Loading...
HomeMy WebLinkAbout55-06 Parkins Mill WWTF Exp. - Wastewater Treatment Facility - Shawnee - BackfilePlease note: The site plans associated with this file are located in the file room. SITE PLAN TRACKING SHEET Date; 0� File opened 1,6 Reference Manual updated/number assigned D-base updated File given to Renee' to update Application Action Summary AWL CLOSE OUT FILE; '"1 / Approval (or denial) letter mailed to applicant/copy made for file File stamped "approved", "denied" or "withdrawn" Reference Manual updated �l N61 D-base updated )to .07 File given to Renee' for final update to Application Action Summary u:Bt Rnise SITE PLAN APPLICATION CHECKLIST The checklist shown below specifies the information which is required to be submitted as part of the site plan application. The Department of Planning & Development will review the application to ensure that it is complete prior to accepting it. If any portion of the application is not complete, it will be returned to the applicant(s). (1) One (1) set of approved comment sheets are required from each relevant review agency prior to final approval of a site plan. It is recommended that applicants contact the Department of Planning & Development to determine which review agencies' are relevant to their site plan application_ A list of potentially relevant review agencies is shown below: Frederick County Department of Planning & Development Department of GIS (Geographic Information Services) Frederick County Sanitation Authority —� Frederick County Building Inspections Department —v"' Frederick County Department of Public Works ✓ Frederick County Fire Marshal ;)-K— Frederick County Health Department Frederick County Department of Parks & Recreation Virginia Department of Transportation (VDOT) City of VTmchester x Town of Stephens City Town of hfiddletowu K Frederick County / Winchester Airport Authority (2) One (1) copy of the Site Plan application fonn. V (3) Payment of the site plan review fee. 4 One 1 reproducible co of the Site Plan if re uired - O O eP PY (� q ). 0 • � N a� o N o m Q C3 o Ec�110 Q CV _O N N � y Q H flllll�l �r y 0 DATE ` RECEIVED FROM ADDRESS `80`Y Zi J7 W L� `6'1 !L ❑ FOR Cl FOR i / b Cv NO. 9049 A, L`V C' / DOLLARS S �• i 0' XT-i• AMT. OF ACCOUNT • CASH • AMT. PAID CHECK (� j BALANCE DUE MONEY ORDER BY 7��� Page 1 of 1 Ned Talbot - Parkins Mills WWTF - Site Plan Review Comments From: Ned Talbot To: Iloyd.ingram@vdot.virginia.gov<Iloyd.ingram@vdot.virginia.gov> Date: Friday, December 22, 2006 12:09:15 PM Subject: Parkins Mills WWTF - Site Plan Review Comments CC: Meinert, William; Moffett, Jesse Lloyd, Have you completed your Frederick County site plan review for the Parkins Mills WWTF Upgrade? To date, we have not received anything. Jesse Moffet (Frederick Winchester Service Authority, owner) sent you a letter (dated 11/13/06) that should have cleared up the main issues you stated through our phone conversations. Please contact Jesse or I if you need further clarification on the work to be completed. Please forward comments at your earliest convenience. Time is running short and we are ready to address any issues you may have. Thanks, Ned Edward (Ned) Talbot, P.E. O'Brien & Gere Engineers, Inc. 8401 Corporate Drive, Suite 400; Landover, MD 20785 Phone: (301) 731-1129 Fax: (301) 577-4737 f`ile://CADocuments and Settings\Ta1botER\Loca1 Settings\Temp\GW}00001.HTM 12/22/2006 EROSION AND SEDIMENT CONTROL PLAN Parkins Mills WWTF ENR Upgrade and Expansion Frederick -Winchester Service Authority Winchester, Virginia July 2006 GBRIEN 6 GERE Job No. 6531/36694 EROSION AND SEDIMENT CONTROL PLAN Parkins Mills WWTF ENR Upgrade and Expansion Frederick- Win. ch ester Service A uth ority Win ch q gcrj. ; Virgin is 4 Williati J. Mcinert, P.L., Vice President O'Brien & Gcrc Engineers, Inc. July 2006 8401 Corporate Dr., Suite 400 Landover, MD 20785 Parkins NVlills WWTI'- ENR Upgrade and Expansion TABLE OF CONTENTS List of Contract Drawings (Appendix F)............................................. Listof Figures...................................................................................... Listof Appcndices......................................................................... 1. Erosion and Sediment Control Plan .......................................... 1.1. Regulatory Illformation.......................................................... 1.2. Project Description................................................................ 1.2.1. Proposed Construction Activity ...................................... 1.2.2. Site Location................................................................... 1.3. Existing Site Conditions........................................................ 1.4. Adjacent Areas....................................................................... 1.5. Soils....................................................................................... 1.6. Critical Areas......................................................................... 1.7. Erosion and Sediment Control Measures ............................... l .7.1. Erosion and Sediment Controls — Structural Practices ... 1.7.2. Additional Storlmvater Controls ..................................... 1.8. Erosion and Sediment Control Measures Phase Outline ....... 1.9. "Temporary Stabilization........................................................ 1.10. Permanent Stabilization....................................................... 1.11. StorniNvater Management Consideration .............................. 1.1 1. I . "Total Runoff Amount ................................................... 1.1 1.2. Peak Runoff................................................................... 1.1 1.3. Compliance with Minimum Standard 19...................... 1.12. Maintcllance......................................................................... 1.12.1. Construction Period Operation and Maintenanec......... 2 P O t '1 (I NVI'lllltell'lIICC ........................................... ........................................... ........................................... ............................................1 ............................................ l ............................................ l ............................................ I ............................................2 ............................................2 ............................................2 ............................................3 ............................................3 ............................................3 ............................................3 ............................................4 .................................................... 5 ....................................................6 ....................................................6 I. l2. . OSL-CO11SU 11C %Jn pc.l a Ion < n ..................... l.13. Calculations.................................................................................. ............................................6 ............................................ 6 ............................................7 ............................................7 ............................................ 8 ............................................ 8 ............................................ 8 ............................................9 Final: July 17, 2006 _ = O'aRIC(V F GCGC I:\DIV33V'ROJEC'rS16351-11aikins ivlills\3669d-WW'1'1'V)ocmnents\ESC PlanTSC-repoit.doc Parkins Mills WWTF- ENR Upgrade and Expansion List of Contract Drawings (Appendix F) Dwg. No. Title C-2 Location and Control Plan (Existing Site) C-6 Location and Control Plan (Proposed Site) C-10 Grading/Stormwater/Erosion Control Plan (Plant Entrance) C-11 Grading/Stormwater/Erosion Control Plan (Lower Site) C-12 Grad ing/Stormwater/Erosion Control Plan (Upper Site) C-14 Erosion and Sediment Controls Details List of Figures Figure 1 Vicinity Map Figure 2 Soils Map List of Appendices A. Land Disturbance Permit Application B. Bond Estimate Form C. Plan Content Checklist D. Topsoil and Seeding Specification E. Calculations F. Contract Drawings n i � I I I I Final: July 17, 2006 D R I E �.��� l:\DIV33\PROJECTS\6351-Parkins Mills\36694-WWTP\Documents\ESC Plan\ESC-report.doc IParkins Nfills WWTF- ENR Upgrade and Expansion 1 1. Erosion and Sediment Control Plan II.I. Regulatory Information This Erosion and Sediment C'oNrol Plon (ESC Plan) Is prepared to instruct personnel Oil mitigation measures to prevent pollutants in stormwater runoff from degrading properties, stream channels, waters, and other natural resources of Frederick County by establishing requirements For the control ' of soil erosion, sediment deposition and nonagricultural runoff. "file following sections discuss and describe actions to be taken to comply with the Erosion and SC(linient Control Ordinance of Frederick County, Virginia adopted June 12, 2002. 1 O'Brien & Gere Engineers, Inc. (O'Brien & Gere) has prepared this ESC Plan on behalf of the Frederick -Winchester Service Authority in support of their proposed project development. 1.2. Project Description Frederick-Wincliestcr Service Authority owns and Frederick County Sanitation Authority (FCSA) operates a 2-MGD-rated Parkins Mills Wastewater "Treatment I-�acilily (WW'fF) required to achieve Sccondary Treatment - Nitrification with tertiary filtration. In 2003, the Al1tIlOrltieS received notification from the Virginia Department of Envirouliental Quality (DEQ) that three (3) consecutive months of flow have exceeded 95% of the rated (2-MGD) capacity. "l'herefore, an expansion and upgrade Of the existing facility is proposed Ill order to handle increascd flows (ill) to 5-NIGD average daily flow). 1.2.1. Proposed Construction Activity The project includes, but is not limited to, the following major coil' Pollen ts: • Ncw Influent Pump Station • New Primary Clarifiers • Conversion of Existing Oxidation Ditches Into biological treatment tanks and construction of new tanks [or biological treatment. • New Secondary Clarifiers New Effluent Filters and Effluent Filter Pump Station • Replacement of existing UV Disinfection system all([ expansion of'Post Aeration cascade • Rcplacenicnt of existing plant effluent piping to Opequon Creek with larger size piping • Conversion of existing Filter building to a chemical feed building having tanks and pumps installed inside for ferric chloride and acetic acid delivery to the plant • New Odor Control Systems • Additional sludge storage tanks • New Sludge Stabilization and Utility Bldg. to accommodate Lime Stabilization process, Electrical Systems, the Utility Water System and Aeration Blowers • Various uporadcs to all new flow distribution structures and sludge pimping stations • New yard piping for process • New potable water, non -potable water and chemical fecd piping • New and expanded gravel and bltilillli101is PaVC units and new driveway, all foi- necessary access Final: July 17, 2006 u®nIrm �C(3C I:\I)IV33\PROII;C'I'S\635I-i'arkinshills\36694-WW'1'P\Documenls\I:SCPlan\6SC-rcpott.doc Parkins Mills WWTF- ENR Upgrade and Expansion Expansion of plant requires construction on upper portion of property and near road. Therefore, clearing, tree removal and site grading will take place. New trees will be planted along the road to provide full coverage of the plant. The work is expected to commence in October 2006 and be completed by the April 2009. Approximately 4.6-acres will be disturbed during construction. A construction phasing sequence related to erosion and sediment control is contained in section 1.7. ._.......... ........... ...._...._-- ............. _.... _- ....... --- ...._.__..._.._._.__.. __..__...._.... _.... ................ _ Responsible Land Disturber: Commonwealth of Virginia License Number .....__...._...__._....._....._._.. __.._._.. ...._.... ......... ........... -.-I ......... License Expiration Date: ......... ..................... .__.._....... ........_.._......... _........._............... _... _.......... ............................. -......... _............. William J. Meiert, P.E. ............... __ ......_....._.....__.......- ..... ....... ..... _...... ............ .................. 041866 _...............__............ _.................. ... __........ ---.......... -.... _... _ .................... _.... ............ _._........_........................ 2/1/08 (renewal required every two years) ..... _.._................ 1.2.2. Site Location The Parkins Mills WWTF is located on 7.4-acres of property along West Parkins Mill Road, approximately 500-feet east of Front Royal Pike (US Route 522). The project site is bordered to the south by Opequon Creek. The general site location is indicated on the attached Vicinity Map (Figure 1). 