Loading...
HomeMy WebLinkAbout80-07 Sherando Towne, Lot 4 - Restaurant - Opequon - Backfile (2)CONSTRUCTION NOTES GENERAL 1. The contractor shall furnish all materials, labor and equipment and perform all work including restoration for the completed installation of the utility systems and all other improvements shown or implied as necessary for the completed facility ready for use. Unless otherwise noted, specifications for all work to be in accordance with applicable Standards and Construction Specifications of The Virginia Department of Transportation, Virginia Department of Health, Frederick County Sanitation Authority and the contract documents. 2. The engineer has attempted to locate existing subsurface utilities; however, such may exist that are not shown. e hall be the to avoid damage to an y utilities. An damn s contractor shall exercise care in this work so as v The co 9 9 Y Y contractor's tractors responsibility. The contractor shal l notify all utility companies s 72 hours prior to construction. struction. Call "Miss Uti lity " 1-800-552-7001. 6, The contractor shall be responsible for all construction truction stakeout. All di mensions, elevations and locations shall i r be innin the work. The Engineer will ap prove all cut sheets. be verified in the field by each contractor pro to g g g pp 4. Any unusual subsurface conditions encountered during the course of the work shall be Immediately brought to the attention of the Engineer and/or the Owner. 5. Contractor to obtain, at his expense, all permits required of this work and shall faithfully adhere to the permit conditions imposed. oct area. An work pe rformed offsite is the Co ntractor's responsibility. A radin for improvements ents to be confined to the project 6. 119 9 P P 1 Y P 7. Cutsheets shall be submitted to the En ineer for approval prior to ordering structures and start of construction. q In f utility, structure or road and offset hub elevation. All cutsheets should show existing round elevations at centerline o y, , 99 FREDREICK COUNTY SANITATION AUTHORITY 1. The Authority's Water and Sewer Standards and Specifications are available at www.fcsa-water.com. 2. The water and sanitary sewer portion of these plans are valid for two years from date of FCSA approval. 3. The contractor shall adhere to the standards and specifications in effect at the time of construction. 4. The contractor shall coordinate with, and arrange for inspection by, the Authority. 5. The contractor shall tie-in a new sewer line to an existing manhole by core drilling the manhole. 6. When an existing water (or forced sewer) main is tapped for the installation of a new line: a. The Authority shall furnish all labor and material. b. The contractor must: 1. make application and pay deposit 2. mark the tap location 3. coordinate installation with the engineering -assistant. 7. Exact locations of water and sewer services on new lines are to be coordinated with the Authority's inspector. 8. The Authority's maintenance department shall furnish and install all water meters through 2" in size. It is the contractor's responsibility to have the meter box assembly installed correctly. Before a permanent meter is installed: a. The meter box, with its frame and cover, must be properly aligned with the coppersetter. b. The frame and cover shall be set to final grade. c. The distance between the top of the cover and the coppersetter shall to be between 18 and 21 inches. d. All components of the meter box assembly shall be in proper working order. 9. For water and sewer services that connect to existing lines: a. The location of the service lateral is to be coordinated with the Authority's engineering assistant. b. An Application for Service must be made and fees paid before work will begin. c. The Authority shall furnish and install all 5/8", 3/4" and 1" water services. d. For all 1 1/2" and 2" water services, the Authority shall make the tap and bring the piping to the property line. The contractor shall furnish and install the meter vault assembly. The Authority will install the meter. C. The Authority will install all sewer laterals. 10. Any water service line must have a backflow prevention assembly (detector double check valve or RPZ, as required). The assembly must meet ASSE standard No. 1015 or 1013. 11. All fire lines shall have a backflow prevention assembly (double check valve or RPZ, as required. The assembly shall meet ASSE standard No. 1048 or 1047. Any exterior, privately owned fire line shall also have a fire service meter. This assembly shall be installed immediately before the backflow prevention unit. Radio read remotes are required. 12. FCSA to review the mechanical plan(s) for design and material approval of: 1) the domestic water meter and its backflow prevention device, and/or 2) the fire service line's backflow prevention device. FIRE & RESCUE 1. Burning of land clearing debris requires a permit from the Fire Marshal. Burning of construction debris on site is prohibited. 2. Access for emergency vehicles must be maintained at all times during construction. Temporary street signs and addresses must be posted as construction begins. Parked vehicles and staging of construction materials are prohibited within 20' of fire hydrants. Fire Hydrants are not to be obstructed at any time. VIRGINIA DEPARTMENT OF TRANSPORTATION V1. All work on this project shall conform to the current editions of and latest revisions to the Virginia Department of Transportation (VDOT) Road and Bridge Specifications and Standards, the Virginia Erosion and Sediment Control Regulations, and any other applicable state, federal or local regulations. In case of a discrepancy or conflict between the Standards or Specifications and Regulations, the most stringent shall govern. V2. All construction shall comp) with the latest U.S. Department of Labor, Occupational Safety and Health Administration (OSHA, and Virginia Occupational Safety & Health (VOSH) Rules and Regulations. V3. When working within VDOT right-of-way, all traffic control, whether permanent or temporary, shall be in accordance with the current edition of VDOT?s Work Area Protection Manual. Furthermore, all traffic control floggers must be certified in accordance with Section 104.04(c) of the VDOT Road and Bridge Specifications. V4 The developer shall be responsible for