Loading...
HomeMy WebLinkAbout68-05 Stonewall Indus. Pk. No. 6 - Office - Warehouse - Stonewall - Backfile� o � v om cc -- o � 3 n RECEIVED FROM 1/ PDpRESS -1-1 i FOR ,\'LA?,-I)�r�A DATE ` i9 uJ 1�1ole-It' U 61 6011 /1Cklt16 CASH ACCOUNT AMT PAID CHECK t BALANCE I MDNEV UE ORDER NO. 4916 oi� DOLLARS $ Q w 1 BY �QS RECEIVED FROM ���J �✓ DATE NO. r 4916 ADpRESS C1 DOLLARS S FOR s_LR �A1{1 �pt�< <�.�.t `� •_.) �.�UJ 4 statea .. a CASH 7DE (� CHCK I J I MONEv I ORDER BY S SITE PLAN TRACKING SHEET Date: �^ S File opened L / Lo-�- Reference Manual updated/number assigned ct1 D-base updated q, l q' d 6- File given to Renee' to update Application Action Summary CLOSE OUT FILE: 5 Approval (or denial) letter mailed to applicant/copy made for file File stamped "approved", "denied" or "withdrawn" Q� Reference Manual updated b� D-base updated 11A File given to Renee' for final update to Application Action Summary 7� 1 U LScv\Common%Tracl:ing shxts\Snc Plan Tracking wpd Revised 02/07/03 i W SITE PLAN APPLICATION CHECKLIST The checklist shown below specifies the information which is required to be submitted as part of the site plan application_ The Department of Planning & Development will review the application to ensure that it is complete prior to accepting it If any portion of the application is not complete, it will be returned to the applicant(s). (1) One (1) set of approved comment sheets are required from each relevant review agency prior to final approval of a site plan. It is recommended that applicants contact the Department of Planning & Development to determine which review agencies' are relevant to their site plan application. A list of potentially relevant review agencies is shown below: Frederick County Department of Planning & Development Department of GIS (Geographic Information Services) �— Frederick County Sanitation Authority Frederick County Building Inspections Department ✓ Frederick County Department of Public Works Frederick County Fire Marshal Frederick County Health Department X Frederick County Department of Parks & Recreation —� Virginia Depummt of Transportation (VDDT) City of SVmchester Town of Stephens City Town of Middletown Frederick County / Winchester Airport Authority `--- (2) One (1) copy of the Site Plan application form. (3) Payment of the site plan review fee. (4) One (1) reproducible copy of the Site Plan (if required). Stonewall Industrial Park, Lot 6 Subject: Stonewall Industrial Park, Lot 6 Date: Thu, 10 Nov 2005 15:12:36 -0500 From: "Ingram, Lloyd"<Lloyd.Ingram@VDOT.Virginia.gov> To: "'ronald.mislowsky@plira.com"' <ronald.mislowsky@phra.com> CC: "Ingram, Lloyd" <Lloyd.Ingram@VDOT.Virginia. gov>, "Baluch, Stephen" <Stephen.Baluch@VDOT.Virginia.gov>, "'Mark Cheran (mclieran@co.frederick.va.us)"' <mcheran@co.frederick.va.us> Ref: Stonewall Industrial Park, Lot 6 McGhee Road, Route 861 (Future Extension) Frederick County This is to acknowledge receipt of your revised plans with latest revisions dated October 18, 2005 for the referenced project. The plans appear satisfactory and are approved. Please advise the developer accordingly. Note however that the following two VDOT standard details on the plans are not the latest versions (see the attached instructions to be sure you are downloading the latest revisions): Standard Sheet Latest Rev. Title Page Notes EC-3 1 of 2 Rev. 7/05 Soil Stabilization Mat, Ditch Installation Type A or B 114.03 Update on sheet 3 with revisions dated 7/05. CG-913 Rev. 1 /04 Standard Entrance Gutter for Use with Unpaved Space between Curb & Sidewalk 203.02 Update on sheet 5 with revisions dated 1/04. Please provide three (3) sets of approved construction plans with signed seal for VDOT distribution. I offer the following comments: • A preconstruction conference should be held by the engineer and/or developer with the attendance of the contractor, various County agencies and VDOT prior to initiation of work. • Materials used and method of construction shall apply to current observed VDOT Road & Bridge Specifications applicable during construction of this development. • Our review and comments are general in nature. Should conditions in the field exist such that additional measures are warranted, such measures shall be completed to the satisfaction of the Department prior to inclusion into the Secondary Road System. • Attached is a copy of the minimum requirements and information needed prior to acceptance of subdivision streets into the Secondary System. This is the responsibility of the developer. • All drainage is to be carried within the right-of-way in ditch lines or gutters along the street to a pipe or drainage easement. • The contractor shall notify VDOT when work is to begin or cease for any undetermined length of time. VDOT will also require 48 hours notice for inspections. • The appropriate land use permits shall be obtained before any work is performed on