1.3. Existing Site Conditions The existing site topography is composed of two relatively flat areas separated by a steep slope. The existing Parkins Mills WWTF is located on the lower flat area which is immediately north of Opequon Creek. The higher flat area is where the proposed facility expansion will occur. Existing vegetation on the site varies from mowed grass in and around the existing WWTF to thick brush in the area of the proposed facility expansion. Existing site drainage generally flows from north to south. The majority of the site drains directly to Opequon Creek, and a portion of the site drains to an unnamed intermittent stream tributary to Opequon Creek. The unnamed intermittent stream has a longitudinal slope of approximately 3%. For purposes of determining the basis of design (runoff rates and volumes) for potential permanent stormwater management facilities, the site was analyzed as one drainage area. A more detailed discussion of this analysis is contained in section 1.10. The existing site has approximately 1.2 acres of impervious area that consists of roadway and building rooftops. As defined by the NRCS TR-55 methodology for calculating runoff, the curve number for the existing site is 82. A more detailed description of the TR-55 calculations for the existing site is contained in Appendix E. 1.4. Adjacent Areas West Parkins Mill Road borders the site to the north and the Opequon Creek borders the site to the south. Brush and wooded areas border the site to the east and west. The area immediately north of West Parkins Mill Road is also undeveloped and has a meadow and brush cover type. 2 Final: July 17, 2006 RIB IEN �,��� IADIV83\PROJECTS\6351-ParkinsMills\36694-WWTP\Documents\ESCPlan\ESC-report.doc Parkins MIIis WWTF- LNR Uppradc and Expansion 1.5. Soils Two different soil types are present on -site as determined from the Survey of Fmdet•ick County Virginia (USDA 1933). On -site soils consist of Weikert-Bcrks channery silt loans (mapping units 41D and 41E), Which are commonly found on slopes and ridges. The surface layer is dark brown cllannery silt loath about three inches thick. '['Ile subsoil is yellowish brown channery silt loath about Mille inches thick. Pe nicabillty of tills soil type is moderately rapid, and the available water capacity is very low. Surface runoff is rapid. Bcdrock is at a depth of 12 to 20-inches. Tile second soil type found on -site is Lobdell silt loam. This moderately well drained soil is conllnonly found on flood plains of many streams within Frederick County. The surface layer commonly consists of a dark brown silt loam approximately 9-inclics thick. The subsoil, to a depth of 44-Inches, is dark brown silt loam and brown, mottled silt loam. Permeability is moderate and the available water capacity is high. 1.6. Critical Areas The on -site areas where erosion and sc(lilllcnt control are most critical are those with the steepest slopes and the areas of concentrate(I storillwater flow. The topography of the nortlicrn and western boundaries of the site have land slopes of approxllliately 40%. It is proposed to collect runoff from these areas in temporary diversion swalcs. Concentrated flow in these swalcs creates an increases[ potential for orosion, therefore these areas arc also considered critical areas of erosion control. Further discussion of these areas and mitigative measures proposed to control crosioll is contained in Section 1.7. 1.7. Erosion and Sediment Conti-ol A/leaslll'es Tile drawings in Appendix F Illustrate locations for the crosioll and sediment control facilities. These Facilities are to be installed an(I Illallltilille(I ill accordance With the Virginia Erosion and Sediment Control Handbook (Virginia Department of Conservation and Recreation 1992). 1.7.1. Erosion and Sediment Controls — Struchlral Practices Proposed erosion and sediment control measures were designed in accordance with the folloWing documents: • Virginia Erosion and Sediment C'ono-ol Handbook (Virginia Department of Conservation and Recreation 1992). • Virginia Stornnvater jLlanagemeni Handbook (Virginia Department of Conservation and Recreation 1999). • Virginia Department of Conservation and Recreation General Permit for Discharges of Stornlwater fi"olll Collstructloll Activities (effective date July 1, 200LI). The Erosion and Sediment Control Drawings (Appendix F) include provisions for erosion and sediment control pleasures to be installed. The Contract Documents include specifications to be adhered to by the Contractor when installing required erosion and sediment control components in compliance With this ESC Plan and the project Storniwater Pollution Prevention Plan (SWPPP). The control measures and Best Management Practices (B1V[Ps) noted below are to be implemented to 3 Final: July 17, 2006 O13�11rN ���� IMAVS3\1'RO3ECrS\6351-Parkins hlills\3669,1-WWl'P\Documenls\ESC Tian\ESC-report.doc Parkins Mills WWTF- ENR Upgrade and Expansion abate and control potential pollutants and sediment transport in storm water discharges from the construction site. The Erosion and Sediment Control Drawings indicate the following temporary erosion and sediment controls to be implemented on this project: 1. Temporary stone construction entrances are to be located at the construction ingress/egress location. If needed, wash -down water is to be directed to stormwater sediment traps prior to discharging off -site. The Contractor is to provide a detail of the sediment trap to be used and its proposed location to the Owner's Representative for approval prior to implementation (Specification 3.021). 2. Silt fencing to be installed along toes of embankments, on downstream portions of the site perimeter, and around spoil piles and stockpiles. Silt fence is to be maintained throughout construction and until the establishment of turf (Specification 3.05). 3. Rock check dams are to be placed in swales to prevent erosion, reduce flow velocities, and promote sedimentation. The check dams are to be installed at intervals such that the crest of the downstream dam is at the elevation of the toe of the upstream dam. Maintenance is to include inspection, cleaning, and/or replacement of stone as required throughout the duration of the project and until the establishment of turf (Specification 3.20). 4. Riprap outlet protection is to be installed at inlet and outlet ends of culverts to prevent erosion and scour through energy dissipation (Specification 3.18). 5. A temporary sediment trap is to be installed at the northern project boundary. The temporary sediment trap is designed to treat runoff from a 0.79-acre drainage area that includes the new biological reactors, primary clarifiers, and Secondary Clarifier No. 5. The sediment trap has a wet storage volume of 0.53 CY and a dry storage volume of 61 CY (see Appendix E for sizing calculations). The temporary sediment trap outlet discharges to the existing unnamed intermittent stream described in Section 1.3 (Specification 3.13). 1.7.2. Additional Stormwater Controls Listed below is a description of additional controls and measures that are to be implemented at the site to minimize pollutant transport. Proper precautions are to be taken so materials do not spill onto public thoroughfares. If materials are dropped onto these areas they are to be removed as soon as practicable so that they do not enter surface and subsurface drainage systems. 2. General Contractor is to provide dust control measures before dust migrates off -site. Measures may include water application or mulching but shall not include use of chemical additives. 3. Solid waste disposal duunpsters and containers are to be covered and emptied regularly. Waste is to be disposed of properly in accordance with local regulations. 1 Specification number is from the Virginia Erosion and Sediment Control Handbook 11 4 Final: July 17, 2006 O'BRIEN 5 GERE IADIVS3\PROJECTS\6351-Parkins Mi11s\36694-WWTP\Documents\ESC Plan\ESC-report.doc Parkins Mills WW'I'F- ENR Upgradc and Expansion 4. Portable toilets are to be installed and cleaned regularly with their contents properly dispose(I of. These toilets are to be secured so they will not be knocked over by construction operators. 5. Construction materials are to be properly store(I and colltalilc(I oil -site. 6. Oil containers are to have appropriate secondary containment. It total oil storagc oil -site excec(Is a cumulative total of 1,320-gallons, a spill prevention control and countermeasure (SPCC) plan is to be prepared and kept on -site. ' 1.8. Erosion and Sediment Control Measures Phase Outline The project construction sequence is outlined below. The Sequence is structured to construct proposed WWTF components with minimal disruption to the existing wastewater treatment process. Erosion an(I se(liment control activities are italicized. 1. "Temporary stone construction entrances installation. 2. Silt fence installation. 3. Realignment of approximately 250feet of existing unnamed inlermittent stream. Relocated section o, str'eam 1Vrll be permanently stabilized with r ipr opz. 4. "Temporary diversion sivales construction. 5. Temporary sediment Crop construction. 6. North and niKkIle access dnve construction. 7. Topsoil stripping and stockpiling. 8. histallation of silt fence around limits of soil stock -piling. 1 9. Demolition including clearing and grubbing, miscellaneous tree removal. 10. 13ioreactors t15 & 6, final Clarifiers #5 & 116, Influent Pump Station 1/2, Primary Clarifiers, and ancillary facilities constructloll. 11. MO(lifications to existing WW'I'F components. 12. WWTF lieadworks modifications (can begin after Primary Clarifier construction is complete). 13. Finish site gra(1ing. 14. Top soiling, seeding, and stabilization. 15. Landscaping. 2 Grading and limits of riprap associated with stream realignment are not shown on the Contract Drawings. At the time this report was issued, additional topographic survey was being obtained to complete the design. -- 5 Final: July 17, 2006 U'13RIEN E GENE I:U)IV33\1'IZOJGC'I'S\6351-I',ukins MIIls\3669,1-WW"rP\Oocumems\I?SC PWAFSC-repoiuloc Parkins Mills WWTF- ENR Upgrade and Expansion 16. Removal of erosion and sediment controls after project site soils are stabilized with vegetation and permanent stabilization mat (as defined on the contract drawings). As described in the contract Special Provisions (located in Volume 1 of the contract documents), the Contractor is responsible for developing a detailed Critical Path Method progress schedule. This schedule will present a more detailed outline of the overall project sequencing (in accordance with the Special Provisions), but the items listed above dictate the sequencing erosion and sediment control measures. 1.9. Temporary Stabilization Temporary stabilization is to be accomplished by either covering with jute matting, plastic, or geotextile fabric, or by seeding and mulching. Stabilization measures are to be installed over portions of the project area where construction activity is temporarily ceased and earth -disturbing activities will not resume within 21 days. Temporary stabilization shall be conducted in accordance with specification 3.31 from the Virginia Erosion and Sediment Control Handbook (1992). On steeper slopes (indicated by shaded areas on contract drawings C-I I & C-12) a permanent turf reinforcement mat will be installed. This mat will facilitate stabilization after grading is complete and provide longer -term reinforcement of side slopes once vegetation is established. 1.10. Permanent Stabilization Disturbed portions of the site where construction activities permanently cease are to be stabilized as specified herein and in the Contract Documents no later than 14 days after the last construction activity. Permanent turf reinforcement mat shall be placed in the areas specified on drawings C-1 I & C-12. The project's technical specification for "Topsoil and Seeding" is included in Appendix D. 1.11. Stormwater Management Consideration The existing and proposed site conditions were analyzed to determine the change in hydrology resulting from the WWTF improvements. The NRCS TR-55 methodology was used to determine the runoff curve numbers and runoff volumes for both site conditions. 1.11.1. Total Runoff Amount The WWTF site contains open tanks (clarifiers and reactors) which are part of the wastewater treatment process. Incident rainfall on these tanks becomes part of the treated effluent discharged to Opequon Creek after passing through the wastewater treatment process. Therefore, this rainfall does not contribute to runoff from the site. Due to this effect of the open tanks, the analysis looked at the site in the following two ways: • Analysis — Open tank area was not included in the TR-55 analysis. The proposed site has more open tank area than the existing site. Therefore, the total site acreage used in the TR-55 analysis was 6.6-acres for the existing site and 5.9-acres for the proposed site (see Appendix E). 6 Final: July 17, 2006 �mm ®���� �.��� IADMRPROJECTS\6351-Parkins Mills\36694-WWTP\Documents\ESCPlan\ESC-report.doc I Parkins Mills WWTF- ENR Upgradc and Expansion • F\nal sy is 2 — Open tank area iiws included in the TR-55 analysis and assigned a curve number of zero. Therefore, the total site acreage used in the TR-55 analysis was 7.4-acres for both the existing and proposed sites. Detailed components of the analyses are contained in Appendix E, and 'fable I summarizes the results of each analysis. Table I Analysis 1 - Runoff volume comparison. Condition 2-Year Storm 10-year Storm Storm Stor Runoff, acre-ft Runoff, acre-ft Runoff, acre-ft Existing 0.66 1.54 2.53 Proposed 0.64 1.42 2.31 Source: O'Brien & Gere Engineers, Inc. 'rable 2 Analysis 2 - Runoff volume comparison. Condition 2-Year Storm 10-year Storm 100-Year Storm Runoff, acre-ft Runoff, acre-ft Runoff, acre-ft Existing 0.43 1.23 2.22 Proposed 0.29 0.94 1.79 Source: O'Brien & Gere Engineers, Inc. As illustrated in `fables l and 2, the anlount of rulloFf leaving the site hinder the proposed conclitloll Is less tllall III the existing condition For both analyses. 