HomeMy WebLinkAbout041-97 Negley Mini Storage Phase II - Stonewall - Backfile (2)FREDERICK COUNTY, VIRGINIA
ABBREVIATIONS
ASSY. ASSEMBLY
GENERAL NOTES
1. The property delineated on this plan is located between Interstate 81 and Route 661, Welltown Pike, in the Stonewall
BF BASEMENT FLOOR
BLK. BLOCK
�4®
Magisterial District in the County of Frederick, Virginia. The developer of the property proposes to construct a
mini buildings on a 3.57 acre tract The tract contains one building which is used for office, maintenance and
BC BOTTOM OF CURB
BSBD. BASEBOARD
4V ,O�' oGV
-storage
storage.
C&G CURB & GUTTER
CMF CONCRETE MONUMENT FOUND,
d �I
2. Property Owner/Developer: Contact, Mr. Paul Negley
Paul Kegley
CPP CORRUGATED POLYETHYLENE PIP
CMPA CORRUGATED METAL PIPE ARCH
E 1
127 Mercedes Court
Winchester, VA 22603 Telephone: 540-665-2792
® ®
CO CLEAN OUT�6
DIA. DIAMETER
EOP EDGE OF PAVEMENT
FF FIRST FLOOR
4. Engineer/Landscape Architect Contact: Mr. John Lewis
FFE FINISHED FLOOR ELEVATION
PAINTER-LEWIS, P.L.C.
F.C. FIRE CONNECTION
302 South Braddock Street, Suite 200
FG FACE OF GUTTER
Winchester, Virginia 22601 Telephone: (540) 662-5792
® ®
FH FIRE HYDRANT.
Ga. GAUGE
5 Property boundary and topographic information shown on these plans was provided by Furstenau Surveying, Inc
® GM GAS METER
GV GAS VALVE
e Slte Oa¢u
HCR HANDICAP RAMP
Parcel Area: 3.5704 acres
Area:
HDR CURB 6" HEADER CURB
PIN:eel
HP HIGH POINT
Zoning: B 3
Use: Office, Equipment Storage, Self Service Storage
Front Yard Setback: Required - 35' Provided - 35'+
UO[PHIEK7®
HTR. HEATER
IIPS PF IRON PIPE FOUND
Interstate 81 Setback: Required 50' Provided - 50'+
Rear Yard Setback: None
15' Provided 15'+
INV INVERT PIPE SET
Side Yard Setback: Required - -
Maximum Building Height: Allowed - 35' Proposed-18'+/-
LP LOW POINT
MPD MULTI -PRODUCT DISPENSER
Q " l e.
Maximum FAR: Allowed 1.0
MP METAL POST
Existing Buildings = 18,089 sf
= 10,237
MH MANHOLE
,��� �' : k�e • �Wj
Proposed Buildings sf
Proposed Total Floor Area = 28,326 sf = 0.182 FAR
NDC NOSE DOWN CURB
NP NO PARKING SIGN
rrs
7. Parkin Lot Landscaping Requirements,
9 P 9 q
NTS NOT TO SCALE
-lJ
Required: 1 shade tree per 40' of lot perimeter plus 1 shade tree per 10 parking spaces
OHE OVERHEAD ELECTRICF
t i
Perimeter 76740' = 2 trees req'd Provided: 2 Red Maples
OHT OVERHEAD TELEPHONE
='-~''"'' i "_ SIT
PL PROPERTY LINE
i)
�-� a' �
8. ParkingSpace Requirements:
S P q
Property Line Setback: Required - 5' Provided - 5'+
PP POWER POLE
l'
PVMT PAVEMENT
Self Service Storage - 14025 sf Required - 1 per 5000 square feet = 3 spaces
RCP REINFORCED CONCRETE PIPE
i'rirErtc NCE e
Provided - 3 Including 1 Accessible Space per ADA
Loading Space Requirements: Required none
RD ROOF DRAIN
RED. REDUCER
R.O. ROCK OUTCROP
P r {i a 76
U f)
®
4 p
S ' r
9. Handicap Accessibility:
SAN. SANITARY
��
HC parking spaces shall have a maximum slope of 1:50.
HC ramps on the site shall have detectable warning surface per ADAAG 4 7 and 4,29.
STD. STANDARD
T.B.D. TO BE DEMOLISHED
,�� ; sr 3r, ' : �r•
HC ramps off site shall be constructed per VDOT standards.
T.B.R. TO BE REMOVED
,il -14867
`,`sub
10. Buffering Requirements:
T.B.P. TO BE PRESERVED
TB THRUST BLOCK
jl I 1t ti ^`�
:5+a
IJ ' f I ®D� �., ---'_� 6a -.®�
The adjacent zoning to the north is B3 which requires no buffer_
TC TOP OF CURB
i e 6 gate " cer)�
The adjacent zoning to the east is RA used as right-of-way for 1-81 which requires no buffer.
TEL. TELEPHONE
f
The adjacent zoning to the south is 82 which requires a B type buffer. The owner proposes to construct a full
TRB TELEPHONE RISER BOX
landscape 10' landscaped in the 25' inactive buffer the buildings beyond
TVRB TELEVISION RISER BOX
screen within a easement and set proposed
the 25' active buffer.
Plants required: 3 per 10 linear feet; >50% evergreen; >33% deciduous, minimum of 3 species, height = 4' @ planting;
TYP TYPICAL
UGE UNDERGROUND ELECTRIC
VICINITY MAP WINCHESTER, VA 7.5' QUAD 1 = 2000'
384.88100 " 3 = 116 plants
-
WL WATERLINE
Plants provided: 59 evergreen + 57 deciduous; please refer to Plant List
WM WATER METER
(�
WV WATER VALVE
l "I
11. Environmental Features:
5'R RADIUS IN FEETO�
Wetlands - No wetlands have been identified on the site.
Flood plains - No flood plain area has been identified on this site.
' ��-�
Sinkholes - No sinkholes have been identified on this site.
Steep Slopes - No steep slopes have been identified on this site. Steep slopes are defined by the Frederick County
(•.. PROVED
Code as slopes exceeding 15%_ The area of steep slopes allowed by the code to be disturbed is 25%_
Woodlands -No woodlands have been identified on this site. Woodlands are generally defined by the Frederick County
-O AiF
o -•
Code as including largely mature trees in groves greater than 1/4 acre.
EROSION AND SILTATION CONTROL NARRATIVE
Project Description
The developer proposes to build a mini storage facility on a3.5 acres parcel. The total area of disturbance on the parcel is
1.
Erosion control practices shall conform to the requirements of the Virginia Erosion and Sediment control Handbook
approximately 1.5 acres. A storm water management pond was previously constructed to serve this area Site grading will
2.
All perimeter sediment control devices shall be erected prior to any land disturbing activities and shall remain in place LANDSCAPE NOTES
`
direct runoff from the proposed impervious areas to this pond.
until the site is fully stabilized. 1.
