Loading...
HomeMy WebLinkAbout70-04 Carnew One - Business Park - Back Creek - Backfile®®®® ®® ®® ® ® ® ® ® ® LEGEND FCSA CONSTRUCTION NOTES VDOT GENERAL NOTESV'I I ITS A 1 �i L 00 M 1% EXISTING FEATURES _ EXISTING EDGE OF PAVEMENT EX EP 1. The Authority's Water and Sewer Standards and Specifications are available at www.fcsa-water.com - 2. The water and sanitary, sewer portion of these plans are valid for two years from date of FCSA approval. ' ' ' 3. Water and sewer lines are to be constructed In accordance with these. plans and shall meet all Authorityrequirements. 'y ° VI. All work on this project shall conform to the current editions and latest revisions to the Virginia Department of Transportation (VOOT) Road and Bridge Specifications and Standards, the Virginia Erosion and Sediment Control Regulations, and an other applicable state, federal or local regulations a applicable. In case of a discrepancy or 9 Y PP i PP ® �� load .o� Miad�e �d> o o .� 0) � � / � P y �� - EX EG EXISTING EDGE' OF c,RAL✓EL ..__,_w _............ w... _.. . _____� ..... .... ......_ 4• The contractorr shall coordinate with, and arrange for inspection by, the Authority, conflict between the Standards or Specifications and Regulations, the most stringent shall govern. ® �� �� o 0 0 ........ : , ..w... S. When an existing water main is tapped for the installation of a new line: a) The Authority steal/ furnish all labor and material. V2. All construction shall comply with the latest U.S. Department of Labor, Occupational Safety & Health Administration (OSHA), and Virginia Occupational Safety & Health (VO'SH) Rules & Regulations. .mac ,� ,�c� `� e `r E EXISTING CURB AND GUTTER c X CG 6 " q _ .._ E�: IN;iERN,IEDIATE CONTOUR b) the developer/contractor must: 1. make application and pay deposit. 2, mark the tap location, V3. When working on VOOT right-of-way, all traffic control whether permanent or temporary, shall be in accordance with the current edition of VDG►Ts Work Area Protection Manual. Furthermore, all traffic control �° �� k,' a \ �O ,�� U -? � � c flaggers must be certified in accordance with Section 104.04(c) of the VDOT Road & Bria`ge Specifications. `'a` a, ®ey E�C'ISTING INDEX CONTOUR 6. The contractor shall tie-in a new sewer line to an existing manhole by core drilling the manhole. 7. Exact locations lines to be the Authority's Inspector. V4. The deve% er shall be responsible for relocating, at his expense, an and al! utilities including P P 9. P Y g traffic signal 40� / �,} J`' �`► .) (0 -C EXISTING SPOT ELEVA TION - 'poles, of water and sewer services on new are coordinated with junction boxes, controllers, etc., owned by VDOT or private / public utility companies. It is the sole ,i lij /-' �' �� o N= N iv EXISTING TELEPHONE LINE - - " 8. The Authority's maintenance department shall furnish and install all water meter through 2" in size. ,It is the deviceloper'slicontraictor's responsibility to have the meter box assembly installed correctly. responsibility of the developer to locate and identify utility facilities or items that may be in conflict with the proposed construction activity. VOOT approval of these plans does not indemnify the developer from this �`�/ ,.; ���' N 0 Before is installed: �`�'-� i"�. �� '�-� \ , 0 �i ; EXISTING SANITARY' SEWER .. , CM" .....n,_ Fw "•° a permanent meter a) The meter box, with its frame. and cover, must properly aligned with the co+ppersetter. responsibility. V5. Design features relating to field construction, regulations, and control or safety of traffic be subject to .� �� a^ T "= �� IT E 0 E $ I c a '. b) The frame and cover shall be set to final grade. ,may change as deemed necessaco ry by VDOT, Any additional expense incurred as a result of any field revision shall SCALE 1 2000' Oki, 1 6 EXISTING ELECTRIC SERVICE' -~ - - - c) The distance between the top of the cover and the coppersetter shall be between 18" and 21 ", be the responsibility of the deve%per, PROJECT INFORMA TI I EXISTING GAS LINE - - d) All components of the meter box assembly shall be in proper working order: 9. For water anal sewer services that connect to existing lines: V6. Prior to initiation of work, the contractor shall be responsible for acquiring all necessary VOOT land use permits for any, work on VOOT right -of- way. rZah.-_ FIC/J E..... � 5 a) The location the service lateral /s to be the Authority's Engineering Assistant. Owner DevelopE�r Contractor Ralph S. Gregory Carnew One, LLG' Commonwealth Design & Build P 9 y EXISTING STORM SEWER' } ,; , ,. :: __ _._. _, _. EXISTING FENCE LINE of coordinated with b) An Application for Service must be made and fees paid before work will begin. 5 3 " 1 water services. c) The Authority shall furnish and install /8 /� V7. If required by the local VDOT Residency Office, a pre -construction conference shall be arranged and held by the engineer and/or developer with the attendance of the contractor, various County agencies, utility companies , ,and d) For al/ 1 i/2 " and 2" water services, the Authority shall make the tap and bring the piping to the and VDOT prior to initiation of work. P.O. Box .520 212 Little Pond Lane 180-9 Prosperity Drive P �' Stephens City, VA 22655 p y, Winchester, VA. 226'03 Winchester, VA �.2602 E�C'ISTI'NG DITCH LINE -- -- -- -" - ---- -- - - - - - property line. The contractor, shall furnish and install the meter vault assembly. The Authority will VS. The contractor shall notifythe local VDOT Residency Office when work is to begin or cease for any, undetermined y 9 y Phone - 540 869-3500 Phone - 540 667-9708 ( ) ( ) (540) 869-0308 EXISTING WATERLINE W,✓ TEE" ��°°xw-� ,. a... F- a_y���. �w install the meter. e) The Authority will install all sewer laterals. length of time. VDOT requires 48 hours advance notice prior to any required or, requested inspection. Contact: Kathleen Diamond Contact: Ben Montgomery _ EXISTING FIRE HYDRANT EX. Eq 10. .Any water service line must have a backf/ow assembly (double check valve or RPZ, as required). The assembly Standard Standa V9• The contractor shall be responsible for maintaining adequate access to the project from the adjacent public roadway via a construction entrance that is constructed and maintained in accordance with Section 3.02 of the ■ V PropeyrEData Building Setbacks Per Code Proposed - EXISTING WATER VAILVE:�..,� .....• must meet ASSE No. 1015 or 1013. Virginia Erosion & Sediment Control Handbook. Furthermore,, access to other properties affected by this project. Tax Map Number 75-((3))-18 Front: 35 36,.0 LE # p Q ,N EXISTING REDUCER ��„� �" 11. Al/ fire lines shall have a fire service meter assembly and a backf/ow prevention assembly (detector double - check valve or a RPZ, as required). The assembly shall meet ASSE Standard No. 1048 or 1047. Radio, read shall be maintained through construction. The Developer shall have, within the limits of the project, an employee certified by the Virginia Department of Conservation and Recreation (VDCR) in Erosion and Sediment Control who Address Sulky Drive Left Side: 0' 13.0' Area 0.804 acres Right Side: 0' 3.0' ! cn �� o � ct l measures on a continuous basis for proper installation and nshalll Rear (I-81): 50' 50.6' ZoninLegal .; � - ~ � EXIISThNG TREE DRIP LINE .: �w. �, - _.,-� remotes are required. Defi+a"enciession Operation.shall bepromptly rectified. Legal References 08 913 PG 1429 ® i � (n d VI 0. Contractor shall ensure adequate drainage is achieved and mainta/red' the site during and at the end of _osed Existing Use Vacant Parking Per Code Pro Proposed Use General Office Front: 5' 27..0' � L...on 0 0 o 'itw GENERAL NOTES PROPOSED FEATURES construction. Left Side: 5 5.0 �r V11. All water and sewer lines within existing or proposed VOOT right-of-way shall have a minimum thirty-six (36) Right Side: 5' S. D' Zoning Data Rear: 5' `L1 " PROPOSED EDGE OF PAVEMENT PROP EP - 1. Permits must be issued from VDOT prior to any construction in a public right-of-way, inches cover and when possible shall be installed under roadway drainage facilities at conflict points. Open Space Minimum 15% = 5,251 sf fo PROPOSED EDGE OF GRAVEL PROP IrG 2. The Manual on Uniform Traffic Control Devices (MUTCD) must be adhered to when working in a public right of way. V12. Any unusual subsurface conditions (e.g., unsuitable soils, springs, sinkholes, voids, caves etc, encountered 9 ) during the course of construction shall be immediately brought to the attention of the engineer and VDOT. Work Open Space Proposed 34% = 11,937 sf F.A.R. Maximum 1.0 F.A.R. Proposed ! cn M E � cz o >_ '11:3 %0 ;? 3. The contractor will remove all mud and debris from the public right of way that is left by vehicles entering shall cease in that vicinity until an adequate design can be determined by the engineer and approved by VDOT. 0.25 Use For Par k�cn Unit _t5 Si t S m N o PROP. CURB & GUTTER PROP C:G-6 and leaving the site. Pr. General Office: 8,650 1 per.?50 sf V13. All fill areas borrow material and undercut areas shall be inspected and approved b a VDOT representative prior I y P Building Data Loading Space: 8,650 1 per 30,000 sf �° , c- Q PROP. ,REVERSE CURB & GUT-7-ER ��! 'ROF CG 6R7777 4. Any damage to neighboring properties including count roads and sidewalks caused b , the development of 9 y y P this site will tie the responsibility of the developer. All damage must be repaired to original conditions. ve to placement and fill. Where CBR testing is� required,, a VDOT representative shall be present to insure the i sample obtained is representative of the location. When samples to laboratories for Type of Construction Both are 2C -Metal Proposed Use General & ; � QJ ,� a) (A soil are submitted private Office Computer o 5. A entrance must be installed in the "Virginia Erosion Sediment Control testing, the samples shall be clearly identified and labeled as belonging to a project to be accepted by VDOT and Back -Up Room M PROPOSED CONTOUR -5O® construction accordance with and Handbook" Section 3.02. The contractor must maintain this access for the duration of the project. that testing shall be performed in accordance with all applicable VDOT'standards and procedures. Proposed Area 8,650 sf total Total Parking Spaces Required 35 Proposed Parkins/ Spaces 35 + � ® z v Height Maximum 35 feet PROPOSED SPOT ELE NATION +5i�� 6. The contractor will be responsible for adequate and positive drainage of this site, V14. All roadway fill,, base, subgrade material, and backfill in utility/storm sewer trenches shall be compacted in six (6) inch lifts to 959✓o of theoretical maximum density as determined by AASHTO T-99 Method A, within plus or minus Height Proposed 28 feet # of Handicap Spaces Required 2 , " PROPOSED STORM SEWER PROP. 2 ADS ����_ 7. The contractor will obtain a Land Disturbance Permit prior to any site work or construction. 2% of o timurn moisture.for the full width of an dedicated street right-of-way. At the direction of VDOT, p y g y'Proposed' d'ensit:y tests shall be performed by a qualified independent agency in accordance with VOOT' Road and Bridge S' Certified test be to VOOT daily, Handicap Spaces 2 Sign Data,,' .� PROPOSED SANITARY SEWER S - 'S --- S -- 8. All construction will be d6ne following the laws and guidelines set forth b OSHA and BOSH. 9 9 y ecifications. copies of a!/ reports shall submitted unless specified otherwise. p P P Y� p # of Loading Spaces Required 1 Sign Area Allowed 100 sf q Pr. Loading Spaces 1 =, .,� PROPOSED TELEPHONE ---- ~i ----_- ? -- --- .,. ---- 9. The contractor will notify engineer of record of any discrepancies between the approved plans and existing site V15. V'DOT' Standard CD and"UD underdrains shall be installed where indicated on these plans and/or as specified by VDDOT: Sign Area Proposed 100 st` g i °„" k PROPOSED ELECTRIC - conditions. Sign Height Allowed 35 feet PROPOSED GAS LINE - 10. The developer is responsible for the relocation of any utilities required by this site plan. VI 6. The installation of any entrances and mailboxes within any dedicated street right-of-way shall meet VOOT minimum design standards and is' the responsibility of the developer. Sign Height Proposed 35 feet t r 11. All Erosion and Sediment Control devices shown on this site plan steal/ be installed prior to construct/on. PROPOSED WATER LINE - „ o r 12. All controlled fill must be compacted to a minimum of 95 /o density following Method A ' of the Standard V17. Prior to VDOT acceptance of any streets, all required street signage and/or pavement markings shall be installed by the developer or, at VD07"'s discretion, by VDOT on an account receivable basis following the Manual On , t" Ct Numbers Sealsl "J 'Signatures PROPOSED WATER l�lETEr4 (� 7 WIN/ ProctorASTM D698, AASHTO-T99, or VTM-1 as applicable. Any fill placed under buildings, structures, or must be inspected by A Uniform Traffic Control Devices. � ui PROPOSED FIRE" HYDRANT pq PROP. FH' pavement and approved a professional soils engineer. geotechnical report supersedes this ,note if provided. VI8. The developer provide to the VOOT Residency Office a list of all material sources to the start 13. The contractor is responsible for contacting MISS UTILITY prior to any site work. All utilities shown on this plan are approximate locations and not all utilities may be shown. ,must prior of construction. Copies of all invoices for materials utilized within any dedicated street right-of-way must be provided to the, local VOOT Residency Office prior to acceptance of that work. Unit and total prices may be obscured. Engineering Firm:_ Mont Montgomery &Associates 540 869-03'08 9 ( ) - Surveying Firm. PLTH OF PXTH OF ��� �j'Q �� ��'i' G O G` p, W COMMON LABELS & f=EATURES V19. A base -� Gr:-yV1/olfe, Inc. (540) 545-78�.3 14. The contractor will contain all litter and debris on -site. The work must be left in an orderly manner of the end re ate and subbase materials shall be laced on subgrade b means of a mechanical spreader. Dens/ r 99 9 P 9 Y P � will be determined usingthe density control strip in accordance with Section 304 of the VOOT Road and Bridge y P dge ZorBing ,Enforcement: Department of Planning ("i40) 665-565�( + ,-� ,.-4 �� E3E N:IAM I N C. y v y GARY R. SATESUJ NI C7 N f G ®M E RY W PROPERTY LINE OF PROJECT ®® of each �rorkalay. 15. An be during Specifications and L?M-10. A certified compaction technician shall perform these tests. Certified copies, of test reports shall be submitted to VDOT daily, unless specified otherwise. In addition to checking stone depths, a Site Inspections: No. 030 342 � No. 151$-B �I \1 � 1 NEIGHBORING R ROPERT) LINES - EASEMENT LINE - approved set of site plans must on -site the construction process. The contractor will notify all utility companies pr/or to excavat/on w/thin easements. VDOT representative shall be notified and given the opportunity to be present during the construction and testing of the density control strip. Department of Inspections (54-0) 665-5650 Erosion and Sediment Control: O �� �;'S-S"'-IA �I a Z ®C16. � PROPERTY CORNER FOUND (OD 17. The contractor will seed and straw, for soil stabilization, any disturbed areas that will be left for more than thirty days. V20. Asphalt concrete pavement shall be placed in accordance with Section 315 of the VDOT Road and Bridge Department of Public Works (540) 665-5643 Sanit r Sewer and Water:' V SURv�yU Specifications. Density shall be determined using the density control strip as specified in Section 315 and VTM-76. A. certified compaction technician shall these tests. Certified the test be Fred. Co. Sanitation Authority (540) 869-1061 Ui C4 U Z �' PARKING SPACE TOTALS @ perform copies of reports shall submitted to VDOT daily, unless specified otherwise. A VDOT representative shall be notified and given the opportunity to be during the testing the Telephone: Verazon 301 954- 6282 �- ( ) Electric: Allegheny Power (80L)) 654-3317 THESE PLANS ,ARE IN CONFORMANCE' WITH COUNTY Of" FREDER.ICK STANDARDS AND ORDINANCES. ANY DEVIATION n. ib v ADA HANDICAP PARKING STALL E TMEN T I PECT1 T EEa present construction and of control strip. Gas: ( ) �- Shenandoah Gas Co. 540 86 ► 1111 OR CHANGE. IN THESE PLANS SHALL BE APPROVED BY THE � � V vi W -� V21. In accordance with Section 302. 03, the foundations for pipe culverts thirty-six (36) inches and larger shall be below the bottom the to determine MISS UTILITY.- 1-800'-552'-7001 - ZONING ADMINISTRAT OR PRIOR TO CONSTRUCTION, a � O '7 t L- i' ' r l �°' l G SIGNS 1. Building(s) ,must` comply with the Virginia Uniform Statewide Building Code Sections 304 (Business) and the International Bu//ding Code/2000. Other codes that apply are CABO A117.1-98 Accessibility the Usable Building & Fac/0/tlee;, explored of excavation the type and condition of the foundation. The report contractor shall re ort findin s of foundation ex /oration to the en ineer and VOOT fora approval prior to placing p g pp p g ® W W � .� qC LC ) SANITARY MANHOLE IDENTIFIER q and 2. The requirements in BOCA mandate either a fire wall (Section 707) or a fire suppression system if height area Foundation designs shall comply i pipe. 9 ply with VDOT Road and Bridge Standard PB-1. Where sofl., yielding, or � i� and otherwise unsuitable foundation is encountered, the foundation design and,/or need for foundation stabilization Ca Maximum, � STORM' DA4IN STRUCTURE IDENTIFIER C'J limitations are exceeded for the type of construction under Table 507 of BOCA. 3. A design professional licensed' of the Commonwealth of Virginia shall seal the structural plans submitted for building permits. Plans must show all ingress/egress locations to the exterior CABO 117.1-92 and meet requirements shall be determinedby the engineer and approved by VDOT. V22. Approval of this plan shall expire three (3) years from the date of the approval letter. Environmental Exissting Disturbance Proposed' Features Acreage? Allowed Disturbance 1. Exterior lighting will be provided by wall -pack lights attached to the building & lightpoles. 2. All lights be directed to U_ C) LIGHT ,POLES per of Chapter 17 of BOCA. will shielded or prevent on neighboring 00 4. Maximum slope across. handicap g o q 9 ,_ p p parkin, stalls shall not exceed 2 /a�. All required egress doors shall be accessible to a V23. VOOT Standard CG-12 Curb Ramps shall be installed where indicated on these plans and/or as specified by VDOT. Flood ,lain 0 acres ®% 0% p glare properties. 3. Outdoor trash receptacles will be in an enclosed p LC>CAT,ION OF TEST PITS min, exterior area for assisted' rescue, section 1003.2.13.7 IBC ; Nate fire ratings around this door if this sect/on is utilzed. 9 5' The 20'00 International Building Cade can be utilized for building design. 9 9 9 V24. VDOT Standard Guardrail shall be installed where warranted and/or as proposed on these plans in accordance with Lakes & Ponds 0 acres o o 0 % 0 /° Wet/ands >1AC 0 acres 0% 0% six (6) foot fence. J VDOTs installation criteria. Final approval of guardrail layout to be given by VDOT after grading is mostly complete. 4. This project will not disturb an environmental P 1 Y ® Sinkholes 0 acres 0% 0% features as defined by the Frederick County FIE MARSHALL GENERAL ✓ L T ®® T I E® Tl %"Aq Natural S. W. 0 acres 10% 0% Retention Areas Zoning Ordinance. 5. The owner will be responsible for obtaining or EROSION & SEDIMENT CONTROL FE:ATU,RE.S - Steep Slopes >50% 0 acres 2.5% 0% Woodlands 0 acres 2.5% 0% granting easements shown on this plan. 6. Easements willbe recorded and copies sent to the LU 1. An inspection by the Fire Marshall's office will determine where curbing must be painted yellow. IN'LE? PROTECTION 0� /P 2. "No Parking -Fire Lane" signs will be placed on the site by the Fire Marshall's direction. DATA TAKE FROM THE L % MANUAL 7th EDITION parties involved. 7. All utilities that will service this site must be ® > o OUTLET PROTECTION 0 3. The contractor must align the fire hydrants to the direction as determined by the Fire Marshall. 4. Burning brush of natural vegetation requires a Burning construction debris is a- P - i r a BUSINESS PARK ( CLASS 770) 12.76 PER 1,0100 Sf X 81650 Sf ® 11 VMS S placed underground. (OP piles permit. prohibited. 5. Emergency vehicle access must be provided at all times. Fire hydrants will be always be left unobstructed, l� I AL `> ,"" U- LU Q CHECKDAM ® CD J a E P I lDISTURBERw DIVERSIONDIKE - �•- ®-- DO w re SILT FENCE W/ WIRE SUPPORT NAME: County - �J LA ►�'A I N 0% TES� Frederick Zoning Administrator Date W ,r, SILT FENCE W/O WIRE SUPPORT - - SF CERTIFICATION �� 1. Miss Utility must be contacted prior to planting. Advise engineer of record of any conflicts in planting locations 1. Site Plan approval from VOOT will expire three (3) years from the date of the approval letter. SE;DIM�ENT TRAP' ��= (Si) �- ^ �'%�P' D/`�I T� and utility markings. Landscaper must stake and guy all trees. Stake locations must avoid utilities. 