Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
48-01 G.E. Lighting, L.L.C. (Hazardous Materials Storage) - Shawnee - Backfile (2)
SITE PLAN CHECKLIST The checklist below indicates all the information that needs to be submitted as part of the site plan application. All required information must be submitted prior to the final approval of any site plan. The Department of Planning and Development will review the application to ensure that it is complete. If any portion is not included or complete, the site plan application will not be accepted and returned to the applicant(s). Site Plan Package 1. One set of approved comment sheets are required from the following review agencies prior to final site plan approval. It is recommended that applicants contact the Department of Planning and Development to determine which review agencies are relevant to their site plan application. ,--vitgtmi epedrnen"ffimnsportation-(vBOT� dek-eourlq-S-6-n-iEgo-n-A-u-ffi-o-nfT- 414 Department 2. One copy of the Site Plan application 3. Five Copies of the Final Site Plan for approval 4. One reproducible copy of the Site Plan (if required) �� 5. A 35mm slide of the Site Plan (if required) SITE PLAN TRACKING SHEET Date: J0 3(-o f File opened Reference Manual updated/number assigned V D-base updated File given to Renee' to update Application Action Summary gjA--- CLOSE OUT FILE: 13 U ) Approval (or denial) letter mailed to applicant/copy made for file File stamped 'approved", "denied" or "withdrawn" Reference Manual updated D-base updated File given to Renee' for final update to Application Action Summary 1 O , U \Cud�Cmmw�Sa. Plan T,a k,ng wpd Rev, fed 03/06t01 0 GE Lighting Steven B. Ritter Project Leader- Fnvironrnental Health & Safety Winchestei Lamp Plant GELighting, LLC 125 Apple Valley Rd, Winchester VA 22602 540 665 3329 Dial Comm 8 275 3329 Fax 540 665-3386 Pager 540 665-1770 F mail sleven ritterMighting ge com oRECEIPT, CASH Date 002418 Received From � W a$ Ad ess W W j 0 /! ( rs �w w For �cWZU� Y Z o Z • • • w AMC M AT�OCIR (:ASH �V[ i a7 AMt Mt PAID {NID CHECK RAIAW F MONEY t'- BY IX1E i RDER goo I December 13, 2001 Mr. Steven Ritter Environmental Health & Safety Project Leader General Electric, L.L.C. 125 Apple Valley Road Winchester, Virginia 22602 COUNTY of FREDERICK Department of Planning and Development 5401665-5651 FAX: 540/ 665-6395 RE: Administrative Approval of Site Plan #48-01 General Electric Hazardous Materials Storage Building Property Identification Number (PIN) 63-A-57 Dear Steve: The Frederick County Department of Planning and Development administratively approved the above referenced plan on December 12, 2001. The site plan meets all requirements for development in the M1 Zoning District. Currently, there are no adverse comments by any of the required review agencies. However, any future continents by these agencies should be addressed promptly. Below is a list of the primary improvements approved with this site plan. The installation of a 140-square-foot (prefabricated) storage building New striping and "no parking" signage will be added for the creation of a new fire lane as shown on the site plan New concrete sidewalk leading from the primary building to the new storage building I am providing you with three copies of the approved site plan. Please forward these to the appropriate representative. Furthermore, please advise the owner that a copy should be kept for future reference, and an approved copy must be kept on the construction site throughout the development process. Once site development is complete, the owner should contact this office to schedule an on -site inspection. Please do not hesitate to contact me if you have any questions. Sincerely, _). canes Jeremy F. Camp - Planner H JFC/kac cc: Jane Anderson, Real Estate; June Wilmot, Economic Development Commission; W. Harrington Smith, Jr., Shawnee Magisterial District Supervisor U: Uerenn 0Srte Plan Rewex-12001 Urrhwe20011G6I111)1;rovalLetterSPH48_Ol.wpd 107 North Kent Street • Winchester, Virginia 22601-5000 • 6 Request For Site Plan Comments Frederick County Inspections Department e, ElVED Mail to: Frederick County Inspections Dept. Attn: Building Official 107 North Kent Street Winchester, VA 22601 (540) 665-5650 Hand deliverRGY 1 9 200"I 107 N. Kent Street Fourth Floor, OF PLAN NINGWVFLOPV': Winchester, VA (540) 665-5650 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach one (1) copy of the site plan with this sheet. Applicant's Name: ,(A", Address: / 5 Apl'ok Ilnw, Phone Number: (nvo --z Name of development and//or description of the request: a�l���s /%'<<�/"l' S ,P/J q ,(3iu�C��,✓t Location of Inspections Department's Comments: Comments are on the back of this form. PUD6 WORK & INSPECTIUivo 7� 0 Building shall comply with The Virginia Uniform Statewide Building Code and section 307, use group H (High Hazzard) of the BOCA National Building Code/1996. Rease note table 705.2 of BOCA for exterior wall rating of building located 10' from existing structure. ( min. rating shall be±20' for 2 HR). Ss/, //, ( O-j r N Request For Site Plan Comments Frederick County Engineerinq Department Mail to: Frederick County Engineering Dept. Attn: Director of Engineering 107 North Kent Street Winchester, VA 22601 (540) 665-5643 Hand deliver to: 107 N. Kent Street Fourth Floor Winchester, VA (540) 665-5643 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the site plan with this sheet. Applicant's Name: t(,' ./< < Address: Phone Number:`_ c z Name of development and/or description of the request: 412,, A Engineering Department's Comments: kle 4h - 4 Engineering Dept. use only Date received 101401 hzcocnplctc Date reviewed 5ignattire and Datc _ SViature and Date (revision) Date revision received hicornplete D review�u�i,/' RECEIVED fr'AFDE�Ii;K COUNTY A,Zmnyi, un��ni�icorrn. Date approved© fREDERICI( CiJI,, ,; �1@1JC'rYORK InsPLEc; Iu,- 0 SPol-w%15-7 Request For Site Plan Comments Frederick County Fire Marshal Mail to: Frederick County Fire Marshal Attn: Director of Engineering 107 North Kent Street Winchester, VA 22601 (540) 665-6350 Hand deliver to: 107 N. Kent Street First Floor Winchester, VA (540) 665-6350 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the site plan with this sheet. Applicant's Name: Address: Phone Number: Name of development and/or description of the request: �, z�,Pc�d•s /%n'l �� �S. Location of property: / Fire Marshal's: Fire and Rescue Dept. use only Dale received 14- Incomplete Date reviewed Signature and Date Signature and Date (revision) Request For Site Plan Comments Date revision received Incomplete Date approved 1 - JS o I COUNTY OF FREDERICK, VIRGINIA FIRE MARSHAL'S OFFICE LAND DEVELOPMENT COMMENTS Control No. SPO1-0057 Date Received 10/15/01 Date Reviewed 10/18/01 Applicant GE Lighting,LLC Plan Rev. Date: Address 125 Apple Valley Road Winchester, Va. 22602 Project Name Hazardous Materials Storage Phone No.540-665-3329 Type of Application Site Plan Current Zoning M-1 1st Due Fire Co. 11 1st Due Rescue Co. 11 Election District Shawnee Tax I.D. No. 63-A-57 RECOMMENDATIONS Automatic Sprinkler System XX Residential Sprinkler System Automatic Fire Alarm System XX Other REQUIREMENTS Emergency Vehicle Access Adequate XX Inadequate Not Identified Fire Lanes Required Yes XX No Comments Provided on plan. Roadway/Aisleway Widths Adequate XX Inadequate Not Identified Special Hazards Noted Yes No XX Comments Hydrant Locations Adequate XX Inadequate Not Identified Siamese Location Adequate Inadequate Not Identified XX Additional Comments Attached? Yes No XX Plan Approval Recommended? Yes XX No Signaturesg;k : t itle 0 0 Request For Site Plan Comments Frederick County -Winchester Health Department Mail to: Frederick -Winchester Health Department Attn: Sanitation Engineer 107 North Kent Street, Suite 201 Winchester, VA 22601 (540) 722-3480 Hand deliver to: 107 North Kent Street, Suite 201 Winchester, VA (540) 722-3480 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach one (1) copy of the site plan with this sheet. Applicant's Name: Address: Phone Number Name of development and/or description of the request: " ,,��d� Location of property: '"J <1/1/«��, �� ���11.21 21 Request For Site Plan Comments Department of Planning and Development Mail to: Department of Planning and Development Attn: County Planner 107 North Kent