Frederick County Landscaping Tabulation:
t°
Existing Site Conditions
The a 4,064 sf building. The construction area is vacant. Slopes range from 1.0 % to approximately 8.0%.
3.
The contractor shall perform overlot grading to provide positive drainage and preclude ponding of water. All off site
Zoning: B-3, Industrial Transition District
site contains
Adiacent Areas
land This land is by hotel The
4,
grading and construction is to be done with the property owner's consent.
Cut and fill slopes shall be graded at a maximum of 2 horizontal to 1 vertical unless otherwise specified on the plans.
P 9 P P
Landscape Area Required: 25% x 3.5704 acres = 0.89 acres
Landscape Area Provided: 74,726 sf or 1.715 acres = 48%
`
The site is bordered on the east by 1-81. To the south is zoned B2. owned adjacent groups. north
5.
The limits of clearing and grading are restricted to the limits of the parcel.
Z $
and west adjacent areas contain developed land zoned B3.
Parking Lot Landscaping
f
Off -site Areas
No off site disturbance or construction activities are anticipated.
SEQUENCE OF CONSTRUCTION
1. establish
Perimeter Landscaping Required: 1 shade tree per 40 feet of perimeter
ZONING ADMINISTRATOR DATE
CI Areas
construction entrances
2. install storm water detention facilities and establish perimeter controls as required
P q
parking perimeter = 76 feet
shade trees provided = 76l40 = 2
The critical area~ on the site consist of perimeter steep slopes and the Buffalo Lick Run corridor Construction will be restricted
P P P
3. clear and grub site
FR DERm c(DMNTYmomfrom
or limited in these areas.
4. strip, stockpile and stabilize top soil
Interior Landscaping Required: 1 shade tree per 10 parking spaces
°
5. perform rough grading
total parking spaces = 3
SITE -PLAN SHALL BE VALID FOR FIVE(5) YEARS
Erosion and Sediment Control Measures
6. construct drainage controls
shade trees provided = 3/10 = 1
FROM DATE OF APPROVAL.
r
3.05 Silt fence will be installed in selected locations downstream from the construction area as a first measure of
7. begin facilities construction
interior to be landscaped
construction. Silt fence will be placed at the toe of slope of the detention ponds prior to fill operations. Silt fences shall
8. perform final grading and site stabilization
of et
interior area = 720 square feet
be inspected after each rainfall and at least daily during prolonged rainfall. Any required repairs shall be made
9. remove all temporary sediment control structures
required interior landscape area = 36 SF
LIST OF DRAWINGS:
e
immediately. Damaged, decomposed or otherwise ineffective silt fence shall be replaced. Sediment deposits should be
interior landscape area provided = 400+/-- SF
removed after each storm event. They must be removed when deposits reach approximately one-half the height of the
CONSTRUCTION NOTES
barrier. Any sediment deposits remaining in place after the silt fence is no longer needed shall be dressed to conform
with the existing grade and stabilized.
1 culvert inlet protection at the upstream ends of culverts. Silt fences shall be inspected
3.08 Silt fence will be installed as cul p Presponsible
1.
The existingutilities shown on these plans are based on available information. The CONTRACTOR shall be
P 2.
Confirm the locations of any utilities above or below ground prior to commencing work. Contact the Landscape
SHT. 1 /2 COVERSHEET
after each rainfall and at least daily during prolonged rainfall. Any required repairs shall be made immediately.
for determining the exact location of all utilities before commencing work and for any damages which
occur by the failure to locate and preserve these utilities. If the CONTRACTOR should encounter utilities other than
Architect in the event that utilities or any other structure conflicts with the layout shown on the plan.
SHT. 2 2 SITE PLAN
/
Damaged, decomposed or otherwise ineffective silt fence shall be replaced. Sediment deposits should be removed
those shown on these plans, the CONTRACTOR shall immediately 'noti the engineer and take the necessary n
P Y fY 9 c ry and 3,
indicated the Ian Contact h L Architect in the
Verify the quantities shown on :the plant list with totals ind cafed on ire pthe Landscape e
h storm event. The must be removed when deposits reach approximately one-half the height of the barrier.
after each s y P PP Y g
proper Steps to protect the facility and assure the continuance of service.
event that discrepancies exist. Supply unit prices to the Owner at time of bidding,
Any sediment deposits remaining in place after the silt fence is no longer needed shall be dressed to conform with the
existinggrade and stabilized.
9
2.
The CONTRACTOR shall have approved Construction drawings prior th
pP t g p o to a start of construction. At least one copy of 4.
All materials are subject to approval by the Owner or Owner's representative. Provide the Owner with a tag from each
in in accordance with the E & S Std & Spec 3,31 will be applied to the topsoil stock pile and all areas
3.31 Temporary seeding c P PP P P
•
approved plans and revisions shall be kept on -site at all times.
plant species and a list of the plant suppliers. Where any requirements are omitted from the Plant List, use plants
which will not be brought to final grade within 30 days. Embankment or excavated slopes denuded for a period of
which meet the normal requirements for the variety according to the American Association of Nurserymen.
greater than 30 days shall be temporarily seeded and mulched. To coincide with the anticipated construction dates,
3.
Cut and fill slopes shall not exceed 2=horizontal to 1-vertical unless otherwise called for on the plans.
the seeding will consist of 50 pounds per acre of German Millet. All temporary seeding areas will be mulched in
5.
Plants shall be sound, healthy, vigorous, well branched, Free of disease; insect eggs and larvae, and shall have
accordance with the schedule included herein.
4.
Controlled Fills:
adequate root systems.
3.32 All disturbed areas will be stabilized by permanent seeding in accordance with the schedule included herein. The
A. Controlled compaction shall occur in all fill sections for pavement, trenches for utilities and in other areas as
anticipated time for construction completion is November 1996.
designated on the plans. 6.
Sizes specified in the Plant List are minimum sizes against which the plants will be judged. Failure to meet minimum
3.35 All seeded areas will be mulched in accordance with the schedule included herein.
B. Controlled fills shall be compacted to 95% density as determined by methods per standard proctor ASTM D 698.
size on any plant will result in rejection of that plant.
Density shall be verified by a qualified soils engineer.
C. Controlled fills shall be compacted in 8 inch lifts (loose thickness) to the specified density, beginning from the 7.
Groups of shrubs shall be placed in a continuous mulched bed, with smooth, continuous edges as shown on the plan.
r
Temporary Seeding
existing ground surface, unless otherwise approved in writing by a qualified soils engineer.
All mulched beds shall be curvilinear in shape following the contour of the plant mass. Apply a minimum of 4 inches of
SEED TYPE RATE MIN. PURITY(%) MIN. GERM.(%,)
D. The surfaces directly beneath areas to receive controlled fill are to be cleared',. grubbed, and stripped of topsoil.
mulch uniformlyover 'beds. Trees located within four feet of any shrub bed'shall share the same bed. Grade finished
Set 1- Feb 15:
P P Y controlled fill too
ematenaltshalltbe ifrom aapproved
planting
lantin beds so as not to impede surface drainage.
