ~ times. Z V ES-5: Prior to commencing land disturbing activities in areas other than indicated on these plans, (including, but not limited to, off -site borrow or waste areas), the contractor shall submit a supplementary erosion � � w 2 CL V CONTACT NUMBERS P LAN REVIEWER DATE BUBBLEWORKS CARWASH: control plan to the owner for review and approval by the plan approving authority. ~ FREDERICK COUNTY ZONING APPROVAL GEORGE DOWERY (540) 678-8746 ES-6: The contractor is responsible for installation of any additional erosion control measures necessary to W 7) prevent erosion and sedimentation as determined by the plan approving authority. L11 _ O v ENGINEERING FIRM: ® o ARTZ & ASSOCIATES, PLC (540) 667-3233 ES-7: All disturbed areas are to drain to approved sediment control measures at all times during land THERE ARE NOT ANY SINKHOLES, RIVERS, STREAMS, TJ disturbing activities and during site development until final stabilization is achieved. STEEP SLOPES, WOODLANDS, OR ANY ENVIRONMENTAL �� �`�� Q[ ® O w LU ZONING ENFORCEMENT: DEPARTMENT OF PLANNING (540) 665-5651 ES-8: During dewatering operations, water will be pumped into approved filtering device. FEATURES THAT WILL IMPACT THIS SITE DEVELOPMENT Z I NG AD I N I STRATO DATE > Q CrAo ® SITE INSPECTIONS: ES-9: The contractor shall inspect all erosion control measures periodically and after each runoff -producing rainfall event. Any necessary repairs or cleanup to maintain the effectiveness of the erosion control devices (OTHER THAN LIMESTONE OF COURSE) a V J O LE DEPARTMENT OF INSPECTIONS (540) 665-5650 shall be made immediately. THIS SITE PLAN IS VALID FOR (5) FIVE Aand Asaociaee, PL ub A SSubsidiary of Valley Engineering, PLC EROSION AND SEDIMENT CONTROL YEARS FROM THIS DATE OF APPROVAL DEPARTMENT OF PUBLIC WORKS (540) 665-5643 LAND SURVEYING LAND PLANNING DEVELOPMENT 16 East Piccadilly Street SANITARY SEWER AND WATER: WINCHESTER, VA 22601-4740 TEL 540-667-3233 FAX 540-667-9188 TOLL FREE 1-800-755-7320 FREDERICK COUNTY SANITATION AUTHORITY (540) 868-1061 OCTOBER 31, 2005 TELEPHONE: VERIZON (301) 954-6282 ELECTRIC: ALLEGHENY POWER (800) 654-3317 PROJECT #21521 GAS: SHENANDOAH GAS COMPANY (540) 869-1111 SHEET 2 OF 2 MISS UTILITY: 1-800-257-7777 L=192.68' R=2819.79' A=03'54'54" C LEN=192.64' BRG=N 34' 12'29" E A� 1 r I ! 1 TM #74B-5-1-1) WILLIAM L. STIEBEL I r I ! 558/382 ZONED 131 r t USE: DENTIST OFFICE 1 I � t I I 1 -- _ r Td j _ �— aive I � 1 J NJ > N f i II i it � � I d I/ 1 1/ � I EX. DI-3B / I / r / / r � � I I I 1 X � � r Z ( � I ■ V�tC• ► f i r f h' l EXIST TING BUILDING 2,400 SF k 4 BAY SELF WASH - — 1,800 SF — LOT "E" 0.98 AC. 114,: EXIST C&G 201.20' l i yyltj POA10 I I J EXIST C&G r v N A �,.• J1 " 2g4 81, '4� W \ r / r 1 r r + t I r + �X / / I 1 I I I I I \ \X. \\ ` L \ SMIN �1D� C PE PROP. STORAG \� 1 BNLI FE E` 240SF V)I I1AC,EX z D� Cf) 2' FT-1 C rrl 70 0 0 /O. 1 1 _ r / Q / i / 1 / 1 / TM 4474 A 105 1 / W. H. EMMART & SON, INC. i 367/545 ( ZONED 131 I USE: VACANT I / r � � t J TM #74B-7-2-27 TINA M. PEREZ, ETAL #030014183 ZONED RP USE: RESIDENTIAL / / 1 ' / 1 r r f r I I LPLYMN OWENS ESTATES \ SECTION 2 N. \ to t a, 1 � ( \ 2 TM #74B-7-2-28 KEVIN R. & STACEY E. CHAPMAN #030023195 ZONED RP USE: RESIDENTIAL z TM #74B-7-2-29 ROGER A. & CYNTHIA A. LAYMAN 672/507 ZONED RP USE: RESIDENTIAL LiJ p-1 H Or 9Xv — v 1 2 O MICHAEL M. Atv No. 1513 O ~ (C D Q r ` H LL v Z Q Lli w �c z H LL H O C) 111316 Q H oz Z or o H q Lu w �mJo � Artz and Associates, PLC A Subsidiary of Valley Engineering, PLC LAND SURVEYING LAND PLANNING DEVELOPMENT 16 Eost Piccadilly Street WINCHESTER, VA 22601-4740 TEL 540-667-3233 FAX 540-667-9188 TOLL FREE 1-800-755-7320 OCTOBER 31, 2005 SCALE 1" = 20' PROJECT #21521 1 SHEET 2 OF 2 MOT GENERAL NOTES SELECT MINIMUM STANDARDS FEROSIONAND In VDOT General Notes SELECT MINIMUM STANDARDS SEDIMENT CONTROL NARRATIVE All work on this project shall conform to the latest editions of the Virginia Department of Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after � as �' i 3 ?®, , Q �� Pffl= MEMMM Transportation (VDOT) Road and Bridge Specifications and Standards, the Virginia Erosion and Sediment final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within 7B > ' '�► This p'oj'd auam ei owwb cil of a 240 of 9 wop INAft ad ` °"m =N* 4raiii m"maw "aw' "m Control Regulations and any other state, federal or local regulations applicable. In the event of seven days to denuded areas that may not be at final grade but will remain dormant for longer `b conflict between any of these standards, specifications or plans, the most stringent shall govern. than 30 days. Permanent stabilization shall be applied to areas that are to be left dormant for V2. Al construction shall comply with the latest U.S. Department of Labor, Occupational Safety and more that one year., Health Administration and VOSH Rules and Regulations. V3. When working on VDOT right-of-way, all traffic control' whether permanent or temporary, shall be During construction of the project, soil stockpiles and borrow areas shall be stabilized or protected °,� 4 y� a ' �''ti,°' ✓ e a 5 e ffi in accordance with the current edition of VDOT's work area protection manual. Furthermore, all traffic with sediment trapping measures. The applicant is responsible for the temporary protection and *' control ftaggers must be certified in accordance with the latest edition of the VDOT Road and Bridge permanent stabilization of all soil stockpiles on site as well as borrow areas and soil intentionally � ... Specifications, Section 104.04-C. transported from the project site. , '� �e V4 The developer shall be responsible for relocating, at his expense, any and all utilities, including traffic signal poles, junction boxes, controllers, etc. owned by VDOT or private utility company. It is Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap , ' ��, F o �, ' >., 9 O the sole responsibility of the developer to locate and identify utility facilities or items which may be in sediment shall be constructed as a first step in any land disturbing activity and shall be made ,� � � z •� conflict with the proposed construction activity. VDOT approval of these plans does not relieve the functional before upslope land disturbance takes place. developer of this responsibility. V5. Design features relating to field construction, regulations, and control or safety of traffic may be Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions >9 Bo sq 'o ti �� subject to change as deemed necessary by VDOT. Any additional expense incurred as a result of any immediately after installation. ��, ''� Jog B field revision will be the responsibility of the developer. V6. Prior to initiation of work, the contractor shall be responsible for acquiring all necessary VDOT Underground utility lines shall be installed in accordance with the following standards in addition to ., ,.,� ? ° land use permits for any work on VDOT right-of-way. other applicable criteria: ,s� '' '� � 49 �' „ " e V7. If required by the local VDOT Residency Office, a pre -construction conference must be arranged -x more than 500 linear feet of trench may be opened one time. ¢9C and held by the engineer and/or developer with the attendance of the contractor, various County -Excavated material shall be placed on the uphill side of the trench. '�' � o, � o, agencies, utility companies and VDOT prior to initiation of work. -Flow from dewatering operations shall be filtered or passed through an '� rfa P ke -- .- �' V8. The contractor shall notify the local VDOT Residency Office when work is to begin or cease for approved sediment trapping divide or both, and discharged in a manner that any undetermined length of time. VDOT will also require 48 hours notice for any inspection. ✓9. The contractor will be responsible for maintaining adequate access to the project from the does not adversely affect flowing streams or off -site property. -Material used for back filling trenches shall be properly compacted in order ,B J ,��� �� t z , a r48q ,� � <� s ,°� w adjacent public roadway through construction and maintenance of a construction entrance in to minimize erosion and promote stabilization. i� R,. ��� ' 87 accordance with the Section 3.02. Furthermore, -Restabilization shall be accomplished in accordance with the regulations. / ,z 13 �• ,s access to other properties affected by this project shall be maintained through construction. The -Applicable safety regulations shall be complied with. Developer shall have, within the limits of the project, an employee certified by the Department of Where construction vehicles access routed intersect paved or public roads, provisions shall be made Conservation and Recreation in Erosion and Sediment Control who shall inspect erosion and siltation to minimize the transport of sediment by vehicular tracking onto the paved surface. Where sediment control devices and measures for proper installation and deficiencies immediately after each rainfall, is transported onto a paved or public road surface, the road surface shall be cleaned thoroughly at the day. Sediment be from the by TH of OFF - at least daily during prolonged rainfall, and weekly when no rainfall event occurs. end of each shall removed roads shoveling or sweeping and P� Contractor shall ensure adequate drainage is achieved and maintained on the site during and at transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual development lots as well as to VICINITY MAP 1 " = 500' the end of construction. the VI I - All water and sewer lines within existing or proposed VDOT right-of-way are to have minimum larger land -disturbing activities. Q MICHAEL M. ARTZ r 36" cover and when possible shall be installed under roadway drainage facilities at conflict points. All temporary erosion and sediment control measures shall be removed within 30 days after final site No. 513 PROJECT DATA: V12, Any unusual subsurface conditions encountered during the course of construction shall be immediately brought to the attention of the engineer and VDOT. Work shall cease in that vicinity until stabilization or after the temporary measures are no longer needed unless otherwise authorized by Lfl �l an adequate design can be determined by the engineer and approved by VDOT. the local program authority. Trapped sediment and the disturbed soil areas resulting from the disposition temporary be to further PROJECT: � '9 0 �� v i 3. All fill areas, borrow material and undercut areas shall be inspected an approved by VDOT of measures shall permanently stabilized prevent erosion and TOTAL AREA OF SITE: 0.98 ACRES O� SURVE'i representative prior to placement and fill. Where CBR testing is required, a VDOT representative shall sedimentation. CURRENT ZONING: B1 be present to insure the sample obtained is representative of the location. When soil samples are CURRENT USE: CAR WASH BUBBLEWORKS submitted to private laboratories for testing, the samples shall be clearly identified and labeled as PROPOSED STRUCTURE. STORAGE SHED belonging to a project which will