relocating, at his expense, any and all utilities, including traffic signal poles, junction boxes, controllers, etc., owned by VDOT or private / public utility companies. It is the sole responsibility of the developer to locate and identify utility facilities or items that may be in conflict with the proposed construction activity. VDOT approval of these plans does not indemnify the developer from this responsibility. V5. Design features relating to field construction, regulations, and control or safety of traffic may be subject to change as deemed necessary by VDOT. Any additional expense incurred as a result of any field revision shall be the responsibility of the developer. V6. Prior to initiation of work, the contractor shall be responsible for acquiring all necessary VDOT land use permits for any work within VDOT right-of-way. V7. If required by the local VDOT Residency Office, a pre -construction conference shall be arranged and held by the engineer and/or developer with the attendance of the contractor, various County agencies, utility companies and VDOT prior to initiation of work. V8. The contractor shall notify the local VDOT Residency Office when work is to begin or cease for any undetermined length of time. VDOT requires and shall receive 48 hours advance notice prior to any required or requested inspection. V9. The contractor shall be responsible for maintaining adequate access to the project from the adjacent public roadway via a construction entrance that is constructed and maintained in accordance with Section 3.02 of the Virginia Erosion and Sediment Control Handbook. Furthermore, access to other properties affected by this project shall be maintained through construction. The Developer shall have, within the limits of the project, an employee certified by the Virginia Department of Conservation and Recreation (VDCR) in Erosion and Sediment Control who shall inspect erosion and siltation control devices and measures on a continuous basis for proper installation and operation. Deficiencies shall be promptly rectified. V10. Contractor shall ensure adequate drainage is achieved and maintained on the site during and at the end of construction. V11. All water and sewer lines within existing or proposed VDOT right-of-way shall have a minimum thirty - six (36) inches cover and when possible shall be installed under roadway drainage facilities at conflict points. V12. Any unusual subsurface conditions (e.g., unsuit able soils, springs, sinkholes, voids, caves, etc.) encountered during the course of construction shall be immediately brought to the attention of the engineer and VDOT. Work shall cease in that vicinity until an adequate design can be determined by the ergineer and approved by VDOT. V13. All fill areas, borrow material and undercut areas shall be inspected and approved by a VDOT representative prior to placement and fill. Where CBR testing is required, a VDOT representative shall be present to insure the sample obtained is representative of the location. When soil samples are submitted to private laboratories for testing, the samples shall be clearly identified and labeled as belonging to a project to be accepted by VDOT and that testing shall be performed in accordance with all applicable VDOT standards and procedures. I; I, I 1 I I I { I•' 1 I I I ,I 1 II .I f.. LI ,► II I I I I , I I 11 I I I li I I 1 II I I I Site Plan llliplll I luul'IIIIII%I I v , I I I I I I. I I. I I , II........... 1 I i II I I 1 I I I ,b 1 , „ I :� If 'I I I I. I I lip ,,,,IIII I I , I I 'I I: i I I I I i II. I , IL I ,, IIIIII ,,,1 III II I I I I I. 1 1 I. , � ,;Ill I I ill) I,II a �"��',� 'I I'{r,,Ir } I'I,,..,I� IIlll�lllllllil� ., III III ,; I I,I II II' 31�4 "I SIP IP' 1 d , :.,ani. I Illn,' ...a.l o,..,. „nd . hu,. I IIIIL�.: IL,,., : ' ....... IIUr' Ih,r t,. :., I 1 be II:II . I : , L,. .1,.. %V . TAX MAP #,- 006-A-102F Zoned: B 2 Pro-NYT-Nosed Use.- Restaurant V14. All roadway fill, base, subgrade material, and backfill in utility/storm sewer trenches shall be compacted in six (6) inch lifts to 95% of theoretical maximum density as determined by AASHTO T - 99 Method A, within plus or minus 2% of optimum moisture for the full width of any dedicated street right -of -way. At the direction of VDOT, density tests shall be performed by a qualified independent agency in accordance with VDOT Road and Bridge Specifications. Certified copies of test reports shall be submitted to VDOT daily, unless specified otherwise. V15. VDOT Standard CD and UD underdrains shall be installed where indicated on these plans and/or as specified by VDOT. V16. The installation of any entrances and mailboxes within any dedicated street right-of-way shall meet VDOT on design standards and is the responsibility of the developer. V17. Prior to VDOT acceptance of any streets, all required street signage and/or pavement markin'!ls shall be installed by the developer or, at VDOT's discretion, by VDOT on an account receivable basis following the Manual On Uniform Traffic Control Devices. V18. The developer shaii provide the VDOT Residency Office with a list of all material sources p rior to the start of construction. Copies of all invoices for materials utilized within any dedicated street right-of-way must be provided to the local VDOT Residency Office prior to acceptance of the work. Unit and total prices may be obscured. V19. Aggregate base and subbase materials shall be placed on subgrade by means of a mechanical spreader. Density will be determined using the density control strip in accordance with Section 304 of the VDOT Road and Bridge Specifications and VTM-10. A certified compaction technician shall perform these tests. Certified copies of test reports shall be submitted to VDOT daily, unless specified otherwise. In addition to checking stone depths, a VDOT representative shall be notified and given the opportunity to be present during the construction and testing of the density control strip. V20. Asphalt concrete pavements shall be placed in accordance with Section 315 of the VDOT Road and Bridge Specifications. Density shall be determined using the density control strip as specified in Section 315 and VTM-76. A certified compaction technician shall perform these tests. Certified copies of test reports shall be submitted to VDOT daily, unless specified otherwise. A VDOT