SITE PLAN CHECKLIST
The checklist below indicates all the information that needs to be submitted as part of the site plan
application. All required information must be submitted prior to the final approval of any site plan. The
Department of Planning and Development will review the application to ensure that it is complete. If
any portion is not included or complete, the site plan application will not be accepted and returned to
the applicant(s).
Site Plan Package
1. One set of approved comment sheets are required from the following review
agencies prior to final site plan approval. It is recommended that applicants contact
the Department of Planning and Development to determine which review agencies
are relevant to their site plan application.
6b� atl 61
Virginia Department of Transportation (VDOT) 4 County Health Department 1
Frederick County Sanitation Authority
City of Winchester
Department of Planning and Development _--_
Town of Stephens City
inspections Department k"At k
Town of Middletown
'VFrederick County Engineer (Public Works)
Airport Authority
Frederick County Fire Marshal d`'�V —
Soil & Water Conservation District
_' Department of Parks and Recreation —
Request for Street Name
2.
One copy of the Site Plan application
3.
Five Copies of the Final Site Plan for approval
4.
One reproducible copy of the Site Plan (if required)
5.
A 35mm slide of the Site Plan (if required)
8
SITE PLAN TRACKING SHEET
Date:
71(- V L File opened
,/ Reference Manual updated/number assigned
D-base updated
D I File given to Renee' to update Application Action Summary
CLOSE OUT FILE;
Approval (or denial) letter mailed to applicant/copy made for file
1z File stamped "approved", "denied" or 'Vithdrawn"
Reference Manual updated
i/ D-base updated
File given to Renee' for final update to Application Action Summary
Cud\Common�Site Plan Tracking wpd
R—v d 03/06/01
COUNTY OF FREDERi moisw. VIRGINI0
DEPARTMENT OF INSPECTION
Caller Time Called _ Date Called rol
Phone No. "��� N Time RequestedDate Requested ! \
I)ial aala
Received By S Date of Inspection
444
PERMIT HOLDER NAMEu�k�(Yta�1
RT. NO. Lot No. SEC. No. SUBDIVISIUN
STREET NAME �rx "► ���'-"�` �Q
DIRECTIONS 1 — BUILDING NO.
-� PLUMBING NO.
0
ELECTRICAL NO.
s
MECHANICAL NO.
PERMIT FOR:
Type of Inspection
Residential
Footers
Slab
Water
Sewer
Rough Plumbing
Groundworks
Other:
Time In:
Time Out:
Results: Approved
Comments: AGL%
c{
n
Setbacks: FR
Draintile
Service
Rough Electric
Rough Mechanical
Gas PipingtTest
Q} SIGN NO.
DISTRICT Iw l
Commercial
BK L
Gas Fire -up
Framing
Final
R _
Final Electrical
Final Mechanical
Site Plan - 61
Final Building Fire Marshall
Final Plumbing Special/Complaint
0
Temperature Cut in No.
XAInnthdotr
Rejected
r.
0 COUNTY OF FREDEF,,,_ VIRGINIA
DEPARTMENT OF INSP1= TION
tl'1 i
Caller _�___- Time Calle _--- ___ Date Called _ i6
Phone No. J " m Time Requested Date Requested
Received By `-- Date of Inspection � a.
PERMIT HOLDER NAME
i AI IA d-V) ,W1 11V - 41 — n A
RT. NO. J4 of No
STREET NAME
DIRECTIONS BUILDING NO.
ILt I �L� -----PLUMBING NO. _
-ELECTRICAL NO.
— MECHANICAL NO.
n_ SIGN NO.
SA'' !
DISTRICT lJl.I�C_,,'
SEC. No. SUBDIVISION
PERMIT FOR: -
Type of Inspection
Residential
Commercial
Footers
Setbacks: FR
BK _ L
Slab
Draintile
Gas Fire -up
Water
Service
_ Framing _
Sewer
Rough Electric
Final _
Rough Plumbing
Rough Mechanical
Final Building
Groundworks
Gas Piping/Test
Final Plumbing
Other
Time In:
--:o +� Temperature
1.
Time Out: ' y Weather
Results: Approvedyz wl _Rejected
Cut in No.
I
Final Electrical
Final Mechanical
Site Plan
Fire Marshall
Special/Complaint
0
•
4, 09/16/2002 08:13
54066732630
PINEKN 0
PAGE 01
PINE KNOLL CONSTRUCTION CO., INC.
210 EBERT RD. WINCHESTER, VA 22603
PHONE W-667-3092 FAX 540-667-3263
September 16. 2002
Charles Zuckerman & Son
195 Ebert Rd.
Winchester VA 22603
Attn: Mark Phelps
Re Paving Schedule
Dear Mr Phelps
The paving schedule for the parking lot for the new add6on per site plan has been tenitivety set for
Wednesday September 18. 2002 as per Stuart M. Perry Inc unless delayed due to weather conditions.
