Loading...
HomeMy WebLinkAbout041-97 Negley Mini Storage Phase II - Stonewall - BackfileSITE PLAN CHECKLIST The checklist below indicates all the information -that needs to be -submitted as part of the site plan application. All required information must -be submitted prior to the final approval of any site plan. The Department of Planning and Development will review the application to ensure that it is complete., If any portion is not included or complete, the site plan application will not be accepted and returned to the applicant(s). Site Plan Packaqe r 1. One set of approved comment sheets are required from the following review agencies prior to final site plan approval. It is recommended that applicants contact the Department of Planning and Development to determine which review agencies are relevant to their site plan application. V Virginia Department of Transportation (VDOT) _ Y Frederick County Sanitation Authority _ Z Department of Planning and Development yInspections Department V/ / Frederick County Engineer (Public Works) L/ Frederick County Fire Marshal Y Department of Parks and Recreation 2. One copy of the Site Plan application 3. Five Copies of the Final Site Plan for approval _X County Health Department _ 4 City of Winchester 4. One reproducible copy of the Site Plan (if required) 5. A 35mm slide of the Site Plan (if required) X Town of Stephens City Town of Middletown Airport Authority ✓� Soil & Water Conservation District 911, �� ga mo �ju-v 17-3 1►- 3- 97 reaj� �11 r Received From Address O IL AMT PAID BALANCE / DUE CASH CHECK MONEY ()PDEn By -19 002525 Dollars $ l COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 678-0682 January 29, 1998 Mr. Paul Negley 127 Mercedes Court Winchester, VA 22603 RE: Approval of the Negley Mini -Storage, Phase 2, Site Development Plan #041-97 Dear Mr. Negley: The Frederick County Planning Department administratively approved Site Plan #041-97 for the above referenced site plan on January 28, 1998. This site plan, for the construction of an additional 10,237 square feet of self-service storage space, meets all County requirements for the development of a self-service storage facility within the B3 (Industrial Transition) zoning district. I have provided you with two copies of the approved site plan. Please keep an approved copy for your files and maintain an approved copy on the construction site. Once the site development has been completed, you should contact this office to schedule an on -site inspection. Please contact me if you have any questions regarding this letter. Sincerely, Michael T. Ruddy, Planner II MTR/cc cc: Charles W. Orndoff, Sr., Stonewall District Supervisor John Lewis, Painter -Lewis P.L.C. Joe C. Wilder, Engineering Technician Garland Miller, Winchester/Frederick County E.D.C. Robert Mongold, Frederick County Real Estate U:\M IKE\COMMON\SrrE.RE V\,4 EGAPPRO.SPR 107 North Kent Street - Winchester, Virginia 22601-5000 0 • PAINTER-LEWIS, P.L.C. CONSULTING ENGINEERS tel.: (540)662-5792 302 South Braddock Street, Suite 200 fax.: (540)662-5793 Winchester, VA 22601 21 JANUARY 1998 Mr. Michael Ruddy Frederick County Department of Planning and Development 107 North Kent Street Winchester, VA 22601 Re: NEGLEY 1VIIN1 STORAGE SITE PLAN - PI-tASE 2 Dear ivlike: Along with this letter you will find five copies of the site plan showing revisions as requested in your letter dated January 8, 1998. 1 am 111Cluding approvals {Toni the Pere Marshal, Engineering, Inspections, and VDOT. If you have any questions, please call me. Sincerely;10 - „ I ohn C. Lewis, P.E., C.L.A. cc: P. Negley file: 9610016 PAINTER-LEWIS, P.L.C. 