representative shall be notified and given the opportunity to be present during the construction and testing of the control strip. V21. In accordance with Section 302.03, the foundations for pipe culverts thirty- six (36) inches and larger shall be explored below the bottom of the excavation to determine the type and condition of the foundation. The contractor shall report findings of foundation exploration to the engineer and VDOT for approval prior to placing pipe. Foundation designs shall comply with VDOT Road and Bridge Standard PB-1. Where soft, yielding, or otherwise unsuitable foundation is encountered, the foundation design and/or need for foundation stabilization shall be determined by the engineer and approved by VDOT. V22. The foundations for all box cul verts shall be investigated by means of exploratory borings advanced below proposed foundation elevation to determine the type and condition of the foundation. The contractor shall submit copies of borehole logs and report findings of foundation exploratio n to the engineer and VDOT for approval prior to constructing box. Foundation designs shall comply with VDOT Road and Bridge Standard PB-1. Contrary to the Standard, where rock is encountered and cast -in -place box is proposed, the thickness of bedding shdl be six (6) inches. Where soft, yielding, or otherwise unsuitable foundation is encountered, the foundation design and/or need for foundation stabilization shall be determined by the engineer and approved by VDOT. V23. Approval of these plans shall expire three (3) years from the date of the approval letter. V24. VDOT Standard CG-12 Curb Ramps shall be installed where indicated on these plans and/or as specified by VDOT. V25. VDOT Standard Guardrail shall be installed where warranted and/or as propo sed on these plans in accordance with VDOT's installation criteria. Final approval of the guardrail layout to be given by VDOT after grading is mostly complete. Vicinity Map Scale 1 "= 2000' OCTOBER 8, 2007 REVISED: DECEMBER ',3, 2007 Owner/ Developer: Sherando Towne Centre, LLC P.O. Box 2715 Winchester, Virginia 22604 (540) 667-2120 LOCAL UTILITIES Frederick County Sanitation Authority P. 0. Box 1877 Winchester, Virginia 22604 (540) 868-1061 P.O.C. John Whitacre Allegheny Power 3463 Valley Pike Winchester, Virginia (540) 722-5852 Verizon 404 Hillandale Lane Winchester, Virginia (540) 665-3156 22604 P.O.C. Cindy Laing 22602 P.O.C. Tim Kelly Comcast 1039 N. Frederick Pike Winchester, Virginia 22601 (540) 667 0364 P.O.C. Art Coleman Shenandoah Gas P. 0. Box 2400 Winchester, Virginia (540) 869-1111 22604 P.O.C. Tim Hockman RESPONSIBLE LAND DISTURBER: NAME: CERTIFICATION #: DATE: THE RESPONSIBLE LAND DISTURBER IS THAT PARTY RESPONSIBLE FOR CARRYING OUT THE LAND DISTURBING ACTIVITY AS SET FORTH IN THE PLANS. ,SHEET INDEX 1 COVER SHEET 2 SITE PLAN 3 GRADING & EROSION CONTROL PLAN 4 LANDSCAPING AND LIGHTING PLAN 5 STORK AND UTILITY PROFILES & DETAILS 6 DETAILS EROSION CONTROL 1. Prior to initiating any land disturbing activity, it will be necessary to schedule an on -site pre -construction meeting with public works staff to discuss the approved erosion and sediment control plan. No pre -construction meetings will be scheduled prior to issuance of the land disturbance permit for the subject project. 2. °contractor to contact the public works department to schedule the required erosion and sediment control measures inspections as indicated by the program administrator. If the erosion and sediment control measurers have been installed in accordance with the approved plan, the Department of Public Works will grant approval to initiate land disturbing activities. 3. Prior to release of building permits, the following items shall be completed: a) Subdivision shall be stabilized in accordance with the approved plan (i.e., road surface, stormwater conveyance system, curb and gutter, sidewalks, channel linings, vegetative cover, stc.) b) Submittal of certified as -built of thr subdivision which contains the following items: stormwater conveyance system, curb and gutter, drainage channels and ditches, stormwater pond. A letter from the engineer -of -record shall be included with the cis -built which states that the subdivision has been constructed in accordance with the approved plan. c) Individual subdivision lot grading plans shall be submitted by the builder at the time of the building permit application for each lot proposed for construction. 4. Temporary and permanent erosion control structures and methods to be in accordance with the Virginia Erosion Control Guidelines and local ordinances and to be utilized during the construction period. 5. All erosion control structures shown or as required during construction shall be continuously maintained throughout the period in which areas are denuded. Areas shown to be surfaced are to have stone base installed at the earliest possible date after establishing grade. No area is to remain denuded for more than 7 calendar days when construction is not in progress. 6. Contractor to clean up and restore disturbed areas immediately upon completion of pipe -laying in the affected area. 7. All unpaved areas of the site which are disturbed by this construction shall be provided with 6" topsoil, ferti;:zed, seeded, compacted and mulched. Seed bed to be watered and cared for as necessary to provide a good lawn quality grass cover. Areas not graded shall be disced, leveled and seeded to achieve lawn conditions. Patton Harris Ruse & Associates,pc Engineers. Surveyors. ., PlannE�rs. Landscape Architects. Approved by Frederick County Zoning Administrator 117 East Piccadilly Street, Suite 200 + Winchester, VA 22601 T 540.667.2139 F 540.665.0493 P\11 H p .ZRONALD A. MISLOWSKY, JR. Z 0 NO. 020674 0 a Site Plan Approval Valid for 5 Years From Date Shown Hence Date Project Number: Sheet Number- 12536-2-0 1of 6 --;f r T 11. 86-A- i02H t THE MARATHON BANK � � ` � v " 0.97 Ac. L �� 1 � ' ` I r - y.'vINST. 060005'6 l/ 1 ONE: 62 ri ( `--__ � .--•-�Y'�--- ..._,,. ""- T.M. 86-A-1021 c WARRIOR COMMONS d_LC C}� 0, 98 Ac. fl INST. # 060012071 ACV ZONE: 82 LAN E A STATE P VIRGIN all - N AD 83 CZ) ED _"_`"':`=:.----`-.,,---:'_- -__ .. _, ! y ``.`-.._.__"., I _..-` _.._._... ""--""' /fig C. /4, "`' ���-.,.__! '.. ~, � •``.,,. ` '` I f . i RAMP t CON TO VERIFY ELEVATION E-XJSTING--WALK-1NG T-RAfL- AND-__----..