P
Annual Ryegrass 50 lb/ac 98 85
F. Fill taken •
borrow areas. It shall be clean soil, free ofroots,woody
o y vegetation,
Winter Rye 50 Ib/ac 98 85
Y
,
oversized stones, rocks, sandy soil, or other objectionable material. S.
Locate trees a minimum of 3'feet from wails or walks, if possible.
May 1 - Aug 31:
German Millet 50 lblac 98 85
5.
Blasting is not permitted within 25 feet of existing utilities without owner permission. 9.
Stake and guy all trees according with standard practice and/or the suppliers recommendations. At a minimum, all
or
deciduous trees shall be double -guyed with 72" hardwood stakes driven firmly into the ground. Secure tree to stakes
Feb 16 - Apr 30:
6.
Storm sewer and pavement materials called for on the plans refer to standard VDOT designations.
with #9 galvanized wire guys with rubber hose connections. Stakes shall be 2" x 2" x 72".
Annual ryegrass 75 Ib/ac 98 85
Mulch: 1.5 ton/ac small grain straw
Fertilizer: 1000 Ib/ac 10-10-10
7.
BENCHMARK: finished floor elevation of the existing building on the site - elevation = 718.50. 10.
Use shredded hardwood bark mulch in all planting beds.`'`+
,
®'�•
8.
All radii indicate edge of gravel, edge of pavement or face of curb as applicable 11.
Remove all tags, twine and containers from installed plants. Roll back burlap one third on all B&B plants.
��,j,"j
Permanent Stabilization
The contractor shall stabilize all denuded land within 7 days after the end of construction. Permanent stabilization shall be
9.
Fire lanes shall be delineated as directed by the Frederick County Fire Marshal. 12.
Plant substitutions are permitted with consent from the Landscape Architect.
0��
� �.
applied to areas that are to be left dormant for more than one year. During construction of the project, soil stockpiles shall be
p' J �N Ire J %
stabilized or protected with sediment trapping measures. The contractor is responsible for the temporary protection and
intentionally from The
10.
The CONTRACTOR shall obtain permission from adjoining property owners prior to conducting any off site 13
Prepare he 1 i II bedding areas b mixing into the to. six inches of soil one cubic and of manure eat and 10-6-4
pact sot in d ga y g p cy ,p
0
permanent stabilization of all soil stockpiles on site as well as soil transported the project site. contractor,
construction activities,
granular fertilizer per 100 square feet of area. Remove any turf, weeds or other vegetation completely prior to
Seedbed Preparation:
11.
The CONTRACTOR shall coordinate the relocation of the existing utilities with the appropriate utility company as
installation.
�
d No. 021621 4j
a. Scarify top 1" to 2" of soil after final grades have been achieved.
necessary. 14_
Plant all materials in their appropriate season. The Contractor shall guarantee all plant materials and workmanship for
b. Add 3 tons per acre pulverized agricultural limestone(140tb/1000sf).
a period of one year from time of installation.
91ONAL
SEED TYPE RATE MIN. PURITY(%) MIN. GERM.(%)
12,
All site and building lighting shall be installed to avoid spill -over onto adjoining properties.
Tall fescue 60 Ib.ac 97 85
Red clover 8 Ib/ac 95 65
Ladino clover 8 Ib/ac 95 65
Nurse Grass -(season dependent)
Sept 1 - Feb 15:
PAJffENt?EDW8g ALCo
Annual Ryegrass 12 Ib/ac 98 85
Winter Rye 12 Ib/ac 98 85
302 South Braddock Street, Suite 200
May 1 - Aug 31
German Millet 12 Iblac 98 85
Winchester, Virginia 22601
or
Telephone (540)662-5792
Feb 16- Apr 30:
Annual ryegrass 12 ib/ac 98 85
Facsimile (540)662-5793
Mulch: 1 5 ton/ac small grain straw
Fertilizer 1000 Ib/ac 10-10-10
JOB NO.: 9610016 SHEET:
DATE: 250CT96 1 /
ON SITE PAVEMENT SECTION
NOT TO SCALE
2" S-5 BITUMINOUS CONCRETE
SURFACE TREATMENT ��� EX. 6' EARTH BERM
6" 21—A loe
STONE BASE
COMPACTED SUBGRADE =III=III
-
�\
INN 0
40
R.O.W. PAVEMENT SECTION
NOT TO SCALE -
/
43 A-50A
\ \ \ \ 7 PENBERN WINCHESTER, LTD.
2" SM-2A BITUMINOUS CONCRETE ZONED: B-2
3" BM-2A BITUMINOUS CONCRETE — I i' / \ \ \ \\ \0 \ USE: MOTEL/RESTAURANT
7\ \ \ -714
STONE BASE // \ /' x \ ` \ �\
Z Z 0L
N
U U W
Z Z
Q Q
CO r__
z U
0 Q
0
N O
W
N ceZ
W O
= N W
EMMA S. DUNCAN , ' /' \ �' / �� �d i' / / I 1 Ln o
ZONED: RA/� I O w
USE: HIGHWAY ROW , / i / ( / i �/ I y `
INSTAL 2 PARKING SPACES
WITH 6" HDR. CURB
/' 1 GRADE TO DRAIN 5'R , J�,o `'ram L / \ I -� Z
lb
/ / �y�, ,� 1 \ I _ EX. SAN. MH 3
EX. GRAVEL X'/
1 I \
/ �2.5'R 2 RED MAPL
/ c
/
EX. TRASH PAD ENCL. _ 6� /� \\
2.5' R \ > ( I �'Z'' I i LC)
C��
CL
PAVE FROM BU TO �� . `LSD 1 ' / �-
yo EX. ROAD F "R� FF / r ` f;; _ T� \ \ \ � Vi
PROP. 1" WATER L1N STORAGE, MATCH ELEV TIONS / /
EXISTING BUILDING / TO BE RELOCATED \ /' �`,' i \ 43-A_ V-
/' \\ OWNER 0 ARRANGE U-HA UNITS NOT /' p" I II 2.5 ACRES
FF = 718.50 \ AS REQUIRED \ J/� ( J
IMPE ACCESS THROUGH T AVEL E. �� ,NINCHESTER NORTH, INC. Z Q
/ / / / i / 1 / i , U �� ' I
'' ' /z Toe I 1 '� ' m F 5'X6'X12'H SIGN 1 ZONED: AN \
EX. EOP USE: VACANT W
'
R=55.00' II 1 U Z t~!_
/ > > —
2 O
L201.07ft