the State's right-of-way. The permit is issued by this office and will require a minimum processing fee, surety bond coverage, and the salary & expenses of a State assigned Inspector. • If mailboxes are to be placed along the roadway fronting lots, a minimum of 4' shall be between the edge of pavement and the front of mailbox as shown on VDOT standard RFD-1. • Any entrances constructed from the referenced streets shall meet VDOT minimum standards. This is the developer's responsibility. • Any signs to be installed will be in accordance with the plans and MUTCD requirements. • I suggest any utilities and/or storm sewer placed within the proposed right-of-way be backfilled completely with C.R. Type I 21-B Stone. This will greatly reduce the possibility of any pavement 1 of 2 12/9/2005 8:24 AM Stonewall Industrial Park, Lot 6 settlement. A copy of any/all recorded plats of dedication for drainage casements or additional right-of-way required for implementation of this proposed project should be provided to VDOT prior to issuance of any land use permit. Dedication should be made to the Commonwealth of Virginia. A copy of any/all RECORDED PLATS of dedication to public use (the County of Frederick) for drainage easements or additional right-of-way required for implementation of this proposed project should be provided for VDOT review prior to issuance of any land use permit. Should you need additional information, do not hesitate to contact me at 540-984-5611 or Mr. Stephen Baluch of our Winchester Office at 540-535-1823. <<Information Needed Prior to Acceptance of Subdivision Streets.doc>> <<Instructions for Downloading VDOT Road and Bridge Standards.doc>> Lloyd A. Ingram Transportation Engineer VDOT — Edinburg Residency Land Development 14031 Old Valley Pike Edinburg, VA 22824 (540) 984-561 1 (540) 984-5607 (fax) Name: Information Needed Prior to Acceptance of Subdivision Information Needed Prior to Acceptance of Subdivision Streets.doc Streets.doc Type: WINWORD File (application/msword) Encoding: base64 Instructions for Downloading VDOT Road and Bridge Standards.doc Name: Instructions for Downloading VDOT Road and Bridge Standards.doc Type: WINWORD File (application/msword) Encoding: base64 2 of 2 12/9/2005 8:24 AM 05 IRequest for Site Plan Comments • erick County EnQineerin2 Department Mail to: hand deliver to: Frederick County Engineering Dept. 107 N. Kent St. RECEIVED Attn: Director of Engineering Fourth Floor 107 N. Kent Street Winchester, VA Winchester, VA 22601 (540) 665-5643 (540) 665-5643 FREDERICK COUNTi PIBUC WORK & INSPECTI= Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach t� o (2) copies of the site plan Nvith this sheet. Applicant's Name: Patton Harris Rust & Associates, pc Address: c/o Ronald A. Mislowsky 117 E. Piccadilly Street Winchester, VA 22601 Phone Number: (540) 667-2139 Name of development and/or description of the request: Stonewall Industrial Park Lot 6 Location of property: South side of Route 861, 0.1 mile north of Route 869 Engineering Dept. use only Date received "10-5 Date revision received_ Incomplete t/x Incomplete Date reviewed Signature and Date ✓ Signature and Date (revisions) �.. �• ems, ,..;;: � ,_ Date approved 0 • • M Favy COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 665-6395 December 22, 2005 Mr. Ron Mislowsky Patton Harris Rust & Associates, PC 117 E. Piccadilly Street, Suite 200 Winchester, Virginia 22601 Re: Approval of Site Plan #68-05; Stonewall Industrial Park Lot 6 Propem. Identification Number (PI`).- 9EI9-58 u� Dear Ron: The above -referenced site plan was approved on December 22, 2005. The site plan is approved for the construction of a 7,500sf office/warehouse facility on McGhee Road. Required site improvements include the following: Construction of parking lot with 16 spaces (including one handicap accessible), including curb and gutter, a sidewalk, landscaped islands, striping, and handicap access. Construction of a dumpster pad within the enclosed storage area (with concrete pad). A gravel outdoor storage area with a six foot board -on -board fence for screening. I am providing you with four copies of the approved site plan. Please forward these copies to the appropriate representative(s). Furthermore, advise the owner(s) that a copy should be kept for future reference, and an approved copy must be kept on the construction site throughout the development process. Once site development is complete, the owner(s) should contact this office to schedule an on -site inspection. Do not hesitate to contact me if you have any questions or concerns. Sincerely, Candice E. Perkins, Planner II Attachments cc: Jane Anderson, Real Estate Patrick Barker, Economic Development Commission Lynda Tyler, Stonewall District Supervisor John Light, Stonewall District Planning Commissioner Greg Sowers, P.O. Box 179, Bloomery, WVA 26817 em: Charles DeHaven, Jr., Planning