Loading...
HomeMy WebLinkAbout60-05 NW Regional Adult Det. Ctr. - Work Release Facility - Stonewall - Backfile (2)� ' _.-> 7 J /_ - � ! �ll ��,���� ll�t,-/ �,- � �,�� -, c SITE PLAN TRACKING SHEET Date: v File opened Reference Manual updated/number assigned �oS D-base updated File given to Renee' to update Application Action Summary CLOSE OUT FILE: OS- Approval (or denial) letter mailed to applicant/copy made for file G 3 0 - File stamped "approved", "denied" or "withdrawn" 3 O S Reference Manual updated D-base updated 9 , / 3.015 File given to Renee' for final update to Application Action Summary P3/ U Tev\Common\Tracking shects\Site Plan Tracking wpd Revised O2/07/03 SITE PLAN APPLICATION CHECKLIST The cbecklist shown below specifies the information which is required to be submitted as part of the site plan application. The Department of Planning & Development will review the application to ensure that it is complete prior to accepting it. If any portion of the application is not complete, it will be retumtd to the applicant(s). (1) One (1) set of approved comment sheets are required from each relevant review agency prior to final approval of a site plan_ It is recommended that applicants contact the Department of Planning & Development to determine which review agencies' are relevant to their site plan application. A list of potentially relevant review agencies is shown below: Frederick County Department of Planning & Development _ Department of GIS (Geographic Information Services) �/ Frederick County Sanitation Authority Frederick County Building Inspections Department ✓ Frederick County Department of Public Works Frederick County Fire Marshal Frederick County Health Department _�. Frederick County Department of Parks & Recreation Virginia Department of Transportation (VDOT) City of Winchester _ Town of Stephens City _ Tovm of 1\,Eddletown `/. Frederick County / Winchester Airport Authority (2) One (1) copy of the Site Plan application form. —NA- (3) Payment of the site plan review fee. (4) One (1) reproducible copy of the Site Plan (if required). CO of FREDERICK Department of 41 Uopment 4 /665-5651 FAX: 540/665-6395 September 13, 2005 Mr. Ron Mislowsky Patton Harris Rust & Associates, PC 117 E. Piccadilly Street, Suite 200 Winchester, Virginia 22601 Re: Approval of Site Plan #60-05; CFFW Regional Adult Detention Center Annex Building Property Identification Number 54-A-36A Dear Ron: The Frederick County Department of Planning and Development administratively approved the above -referenced site plan on September 13, 2005. The site plan is approved for the construction of a 60' x 120' work release annex building located next to the Work Release Facility, in the Stonewall Magisterial District. All requirements of the Frederick County Zoning Ordinance have been met in the approved site plan, including review agency comments from all relevant review agencies. I am providing you with five (5) copies of the approved site plan. Please forward these copies to the appropriate representative(s). Furthermore, advise the owner(s) that a copy should be kept for future reference, and an approved copy must be kept on the construction site throughout the development process. Once site development is complete, the owner(s) should contact this office to schedule an on - site inspection. Do not hesitate to contact me if you have any questions or concerns. Sincerely, Candice E. Perkins Planner II Attachments CEP/bad cc: Jane Anderson, Real Estate Patrick Barker, Economic Development Commission Lynda J. Tyler, Shawnee District Supervisor John Light, Stonewall District Planning Commissioner Clarke -Frederick -Winchester Adult Detention Center, 141 Fort Collier Rd., Winchester, VA 22603 em: Charles DeHaven Jr.. Planning Commission Chairman 107 North Kent Street, Suite 202 - Winchester, Virginia 22601-5000 • Request for Site Plan Comments Frederick County Inspections Department Maibto: Frederick County Inspections Dept. Attn: Building Official 107 N. Kent Street Winchester, VA 22601 (540) 665-5650 Hand deliver to: 107 N. Kent St. Fourth Floor Winchester, VA 22601 (540) 665-5650 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach one (1) copy of the site plan with this sheet. Applicant's Name: Patton Harris Rust & Associates, pc Address: c/o Ronald A. Mislowsky 117 E. Piccadilly Street Winchester, VA 22601 Phone Number: (540) 667-2139 Name of development and/or description of the request: NW Regional Adult Detention Center CCF Annex Location of property: 141 Fort Collier Road, north of existing Work Release Center (CCF) ent's Comments: Inspection Dept. use