HomeMy WebLinkAbout54-08 Winchester Country Club - Pool Renovation - Shawnee - Backfilem GENERAL NOTES 1. The property delineated on this plan is located approximately 0.4 miles east of Interstate 81 on the south side of Seseny Road. The site currently holds the Winchester Country Club. The property owner proposes to reconstruct the existing inground pool area. There is no required parking or loading associated with this construction and all required landscaping buffers currently exist. 2. Property Owner/Developer: Contact: Mr. Rupert Werner Winchester Golf Club 1300 Senseny Road Winchester, Virginia 22602 Telephone: (540) 723-9780 3. Engineer/Landscape Architect: Contact: Mr. Timothy G. Painter, P.E. PAINTER-LEWIS, P.L.C. 817 Cedar Creek Grade, Ste. 120 Winchester, Virginia 22601 Telephone: (540) 662-5792 4. Topographic information shown on these plans was provided by Perry Engineering. 5. Site Data: Total Parcel Area: 156.18 Acres P.I.N: 54-A-139; 54-A-140; 54-A-141 Zoning: RA -Rural Areas District (all parcels) Magisterial District: Shawnee Existing Use: Recreational Use (Country Club) Front Yard Setback (R.O.W.): 60 ft Rear Yard Setback: 100 ft Side Yard Setback: 100 ft Maximum Building Height: 35 ft 6. Parking Space Requirements: No additional parking or loading is required. 7. Landscaping Requirements: No additional landscaping is required. WATER AND SEWER SERVICE Frederick County Sanitation Authority P.O. Box 1877 Winchester, VA 22604 540-868-1061 BUILDING INSPECTIONS Frederick County Inspections Department 107. N. Kent Street Winchester, VA 22601 540-665-5656 EROSION AND SEDIMENT CONTROL Frederick County Public Works Department 107 N. Kent Street Winchester, VA 22601 540-665-5643 NATURAL GAS Shenandoah Gas 350 Hillandale Lane Winchester, VA 22602 540-868-7911 ELECTRIC SERVICE Allegheny Power 3463 Valley Pike Winchester, VA 22602 540-722-5830 TELEPHONE SERVICE Verizon 404 Hillandale Lane Winchester, VA 22602 540-665-3156 PUBLIC ROAD IMPROVEMENTS Virginia Department of Transportation 14031 Old Valley Pike Edinburg, VA 22824 540-535-1818 RESPONSIBLE LAND DISTURBER NAME: CERTIFICATION #: DATE: THE RESPONSIBLE LAND DISTURBER IS THE PARTY RESPONSIBLE FOR CONSTRUCTION & MAINTENANCE OF ALL THE LAND DISTURBING ACTIVITIES AS SET FORTH IN THESE PLANS. nwill MLCHE TER COO U TRY CLU = POOL RENOVATION ❑, SHAWNEE MAGISTERIAL DISTRIC-r 1300 SENSENY ROAD FREDERICK COUNTY, VIRGINIA ti h CITY OF WINCHESTER 4 _ 1 // r VICINITY MAP 1" = 2000' 00 1 0 1 �� li ate•.•.. O o 0, p 13 e 1TA y i A.A e iPROPOSED`V / 1 POOL RMVAWN I �! o 77. 9705 ACRES LOG470V ® TAX PARCEL �- 24.4385 ACRES 1 1 1 EX PARKIAIG r 1 � Ex. GYl1BM0USE `;•- w r' 1 f.. I � TAX PARCEL ' ' A-A.141 1 I 53. 7�97 ACRES 1 1 t 100— YEAR 1 �► FLoo®PLAIN LIMITS 1 ID / 1 _ O 1 O PROJECT OVERVIEW 1 " =300' ABBREVIATIONS ASSY. ASSEMBLY B.F. BASEMENT FLOOR BLK. BLOCK BC BOTTOM OF CURB BML BUILDING MOUNTED LIGHT BP BREAK POINT BSBD. BASEBOARD CG-2 VDOT CURB CG-6 VDOT CURB & GUTTER CIP CAST IN PLACE CONCRETE CL CLASS CMF CONCRETE MONUMENT FOUND CPP CORRUGATED POLYETHYLENE PIPE CMP CORRUGATED METAL PIPE CMPA CORRUGATED METAL PIPE ARCH CO CLEAN OUT DIA. DIAMETER DS DOWNSPOUT EOP EDGE OF PAVEMENT EOG EDGE OF GRAVEL EX. EXISTING F.F. FIRST FLOOR F.F.E. FINISHED FLOOR ELEVATION FDC FIRE DEPARTMENT CONNECTION FG FACE OF GUTTER FH FIRE HYDRANT F.L.S. FIRE LANE SIGN F.LT. FLOOD LIGHT Go. GAUGE GM GAS METER GV GAS VALVE or GATE VALVE HCR HANDICAP RAMP HB HOSE BIB HDR CURB 6" HEADER CURB HP HIGH POINT HTR. HEATER INC INCREASER INV INVERT IPF IRON PIPE FOUND IPS IRON PIPE SET LP LOW POINT LT. LIGHT MLP METAL LIGHT POLE MPD MULTI -PRODUCT DISPENSER MP METAL POST MH MANHOLE NDC NOSE DOWN CURB N.P.S. NO PARKING SIGN NLT NO LEFT TURN NRT NO RIGHT TURN N.T.S. NOT TO SCALE OHE OVERHEAD ELECTRIC OHT OVERHEAD TELEPHONE PIV POST INDICATOR VALVE PL PROPERTY LINE PP POWER POLE PROP. PROPOSED PVMT PAVEMENT RCP REINFORCED CONCRETE PIPE R.D. ROOF DRAIN RED. REDUCER R.O. ROCK OUTCROP SAN. SANITARY SEW. SEWER STD. STANDARD T.B.D. TO BE DEMOLISHED T.B.R. TO BE REMOVED T.B.P. TO BE PRESERVED or PROTECTED TB or T.B. THRUST BLOCK TC TOP OF CURB TEL. TELEPHONE TRB TELEPHONE RISER BOX TVRB TELEVISION RISER BOX TYP or TYP. TYPICAL UGE UNDERGROUND ELECTRIC UGG UNDERGROUND GAS UG CATV UNDERGROUND CABLE T.V. UGT UNDERGROUND TELEPHONE XFMR ELECTRIC TRANSFORMER WL WATERLINE WM WATER METER WPP WOOD POWER POLE WTP WOOD TELEPHONE POLE WV WATER VALVE 5'R RADIUS IN FEET *00.00 PROPOSED SPOT ELEVATION x(00.00) EXISTING SPOT ELEVATION HATCHING INDICATES REVERSED PITCH IN THE GUTTER PAN: PITCH TO BE PER FOOT. TRANSITION THE GUTTER OVER 0LENGTH � P) TH Op �1 . PAINTER Lic. o. 018260 st2q /og �� w SSIONAL LIST OF DRAWINGS: SHEET 1/8: COVER SHEET SHEET 2/8: SITE DEMOLITION PLAN SHEET 3/8: SITE LAYOUT PLAN SHEET 4/8: SITE GRADING PLAN SHEET 5/8: EROSION AND SEDIMENT CONTROL PLAN SHEET 6/8: SANITARY LATERAL PLAN, PROFILE, AND EROSION AND SEDIMENT CONTROL PLAN SHEET 7/8: EROSION AND SEDIMENT CONTROL DETAILS SHEET 8/8: CONSTRUCTION DETAILS ZONING ADMIN APPROVED FREDERICK COUNTY, VIRGINIA SITE PLAN VALID FOR FIVE (5) YEARS FROM DATE OF APPROVAL SITE PLAN VALID FOR TWO (2 YEARS FROM DATE OF FCSA APPROVAL [POOL R"IENOWATWX SHAWNEE MAGISTERIAL DISTRICT 1300 SENSENY ROAD FREDERICK COUNTY, VIRGINIA PAINTERmLEWIS, P.LC, 817 Cedar Creek Grade, Suite 120 Winchester, Virginia 22601 Telephone (540) 662-5792 op FF Facsimile (540) 662-5793 Email: off icegpainterlewis.com JOB NO.: 0806001 CONSULTING September 5, 2008 SHEET: ENGINEERS 1 /8 Latest Revision Date: October 28, 2008 \ lA \ EX. TREES \ \ \ 1 I ❑ J FCC. FENCE (TO REMAIN EX. WOODEN _ STAIRS (APRX.) APRX LOC. EX. CPP I PR. SEATING AREA (TO REMAIN) 5 ,fi $ P _ ECANOPY LINE —_ I EJINV-685.3 X. 7 EX. CONC. (TO REMAIN) L — a INv=s55 5 0 0 ° o 13EX. CO II Q� EX. GREEN 9OP=688.7 =684.9 EX. TREES (TO REMAIN) EX. TREES EX. TREE X'`\ ALL PR. STORM PIPES SLOPE ® 1.00% (TYP.) z _j\`i�, �/ (TO REMAIN) (SEE STORMWATER MANAGEMENT REPORT) L V 1 INV=6684. N.3 45 PR. 8"0 PATIO DRAIN (TYP.) 6 a Pvc (SEE DETAIL) EX. TREE l { � r. • �g �B PR. CO (TO REMAIN) 1 INV 683.9 O�--- _ — — — — — -� TO s9,/0 REMAIN as 0 P i �' P� X. FENCE E O=688. PR. 10'x10' FNO=688.7 1 INPV=683.5 .�j RIPRA; _ INPV=684.1 ❑O INv �s>310 / TRANCE DRIVE R. POOL �-PR. 8' GATE,/ EX. EN \� EQUIPMENT RROCHS() E PROPOSED POOL AREA v SEE ARCH. DRAWINGS G FOR DIMENSIONS AND"->- EX. TREES T =7 =•7 /;INV-=M3 LAYOUT DETAILS) h° $a EX. TREE I 3 INv=6 .7�' :o(TO REMAIN) C014+00 PR. 8"0 PATIO DRAIN (TYP.) _ 0 EX. AREA DRAINS cnlo `o I .■ 45' D (L� / /�PR. 100'-8"0 PRIVATE LAT. 16+00 TO REMAIN (TYP.) - �0 �` CO 15+00 �Im�l I PROPOSED POOL AREA �/ ,�e �C ® PR.PRIVATE LAT. Io z � P-¢QQ.7 SEE ARCH. DRAWINGS EX. BUBBLE COVERING Q INv= s FOR DIMENSIONS ANDQ' EX. TENNIS COURTS � LAYOUT DETAILS) PR. 2" METER _ �I J o 4Q IN =685.7 EX. POOL HOUSE (' ° f ' �c \ FENEEWWS LOCATED ERE AND TENNIS BUILDING I To , 45. REN 5 �4e / EX. TREES RUNE FF=689.45 e ,g. tiC� EX w_» °ey a ALL PR. STORM PIPES /SLOPE ® 1.00% (TYP.) (SEE STORM WATER/AN AGEMENT REPORT) ®INv=685:9 2. PQ \ Ex. LIGHT / (7-0 REMAIN) ' - - I i l 688'7 �OP=688.7 INV=685.8 ,NV=685.6 O f EX.-WALKWAYI I I I .� / \ PR. TEE CONN. 1 I I tiN 2 .8 - 0 PVC 23.8 -6 o PVC 68�8E.7 \/ / jWE ONPV=6853 PFOOL HOUSE,I (`'EE ARCH. F -EX-gA/CK-L LJ�J DRAWINGS) 9R(OREMA/N)4- EX. CONC. ' 1 INP'6 0 91 Nv=665.8 I i EX. GRASS AREA (TO REMAIN) I �c �� • i 3 i EX LATERAL TO BE I I RELOCATED AS REQUIRED EX. TENNIS COURTS PR.4 CONIC. WA '^ _T-7 - L K PR 4 CON-LWALK EX TREES r11ll�1:E CL1U11;17111irl]1L1\ (TO BE REMOVED AND --REPLACED w/ CC-6R) NYLOPLAST DRAIN BASIN / EX. WATER SERVICE LINES TO BE LOCATED IN THE FIELD Q(7;INTEGRATEDOLICTNEIRON EX. PARKING LOT AT THE TIME OF CONSTRUCTION; FTEDDUCRAME & GRATE TO — NEW 5/8" METER TO BE INSTALLEDO.D. PR. WYE CONNECTION IF REQUIRED MATCH BASIN O��` 0 EXISTING LATERAL FIELD VERIFY LOCATION) EX METER BOX i / 18•MINWIDTHGUIDELINE EX. (PRIVATE) r �R, e �EX. CO 8' MIN THICKNESS GUIDELINE MIN�IUM PIPE BURIAL (3) VARIABLE INVERT HEIGHTS DEPTH PER PIPE v� AVAILABLE (ACCORDING TO ®ADAPTER \� RECOMMENDATION ANOLEs PLANS! I AKL OFF) VARIABLE 6' • 7W TRAFFIC LOADS: CONCRETE SLAB DMr1ENS10NS ARE FOR OUDELINE o\r EX. PARKING LOT %Rl ACCNG TO LCONCRETE ` TAKING INTO CONSIDERATION LOCAL OCAL SOIL CONDITIONS, TRAFFIC Vl; I / LOADING, 3 OTHER APPLICABLE DESIGN FACTORS. rQ \� �\ ya[VARIABLE SUMP DEPTH J I ACCORDMG TO PLANS a• MRJ ON s• - za" (E" MM ON a- - 24•,10• MN ON 301 @ \y VARIOUS TYPES OF INLET 6 OUTLET ADAPTERS \ I AVAIABLE: 4' - 30' FOR CORRUGATED HOPE 6" MIN ON 30" I \ (ADS N-12, ADS SINGLE WALL, HANCOR DUAL. WALL), SDR 35, SCH 40 DWV, CORRUGATED R RIBBED PVC \ ❑ � i � \ THE BACKFMI MATERIAL SHALL BE CRUSHED STONE OR OTHER - \ GRANULAR MATERIAL MEETNG THE REQUIREMENTSI OF CLASS I EX. PARKING L 0 r EX. TREES \I \ I I �\ I I \\ I A Mr# I GRATE OPTIONS 8" 2808AG PEDESTRWNISTANDARD SOUO I BRONZE DOMEIDROPMI 10' 2810AG PEDESTIRIAWSTANDARD SOLID I BRONZE DOME DROP IN 12- 2812AG PEDESTRIAN I STANDARD SOLD BRONZE DOME DROP IN 15' 2815AG PEDESTRIAN STANDARD SOLD BRONZE DOME DROP IN 18' 2818AG PEDESTRIAN STANDARD SOLD NIA DOME DROP IN 24' 2074AG PEDESTRIAN STANDARD SOLD NIA DOME DROP IN 30• 2830AG PEDESTRIAN STANDARD SOLID N/A I DOME NIA CO N PSE �A 002 \ C \ \ w \ _ \ Na \ F4- \ w 1)n n 1)n Scale 1 = 2U tt 1 �o Iuj z I CD Z I z o z OL N E Z I �; O w O c� L i, I w I I 00 CD 0 N Q c� O m U Q D M Z J U Z �Q� >- o �0> Z < <}w :D >O FrLLJ Z f— 0 Z �-- N D o W (DWU F- 0 U _ a w o I U Z MW I- 3W Z w 3 m ll V) ■ J aN o � CD N 0) pry Cn 0 U 7 c\j� Ln 1 N 0) N CD 1 N CO 3 N L � p Lc^ (0 CO N c W CDp J y > 't ��� U c N Wp Cn N U E o 'p Q) U U 0) F- U w E Z '� L 00 44 IL Pti'tH OF 7 Lic. J 18260 OZ 8 IOt'1. L��'sIONAL. SURVEY: PERRY DRAWN BY: RED I;n SCALE: 1 "=20.0' SHEET: C.I.: NA JOB NO.: 0806001 DATE: 09/05/08 3/8 / EX. GREEN - ; ' '' >',, f a� m EX. �\ �\ ... GQ�/ \ C •, � d ! � k; Z U) t \ _ �� , h�•,-, EX. TREES:_ EX. W60DEN 1 STAIRS (APRX,) EX. ]BEES (TO REMAIN) _ TREES _ } 1 f EX. TREES w __.. Q _ z, o EX. TEE 8 y ;•� v ; �. EX. TREE �' IY�j\ (TO REMAIN)TO ,fit w -a �v . � I . ' ,� .Y�- � ✓ lam_ .: ,\�-I + Q CONIC. `�\w TREE - EX l �, TO REMAIN)-- =T TOP ( I P POOL - Y,� — — ' - -y r �' • � AIN RM — FE C TO R MAIN FENCE TO f CE TO REMAIN T POOL 0 ' \ TOP 7 I P TOP— / CE DRIVE TOP / EX ENTRAN T — E CANOPY LINE I o = = o o I TOP O TOP PO OL 10P 'I IQ / I EX. CONIC (TO REMAIN) I I I L o O O ° O F TOP IQ--- 688.70 T w TOP OP EX. TREE i a I ,` (TO REMAIN) TOP 1 00 TOP Q I OI — i I z I I TOP Z CON _ EX. BUBBLE COVERING (n 0 I I I TOP (� (' E�� i ° EX. TENNIS COURTS I I IO T / r \ - O ZO Q O — aD T TOI OOL TOP 7` \ Z Q Q EX. POOL HOUSE " o �, OOL TOP / � � � � \ > Z� AND TENNIS BUILDING W I L T EX. TREES \ W O W Z FF=689.45 I �' EX. 7FE ,\ N O W F- W OOL 10 TOP ——I TOP OOL 00 \ \ W O Q U EX. LIGHT / LDMG (TO REMAIN) \ \ \ _ LDG W M W I L'BDG / � / � U Z \ \ � Tv Z 3W LKWAY I I I I TOP TOP TOP CONC. / \ / / �` \ U EX. I�A3 Q w _1 / w ---------------�— — I I I \ = LL � L J PLANTERS (TO REMAIN) r j EX. CONC, I Ih TOP TOP r' TO REMA/N) - - - - - � EX. GRASS AREA (TO REMAIN) I C NCO 3 C*' I CONIC. / ccc��'��� / v` i 0 CN Q BLDG EX. TENNIS COUR7S j p� 0 Ikl I W I -- --- --- EX. TREES Cn (n N N '3 TOC �EX. (TOl BE REMOVED ANLT I 1 _ I I / CU�� • 1 � -�, � i � � � N REPLACED w/ CG-6R)uj J>LoLn@ 1 I EX. PARKING LOT N U C: O o a� Wvs a Fn_ W 0 Q) •u 'o LOL E A: Z � w 00 a EX. PARKING LOT / U V) J Lu W W I I Z ELI PZ,TH OF Dl EX. PARKING LOT «�\ \ I I I EX. TREES \ U TmwTrm Lic. N . 01� I SSIONAL SURVEY: C.I.: I \ I \ Y I� I PERRY 1' DRAWN BY: JOB NO.: \ I RED 0806001 20 0 20 60 SCALE: DATE: I 1 "=20.0' 09/05/08 I ��lb•,: I \\ SHEET: Scale 1 " = 20 ft 4/8 i m I Z 0 Z'I U I \ � ,4A 1 . 1 in Q- Z O Q � , 00 \ R - O F- sr Q \ SF U I- V 81111" (n p ' + Er- 0 } x v TS C* !' �`y . 