HomeMy WebLinkAbout34-01 Tri-State Nissan - Shawnee - Backfile (2)SITE PLAN CHECKLIST
The checklist below indicates all the information that needs to be submitted as part of the site plan
application. All required information must be submitted prior to the final approval of any site plan. The
Department of Planning and Development will review the application to ensure that it is complete. If
any portion is not included or complete, the site plan application will not be accepted and returned to
the applicant(s).
Site Plan Package
1. One set of approved comment sheets are required from the following review
agencies prior to final site plan approval. It is recommended that applicants contact
the Department of Planning and Development to determine which review agencies
are relevant to their site plan application.
II
Virginia Department of Transportation (VDOT)e"l,,IC/p 1
V Frederick County Sanitation Authority '�Jj& I6t
Department of Planning and Development
Inspections Department 'i� I.O�Cj b L
V Frederick County Engineer (Public Works) loi j o i
Frederick County Fire Marshal QIl to 1
Department'of-Parksand-Rer,reation--
2. One copy of the Site Plan application
3. Five Copies of the Final Site Plan for approval
--4.-- One reproducible copy of the Site Plan (if required,)
5.---A--35mm-slide-of-the-Site-Plan-(if_requ ired.)___
ty Health Department
--City-of-Win chester—
Town-of-Middletown—
_Airport-Authority--
-Soil-& Water -Conservation -District
-Request-for-Street-Name
8
Date:
SITE PLAN TRACKING SHEET
File opened
Reference Manual updated/number assigned
D-base updated
File given to Renee' to update Application Action Summary
CLOSE OUT FILE:
- 61 Approval (or denial) letter mailed to applicant/copy made for file
,/ File stamped "approved", "denied" or 'withdrawn"
L11,— Reference Manual updated
D-base updated
DI File given to Renee' for final update to Application Action Summary
U \Cuol\Common\Site Mw Tucking wpd
Revised O3106101
RECEIPT Date 8__ �" I/l 002291
Received From —fV / — -!�' % /1 7 f_
Address
Li
For
W AMT PAIL
BALANCE
WE
IT HOW PAID
Dollars $ 1,0�
'e/0 -;I
0
•
5 ..,_ • 11
Mr. Jason Thomas
Creenway Engineering
151 Windy Hill Lane
Winchester, Virginia 22601
COUNTY of i+ REDERICK
Department of Planning and Development
540/665-5651
FAX: 540/ 665-6395
A pPa v al
RE: eats, Tri-State Nissan; Lot Expansion, Site Plan 43"l
Property Identification Number (PIN) 64-A-89A
Dear Mr. Thomas:
The Frederick County Department of Planning and Development administratively approved the above -
referenced plan on October 9, 2001 The site plan meets all requirements for development in the B2 Zoning
District. Currently, there are no adverse comments by any ofthe required review agencies, however, any future
comments by these agencies should be addressed promptly. Primary improvements of this development include
expansion of parking areas to create 64 additional display spaces and the appropriate landscaping required with
this expansion. This includes the planting of 41 trees.
I am providing you with several copies of the approved site plan. Please forward these to the appropriate
representative for Tri-State Nissan. Furthermore, please advise the owner that a copy should be kept for future
reference and an approved copy must be kept on the construction site throughout the development process.
Once site development is complete, please contact this office to schedule an on -site inspection.
Please do not hesitate to contact me if you have any questions.
Sincerely,
Rebecca Ragsdale, Planner I
RAR/kac
Enclosures
V: Webetcnl4ilr P1aW'&-A e'WP- wq!
• 0
GREENWAY ENGINEERING
2461 Montvale Road Roanoke, VA 24015
Telephone 540-974-0369
MEMORANDUM
TO: PROM:
Rebecca Ragsdale Jason Thomas
COMPANY: DATE:
Frederick County Planning OCTOBER 4, 2001
RE: YOUR IZI?I7ERENCE NUMBER:
Tri-State Nissui 0176
❑ URGENT X FOR REVIEW ❑ PLEASE COMMEN"r ❑ PLEASE REPLY ❑ PLEASE RECYCLE-
NOTES/COMMENTS:
Rebecca: Please accept the attached agency approvals for the above -referenced project. I
will contact you on Friday to discuss the Site Plan approval.