only ;ram:• •rr+-r. : �. Date received Date revision received__ - Incomplete Incomplete Date reviewed Date reviewed _t1e� Signature and Date r ► - ; Signature and Date (revision) Date -approved Patton Hams Rust & Associatedc Engineers, Surveyors, Planners, Landscape Architects 117 Eric Piccadilly Street, Suite 200 R+A Winchester, Virginia 22601 r, T 540.667.2139 PH F 540.665.0493 To: Candice Perkins Organization/Company: From: Date: Project Name/Subject: PHR+A Project file Number: cc: Frederick County Planning Ron Mislows September 8, 2005 NWRADF - CC F Annex Memorandum I've enclosed plan approval comment sheets from the FCSA, Fire Marshal and Building Inspections. I under from Mr. Strawsnyder that he has provided his approval. Please let me know when you need plan sets for approval. • • FOSA Obert w. cliffordt& associates si Patton H arris Rost a Associates,pc Engineers. Surveyors Piannerm. Landscape Architects r 1 2005 117 East Piccaddy Street, Sate 200 ][ Winchester. Virginia F 5/0.66.2139 Pi4 510.665.0193 G.: •7 � � � � To: OrganizationlCompany: Address Telephone Number: Date: From: Project Name/Subject: Via: John Whitacre FCSA P.O. Box 1877 Winchester, VA 22604 August 31, 2005 Ron Mislowsby, P.E. Northwest Regional Adult Detention Center Internal Project File #: Quantity File # Date Description Transmitted Annex Building Revised per Agency ❑ Herewith Comments for Approval ❑ Under separate cover Material ❑ Originals ❑ Photocopies ❑ Diskette ❑ Shop Drawings ❑ Mylar ❑ Ozalid Prints ❑ Invoice ❑ Sepia Purpose ❑ Your Use ❑ Your Files Notes: - - — ❑ Approval d�� R�"/,��� f,-- /���RoY.c�l /�s ���� ❑ Please Return: SF�YTiI�I,E • / S.6T p.4/ITS Can rw Pnnts • /%%y�/�/� �/C S��jC, ,_ �rs ❑ Please Submit: 13 /6 Received by: 49 Control number SP05-0060R Project Name NW Adult Detention Center Address 117 E. Piccadilly St. Type Application Revised S.P. Current Zoning M-1 Automatic Sprinkler System Yes Other recommendation Emergency Vehicle Access Adequate Siamese Location Adequate Emergency Vehicle Access Comments Access Comments Additional Comments Date received 8/29/2005 City Winchester Tax ID Number 54-A-36A Date reviewed 9f7/2005 Applicant PHR&A State Zip VA 22601 Fire District 13 Recommendations Automatic Fire Alarm System Yes Req€ k,e€ne€ is Hydrant Location Adequate Roadway/Aisleway Width Adequate Date Revised Applicant Phone 540-667-2139 Rescue District 13 Election District Residential Sprinkler System No Fire Lane Required Yes Special Hazards No No parking signage and curd painfing is required at all hydrants and lire department connections. w ,I Plan Approval Recommended Reviewed By Signature Yes Jay Bauserman t Title �A,,,,U� �8 FP Title TV tom® 0 • COUNTY of FREDERICK Department of Public Works 540/665-5643 FAX: 540/ 678-0682 MEMORANDUM TO: Candice E. Perkins, Planner II, Planning and Development r FROM: Harvey E. Strawsnyder, Jr., P.D. Director of Public Works SUBJECT: Site Plan Approval for Northwest Regional Adult Detention Center CCF Annex DATE: September 7, 2005 The attached revised site plan for the CCF Annex Building has satisfactorily incorporated the Frederick County staffs comments presented during a meeting held on August 26, 2005. Staff comments were provided by engineering, planning and development, inspections and, fire and rescue. Because of the satisfactory compliance, we recommend that the site plan be approved for Construction. HES/rIs cc: Ron Mislowsky, Patton Harris Rust & Associates File n:�crwurc,\nui. rnr�•r�\cco�L��ha 107 North Kent Street • Winchester, Virginia 22601-5000 filbert w. clifford & ass ciates a division of Patton Harris Rust & Ass ociate s,1)c Engineers. Surveyors. Planners. Landscape Architects. RA 117 ches E-astPiccadilly Street, Suile 200 Winchester,Virginia 22601 PH T 540.667.2139 F 540.665.0493 To: Mark Cheran, Planning -- Joe Wilder, Public Works Tun Welsh, Fire and Rescue John Trenar- ,, Inspections John Whitacre, FCSA From: Ron MislowslgrdPN Date: August 29, 2005 Project Name/Subject: Northwest PHR+A Project file Number: cc: Memorandum nal Adult Detention Center CCF Annex We've revised the Annex plans per comments received on Friday, 26 August. I've enclosed copies here for approval. The changes are: 1. The access road has been shifted to the active portion of the buffer area. 2. A sidewalk has been extended to the west side of the Community Corrections Facility (CCF). This will provide access to the parking lot for that facility. 3. A cleanout has been added to the 6" sewer lateral. 4. A rock check dam has been specified downstream of the project. 5. Handicapped parking is provided at the east side of the new building. 