2 _ \ \ A-{ �t rk° �m4 � mod., �i � i /" � p, � .. •-. � � "-.l"f � '�I PS TO U \ ,_ , y O CE ❑ \ \ r Xr Ar 4 LJJ i ->r •Y1 O w0w wnw _ o 0 of ,. �; ; • _ _ . ,0 P %TO mu / _ e-' I.. i �-`❑�` N � L j T 6SF 0 I � / PS TO - Citi1IT�b � —� \ _ W 0 o o 'o I / O MU D \ \ ���� Y > � 00, EX. POOL HOUSE \ \ a AND TENNIS BUILDING I i O,�t► SF '� \ W a) o FF=689.45 c, f? h \ _ U E ~ \ \ W 00 N / a z ch w j ZZ -------- - - lil i Ld $ i SFTH OF D / / * 1 /rIPA EROSION & SEDIMENT CONTROL KEY PAINTER I lie w \ L--- `♦ \ I Y' 3.02 TEMPORARY STONE CONSTRUCTION (;E ..... ....................... ENTRANCE 3.05 SILT FENCE X x x x 3.30 TOPSOILING ro 3.31 TEMPORARY SEEDING 3.32 PERMANENT SEEDING Ps 3.35 MULCHING Mu NOTE: THE ENTIRE DISTURBED AREA FOR THIS SITE IS LESS THAN 1 ACRE Li 018260 THEREFORE NO SEDIMENT TRAP OR BASIN IS REQUIRED FOR EROSION AND SEDIMENT CONTROL. �04��u�dPi ssIONAL SURVEY: C.I.: PERRY 1 DRAWN BY: JOB NO.: RED 0806001 20 0 20 60 SCALE: DATE: 1 "=20.0' 09/05/08 SHEET: 0 Scale 1 " = 20 ft / 5� ma '_IMI tS OF -pN rR�CTOt PS 8TO O MU nSF —Z R. 100'-8"0 PRIVA TE A p PR. 27'-PRIVATE ""I�Sj�� 8'0 LATERAL j EX WA/FRL/NE — :� _-CO 2�0 �0 - - - - SF _=�0 �g I ,o j %Ej % ! n I 0 4 SF - �� P:c `•�'9T ONS ` O EX. PUMP \\_ \HOUSE/ ` SF 0 �F�N`,�q SF 0 __ - ` PRX. LOC. EX. SANI TAR SEWER — --- P�2. 10'-PUBLIC r EX. INV. = ±624.00 8'0 LATERAL / r � r / r �OEX�.. I / 20 0 20 so ABRAMS CREEK Scale 1 " = 20 ft r SANITARY LATERAL PROFILE CALES: ( ) 1" = 0.0' (1) ill i= 15.0' 665 I I I I I 665 660 660 1 1 I I EXISTING GRAD III I I I I III 655 Jl a 655 71 I I I I III Q �I I I I I III 650 650 Z ui IOZ w Im 0I 645 o zz l __j 0 645 Ln m II �z �'I II III CD Z z CD _ Z 640 � +v?w +zCD ol- + I I I I PR. 100.0'-8" PVC 0 10.0% I 640 I I I II I PR. 27.0'-8'0 III I I Pvc @ 10.0 635 to 635 + EXISTING I GRI DE II//PR. I I I I M I I I 630m I I IILn II ml I o630 '-8"0 l i l l PVC 0.0% N I > i > > I I 625 �I PR. 90.0'-8"0I PVC ® 4.0% I nk, u Info - " h wlo " h W z 625 PR. 10.0' 8"0 I Q_ 0-1� Q-1� = PVC @4.% I 11111 I11111 Z 11111 U 620 I I CD00 + > Z BIZ NJ + Z �Iz NJ + Z 620 10+00 11 +00 12+00 13+00 SANITARY LATERAL PROFILE CALES: (H) 1" =50.0' 1 (V) 1 ' 1= 5.0' 695 695 ooL QUIPMEN 690 FOOM 690 P OPOSED GRADE 685 I I I EXISTING GRADE ! 685 680 i I I -_ li II II II 680 675 � �� PVC ® 6.0% 675 II II I I PR. 10 .0-8"0 o : I I I PVC ® 6.0% 670 +z 670 EXISTING GRADE I II 665 � II I II 665 + PR. 78. '-8"0 M 11 PVC @ 110.0% r— Z U � PR0'-8"0 .172. �I I I w o 660 a PVCI ® 6.0% ml I �n I m i N m 660 V) N I N o t o 0 0 /PR..0'-8"0 655 W Z I I Lj " Z I w 1 `�� N °° Z �� "� Z w "� 00 655 = PVC @ 10.0% I I �� �� �� U I n it 1 n 11 II II II II � 1 0 I oz coz cnz 650 + �' + Z �' + Z �' + Z 650 14+00 15+00 16+00 17+00 w J o, wim Q:f- zQg gZ113- a 0 J J O 0 X X_ ~ W O goU �QF- z F_ m U Q J R z U Z NQ� 0 �0> Z Q Q >O IxZz W H�Z) O W Q WU F- O 0 2�U _ Q_ W R U Z�W z_ 3 �W 3 m L.L. V J aN o N rr, r, E 0 U cno � C L 1 L cv ai CN 1 N (0 3 ° C^.� cfl o W CD � CDo p �° a L o o F_ N U U N I- U L' p W Z _ 00 Q a 0 U) z w J jw �z z5 Ow t n1u UIT G PAINM LiC. o. 018260 ssjONAL SURVEY: C.I.: PERRY NA DRAWN BY: RED JOB NO. 0806001 SCALE: DATE: 1 "=20.0' 09/05/08 SHEET: 6/8 GENERAL NOTES: 1. ALL WORK AND MATERIALS SHALL CONFORM TO THE CURRENT STANDARDS OF THE COUNTY OF FREDERICK, VIRGINIA, THE VIRGINIA DEPARTMENT OF TRANSPORTATION, AND THE REGULATIONS OF THE AMERICANS WITH DISABILITIES ACT, WHERE APPLICABLE. 2. EROSION AND SEDIMENT CONTROL SHALL CONFORM TO THE STANDARDS AND SPECIFICATIONS OF THE COMMONWEALTH OF VIRGINIA AND THE COUNTY OF FREDERICK, VIRGINIA, WHERE APPLICABLE. 3. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY "MISS UTILITY" AT 1-800-257-7777 AT LEAST TWO (2) WORKING DAYS, BUT NOT MORE THAN TEN (10) DAYS, PRIOR TO THE COMMENCEMENT OF ANY LAND DISTURBING ACTIVITY. PAVING AND CONCRETE: 1. ALL POINTS OF CONNECTION WITH THE EXISTING PAVEMENT SECTIONS SHALL BE SAW -CUT TO PROVIDE A SMOOTH TRANSITION BETWEEN PAVEMENT SECTIONS. 2. ALL CONCRETE SHALL BE VDOT CLASSIFICATION A-3 CONCRETE. IF APPLICABLE, THE CONCRETE ENTRANCE AND ON -SITE CURB AND GUTTER SHALL CONFORM TO VDOT STANDARD CG-6, CG-6R, AND CG-2. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE STANDARDS AND SPECIFICATIONS OF VDOT. 4. ALL EXISTING UTILITIES HAVE BEEN SHOWN BASED UPON THE BEST AVAILABLE INFORMATION. HOWEVER, THERE MAY BE EXISTING UTILITIES WHICH ARE NOT SHOWN AND SHOULD BE LOCATED. THEREFORE, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE LOCATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. ANY DISCREPANCIES BETWEEN THESE PLANS AND THE ACTUAL FIELD CONDITIONS SHALL BE REPORTED IMMEDIATELY TO THE ENGINEER, THE OWNER, AND THE APPROPRIATE UTILITY COMPANY. 5. ALL PROPOSED UTILITIES SHALL BE INSTALLED UNDERGROUND. D 6. IT SHALL BE THE RESPONSIBILITY F TH T T T T 0 E CONTRACTOR OR 0 OBTAIN ALL PERMITS NECESSARY FOR CONSTRUCTION PRIOR TO COMMENCEMENT OF WORK. AN APPROVED SET OF CONSTRUCTION DOCUMENTS SHALL BE PRESENT ON THE SITE AT ALL TIMES. 7. TOPOGRAPHIC INFORMATION WAS DERIVED FROM A FIELD SURVEY PERFORMED BY PERRY ENGINEERING. A CONTOUR INTERVAL OF ONE (1') FOOT HAS BEEN ESTABLISHED FOR THIS PROJECT. 8. NO SOILS REPORT WAS PREPARED FOR THIS PROJECT. 9. ALL RADII DESIGNATIONS INDICATE FACE OF CURB, EDGE OF PAVEMENT, OR EDGE OF CONCRETE, WHERE APPLICABLE. 10. THE CONTRACTOR SHALL COORDINATE THE RELOCATION OF AND THE CONNECTION TO EXISTING UTILITIES WITH THE APPROPRIATE UTILITY COMPANY, WHERE APPLICABLE. CONSTRUCTION NOTES: EROSION AND SEDIMENT CONTROL: 1. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITIES. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CURRENT EDITION OF THE COMMONWEALTH OF VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. 2. ALL WORK SHALL BE CONFINED TO THE DESIGNATED LIMITS OF CONSTRUCTION. FOR THIS PROJECT, THE LIMITS OF CONSTRUCTION ARE DEFINED AS SHOWN ON THE EROSION AND SEDIMENT CONTROL PLAN. 3. NO DISTURBED AREAS SHALL BE DENUDED FOR MORE THAN THIRTY (30) DAYS. THE CONTRACTOR SHALL STABILIZE ALL DENUDED AREAS WITHIN SEVEN (7) DAYS AFTER THE END OF CONSTRUCTION. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL MEASURES. ALL MEASURES SHALL BE INSPECTED DAILY AND AFTER EACH SIGNIFICANT RAINFALL BY THE SITE SUPERINTENDENT OR HIS REPRESENTATIVE. ANY DAMAGED STRUCTURES SHALL BE REPAIRED OR REPLACED BY THE END OF WORK THAT DAY. 5. UPON COMPLETION OF CONSTRUCTION, ALL PERMANENT EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED. AFTER STABILIZATION, THE TEMPORARY EROSION CONTROL DEVICES SHALL BE REMOVED, AS APPROVED BY THE LOCAL INSPECTION AUTHORITY. ALL VEGETATIVE COVER SHALL BE CHECKED REGULARLY AND ANY DAMAGED AREAS SHALL BE REPAIRED, FERTILIZED, REPLANTED, AND MULCHED, AS NEEDED. 6. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF CLEANING TRUCKS AND OTHER CONSTRUCTION EQUIPMENT PRIOR TO ENTERING THE PUBLIC R-O-W. A TRASH RACK SHALL BE USED AS PART OF THE CONSTRUCTION ENTRANCE TO HELP IN THE CONTROL OF POTENTIAL MUD GENERATED AS PART OF THE DEVELOPMENT OF THIS SITE. IF IT IS DETERMINED THAT THIS IS NOT SUFFICIENT, THEN A WASH RACK SHALL BE INSTALLED, AS NEEDED. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN CLEAN STREETS AND TO ALLAY DUST AT ALL TIMES. EXCAVATION AND GRADING: 1. TEST PITS SHALL BE EXCAVATED TO DETERMINE THE DEPTHS AND LOCATIONS OF ALL OF THE EXISTING UTILITIES. IF CONFLICTS EXIST, THEN THE EXISTING UTILITIES SHALL BE LOWERED OR MOVED TO PROMOTE THE CONSTRUCTION OF THE PROPOSED DEVELOPMENT. 2. ALL DELETERIOUS MATERIALS, DEMOLISHED DEBRIS, AND CLEARED AND GRUBBED MATERIALS SHALL BE REMOVED AND PROPERLY DISPOSED OF OFF -SITE OR ON -SITE AS DIRECTED BY THE OWNERS REPRESENTATIVE. 3. ALL TOPSOIL OR VEGETATIVE COVER SHALL BE EXCAVATED TO ITS FULL DEPTH AND STOCKPILED ON -SITE, IF APPLICABLE, IN THE AREA AS DIRECTED BY THE OWNER'S REPRESENTATIVE FOR FUTURE FINISH GRADING. 4. ALL BORROW FILL MATERIAL, IF NECESSARY, SHALL BE OBTAINED BY THE CONTRACTOR AND APPROVED BY A CERTIFIED GEO-TECHNICAL ENGINEER. ALL FILL MATERIAL SHALL BE PLACED IN LIFTS OF 8" OR LESS AND SHALL BE COMPACTED TO 95% OF ASTM D-698 MAXIMUM DRY DENSITY, OR AS DIRECTED BY THE GEO-TECHNICAL ENGINEER. 5. NO BLASTING SHALL BE PERMITTED WITHIN 25 FEET OF EXISTING UTILITIES OR STRUCTURES WITHOUT PERMISSION OF THE OWNER. 6. ALL LANDSCAPED ISLANDS, SLOPES, AND LAWN AREAS SHALL RECEIVE A MINIMUM OF 6" TOPSOIL OBTAINED OFF -SITE OR FROM THE TOPSOIL STOCKPILE ON SITE. THE TOPSOIL SHALL BE GRADED AND RAKED, PRIOR TO APPLICATION OF PERMANENT VEGETATIVE COVER. 7. ALL DISTURBED LAWN AREAS SHALL BE RESEEDED, FERTILIZED AND MULCHED AS NEEDED. 8. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: a. NO MORE THAN 500 LINEAR FEET OF TRENCH SHALL BE OPENED AT ONE TIME. b. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. c. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF -SITE PROPERTY. d. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. e. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS. f. APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH. MISCELLANEOUS: 1. FIRE LANES SHALL BE DELINEATED, AS DIRECTED BY THE COUNTY OF FREDERICK, VIRGINIA FIRE MARSHAL. 2. ALL BUILDINGS AND ADDITIONS SHALL COMPLY WITH THE VIRGINIA UNIFORM STATEWIDE BUILDING CODE (V.U.S.B.C.) AND SECTION 304, USE GROUP (B) BUSINESS OF THE B.O.C.A NATIONAL BUILDING CODE, 1996 EDITION (NOTE: IBC 2000 CAN BE UTILIZED THROUGH MODIFICATION). 3. THE MAXIMUM SLOPE ACROSS THE HANDICAPPED PARKING AREAS SHALL NOT EXCEED A 2% GRADE. ALL REQUIRED EGRESS FROM THE BUILDINGS SHALL COMPLY WITH C.A.B.O. Al 17.1 -92. 4. THIS SITE AND BUILDINGS RELATED THERETO SHALL BE SUBJECT TO ALL FIRE -RATINGS AND FIRE SEPARATIONS IN ACCORDANCE WITH SECTION 707 OF THE B.O.C.A. NATIONAL BUILDING CODE. 5. CHAPTER 17 OF THE B.O.C.A NATIONAL BUILDING CODE, 1996 EDITION REQUIRES THAT THE STRUCTURAL PLANS AND ANY SPECIAL INSPECTIONS (SOIL TESTING, CONCRETE, STEEL, ETC.) SHALL BE PERFORMED AND PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN THE COMMONWEALTH OF VIRGINIA. ALL RELATED DOCUMENTATION SHALL BE SUBMITTED TO THE BUILDING DEPARTMENT FOR PERMIT AND APPROVAL. EROSION AND SEDIMENT CONTROL NARRATIVE: Project Description The property delineated on this plan is located in the southern quadrant between Interstate 81 and Senseny Road adjacent to the Winchester City limits. The site is currently the location of the Winchester Country Club. The property owner proposes to demolish and reconstruct a new outdoor swimming pool and related facilities. Existing Site Conditions The existing site is currently used for a private outdoor swimming facility. The site construction is located at a high point on the site, The site drains to the north down an existing approximate 3:1 slope and to the south down an existing road side ditch towards Senseny Road to Abrams Creek. Soils The USGS Soils map shows the predominant soil type on the site is Clearbrook channery silt loam (9B). This soil is moderately deep, gently sloping, and somewhat poorly. Slopes range from 2 to 7 percent typically. Adjacent Areas The property to the north, south, and east is currently residential. To the west is Interstate 81. Off -site Areas No off -site areas will be disturbed for the construction of this site. Fill material will need to be imported to this site. If over 10,000 sf of offsite area is disturbed to acquire this material this location will either need to be included in the land disturbance package for this project or acquire its own land disturbance permit. Critical Areas Critical areas may exist where proposed fill slopes are greater than 3:1. These slopes will require a slope stabilization analysis prior to issuance of a land disturbance permit. rive it to remain in tact during nstruction and The ditchline along the entrance d g cu after completion of construction as shown on the grading plan. Erosion and Sediment Control Measures 3.02 A 12'w by 70'1 temporary stone construction entrance will be constructed and shall be maintained in a condition which will prevent tracking or flow of mud onto the public rights -of -way. This may require periodic top dressing with additional stone or the washing and reworking of existing stone as conditions demand and repair and/or cleanout of any structures used to trap sediment. All' materials spilled, dropped, washed, or tracked from vehicles onto roadways or into storm drains must be removed immediately. The use of water trucks to remove materials dropped, washed, or tracked onto roadways will not be permitted under any circumstances. 