Commission Chairman CEP/bad 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 Patton Harris Rust & Psoclates Engineers. Surveyors. Planners. Landscape Architects. P R A 117 East Piccadilly Street H 1 Winchester, Virginia 22601 T 540.667.2139 F 540.665.0493 To Organization/Company: From: Date: Project Name/Subject: PHR+A Project file Number: cc: Candice Perkins Frederick County /71 Ron Mislows December 221005 Stonewall Lots 6/7 Memorandum We've revised the plans per the new lot lines and 6 copies are enclosed here for signature. Please call if you have questions. Patton Harris Rust Asociates Engineers. Surveyors. Planners. Landscape Architects. R+A 117 East Piccadilly Street Winchester, Virginia 22601 PH T 540.667.2139 F 540.665.0493 To: Candice Perkins Organization/Company: From: Date: Project Name/Subject: PHR+A Project file Number: Frederick County Planning Ron Mislows November 17, 2 C7 Stonewall Industrial Park, Lot 6 and 7 I have attached the approval letters from the County Agencies for this site plan. Please let me know when you are ready for plan sets for final approval. Memorandum • Request for Site Plan Comments Frederick County Inspections Department Mail to: Frederick County Inspections Dept. Attn: Building Official 107 N. Kent Street Winchester, VA 22601 (540) 665-5650 Hand deliver to: 107 N. Kent St. Fourth Floor r Winchester, VA 22601 (540) 665-5650 RECEIVED SEP 12 2005 FR 6MU,OJNN fMLIC WORK & INSPECTION. Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach one (1) copy of the site plan with this sheet. Applicant's Name: Patton Harris Rust & Associates, pc Address: c/o Ronald A. Mislowsky 117 E. Piccadilly Street Winchester, VA 22601 Phone Number: (540) 667-2139 Name of development and/or description of the request: Stonewall Industrial Park Lot 6 Location of property: South side of Route 861, 0.1 mile north of Route 869 Inspections Development's Inspection Dept. use only Date rcceivmed _ Date rc%,ision received Date approved D C� Incoplete _ Incomplete -- Date re icwcd _ Date rcvie�� cci Si L,nature and DateC/ _ Si, -,nature and Date (revision) • • Mail to: Frederick Co. Fire Marshal Attn: Director of Engineering 107 N. Kent St. Winchester, VA 22601 (540) 665-6350 Request for Site Plan Comments Frederick Countv Fire Marshal Hand deliver to: 107 N. Kent St. First Floor Winchester, VA (540) 665-6350 RECEIVED SO 1 2 200S Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the site plan with this sheet. Applicant's Name: Patton Harris Rust & Associates, pc Address: c/o Ronald A. Mislowsky 117E Piccadilly Street Winchester, VA 22601 Phone Number: (540) 667-2139 Name of development and/or description of the request: Stonewall Industrial Park Lot 6 Location of property: South side of Route 861, 0.1 mile north of Route 869 Fire Marshal's: Fire and Rescue Dept. use only Date rcce1ved'4-la-GS. Incomplete Date reviewed Jo—IF—QS _ Si,nature and Date Si(Inature and Date (revision) Date revision received Date approved 1 Incomplete Date revi �ved /tc $ r o a.. � x A- ti VIBGINIA Control number SP05-0071 Project Name Stonewall Ind. Park Lot 6 Address 117 E Piccadilly Street Type Application Site Plan Current Zoning M1 Automatic Sprinkler System Yes Other recommendation Emergency Vehicle Access Adequate Siamese Location Not Identified Emergency Vehicle Access Comments Access Comments Date received 9/12/2005 City Winchester Tax ID Number 49-19-58 uate revieweu 10/18/2005 Applicant P H R & A State Zip VA 22601 Fire District 13 Recommendations Automatic Fire Alarm System Yes Requirements Hydrant Location Adequate Roadway/Arsleway Width Adequate Additional Comments Fire hydrant shown provides adequate coverage. Applicant Phone 540-667-2139 Rescue District 13 Election District Stonewall Residential Sprinkler System No Fire Lane Required Yes Special Hazards No Plan Approval Recommended Reviewed By Signature _ Yes Tie PLANS A Q • Request for Site Plan Comments• Frederick Countv Engineering Department Mail to: Hand deliver to: Frederick County Engineering Dept. 107 N. Kent St. Attn: Director of Engineering Fourth Floor 107 N. Kent Street Winchester, VA Winchester, VA 22601 (540) 665-5643 RECEIVED C- ? H95 (540) 665-5643 FREDERICK COUNTY PUBLIC WORK & INSPECTIM Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the site plan with this sheet. Applicant's Name: Patton Harris Rust & Associates, pc Address: c/o Ronald A Mislowsky 117E Piccadilly Street Winchester, VA 22601 Phone Number: (540) 667-2139 Name of development and/or description of the request: Stonewall Industrial Park Lot 6 Location of property: South side of Route 861, 0.1 mile north of Route 869 Engineering De artment's Comments: +r ;r,' ^� Engineering Dept. use only i Date recei�-ed �� is Date re�-Ision received____ Incomplete_ Incomplete Date rcvie�`ed -�� �J Date re ed 7 Sicnature'and Date Si -,nature and Date (revisions) Ronald A. Mislowsky • From: Funkhouser, Rhonda [Rhonda.Funkhouser@VDOT.Virginia.gov] on behalf of Ingram, Lloyd [Lloyd.Ingram@VDOT.Virginia.gov] Sent: Thursday, November 10, 2005 3:13 PM To: 'ronald.mislowsky@phra.com' Cc: Ingram, Lloyd; Baluch, Stephen; 'Mark Cheran (mcheran@co.frederick.va.us)' Subject: Stonewall Industrial Park, Lot 6 Ref: Stonewall Industrial Park, Lot 6 McGhee Road, Route 861 (Future Extension) Frederick County Flus is to acknowledge receipt of your revised plans with latest revisions dated October 18, 2005 for the referenced )roject. The plans appear satisfactory and are approved. Please advise the developer accordingly. Note however that the .bllowing two VDOT standard details on the plans are not the latest versions (see the attached instructions to be sure you ire downloading the latest revisions): itandard Sheet Latest Rev. Title Page Notes 3C-3 1 of 2 Rev. 7/05 Soil Stabilization Mat, Ditch Installation Type A or B 114.03 Update on sheet 3 with revisions dated 7/05. �G-913 Rev. 1/04 Standard Entrance Gutter for Use with Unpaved Space between Curb & Sidewalk 203.02 Jdate on sheet 5 with revisions dated 1/04. ?lease provide three (3) sets of approved construction plans with signed seal for VDOT distribution. offer the following continents: • A preconstruction conference should be held by the engineer and/or developer with the attendance of the contractor, various County agencies and VDOT prior to initiation of work. • Materials used and method of construction shall apply to current observed VDOT Road & Bridge Specifications applicable during constriction of this development. • Our review and comments are general in nature. Should conditions in the field exist such that additional measures are warranted, such measures shall be completed to the satisfaction of the Department prior to inclusion into the Secondary Road System. • Attached is a copy of the minimum requirements and information needed prior to acceptance of subdivision streets into the Secondary System. This is the responsibility of the developer. • All drainage is to be carried within the right-of-way in ditch lines or gutters along the street to a pipe or drainage easement. • The contractor shall notify VDOT when work is to begin or cease for any undetermined length of time. VDOT will also require 48 hours notice for inspections. • The appropriate land use permits shall be obtained before any work is performed on the State's right-of-way. The permit is issued by this office and will require a minimum processing fee, surety bond coverage, and the salary & expenses of a State assigned Inspector. • If mailboxes are to be placed along the roadway fronting lots, a minimum of 4' shall be between the edge of pavement and the front of mailbox as shown on VDOT standard R17D-1. • Any entrances constructed from the referenced streets shall meet VDOT minimum standards. This is the developer's responsibility. • Any sighs to be installed will be in accordance with the plans and MUTCD requirements. • I suggest any utilities and/or storm sewer placed within the proposed right-of-way be backfdled completely with C.R. Type I 21-B Stone. This will greatly reduce the possibility of any pavement settlement. • A copy of any/all recorded plats of dedication for drainage easements or additional right-of-way required for implementation of this proposed project should be provided to VDOT prior to issuance of any land use permit. Dedication should be made to the Commonwealth of Virginia. 11/10/2005 . A copy of any/all R' CORDE PLATS of dedication to public use (the County of Frederick) for drainage easements or additional right -Way required for implementation of thie-oposed project should be provided for VDOT review prior to issuance of any land use permit. ')hould you need additional infornlation, do not hesitate to contact me at 540-984-5611 or Mr. Stephen Baluch of our Winchester Office at 540-535-1823. c<Information Needed Prior to Acceptance of Subdivision Streets.doc>> <<Instructions for Downloading VDOT Road and Bridge 3tandards.doc>> .loyd A. Ingram Cransportation Engineer VDOT — Edinburg Residency -and Development (4031 Old Valley Pike dinburg, VA 22824 .540) 984-5611 540) 984-5607 (fax) 11/10/2005 Revised 0812005 INFO"A TION NEEDED PRIOR TO ACCEPTANCE OF SUBDIVISION STREETS INTO STATE SECONDARY SYSTEM Subdivision streets may be considered eligible for acceptance into the State Secondary System when: • Built according to plans approved by the Department of Transportation, properly maintained since completion and • Rendering a public service [serving three (3) occupied dwellings or three (3) businesses per street]. THE FOLLOWING WILL BE REQUIRED TO BE FURNISHED TO VDOT (Edinburg Residency Office or Winchester Complex) AT LEAST THIRTY (30) DAYS PRIOR TO VDOT REQUESTING THE ADOPTION OF THE RESOLUTION BY THE BOARD OF SUPERVISORS REQUESTING THE ADDITION: 1. Three (3) copies of as -built construction plans showing: ■ Roadway Geometrics ■ Drainage & Drainage Easements 2. Three (3) copies of the final plats with date & place of recordation, deed book number and page number or instrument number. 