6. The development notes have been adjusted. If you have any further comments, please feel free to call. AUG 2 9 2005 COUN of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/66S-6395 August 24, 2005 Mr. Ron Mislowsky Patton Harris Rust & Associates 1 ] 7 R. Piccadilly Street Winchester, VA 22601 Re: Comments for CFFW Regional Adult Detention Center Annex Building Property Identification Number (PIN) 54-A-36A Dear Ron: Staff is in receipt of the site plan for the above -referenced project, accepted on October 14, 2004. At this time, the site plan is denied until the following comments are adequately addressed. Review Comments: 1) Sidewalk. It appears that a sidewalk might be needed from the annex building to the work release facility. 2) Access Road. Pavement is not allowed to be within the inportion of portioof the buffer. The access road needs to be relocated to the active portion of the buffer. 3) Sianaae. On sheet 2 of 4 under notes, revise the 150sf to 100sf. Once you have adequately addressed all of these comments, please resubmit a copy for my review. I will need all approved review agency continent sheets and at least five copies of the final plan for approval. Comment sheets are required from the following agencies: The Frederick County Dept. of Building Ins73ections, Frederick County Engineer (Public Works), the Frederick County Fire Marshal, the Frederick County Sanitation Azahorll),. Peel free to contact me ifyou have any questions. Sincerely, Candice R. Perkins Planner it CEP/bad 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 • SITE PLAN APPLICATION 1. Project Title: NW Regional Adult Detention Centcr CCF — Annex Building 2. Location of Property: North of Work Release Center (CCF) (Address): 3. Property Owncr: NW Regional Adult Detention Center Address: 141 Fort Collier Road Winchester, VA 22603 Telephone: 540-665-6374 4. Applicant/Agent: Patton Harris Rust & Associates, pc Address: 117 E. Piccadilly Street Winchester, VA 22601 Telephone: 540-667-2139 5. Designer: Patton Harris Rust & Associates, pc Address: 117 E. Piccadilly Street Winchester, VA 22601 Telephone: 540-667-2139 Contact: Ronald A. Mislowsky n L� r'l u 6a. Is this a standard or `minor' site plan? 6b. Is this an original or revised site plan? 7a. Total acreage of parcel to be developed: 7b. Total acreage of parcel: 8. Property Information: a) Property Identification Number: b) Current Zoning C) Present Use: d) Proposed Use: e) Adjoining Property Use(s) f) Adjoining Property Identification Number (s) g) Magisterial District (s) Standard X Minor Original X Revised 1.5 acres 11.78 acres 54-A-36A MI Vacant Work Release Facility (CCF) Mobile home park, detention center, vacant 55-A-91, 36A, 92B Stonewall I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to the submission of my site plan. Signature Date August 23, 2005 • • Request For Site Plan Comments Department of PlanninlZ and Development Mail to: Hand deliver to: Department of Planning and Development 107 N. Kent St. Attn: County Planner Fourth Floor 107 N. Kent Street Winchester, VA Winchester, VA 22601 (540) 665-5651 (540)665-5651 Please fill out the infon-nation as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the site plan with this sheet. Applicant's Name: Patton Harris Rust & Associates, pc Address: c/o Ronald A. Mislowsky 117 E. Piccadilly Street Winchester, VA 22601 Phone Number: (540) 667-2139 Name of development and/or description of the request: NW Regional Adult Detention Center CCF Annex Location of property: 141 Fort Collier Road, north of existing Work Release Center (CC Planning and Development's Comments: Planning and Development use only Date received Date revision received Incomplete Incomplete Date reviewed Date reviewed Signature and Date Signature and Date (revision) Date approved _ gil.bert w. clifford & ass iates a division of Patton 11 a r r i s Rust & As sociates,pc Engineers. Surveyors. Planners. Landscape Architects. PH R+ l 117 Eastches er, Vir innlly Street, Sulle 200 Winchester, Virginia 22601 T 5,10.667.2139 F 540.665.0493 To: Mark Cheran, Plaiuung Joe Wilder, Public Works Tun Welsh, Fire and Rescue John Trenar- ,, Inspections Lloyd Ingram, VDOT John Whitacre, FCSA From: Ron Mislo�sky Date: August 22, 2005 Project Name/Subject: Northwest Regional Adult Detention Center PHR+A Project file Number: cc: E Memorandum The Regional Detention Center is having to provide temporary housing for sonic of Its inmates while waiting for the �Vork Release Facility (CCF) to be completed. We've prepared a site plan for a 7200 sq ft building to be