1.11.2. Peak Runoff To assess whether the proposed site condition would contribute to stream channel erosion and flooding problems downstream of the WWTF site, the times of concentration for the existing and proposed site conditions were determined. The times of concentration for both conditions were less than 0.1-hours, which is the n11I11111UIll recommended by the NRCS TR-55 nlctlnod. Therefore, the tinnes of concentration for both the existing and proposed conditions were assumed to be equivalent; thus the peak runoff rates for the 2- and 10-year storms are expected to be approximately equivalent. 1.11.3. Compliance with Minimum Standard 19 Permanent measures for treating the water quality volume, preventing downstream stream channel erosion (mitigating the 2-year peak runoff rate), and preventing flooding (mitigating the 10-year runoff rate) are not proposed. Tile proposed project complies with the Virginia Erosion and Sediment Control Rcgulatlons 4VAC50-30-40, lVlllllnlUlnl Standard 19 for the following reasons: • "file total runoff fi-onl the proposed site for the 2-, 10-, and 100-year storlms Is less than that from the existing site. • The peak now rate being discharged fi-om the proposed site is less than that of the existing site. 7 Final: July 17, 2006 ___ 11ORICM6SERE 1:\DIV83\I'ROJI:C"I'S\6351-1larkins Mills\3669,1-WW'F1'\llocuments\-SCPWAFSC-rcport.doc Parkins Mills WWTF- ENR Upgrade and Expansion 1.12. Maintenance The following sub -sections describe requirements for maintenance and inspection during and after construction activities: 1.12.1. Construction Period Operation and Maintenance This ESC Plan describes procedures that are to be utilized to maintain the effectiveness of the erosion and sediment control measures. The procedures include: Inspection of the facilities at least every 14-days and within 48-hours of the end of any runoff producing storm event. Where areas have been finally or temporarily stabilized or runoff is unlikely due to winter conditions (e.g., the site is covered with snow or ice, or frozen ground exists) such inspections shall be conducted at least once a month. An Inspection Form is included in the project Storm Water Pollution Prevention Plan (SWPPP) as Appendix B, a copy of which is to be completed and inserted in Appendix E of the SWPPP after each inspection. Based on the results of the inspection the site, activity, and pollution prevention measure descriptions (Sections 1.2 and 1.7) identified in this plan shall be revised as appropriate within 7 days of the inspection. 2. Cleaning, repairing, and/or replacing silt fences, oil -absorbent boom material, and riprap aprons as necessary. Removal of accumulated sediment from the sediment trap as necessary to maintain proper function. Samples of sediment are to be submitted for laboratory analysis and subsequently disposed of in accordance with local, state, and federal regulations. 4. Cleaning and/or sweeping affected roadways daily, or more frequently if otherwise required by the Owner or Owner's representative. 5. Removing debris and litter on a weekly basis or more frequently if necessary. 6. Observation of equipment/vehicles within the work area, particularly for identification of vehicles leaking petroleum products that enter adjacent stormwater drainage facilities. 1.12.2. Post -construction Operation and Maintenance Following completion of excavation and backfill operations, the Frederick -Winchester Service Authority is responsible for operation and maintenance of stormwater facilities. These operation and maintenance activities are to include: 1. Paved areas to be cleaned or swept annually. Catch basins and storm manhole sumps inspected semi-annually and cleaned when 50% of the sump capacity is filled with sediment. 3. Storm sewer inlet grates inspected annually and debris removed. _- $ Final: July 17, 2006 I:\D1V33\PROJECTS\6351-Parkins Mi11s\36694-WWTP\Documents\ESC Plan\ESC-report.doc Q- 13RIEN J l(7ERE Parkins Mills WW"CP- I NR Up ride and Expansion 4. Permanent swales and riprap outlet aprons inspected annually. 'frees, brush, obstructions, and other foreign objects removed and disposed of to prevent interference with proper Facility function. 5. Seeded areas maintained and/or reseeded or stabilized to protect against erosion. 6. Repair sloughing or croslon of embankments. 7. Inspection of and cleaning of storm pipes. S. Drainage swales and culverts are to be inspected on an annual basis. 'frees, brush, obstructions, and other foreign objects are to be removed and disposed Of tO allow the facilities to Operate at their intended design capacity. 1.13. Calculations Hydrologic and croslon and scdllllCnt COIlt1'OI CalClllations are included in Appendix E. -- 9 anal: JIIIy 17, 2006 — _ _ O oRiEri GG�� 1.\I)IV33\I'IZOJI'C"rS\6351-Parkins Mills\3669d-w1V'1'1'\I)oCUl11e01S\JSSC flan\ESC-reporuloc a SOILS MAP NOT TO SCAT F FILE NO. rom 013RIENSGERE FREDERICK-WINCH ESTER SERVICE AUTHORITY 6351.36694-002 _ PARKINS MILLS WWTF DATE ENR UPGRADE AND EXPANSION JULY 2006 WINCHESTER, VIRGINIA DWG No. 2006 0 O'Bne, a cwa Engwwws. VcFIGURE 2 EROSION AND SEDIiVIEN'C CONTROL PLAN SUBMISSION CHECKLIST This application package is designed to ensure that regulated land disturbing activities occur only after approval oran erosion and sediment control plan. The erosion and sediment control application is not considered complete unless all the required information listed below is present. [rally part of the required information is missing, the application will not be accepted by the Frederick County Public Works Department. 1. Completed Land Disturbance Permit Application. 2. Completed Bond Estimate form (provided in the land disturbance permit application. 3. Two (2) copies or the approved erosion and sediment control plan complete with narrative and engineering calculations. 4. Completed checklist For comnlerclal/industrial development or residential subdivision development. NIA 5. Written approval f►•om the Frederick County Sanitation Authority its applicable. See 13clow 6. Written approval front the Virginia Department of Transportation (V.D.O.7.) consisting of a letter and/or the V D.O.7. temporary construction entrance permit. 7. Copies of till applicahle local, state anti federal environ►nental permits. Note: '['here is .in applicable fee required for all land disturbance permit applications. The fee is payable at the time the land disturbance permit is issued. O'Brien & Gere Notes: 1. Written approval from the VDOT will be received later in a separate correspondence. 2. Application for coverage under General Permit No. DCROI has been made to the VDCR. Acknowledgement of coverage will be forwarded once received. 7 11 1 1 1 t LAND DISTURBANCE PERMIT APPLICATION DATE: July 12, 2006 APPLICANT: Frederick -Winchester Service Authority PROPERTY OWNER: Frederick -Winchester Service Authority ADDRESS: 107 N. Kent Street, County Office Complex Winchester, Virginia 22601 TELEPHONE: (5,10) 722-3579 DESIGN FIRM/DESIGNER: O'Brien & Gere ADDRESS: 8`101 Corporate Drive, Suite 400 Landover, Maryland 20755 TELEPHONE: (301) 731-5622 CONTRACTOR: 'fo be determined ADDRESS: TELEPHONE: / (24 HOUR EMERGENCY CONTACT PROJECT NAME: Parkins Mills WWTF ENR Upgradc and Expansion MAGISTERIAL DISTRICT: Shawnee PROPERTY IDENTIFICATION NUMBER: Parcel ID Number 76 A 94A TOTAL AREA OF PROPERTY: 6.73 acres ( Plus 0.73 acre Easement) AVERAGE OF AREA TO BE DISTURBED: 5.0 acres (Rounded up to nearest acre i.e., 1.2 round up to 2, fee shall be based on this acreage.) ZONING OF PROPERTY: Residential Performance District TYPE OF PROJECT: COMMERCIAL/INDUSTRIAL/SITE PLAN SUBDIVISION PLAN RESIDENTIAL/RURAL (CIRCLE ONE) HYDROLOGIC UNIT (TO BE COMPLETED BY FREDERICI{ COUNTY) 9 Appendix 2 FREDERICK COUNTY, VIRGINIA EROSION AND SEDIMENT CONTROL BOND ESTIMATE FORM PROJECT NAME: Parkins Mills WWTF ENR Upgrade and Expansion DATE: July 13, 2006 DESIGN FIRIIM: O'Brien& Gere CONTACT PERSON: William J. Mcinert PHONE #: (301) 731-1 130 x 130 MININIUM STANDARD# SEDIMENT DEVICE COST UNIT QUANTITY COST 3.01 Safety Fence $4.00 Linear Foot 3.02 Construction Entrance $1,500.00 Each 3 $4,500 3.05 Reinforced Silt Fence $5.00 Linear Foot 1,680 $58,400 3.07 Curb Inlet Protection $150.00 Each 3.08 Culvert Inlet Protection S200.00 Each 3.09 Diversion Berm $5.00 Linear Foot 3.10 Fill Diversion S2.00 Linear Foot 3.12 Diversion $12.00 Linear Foot 100 $1,200 3.13 Sediment Trap - I acre S2,000.00 Each 1 $2,000 Sediment Trap - 2 acres $2,500.00 Each Sediment Trap - 3 acres S3,000.00 Each 3.14 Sediment/Stormwater Basin (Lump 3.16 Paved Flume $35.00 Square Yard 3.17 Stormwater Conveyance Channel Seeded $10.00 Square Yard Sodded $20.00 Square Yard Temporary Matting $30.00 Square Yard Permanent Matting $40.00 Square Yard Riprap S60.00 Square Yard 3.18 Outlet Protection Riprap $60.00 Square Yard 53 $3,180 Grouted Riprap $50.00 Square Yard Concrete $40.00 Square Yard 3.20 Rock Check Darn S30.00 Square Yard 3.21 Level Spreader S12.00 Square Yard 3.22 Temporary Seeding/Mulch $2,500.00 Acre 3.23 Permanent Seeding/Mulch $3,000.00 Acre 2.0 $6,000 SUBTOTAL $75,280 Contingeney 25 percent of total Required Contingency $18,820 Amount GRAND TOTAL $94,100 Note: Items not listed will be checked on a per site basis. *Design firms will provide cost estimate and Frederick County will verify if costs are appropriate. 12 PLAN CONTENT CHECKLIST The Erosion and Sediment Control Plan must contain all of the following information: NARRATIVE: Project Description - Briefly describe the nature and purpose of the land disturbing activity and the amount of grading involved. Existing Site Conditions - A description of the existing topography, vegetation and drainage. Adjacent Areas - A description of neighboring areas such as streams, lakes, residential areas, roads, etc., which might be affected by the land disturbance. Soils - A brief description of the soils on the site giving such information as soil names, mapping unit, crodibility, permeability, depth, texture and soil structure. Critical Areas - A description of areas on the site which have the potential for serious erosion problems. Erosion and Sediment Control I1leasures Phase Outline - A delineation of the phases in which the erosion and sediment control measures will be implemented. ✓ Erosion and Sediment Control Measures - A description of the methods which will be used to control erosion and sedimentation on the site. ✓ Temporary Stabilization - A brief description, which includes specifications as to how the site will be stabilized after construction has been completed. Permanent Stabilization - A brief description, including specifications, of how the site will be stabilized after construction is completed. Stormwater Management Consideration - Will the development of the site result in increased peak rates of runoff? Will this result in flooding or channel degradation downstream? If so, considerations should be given to stormwater control structures on the site. Comply with minimum Standard 19 of the Erosion and Sediment Control Law and Regulations. (Maintenance - A schedule of regular inspections and repair of erosion and scdunent control structures should be set forth. Calculations - Any calculations made for the design of such items as sediment basins, diversions, waterways and calculations for runoff and stormwater detention basin design (if applicable). El SITU PLA-NUSUBDIVISION PLAN ✓ Vicinity Map - A small map locating the site in relation to the surrounding area. Existing Contours - The existing contours of the site should be shown on a map. Existing Vegetation - The existing tree lines, grassy areas, or unique vegetation should be shown on the map. ✓ Soils - The boundaries of the different soil types should be shown on a map. ✓ Indicate North - The direction of north relative to the site should be shown. ✓ Critical Erosion Areas - Areas with potentially serious erosion problems should be shown on a map. Existin Drainage Patterns - The dividing lines and the direction of flow for the different drainage areas should be shown on a map. Final Contours - Changes to the existing contours should be shown on a map. ✓ Limits of Clearigg and Grading - Areas which are to be cleared and graded should be outlined on a map. Location of Practices - The locations of the erosion and sediment control and stormwater management practices used on the site should be shown on a map. Variance Request - A list of exemptions to any of the Minimum Standards of the Virginia Erosion and Sediment Control Law and Regulations. Detail Drawing - Any structural practices should be explained and illustrated with detail drawings. Overall Lot Grading Plan - A grading (site) plan for all lots in a subdivision and the proposed finished floor elevations (if applicable). Construction Entrance - A detailed plan or narrative to ensure that the transport of sediment onto subdivision streets does not occur during any phase of construction. 02980-1 6351.36694 SECTION 02980 TOPSOIL AND SEEDING PART 1 GENERAL 1.1 SUMMARY A. This Section includes requirements for furnishing topsoil, fertilizer, seed, and mulch; the preparation of the subgrade and the placing of the topsoil, fertilizer, seed and mulch. B. Maintenance requirements until acceptance. 