Stripping to follow paving
Thank you,
Jeff Jenkins
Pine Knoll Construction. Inc
0
• . FILE corn
COUNTY of FREDERICK
Department of Planning and Development
540/665-5651
FAX: 540/ 665-6395
October 30, 2001
Mr. Ronald A. Mislowsky, Jr., P.E.
Gilbert W. Clifford & Associates, Inc.
117 E Piccadilly Street, Suite 200
Winchester, Virginia 22601
RE: Administrative Approval of Site Plan # 29-01, Charles Zuckerman & Sons, Inc.
Warehouse Expansion; Property Identification Number (PIN) 44-A-12A
Dear Ron:
The Frederick County Department of Planning and Development administratively approved the above -
referenced plan on October 29, 2001. Currently, there are no adverse comments by any of the required
review agencies; however, any future comments by these agencies should be addressed promptly. Below
is a list of the primary improvements of this development:
• Construction of a 12,500-square-foot warehouse building.
• The existing screen and buffer shall be maintained and improved in some locations. The existing
landscape screen along the southeast property line shall be maintained as part of the required buffer
between the RP (Residential Performance) and M 1(Light Industrial) Zoning Districts. Improvements
include an eight -foot- high opaque fence. The fence will be located along the center of the southeast property
line and shall be 535 linear feet long.
• Improved parking conditions are required. Although the new building will not require any additional parking
spaces, the site plan requires new pavement, signs, striping, and re -striping.
• Improvements shall be made to the existing entrance off of Ebert Road (Route 837).
• The existing trailer and tank will be relocated. A building permit shall be required for both.
I have provided you with five copies of the approved site plan. Please forward these to the appropriate
representative. Furthermore, please advise the owner that a copy should be kept for future reference and an approved
copy must be kept on the construction site throughout the development process. Once site development is complete,
the owner should contact this office to schedule an on -site inspection. Please do not hesitate to contact me if you have
any questions.
Sincerely,
J emy Franklin Camp
Planner II
JFC/ch
Enclosure
cc: Charles W. Omdoff, Sr., Stonewall Magisterial District Supervisor
Jane Anderson, Real Estate
June Wilmot, Economic Development Commission
U Uerem)\Site Plan Review000Mrcluve2001"arles Zuckerman & Son�AdmApprovalLeaerSP029.01 wpd
107 North rent Street • Winchester, Virginia 22601-5000
•
gilbert w. clifford & associates, inc.
1 / 7 F_ Piccadilly Street, Suite 200
Winchester, Vrginia 22601
540-667-2139 Fax:540-665-0493
e-mail: gwcliffa mnsina com
To: Frederick County Plann
107 N. Kent Street
Winchester. VA 22601 1
We are sending you
aHand Delivered
Shop Drawings
0 Copy of Letter
❑ Attached
Change Order
❑ Prints
Plats
•
LETTER OF TRANSMITTAL
Present Datc Job No.
10-26-01
Attention: Jeremy Cam
Re: Zuckerman Expansion
aUnder Separate via
❑ Samples
aPlans
Copies Date Description
7 Zuckerman Expansion
Arc Transmitted
For Approval
0 For Your Use
As Requested
aFor Review or Comment
0 For Bids Due
Remarks
Copy To:
0 Approved/Submitted
0 Approved/As Noted
aReturn/Corrections
Approval/Signature
20
the following items
❑ Specifications
❑ Other
aResubmit for Approval
Submit for Distribution
0 Returned Corrected Prints
aLoan Print/Retum
0 Return/with Signatures
tit�t�vE°
Signed Ronald A. Mislowsky,j-E ; VP
Rev 3.0
3/10/97
9eQuest for Site Plan Comments •
Virginia Department of Transportation
Mail to:
Virginia Department of Transportation
Attn: Resident Engineer
P.O. Box 278
Edinburg, VA 22824-0278
(540) 984-5600
Hand deliver to:
Virginia Department of Transportation
2275 Northwestern Pike
Winchester, VA 22603
(540) 535-1818
Please fill out the information as accurately as possible in order to assist the Virginia Department of
Transportation with their review. Please attach five (5) copies of the site plan with traffic generation
data and drainage calculations with this sheet.
Applicant's Name
Address:
Phone Number
Gilbert W. Clifford & Associates, Inc.
c/o Ronald A. Mislowsky
117 E. Piccadilly Street
Winchester, VA 22601
(540) 667-2139
Name of development and/or description of the request:
Charles Zuckerman & Son, 12,500 S.F. Expansion
RECEOir�
VD - Ed;^1.j0(0 f�?tJll�iicv
Location of property:
195 Ebert Road, .15 miles west of US Route 1 1 JUL 1 i Ldn
- - MiAL
e
Virginia Department of Transportation Comments� EILAI ■ •
]he application for site plan for this property appears r-o M7M 1tr-rie nrAsurable liapacr- on Foute bJ1,
PLIIPeTty. if .1Y MOLk iS PeTfULLIed .
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
EDINBURG RESIDENCY
14031 OLD VALLEY PIKE
CHARLES D. NOTTINGHAM EDINBURG. VA 22824
cOMMISSIiiNER
September 6, 2001
Mr. Ronald A. Mislowsky, P.E., V.P.