'X COMMONWEALTH of VIIRGjINIA DEPARTMENT OF TRANSPORTATION AVEDINBURG RESIDENCY DID R. GEHR AVR.GECOMMISSIONER 14031 OLD VALLEY PIKE P.O. BOX 273 EDINBURG, VA 22824-0278 January 15, 1998 Mr. John C. Lewis, P.E. C/O Painter -Lewis, P.L.C. 302 South Braddock Street, Suite 200 Winchester, VA 22601 Dear John: JERRYCOPP RESIDENT ENGINEER TELE (540) 984-5600 FAX (540) 984-5607 Ref: Negley Mini Storage, Phase II Route 661 (Welltown Pike) Frederick County We have received your revised site plan dated December 17, 1997 for the referenced project. It appears all of our earlier review comments have been satisfactorily addressed. Please advise the owner of our approval. There are no conditional comments or requirements for this approval. However, due to the ever increasing outlet drainage on downstream VDOT facilities, we retain the privilege to monitor the sources of stormwater entering our existing system. The appropriate land use permits may now be applied for to cover work within the Route 661 right-of-way, if necessary. The permits are issued by this office and will require a minimum processing fee, surety bond coverage and the salary & expenses of a State assigned Inspector. Once satisfactory application has been made, a permit will normally take approximately thirty days to process and issue. Should you have any questions, please feel free to call. BJS/rf Enclosure xc: Transportation Engineer Mr. S. A. Melnikoff Mr. W. C. Gochenour Mr. Kris Tierney Sincerely, "Barry J. Sweitzer Trans. Roadway Engineer For: Norman K. Sparks Trans. Ass't. Resident Engineer '-VE :BEEP VIRGINIA MOVING i f n 0 Request for Site Plan Comments Virginia Department of Transportation Mail to: Virginia Department of Transportation Attn: Resident Engineer P.O. Box 278 Edinburg, Virginia 22824-0278 (540) 984-5600 fvuv i991 i n Hand deliver to: Virginia Department of Transportation 1550 Commerce Street Winchester, VA (540) 722-3460 Please fill out the information as accurately as possible in order to assist the Virginia Department of Transportation with their review. Please attach five (5) copies of the site plan with traffice generation data and drainage calculations with this sheet. Applicant's Name Address: Phone Number: Tb.l kv%l2- le W, , rp L Name of development and/or description of the request: Location of property: LokErL-L -["cgs ►J. VtV- - Virginia Department of Transportation's Comments: See attached letter from Barry Sweitzer to Mr. John c. Lewis dated January 15, 1998. Request for Site Plan Comments Virginia Department of Transportation Mail to: Virginia Department of Transportation Attn: Resident Engineer P.O. Box 278 Edinburg, Virginia 22824-0278 (540) 984-5600 NO 1997 Hand deliver to: Virginia Department of Transportation 1550 Commerce Street Winchester, VA (540) 722-3460 Please fill out the information as accurately as possible in order to assist the Virginia Department of Transportation with their review. Please attach five (5) copies of the site plan with traffico' generation data and drainage calculations with this sheet. Applicant's Name: Address: Phone Number: T,►a` o12 - Low, pL�-,. Name of development and/or description of the request: ties (n lzal 0 l S R� 2 3 Location of property:c— Virginia Department of Transportation's Comments: See attached letter from Barry Sweitzer to Mr. John c. Lewis dated January 15, 1998. COMMONWEALTH of VIRCjINIA DEPARTMENT OF TRANSPORTATION DAVID R. GEHR EDINBURG RESIDENCY JERRYA. COPP COMMISSIONER 14031 OLD VALLEY PIKE RESIDENT ENGINEER P.O. BOX 278 TELE(540)98,1-5600 EDI NBURG, VA 22824-0278 FAX (540) 98,1.5607 January 15, 1998 Mr. John C. Lewis, P.E. Ref: Negley Muni Storage, Phase II C/O Painter -Lewis, P.L.C. Route 661 (Welltown Pike) 302 South Braddock Street, Suite 200 Frederick County Winchester, VA 22601 Dear John: We have received your revised site plan dated December 17, 1997 for the referenced project. It appears all of our earlier review comments have been satisfactorily addressed. Please advise the owner of our approval. There are no conditional comments or requirements for this approval. However, due to the ever increasing outlet drainage on downstream VDOT facilities, we retain the privilege to monitor the sources of stormwater entering our existing system. The appropriate land use permits may now be applied for to cover work within the Route 661 right-of-way, if necessary. The permits are issued by this office and will require a minimum processing fee, surety bond coverage and the salary & expenses of a State assigned Inspector. Once satisfactory application has been made, a permit will normally take approximately thirty days to process and issue. Should you have any questions, please feel free to call. BJS/rf Enclosure xc: Transportation Engineer Mr. S. A. Melnikoff Mr. W. C. Gochenour Mr. Kris Tierney Sincerely, "V Barry J. Sweitzer Trans. Roadway Engineer For: Norman K. Sparks Trans. Ass't. Resident Engineer WE KEEP VIRGINIA MOVING Request For Site Plan Comments Frederick County Inspections Department Mail to: Frederick County Inspections Dept. Attn: Building Official 107 North Kent Street Winchester, VA 22601 (540) 665-5650 Hand deliver to: 107 N. Kent Street Fourth Floor Winchester, VA (540) 665-5650 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach one (1) copy of the site plan with this sheet. Applicant's Name: �- '�� 1,3w L Address: _ -2;v Z S Phone Number: 69(P 'SIII Z Name of development and/or description oft e request: 4' �� `•` �� P ' . Location of property: GL�nUv r u J Inspections Departments Comments: Comments are on the��S�othis Form. 17 • • Request For Site Plan Comments Frederick County Engineering Department Mail to: Frederick County Engineering Attn: Director of Engineering 107 North Kent Street Winchester, VA 22601 (540) 665-5643 Hand deliver to: Dept. 107 N. Kent Street Fourth Floor Winchester, VA (540) 665-5643 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the site plan with this sheet. Applicant's Name: Address: Phone Number: 25%f 2- Name of development and/or description of the request: i. I ix?�, I ,v,%-f t-A I %A 1 18 L!� Z _;� t--Cno COUNTY OF FREDERICK, VIRGINIA FIRE MARSHAL'S OFFICE LAND DEVELOPMENT COMMENTS Control No.SP97-0045 Date Received 10/22/97 llate Reviewed 10/30/97 Applicant Painter -Lewis, P.L.C. Plan Rev. Date: 10/20/97 Address 302 S. Braddock St. Suite 200 Winchester, Virginia 22601 Project NanicNegley Mini -Storage Phase II Phone No.540-662-5792 Type of ApplicationSite Plan Current Zoning B-3 1st Due Fire Co. 13 1st Due Rescue Co. 13 Election DistrictStonewall Tax I.D. No. 43-A-52 RECOMMENDATIONS Automatic Sprinkler SysteniXX Residential Sprinkler System Automatic Fire Alarin SystemiX Other REQUIREMENTS Emergency Vehicle Access Adequate XX Inadequate Not Identified Fire Lanes Required Yes XX No Comments Posted fire Lanes required at all hydrant locations Roadway/Aisleway Widths Adequate XX Inadequate Not Identified Special Hazards Noted Yes XX No Comments Distance to exterior property lines must be greater than 15' unless exterior building walls are Fire Rated for 1 Hour. Hydrant Locations Adequate XX Inadequate Not Identified Siamese Location Adequate Inadequate Not Identified XX Additional Comments Attached? Yes No XX Plan Approval Recommended? Yes XX No Signature Title M%.V. f- COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION DAVID R. GEHR EDINBURG RESIDENCY COMMISSIONER 14031 OLD VALLEY PIKE P.O. BOX 278 EDINBURG. VA 22824-0278 December 15,1997 Mr. John C. Lewis, P.E. C/O Painter -Lewis, P.L.C. 302 South Braddock Street, Suite 200 Winchester, VA 22601 Dear John: JERRY A. COPP RESIDENT ENGINEER TELE (540) 984-5600 FAX (540)984-5607 Ref: Negley Mini Storage - Phase 2 Route 661 (Welltown Pike) Frederick County We have reviewed the preliminary plan dated October 20, 1997, received November 25,1997, for the referenced project. Our comments are as follows and as shown in red on the plan sheet: 1. The east entrance to the site should be 30' wide at the radii end(s) to conform to current standards. The taper may be variable but not less than 30'. 2. The proposed increase in square footage of impervious physical topography (roof, asphaltic surface) should be factored into drainage entering the SWM detention pond. There appears to be an appreciable amount of retained water against VDOT roadway fill slopes. This should not be increased. Please assess the impact. 3. The impact of site drainage (post development) discharge on down stream ditch and existing culverts should be addressed and presented. 4. The area outlined and hatched is an approximate location of an existing drainage easement as shown on VDOT approved plats dated June 4, 1993 (approved by VDOT 03/01/94) and is sufficient easement for this location for the present site plan. Please confirm the easement. 