Street Winchester, VA 22601 (540) 665-5651 Nand deliver tBECEIVER 107 N. Kent StreebCT 12 2001 Fourth Floor Winchester, V T OF PLANNING/DEVELOPMENr (540) 665-565 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the site plan with this sheet. Applicant's Name: Address: Phone Number: ias /t 41"11Y ' / 65-,10) (�6.5 - 351?q Name of development and/or description of the request: �� z���d�4s ���'l �'� lS Location of SLd1J,6 e Planning and Development's Comments: 16 t iau.;vtat otviaEV - t_t:unv t IvUUl1J - IIIUUJUtdt, JdIUty, Uiuiu_ I I M LAJA, InaIitr�, gdtCs, JLUI.. 1-dgC 1 01 L • _ Alt/tl< y BENKO RODUCTS INC- Engineered Solutions since 1983 About Benko Products Hazardous Material Storage Drum Warming Buildings Environmental Hot Boxes Products, Inc. There are many reasons why businesses are A DmsicnO Eenkc PfWwr.. Inc. Industrial incorporating the E.P. Containment System® Ovens into their responsible hazardous material storage programs. Our products offer the highest quality and the best available technology to provide safe storage of hazardous materials for: Access and Fall Protection • Regulatory Compliance • Security Hazmat Storage • Secondary Containment Buildings • Limiting Personal and Property Liability Drum Handling • Employee Protection --- Equipment • Improved Public Image..s°'`' Drum EP Containment System® chemical storage buildings are sized for Crusher/In- capacities from 5 through 96 drums, and can be easily customized to your drum specific needs. Modular construction and riveted design allows us to keep Compactor an ample inventory of standard components in stock for quick assembly and delivery to your precise requirements. Mezzanine Safety Gates Features: Industrial • Factory Mutual Approved Refrigerator/Freezers • Advanced protective coatings throughout • Stainless steel interior panels (insulated and fire rated models) • Oversized sump capacity • No ground -to -metal contact • Re -locatable with built-in forklift access points • Space age sealant • UL listed fire -rated doors (fire rated models) • Heavy-duty security latch with emergency release • Completely prefabricated and ready to use Available Options: • Fire suppression systems • Interior partition wall(s) • Emergency eye/face cleansing systems • Heating and cooling systems • Interior lighting • Adjustable storage shelving for small containers IIttp.// W WW.00IIKOPIODUCLS.COIll/fldZiIldt.I)LIIII XXV1 I Id!_.*Iat .)I VIdL•r - 11I11PV I I\IUUA.IJ - III Uuauldl, NdIt: LV. UIU111, IIVI l/�).i, llldIItIIIIIN, ? dMUN, MUI.. 1-dgC L UI L • • • Forced air ventilationsystems�_ �- III Loading ramp • Exterior lighting • Spill detection system • R12 insulation • Fiberglass floor grating • Other options as required Also in this area, we carry spill containment pallets and mats. Standard Features Include: • Capacities from 1 to 32 drums • Units constructed of rugged 14- gauge steel and coated with chemical resistant epoxy paint • Spill containment Capacity • Removable grating for easy access to sump area • Portable • Static grounding Connector Polyethylene pallets also available. For any questions contact Benko Products via the Web or by phone at (440) 934-2180. About Benke — Drum Warming Hot Boxes — Industrial Ovens — Access and Fall Protection Hazmat Storage Buildings — Drum Handling Equipment — Drum Crusher/In-drum Compactor Mezzanine Safety Gates — Industrial Refrigerator/Freezers Illy.// W W W.IJCIIKUPI UUUI IJ.I UIIU11i1Llllitl.11ll111 XX V I I IaLJvlal JIUI d6k; - 1)GIIPU ! I UUM-Lb - IIIUUJII lal, MICLY, Ul Ulll_ IIUI UUA, t)IaIIUJ 111J, gdMb, MUI .. I-dgC 1 01 • • /`fc�< C—' BENKO RODUCTS INC. Engineered Solutions since 1983 About Benko Products Hazardous Material Storage Drum Warming Buildings Environmental Hot Boxes Products, Inc. fl. Industrial Ovens Access and Fall Protection Hazmat Storage Buildings Drum Handling Equipment There are many reasons why businesses are A D,181on n s,r*c Finaurls. Inc incorporating the E.P. Containment System® into their responsible hazardous material storage programs. Our products offer the highest quality and the best available technology to provide safe storage of hazardous materials for. • Regulatory