situated just north of the CCF, adjacent to the existing access loop road. As all of the inmates to be hotised in this facility are existing, no additional parking is 1-equired. No new entrances to state roads are proposed. Utility extensions are shown on the plans. Watcr and sewer lines will be extended fi-om existing FCSA lines on site. Gas and electric sei-vices will be extended by those companies. Telephone/cable will be extended front the existing Regional Detention Facility system. Plans arc enclosed with County conlnlent sheets. Please let nle know if you have questions. /f 71 The following information must be included on your site plan. If your site plan is incomplete or is missing information, it will not be reviewed and returned to you for revisions. Administrative Information Y N ✓ 1. Name of proposed development. ✓ 2. Name, address, and phone number of owner. 3. Name, address, and phone number of developer. 4. Name, address, and phone number of designer. 5. Certificate of surveyor, engineer, or architect. 6. Date plan prepared and date of revisions. �v r\ 7. A listing of all conditions placed on the site as a result of a conditional use permit or conditional zoning approval. ✓ 8. A space labeled "Approved by the Zoning Administrator" for the approval signature and date of approval. 9. A description of setbacks or conditions placed on the site as a result of a variance approval. (Reference the variance application number.) General Site Information Y N 10. Location map (scale 1:2000) 11. Magisterial District 12. Scale of site plan (not to exceed 1:50) 13. North Arrow 14. Zoning of site 1� 15. Use, zoning, and Property Identification Number (PIN#) of all adjoining properties. This includes properties located across right-of-ways, streams, and railroad tracks. ✓ 16. Surveyed boundaries for all lots and parcels. 9 0 • General Site(con't Y N 17. Acreage of all lots included in the plan. ✓ 18. The location and dimensions of all required setbacks and yard areas. 19. The location and type of all dwelling units. 20. Location and description of all recreation facilities. 21. Location of sidewalks and pedestrian ways. 22. Location and area of common open space. 23. The location, height, and dimensions of all signs. 24. Location, height, and specifications of outdoor lighting fixtures. 25. Location and nature of outdoor storage areas. 26. Location of outdoor trash receptacles and dimensions of Of structure (fencing, etc.) required to enclose receptacles. Building Information Y N 27. The height of all buildings and structures. 28. Location of all buildings, structures and uses. �- 29. The proposed use of each building, structure and area. 30. Ground floor area and total floor area of all buildings with FAR calculations for commercial and industrial zoning districts. Roads Y N 31. Name and number of existing and planned streets on and adjoining the site. 32. Location of existing and planned streets on and adjoining the site. 33. Posted speed limit of existing adjacent roads. 34. Location and dimensions of all proposed entrances from public 0 right-of-ways. In n I� ✓ 35. Location of all entrances on adjoining roads within 200 feet of the proposed or existing entrance. 36. Dimensions, boundaries, width, pavement, and construction of planned roads. Utilities Y N 37. Location of all utilities, including sewer and water lines with the size of lines, mains, and laterals. ✓ 38. Location and width of all easements, including access, utility, and drainage easements. 39. Location and nature of fire lanes, fire hydrants, and all other facilities necessary to meet Fire Code requirements. Parking Y N 40. Calculations describing the required number of parking and loading spaces. c-� I 41. Location and dimensions of all parking and loading spaces, driveways, parking aisles, curbing and other features to be used. 42. Location and dimension of all disabled parking spaces and ramps. Natural Features Y N ✓ 43. Existing and finished contour lines. . 44. Location of steep slopes, woodlands, floodplains, wetlands, sinkholes, and other environmental features. ,� �� 45. Location of streams and drainage ways. Landscaping Y N 46. Landscaping plan describing location and types of plants to be used. 47. Location of required buffers and screening with cross sections or profiles. Erosion and Sediment Control Y N 48. A stormwater management plan with run off calculations and location and description of facilities to be used. 49. Soil erosion and sedimentation control plan describing the location and methods to be used to minimize erosion and sedimentation during development. 12