3.05 Silt fence will be installed in selected locations downstream from the construction areas as a first measure of construction. Silt fence will be installed around the downstream side of topsoil stockpiles. Silt fences shall be inspected after each rainfall and at least daily during prolonged rainfall. Any required repairs shall be made immediately. Damaged, decomposed or otherwise ineffective silt fence shall be replaced. Sediment deposits should be removed after each storm event. They must be removed when deposits reach approximately one-half the height of the barrier. Any sediment deposits remaining in place after the silt fence is no longer needed shall be dressed to conform with the existing grade and stabilized. 3.30 Replacement of topsoil will generally occur throughout the work site where vegetation is to be reestablished. Topsoil will be uniformly spread and rolled to a minimum depth of 6". Topsoil shall not be placed while in a frozen or wet condition. 3.31 Temporary seeding in accordance with the E & S Std & Spec 3.31 will be applied to the topsoil stock pile and all areas which will not be brought to final grade within 30 days. Embankment or excavated slopes denuded for a period of greater than 30 days shall be temporarily seeded and mulched. To coincide with the anticipated construction dates, the seeding will consist of 50 pounds per acre of German Millet. All temporary seeding areas will be mulched in accordance with the schedule included herein. 3.32 All disturbed areas will be stabilized by permanent seeding in accordance with the schedule included herein. The anticipated time for construction is Spring 2008. 3.35 All seeded areas will be mulched in accordance with the schedule included herein. 3.36 All cut slopes and fill slopes along the proposed road will be stabilized with matting to promote the establishment of a vegetative cover. The mat areas will be inspected after each significant rainfall event and repairs will be made as required. Temporary Seeding SEED TYPE RATE MIN. PURITY(%) MIN. GERM.(%) Sept 1 - Feb 15: Annual Ryegrass 50 Ib/ac 98 85 Winter Rye 50 Ib/ac 98 85 May 1 - Aug 31: German Millet 50 Ib/ac 98 85 or Feb 16 - Apr 30: Annual ryegrass 75 Ib/ac 98 85 Mulch: 1.5 ton/ac small grain straw Fertilizer: 1000 Ib/ac 10-10-10 Permanent Stabilization The contractor shall stabilize all denuded land within 7 days after the end of construction. Permanent stabilization shall be applied to areas that are to be left dormant for more than one year. During construction of the project, soil stockpiles shall be stabilized or protected with sediment trapping measures. The contractor is responsible for the temporary protection and permanent stabilization of all soil stockpiles on site as well as soil intentionally transported from the project site. No soil testing is required. The contractor shall establish vegetation on all areas not otherwise stabilized according the following specification: Seedbed Preparation: a. Scarify top 1" to 2" of soil after final grades have been achieved. b. Add 3 tons per acre pulverized agricultural limestone(1401b/1000sf).ng a SEED TYPE RATE MIN. PURITY(%) MIN. GERM.(%) Tall fescue 60 Ib/ac 97 85 Red clover 8 Ib/ac 95 65 Ladino clover 8 Ib/ac 95 65 Nurse Grass -(season dependent) Sept 1 - Feb 15: Annual Ryegrass 12 Ib/ac 98 85 Winter Rye 12 Ib/ac 98 85 May 1 - Aug 31: German Millet 12 Ib/ac 98 85 or Feb 16 - Apr 30: Annual ryegrass 12 Ib/ac 98 85 Mulch: 1.5 ton/ac small grain straw Fertilizer: 1000 Ib/ac 10-10-10 1. All perimeter sediment control devices shall be erected prior to any land disturbing activities and shall remain in place until the site is fully stabilized. 2. The contractor shall perform overlot grading to provide positive drainage and preclude ponding of water. All off site grading and construction is to be done with the property owner's consent. 3. Cut and fill slopes shall be graded at a maximum of 2 horizontal to 1 vertical unless otherwise noted. SEQUENCE OF CONSTRUCTION 1. Schedule an onsite preconstruction meeting with the Erosion and Sediment control Inspector. 2. Establish the construction entrance. 3. Install silt fence along downstream perimeter of work areas. 4. Strip, stockpile and stabilize topsoil. 5. Perform demolition and rough grading of the construction area. 6. Install pool and related utilities. 7. Perform final grading of site. Apply seeding and mulch and stabilization fabric. 8. Remove temporary controls after work areas have been stabilized. NOTE: ALL TEMPORARY CONTROLS WILL BE REMOVED WITHIN 30 DAYS ONCE NO LONGER NEEDED. TRAPPED SEDIMENT MUST BE REMOVED AND STABILIZED. MAINTENANCE: The contractor shall be responsible for the installation and maintenance of all erosion and sediment control measures. All measures shall be inspected daily and after each significant rainfall by the site superintendent or his representative. Any damaged structures shall be repaired or replaced by the end of work that day. a. The construction entrance shall be maintained so as to control the amount of soil materials that may get caught on the existing pavement. If the pavement becomes too soiled with soil and mud that it will not prevent tracking onto the right of ways, then it shall be cleaned and/ or washed, as may be deemed necessary. A trash rack shall be installed as part of the construction entrance construction. If this measure fails to properly clean the construction vehicles, then a wash rack must be installed as directed by the local program administrator. b. The inlet and outlet protection devices, and the silt fencing shall be checked regularly for deposited sediment. If sediment is trapped, it shall be cleaned carefully so as not to release the trapped sediment downstream or on adjacent properties. c. All seeded and sodded areas shall be checked regularly to ensure that a good stand of grass is maintained. Areas shall be repaired, fertilized, and reseeded or resodded, as 4VAC50-30-40. Minimum Standards 1-19: An erosion and sediment control program adopted by a district or locality must be consistent. with the following criteria, techniques and methods: 1. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant for longer than 30 days. Permanent stabilization shall be applied to areas that are to be left dormant for more than one year. 2. During construction of the project, soil stockpiles and borrow areas shall be stabilized or protected with sediment trapping measures. The applicant is responsible for the temporary protection and permanent stabilization of all soil stockpiles on site as well as borrow areas and soil intentionally transported from the project site. 3. A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieved that is uniform, mature enough to survive and will inhibit erosion. 4. Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land -disturbing activity and shall be made functional before upslope land disturbance takes place. 5. Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. 6. Sediment traps and sediment basins shall be designed and constructed based upon the total drainage area to be served by the trap or basin. a. The minimum storage capacity of a sediment trap shall be 134 cubic yards per acre a s a 9 P Y P Y of drainage area and the trap shall only control drainage areas less than three acres. b. Surface runoff from disturbed areas that is a areas comprised of flow from drainage 9 greater than or equal to three acres shall be controlled by a sediment basin. The minimum storage capacity of a sediment basin shall be 134 cubic yards per acre of drainage area. The outfall system shall at a minimum, maintain h structural int rit oaf g y utheintegrity the basin during a 25-year storm of 24-hour duration. Runoff coefficients used in runoff calculations shall correspond to a bare earth condition or those condit ions expected to exist while the sediment basin is utilized. 7. Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. 8. Concentrated runoff shall not flow down cut or fill slopes unless contained within an adequate temporary or permanent channel, flume or slope drain structure. 9. Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. 10. All storm sewer inlets that are made operable during construction shall be protected so that sediment -laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. 10. All storm sewer inlets that are made operable during construction shall be protected so that sediment -laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. 11. Before newly constructed stormwater conveyance channels or pipes are made operational, adequate outlet protection and any required temporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel. 12. When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structures if armored by nonerodible cover materials. 13. When a live watercourse must be crossed by construction vehicles more than twice in any six-month period, a temporary vehicular stream crossing constructed of nonerodible material shall be provided. 14. All applicable federal, state and local regulations pertaining to working in or crossing live watercourses shall be met. 15. The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed. 16. Underground utility lines shall be installed in accordance with the following standards in addition to other applicable criteria: a. No more than 500 linear feet of trench may be opened at one time. b. Excavated material shall be placed on the uphill side of trenches. c. Effluent from dewatering operations shall be filtered or passed through an approved sediment trapping device, or both, and discharged in a manner that does not adversely affect flowing streams or off -site property. d. Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote stabilization. e. Restabilization shall be accomplished in accordance with these regulations. f. Applicable safety regulations shall be complied with. 17. Where construction vehicle access routes intersect paved or public roads, provisions shall be made to minimize the transport of sediment by vehicular tracking onto the paved surface. Where sediment is transported onto a paved or public road surface, the road surface shall be cleaned thoroughly at the end of each day. Sediment shall be removed from the roads by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual development lots as well as to larger land -disturbing activities. 18. All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after the temporary measures ore no longer needed, unless otherwise authorized by the local program authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sedimentation. 