Compliance • Security • Secondary Containment • Limiting Personal and Property Liability • Employee Protection • Improved Public Image Drum EP Containment System® chemical storage buildings are sized for Crusher/In- capacities from 5 through 96 drums, and can be easily customized to your drum specific needs. Modular construction and riveted design allows us to keep Compactor an ample inventory of standard components in stock for quick assembly and delivery to your precise requirements. Mezzanine Safety Gates Features: Industrial . Factory Mutual Approved Refrigerator/Freezers • Advanced protective coatings throughout • Stainless steel interior panels (insulated and fire rated models) • Oversized sump capacity o No ground -to -metal contact • Re -locatable with built-in forklift access points • Space age sealant • UL listed fire -rated doors (fire rated models) • Heavy-duty security latch with emergency release • Completely prefabricated and ready to use Available Options: t • Fire suppression systems • Interior partition wall(s) t� • Emergency eye/face cleansing - systems a • Heating and cooling systems • Interior lighting • Adjustable storage shelving for small containers ,'' '" Ir Illy.// W W W.UCIIKOPI ODUCLS.L;Ulli/ildLllldt.iltllll J/X V I 05/09/2001 13:40 FAX 440 934 4052 • I3ENK0 PRODUCT'S I NC . Lgjuuz/uu9 Metz 21 (fir Un: 5350 Evergreen Pkwy. Sheffield Village, OH '44054 (440)934-2180 Fax(440)934-4052 Quote] t?vtl �C�ru /lc� M . Steve Ritter G neral Electric SALES REP C: Laurie K. -Benko DATE FOB SHIP VIA TERMS DEUVERY Sheffield Village, OH . Common Carrier -/v N/30 QTY DESCRIPTION 1 E.P. Hazardous Material Storage Building M del 1228, 28 drums, 2 hour fire rated. O tside dimensions: 16-1/2 x 8-1/2 x 8-1/2ft. F approved, Rust Guard Design, static g ounding system, one set of 3 hour fire rated d uble doors, steel floor grating 350 lbs./ft. 1 ading, sump capacity 490 gallons, and v ntilation in accordance with NFPA 30. S eel construction with 16 ga. ext./int. walls a roof, 10 ga. containment sump. OP ZONAL ADDERS: *o e interior light, xp. *P wer ventilation system. *O e dry chemical fire suppression system, w-th alarm and all necessary plumbing to NFPA 17. *E plosion relief panel. *S eel loading ramp. Bu�lding weight: 8500 pounds QUOTE VALID FOR 60 DAYS 6Y UNIT PR TOTAL $ 9,905 $ 71 $1,56 $2,89 $ 23 $ 25 MOV pq ORM1 1 c:;: G1? 440 934 4052 PAGE.02 Za'�Jdd ESab VE6 ab. . S1:7:6e TooE eE Snd EP Containment System Fire Rated 12U^O'Senes �+� .� ;� •.'..'ate•.. _fl., �. �. .4j .'�. Environmental Products, IncX"' _ Provides secondary containment and fire protection for hazardous materials and waste storage The 1200 Series EP Containment System is Factory Mutual approved for the storage of Class 1 A and the dispensing of Class 1 B flammable liquids.* It is explosion rated to 100 P.S.F. It carries a two-hour fire rating for both walls and ceiling allowing placement as close as 10 feet to a main structure. Standard Features • Completely portable • Durable, high quality, high strength steel construction • Hazard labeling • Easy under floor visual inspection • One year limited warranty • Static grounding ' Requires the use of Explosion Vent Panels lent, t,ea nt,t, V11.1 RT:An TnnZ/nZ/Rn E0'3JHd ZSOb VE6 04 lop ' The 1200 Series is completely portable -requires no additional foundation or support. The containment system features a heavy duty steel containment floor with steel grating. The walls and rooi are constructed of interlocking steel sections with a stainless steel interior wall for lasting strength and durability. Features louvered vents with fire dampers for cross -flow gravity ventilation and provisions for front or rear forklift access. Hold-down points furnished for areas susceptible to high winds or seismic activity. Containment Floor • One-piece, factory tested leakproof construction, certified and serialized. 