-._ __ ENSURE THAT SLOPE OF RAMP --� --`` j NOT EXCEED 1:12. HIKE "�z- a _``EX 47SAN. ~ / LAT. STUB, 7 a \ ¢ _ 0.0 . u 1'.i ram -- " f DIIM#TS �=- . % _.. - --_ CONN TO `EX: 4 (A SAN.?LAT. , TUB �. .. --•..,.`, I �, -. \ EX INV 746.55 MENU I ; 3� 8. SIGN R. L. �STOP I I � _ 1 /p M � Oa a • J ; CG 12B i � I i" '` . . - �1.-.1.,... /i .j�.� ~/'\.`" i% .:,-, ` ,r1. ~'r,. cn DO I t ENTER ; RESTAURANT Co ONE s }}rnONE SIGN 2500 SQ FT INDOOR .....,. % .... \-- AA I ,.. , STOP SIGN 98 N10 45 34 E _ _ _ _ _� INST. #-00157511 - Culvert Summary Culvert Inv. In Inv. Out L(ft) D(in.) SON Type 1 744.49 744.32 17 15 1.00 CPP 2 745.56 744.69 87 15 1.00 CPP 3 745.99 745.76 23 15 1-00 CPP 4 747.16 746.19 97 15 1.00 CPP 5 749.00 747.69 131 15 1.00 CPP NOTE ALL CPP IS TO BE GRUMPLER SMOOTHCQRE OR EQUIVALTENT. Storm Inlet Summary Str. No. Inv. In Inv. Out Inv. In Top Elv. Type Throat 1 744.69 744.49 747.69 751.50 DI-3C 6 2 745.76 745.56 - 750.40 DI-1 - 3 746.19 745.99 - 750.68 DI-1 - 4 - 747.16 -- 751.00 DI-1 - 5_T -- 749.00 - 751.8Q DI-1 T - 400 SQ. FT. 'PATIO 2900 SQ. FT. TOTAL -6" GATE VALVE GREASE 6" FIRELINE TRAP D 2" WTR SERVICE OD 1 1 /2" WTR METER o ' Yl SIDEWALK 4' o CROSSWALK ! -- - 8W---V_-N10'45'34 487.65' PART OF T.1. 86-A 102A 11.6348 Ac. G.B. 740, 43. 515 - D.B. 768, PG.17, EX. FH 4 ZONE: B2 J� i [ CIO ¢ i C-) f, STOP SIGN 8183� . loon-� %AND BAR IcSil a EX. FH GR4plylcScWhL ' 20 10 0 20 40 !N FEET 1 inch = 20 ft. CONCRETE STONE ''1'1 III MUM SEMON'1 1.5" SM12.5A 3" BM25 OVER PRIME COAT - 8" VDOT 21 B i- WELL COMPACTED SUBGRADE n" CNIIn CA 1B ,OMPACTED SUBGRADE HEAVY PAVEMENT SECTION STANDARD PAVEMENT SECTION Not to Scale Not to Scale TAX IDENTIFICATION NUMBER 86-A-102F EXISTING PARCEL AREA 0.82 ACRES DEVELOPED PARCEL AREA 0.82 ACRES ZONING B2 ADDRESS WARRIOR DRIVE CURRENT USE VACANT PROPOSED USE RESTAURANT DISTURBED AREA 0.6 ACRES SETBACKS REQUIRED PROVIDED FRONT (Warrrior Drive) 35' 37.24' RIGHT SIDE 0 81.8, LEFT SIDE 0 82.0' REAR 0 77' PARKING 5' 10' BUILDING HEIGHT 35' (MAX.) 24'(+/-) GROUND BOOR AREA 2,50. 0 S,(,Fr-- PATIO AREA SQ.FT, TOTAL AREA 2,900 SQ.FT. NUMBER OF STORIES 1 (24' f} FAR ALLOWED 1 FAR PROVIDED 0.08 MINIMUM LANDSCAPED AREA 0.12 AC. (15%) LANDSCAPED AREA PROVIDED 0.15 AC. (187) DRIVE -THROUGH LENGTH REQUIRED 90 FT. DRIVE -THROUGH LENGTH PROVIDED 100 FT. PARKING REQUIRE PROVIDED LOT 4 STANDARD SPACES (1.4/100) 39 20 LOT 4 HANDICAP SPACES 2 2 SHERANDO TOWNE CENTRE 212 231 TOTAL SPACES 253 253 LOT 4 LOADING SPACES 0 0 NOTES: 1. ALL SIGNS INSTALLED ON THE PROPERTY WILL COMPLY WITH THE REQUIREMENTS OF THE FREDERICK COUNTY ZONING ORDINANCE. SIGNS ARE REQUIRED TO HAVE A PERMIT. 9GNS- SHALL BE LOCATED 3 FT. FROM FACE OF CURB AND 10 FT. FROM OP. LINES. MAX. SIGN HEIGHT= 35'. MAX. SIGN AREA= 100 S.F. 3. ALL LIGHTING IS TO BE CONTROLLED TO PREVENT OFF -SITE GLARE. 4, ALL REQUIRED EGRESS SHALL BE HANDICAP ACCESSIBLE TO MINIMUM EXTERIOR LANDING, AND 50% OF THE ENTRANCES SHALL BE ACCESSIBLE. 5. HANDICAPPED SPACES AND ACCESSIBLE ROUTES MAY NOT HAVE CROSS SLOPES OF MORE THAN 1:50. THE ACCESSIBLE ROUTE SLOPE CANNOT EXCEED 1:20. 6. HANDICAPPED ACCESS SHALL MEET ANSI 117.1 SECTION 4.1 7. NO STEEP SLOPE, WETLANDS, WOODLAND OR OTHER ENVIRONMENTAL FEATURES EXIST. 8. ALL UTILITIES TO BE PLACED UNDERGROUND 9. ALL FIRE LANES TO BE MARKED AND POSTED PER FREDERICK COUNTY ARE MARSHALL REQUIREMENTS. 10, ARELANE MARKING MALL BE PROVIDED AT ALL FIRE HYDRANT AND THE F.D.C. THE STRIPING CURB PAINTING AND SIGNAGE SHALL MEET THE REQUIREMENTS OF THE FIRE MARSHALL. 11. BUILDINGS SHALL COMPLY WITH THE VIRGINIA UNIFORM STATEWIDE BUILDING CODE AND SECTION 303-A, ASSEMBLY USE GROUP ON THE INTERNATIONAL BUILDING CODE/2003. OTHER CODE THAT APPLIES IS ICC/ANSI A117.1-03 ACCESSIBLE & USABLE BUILDINGS AND FACILITIES. 12. NOTE SPECIAL INSPECTION REQUIREMENTS OF CHAPTER 17 OF BOCA SHALL APPLY TO THIS TYPE OF STRUCTURE (SOILS, CONCRETE, STEEL ETC.) STRUCTURAL PLANS SUBMITTED FOR PERMIT APPLICATION SHALL BE SEALED BY A VIRGINIA LICENSED DESIGN PERSON. 13. PROPOSED 2980 SQ FT RESTAURANT IS TO BE TOTALLY SPRINKLED. !UBJECT PARTY IS SUBJECT TO SHARED PARKING AND ACCESS EASEMENTS COVERING THE SHERANDO TOWNE CENTRE. NO NEW ENTRANCE IN VDOT ROAD PROPOSED. TRIP GENERATION iTE, 7TM EDri TON EST+AATES T!-US SITE AT DILL DEVELOPMENT WOULD GENERATE 1478 TPD ITE CODE 934 FIRE LANES REQUIREMENTS= Fire Lane markings and signage is required at all fire hydrants, fire department connections, curbing not delineated as parking, and all normal and emergency access points to the structure. The contractor shall coordinate with the Fire Marshall to ensure these requirements are satisfied. PROPOSED CURB & GUTTER .................................... PROPOSED STANDARD PAVED AREA (8. 21B/2• SM 12.5A) ............••. PROPOSED HEAVY DUTY PAVED AREA(8- 21B/3• BM-25.0/1.5• SM-12.5A)• - PROPOSED CONCRETE AREA PROPOSED GRASS AREA ........................................ PROPOSED EASEMENT AREA ........................................ - - ZONING BOUNDARY ............................................... ZB UTILITY PEDESTALS ............................................... ff] M EXISTING STORM DRAINAGE & STRUCTURE .........................•- PROPOSED STORM DRAINAGE & STRUCTURE ........................... PROPOSED WATER MAIN ........................................... --i W EXISTING WATER MAIN ............................................. --- -t W PROPOSED ARE HYDRANT .......................................... PROPOSED GATE VALVE & BOX ...................................... W1- EXISTING SAN. SEWED AND MANHOLE • .............................- PROPOSED UNDERGROUND ELECTRIC SERVICE ........................ E PROPOSED UNDERGROUND TELEPHONE SERVICE ..................•••••. T PROPOSED GAS SERVICE .......................................... G \ G 1 N T q J Yo z � o¢ Q 0 � W SOW O Uz z _vo (� 1-0 01Z WM W , wo a_ w O � c � ry o N��W00 CL - 0 6 IM 4� U %b pf � �Q 00 ._ Q) r- ti n_ CO O i NN L Q C oN o J tz Q Q0 (00 > 0i 06 N c O O (7 Lf) 0 h r-, LL' � ¢ c) f- u. N 6 I,Q� • o i .�� + O a� RS CY' IL Li w J W W 'eC aLLJ � o °d o Cn � U CD � w W Q � 0 N w O 00 N t ,_ w Cf)� W wig w m O N Ow> w U) Iod w U cf) z w Q i- 0 060 w O U 0 Q o N Z z Y O U O w � _ LLJ -� Z O U Li r GRAPH/CSCA'lE 20 70 0 20 40 /N FEET 1 inch = 20 ft. .dedij�ddi+E.LiC EXISTING STORM DRAINAGE & STRUCTURE _ 13 PROPOSED STORM DRAINAGE & STRUCTURE PROPOSED CURB & UTTER .............. DRAINAGE -FLOW ............... ........ EXISf1NG - GRADE ...................... PROPOSED GRADE .................... PROPOSED EASE►�NT-AREA--.........-- PROPOSED -SILT. FENCE- . . ........... SF SF — INLET PROTECTION ............... IP !// LIMITS OF DISTURBANCE ................. DRAINAGE- DIVIDE ....... ....... ............... Permanent Stabilization: NI disturbed areas not paved shall receive a min. 6 in. topsoil and be seeded as follows: 200 Ibs Tall Fescue per ac. 12 lb. Annual Rye per ac. 1000 Ibs. 10-20-20 Fertilizer per ac. 2 tons (agricultural limestone per ac 2 tons straw mulch per ac. Permanent seeding will occur as the final phase of construction Temporary Stabilization: Seeding to stabilize areas left denuded for more than 7 days, but not yet at final grade shall be as follows: 60 Ibs German Millet per ac. (May through September) 60 lb. Annual Rye per oc. (October through April) 450 lbs. 10-20-20 Fertilizer per ac. 2 tons agricultural limestone per ac 2 tons straw mulch per ac. Seeded areas to be watered and cared for as necessary to provide grass emergence. BLOCK & GRAVEL CURB INLET SEDIMENT FILTER CURB INLET O71 1 WIRE SCREEN RUNOFF OVERFLOW WATER WITH SEDIMENT It- AWRIW CONCRETE BLOCK GRAVEL FILTER SEDIMENT —""'M' ill^Il��ttlllr WIRE SCREEN 2" X 4" WOOD STUD SPECIAL APPLICATION FILTERED WATER CURB INLET THIS METHOD OF INLET PROTECTION IS APPLICABLE AT CURB INLETS WHERE AN OVERFLOW CAPABILITY IS NECESSARY TO PREVENT EXCESSIVE PONDING IN FRONT OF THE STRUCTURE. • GRAVEL SHALL BE VDOT #3, #357 OR #5 COARSE AGGREGATE SOURCE: VA. DSWC STONE CONSTRUCTION ENTRANCE 70' MIN, J FILTER CLOTH- 6" MINI q l / SIDE ELEVATION GROUND 70' MIN. B WASHRACK I F_ REQUIRED y 12' MIN. VDOT itl POSITIVE DRAINAGE COURSE AGGREGATE B TO SEDIMENT TRAPPING DEVICE MUST EXTEND FULL WIDTH OPERATIONS AND EGRESS PLAN VIEW FILTER CLOTH SECTION A —A REINFLR��D SECTION B—B 10, EXISTING PAVEMENT 5:1 MOUNTABLE BERM (OPTIONAL) T 10' MIN. EXISTING PAVEMENT 10' MIN. DKHIN JrRuL I SOURCE: ADAPTED from 1983 Maryland Standards for Soil erosion and Sediment Control, and Va. DSWC Plate 3.02-1 RUNOFF WATER WITH SEDIMENT SEDIMENT - OVERFLOW SPECIFIC APPLICATION THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE HEAVY FLOWS ARE EXPECTED AND WHERE AN OVERFLOW CAPACITY IS NECESSARY TO PREVENT EXCESSIVE PONDING AROUND THE STRUCTURE. ' GRAVEL SHALL BE VDOT #3, #357 OR #5 COARSE AGGREGATE. SOURCE: VA. DSWC CONSTRUCTION OF A SILT FENCE (WITH WIRE S UPPOR T) 1. SET POSTS AND EXCAVATE A 4'X4" 2. STAPLE WIRE FENCING TO THE POSTS. TRENCH UPSLOPE ALONG THE LINE OF POSTS. i !)NI i no 3. ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND IT INTO THE TRENCH. 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. G FLOW •� j =I1 EXTENSION OF FABRIC AND WIRE INTO THE TRENCH. I PLATE 3.07-8 S SOURCE: Adapted from Installation of Straw and Fabric Filter Barriers for Sediment Control, Sherwood & ITan PLATE. 3.07-3 PIAM 3,05-I � A- U) J a �O J (k 3 z ] Q Q O o wd- wZ QO Z N Q w pi _ 0 0 � w (� r IZ_ N Q F 0 IL w0 LLJ Ld Otf ar a L� 0 a a /V°wwoo _ <.i 0 v � Q) d _ V Q co O I N U7 L0 u► a O O d Q a o c Q 06 > N rrj c 0 0 0 C) In a h U F- LL N Ui •L 0 v c� = cn + a O v �+ v a LL W W Q W o W ' Q 0 o O >Y F to U w —, O a- o W CD Q I� N O O N � 00 Z O to Q wN O Cn �j UJ W m > O W o 0_ 0_ W U _j LLJ ~ 60 o curl c=n z � w CD LLLJ w O w 0 o C U Q 0 w o z z y z _ CO F Q w Ld Z w � _ Q O L, !- QJ IA W \�GlN J 11 O C� 3 Z —t o Q Q o ow¢ X_ow 0 �InZ S C) W (D V) lL N Q �O UJKW LLJ '0 n L� o U �� O `o a_ N�4"00 - PANE U STATE Prune codominant leaders DO NOT prune terminal VIRGfN A leader or branch tips d SHOW 0 Prune rubbing or �.• NAD g3 OW BOX, DOWNCAST LIGHT FIXTURES REQUIRED. M Q cross branches I� v Q) Q0 J4 STEEL REINFORCEMENT BARS O 0 � I 13 STEEL REINFORCEMENT y 'n ALL FIXTURES TO BE SHIELDED vs TIES 01-6 O.C. Prune narrow crotch angles O TO PREVENT LIGHT SPILLAGE DO NOT stake or wrap and water spouts Q o r OFF SITE LIGHT POLE TO BE GALVANIZED STEEL trunk unless necessary Prune broken branches adJ > 0) PLAN WITH TAPERED TUBULAR SEAMLESS SHAFT Remove all tags and labels i It _j POLE HEIGHT = 20 FT. Prune suckers Cut away all balling ropes 2"-3' mulch kept away from trunk 0 U LL LIGHT POLE 1' TOOLED EDGES y HAND RUB FINISH ON LIGHT POLE BASE Remove top of wire basket Soil well to contain water •— WITH COVER PLATE SURFACE OF CONCRETE \ L N AND ALL IN VOIDS. ,.,, �. SMOOTH FINISH ON All := ', ':'':_; IXPOSED CONCRETE NONSHRINK LOAD '� : _ ;� "• ->'- : o: UNAMENDED backfill soil = t j SURFACES. BEARING GROUT :.4 - <+< _ _ _ Widen and score hole wall = rty ,. <> _ Qa• -• Partially backfill, water to ANCHOR BOLTS FURNISHED ' _ r : - C to WITH LIGHT POLE. BOLT SIZE Q' Q settlesoil, finish backfilling O a) 3'-0" : FACE OF -- ' a •. ` PROJECTION AND BOLT �+ WHEN PLANTING SHRUBS IN cuR6 GRADE ; CIRCLE PER MANUFACTURER'S — ++ .0 Area for water drainage THIS AREA CONTRACTOR MR RECOMMENDATION. Remove container and cut circling C Leave solid soil pedestal - do SHALL CONFIRM LOCATION 8' GALVANIZED GROUND . r ROD. BOND TO POLE. . ' %1FI 1'-8' 4 CONCRETE BASE roots 'rf container -grown, or as much not dig deeper than ball depth d. W If OF UTILITIES ,.. burlap as possible if #field grown < P.V.C. CONDUIT AT 2'-6 'I1 1 12,2t #3 STEEL REINFORCEMENT - -,� . ( I BELOW GRADE TO PANEL 1000 TIES !� 1'-6' O.C. #4 STEEL REINFORCEMENT to . -' I - NOTE: BARS 'd ALL UNDERGROUND WIRING Dig hole 2-3 times root ball width - DU ER o �tr I <4 e: TO BE IN NON-METALLIC CONDUIT _ o I 1 � 2 o� — — j- ESTAU RANT ,,. 2.00nSQ. � p .QNDO R an�,�TI C) NOT TO SCALE LIGHT POLE FOUNDATION DETAIL o•a LITHONIA KAD 40OW MH 1-FIXTURE MOUNTING HEIGHT-20' ALL UGHTING IS TO BE CONTROLLED TO PREVENT OFFSITE GLARE ONTO ADJOINING PROPERTIES AND RIGHT-OF-WAY. I �jl Arm rdounted or Flnt Lens CutnN i}r1IMLgert,np .arlriy: Ly.AC r•r! xr r:.4;_yl 1. aurnn• D , 1F:.•i ' ILI 114 ' J11,101-111 1211 VI IIt i l /aat:dwl 116ill w,F•- :4.114:% dry. +.40 .11 al 11:. .nsvl..= a livic 7 r h••ryr•y.7:1 it:t- LOf.ILLI.�r. ^nr Iy:lr I'7� .9 r.Y •• 1't'd l.11TA� i-trhriva,-irl:•rr-c:,r+:a:tytlnl- llcu;rp C„cd (1::s:; :auto •?r r„•,.,. 1=r•:.-'d•'A1I%J : h,- :L.•IrU'r �^�tlr,)•.Yt'�i'•{.Trip :ri .+i ,tuc.r ^a •1 ud'Ilt.,lrl:;; .,__......._._._..... ... ,.. .. .._, ..: -:... I -I t 7" .'