3. Signed permits covering all utilities, publicly or privately owned, to occupy or cross the right-of-way and quitclaiming any prior rights. 4. Surety to guarantee workmanship and performance of material for one year from date of acceptance. Surety amount provided by VDOT Representative after acceptance of construction. Surety amount is based on mileage. It is necessary that the surety instrument be provided for one year, beginning the month of the County resolution. 5. Maintenance Fee — check payable to the "Virginia Department of Transportation". Maintenance Fee amount provided by VDOT Representative after acceptance of construction. Maintenance Fee based on mileage. 6. Administrative Cost Recovery Fee - check payable to the "Virginia Department of Transportation". Administrative Cost Recover Fee provided by VDOT Representative after acceptance of construction. Recovery Fee based on mileage. Patton Harris Rust & Assoc, pc • Er4meess, S�rxs, Plarmm, landscape Architects F C ESA ][117 Eut�cam 226Stree0 Stripe 200�► ._ Winches v 22601 T 540.667.2139 " �'`y1 PH 1p� F 540.665.0493 , I f t �; Nov 15 2�c5 Transmittal i�'� fL.Jd L; di To: John Whitacre Organization/Company: FCSA _ Address: P.O. Bog 1877 Winchester, VA 22604 Telephone Number: Date: November 15, 2005 From: Ron Misloaysky, P.E. Project Name/Subject: Stonewall Industrial Park Tots 6 Va: Intemal Project Fde #: Quantity He # Date Description Transmitted ❑ Herewith Construction Drawings for Approval ❑ Under separate cover Material ❑ Originals A,EV�,•t/ ❑ Photocopies `' /n� �—7+ ❑ Diskette /�/'%lq 0 / ���S 4 / ! ,�Q - - -- ❑ Shop Drawings ❑ Mylar ❑ Ozalid Prints C �/��+ ❑ Invoice ❑ Sepia of S,6�E��TS jk-� Purpose ❑ Your Use ❑ Your Files Notes: Z Approval J 3 Ve V _ ❑ Please Return. 0/4" /�Y.,6WA5/V,7 )q%/t 7W E oF;"" 5 /7;Zr ❑ Please Submit: *F��/ O%i L S� WZ4 T�� Revised Prints Received by: /6 1V411 0 5" Patton HarrihRust & Assoc ates,pc October 18, 2005 Candice Perkins Frederick County Planning 107 N. Kent Street Winchester, VA 22601 RE: Review Comments for Site plan #60-05; Stonewall Industrial Park Lot 6 Property Identification Number (PIN): 49-19-58 Dear Candice, We've revised the site plan per your comments. I've enclosed one set of plans here for your review and approval. Specific responses to each of your concerns are provided as PHR _ /� follows: 1 �1 1. On Sheet 2 under the project summary, the signage area needs to be changed from max area of 150sf to 100sf. e" `°'` Signage area has been revised. 2. On sheet 2 under the project summary, the minimum landscaped area is 25%, not 15°'w Minimum landscape area has been changed to 25%. 3. On sheet 2 under the project summary, the office needs to be parked at 1/250sf not 300sf. Parking calculations have been revised. 4. Provide the adjoiner information across McGhee Road as well as the complete information for lot 7. Adjoining owners have been added. 5. The outdoor storage area can only be screened by board -on -board fence or o° evergreen trees. The reference to chain link with slats needs to be removed. Also, the back portion of the storage area needs to be screened as well. Reference to chain link has been removed from fence note on page 2. 6 foot opaque board -on -board fence has been extended around the back portion of the storage area. A detail is also provided. 6. It appears that this parcel has already been created. The reference to the minor W. V :. •. - subdivision needs to be removed and the new surveyed boundary included (front needed also). While the minor subdivision to create these parcels has been recorded, the owners will further refine the common property line. The new line location is shown. The minor subdivision plat to further change these parcels is being prepared and will be submitted to the County for approval. E 0 7. Provide a breakdown of the Proposed building on sheet 2. A breakdown has been included on Page 2 in the summary. 8. Provide the legal references for all existing easements. The legal reference is provided for the easement and property lines shown. 9. The striping provided appears to be on the plan to direct traffic out of the parking area and back to McGhcc Road, but seems out of place for the vehicles that have to drive over it to get to the storage lot. The striping for traffic control has been removed. 10. The Leyland Cypress being used to careen the dumpster need to be a mirinnuin Pf—T� of six feet in height at time of planting. (see comment 12) A The Cypress used for dumpster screening have been relocated. The dumpster will be screened by the G foot board -on -board fence. 11. Provide a statement that the Fletz Holly must be three feet tall at time of planting. Hetz Holly note has been added to die planting schedule with the height shown. 