Thanks!
Engineers Surveyors
Pounded in 1971
11
9
Request For Site Plan Comments
Frederick County Fire Marshal
Mail to:
Frederick County Fire Marshal
Attn: Fire Marshall
107 North Kent Street
Winchester, VA 22601
(540) 665-6350
Hand deliver to:
107 N. Kent Street
First Floor
Winchester, VA
(540) 665-6350
Please fill out the information as accurately as possible in order to assist the agency with
their review. Please attach two (2) copies of the site plan with this sheet.
Applicant's Name: _ Greenway Engineering
Address: 151 Windy Hill Lane Winchester VA 22602
Phone Number: r (540) 662-4185
Name of development and/or description of the request: Tri-State Nissan parking lot
addition
Location of property: 1230 Millwood Pike
Fire Marshall's Comments:
(Fire and Rescue Dept. use only
Date received `7-31-a1
Incomplete
Date reviewed �r 1
Signature and Date
Signature and Date (revision
Date revision received Date approved
Incomplete
Date re iewed .
• 0
COUNTY OF FREDERICK, VIRGINIA
FIRE MARSHAL'S OFFICE
LAND DEVELOPMENT COMMENTS
Control No. SPO1-0040 Date Received 7/31/01 Date Reviewed 8/06/01
Applicant Greenway Engineering Plan Rev. Date:
Address 151 Windy Hill Lane
Winchester, Va. 22602
Project Name Tri-State Nissan Phone No.540-662-4185
Type of ApplicationSite Plan Current Zoning B2
1st Due Fire Co. 21 1st Due Rescue Co. 21 Election DistrictShawnee
Tax I.D. No. 64-A-89A
RECOMMENDATIONS
Automatic Sprinkler System Residential Sprinkler System
Automatic Fire Alarm System Other
REQUIREMENTS
Emergency Vehicle Access
Adequate XX Inadequate Not Identified
Fire Lanes Required Yes No XX
Comments
Roadway/Aisleway Widths Adequate XX Inadequate Not Identified
Special Hazards Noted Yes XX No
Comments : Water supplies for firefighting.
Hydrant Locations Adequate Inadequate Not Identified XX
Siamese Location Adequate Inadequate Not Identified XX
Additional Comments Attached? Yes No XX
Plan Approval Recommended? Yes XX No
Signature n
0
0
COMMONWEALTH of VIRGI IA
CHARLES D. NOTTINGHAM
COMMISSIONER
Mr, Jason J. Thomas, P.E.
C/O Greenwa;/ Engineering
151 Windy Hill Lane
Winchester, VA 22602
DEPARTMENT OF TRANSPORTATION
EDINBURG RESIDENCY
14031 OLD VALLEY PIKE
EDINBURG. VA 22824
August 10, 2001
Ref: Tri State Nissan
Route 781, Prince Frederick Drive, & Routes 17/50
Frederick County
Dear Jason:
JERRY A. COPP
RESIDENT ENGINEER
TELE (540) 984-5600
FAX (540) 984-5607
We have received your revised site plan dated 04/06/01 (received 07/31/01) for the referenced
project. It appears all of our earlier review comments have been satisfactorily addressed.
Please advise the owner of our approval. Also please provide seven (7) sets of approved
construction plans with signed seal for VDOT distribution.
The construction plans should include the following notes, placed near Structure #1:
1. A double line of conduits is in place near south side of DI Structure #1. Care should be
exercised not to damage the conduits.
2. Installation of the new 15" culvert into the existing DI Structure #1 should be accomplished
without excessive damage to structure walls at risk of being liable to replace entire
structure.
The appropriate land use permit may now be applied for to cover work within the Routes 17/50
& 781 rights -of -way. The permit is issued by this office and will require a minimum processing
fee, surety bond coverage, and the salary & expenses of a State assigned Inspector.
Once satisfactory application has been made, a permit will normally take approximately thirty
days to process and issue. Should you have any questions, do not hesitate to call.