1.2 SUBMITTALS A. In addition to those submittals identified in the General Provisions, the following items shall also be submitted: l . The Contractor shall submit the location of source and data for off -site topsoil. 2. Analysis of lie seed, including mixtures, purities, geminations and weed seed content. 3. Should hydrosecder be used, the Contractor shall submit all data Including material and application rates. PART 2 PRODUCTS 2.1 MATERIALS A. Topsoil shall be unfrozen friable clayey loam free from clay lumps, stones, roots, sticks, stumps, brush or foreign objects. B. Fertilizer shall be a standard quality commercial carrier of available plant food elements. A complete prepared and packaged material containingi minimum of 10% nitrogen, 10% phosphoric acid and 10% potash, unless otherwise shown on the Contract Drawings. 1. Each bag of fertilizer shall bear the manufacturer's guaranteed statement of analysis. C. Seed mixtures shall be of commercial stock of the current season's crop and shall be delivered in unopened containers bearing the guaranteed analysis of the mix. l . All seed shall meet the State standards of germination and purity. D. Seed mixtures sliall be in accordance with the Contract Drawings. E. Mulch shall be stalks of oats, wheat, rye or other approved crops which are free from noxious weeds. 1 06/06 "Topsoil and Seeding 02980-2 63 51.3 6694 PART 3 EXECUTION 3.1 INSTALLATION A. The area to receive topsoil shall be graded to a depth of not less than 4 inches or as specified, below the proposed finished surface. If the depth of topsoil existing prior to construction was greater than 4 inches, the topsoil shall be replaced not less than the greater depth. l . All debris and inorganic material shallbe removed and the surface loosened for a depth of 2 inches prior to the placing of the topsoil. 2. The topsoil shall not be placed until the subgrade is in suitable condition and shall be free of excessive moisture and frost. B. Satisfactory topsoil removed from the excavations shall be placed on the prepared subgrade to the depth required. 1. In the event the topsoil removed during excavation is unsatisfactory or inadequate to obtain the required finish grades, the Contractor shall furnish the required quantity of satisfactory topsoil from approved sources off site. 2. All topsoil shall be free from stones, roots, sticks and other foreign substances and shall not be placed in a frozen or muddy condition. 3. The finished surface shall conform to the lines and grades of the area before disturbed or as shown on the Contract Drawings. Any irregularities shall be corrected before the placement of fertilizer and seed. C. The fertilizer shall be applied uniformly at the rate of 20 pounds per 1,000 square feet, unless otherwise shown on the Contract Drawings. Following the application of the fertilizer and prior to application of the seed, the topsoil shall be scarified to a depth of at least 2 inches with a disc or other suitable method traveling across the slope if possible. D. When the topsoil surface has been fine graded, the seed mixture shall be uniformly applied upon the prepared surface with a mechanical spreader at a rate a$hown on the Contract Drawings. 1. The seed shall be raked lightly into the surface and rolled with a light hand lawn roller. 2. Seeding and mulching shall not be done during windy weather. E. The mulch shall be hand or machine spread to form a continuous blanket over the seed bed, approximately 2 inches uniform thickness at loose measurement. Excessive amounts or bunching of mulch will not be permitted. Mulch shall be anchored by an acceptable method. 06/06 Topsoil and Seeding 02980-3 6351.36694 2. Unless otherwise specified, mulch shall be left in place and allowed to disintegrate. 3. Any anchorage or mulch that has not disintegrated at time of first mowing, shall be removed. Anchors may be removed or driven flush with ground surface. F. Seeded areas shall be watered as often as required to obtain germination and to obtain and maintain a satisfactory sod growth. Watering shall be in such a manner as to prevent washing out of seed. G. Hydroseeding may be accepted as an alternative method of applying fertilizer, seed and mulch. The Contractor must submit all data regarding materials and application rates to the Engineer for review. 3.2 MAINTENANCE A. All lawn areas shall be mowed by the Contractor before the new grass reaches a height of 4 inches. The Contractor shall maintain the newly seeded areas in good condition until acceptance, including regular mowing to a height of 2 inches. 06/06 Topsoil and Seeding WinTR-55 Current Data Description --- Identification Data --- User: DainZ Date: 7/12/2006 Project: Parkins Mills WWTF A Units: English SubTitle: Ex Site without Open Tanks(Ai(evn`k 0l) Areal Units: Acres State: Virginia County: Frederick Filename: I:\DIV83\PROJECTS\6351-Parkins Mills\36694-WWT P\Notes-data\TR55\Ex Site_Without_tanks.w_` --- Sub -Area Data --- Name Description Reach Area(ac) RCN Tc ------------------------------------------------------------------------------ Ex. Site Outlet 6.6 79 0.100 Total area: 6.60 (ac) --- Storm Data -- Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr (in) (in) (in) (in) (in) (in) (in) -------------------------------------------------------------------------------- 3.0 4.0 4.9 5.8 6.5 6.9 2.5 Storm Data Source: Frederick County, VA (MRCS) Rainfall Distribution Type: Type II Dimensionless Unit Hydrograph: <standard> WinTR-55, Version 1.00.00 Page 1 7/12/2006 12:45:16 PM DainZ Parkins Mills WWTF Ex Site without Open Tanks Frederick County, Virginia Watershed Peak Table Sub -Area Peak Flow by Rainfall Return Period or Reach 2-Yr 10-Yr 100-Yr Identifier (cfs) (cfs) (cfs) ---------------------------------------------------------------------------------- SUBAREAS Ex. Site 11.93 27.61 45.23 REACHES OUTLET 11.93 27.61 45.23 WinTR-55, Version 1.00.00 Page 1 7/12/2006 12:45:16 PM DainZ Parkins Mills WWTF Ex Site without Open Tanks Frederick County, Virginia Sub -Area Land Use and Curve Number Details Sub -Area Hydrologic Sub -Area Curve Identifier Land Use Soil Area Number Group (ac) -------------------------------------------------------------------------------- Ex. Site Paved parking lots, roofs, driveways D 1.7 98 Pasture, grassland or range (good) B 1 61 Pasture, grassland or range (good) D 1.2 80 Brush - brush, weed, grass mix (good) B .03 48 Brush - brush, weed, grass mix (good) D 1.07 73 Woods (good) B .31 55 I•Ioods (good) D 1.29 77 Total Area / Weighted Curve Number 6.6 79 winTR-55, Version 1.00.00 Page 1 7/12/2006 12:45:16 PM DainZ Parkins Mills WWTF Ex Site without Open Tanks Frederick County, Virginia Sub -Area Time of Concentration Details Sub -Area Flow Mannings's End Wetted Travel Identifier/ Length Slope n Area Perimeter Velocity Time (ft) (ft/ft) (sq ft) (ft) (ft/sec) (hr) -------------------------------------------------------------------------------- Ex. Site SHEET 20 0.1000 0.150 0.024 SHALLOW 190 0.0100 0.025 0.026 SHALLOW 240 0.1750 0.050 0.010 CHANNEL 45 3.000 0.004 Time of Concentration 0.100 WinTR-55, Version 1.00.00 Page 1 7/12/2006 12:45:16 PM WinTR-55 Current Data Description --- Identification Data --- User: DainZ Date: 7/12/2006 Project: Parkins Mills WWTF Units: English SubTitle: Prop without Open Tanks (/.iltr� 'A'vt i� Areal Units: Acres State: Virginia County: Frederick Filename: I:\DIV83\PROJECTS\6351-Parkins Mills\36699-WWTF\Dlotes-data\TR55\Prop_Site_without_tanks. --- Sub -Area Data --- Name Description Reach Area(ac) RCN Tc ------------------------------------------------------------------------------ prop Site Outlet 5.9 80 0.1 Total area: 5.90 (ac) --- Storm Data -- Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr (in) (in) (in) (in)--------(in)--------(in)--------(in)- 3.0 4.0 ---------------------------9---------5-- 6.5 6.9 2.5 Storm Data Source: Frederick County, VA (MRCS) Rainfall Distribution Type: Type II Dimensionless Unit Nydrograph: <standard> WinTR-55, Version 1.00.00 Page 1 7/12/2006 12:51:50 PM DainZ Parkins Mills WWTF Prop without Open Tanks Frederick County, Virginia Sub -Area Land Use and Curve Number Details Sub -Area Hydrologic Sub -Area Curve Identifier Land Use Soil Area Number Group (ac) -------------------------------------------------------------------------------- prop Site Paved parking lots, roofs, driveways D 2 98 Pasture, grassland or range (good) B 1 61 Pasture, grassland or range (good) D 1.2 80 Brush - brush, weed, grass mix (good) B .03 48 Brush - brush, weed, grass mix (good) D .57 73 Woods (good) B .31 55 Woods (good) D .79 77 Total Area / Weighted Curve Number 5.9 80 WinTR-55, Version 1.00.00 Page 1 7/12/2006 12:51:50 PM DainZ Parkins Mills WWTF Prop without Open Tanks Frederick County, Virginia Sub -Area Time of Concentration Details Sub -Area Floor Mannings's End Wetted Travel Identifier/ Length Slope n Area Perimeter Velocity Time (ft) (ft/ft) (sq ft) (ft) (ft/sec) (hr) -------------------------------------------------------------------------------- prop Site SHEET 35 0.1100 0.150 0.037 SHALLOW 65 0.0500 0.025 0.004 SHALLOP] 250 0.1500 0.050 0.011 WinTR-55, Version 1.00.00 Page 1 Time of Concentration 0.1 7/12/2006 12:51:50 PM DainZ Parkins Mills WWTF Prop without Open Tanks Frederick County, Virginia Watershed Peak Table Sub -Area Peak Flow by Rainfall Return Period or Reach 2-Yr 10-Yr 100-Yr Identifier (cfs) (cfs) (cfs) ---------------------------------------------------------------------------------- SUBAREAS prop Site 11.26 25.51 41.34 REACHES OUTLET 11.26 25.51 41.34 WinTR-55, Version 1.00.00 Page 1 7/12/2006 12:51:50 PM WinTR-55 Current Data Description --- Identification Data --- User: DainZ Date: 7/12/2006 Project: Parkins Mills WWTF Units: English SubTitle: Ex Site w/ open Tanks ��11TL^nc�,(1�Z a> Areal Units: Acres State: Virginia County: Frederick Filename: I:\DIV83\PROJECTS\6351-Parkins Mills\36694-WWTP\Notes-data\TR55\Ex site with tanks.w55 --- Sub -Area Data --- Name Description Reach Area(ac) RCN Tc ---------------------------------------------------------------------------- Ex. Site Outlet 7.4 70 0.100 Total area: 7.40 (ac) --- Storm Data -- Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr (in) (in) (in) (in) ------(in)--------(in)--------(in) -- 3.0---4.0---------4.9---------S---- 6.5 6.9 2.5 Storm Data Source: Frederick County, VA (NRCS) Rainfall Distribution Type: Type II Dimensionless Unit Hydrograph: <standard> WinTR-55, Version 1.00.00 Page 1 7/12/2006 12:43:54 PM DainZ Parkins Mills WWTF Ex Site w/ Open Tanks Frederick County, Virginia Sub -Area Land Use and Curve Number Details Sub -Area Hydrologic Sub -Area Curve Identifier Land Use Soil Area Number Group (ac) -------------------------------------------------------------------------------- Ex. Site CN directly entered by user - 7.4 70 Total Area / Weighted Curve Number 7.4 70 WinTR-55, Version 1.00.00 Page 1 7/12/2006 12:43:54 PM Worksheet 2: Runoff curve number and runoff Project VCr ns N,I YV 3 31 By 0 Z Date Location \NIAAeS+"er Fre.V-A- Checked Date Circle one: Present Developed �j� s F�q tvll Mks �CP,'1c, o I. Runoff curve number (CN Soil name and Cover description 1/ Area Product hydrologic (cover type, treatment, and CN of CN x area cv group hydrologic condition; 'Ilii i ❑ acres percent impervious; y N , `V []mil (appendix A) unconnected/connected impervious area ratio) p H w w �3erv�ov5 Su• ��'ce 5 G3 ' .3 I b ��en IGnr\s d 1 0-� 0 Wei i\er i (�� G c cSS (�ooc IM I .3 l� VV 00 77 \T' 73 I.3 3 3 O I �rlo�os (G��aj 55 031 ru5� �,c)O) 46 0.3 _ Use oaly,flne CN source per line. Totals = � �. + 5 l total product' CN (weighted) t: Use CN = 3d total area 7. l� , 2: Runoff' Frequency .......:.':.................... yr Rainfall,` P (24-hour) .................. in Runoff ":Q ..........................8.... in Storm.