12. The dumpster area should be screened by a continuation of the board -on -board fence and the Cypress "frees by placed elsewhere on the site (four foot height). Also, a few more trees should be added to the site for a better appearance or the relocation of other trees as noted on sheet 4. The dumpster is screened by board fence and the Leyland Cypress have been relocated. 13. Two entrances for one site seem excessive. Tlie parking and storage lot entrances should be configured so that only one entrance is needed. The owner believes this design is required for proper and safe vehicle circulation around the site. We've kept the two entrances as previously shown. If you have any further questions or concerns on tliese plans, please do not hesitate to call. Regards, PATTON HARRIS RUST & ASSOCIATES, pc o aid A. Mislowsky, P.C., VI Aft October 12, 2005 Mr. Ron Mislowsky Patton Harris Rust & Associates, PC 117 E. Piccadilly Street, Suite 200 Winchester, Virginia 22601 Ah Re: Review Comments for Site Plan #65-05; Stonewall Industrial Park Lot 6 Property Identification Number (PIN): 49-19-58 Dear Ron: Planning Staff has reviewed the above -referenced site plan to determine if administrative approval can be granted. At this time, administrative approval cannot be granted. This site plan is denied until the issues in this letter, as well as all issues of the other review agencies, have been adequately addressed. Please review Staffs comments listed below and then prepare a revised site plan which adequately addresses each concern. Review Comments: 1) Si na e. On sheet 2 under the project summary, the signage area needs to be changed from max area of 150sf to 100sf. 2) Landscaped Area. On sheet 2 under the project summary, the mini mum landscaped area is 25%, not 15%. 3) Parking Calculations. On sheet 2 under the project summary, the office needs to be parked at 1/250sf not 300sf. 4) Adjoining Properties. Provide the adjoiner information across McGhee Road as well as the complete information for lot 7. 5) Outdoor Storage Screening. The outdoor storage area can only be screened by board -on -board fence or evergreen trees. The reference to chain link with slats needs to be removed. Also, the back portion of the storage area needs to be screened as well. 6) Minor Subdivision. It appears that this parcel has already been created. The reference to the minor subdivision needs to be removed and the new surveyed boundary included (front needed also). 7) Office/Warehouse Use. Provide a breakdown of the proposed building on sheet 2. 8) Legal References. Provide the legal references for all existing easements. 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 Mr. Ron Mislowsky Patton Harris Rust & Associates, PC Re: Site Plan #65-05 October 12, 2005 9) Traffic Control/Striping. The striping provided appears to be on the plan to direct traffic out of the parking area and back to McGhee Road, but seems out of place for the vehicles that have to drive over it to get to the storage lot. 10) Dumpster Screening. The Leland Cypress being used to screen the dumpster need to be a minimum of six feet in height at time of planting. (see comment 12) 11) Parking Lot Screening. Provide a statement that the I-Ietz Holly must be three feet tall at time of planting. 12) Landscaping. The dumpster area should be screened by a continuation of the board -on -board fence and the Cypress Trees be placed elsewhere on the site (four foot height). Also, a few more trees should be added to the site for a better appearance or the relocation of other trees as noted on sheet 4. 13) Site Entrances. Two entrances for one site seem excessive. The parking and storage lot entrances should be configured so that only one entrance is needed. After you have revised the site plan, please resubmit one copy so that I may verify the information contained on the plan. I will need all approved review agency comment sheets and at least five copies of the final plan for final administrative approval. Comment sheets are required from the following agencies: the Frederick County Inspections Departn7ent, the Frederick County Engineer, the Frederick County Fire kfarshal, the Frederick County Sanitation Authority, and the Virginia Department of Transportation. Do not hesitate to contact me if you have any questions or concerns regarding this letter. Sin erely, andice E. Perkins Planner II Attachment CEP/bad cc: Greg Sowers, P.O. Box 179, Bloomery, WVA 26817 � f The following information must be included on your site plan. If your site plan is incomplete or is missing information, it will not be reviewed and returned to you for revisions. ,✓Administrative Information Y N ✓ 1. Name of proposed development. 2. Name, address, and phone number of owner. 3. Name, address, and phone number of developer. 