0 9t,,: 60 T aoE of and Roof • Center -ridge pitch design • Steel formed beams and roof panels • Paintj finish both sides • Two-hour fire rated ceiling per ASTM E119 with Class A Flame Spread Flre-Rated Walls • Walls Incorporate an interlocking steel panel design • Tested for two hour fire resistance both sides per ASTM E119 • Efficient three -layer Gypsum Board Fire Resistant System (Patent in Progress) MODEL OUTSIDE DIMENSIONS NUMBER LENGTH !WIDTH HEIGHT 1244 24' B'6" 8'6" INSIDE DIMENSIONS LENGTH WIDTH HEIGHT 23'2" 7'2" 7' WEIGHT (APPROX.) (LBS) 11,500 DOOR OPENINGS HEIGHT 6'6.-lh" WIDTH 4'10-3/4" DESIGNED CAPACITIES DRUMS 44 SUMP 735 GAL. 122B 16' 8'6" 8'6" 15'2" 7'2" 7' 8,500 6'6-'/s" 4'10-3/4 28 490 GAL. 1212 g' 8,6" B.6- 7,2.. 7 2.. 7 5,500 6'6'/z" 4'10'/4" 12 245 GAL. Characteristics Maximum Wind Load Floor Loading (steel) Exterior Paint Interior Walls Doors Gelling and Wails Roof Snow Loading Electrical System 30 PSF (110 mph) 350 PSF live load capacity Weather resistant Stainless Steel 3 hour fire rated - UL labeled 2 hour fire rated per ASTM E119 40 PSF static loading All UL rated/classified WARRANTY Contact Environmental Products Inc. or your local representative for details on our one year limited warranty. Ask about our extended warranty program. options Available • UL listed, dry chemical fire suppression system • Two-hour, fire -rated interior partition wall(s) • Emergency eye/face cleansing system • Heating/cooling systems for temperature sensitive chemicals • Interior explosion -proof lighting with weather-proof switch - UL Listed • Storage shelving for small containers • Forced air ventilation system designed to provide in excess of 20 air changes per hour to eliminate hazardous vapors • Loading ramp designed to load and unload materials using a hand truck • Exterior lighting - UL Listed • Spill Detector • Water sprinkler system • R12Insulation • Explosion vent panels • Static bonding system • Fiberglass floor grating • Additional protective coating in sump for enhanced chemical security ,y Environmental TM Products, IncK A Division of Bertko Products Inc, 5350 Evergreen Pa kway Tclephone: 440-934-2180 Fax: "(M4-4052 Sheffield Ydlage, Ohio 44054 E-mail: benko@ix.netcom.corr, www.bc nkoproducrs.com Form EP121-4-95 n%rT ciwnnr»ra nur.raa 7.gnt 4C6 066 TVA TZ:90 TOOZ/OZ/90 SITE PLAN APPLICATION Project Title: 2. Location of Property / a S A n P/,:- (street address) s•fc=/a 3. Property Owner:�;v/I,� Address: c Telephone: Lt�iivc /ems �r2 �izr IA-)l a6a 2 4. Applicant/Agent Address Ile i2'Y J // /J,✓C /� =-<• •,/r 2 vim. Telephone: l3`�a,� 6 6 S — .33 a--1 5. Designer: f-ylLc) 4 ,-c%i'lec 13 Address: 12 get-) L'�rvr l,��d Dh�a Telephone: Q 3 - 0,2,� v Contact: i nC1,CL�Sk�:t LJ 6. 7a 7b 8. a) b) c) d) e) 0 g) Is this an original or revised site plan? Total acreage of parcel to be developed: Total acreage of parcel: Property Information: Property Identification Number: Current Zoning: Present Use: Proposed Use: Adjoining Property Use(s) Adjoining Property Identification Number(s) Magisterial District(s) Original Revised ✓ 0,05ze�2� s /a "7 ac ram✓= s 6-11�1 . > /1 Q 1II&C- E I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to the submission of my site plan. Signature: Date: �� ✓ /D ����/ 0 SITE PLAN CHECKLIST The checklist below indicates all the information that needs to be submitted as part of the site plan application. All required information must be submitted prior to the final approval of any site plan. The Department of Planning and Development will review the application to ensure that it is complete. If any portion is not included or complete, the site plan application will not be accepted and returned to the applicant(s). Site Plan Package 1. One set of approved comment sheets are required from the following review agencies prior to final site plan approval. It is recommended that applicants contact the Department of Planning and Development to determine which review agencies are relevant to their site plan application. Virginia Department of Transportation (VDOT) Frederick County Sanitation Authority Department of Planning and Development Inspections Department Frederick County Engineer (Public Works) Frederick County Fire Marshal Department of Parks and Recreation 2. One copy of the Site Plan application </ 3. Five Copies of the Final Site Plan for approval 1--' 4. One reproducible copy of the Site Plan (if required) 5. A 35mm slide of the Site Plan (if required) y County Health Department City of Winchester Town of Stephens City Town of Middletown Airport Authority Soil & Water Conservation District Request for Street Name n u r� u The following information must be included on your site plan. If your site plan is incomplete or is missing information, it will not be reviewed and returned to you for revisions. Administrative Information Y N 1. Name of proposed development. 