C/O G. W. Clifford & Associates, Inc.
117 E. Piccadilly Street, Suite 200
Winchester, VA 22601
Ref: Zuckerman Expansion
Route 837, Ebert Road
Frederick County
Dear Ron:
JERRY A. COPP
RESIDENT ENGINEER
TEL E (540) 984-5600
FAX (540) 984-5607
We have received your revised site plan dated July 18, 2001 for the referenced project. It
appears all of our earlier review comments have been satisfactorily addressed. Please advise
the owner of our approval. Also please provide seven (7) sets of approved construction
plans with signed seal for VDOT distribution.
The appropriate land use permit may now be applied for to cover work within the Route 837
right-of-way. The permit is issued by this office and will require a minimum processing fee,
surety bond coverage, and the salary & expenses of a State assigned Inspector. A copy of
any/all recorded plats of dedication for drainage easements or additional right-of-way required
for implementation of this proposed project should be provided to VDOT prior to issuance of
any land use permits. Dedication should be made to the Commonwealth of Virginia.
Once satisfactory application has been made, a permit will normally take approximately thirty
days to process and issue. Should you have any questions, do not hesitate to call.
Sincerel
toty
Barry J. Sweitzer, Tran . Roadway Engin
For: Steven A. Melnikoff, Transportation Engineer
BJ S/ rf
Enclosure
xc: Mr. Dave Heironimus
Mr. Evan Wyatt
RECEIVED
SEP 1 3 2001
-OT ()F PLANNINGTEVELOPMENT
WE KEEP VIRGINIA MOVING
•
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
EDINBURG RESIDENCY
14031 OLD VALLEY PIKE
CHARLES D. NOTTINGHAM EDINBURG, VA 22824
CONRAISSIONER
September 6, 2001
Mr. Ronald A. Mislowsky, P.E., V.P.
C/O G. W. Clifford & Associates, Inc.
117 E. Piccadiily Street, Suite 200
Winchester, VA 22601
Ref: Zuckerman Expansion
Route 837, Ebert Road
Frederick County
Dear Ron:
JERRY A. COPP
RESIDENT ENGINEER
TELE (540) 984-5600
FAX (540) 984-5607
We have received your revised site plan dated July 18, 2001 for the referenced project. It
appears all of our earlier review comments have been satisfactorily addressed. Please advise
the owner of our approval. Also please provide seven (7) sets of approved construction
plans with signed seal for VDOT distribution.
The appropriate land use permit may now be applied for to cover work within the Route 837
right-of-way. The permit is issued by this office and will require a minimum processing fee,
surety bond coverage, and the salary & expenses of a State assigned Inspector. A copy of
any/all recorded plats of dedication for drainage easements or additional right-of-way required
for implementation of this proposed project should be provided to VDOT prior to issuance of
any land use permits. Dedication should be made to the Commonwealth of Virginia.
Once satisfactory application has been made, a permit will normally take approximately thirty
days to process and issue. Should you have any questions, do not hesitate to call.
Sincerel
124 •
Barry J. Sweitzer, Tran . Roadway Engin
For: Steven A. Melnikoff, Transportation Engineer
BJS/rf
Enclosure
xc: Mr. Dave Heironimus
Mr. Evan Wyatt
r{ECEIVED
SEP 1 0 Z001
WE KEEP VIRGINIA MOVING
-DT OF PLANNINGIDEVELOPMENT
Request for Site Plan Comments
Virginia Department of Transportation
:Mail to:
Virginia Department of Transportation
Attn: Resident Engineer
P.O. Box 278
Edinburg, VA 22824-0278
(540) 984-5600
Hand deliver to:
Virginia Department of Transportation
2275 Northwestern Pike
Winchester, VA 22603
(540) 535-1818
Please fill out the information as accurately as possible in order to assist the Virginia Department of
Transportation wish their review. Please attach five (5) copies of the site plan with traffic generation
data and drainage calculations with this sheet.
Applicant's Name: Gilbert W. Clifford & A
Address: c/o Ronald A. Mislowsk
117 E. Piccadilly Street
Winchester, VA 22601
Phone Number: (540) 667-2139
Name of development and/or description of the request:
Charles Zuckerman & Son, 12,500 S.F. Expansion
Location of property:
195 Ebert Road, .15 miles west of US Route 11
Inc.
- Fdlr?[julo Rf?f ldim6V
JUL 9 1 z00
Virginia Department of Transportation Comments: 13 LAI ❑ SAM
'the application for site plan for this property appears tffi—pct on Route 6-37,
is issued:bv this office and requires a fee and surety bond coverage: See attached letter dated r0��
�'i3£XP i tr, . V. ('lif€ot.d. 'shank JLb3 for ali��nr ,1s OxK OrIcrt�Atit} to 0(l1rt�t..
Date received-711liOt Date revision re�i4ed�3�i=�a 1
liituinplete litcUritl�iete
Date reviewedefi�:, I Date reviewed
Signature anti Date
- ........... _.....