5. VDOT General Notes numbers 1 thru 8 should be made a part of the plan assembly (copy attached). All miscellaneous notes shown in red should be addressed. WE KEEP VIRGINIA MOVING Mr. John C. Lewis Ref: Negley Mini Storage, Phase 2 December 15,1997 Page 2 When all the above comments have been addressed, please submit five copies of revised plans for review. If you have any questions, please call. Sincerely, B. Sweitzer Y Trans. Roadway Engineer For: Robert B. Childress Transportation Engineer BJS/ rf Enclosures xc: Mr. R. B. Childress Mr. S. A. Melnikoff Mr. Kris Tierney •FIE, CH1"W w? January 8, 1998 Mr. John Lewis Painter -Lewis, P.L.C. 302 South Braddock Street, Suite 200 Winchester, VA 22601 COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 678-0682 RE: Second Review of Negley Mini Storage, Phase 2, Site Development Plan 9041-97 Dear John: I have had the opportunity to review the above referenced site plan resubmitted to our department on December 19, 1997. Thank you for addressing my previous comments. Please resolve the following two issues and submit five copies of the final site plan for approval. 1) Please revise the setback adjacent to the Interstate 81 right-of-way. A front yard setback of 50 feet is required wherever a B3 lot abuts an arterial highway. 2) Please demonstrate that the area designated for U-Haul vehicles is sufficient to accommodate vehicles of this size without obstructing the driveway. Should you need to gain additional space to accomplish this, the minimum spacing between storage units is thirty feet. In addition, I will also need the approved review agency comment sheets from the Virginia Department of Transportation and the Frederick County Sanitation Authority prior to final approval of this site plan. Please contact me if you have any questions regarding this letter. Sincerely, Michael T. Ruddy Planner II MTR/cc U:\MIKMCOMMON\SrM.UVWEGLEY2.SPR 107 North Kent Street • Winchester, Virginia 22601-5000 ALICATIONS CHECK LIST 0 TO: l -)-� �)FROM: 1 TIME RECEIVED: l L�I Initials DATE: �� " Cj - C� NAME OF APPLICATION: RECEIVED BY: U.S. Mail Federal Express U.P.S. Courier The Applicant Type of Application: Rezoning Site Plan Variance Master Development Plan Conditional Use Permit Other Received from applicant at time of submittal: Application R A C mments L—' Check/Amount Instructions to Clerical Staff: evew gency o Plats Slides Plans - Sign Deposit_ `J PAINTER-LEWIS, P.L.C. CONSULTING ENGINEERS tel.: 302 South Braddock Street, Suite 200 fax.: Winchester, VA 22601 18 DECEMBER 1997 Mr. Michael Ruddy Frederick County Department of Planning and Development 107 North Kent Street Winchester, VA 22601 Re: NEGLEY MINI STORAGE SITE PLAN - PHASE 2 Dear Mike: (540)662-5792 (540)662-5793 Along with this letter you will find two copies of the site plan showing revisions as requested Ill your letter dated November 21, 1997. I am including approvals from the Fire Marshal, Engineering and Inspections. VDOT is still in the process of review. If you have any questions, please call me. Sincerely; Joh C. Lewis, P.E., C.L.A. cc: P. Negley file: 9610016 c o PAINTER-LEWIS, P.L.C. n • • COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 678-0682 November 21, 1997 Mr. John Lewis Painter -Lewis, P.L.C. 302 South Braddock Street, Suite 200 Winchester, VA 22601 RE: Review of Negley Mini Storage, Phase 2, Site Development Plan #041-97 Dear John: I have had the opportunity to review the above referenced site plan received by our department on October 22, 1997. The following comments need to be addressed during the revision of this site plan: 1) Please revise the setback adjacent to the Interstate 81 right-of-way. A front yard setback of 50 feet is required wherever a B3 lot abuts an arterial highway. i d 2) It may be desirable to provide pedestrian access from the new parking spaces to the existing sidewalk. Pedestrian access should also be considered from the existing parking and building to the proposed storage units. ✓ 3) Please ensure that the location of the parking area accommodating the U-Haul vehicles is identified and paved accordingly. Please disregard this comment if this part of the operation will be discontinued. P%V-JA tg Savww atS A►v O t W%4-41' tic .r /4) Please provide the size of the proposed relocated sanitary sewer line and the lateral serving the existing building. y ' ' l' The location and nature of all facilities necessary to meet Fire Code requirements shall be approved / by the Fire Marshal. ✓ 6) Within the General Notes, please provide the existing parking space calculations in addition to those you have identified as required with this Phase 2 development. The proposed square footage of this development would require the provision of three parking spaces. However, if we were to consider the development as a whole, the rounding up of the fractional space may not be necessary. 