{d'rc-F.S-y-Cr+R'r{r .,>,n. In re -.71 Tmrrr, r. •:-rAlls I•n-'JR'hvtn+III d': rr,lrJ.n•v.u•,• trailFII L(..T:i:,:!ai li:(fi •,r(.I,vnrpv..? -11t1'111%il, L:h 4.::oF1y •rJr:--r^•a'::Iravabhc '+�L-r ; )^ _ o•i rin>p-cr 5o:•fi: .Ix::il. :li:•:rrtf::,,;iYa11 L91.Lt uJ. r. 1 tr 'r LIL .Jy.J rl••1. rl•'Jr. .. M -epp) J :. rd,+- rt * did rr.�s.-y •. •rn.{r jy};�3m :Sh y.q- .;15Y.d Alrrsvl].:. ;trltr WT.]SL �n �•a 1 I Scr:-tpiIr11111]A•ritt. •:ep,rr•Ill: it .m1v.•rrVlJrrrJJA[gMltrrrylr{n _x - 1h; 4' elw it. L=.+_: 4l .J'Y1; C ��rarcxr rcol:extl7, !:cttJ--AUrY:[I-,.:i:r:r.:;.LLIs � rd., c r?u 1?: rnii:)'cr71:U :rlt' R,s 11 f.:.15:,ar-a,•r {. <I:Tt1nJ} r-1.,;; ,;•< 'w. •� rrr•ntl.:M -N- wirrv:na-h- Olrlrnxp,tnnml:t.m. al111d:: KAD 4Lui1 H. 13USI'D1N Ic�r,..a.1 17 r•it •. ., Ji.}; ._,rl :F:S'?.'•:SrY1Nr!. ' J r,.AAL :A J I 't: P1.1k 3 1D4 I:IJ.tr Ir'ji»[ ►4} CS R :r 1 rclem: M, ST]M milt F� y JTV -IV. 1 LM ... 1 1 .LI '1 VA M 11 a.. J .1yPr■ 4. . —1, '•.. :to :. 'i P. 1' 71% q.lrq .A P C"7t ';' PJX : u. LJ. 41" r, ata'o. Y x �• 1.1r �� I^ ME ) sr: pal ar vfb •F:•41A . ....air...i. r. .r.1 4P, .-6: • '4 -V.YIM • 1WI r'V +'1.11• J %IJ.t1.LC y1 .14 " {6,f�.t f.j t,lxa 1.1 Wv Iw 4 n . I . r. ..d ]CS :l•r-'r:•1.�vT 1'7'::T.-:, e I •rmv SP i :yr:•air SS63?4 I'h; 'S...;r+ra LJ:.a Y4J :.r: �., . n w., ., Y1hJs .., •It+b1 -, -..,. .• ILI •.Y'J SPSC 1,.\7: ;7. •,, ,,1. .4 •VI ..•al••.- dr.J a':1 11—.rt.•r .:J 1]It V71: 61T 1:1.11' CC-..pr-. t•:LI .Ll zin 011114 '.W Tv vlr•; n• SLOG 1.1.., ,.•:•er 'r.1 �:t ILI x.r." Ivey+ I- r• .-. r►, IX+.:'•::I ILI v&,. i:AltXt 1-,.+ lw tw 1 :ia• .L'• rtY :! 7�:�i .Sa 1Jr 1� • IT rJr ..1 F1. • xat: tl __. rr ...r...t�+1� IS �x.:.a:e dl.r 1:. E to :At it8 . �.--- _.________�..—.. r J�Pt +'rrFh'ui JdmrhYJQ' -'�rr`�-ttit•..�rJ:� TREE PLANTER DETAIL no scale PLANTING SCHEDULE COMMON NAME SIZE AT TIME OF PLANTING SPACING QUANTITY o THORNLESS HONEY LOCUST 2' CAL. @ 6' HIGH AS SHOWN 6 RED MAPLE 2' CAL 0 C HIGH AS SHOWN 5 HETZ HOLLY 3 GAL CONTAINERS-3' HIGH 3' ON CENTER 89 LOAD CYPRESS 3 GAL CONTAINERS-4' HIGH AS SHOWN 9 0 INK BERRY 3 GAL CONTAINERS-3' HIGH AS SHOWN 18 SEEDING REQUIREMENTS ALL DISTURBED AREAS NOT PAVED WILL RECIEVE AT A MINIMUM 6" OF TOPSOIL AND BE SDDED. FERTILIZATION REQUIREMENTS TO BE DETERMINED BY ONSITE TESTING PERFORMED AT TIME OF CONSTRUCTION. AT A MINIMUM LIME SHALL BE APPLIED AT 70-120 LBS. PER 1,000 SO. FT. MAINTENANCE OF LANDSCAPE NOTE: ALL LANDSCAPED AREA SHALL BE MAINTAINED IN GOOD CONDITION BY OWNER. ALL PLANTINGS SHALL CONFORM W/ 165-36B OF FREDERICK CO. ZONING ORDINANCE. ANY PLANT SUBSTITUTIONS MUST BE APPROVED IN WRITING BY THE FREDERICK COUNTY PLANNING DEPARTMENT. PARKING LANDSCAPING PAVEMENT AREA 14,998 S.F. ,GRAPH/CSC.4LE PAVEMENT TREES REQUIRED 7.5 0 1/2000 SQ. FT. 20 10 O 40 INTERIOR TREESS PROVIDED 8 I REQUIRED 2.3 (01/10 SP.) IN FEE/. ) INTERIOR TREES PROVIDED 3 7 inch = 20 ft. TOTAL TREES REQUIRED 11 TOTAL TREES PROVIDED 11 MINIMUM LANDSCAPED AREA REQUIRED 0.12 AC. (15%) LANDSCAPED AREA PROVIDED 0.15 AC. (18%) N w 40 O w O N � Q w 0 O Cn m w CD p d- C) ZO w > L`' C) -' w � a o0 z w CD Cr o a J "J 0 M 1't o O �- N � U N 0 w o z z Y z - O U) Q w � Z L,_' Ly 3: 0 U LL_ VM CONCRETE CRADLE 755 - EX .-GRADE _ ±4pROP. GRAD W� (E 750 - - >o'� - ---- E �tU�' _ __-_WATERLINE _ 6" PVC SDR-21 745 _ cn w o >' W --- o Q W in m > O < O CD N (.0 co 0+00 0+50 WATERLINE PROFILE ; 1 755 750� �o V)71 7451 X W W � > oLLJ w O� Z CO > w Ca _o CK 1--0'O NN ��� dM00 o It cv �t UaUJ Q ar`� II II I �<WOd11ZZ Z W (D CD O J AY X -1- W O » G W W WCdl-ZZ C2) n3 ID I i 1 I EX. GRADE r- __-� _� __ _� _�_� .___. _� �-FPROP:.-GRADE i 1 C jI i I ( 87.36 C3 1::: 1 ®1.Q0 % I I C1 _- __ -, p 1.00-� 23:07 15" CPP 1600 , r� 1.0 70 M1 % �.15" COP -- X 15I - W I NrnU M U d 0 I NId r`-- - ---- (9 �? - --O -- i - N d fah OU6 �GO�- �� LLi ! E :D O>Z -4- Lo (V 00 0 F�I_ 1III fI �Lo� »> IN -7 N _OfO I Z11Z �ZFZD ±"It �dj NOO 0+00 0+50 1+00 1+50 2+00 STORM SEWER PROFILE GRAPHIC SCALE 50' 25" 0' 50' 100' 1 INCH = 50 ft. HOR/Z. 1 INCH = 5 ft. I/ERT. Valvco, Inc valve box assembly. lid: Figure No. 7 marked SEWER top section: Figure No. 7S26TO bottom section: Figure No. W524 concrete skid pad finished �18' dia. x G deep grade \ SEWER CLEANOUT -19- 2 O.D. CONCRETE ENCASEMENT TRENCH & BEDDING -1- MAY 06 . • . .: . .: :. . err. • . 6; ' a c��� CONCRETE ARCH 4- select ackflll 2 O.D. MAR 06 2' custom setter (meter by FGSA) meter Interface unit (see note 4) /_ndad flat top for 4' diameter manhole finished grade V riser section for N dhemeter manhole with cutouts 09 3' min. .......... ..... ....................•..... 6' stone bedding solid support blocks ng under custom setter saddle with 12 gauge solid Iruiulaterl oorpos ation swP Copper wire for line tracing, Pi X coupling an taped at 10 foot intervals MIP plastic plug water main bell valve curb stop with PJ (CTS) both ends with 2• NOTES: gate valve offing nut 1. Access door shall be by Halliday Products or our approved equal: a) in non -traffic area - model no. St R3030 b) In traffic area - model no. H1 R2424 2. Water service crossing street shall be encased In SCH 40 PVC or SDR 21 pipe. The piping shall run from one foot beyond sidewalk, across street, to one foot beyond sidewalk 8• 3. Install 12 gauge solid insulated copper wire (for line tracing) from corp. stop to into the meter box [ wrap wire around carp. step; wire to be taped to top of PET at 10 foot Intervals; come up Into meter box; wrap around bottom of angle ball valve; terminate with 121 tall piece). 4. Meter interface unit requires 1 3/4• diameter hole. CUTOUT DETAIL ftp+cal)l THIS WATER SERVICE CONFORMS TO THE UNIFORM STATEWIDE BUILDING CODE 1 1/20 and 2n METER INSTALLATION 75 1 - 750 745 d- U � n 110 M M I JUN 06 PROP. f GRADE - -- X _ -- _ EX.-- R-ADE----''- - 131.12 p 1.00 I% �PP i C5 i ; , 1 1 � J1 i Z NL", 0(00) w - dc�D�rf �t �T�, r� O 11 ZZO 1 I CD CL p O- Z Z 0+00 0+50 1+00 STORM SEWER PROFILE -.__. 8va H ft!•u 12- NOTES !. DEPTH O< a4 VII M TO K TatOrn► QM 1 AIC 7. • 4 X W' SMOOTH Da*V-S AT A 01 MTELY IAAYtiY 1K.P'IN at! To !tt 2W' /brt WP M C-�C TO GE PLACED M ALL AWAS AD.WANT LttKM TYLtrt stAM410 t8•I. 55 T12q- 11 2 THE -W OaIfM!" Sal W4 ON 11W STAaDAVS, ltrTr�r•t M of 7 x it- WSTCH MAY K PR0vl6Era. 3EE 3Tff4O IRD AMO SPECIFIED ON T►iE PLANS WILL BE T-0-3, 4 FOR ALTEAMIATE OESCk ►EARMI) FW* THE IrfMERT OF THE OVI FALL PPE 70 THE TOP OF THE STgaGTigrE[`� A, 3. DAWICER K P HOLE n U-XU- Bar? M PLAN 'W DWORPWS ARK APa'q.71pYAT[ OMY PLOS iC INMWWANiE CLOTH <Aa- WSN 9]' ti_a raR iSTaAAtaaG T GSKS AhPQ Ttit nCrtrA; ptAKNSIIoarS SI+RL 9f OICriRw[b dtlr 1t1( on SALM 'STEER. iiptE.AltpAJM Tr1E ts)MTRAtTOR TkW FELO [GnCl7i6IIrS CIOXIER 0.43" *AMR 4 MESH ►AMNOAE CKQIIN AMIT1tOR�0 FAHALY r0 TK OOTM 0T INC #IIRtAErWE. 