Signature and Date frevision
Tz_�zs.x>ztati.�n�.a,ir�E
1 3
Date approved 9 Q. I Q g
gilbert & Clifford & associates ' c
INCORPORATED 1972
Engineers — Surveyors — Land Planners — Water Quality
memorandum
Cyr; -
To.- John Whitacre, FCSA D
Barry Sweitzer, VDOT AUG 8_�001
Tim Welsh, Frederick County Fire and Rescue S
From: Ron Misiowsky *ED
Re.- Charles Zuckerman & Sons
Date.- August 3, 2001 -
We've revised the plan to include an extension of water service to the site, placing a fire hydrant at the
rear of the new building.
I've attached two sets of plans for your review. Please call if you have questions.
------- --- - ---- ------ -- --
15yZ,14 altsir � � /,;.
G
117 East Piccadilly Street, Suite 200, Winchester, Virginia 22601
(540) 067-2139 Fax (540) 665-0493 e-mail gwc1iii(a.mnsinc.c0m
,tfember.-lmerican Consulting Engineers Council
•
•
Request For Site Plan Comments
Frederick County Inspections Department
Mail to: Hand deliver to:
Frederick County Inspections Dept. 107 N. Kent Street
Attn: Building Official Fourth Floor
107 North Kent Street Winchester, VA
Winchester, VA 22601 (540) 665-5650
(540) 665-5650
Please fill out the information as accurately as possible in order to assist the agency with their
review. Please attach one (1) copy of the site plan with this sheet.
Applicant's Name:
Gilbert W. Clifford & Associates, Inc.
c, o Ronald A. Mislowsky
Address: 117 E. Piccadilly Street
Winchaster, VA 22601
Phone Number: (540) 667-2139
Name of development and/or description of the request: Charles Zuckerman & Sons Inc.
Location of property: 195 Ebert load
Inspections Department's Comments: Cents are on the back of this form.
Inspections Dept. use only
Date received Date revision received Date approved a j
Inc=plcte "Pletw
Date rm- imed T
•ed '
Signature and Date
Signature and Date (revision)
17
•
9
Building shall comply with The Virginia Uniform Statewide Building Code and section,
311, use group S (Storage ) of the BOCANational Building Code/1996. Other code that
applies is CABO A117.1-92 Accessible and Usable Buildings and facilities.
Note HC parking and building access is not shown on the site plan.
The existing Trailer and Propane tank to be relocated shall require building
permits and inspections.
Section 1110.2.1 Exception #1 (The ADA 20% rule for additions and renovations) shall
apply in chapter 11 of BOCA. Also note the requirements in chaper 17 of BOCA for
special inspection requirements for this type of structure.
Please check section 707 of BOCA for firewall requirements and section 904 for Fire -
Suppression system requirements or exemtion.
E
Mr. Ronald A. Mislowsky, Jr. P.E.
Gilbert W. Clifford and Associates, Inc.
200 North Cameron Street
Winchester, Virginia 22601
0
COUNTY of FREDERICK
Department of Public Works
540/665-5643
FAY: 540/ 678-0682
October 1, 2001
Re: Site Plan Comments - Charles Zuckerman and Sons, Inc.
Warehouse Expansion
Frederick County, Virginia
Dear Ron:
Upon review of the revised site plan dated September 13, 2001, all of our previous
comments have been addressed. Therefore, we recommend approval of the subject site plan.
If you have any questions, do not hesitate to contact me.
Sincerely,
CGS/
Joe C. Wilder
Civil Engineer
j cw
cc: Frederick County Planning Department
file
107 North Kent Street • Winchester, Virginia 22601-5000
• 9
COUNTY OF FREDERICK, VIRGINIA
FIRE MARSHAL'S OFFICE
LAND DEVELOPMENT COMMENTS
Control No. SPOI-0034R Date Received 8/7/2001 Date Reviewed 8/7/2001
Applicant G.W.Clifford & AssociatesPlan Rev. Date: 07/18/2001
Address 117 E.Piccadilly Street
Winchester, Va. 22601
Project Name Charlse Zuckerman & Sons Plione No.540-667-2139
Type of Application Site Plan Current Zoning M-2
1st Due Fire Co. 13 1st Due Rescue Co. 13 Election DistrictStonewall
Tax I.D. No. 44-A-12A
RECOMMENDATIONS
Automatic Sprinkler System XX Residential Sprinkler System
Automatic Fire Alarm System XX Other Poetable Fire Extinguishers
REQUIREMENTS
Emergency Vehicle Access
Adequate XX Inadequate Not Identified
Fire Lanes Required Yes XX No
Comments
Roadway/Aisleway Widths Adequate XX Inadequate Not Identified
Special Hazards Noted Yes No XX
Comments
Hydrant Locations Adequate XX Inadequate Not Identified
Siamese Location Adequate Inadequate Not Identified XX
Additional Comments Attached? Yes No XX
Plan Approval Recommended? Yes XX No
Signature Title
e uest for Site Plan Comments
Frederl Countv-Winchester Health Deoaront
Mail to:
Frederick -Winchester Health Dept.