#1 Storm 02 Storm #3t 3 •' I� '�c�o �:. (Use P and -CN with table 2-1, fig.. 2-1, :or eqs. 2-3 and 2-4.) D-2 (210-VI-TP-55, Second Ed., June 1986) DainZ Parkins Mills WWTF Ex Site w/ Open Tanks Frederick County, Virginia Sub -Area Time of Concentration Details Sub -Area Flow Mannings's End Wetted Travel Identifier/ Length Slope n Area Perimeter Velocity Time (ft) (ft/ft) (sq ft) (ft) (ft/sec) (hr) -------------------------------------------------------------------------------- Ex. Site SHEET 20 0.1000 0.150 0.024 SHALLOW 190 0.0100 0.025 0.026 SHALLOW 240 0.1750 0.050 0.010 CHANNEL 45 3.000 0.004 WinTR-55, Version 1.00.00 Page 1 Time of Concentration 0.100 7/12/2006 12:43:54 PM DainZ Parkins Mills WWTF Ex Site w/ Open Tanks Frederick County, Virginia Watershed Peak Table Sub -Area Peak Flow by Rainfall Return Period or Reach 2-Yr 10-Yr 100-Yr Identifier (cfs) (cfs) (cfs) ---------------------------------------------------------------------------------- SUBAREAS Ex. Site 7.32 22.10 40.33 REACHES OUTLET 7.32 22.10 40.33 WinTR-55, Version 1.00.00 Page 1 7/12/2006 12:43:54 PM WinTR-55 Current Data Description --- Identification Data --- �I User: DainZ Date: 7/12/2006 Project: Parkins Mills WWTF Units: English SubTitle: Prop Site w/ Open Tanks(MQv4,,w )> Areal Units: Acres State: Virginia County: Frederick Filename: I:\DIV83\PROJECTS\6351-Parkins Mills\36694-WWTP\Notes-data\TR55\Prop_Site_with_tanks.w5 --- Sub -Area Data --- ' Name Description Reach Area(ac) RCN Tc ------------------------------------------------------------------------------ Prop Site Outlet 7.4 64 0.100 Total area: 7.40 (ac) --- Storm Data -- Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr (in) (in) (in) (in) (in) (in) (in) --------------------------------------------------------------- 3.0 4.04.95.86.5 6.92 5 , Storm Data Source: Frederick County, VA (NRCS) Rainfall Distribution Type: Type II Dimensionless Unit Hydrograph: <standard> r WinTR-55, Version 1.00.00 Page 1 7/12/2006 12:47:00 PM DainZ Parkins Mills WWTF Prop Site w/ Open Tanks Frederick County, Virginia Sub -Area Land Use and Curve Number Details Sub -Area flydrologic Sub -Area Curve Identifier Land Use Soil Area Number Group (ac) ---------------------------------------------------------------------------- Prop Site CN directly entered by user - 7.4 64 Total Area / Weighted Curve Number 7.4 64 winTR-55, Version 1.00.00 Page 1 7/12/2006 12:47:00 PM Worksheet 2: Runoff curve: number and runoff Project ?C r r`1 s I I' S w 1 \ ' 1 By 0 T2 Date Location W I NCI QSJer �feoef;�'�\ L� ,/A Checked Date Circle one: Present Developed 9roVo52d \,,J.,A Oyw 74f\�k5 SCenr'r; U 1. Runoff curve number (CN) Soil name andCN Cover description 1/ Area Product hydrologic (cover type, treatment, and of 'CN x area N group hydrologic condition; N 1 I ❑ acres percent impervious; W N ❑mi2 (appendix A) unconnected/connected impervious area ratio) p H -H w �I v-S k -fv We; I<CfI (D> 61 dGO JGod) 771 0.7q ko, 73 57 W ao S ood 55 OQ 31 7 . 1/ Use only -one CN source per'line. Totals :. �f total produc(.t' I CN '(weighted) _. - _ _ q. U� Use CN = F total area r7- Runoff' Frequency ti......''.::................... yr RainfallP (24-hour) in Runoff .............................. in '= (Us e.P and CN with - b to le 2-1, fig'. 2-1, _or ' eqs. 2-3 and 2-4. ) Storm.#1 Storm #2 Storm #3. U 00 � 4 9. D-2 (210-VI-TR-55,, Second Ed., June 1986) Dain2 Parkins Mills WWTF Prop Site w/ Open Tanks Frederick County, Virginia Sub -Area Time of Concentration Details Sub -Area Flow Mannings's End Wetted Travel Identifier/ Length Slope n Area Perimeter Velocity Time (ft) (ft/ft) (sq ft) (ft) (ft/sec) (hr) -------------------------------------------------------------------------------- Prop Site SHEET 35 0.1100 0.150 0.037 SHALLOW 65 0.0500 0.025 0.004 SHALLOW 250 0.1500 0.050 0.011 Time of Concentration 0.100 WinTR-55, Version 1.00.00 Page 1 7/12/2006 12:47:00 PH DainZ Parkins Mills WWTF Prop Site w/ Open Tanks Frederick County, Virginia Watershed Peak Table Sub -Area Peak Flow by Rainfall Return Period or Reach 2-Yr 10-Yr 100-Yr Identifier (cfs) (cfs) (cfs) ---------------------------------------------------------------------------------- SUBAREAS Prop Site 4.44 16.49 33.10 REACHES OUTLET 4.44 16.49 33.10 WinTR-55, Version 1.00.00 Page 1 7/12/2006 12:47:00 PM GGRICN 6 GCRC U .1, � AA" �� 5 �;�J l� T�� � �'NR BY: IDATE: . IJOB NUMBER: I� � YY� `. 3-� � A � �� 1-�G� �f d .=f?rl,-n/10,�,.� ��. � ..+ j � . T -1 ,�1 � i'? 3 1 Ci . �� " ✓ w % lam. L%��{'C' S / _ = /1 . -t- 1 1 .�Ci- fJ't h ). ' i�t N r\-? i/?:,)f. on ■ j� T-5q<y I l Parkins Mill WWTP N�Iater M PCSA Project 34 - Route 522, Fi County Page 1 of 1 Mark Cheran From: Funkhouser, Rhonda [Rhonda.Funkhouser@VDOT.Virginia.gov] on behalf of Ingram, Lloyd [Lloyd.Ingram@VDOT.Virginia.gov] Sent: Wednesday, April 09, 2008 8:55 AM To: adam.zimmerman@phra.com Cc: Ingram, Lloyd; Dove, Ronald; mcheran@co.frederick.va.us Subject: Parkins Mill WWTP Water Main - FCSA Project 34 - Route 522, Frederick County We have received your revised site plan dated January 11, 2008 for the referenced project. It appears all of our earlier review comments have been satisfactorily addressed. Please advise the owner of our approval. Also please provide ttivo (2) sets of approved construction plans with signed seal for VDOT distribution. The appropriate land use permit may now be applied for to cover work within the Route 522 right-of-way. The permit is issued by this office and will require a minimum processing fee, surety bond coverage, and the salary & expenses of a State assigned Inspector. A copy of any/all recorded plats of dedication for drainage easements or additional right-of-way required for implementation of this proposed project should be provided to VDOT prior to issuance of any land use permits. Dedication should be made to the Commonwealth of Virginia. Once satisfactory application has been made, a permit will normally take approximately thirty days to process and issue. Should you have any questions, do not hesitate to call me or contact Ronnie Dove at (540) 984-5633• Lloyd A. Ingram, Transportation Engineer Virginia Department of Transportation Edinburg Residency — Land Development 14031 Old Valley Pike Edinburg, Virginia 22824 Phone #(540) 984-5611 Fax #(540) 984-5607 5/7/2008 �� } ocomy o F�ZI'J gICK Department of Planning and Development 540/ 665-5651 FAX: 540/ 665-6395 April 13, 2007 Mr. William Meinert, P.E. O'Brian & Gere Engineers 8401 Corporate Drive, Suite 400 Landover, Maryland 20785 Re: Approval of Site Plan #55-06; Parkins Mill Plant Expansion Property Identification Number (PIN): 76-A-94A Dear Mr. Meinert: The Frederick County Department of Planning and Development administratively approved the above -referenced site plan on April 13, 2007. The site plan is approved for the upgrade and expansion of the existing Parkins Mill Waste Water Treatment Facility located on Parkins Mill Road (Route 644) in the Shawnee Magisterial District. All requirements of the Frederick County Zoning Ordinance have been met in the approved site plan, including review agency comments from all relevant review' agencies. I am providing you with three (3) copies of the approved site plan. Please forward these copies to the appropriate representative(s). Furthermore, advise the owner(s) that a copy should be kept for future reference, and an approved copy must be kept on the construction site throughout the development process. Once site development is complete, the owner(s) should contact this office to schedule an on -site inspection. Do not hesitate to contact me if you have any questions or concerns. Sincerely, Candice E. Perkins Planner II CEP/bad Enclosures cc: Jane Anderson, Real Estate Patrick Barker, Economic Development Commission Gene Fisher, Shawnee District Supervisor June Wilmot and Robert Morris, Shawnee District Planning Commissioners Commissioner of Revenue Wendy Jones, FCSA, 315 Tasker Road, Stephens City, VA 22655 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 • • APi 2007 To: Candice E. Perkins, Planner II Department of Planning and Development 107 North Kent Street Winchester, VA 22601 PH: 540-665-5651 ***** OVERNIGHT *****39940.600.100 We are sending you: X herewith under separate cover X drawings If material received is not as listed, please notify us at once. TRANSMITTAL Date: April 2, 2007 File: \6351 \36694 \corres \ Re: Parkins Mills WWTF Site Plan #55-06 descriptive literature X letters Quantity Identifying Number Title Action 5 April 2, 2007 Parkins Mills W WTF — Site Plan Drawing Package (Cover, C-1 through C-12 as indicated on cover slieet Y Action letter code: R-reviewed N-reviewed and noted I -for your information S-resubmit J-rejected Y-for your approval Remarks: The attached is being re -submitted to the County for final Site Plan approval. The zoning was changed from RP to RA on the plans per Planning Dept. request through Bill Meinert on 3/30/07. Please feel free to contact us with any questions regarding this matter. (301-731-5622) cc: w/enclosure Jesse Moffett — FWSA Ginny Ferrara — OBG — Richmond Jason Pledger — OBG — Parkins Mills Trailer File — Landover w/o enclosure Bill Meinert — OBG Very truly yours, O'BRIEN & GERE ENGINEERS, INC. G Ned Talbot, P.E. Senior Project Engineer UnRIEN G GERE S fir' 60Tr ANNIVEnSAnY :vah offices in 25 m�,.ior onotropolitan areas and grolving. I: PROJECTS\6351 FWSA\36694 1114 Design 13id\2_cones\Permits\Site flan ReViOVVY111-n1itlal Site flan - Planning d-2-07.doc =- O'DRIEN G GERE To: Candice E. Perkins, Planner II Department of Planning and Development 107 North Kent Street Winchester, VA 22601 PH: 540-665-5651 ***** OVERNIGHT *****39940.600.100 TRANSMITTAL Date: February 8, 2007 File: \6351 \36694 \cones \ Re: Parkins Mills WWTF Site Plan #55-06 We are sending you: X herewith under separate cover X drawings descriptive literature X letters If material received is not as listed, please notify us at once. %Quantity fidentifying Number; Title . Action ' I February 7, 2007 Parkins Mills WWTF Y OBG Site Plan Comment Response Letter Original Dept. Of Planning Review Comments 5 February 7, 2007 Parkins Mills WWTF — Site Plan Drawing Package Y (Cover, C-I through C-12 as indicated on cover sheet) I Various Request for Site Plan Comments — Approval I correspondence from the following agencies: • Frederick County Sanitation Authority - approval comment sheet • Frederick County Inspections Department initial agency review comments OBG response letter approval comment sheet • Frederick County Engineering Department - approval comment sheet • Frederick County Fire Marshall - initial comments and approved re -submittal initial agency review comments OBG response letter approval comment sheet • Virginia Department of Transportation (VDOT) original request for comments correspondence FWSA letter to VDOT OBG email to request comments or approval VDOT aeproval email Action letter code: R-reviewed N-reviewed and noted 1-for your information S-resubmit ,J-rejected Y-for your approval F F 5 1 2 2037 O'BRIE19 j�GERE3 6 ,2OO�TH SARY ... with offices in 25 major metropolitan areas and growing. I:\PROJEC7S\6351 FNVSA06694 PM Design Bid\2_coms\Pemiits\Site Plan ReviewUranslnittal Site Plan - Planning 2-7-07.doc • 9 Remarks: TRANSMITTAL The attached is being submitted to the County for final Site Plan approval. Please feel free to contact us with any questions regarding this matter. (301-731-5622) cc: w/enclosure Jesse Moffett — FWSA File — Landover w/o enclosure Bill Meinert — OBG Very truly yours, O'BRIEN & GERE ENGINEERS, INC. Ned Talbot, P.E. Senior Project Engineer 19%6 fr3q' WO6 O'BRIEN 5 GERE S 60TH ANNIVERSARY .with offices in 25 major metropolitan areas and growing. 1:\PROJECTS\6351 FWSA\36694 PM Design Bid\2_con— s\Pennits\Site Plan Review\Transmittal Site Plan - Planning; 2-7-07.doc M ®® O'BRICN6GERE February 7, 2007 Candice E. Perkins Frederick County Dept. of Planning and Development 107 North Kent Street, suite 202 Winchester, VA 22601-5000 Dear Ms. Perkins: 0 Re: ROSUblmittal of Site Plan #55-06; Parkins Mills WWTF ENR Upgrade and Expansion File: 6351/36694 #2 The attached Site Plan Package (dated 2/7/07) for the Parkins Mills WWTF ENR Upgrade and Expansion is hereby being resubmitted to your department for Frederick County Final Site Plan Approval. Please note the following in response to your review comments dated August 16, 2006: 1) General Information • The PIN #, Magisterial District have been added to the coversheet. • Zoning, total site area and disturbed area, site address, owner/applicant/developer, district height regulations, building restriction lines, and variance information has been added to Sheet C-1. • Note that this is a main►c►pal project and the site is being developed by the operator/applicant (Frederick Winchester Service Authority). A general contractor will be hired by the Authority to construct the facilities in question. 2) Landscaping Notes — Notes have been added to the Landscaping Detail on Sheet C-2. 3) Building Heights — Silo height added to Sheet C-4. Note that Sheet C-6 contains structure/building heights for other proposed structures in the form of elevations). 4) Variance — Please refer to Sheets C-1 (Project Note 4), C-5, C-6 and C-7 for variance information. 5) Labeling — Proposed building additions have been labeled on Sheet C-4. Please be aware Sheet C-4 is intended to display survey control data. Labels and heights (elevations) of structures are provided on Sheets C-5, C-6 and C-7 in a more legible scale. IAPROJECTS\6351 FWSA\36694 I'M Design ►lid\2_cm-cs\Permits\site Plan Review suite 100, 8,101 corporate Drive, Landover, MD 20785 (30 1 ) 731-5622 / FAX (301) 577-4737 . htlp://w%vw.obg.com ...with offices in 25 major metropolitan areas and growing. Candice E. Perkins February 7, 2007 Page 2 In addition, per your request and in accordance with your procedures, find attached Site Plan Review comments and approvals from the following agencies: • Frederick County Sanitation Authority (also Property Owner) • Frederick County Inspections Department - initial comments and approved re -submittal • Frederick County Engineering Department • Frederick County Fire Marshall - initial comments and approved re -submittal • Virginia Department of Transportation (VDOT) —approval letter We hope this site plan package is satisfactory for your administrative approval. Please do not hesitate to contact me (301-731-5622) or the Frederick Winchester Service Authority (Jesse Moffett, 540-722- 3579) if you have any questions or need additional information. Very truly yours, O'BRIEN AND GERE UcillLJ.ert,P.E. e President L__J 9 August 16, 2006 ivlr. William Meincrt, P.E. O'Bi-ian & Gere Engineers 8401 Corporate Drive, Suite 400 Lanclover, Maryland 20785 COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/665-6395 Re: Conlnleuts for Site Plan #55-06; Parkins Mill Phnit Expansion Property Identilicatiou Number (PIN): 76-A-94A Dear Mr. Nleinert: Planning Staff has reviewed the above-rcfel•Cilcecl site 1)lall to cletei•I11111C If adnllllisti•ative apploval call be Granted. At this time, administrative approval cannot be grantecl. This Site plan is denied until the issues in this letter, as well as all ISSLICS Of the Othei- i-eview agencies, have been adequately acich•essecl. Please review Staffs comments listed below and then prepare a revisecl site plan which a(lequately addresses each concern. Review CoUllnenis: 1) General lnformation. On the covershcet, I)rovicle the PIN# as well as the Magisterial District. Sheet C-1 should contain the zoning ofthe site, total site area/clisturbed area, site address, developer, clistrict height regulations, and the building restriction lines. 