Sin r y,
13al,-� -Barry J. Sweitzer, Trans. Roadway
For: Steven A. Melnikoff, Transportation Engineer
BJS/rf
Enclosure
xc: Mr. Dave Heironimus
Mr. Evan Wyatt
WE KEEP VIRGINIA MOVING
•
�J
Request For Site Plan Comments
Frederick County Sanitation Authority
Mail to: Hand deliver to:
Frederick County Sanitation Authority 315 Tasker Road
Attn: Engineer Director Stephens City, VA
P.O. Box 1877 (540) 868-1061
Winchester, VA 22604
(540) 868-1061
Please fill out the information as accurately as possible in order to assist the agency with their
review. Please attach two (2) copies of the site plan with this sheet.
Applicant's Name: Greenway Engineering
Address: 151 Windy Hill Lane Winchester, VA 22602
Phone Number: — (540) 662-4185
Name of development and/or description of the request: Tri-State Nissan parking lot addition
Location of property: 1230 Millwood Pike
Frederick County Sanitation Authority's Comments: % `j� 1'~�• ji;"�1,
Sanitation Authority use only
Date received Date revision received Date approved
Incomplete Incomplete
Date reviewed Date
Signature anreviewe t�
Si d Date V� �ev
�' �!� li E •3 J
Signature and Date (revision)
Request For Site Plan Comments
Fi ederick County Inspections Department
Mail to:
Frederick County Inspections Dept.
Attn: Building Official
107 North Kent Street
Winchester, VA 22601
(540) 665-5650
Band deliver to:
107 N. Kent Street
Fourth Floor
Winchester, VA
(540) 665-5650
Please fill out the information as accurately as possible in order to assist the agency with
their review. Please attach one (1) copy of the site plan with this sheet.
Applicant's Name: _ Greenway Engineering
Address: 151 Windy Hill Lane Winchester, VA 22601
Phone Number: — (540) 662-4185
Name of development and/or description of the request: Tri-State Nissan parking lot
addition
Location of property: 1230 Millwood Pike
Inspections Department's Comments:
No conunent required.
Inspections Dept use only _
Date received
Incomplete
Date reviewed
Signature and Date
Signature and Date (revision) _
Date revision received..; Date approved
Incomp etc
Date e i ed
rL
9!b"-)0",
1 / v
COUNTY of FREDERICK
Department of Public Works
540/665-5643
FAX: 540/ 678-0682
October 1, 2001
Mr. Jason J. Thomas, P.E.
Greenway Engineering
151 Windy Hill Lane
Winchester, Virginia 22602
Re: Site Plan Comments - Tri-State Nissan
Frederick County, Virginia
Dear Jason:
Upon review of the revised site plan dated September 10, 2001, all of our previous
comments have been addressed. Therefore, we recommend approval of the subject site plan.
If you have any questions, do not hesitate to contact me
Sincerely,
Joe C. Wilder
Civil Engineer
J cw
cc: Frederick County Planning Department
file
107 North Kent Street • Winchester, Virginia 22601-5001)
1b��161�
C
I
Mr. Jason J. Thomas, P.E.
Greenway Engineering
151 Windy Hill Lane
Winchester, Virginia 22602
Re: Site Plan Comments - Tri-State Nissan
Frederick County, Virginia
Dear Jason:
COUNTY of FREDERICX
Department of Public Works
August 16, 2001
Upon review of the subject site plan, we offer the following comments:
1. Indicate how culvert one(1) will discharge and provide a detail.
540/665-5643
FAY: 540/678-0632
2. The detail for the proposed silt fence shall indicate that wire reinforcement is required or
provide a diversion berm with a rock check dam.
3. Provide a permanent riser structure for the proposed stormwater pond to help prevent
clogging. Provide a level spreader and/or outlet protection at the outfall of the pond. Provide a
detail of the proposed weir and the lining of the spillway.
4. A signature block on the cover sheet of the plans is required naming a certified land disturber
for the project.
5. Revise the seeding note on sheet 4 of 5 to include an appropriate nurse seed mix. Sercia
lespedeza is not recommended in this application.
6. Provide dimensions of the proposed sediment trap based on the drainage area.
7. Place a note on the plan indicating that a land disturbance permit shall be obtained from our
office. Also, place a note indicating a pre -construction meeting on-- site shall be required prior to
commencing site grading work.