Attn: Sanitation Engineer
107 N. Kent St., Suite 201
Winchester, VA 22601
(540)722-3480
Hand deliver to:
107 N. Kent St.
Suite 201
Winchester, VA
(540) 722-3480
Please fill out the information as accurately as possible in order to assist the agency with their review.
Please attach one (1) copy of the site plan with this sheet.
Applicant's Name: Gilbert W. Clifford & Associates, Inc.
Address: c/o Ronald A. Mislowsky
117 E. Piccadilly Street
Winchester, VA 22601
Phone Number: (540) 667-2139
Name of development and/or description of the request:
Charles Zuckerman & Son, 12,500 S.F. Expansion
Location of property:
195 Ebert Road, .15 miles west of US Route 11
Health Dept's Comments:
LI— .tA L/,/I/L.! A/"a
tW'DejWU.W only
Date mcivc d
Inoomplete
Tate reviewed
Signature and Date
Signature and Date (revision)
Date mjsion roceiveri bate apprrw d
Inoomplete
Da€e
•
gilbert w. clifford & associates, inc
INCORPORATED 1972
Engineers — Land Planners — Water Quality
31 August 2001
Board of Directors:
President:
Mr. Jeremy Camp
Thomas J. O'Toole, P.E.
Frederick Count PlanningPresidents:
Vice
y
Charles G. Maddox, Jr., P.E.
Charles
107 N. Kent Street
Earl R. Sutherland, P.E.
Winchester VA 22601
RoMislowsP.E.
�
P.E.nald.S
David J. Saunders, P.
Directors:
RE: Charles Zuckerman Expansion
William L. Wright
Michael A Hammer
Thumas W. Price
Dear Jeremy,
We've revised the Zuckerman Expansion plan per your comments of 20 July 2001. I've attached one copy of
the plan for your approval. The changes include:
1 V A water line extension to a hydrant behind the expansion area has been added.
Pavement overlay is required at the entrance on Ebert Road.
%3! The zoning classification of the parcel has been revised.
4/The note regarding setback of signs has been revised.
S/The adjoining property owner information, for the Valley Fertilizer site, has been added.
�,An additional note, specifying that no outdoor storage is proposed, has been added.
7. The use of all buildings has been specified on the plans. The area summary has also been revised to reflect
tl a warehousing use. This use is integral to the industrial operation of the site.
8.v/A parking calculation for the site has been added to the plans. As stated previously, this expansion will not
uire additional employees to be hired.
9. rgqhe employee parking locations are shown. I visited the site and reviewed these areas with Mr. Mark
Phelps, my contact at Charles Zuckerman. He verified that the locations shown are correct. I also
observed that the surfacing materials, designated by Marsh and Legge Land Surveyors on their base
mapping, are correct. All of the parking areas are currently paved, but for the 4 spaces between the
b} ildings. That area will be paved as part of the expansion.
10.`ThKhe
handicapped parking space is shown on the plan. This area had been designated as handicapped
ng, but the signs are not posted. The new signage will be provided as part of the expansion.
11.existing water and sewer lines have been added to the plan. ✓ i/
The fencing proposed as part of the required buffer has been increased to 8-ft. high, and 535 ft. long. I
V2.
dismissed this issue with Mr. Phelps and he understands what is required. ---�
13 The pavement legend has been clarified.
I've also attached the approval notices from all agencies but VDOT. VDOT has reviewed the entrance
in the field and indicated that the overlay would be required. They are currently reviewing this revised
plan, and we expect their approval shortly.
RECEIVED
Ah 117 East Piccadilly Street, Suite 200, Winchester, Virginia 2260 E p p 4 2001
IM (540) 667-2139 Fax (540) 665-0493 e-mail gwclifi'@mnsitic.com
Member American Consulting Engineers Council
- 31DEVELOPMENT
•. 0
gilbert w. clifford and associates, inc
Page 2
If during your review, you should have any questions, please let me know. I'd be happy to meet
should you think it necessary to review the plan.
I look forward to hearing from you.
Regards,
gilbert w. clifford & associates, inc
W��
n islowsky, P
Vice President
cc: Mark Phelps
•
•
gilbert w. clifford & associates, inc
INCORPORATED 1972
Engineers — Land Planners --- Water Quality
September 27, 2001
Jeremy Camp
Frederick County Planning
107 N. Kent Street
Winchester, VA 22601
RE: Zuckerman Expansion
Dear Jeremy,
Board of Directors:
Pr"Und:
Thomas J. O'Toole, P.E.
Vice Presidents:
Charles E. Maddox, Jr.. P.E.
Earl R. Sutherland, P.E.
Ronald A. liislowsky, P.E.
David J. Saunders, P.E.
Directors:
William L. Wright
Michael A Hammer
Thomas W. Price
I've enclosed two copies of the revised sheet 2 of the site plan. We've added the required handicap spaces and
adjusted the parking calculations.
If these are okay, please let me know how many copies you will require of approval.