2) Landscaping Notes. On sheet C-2, notes nee(I to be provided that slate (1) all planting shall Collfoi-ill with S 165-36B of the Freclericl( County Zoning OI'diilailCC (Plant selection, planting procedure, and maintenance), and (2) ally plant su[;StitutionS must be approvecl in writing by the Frederick County Plailllillg Department. 3) Buil(ling Heights. On sheet C4. label the height of the silo. 4) Variance. This property received a variance in 2005 (1127-05), which gave this property 20 foot BRI.,'s offnf the road right-of-way and 15 (loot side BRL's. This variance nee(Is to be refercncecl in the plan. 5) Labeling. Sonle of the additions shown on the site plan (see sheet C-4) need to be labeled. Once you have adequately addressed all of these conllllcnts, please resubmit a copy for illy review. I will ncecl all approved review agency coillnlellt sheets allcl at least fife COpies OI tllc Filial i)Iall f01• appl•ovFll. Collllllcllt sheets are required from the following agencies: the Frederick Coma.)), h7g7 ections DeparMient, the Frederick Cohn.)) Department gI'Public Hlorks (Corm.)) Engineer), Frederick Couwy Fire iLka•shal, the Preclerick Coil/ rt)7 Sallita.io)I 4111ha•it)) arrd the Viri,Tinia Deparmiew gf'T1-anti7)0rt6rti0n. Feel free to contact nle ifyou have any questions. Sin�.crely, Candice E. Perkins, Planner 11 CEP/hh(1 cc: Haves. Sea. Mattern & Mattern; hlc., Attu: Shane Powers, 1315 Franklin Roa(I, Roanoke, VA 24034 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 0 • ReCuest For Site Plan Comments Frederick County Sanitation Authority Mall to: Hand deliver to: Frederick County Sanitation Authority 315 Tasker Road Attn: Engineer Director Stephens City, VA P.O. Box 1877 (540) 868-1061 Winchester, VA 22604 (540) 868-1061 Nov 0 9 2006 O'Bl `fir+ I-! 6" tisTZ,RE LIUIU U 1V R? MlNCEt Please fill out the information as accurately as possible In order to assist the agency with their review- Please attach two (2) copies of the site plan with this sheet. Applicant's Name Address: Phone Number: J/t'C�(�tlll Wi4C.ItCo 1,(2l'thecUlcl�/rr``I &"c) L/ it t C.(J..,/,tc•)<' 1 2 2 L L- 1 `f Name of development and/or description of the request: Location of property: _W ,v 5 C; I +l•y Frederick County Sanitation Authority's Comments: Since this project involves a plant operated and funded by the Sanitation Authority, County Planning —should expedite their review process in orderto avoid increased1ewaer—rates hecause we were unable to complete the upgrade_ and expansion_]�y—ihe�� equiredQ— deadline for waste load allocations for the Cheast edl - may-. Sanitation Authority use only Date received 8 Nov 06 Date revision received Date approve(I Incomplete Incomplete, Date reviewed 8 Nov 06 Date Signature and Date ��-1 t � .� :rfvr %).v�. R -Nov-06 Signature an(I Date (revision)Y — IA 1i 0 Re ue t For Site Plan Comments Frederic County Inspections Department M ate- Frederick County Inspections Attn: Building Official 107 North Kent Street Winchester, VA 22601 (540) 665-5650 Hand deliver to: . Dept. 107 N. Kent Street, Suite 200 North Building, 2"d Floor Winchester, VA (540) 665-5650 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach _ ne (1) copy of the site plan with this sheet. Applicant's Name: Frederick -Winchester Service Authority (FWSA) Address: P.O. Box 43, Winchester, Va. 22604 (I07 North Kent street, county Office complex, 2260I Phone Number: Jesse W. Moffett, 5 -7 - 3579 Name of development and/or description of the request: Parking Mille WWTF ENR k&12de and Expansion Location of property: iy,'m� entrance is located 4n West Parkins Mills Road (State Route 644) , approximately 1 4 mile east of State Route 522. Inspe t' nsDepartment's Comments: Gu:..as czve'� a �ac�c Inspections Dept. use only Date received Date revision received Date approved Incomplete Inc pi e Date reviewed Signature and Date 6 a Signature and Date (revision f)e 200b 11 : 22 b40 122HI90 INbf'LU I luNS rHut r�� i i Tacks shall comply with The Virginia uniform ode Building Code and section 312 use group U (Utility) and the buildiop shall comply with either S (%orage) or H (Higb Hazard) of The balemational. Building Code12003. Please con$tm the use ckssifiartioR by def mition, within the bdWngcode and note the requirements in table 6021BC for fire rating of exterior wa11s based on scparahon distance. Playa submitted for the permit, including site plea, shall be sealed by a Virginia licensed Design Professional. Please indicate the elevation of the 100 you flood plain elevation of Opequoxt Creek in relationship to the base elevations of the structures. Note section Appendix G, MC for Flood Resistant Constroodoo- Accessible parking space shall have a rninimum van accessible Sp= with a 8' striped unloading arm. Question. accessible route to the ncw stzuctum in accordance to chapter 11 Mc? Please note the requixemcats in chapter 171W for sp=W inspections for this type stnicture_ (bolts, steel, welding etc-) ..A.11. inspections under chapter 1 of the VUSBC shall be conducted by county staff or obtain prior approval to utilize an approved Third Party Inspection agency under Frederick Coustty's Policy- December 22, 2006 Building Official Frederick County Inspections Department 107 North Kent Street Winchester, VA 22601 Re: Parkins Mills WWTF - Site Plan Review File: 36694 #2 Dear Building Official, On behalf of the Frederick Winchester Service Authority, find below our responses to your Site Plan review continents dated 9/6/06. 1. Tanks will comply with The Virginia Uniform Statewide Building Code and section 312 use group U (Utility) and the buildings shall comply with either S (Storage) or H (High Hazard) of the International Building Code/2003. Please confirm the use classifications by definition within the building code and note the requirements in table 602 IBC for fire rating of exterior walls based on separation distance. Plans submitted for the permit, including the site plan, shall be sealed by a Virginia licensed Design Professional. All work shall comply with the Virginia Uniform Statewide Building Code, 2003. Per the International Building Code, 2003, we have classified all open air "tanks" within the project scope (Biological Reactors, clarifiers, distribution boxes, storage tanks, etc) as use group U (Utility). We have classified all new buildings and pump stations as use group F-2 (Factory Industrial, Low Hazard) of Type 2B construction. We have classified all building modifications as use group F-2 (Factory Industrial, Low Hazard) of Type 2B construction, with the exception of the Sand Filtration Building modification to a Chemical Building. We have classified the Sand Filtration Building modifications to convert the building into a Chemical storage and feed building as use group H (High Hazard) of Type 2B consti-uction. We note the requirements for fire rating of exterior walls based on separation distance. We have determined the fire rating of exterior walls based on separation distance (IBC Table 602) to be 0 for most new construction. The exceptions to this are the Influent Pump Station No. 2, Sludge Stabilization Building, and Solids Dewatering Building expansion that will have an exterior wall rated for I -hour fire resistance. Plans for permits (including site plan permit) shall be sealed by a Virginia licensed Design Professional. IAPROJGCrS\6351 FWSA\36694 PM Design [3id\2_corres\13ermits\Site Plan Review Suite too. a 101 Corporate Drive, Landover. NID 20735 (301) 731-5622 r FAX (301 ( 377. 1737 . http llvm i ohg.com v:ith offices in 25 major mefropolit.in areas and grov;mg T � • Building Official December 22, 2006 Page 2 2. Please indicate the elevation of the 100 year flood plain elevation of Opequon Creek in relationship o the base elevations of the structures. Note section Appendix G, IBC for Flood Resistant Construction. The 100-year flood elevation of Opequon Creek is 626.09 at the downstream end of the plant (southeast corner) and 627.93 at the upstream corner of the plant (southwest corner). This information was obtained from the previous construction contact drawing set for the plant (Rust, 1994). The expansion of the plant includes two structures that are near but above the 100 year flood plane: Influent PS No. 2 (F.F. EL. 629.00); RAS/WAS PS No. 4 (F.F. EL. 631.00). All other new Structures have finished floors / top of walls at 633.00 or above. Accessible parking spaces stall have a minimum van accessible space with an 8' striped unloading area. Question accessible route to the new structures in accordance to chapter 11 IBC? The existing Administration Building is the only building /structure on site designed / intended for handicap access. The revised parking area to the north of the existing administration building Will include an 8' wide striped unloading area, per "Pavement Marking & Striping Details" on drawing C-8. The building has ail existing entrance ramp bUilt Into the sidewalk, which will be maintained with the plant expansion to provide an "accessible route" to the building from the van parking space. The rest of the site buildings / structures are considered "utility" buildings or "equipment' spaces that would only be frequented by maintenance personnel for maintenance, repair, or monitoring of equipment. 4. Please note the requirements of chapter 171BC for special inspections for this type of structure (bolts, steel welding, etc.) All inspections under Chapter I of the VUSBC shall be conducted by County staff or obtain prior approval to utilize an approved Third Party Inspection agency under Frederick County Policy. Requirements of Chapter 17 are noted. The contractor will be required to follow IBC and the VUSB, and follow Frederick County policy regarding inspections. We hope these responses are satisfactory and that you may find the Site Plan application acceptable. Please feel free to contact us if you need any further information. Very truly yours, O'BRIEN AND GERE ENGINEERS Ned Talbot, P.E. Senior Project Engineer PH: 301-73 l -1 l 29 1APROIECTS\6351 FWSA\3669,1 PNI Design Bid\2_corres\Permits\Site Plan Review 0 • Request For Site Plan Comments Frederick County Inspections Department Mail to: Frederick County Inspections Dept. Attn: Building Official 107 North Kent Street Winchester, VA 22601 (540) 665-5650 1R`jif(y Hand deliver to: 107 N. Kent Street, Suite 200 North Building, 2nd Floor Winchester, VA (540) 665-5650 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach one (1) copy of the site plan with this sheet. Applicant's Name: ��� dtGY i c (c wf 4 -tic s fC ✓ .S4 r� i c u AQ 41oo ,' //� 6U Address: �I U 7 U )b v- H, Ice .11 S •{-l-cc •i ! o k-Y I Lx 0 t"-f c- 6u r;,,� Phone Number: c s s, , 7 Z2 79rci Name of development and/or description of the request: Pa % rh s 04;((-.�: \-V to i F 4- tQ (1 ( /" a cQc G � r� •� ! U Inspections Department's Comments: Inspections Dept. use only Date received Incomplete Date reviewed Signature and Date Signature and Date (revision) Date revision received Incomplete Date reviewed — 16 R Date approved WO / ;;" 6 • 0 Request For Site Plan Comments Frederick County Engineering Department Mail to: Hand deliver to: Frederick County Engineering Dept. 107 N. Kent Street, Suite 200 Attn: Director of Engineering North Building, 2"d Floor 107 North Kent Street Winchester, VA Winchester, VA 22601 (540) 665-5643 (540) 665-5643 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the site plan with this sheet. Applicant's Name: Address: Phone Number: Frederick -Winchester Service Authority (FWSA) Box 43, Winchester, Va. 22604 (107 North Kent Street, County Office Complex, 22601) Jesse W. Moffett, 540-722-3579 Name of development and/or description of the request: Parkins Mills WWTF ENR Upgrade Engineering Department's Comments: i J14) 4le Engineering Dept. use only Date received 7 b VO V Date revision received Date approved Incomplete Incomplete Date revic%vcd Dat rcvicwcd Signature and Date , f leh`/k6 Slgnattll'e and Date (I'evlslolt) %LL" 17 Frederick -Winchester Service Authority Post Office Box 43 Winchester, Virginia 22604 Office.- 107 North Kent Street County Office Complex Winchester, Virginia 22601 1-540-722-3579 August 28, 2006 O'Brien & Gere Engineer, Inc. 8201 Corporate Drive, Suite 1000 Landover. MD 20785 Attn: Sami Nasr Dear Sami: + i^`�rI�' o AUG 2. 