2. Name, address, and phone number of owner. Name, address, and phone number of developer. 4. Name, address, and phone number of designer. 5. Certificate of surveyor, engineer, or architect. i� Date plan prepared and date of revisions. 7. A listing of all conditions placed on the site as a result of a conditional use permit or conditional zoning approval. A space labeled "Approved by the Zoning Administrator' for the approval signature and date of approval. " Ua 1-fP f✓1 J���5 9. A description of setbacks or conditions placed on the site as a result of a variance approval. (Reference the variance application number.) General Site Information Y N 10J Location map (scale 1:2000) 1' Magisterial District 12. Scale of site plan (not to exceed 1:50) 13. North Arrow 14. Zoning of site 15. Use, zoning, and Property Identification Number (PIN#) of all adjoining properties. This includes properties located across right-of-ways, streams, and railroad tracks. 16. Surveyed boundaries for all lots and parcels. 9 • • General Site (con't) Y N Building Information Y N Roads Y N 17. Acreage of all lots included in the plan. Cam. The location and dimensions of all required setbacks and yard C� areas. 19. The location and type of all dwelling units. 20. Location and description of all recreation facilities. 21. Location of sidewalks and pedestrian ways. 22. Location and area of common open space. 23. The location, height, and dimensions of all signs. 24. Location, height, and specifications of outdoor lighting fixtures. 25. Location and nature of outdoor storage areas. 26. Location of outdoor trash receptacles and dimensions of structure (fencing, etc.) required to enclose receptacles. (27? The height of all buildings and structures. 28. Location of all buildings, structures and uses. 29. The proposed use of each building, structure and area. 30 Ground floor area and total floor area of all buildings with FAR calculations for commercial and industrial zoning districts. 31. Name and number of existing and planned streets on and adjoining the site. 32. Location of existing and planned streets on and adjoining the site. 3 Posted speed limit of existing adjacent roads. Location and dimensions of all proposed entrances from public right-of-ways. 10 a • • Utilities Y N Parking Y N Natural Features Y N 35. Location of all entrances on adjoining roads within 200 feet of the proposed or existing entrance. 36. Dimensions, boundaries, width, pavement, and construction of planned roads. 37. Location of all utilities, including sewer and water lines with the size of lines, mains, and laterals. 0Location and width of all easements, including access, utility, �� and drainage easements. 391 Location and nature of fire lanes, fire hydrants, and all other facilities necessary to meet Fire Code requirements. 40. Calculations describing the required number of parking and loading spaces. 41. Location and dimensions of all parking and loading spaces, driveways, parking aisles, curbing and other features to be used. 42. Location and dimension of all disabled parking spaces and ramps. 43. Existing and finished contour lines. 44. Location of steep slopes, woodlands, floodplains, wetlands, sinkholes, and other environmental features. 45. Location of streams and drainage ways. Landscaping Y N 46. Landscaping plan describing location and types of plants to be used. 47. Location of required buffers and screening with cross sections or profiles. Erosion and Sediment Control Y N 48. A stormwater management plan with run off calculations and location and description of facilities to be used. 49. Soil erosion and sedimentation control plan describing the location and methods to be used to minimize erosion and sedimentation during development. 12