Regards,
gilbert w. clif ford & associates, inc.
(t4ld A. Mislows y, P. ., VP
RECE/V
CD
SEP 2 8 2001
OF"MIIIMGjOE VELO�W
117 East Piccadilly Street, Suite 2M, Winchester, Virginia 22601
(540) 667-2139 Fax (540) 665-0493 a -mail gwcliff(a mnsinc.com
,tlemherAmerican Consulting Engineers Council
gilbert w. clifford & associates, inc
INCORPORATED 1972
Engineers — Land Planners — Water Quality
September 13, 2001
Jeremy Camp
Frederick County Planning
107 N. Kent Street
Winchester, VA 22601
RE: Charles Zuckerman Expansion
Dear Jeremy,
Board or Directors:
President:
Thomas J. O'Toole, P.E.
Vice Presidents:
Charles E. Maddox, Jr., P.E.
Earl R. Sutherland, P.E.
Ronald A Mislowsky, P.E.
David J. Saunders, P.E.
Directors:
William L. Wright
Michael A Hammer
Thomas W. Price
Previously we had revised the plans per your comments and forwarded copies to you. I have attached here the
approvals from each of the review agencies but for Engineering. I expect to receive their approval in a few
days. You will be copied on that notice.
Please let me know how many copies of the plan you will need for final signature.
Regards,
gilbert w. clifford & associates, inc.
A. �Mislowsky, P.E., VP
RECEIVED
SEP 13 2001
"DT OF PLANNINGTEVELOPMENT
117 East Piccadilly Street, Suite 200, Winchester. Virginia 22601
(540) 667-2139 Fax (540) 665-0493 e-mail gwcliPP%i.mnsinc.com
Member American Consulting Engineers Council
•
0 FILE COPY
COUNTY of FREDERICK
Department of Planning and Development
540/665-5651
FAX: 540/ 665-6395
July 20, 2001
Mr. Ronald A. Mislowsky, Jr., P.E.
Gilbert W. Clifford & Associates
117 E Piccadilly Street, Suite 200
Winchester, Virginia 22601
RE: Initial Review of Site Plan # 29-01, Charles Zuckerman Expansion,
Submitted: July 11, 2001
Property Identification Number (PIN) 44-A-12A
Dear Ron:
Upon review of the above -referenced site plan, the Department of Planning and Development is
requiring that you submit a revisal. The following comments have not been addressed and should be
included in your revised copy. To assist you, I have enclosed a numbered plan which corresponds
with the following requests.
Zoning Information. The Official Frederick County Zoning Map indicates that the subject
property is zoned M-1, rather than M-2 as you show on the referenced site plan. Please
correct the zoning and make all other associated changes, such as the percentage of open
space (landscaped area) required.
2.✓ Construction Road. Please provide the location of the construction road that is mentioned
on the site plan. Furthermore, if this entrance to the property is not an approved commercial
entrance, please provide a statement to the effect that during normal operating times this
/entrance will not be used.
3. v Sign Setbacks. You state on the site plan that signs shall be located three feet from the curb.
However, the Frederick County Zoning Ordinance requires that all signs be setback at least
five feet from curbs and at least 10 feet from property lines. Please change your statement
to indicate at least five feet, rather than three feet.
4. � Adjoining Property Information. Please show all required information for the adjoining lot
located across Ebert Road from the northern corner of the property. The Property
Identification Number for that lot is 44-A-6, and the zoning is M-2.
107 North Bent Street • Winchester, Virginia 2260 1 -5000
r:
•
Mr. Ronald A. Mislowsky, Jr., P.E.
Site Plan #29-01, Charles Zuckerman Expansion
Page 2
July 20, 2001
5 Outdoor Storage. Since no outdoor storage areas are shown, please provide a statement to
the effect that there will be no outdoor storage on the premises.
6" Use of all Buildings. Please provide a more detailed description of the use for each building.
Furthermore, explain what the use of the relocated trailer will be. Tshwy
7. Zpffkin.& Calculations. Please provide staff with the required parking calculations.
Manufacturing uses require three parking spaces for every four employees. Therefore, you
need to state how many employees work on the premises. The existing office building should
be included in the calculation, but there should be one parking space for every 250 square feet
of office area.
8. V Handicap Parking Spaces. Please show how many handicap parking spaces are required. In
addition, please show the location and dimensions of these spaces on the site plan. There are
presently no handicap parking spaces at the property.
9. EmRlloyee Parking Locations. During an inspection of the premises, I noticed that there are
actually four areas that are being used for employee parking. All of these areas are at a
standard less than what is required by the Frederick County Zoning Ordinance for parking lots
in the M-1 Zoning District. Staff is looking to see an improvement in the parking situation
with this proposed expansion. After you have calculated the required number of parking
spaces, please show on the site plan all areas that will be utilized for parking. All parking
areas should be hard surfaced and each parking spaces should be striped.
10. \/ Location of Utilities. Please provide the location of all electric utilities, the on -site well, and
the drainfield.
1 J Fire Code Improvements. Please show and label the location of all fire hydrants and fire lanes
required by the Fire Marshal.