19. Properties and waterways downstream from development sites shall be protected from sediment deposition, erosion and damage due to increases in volume, velocity and peak flow rate of stormwater runoff for the stated frequency storm of 24-hour duration in accordance with the following standards and criteria: a. Concentrated stormwater runoff leaving a development site shall be discharged directly into an adequate natural or man-made receiving channel, pipe or storm sewer system. For those sites where runoff is discharged into a pipe or pipe system, downstream stability analyses at the outfall of the pipe or pipe system shall be performed. b. Adequacy of all channels and pipes shall be verified in the following manner: (1) The applicant shall demonstrate that the total drainage area to the point of analysis within the channel is one hundred times greater than the contributing drainage area of the project in question; or (2) (a) Natural channels shall be analyzed by the use of a two-year storm to verify that stormwater will not overtop channel banks nor cause erosion of channel bed or banks. (b) All previously constructed man-made channels shall be analyzed by the use of a ten-year storm to verify that stormwater will not overtop its banks and by the use of a two-year storm to demonstrate that stormwater will not cause erosion of channel bed or banks; and (c) Pipes and storm sewer systems shall be analyzed by the use of a ten-year storm to verify that stormwater will be contained within the pipe or system. c. If existing natural receiving channels or previously constructed man-made channels or pipes are not adequate, the applicant shall: (1) Improve the channels to a condition where a ten-year storm will not overtop the banks and a two-year storm will not cause erosion to the channel bed or banks; or (2) Improve the pipe or pipe system to a condition where the ten-year storm is contained within the appurtenances; (3) Develop a site design that will not cause the pre -development peak runoff rate from a two-year storm to increase when runoff outfalls into a natural channel or will not cause the pre -development peak runoff rate from a ten-year storm to increase when runoff outfalls into a man-made channel; or (4) Provide a combination of channel improvement, stormwater detention or other measures which is satisfactory to the plan -approving authority to prevent downstream erosion. d. The applicant shall provide evidence of permission to make the improvements. e. All hydrologic analyses shall be based on the existing watershed characteristics and the ultimate development of the subject project. f. If the applicant chooses an option that includes stormwater detention, he shall obtain approval from the locality of a plan for maintenance of the detention facilities. The plan shall set forth the maintenance requirements of the facility and the person responsible for performing the maintenance. g. Outfall from a detention facility shall be discharged to a receiving channel, and energy dissipaters shall be placed at the outfall of all detention facilities as necessary to provide a stabilized transition from the facility to the receiving channel. h. All on -site channels must be verified to be adequate. i. Increased volumes of sheet flows that may cause erosion or sedimentation on adjacent property shall be diverted to a stable outlet, adequate channel, pipe or pipe system, or to a detention facility. j. In applying these stormwater management criteria, individual lots or parcels in a residential, commercial or industrial development shall not be considered to be separate development projects. Instead, the development, as a whole, shall be considered to be a single development project. Hydrologic parameters that reflect the ultimate development condition shall be used in all engineering calculations. k. All measures used to protect properties and waterways shall be employed in a manner which minimizes impacts on the physical, chemical and biological integrity of rivers, streams and other waters of the state. STEEL OR WOOD POST EXTRA STRENGTH FILTER FABRIC NEEDED WITH WIRE SUPPORT U.N. //p//rpI 10 FT MAX. SPACING WITH WIRE SUPPORT FENCE PONDING HT. STEEL OR WIRE & FILTER FABRIC WOOD POST ATTACH SECURELY 36' HIGH MAX TO UPSTREAM SIDE OF POST. FLOV R RUNOFF RUNOFF 4"x6" TRENCH WITH COMPACTED BACKFILL STANDARD DETAIL 9 MAX. RECOMMENDED STORAGE HT. �r t' 12" MIN. GRAVEL ALTERNATE DETAIL TRENCH WITH NATIVE BACKFILL TRENCH WITH GRAVEL NOTE: 4. SET POSTS AND EXCAVATE A 4"x4" 1. INSPECT AND REPAIR FENCE AFTER EACH TRENCH UPSLOPE ANLONG THE LINE STORM EVENT AND REMOVE SEDIMENT WHEN OF POSTS. NECESSARY. 5. STAPLE WIRE FENCING TO THE POSTS. 2. REMOVED SEDIMENT SHALL BE DEPOSITED 6. ATTACH WIRE FILTER FABRIC TO THE WIRE TO AN AREA THAT WILL NOT CONTRIBUTE FENCING AND EXTEND IT INTO THE TRENCH. SEDIMENT OFF -SITE AND CAN BE PERMANENTLY STABILIZED. 7. BACKFILL AND COMPACT THE EXCAVATED 3. SILT FENCE SHALL BE PLACED ON SLOPE SOIL. CONTOURS TO MAXIMIZE PONDING EFFICIENCY. SILT FENCE DETAIL WITH WIRE SUPPORT NOT TO SCALE ADDAPTED FROM: 1992 VA E&S CONTROL HANDBOOK 3.05 EROSION & SEDIMENT CONTROL KEY 3.02 TEMPORARY STONE N TRU TI CO N S C 0 ENTRANCE 3.05 SILT FENCE SF X X X X 3.30 TOPSOILING To 3.31 TEMPORARY SEEDING 3.32 PERMANENT SEEDING 3.35 MULCHING EXISTING PA EV D ROADWAY SEDIMENT BARRIER (STRAW BALE TYPE SHOWN) \ \ SUPPLY WATER TO WASH WHEELS IF NECESSARY. DIVERSION RIDGE REQUIRED WHERE GRADE EXCEEDS 2% GREATER 2y,OR FILTER FABRIC SECTIONA - A NOTE: SPILLWAY USE NDBAGS, STRAW BALES OR HER APPROVED METHODS TO HANNELIZE RUNOFF TO BASIN AS AREQUIRED. FLOW FLO1P i Y.' ;A .. I '. Z 2"-3" COURSE ti, A y. WASHRACK AGGREGATE MIN. 6" THICK t. s: �a O 4 n U a b ,I DIVERSION RIDGE 70' MIN, 01 AAI NOTES: 1. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHTS - OF -WAY. THIS MAY REQUIRE TOP DRESSING, REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 2. WHEN NECESSARY, WHEELS SHALL BE CLEANED TEMPORARY PRIOR TO NTO PUBLIC 3. WHEN WASHING ENTRANCE IS REQUIRED, REQUIRED,ITSIHALL BE DONE GRAVEL ON AN AREA AT DRAINS INTO STABILIZED ANAPPROVED SEDIMENT TWITH CRUSHED TRAP CONSTRUCTION O4. R SEDIMENT INSTALL CATT EINGUARDS AS CALLED FOR ON THE PLANS. ENTRANCE/EXIT Z O D_ U Cn w 0 w Q 0 O Z Z 0 Q LLJ U) ® J Z0 Q Z Z ® (n 0 0 Ld w J m 0 Q Z J V Z �Fn Q� >- 0 0> Z Q Q } DO XZZ W HA D 0 0 L? V LLJJ A OMY w0 V_ _ Q- W 0 it V ZMW r I- Z 3 W � U) a- ■ V ■ J � O N E N n 0 6:3 N U-) Lf vi _Cf) cV ai o N co I co4. 3 m W O'&00.0- O 1 o J Y'�Ln(D 1 � .+ 0 a ) W 0 Cs o a E cn o - - U U U p W 00 a ��'TH OF v j Tl PAINTER Lic. 018260 05 I ZZ1US `SSIONAL SURVEY: C.I.: NA NA DRAWN BY: JOB NO.: RED 0806001 SCALE: DATE: NA 09/05/08 SHEET: 7/8 EXISTING OR PROPOSED CURB(TYP) WHERE SHOWN ON PLANS 3.5' (OR AS SHOWN ON PLANS) EXP. JT. MAT'L 4" CRUSHED STONE (3000 PSI) 4" CONC 6x6xW1.4xW1.4 WWF (1.5" Min. CLEAR) TYPICAL SIDEWALK/CURB DETAIL NOT TO SCALE F GUTTER TYPICAL 1' NOSE DOWN CURB NOT TO SCALE PER PLANS 4.1 4" CRUSHED STONE (3000 PSI) 6" CONIC 6x6xW2.9xW2.9 WWF (1.5" Min. CLEAR) CONCRETE STOOP DETAIL NOT TO SCALE TENSION WIRE L_ J L_ J FENCE SECTION ELEVATION WITHOUT TOP RAIL & WITHOUT BARBED WIRE GRADE 2'R (D ;.1/ •I T- r C G - 6 R 6.G � 2'_0" COMBINATION 6" CURB & GUTTER REVERSED NOT TO SCALE J LJ FENCE SECTION ELEVATION WITH TOP RAIL & WITHOUT BARBED WIRE FENCE HEIGHT END & CORNER POSTS LINE POSTS NOMINAL HEIGHT B-1 BAR LENGTH H-1 HEIGHT ABOVE GRADE B-2 BAR LENGTH H-2 HEIGHT ABOVE GRADE 8'-0" [2438MM] 11'-0" [3353MM] 8'-0 5/8" [2454MM] 10'-8" [3251MM] 7'-8 7/8" [2359MM] NOTES: 1. THIS DETAIL CORRESPONDS WITH 'ANCHOR FENCE PRODUCTS'. 2. SIMILAR PRODUCTS MAY BE USED. TYPICAL 8' HIGH FENCE DIMENSIONS & SPECIFICATIONS CITY OF WINCHESTER, VA DEPARTMENT OF PUBLIC UTILITI TYPICAL RESILIENT SEAT VALVE INSTALLATION: VALVE BOX AND BOOT SHALL BE CAST IRON VALVE BOX COVER SHALL. BE MARKED 'WATER' VALVE TOP SHALL BE FLUSH WITH FINISHED GRADE 1R- X tg' CONCRETE PAD SHALL BE PLACED AROUND VALVE BOXES LOCATED OUTSIDE OF PAVEMENT AREAS VALVE BOX SHALL BE SCREW TYPE FOR ADJUSTMENT MECHANICAL JOINT FITTINGS AND PIPE RESTRAINED BY USING MEGA -LUG RESTRAINING FLANGES STANDARD TYPICAL VALVE & BOX INSTALLATION DATE: 12/03 DETAIL NO. SCALE: NONE WD- 9 CITY OF WINCHESTER, VA DEPARTMENT OF PUBLIC UTILITIES OAADE _ IMCHM EXCAVATION LOOT FORD! I TAN■ (TYPJ of R—F.-... THENCH IOTTOIaImas GATE VALVE TYPICAL SECTION TEE, WYE, OR PLUG IN LIED OF V10 FOMM THE FITTING MY X WRAPPER VLTH M■oorES IAA■ ExCAVATIN PRYET"njm no THE cmcpwm POIED TO avrL.ETELY s1RNOR■t 'I' - Ir' MN FOR 1r AND STARER PIPE THE FrrrV= A■ AGAINST LNNYTU® Imo. THE WARM BDI39MOM 'I' I*- Ir' IDK FOR 1r' THU Or PRE AGAINST LIB SOR SHALL REHMIN AS SHWK SEE CHART IELDV FOR AJ,C DIENSIONL CONCRETE DIMENSIONS FOR HORIZONTAL THRUST BLOCKS K,NVIA 11 1/4 THRU 90• BENDS GALV. nTOs OVER FITTI■s AND D®IED N CONCRETE THRUST /LOCKS FITTING SIZE ROD SIZE NO, RODS EMBEDMENT V. 1C' 6 LESS 6 2 30, COTE I 14"-20" I 2 36" VERTICAL BENDS FRTDIf vO.UE THRUsf IL.00K IN g1.YA S9 ll-V4' i[-L/r 4T w STOW >EDIOK / LI 23 THRUST BLOCKS FOR VERTICAL Ir• - - L/ 3.7 UP BENr3 SHALL BE THE SAME AS FOR HORIZONTAL BENDS. 14" 0.5 L7 39 7A 16" 09 E.3 5.1 - Ir' 1.4 32 6.3 - ar, P4 C5 72 - STANDARD CONCRETE THRUST BLOCKING DATE: 9/01 DETAIL NO. SCALE: NONE WD-12 PIPE PLUG:, vrEs a TQs D v4• ALAI Pe yr IFJOf 45' AM w -- A ) C A I C A l C s•• r-r r-9" 1.1" r-9- r-9" r-r' 1•-I- r-r' t•-'" w I'-Y' r-r• r-r' r-r r-s" r-r 1•i•• r-9" r-3r' 1r' Yi" r-r' t'i" 1'-/" r-9" t'-Y' I'-Y' r-s- Ci" Ir• 1'-9" 1'-0" ri" r-3^ 1•-0'• ri•• r-/" ra- 3•-EI" /4" r-e" 1'-0" 3'-T 1'-3" 1'-r• 1'i" ri' 1'-0" Ib" r-3" 1'-0" 3'i^ 1'i^ rv' C-I- t'-0" 4•-6' Ir' 4'-9" er' r-9" 1•�" 4•-0" 1'-r• 1•�•' r-0"1'i" ram• CITY OF WINCHESTER, VA • METER SUPPLIED BY THE DEPARTMENT OF PUBLIC UDLITIES DEPARTMENT OF PUBLIC UTILITIES ' FLANGED ANGLE METER VALVE SHALL HAVE "0' RING TYPE FLANGE METER SUPPORT BRACKETS • 2" FORD COPPERSETTER MODEL / VBHH77-1-PAW-11-77 • BACK FLOW DEVICE REQUIRED AS SET FORTH IN CITY CROSS " 1-1/2 FORD: SAME LAYING DISTANCE CONNECTION CONTROL PROGRAM AS 2" WITH ONE PAIR OF Z" x 1-1/2" • BACKFLOW DEVICE MAY NOT BE INSTALLED IN METER VAULT METER ADAPTERS, FORD pgR7 � pg7 •METER SETTING TO BE FORD CUSTOM SETTER OR APPROVED EQUAL • PRECAST VAULT AS MANUFACTURED BY THE CLEAR FLOW COMPANY OF WAYNESBORO, VA OR APPROVED EQUAL 5'0" o � 17" ` 2" OR 1 1/2 TYPE "K COPPER PIPE (TYP) 24" x 36" ALUMINUM BALL VALVE CURB STOP WITH 2" ACCESS HATCH GATE VALVE OPERATING NUT HALLIDAY FORD JODEL 844-777 W/ (SIR-2436) QT67 I TAPPING SADDLE AND CORP STOP 4" T 1 1/2" OR 2" METER SETTER DOUBLE CHECK VALVE l I � 0 BALL VALVE FORD CUSTOM SETTER L4" DIAMETER BLOCKOUT SECTION VIEW FOR DRAIN STANDARD 1 1/2" & 2" METER INSTALLATION DATE: 9/01 DETAIL NO. SCALE: NONE WD- 4 CITY OF WINCHESTER, VA DEPARTMENT OF PUBLIC UTILITIES SANITARY SEVER MN FLOW SIR 35 PRELMNfACTU I D �w U1LESf Oi1ERVOE TEE OR WYE SAWN ON PLANS m m riAS ETED PIPE NO FITTINGS W. Iml SEVER SERVICE CONNECTION STANDARD C#WILAR PER SPEETFICATIM IEUOI6 THOUCHOUT CLEAN OUT O G a f PROPOSED SERVICE LATERAL � 4 RIM FERNLO COILm E%OTD4G SERVE LATERAL STANDARD STANDARD SANITARY DATE: 9/01 DETAIL NO. LATERAL CONNECTION SS- 3 SCALE: NONE CITY OF WINCHESTER, VA DEPARTMENT OF PUBLIC UTILITIES • THE FOUDWING JOINTS MUST BE RESIRW*D IN ALL APPLICATION: 1. TOO- MET ! OURET 2. lEE- ALL BRANCHES 3. OFFSETS- INLET AND OUTLET 4. CMS 5. PLUGS 6. DEAD ENDS 7. HYDRANT RUNOUIS SMALL BE RESTRAINED AS DEAD • TIMIAT RESM40W ON SUP JOT DUCII.E LION PIPE SHALL BE U.S. PIPE FIELD LOCI LOCK GASKETS FOR TYITIN JOINT PIPE OR APPROVED EQUAL • THRUST RESTRAINT ON OUCIIE LION Fff1MOS SMALL BE PROVIDED BY THE USE OF MEGAUIG RETAINER (OR APPROVED EOUAL) AND MECHANICAL JOT FrOTN(S STD. JOT NMIlR1 LENCM OF RESRWNf, L I ........�..... _........ I STD. JOT L- MINIMUM LEKK'IH TO BE RESTRAINED ON EACH SIDE OF FlrnNc (FT) LIIIIIL FDOG(E of RQIRAMIm PIPE L PIPE DLAMEIER (IN) ELBOWS (Mp) VALVE, TEES, BRACHES DEAD END 6 3FT 5FT 11FT 27FT 41 FT I 3Fr 7TT 14FT 35FF 52FT 10 4FT AFT 17FT 42FT 53FT 16 SIFT 13Fr 27FT //FT 99Fr 20 SIFT 1IFT 34FT I1 Fr 122FT 24 9FT 1 1 • FKCURES BASED ON 36 INCH BURIAL DEPTH 150 PSI TEST PRESSURE •FKA)RES BASED ON SOIL BE~ CAPACITY OF 1500 PSF •FIOURES BASED ON LAYING CONDITION AS SPECIFIED N THE WIN(.'HESTER STANDARD DETAILS •FWRES DO NOT APPLY 1D POLY WRAPPED PIPE STANDARD DUCTILE IRON PIPE RESTRAINT DATE: 9/01 DETAIL NO. SCALE: NONE WD- 11 CITY OF WINCHESTER, VA DEPARTMENT OF PUBLIC UTILITIES CAST �N CLEAN OR CAP VITH ARAM PLUG. PANEILA H� PA4SV � W> CDR CK PATELLA NOBEL PA6SV{SAL (6') vlaw PIETYVlFAC7ISIED T—TEE ■e VYE INVERT O MUSE CON TO >E AT CRAM OF SEVER ME C SPRING LINE STANDARD STANDARD SANITARY DATE: 9/01 DETAIL NO. LATERAL CONNECTION SS-4 SCALE: NONE U) z O V / rQ W Z 0 F_ U Z 0 U Lv J w a O z I_ m U Q � Z J U Z �Qit 0 0 / Z Q w O I..