107 Kurth lent Street Winchester, Virginia 2_001-5Olil)
•
f`
Site Plan Comments - Tri-State Nissan
August 16, 2001
Page 2
Once these comments are addressed, submit two (2) copies of the plan for further review.
If you have any questions, do not hesitate to contact me
j cw
cc: Frederick County Planning Department
file
Sincerely,
ajo�CGZ&--'
ec. Wilder
Civil Engineer
COUNTY of Ii REDERICK
Department of Planning and Development
540/665-5651
FAX: 540/665-6395
August 8, 2001
Mr. Jason Thomas
Greenway Engineering
151 Windy Hill Lane
Winchester, Virginia 22601
RE: Review Comments, Tri-State Nissan; Lot Expansion, Site Plan #34-01
Property Identification Number (PIN) 64-A-89A
Dear Mr.Thomas:
Thank you for the recent submission of the above -referenced site plan. I have completed a review
of the plan and would like you to address a few issues in a revision. I have enclosed a red -lined copy
of the site plan to clarify the concerns of staff. Please note the comments I have made below.
Review Comments
1. Please remember to sign the engineer's seal on all pages of the final site plan.
2. L-,/'Please provide a space labeled, "Approved by the Zoning Administrator," for the approval
signature and date. Also, please provide a statement that approval is valid for five years. The
County Administrator and Planning Director's signatures are not required for this site plan
approval.
3. Please provide a statement to the effect that all outdoor lighting will be directed away from
adjoining properties.
4. ✓ P ease show and label all trash receptacles.
5. Please provide the height of all structures.
107 North Kent Street ^ Winchester, Virginia 22601-5000
•
Page 2
Mr. Jason Thomas, Greenway Engineering
Re: Site Plan #34-01, Tri-State Nissan
August 8, 2001
•
6. Please show and label the location of the sales office and all other uses in the primary
structure, such as the service garage. Please label the western parking area as proposed
parking lot expansion so there is no confusing it as a display area. ✓
7.✓ Please show the posted or un osted speed limit for all adjacent roads. U
P P P �
8. Please add more detail to your parking calculations to include the required number of spaces
and how that is determined. Also, please show the total number of spaces for display and
the total number of regular spaces. 15t #
1► 0v4 �C- cak-"O
9kV Please illustrate on the site plan which parking areas are designated only f6r existing
d proposed. Also, please illustrate which parking spaces are for regular use.
�(✓ On the west'side of the parking lot, where there is a row of proposed spaces for display, it
is not clear how the configuration of spaces will be after changes are made. You show three
rows" f spaces, but there is only room for two. Please change the site plan to show which
#aces will actually exist after the changes are made.
11. ,� Please show the location and dimension of all existing and proposed signs.
12. Please provide the perimeter of the parking area when calculating yourperimeter landscaping
requirements. Furthermore, please provide the total number of regular parking spaces when
calculating interior landscaping requirements.
13z Please show and label all loading spaces and maneuvering areas.
14. v Please provide the location of all improvements necessary to meet the fire code requirements.
15. ✓ Please show all underground utilities, if any exist in the project area.
AA wv�
V, i 'I WO-T(-f
UO�A
0
Page 3
Mr. Jason Thomas, Greenway Engineering
Re: Site Plan #34-01; Tri-State Nissan
August 8, 2001
After you have revised the site plan, please resubmit one copy so that I may verify the information
on the plan. I will then need all approved review agency comments and five copies of the final site
plan for approval. Comment sheets are required from the following agencies:
Frederick County Engineer (Public Works)
Frederick County Fire Marshall
Virginia Department of Transportation
,O�Aj-"
Frederick County Inspections Department
If you have any questions concerning this review, please do not hesitate to contact me.
Sincerely,
-K'L'.cca- 4T�u
Rebecca Ragsdale
Planner I
RAR/bah
Enclosure
s
E
0
SITE PLAN APPLICATION
1. Project Title: Tri-State Nissan Parking Lot Expansion
2. Location of Property 1230 Millwood Pike
(street address) Winchester VA 22602
3. Property Owner: Marlow Investments L.C.
Address: 707 North Commerce Ave,
Front Royal VA 22630
Telephone: (540) 667-6800 (Steve Ward)
4. Applicant/Agent Greenway Engineering
Address 151 Wince Hill Lane Winchester, VA 22602
Telephone: (540) 662-4185
5. Designer:
Address:
Telephone:
Contact:
Jason Thomas
same as agent
Jason Thomas
6a. Is this a standard or 'minor' site plan?