7) Please ensure that the excavated portion of the berm provided in conjunction with the previous site plan is intact and stabilized. , - .'.N / 107 North Kent Street • Winchester, Virginia 22601-5000 7 • • Negley Mini -Storage Site Plan Review Page 2 November 21, 1997 8) Please provide the required self-service storage facility landscaping or screening. The side yards of facilities located in the B3 zoning district shall be planted with a single row of evergreen or deciduous trees that are planted a maximum of 40 feet of center. The opportunity may exist to stagger these required plantings with those existing around the adjoining Virginia Giant, Inc. parking i lot. Alternately, he installation of an opaque wall or fence may be substituted for the required landscaping. l0 S (/ 9) The stormwater management plan, and the soil erosion and sedimentation control plan, shall be approved by the Department of Public Works. (,,- Please revise your site plan to reflect the comments specified in this letter and resubmit one copy for my review. Once I have verified the information contained on the revised site plan, I will need all approved review agency comment sheets and five copies of the final site plan for approval. Comment sheets are required from the following agencies: the Virginia Department of Transportation, the Frederick County Sanitation Authority, the Inspections Department, the Frederick County Engineer, and the Frederick County Fire Marshal. Please contact me if you have any questions regarding this letter. Sincerely, Michael T. Ruddy Planner II MTR/cc • • Request For Site Plan Comments Frederick County Inspections Department Mail to: Frederick County Inspections Dept. Attn: Building Official 107 North Kent Street Winchester, VA 22601 (540) 665-5650 Hand deliver to: 107 N. Kent Street Fourth Floor Winchester, VA (540) 665-5650 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach one (1) copy of the site plan with this sheet. Applicant's Name: Address: camL5 t-f e: 2.AC;0 M Phone Number: %(�Z— ,52q Z Name of development and/or description of the request: 17 • u Building shall conply with The Virginia Uniform Statewide Building Code and Section 311 Use Group S (Storage) of The BoCA National Building Code /1996. Other codes that apply are CABO A117-92 Accessible and Useable Buildings and Facilities. Areas where sewer main is to be removed shall require proper conpaction evaluation at the time of foundation inspection. *. • Request For Site Plan Comments Frederick County Engineering Department Mail to: Frederick County Engineering Dept. Attn: Director of Engineering 107 North Kent Street Winchester, VA 22601 (540) 665-5643 Hand deliver to: 107 N. Kent Street Fourth Floor Winchester, VA (540) 665-5643 A Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the site plan with this sheet. Applicant's Name:l�l Address: 1.XO7, C2 16V�+p"-KM CO-r— C A J L"Cv�g two \,N t o Phone Number: �0,VVz--' J5112 Name of development and/or description of the request: Engineering Department's Comments: S�6 i OF, ot +� 18 0 0 COUNTY OF FREDERICK, VIRGINIA FIRE MARSHAL'S OFFICE LAND DEVELOPMENT COMMENTS Control No.SP97-0045 Date Received 10/22/97 llate Reviewed 10/30/97 Applicant Painter -Lewis, P.L.C. Plan Rev. Date: 10/20/97 Address 302 S. Braddock St. Suite 200 Winchester, Virginia 22601 Project NameNegley Mini -Storage Phase II Phone No.540-662-5792 Type of ApplicationSite Plan Current Zoning B-3 1st Due Fire Co. 13 1st Due Rescue Co. 13 Election Dist•ictStonewall Tax I.D. No. 43-A-52 RECOMMENDATIONS Automatic Sprinkler SystemXX Residential Sprinkler System Automatic