be accepted by VDOT and that testing shall be conducted according GENERAL NOTES BUILDING HEIGHT ALLOWED: 35' MAX. CARWASH to all applicable VDOT standards. BUILDING HEIGHT PROPOSED: 10' V14. All roadway fill, base, subsurface material and backfill of utility/storm sewer trenches shall be 1. PERMITS MUST BE ISSUED FROM VDOT PRIOR TO ANY CONSTRUCTION F.A.R.: 1.0 compacted in 6' lifts to 95% of theoretical maximum density as determined by AASHTO T-99 Method IN A PUBLIC RIGHT OF WAY. 2. MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES MUTCD MUST BUILDING SETBACK REQUIREMENTS B1 SITE INFORMATION: A, within plus or minus 2% of optimum moisture for the full width of any dedicated street right-of-way. At the direction of VDOT Inspector, density tests performed by a qualified independent BE ADHERED TO WHEN WORKING IN A PUBLIC RIGHT OF F WAY.) FRONFTT: 550' ADDRESS: 1033 AYLOR ROAD agency shall be conducted as required in the VDOT Road and Bridge Specifications. A copy of all 3. THE CONTRACTOR WILL REMOVE ALL MUD AND DEBRIS FROM THE WAY THAT RIGHT: 0 TM #74 - ((A)) - 104 tests shall be submitted to VDOT prior to final VDOT approval. PUBLIC RIGHT OF IS LEFT BY VEHICLES ENTERING AND V15. VDOT Standard CD and LID under -drains shall be installed where indicated on these plans and THE SITE. REAR: 0D ZONED: B-1 further where determined necessaryb VDOT Inspector. y 4. ANY DAMAGE ON NEIGHBORING PROPERTY AND THE COUNTY ROADS BUILDING SETBACKS PROPOSED INSTRUMENT #030009698 V16. The installation of any entrances and mailboxes within any dedicated street right-of-way shalt AND SIDEWALKS CAUSED BY THE DEVELOPMENT OF THIS SITE WILL BE THE RESPONSIBILITY OF THE DEVELOPER. ALL DAMAGE MUST BE REPAIRED FRONT: 201.2' USE: �CARWASH (EXISTING) FIRE MARSHALL GENERAL NOTES meet VDOT minimum design standards and is the responsibility of the developer. v17. Prior to acceptance by VDOT of any streets, any required street signage and/or pavement TO ORIGINAL CONDITIONS. LEFT: 53.1' RIGHT: 67.4' OWNER/DEVELOPER: 1. AN INSPECTION BY THE FIRE MARSHALL'S OFFICE WILL DETERMINE markings must be installed by the developer or at VDOT's discretion, by VDOT on an account 5. A CONSTRUCTION ENTRANCE MUST BE INSTALLED IN ACCORDANCE WITH *VIRGINIA REAR: 51.1' WHERE CURBING MUST BE PAINTED YELLOW. receivable basis. Stop signs shall be thirty (30) inches tall with high intensity sheeting. The bottom THE EROSION AND SEDIMENT CONTROL HANDBOOK" SECTION 3.02. THE CONTRACTOR MUST MAINTAIN THIS ACCESS FOR THE DURATION UPPERCRUST LLC M M 2. NO PARKING - FIRE LANE SIGNS WILL BE PLACED ON THE SITE of the sign shall be six (6) feet above the edge of pavement and the post shall be installed a OF THE PROJECT. 112-A BRUCE DRIVE AT THE FIRE MARSHALL'S DISCRETION. minimum of four (4) feet from the edge of pavement. Sign posts shall be of a type found on 6. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE POSITIVE DRAINAGE VDOT's approved list. A copy of this list may be obtained from the District Material Section. Contact OF THIS SITE. WINCHESTER, VA 22601 3. CONTRACTOR MUST ROTATE THE FIRE HYDRANT TO THE DIRECTION the local VDOT residency office with any questions regarding sign material and placement. 7. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL REQUIRED LAND (540) 7678-8746 AS DETERMINED BY THE FIRE MARSHALL. V18. The developer must provide to the local VDOT office a list of all material sources prior to DISTURBANCE PERMITS PRIOR TO CONSTRUCTION. construction. Copies of all invoices for materials within any dedicated street right of way must be 8. ALL CONSTRUCTION WILL BE DONE FOLLOWING THE LAWS AND SEAL AND SIGNATURE provided to the local VDOT residency office prior to acceptance of the work. Unit and total prices GUIDELINES SET FORTH BY OSHA AND VOSH. TRIP GENERATION DATA may be obscured. V19. Aggregate bases and sub -bases shall be placed on the sub -grade by means of a mechanical 9. THE CONTRACTOR WILL NOTIFY ARTZ AND ASSOCIATES AT (540) 667-3233 OF ANY DISCREPANCIES BETWEEN THE APPROVED PLANS AND NONE PROVIDED spreader. Density will be determined using the density control strip as specified in VDOT's 'Road and EXISTING SITE CONDITIONS. Li H OF Bridge Specifications'(Section 304) and VTM-10. A certified compaction technician shall perform these 10. THE DEVELOPER IS RESPONSIBLE FOR THE RELOCATION OF ANY tests. A certified copy of the test results shall be provided to the Residency Office. In addition to UTILITIES REQUIRED BY THIS SITE PLAN. �� �••i� checking stone depths, A VDOT representative shall be notified and given the opportunity to be present 11. ALL EROSION AND SEDIMENT CONTROL DEVICES SHOWN IN THIS SITE during the construction and testing of the density control strip. PLAN ARE TO BE INSTALLED PRIOR TO CONSTRUCTION. MICHAEL M. A TZ P V j V20. Asphalt concrete pavement shall be placed in accordance with the latest edition of VDOT's 'Road 12. ALL CONTROLLED FILL MUST BE COMPACTED TO A MINIMUM OF 95% 'A' No. 1513 and Bridge Specifications'(Section 315). Density will be determined using the density control strip as DENSITY FOLLOWING METHOD OF THE STANDARD PROCTOR ASTM-D698, specified in Section 315 and VTM-76. A certified compaction technician shall perform these tests. A AASHTO-T99, OR VTM-1 AS APPLICABLE. ANY FILL PLACED UNDER certified copy of the test results shall be provided to the Residency Office. A VDOT representative BUILDINGS, STRUCTURES, OR PAVEMENT MUST BE INSPECTED AND SURVE'IO shall be notified and given the opportunity to be present during the construction and testing of the APPROVED BY A PROFESSIONAL SOILS ENGINEER. A GEOTECHNICAL control strip. SUPERSEDES THIS NOTE IF PROVIDED. V21. Approval of these plans shall expire three (3) years from the date of the approval letter. 13. THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING MISS UTILITY THESE PLANS ARE IN CONFORMANCE WITH COUNTY (Y PRIOR TO ANY SITE WORK. ALL UTILITIES SHOWN ON THIS PLAN ARE APPROXIMATE LOCATIONS AND NOT ALL UTILITIES MAY BE SHOWN. OF FREDERICK STANDARDS AND ORDINANCES. ANY DEVIATION 14. ANY WATER AND SANITARY SEWER CONSTRUCTION, MODIFICATION, OR OR CHANGE IN THESE PLANS SHALL BE APPROVED BY Q REPAIRS WILL BE IN ACCORDANCE WITH THE CURRENT STANDARDS AND SPECIFICATIONS SET BY THE CITY OF WINCHESTER DEPARTMENT OF PUBLIC THE ZONING ADMINISTRATOR PRIOR TO CONSTRUCTION. EROSION AND SEDIMENT CONTROL NOTES WORKS. THE CONTRACTOR WILL OBTAIN ALL NECESSARY PERMITS AND (y GENERAL EROSION AND SEDIMENT CONTROL NOTES FREDERICK COUNTY PUBLIC WORKS APPROVAL COORDINATE THE WORK WITH PUBLIC WORKS. ES-1: Unless otherwise indicated, all vegetative and structural erosion and sediment control practices will be 15. THE CONTRACTOR WILL CONTAIN ALL LITTER AND DEBRIS ON SITE. L.L constructed and maintained according to minimum standards and specifications of the Virginia Erosion and THE WORK MUST BE LEFT IN AN ORDERLY MANNER AT THE END OF EACH WORK DAY. z SURVEY NOTES Sediment Control Handbook and Virginia Regulations VR 625-02-00 Erosion and Sediment Control Regulations. 16. AN APPROVED SET OF SITE PLANS MUST BE ON SITE DURING THE Q CONSTRUCTION PROCESS. J 1. BOUNDARY AND TOPOGRAPHY SHOWN HEREON WAS TAKEN FROM ES-2: The plan approving authority must be notified one week prior to the preconstnuction conference, one 17. THE CONTRACTOR WILL NOTIFY ALL UTILITY COMPANIES PRIOR TO ''' ;, DIRECTOR DATE W SITE PLAN APPROVED ON 5/21 /91 (#006-91) week prior to the commencement of land disturbing activity, and one week prior to the final inspection. EXCAVATION WITHIN EASEMENTS.F- 18. THE CONTRACTOR WILL SEED AND STRAW ANY DISTURB AREA THAT , NS161 ES-3: All erosion and sediment control measures are to be placed prior to or as first step in clearing. WILL BE LEFT FOR MORE THAN THIRTY DAYS FOR SOIL STABILIZATION. FREDERICK COUNTY PLANNING DEPARTMENT APPROVAL c H ES-4: A copy of the approved erosion and sediment control plan shall be maintained on the site at all / ® II Z Z times. Z v ES-5: Prior to commencing land disturbing activities in areas other than indicated on these plans,(including, 9 g pPLAN (ID W CONTACT NUMBERS but not limited to, off -site borrow or waste areas), the contractor shall submit a supplementary erosion REVIEWER DATE BUBBLEWORKS CARWASH: control plan to the owner for review and approval by the plan approving authority. CL V GEORGE DOWERY (540) 678-8746 ES-6: The contractor is responsible for installation of any additional erosion control measures necessary to Z W �- ::) FREDERICK COUNTY ZONING AP P R OVAL prevent erosion and sedimentation as determined by the plan approving authority. W LL kn O ENGINEERING FIRM: ARTZ &ASSOCIATES, PLC (540) 667-3233 ES-7: All disturbed areas are to drain to approved sediment control measures at all times during land disturbing activities and during site development until final stabilization is achieved. THERE ARE NOT ANY SINKHOLES, RIVERS, STREAMS, _ Q v o Y � tj ® ZO ZONING ENFORCEMENT: STEEP SLOPES, WOODLANDS, OR ANY ENVIRONMENTAL �� �� ���� W:D Z LL, DEPARTMENT OF PLANNING (540) 665-5651 ES-8: During dewatering operations, water will be pumped into approved filtering device. FEATURES THAT WILL IMPACT THIS SITE DEVELOPMENT ONING ADMINISTRATOR DATE > C1 a Qww SITE INSPECTIONS: ES-9: The contractor shall inspect all erosion control measures periodically and after each runoff -producing rainfall event. Any necessary repairs or cleanup to maintain the effectiveness of the erosion control devices (OTHER THAN LIMESTONE OF COURSE) ® � V _1 O � DEPARTMENT OF INSPECTIONS (540) 665-5650 shall be made immediately. THIS SITE PLAN IS VALID FOR (5) FIVE Aend Associates, PLC EROSION AND SEDIMENT CONTROL: YEARS FROM THIS DATE OF APPROVAL DEPARTMENT OF PUBLIC WORKS (540) 665-5643 Sub A Subsidiary of Valley Engineering, PLC LAND SURVEYING LAND PLANNING DEVELOPMENT 16 East Piccadilly Street SANITARY SEWER AND WATER: WINCHESTER, VA 22601-4740 TEL 540-667-3233 FAX 540-667-9188 FREDERICK COUNTY SANITATION AUTHORITY (540) 868-1061 TOLL FREE 1-800-755-7320 OCTOBER 31, 2005 TELEPHONE: VERIZON (301) 954-6282 ELECTRIC: ALLEGHENY POWER (800) 654-3317 PROJECT #21521 GAS: SHENANDOAH GAS COMPANY (540) 869-1111 SHEET 2 OF 2 MISS UTILITY: 1-800-257-7777 L=192.68' R=2819.79' ,L=03'54'54" C LEN=192.64' BRG=N 34' 12'29" E q TM #74B-5-1-D WILLIAM L. STIEBEL 558/382 ZONED 131 USE: DENTIST OFFICE 41 / TM #74-A-105 W. H. EMMART & SON, INC. 1 3ZONED B5 f ' ► USE: VACANT I I � I I r f N TM #74B-7-2-27 TINA M. PEREZ, ETAL #030014183 ZONED RP USE: RESIDENTIAL i r r , / — -- \ \\ \ PLYMN OWENS ESTATES \� SECTION 2 Lp ?Li TM #74B-7-2-28 KEVIN R. & STACEY E. CHAPMAN #030023195 ZONED RP USE: RESIDENTIAL TM #74B-7-2-29 ROGER A. & CYNTHIA A. LAYMAN 672/507 ZONED RP USE: RESIDENTIAL w 0 H OF �/p MICHAEL M. ATZ v No. 1513 y 0 � SURV03�� Artz and Associates, PLC A Subsidiary of Valley Engineering, PLC LAND SURVEYING LAND PLANNING DEVELOPMENT 16 East Piccadilly Street WINCHESTER, VA. 22601-4740 TEL 540-667-3233 FAX 540-667-9188 L TOLL FREE 1-800-755-7320 OCTOBER 31, 2005 SCALE 1" = 20' PROJECT #21521 1 SHEET 2 OF 2