Q2.
Screening & Buffer. Staff has observed two problems with the proposed screening. First,
the applicants proposal to use the existing trees along the perimeter of the property as a
landscape screen fail to meet the requirements of the Zoning Ordinance. The Ordinance
requires that all landscape screens be composed of mostly evergreen trees. The majority of
existing trees are deciduous. A second problem with the proposed screening is that the 6'
opaque fence does not extend far enough along the eastern property line. Staff would like
for the applicant to propose a better screening plan. I advise that you extend the fence at least
68 feet (as shown) and increase the height of the fence by 2 foot (as shown) to compensate
for the less than standard landscape screen.
•
•
Site Plan # 29-01, Charles Zuckerman Expansion
Page 3
July 20, 2001
Tt.� Proposed Overly and Proposed Pavement Legend.- Please change or enhance the graphics
of the site plan so staff can distinguish between these two areas.
After you have revised the site plan, please resubmit one copy so that I may verify the information
contained on the plan. I will then need all approved review agency comment sheets and five copies
of the final site plan for approval. Comment sheets are required from the following agencies:
Frederick County Building Inspections Department
Frederick County Engineer (Public Works)
Frederick County Fire Marshal.
Frederick County Health Department
Virginia Department of Transportation
If you have any questions or if any of the numbered items are unclear, do not hesitate to contact me.
Sincerely,
Jeremy Franklin Camp,
Planner II
JFC/ch
Enclosure
U. JeremvOte Plan Review1:001ICharles Zuckerman & Sontinirial Review LetterSPN:9-01.wpd
11
•--4 24 — o 1
Site Plan Information Checklist
The following information must be included on your site plan. If your site plan is incomplete or
is missing information, it will not be reviewed and returned to you for revisions.
Administrative Information
Y N
1.
Name of proposed development. C'C Ieo 71,C4',n"W (-Idrto", W
2.
Name, address, and phone number of owner.
3.
Name, address, and phone number of developer.
4.
Name, address, and phone number of designer.
ll
�/
5.
Certificate of surveyor, engineer, or architec . ;17 es
6.
Date plan prepared and date of rev isions/7�t97)(, .e
7.
A listing of all conditions placed on the site as a result of a
conditional use permit or conditional zoning approval.
8.
A space labeled "Approved by the Zoning Administrator" for the
approval signature and date of approval.
9.
A description of setbacks or conditions placed on the site as a
result of a variance approval. (Reference the variance
application number.)
General Site Information
Y N
_/ 10. Location map (scale 1:2000)
V 11. Magisterial District! J1,-4lPw.,Z/ )
_z 12. Scale of site plan (not to exceed 1:50)� l S O
13. North Arrow
4 Zoning of site i.t,(CyVe(�17 \ ��. lid — T (Oc4d 6-t
15. Use, zoning, and Property Identification Number (PIN#) of all
adjoining properties. This includes properties located across right-
I4
/ of -ways, streams, and railroad tracks.
16. Surveyed boundaries for all lots and parcels.
General Site (con't)
Y/ N
c/ 17. Acreage of all lots included in the plan.
✓ 18. The location and dimensions of all required setbacks and yard
areas.
~/Of 19. The location and type of all dwelling units.
20. Location and description of all recreation facilities.
��. 21. Location of sidewalks and pedestrian ways.
22. Location and area of common open space.
23. The location, height, and dimensions of all sign JZPAJ
24. Location, height, and specifications of outdoor lighting fixtures.
25. Location and nature of outdoor storage areas. C/V* - f7WJ.4/)
26. Location of outdoor trash receptacles and dimensions of structure
(fencing, etc.) required to enclose receptacles.
Buildina Information
Y N
27. The height of all buildings and structures.
.rt�
28. Location of all buildings, structures and uses. IF 46ctyl
f �y
29. The proposed use of each building, structure and area.(y," %d,•
30. Ground floor area and total floor area of all buildings with FAR
calculations for commercial and industrial zoning districts.
Roads
Y N
31. Name and number of existing and planned streets on and adjoining
the site.
32. Location of existing and planned streets on and adjoining the site.
3,3 Posted speed limit of existing adjacent roads.
Location and dimensions of all proposed entrances from public
�LoM r�(t right-of-ways.
G
• •
X 35. Location of all entrance�tjpft�'
nadjoining roads within 200 feet of the
proposed or existing entrance.
36. Dimensions, boundaries, width, pavement, and construction of
planned roads.
Utilities
Y N
X 37. Location of all utilities, including sewer and water lines with the size
of lines, mains, and laterals.
38. Location and width of all easements, including access, utility, and
drainage easements.
alax Location and nature of fire lanes, fire hydrants, and all other
facilities necessary to meet Fire Code requirements.
•fir wo 1 Ir s ' t lac • . •
Parking
Y N
40. Calculations describing the required number of parrkiinn� and loading
spaces. N AW
"IdJeAS;< 3 I y
✓ 41. Location and dimensions o all parking and loading spaces,
driveways, parking aisles, curbing and other features to be used.
—W*S#g2. Location and dimension of all disabled parking spaces and
ramps.
Natural Features
Y N
43. Existing and finished contour lines.
44. Location of steep slopes, woodlands, floodplains, wetlands,
sinkholes, and other environmental features.
_�//� 45. Location of streams and drainage ways.
•
•
i A
Landscaping
Y N
146
• C
47
Landscaping plan describing location and types of plants to be
used.
Location of required buffers and screening with cross sections or
profiles.
`Cx -rowcx- asf�d v
Erosion and Sediment Control
Y N I I V` I
49
A stormwater management plan vV1th run off calculations
location and description of facilities to be used.
Soil erosion and sedimentation control plan describing the location
and methods to be used to minimize erosion and sedimentation
during development.
yq--A
M- a
1 5" . S -3 mac. r e s.
-o,r4 �o �
� s �� � f � � i i :. r ! .
a 7
a r��..
•
i
SITE PLAN APPLICATION
.........
Department of Manning and Devctopmenl tlNc onh
Date aWica£ton recch-W
��{ r � � Apjtbcstion
_._ ....
Complcte_ Date of act,cptanct
1nruunp#otc. Date of return,
1.
Project Title:
Charles Zuckerman Expansion
2.
Location of Property:
195 Ebert Road
(Address):
Winchester, VA 22603
3.
Property Owner:
Charles Zuckerman & Son
Address:
195 Ebert Road
Winchester, VA 22603
Telephone:
540-667-9000
4.
Applicant/Agent:
Gilbert W. Clifford & Associates, Inc.
Address:
117 E. Piccadilly Street
Winchester, VA 22601
Telephone:
540-667-2139
5.
Designer:
Gilbert W. Clifford & Associates, Inc.
Address:
117 E. Piccadilly Street
Winchester, VA 22601
Telephone:
540-667-2139
Contact:
Ron Mislowsky
i
6
i
Is this an original or revised site plan?
7a. Total acreage of parcel to be developed:
7b. Total acreage of parcel:
8. Property Information:
a) Property Identification Number:
b) Current Zoning
c) Present Use:
d) Proposed Use:
e) Adjoining Property Use(s)
0 Adjoining Property Identification Number (s)
g) Magisterial District (s)
Original X Revised
1.5
15.83
44-A-12A
M2
Manufacturing
Manufacturing
Manufacturing/Residential
44-A-11,12,13,14,15,16,18
Stonewall
I have read the material included in this package and understand what is required by the Frederick
County Planning Department. I also understand that all required material will be complete prior to the
submission of my site plan.
Signature
Date 2 1 O
gilbert w. clifford & associates, inc
INCORPORATED 1972
Engineers — Land Planners — Water Quality
July 3, 2001
Jeremy Camp
Frederick County Planning
107 N. Kent Street
Winchester, VA 22601
RE: Charles Zuckerman Expansion
Dear Jeremy,
Board or Directors:
President:
Thomas J. O'Toole, P.E.
Vice Presidents:
Charles E. Maddox, Jr., P.E.
Earl R. Sutherland, P.E.
Ronald A Mislowsky, P.E.
David J. Saunders. P.E.
Directors:
William L. Wright
Michael A Hammer
Thomas W. Price
I've enclosed plans for a 12,500 S.F. facility expansion at the Charles Zuckerman Plant on Ebert Road. In
addition to the building, a new driveway will be installed for access, and a detention pond constructed to
mitigate increased flows. Zuckerman will have no additional employees for this project. The existing parking
is adequate. We intend to maintain the existing landscape screens to the east and south, augmenting that with a
board fence to satisfy the residential buffer requirement.
If you have any questions, please call.
Regards,
gilbert w. clifford & associates, inc.
rhald A.Mislowsky, P.E.,
- 2001
117 East Piccadilh• Street. Suite 200, Winchester. Virginia 22601
(540) 667-2139 Fax (540) 665-0493 c-mail gwcliii(a.mnsinc.com
Member American Consulting Engineers Council
1'-NT
i
•
Request For Site Plan Comments
Department of Planning and Development
Mail to: Hand deliver to:
Department of Planning and Development 107 N. Kent St.
Attn: County Planner Fourth Floor
107 N. Kent Street Winchester, VA
Winchester, VA 22601 (540) 665-5651
(540) 665-5651
Please fill out the information as accurately as possible in order to assist the agency with their review.
Please attach two (2) copies of the site plan with this sheet.
Applicant's Name: Gilbert W. Clifford & Associates, Inc.
Address: c/o Ronald A. Mislowsky
117 E. Piccadilly Street
Winchester, VA 22601
Phone Number: (540) 667-2139
Name of development and/or description of the request:
Charles Zuckerman & Son, 12,500 S.F. Expansion
Location of property:
195 Ebert Road .15 miles west of US Route l I
Planning and Development's Comments:
Plane and Do,t opneat use uah
Date received Date revision received Date approved
Incomplete lncornplete
Date reviewed _ Date re%iewed
Signature and Hate