Fire Alarm SystenYX Other REQUIREMENTS Emergency Vehicle Access Adequate XX Inadequate Not Identified Fire Lanes Required Yes XX No Comments Posted Fire Lanes required at all hydrant locations Roadway/Aisleway Widths Adequate XX Inadequate Not Identified Special Hazards Noted Yes XX No Comments Distance to exterior property lines must be greater than 15' unless exterior building walls are Fire Rated for 1 Hour. Hydrant Locations Adequate XX Inadequate Not Identified Siamese Location Adequate Inadequate Not Identified XX Additional Comments Attached? Yes No XX Plan Approval Recommended? Yes XX No � P Signature Title F � L COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 FAX: 540/678-0682 November 21, 1997 Mr. John Lewis Painter -Lewis, P.L.C. 302 South Braddock Street, Suite 200 Winchester, VA 22601 RE: Review of Negley Mini Storage, Phase 2, Site Development Plan 8041-97 Dear John: I have had the opportunity to review the above referenced site plan received by our department on October 22, 1997. The following comments need to be addressed during the revision of this site plan: I) Please revise the setback adjacent to the Interstate 81 right-of-way, A front yard setback of 50 feet is required wherever a B3 lot abuts an arterial highway. 2) It may be desirable to provide pedestrian access from the new parking spaces to the existing sidewalk. Pedestrian access should also be considered from the existing parking and building to the proposed storage units. 3) Please ensure that the location of the parking area accommodating the U-Haul vehicles is identified and paved accordingly. Please disregard this comment if this part of the operation will be discontinued. 4) Please provide the size of the proposed relocated sanitary sewer line and the lateral serving the existing building. 5) The location and nature of all facilities necessary to meet Dire Code requirements shall be approved by the Fire Marshal. 6) Within the General Notes, please provide the existing parking space calculations in addition to those you have identified as required with this Phase 2 development. The proposed square footage of this development would require the provision of three parking spaces. However, if we were to consider the development as a whole, the rounding up of the fractional space may not be necessary. 7) Please ensure that the excavated portion of the berm provided in conjunction with the previous site plan is intact and stabilized. 107 North Kent Street - Winchester, Virginia 22601-5000 • i Negley Mini -Storage Site Plan Review Page 2 November 21, 1997 8) Please provide the required self-service storage facility landscaping or screening. The side yards of facilities located in the B3 zoning district shall be planted with a single row of evergreen or deciduous trees that are planted a maximum of 40 feet of center. The opportunity may exist to stagger these required plantings with those existing around the adjoining Virginia Giant, Inc. parking lot. Alternately, the installation of an opaque wall or fence may be substituted for the required landscaping. 9) The stormwater management plan, and the soil erosion and sedimentation control plan, shall be approved by the Department of Public Works. Please revise your site plan to reflect the comments specified in this letter and resubmit one copy for my review. Once I have verified the information contained on the revised site plan, I will need all approved review agency comment sheets and five copies of the final site plan for approval. Comment sheets are required from the following agencies: the Virginia Department of Transportation, the Frederick County Sanitation Authority, the Inspections Department, the Frederick County Engineer, and the Frederick County Fire Marshal. Please contact me if you have any questions regarding this letter. Sincerely, Michael T. Ruddy 7 Planner II MTR/cc N Eq �-ty* M I N I -'S-rcrlq A q6� OF, Hc SITE PLAN CHECKLIST 111 2-0/ q/lw The checklist below indicates all the information that needs to be submitted as part of the site plan application. All required information must be submitted prior to the final approval of any site plan. The Department of Planning and