6b. Is this an original or revised site plan?
7a. Total acreage of parcel to be developed
7b. Total acreage of parcel:
8. Property Information:
a) Property Identification Number:
b) Current Zoning:
c) Present Use:
d) Proposed Use:
e) Adjoining Property Use(s)
f) Adjoining Property Identification Number(s)
g) Magisterial District(s)
Standard X Minor
Original Revised X
1.236 acres
5.363 acres
64-(A)-89A
B-2
Auto Sales
Auto Sales
Vacant
64((A))97, 64((A)) 100, 64((A))100A
64((10))2, 64((A))92
Shawnee
I have read the material included in this package and understand what is required by the
Frederick County Planning Department. I also understand that all required material will be
complete prior to the submission of my site plan.
Signature:
Date: 3 D
0
STORMWATER MANAGEMENT PLAN
TRI-STATE NISSAN
LOT EXPANSION
FREDERICK COUNTY, VIRGINIA
July 25, 2001
GREENWAY ENGINEERING
0 •
STORMWATER MANAGEMENT PLAN
TRI-STATE NISSAN
July 25, 2001
Description:
Two new display areas and parking lot expansion have been proposed for the existing
Tri-State Nissan (formerly G.W. Motors) site at the corner of Route 50 and Prince
Frederick Drive in Frederick County, Virginia. The project consists of a new paved areas
and stormwater controls. The project site is located adjacent to existing paved areas.
Existing Conditions
Tri-State Nissan currently occupies the site. A majority of the proposed project area is
open and grass -covered. Soils belong to the Blairton silt loam (313), which has a
hydrologic soil group C. The site is divided into two drainage areas. The northern
portion of the site drains to the existing storm sewer along Route 50 (Outfall A). The
rational method was used to deternvne the adequacy of the existing storm sewer system.
The southern portion of the site drains off site (Outfall I3). I-IydraIlow Hydrographs
v6.01 was used to develop 2- and 10-year 24-hour unit hydrographs for the southern
drainage area. PRE-D consisted of 1.4 acres with a curve number of 85 and time of
concentration of 5 minutes.
Storin Structure Sizing
All storm structures on site were sized to pass a 10-year storm. Calculations are provided
in Attachment A.
Stornnvater Management Quantity Control
Outfall A
Based on the post -development flow rates presented in Attachment B, the existing storm
sewer provided adequate capacity to handle the increased 10-year storm flow.
Outfall B
A stormwater detention pond was located at Outfall B in order to attenuate 2- and 10-year
peak flows. POST-D consisted of 1.4 acres with a curve number of 88 and time of
concentration of 5 minutes.
A double 16'-12" PVC pipe at 0.5% was selected as the main control structure. A 10'
emergency overflow weir was set at 700.0' and the top of darn was set at 700.5'. The
100-year storm was stored at 700.22'. Pond routing results are tabulated below:
Storm
Pre-Devel. (cfs)
Pond Outflow
Storage Elev.
2
3.80
2.73
699.5
10
7.65
6.65
699.95
Based on the above results, POND A provided adequate storage to attenuate the 2- and
10-year post -development storm peaks to the respective pre -development rates. Pond
routing calculations are provided in Attachment B.
•
•
ATTACHMENT A
TRI-STATE NISSAN
Storm Sewer Sizing Calculations
0
10r--r�r---�^--
y
!
04 CUR$
r
O j e{ �� W
Z� C,3 �' ■
Or— L —14
• I A r CLIAR OF"IW ARICA
P : 2 W + L (WITH CURB)
P ■2(W+1.) (WITHOUT CUFA)
0,1
1 2 S 4 7 i IQ 20 30 40 50 W So 100
yy USCUAM o rR 3is)
CHART 14 Grate inlet capacity in sump conditions_
,.S 77t Z = /C' = / 0
4.60
Rev 6-85
STORM SEWER DESIGN COMPUTATIONS
nlHl_C] (.PP) - 0 01
FROM
POINT
TO
POINT
D.A.
D.A.
(acres)
RUNOFF
COEF. (C)
CA
INLET Tc
(MIN)
I
(IN/HR)
a (10)
(CFS)
INV. IN
INV. OUT
LENGTH
(FT)
SLOPE
(FT/FT)
HEIGHT, B
(IN)
WIDTH, W
(IN)
DES. CAP.
(CFS)
VEL
(FT/SEC)
FLOW
TIME (MIN)
NOTES
Cap. Chk
INCR.
ACCUM.
A
1.38
0.82
1.13
2.31
8.6
5.8
13.42
675.76
675.24
54
0.010
18
18
13.43
7.60
0.1
ex RCP
0. k.
1
2
B
0.77
0.84
0.64
0.64
5.0
6.8
4.38
683.00
676.00
24
0.292
15
15
45.43
37.04
0.0
RCR
o.k.
C
0.97
0.55
0.53
0.53
10.0
5.5
2.94
E
LD-229
Inlets
7/25/01
ATTACIIMENT B
TRI-STATE NISSAN
I-Iydrograph and Pond Routing Calculations
Hydrograph Summaroeport
Hyd, Hydrograph) Peak I The Tlmeto Voiunre Roturn Inflow
No. type flow Interval Pak pulod hyd(s)
(origin) 104) (min) I (min) (Cott) (yrs)
1 SCS RunO}( 3.80 I 2 I 718 7,875 2 —
2 SCS Runoff 7.65 2 I 716 15,830 10 --
3 SCS Runafl 4.30 2 718 8,786 2 --
4 SCS Runoff 8.20 2 716 17,271 10 —
5 I $CS Runoff 12.07 2 710 2a,112 100
8 I Reservoir 2.73 2 722 8,786 2 3
8 Re"rvolr 111.34 2 I 718 126,092 ( 100 b
I
I
--
Prof, file: 9torm.GPW I I[
I
i
)F file: Fredcova_ldf
Maximum
I Maximum
elwatlon
storage
(ftj
(cuff)
699.50
i 1,541
699.95
2,567
700.22
3,1W
Hydrograph
d4wriptlon
PRE-D-2
PRE-D• 10
POST-0-2
POST-D-10
POST-D-100
ROUTE-0-2
ROUTE-D-10
ROUTE-0-10D
Page 1
I
Run date: 04-11-2001 --
•
0
Request For Site Plan Comments
Department of Planning and Development
Mail to:
Hand deliver to:
Department of Planning and Development
107 N. Kent Street
Attn: County Planner
Fourth Floor
107 North Kent Street
Winchester, VA
Winchester, VA 22601
(540) 665-5651
(540) 665-5651
Please fill out the information as accurately as possible in order to assist the
agency with their review. Please attach two (2) copies of the site plan with
this sheet.
Applicant's Name: _ Greenway Engineering
Address: 151 Windy Hill Lane Winchester VA 22601
Phone Number: — (540) 662-4185
Name of development and/or description of the request: Tri-State Nissan parking lot
additon
Location of property: 1230 Millwood Pike, Winchester
Planning and Development's Comments:
Date received
Incomplete
Date reviewed
Signature and Date _
Signature and Date (revision)
Date revision received Date approved
Incomplete
Date reviewed _
Plannin and Development use only
GREENWAY ENGINEERING
151 Windy Hill Lane
Winchester, Virginia 22602
Founded in 1971
T R A N S M I T T A L
Project Name: Tri-State Nissan
File No.: 176
Date: July 31, 2001
To: Frederick Co Planning
Attn: Jeremy Camp
Copied:
From: Jason Thomas/ds
GREENWAY ENGINEERING
Phone: 540-662-4185
Fax: 540-722-9528
Remarks: F- Urgent El For Your Review r As You Requested F ! Please Comment
Message:
Jeremy,
Attached are the following for the above project:
-1 copy of the stormwater management report
-Site plan application
-Comment sheet
-Application fee check
-2 copies of the site plan
Call with any concerns.