4. Name, address, and phone number of designer. ✓ 5. Certificate of surveyor, engineer, or architect. 6. Date plan prepared and date of revisions. 7. A listing of all conditions placed on the site as a result of a conditional use permit or conditional zoning approval. 8. A space labeled "Approved by the Zoning Administrator" for the approval signature and date of approval. JL A 9. A description of setbacks or conditions placed on the site as a result of a variance approval. (Reference the variance application number.) General Site Information Y N 10. Location map (scale 1:2000) ✓ 11. Magisterial District 12. Scale of site plan (not to exceed 1:50) 13. North Arrow 14. Zoning of site 015. Use, zoning, and Property Identification Number (PIN#) of all adjoining properties. This includes properties located across right-of-ways, streams, and railroad tracks. Surveyed boundaries for all lots and parcels. 6 General Site (con't Y N 17. Acreage of all lots included in the plan. 18. The location and dimensions of all required setbacks and yard areas. ,ter n 19. The location and type of all dwelling units. /J f q 20. Location and description of all recreation facilities. 21. Location of sidewalks and pedestrian ways. 22. Location and area of common open space. The location, height, and dimensions of all signs. 24. Location, height, and specifications of outdoor lighting fixtures. Location and nature of outdoor storage areas. -,SC ✓ 6? Location of outdoor trash receptacles and dimensions of structure (fencing, etc.) required to enclose receptacles. Building Information Y N 27. The height of all buildings and structures. 28 Location of all buildings, structures and uses. 29. The proposed use of each building, structure and area. _ ✓ 30. Ground floor area and total floor area of all buildings with FAR calculations for commercial and industrial zoning districts. Roads Y/ N 31. Name and number of existing and planned streets on and adjoining the site. 32. Location of existing and planned streets on and adjoining the site. 33. posted speed limit of existing adjacent roads. 34. Location and dimensions of all proposed entrances from public right-of-ways. H 35. Location of all entrances on adjoining roads within 200 feet of the proposed or existing entrance. I/ 36. Dimensions, boundaries, width, pavement, and construction of planned roads. Utilities Y N 37. Location of all utilities, including sewer and water lines with the size of lines, mains, and laterals. G3) Location and width of all easements, including access, utility, and drainage easements. uya 11-�. 39. Location and nature of fire lanes, fire hydrants, and all other facilities necessary to meet Fire Code requirements. Parking Y N ✓ 4(� Calculations describing the required number of parking and loading spaces. 0-- c-( Lu s ` 41. Location and dimensions of all parking and loading spaces, driveways, parking aisles, curbing and other features to be used. 42. Location and dimension of all disabled parking spaces and ramps. Natural Features Y N 43. Existing and finished contour lines. 44. Location of steep slopes, woodlands, floodplains, wetlands, sinkholes, and other environmental features. /h l n 45. Location of streams and drainage ways. Landscaping Y N 46. Landscaping plan describing location and types of plants to be used. 47. Location of required buffers and screening with cross sections or profiles. Erosion and Sediment Control Y N 48. A stormwater management plan with run off calculations and location and description of facilities to be used. 49. Soil erosion and sedimentation control plan describing the location and methods to be used to minimize erosion and sedimentation during development. 12 0 0 SITE PLAN APPLICATION Department of Planning 1 Date application received d LO-V- -T Complete. Date of acceptance Incomplete. Date of return. Use only. Application # SEP 1 4 2005 1. Project Title: Stonewall Industrial Park Lot 6 2. Location of Property: South side of Route 861, 0.1 mile north of (Address): Route 869. 3. Property Owner: Greg Sowers & Gary Dove Address: P.O. Box 179 Bloomery, WV 26817 Telephone: 304-856-3652 4. Applicant/Agent: Patton Harris Rust & Associates, pc Address: 117 E. Piccadilly Street Winchester, VA 22601 Telephone: 540-667-2139 5. Designer: Patton Harris Rust & Associates, pc Address: 117 E. Piccadilly Street Winchester, VA 22601 Telephone: 540-667-2139 Contact: • 6a. Is this a standard or `minor' site plan? 6b. Is this an original or revised site plan? 7a. Total acreage of parcel to be developed: 7b. Total acreage of parcel: 8. Property Information: a) Property Identification Number: b) Current Zoning c) Present Use: d) Proposed Use: e) Adjoining Property Use(s) f) Adjoining Property Identification Number (s) g) Magisterial District (s) • Standard X Minor Original X Revised 2.5 acres 2.5 acres 43-19-58 M1 Vacant Office/warehouse Industrial 43-19-54, 49, 31 