` Z �7_ O� ; � F- /11 .j 0 itir Q W U LLJN 0 U_ 6- w 0— U Z MW Z 3�w w 3 �X lei � V/ a_ ■ U ■ J aN O ■� V) CND N � Lo I I.r� U O U In N -(J N p N CD � I N CO tp 3 N Q) N W C ^ 0 p C O J Q) � I �Q) �` Ill 0 _0 W L o aJ U a O E _ U O - O ?� p E LLJ Z a 00 a 0� z � Jw w V) Z Z O O LL11 c) w PtiTH OF v j . PLANTER a Lic. 018260 w� sS10NAL SURVEY: C. I.: NA NA DRAWN BY: JOB NO.: RED 0806001 SCALE: DATE: NA 09/05/08 SHEET: 8/A ABBREVIATIONS GENERAL NOTES 1. The property delineated on this plan is located approximately 0.4 miles east of Interstate 81 on the south side of Seseny Road. The site currently holds the Winchester Country Club. The property owner proposes to reconstruct the existing inground pool area. There is no required parking or loading associated with this construction and all required landscaping buffers currently exist. 2. Property Owner/Developer: Winchester Golf Club 1300 Senseny Road Winchester, Virginia 22602 3. Engineer/Landscape Architect: PAINTER-LEWIS, P.L.C. 817 Cedar Creek Grade, Ste. 120 Winchester, Virginia 22601 Contact: Mr. Rupert Werner Telephone: (540) 723-9780 Contact: Mr. Timothy G. Painter, P.E. Telephone: (540) 662-5792 4. Topographic information shown on these plans was provided by Perry Engineering. 5. Site Data: Total Parcel Area: 156.18 Acres P.I.N: 54-A-139; 54-A-140; 54-A-141 Zoning: RA -Rural Areas District (all parcels) Magisterial District: Shawnee Existing Use: Recreational Use (Country Club) Front Yard Setback (R.O.W.): 60 ft Rear Yard Setback: 100 ft Side Yard Setback: 100 ft Maximum Building Height: 35 ft 6. Parking Space Requirements: No additional parking or loading is required. 7. Landscaping Requirements: No additional landscaping is required. WATER AND SEWER SERVICE Frederick County Sanitation Authority P.O. Box 1877 Winchester, VA 22604 540-868-1061 BUILDING INSPECTIONS Frederick County Inspections Department 107. N. Kent Street Winchester, VA 22601 540-665-5656 EROSION AND SEDIMENT CONTROL Frederick County Public Works Department 107 N. Kent Street Winchester, VA 22601 540-665-5643 NATURAL GAS Shenandoah Gas 350 Hillandale Lane Winchester, VA 22602 540-868-7911 ELECTRIC SERVICE Allegheny Power 3463 Valley Pike Winchester, VA 22602 540-722-5830 TELEPHONE SERVICE Verizon 404 Hillandale Lane Winchester, VA 22602 540-665-3156 PUBLIC ROAD IMPROVEMENTS Virginia Department of Transportation 14031 Old Valley Pike Edinburg, VA 22824 540-535-1818 RESPONSIBLE LAND DISTURBER NAME: CERTIFICATION #: DATE THE RESPONSIBLE LAND DISTURBER IS THE PARTY RESPONSIBLE FOR CONSTRUCTION & MAINTENANCE OF ALL THE LAND DISTURBING ACTIVITIES AS SET FORTH IN THESE PLANS. WINCHE TER COUNTRY CLU = POOL RE OVATION O 0 i SHAWNEE MAGISTERIAL DISTRICT 1300 SENSENY ROAD FREDERICK COUNTY, VIRGINIA i / O f o0 i f ✓s ` ° < O 1f ( U CfA i O TAX PARCEL '`%�O JqA- -13� 1 POOL RENOv"ON � C 77. 9705 ACRES L004WN i TAX PARCEL 54-A-140 24.4385 ACRES 1 J { f 1 EX. PARlII'WW DC CLUBHOUSE ' 1 1 TAX PARCEL —A-141 ° 1 1 0 53 7�97 ACRES { 1 1 � 1 C { { o I 100- YEAR 1 0 0 FL 00®PL.AIN LIMI TS { o: ro 1 PROJECT OVERVIEW 1 " =300' M N .1 TH op 'N r A � r.c. PAINTER o.018260 G 4SSIONAL ASSY. ASSEMBLY B.F. BASEMENT FLOOR BLK. BLOCK BC BOTTOM OF CURB BML BUILDING MOUNTED LIGHT BP BREAK POINT BSBD. BASEBOARD CG-2 VDOT CURB CG-6 VDOT CURB & GUTTER CIP CAST IN PLACE CONCRETE CL CLASS CMF CONCRETE MONUMENT FOUND CPP CORRUGATED POLYETHYLENE PIPE CMP CORRUGATED METAL PIPE CMPA CORRUGATED METAL PIPE ARCH CO CLEAN OUT DIA. DIAMETER DS DOWNSPOUT EOP EDGE OF PAVEMENT EOG EDGE OF GRAVEL EX. EXISTING F.F. FIRST FLOOR F.F.E. FINISHED FLOOR ELEVATION FDC FIRE DEPARTMENT CONNECTION FG FACE OF GUTTER FH FIRE HYDRANT F.L.S. FIRE LANE SIGN F.LT. FLOOD LIGHT Go. GAUGE GM GAS METER GV GAS VALVE or GATE VALVE HCR HANDICAP RAMP HB HOSE BIB HDR CURB 6" HEADER CURB HP HIGH POINT HTR. HEATER INC INCREASER INV INVERT IPF IRON PIPE FOUND IPS IRON PIPE SET LP LOW POINT LT. LIGHT MLP METAL LIGHT POLE MPD MULTI -PRODUCT DISPENSER MP METAL POST MH MANHOLE NDC NOSE DOWN CURB N.P.S. NO PARKING SIGN NLT NO LEFT TURN NRT NO RIGHT TURN N.T.S. NOT TO SCALE OHE OVERHEAD ELECTRIC OHT OVERHEAD TELEPHONE PIV POST INDICATOR VALVE PL PROPERTY LINE PP POWER POLE PROP. PROPOSED PVMT PAVEMENT RCP REINFORCED CONCRETE PIPE R.D. ROOF DRAIN RED. REDUCER R.O. ROCK OUTCROP SAN. SANITARY SEW. SEWER STD. STANDARD T.B.D. TO BE DEMOLISHED T.B.R. TO BE REMOVED T.B.P. TO BE PRESERVED or PROTECTED TB or T.B. THRUST BLOCK TC TOP OF CURB TEL. TELEPHONE TRB TELEPHONE RISER BOX NRB TELEVISION RISER BOX TYP or TYP. TYPICAL UGE UNDERGROUND ELECTRIC UGG UNDERGROUND GAS UG CAN UNDERGROUND CABLE T.V. UGT UNDERGROUND TELEPHONE XFMR ELECTRIC TRANSFORMER WL WATERLINE WM WATER METER WPP WOOD POWER POLE WTP WOOD TELEPHONE POLE WV WATER VALVE 5'R RADIUS IN FEET *00.00 PROPOSED SPOT ELEVATION x(00.00) EXISTING SPOT ELEVATION HATCHING INDICATES REVERSED PITCH IN THE GUTTER PAN: PITCH TO BE 1 /2" PER FOOT. TRANSITION THE GUTTER OVER A 10' LENGTH (TYP). LIST OF DRAWINGS: SHEET 1/8: COVER SHEET SHEET 2/8: SITE DEMOLITION PLAN SHEET 3/8: SITE LAYOUT PLAN SHEET 4/8: SITE GRADING PLAN SHEET 5/8: EROSION AND SEDIMENT CONTROL PLAN SHEET 6/8: SANITARY LATERAL PLAN, PROFILE, AND EROSION AND SEDIMENT CONTROL PLAN SHEET 7/8: EROSION AND SEDIMENT CONTROL DETAILS SHEET 8/8: CONSTRUCTION DETAILS ZONING ADMINISTRATOR DAI E APPROVED FREDERICK COUNTY, VIRGINIA SITE PLAN VALID FOR FIVE (5) YEARS FROM DATE OF APPROVAL SITE PLAN VALID FOR TWO (2) YEARS FROM DATE_ OF FCSA APP W0NC= 9GilE 34LG3 COOMnM4G��iSi' ��LMC F) 0 Off RDE H 0 W A 7 0 rr --" I N I SHAWNEE MAGISTERIAL DISTRICT 1300 SENSENY ROAD FREDERICK COUNTY, VIRGINIA CONSULTING ENGINEERS PAINTER=LEWIS, RLIC, 817 Cedar Creek Grade, Suite 120 Winchester, Virginia 22601 Telephone (540) 662-5792 Facsimile (540) 662-5793 Email: off ice@painterlewis.com JOB NO.: 0806001 September 5, 2008 SHEET: Q Latest Revision Date: October 28, 2008 I �v \ TA \ EX. TREES \ \ \ • 1 \ I 4 1 N-11 c� �>y� EX FENC€ (TO REMAIN i \ I EX. WOODEN _ :9 STAIRS (APRX.) EX. GREEN i EX. TREES (TO REMAIN) - 1 EX. TREES EX. TREE ALL PR. STORM PIPES SLOPE ® 1.00% (TYP.) z f (To REMAIN) (SEE STORMWATER MANAGEMENT REPORT) I INV=684.7 45 PR. 8"0 PATIO DRAIN (TYP.) 13.5-8 o P(SEE DETAIL) i V Jr / EX TREE PR. Co f `k= (TO REMAIN) — 1 INv=.: — ,to, T ^�= ems; , P� EX. FENCE To — PR. 10'x10' PR. SEATING AREA. _ — J���4 tip' 7 1 INv=se883.5 y, RIPRAj APRX. LOC. EX. CPP TO REMAIN I - r t=1 m. ( — — CINV-681.7� / EX.ENTROCE 10 DRIVE — a R. POOL - PR. 8' GATE/ ` �_ •� ti� EQUIPMENT EX. CANOPY LINE INv= 3 ROOM (SEE IINv=Bs ���QS 00� Q gg�� RCHS.) 51 EX. CONC. (TO REMAIN) L — a QC�• Q� •• INV=684.9 • O� Q = PROPOSED POOL AREA _ I EX. Co _ 2 INv= (SEE ARCH. DRAWINGS FOR DIMENSIONS AND>_ ~ LAYOUT DETAILS) �h° 2 0 ' T EX. TREE EX. TREES �lQ1 I INv= 7 6. " 'of (TO REMAIN) CO14+00 Q 1 INv= TS PR. 8 0 PATIO DRAIN (TYP.) ��• 9j� (SEE DETAIL) EX. AREA DRAINS I oilo \o I .� 45• D G� 2 ' PR. 100'-8"0 PRIVATE LAT. 16+00 TO REMAIN (TYP.) #o I �� /I CO PR. 78'-8"0 PRIVATE LAT. 15+00 Im e I PROPOSED POOL AREA I 'IoQ I I INv-Mg EX. BUBBLE COVERING (SEE ARCH. DRAWINGS 4i FOR DIMENSIONS AND EX. TENNIS COURTS ml�� I cn LAYOUT DETAILS) d al�� o J PR. 2" METER 1 IvVe � �7 � I IN -N 7$s� EX. POOL HOUSE ` ' �c EX. GATE WERE O�L AND TENNIS BUILDING W Io I „os 45' BE �5 Q /�� EX. TREES X WA &TJ:RLINF — FF=689. 45 , �r I o , LCATE/ // , ALL PR. STORM PIPES SLOPE ® 1.00% (TYP.) / (SEE STORM WATEVANAGEMENT REPORT) o�\ �� I_ 7 EX. LIGHT I I Qom' (TO REMAIN) - � M��AA- ' IN=6.EX.WALKWAY❑❑1N.8 � ___ E PR. TEE CONN. I I - 4 VC 2 .B -6 PVC F �— — — < I PROPOSED Y s IN=3 9�\� / W�'iN� POOL HOUSE EE ARCH. e ti LLJ PLANTERSJ Z I 0- DRAWING>) (TO REMAIN) LJ EX. CONC. 22l 1 �g7 TO REMAIN) INv=888:b 1 INV I ----------- �P EX. GRASS AREA (TO REMAIN) I q► �,� / \ i 3 I EX. LATERAL TO BE I I RELOCATED AS REQUIRED EX. TENNIS COURTS j 3 I PR. 4' CONC. WALK �: 99\s �& EX. TREES — `D� TI I friTl"1 I 111I i�1L� ' I (TO BE REMOVED AND REPLACED w/ CG-6RJ I L--- - I EX. WATER SERVICE LINES TO BE LOCATED IN THE FIELD EX. PARKING LOT AT THE TIME OF CONSTRUCTION; PR. WYE CONNECTION NEW 5/8" METER TO BE INSTALLED J, I ) EXISTING LATERAL IF REQUIRED FIELD VERIFY LOCATION) EX METER BOX I EX. (PR �RTE) T EX. CO �.... 1� o\ r- / / EX. PARKING LOT / I %Rc �p\Za � J � IEX. PARKING LOT \ \ \ I I I EX. TREES \\I I �\ 1 \\ I \ I I I \ 8' AWAG PEDESTRIIANIISTANDARD I SOLID BRONZE DOME DROP IN 10' 2810AG PEDESTRIANISTANDARD SOLID BRONZE DOME DROP IN 12' 2812AG PEDESTRIAN STANDARD 5OLD BRONZE DOME DROP IN 15' 315AG PEDESTRIAN STANDARD SOLD BRONZE DOME DROP IN 18' 1211116AG PEDESTRIAN STANDARD SOLD NIA DOME DROP IN 24- 1 2424A8 11 KDFSTRIAN STANDARD SOLD WA DOME DROP IN 30 I 2830AG PEDESTRIAN STANDARD SOLID MIA I DOME WA 11 of I I � o) z z, o z F- a ckf U V) W O! C) j 0 w M 0 z Z 441, CL D O LLI V) i CU (n p p \\ o� Z p Q ' az � o O O > �� \\ i O Z W� vLLJ NZO \ Fl \ W g C� W U H JO � (nY \� �\ W O W C) C) \ \ _ OW W te) W \\ \\ Z Z V- Q \ \ \ \ Ld 3 Q \ o \ 0!� V) \ a_ On n 0 ■ J aN o 0 N M V V cn 7 N N In 1 N "V (V (0 CD I 3 N (D 0 CD 4; W C�000 oo �° 0 L ° v- ° V U N ~ U p L? E Ld Q a / V) Z ch J Lj / D Z V) CD C) L d �j,TH OF Dj .PLANTER a Lic. 018260 r 0) a e1.06 SSIONAL \ SURVEY: PERRY NA DRAWN BY: JOB NO.: RED 0806001 1)n an SCALE: DATE: 1 "=20.0' 09/05/08 SHEET: 3/8 Scale -1 = LU Tt I fi 4z � EX. GREEN m EX. TEE , R e*v__ U EX. TREES EX. WOODEN STAIRS (APRX.) T EX. (MA/N) TREES TO RE 1 � � EX ]BEES • _ 1� _j u i 1Ad J, I EX. TEE 4 <4 El FE TD R MAIN I V. EENCE CrO REMAIN I TP — EJ� CANOPY LINE I688.70 TOP O EX. CONC. (TO REMAIN) I I t o o p p o II iiR TOP '0----�— ^ TOP7 In I 1 TOP I I _ 10 `o o I I I TOP EX. BUBBLE COVERING I I EX. TENNIS COURTS I I o to TO OOL EX. POOL HOUSE �' p OOL AND TENNIS BUILDING W FF=689.45 I Ip TOP II OOL BLDG L� — EX. WALKWAY I ( I TOP I I I _ I I � I I I L_---_ I � � Ex. BRTCTr � -J I L J PLANTERS L J (TO REMAIN) 12 EX. CONC. I TOP r(r0 REMAIN) ----- I I EX. GRASS AREA (TO REMAIN) I C 3 i I CONC. omo I I F l BLDG I EX. TENNIS COURTS 13 I I I I k I I I TOC L;EX. BEREMOVEDI I i I CU ( AN Y I I I REPLACED w/ CG-6R) EX. PARKING LOT Qc I \ � L `\ J / EX. PARKING LOT El \\ I I \I I �\ I \\ EX. EES w 0 OZ m EX. TREE I'v (TO REMAIN) _ v V V EX. TREE , (TO REVA IN) CL op- P POOL T r R MAINTo POOL 0 t ` TOPv' / Y TOP— CE DRIVE EX. ENTRAN uj TOP PO OL T� / / /_ _ _ V) OP'{����< ' _j -0. EX. TREE i (TO REMAIN) TOP ��• Po0 � Z CON . OP < \\ _ LOL. ZCD of w 000 om_ T / 7 TOP / \ `� \ m Z ; Q TOP r W O Z Z Lp,F; / EX. TREES / / / EX. TEE \ = O W Ld N D N U TOP C)U 00 \ EX. LIGHT / /' W 0 W C) FX / (TO REMAIN) \ \ U LLJ 1-0 W Z / / \ / _ W TOP TOP CONC. w 3 Q w \\/ \ � cn a- V\ j / TOP 6� SCE \ / / \ • 11 / /1 ■ NC CD N _ N n E EX. ]BEES 6 � O � 0) � cf) N N N i N c0 Cp \ J >� )@ 1 Q) a: U 0 N 0 E 0 W _ a — � U N U •p ~ L` L� 00 a EX. PARKING LOT / Z / Jw / �w z0 % C)w \ T H OF D j C ' EX. TREES �Ji \ UTIMMY • PARM \ � Lic. N . 018260 ro ",)I1 of ,08 lssIONAL I\ SURVEY: II'6. PERRY 1' DRAWN BY: JOB NO.: IRED 0806001 I 20 0 20 60 SCALE: DATE: 1 "=20.0' O9/O5/08 SHEET: �/� Scale 1 " = 20 ft s �� N ,�, _ S P TO - CO 13+ MU SF Z _ — _ __ PR. 100" '-80 PRIVA E� —�►- -- _ O F — — _ EX. Wq --�2 8R0 LATERAIL ATE _—���� 0 SF Liu ww wg ,1B1?"S CREEK \ w \ v , \ ��4 SF o \ O \ S +. yam► �/ — — — — — _ / yyA1EE' \ -0Ns� T° \ EX. PUMP \ HOUSESF \ a SF Yo ` PRX. LOC. EX. SANI TAR SEWER — — — 8,0 10' -PUBLIC / EX. lNv. = f624.o0 \ / / \ EX. CONC. / X 20 0 20 60 A BRA 1f5 ^REEK Scale 1 " = 20 ft SANITARY LATERAL PROFILE CALES: ( ) 1" = 0.0. () V, 1= II 5.0' 665 I I I I 665 660 I I I 660 I 14STING GRADE II I< I i I I III 655 Q 655 � I I I I III Q I III 6501 1Z I 650 Uj J W I� I I O Z Q 10l OI it 645 Mi z o zZo zl j Z III 645 w `� 0- a_ 0 „mII zz� III�� z I'I�� III II z 640 CIDUZw o +Z of oZ I PR. 100.0'-8" Pvc ® 10.0% I 640 II I I PR. 27.0'-8 0 III I PVC ® 10.01/10 635 tc) 635 + EXISTING to IGR�DE II II wl I z 630 I III ml I Iml I 630 (�1 I PR. 80. . '-8"0 III PVC @ 10.0% Ill III I o 0 0l I 625 I' II V 1 I PR.90.0'-8"01 PVC ® 4.0% I z L Up Iz I�10 I" r zl 1,1 "h W z 625 1 PR. 10.0' 8"0 I `D la ad J = PVC@4.% 1 1111 11111 11111 U I �Iz BIZ 620 CDZ co> +Z N� +Z N� +Z 620 10+00 11 +00 12+00 13+00 SANITARY LATERP:L PROFILE CALES: (H) 1" = 50.0' (V) 1" h 5.0' 695 I I 695 OOL I IROOM EQUIPMENT 690 690 P OPOSED GRADE 9.0 685 EXISTING GRADE 685 680 II II 680 O I I II 675 o I l I I II PR. PVC 37.0'-8"0 @ 6.0% 675 U I a a- I I I I I II II I I I PR. 10 .0'-8'0 o L I I I PVC @ 6.0% 670 +Z 670 EXISTING GRAD I I �665 II II I I XPR.8"0 665 + II PVC @ 110.0% z PR.I12.0'-8"0 o wl I o z I m o 660 PVCI ® 6.0% ml I m 660 N I o o 0 0 655 w Z PR. 10 I �4 I " I JN I " oo 13(o U r� Ico U co 655 = PVC @ .0'-8"0 10.0% I a a_ a_ a_ U ( n II I I1 11 II 1 II 11 �-- I o� oz z z 650 4 0) 1_ + - �' +Z �' +Z �' +z 650 14+00 15+00 16+00 17+00 N Z 0 N w U W O z F Q O W �Ir(,() CL m U Q J Z U �Q� >- Z 0 Z :30 Q 0> w �Z� OU H �Z) LLJZ it0Lj O w F- O ��U _ W O� MW U Z Z 3�w 3 = W V) U J o N N E 0 7 � rI / N N (D(� I N 3 W� ° 0 "� O �..c o 0 J `� y > L0 a @ 1 � � 0 0 0 W o�_ ° � E 0 U ULOL Q) U p w Z m Q a ��'PtiTH OF Dr u' TDdO G PLANTER Lic�Jo. 018260 BOA �SSIONAL� SURVEY: C.I .: PERRY NA DRAWN BY: RED JOB NO.: 0806001 SCALE: DATE: 1 "=20.0' 09/05/08 SHEET: 6/8 GENERAL NOTES: 1. ALL WORK AND MATERIALS SHALL CONFORM TO THE CURRENT STANDARDS OF THE COUNTY OF FREDERICK, VIRGINIA, THE VIRGINIA DEPARTMENT OF TRANSPORTATION, AND THE REGULATIONS OF THE AMERICANS WITH DISABILITIES ACT, WHERE APPLICABLE. 2. EROSION AND SEDIMENT CONTROL SHALL CONFORM TO THE STANDARDS AND SPECIFICATIONS OF THE COMMONWEALTH OF VIRGINIA AND THE COUNTY OF FREDERICK, VIRGINIA, WHERE APPLICABLE. 3. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY "MISS UTILITY" AT 1-800-257-7777 AT LEAST TWO (2) WORKING DAYS, BUT NOT MORE THAN TEN (10) DAYS, PRIOR TO THE COMMENCEMENT OF ANY LAND DISTURBING ACTIVITY. PAVING AND CONCRETE: 1. ALL POINTS OF CONNECTION WITH THE EXISTING PAVEMENT SECTIONS SHALL BE SAW -CUT TO PROVIDE A SMOOTH TRANSITION BETWEEN PAVEMENT SECTIONS. 2. ALL CONCRETE SHALL BE VDOT CLASSIFICATION A-3 CONCRETE. IF APPLICABLE, THE CONCRETE ENTRANCE AND ON -SITE CURB AND GUTTER SHALL CONFORM TO VDOT STANDARD CG-6, CG-6R, AND CG-2. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE STANDARDS AND SPECIFICATIONS OF VDOT. 4. ALL EXISTING UTILITIES HAVE BEEN SHOWN BASED UPON THE BEST AVAILABLE INFORMATION. HOWEVER, THERE MAY BE EXISTING UTILITIES WHICH ARE NOT SHOWN AND SHOULD BE LOCATED. THEREFORE, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE LOCATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. ANY DISCREPANCIES BETWEEN THESE PLANS AND THE ACTUAL FIELD CONDITIONS SHALL BE REPORTED IMMEDIATELY TO THE ENGINEER, THE OWNER, AND THE APPROPRIATE UTILITY COMPANY. 5. ALL PROPOSED UTILITIES SHALL BE INSTALLED UNDERGROUND. 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN ALL PERMITS NECESSARY FOR CONSTRUCTION PRIOR TO COMMENCEMENT OF WORK. AN APPROVED SET OF CONSTRUCTION DOCUMENTS SHALL BE PRESENT ON THE SITE AT ALL TIMES. 7. TOPOGRAPHIC INFORMATION WAS DERIVED FROM A FIELD SURVEY PERFORMED BY PERRY ENGINEERING. A CONTOUR INTERVAL OF ONE (1') FOOT HAS BEEN ESTABLISHED FOR THIS PROJECT. 8. NO SOILS REPORT WAS PREPARED FOR THIS PROJECT. 9. ALL RADII DESIGNATIONS INDICATE FACE OF CURB, EDGE OF PAVEMENT, OR EDGE OF CONCRETE, WHERE APPLICABLE. 10. THE CONTRACTOR SHALL COORDINATE THE RELOCATION OF AND THE CONNECTION TO EXISTING UTILITIES WITH THE APPROPRIATE UTILITY COMPANY, WHERE APPLICABLE. CONSTRUCTION NOTES: EROSION AND SEDIMENT CONTROL: 1. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITIES. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CURRENT EDITION OF THE COMMONWEALTH OF VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. 2. ALL WORK SHALL BE CONFINED TO THE DESIGNATED LIMITS OF CONSTRUCTION. FOR THIS PROJECT, THE LIMITS OF CONSTRUCTION ARE DEFINED AS SHOWN ON THE EROSION AND SEDIMENT CONTROL PLAN. 3. NO DISTURBED AREAS SHALL BE DENUDED FOR MORE THAN THIRTY (30) DAYS. THE CONTRACTOR SHALL STABILIZE ALL DENUDED AREAS WITHIN SEVEN (7) DAYS AFTER THE END OF CONSTRUCTION. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL MEASURES. ALL MEASURES SHALL BE INSPECTED DAILY AND AFTER EACH SIGNIFICANT RAINFALL BY THE SITE SUPERINTENDENT OR HIS REPRESENTATIVE. ANY DAMAGED STRUCTURES SHALL BE REPAIRED OR REPLACED BY THE END OF WORK THAT DAY. 5. UPON COMPLETION OF CONSTRUCTION, ALL PERMANENT EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED. AFTER STABILIZATION, THE TEMPORARY EROSION CONTROL DEVICES SHALL BE REMOVED, AS APPROVED BY THE LOCAL INSPECTION AUTHORITY. ALL VEGETATIVE COVER SHALL BE CHECKED REGULARLY AND ANY DAMAGED AREAS SHALL BE REPAIRED, FERTILIZED, REPLANTED, AND MULCHED, AS NEEDED. 6. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF CLEANING TRUCKS AND OTHER CONSTRUCTION EQUIPMENT PRIOR TO ENTERING THE PUBLIC R-O-W. A TRASH RACK SHALL BE USED AS PART OF THE CONSTRUCTION ENTRANCE TO HELP IN THE CONTROL OF POTENTIAL MUD GENERATED AS PART OF THE DEVELOPMENT OF THIS SITE. IF IT IS DETERMINED THAT THIS IS NOT SUFFICIENT, THEN A WASH RACK SHALL BE INSTALLED, AS NEEDED. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN CLEAN STREETS AND TO ALLAY DUST AT ALL TIMES. EXCAVATION AND GRADING: 1. TEST PITS SHALL BE EXCAVATED TO DETERMINE THE DEPTHS AND LOCATIONS OF ALL OF THE EXISTING UTILITIES. IF CONFLICTS EXIST, THEN THE EXISTING UTILITIES SHALL BE LOWERED OR MOVED TO PROMOTE THE CONSTRUCTION OF THE PROPOSED DEVELOPMENT. 2. ALL DELETERIOUS MATERIALS, DEMOLISHED DEBRIS, AND CLEARED AND GRUBBED MATERIALS SHALL BE REMOVED AND PROPERLY DISPOSED OF OFF -SITE OR ON -SITE AS DIRECTED BY THE OWNERS REPRESENTATIVE. 3. ALL TOPSOIL OR VEGETATIVE COVER SHALL BE EXCAVATED TO ITS FULL DEPTH AND STOCKPILED ON -SITE, IF APPLICABLE, IN THE AREA AS DIRECTED BY THE OWNER'S REPRESENTATIVE FOR FUTURE FINISH GRADING. 4. ALL BORROW FILL MATERIAL, IF NECESSARY, SHALL BE OBTAINED BY THE CONTRACTOR AND APPROVED BY A CERTIFIED GEO-TECHNICAL ENGINEER. ALL FILL MATERIAL SHALL BE PLACED IN LIFTS OF 8" OR LESS AND SHALL BE COMPACTED TO 95% OF ASTM D-698 MAXIMUM DRY DENSITY, OR AS DIRECTED BY THE GEO-TECHNICAL ENGINEER. 5. NO BLASTING SHALL BE PERMITTED WITHIN 25 FEET OF EXISTING UTILITIES OR STRUCTURES WITHOUT PERMISSION OF THE OWNER. 6. ALL LANDSCAPED ISLANDS, SLOPES, AND LAWN AREAS SHALL RECEIVE A MINIMUM OF 6" TOPSOIL OBTAINED OFF -SITE OR FROM THE TOPSOIL STOCKPILE ON SITE. THE TOPSOIL SHALL BE GRADED AND RAKED, PRIOR TO APPLICATION OF PERMANENT VEGETATIVE COVER. 7. ALL DISTURBED LAWN AREAS SHALL BE RESEEDED, FERTILIZED AND MULCHED AS NEEDED. 8. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: a. NO MORE THAN 500 LINEAR FEET OF TRENCH SHALL BE OPENED AT ONE TIME. b. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. c. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF -SITE PROPERTY. d. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. e. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS. f. APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH. MISCELLANEOUS: 1. FIRE LANES SHALL BE DELINEATED, AS DIRECTED BY THE COUNTY OF FREDERICK, VIRGINIA FIRE MARSHAL. 2. ALL BUILDINGS AND ADDITIONS SHALL COMPLY WITH THE VIRGINIA UNIFORM STATEWIDE BUILDING CODE (V.U.S.B.C.) AND SECTION 304, USE GROUP (B) BUSINESS OF THE B.O.C.A NATIONAL BUILDING CODE, 1996 EDITION (NOTE: IBC 2000 CAN BE UTILIZED THROUGH MODIFICATION). 3. THE MAXIMUM SLOPE ACROSS THE HANDICAPPED PARKING AREAS SHALL NOT EXCEED A 2% GRADE. ALL REQUIRED EGRESS FROM THE BUILDINGS SHALL COMPLY WITH C.A.B.O. Al 17.1-92. 4. THIS SITE AND BUILDINGS RELATED THERETO SHALL BE SUBJECT TO ALL FIRE -RATINGS AND FIRE SEPARATIONS IN ACCORDANCE WITH SECTION 707 OF THE B.O.C.A. NATIONAL BUILDING CODE. 5. CHAPTER 17 OF THE B.O.C.A NATIONAL BUILDING CODE, 1996 EDITION REQUIRES THAT THE STRUCTURAL PLANS AND ANY SPECIAL INSPECTIONS (SOIL TESTING, CONCRETE, STEEL, ETC.) SHALL BE PERFORMED AND PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN THE COMMONWEALTH OF VIRGINIA. ALL RELATED DOCUMENTATION SHALL BE SUBMITTED TO THE BUILDING DEPARTMENT FOR PERMIT AND APPROVAL. EROSION AND SEDIMENT CONTROL NARRATIVE: Project Description The property delineated on this plan is located in the southern quadrant between Interstate 81 and Senseny Road adjacent to the Winchester City limits. The site is currently the location of the Winchester Country Club. The property owner proposes to demolish and reconstruct a new outdoor swimming pool and related facilities. Existing Site Conditions The existing site is currently used for a private outdoor swimming facility. The site construction is located at a high point on the site, The site drains to the north down an existing approximate 3:1 slope and to the south down an existing road side ditch towards Senseny Road to Abrams Creek. Soils The USGS Soils map shows the predominant soil type on the site is Clearbrook channery silt loam (9B). This soil is moderately deep, gently sloping, and somewhat poorly. Slopes range from 2 to 7 percent typically. Adjacent Areas The property to the north, south, and east is currently residential. To the west is Interstate 81. Off -site Areas No off site areas will be disturbed e for the construction of this site. Fill material will need to be imported to this site. If over 10,000 sf of offsite area is disturbed to acquire this material this location will either need to be included in the land disturbance package for this project or acquire its own land disturbance permit. Critical Areas Critical areas may exist where proposed fill slopes are greater than 3:1. These slopes will require a slope stabilization analysis prior to issuance of a land disturbance permit. hentrance drive it to remain in tact during nstruction and The ditchline along the g cu after completion of construction as shown on the grading plan. Erosion and Sediment Control Measures 3.02 A 12'w by 70'1 temporary stone construction entrance will be constructed and shall be maintained in a condition which will prevent tracking or flow of mud onto the public rights -of -way. This may require periodic top dressing with additional stone or the washing and reworking of existing stone as conditions demand and repair and/or cleanout of any structures used to trap sediment. All materials spilled, dropped, washed, or tracked from vehicles onto roadways or into storm drains must be removed immediately. The use of water trucks to remove materials dropped, washed, or tracked onto roadways will not be permitted under any circumstances. 3.05 Silt fence will be installed in selected locations downstream from the construction areas as a first measure of construction. Silt fence will be installed around the downstream side of topsoil stockpiles. Silt fences shall be inspected after each rainfall and at least daily during prolonged rainfall. Any required repairs shall be made immediately. Damaged, decomposed or otherwise ineffective silt fence shall be replaced. Sediment deposits should be removed after each storm event. They must be removed when deposits reach approximately one-half the height of the barrier. Any sediment deposits remaining in place after the silt fence is no longer needed shall be dressed to conform with the existing grade and stabilized. 3.30 Replacement of topsoil will generally occur throughout the work site where vegetation is to be reestablished. Topsoil will be uniformly spread and rolled to a minimum depth of 6". Topsoil shall not be placed while in a frozen or wet condition. 3.31 Temporary seeding in accordance with the E & S Std & Spec 3.31 will be applied to the topsoil stock pile and all areas which will not be brought to final grade within 30 days. Embankment or excavated slopes denuded for a period of greater than 30 days shall be temporarily seeded and mulched. To coincide with the anticipated construction dates, the seeding will consist of 50 pounds per acre of German Millet. All temporary seeding areas will be mulched in accordance with the schedule included herein. 3.32 All disturbed areas will be stabilized by permanent seeding in accordance with the schedule included herein. The anticipated time for construction is Spring 2008. 3.35 All seeded areas will be mulched in accordance with the schedule included herein. 3.36 All cut slopes and fill slopes along the proposed road will be stabilized with matting to promote the establishment of a vegetative cover. The mat areas will be inspected after each significant rainfall event and repairs will be made as required. Temporary Seeding SEED TYPE RATE MIN. PURITY(%) MIN. GERM.(%) Sept 1 - Feb 15: Annual Ryegrass 50 Ib/ac 98 85 Winter Rye 50 Ib/ac 98 85 May 1 - Aug 31: German Millet 50 Ib/ac 98 85 or Feb 16 - Apr 30: Annual ryegrass 75 Ib/ac 98 85 Mulch: 1.5 ton/ac small grain straw Fertilizer: 1000 Ib/ac 10-10-10 Permanent Stabilization The contractor shall stabilize all denuded land within 7 days after the end of construction. Permanent stabilization shall be applied to areas that are to be left dormant for more than one year. During construction of the project, soil stockpiles shall be stabilized or protected with sediment trapping measures. The contractor is responsible for the temporary protection and permanent stabilization of all soil stockpiles on site as well as soil intentionally transported from the project site. No soil testing is required. The contractor shall establish vegetation on all areas not otherwise stabilized according the following specification: Seedbed Preparation: a. Scarify top 1" to 2" of soil after final grades have been achieved. b. Add 3 tons per acre pulverized agricultural limestone(1401b/1000sf).ng a SEED TYPE RATE MIN. PURITY(%) MIN. GERM.(%) Tall fescue 60 Ib/ac 97 85 Red clover 8 Ib/ac 95 65 Ladino clover 8 Ib/oc 95 65 Nurse Grass -(season dependent) Sept 1 - Feb 15: Annual Ryegrass 12 Ib/ac 98 85 Winter Rye 12 Ib/ac 98 85 May 1 - Aug 31: German Millet 12 Ib/ac 98 85 or Feb 16 - Apr 30: Annual ryegrass 12 Ib/ac 98 85 Mulch: 1.5 ton/cc small grain straw Fertilizer: 1000 Ib/ac 10-10-10 1. All perimeter sediment control devices shall be erected prior to any land disturbing activities and shall remain in place until the site is fully stabilized. 2. The contractor shall perform overlot grading to provide positive drainage and preclude ponding of water. All off site grading and construction is to be done with the property owner's consent. 3. Cut and fill slopes shall be graded at a maximum of 2 horizontal to 1 vertical unless otherwise noted. SEQUENCE OF CONSTRUCTION 1. Schedule an onsite preconstruction meeting with the Erosion and Sediment control Inspector. 2. Establish the construction entrance. 3. Install silt fence along downstream perimeter of work areas. 4. Strip, stockpile and stabilize topsoil. 5. Perform demolition and rough grading of the construction area. 6. Install pool and related utilities. 7. Perform final grading of site. Apply seeding and mulch and stabilization fabric. 8. Remove temporary controls after work areas have been stabilized. NOTE: ALL TEMPORARY CONTROLS WILL BE REMOVED WITHIN 30 DAYS ONCE NO LONGER NEEDED. TRAPPED SEDIMENT MUST BE REMOVED AND STABILIZED. MAINTENANCE: The contractor shall be responsible for the installation and maintenance of all erosion and sediment control measures. All measures shall be inspected daily and after each significant rainfall by the site superintendent or his representative. Any damaged structures shall be repaired or replaced by the end of work that day. a. The construction entrance shall be maintained so as to control the amount of soil materials that may get caught on the existing pavement. If the pavement becomes too soiled with soil and mud that it will not prevent tracking onto the right of ways, then it shall be cleaned and/ or washed, as may be deemed necessary. A trash rack shall be installed as part of the construction entrance construction. If this measure fails to properly clean the construction vehicles, then a wash rack must be installed as directed by the local program administrator. b. The inlet and outlet protection devices, and the silt fencing shall be checked regularly for deposited sediment. If sediment is trapped, it shall be cleaned carefully so as not to release the trapped sediment downstream or on adjacent properties. c. All seeded and sodded areas shall be checked regularly to ensure that a good stand of grass is maintained. Areas shall be repaired, fertilized, and reseeded or resodded, as 4VAC50-30-40. Minimum Standards 1-19: An erosion and sediment control program adopted by a district or locality must be consistent with the following criteria, techniques and methods: 1. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant for longer than 30 days. Permanent stabilization shall be applied to areas that are to be left dormant for more than one year. 2. During construction of the project, soil stockpiles and borrow areas shall be stabilized or protected with sediment trapping measures. The applicant is responsible for the temporary protection and permanent stabilization of all soil stockpiles on site as well as borrow areas and soil intentionally transported from the project site. 3. A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieved that is uniform, mature enough to survive and will inhibit erosion. 4. Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment sholl be constructed as a first step in any land -disturbing activity and shall be made functional before upslope land disturbance takes place. 5. Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. 6. Sediment traps and sediment basins shall be designed and constructed based upon the total drainage area to be served by the trap or basin. a. The minimum storage capacity f act o a sediment trap shall be 134 cubic yards per acre 9 P Y P Y of drainage area and the trap shall only control drainage areas less than three acres. b. Surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three acres shall be controlled by a sediment basin. The minimum storage capacity of a sediment basin shall be 134 cubic yards per acre of stem drainage area. The outfall s I g y shall, at a minimum, maintain the structural integrity of the basin during a 25-year storm of 24-hour duration. Runoff coefficients used in runoff calculations shall correspond to a bare earth condition or those conditions expected to exist while the sediment basin is utilized. 7. Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. 8. Concentrated runoff shall not flow down cut or fill slopes unless contained within an adequate temporary or permanent channel, flume or slope drain structure. 9. Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. 10. All storm sewer inlets that are made operable during construction shall be protected so that sediment -laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. 10. All storm sewer inlets that are made operable during construction shall be protected so that sediment -laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. 11. Before newly constructed stormwater conveyance channels or pipes are made operational, adequate outlet protection and any required temporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel. 12. When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structures if armored by nonerodible cover materials. 13. When a live watercourse must be crossed by construction vehicles more than twice in any six-month period, a temporary vehicular stream crossing constructed of nonerodible material shall be provided. 14. All applicable federal, state and local regulations pertaining to working in or crossing live watercourses shall be met. 15. The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed. 16. Underground utility lines shall be installed in accordance with the following standards in addition to other applicable criteria: a. No more than 500 linear feet of trench may be opened at one time. b. Excavated material shall be placed on the uphill side of trenches. c. Effluent from dewotering operations shall be filtered or passed through an approved sediment trapping device, or both, and discharged in a manner that does not adversely affect flowing streams or off -site property. d. Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote stabilization. e. Restabilization shall be accomplished in accordance with these regulations. f. Applicable safety regulations shall be complied with. 17. Where construction vehicle access routes intersect paved or public roads, provisions shall be made to minimize the transport of sediment by vehicular tracking onto the paved surface. Where sediment is transported onto a paved or public road surface, the road surface shall be cleaned thoroughly at the end of each day. Sediment shall be removed from the roads by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual development lots as well as to larger land -disturbing activities. 18. All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after the temporary measures are no longer needed, unless otherwise authorized by the local program authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sedimentation. 19. Properties and waterways downstream from development sites shall be protected from sediment deposition, erosion and damage due to increases in volume, velocity and peak flow rate of stormwater runoff for the stated frequency storm of 24-hour duration in accordance with the following standards and criteria: a. Concentrated stormwater runoff leaving a development site shall be discharged directly into an adequate natural or man-made receiving channel, pipe or storm sewer system. For those sites where runoff is discharged into a pipe or pipe system, downstream stability analyses at the outfall of the pipe or pipe system shall be performed. b. Adequacy of all channels and pipes shall be verified in the following manner: (1) The applicant shall demonstrate that the total drainage area to the point of analysis within the channel is one hundred times greater than the contributing drainage area of the project in question; or (2) (a) Natural channels shall be analyzed by the use of a two-year storm to verify that stormwater will not overtop channel banks nor cause erosion of channel bed or banks. (b) All previously constructed man-made channels shall be analyzed by the use of a ten-year storm to verify that stormwater will not overtop its banks and by the use of a two-year storm to demonstrate that stormwater will not cause erosion of channel bed or banks; and (c) Pipes and storm sewer systems shall be analyzed by the use of a ten-year storm to verify that stormwater will be contained within the pipe or system. c. If existing natural receiving channels or previously constructed man-made channels or pipes are not adequate, the applicant shall: (1) Improve the channels to a condition where a ten-year storm will not overtop the banks and a two-year storm will not cause erosion to the channel bed or banks; or (2) Improve the pipe or pipe system to a condition where the ten-year storm is contained within the appurtenances; (3) Develop a site design that will not cause the pre -development peak runoff rate from a two-year storm to increase when runoff outfalls into a natural channel or will not cause the pre -development peak runoff rate from a ten-year storm to increase when runoff outfalls into a man-made channel; or (4) Provide a combination of channel improvement, stormwater detention or other measures which is satisfactory to the plan -approving authority to prevent downstream erosion. d. The applicant shall provide evidence of permission to make the improvements. e. All hydrologic analyses shall be based on the existing watershed characteristics and the ultimate development of the subject project. f. If the applicant chooses an option that includes stormwater detention, he shall obtain approval from the locality of a plan for maintenance of the detention facilities. The plan shall set forth the maintenance requirements of the facility and the person responsible for performing the maintenance. g. Outfall from a detention facility shall be discharged to a receiving channel, and energy dissipaters shall be placed at the outfall of all detention facilities as necessary to provide a stabilized transition from the facility to the receiving channel. h. All on -site channels must be verified to be adequate. i. Increased volumes of sheet flows that may cause erosion or sedimentation on adjacent property shall be diverted to a stable outlet, adequate channel, pipe or pipe system, or to a detention facility. j. In applying these stormwater management criteria, individual lots or parcels in a residential, commercial or industrial development shall not be considered to be separate development projects. Instead, the development, as a whole, shall be considered to be a single development project. Hydrologic parameters that reflect the ultimate development condition shall be used in all engineering calculations. k. All measures used to protect properties and waterways shall be employed in a manner which minimizes impacts on the physical, chemical and biological integrity of rivers, streams and other waters of the state. EXTRA STRENGTH FILTER FABRIC NEEDED WITH WIRE SUPPORT STEEL OR WOOD POST /_-- 'FLO -- 10 FT MAX. SPACING WITH WIRE SUPPORT FENCE PONDING HT. PONDING HT. STEEL OR WIRE & FILTER FABRIC WOAD POST ATTACH SECURELY 36' HIGH MAX TO UPSTREAM SIDE OF POST. RUNOFF 1 RUNOFF 12" MIN.12 - I 4"x6" TRENCH :. WITH COMPACTED BACKFILL STANDARD DETAIL TRENCH WITH NATIVE BACKFILL 9 MAX. (RS ECOMMEORAGENDHTD)'� 12" MIN..: - -I� ' GRAVEL I ALTERNATE D ETAI L TRENCH WITH GRAVEL NOTE: 4. SET POSTS AND EXCAVATE A 4"x4" 1. INSPECT AND REPAIR FENCE AFTER EACH TRENCH UPSLOPE ANLONG THE LINE STORM EVENT AND REMOVE SEDIMENT WHEN OF POSTS. NECESSARY. 5. STAPLE WIRE FENCING TO THE POSTS. 2. REMOVED SEDIMENT SHALL BE DEPOSITED 6. ATTACH WIRE FILTER FABRIC TO THE WIRE TO AN AREA THAT WILL NOT CONTRIBUTE FENCING AND EXTEND IT INTO THE TRENCH. SEDIMENT OFF -SITE AND CAN BE PERMANENTLY STABILIZED. 7. BACKFILL AND COMPACT THE EXCAVATED 3. SILT FENCE SHALL BE PLACED ON SLOPE SOIL. CONTOURS TO MAXIMIZE PONDING EFFICIENCY. SILT FENCE DETAIL WITH WIRE SUPPORT NOT TO SCALE ADDAPTED FROM: 1992 VA E&S CONTROL HANDBOOK 3.05 EROSION & SEDIMENT CONTROL KEY 3.02 TEMPORARY STONE ........ CONSTRUCTION (;E ............................... ENTRANCE 3.05 SILT FENCE 3.30 TOPSOILING - 3.31 TEMPORARY SEEDING 3.32 PERMANENT SEEDING 3.35 MULCHING EXISTING PAVED ROADWAY SEDIMENT BARRII (STRAW BALE TYI SUPPLY WATER Tf WHEELS IF NECE� Q Q O 0 W 0- A O O CD Z to X w _J DIVERSION RIDGE REQUIRED WHERE GRADE EXCEEDS 2% 2 % OR GREATER FILTER FABRIC SECTION A - A NOTE: / eNDBAGS, STRAW BALES HER APPROVED METHODS HANNELIZE RUNOFF TO BASIN EQUIRED. Q` O b� _� FLOW FLOW r • :'ice � `j �r i � X •„ .�.�. .:�:' :•; �..�,., • n ,_ar'" �`;', R z A 2" 3" COU SE r . W SHRACK AGGREGATE MIN. 6" THICK cu r.� ` n c,•r�rn.t o O =!:! �.) j �°. v„ c� +!��NtL � r`"a 0, £�'.�-.�11��. __ � ':d �° � C,,y '-,.o i-t is-, y.'..� .�_.p. An��•`•� "'•' ;-fig"}p ��.•. ,. ��x Q' � ,-,F`+,..yl.�.gr��'.��^... ..0 -��. �'M +s.,... �•'J> c�.•�.1..r-ir +.-�.c,,.� .� „�.. 'r.r. r.., n,a �x�> 1,:iJ,..,�2r .�' �I 1 DIVERSION RIDGE 70' MIN. DI AAII NOTES: 1. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHTS - OF -WAY. THIS MAY REQUIRE TOP DRESSING, REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 2. WHEN NECESSARY, WHEELS SHALL BE CLEANED TEMPORARY PRIOR TO NTO PUBLIC 3. WHEN WASHING ENTRANCE IS REQUIRED, REQUIRED,ITSIHALL BE DONE GRAVEL ON AN AREA THAT DRAINS INTO STABILIZED ANAPPROVED SEDIMENT TRAP CONSTRUCTION OR SEDIMENT 4. INSTALL CATT EINGUARDS AS CALLED FOR ON THE PLANS. ENTRANCE/EXIT U w O Of IZ w I - a O Z Z Q W V 0 ® J Zo Q Z ® Z to U 0 W m U Q D X Z J U Z NEj Q� X 0 0> Z�- < <}}w D 0 ZZ o w F �D (n 0 it W Q WU F- 0 �U _ C W 0ir Z POW Z �- 3 Q W d ■ J a: N ■� v N 0 U 7 N I _� CN N N I N (0 3 N t W0 �0�.c O V J � @ 0 a� n L E o �p F_ o N U a)_ ~ U LL_ W Z 4 00 a U (f) Z 0_ J W �w Z_ ZO O Z VP_XTH OF I n r TIMOTM GJ PANPER Lic. 018260 I�AoA60 ZZ/a 1ONAI, SURVEY: C.I.: NA NA DRAWN BY: RED JOB NO.: 0806001 SCALE: DATE: NA 09/05/08 SHEET: 7/ A EXISTING OR PROPOSED CURB(TYP) WHERE SHOWN ON PLANS i3.5 (OR AS SHOWN ON PLANS) ................................. .. ... .................................. ...... EXP. JT. MAT'L 4" CRUSHED STONE (3000 PSI) 4" CONC 6x6xW1.4xW1.4 WWF (1.5" Min. CLEAR) TYPICAL SIDEWALK/CURB DETAIL NOT TO SCALE F GUTTER TYPICAL 1' NOSE DOWN CURB NOT TO SCALE PER PLANS a 4.1 .''..'. .. .. . ... ... ,.... 4" CRUSHED STONE (3000 PSI) 6" CONC 6x6xW2.9xW2.9 WWF (1.5" Min. CLEAR) CONCRETE STOOP DETAIL NOT TO SCALE run 9- nnnurn nI lAui I MArHi Tra!`InAI uu nr GRADE L I LJ FENCE SECTION ELEVATION WITHOUT TOP RAIL & WITHOUT BARBED WIRE � [72'R C G - 6 R 6" � 2'-0" COMBINATION 6" CURB & GUTTER REVERSED NOT TO SCALE ran R- nnnAirn CHAIN LINK L- J L J FENCE SECTION ELEVATION WITH TOP RAIL & WITHOUT BARBED WIRE FENCE HEIGHT END & CORNER POSTS LINE POSTS NOMINAL HEIGHT B-1 BAR LENGTH H-1 HEIGHT ABOVE GRADE B-2 BAR LENGTH H-2 HEIGHT ABOVE GRADE 8'-0" [2438MM] 1 1'-0" [3353MM] 8'-0 5/8" [2454MM] 10'-8" [3251 MM] 7'-8 7/8" [2359MM] NOTES: 1. THIS DETAIL CORRESPONDS WITH 'ANCHOR FENCE PRODUCTS'. 2. SIMILAR PRODUCTS MAY BE USED. TYPICAL 8' HIGH FENCE DIMENSIONS do SPECIFICATIONS CITY OF WINCHESTER, VA DEPARTMENT OF PUBLIC UTILI TYPICAL RESILIENT SEAT VALVE INSTALLATION: VALVE BOX AND BOOT SHALL BE CAST IRON VALVE BOX COVER SHALL BE MARKED 'WATER' VALVE TOP SHALL BE FLUSH WITH FINISHED GRADE 18' X 18' CONCRETE PAD SK41 BE PLACED AROUND VALVE BOXES LOCATED OUTSIDE OF PAVEMENT AREAS VALVE BOX SHALL BE SCREW TYPE FOR ADJUSTMENT MECHANICAL JOINT FITTINGS AND PIPE RESTRAINED BY USING MEGA -LUG RESTRAINING FLANGES STANDARD TYPICAL VALVE & BOX INSTALLATION DATE: 12/03 DETAIL NO. SCALE: NONE WD— 9 CITY OF WINCHESTER, VA DEPARTMENT OF PUBLIC UTILITIES NMR TImNcM 6" MINIMUM MACHINE EXCAVATION Leer FORM 1OAO (TY►3 Mjj& TINEKCN GATE VALVE uMIMrrDRIMEa mrrm- ` . NOES STONE EDDING TEE, VYE, OR PLUG TYPICAL SECTION IN LZU IS V® FflIDG THE FrTTRG TRY E WNAPPO WITH MdODTES HAW EXCAVATION POLYETHYLENE` AND THE CONCRETE POSED TO COMPLETELY 71II01■1 'V - Ie^ MK FOR W AD SNALLLIR POPE HE TFEBfiS TNO AGIIDKT IIIOITIUOEB S®_ THE FARM MENTIONS 'W W IOU FOR le" TIRL W- PIPE AGADRT UDUTUfED SOL $HA L REMAIN AS TDVM SEE CHART FLOW FOR AJ.0 RI ENSDNS. CONCRETE ➢IMENSIONS FOR HORIZONTAL THRUST BLOCKS PIPE PLUGS. WYES 3 TIMES 11 U4• AND e2 L r 1EMN 4M AID 1I' -- A 1 C A I C A I C 6^ 1,-9^ r-9- V-V r-'1^ r-9" r-9" V-3" r-r 1_11' r'r-a" Iw I'i" r-r' 1'i" I-V r-9" 1'-7, 1-9-r-r r-6" Le r-r' r-r' r-Nv' 1'-]" r-v i'i" r-0" 1.�.• 7-0'• 14^ C-r' 1'i" 7--V1'-3" 1'�'• 1'-6" L—V 1'-I"' 4'-r' 14" r-3" 1'-O" 7i" 1'i^ 1•-W" ram" r-s" Y-O" 4•.<'• 1'-3^ ram"' 3-Y' 1-3- 4-9- v-4- r-4 7-3 r-4- - 11 1/4 THRU 90' BENDS EALV.n101 EWER FITTwu AID u■nED IN CO NCETE THRUST BLACKS FITTING SIZE ROD SIZE NO. RODS EMBEDMENT IC' G LESS 14"-er' 6 e e e 3r' 36•• VERTICAL BENDS FITnMG VI1.IK ff THRRT )LOCK IN CI.YA I :>g ee yr ,r 9r STOE EDDDG w THRUST BLOCKS FOR VERTICAL 1Nw - - LI u Pa 3,7 UP BENDS SHALL BE THE SAME AS FOR HORIZONTAL BENDS. Ir' 14" 16" 1w _ 0.5 L7 0.9 E3 IA 32 3.9 5.1 63 7.6 - ar, e2 4.5 79 - STANDARD CONCRETE THRUST BLOCKING DATE: 9/01 DETAIL NO. SCALE: NONE WD-12 CITY OF WINCHESTER, VA • METER SUPPLIED BY THE DEPARTMENT OF PUBLIC UTILITIES DEPARTMENT OF PUBLIC UTILITIES L FLANGED ANGLE METER VALVE SHALL RAVE '0' RING TYPE FLANGE METER SUPPORT BRACKETS • 2" FORD COPPERSETTER MODEL / VBHH77-15BM-11-77 • BACK FLOW DEVICE REQUIRED AS SET FORTH IN CITY CROSS • 1-1/2 FORD: SAME LAYING DISTANCE CONNECTION CONTROL PROGRAM AS 2" WITH ONE PAIR OF 2" x 1-1/2' • BACKFLOW DEVICE MAY NOT BE INSTALLED IN METER VAULT METER ADAPTERS, FORD PART III A67 • METER SETTING TO BE FORD CUSTOM SETTER OR APPROVED EQUAL • PRECAST VAULT AS MANUFACTURED BY THE CLEAR FLOW COMPANY OF WAYNESBORO. VA OR APPROVED EQUAL 5'D" o � I 17" 60 l 1 2" OR 1 1/2 TYPE "K" COPPER PIPE (TYP) PLAN VIEW 24" x 36" ALUMINUM BALL VALVE CURB STOP WITH 2" ACCESS HATCH GATE VALVE OPERATING NUT HALLIDAY FORD MODEL B44-777 W/ (SIR-2436) OT67 I DOUBLE CHECK VALVE TAPPING SADDLE AND CORP STOP 0 z. 4" BALL 1 1/2" OR 2" METER SETTER VALVE FORD CUSTOM SETTER 4" DIAMETER BLOCKOUT SECTION VIEW FOR DRAIN STANDARD 1 1 /2" & 2" METER INSTALLATION DATE: 9/01 DETAIL NO. SCALE: NONE WD— 4 CITY OF WINCHESTER, VA DEPARTMENT OF PUBLIC UTILITIES SANITA Y SEVER MAIN FLOW 35 PIVRMIFACRRE.D �V mxn DTIERVISE THE OR VYE SIOVN ON PLANS SIl el GASI<EfED PIPE me MITWIS II" ION SEVER SERVOI CONNECTION STADANB GRANULAR PER SPECIFICATDNS EDDDIG TFIRIUUR CLEAN OUT 0 f PREPOSED SERVICE LATERAL T i R® FEDMCO COIPLDNG IXISTDG SERVICE LATERAL STANDARD STANDARD SANITARY DATE: 9/01 DETAIL NO. LATERAL CONNECTION SS— 3 SCALE: NONE CITY OF WINCHESTER, VA DEPARTMENT OF PUBLIC UTILITIES • THE FOLLOWING JOINTS MUST BE RESTRAINED IN ALL APPLX'AATION: H. mm- IAET • OURET 2. TEE- ALL MW1CHES 3. OFFSETS- MAST AND OURET 4. CAPS 5. PLUGS e. DEAD EMS 7. MOUR HYDRANT RUS SMALL BE IIFSTTFAM/ED AS DEAD NTRUST • IRFSTRAOR ON SLIP JOINT DUCTILE EON PIPE S/Wl BE U.S. PIPE FIELD LACK LACK (LL9 M FOR TYTON JOINT PIPE OR APPROVED EQUAL • THRUST RESTRAINT ON DUCTILE LION FRTINZ SHILL BE PROVIDED BY THE USE OF MEQALUG RETAINER (OR APPROVED EQUAL) AND MECHANICAL JOINT FITTINGS STD. JOINT MINIMUM LENGTH OF RESTRAINT, L RESTRAINED JGHTS STD. JOINT L- MINIMUM LENGTH TO BE RESTRAINED ON EACH SIDE OF FTM"G (FT) MI/DAUM FOOTAGE OF RFSIRNNED PIPE PIPE (IN) ELBOWS (dp) VALVE, TEES. BIRCHES DEAD AD END 6 3FT 5FT 11FT 27FT 41 FT e 3FT 7FT 14FT 35FT 52FT 10 4FT SIFT 17Fr 42FT 63FT 1e an i3FT 27Fr DAFT j "Fr 20 6Fr 1eF7 _,*7 a FT 122Fr 24 1 1 • FILLIES BATED ON 36 INCH BURIAL DEPTH 150 PSI TEST PFESSLW -FIGURES MATED ON SM WARIG CAPACITY OF IWO PW -FIGURES BASED ON LAYING CONDITION AS SPEOM IN THE WINCHESTER STANDARD DETAILS -FIGURES DO NOT APPLY TO POLY WRAPPED PIPE STANDARD DUCTILE IRON PIPE RESTRAINT DATE: 9/01 DETAIL NO. SCALE: NONE WD— 11 CITY OF WINCHESTER, VA DEPARTMENT OF PUBLIC UTILITIES GATT IRO( CLEAN/ I)rr CAP WITH ■vm PLUG PAELLA M®EL PA4N-LYx U"') MDR e1 PAELLA MEMEL PANwSV{3K (b'7 P�WIiACTIIED (--TEE IR WYE INVERT OF IR■E COIN TO E AT CROWN OF SEVER ]PFf06 LDE STANDARD STANDARD SANITARY DATE: 9/01 DETAIL NO. LATERAL CONNECTION SS-4 SCALE: NONE I7 V) z O LL; _J IN z O a_ V) 0 Q 0 'n I— m U Q Z_ U V) 00 Z 0<1x O U> ZF- < w O Z Z 1.1 O w 11.—/(n , Ix V)z o Ix Q U � O M�U W p WON_ I � w O Ld ILL Z Z T-p LLJ u 3 QIx D T ILL ^� V) I..L ■ CU ■ .TJ . O � n O cND CV r T.-) E O U �_ 0 CN Ln I In I T» 3 0 N CD N CO N N W0 �0^c J L't'ta �' � �� O c N Q) L O E O O U O N ~ U 0 w Z '� 00 R IL CDcn z J LLJ �W �z z� LLLLuw -T H OTNW F j o U PARM 9 Liic 018260 w� �%; SSIONAL I SURVEY: C. I.: NA NA DRAWN BY: JOB NO.: RED 0806001 SCALE: DATE: NA 09/05/08 SHEET: 8/8