2006 LAVYIN'rn nz r. yCr SUBJECT: SITE PLAN COMMENTS — FREDERICK COUNTY FIRE MARSHAL — PARKINS MILLS WWTF ENR UPGRADE AND EXPANSION Please find enclosed Site Plan Comments from the Frederick County Fire Marshal regarding the Parkins Mills WWTF ENR Upgrade and Expansion. Sincerely, �'UJti� Ke Jesse W. Moffe� Executive Director Frederick -Winchester Service Authority JW M:ncg Enclosure Mahlawm,o amd Droxjoliug IAa Va&ws of Ilia C'omixiaNily Uiroagli 8nvirommaNtae SlowwdsQip" Request For Site Plan Comments Frederick Countv Fire Marshal Mail to: Hand deliver to: Frederick County Fire Marshal 107 N. Kent Street Attn: Director of Engineering First Floor 107 North Kent Street Winchester, VA Winchester, VA 22601 (540) 665-6350 (540) 665-6350 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the site plan with this sheet. Applicant's Name: Address: Phone Number: Frederick -Winchester Service Authority (FWSA) P.O. Box 43 Winchester, Va. 22604 (107 North Kent Street, County Office Complex, 22601) Jesse W. Moffett, 540-727-3579 of development and/or description of the request: Parkins Mills WWTF ENR Upgrade ind ExDansion Location of property:t,TFPntrance is located on West Parkins Mills Road (State Route /44). east of State Route 522. Fire Marshal's Comments: .5ed-c��r.�ti.� Fire and Rescue Dept. use only Date received Date revision received Date, approved Incomplete Incomplete Date reviewed Date reviewed Signature and Date Signature and Date (revision)_ 18 �CK 0 VIRGINIA Control number SP06-0058 Project Name Parkins Mills WWTF Address 107 North Kent Street Type Application Site Plan Current Zoning Automatic Sprinkler System Yes Other recommendation Emergency Vehicle Access Inadequate Siamese Location Not Identified Emergency Vehicle Access Comments Access Comments Additional Comments Date received 7/28/2006 City Winchester Tax ID Number 76-A-94A Date reviewed Date Revised 8/22/2006 Applicant Frederick - Winchester Service Authority State Zip Applicant Phone VA 22601 (540)722-3579 Fire District 21 Recommendations Automatic Fire Alarm System Yes Pc nrmirell"Tlents Hydrant Location Inadequate Roadway/Aisleway Width Inadequate Rescue District 21 Election District Residential Sprinkler System No Fire Lane Required Yes Special Hazards Yes Plan Approval Recommended Reviewed By Signature No Mark Showers Title __ = O'BRICN F GERE December 14, 2006 Mr. Mark Showers Frederick County Fire Marshal Office 107 North Kent Street Winchester, VA 22601 Re: Parkins Mills WWTF Site Plan Review File: 6351/36694 Dear Mr. Showers Please see revised site plan enclosed for your review. Per comments in your August 22, 2006 review, we have made the following changes to the Site Plan: 1. The entrance and middle driveway have been widened to 20', (please see Sheets C-5 and C- 6), to provide adequate emergency vehicle access to all hydrants on the lower site. There will be no need to travel along the lower driveway because sufficient area is available for a truck to turn around and exit along the same middle driveway. 2. One hydrant has been added to the west of the Existing Solids Dewatering Bldg., and another hydrant was relocated to the west side of the New Chemical Bldg. (please see sheet C-6). Given these changes, all buildings on site are within 300' of a fire hydrant (C-6 and C-7). A new driveway extension has been added to better access the hydrant at the west of the Chemical Bldg. 3. The fire department connection on the Chemical Bldg. is indicated on C-6. 4. The pipe sizes are indicated on piping supplying water to fire hydrants — all watermain for fire flows is 8", and fire hydrants are 6" (C-6 and C-7). Please contact me at 301-731-1132, or the Lead Engineer, Ned Talbot, at 301-731-1129, if you have any questions. Very truly yours, O'BRIEN AND GERE Melissa A. Bill Project Engineer cc: Jesse W. Moffett Suite 400. 8401 Corporate Drive, Landover. PAD 20785 (301) 731.5622 / FAX (301) 577.4737 . http://wv+w.oh0.c0rn ... wifh offices in 25 ma/or metropolitan areas and growing. r4 gill lii y VIRGINIA Control number sP06-0056R Project Name Parkins Mill WWTF Address 107 N. Kent St. Type Application Site Plan Resubmit Current Zoning Automatic Sprinkler System Yes Other recommendation Emergency Vehicle Access Adequate Siamese Location Adequate Emergency Vehicle Access Comments Access Comments Additional Comments Plan Approval Recommended Yes 1 0 Ft_c'(-_0'(;i C;Ot111ty V-*ive and Res- Ue OiNc e of he Fire hN r. sal Plan Review and C onit-tlent-s Date received Date reviewed Date Revised 12/15/2006 1 /5/2007 Applicant Frederick -Winchester Service Authority City State Zip Applicant Phone Winchester VA 22601 540-722-3579 Tax ID Number Fire District Rescue District 76-A-94A 21 21 Recommendations Automatic Fire Alarm System Yes Hydrant Location Adequate Roadway/Aisleway Width Adequate Election District Shawnee Residential Sprinkler System No Fire Lane Required Yes Special Hazards No �� a C�1� "1t'QED JAN 0 8 2007 LANDOVETR OMCE Reviewed By Signature A-f• J. Neal "'"""((A Title yt To: Virginia Dept. of Transportation. Attn: Resident Engineer 14031 Old Valley Pike Edinburg, VA 22824 OVERNIGHT' Date: July 27, 2006 File: \6351 \36694 \corres \ Re: Parkins Mills WWTF Site Plan We are sending you: X herewith _ under separate cover X drawings X descriptive literature letters If material received is not as listed, please notify us at once. Quantity Identifying Number Title Action 5 July 27, 2006 Parkins Mills WWTF Site Plan _7 I, Y I --- Form — "Request for Site Plan Comments — Virginia Department of Trans ortation." I, Y 5 July 2006 Storn3water Pollution Prevention Plan I, Y Action letter code: Remarks: cc: File Jesse Moffett R-reviewed N-reviewed and noted I -for your information S-resubmit J-rejected Y-for your approval Very truly yours, Melissa A. Bill Project Engineer O'BRIEN & GERE ENGINEERS, INC. 0 oni iy o oCne con e ara; ;wi:n5nrt \\LANDOVER—FSI\ALT\LANDOVER\PROJECTS\6351 BVSA\-36694 PM Design I3id\2 con-es\Sire Klan Review\Transrninal Site Plan - VDnT 7_v7-n(,,f— Request for Site Plan Comments Virginia Department of Transportation Mail to:Hand deliver to: Virginia Department of TransportationVirginia Department of Transportation Attn: Resident Engineer2275 Northwestern Pike 14031 Old Valley PikeWinchester, Virginia 22603 Edinburg, Virginia 22824(540) 535-1818 (540) 984-5600 Please fill out the information as accurately as possible in order to assist the Virginia Department of Transportation with their review. Please attach five (5) copies of the site plan with traffic generation data and drainage calculations with this sheet. Applicant's Name:Frederick-Winchester Service Authority (FWSA) Address: P.O. Box 43, Winchester, Va. 22604 107 North Kent Street, County Office Complex, 22601 Phone Number: Jesse W. Moffett, 540-722-3579 Name of development and/or description of the request: Parkins Mills WWTF ENR Upgrade and Expansion Location of property: WWTF entrance is located on West Parkins Mills Road (State Route 644), east of State Route 522. Virginia Department of Transportation's Comments: VDOT use only Date received Incomplete Date reviewed Signature and Date Signature and Date (revision) Date revision received Incomplete Date reviewed 13 Date approved i Frederick -Winchester Service Authority Post Office Box 43 Winchester, Virginia 22604 Office: 107 North Kent Street County Office Complex Winchester, Virginia 22601 1-540-722-3579 November 13, 2006 Mr. Lloyd A. Ingram Virginia Dept. of Transportation 14031 Old Valley Pike Edinburg, VA 22824 Reference: Parkins Mills WWTF - Site Plan Dear Lloyd, QED NOV 15 2006 O'l$f 1LIN & GERE { 1ANDO ER OFFICE It is our understanding that you have reviewed the site plan submittal for the Parkins Mills WWTF ENR Upgrade and Expansion, and require verification of our understanding of VDOT requirements of the site to approve the application. The Expansion and ENR Upgrade project of the Parkins Mills WWTF will maintain the existing entrance to the WWTF, upgrade an existing gated entrance in the middle of the site, and provide a new gated entrance to the upper site of the plant. All three entrances are along Parkins Mills Road / VA Route 644. It is our understanding that line of sight profiles of the two provisional gated entrances have been reviewed by your office, and you determined that the sight distances do not meet the minimum VDOT sight distance requirements and a waiver can not be obtained. It is our intent to request a permit from your office for the two provisional entrances to allow us to use the gated entrances minimally for maintenance activities, etc. We intend to set up a VDOT approved traffic control zone using signs and flaggers to control traffic while either gated entrance is in use. This would be a yearly renewable permit obtained from your office. Please forward information on this permit process so we can move forward with obtaining this permit once plant construction is complete. The contract documents for the expansion project require that the contractor apply for a Land Use permit through VDOT for construction activities at the plant. We assume this permit will cover contractor use of construction entrances during the upgrade. "Maintaining and Promoting the Values of the Community through Environmental Stewardship" 1974 t November 13, 2006 Page 2 We hope this concurs with your understanding of the project. Please contact us if any further clarification is required. Please return the comment sheet for the Frederick County Site Plan Request for Comments when you have completed your review. erely, Jesse W. Moffett Executive Director Frederick -Winchester Service Authority CC: William Meinert, P.E. — O'Brien & Gere Engineers Ned Talbot, P.E. — O'Brien & Gere Engineers Wellington H. Jones, P.E. — Engineer/Director - FCSA • Page 1 of 1 Ned Talbot - Parkins Mills WWTF - Site Plan Review Comments From: Ned Talbot To: Iloyd.ingram@vdot.virginia.gov<Iloyd.ingram@vdot.virginia.gov> Date: Friday, December 22, 2006 12:09:15 PM Subject: Parkins Mills WWTF - Site Plan Review Comments CC: Meinert, William; Moffett, Jesse Lloyd, Have you completed your Frederick County site plan review for the Parkins Mills WWTF Upgrade? To date, we have not received anything. Jesse Moffet (Frederick Winchester Service Authority, owner) sent you a letter (dated 11/13/06) that should have cleared up the main issues you stated through our phone conversations. Please contact Jesse or I if you need further clarification on the work to be completed. Please forward comments at your earliest convenience. Time is running short and we are ready to address any issues you may have. Thanks, Ned Edward (Ned) Talbot, P.E. O'Brien & Gere Engineers, Inc. 8401 Corporate Drive, Suite 400; Landover, MD 20785 Phone: (301) 731-1129 Fax: (301) 577-4737 file://CADocunients and Settings\TalbotCR\Local Settings\Temp\GW}0000LHTM 12/22/2006 Parkins' Mill Watcwatcr "I 1CIlt I'aClllt)' - Routc 644 1,1 ccicricl:10lnty - VD0T Appr... Pagc I of 1 Ned "Talbot -Parkins' YI atewater Treatment Facility - Ilou 644, Frederick County - VDOT Approval From: "Ingram, Lloyd" <Lloyd.Ingram a VDOT.Virginia.gov> To: <MccormCS@obg.com> Date: Monday, February 05, 2007 8:1 1 AM Subject: Parkins' Mill Watewater Treatment Facility - Route 644, Frederick County - VDOT Approval CC: "Ingram, Lloyd" <Lloyd.Ingram@VDOT. Virginia.gov>, "Dove, Ronald" <Ronald.Dove@VDOT.Virginia.gov>, <elawrenc@co.frederick.va.us>, <jmoffett@fredwin.com>, <TalbotCR@obg.com> We have received your revised site plan dated July 26, 2006 for the referenced project. It appears all of our earlier review comments have been satisfactorily addressed. Please advise the owner of our approval. Also please provide four (4) sets of approved construction plans with signed seal for VDOT distribution. The appropriate land use permit may now be applied for to cover work within the Route 644 right-of-way. The permit is issued by this office and will require a minimum processing fee, surety bond coverage, and the salary & expenses of a State assigned Inspector. A copy of any/all recorded plats of dedication for drainage easements or additional right-of-way required for implementation of this proposed project should be provided to VDOT prior to issuance of any land use permits. Dedication should be made to the Commonwealth of Virginia. Once satisfactory application has been made, a permit will normally take approximately thirty days to process and issue. Should you have any questions, do not hesitate to call. Ronnie Dove, Hig. Permits & Subd. Specialist Sr. Virginia Department of Transportation Edinburg Residence — Land Development 14031 ON Valley Pike Edinburg, Virginia 22824 Phone #(540) 984-5633 I ax #(540) 984-5607 file://C:\Documents and Settings\"TalbotCR\Local Settings\Temp\GWIOOOOI.I-ITM 2/6/2007 * • };r. "§d i'3i::E'- (.•ou1 -vlv y.,"ivc., !