2. Tress and shrubs be healthy free insect larvae, disease. The 2. Frederic;k County Zoning Administrator approval expires at five (5) Nears from the date of site plan approval. 3. The Frederick County Sanitation Authority approval is valid for two years from date of approval. If construction is DATE: DEC. 6 2004 - shall and of eggs, and plants shall have ample roots 1. The Responsible. Land Disturber is that party responsible for carrying out the land disturbing activity as set forth in and be well branched. The planter shall guarantee all plants for one year not in progress at the end of this period; Authority approval shall be void. the plans. 4. The Frederick County Department of Public [Yorks approval is not enough to begin site development.. The SCALE:. N/A CONSTRUCTION ENTRANCE ( 2. Note: An on -site pre -construction meeting is required with the Owner, Site Contractor Public Works / ner & Des9 to 3• Landscaper shall use shredded mulch in all planting beds and around trees. Tags from each plant will be provided to the owner. owner/contractor must obtain a Land Disturbance Permit and agree, to periodic inspections. shall' be void. 5. The Frederick County Department of Inspections approval does not constitute a building permit. Building plans FILE NO. D144 prior commencing any site work. must be submitted and approved prior to constructing any, structure. Furthermore, the site must meet all AD.A 3. The contractor will possess a Land Disturbance Permit` prior to any site work or construction. 4. Plant substitutions will be allowed with the approval of the owner and the Frederick County Planning Department. requirements and be approved by Inspections. SHEET 1 OF 3 6"dia. schedule 40 steel pipe filled with concrete 3 and painted yellow 7 2 1--6„ 18" dia. Cor1CfE:le ri, IiL``— encasement { L; 3, BOLLARD DETAIL FIRE HYDRANTASSEMBLY Figure 8 SDR 35 spigot SDR 35 spigot by by gasketed SDR 21 gasketed bell 45 bend `bell adapter (see rlote) / x 6" deep locator marker chanical joint veI tee with )ranch 2' '. • f • b' !^u?:t. _ ::i:W,/lY,>;7i, F. 'or" ��A?:': .•icb7rCYiti;.1.!4."`S.. i„Wi• �R �' tN i' f N •.^w..,," h`;J, NS•�^ .".hT `+' ..' Y 4Is ,,.yl 1 3' minimum \_SDIR 21 gasketed SDR 35 8'S(4" pipe and fittings gasketed bell wye SCH (sae note) solvent r weld cap IiY property lime '-R[ma.acQc¢�5.ce[ata�aRzcvsaca[aca�sxt�a�Q.cce�e��;cecQc¢c 18 location marker stone -� s 4" pipe at 2.00 minimum grade concrete cradle if top of main is greater than 15' deep 36" miin. cover treated 2'k 4" with top 6" painted green Note: If top of main is greater than 15 ft deep use heavy wall SDR 35 GRAVITiI(SEWIER SERVICE LATERAL Figure 14 METER BOX and COVER METER SIZE METER 13OX METER BOX COVER 5/8'S(3/4" or 3/4" 18 in. Dia. Non -Traffic IM32C-PW Traffic A32HH 1" 24 in. Dia. Non -Traffic MC-30 (Frame) WITH RNIL-I-T (Top Lid) Traffic MC-30 (Frame) WITH RMIL-12-T (Top Lid) Opposite Side- meter Ibox and cover 18"-21" 3" stone surrounding box treated 2'k 4" with top 6" painted blue - fyc.nyncf a r.uu y 1 coupling / (PET) 200 psi with SS inser¢s (PJX FIP) C14-44 at all connections with SS Inert and MIP plastic plug Same Side COP13ERSETTER meter Opposite Side Same Side size 5/8'S(314" VBHC7218WD-44-44-B4 V6HC82-10WD44-44-B4 3/4" VBHC72-18WD-44-44-841 VBHC82-18WD-44-44-B4 1" VBHC74-15WD-44-44-B4 - N/A - INSTALLATION NOTES: 1. Exact location of meter box assembly to be approved priorto installation. 2. Water service crossing street: c a Encase in 3 diameberSCH40 PVC or ire. The piping s from one sidewalk, o pipe. p p g hall run fr foot beyond , dewalk, across the street, to one foot beyond sidewalk. b) Install 12 gauge insulated copper wire (for line bracing) from corp stop to into the meter box [wrap wire around corp. shop; wire to be taped to top of PET at 10 foot intervals; come up into meter box and terminate level with angle ball) valve], 508'"A3hP', 3/411 & 11" METER INSTALLATION (4 FOOT COVER) Figure 5 R finished grade �'W9, VALCO, Inc KEW Q Fig. No 71 BOB with lid marked lid "SEWER' bottom section - of box SDR 35 gasketed bell wye sanitary (see note) sewer main SDR 21 cast iron cleanout cap with brass / plug must be 8" from the top of the `ssc`�rrew�type adjustable box square concrete _ skid pad 20'k 20'k 6" deep cast iron cleanout cap with brass plug having a countersunk square plead Panella Model PA4SV-CSK (4') SDR 21 - cleanout pipe brick base w�:"•u' SDR 35 spigot by ,%SDR 21 gasketed .,,, ,.bell adapter •.••.•SDR 35 gasketed C'-bell 45' bend 6" stone bedding NOTE : If top of sewer main is greater than 15' deep, then wye and bend to be heavy wall SDR35. SIEWER CLEANOUT Figure 16; R7--8 HANDICAP PARKING S/GAL RESERVED 1 PARKING MAY BE PLACED INTERNATIONAL SYMBOL ON ONE BLANK. OF ACCESSIBILITY ADJUSTING THE REQUIRED HEIGHT iF REQUIRED TO ACCOMMODATE \ THE ADDITIONAL LINES VAN ACCESSIBLE REQUIRED N P-NALTY $10Q-5061 EFFECTIVE JULY 1, 199,8 TOW —AWAY ZONE Z PARKING SURFACE �— CONCRETE WHEEL STOP , (IF REQUIRED) HANDICAP PARKING SIGN DETAIL (NOT TO SCALE) nj 4.1 J W �' LO J Li m Q� C) �� �- I \ Q VJ Z � ,J .�mN" ,; lr� oo � W i C� O � c� , 10.I3' 1.2 OF 21B-- 12. a' -- 2'-7"(CG-6)-- TAPER PROFILE Grp r � , , I lk is 4 S !1 . n --a- 3' MIN. MOTES_ I r -- I I 1. H/C SPACES' MAY NOT EXCEED A 29 SLOPE 2. R41MP BUILT TO VDOT CC-12 STANDARDS J. WHITE STRIPING SHOULD BE 3" WIDE. 4. H/IC SIGNS TO BE SET 3' BEHIND SIDEWALK OR MOUNTED TO BUILDING lF POSSIBL-E. Q N W i N W L+ Qom. U �. Q U N QOIQ I Z`r i m NI W :� k Q I '\ `� 00 ^ O Q) �I U C C)� U (/) W 75-((3(U O_p. q�)J, .mac, aA L I�' - iR% II 4' ARM 400 WAIF LIGHT 20' POLE MINIMUM SFACI11IIG ?'-0'r PAVL -T-1 .NT (— CURBING TYPICAL INST4LLATION OF LIG'HTPOLES BEHIND CURB & GUTTER Lighting General Notes: 1, Proposed Lights for this project are Hubbell RCSA-400ST (400 Watt) Lights or equivalent. 2• Lighting must be installed so as not to produce glare onto neighbors and roadway. KKS'RLE.I 1410ROM:N S,1ML SOPFA,CNG AS NA1,1LIRE rRA I.I; 3 fY- A3, 1 �4.0 SHCAIJ ON PI411-) 1 i- (, el 5 u, As ST'D CG 1: —..� f ...�R4Ul L� Gh18 r4tf�UN{� %�r _.� J I �M AND tN F0.::L S) J ; LSc Fa L L S t.. viI 1 J p0IrNLF PIE- kzt s exr.rR� T �`, �_^'"�,."_---....^.--•-, �! -- 1 Dti Nr I ' - LxvrJh l aGy?. oar Jnnm ; c Or As al 1NU4413 R04DwAi` S CTI��.1 -C _HOME. F. 1"ICAL SLC 110.. rl. .. F Lhr•: `.'ILV/ L1 'STRU r IL'. cilmors mir FA3oi is ajrvr. WIFLI� THF1 TURNING RIn RFIAITS A0F.AtnC ATF7'LAIL HFA/' .- PPRABO1.-C r,UFdr PLY,K TPaLFFIL .HE 0 PJH FOR 5GEWAUi a CURS 1 RW f S WiY ION MC' Uld S 01 11 L 1 4J 1SHOU D M ErGI OF cHOLLDER OR B ,NIA _ ,� .�-• U NCR'..ASF7 T1 Of IILIL;L I O5Y LINE_ f S�0 E ( AIGL t� ( .._,.��� C WHE: `• D vl 11S 5 U FDR JJIRAJ.CeS 1TJLi- IN 00N UNIT 11 W711 n rp I CT 1Fti F S adJ rOIE. 7 E rJ -LOWING: S_OPL LH fJ-"'t 1114E INL PA LkiJlr 1HAL E LJ StkU "❑ 5'h11u U O UR SiR Ll ~ C I� itT W LIN L)I L FA)Y OIJ RAL1L r':T 9r + AR1I TIChI RE tIRFD FOR hIA1411.F IP AA C rcr r.oio. F,,c1?- d•.eN (JI AH G� tirN He ;,WIT-. rD N IJTRA-�C� Tfi _FJTRNV4-. 3FCT 7I1ANC A PJLA°L CLI D ON CLFkSINA K]K C I& (i I.�II._L P,L: I �I. UI•±�[;L Ci:-I �IV'L �: t UTTFR RE:YUNMEEE RH' WLNETE8FEF1XfIFORIJCTF RFPI,. AG hFl1T PUR-07,F5. MILJO USIED 81 CG3.UUJ1 i Wl WITH ffd4Ja�70 C, ; OP C ,THE C PR A^F CII THIS EMI R,='f10E '+U,-UUE DESF;�J3LE iry{KI44VN S Pfl�..l L 6 "-O tl UJu ED IJ MATL4 T-k: -- Id0J4TMI E C1Po3 C,.NFIG.IRAToN. HI H IrAORE T,X1 15CO iP l +' 3 2 SE_ rl A,53 - f CURB "AVA, DESK11 R+L M 90L hi] '�°FD? i J 'A'� (f X 1 O 'i. 1 r J I D/ U, $ N S%(1 tF>.;`. 6 C ,R R: ,( PLs'IS M If RLJ IL Hr+E'1 GQWSIRJGTV:7N GF A F rAv I INr 5 Rt.4p r 0 r) R 'i ll E PDSITI r CP IIAGE \CROSS THE RJTRNUC.I P710NW L WI WN SY l FF47U;R WARPH! P A nRI"ION F lUl"TER O N,2LGiU E KKDTl'� U N=: LR. x• Iru:ATIOk - kE'L��GE ; ---"OC.) OF TREIwPAEfdT_ G )f•1NFC,fION FC,. S;h INIFF?SECI �7 `ND Cu RJER L F�,,�T ��.. I._"����� k269z4i; JL�Ak PA ENT U� 91AF✓rISWORI'•2C1'd � GS 1" �F 75 ((7) 14 RAIPH ._. G'Rt_L7L/; f f qb'4 0�C ` �- •-i I I INSTALL r1RE HYDRANT AT THE END OF D'ISTING LINE. p' HYDRANT OUST OBE AT LEAST 3 FROM "PAVEMENT EDGE W ' LIGI'•lTPOLE FH Ex 8, W� L Wv i T30 i I2,5'R Ica-7 5 W —`, QL QL 3 q %Lo Lu IQ l �.l I � d q R'. T , 31. (9 E,1 b,�' SL, II, Li'I,,I � 25'RI 3 f_ a /4k,301 ' SSMH A S 28�' M 8' - H_ CII'f'C LPL 719 5.. PER A1R� ;<r'Cl':, ITL I- L-1 -lril i 1N '� IN„l.` 00` .4 TRI,gJ cA/, FR/N, 1.,' 339� 321 F . . Q 35' HlGl4 • �] , 4I RRIL 21, Z 0 p ,O SIGN lOD E y ni VE7ERAA1 OF f ORC /V !lV 1 R' " SF IN AREA, l36.0' ft I , I , I , 3 ,,,q [ f I s. c - f/ FCSA I e A R k ' 32 S ]- E �p of �5 20' 0' 20' 5 GRAPHIC SCALE --S --S —S F "e 7)-((0)i- 94 PAR' s, GRE-ORY UI N rlt_-`I B- . r TREAT WOODEN f'ANEL•S WITH WATER SEALANT. Stormwater Management Note This ,site is served by an approved and installed regional stormwater management pond located at the southern end of the park. 2" OF SM-2A 6" OF 21-B COMPACTED TO / 95Z DENSITY SUBGRADE FREE OF ORGANICS & COMPACTED TO 95% DENSITY' TYPICAL 6" TALL BY 8' WIDE DOG-EARED FENCE PANEL. INSTALL ON 4'X4'X8' TREATED POSTS SET TYPICAL PAVEMENT :SECTION ' D DIRECTLY UNDER THE PARKING DUMPSTEk fNCE DETAIL SPACES N. T S. 1.5" OF SM-2A �/�-112 ��!\��\� 3" OF BM-2 i i i 1 1 1 1 ��1 i 1 1 8" OF 21-B COMPACTED TO 959 DENSITY SUBGRADE FREE OF ORGANICS & COMPACTED TO 95q" DENSITY TYPICAL PAVEMENT SECTION UNDER ENTRANCE, DRIVE AISLES, AND INSTAL!' GATES ONTO 16'X6" POSTS INSTALL OPAQUE ,FENCE AROUND THE REST OF THE DUMPSTER TO >0 -%a* LU_ d Q IL C15 N 0 O (cl Cl Ito I CF U c > O = w�V CO N N C Oc i E O � � 0 @) U 1p "y C T i Q C cV CD t Lh V I Ui CD O V o : p I .�"• a t0 Ci ' Q: Q Cod =3 t.••1 \i �r^�` I�w� W V) c Co € ra ^o a z Z U �o J w J W Ua Q a� LCQ� �O U) Jw � �t W W pW sw �J qfY a� U O ti ti O J LOADING AREAS PROVIDE ;SCREENING w -- TREAT WOODEN PANEL GATES WITH WATER SEALANT Z w :'•..; 4 OF 3000 PSI CONCRETE W/ DUMPSTER GATE DETAIL FIBER 0 ' Z ` N. T S. ro. 0 G 4" OF 21-8 COMPACTED TO I W ^�' l 959 DENSITY Seals and.Signatures LU a SUBGRADE FREE OF ORGANICS w & COMPACTED TO 957. DENSITY' ' a �PLTH plc 1, LPL f H OF > TYPICAL SIDEWALK SECTION ��" j�f' ��� r�� � BENJ,AMIN C. may! Ln GARY R. OATESi W 0 MONTGOIAERY _`0 No.0303-42 No.:1518-B Q ,� 8 OF 3000 PS/ CONCRETE W/ WOVEN U,� WIRE- REINFORCEMENT FSI G� �qJ •..:'p.:. s y , I E O <- E O n� � 1 8 OF 21-B COMPACTED TO A'� DATE: DEC. 6, 2004 lQ 95X DENSITY � SUBGRADE FREE OF ORGANICS THESE PLANS AIRS IN CONFORMANCE WITH COUNTY OF SCALE: 1" _ 20' FILE NO. 0144 & COMPACTED TO 95% DENSITY' FREDERICK STANDARDS AND ORDINANt:ES, ANY DEVIATION OR CHANGE IN THESE PLANS SHALL BE APPROVED BY THE SHEET 2 OF 3 TYPICAL DIUMPSTER SECT/ON :�ONl'NGADMINIS7RATi9R PRIOR TO CONSTRUCTION, m IcFn < FM r-- C:: ,Z) 73 m EROSION & SEDIMENT CONTROL STANDARDS E & S CONTROL NARRATIVE g y ' � XX , : I i } s SILT FENCE WITH WIRE SUPPORT SF ' ; w LUL Q OD M Cl) Project Description 1, Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is Cl) reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant for longer than 30 days, Permanent stabilization shall be This site is located in the Battlefield Business Park on the east _ —_ -.. . ,6 .„ .w, � M Nu..,. m i ..' ' ,• UJ 0) Go applied to areas that are to be left dormant for more than one year, side of Sulky Drive. The purpose of this development for the construction of 8,650 sq, ft. of buildings to be used for aces O .• I o 2. During construction of the project, soil stockpiles and borrow areas shall be stabilized or protected with sediment and computers. This development also has parking and drive U trapping measures. The applicant is responsible for the temporary protection and permanent stabilization of al/ sort aisles for access, ; ; O stockpiles on site as well as borrow areas and soil intentionally transported from the project site. - Im 0 3. A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent is that is to Existing Site Conditions vegetation shall not be considered established until a ground cover achieved uniform, mature enough survive and will inhibit erosion, The lot is a vacant field. The ground cover is grass with some.; brush along the eastern side. o co 4. Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be first in land -disturbing shall be made functional before upstream land i � •• ' • •• `• • 4, N a constructed as a step any activity and disturbance takes place. Adjacent Parcels : p.• ••.. • C; The adjacent are a vacant lot like this one. o 5, Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. basins be designed based the total drainage to be parcels SoilsCIOU g I o aU o 6,Sediment traps and sediment shall and constructed upon area "Soils C C served by the trap or basin. a. The minimum storage capacity of a sediment trap shall be 134 cubic yards per acre of drainage area and the trap The soils types determined from the USDA's Survey of Frederick County, VA"shows Carbo-Oaklet rocky silt /oams classified as #6C. This soil is predominately yellowish brown silt `'' • ' • ' �'' �' ` shall only control drainage areas less than three acres, /oams over bedrock and offers severe erosion hazards, Topsoil '• ' °' ! ' ( b,Surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three acres shall be controlled by a sediment basin. The minimum storage capacity of a sediment basin shall be 134 cubic on this site appears to be 9" thick with rock outcroppings. O s , Et Erosion Control Program e area, The outfall system shall at a minimum maintain the structural integrity of the basin yards per acre of drainage ea, y g ty during a twenty-five year storm of 24-hour duration. Runoff coefficients used in runoff calculations shall correspond to a bare earth condition or those conditions expected to exist while the sediment basin is utilized. • Install construction entrance with wash rack y I I ' . Install wire supported silt fence 7,Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to •Install culverts outlet protection be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. • Grade site and seed all exposed surfaces immediately upon reaching final k °- � � „ I " � � ■ U O LC grade „� � � 8, Concentrated runoff shall not flow down curt or fill slopes unless contained within an adequate temporary or'� Flume drain General Erosion and Sediment Control Notes (VESH Table 6-1) � °, �q I I _ o permanent channel, or slope structure. $ 9, Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. ES-1. Unless otherwise indicated, all vegetative and structural erosion and sediment control practices will be constructed and k „- a141) / E pU / , -� �s .,E,��T�RS / " • -- ;/ .; j F k s - ;.. ` `.C/o EZpO' i th O U o 0 v 10, All storm sewer inlets that are made operable during construction shall be protected so that sediment -laden water maintained according to minimum standards and specifications of a „. q i j cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment, the Virginia Erosion and Sediment Control Handbook and Virginia % — S S — S s ='s — S — S 1a, ' S — S — s — S — s — S — S 5 i -p Regulations 4VAC50-30 Erasion and Sediment Contra/ Regulations. — G o 11,Before newly constructed stormwater conveyance channels or pipes are made operations., adequate outlet protection temporary lining shall be installed in both the conveyance channel and i V 1�fo and an required or permanent channel Y q P rY P 9 Y receiving channel, is be ES-2. The plan approving authority must be notified one week prior to the pre -construction conference, one week prior to the commencement of land disturbing activity, and one week prior to , SF i C N o f°' 12. When work in a live watercourse performed, precautions shall taken to minimize encroachment, control the final inspection. I Q Ga sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerodib/e material Ica � c, shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structures if ES-3. s armored by nonerodib/e cover materials. All erosion and sediment control measures are to be placed prior to or as the first step in clearing, All plantings will conform with Section 165-366 of PROPOSED PLANTINGS a�1 -0 � n o a) 13. When a live watercourse must be crossed by construction vehicles more than twice in any six-month period, a the Frederick County Zoning Ordinance, Planting Selection, Planting Procedure, and Maintenance, 20' 0' 20' temporary vehicular stream crossing constructed of nonerodible material shall be provided, ES-4. A copy of the approved erosion and sediment control plan k o o 14. All applicable federal, state and local regulations pertaining to working in or crossing live watercourses shall be met, shall be maintained on the, site at all times. Parking Lot Landscaping Data HEDGE - BOXWOOD - (28) PROPOSED FOR GRAPHIC SCALE HEADLIGHT SCREENING GALLON CONTAINER) - (3 15. The bed and banks of a water course shall be stabilized immediately after work in the watercourse is completed, oche Prior to commencing land disturbing activities in areas other than indicated an these plans (including, but limited to, off -site borrow or waste areas), the contractor shall submit a Per Code Proposed 1 Tree per 10 spaces 3.5 4 � 16. Underground utility lines shall be installed in accordance with the following standards in addition to other applicable criteria: supplementary erosion contra/ plan to the owner for review and approval by the plan approving authority, (39 spaces) to TREE -PIN OAK 8S/OR RED MAPLE -16 PROPOSED OTHER DECIDUOUS SPECIES AAYBESUBSTITUTED a. No more than 500 linear feet of trench may be opened at one time. Total Impervious Area 1 per 2000 sf 12 WITHAPPROV/AL OFFRED. CO, DEPT, OFPLANNING ` ES-6. The contractor is responsible for installation of any 23,085 sf 11.5 MINIMUM - 2" CALIPER b. Excavated material shall be placed on the uphill side of trenches, additional erosion control measures necessary to prevent erosion c. Effluent from dewatering operations shall be filtered or passed through an approved sediment trapping device, or and sedimentation as determined by the plan approving authority, Percentage of Green 5% 6, 6% Area in Parking Lot 721 sf 955 both, and discharged in a manner that does not adversely affect flowing streams or off -site property, ES-7. All disturbed areas are to drained to approved sediment 14,435 sf d. Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote control measures at all times during land disturbing activities and W stabilization, during site development until final stabilization is achieved. INLET PROTECTION NOTE: e, Restabilization shall be accomplished in accordance with these regulations. ES-8. During dewatering operations, water will be pumped into SILT FENCE USED AS INLET PROTECTION PIPE OUTLET CONDITIONS U O f,Applicable safety regulations shall be complied with, an approved filtering device, IS NOT ALLOWED IN FREDERICK COUNTY, A J 17. Where construction vehicle access routes intersect paved or public roads, provisions shall be made to minimize the ES-9. The contractor shall inspect all erosion control measures periodically and after each runoff -producing rainfall event, Any CONTRACTOR MUST INSTALL THE A ado (NIN.) W J LQ Q transport of sediment by vehicular tracking onto the paved surface. Where sediment is transported onto a paved or public road surface, the road surface shall be caned thoroughly at the end of each day, Sediment shall be removed necessary repairs or cleanup to maintain the effectiveness of the OPTIONAL STONE ARC AS SHOWN, d O a o U a Z q - 4 � Z from by erosion control devices shall be made immediately, I Z the roads shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This shall apply to individual development lots as well PIPE OUTLET TO WELL CONSTRUCTION OF A SILT FENCE DEFINED CHANNELtj g �i O a p provision to larger land VIEW W W , as -disturbing activities, Frederick County Note: (WITH WIRE SUPPORT)PLAN Z 18.A11 temporary erosion and sediment measures be removed 30 days final The Public Works and Engineering Department will retain the SILT FENCE CULVERT INLET L a W O contra/ shall within after site stabilization or after the temporary measures are no longer needed, unless otherwise authorized by the local program authority, right to add to or modify these erosion and sediment control measures during the construction process, within reason, to 1. SET POSTS AND EXCAVATE A 4"X4" 2. STAPLE WIRE FENCING TO THE POSTS. o % _ TRENCH UPSLOPE ALONG THE LINE PROTECTION Z k U_ 4 Q o Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sedimentation, ensure adequate protection to the public and environment, OF POSTS. d W (n Z Q Q O V Q Y SECTION A -A t LLj 19. Properties and waterways downstream from development sites shall be protected from sediment deposition, erosion and damage due to increases in volume velocityand peak flow rate of storm water runoff for the stated frequency g r P �l Y _- , , ENDWALL FILTER CLOTH A8'Y IN 8"-9"; PJcom 1ENDED !'OR ENTIRE P6Rzmzrjm NOTES. 1. APRON LINING MAY BE RIPRAP, GROUTED RIPRAP, GABION HASEET, OR CONCRETE. 2, La IS THE LENGTH OF THE RIPRAP APRON AS CALCULATED Z � Z4 O Q c) '� 1I � �=: Z 4 W O W W W � W storm of 24-hour duration in accordance with the following standards and criteria: -� /// .- ! USINO PLATES 3.18-3 AND 3.18-4. 3. d = 1,5 TIMES THE MAXIMUM STONE DIAMETER, BUT NOT LESS THAN 6 INCHES. O Q J QC ELI 'Q C it LC I C / l l -''� / TOE OF FILL CULVERT Source: Va DSWC Plate 5.18-1 r� Ca Prune out any dead or broken branches, remove all togs, labels, strings, STONE CONSTRUCTION ENTRANCE wires, etc. from plan.O / U 2-3" mulch Prune codominant /eodeF& - DO Nor prune terminal leader or branch tips 70' MIN, EXISTING / i 1 �- Seeding Schedule (per section 3, 32 of VESH) Set tap of root boll 2-3' Saucer y equal to or 1-2" — . f above grade. ��,FILTER Prune rubbing or cross branches- `� A ' 5:, defiadma CLOTH MOUNTABLE BERM L�✓ - G� - �� � = 1,) Topsoil will be spread at a minimum depth of4 I - 2.) Pulverized agricultural limestone will be incorporated into O , .' 6° MIN. A (OPTIONAL) l_/�— I the soil at a rate of 92 ibs per 1000 square feet 2 tons per Y ( Y J .. ?; `;; •i Remove container, use '•' '?:':..': SIDE ELEVATION FLOW — III "' III ' — acre), 0 0 3.) Fertilize with 10-10-10 at a rate of 23 lbs per 1000 +'•'"" `'< sharp blade to make four 1/4"-1" curs the +^'`•'.i`•t Prune narrow crotch angles & warer 6pours ExtsttrrG GROUND 4" ° square feet (1000 ibs per acre). + " len th of ball and cut a 1�" X on bottom of 70' MIN. 4.) Seed mix will consist of 75% Kentucky 31 Tall Fescue, TOE OF FILL ball, loosen compacted <;•,'' •:, p roots. �-- Prune broken branches Remove togs and labels H lo' MIN. 3WASHRACK. ATTACH THE FILTER FABRIC TO THE WIRE 4. BACKFILL AND COMPACT THE o o O O 10 /o Annual Rye, 10 /o Foxtail Millet, and 5 /o Red Clover at Y 200 ibs per acre, w CONTAINER GROWN SHRUB (OPTIONAL) FENCE AND EXTEND IT INTO THE TRENCH. EXCAVATED SOIL. , , 5, Straw mulch will be applied to all seeded areas at the SILT FENCE a ° ) PP Z w Prune out any dead Prune suckers Cut away all balling ropes 2"=3" mulch kept 10' MIN. 12, MIN, + EXISTING PAVEMENT l DISTANCE IS 6' MINIMUM IF FLOW rate of 3500 ibs per acre and anchored with cutback, or IS TOWARD EMBANKMENT emulsified asphalt applied at a rate of 200 gallons per acre. C! Z or broken branches. f _ Remove all tags, labels, Remove top of wire basket away from trunkL YY I ;'r,•,•; i 1 FLOW ti Z strings, wires, etc. from plant. P Soil well to contain Wafer V00T Nl ~� POSITIVE DRAINAGE 10' M[N. COURSE AGGREGATE B I TO SEDIMENT i TRAPPING DEVICE "^ hill .`.i /�/'• '• `�''•" ��]/ / SeaIS ���rl Sl///J�Jnatures / g /// A STONE COMBINATION W Q .,: �. � ;iX`:'''�':•:•"'•' MUST EXTEND FULL WIDTH — �, ;..... '''ra >> ' 2-3" mulch Set top of root boll 2 -3" Saucer equal to or 1-2" ,. ar+ ... ` 8ockfil! soil < OPERATIONOF S AND EGRESS PLAN VIEW �z' MIN. _ _ ;t:": .. :;.:.::'.., �- I I -� -' �y h .i;:;,".� .•,. ` r I I I I L OF L OF W a > above grade. ... Partially bockfi!l, • • y water to settle Widen and score e --�� soi/, finish 3" MIN. -- V= ,���jp S r �� _ / �,�/ _ I - FLOW _ 1 .0' ��V F ,p I= -�{ I W Remove rope &burlap from root boll. : f holes in wall backfilling �� Area for water Remove container and cut y + �y drainage (Pipe circ#ng roots if or tile could 3+ MIN. FILTER CLOTH SECTION A -A �- "" II =� I I I I �� I 2 2 U BENJAMIN C. y GARY R. OATES �' ;i M 0 NTG 0 M E RY U FLOW �, No, No. 1518-B 030342 W o \ ''.' :: '' • • = ;'`'^ ^ ' container -grown, or as be installed) much burlap as possible if 6'-7" ., c^ ''"• - ': ;' +;,� EXTENSION OF FABRIC AND WIRE INTO THE TRENCH. 2.5' U Di hole 2-3 times 9 width of root ball. Leave solid soil pedestal - do not field -grown dig deeper than boll depth., . ,; ; ,. ;. }; ' ' , '�,.: ;. ;, "`' ••;`'��sSIONA ��G ` Np BALL & BURLAP SHRUB Dig hole 2-3 times root ball width FILTER FABRIC L S Rv U DATE: DEC. 6, 2004 SCALE: 111 = 20' SHRUB PLANTING DETAIL TREE PLANTING DETAIL REINFORCED CONCRETE DRAIN SPACE SECTION B-B - ;; t ; ;"" ,:•: WIRE I ��� I •VDOT #3, #357, #5, #56 OR #57 COARSE AGGREGATE CLASS I RIPRAP TO REPLACE SILT FENCE IN "HORSESHOE WHEN HIGH VELOCITY OF FLOW IS EXPECTED THESE PLANS ARE IN CONFORMANCE WITH COUNTY OF (NOT TO SCALE) SOURCE: ADAPTED from 1983 Mwiforod Standards for Soil emsion ond Sedimentrol and Va. DSWC FREDERICK STANDARDS AND ORDINANCES, ANY DEVIATION FILE NO. 0144 (NOT TO SCALE) =1 SOURCE: Adapted from Installation of Straw and Fabric Filter Barriers for Sediment Control, OR CHANGE IN THESE PLANS SHALL BE APPROVED BY THE PLATE. 3.05-1 ZONING ADMINISTRATOR PRIOR TO CONSTRUCTION, SHEET 3 OF 3 Sherwood & Wyant SOURCE: ADAPTED from VDOT Standard Sheets and Va. DSWC PLATE. 3.08-1 m LEGEND FCSA CONSTRUCTION NOTES VDOT GENERAL NOTES VICINITY MAP >M _t,4* 0 � o� N EXISTING FEATURES �� cp 1. The Authority's Water and Sewer Standards and Specifications are available at www.fcsa-water.com 2. The water and sal itary sewer portion of these plans are valid h r two years from date of FCSA approval. V1, All work on this project shall conform to the current editions and latest revisions to the Virginia Department of Transportation (VDOT) Road and Bridge Specifications and Standards, the Virginia Erosion and Sediment Control "�9Go M co 0 0 ~ 0) EXISTING EDGE OF PAVEMENT ..�.._----.-_...__. _.___.___- ._�-_._...._ ___-.-.._._-.._.__....._.._..._-._ ...__....._ 3. Water and sewe ines a e o be co stru ed n ac ordance w these /ans and shall meet all Authori re uirements. A tY q Re Regulations, and an other a licable state, federal or local re ulations a licable. In case of a discre discrepancy or 9 Y applicable , 9 pp P Y ade�2� �,� M� 6 �ti, .,�, co r EXISTING EDGE OF GRAVEL ____.____-- .._._____._._....._._______.. 4. The contractor shall coordinate with, and arrange for inspection by, the Authority, conflict between the Standards or Specifications and Regulations, the most stringent shall govern. �-� y �. 0 Ln c :: _: " "4Yif - - c`u- - " "_-: - -"`"~' 5, When an existing water main is tapped for the installation of a new line: a) The Authority shall furnish all labor and material. V2. All construction shall comply with the latest U.S. Department of Labor, Occupational Safety & Health Administration (OSHA), and Virginia Occupational Safety & Health (VOSH) Rules & Regulations. o 0 EXISTING CURB AND GUTTER X `ate _._-..__...__-__._..._..._.___.._- ._-._.-.- _..._.__. EX. INTERMEDIATE CONTOUR b) the deve%per/contractor must: 1, make application and pay deposit. 2, the tap location. V3, When workingon VOOT right-of-way, all traffic control whether permanent or tem ora g y, p p ry, shall be in accordance with the current edition of VOOT's Work Area Protection Manual, Furthermore, all traffic control a QO ti EXISTING INDEX CONTOUR =; ' mark 6, The contractor shall tie-in a new sewer line to an existing manhole by core drilling the manhole. flaggers must be certified in accordance with Section 104.04(c) of the VDOT Road & Bridge Specifications, �' 4° ; o 7, locations lines be V4. The developer shall be responsible for relocating, at his expense, any and all utilities, including traffic signal �ti� J`' a co iz EXISTING SPOT ELEVATION Exact of water and sewer services on new are to coordinated with the Authority's Inspector, poles, junction boxes, controllers, etc., owned by VDOT or private /public utility companies. It is the sole ii L�� �, `®� Zv EXISTING TELEPHONE LINE - - --- - T -- - " - i - - 8. The Authority's maintenance department shall furnish and install all water meter through 2" in size. Zt is the developer s/contractor s responsibility to have the meter box assembly installed correctly. responsibility of the developer to locate and identify utility facilities or items that may be in conflict with the proposed construction activity. VOOT approval of these plans does not indemnify the developer from this �� a > o Before a permanent meter is installed: responsibility, � �� �' a �n �; E 0 a E EXISTING SANITARY SEWER - .: z h° a) The meter box, with its frame and cover, must properly aligned with the coppersetter. SITE00 b) The frame and cover shall be set to final grade, V5. Design features relating to field construction, regulations, and control or safety of traffic may subject to change as deemed necessary by VDOT. Any additional expense incurred as a result of any field revision shallJ SCALE 1 "= 2000' o .� o EXISTING ELECTRIC SERVICE -- '_ ---- --" r - --------- ::_ - -- - c) The distance between the top of the cover and the coppersetter shall be between 18" and 21 ", be the responsibility of the developer, r .__ PROJECT INFORMA TI N EXISTING GAS LINE -" -- --- --- r,;,:;, < _-.-_..___....._.. r; , <, d) All components of the meter box assembly shall be in proper working order. 9. For water and sewer services that canned to existing lines: V6. Prior to initiation of work, the contractor' shall be responsible for acquiring all necessary VOOT land use permits for any work on VOOT right-of-way, EXISTING STORM SEWER --- "_.. _ _-_X._-_ ` _ - `^rp ____ . _ _..__ - --- a) The location of the service lateral is to be coordinated with the Authority's Engineering Assistant. Owner Developer Contractor b) An Application for Service must be made and fees paid before work will begin, V% If required by the local VDOT Residency Office, a pre -construction conference shall be arranged and held by Ralph S. Gregory Carnew One, LLC Commonwealth Design &Build EXISTING FENCE LINE -----__._-.__.__._ __........__-_ _.. c) The Authority shall furnish and install 5/8'; 314 ", and 1 " water services, the engineer and/or developer with the attendance of the contractor, various County agencies, utility companies P.O. Box 520 212 Little Pond Lane 180-9 Prosperity Drive EXISTING DITCH LINE -- ~" -- --- ---- - ---- -- - -- �� ,� d) For all 1 /z and 2 water services, the Authority shall make the tap and bring the piping to the and VOOT prior to initiation of work, Stephens City, VA 22655 Winchester, VA 22603 Winchester, VA 22602 - property line. The contractor shall furnish and install the meter vault assembly. The Authority will V8. The contractor shall notify the local VDOT Residency Office when work is to begin or cease for any undetermined Phone - (540) 869-3500 Phone - (540) 667-9708 (540) 869-0308 EXISTING WATERLINE W/ TEE x,. ,. ,n. N,,, a,. K,• w.~. w ,m.:..H install the meter. e) The Authority will install all sewer laterals. length of time. VDOT requires 48 hours advance notice prior to any required or requested Inspection, Contact: Kathleen Diamond Contact: Ben Montgomery EXISTING FIRE HYDRANT EX. Fr tr,Yn. 10, Any water service line must have a backflow assembly (double check valve or RPZ, as required). The assembly V9, The contractor shall be responsible for maintaining adequate access to the project from the adjacent public roadway via a construction entrance that Is constructed and ,maintained in accordance with Section 3.02 of the Property Data Building Setbacks Per Code Proposed ® U Q _ . _,., _..W EXISTING WATER VALVE a -" must meet ASSE Standard No, 1015 or 1013, Virginia Erosion &Sediment Control Handbook. Furthermore access to other properties affected b this project Tax Ma Number 75- 3 -18 Front: 35' 36,0' .. EXISTING REDUCER - _ .•.2 ,F m - 11. A// fire lines shall have a fire service meter assembly and a backflow prevention assembly (detector double shall be maintained through construction, The Developer shall have, within the limits of the project, an employee certified by the Virginia Department of Conservation and Recreation (VOCR) in Erosion and Sediment Control who Address Sulky Drive Left Side: 0' 13, 0' Area 0,804 acres Right Side: 0 3,0 C N o "No o check valve or a RPZ, as required). The assembly shall meet ASSE Standard No, 1048 or 1047. Radio read shall inspect erosion and siltation control devices and measures on a continuous basis for proper installation and Zoning B-2 Rear (I-81): 50' 50, 6' �, EXISTING TREE DRIP LINE , _: � r.-_._.��_>__-.w.,�._.r..._�..�_._:,._..__,._-,•_.,....., V " 1 remotes are required, operation. Deficiencies shall be promptly rectified. Legal References DB 913, PG 1429 ® (n PROPOSED FEATURES V10. Contractor shall ensure adequate drainage Is achieved and maintained on the site during and at the end of construction, Existing Use Vacant Parking Setbacks Per Code Proposed Proposed Use General Office Front: 5' 27.0' Left Side: 5' 5.0' C ® o 0 U GENERAL NOTE V11. All water and sewer lines within existing or proposed VDOT right -of- shall have a minimum thirty-six (36) .S0' Zoning Data Right Side: 5' Rear: 5' � 't3 `� C PROPOSED EDGE OF PAVEMENT PROP EP 1. Permits must be issued from VDOT prior to any construction in a public right-of-way. inches cover and when possible shall be installed under roadway drainage facilities at conflict points, o Open Space Minimum 1 S /o = 5,251 sf ® M a PROPOSED EDGE OF GRAVEL PROP EG 2. The Manual on Uniform Traffic Control Devices (MUTCD) must be adhered to when working in a public right of way, V12. Any unusual subsurface conditions (e.g,, unsuitable soils, springs, sinkholes, voids, caves, etc. encountered ) during the course of construction shall be immediately brought to the attention of the engineer and VDOT, Work Open Space Proposed 34% = 11 937 sf F A. R. Maximum 110 i C M C o ° ; N N 3. The contractor will remove all mud and debris from the public right of way that is left by vehicles entering shall cease in that vicinity until an adequate design can be determined by the engineer and approved by VOOT, F.A,R, Proposed 0,25 Use For Parking Unit Space per Sq. Ft na PROP, CURB & GUTTER PROP CG-6 and leaving the site. Building Data Pr, General Office: 8,650 1 per 250 sf ,a PROP, REVERSE CURB & GUTTER 4. Any damage to neighboring properties including county roads and sidewalks, caused by the development of be developer. All damage be V13 top flat cement and fill. Whereborrow / CBR testing and cis requiredt areas ala VOOl be T representatived and e shall broved e resent to VOOT representative theJve prior Type of Construction Both are 2C - Meta! Loading Space: 8,650 1 per 30,000 sf � �. PROP CG-6R this site will the responsibility of the must repaired to original conditions. sample obtained is representative of thlocation. When soil samples are submitted to private laboratories for Proposed Use General Office & Computer 5, be installed in the testing, the samples shall be clearly identified and labeled as belonging to a project to be accepted by VDOT and Back Up Room 35 C v PROPOSED CONTOUR 50 A construction entrance must accordance with Virginia Erosion and Sediment Control Handbook" Section 3.02. The contractor must maintain this access for the duration of the that testingshall be performed in accordance with all applicable VDOT standards and procedures. p pp p Proposed Area 8 650 sf total Total Parking Spaces Required p Proposed Parkin Spaces 35 ° au J o S t� project. P J Height Maximum 35 feet p 9 P PROPOSED SPOT ELEVATION +50� 6. The contractor will be responsible for adequate and positive drainage of this site. V14, All roadway fill, base, subgrade material, and backfill in utility/storm sewer trenches shall be compacted in six (6) inch lifts to 9596 of theoretical maximum densityas determined b AASHTO T-99 Method A, within plus or minus Y P Height Proposed 28 feet # of Handicap Spaces Required 2 PROPOSED STORM SEWER PROP. 24 " ADS 7. The contractor will obtain a Land Disturbance Permit prior to any site work or construction. 2% of optimum moisture for the full width of any dedicated street right-of-way. At the direction of VDOT, density tests shall be performed by a qualified independent agency in accordance with VDOT Road and Bridge Proposed Handicap Spaces 2 Sign Date �� PROPOSED SANITARY SEWER S S S 8. All construction will be done following the laws and guidelines set forth by OSHA and VOSH. 9. The contractor will notify engineer of record of any discrepancies between the Specifications, Certified copies of a// test reports shall be submitted to VOOT daily, unless specified otherwise. V15. VOOT Standard CD # of Loading Spaces Required 1_- Sign Area Allowed 100 sf Pr. Loading Spaces 1 Sign Area Proposed 100 sf - TM`��► =" i " PROPOSED TELEPHONE --- T -- T T -- approved plans and existing site and UD underdrains shall be installed where indicated on these plans and/or as specified by PROPOSED ELECTRIC conditions. VDOT, Sign Height Allowed 35 feet 10. The developer is responsible for the relocation of any utilities required by this site plan. V16. The installation of any entrances and mailboxes within any dedicated street right-of-way shall meet VDOT Sign Height Proposed 35 feet !. PROPOSED GAS LINE minimum design standards and is the responsibility of the developer, 0! 11. All Erosion and Sediment Control devices shown on this site plan shall be Installed prior to construction. PROPOSED WATER LINE „ 12. All controlled fill must be compacted to a minimum of o density fallowing Method A of the Standard V17. Prior to VDOT acceptance of any streets, al/ required street signage and/or pavement markings shall be installed by the developer or, at VOOT's discretion, by VOOT on an account receivable basis following the Manual On Gont ct Numb ber ,./ S /S n gn ture5 h. PROPOSED WATER METER � 1 WM ble. Proctor ASTM-D698, AASHTO-T99, or VTM-1 as applicable. Any fill placed under buildings, structures, or be inspected by A Uniform Traffic Control Devices. Z Uj PROPOSED FIRE HYDRANT D& PROP. FH pavement must and approved a professional soils engineer. geotechnical report supersedes this note if provided. V18. The developer must provide to the VOOT Residency Office a list of all material sources prior to the start of construction. Copies invoices for Engineering Firm: H OF q 13. The contractor is responsible for contacting MISS UTILITY prior to any site work. Alf utilities shown on this plan are approximate locations and not all utilities may be shown. of all materials utilized within an dedicated street right-of-way must be provided to the local VDOT Residency Office prior to acceptance of that work. Unit and total prices may be obscure Montgomery &Associates (540) 869-0308 Surveying Firm: PLTH ��� �J� ��ti Lf� C� C� Q „� COMMON LABELS & FEATURES 14, The contractor will contain all litter and debris on -site, The work must be left In an orderly manner at the end V19. Aggregate base and subbase materials shall be placed on subgrade by means of a mechanical spreader. Density Inc.. GreyWolfe 540) 545-7823 Zoning Enforcement: �p 3 2 BE NJAMIN C. y U! of each workday. will be determined using the density control strip in accordance with Section 304 of the VDOT Road and Bridge Department of Planning (540) 665-5651 u GAR K. 0 M 0 NTG 0 M E RY t Q �.. PROPERTY LINE OF PROJECT 15, An be -site during the Specifications and VTM-10. A certified compaction technician shall perform these tests, Certified copies of test reports shall be submitted to VDOT daily, unless specified otherwise. In addition to checking stone depths, a Site Inspections: No. 030342 No. 1518-� U 4 U ,Q NEIGHBORING PROPERTY LINES approved set of site plans must on construction process. VDOT representative shall be notified and given the opportunity to be present during the construction and testing Department of Inspections p (540) 665-5650 O,� _� �21d M O LINE 16, The contractor will notify all utility companies prior to excavation within easements. of the density control strip. Erosion and Sediment Control: Department of Public Works (540) 665-5643 FSS ��,ti �,9� ypQ- -fONA L C D S U Rv CC U,W C)EASEMENT U PROPERTY CORNER FOUND Q 17, The contractor will seed and straw, for soil stabilization, any disturbed areas that will be left for more than thirty days, V20. Asphalt concrete pavement shall be placed in accordance with Section 315 of the VOOT Road and Bridge Sanitary Sewer and Water: Specifications. Density shall be determined using the density control strip as specified in Section 315 and VTM-76, A Fred. Co. Sanitation Authority (540) 869-1061 j ® Q (,4(3 PARKING SPACE TOTALS 12 certified compaction technician shall perform these tests. Certified copies of the test reports shall be submitted to VDOT daily, unless specified otherwise. A VDOT representative shall be notified and given the opportunity to be Telephone: Verizon (301) 954-6282 Electric: Alleghany Power (800) 654-3317 THESE PLANS ARE IN CONFORMANCE WITH COUNTY OF FREDERICK STANDARDS AND ORDINANCES, ANY DEVIATION W LC Q, O O O V ADA HANDICAP PARKING STALL DEPARTMENT OF INSPECTION GENERALNOTES present during the construction and testing of the control strip, Gas: Shenandoah Gas Co, (540) 869-1111 OR CHANGE IN THESE PLANS SHALL BE APPROVED BY THE V W L -° V21. In accordance with Section 302.03, the foundations for pipe culverts thirty-six (36) inches and larger shall be MISS UTILITY: 1-800-552-7001 ZONING ADMINISTRATOR PRIOR TO CONSTRUCTION, w 1s Ol,l%l �e%le%�l Notes SIGNS 1. Building(s) must comply with the Virginia Uniform Statewide Building Code Sections 304 (Business) and the International Building Code/2000. Other codes that apply are CABO All7.1-98 Accessibility the Usable Building & Facilities, explored below the bottom of the excavation to determine the type and condition of the foundation. The contractor shall report findings of foundation exploration to the engineer and VDOT for approval prior to placing Q u, Q � z LC (� SANITARY MANHOLE IDENTIFIER `✓ and 2. The requirements in BOCA mandate either a fire wall (Section 707) or a fire suppression system if height and area F g comply g , yielding, or pipe. Foundation designs shall com l with VDOT Road and Bridge Standard PB-1. Where soft otherwise unsuitable foundation Is encountered, the foundation design and/or need for foundation stabilization Q t4 STORM DRAIN STRUCTURE IDENTIFIER limitations are exceeded for the type of construction under Table 507 of BOCA. 3. A design professional licensed of the Commonwealth of Virginia shall seal the structural plans submitted for building Plans must show all ingress/egress locations to the exterior CABO 117.1-92 and meet requirements shag be determined by the engineer and approved by VDOT, V22. Approval of this plan shall expire three (3) years from the date of the approval letter. Maximum Environmental Existing Disturbance Proposed Features Acreage Allowed Disturbance 1. Exterior lighting will be provided by wall -pack lights attached to the building & lightpoles. 2. All lights be directed LIGHT POLES permits. per of Chapter 17 of BOCA, will shielded or to prevent on neighboring 4. Maximum slope across handicap parking stalls shall not exceed 2%. All required egress doors shall be accessible to a V23. VOOT Standard CG-12 Curb Ramps shall be installed where indicated on these plans and/or as specified by VDOT, Flood lain 0 acres 0% 0% p glare properties, 3, Outdoor trash receptacles will be in an enclosed LOCATION OF TEST PITS min, exterior area for assisted rescue, section 1003,2.13,7IBC, Note fire ratings around this door if this section is utiized 5. The 2000 International Building Code can be utilized for building design. V24, VDOT Standard Guardrail shall be installed where warranted and/or as proposed on these plans in accordance with Lakes & Ponds 0 acres 0% 0% Wetlands >1AC 0 acres 0% 0% six (6) foot fence. Q .,,J VOOT's installation criteria. Final a approval of guardrail layout to be given by VDOT after grading is mostly complete. 4. This project p � ct will not disturb any environmental Sinkholes 0 acres 0% 0% features as defined by the Frederick County C FIRE MARSHALLGENERAL NOTEST I T N A Natural S. W. 0 acres 10% 0% Retention Areas Zoning Ordinance. 5. The owner will be responsible for obtaining or EROSION & SEDIMENT CONTROL FEATURES Steep Slopes >50% 0 acres 25% 0% o 0 Woodlands 0 acres 25 /o D /o granting easements shown on this plan, 6. Easements will be recorded and copies sent to the w 1. An inspection b the Fire Marshall's office will determine where curbing must be painted yellow. p y g p Y INLET PROTECTION /P 2. "No Parking -Fire Lane" signs will be placed an the site by the Fire Marshall's direction, DATA TAKEN FROM THE L T. E. MANUAL 7th EDITION parties Involved. 7. All utilities that will service this site must be Z o > LU OUTLET PROTECTION 00 Op 3. The contractor must align the fire hydrants to the direction as determined by the Fire Marshall. 4. Burning brush piles of natural vegetation requires a permit, Burning construction debris is prohibited, , BUSINESS PARK (CLASS 770, 12. �� PER 1/ OOO Sf X �� 65O Sf = 110 4iPD s laced underground. pV} ►� z 5. Emergency vehicle access must be provided at all times. Fire hydrants will be always be left unobstructed. 1 � ®C �7�1�f APP OVALJ SP A V-04 W E CHECKDAM ®CD a RESPONSIBLE N DISTURBER UJ w DIVERSION DIKEloop PON.DD a w r W LO O SILT FENCE W/ WIRE SUPPORT NAME: CAPI TES LANDSSILT Frederick County Zoning Administrator : , 3 r° Date 0` ? FENCE W/O WIRE SUPPORT SF CERTIFICATION #o s�. a �' I �s 1, Miss Utility must be contacted prior to planting. Advise engineer of record of any conflicts in planting locations 1, Site Plan approval from VDOT will expire three (3) years frorMe* date of the approval letter. SEDIMENT TRAP ST EXP. DATE and utility markings. Landscaper must stake and guy all trees. Stake locations must avoid utilities. 2, Frederick County Zoning Administrator approval expires at five (5) years from the date of site plan approval. 2. Trees and shrubs shall be healthy and free of insect eggs, larvae, and disease. The plants shall have ample roots 3. The Frederick County Sanitation Authority approval is valid for two years from date of approval. If construction is DATE: DEC. 6 2004 1. The Responsible Land Disturber is that party responsible for carrying out the land disturbing activity as set forth in and be well branched The planter shall guarantee all plants for one year. not in progress at the end of this period, Authority approval shall be void. the plans. 4. The Frederick County Department of Public Works approval is not enough to begin site development. The SCALE: N/A CONSTRUCTION ENTRANCE CE 2. Note: An on -site pre -construction meeting is required with the Owner, Site Contractor, Public Works, & Designer 3. Landscaper shall use shredded mulch in all planting beds and around trees. Tags from each plant will be provided to the owner. owner/contractor must obtain a Land Disturbance Permit and agree to periodic inspections. shall be void. 5. The CountyDepartment FILE NO. 0144 prior to commencing any site work, Frederick of Inspections a g p g p p p approval does not constitute a building permit Building laps must be submitted and approved prior to constructing any structure. Furthermore, the site must meet all ADA 3. The contractor will possess a Land Disturbance Permit prior to any site work or construction, 4. Plant substitutions will be allowed with the approval of the owner and the Frederick County Planning Department. requirements and be approved by Inspections. SHEET 1 OF 3 trench vAdth 7 as required ,e , ' 6" dia. schedule 40 steel pipe filled %Yhh concrete 3. and painted yellow -3- . . . . . . 7' 2' (D 0 18"dia concrete encasement BOLLARD concrete thrust block DETAIL FIRE HYDRANT ASSEMBLY Figure 8 SDR 35 spigot SDR 35 spigot by by gasketed SDR 21 gasketed bell adapter bell bend (seenote) x 6" deep locator marker METER BOX and COVER METER SIZE METER BOX METER BOX COVER 5/8'k314" 013!4" 18 in. Dia. Non -Traffic M32C-PW Traffic A32HH 24 in. Dia. Non -Traffic MC-30 (Frame) WITH RML-1-T (Top Lid) Traffic MC-30 (Frame) WITH RML-12-T (Top Lid) Opposite Side 18%21 3"stone _ surrounding box meter box and cover lop 6" painted blue 1 coupling / (P 200 psi with SS inserts (PJX FIP) 014-44 at all connections with SS insert and MIP plastic plug Some Side COPPERSETTER meter size Opposite Side Some Side 5/8'k04" VBHC72-18WD-44-44-B4 VBHC82-IOWD-44-44-B4 3/4" VBHC72-18WD-44-44-B4 VBHC82-18WD-44-44-B4 VBHC74-15WD-44-44-54 - N/A - INSTALLATION NOTES: chanical joint 1. Exact location of meter box assembly to be approved priorto installation. veI tee vAth 2. Water service crossing street: Na rich at Encase in 3" diameter SCH40 PVC or SDR21 pipe, The piping shall win from one foot beyond sidewalkacross the street,to one foot beyond sidewalk stop; wire to be taped to top of PET at 10 foot intervals: come up into meter box and terminate level with angle ball valve). l b� Install 12 gauge insulated copper vAre (for line tracing) from corp. stop to into the meter box [virapvAre around corp. 5/8-X3/411, 3/4' & I- METER INSTALLATION (4 FOOT COVER) Figure 5 2- - \_SDR 21gasketed SDR 35 8.`x4" pipe and fittings ' gasketed bell Viye S CH 40 solvent weld cap (see note) J propert y line tocaflon marker mi n. cover stone treated 2x 4" with top 6" painted green 4" pipe at 2.00% minimum grade Note: 11 top of main is greater than 15 ft deep use heavy wall SDR 35 concrete cradle it top ofmain ,s greater than 15'deep GRAVITY SEWER SERVICE LATERAL Figure 14 VALCO, Inc Fig. No. 71 BOB with lid marked 'SEWER bottom section - of box I SDR 35 gasketed bell wye (see sanitary note) Sevier main SDR 21 cast iron cleanoul rap vAth brass plug must be 8' from the top of the screw type adjustable box square concrete Skid pad - 2ON2ON6'deep cast iron cleanoull cap vAth brass plug having a countersunk square head Panella Model PA4SV-CSK (41 SDR 21 cleanout pipe brick base SDR 35 spigot by SDR 21 gasketed `bell adap ter SDR 35 gasketed bell 45' bend 6" stone bedding NOTE: �f top of Saw r main is greater than 15'deep, hen viye and bend to be heavy. wall SDR35. SEWER CLEANOUT Figure 16 R7-8 HANDICAP PARKING S1G`f",k_ (12- X 18) RESERVED PARKING INTERNATIONAL SYMBOL OF ACCESSIBILITY IF REQUIRED VAN ACCESSIBLE MAY BE PLACED ON ONE BLANK ADJUSTING THE REQUIRED HEIGHT TO ACCOMMODATE THE ADDITIONAL LINES zll REQUIRED PENALTY $100-500 EFFECTIVE 'IUL Y 1, 1998 TOW —AWAY ZONE PARKING SURFACE CO =7' NCRETE WHEEL STOP (IF REQUIRED) HANDICAP PARKING SIGN DETAIL (NOT TO SCALE) cz CIL C) oc c ILI- Q) Q_ ��:z (Z) I di LIJ (,) — n CO U 7 10.8, 12" OF 218 2'- 12.0, 7 "(CG - 6)— TA PER PROFILE ct C) 61 U U) % N 54*4 0'11 W 264.54' ;J12, 50.6' 600 5f 32J1 COMPUTER ROOM FF= 732. JJ' J0, 75 - 114 'ORY RALPH S. GRE6 �,o DB 913, PC 1429 ZONED: LR -2 75-((,3))- 17 USE VACAlVT RALPH S. GREGORY D8 91,3, PC 1429 ZONED: B-2 USE- VACANT INSTALL nRE HYDRANT AT THE END OF EXISTING LINE ' �111 10h I HYDRANT MUST RE AT LEAST "PAVEMENT J' FROM EDGES 728 LIGHTPOL E Ffi. FX 8 011L WV i Jr 1. to s. 28' '29P 28 J r7, 7' "141 /8 WA 4 9 -730- �251R 1 1� N L - R .5 "'i: J4 Q- g :::] I / T 12'x 5) L in ace 00 i i . I Rry I C) C te) -0 10v Q t 75 ((3)) - 9A qUw;', TER f'AD i a gcj� pc It 1i 1 FTFRIVIS OF FORGEIN WARS it VL- INST J 020010462 j22 1 81 JIS 8'. 5 ZONED: B­2 12'R 5R f J2 -mc 9 USE: VACANT 2.5ff -732- �5 2t 32-5 -Z I ; PROPOSED ENTPRANCES SHOWN n , R. 7,50.'88' J21 A - 4 32 281! IN V )M:47 I 9� 5,' 2 IF PER APPROVED ITE PLAN BY 4 7, .0i Si "r,1 33,1 719.4 TRIAD ENCINEERIN6 I jj�o 7,51 J21 J APR/t 21, 200J, TITLED ITB0C HIGH C.0 ! \ I Q� "VETERANS OF FOPC-EIN 1111ARS" j\ I SF IN AREA. SIGN 100 12� kc� 36.0' JJJ 8,050 5f + GENERA L OFFICE USE- J2-7, WALLPACK LIGHTS (�YPICAL) FF= 7JJ. JJ 1i I % TYPE i8­,CONSTRUCTION, USE B 20'R 4 Q) TAP By FC9 k11- 39S 2 'R Q) 32J is 4, 2 0 5 0 20' 0, 20' ;C/10 -7J2 21P 200 JV \,J2 GRAPHIC SCALE "'s ., 0 S --o's S S S S S I+ J4 .1h J9.9 J7-0 J6-0,11 1 54'40'11 E 27J.4J"', i8o' WALL 75 - ((J)) - 14 75 - ((3))-20 __CORV - CH,u�, RALPH S. GRE, FnLOPYSHIP '018LE w, A DR 9 15, PC 1429 'DF, 955, PC 528 3-2 L ZONED: 13-2 USE VACANT USE: VACANT f IV o n acee J2 n 5' MIN. 12:1 12:1 3' MIN. CG- 6 CG - 6 NO TES: H/C SPA 1. CES CES MAY NOT EXCEED A 29 SLOPE, 2. RAMP BUILT TO VDOT CG- 12 STANDARDS. J WHITE STRIPING SHOULD BE J" 011DE, 4. HIC SIGNS TO BE SET J' BEHIND SIDEWALK OR I MOUNTED TO BUILDING IF POSSIBLE t7), Q- L0 cr N Li- Q) CI_ (Z) CQQ Q) Q) G 7 1 U,7_T 10.8, 130.0, 35. 0' @ 25o ENTRANCE PROFILE 4' ARM 400 WATT LIGHT 20' POLE MINIMUM SPACING 3f-Orl PA VEMEN (CG-6) CURBING TYPICAL INSTALLATION OF LIGHTPOLES BEHIND CURB & GUTTER Lighting General Notes: 1. Proposed Lights for this project are Hubbell RCSA-400ST (400 Watt) Lights or equivalent, 2. Lighting must be installed so as not to produce glare onto neighbors and roadway, v. X-SrREET iVPROACn ENJE _URVArNG AS 'JAWLIRF 'CAYLS'?GrLWAY SHaW,11 ell PLPtjFkL k 0 C MACkIr 10 S1CAVN 01; PLAIIS) cii"S"i-C , /,�� rs,!, `,Y", . "' AL,�\. SUEVA.K A. O-TION 4 ,;1 , ;11 1 rXPIWSION :41T .m 1 —1 -cil J k'Dlr,)Yl TH "iT" ­-0' OP A. _111= ZrVROADWAY SHORN ai TYPICAL SEC1101J. SECI�ION C-C. FLAR 'VIEW 0 CONSTRUCT ONO- CHANGES WI -IF; A PAPX-:01 IC MIL14 THE 04TRA-111Z RM111-INKOT A=W-IDDAIL 7H. F E TURI14 I R..CAJPFW3ITS OF ANTI CIPAIM NFRil' PPRACCUC ZU5'/F rpwl< HE DE�B PTH FOR S :W&K U CU RQtriS 4'�AN IqL LAMS Of fit: IDMID-15HCU40 D: COGE 0- SHOUDEq 101M, CL, NCR-ALSEO T3 7'_ Op, , ff)�KL �LGW LRILOR LO :z i -------- D F "E�J US-0 FDR EP11141-1-.C�S Kill.r P('A3WAJ III C014'6�CT04 %1711 Qf)tl.7 ripm.-ers, kCA-,r Slit �- ukx� D FOIE T•IE FOLLUM",V: UVE CH91JCL 10- 1,11J. FOR S I PE I TO TIC ?,'w UW DXL, AN ( 2W. 'RADL AF;G7ATlCtl,RFMIR-0 FOR NIAN11,F. - FAf; I HCH GAI 8MUti F TIE . "VI --UTR/44t V) 40r.31 SFCT!3I,I A - A 1uVDPL CLI13 OR CCE01111VTO11 Alit., CUTTFR SHAD kOT RE ZMLS'IRWIT"D GUID_-04ES i tit? GRADE C;IA`IGL 1) 8ENF xCE.- Fu.--f _ F7END [H� PfW LPIL F1 JC51il:fr PA-CS-S. 610,1 U30 N C*lkLr4C,iMl Willi GfMD", rG-j OR CC-7 THE ENlF.PPKL VOLINE E CL,P.3 FA:,E,CM THS S'PrIUA-L) PVJUS,!X 0 WATC1 t-E ItOJ1,17ABLE CUFU C^NrIGLP4:1.!ON. HIGH (HORE 'i'A't 1500 VPD) 0 1., 3 9: SE. F, rdl.7Mo rr.-*-2 FQ9 CURB 4AMDEVCN VI-Mi 7'1S t.ow V.r15 Ti'M 5CO "pD) S V X pL;NqS gR.L 101CIICA'E W-Pe CON51RUCIKA, OF A r. MV 114 ,,3r�v RCUPFn -o nu roqTwr CR ^Jy�,ZE r4QSS THE 6jTP1krL 0 110�'i FLOWUP: MAT W.QIJR= WARPri- Or a PCF.KPI OF GUI-R. 70 F"LGLUJL KJQ1,40 O^ W1,rEJ1.1 -------eMEnGE -- M-7�'OD OF TREATbIENT- ­)NNEC]101v Foli�� , 1r1­F,P1S11,✓ C I L HGPlt. X�X`I7'41%11T OFI v 3-.D4 TREAT WOODEN PANELS WITH WATER SEALANT Stormwater Management Note This site is served by an approved and installed9 regional stormwater management pond located at the southern end of the park. 2" OF SM-2A 6" OF 21-B COMPACTED TO 9573 DENSITY SUBGRADE FREE OF ORGANICS & COMPACTED TO 95% DENSITY TYPICAL PAVEMENT SECTION DIRECTLY UNDER THE PARKING SPACES 1.5" OF SM-2A J" OF BM-2 8" OF 21-8 COMPACTED TO 95Z DENSITY SUBGRADE FREE OF ORGANICS & COMPACTED TO 957. DENSITY TYPICAL PAVEMENT SECTION UNDER ENTRANCE DRIVE AISLES AND TYPICAL 6' TALL BY 8' WIDE DOG-EARED FENCE PANEL. INSTALL ON 4X4"X8' TREATED POSTS SET ' DUMPSTL_kMCE DETAIL N. TS, 2 INSTALL GATES ONTO 6X6" POSTS INSTALL OPAQUE FENCE AROUND THE REST OF THE DUMPSTER TO UU NN U) W% 0 Q O MOM j C: U 'g :3 Q) -0 C: O fog 4 rZ _Q) , , LOADING AREAS PROVIDE SCREENING TREAT WOODEN PANEL GATES WITH WATER SEALANT LU > 1 4 OF 3000 PSI CONCRETE W1 DETAIL DUMPSTER GA TE UJ cl� FIBER N. T S. 4" OF 21-8 COMPACTED TO 1%,' DENSITYLU 95 SUBGRADE FREE OF ORGANICS LU CL %>Ig Is and, natures & COMPACTED TO 95% DENSITY I I1111111 HOP NTH OF TYPICAL SIDEWALK SECTION LU BENJAMIN C. U U) Lr) R R. Tff CD MONTGOMERY No. 030342 zZ/ No. 1518-B 8" OF JOOO PSI CONCRETE W1 WOVEN WIRE REINFORCEMENT 10N \j � 8 OF 21 -B COMPACTED TO A U P, DATE: DEC. 6,2004 95.7, DENSITY SUBGRADE FREE OF ORGANICS THESE PLANS ARE IN CONFORMANCE WITH COUNTY OF SCALE: 1" = 20' FILE NO. 0144 & COMPACTED TO 95% DENSITY FREDERICK STANDARDS AND ORDINANCES. ANY DEVIATION OR CHANGE IN THESE PLANS SHALL BE APPROVED BY THE SHEET 2 OF 3 TYPICAL DUMPSTER SECTION ZONING ADMINISTRATOR PRIOR TO CONSTRUCTION. Lb � P, V, , L Op TY EROSION & SEDIMENT CONTROL STANDARDS E & S CONTROL NARRATIVE 1, Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is Project Description II �; 1 �7 �'� I i SILT FENCE WITH WIRE SUPPORT reached on any portion of the site. Temporary so# stabilization shall be applied within seven days to denuded areas ` \ `,• ..r ys :a r t µ • 3 -" „ j that may not be at final grade but will remain dormant for longer than 30 days, Permanent stabilization shall be This site is located in the Battlefield Business Park on the east I i applied to areas that are to be left dormant for more than one year, side of Sulky Drive. The purpose of this development for the 0 construction of 8,650 sq. ft, of buildings to be used for offices } 2. During construction of the project, soil stockpiles and borrow areas shall be stabilized or protected with sediment and computers. This development also has parking and drive # I �` - ^ s * ` : '` i i trapping measures. The applicant is responsible for the temporary protection and permanent stabilization of all soil p p p g aisles for access, I a stockpiles on site as well as borrow areas and soil intentionally transported from the project site. i I 4 k I i Existing Site Conditions i 3. A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieved that is uniform, mature enough to ' x survive and will inhibit erosion. The lot is a vacant field. The ground cover is grass with some 4. Sediment basins and traps, brush along the eastern side. � `�• � x • ` i p , perimeter dikes, sediment barriers and other measures intended to trap sediment shall �( 1 ' I ? c�LLL_L_ be constructed as a first step in any land -disturbing activity and shall be made functional before upstream land Adjacent Parcels disturbance takes place. .� . , `' ` CE The adjacent parcels are a vacant lot like this one. ' I 5, Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after F r I f installation. SOUS ! •, '� \ !Ilk `` ,, �• A°�,, � ' '; 6,Sediment traps and sediment basins shall be designed and constructed based upon the total drainage area to be served b the trap or basin. The soils types determined from the USDA's Soils Survey of Y p Frederick County, VA"shows Carbo-Oaklet rocky silt loams a. The minimum storage capacity of a sediment trap shall be 134 cubic yards per acre of drainage area and the trap classified as #6C. This soil is predominately yellowish brown silt shall only control drainage areas less than three acres, loams over bedrock and offers 'severe' erosion hazards. Topsoil j >~' , • ' < ® ••� : d ' ` '®• •' ' ," ' ,•® "! �'';° '` ' t + ; i on this site appears to be 9" thick with rock outcroppings. b,Surface runoff from disturbed areas that is comprised of flow from drainage areas greater than ore ual to three acres shall be controlled b a sediment basin. The minimum storage capacity of a sediment basin shall be 134 cubic y g p �' Erosion Control Program yards per acre of drainage area. The outfall system shall, at a minimum, maintain the structural integrity of the basin during a twenty-five year storm of 24-hour duration. Runoff coefficients used in runoff calculations shall correspond to a bare earth condition or those conditions expected to exist while the sediment basin is utilized. •Install construction entrance with wash rack k 1 ® Install wire supported silt fence 7.Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to s Install culverts outlet protection \ A" •� ( 1 ' ' be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing . Grade site and seed all exposed surfaces immediately upon \ I I 1 • A' I measures until the problem is corrected, reaching final grade �• \ ` t } & I ' I ' I 8. Concentrated runoff shall not flow down curt or fill slopes unless contained within an adequate temporary or General Erosion and Sediment Control Notes (VESH Table 6-1) ! permanent channel, flume or slope drain structure. € ! ES-1. Unless otherwise indicated, all vegetative and structural ` ,, Fo/ 9, Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. , k 1 ,< as ;,-� TEf�/ f erosion and sediment control practices will be constructed and , c,s/ �F 10. All storm sewer inlets that are made operable durin construction shall be protected so that sediment -laden water maintained according to minimum standards and specifications of I t/0 ` E 0 5 ' cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment, the Virginia Erosion and Sediment Control Handbook and Virginia I \..._ F --- / S gib 1 ! > > 1 CO s `. s-s-s--s-s�C0' s-s-s W s-s-s s Regulations 4VAC50-30 Erosion and Sediment Control Regulations. \ / C/o 11.Before newly constructed stormwater conveyance channels or pipes are made operations,, adequate outlet protection I t 06 1 ; i and any required temporary or permanent channel lining shall be installed in both the conveyance channel and ES-2. The plan approving authority must be notified one week receiving channel. prior to the pre -construction conference, one week prior to the commencement of land disturbing activity, and one week prior to 12. When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control g yr p the final inspection. \, � �:., `'� `•`' sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerodible material p shall be used for the construction of causeways and cofferdams, Earthen fill may be used for these structures if armored by nonerodible cover materials. ES-3. All erosion and sediment control measures are to be placed All plantings will conform with Section 165-36B of prior to or as the first step in clearing, the Frederick County Zoning Ordinance, Planting PROPOSED PLANTINGS 13. When a live watercourse must be crossed by construction vehicles more than twice in any six-month period, a Selection, Planting Procedure, and Maintenance. 20` D° 20' temporary vehicular stream crossing constructed of nonerodible material shall be provided, ES-4. A copy of the approved erosion and sediment control plan 14, All applicable federal, state and local regulations pertaining to working in or crossing live watercourses shall be met, shall be maintained an the site at all times. HEDGE -BOXWOOD - (28) PROPOSED FOR GRAPHIC SCALE Parking Lot other Prior to commencing land disturbing activities in areas Landscaping Data HEADLIGHT SCREENING - (3 GALLON CONTAINER) 15. The bed and banks of a water course shall be stabilized immediately after work in the watercourse is completed, o other than indicated on these plans (including, but limited to, Per Code Proposed 16. Underground utility lines shall be installed in accordance with the following standards in addition to other applicable off -site borrow or waste areas), the contractor shall submit a 1 Tree per 10 spaces 3.5 4 y criteria: supplementary erosion control plan to the owner for review and (39 spaces) TREE - PIN OAK 8/OR RED MAPLE -16 PROPOSED approval by the plan approving authority. OTHER DECIDUOUS SPECIES MA Y BE SUBSTITUTED a. No more than 500 linear feet of trench may be opened at one time. Total Impervious Area 1 per 2000 sf 12 WITHAPPROVAL OFFRED. CO, DEPT: OFPLANNING ES-6, The contractor is responsible for installation of any 23,085 sf 11.5 MINIMUM - 2" CALIPER b. Excavated material shall be placed on the uphJ// side of trenches. additional erosion control measures necessary to prevent erosion and sedimentation as determined by the plan approving authority, Percentage of Green 5% 6, 6% c. Effluent from dewatering operations shall be filtered or passed through an approved sediment trapping device, or Area In Parking Lot 721 sf 955 both, and discharged in a manner that does not adversely affect flowing streams or off -site property. 14,435 sf ES-7. All disturbed areas are to drained to approved sediment d. Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote control measures at all times during land disturbing activities and stabilization• during site development until final stabilization is achieved. INLET PROTECTION NOTE' e, Restabilization shall be accomplished in accordance with these regulations. ES-8. During dewatering operations, water will be pumped into SILT FENCE USED AS INLET PROTECTION f,Applicable safety regulations shall be complied with. an approved filtering device. IS NOTALLOWED IN FREDERICK COUNTY, inspect all erosion control measures The contractor shall inspsures 17. Where construction vehicle access routes intersect paved or public roads, provisions shall be made to minimize the ES-9. CONTRACTOR MUST INSTALL THE transport of sediment by vehicular tracking onto the paved surface. Where sediment is transported onto a paved or periodically and after each runoff -producing rainfall event, Any public road surface, the road surface shall be cleaned thoroughly at the end of each day. Sediment shall be removed necessary repairs or cleanup to maintain the effectiveness of the OPTIONAL ,STONE ARC AS SHOWN. WN. from the roads by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be erosion control devices shall be made immediately, allowed only after sediment is removed in this manner. This provision shall apply to individual development lots as well CONSTRUCTION OF A SILT FENCE as to larger land -disturbing activities. Frederick County Note: (WITH WIRE SUPPORT) The Public Works and Engineering Department will retain the 18.All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or right to add to or modify these erosion and sediment control after the temporary measures are no longer needed, unless otherwise authorized by the local program authority, 1. SET POSTS AND EXCAVATE A 4"X4" 2. STAPLE WIRE FENCING TO THE POSTS. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be measures during the construction process, within reason, to TRENCH UPSLOPE ALONG THE LINE permanently stabilized to prevent further erosion and sedimentation, ensure adequate protection to the public and environment, OF POSTS, 19. Properties and waterways downstream from development sites shall be protected from sediment deposition, erosion and damage due to increases in volume, velocity and peak flow rate of stormwater runoff for the stated frequency storm of 24-hour duration in accordance with the following standards and criteria: �- Prune out any dead or broken broaches, remove all tags, labels, strings, S, TONE CONSTRUCTION ENTRANCE / �- �-� _ ��►� wires, etc. from plan, 2-3" mulch Prune codominont leaders ~" '- DO NOT prune terminal leader or branch tips ru MtN STING PAVEMENT A 3 Set top of root boll / - 2-3" Saucer 3 equal to or 1-2" Prune rubbing or above grade. cross branches` FILTER CLOTH 6' MIN A MOUNTABLE BERM I.<t�'. Remove container, use SIDE ELEVATION FLOW -I (,1 I r;. ' " " sharp blade to make Prune narrow crotch EXISTING GROUND four 1/4 "-1 " cuts the angles &water spouts I: ;.,•.;.: ': '; .r ,, .: th of boll and cut a leng70' MIN• f 4" X on bottom of :.:'s{.. i..�.:.. ball; loosen compacted -Prune broken branches B Su NSN 3. ATTACH THE FILTER FABRIC TO THE WIRE roots. Remove tags and labels (OPTIONAL) �_ FENCE AND EXTEND IT INTO THE TRENCH. CONTAINER GROWN SHRUB Prune suckers " 10' MtN. Cut away all balling ropes % IL- MIN,�- PAVEMENT Prune out any dead 2"=3" mulch kept for broken branches. Remove to of wire basket away from trunk - Remove all tags, labels, p strings, wires, etc. from Soil well to VDOT 81 I �� POSITIVE DRAINAGE 10' MIN. plant, contain water COURSE AGGREGATE B TO SEDIMENT TRAPPING DEVICE i�f 'k•: ;',, �, `.�.' � ;.'ri:.•' ,a1,:.`';'��:' � MUST EXTEND FULL WIDTH }. . F INGRESS RE 0 G (SS AND EGRESS 2-3" mulch OPERATION PLAN VIEW ll 2-3" Saucer Set top of root boll •• •a, •..,. ) Bockfill soil II equal to or 1-2" < 12' MIN. above grade. • Partially bockfill, water to settle 3' MIN. I {„ Widen and sore 1lyt� 7 soil, finish holes in w01! % 3' MIN. /" FLOW ='i ::' SS c'• bockfilling - -goo- Remove `. rope & burlap 7 „ FILTER CLOTH root ball. a,,.:. '' Area for water _ iII Dig hole 2-3 times width of root boll. BALL & BURLAP SHRUB SHRUB PLANTING DETAIL (NOT TO SCALE) Aernove con olner an:-..� y circling roots if or tile could 6'-7- coni!67er-grown, or as be installed) much bunoo as po,mble if Leave solid soil pedestal do not Aeld-grown dig deeper than boll depth Dig hole 2-3 times root boll width TREE PLANTING DETAIL REINFORCED CONCRETEDRAIN SECTION B-B TO �. r ADAM .. +sru eie:!sw atir,t ±:�+ .: > sn via 1:71 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. EXTENSION OF FABRIC AND WIRE INTO THE TRENCH. SOURCE: Adapted from Installation of Straw and Fabric Filter Barriers for Sediment Control, Sherwood & wyont SILT FENCE CULVERT INLET PROTECTION DISTANCE IS 6' MINIMUM IF FLOW IS TOWARD EMBANKMENT FLOW 9IC OPTIONAL STONE COMBINATION TION 1.0, 7.5' �i• FLOW 2.5' `VDOT #3, #357, #5, #56 OR #57 COARSE AGGREGATE `-CLASS I RIPRAP TO REPLACE SILT FENCE IN ' HORSESHOE " WHEN HIGH VELOCITY OF FLOW IS EXPECTED PLATE.3.05-1 SOURCE: ADAPTED from VDOT Standard Sheets and Va. DSWC O LL Q 00 C0 o c0 m o LU OD w ZZ � o 0 0 U c rn ®� N N 0 R� 0 N % N > G O 00 a) E d. a) U C Ua o o OD ­ 1 C T ■ j.0) O � C N O ® l :3 C OCO U o 0 ' C � M o C �Q@r S' AM OL {n w n 0 i CZ) W PIPE OUTLET CONDITIONS U W A � W A 3da {h m) UJ O d I ® O UQw QZ� F`ti PIPE OUTLET TO WELL � Q 0 DEFINED CHANNEL O 4 L 1 Pv Q PLAN VIEW Z W LV 5 -La a �`4' tW-.j d QI �® Q� SECTION A -A FILTER CLOTR Jffi'Y M 6'-8": R9C01tNBNDLD AY1R ENTIRd PSRLY6T%R NOTES- 1. APRON LINING MAY BE RIPRAP, GROUTED RIPRAP, GABION O Q Uj W BASKET, OR CONCRETE. '''o KK ®`±. W 2. La IS THE LENGTH OF THE RIPRAP APRON AS CALCULATED W USING PLATES 8.18-3 AND 8.18-4. O (3 a U1 3. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER, BUT NOT K ^ ��, LESS TH" 8 INCHES. W CIE Source: Vm DSWC Plate 3.18-1 0 Seeding Schedule (per section 3.32 of VESH) 1.) Topsoil will be spread at a minimum depth of4 2.) Pulverized agricultural limestone will be incorporated into p the soil at a rate of 92 lbs per 1000 square feet (2 tons per -� acre). 3.) Fertilize with 10-10-10 at a rate of 23 lbs per 1000 square feet (1000 lbs per acre). 4.) Seed mix will consist of 75% Kentucky 31 Tall Fescue, 10% Annual Rye, 10% Foxtail Millet, and 5% Red Clover at 200 lbs per acre, 3: 5.) Straw mulch will be applied to all seeded areas at the Z w rate of 3500 lbs per acre and anchored with cutback, or C� emulsified asphalt applied at a rate of 200 gallons per acre. z j z Seals and signatures TH of i, �PLTH OF' V w rpc � J N C. In NT MERY �7, W U o GQRY . � � � po No. 030342 �w Noz58 B o SSIONAL qN0 SURN��O DATE: DEC. 6, 2004 SCALE: 1" = 20' THESE PLANS ARE IN CONFORMANCE WITH COUNTY OF FREDERICK STANDARDS AND ORDINANCES, ANY DEVIATION FILE NO. 0144 OR CHANGE IN THESE PLANS SHALL BE APPROVED BY THE ZONING ADMINISTRATOR PRIOR TO CONSTRUCTION. SHEET 3 OF 3 PLATE. 3.08-1 __ _.—'.aui LEGEND FCSA CONSTRUCTION NOTES VDOT GENERAL NOTES VICINITY MAP >0 _�4* 0 � FEATURES 1. The Authority's Water and Sewer Standards and Specifications are available at www.fcsa-water.com V1. All work on this project shall conform to the current editions and latest revisions to the Virginia Department of o M coEXISTING 0 0 EXISTING EDGE OF PAVEMENT C%, c _.._......._ 2. The water and sanitary sewer portion of these plans are valid for two years from date of FCSA approval. 3. Water and sewer lines are to be constructed in accordance with these plans and shall meet all Authority requirements. P tY q Transportation VDOT Road and Bridge Specifications and Standards the Virginia Erosion and Sediment Control Regulations, and an other applicable state federal or local regulations applicable. In case of a discrepancy or 9 Y PP � 9P Y as �� �i�da\e 62g 9��� �� � rn rn LU c co __...__..______......_____._ _._..._..._._ ....___.w. _.�..___.. .._.__._. i i ��,. ,ti EXISTING EDGE OF GRAVEL .____.__._......_..____-_.._._ �'�__.�_G._ _.._.___._____ ._...____._..-._... 4, The contractor shall coordinate with, and arrange for inspection by, the Authority.conflict between the Standards or Specifications and Regulations, the most stringent shall govern. C� c. Ln r---------- .:-.--- == = == =.=.==--= ==.=-= . _.== :==:=:_=:-.=_=-._=; 5, When an existing water main is tapped for the installation of a new line: a The Authority shall furnish all labor and material. ) ty V2. AH construction shall comply with the latest U.S. Department of Labor, Occupational Safety & Health Administration (OSHA), and Virginia Occupational Safety & Health (VOSH) Rules & Regulations. ti Da a .�� �' E EXISTING CURB AND GUTTER E;� r - i �° 0 _._._.._...._....______....._._.___..____.._... _._..__.__._...__._._._. _.-.___.. EX. INTERMEDIATE CONTOUR t� } -' b) the developer/contractor must: 1, make application and pay deposit. 2, the location, V3, When working on VDOT right-of-way, all traffic control whether permanent or temporary shall be in ' accordance with the current edition of VOOT s Work Area Protection Manual, Furthermore, all traffic control w ,� AM s EXISTING INDEX CONTOUR mark tap 6. The contractor shall tie-in a new sewer line to an existing manhole by core drilling the manhole, flaggers must be certified in accordance with Section 104. 04(c) of the VOOT Road & Bridge Specifications. oQ0 ° J `� 4° + ; CM 4) 7 locations lines to be V4. The developer shall be responsible for relocating, at his expense, any and all utilities, including traffic signal o N EXISTING SPOT ELEVATION ;;+. Exact of water and sewer services on new are coordinated with the Authority's Inspector. ty P poles, junction boxes, controllers, etc., owned by VDOT or private / public utility companies. It is the sole , a TELEPHONE LINE -- e- ----- LL --------- _...__..,. �� 8, The Authority's maintenance department shall furnish and install all water meter through 2 in size. It is the developer's/contractor's responsibility to have the meter boat assembly installed correctly, responsibility of the developer to locate and identify utility facilities or items that may be in conflict with the proposed construction activity. VOOT approval of these plans does not indemnify the developer from this Q�� � > o EXISTING Before a permanent meter is installed: responsibility. � �� ~� E 0 0 E EXISTING SANITARY SEWER w .... ua... -._,_ -° ° A y a) The meter box, with its frame and cover, must properly aligned with the coppersetter. IT E J- @1 .- b) The frame and cover shall be set to final grade, V5, Design features relating to field construction, regulations, and control or safety of traffic may subject to change as deemed necessary by VDOT, Any additional expense incurred as a result of any field revision shall SCALE 1 „_C 2000; 0 E o § EXISTING ELECTRIC SERVICE - F r. -- - r- c) The distance between the top of the cover and the coppersetter shall be between 18" and 21'; be the responsibility of the developer. ,- ._ RX.7ECT INFORM TIV EXISTING GAS LINE AY'. I ., RCP d) All components of the meter box assembly shall be in proper working order. 9. For water and sewer services that canned to existing lines: V6. Prior to initiation of work, the contractor shall be responsible for acquiring all necessary VDOT land use permits for any work on VDOT right-of-way. EXISTING STORM SEWER _...._..___--_-,...... ....................._....v_._.__. a The location of the service lateral is to be coordinated with the Authority's Engineering Assistant. Owner Developer Contractor b) An Application for Service must be made and fees paid before work will begin, V7. If required by the local VDOT Residency Office, a pre -construction conference shall be arranged and held by Ralph S, Gregory Carnew One LLC Commonwealth Design & Build g �` - EXISTING FENCE LINE j' - - - - s s �� �� c) The Authority shall furnish and install /e /4 and 1 water services. the engineer and/or developer with the attendance of the contractor, v 9 P various County agencies, utility companies 10 , , P.O. Box 520 212 Little Pond Lane 180-9 Prosperity Drive i �� �� d) For all 1 /2 and 2 water services, the Authority shall make the tap and bring the piping to the and VDOT prior to initiation of work, Stephens City, VA 22655 Winchester, VA 22603 Winchester, VA 22602 EXISTING DITCH LINE --- --- --- ----- - -- - -- property line. The contractor shall furnish and install the meter vault assembly. The Authority will V8. The contractor shall notify the local VDOT Residency Office when work is to begin or cease for any undetermined Phone - (540) 869-3500 Phone - (540) 667-9708 (540) 869-0308 EXISTING WATERLINE W/ TEE install the meter. e) The Authority will install all sewer laterals. length of time. VOOT requires 48 hours advance notice prior to any required or requested inspection, Contact: Kathleen Diamond Contact: Ben Montgomery Property Data Building Setbacks Per Code Proposed ■ k EXISTING FIRE HYDRANT Fy". r h' 10. Any water service line must have a backflow assembly (double check valve or RPZ, as required). The assembly V9, The contractor shall be responsible for maintaining adequate access to the project from the adjacent public roadway via a construction entrance that is constructed and maintained in accordance with Section 3.02 of the EXISTING WATER VALVE - _' K - - must meet ASSE Standard No, 1015 or 1013, Virginia Erosion & Sediment Control Handbook. Furthermore, access to other properties affected by this project Tax Map Number 75-((3))-18 Front: 35' 36, 0' ac p 4 Hs ....r.,. m,...., EXISTING REDUCER w; 11, All fire lines shall have a fire service meter assembly and a backf/ow prevention assembly (detector double shall be maintained through construction, The Developer shall have, within the limits of the project, an employee certified b h Virginia D y the g nia apartment of Conservation and Recreation (VDCR) in Erosion and Sediment Control who Address Sulky Drive Left Side: 0' 13, 0' Area 0.804 acres Right Side: 0 3, 0 C a -�, ca o check valve or a RPZ, as required). The assembly shall meet ASSE Standard No. 1048 or 1047, Radio read shall inspect erosion and siltation control devices and measures on a continuous basis for proper installation and Zoning B-2 Rear (I-81): 50' 50, 6' � EXISTING TREE DRIP LINE - - - - -° - -� ^- - - - ` ' remotes are required. operation, Deficiencies shall be promptly rectified, Legal References DB 913, PG 1429 N _e __.>....� PROPOSED FEATURES V10. Contractor shall ensure adequate drainage is achieved and maintained on the site during and at the end of construction, Existing Use Vacant Parking Setbacks Per Code Proposed Proposed Use General Office Front: 5' 27.0' Left Side: 5' 5, 0' C O o Q U L NOTES T Vll. All water and sewer lines within existingor ro osed VDOT right -of- shall have a minimum thirty-six 36 P P 9 Y nY- () Right Side: 5' S.0' Zoning Data Rear: 5' 26.3' �' 4 I C PROPOSED EDGE OF PAVEMENT PROP EP 1. Permits must be issued from VOOT prior to any construction in a public right-of-way. inches cover and when possible shall be installed under roadway drainage facilities at conflict points. Open Space Minimum 15% 5,251 sf M PROPOSED EDGE OF GRAVEL PROP EG 2• The Manual on Uniform Traffic Control Devices (MUTCD) must be adhered to when working in a public right of way. V12. Any unusual subsurface conditions (e.g., unsuitable soils springs, sinkholes voids caves etc. encountered ) during the course of construction shall be immediately brought to the attention of the engineer and VDOT, Work _ Open Space Proposed 34 /o - 11,937 sf F,A,R, Maximum 1,0 n's o C ko 1 I b N 3. The contractor will remove all mud and debris from the public right of way that is left by vehicles entering shall cease in that vicinity until an adequate design can be determined by the engineer and approved by VDOT, F.A.R. Proposed 0.25 Use For Parking Unit Space per Sq. Ft ! o n, 6 PROP, CURB & GUTTER PROP CG-6 and leaving the site. 9 V13. All fill areas, borrow and undercut areas be inspected by VOOT Pr. General Office: 8, 650 1 per 250 sf Building Data { L b j { PROP. REVERSE CURB & GUTTER 4, An damage to neighboring properties including county roads and sidewalks caused b the development of Y 9 9 9 P 9 tY Yto this be the the developer, All damage be to material shall and approved a representative prior placement and fill. Where CBR testing is required, a VDOT representative shall be present to insure the Loading Space: 8,650 1 per 30, 000 sf Type of Construction Both are 2C - Metal � U) b PROP CG-6R site will responsibility of must repaired original conditions. sample obtained is representative of the location. When soil samples are submitted to private laboratories for Proposed Use General Office &Computer o "� testing, the samples shall be clearly identified and labeled as belonging to a project to be accepted by VDOT and Back -Up Room 35 i M PROPOSED CONTOUR 50 5, A construction entrance must be installed in accordance with the Virginia Erosion and Sediment Control Handbook" Section 3.02. The contractor must maintain this access for the duration of the that testin shall be erformed in accordance with all a hcab/e VDOT standards and rocedures. 9 P PP P Pro Proposed Area 8 650 sf total Total Parking Spaces Required p Proposed Parking Spaces 35 fo o- L •-, S io project. Height Maximum 35 feet -1 PROPOSED SPOT ELEVATION +50 6. The contractor will be responsible for adequate and positive drainage of this site, V14. All roadway fill, base, subgrade material and backfill in utilit /storm sewer trenches shall be compacted in six 6 Y P O inch lifts to 95% of theoretical maximum density as determined by AASHTO T-99 Method A, within plus or minus Height Proposed 2-� feet # of Handicap Spaces Required 2 r, PROPOSED STORM SEWER PROP. 24' ADS ,_, 7. The contractor will obtain a Land Disturbance Permit prior to an site work or construction. P Y 2% of optimum moisture for the full width of any dedicated street right-of-way. At the direction of VDOT, density tests shall be performed by a qualified independent agency in accordance with VOOT Road and Bridge Proposed Handicap Spaces 2 Sign Date a PROPOSED SANITARY SEWER S S S 8. All construction will be done following the laws and guidelines set forth by OSHA and VOSH. discrepancies Specifications. Cerified copies of all test reports shall be submitted to VOOT daily, unless specified otherwise. V15. Sign Area Allowed 100 sf # of Loading Spaces Required 1 Pr. Loading Spaces 1 Sign Area Proposed 100 sf = , 'A ! PROPOSED TELEPHONE -- T - T - T 9. The contractor will notify engineer of record of any between the approved plans and existing site VOOT Standard CD and UD underdrains shall be installed where indicated on these plans and/or as specified by conditions. VDOT, Sign Height Allowed 35 feet PROPOSED ELECTRIC 10. The developer is responsible for the relocation of any utilities required by this site plan. V16. The installation of any entrances and mailboxes within any dedicated street right-of-way shall meet VDOT Sign Height Proposed 35 feet PROPOSED GAS LINE minimum design standards and is the responsibility of the developer. 11. All Erosion and Sediment Control devices shown on this site plan shall be installed prior to construction. PROPOSED WATER LINE "WM o 12. All controlled fill must be compacted to a minimum of 95/o density following Method A of the Standard V17. Prior to VDOT acceptance of any streets, al/ required street signage and/or pavement markings shall be installed by the developer or, at VDOT's discretion, by VOOT on an account receivable basis following the Manual On Contact Numbers Seals Can,./ Sian t#- tires �- PROPOSED WATER METER ® 1 Proctor ASTM-D698, AASHTO-T99, or VTM-1 as applicable. Any fill placed under buildings, structures, or be inspected by Uniform Traffic Control Devices, PROPOSED FIRE HYDRANT D& PROP. FH pavement must and approved a professional soils engineer. A geotechnical report supersedes this note if provided. V18. The developer W must provide to the VOOT Residency Office a list of all material sources prior to the start of construction. Copies invoices for dedicated Engineering Firm: H LTH OF a U4 13, The contractor is responsible for contacting MISS UTILITY prior to any site work. A!1 utilities shown on this plan are approximate locations and not all utilities may be shown, of all materials utilized within any street right-of-way must be provided to the local VOOT Residency Office prior to acceptance of that work. Unit and total prices may be obscured. Montgomery &Associates (540) 869-0308 Surveying Firm: U �P L �� l� �`� l� G, G, J COMMON LABELS & FEATURES V19. Aggregate base and subbase materials shall be placed on subgrade by means of a mechanical spreader, Density GreyWolfe Inc, (540) 545-7823 �p 2 A ,.- � W 14, The contractor will contain all litter and debris on -site. The work must be left In an orderly manner at the end will be determined using the density control strip in accordance with Section 304 of the VDOT Road and Bridge Zoning Enforcement: Department of Planning (540) 665-565X B E NJA M I N C v . y GAR K. 0� M ONTGOMERY Q V PROPERTY LINE OF PROJECT of each workday, 15. be during the Specifications and VTM-10, A certified compaction technician shall perform these tests. Certified copies of test reports shall be submitted to VOOT daily, unless specified otherwise, In addition to checking stone depths, a Site Inspections: No. 030342 No. 1518-8 ® Q �-, Q NEIGHBORING PROPERTY LINES An approved set of site plans must on -site construction process, VOOT representative shall be notified and given the opportunity to be present during the construction and testing Department of Inspections (540) 665-5650 p `y a , EASEMENT LINE 16, The contractor will notify all utility companies prior to excavation within easements. of the density control strip. Y p• Erosion and Sediment Control: Department of Public Works (540) 665-5643 F SS �C� yN �O IONA L 6 D S U PN � UJ V Q 17, The contractor will seed and straw, for soil stabilization, any disturbed areas that will be left for more than thirty V20. Asphalt concrete pavement shall be placed in accordance with Section 315 of the VDOT Road and Bridge Sanitary Sewer and Water: Z i `'� � PROPERTY CORNER FOUND Q days, Specifications. Density shall be determined using the density control strip as specified in Section 315 and VTM-76, Fred. Co. Sanitation Authority (540) 869-1061 a L c 0 C) O PARKING SPACE TOTALS 12 A certified compaction technician shall perform these tests. Certified copies of the test reports shall be submitted to VDOT Bail unless s ecified otherwise. A VDOT re resentative shall be notified and iven the o ortuni to be Y, P P g opportunity Telephone: Verizon (301) 954-6282 Electric: Allegheny Power (800) 654-3317 THESE PLANS ARE IN CONFORMANCE WITH COUNTY OF FREDERICK STANDARDS AND ORDINANCES. ANY DEVIATION W , V O ®® q ADA HANDICAP PARKING STALL /► DEPARTMENT DEPA T EDIT F INSPECTION GENERAL L NOTES present during the construction and testing of the control strip. Gas: Shenandoah Gas Co. (540) 869-1111 OR CHANGE IN THESE PLANS SHALL BE APPROVED BY THE v W J v � J Z � -cr V21. In accordance with Section 302.03, the foundations for pipe culverts thirty-six (36) inches and larger shall be MISS UTILITY: 1-800-552-70Q' ZONING ADMINISTRATOR PRIOR TO CONSTRUCTION, W o O/')l%,g General Notes SIGNS 1. Building(s) must comply with the Virginia Uniform Statewide Building Code Sections 304 (Business) and the International Building Code/2000. Other codes that are CABO All 7.1-98 Accessibility the Usable Building & Facilities, explored below the bottom of the excavation to determine the type and condition of the foundation. The contractor shall report findings of foundation exploration to the engineer and VDOT for approval prior to placing Q J SANITARY MANHOLE IDENTIFIER ,q apply and 2. The requirements in BOCA mandate either a fire wall (Section 707) or a fire suppression system if height and area pipe. Foundation designs shall comply with VDOT Road and Bridge Standard PB-1. Where soft, yielding, or otherwise unsuitable foundation Is encountered the foundation design and/or need for foundation stabilization Maximum STORM DRAIN STRUCTURE IDENTIFIER limitations are exceeded for the type of construction under Table 507 of BOCA. 3. A design profess/ono/ licensed of the Commonwealth of Virginia shall seal the structural p/ens submitted for building Plans must show all ingress/egress locations to the exterior CABO 117.1-92 shall be determined by the engineer and approved by VDOT. V22. Approval of this plan shall expire three (3) years from the date of the approval letter. Environmental Existing Disturbance Proposed Features Acreage Allowed Disturbance 1. Exterior lighting will be provided by wall -pack lights attached to the building & /ightpo/es. 2, All lights be directed to LIGHT POLES permits. per and meet requirements of Chapter 17 of BOCA, will shielded or prevent glare on neighboring properties, 4, Maximum slope across handicap parking stalls shall not exceed 2%. All required egress doors shall be accessible to a V23. VDOT Standard CG-i2 Curb Ramps shall be installed where indicated on these plans and/or as specified by VDOT, p Flood lain 0 acres 0% 0% 3, Outdoor trash receptacles will be in an enclosed P LOCATION OF TEST PITS min, exterior area for assisted rescue, section 1003,2,13,7IBC. Note fire ratings around this door if this section is utl/zed, 5. The 2000 International Building Code can be utilized for building design. V24. VDOT Standard Guardrail shall be installed where warranted and/or as proposed on these plans in accordance with VDOT's installation Lakes & Ponds 0 acres 0% 0% Wetlands >1AC Q acres Q% 0% six (6) foot fence. 4. This will not disturb any environmental p criteria. Final approval of guardrail layout to be given by VOOT after grading is mostly complete. project Sinkholes 0 acres 0% 0% features as defined by the Frederick County FIRE MARSHALL GENERALGENERATIONTES T I DATA Natural S. W. 0 acres 100/00% Retention Areas Zoning Ordinance. 5, The owner will be responsible for obtaining or EROSION & SEDIMENT CONTROL FEATURES Steep Slopes >50% 0 acres 25% 09/0 o 0 Woodlands 0 acres 25 /0 0 /o granting easements shown on this plan, 6, Easements will be recorded and copies sent to the w 1, An inspection b the Fire Marshall's office will determine where curbing must be painted allow. P y g P Y INLET PROTECTION 1p 2. "No Parking -Fire Lane" signs will be placed on the site by the Fire Marshall's direction, DATA TAKEN FRO+�1 THE I, T. E. MANUAL 7th EDITION parties involved. 7 All utilities that will service this site must be ® w � OUTLET PROTECTION� 3. The contractor must align the fire hydrants to the direction as determined by the Fire Marshall, 4. Burning brush of natural vegetation requires a Burning construction debris is r BUSINESS PARK (CLASS 770) .12. 76 PER 1,000 Sf X 81650 Sf = 110 VMS placed underground, z Op piles permit, prohibited. j z 5. Emergency vehicle access must be provided at all times. Fire hydrants will be always be left unobstructed. / .,rc /� APPROVALS SP �t 70-04 W a CHECKDAM CD RESPONSIBLE LAND DISTURBER W DIVERSION DIKE OD _ / ` > w CK SILT FENCE W/ WIRE SUPPORT �yF NAME: o C LANDSAPI OT t Frederick County Zoning Administrators ,` Date SILT FENCE W/O WIRE SUPPORT SF CERTIFICATION #: 1, Miss Utility must be contacted prior to planting, Advise engineer of record of any conflicts in planting locations 1, Site Plan approval from VOOT will expire three (3) years from the date of the approval letter. SEDIMENT TRAP ST EXP. ®ATE and utility markings. Landscaper must stake and guy all trees. Stake locations must avoid utilities. 2. Frederick County Zoning Administrator approval expires at five (5) years from the date of site plan approval, 2. Trees and shrubs shall be healthy and free of insect eggs, larvae, and disease. The plants shall have ample roots 3. The Frederick County Sanitation Authority approval is valid for two years from date of approval. If construction is DATE: DEC. 6 2004 1. The Responsible Land Disturber is that party responsible for carrying out the land disturbing activity as set forth in and be well branched. The planter shall guarantee a// plants for one year. not in progress at the end of this period, Authority approval shall be void. the plans, 4. The Frederick County Department of Public Works approval is not enough to begin site development. The SCALE: N/A CONSTRUCTION ENTRANCE CE 2. Note: An on -site pre -construction meeting is required with the Owner, Site Contractor, Public Works, & Designer 3. Landscaper shall use shredded mulch in all planting beds and around trees. Tags from each plant will be provided to the owner. owner/contractor must obtain a Land Disturbance Permit and agree to periodic inspections. shall be void. 5. The Frederick County Department of inspections approval does not constitute a building Building FILE NO. 0144 prior to commencing any site work, permit. plans must be submitted and approved prior to constructing any structure. Furthermore, the site must meet all ADA 3. The contractor will possess a Land Disturbance Permit prior to any site work or construction. 4. Plant substitutions will be allowed with the approval of the owner and the Frederick County Planning Department, requirements and be approved by Inspections. SHEET 1 OF 3 trench 1,enchvAd as required" In width I dle. schedule 40 steel 4-• Ilse filled with concrete and painted yellow 7' 2' 18"dia. (D concrete encasement 3' concrete thrust block _dL DETAIL BOLLARD FIRE HYDRANT ASSEMBLY Figure 8 SDR 35 spigot SDR 35 spigot by by gasketed SDR 21 gasketed bell 45' bend bell adapter (see note) T SDR 35 8.!10" gasketed bell wye (see note) location marker stone — I x G'deep locator marker chanicalloint vel tee with xanch 2' I SDR 21 gasketed pipe and fittings SCH 40 solvent weld cap property line 4" pipe at 2.00% minimum grade concrete cradle if top of main is greater than 15deep 36'min. cover created 21x 4"vAth top 6" painted green Note: If top of main is greater than IS it deep use heavy wall SDR 35 GRAVITY SEWER SERVICE LATERAL Figure 14 METER BOX and COVER METER SIZE METER BOX METER BOX COVER 518'x314" or 3M" 18 in. Dia. Non -Traffic M32C-PW Traffic A32HH 24 in. Dia. Non -Traffic MC-30 (Frame) WITH RML-1-T (Top Lid) Traffic MC-30 (Frame) WITH RML-12-T (Top Lid) treated 2N,1"with ineter box top 6" painted blue and cover 5 it 24"' X0 3"stone surrounding box 8 Opposite Side COPPERSETTER mete, size Opposite Side Some Side 5/8"x3/4" VSHC72-18WO-44-44-B4 VBHC82-1OWD-44-44-134 3/4' VBHC72-18WO-44-44-B4 VEII-IC82-18WD-44-44-134 V V13HC74-15WD-44-44-134 - NIA - INSTALLATION NOTES; 1. Exact location of meter box assembly to be approved prior to installation. 2. Water service crossing street: a) Encase in 3' diameter SCH40 PVC or SDR21 pipe. The piping shall run from one toot beyond sidewalk, across the street, to one fool beyond sidewalk b� Install 12 gauge insulated copper wire for line tracing) from corp. stop to into the meter box 1wrapwire around corp. stop; wire to be taped to top of PET at 10 toot intervals; come up into meter box and terminate level with angle ball valve). 5/8'X3/4", 3/4" & 1" METER INSTALLATION (4 FOOT COVER) Figure 5 q finished Wade 8. 1 VALCO, Inc Fig. No. 71 BOB with lid marked 'SEWER' I bottom section of box SDR 35 gasketed bell Wye sanitary (see note) sewer main SOR 21 cast iron cleanout cap with brass plug must be 8" from the top of the screw type adjustable box square concrete skid pad 20"x 20'7< 6'deep cast Iron cleanout cap with brass plug having a countersunk square head Panella Model PA4SV-CSK (41 SDR 21 - cleanout pipe brick base SDR 35 spigot by ,SDR 21 gasketed bell adapter �.SDR 35 gasketed ..,bell 45' bend \— 6'stone bedding NOTE : If top of sewer main is greater than 15'deep, then wye and bend to be heavy wall SDR35. SEWER CLEANOUT Figure 16 R7-8 HANDICAP PARKING SIGN,_ RESERVED PARKING MAY BE PLACED INTERNATIONAL SYMBOL ON ONE BLANK OF ACCESSIBILITY ADJUSTING THE REQUIRED HEIGHT IF REQUIRED TO ACCOMMODATE THE ADDITIONAL LINES VAN I ACCESSIBLE Zi REQUIRED EFFECTIVE PENALTY 1100-500 JUL Y 1, 1998 TOW —AWAY 20NE tl PARKING SURFACE CONCRETE WHEEL STOP=::� (IF REQUIRED) HANDICAP PARKING SIGN DETAIL (NOT TO SCALE) Cl- oc (n L0 12, Q) Q� CL_ C) :Z — tz C) LLJ o (J � J 1 L 10,8, 12 OF 21B 12. 0' 2'-7"(CG-6)— TAPER PROFILE 75- ((3))- 14 RALPH S. GRECORY V OB 913, PC 1429 - ZONED: 6-2 USE,VACANT 01 RALPH S. CRE-GOP Y 08 913, PC 142,0 Z 0 ZOA/FD: 8-2 USE: VACANT INSTALL FIRE HYDRANT AT THE END OF EXISTING LINE io`� HYDRANT MUST RE AT LEAST J' FROM PAVEMENT EDGE 3 N 54'40'11", W 264,54' LIGHTPOLE EY728 sl 50.6' WV 28' b 2� N, 600 sf 32J COMPUTER ROOM IWA4 Y8 FF= 7J2. t —730— 9.1 q'R I JO) ti r 2' J0 J 2, r 5 12�f,5 � !1 L—d"', ace 7 73I W C)Pa Ci (n 75 - ((3)) - 9A Q:11 4 PC I VETERANS OF FORG[-IN WARS RS 45 321 ST J 020070462 _n 9' J1.0 8', 5R nT. ZONED: B-2 USE VACANT —732 1 0 4 2.5R 51111'H 1,l5 (_0 R11V= 7,,30188' PROPOSED ENTRRANCES SHOA,'bl J2.6 I i S J2 4 28,0! Q5 �J22 f INV )k=i70-5' 1 PER APPROVED RE PLAN BY * 4 :7- -p W=119.4), TRIAD ENGINEERING St"CIVED J; JJJT JJ.J 33'. J2-7� J5, HIGH APPN 21, 2003, TITLED SIGN 100 "VETERANS OF FOPCEIN WARS" Q) SF IN AREA 12 3 ol 6. + JJJ 8,050 Sf 32 WALLPA CK LIGHTS (TYPICAL) 11 GENERAL OFFICE U§E--,,,, GENE FF= 7JJ. JX TYPE iR CONSTRUCTION, USE: B 20'R 1. V QJ It J91 2R 4 VP By 12 1 S 2R L X1.32�0 0 1 20' 0, 20' /0 7,52 % _­T 20 2R 2 r '6 r 21P 39�+34 bS S—S—S S —S S C/o GRAPHIC SCALE 38 37 Jj6s,34 S,54'40'11"E 27J.4J`,,- .5 1. 1i8O' WA Q 75 75-(I1J))-2l0 ((3)) -14 FELIOPYSHIP ROLE CHUACq, S. CRr1__61ORY a DR 913, PO 14')9 DF_,. 955, PG 528 B-2 ZONED: B -- 2 USE ACAN7 USE VACANT TREAT WOODEN PANELS WITH WATER SEALANT. Stormwater Management Note 4' ARM This site is served by an approved and installed 400 WATT LIGHT regional stormwater management pond located at the southern end of the park. 20'POLE 2 " OF SM-2A MINIMUM SPACING 6" OF 21-8 COMPACTED TO 3r-O" 957,. DENSITY PAVEMENT SUBGRADE FREE OF ORGANICS . . . . . . . . . . & COMPACTED TO 95% DENSITY TYPICAL 6' TALL BY 8' WIDE DOG-EARED FENCE XG-61 CURBING�W PANEL. INSTALL ON 4'X8' TREATED POSTS SET TYPICAL PAVEMENT SECTION D 3, MIN. 12:1 72:1 J, MIN. DIRECTLY UNDER THE PARKING DUMPSTER FENCE DETAIL TYPICAL INSTALLATION OF LIGHTPOLES SPACES N. Ts. CG-6 CG-6 BEHIND CURB & GUTTER 1.5" OF SM-2A AAA J" OF 8M-2 Lighting General Notes: 1. Proposed Lights for this project are Hubbell RCSA-400ST d 8" OF 21-B COMPACTED TO (400 Watt) Lights or equivalent, 957. DENSITY ® ® 2. Lighting must be installed so as not to produce glare onto neighbors and roadway- SUBGRADE FREE OF ORGANICS & COMPACTED TO 95% DENSITY Ku S FKET APPROACH SAIJE . . . . I 11—u 5 R"A1:riC AS NAKIIIE TYPICAL PAVEMENT SECTION UNDER A U flulurll TO K Ai 1 1 ',CKMAY INSTALL GATES ONTO 6'�W' POSTS W1 11 a J i PLAPS) =Uj7 '0 R. 4S ENTRANCE, DRIVE AISLES, AND INSTALL OPAQUE FENCE AROUND THE REST OF THE DUMPSTER TO NOTES: LOADING AREAS PROVIDE SCREENING 'G 1. H/C SPACES MAY NOT EXCEED A 27, SLOPE. ST'D UJ > 2. RAMP BUILT TO VDOT CG- 12 STANDARDS. TREAT WOODEN PANEL GATES WITH WATER SEALANT UJ u, CIL I's S tJ I 4^� 4' SUIEWA. K I ff')" V DUMPSTER GATE DETAIL 4" OF JOOO PSI CONCRETE W1 J. WHITE STRIPING SHOULD BE J" 411DE. O-TICIIAL\ \1, 6- �,__ 7_J 11.01 LIE FIBER SIDEWALK OR EXPA1450111 Xlur 4. HIC SIGNS TO BE SET 3' BEHIND SIDEW N. T S. MOUNTED TO BUILDING IF POSSIBLE OF 21-B COMPACTED TO IOTH "T' ­O'OP A7 4 �Olr, W -­ SEC�10"J 4T�6a SHZ)Wt, 04,i TY-ICPL SLCMIN. LU FLArj VIEW 957, DENSITY als and, Signatures C�4 LJJ CONSTRUCT GrAfi_ CIW40CS Wilt! A FA4AIOI IC WRV!, SUBGRADE FREE OF ORGANICS LU ek - T 0- WHEN 04`1,04 RAI)U2 A=V?4OL1AIL & COMPACTED TO 957,, DENSITY 7-HF. TURN S RFOUR7W3IT_9 OF AunOPA121 HFRiY T H OF N _1PLC H OF v V I'MMOUC C1.13K MLCI.v7�Ei DEPTH FOR SD -WALK & CURS 0GE O� SHOIUCERL�R 3I�w X, - RA) IS , L L JJIS or 1,11: fi�'ISHCU,_b a_ LLJ � NIAI r-ICR-XSE,.) TO 7". LO C�IANCL­ - _q Q_ 0111`0411 tLOW Llu D TYPICAL SIDEWALK SECTION C� o C) U) U} Ln C 0 Lr) C U It zi -r) U) bm I Qom) Q) () CL 'S LLJ LQ Q LL1 Q� C) 04 U c) LLj Q LLJU-1 Z! 6 LLJ c Zt Lul Q) �N Q) j Q) 6 41 Q) U) n CO Q JO. 0' 35. 0' @ 2% ENTRANCE PROFILE �A46�,F_70_ WHE�J 5`0. CC-`n IS USED rDH :fJlR,*.Cm5 KALF III CON,-UNCTON WITH ffi!)7 VIR0,170TS, rl-FAV. 1,01E THL FOLLUAP,U: _oPL CXH'r..N-L "J, L4,� OR P�U -t PXAMPJTSH� �E CONSTIOUo L TO T L R,W LIK XXCUAN( =3�'RADL F;7ADI,,7ATICbI FF^,UP-0 FOR 1dANIlF PAfv_I,1M4t V)H:C14 C,11q Ow GIAVE0 n EIJTRA�CE TIE FI`JTM4V,, NrAPL C61113 OR Ccl-ONINT-011 CL1-2 ',O11!;TqLICTF,1, GUIOLLVES OR GN AVE Cid_*IGE 1) PIC, CUTTER SHAD kOT R-- IT rON, illPfV LNE G11WP_ FOR FiFF1 RR,-CSvS, iflILN N C0lkUNG1!(kI Willi SIPSIDA:U ENIPPrKE VOLUVL CESPABI- VX4IYLN OG-3 OaCC 6 0 CC-7, THE CtY,3 FAZ.F7CI4 THS slmux- �13L PDJUS_1�0 U MAI(:1 t-E HIGH IMORE ',,X1 15CO VPM n Y. 3 % 110J11-ABLE CL;FU CINFICL�P,47!0ll. f&QIjM *151.10_11�0111 qpo) It N SE " sl"12XIM FCR CIPS qP95'i DESICIN 1*0 %0_17.1. 5AT14 71"If, 1.0'# C,rSS 7nM 5,'x0 tPli) s 9 Y. 8 X '4' PLANS -F.i l(; 1-LtC17E W,EN "QW5TRXIrJX, OF A r'-mv (.iNr 9 R.r.CUP'n -0 po-in;r CRIIJIArE r:r1JSS THE 6JTP1JrE. ' , FLOWL.OF "Ay '�, - wRv WARPrM Orl 4 PCIR.11UN ji WI-R. 70 K?L="'E: P`JQU0 O% WFJER. M.77",OD OF TREATP/IENT- PEFERENCE :')NNFC, I ION F G�� S_ ' tc IN' ; F RSEC T � 4 C;NS snz AND CrjROERCIAL L_",�7ANOZS "IRGIll OIL JH1JlSP()1 1 BENJAMIN C. 4 U 1:1 1 � GAR R3;, 0. T 0 MONTGOMERY - r_1 No. 030342 No1518-B 8- OF JOOO PSI CONCRETE W1 WOVEN WIRE REINFORCEMENT "OAI A I NpC o\1 f, 1 0 OF ZI—LI UUMI-libILU IU D rvV r 95%, DENSITY DATE: DEC. 6,2004 - SUBGRADE FREE OF ORGANICS THESE PLANS ARE IN CONFORMANCE WITH COUNTY OF SCALE: 1" = 20' FILE NO. 0144 & COMPACTED TO 95% DENSITY FREDERICK STANDARDS AND ORDINANCES. ANY DEVIATION OR CHANGE IN THESE PLANS SHALL BE APPROVED BY THE SHEET 2 OF 3 TYPICAL DUMPSTER SECTION ZONING ADMINISTRATOR PRIOR TO CONSTRUCTION. € - - 6 -, ,' � \Jr_L/ r I ! o —� � d�c�� � �-�: � ��:u Nni rr � � p I � � � � V —! F--. I i u u LI \,..`— �� EROSION & SEDIMENT CONTROL STANDARDS 1. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant for longer than 30 days. Permanent stabilization shall be applied to areas that are to be left dormant for more than one year, 2, During f h r ll iliz r protected with sediment o t e project, soil stockpiles and borrow areas shall be stabilized o p otect t t trapping measures. The applicant is responsible for the temporary protection and permanent stabilization of all soil stockpiles on site as well as borrow areas and soil intentionally transported from the project site, 3. A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieved that is uniform, mature enough to survive and will inhibit erosion. 4. Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land -disturbing activity and shall be made functional before upstream land disturbance takes place, 5. Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. 6.Sediment traps and sediment basins shall be designed and constructed based upon the total drainage area to be served by the trap or basin. a. The minimum storage capacity of a sediment trap shall be 134 cubic yards per acre of drainage area and the trap shall only control drainage areas less than three acres. b.Surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three acres shall be controlled by a sediment basin. The minimum storage capacity of a sediment basin shall be 134 cubic yards per acre of drainage area. The outfall system shall, at a minimum, maintain the structural integrity of the basin during a twenty-five year storm of 24-hour duration. Runoff coefficients used in runoff calculations shall correspond to a bare earth condition or those conditions expected to exist while the sediment basin is utilized. 7. Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. 8. Concentrated runoff shall not flow down curt or fill slopes unless contained within an adequate temporary or permanent channel, flume or slope drain structure. 9. Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. 10. All storm sewer inlets that are made operable during construction shall be protected so that sediment -laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. 11.Before newly constructed stormwater conveyance channels or pipes are made operations., adequate outlet protection and any required temporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel, 12. When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structures if armored by nonerodible cover materials. 13. When a live watercourse must be crossed by construction vehicles more than twice in any six-month period, a temporary vehicular stream crossing constructed of nonerodible material shall be provided, 14• All applicable federal, state and local regulations pertaining to working in or crossing live watercourses shall be met. 15. The bed and banks of a water course shall be stabilized immediately after work in the watercourse is completed. 16. Underground utility lines shall be installed in accordance with the following standards in addition to other applicable criteria: a. No more than 500 linear feet of trench may be opened at one time. b. Excavated material shall be placed on the uphill side of trenches. c. Effluent from dewatering operations shall be filtered or passed through an approved sediment trapping device, or both, and discharged in a manner that does not adversely affect flowing streams or off -site property, d. Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote stabilization. e. Restabilization shall be accomplished in accordance with these regulations. f•Applicable safety regulations shall be complied with. 17. Where construction vehicle access routes intersect paved or public roads, provisions shall be made to minimize the transport of sediment by vehicular tracking onto the paved surface. Where sediment is transported onto a paved or public road surface, the road surface shall be cleaned thoroughly at the end of each day. Sediment shall be removed from the roads by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual development lots as well as to larger land -disturbing activities. 18.AI1 temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after the temporary measures are no longer needed, unless otherwise authorized by the local program authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sedimentation, 19, Properties and waterways downstream from development sites shall be protected from sediment deposition, erosion and damage due to increases in volume, velocity and peak flow rate of stormwater runoff for the stated frequency storm of 24-hour duration in accordance with the following standards and criteria: Prune out any dead or broken / oremove aJ/ tags,, llabelsbels,, strings, wires, etc. from plan. Prune codominont leaders �"" DO NOT prune terminal 2-3" mulch leader or branch tips Set top of root ball /7-3 Saucer y equal to or 1-2" Prune rubbing or above grade. cross branches „'.. Remove container; use '• cn '+"'<' sharp blade to make Prune narrow crotch four 1 4'-1" cuts the �.t o .r• angles & water spouts length of ball and cut a ?.:?':j:,`:. •;`,i; r _� 114" X on bottom of boll; loosen compacted �r Prune broken branches roots. Remove tags and labels CONTAINER GROWN SHRUB Prune out any dead h-k-a branches. all tags, labels, wires, etc. from I" mulch Set top of root boll equal to or 1-2" above grade. s rope & burlap oot boll. Dig hole 2-3 times width of root ball. BALL & BURLAP SHRUB SHRUB PLANTING DETAIL (NOT TO SCALE) Prune suckers Cut away all balling ropes 2.-3" mulch kept Remove top of wire basket away from trunk Soil well to 1 contain water B k1'!l ' .. 4".•' ' • ... ac / soil Partially backfill, � water to settle Widen and score �� soil, finish holes in wall l bcckfillinq 4 Area for water Remove container and cut ;,,. drainage (Pipe circrng roots if or tile could container -grown, or as be installed) much budop as possible if Leave solid soil pedestal - do not field -grown dig deeper than ball depth Dig hole 2-3 times root ball width TREE PLANTING DETAIL (NOT TO SCALE) E & S CONTROL NARRATIVE Project Description I This site is located in the Battlefield Business Park on the east side of Sulky Drive. The purpose of this development for the construction of 8,650 sq. ft. of buildings to be used for offices ncomputers. This a d development also has parking and drive aisles for access, Existing Site Conditions i The lot is a vacant field. The ground cover is grass with some brush along the eastern side, Ad ' 4. P I 't \ SILT FENCE WITH WIRE SUPPORT SF 3 i SI a • I , CE 1 The adjacent parcels are a vacant lot like this one. ` •-' ' ` 1 i i Soils The soils types determined from the USDA's "Soils Survey of Frederick County, VA" shows Carbo-Oaklet rocky silt loams `, I classified as #6C, This soil is predominately yellowish brown silt foams over bedrock and offers 'severe' erosion hazards. Topsoil ( ` ' ' ' `' .• ' '• ! Y' '" " s + • ,- ? ` i on this site appears to be 9" thick with rock outcroppings, Erosion Control Program • Install construction entrance with wash rack • Install wire supported silt fence • Install culverts outlet protection , I • Grade site and seed all exposed surfaces immediately upon �, ;� �, ! •'� I i reaching final grader General Erosion and Sediment Control Notes (VESH Table 6-1) ES-1. Unless otherwise indicated, all vegetative and structural ! erosion and sediment control practices will be constructed and --roc-` - / s "E , I maintained according to minimum standards and specifications of ,cr/o..-„",==�%- E200 i the Virginia Erosion and Sediment Control Handbook and Virginia Regulations 4VAC50-30 Erosion and Sediment Control Regulations. l _ = ES-2. The plan approving authority must be notified one week prior to the pre -construction conference, one week prior to the \ commencement of land disturbing activity, and one week prior to e the final inspection. ES-3. All erosion and sediment control measures are to be placed prior to or as the first step in clearing, All plantings will conform with Section 165-36B of the Frederick County Zoning Ordinance, Planting Selection, Planting Procedure, and Maintenance, ES-4. A copy of the approved erosion and sediment contra/ plan shall be maintained on the site at all times. Landscaping Parking Lot Landscap n Data ES-5. Prior to commencing land disturbing activities in areas other than indicated on these plans (including, but limited to, Per Proposed off -site borrow or waste areas), the contractor shall submit a 1 Tree per 10 spaces 3.5 4 supplementary erosion control plan to the owner for review and (39 spaces) approval by the plan approving authority. Total Impervious Area 1 per 2000 sf 12 ES-6. The contractor is responsible for installation of any 23,085 sf 11.5 additional erosion control measures necessary to prevent erosion and sedimentation as determined by the plan approving authority. Percentage of Green 5% 6, 6% Area in Parking Lot 721 sf 955 ES-7. All disturbed areas are to drained to approved sediment 14,435 sf control measures at all times during land disturbing activities and during site development until final stabilization is achieved, ES-8. During dewatering operations, water will be pumped into an approved filtering device. ES-9. The contractor shall inspect all erosion control measures periodically and after each runoff -producing rainfall event. Any necessary repairs or cleanup to maintain the effectiveness of the erosion control devices shall be made immediately, _ I C/0 s---s-s-s-�s-S-s_0i' s-s-s-s-s-s -sCC; iv 3 e,a i 1� tlk% 1 PROPOSED PLANTINGS HEDGE - BOXWOOD - (28) PROPOSED FOR HEADLIGHT SCREENING - (3 GALLON CONTAINER) TREE - PIN OAK WOR RED MAPLE -16 PROPOSED OTHER DECIDUOUS SPECIES MAYBE SUBSTITUTED WITH APPROVAL OF FRED. CO, DEPT. OF PLANNING MINIMUM - 2" CALIPER CONSTRUCTION OF A SILT FENCE Frederick County Note: (WITH WIRE S UPPOR T� The Public Works and Engineering Department will retain the right to add to or modify these erosion and sediment control 1. SET POSTS AND EXCAVATE A 4"X4" 2. STAPLE WIRE FENCING TO THE POSTS. measures during the construction process, within reason, to TRENCH UPSLOPE ALONG THE LINE ensure adequate protection to the public and environment. OF POSTS, S T ONE CONSTRUCTION ENTRANCE A ME .r•nr.nr.r+r•c•r•�•r•r•�r•r•r.r•r••c•r�t�r���ew, t Ii=11�11=11-�1=,'Jiy.I�r�t�t�t�rK?nf�r�r�r�t+I�r�r�t+r�r�tK�r�l�r+r.�r u n=n=n=n- FILTER CLOTH 6- MIN, A MMO E BERM (OPTIONAL) ELEVATION S�IDIE EXISTING GROUND .j+ VASHRA 10, MIN. c• ,t •��c•��c•. ��. Vic•. �p ? �f.! �?•�j.�$� i <i. t�I•�?:�. PEAXVISETMIENNG . �.. •• . ';� POSITIVE 0 ,. SEDIMENT TRAPPING DEVICE EXTEND FULL MOTH INGRESSMUST OF OPERATION CLOTHFILTER SECTION or SECTION B-B [or Sol erosion and Segment Control. and Va. M FLOW 3. ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND IT INTO THE TRENCH. 4 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. G FLOW EXTENSION OF FABRIC AND WIRE INTO THE TRENCH. SOURCE: Adapted from installation of Straw and Fabric Filter Barriers for Sediment Control, Sh6wood & Wyont INLET PROTECTION NOTE: SILT FENCE USED AS INLET PROTECTION IS NOT ALLOWED IN FREDERICK COUNTY. CONTRACTOR MUST INSTALL THE OPTIONAL STONE ARC AS SHOWN, SILT FENCE CULVERT INLET PROTECTION DISTANCE IS 6' MINIMUM IF FLOW IS TOWARD EMBANKMENT FLOW OPTIONAL STONE COMBINATION cVDOT #3, #357, #5, #56 OR #57 COARSE AGGREGATE TO REPLACE SILT FENCE IN " HORSESHOE " WHEN HIGH VELOCITY OF FLOW IS EXPECTED PLATE. 3.05-1 SOURCE: ADAPTED from VDOT Standard Sheets and Va. DSWC 20' of 20' GRAPHIC SCALE PIPE OUTLET CONDITIONS I ado (MIN.) PIPE OUTLET TO WELL PLAN VIEW lv7w DEFINED CH"ArEL L a l o% - d SECTION A -A FILTER CLOTH HSY BI 6•-6': R6couusyD.6D FOR 6Nrms PA'RIAI6TER NOTES- L APRON LINING MAY BE RIPRAP, GROUTED RIPRAP, GABION BASKET, OR CONCRETE. 2. Ln IS THE LENGTH OF THE RIPRAP APRON AS CALCULATED USING PLATES 3.18-3 AND 3.18-4. 3. d = IS TIMES THE MAXIMUM STONE DIAMETER, BUT NOT LESS THAN 6 INCHES. Source: Va. DSWC Plate 3.18-1 Seedina Schedule (Der section 3.32 of VESH 1,) Topsoil will be spread at a minimum depth of 4", 2.) Pulverized agricultural limestone will be incorporated into the soil at a rate of 92 Ibs per 1000 square feet (2 tons per acre). 3.) Fertilize with 10-10-10 at a rate of 23 Ibs per 1000 square feet (1000 Ibs per acre). 4.) Seed mix will consist of 75% Kentucky 31 Tall Fescue, 10% Annual Rye, 10% Foxtail Millet, and 5% Red Clover at 200 /bs per acre. 5•) Straw mulch will be applied to all seeded areas at the rate of 3500 /bs per acre and anchored with cutback, or emulsified asphalt applied at a rate of 200 gallons per acre, Seals and Signatures o�-p,.TH op Irr�c ,�k-rH of J N C. �y /� -y ARY . bA NT MERY GES ? No. 030342 �w Noz518 B SS10A1A L q�0 S Rv EEO 0Q o LL OC) � O M 0O LU OD (0 OD Lo o a 0 o 0 C a) (V N oc��os Z � N � _ aD `m > c p+� _ E 0 d 0 R 1 U 0 o C r ■ Q >< N �0 O i vi d- C '"'t^ V l 'It I d o V _0 C s i � c o0 > N Q CaJ L :3CDQ p c v w H 1411. �I� HI U DATE: DEC. 6, 2004 I RIPRAP SCALE: 1" = 20' THESE PLANS ARE IN CONFORMANCE WITH COUNTY OF FREDERICK STANDARDS AND ORDINANCES. ANY DEVIATION FILE NO. 0144 OR CHANGE IN THESE PLANS SHALL BE APPROVED BY THE ZONING ADMINISTRATOR PRIOR TO CONSTRUCTION. SHEET 3 OF 3 PLATE. 3.08-1 c 0, T y ''!ENT EROSION & SEDIMENT CONTROL STANDARDS E & S CONTROL NARRATIVE 0 ILL r' Project DescriAtion G - 1 `� 1. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is ; + \ ` - - - 728 - UGHTPOLE { `+ ECG a" lY/l reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas 3 : rw w�- w w that may not be at final grade but will remain dormant for longer than 30 days. Permanent stabilization shall be This site is located in the .Battlefield Business Park on the east + { 5D•s __._ _. �.____________.___.___ �u, , o # I W m 28 applied to areas that are to be left dormant for more than one year. side of Sulk Drive. The purpose of this development for the 1 1 �" '=-=""""--°----� --- -- -- - -= `�` - - ' ' ' ' jy 0 o PP Y Y P 1 � ,�._.__1..._.._��' _!..�._.._.._y_T-_`._ .__._i- ;>�--�-•------s..,�- � 'g ido, �r construction of 8,650 sq. ft. of buildings to be used for offices 3 / �, 1600 sf 1 i / I ii ``✓ I i 1 `` 13� L 2. During construction of the project, soil stockpiles and borrow areas shall be stabilized or protected with sediment and computers. This development also has parking and drive t o P P g i COMPUTER ROOM i r` j 3 II►� i%s 1Y trapping measures. The applicant is responsible for the temporary protection and permanent stabilization of all soil aisles for access. 1 # 0 I ! ` E F 732.33 I j f , stockpiles on site as well as borrow areas and soil intentionally transported from the project site. E�lOR ! ' + `, ( 730 , 2#5R 0 �t 1 3O # I I ' i t ti 1' y 3t? 41 v 3. A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent Existing Site Conditions 2 } { ; i i 3 9 y # vegetation tion shall not be considered established until a ground cover is achieved that is uniform, mature enough to i ' \, 5'R W CL g The lot is a vacant field. The ground cover is grass with some �. a) N •� survive and will inhibit erosion. brush along the eastern side. 1 X oading ,pace \ i 731� / �` # ") .2 g 4. Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall t. ! / f `/ I ' I ca �. be constructed as a first step in any land -disturbing activity and shall be made functional before upstream land Adjacent Parcels�t disturbance takes place. DUMPS�Rr ` a. , ; # I �� N 0 The adjacent parcels are a vacant lot like this one. t'x12 9 a' e ( a i f ` # I o �. E 5. Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after ' E1 \ j f { o , y30.�' O �- installation. �0 1 r '# { i # O c Soils \ ; 1 4 1 732 1 i �', ca iS / I I �° S� c 6.Sediment traps and sediment basins shall be designed and constructed based upon the total drainage area to be , 1 �\ �/ ? r # / JM* R X.3' The soils types determined from the USDA's Soils Survey of ` i i r �. I served by the trap or basin, .� ' ! 3 , ( �, 1 f Frederick County, VA shows Carbo-Oaklet rocky silt loams i� I , 1 # �f i ! I / w L SSMH #5 a. The minimum storage capacity of a sediment trap shall be 134 cubic yards per acre of drainage area and the trap classified as #6C. This soil is predominately yellowish brown silt `=1---- ; __ ._ 1 _ _ ' _ i / { / RIM=7 drainage areas less than three acres. loams over bedrock and offers severe er son hazards. Topsoil a'• ' ' �' �:. "'� . • ; • s . • .? i, `' 1NV 71 . shall only controld a nagelV �. _.+__._,.. �..__.. _.. .._�..a._w._.., �_._ _ ,..-.., _ ,_.._...._.._..r_..__1_.. _..... _....�___.__w..__._......_....___...._ ._. �_,• ��.__ ___..c.�_._,__..__...k___ , ter. �._..j._4._. ,1 ,r \ ti IN,V'10 =719.4 on this site appears to be 9 thick with rock outcroppings. `75 I b. Surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three' \ ` \, oc \ c� Q* -� r 0 ✓ acres shall be controlled by a sediment basin. The minimum storage capacity of a sediment basin shall be 134 cubic Erosion Control Program Qe i� yards per acre of drainage area. The outfall system shall, at a minimum, maintain the structural integrity of the basin TABL PA during a twenty-five year storm of 24-hour duration. Runoff coefficients used in runoff calculations shall correspond to . �, \ ►� • Install construction entrance with wash rack \ 1 A :I � + 36.0' I J a bare earth condition or those conditions expected to exist while the sediment basin is utilized. \ . e \ 8 050 sf \ j • Install wire supported silt fence ►� . •' 1 , �, will minimize erosion, Slopes that are found to • Install culverts outlet protection \ ' 1. WALLPA�K LIGHTS PIG4L 0 ` \ GENERAL OFFICE USE \ ! 7. Cut and fill slopes shall be designed and constructed in a mannerthat p (�'Y ) be erodingexcessive/ within one year of permanent stabilization shall be provided with additional slope stabilizing • Grade site and seed all exposed surfaces immediately upon \ \ °l . ;, + t `` FF=73233' \ i I 3r 3 Y TYPE 2,9,CONSTRUCTION, USE- B 0 measures until the problem is corrected. reaching final grade \ 8. Concentrated runoff shall not flow down curt or fill slopes unless contained within an adequate temporary orGeneralErosion and Sediment Control Notes VESH Table 6-1 \ \ m°' a t ) 'i t o o �ITa� eY permanent channel, flume or slope drain structure. \ \ ' S 4 g �. ';' cis �, I ES-1. Unless otherwise indicated all vegetative and structuralFCSA / 9. Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. Gov�ITOi� \ _ _ _ _� e "� \`` �/ C o j erosion and sediment control practices will be constructed and . _ ______._______ ____.____ , 0 s -- ., maintained according to minimum standards and s ecifications of --732-- �- 10. All storm sewer inlets that are made operable during construction shall be protected so that sediment -laden water 9 P a ' cannot enter the conveyance system without First being filtered or otherwise treated to remove sediment. the Virginia Erosion and Sediment Control Handbook and Virginia Regulations 4VAC50 30 Erosion and Sediment Control Regulations. '� C/0 11. Before newly constructed stormwater conveyance channels or pipes are made operations., adequate outlet protection ! and any required temporary or permanent channel lining shall be installed in both the conveyance channel and ES-2. The plan approving authority must be notified one week receiving channel, prior to the pre -construction conference, one week prior to the commencement of land disturbing activity, and one week prior to ti 12. When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control \ \ \ the final inspection. sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structures if armored by nonerodib/e cover materials. ES-3. All erosion and sediment control measures are to be placed All plantings will conform with Section 165-368 of prior to or as the first step in clearing, the Frederick County Zoning Ordinance, Planting PROPOSED PLANTINGS 13. When a live watercourse must be crossed by construction vehicles more than twice in any six-month period, a Selection, Planting Procedure, and Maintenance. 20' 0' 20' temporary vehicular stream crossing constructed of nonerodib/e material shall be provided. ES-4. A copy of the approved erosion and sediment control plan shall be maintained on the site at all times. HEDGE -BOXWOOD - (18) PROPOSED FOR 14. All applicable federal, state and local regulations pertaining to working in or crossing live watercourses shall be met. Parking Lot Landscaping Data HEADLIGHT SCREENING - (3 GALLON CONTAINER) GRAPHIC SCALE r Prior to commencing land disturbing activities in areas 15. The bed and banks of a water course shall be stabilized immediately after work in the watercourse is completed. other than indicated on these plans (including, but limited to, Per Code Proposed other 16. Underground utility lines shall be installed in accordance with the following standards in addition Ca other applicable off -site borrow or waste areas), the contractor shall submit a 1 Tree per 10 spaces 3.5 4 criteria: supplementary erosion control plan to the owner for review and (39 spaces) TREE - PIN OAK &/OR RED MAPLE -16 PROPOSED approval by the plan approving authority. OTHER DECIDUOUS SPECIES MA Y BE SUBST17VTED a. No more than 500 linear feet of trench may be opened at one time. Total Impervious Area 1 per 2000 sf 12 WITHAPPROVAL OFFRED. CO. DEPT. OFPLANNING ES-6. The contractor is responsible for installation of any 23,085 sf 11,5 MINIMUM - 2" CALIPER b. Excavated material shall be placed on the uphill side of trenches. additional erosion control measures necessary to prevent erosion and sedimentation as determined by the plan approving authority. Percentage of Green 5% 6.6% c. Effluent from dewatering operations shall be filtered or passed through an approved sediment trapping device, or Area in Parking Lot 721 sf 955 both, and discharged in a manner that does not adversely affect flowing streams or off -site property. ES-Z All disturbed areas ,are to drained to approved sediment 14,435 sf d. Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote control measures at all times during land disturbing activities and stabilization. during site development until final stabilization is achieved. INLET PROTECTION NOTE: e. Restabilization shall be accomplished in accordance with these regulations. ES-8. During dewatering operations, water will be pumped into SILT FENCE USED AS INLET PROTECTION PIPE OUTLET CONDITIONS 0. an approved filtering device. 4 f.Applicable safety regulations shall be complied with. IS NOT ALLOWED IN FREDERICK COUNTY, A ---�- .�,� Y. 17. Where construction vehicle access routes intersect paved or public roads, provisions shall be made to minimize the periodically The contractor shall inspect al/ erosion control measures CONTRACTOR MUST INSTALL THE A ° 1 J U4 transport of sediment by vehicular tracking onto the paved surface. Where sediment is transported onto a paved or periodically and after each runoff -producing rainfall event. Any public road surface, the road surface shall be cleaned thoroughly at the end of each day. Sediment shall be removed necessary repairs or cleanup to maintain the effectiveness of the OPTIONAL STONE ARC AS SHOWN, I shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be erosion control devices shall be made immediately, se \ a from the roads by shoe g p g P P 'Q allowed only after sediment is removed in this manner. This provision shall apply to individual development lots as well CONSTRUCTION OF A SILT FENCE � W U) t� o as to larger land -disturbing activities. Frederick Counts Note: (WITH WIRE SUPPORT) �'"'�'" _� � � U z Q The Public Works and Engineering Department will retain the SILT FENCE CULVERT INLET 18.All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or right to add to or modify .these erosion and sediment control 1, SET POSTS NO EXCAVATE A 4"1 2. STAPLE WARE FENCING TO THE POSTS. after the temporary measures are no longer needed, unless otherwise authorized by the local program authority. measures during the construction process, within reason, to H Up�ppE /�,Orp ME UNE b s Q O � at W Z Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be ensure adequate protection to the public and environment. OF POSTS. PR 0 rA.IirDL N °" '-' 4 O CL p permanently stabilized to prevent further erosion and sedimentation, i � � co v 19. Properties and waterways downstream from development sites shall be protected from sediment deposition, erosion Q ENDwAL s�xo�r A -A .- m W v and damage due to increases in volume, velocity and peak flow rate of stormwater runoff for the stated frequency -. woos,,,,, , u ,�Y „ „r,; agM~` NMIIIIIIIIIIIIIIIIM """�""'�0°a' IT IT it W W ~ with the following standards and criteria: `�i z ` III~ OW As �AT� U j Z Q � � s �� � n%��si�oi swa�ae, cur � � � -CI � storm of 24-hour duration in accordance w o gLCJ boom '°' " w STONE CONSTRUCTION ENTRANCE -- /� ''°'E °� "`' CULVERT �°""°" '� • are-? Q 0 ,, (III III ,Q m Phru oodorn4,°rr M•abw•- `-- Dd NL�T t twnnihat W WL ulna - Seeding Schedule er section 3.32 of VESH � .��/� ,/ g fa ) U 00 2-J• IPNI�Ch tiadK a' bronoA t�7• A � ��."■+ I �� W sat �r _ 1.} Topsoil will be spread at a minimum depth of 4 ". 2-3• sauoar s a�Ow��yr of r M= cum pow 2.) Pulverized agricultural limestone will be incorporated into ~ Phm n�ea►p r �" A ' the soil at a rate of 92 lbs per 1000 s uare feet 2 tons per JJ a:rnMu P q ( P ftm awao rn , u°e SIDE ELEVATION FLOW " acre). atiarp to wows Phan• nwor anm ewola• 4 3.) Fertilize with 10-10-10 at a rate of23 /bs per 1000 0bW r/4 =t Cub an OWM & "'w spoub square feet p ) o N, ana � o 7. ww. q (1000 Ibs er acre . x an hottan a T 4.) Seed mix will consist of 75 %Kentucky 31 Tall Fescue, 10 10"I"' oonpootad --�+� t++ + lArnnoha° W MN 3. ATTACH THE WEIR FABRIC TO THE WIRE 4. BACKFi L AND COWACT THE • 7�E OF �' ADO ' % Annual Rye, 10 % Foxtail Millet, and 5 % Red Clover at y �+"° � arrd ktok, -%.. FENCE AND EXTEND R MW THE TRENCH. EXCAVATED S014 200 !bs per acre, w CONTAINER GROWN SHRUB ,� SLT FENCE 5.) Straw mulch will be applied to al/ seeded areas at the Z Phi suak"1° w is TCMr�aoDISTMCE �� IF FMrate of 3500 ibs per acre and anchored with cutback, or 0 � Phmet' 2'-3" muk+h emulsified asphalt applied at a rate of 200 gallons per acre. Z Z or b) out arty dead Flew Z O or brotarr bnnohea AMrrrow lop o/ a�lir baNwt Barn bunk LAwnow wdtn"R ita n,a:r slot► o+r to v or a -\ Nunn i T / z � "'°"' • ; I �- �- !i * Seals and Signatures ft4 PAN/' I - ,/ OPTIONAL STONE COMBINATION W � a,00t oar r»rr,. 2-3• saw« eorrol to or t 2' ��" �! VIEW r�' ur rx r� �p,1.TH QF j m dww r e' °Bali w=0 A."�' wM. r PLOW- G'r 4} BENJAMIN C. `� iam„ow b a '"'Q NOS z�oeaoTM h v MONTGOMERY v Q root bow4 SECTION A -A ii mw ,� , _ 0 0 nsolr x kwbF4INT QWV be FtAwor a " A No. 030342 woEXTENSION OF FABRIC AND MITRE INTO TM TRENCH. � O� �� ,-+ Ln � �~ p� ~ O""�aM M Lw a w *WZ - do not b1 w?dM io dr0 ' *PO ' • • , ' S C7 { r L hdo 2-1 Lino• root bar ob" 1 FILTER FABRIC ti SI011JAL �� DATE: DEC. 6, 2004 BALL & BURLAP SHRUB TREE PLANTING DETAIL "�'°"�' ,w 'T �TAWIN «A� I RIPR�P SCALE: i° = 20' SHRUB PLANTING DETAIL . m sME) SECTION B-B I rr�E HM VEII OF A w m cooblib THESE PLAINS ARE IN CONFORMANCE WITH COUNTY OF (NOT In S1Cr4t4 FREDERICK STANDARDS AND ORDINANCES. ANY DEVIATION FILE NO. 0144 OR CHANGE IN THESE PLANS SHALL BE APPROVED BY THE ZONING ADMINISTRATOR PRIOR TO CONSTRUCTION. SHEET 3 OF 3 90URCE: from lest�loiion of Show and fo6ric Fier Banters for Sediment Control PtAiE. 3.0�1 PLATE. 3.08-1 Snood & SOURCE: ADAPTED from VDOT Standard Shoats and Va. DSWC �4 EROSION &SEDIMENT CONTROL STANDARDS E & S CONTROL NARRATIVE i ` `� �� LL L f Jo. F', � cm Project Description � � � 4a-°"""��"� �� \ � } �'"""'--� � �� 1. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is p , \ 728 ti UgHMOLE f ix g w/1 \� w 3 ' •. reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas �'-� `-" "--" ;raw Iw - " '� w that may not be at final grade but will remain dormant for longer than 30 days. Permanent stabilization shall be This site is located in the Battlefield Business Park on the east 5os _" "�"�____.____-_..________�_h �; �^ _ _- , c :' ::: J `� applied to areas that are to be left dormant for more than one year. side of Sulky Drive. The purpose of this development for the co co .� K- , construction of 8, 650 sq, ft. of buildings to be used for offices T/' "' 600 sf i, , i ' f' ; ` `w� _ i i , `` I �c.' a 2. During construction of the project, soil stockpiles and borrow areas shall be stabilized or protected with sediment and computers. This development also has parking and drive t i o COMPUTER ROOM S� ! ' i i i I { ri # { t/s'IYM trapping measures. The applicant is responsible for the temporary protection and permanent stabilization of all soil \ N Q ' ' # � I ' ! ` ( o PP 9 PP P P rY P P aisles for access, , F) 732.33 i t i i �. ! 73o I I 215.R O stockpiles on site as well as borrow areas and soil intentionally transported from the project site. �70R _ 4- i i , ! \ 30' j I I�I 3. A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent Existing Site Conditions Q 2 y P 9 P Y 1 S.R.,__, vegetation shall not be considered established until a ground cover is achieved that is uniform, mature enough to 1\ t ( survive and will Inhibit erosion. The lot is a vacant field. The ground cover is grass with some / ,� / ; > N brush along the eastern side. 1 x Loading ,pace / ,- «731- f ete dikes, sediment barriers n other measures Intended to trap sediment shall ` "' % `% \ '� "`"- ii 4. Sediment basins and traps, perimeter d es, ed ent ba and p , ���. � � !! �, � � \ ` I 4L�4_�,�, � � •� Q 3 be constructed as a first step in any land -disturbing activity and shall be made functional before upstream land Ad acent Parcels �, , W `'' o " Z a� > _ disturbance takes place. i DUM15F\ \ \ \ �, 9' 8' 8' Og- 1-5 �= p 2 , I � �a► O E The adjacent parcels are a vacant lot like this one. \ A� , ! \ ; �, f , - { r . „ I O a3 0 5. Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after ` ( ' ! ti I I ! �� {���~° i '\ ` i X.3 .7 I C installation. Soils\! 732OD 6.Sediment traps and sediment basins shall be designed and constructed based upon the total drainage area to be f � � s E\ ! � w ! r `:� served by the trap or basin. The soils types determined from the USDA's "Soils Survey of Q ` ti + \ 1 ! I, { ! ! , !! ! i l \ J \ ti ! i I I ! f ! SSMH 5 Frederick County, VA"shows Carbo-Oaklet rocky silt loams a. The minimum storage capacity of a sediment trap shall be 134 cubic yards per acre of drainage area and the trap classified as #6C. This soil is predominately yellowish brown silt r r r �,� •�'1, tVr''�,apt' .. .' SI° '�';.+� INV shall onlycontrol drainage areas less than three acres. _ _._.... __....__._r_ ... �_,... �_.� _..-,,,..._ . __�...___.�4c:�'.<,__, _...:___.,_ :...�r. __a.___, a + 9 hams over bedrock and offers severe erosion hazards. Topsoil lu , �., .x __...,... rr:.._._..r,___..�_..�.._x..�, 1 . . a __ _ ._ .._ l,...._-_.., _ _ ...,. _.....__ :..._ ....... ,._, �; - is '` i I I IN,V'OLI=719.4 on this site appears to be 9" thick with rock outcroppings. ; j 75 b.Surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three ` \ �, t, d' 1, c� \ o M _ - .- - o - { r . o ✓� acres shall be controlled by a sediment basin. The minimum storage capacity of a sediment basin shall be 134 cubic Erosion Control Program yards per acre of drainage area. The outfall system shall, at a minimum, maintain the structural integrity of the basin TABL PADS during a twenty-five year storm of 24-hour duration. Runoff coefficients used in runoff calculations shall correspond to 3s0' • Install construction entrance with wash rack \ :� i \ I ` a bare earth condition or those conditions expected to exist while the sediment basin is utilized. � � a •'� � p • Install wire supported silt fence \ ,� �� !... + �; 8,050 sf. 1 , 7. Cut and fi/I slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to • Install culverts outlet protection \ `, 1'• WALLPA�K LIGHTS IYPICAL) i `` ` `GENERAL OFFICE USE-,,, be erodingexcessive/ within one year of permanent stabilization shall be provided with additional slope stabilizing • Grade site and seed all exposed surfaces immediately upon \ \ ` , . i, \ FF-732.33 \ �' y y P P P 9 \ co � ! TYPE 2�B,,CONSTRUCTION, USE 8 measures until the problem is corrected. reaching final grade \� \ t' ' �r �n \ 1 rye 8. Concentrated runoff shall not flow down curt or fil/ slopes unless contained within an adequate temporary or \ C �4' ' "� C± ?' i i`TAP er P q P O' General Erosion and Sediment Control Notes (VESH Table 6-1) e,j k S `�. \ �5 permanent channel, flume or slope drain structure, S �q ES-1. Unless otherwise indicated all vegetative and structural \ ,4, 9. Whenever water seeps from a slope face adequate drainage or other protection shall be provided. g GENERATOR \ erosion and sediment control practices will be constructed and \ \ a ----- - -- --- ---- -----------� -- -- = y A -� --� - 10. All storm sewer inlets that are made operable durin construction shall be protected so that sediment -laden water maintained according to minimum standards and specifications of �'"" 0 cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment, the Virginia Erosion and Sediment Control Handbook and Virginia Regulations 4VAC50-30 Erosion and Sediment Control Regulations. 5 - s -- S - --'S 0 0�l S -- S - S - 5 - S - $ - - S0 11.Before newly constructed stormwater conveyance channels or pipes are made operations., adequate outlet protection t e and an required temporary or permanent channel lining shall be installed in both the conveyance channel and Y q P Y P 9 Y ES-2. The plan approving authority must be notified one week receiving channel, \ j prior to the pre -construction conference, one week prior to the IZ, When work in a live watercourse is performed, commencement of land/ disturbing activity, and one week prior to `� ' �. t p , precautions shall be taken to minimize encroachment, control the final inspection. \ \ \ / ► I I , sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerodib/e material shall be used for the construction of causeways and cofferdams. Earthen fill maybe used for these structures if armored by nonerodible cover materials, ES-3. All erosion and sediment control measures are to be placed All plantings will conform with Section 165-36B of prior to or as the first step in clearing. the Frederick County Zoning Ordinance, Planting PROPOSED PLANTINGS 13. When a live watercourse must be crossed by construction vehicles more than twice in any six-month period, a Selection, Planting Procedure, and Maintenance. 20' 0' 20' temporary vehicular stream crossing constructed of nonerodible material shall be provided. ES-4. A copy of the approved erosion and sediment control plan shall be maintained on the site at all times. HEDGE - BOXWOOD - (28) PROPOSED FOR GRAPHIC SCALE 14. All applicable federal, state and local regulations pertaining to working in or crossing live watercourses shall be met. Parking Lot Landscaping Data HEADLIGHT SCREENING - (3 GALLON CONTAINER) 15. The bed and banks of a water course shall be stabilized immediately after work in the watercourse is completed. ochES-e Prior to commencing land disturbing activities in areas Per Code Proposed other than indicated on these plans (including, but limited to, --- 16. Underground utility lines shall be installed in accordance with the following standards in addition to other applicable off -site borrow or waste areas), the contractor shall submit a 1 Tree per 10 spaces 3.5 4 criteria: supplementary erosion control plan to the owner for review and (39 spaces) TREE - PIN OAK 8/OR RED MAPLE -16 PROPOSED approval by the plan approving authority. OTHER DECIDUOUS SPECIES MAYBESUBSTITUTED a. No more than 500 linear feet of trench may be opened at one time. Total Impervious Area 1 per 2000 sf 12 WITHAPPROVAL OFFRED, CO. DEPT. OFPLANNING ES-6. The contractor is responsible for installation of any 23,085 sf 11.5 MINIMUM - 2" CALIPER b. Excavated material shall be placed on the uphill side of trenches. additional erosion control measures necessary to prevent erosion and sedimentation as determined by the plan approving authority. Percentage of Green 5% 6.6% c. Effluent from dewatering operations shall be filtered or passed through an approved sediment trapping device, or Area in Parking Lot 721 sf 955 both, and discharged in a manner that does not adversely affect flowing streams or off -site property. ES-7. All disturbed areas are to drained to approved sediment 14,435 sf d. Material used for backfrlling trenches shall be properly compacted in order to minimize erosion and promote control measures at all times during land disturbing activities and W stabilization, during site development until final stabilization is achieved. INLET PROTECTION NOTE: a e. Restabilization shall be accomplished in accordance with these regulations. ES-8. During dewatering operations, water will be pumped into SILT FENCE USED AS INLET PROTECTION PIPE OUTLET CONDITIONS an approved filtering device. � f.Applicable safety regulations shall be complied with. IS NOT ALLOWED IN FREDERICK COUNTY. A, r'•®I j 17. Where construction vehicle access routes intersect paved or public roads provisions shall be made to minimize the ES-9. The contractor shall inspect all erosion control measures CONTRACTOR MUST INSTALL THE �(�►►.) W P p ' P periodically and after each runoff -producing rainfall event. Any A O transport of sediment by vehicular tracking onto the paved surface. Where sediment is transported onto a paved or OPTIONAL STONE ARC AS SHOWN I v a Q public road surface, the road surface shall be cleaned thoroughly at the end of each day. Sediment shall be removed necessary repairs or cleanup to maintain the effectiveness of the so \ �, c from the roads b shoveling or sweeping and transpotted to a sediment control dis osal area. Street washin shall be erosion control devices shall be made immediately. LU Q Z allowed only after sediment is removed in this manner. This provision shall apply to individual development ots as well CONSTRUCTION OF A SILT FENCE Z � � p M as to larger land -disturbing activities. Frederick County Note: (WITH WIRE SUPPORT '" �"' --�- U w Q '. The Public Works and Engineering Department will retain the SILT FENCE CULVERT INLET z a C" - 18.A11 temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or right to add to or modify these erosion and sediment control �, g� ppgTg �D EXCMATE A 4•X4• 2. STAPLE WIRE FENCING TO THE POSTS. p tZ C: , z after the temporary measures are no longer needed, unless otherwise authorized by the local program authority. measures duringthe construction process, within reason, to TRENCH UPSLOPE WING THE LINE D s --- � Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be P PR 0 TECTION O i O ensure adequate protection to the public and environment. OF P05i5. i ti C� U permanently stabilized to prevent further erosion and sedimentation, m Q Q Q EHDIYNl 8rertauHt A-,t aewr ar�r r-rr �aao�s T �aimra� cn V) W W 19. Properties and waterways downstream from development sites shall be protected from sediment deposition, erosion ferFs 1 MRQi L1i1a 1NY 1[ RlMP, illaDr[p R1PIdW. 611Oi �L O � W W and damage due to increases in volume, velocity and peak flow rate ofstormwater runoff for the stated frequency f + � a oarnae:s CL. L. Z q / L La = Me Le" or TW FAMW MIW a cMAUTO storm of 24-hour duration in accordance with the following standards and criteria: -'' �' �� �n,o r &,�,. AM ��� O W � W r j � // TOE OF FILL 8owvw Va am Pfabr 8. f8-f � Q Runt out oraA or -,�„ CULVERT Almor"I.t, , STONE CONSTRUCTION ENTRANCE -- � � M ��= ea =�. �� � Jill 1 Jill Q LL Q „ , pi n, ooeovnprmrrt .. DO moo pin, bnn*w/ �,,,� wwnTwa � i �/ � � Seeding Schedule (per section 3.32 of VESH) � � Ibodrr or brmoA � � G"'y J - /� C� • 2�. s�,cN s sit topes ( ror "t ho = 1.) Topsoil will be spread at a minimum depth of 4'. Ptir,• nee►,p I 2.) Pulverized agricultural limestone will be incorporated into p rL TQ a orn r osrn�u �'" the soil at a rate of 92 lbs per 1000 square feet (2 tons per J SIDE ELEVATION FLOW I I acre). O°"�'01DW' we 3.) Fertilize with 10-10-10 at a rate of 23 lbs per 1000 ae10�rf�otrb �. & � °"°"� 4 • square feet (1000 lbs per acre). Pam e ar, d ° 7' � -�- 4.) Seed mix will consist of 75 % Kentucky 31 Tall Fescue, 10 rnobr Rrmow and _' - ate' an1101iN , W NK 3. ATTACH THE FILTER FABRIC 70 THE WIRE 4. eACKFILL AND COMPACT' THE • � °F �' % Annual Rye, 10 % Foxtail Millet, and 5 % Red Clover at 3 _I._ FENCE MID EXTEND tr Irro THE TRENCH. EXCAVATED SOIL 200 lbs per acre, w sLT FENCE • 5. Straw mulch will be applied to all seeded areas at the CONTAINER GROWN SHRUB ) pp Aug. VA*" � � D � IF � rate of 3500 lbs per acre and anchored with cutback, or a� asrod art oMW oI baft 2.�. rMrk�r emulsified' asphalt applied at a rate of 200 gallons per acre. Z z r 1 Wne al fiWMW bop o/ wkw bolt FLAW ti Z / _ w�r� •bc ► &I w.a to emu � --� T '� � * W z w „orm ..� �. �.-- Seals and Signatures ,,,,� _ _ OPTIONAL S T ONE COMBINATION or�tnoN PLAN VIEW Sit bop of root boI k''.,�N, r� �, •�► ��. (jil /'�`-�''`. (III > im 2-3• sarroor bo or 1-r � ..r P, , ur rx __�...� � LTH p fi !r m - . prodw �� ` •' � P&tA to New �' w. / L� _ 1.0' �,S• w r--- l�� Q I haw" °� �"' ,w,� � �. � � Flow _ w► mm mpo & bwlap ra.,� a mu v B E NJAM I N C. y w u� kD h°"' ,00t bob: '�"'° SECTION A -A I . MONTGOMERY o M a M r p Nlo. 030342 w p P t ow a aoI - EXI N" OF FABRIC AND WIRE INTO THE TRENCHdo wt. O� � *-+ Ln wider,! moot &A er�e�or. *V ate«, 0 dopM C% Orb hod 2-3 &w root bW wA*h � ' FILTER FABRIC NAL DATE: DEC. 6, 2004 F BALL & BURLAP SHRUB / TREE PLANTING DETAIL a� ,� rm T MBA iTfF IN 'H of • � «Ass I RPW SCALE: 1" = 20' SHRUB PLANTING DETAIL SECTION B-8 I • WIRE HIGH V01M Of FLAW IS ExPE�= THESE PLANS ARE IN CONFORMANCE WITH COUNTY OF (NOT 1n SCALE) - FREDERICK STANDARDS AND ORDINANCES. ANY DEVIATION FILE NO. 0144 (NOT Tiff SC40 OR CHANGE IN THESE PLANS SHALL BE APPROVED BY THE ZONING ADMINISTRATOR PRIOR TO CONSTRUCTION. SOURCE: A ed from lmtda6m of Stmw and Fabric Filler Baal M far Sediment Cotrtral. PME 3.05--1 SOURCE: ADAPTED from VDOT Standard Sheets and Va. DSWC SHEET 3 OF 3 f %MW PLATE. 3.08-1 Lin N Q