3_ Wt" WECIFED ON Tat PLANS TrC 4vAERT IS TO BE SHAPED III Ai9t9}>4 kKE 1NTM SrAkC^;D 1. OLL iIIMC1'at6 STfLL SMIL RMI A►UK 15-1. THE COST OF FLRIiSW4 AND PLOOM ALL COVER OF 2". IdATERIA.S III MftTAl TO THE S"~ IS TO BE MCiUDEA M THEE 810 PRICE FOR THE S7TitXPJK, 10- ALL REV#' STEEL TO BE CUT CLEAR OF ALL OPE4040 SY 2•' 17` g •2" U 4. IN THE EVENT ER T►W NVT 0r THE OtJTTAit 'to PPE 15 WAN" TKU4 7K WTTOM 4F T!4 11, CAST-04 PLAICE CONORETE 15 K CLASS ►3 'j7t4 TtArR TM M'K11II t7F 7Mlt StIPJ 'itA� 131M P91, PRECAST CCIMIGK71 IS TO BE ,{.,t 4i_ SMALL YAI" C>:YCM aAbRTAhR T *D�iO P#t f+KAW VxAvaC C+R POW" OF WATER SECTION A -A 3 V TO 9E 1� IItYY OF r Dttrnatw � Pt HE SAOIC #XIDENTO r2. 40 *fO i , MATERALS ft +ra4s A44. THE go~ n» '►O K 40CLUDED NI THIS END COW $44 -00114 •. PRICE rM THE STRUCTURE7, t3. IF OPTKit1AL 4XDNSTf1AlGTKY4 Aw ,s USED. - S. STIPS AM IT QUIMD. roar DETAILS SU IT IS 10 tlf METED. --'-y WAHOAF& ST-L - - .. 14. roR OETut# AM QkMVWWk%, CTG, Cr PUT[ AM t► 6, THIS fTEY NAY BE PRECAST OR CAST-h-PLACE. STEEL OR CAST PON COLLAR SEE STAMATM IN-11. - L Ma1a1OWN CAOM - fr` CaC &Wt/ LO it- + , ,. _ kCll 0MJI4G STKh C t+ , #trPa,T+r ttoit a, aIMM4 92E ND REiDT? LENCIM # r BMA ti 45lAtJM *27 1'-r0` A 1 flars -a 3 o9ch y3"c* +r lam H aMfb•r-temoat SECTION THROUGH ELEVATION AtPf*WMaaTE oA1.&WnTIES FOR Ir*" 411113DEPTH CONPIIETEPOE Ch0a1CAAiTE STEEL p, TER w ft- III' S.M3 651 ur' 5.1064 441' 74" t5.4t4,4 tl]P kv odw a it bt AL6taa for e0th vdll►wra rant 91 dlp46 5M1• Q•44LS GYL. T'�. td telertit 3&7 Ltlt, 4r r,pr gA%q a44N STANDARD DROP INLET 2233 1214 - 24" PIPE: DEPTH (H) 10' TO 20' 302 VOYtOM i1ff"AdITMIMT Of IRAV046RTAINON 02 f_-- L --- Both joints of the fitting shall be restrained. In addition, all joints within the recommended length (L) on the large side of the reducer shall be restrained. SAdALL SIDE JOINT RESTRAINED LENGTH OF PIPE (Ft) LARGE SIDE JOINT PVC DIP 6" 8' ro" r2" s" 8" 10' 12" 6' -- 40 60 60 -- 20 40 40 8" -- -- 40 60 -- -- 20 40 10° -- -- -- 40 -- -- -- 20 REDUCER ,� ".. .c . _ '�x,�' .9E'^''atlJ:,4+3.._ <.- ,-. . -.• ... vg��c.. 'fill �r�� '�^`'.�:X' .. i �L I LMW In addition to restraining the connection, any joint that falls within the recommended length (L) shall be restrained. RESTRAINED LENGTH OF PIPE (Ft) PVC DIP 6" 8- 10" 12' 6' 8" 10 12' 60 60 80 100 40 40 1 60 60 VALVE, DEAD END (PLUG, FIRE HYDRANT) RESTRAINED JOINTS - 6" THRU 12" 1 0173 -2- MAR 06 r3.3A,3B,3C FO14 iT+, iYiLCT hr '�� _ �•x EalvAarlsoli ACN1T - r a tBrFR BADC OF &W*A x 66 # .:R t4AP45 i" 9C wm.+ i N r C � Y.a•fJtf W hm F Fikg B _ : F yAp iA14pf� + i 5!E nrilfE L i it *'Hams D FACE OF C_ + aObiT GOTE7 �IMC P� AN A -A irl r ►(EYEO C.CiWY. J(wT vAmv* E - MAX 2D•IriiTTER 41 J 4"A pOT H E -... ---------- BARS F taaVkS E - - 41>tR5 6 [ *_' duiaif Tt7k Icl tic BARS 11 [ rEEP ►101E FRONT ELEVATION Rqk$ i i IwTTER R NOVI:DI f{ 3'- (�,� I W/,^ KrrT PLATE _ SECTION 6-8 TTPE A aM 4AiTAE 'jF1All of LJSfo lNTIi C41-3 i 46-7 #TArYa4Rbi : •- ,-.. TYPE b !iilS£ CETOIL SMALL K tA' 0 -W CO-2 'SrA ADARDs, TYPE A T"le `aFE R T 4^ S'lub SIfENk OL+rlEtT8,1 WELVED VAd� PLATE r0a IvK A To 111E 11ENT ON #M P#GLt Of +t+l -W r8 incLE RIM AT 2,c-C. ,;IaCC1A',ft AIM IS TO BE AM4COMI) 1111111 1fr IC 4' STUD SKIN NOSE DETAILS MELDED To KW PLATE AT L DI.3C L WAN" PMfffNT � a-3A „1 �•� 1 _ L- y. -ter -- I Y 1 I oil. 0 j 0,1OETAiL WHEN iJSIrD IrOt WE ON DWAOE'5 Ail, AGENT TO CURB fee LSE 04 SACS WITHOUT GUTTER Dow $or$ TO BE Sir"&TRIC,AL SWEI I OF STANDARD CURB DROP INLET - 1.2" - 30" PIPE: MAXIMUM DEPTH (H) 8' 233 uAa rAtAkArtTMEMT OF TRANSPORTAttptl 307 } In addition to restraining each jointofthetee, (1) any joint Lb that falls within the recommended length on the branch outlet (Lb) piping shall be restrained, (2) any joint that falls within the recommended length of the run (straight through) outlets (Lr) shall be restrained. A cross shall be restrained per a tees requirements for Lb. A Wye shall be restrained per a tee's Lr and a 45° bend's L requirement RESTRAINED LENGTH OF PIPE (Ft) TEE PVC DIP r X b Lr Lb Lr Lb 6 X 6 20 20 20 20 8 X & 20 20 20 20 8 X 6 20 20 20 20 10 x 10 20 20 20 20 10 x 8 20 20 20 20 RESTRAINED LENGTH OF PIPE (Ft) TEE PVC DIP r X b Lr Lb Lr Lb 10 X 6 20 20 20 20 12 X 12 20 20 20 20 12 X 10 20 20 20 2D 12 X 8 20 20 20 20 12 X 6 20 20 20 20 TEE, CROSS WYE In addition to restraining each side of the bend, any joint that falls within the recommended length on each side of the bend shall be restrained. TYPE RESTRAINED LENGTH OF PIPE (Ft) RESTRAlidEO LENGTH OF PIPE (Ft) FITTING PVC DIP DEGREE 6" 8' 10" 12' 6" 8" 10" 12" 50 20 20 40 40 20 20 20 40 45 20 20 20 20 20 20 20 20 22.5 20 20 20 20 20 20 20 20 11.25 20 20 20 20 20 20 r 20 20 HORIZONTAL BEND RESTRAINED JOINTS - 6" THRU 12" -3- 20F3 MAR 06 DOWN BEND DEPTH 4 MIN. L d AIL finished L UP BEND DEPTH DOWN BEND RESTRAINED LENGTH L Vertical offsets contain down and up bends. On down bends, one joint faces horizontal and tl other points down. On up bends, one joint faces horizontal and the other points up. Each side of any / vertical offset bend shall be restrained, in addition, any UP BEND RESTRAINED LENGTH joint that falls within the recommended length on each side of the fitting shall be restrained (Ld, Lu). RESTRAINED LENGTH OF PIPE (Ft) DEPTH OF BURY DEPTH OF BURY 4 FT. 1I,11N. 5-12 F. 4 FT. ?;IIJ. 5-12 FT. SIZEII PE DEGREE OF BENDS Ld (DO'r'lN) Lu (UP) SIZEITYPE DEGREE OF BEVDS Ld (DOi9N) Lu (tip) 6" PVC/DIP 45, 22.5 & 11,25 20 20 10' PVC 22.5 & 11.25 20 20 8" PVC 45 40 20 10" DIP 45, 22.5 & 11.25 20 20 8" PVC 22.5 & 11.25 20 20 12" PVC/OIP 45 40 20 8" DIP 45. 