�Iald 4 0-i�'iee, of the Fire, iWamhal e*1 n't Ca[lan s � VIRGINIA Control number sP06-0058R Project Name Parkins Mill WWTF Address 107 N. Kent St. Type Application Site Plan Resubmit Current Zoning Automatic Sprinkler System Yes Other recommendation Emergency Vehicle Access Adequate Siamese Location Adequate Emergency Vehicle Access Comments Access Comments Additional Comments J A N 5 2007 Date received Date reviewed Date Revised 12/15/2006 1 /5/2007 Applicant Frederick -Winchester Service Authority City State Zip Applicant Phone Winchester VA 22601 540-722-3579 Tax ID Number Fire District Rescue District 76-A-94A 21 21 Election District Recommendations Shawnee Automatic Fire Alarm System Residential Sprinkler System Yes No ,i Hydrant Location Adequate Roadway/Aisleway Width Adequate Fire Lane Required Yes Special Hazards No Plan Approval Recommended Reviewed By Signature ��u U� Yes J. Neal Title—ASSr'•—�-� — 0 0 COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION P. O. Box 2249 Staunton, VA 24402-2249 www.VirginiaDOTorg DAVID S. EKERN, PE COMMISSIONER March 13, 2007 Mr. Jason Lemire C/O Ulliman Schulte Construction 9900 Springboro Pike, Suite 200 Miamisburg, OH 45342 Ref: Parkins Mill Waste Water Treatment Plant Route 644 Frederick County Dear Jason: Enclosed is your approved Land Use Permit #855-8019 to cover right-of-way improvements at the referenced location. Please ensure a copy of the approved permit assembly is kept at the job site whenever working within the Route 644 right-of-way. I would also like to remind you of the need to erect and maintain proper traffic control in accordance with our Virginia Work Area Protection Manual. You are required to contact Mr. John Davis at (540) 535-1828 at least 48 hours in advance of the startof construction- to arrange -for any_ necessary inspections: If you have any questions concerning the permit requirements or during construction, do not hesitate to call. Sincerely, Qm�t�QO-VL) ', Ronnie Dove, Hwy. Permit & Subd. Specialist Sr. Virginia Department of Transportation Edinburg Residency - Land Development 14031 Old Valley Pike Edinburg, VA 22824 Phone #(540)984-5600 Fax #(540)984-5607 Enclosure xc: Mr. John Davis Mr. Mark Cheran IMAR 1 6 2007 WE KEEP VIRGINIA MOVING COUNTY of FREDERICK Department of Public Works 540/665-5643 FAX: 540/678-0682 November 13, 2006 Mr. William J. Meinert, III, P.E. O'Brien & Gere 8401 Corporate Drive, Suite 400 Landover, Maryland 20785 RE: ParkiIls Mill Wastewater Treatment Facility - Erosion and Sediment Control Plan COillllleilts Frederick County, Virginia Dear Mr. Meinert: Upon review of the revised plan dated October 2, 2006, all our previous comments have been addressed. Therefore, we recommend approval of the subject plan. Sincerely, Joe C. Wilder Deputy Director JCW/rls cc: Planning and Development �— file C:\Program Fi1cs\1VordPerfcct Office X3\Rhonda\'I'I;pI11CO<INIGN'rs\psu9cinsmilllrlmlpl:uitexpaneSurevcom.%ti'pd 107 North Kent Street o Winchester, Virginia 22601-5000 0 6 JAIi r�RICK COIxI FD Department of Planning and Development 540/665-5651 FAX: 540/ 665-6395 August 16, 2006 Mr. William Meinert, P.E. O'Brian & Gere Engineers 8401 Corporate Drive, Suite 400 Landover, Maryland 20785 Re: Comments for Site Plan #55-06; Parkins Mill Plant Expansion Property Identification Number (I'IN): 76-A-94A Dear Mr. Meinert: Planning Staff has reviewed the above -referenced site plan to determine if administrative approval can be granted. At this time, administrative approval cannot be granted. This site plan is denied until the issues in this letter, as well as all issues of the other review agencies, have been adequately addressed. Please review Staff's comments listed below and then prepare a revised site plan which adequately addresses each concern. Review Comments: 1) General Information. On the coversheet, provide the PIN# as well as the Magisterial District. Sheet C-1 should contain the zoning of the site, total site area/disturbed area, site address, developer, district height regulations, and the building restriction lines. 2) Landscaping Notes. On sheet C-2, notes need to be provided that state (1) all planting shall conform with § 165-36B of the Frederick County Zoning Ordinance (Plant selection, planting procedure, and maintenance), and (2) any plant substitutions must be approved in writing by the Frederick County Planning Department. 3) Building Heights. On sheet C4, label the height of the silo. 4) Variance. This property received a variance in 2005 (1127-05), which gave this property 20 foot BRL's off of the road right-of-way and 15 foot side BRL's. This variance needs to be referenced in the plan. 5) Labeling. Sonic of the additions shown on the site plan (see sheet C-4) need to be labeled. Once you have adequately addressed all of these comments, please resubmit a copy for my review. i will need all approved review agency comment sheets and at least five copies of the final plan for approval. Comment sheets are required from the following agencies: the Frederick Coul7ty Inspections Depar1171ent, the Frederick County Deportment of Public [+orks (Count), Engineer), Frederick County Fire Alarshal, the Frederick C01,1171y SC1171tC16017 Awha1'1ty and the ilirginicl Depcn7lnent of Transportation. Feel free to contact me if you have any questions. Sincerely' Candice E. Perkins, Planner 11 CEP/bad cc: Hayes, Sea, Mattern & Mattern, inc., Attn: Shane Powers, 1315 Franklin Road, Roanoke, VA 24034 107 North Kent Street, Suite 202 - Winchester, Virginia 22601-5000 15 2006 COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 14031 OLD VALLEY PIKE GRE3ORYA. WHIRLEY EDINBURG, VA 22824 ACTING COMMONWEALTH TRANSPORTATION COMMISSIONER May 12, 2006 Mr. Dennis G. Barker CIO DLB, Inc. P. O. Box 1239 Hillsville, VA 24343 Ref: FCSA Project #25 Route 50 Frederick County Dear Mr. Baker: Enclosed is your approved Land Use Permit #855-7583 to cover the referenced project. Please ensure a copy of the approved permit assembly is kept at the job site whenever working within the Route 50 right-of-way. I would also like to remind you of the need to erect and maintain proper traffic control in accordance with our Virginia Work Area Protection Manual. For your information the account receivable number for this project is 00081097. Any inspection costs we incur will be billed to you monthly. If you have any questions concerning the permit requirements or during construction, do not hesitate to call. Sincerely, Ronnie Dove Hwy. Permits & Subd. pecialist Sr. Enclosure xc: Mr. Robert Hawkins Mr. Mark Cheran Mr. John Whitacre VirginiaDOT.org WE KEEP VIRGINIA MOVING AUG 1 5 2006 Request For Site Plan Comments Frederick County Engineering Department Mail to: Frederick County Engineering Dept. Attn: Director of Engineering 107 North Kent Street Winchester, VA 22601 (540) 665-5643 Hand deliver to: 107 N. Kent Street, Suite 200 North Building, 2d Floor Winchester, VA (540) 665-5643 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the site plan with this sheet. Applicant's Name: Frederick —Winchester Service Authority (FWSA) Address: P.O.Box 43, Winchester, Va. (107 North Kent Street, County Office Complex, 22601) Phone Number: Jesse W. Moffett, 540-722-3579 Name of development and/or description of the request: Parkins Mills 14WTF RNR Upgrade Engineering Department's Comments Engineering Dept. use only Date rcccivcd 7 Z Vey, Incomplctc Date reviewed Signature and Date Signatw-e and Date (revision) Date revision rcccivcd Incomplctc Dat5�rcvimed 17 Date approved gh`&6 0 �nnr, COUNTY of FREDERICK I AuguSt 11, 2006 Mr. William J. Meinert, ill, P.C. O'Brien & Gere 8401 Corporate Drive, Suite 400 Landover, Maryland 20785 Department of Public Works S40/665-5643 FAX: 540/678-0682 RC: Parkins Mill Wastewater Treatment Facility - Erosion and Sediment Control Plan and Land Disturbance Permit Comments Frederick County, Virginia Dear Mr. Meinert: Upon review of the subject plans, Nye offer' the followlllg co111111elits: Provide a grading plan for the proposed sediment trap to ensure that the trap will be properly graded. 2. Provide a topo on the adjacent property located to the cast of the site to verify the drainage channel dimensions. 3. It is recommended that the owner have their carthwofl< contractor or their responsible land disturber (RLD) obtain the land disturbance permit for the project., It will be necessary to name a certified responsible land disturber (RLD) for the project. The RLD will be responsible for the inlplenlentatloll of the efosioll alld scdllllcllt colltfol Illeasul'es in accordance with the approvccl plans. We have attached the land disturbance permit, bond estimate form and plan content checklist. Once these conullents have been adch-essecl, submit two (2) sets of the revised plans for further review as well as the land disturbance application package. Sincerely, 1 J (CC. Wilder Deputy Director JC W/rls cc: Plalllllllg alld Develol)lllellt \ file C:\Program Files\\VordPerfect Office X3\IZhond::Cl'Lp11'CO:\1iN1I'sN'1'S\parlcinsmilltrtmtpinnlezp.ine&scom.wpd 107 North Kent Street • Winchester, Virginia 22601-5000 SITE PLAN APPLICATION Department of Planning and Development Use only. Date application received: Application # ��, �� e,fl Fees received: 706 Initials: 1 Project Title: 2. Location of Property (street address) 3 rd 5 Property Owner: Address: Telephone: Parkins Mills WWTF ENR Upgrade and Expansion 158 West Parkins Mills Road (Route 644) Winchester, Va. 22602 Frederick County Sanitation Authority P.O.Box 1877, Winchester Va. 22604-1877 (315 Tasker Road, Stephens City, Va. 22655) Wellington (Wendy) Jones, P.E., FCSA Engineer -Director 540-868-1061 Applicant/Agent Frederick -Winchester Service Authority (FWSA) Address P.O. Box 43, Winchester, Va. 22604 (107North Kent Street, County Office Complex, 22601) Jesse W. Moffett, FWSA, Executive Director Telephone: 540-722-3579 Designer: O'Brien & Gere Engineers Address: 8401 Corporate Drive, Ste. 400 Tnndnver — Maryland 20785 Telephone: 301-731-1130 Contact: William (Bill) Meinert P.E., Sr. Managing Engineer li U • 6a 6b 7a 7b M a) b) c) d) e) 0 g) Is this a standard or 'minor' site plan? Is this an original or revised site plan? Total acreage of parcel to be developed: Total acreage of parcel: Property Information: Property Identification Number: Current Zoning: Present Use: Proposed Use: Adjoining Property Use(s) Adjoining Property Identification Number(s) Magisterial District(s) Standard X Minor Original x Revised Municipal Was war-Trea m nt Facility Municipal Wastewater Treatment Facility Private (Owners, Zoned RA 76 A 95, 76 A 94, 76 A 96B, 76 A 97 Shawnee District of Frederick County I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to the submission of my site plan. Signature: k/1" -li�/L.. 1 Date: 1 1 i (x) 7 Request For Site Plan Comments Department of Planning and Development Mail to: Department of Planning and Development Attn: County Planner 107 North Kent Street Winchester, VA 22601 (540) 665-5651 Hand deliver to: 107 N. Kent Street North Building, 2nd Floor Winchester, VA (540) 665-5651 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the site plan with this sheet. Applicant's Name: Address: Phone Number: Frederick -Winchester Service Authority (FWSA) P.O. Box 43, Winchester, Va. 22604 (107 North Kent Street, County Office Complex, 22601) Jesse W. Moffett, 540-722-3579 Name of development and/or description of the request: Parkins Mills WWTF ENR Upgrade and Expansion Location of property: WWTF entrance is located on West Parkins Mills Road (State Route 644). approximately 1/4 mile east of State Route 522. Planning and Development's Comments: Planning and Development use only Date received Date rcvision received Date approved Incomplete Incomplete Date reviewed Date reviewed Signature and Date Signature and Date (revision) 15 0 • AUG 1 2006 To: Department of Planning and Development Attn: County Planner 107 North Kent Street Winchester, VA 22601 OVERNIGHT' • We are sending you: Date: July 27, 2006 File: \6351 \36694 \corres \ Re: Parkins Mills WWTF Site Plan X herewith under separate cover X drawings dCSCJ'll)t1VC literature letters If material received is not as listed, please notify us at once. Quantity Identifying Number --- - Title -- -- — — Action; 3 July 27, 2006 Parkins Mills WWTF Site Plan I, Y I -- Form — "Request For Site Plan Comments — Department of, Planningand Development" 2 July 2006 Erosion and Sediment Control Plan 2 July 2006 SIOrmWater Pollution Prevention Plan I -- Check for Site Plan review fees Action letter code: R-reviewed N-reviewed and noted I401- your information S-resubmit J-rejected Y-for your approval Remarks: The attached is being submitted to the County for Site Plan Review. Requests for comments have been submitted under separate cover with each relevant review agency. These include the Frederick County Fire Marshal, the Virginia Department or Transportation, the Frederick County Engineering Department, and the Frederick County Inspections Department. Please feel free to contact tls with any questions regarding this matter. (301-731-S622) cc: File Very truly yours, Jesse Moffett Melissa A. Bill Project Engineer O'BRIEN & GERE ENGINEERS, INC. `>l 0(1 O.ORIGN 6 G[n E'S i GOTH ANNIVERSARY .. rith offices in 25 major metropohtan areas and growing. �-36C t P�1 I si n��ic1\2 corrcs\Site Plan ReviewUransminal Site Plan - Planning 7-27-06.docQ:\36694 I'M Design Bid\2_conts\.Site Plan Review\Transmittal Site an -Planning c o� I I I 1 I ( ( AUG 1 2006 Document Approval Form PLEASE REVIEW TBE ATTACHED DOCUMENT. IF T141S DOCUMENT MEETS YOUR APPROVAL PLEASE INITIAL AND PROVIDE TB E DATE AND TIME OF YOUR APPROVAL. IF THIS DOCDMENT DOES NOT MEET YOUR APPROVAL PLEASE PROVIDE COABIMVTSAS TO WHAT YOU WOULD LIKEE TO ]SAVE COMPLETED: f. RgTTALS DATE & T IM ((Can'di cc) Bernie Mark. Susan Eric M`il-e Kevin John COMMENTS: Received by Clerical Staff (Date & Time):