\ / CDN 1 1'43'44" E O
LI 1 TRIP GENERATION DATA
N I EXPAND ASPHALT SOURCE: ITE TRIP GENERATION MANUAL FIFTH EDITION N
-71B _ - - 15.70 �, ENTRANCE TO 3Q' WIDTH CATEGORY: I Z Y
oe / / o INSTALL RADIUS TO MATCH ATEGO : O V J
5.70 / �O. .o EX. PVMT. WEEKDAY: 2.61 TRIPS PER 1000 SF = 24,262/1000*2.61 = 63 TRIPS ( -
/ \ �/ EX 6" WATER j I CATEGORY: GENERAL OFFICE BUILDING WITH 4 EMPLOYEES
43-A-528 ss \\ 1� �pQ �'i ,' EX. 32'-15" RCP WEEKDAY: 6 TRIPS PER EMPLOYEE = 4*6 = 24 TRIPS G\� W Q
2.3986 ACRES c� 1 h �� I TOTAL WEEKDAY TRIP ESTIMATE = 87 TRIPS �P/ M 3
� /�l/ / �� W
�� VIRGINIA GIANT, INC. \�� �cFO I O Cj � � Z
ZONED: B-3 S� �� 0 6�� �/ >�O 4 �� - - _ _ I �
ZU
SE: PRIVATE VEHICLE STORA„ E & REPAIR �9 i �(� � \ vo '2 N' W
~
�9. o / c �» <iy / c
J I L 15.7CIO V)
L.I ~
1 o �� do , o. ti \ (O
EX. BUILDING �. _ `� \ ,
Cl
PROPOSED 9
/ CI \ \ �L -
\ Quo?/ y\ > ( �A 1• ASPHALT �/ \ ���J, /'
` -- 20' DRAIN ESMT
PAVEMENT O� ` ; / -15" RCP �\\ �_ - - \ [U) 00
\ j / \ / (V
3 MATCH EX. +1�'
G - - / / n
I � 1 %, }q -� Sp,N• SSW `t?s O o. D� (6 � ii' >� ay �� \ ��\ � \ �' �� ' � �-� U) O N r�
s \\O S 60 / / \� / / a rn
(6. a0o,// ///� \ \\�\\ �\\ �' /�i��� \pr1E �n N N LjLn
C.O. F ' 07.76
�N GV
\ EX. SA SEW. 5 �F \5 (10) jA� KITE PINES �' 'i' `
\ TO BE ABA NDO D L6.8 " i 0 O O
\ ( ) BUILDING E O 5 P� ® CC AS SHOWN i / �� \\� /
193
7 SF
ICI V=708.00
Mi
x � EX. 32'-15" RCP \��/i / �/// �� \ O� �
SF x �
- X X �\ EX. SIGN \ ' / i f �
CIP L E
/ - E
+.
OP 0
32.05ft — \ '< P\ °' "
CD 0
/-20' WATERLINE ESMT Z_ _
.01
-----------�________,' 864.05 - -- __ �--�------ - - - - -- - - ---- -- ____ �— _ �-- - -�' �'�`._.�\�, _____./ ��i,-' ,,' �� � � 43-1-51
__ \ __ - -- ---�� � � � � � / PAUL D. MULDOWNEY
- - - - ------ - - - - ------------------------------ - - -
- -- _---_- -- ------ --- __ _ \ i� / ZONED: M-1
__
*- - . -- -- �------------------------------------- ,--------------------� k ---- ---� __-_ N 42 16' 10' E w+�•� ��� � USE: COMMERCIAL fH
_ _ _ 4!ti
---- ---- -- -------- - - - - --------------- _ _-�
_ —-------------- j- -
Virginia Department of Transportation
Staunton District
Rev ",195 page 1 of 1
GENERAL NOTES FOR ENTRANCE PLANS
Ym 92ANX&I Notes
V1. All work on this project shall conform to the latest
editions of the Virginia Department of Transportation
(VDOT) Road and Bridge Specifications, and Standards,
The Virginia Erosion and Sediment Control Regulations
and any other state, federal or local regulations
applicable. In the event of conflict between any of
these standards, specifications or plans, the most
stringent shall govern.
V2. All construction shall comply with the latest U.S.
Department of Labor Occupational Safety & He lth
Administration and VOSH Rules & Regulations.
V3. when working on VDOT right of way, all traffic
control, whether permanent or temporary, shall be in
accordance with the current edition of VDOT's work
area protection manual. Furthermore, all traffic
control flaggers must be certified in accordance with
VDOT's January, 1994 (or latest edition of) Road &
Bridge Specifications, Section 104.04-C.
V4. Design features relating to construction or to
regulation, control and safety'of traffic may be
subject to change as deemed necessary by VDOT.
V5. Prior to initiation of work, Contractor shall be
responsible for acquiring all necessary VDOT land use
permits for any work on VDOT right of way.
V6. If required by the local VDOT Residency Office, a
n preconstruction conference must be arranged and held
Oo by the engineer and/or developer with the attendance
\ \ \ \ 1 of the contractor, various County agencies, utility
COMPACTED SUBGRADE =III=III- / // O /' \�\ \\ \ \\� EX. 6' BOARD FENCE I companies and VDOT prior to initiation of work.
1
V7 . Contractor shall notify the local VDOT Residency
/ / �/ BOLLARD \ \ \ \> �Ak ` / i office when work is to begin or cease for any
4JND`) \ I`` undetermined length of time. VDOT will also require
48 hours notice for any inspection.
V8. The Contractor will be responsible for maintaining
adequate access to the project from the adjacent
public roadway through construction and maintenance of
a construction entrance in accordance with the
`F*R
ACk� Virginia Erosion & Sediment Control Handbook, Sec 3 . 02 .
Furthermore, access to other properties affected by
G /i F.f �� �tFER {' Q S6 � this project shall be maintained through construction.
0 x� G�' Q
EX. TYPICAL WALL MOUNT 0 O \1" / AC r�
TIV �-
43-A-99 /,' ,' /� \ \ FLOOD LT. 11 <-+• �°`�1 /i ��'� f BUFFER �I I � EX. SAN. MH 315.40.
------------- INCH S I E & ES RN AIL OAD , U JOHNC.
�\ --- —-------------------lE ---- ---- / / /' QC % No.
21621
\---------------------- ---- ---- ---- __ _ _ � G /f/ Ago {ww
714 43-A-56 ----- ---- '��, G\
K&J INVESTMENTS - _ _ _ _ s`SIONAL
ZONED: M-1
\ USE: COMMERCIAL EROSION & SEDIMENT CONTROL KEY 7>\
PLANT LIST
SYMBOL
QUAN.
BOTANICAL NAME
COMMON NAME
SIZE
REMARKS
2
Acer rubrum
Red Maple
1 1/2"-2 1 /2" cal.
10
Pinus strobus
Eastern White Pine
6'-8' min.