I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to the submission of my site plan. Signature Date �' Special Limited Power of Attorney County of Frederick, Virginia Frederick Planning Web Site: www.co.frederick.va.us Department of Planning & Development, County of Frederick, Virginia, 107 North Kent Street, Winchester, Virginia 22601 Phone 540-665-5651 Facsimile 540-665-6395 Know All Men By Those Present: That I (We) (Name) Greg Sowers (Phone) 304-856-3652 (Address) P.O. Box 179 Bloomery WV 26817 the owner(s) of all those tracts or parcels of land ("Property") conveyed to me (us), by deed recorded in the Clerk's Office of the Circuit Court of the County of Frederick, Virginia, by Instrument No. on Page , and is described as Inst. Yr. 2005 Inst. 8976 Parcel:58 Lot: Block:19 Section:43 Subdivision: do hereby make, constitute and appoint: (Name Ronald A. Mislowsky, PHRA Phone: 540-667-2139 (Address)117 E. Piccadilly Street Suite 200 Winchester VA 22601 To act as my true and lawful attorney -in -fact for and in my (our) name, place, and stead with full power and authority I (we) would have if acting personally to file planning applications for my (our) above described Property, including: Rezoning (including proffers) Conditional Use Permits Master Development Plan (Nrehininary and Final) Subdivision X Site Plan My attorney -in -fact shall have the authority to offer proffered conditions and to make amendments to previously approved proffered conditions except as follows: This authorization shall expire one year from the day it is signed, or until it is otherwise rescinded or modified. In witness th eo , I (we) ha^Aeretq)set W (our) hand and seal this 1 Z44' day of _, 200 Signature(s State of Virginia, City/County of LA-) \1 ,To -wit: I, jn�Ipry� Notary Public in and for the jurisdiction aforesaid, certify that the person(s) who signed to the foregoing instrument personally appeared before me and has acknowledged the same before mein the jurisdiction aforesaid this IZt", day of5; 200 e� Request For Site Plan Comments Department of Planning and Development Mail to: Hand deliver to: Department of Planning and Development 107 N. Kent St. Attn: County Planner Fourth Floor 107 N. Kent Street Winchester, VA Winchester, VA 22601 (540) 665-5651 (540) 665-5651 ,4 Please fill out the information as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the site plan N� ith this sheet. Applicant's Name: Patton Harris Rust & Associates, pc Address: c/o Ronald A. Mislowsky 117 E. Piccadilly Street Winchester, VA 22601 Phone Number: (540) 667-2139 Name of development and/or description of the request: Stonewall Industrial Park Lot 6 Location of property: South side of Route 861, 0.1 mile north of Route 869 Planning and Development's Comments: Planning and Development use only Date received Incomplete Date reviewed Signature and Date Signature and Date (revisi Date revision received Incomplete Date reviewed Date approved Patton Harris Rust & Associate* • Engineers, Surveyors, Planners, Landscape Architects 117 East Piccadilly Street, Suite 200 R+A 'Winchester, Virginia 22601 T 540.667.2139 PH F 540.665.0493 Memorandum To: Mark Cheran, Planning Joe Wilder, Public Works Tun Welsh, Fire and Rescue John Trenary, Inspections Lloyd Ingram, VDOT John Whitacre, FCSA From: Ron Mislows Date: September 9, 200 Project Name/Subject: Stonewall Industrial Park Lot 6 PHR+A Project file Number: cc: Greg Sowers Gary Dove We've prepared plans for an office/warehouse facility on McGhee Road in Phase 3 of the Industrial Park The roads, sewer and water were extended some time ago. VDOT has not yet accepted the road for maintenance. Water and sewer services are shown. Other utilities, gas, electric and telephone will also be run to the building underground. One fire hydrant is proposed at the north end of the site. No fire service is required. Storm runoff discharges to existing detention pond at the rear of the site. A Grading and Erosion Control Plan was previously approved for the site. A detailed planting plan is provided. The adjoining properties to the south are zoned M1. A 6 foot opaque fence is required around the storage yard. Two access points are provided to state roads VA Route 861 (McGhee RoadO. Though both entrance are two way, the access around the building will be one way, clockwise. An access easement to Lot 7 is provided in order that that future use can utilize our western entrance If during your review any questions arise, please do not hesitate to call.. Document Approval Form PLEASE REVIEW THE ATTACHED DOCUMENT. IF THIS DOCUMENT MEETS YOUR APPROVAL PLEASE INITIAL AND PROVIDE THE DATE AND TPAE OF YOUR APPROVAL. IF THIS DOCUMENT DOES NOT MEET YOUR APPROVAL PLEASE PROVIDE COMMENTS AS TO RWAT YOU WOULD LIKE TO HAVE COMPLETED. INITIALS DATE & TIME Candice Bernie Mark Susan Eric Mike Kevin John COMMENTS: Received by Clerical Staff (Date & Time):