Development will review the application to ensure that it is complete. If any portion is not included or complete, the site plan application will not be accepted and returned to the applicant(s). Site Plan Package 1. One set of approved comment sheets are required from the following review agencies prior to final site plan approval. It is recommended that applicants contact the Department of Planning and Development to determine which review agencies are relevant to their site plan application. Virginia Cepartment of Transportation NOCT) Frederick County Sanrtaoon Authority Department of Planning and Development ✓ Inspections Department Frederick County Engineer (Public Works) Fredenck County Fire Marshal ( Department of Parks and Recreation 2. One copy of the Site Plan application 3. Five Ccpies of the Final Site Plan for approval County Health Department City of Winchester Town of Stephens City Town of Middletown _mac Airport Authority _1C Soil 3 Water Conservation District 4. One reproducible copy of the Site Plan (if required) 5. A 35mm slide of the Site Plan (if required) 8 Site Plan Informatioh Checklist The following information must be inc!uded on your site plan. If your site plan is incomplete or is missing information, it will not be reviewed and returned to you for revisions. Administrative Information Y N 1. Name of proposed development. ✓ 2. Name, address, and phone number of owner. 3. Name, address, and phone number of developer. 4. Name, address, and phone number of designer. ✓/ 5. Certificate of surveyor, engineer, or architect. J 6. Date plan prepared and date of revisions. ✓ 7. A listing of all conditions placed on the site as a result of a conditional use permit or conditional zoning approval. 8. A space labeled 'Approved by the Zoning Administrator' for the approval signature and date of approval. 9. A description of setbacks or conditions placed on the site as a result of a vanance approval. (Reference the variance applicabcn number.) General Site Information Y N ✓ 10. Location map (scale 1:2000) ✓/ 11. Magisterial Distnct ✓ 12. Scale of site plan (not to exceed 1:50) 13. North Arrow 14. Zoning of site (15- Use, zoning, and Property Identification Number (PINK) of all adjoining properties. This includes properties located across right-of-ways, streams, and railroad tracks. 16. Surveyed boundanes for all lots and parcels. t General Site (con't) Y N 17. Acreage of all lots included in the plan. 18. The location and dimensions of all required setbacks and yard areas. _/ 19. The location and type of all dwelling units. V/ 20. Location and description of all recreation fatalities. Location of sidewalks and pedestrian ways. �o�t.t,.„h.�►,G Crlh v�t.c��wk 22. Location and area of common open space. 23. The location, height, and dimensions of all signs. 24. Location, height, and specifications of outdoor lighting fixtures. 7 25. Location and nature of outdoor storage areas. 26. Location of outdoor trash receptacles and dimensions of structure (fencing, etc.) required to enclose receptacles. Building Information Y N 27. The height of all buildings and structures. 28. Location of all buildings, structures and uses. P .Ju;�) U 29. The proposed use of eacti building, structure and area. 30. Ground floor area and total floor area of all buildings with PAR calculations for commercial and industnal zoning distrc:s. Roads Y N 31 Name and number of existing and planned streets on and n adjoining the site. 14&c d LA v IA*G .f yskAM ./ 22. Location of existing and planned streets an and adjoining the site. 11 3. Posted speed limit of existing adjacent roads. Location and dimensions of all proposed entrances from public J right-of-ways. • • 35. Location of all entrances on adjoining roads within 200 feet of the proposed or existing entrance. 36. Dimensions, boundaries, width, pavement, and construction of planned roads. Utilities Y N C37) Location of all utilities, including sewer and water lines with the size of lines, mains, and laterals. ✓ 38. Location and width of all easements, including access, utility, and drainage easements. I`m"'(, 39. Location and nature of fire lanes, fire hydrants, and all other fadities necessary to meet Fire Ccde requirements. P2rking Y N 6i) Calculations describing the required number of parking and loading spaces. 