22.5 & 11.25 20 20 12' WC 22.5 & 11.25 20 20 10' PVC 45 40 20 12" DIP 22.5 & 11.25 20 20 VERTICAL OFFSET RESTRAINED JOINTS - 6" THRU 12" -4- 30F3 MAR 06 -I \�c,INIA cri J _� O _J 3 Z o � o = vo )CL lL Nwo Ld 0 '�1 O �O4A0� IZ W W s'C F-C FW- S� �C _0 Q 0 0 W -D O tr � CD � W N A 0 O Z N � o Q o w LL w ail aj O w m :iii >_ O L0 :�E w U 0 0 ¢O < _ U a- U) 0 M M W W < J w LAJ O 0 c`: i z- w O Ar F o v C) 00 N LLJ O 0 0 - 12i cn `�Ld Ld w _ 0 0 C.0 N F RAI tti riTFis i 111' 111 UC'All ! I hf&dM:; lit ri10VIII :1 !V-Y I q-I-C-ov I It 11!34!,- 2. - a I j ECrECTABLE fir�FNVC -0 BE (L,%12 A-3 CtaiC��--rE !L A -A 6 I " Etos 4,A4 i 0 MECII& ISU;IFAC'E C0oIEHVA; '11 'LL1 wiJri4 V I"" PrMP FL7X0 By C FOOT W ilm^,Tm m 1-4-- DiRECTCov, OF P:rj:STFhw !Q#VoFL CTwf; T*q77E5 CF 0AICFak *11-f -K IP1.1rjCKTFO C;)VES -O--!ECTAB.E OVW.hr,- wAy RE ..,Sfj) w-To 111_ APPRZI-ON OF 7F F4-,NE>_R "I Crt'C. 'Zn;S rC CiAg R40 MAY PE $7'n32-.r WQ--107":,ALLy WITH RAW F1 Orff r" We PEF-wPir-M 174N,-90:-*4 )UPW 1017v. RE,."IJAEVI PARS V TIA". &t.m- nr mfwvi rw, naori nQi-, w) 'Klkr A:A3';,M*4C; FLA"til, CM r!t. I:A%l IN KA-1At rtl I Onww C# Pt<-CX&1 X.AA� FLUCfi. UkA-4. 5. F;,ECq-o;t-:- BM5 ME 10 BE to) S 9 kFt4-`-;'0 Tr taiEk 7;) CfNfER ALEt'L &DTH SQ---S Cf T-i: RAOh-LCOaR,A#C-cEPTi OF R.AYF f.004 Vq•ikwv 6 f,�j% lj�S N%D To .:jia pt4A�S ME 14C.LCED h ;'MuE4T FOR C� mD 1.j11ER. T .73 t-.0 A.X4F, &x 7 C.- FF [I AS a-37tw. ':Y4 !K P-L45 OR AS Lh71TC--EU III Tar [hrilhk-g OAF Ir, PF i�;Y)vtXD A-- CI t RSFr 1431.' 'Al4t;'-N"ER AN RZJJ7! WIN -14• RUPT !;I -N,%- -,T A 11rFWAY FACILI", r3f1roN,,, A -V" 111!;KA-K L!;!. 01 'All 111[7 `*F%XX I'S FX'5I`W,.M,,',kV7Et?- "- i Vt -fJAN % N 0;! 1 1Y k,&*f f1i LaCiklf,3 101�1*4 �� !iI C-1:1 ANY AS Slb%h f.*N PL.Qil:i CH. kk BY 'tf tW-44zt-, AV ..t'XIAI- Ncr EE ij!",47 vitv-,.E SICK, EX:ifv; uuf+l 1-�4f % i t "i H,QRvvTS ti.rls, ETC. AC--SlElxr hijils Pnulit-t x C04,iqL1:;u% U%C0Sr4UTED.S1#-,31,:, F" kla. :-,LP MMS14%; VA11 A[ o-CCESSih-' E-LwEhf& Of A i*OA.LJ*,Y (11AT CON Ut 0-0 JS--0 Ur PFOESI.�AN:- F;,vk*S folf," 1-C F-L-4(E:; j% ?AaAL T!-E AP.7ma:i 15 R.ALEO 'kT4,-* THE LAMIS C;7 T,f.- Tt-AT TFF S-LJD-,- AT -tV ="ECTOM 9 T:1E 6.4 rribiNG r; XU tbE 1JYJ5-• 14. I`M,':& X,Ch NS t4T-T4,t"J' RAZ%d,',0ht,0' A.17C*AKI.-.ATE TI-r -JgKW-. Pt-*-K-SMEW! OF M--jC;3ATFD HEAiV -R%-CK TAXM-OrTV10 117W4A) Ce-13 C.)yW_RrIxt. E*41;MCE TRi;CX TRkrr.i rcg CCt.CAFTE 07`rw 7-1- WIN ::J161 RAA#V°; AW N I-qINJ-1K.Fn4 VkII-I 0, 54&IEU -'j5r r.KI;4, 11,1 vtvw.w 'Aww 4A I UE 7t-k kPl'.ft. ',V IST 1,4ANLI AK PAT4 + SI)e TRUNCA7;70 DOME St EE 7 1 CF w T'F'E A PEr(PENDICU-AR TV T-;:E 3 PARALLEL TA' X •21 I-K> IE 8 1 _ :-EQ-7 Cf :14-1-1-444T A XX .,7kOc_ AS T3P ,r O.6;1_ I YPIL P AR,4- E L & PERPEN11CULAI-% 'lot 7 IS- .U. C 1> 0 C. U C. Tj Q C, V V o 0 t.� 0 C. 0 0 t, 0060oo7 0 e, C:, :> 0 0 0 .> r,. t:j 0, Cr ,Lj IC, j:., 3 fj 0 Q Q1. 0 r: 0 0 0 it 10 0 f #pr*ya#A. - o PA* OP:TS DETECTr6l.-F kVARr,.:&kG DL I AIL PE?IKSUL--L A 17TWSTR0CTrjN 11-5 1:11ML5.5- LWJ 12, C-C, NJ%K:A I 1 11 X1401 SE- S-CE I t 0: o FOR DET4LS A TYPICAL DESIGN IZ-1 LIU MAX CTIGN A -A -inE A WLo 3�4. E r, WT Y". SEC'TION 0-3 K01t, M14 !--FwRX, lely!"; C14 1W NVEr,'ABLE WAMAC 5.R,--ACE. !;It 10r 4 MAK- LAWN NC -1 r-JIV- - 4REa CO.J50E Ck L 0, 4 VT re F� U VI It �V, ),I K K CPOSWAI S ZRC" SSW Al K 1*1 11 .1 fl I-) 1055WALK 7yp��.--AL PLACEWNT PLACUh N, Ar 1%1UH5LCIIQN 1Kj`TE-R'ZE-P7;;3K DIAC.IONAL VARIATION '61THIN CROSSWA-K WITHVI,. CROSSWALK (WITH -:)JFzFR STRIP) T,S5 CCS<�h TO � JSED rOR CCASTPJ."ItIN 11-A1 M-CI7`ILKIIA11!1 %V# IP 3KWWAi X. I AN-M ;-Ifl' fACE,R,--GVRE) AT TOP OF CJ7�a; R*P. MKWIA LIMB RAW it hUTH a Mt M1 %�W -H51KC rJON, 6 FEE I rN WrERATD45, CG-12Z DET[CTAFA 1- 'WARNINS SURFACE TYPE A6, k'PERP`END1CL.ILA?1`j APPLICATION VfkCw4;A COFFA9TMENT OF 'RANV13P.TA1i2s AL 1 LH A T i 0 NS N'SERTABLE SHEET A179 NOTES; i it4 irtm MAY Ot POMCAST OR CAST N PtACC. 2, C04C 11E TO Ef CLAM jU F CA52 IN MALL, 40w Ps r MWCAST, cou IWAI rM rLFn 16 Wt TtH H01419 A PJLPUS Cr]fir?'I t1l CR IFNS fAI0W. FACE or CtWaj SN&C Rr PAM FOR ks RAOK CC49KkkTtOI4 ek" L WITTIER, 4. FOR USE APT4 STh-*-QED OPEN-GMED gAIT.. "1-THEL WIC. <1 THE CIPS 44fif jkxr(b P I rIL TO TFE SLOPE C# �MA60NZy.ABET. " TO T1,C OEPTH Cf THE P4VEVEP4r, S. ALL0000LE MTERA FOR THE LSE OF cc-fi is BASED am ftJailAv c5i4r.0kna4 ANO Ilf=1 SK911 AS S;CNN N APOCKOX A 2' R cr Thr vwr ROAD Drjr* 4AwAL. T,r THE G10TTDV Or THE C403 A40 CUTTER WAY BE 0&6TRUCTEID PAAOAP- TO TI-11E SLOW- (if SIMMSE COUNSCS PHOWME! A UHL'AJU CIPI-11 QF T. f-; MAINTAYWD. AT C. Iv:Tr11r ACT_ COMBINATION 15" CURB & GUTTER 502 vIRD4A DEPARTWOuT Or TRw!S;"rAT*" 1 2'-0" 1 6, 1 CG-6R Note: Comb. curb & gutter having a radius of 300' or less (along face of curb) shall be paid for as radial combination curb gutter. This item may be precast or cost in place, Concrete to be Class A3 if cast in place, 4000 PSI if precast. I Y. VC6 I i 20 17M I 41 CC-t2 6.1 1;.6-, C.-r. FIXTPA 'Q I UAX w -2 T;-I UAY L \-.-TRtihCAT:Ls VO4ES SEE tWf 'OF 4 FO+. Of TAII S Lei D1 zma --4 SHOPE TO� WATCH FACE-, F OF PDAONAY CIJRR 0.148 1 4a I MWE 1) H n r-ROSSWAI K I�ECTION A -A TYPICAL PLACEMENT AT INTERSECTION wiT,-i1N CR0S,9WXK 7PEAL4531OX /:)4STQ,-2ICV xflw r SECTION 3-13 K17- FIN GL4f.RA k-Q7L5 QN TK 0.-'1LQ7VLF- Vh:;V"G SEA :NEE' I OF 4. TYH B PARALLEL. APPLIC'ATION IfoAr-WAY rqAjV, IAXV`W OW LEKrV 4Y *CETKIAIIIJ IN M.11CUNT - 4- -TI Tj No 1: T,V #-I mairn ' Fhr7H rAr A PARALLE- RAMP z LW, rrII to isrrrT.4ttCO6'TrkCS5 Qr TINE %. Off. 'C' G - 12 D E T LE C 'I - A B L '-- WARNING SURFACC T YPE B (PARAL 1, F I j /%PPL IC Al ION 4*x 4* WOOD RAIL I'x 8' ROUGH SAWN WARDS 6'-4* LONG. SlAiDGM SLOPE FOR DRAINAGE W/1- UARW 6"x 6' (TREATED) Zo WfPR�T BASE & 5/� DIk BOLTS Typa) 4'x 4' WOOD RAIL- 6- CONCRETE SLAB W1 6x6 WIRE MESH (SEAL CONCRETE SLAB AGAINST GREASE ABSORPTION) r- ZIP VDOT CG-6 12* DIk M CONCRETE EXPANSION JOINT AT FOOTING EKH POST FOOTING (TYPICAL OF 4) SECTION A I b WPW47- 3- SQUARE -- STEEL TUBING 1 1/2' SQUARE STEEL ROW. SHOP WELD ALL JOINTS (2) 6- CONCRETE FILLED POST PLAN VIEW !0 1 9' rDRIVE ON CAPS DMIENSIM MAY VERIY = 7i�- FOR SOLID CONNECTIONS 5zilt-ff- ZT - - - - - - - - - - - - FOOTING YJ ix 8ROUGH SAWN BARD a. - 6'-4' LONG WITH 3 8 SF BETWEEN BOARDS 3*, FRONT ELEVATION STANDARD TRASH ENCLOSURE DETAIL A RL"P, DRILL HOLES TO LOCK GATLE4S CONCRETE AND CLOSED POSITIONS. (2) 24- LONG 3/8- RODS (CONC. APRON) G- N 1 4- L Cn 0- U) = 3.1 < 0 L Lj �3- Of 0 Ld I () LL LLI 0 V 0 ( 1r) V) V) p:: 0 V) 0 LL Z: Ld 0 Lj W C) LLI -0 Ld CL LL- 0 0 C 0 Q� 0 kv a- - A 0 LAJ LLJ F- < 0 0 Cn 0 0 Ld o F- < 0 0 z 0 Z: -r 0 00 V) V) < LL- � V) 0 Cn j LLJ L'i M ":E CO 0 CD Z Ld 11-- LLI > LLJ U -J LJ 0 0� Li IL Cn 0 Ln V) LLJ CD < Q V) cn LLJ 00 V) -q- LLJ 0 a) U < 0 < C4 Ld 0 z 0 0 O Ff) < LLJ LLJ z LLJ D' 1E -i i 10 1 LL- Vw -j