3.05 SILT FENCE
$F x X x
3.08 CULVERT
CIP
INLET PROTECTION
3.32 PERMANENT SEEDING
3.35 MULCHING
U
30 0 30
Scale 1" = 30 ft
4E_P1
DATE: SURVEY:
20OCT97 FS
9C
SCALE: DRAWN:
1 " = 30' JCL
C.I.:
2'
JOB NO.: SHEET:
9610016 2/2
FREDERICK COUNTY, VIRGINIA
ABBREVIATIONS
s '69 0117
ASSY. ASSEMBLY
GENERAL NOTES
1. The delineated on this is located between Interstate 81 and Route 661, Welltown Pike, in the Stonewall
BF BASEMENT FLOOR
BLK. BLOCK
®
�� 10e �y
property plan
Magisterial District in the County of Frederick, Virginia The developer of the property proposes to construct a
BC BOTTOM OF CURB
mini -storage buildings on a 3.57 acre tract. The tract contains one building which is used for office, maintenance and
BSBD. BASEBOARD
n
storage.
C&G CURB & GUTTER
CMF CONCRETE MONUMENT FOUND
2. Property Owner/Developer: Contact: Mr. Paul Negley
CPP CORRUGATED POLYETHYLENE PIPE
CMPA CORRUGATED METAL PIPE ARCH
C_ �+
°P� �
Paul Negley
127 Mercedes Court
CO CLEAN OUT
,l'Pn �Z22
Winchester, VA 22603 Telephone: 540-665 2792
®
DIA. DIAMETER
EOP EDGE OF PAVEMENT
FF FIRST FLOOR
4 Engineer/Landscape Architect" Contact: Mr. John Lewis
FFE FINISHED FLOOR ELEVATION
PAINTER-LEWIS, P.L.C.
F.C. FIRE CONNECTION
302 South Braddock Street, Suite 200
FG FACE OF GUTTER
FIRE HYDRANT
Winchester, Virginia 22601 Telephone: (540) 662-5792
®H7V
Go. GAUGE
5. Property boundary and topographic information shown on these plans was provided by Furstenau Surveying, Inc.
(0 UFH
GM GAS METER
22, GV GAS VALVE
• C)to;r=
9
HCR HANDICAP RAMP
Parcel Area: 3.5704 acres
HDR CURB 6" HEADER CURB
PIN: 43((A))52
HP HIGH POINT
Zoning: B-3
Use: Office, Equipment Storage, Self Service Storage
Front Yard Setback: Required - 35' Provided - 35'+
® ®
IPF HEATER
IPF IRON PIPE FOUND
HS
Interstate 81 Setback: Required - 50' Provided - 50'+
IPS IRON PIPE SET
INV INVERT
, t`
9 r,
Rear Yard Setback: None
70
Side Yard Setback: Required - 15' Provided - 15'+
LP LOW POINT
� ° •
Maximum Building Height: Allowed - 35' Proposed -18'+A
MPD MULTI -PRODUCT DISPENSER
/� -�� �
1,
Maximum FAR:� Allowed - 1.0
MP METAL POST
+.
6}}
�$ �
ti 51 ,r
Existing Buildings = 18,089 sf
MH MANHOLE
Proposed Buildings = 10,237 sf
Proposed Total Floor Area = 28,326 sf = 0.182 FAR
NDC NOSE DOWN CURB
NP NO PARKING SIGN
(� 9j l • °
�J I
7. Parkin Lot Landscaping Requirements:
9 P 9 q
NHS NOT SCALE
Required: 1 shade tree per 40' of lot perimeter plus 1 shade tree per 10 parking spaces
OHE OVERHEAD ELECTRIC
f
Perimeter : 76'/40' = 2 trees req'd Provided: 2 Red Maples
OHT OVERHEAD TELEPHONE
��� Aso ) ' SIT
PL PROPERTY LINE
8. Parking Space Requirements:
Required 5' Provided 5'+
PP POWER POLE
`r�� �� ,'+ oM
Property Line Setback: - -
PVMT PAVEMENT
° •
Self Service Storage - 14025 sf Required - 1 per 5000 square feet = 3 spaces
Provided - 3 Including 1 Accessible Space per ADA
Loading Space Requirements: Required - none
RCP REINFORCED CONCRETE PIPE
RD ROOF DRAIN
RED. REDUCER
rNTeRci NGE 8�,.�.
" .r" '
I'! U '� ' lie ,
R.O. ROCK OUTCROP
•
9 Handicap Accessibility
SAN. SANITARY
°
HC parking spaces shall have a maximum slope of 1:50.
STD. STANDARD
1 -. 66'7 :
HC ramps on the site shall have detectable warning surface per ADAAG 4.7 and 4.29.
T.B.D. TO BE DEMOLISHED
�..
HC ramps off site shall be constructed per VDOT standards.
T.B.R. TO BE REMOVED
T.B.P. t0 BE PRESERVED
ji �," li a '�, ti sib.,
`""
10. Buffering Requirements:
TB THRUST BLOCK
TC
' s s
The adjacent zoning to the north is B3 which requires no buffer.
TOP OF CURB
:' e3 B
The adjacent zoning to the east is RA used as right-of-way for 1-81 which requires no buffer.
The adjacent zoning to the south is B2 which requires a B type buffer The owner proposes to construct a full
TEL. TELEPHONE
TRB TELEPHONE RISER BOX
TVRB TELEVISION RISER BOX
4
1l �..• '�'i_
landscape screen within a 10' landscaped easement in the 25' inactive buffer and set the proposed buildings beyond
a _ i'
the 25' active buffer.
Plants required: 3 per 10 linear feet; >50%° evergreen; >33% deciduous, minimum of 3 species; height = 4' @ planting,
TYP TYPICAL
UGE UNDERGROUND ELECTRIC
VICINITY MAP WINCHESTER, VA 7.5' QUAD 1" = 2000'
384.881f/10 ° 3 = 116 plants
Plants provided: 59 evergreen + 57 deciduous; please refer to Plant List
-
WL WATERLINE
WM WATER METER
WV WATER VALVE
11. Environmental Features:
5 R RADIUS IN FEET
T �
Wetlands - No wetlands have been identified on the site.
Flood plains - No flood plain area has been identified on this site.
D
f
�1771
Sinkholes - No sinkholes have been identified on this site.
�C
Steep Slopes - No steep slopes have been identified on this site. Steep slopes are defined by the Frederick County
Code as slopes exceeding 15%. The area of steep slopes allowed by the code to be disturbed is 25%.
Woodlands -No woodlands have been identified on this site. Woodlands are generally defined by the Frederick County
Code as including largely mature trees in groves greater than 1/4 acre.
EROSION AND SILTATION CONTROL. NARRATIVE
Project Description
The developer proposes to build a mini storage facility on a3.5 acres parcel. The total area of disturbance on the parcel is
1.
Erosion control practices shall conform to the requirements of the Virginia Erosion and Sediment control Handbook.
approximately 1.5 acres. A storm water management pond was previously constructed to serve this area. Site grading will
2.
All perimeter sediment control devices shall be erected prior to any land disturbing activities and shall remain in place LANDSCAPE NOTES
direct runoff from the proposed impervious areas to this pond.
Existing Site Conditions
3.
until the site is full stabilized.
y 1.
The to drainage
Frederick County Landscaping Tabulation:
t
The site contains a 4,064 sf building. The construction area is vacant. Slopes range from 1.0 % to approximately 8.0%
Adjacent Areas
4.
contractor shall perform overlot grading provide positive and preclude ponding of water. All off site
grading and construction is to be done with the property owners consent.
Cut and fill slopes shall be graded at a maximum of 2 horizontal to 1 vertical unless otherwise specified on the plans.
Zoning: B-3, Industrial Transition District
Landscape Area Required: 25% x 3,5704 acres. = 0.89 acres
Landscape Area Provided: 74,726 sf or 1.71-5 acres = 48%
The site is bordered on the east by I-81. To the south is land zoned 82. This land is owned by adjacent hotel groups. The north
5.
The limits of clearing and grading. are restricted to the limits of the parcel.
f
and west adjacent areas contain developed land zoned 133.
Parking Lot Landscaping
'Off -site a Areas
SEQUENCE OF CONSTRUCTION
Perimeter Landscaping Required: 1 shade tree per 40 feet of perimeter
ZONING ADMINISTRATOR DATE
No off site disturbance or construction activities are anticipated.
1. establish construction entrances
parking perimeter = 76 feet
o
AP MOVED
Critical Areas
2. install storm water detention facilities and establish perimeter controls as required
P q
shade trees provided = 76/40 = 2
The critical areas on the site consist of perimeter steep slopes and the Buffalo Lick Run corridor Construction will be restricted
T P P P
3. clear and grub site
FRIsDEmm MU���D vmmm
from or, limited in these areas
4, strip, stockpile and stabilize top soil
Interior Landscaping Required: 1 shade tree per 10 parking spaces
5. perform rough grading
total parking spaces = 3
SITE PLAN SHALL BE VALID FOR FIVE(5) YEARS
Erosion and. Sediment Control Measures
6. construct drainage controls
shade trees provided T 3/% = 1
FROM DATE OF APPROVAL.
3.05 Silt fence will be installed in selected locations downstream from the construction area as a first measure of
7. begin facilities construction
5% of interior to be landscaped
construction. Silt fence will be placed at the toe of slope of the detention ponds prior to fill operations Silt fences shall
Any be made
8. perform final grading and site stabilization
area = 720square feet
LIST OF DRAWINGS:
be inspected after each rainfall and at least daily during prolonged rainfall. required repairs shall
9. remove all temporary sediment control structuresinterior
=
required interior landscape area 36 SF
immediately. Damaged, decomposed or otherwise ineffective silt fence shall be replaced. Sediment deposits should be
interior landscape area provided 400+/-- SF =
removed after each storm event. They must be removed when deposits reach approximately one-half the height of the
CONSTRUCTION NOTES
barrier Any sediment deposits remaining in place after the silt fence is no longer needed shall be dressed to conform
SHT. 1 �2 COVERSHEET
with the existing grade and stabilized.
1.
The existingutilities shown on these plans are based on available information. The CONTRACTOR shall be 2.
Confirm the locations of an utilities above or below round. prior to commencing work. Contact the Landscape
y g P g P
3,08 Silt fence will be installed as culvert inlet protection at the upstream ends of culverts. Silt fences shall be inspected
responsible For determining the exact location of all utilities before commencing workand for any damages which
Architect In the event that utilities or any other structure conflicts with the layout shown on the plan..
SHT. 2/2 SITE PLAN
after each rainfall and at least daily during prolonged rainfall. Any required repairs shall be made immediately,
occur by the failure to locate and preserve these utilities. If the CONTRACTOR should encounter utilities other than
Damaged, decomposed or otherwise ineffective silt fence shall be replaced. Sediment deposits should be removed
those shown on these plans, the CONTRACTOR shall immediately notify the engineer and take the necessary and 3.
Verify the quantities shown on the plant list with totals indicated on the plan. Contact the Landscape Architect in the
after each storm event. They must be removed when deposits reach approximately one-half the height of the barrier.
proper steps to protect the facility and assure the continuance of service,
event that discrepancies exist. Supply unit prices to the Owner at time of bidding.
Any sediment deposits remaining in place after the silt fence is no longer needed shall be dressed to conform with the
existing grade and stabilized.
2.
The CONTRACTOR shall have approved construction drawings prior to the start of construction. At least one copy of 4.
All materials are subject to approval by the Owner or Owner's representative. Provide the Owner with a tag from each
3.31 Temporary seeding in accordance with the E & S Std & Spec 3.31 will be applied to the topsoil .stock pile and all areas
approved plans and revisions shall be kept on -site at all times.
plant species and a list. of the plant suppliers. Where any requirements are omitted from the Plant list, use plants
which will not be brought to final grade within 30 days. Embankment or excavated slopes denuded for a period of
which meet the normal requirements for the variety according to the American Association of Nurserymen.
greater than 30 days shall be temporarily seeded and mulched. To coincide with the anticipated construction dates,
3.
Cut and fill slopes shall not exceed 2-horizontal to 1-vertical unless otherwise called for on the plans.
the seeding will consist of 50 pounds per acre of German Millet. All temporary seeding areas will be mulched in
5.
Plants shall be sound., healthy, vigorous, well branched., free of disease, insect eggs and larvae, and shall have
accordance with the schedule included herein.
4.
Controlled Fills:
adequate root systems.
3,32 All disturbed areas will be stabilized by permanent seeding in accordance with the schedule included herein The
A. Controlled compaction shall occur in all fill sections for pavement, trenches for utilities and in other areas as
anticipated time for construction completion is November 1996.
designated on the plans. 6.
Sizes specified in the Plant List are minimum sizes against which the plants will be judged. Failure to meet minimum
3 35 All seeded areas will be mulched in accordance with the schedule included herein.
B o
Controlled fills shall be compacted to 95 /o density as determined by methods per standard proctor ASTM D 698.
size on any plant will result in rejection of that plant.
Density shall be verified by a qualified soils engineer.
C. Controlled fills shall be compacted in 8 inch lifts (loose thickness) to the specified density, beginning from the 7
Groups of shrubs shall be placed in a continuous mulched bed with smooth, continuous edges as shown on the plan.
Temporary Seeding
existing ground surface, unless otherwise approved in writing by a qualified soils engineer.
All mulched beds shall be curvilinear in shape following the contour of the plant mass. Apply a minimum of 4 inches of
SEED TYPE RATE MIN. PURITY(%) MIN. GERM.(%)
D. The surfaces directly beneath areas to receive controlled fill are to be cleared, grubbed, and stripped of topsoil,
mulch uniformly over beds. Trees located within four feet of any shrub bed shall share the same bed. Grade finished
Sept 1 - Feb 15.
The area is then to be scarified and compacted to a depth of 6 inches to the same density as the controlled fill to
planting beds so as not to impede surface drainage.
Annual Ryegrass 50 ib/ac 98 85
E. Fill material shall be taken from approved borrow areas. It shall be clean soil, free of roots, woody vegetation,
Winter Rye 50 Ib/ac 98 85
oversized stones, rocks, sandy soil, or other objectionable material. 8.
Locate trees a minimum of 3 feet from walls or walks, if possible.
May 1 -Aug 31:
German Millet 50 Ib/ac 98 85
5.
Blasting is not permitted within 25 feet of existing utilities without owner permission. 9
Stake and guy all trees according with standard practice and/or the suppliers recommendations At a minimum, all
or
deciduous trees shall be double -guyed with 72" hardwood stakes driven firmly into the ground. Secure tree to stakes
Feb 16 - Apr 30_
6.
Storm sewer and pavement materials called for on the plans refer to standard VDOT designations.
with #9 galvanized wire guys with rubber hose connections. Stakes shall be 2" x 2" x 72".
Annual ryegrass 75 Ib/ac 98 85
Mulch: 1 5 ton/ac small grain straw
7.
BENCHMARK: finished floor elevation of the existing building on the site - elevation = 718,50. 10.
Use shredded hardwood bark mulch in all planting beds.
1000 Ib/ac 10-10-10
�EAL1` 0Fertilizer
'411,r
Permanent Stabilization
8
All radii indicate edge of gravel, edge of pavement or face of curb as applicable. 11
Remove all tags, twine and containers from installed plants. Roll back burlap one third on all B&B plants,
p�
The contractor shall stabilize all denuded land within 7 days after the end of construction Permanent stabilization shall be
9.
Fire lanes shall be delineated as directed by the Frederick County Fire Marshal. 12.
Plant substitutions are permitted with consent from the Landscape Architect.
® JOHN I
E f$ "
applied to areas that are to be left dormant for more than one year During construction of the project, soil stockpiles shall be
trapping The is for the temporary
U
•
stabilized or protected with sediment measures contractor responsible protection and
10.
The CONTRACTOR 13
AC OR shall obtain permission from adjoining property owners prior to conducting any off site
Prepare the soil in all bedding areas by mixing into the top six inches of soil one cubic yard of manure, peat and 10-6-4
permanent stabilization of all soil stockpiles on site as well as soil intentional) transported from the project site The contractor
P P y P P I
construction activities.
granular fertilizer per 100 square feet of area. Remove any turf, weeds or other vegetation completely prior to
�`�
Seedbed Preparation:
installation.
p� 0.021621
aScarify top 1" to 2" of soil after final grades have been achieved
11.
The CONTRACTOR shall coordinate the relocation of the existing utilities with the appropriate utility company as
necessary.14.
Plant all materials in their appropriate season. The Contractor shall guarantee all plant materials and workmanship for
��'
w
ssIONAL
.
b. Add 3 tons per acre pulverized agricultural limestone(1401bl1000sf)
a period of one year from time of installation.
SEED TYPE RATE MIN. PURITY(%) MIN. GERM.(%)
12
All site and building lighting shall be installed to avoid spill -over onto adjoining properties.
Tall fescue 60 lb ac 97 85
Red clover 8 Ib/ac 95 65
Ladino clover 8 Ib/ac 95 65
Nurse Grass -(season dependent)
Sept 1 - Feb 15:
PA 1hffERA &IE A CO
LJ (JSp o
Annual Ryegrass 12 Ib/ac 98 85
Winter Rye 12 Ib/ac 98 85
302 South Braddock Street, Suite 00
May 1 - Aug 31:
German Millet 12 Ib/ac 98 85
Winchester, Virginia 22601
or
Telephone (540)662-5792
Feb 16 - Apr 30
Annual ryegrass 12lb/ac 98 85
Facsimile (540)662-5793
Mulch 1 5 tonlac small grain straw
Fertilizer 1000 Ib/ac 10-10-10
JOB NO.: 9610016 SHEET:
DATE: 250CT96 1/2
ON SITE PAVEMENT SECTION
NOT TO SCALE
2" S-5 BITUMINOUS CONCRETE
SURFACE TREATMENT EX. 6' EARTH BERM
6" 21—A
STONE BASE
COMPACTED SUBGRADE — =III —III-
100,
R.O.W. PAVEMENT SECTION
NOT TO SCALE ,' ,' \ \ �� `� `\' ,'
\ / j 43-A-50A
PENBERN WINCHESTER, LTD.
ZONED: B-2
2" SM-2A BITUMINOUS CONCRETE USE: MOTEL/RESTAURANT
3" BM-2A BITUMINOUS CONCRETE
17 1/ x /
i \r
cn
cn
o
F-
I--
P-
Z
Z
w
w
CL,
O
O
W
U
U
Q)
U
U
Z
Z
CW�
Cw.�
Q
Q
00
I-
CY)
rn
Z
U
IL-
�
Q
00
r1_
O
N
�
LI
N Z
W OCL
= N W
H
CL
Z N
EMMA S. DUNCAN / ' ,' -}- // \ i FF �d '' ' I 1 �� o
to
ZONED: RA 0 / J
USE: HIGHWAY ROW , / / i �` � / / I
I-
/ INSTAL 2 PARKING SPACES
WITH 6" HDR. CURB
/ GRADE TO DRAIN 5'R
'' / �� �� \ `\ I I _ EX. SAN. MH 3
EX. GRAVEL
/ , �2.5'R 2 RED MAPL
+/ /Z i c
EX. TRASH PAD ENCL. 2.5'R \ %/ ' / I 1 I� N `
- I/ '� I�In
z / C�
100,
PAVE FROM BU TO
EX. ROAD FOR U- AUL
/ PROP. 1" WATER LIN STORAGE, MATCH ELEVATIONS / / , , i /7 I 1I U
EXISTING BUILDING TO BE RELOCATED \ /
FF = 718.50 ` AS REQUIRED I OWNER 0 ARRANGE U-HA UNITS NO ' 43-A-52A
\ / / I 2.5 ACRES
IMPE ACCESS THROUGH T VEL E. ' i' " `
�i U �I / I WINCHESTER NORTH, INC. 1 Z
I ZONED: B-2 \
EX. 5'X6'X12'H SIGN I USE: VACANT Lai EOP R=55.00' I
L201.07ft I N
2 ' CDN 1 1`43'44" E
----------
' ///� WA. TER LI i - ' - i I TRIP GENERATION DATA
N _ _ EXPAND ASPHALT SOURCE: ITE TRIP GENERATION MANUAL FIFTH EDITION I N
15:70 I r --.� - --- ----- -.- -Q- --- -- o------ u' �o ENTRANCE TO 30' WIDTH
CATEGORYMINI-WAREHOUSEINSTALL RADIUS TO MATCH Z Y
Q U J
15.70 •Op EX. PVMT. I WEEKDAY: 2.61 TRIPS PER 1000 SF = 24,262/1000*2.61 = 63 TRIPS f U .�. J
6" WATER / / I CATEGORY: GENERAL OFFICE BUILDING WITH 4 EMPLOYEES f Q
`. Q WEEKDAY: 6 TRIPS PER EMPLOYEE = 4*6 = 24 TRIPS LLJ
43-A-528 pQ / ' EX. 32'-15" RCP I G
2.3986 ACRES `r(r` \ I �' / 40 I �F� I 2j:
TOTAL WEEKDAY TRIP ESTIMATE = 87 TRIPS co
i
ilooVIRGINIA GIANT, INC. �� 2Cy > LIN \``, hQ C I � UJ
ZONED: B-3 S � _ _��` I GJ� / Q LA -
USE: O
/ PRIVATE VEHICLE STORAGE & REPAIR ��e Sl I O� �G, �� o0.1,c \� �FLai
`90 �6 s'T C � '40 / ' � � .i-' _ \ CO / �/ Z v)
\ EX. BUILDING �. O. B _ / O
PROPOSED \ �� / CI ` ry \ �,
�OQ�y�• 16 ASPHALT � / `J,--- 20' DRAIN ESMT
�$ PAVEMENT O� , \ �' -15" RCP / mac\, , \ \ �' O
"\ ' O
\ \ &I Off' MATCH X. -
VMT.(TYP) ' - - - / \ \a , i \ /p ` 1p/ i CJ N
P
� -►'' �� �'ti � . �� j. - � o n �. 1 ' `� �, o�h \\ \\ � � EX. 60'-24', � � ��/ p
10 0 �
III
VV
I C:0. G� sO / , �, ♦ \\ - v=7o�.7s ' / w� j Cl)41
N
-�'� 0_ cD
ID
EX. SA SEW. 5 r\ 15 - (10)� �TE PINES i" '�' \ - - - - - - ---
(TO U .�
BE AB )0 D) ' _ _ T6.8i o S P� / -_tAYO' CC AS SHOWN i � X,� \ � � � -
\ BUILDING E o i , 1 (, O
\ \ 937 SF N 4/ , �� / ,i/ / i'� \ \ CJ (j -0
% FF = 714.43 0 �1 / - �o ,�' ,'i' v=7o8.00 \ CJ O >
\ \ x x X X \ 1 EX. 32'-15" RCP ��aJ�,�� ,'� \ EX. SIGN \ \� / \ O L 0
P \ < P 0
1 N U
_T32.05ft-- -,
/ \ - �y
LL
----------- --1 f / 20' WATERLINE ESMT.
-----�� __--- - - - - -- -- - - - - -- - - -- ---- -- — �i _ f -� ��� / / 43 1 51 0
---------- _----,' 864.05 �- -►— \ --- -- ------------------- Y; �'i / PAUL _ _ _ D. MULDOWNEY
------------------------------------ ---- - ---- +- - \_� ------ i� / ZONED: M-1
---------- --- - - ----
--- --- -------------------------------------- -------------- - --- ----- -� - ---- _ N 42 16' 10' E ._ - - _�__-- _ -- �/ / �� �� USE: COMMERCIAL T
- -
-r -----.---- - --- - - - - - P
.
_ - - -- ---- ---- ----------------------------- � � / BOG / ' ;:/ ,�,� ''
--------
INCH STE & ES RN AIL 0 JOHNC. S�
\ -----
------------------ --- AD - ----- ---- / / /� / No. 21621
43-A-56 ---- ---- ---- ---- ----- --- - �/ 041
G\�
714 K&J INVESTMENTS _ - - _ _ _ _ _ SSIONAL
ZONED: M-1
USE: COMMERCIAL EROSION & SEDIMENT CKEY
Virginia Department of Transportation
Staunton District
Rey '7 '05 page 1 of 1
GENERAL NOTES FOR. ENTRANCE PLANS
VDOT General Notes
V1. All work on this project shall conform to the latest
editions of the Virginia Department of Transportation
(VDOT) Road and Bridge Specifications, and Standards,
The Virginia Erosion and Sediment Control Regulations
and any other state, federal or local regulations
applicable. In the event of conflict between any of
these standards, specifications or plans, the most
stringent shall govern.
V2. All construction shall comply with the latest U.S.
Department of Labor Occupational Safety & lie+lth
Administration and VOSH Rules & Regulations.
V3. When working on VDOT right of way, all traffic
control, whether permanent or temporary, shall be in
accordance with the current edition of VDOT's work
area protection manual. Furthermore, all traffic
control flaggers must be certified in accordance with
VDOT's January, 1994 (or latest edition of) Road &
Bridge Specifications, Section 104.04-C.
V4. Design features relating to construction or to
regulation, control and safety of traffic may be
subject, to change as deemed necessary by VDOT.
V5. Prior to initiation of work, Contractor shall be
responsible for acquiring all necessary VDOT land use
permits for any work on VDOT right of way.
STONE BASE , , \ \ \ \ 1 \ N V6. If required by the local VDOT Residency Office, a
\\ \ \ \ preconstruction conference must be arranged and held
FO
`\ by the engineer and/or developer with the attendance
of the contractor, various County agencies, utility
COMPACTED SUBGRADE—III—III- / / �' O / �\ \ \ \ EX. 6' BOARD FENCE companies and VDOT prior to initiation of work.
BOLLARD `\ \\ �/ V7. Contractor shall notify the local VDOT Residency
\ \ \ \ \� Q1 Office when work is to begin or cease for any
�( P) \ I !Tl undetermined length of time. VDOT will also require
\ , 48 hours notice for any inspection.
+ V8. The Contractor will be responsible for maintaining
1tik / i/ I � �\ adequate access to the project from the ad)acent
public roadway through construction and maintenance of
3T a construction entrance in accordance with the
Virginia Erosion & Sediment Control Handbook, Sec 3 . 02 .
N 1 I ,� /'J ��CV(y �. �► l ..` Furthermore, access to other properties affected by
S
nrro / / O� iJ�\ PGA I �� G F� ��vFFfR 56 this project shall be maintained through construction.
/ /' S� / `\ ' / \\O\ `'� �o i' �' 25,
' / EX. TYPICAL WALL MOUNT 0J O �'\ / , gCTI 4-
/ FLOOD J b�j 1 / / / Vf g \ r ' 3
43-A-99 / i' /' �' / ��\ I'' / "1+ y ' llFFER z 1 �t EX. SAN. MH 15.40.
PLANT LIST
SYMBOL
QUAN.
BOTANICAL NAME
COMMON NAME
SIZE
REMARKS
2
Acer rubrum
Red Maple
1 1/2"-2 1 /2" cal.
10
Pinus strobus
Eastern White Pine
6'-8' min.
3.05 SILT FENCE
x x
3.0E CULVERT
INLET PROTECTION
CIP
3.32 PERMANENT SEEDING
�J
3.35 MULCHING
MU
30 0 30
Scale 1" = 30 ft
DATE:
SURVEY:
20OCT97
FS
90
SCALE:
DRAWN:
1 " = 30'
JCL
C.I..
2'
JOB NO.:
SHEET:
9610016
2�2