10 Z ,i i3 �►,cwri% 41. Location and dimensions of all parking and loading spaces, driveways, parking aisles, curbing and other features to be used. Location and dimension of all disabled parking spaces and ramps. Natural Features Y N 43. Existing and finished contour lines. 44. Location of steep slopes, woodlands, floodplains, wetlands, sinkholes, and other environmental features. 45. Location of streams and drainage ways. i 0 46 Landscaping Y N 46. Landscaping plan describing location and types of plants to be used. 47. Location of required buffers and screening with cross sections or profiles. Erosion and Sediment Control Y . N 48. A stonnwater management plan with run off calculations and location and description of facilities to be used. i 49. Soil erosion and sedimentation control plan describing the location and methods to be used to minimize erosion and sedimentation during development. r F (2) Prv...,k d� �r . �w r- �� 6 12 i 2 K 4 SITE PLAN APPLICATION Project Title:+ W����•S'��I>C-c l� Q�'�C'� L Location of Property ',5 6O V Q-�-r (street address) �1J �� '���� \/l4 Z2cnp � Property Owner: � C,�ua / Address: lZ�i��-G�n�S GNU 2-T Telephone:��—Z'�lai z' Applicant/Agent Address Telephone: 5. Designer: Address: Telephone: Contact: �U �Tr3 Zcx� - �-1 6 L] 6. Is this an original or revised site plan? Original Revised 7a. Total acreage of parcel to be developed: 7b. Total acreage of parcel: �j •1 8. Property Information: a) Property Identification Number: b) Current Zoning: c) Present Use: d) Proposed Use: e) Adjoining Property Use(s) f) Adjoining Property Identification Number(s) �J� '��"SZ$ `14'`��� g) Magisterial District(s) I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to the submission of my site plan. Signature: ''^^ Date: Pi 0 ............ ....... ....... . .............. .... . ..................... .. ............ . . .... .... ....................... ................... RANS . . .. . . ......... . ......... ...... . . .. .... ........ ........ .. . ........ .. ........... . ............ ...................... . ... ....... ........... ....... .. .. ... ........ . ....... ... . . From: John Lewis To: Mr. Eric Lawrence Company: Planning & Zoning 107 N. Kent Street Winchester, VA JOB: NEGLEY MINI -STORAGE Eric: Date: 10/30/97 Time: 8:26 AM V review fee check in the amount of $1150 for 1 1/2 acres of disturbance If you need any more information, please call me. VOICE: 540-662-5792 FAX: 540-662-5793 .......... ................... . ..... ............ ....................... . ................ oc Oth Braddock Utte 20.d:W'nqh:60 ................... . .... . ......... . ... .. . . ......... ... ...... .. PAINTER-LEWIS, P.L.C. CONSULTING ENGINEERS tel.: (540)662-5792 302 South Braddock Street, Suite 200 fax.: (540)662-5793 Winchester, VA 22601 20 OCTOBER 1997 Mr. Eric Lawrence Frederick County Department of Planning and Development 107 North Kent Street Winchester, VA 22601 Re: NEGLEY MINI STORAGE SITE PLAN - PHASE 2 Dear Eric: Along with this letter you will find two copies of a site plan IOr additional mini -storage LlllltS O11 the property Of Paul Negley on Welltown Pike. I am requesting comments from the Fire Marshal, Engineering and Inspections. Please let me know what the fee will be for the review of this project. If you have any questions, please call nle. Sincerely; JolLewis, P.E., C.L.A. cc: P. Negley file: 9610016 PAINTER-LEWIS, P.L.C. • 0 Request For Site Plan Comments Department of Planning and Development Mail to: Hand deliver to: Department of Planning and Development 107 N. Kent Street Attn: County Planner Fourth Floor 107 North Kent Street Winchester, VA Winchester, VA 22601 (540) 665-5651 (540) 665-5651 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two -(2) copies of the site plan with this sheet. Applicant's Name: Address: Z S . TZ-it 1; Q'pcc - CT ?moo Phone Number: 60(� 7I Z2- 7Gl 7-- Name of development and/or description of the request: tA, L.d`� U�l ► ll STD 6?-t��-tomkA�s Z Location of property: � )a(.L'�[Ow 1J L31 Planning and Development's Comments: